HomeMy WebLinkAboutTIS 2021-11-08 Item 1A - Public Safety Plan - Public Works Fleet and Facilities Tenant Improvements UpdateTO: FROM: CC: DATE: SUBJECT: City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/CityEragineer INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Hari Ponnekanti, Public Works Director/ City Engineer Mayor Allan Ekberg November 5, 2021 Public Works Fleet and Facilities Tenant Improvements Project No. 91630601 Project Update Issue Project update on the construction progress for the tenant improvements at the Public Works - Fleet & Facilities Shop and next steps. Background At the March 15, 2021 Regular Meeting, Council approved the contract with Lincoln Construction for the Public Works Fleet and Facilities Tenant Improvement Project including contingency totaling $5,849,244.39. The contract scope includes seismic upgrades, plumbing and electrical, fire protection, HVAC upgrades, and interior offices, locker rooms, and showers. The anticipated project completion date is December 2021, and the contractor is currently on schedule as of October 26, 2021 and projected to be within budget. However, there will likely be potential delays due to Covid -19 related supply chain material delays; we are in the process of understanding how much of an impact this will bring to the project completion schedule. The project team is working together to minimize the cost and schedule impact. After the completion of tenant improvement work, there will be two additional scopes of work scheduled to be completed by different contractors; exterior envelope repair and painting scope, and covered parking structure construction at the south end of the western property. These scopes of work, which are budgeted, will be executed by smaller contractors hired from the Job Order Contracting roster or via low -bid process and to be completed by the fall of 2022. On October 5, 2021, City of Tukwila received approval from the Department of Ecology on the relief request from the Shoreline Management Act (SMA) and the Tukwila Shoreline Master Program (SMP) under RCW 90.58.580. This will allow construction of some structures located within those portions of the property that are not already in shoreline jurisdiction prior to the restoration construction and anticipated change to the Ordinary High Water Mark, caused by the development of the new park, Chinook Winds. This is an important milestone in the overall plan for the Public Works campus development, as it preserves the buildable area for the property, as long as the shoreline regulations do not change in the near future. Analysis: The Tenant Improvements Project is on schedule and is approximately 82% complete. 68% of the project budget being expended to date. Currently no delays are expected. Please see attached monthly progress report for more detailed information on construction status. The attached "Tukwila Maintenance and Fleet Building Renovation CPM Schedule" provides the timeline for construction progress. To date, we have completed all demolition work, all seismic reinforcement work involving upgraded foundations, new steel brace frames, and strengthening of existing steel frames; all of the framing and drywall installation Tukwila City Hall • 6200 Southcentor Boulovar d • Tukwila, WA 98158 • 206.433-3800 • Website: TukwilaWA.gav 1 INFORMATIONAL MEMO Page 2 in the administrative offices area including the restrooms and locker rooms, and installation of cabinets and finishes have commenced. Next Steps The City is not immediately able to move forward with demolition of the existing UPS building until the property transfer that occurs in late 2023. However, it is strongly recommended to start preparing for eventual construction of the structures that will be located within the shoreline jurisdiction buffer areas — thereby securing the Public Works department's full potential for buildable areas. As project design, permitting and bidding process can take up to two years on a substantial development of a new building, it is recommended that the Administration building (which is planned in the shoreline jurisdiction area) design process begin as soon as possible. As a reminder, the Administration building will be shared by enterprise and general fund divisions, meaning both funds will be responsible for funding design and construction of the new building. Staff will return to Council in early 2022 to present opportunities to move forward, maintain project momentum and ensure the City is prepared for the property transfer in the last quarter of 2023. Financial Impact and Expenditure Summary Contract Amount Construction Budget Lincoln Construction Inc. $5,331,752.13 $6,082,547.92 Invoiced to date 3,692,145.69 Remaining Contract $1,639,606.44 Recommendation Information only — please see attached monthly construction progress report (Tenant Improvement project) with photos. Attachments: October Monthly Budget Report October Monthly Construction Report Five Week Schedule Wetland Buffer Maps 2021 CIP Page 56 Phone; 2O6-433-1200 • Email: Mayorta]TukwilaWA,gov + Website: TukwilaWA.gov 2 City of Tukwila - Public Works Fleet & Facilities TOTAL PROJECT MONTHLY Budget Report (REVISED Budget; D-20 Plan Adopted by Council) Life to Date Costs as of October 25, 2021 (reconciled w/acctg thru July 11, 2021 GL) 3 COUNCIL REPORTING SUMMARY - PUBLIC WORKS Original Budget Budget Transfers Current Budget Committed Budget Life to Date Costs Remain'g Committed Remaining Budget A/E Services (Design & CA) $ 670,768 $ - $ 670,768 $ 611,393 $ 524,996 $ 86,397 $ 59,375 Permits/Fees $ 130,000 $ - $ 130,000 $ 114,222 $ 74,222 $ 40,000 $ 15,778 Construction $ 6,715,000 $ (184,077) $ 6,530,923 $ 5,208,650 $ 3,662,959 $ 1,545,691 $ 1,322,273 Construction (Tax) $ 662,618 $ - $ 662,618 $ 516,868 $ 337,241 $ 179,627 $ 145,750 Construction Related Costs $ 378,186 $ 39,135 $ 417,321 $ 274,845 $ 205,431 $ 69,414 $ 142,476 PM Services (incl Other Professional Svcs) $ 350,000 $ 93,900 $ 443,900 $ 413,746 $ 349,813 $ 63,933 $ 30,154 Contingency (incl Construction & Project) $ 843,437 $ 51,042 $ 894,479 $ - $ - $ - $ 894,479 SUBTOTAL -CURRENT MANAGED PROJECT $ 9,750,009 $ - $ 9,750,009 $ 7,139,724 $ 5,154,662 $ 1,985,062 I $ 2,610,285 Previously Managed Svcs (Land,A/E,Bond,Demo) $ 25,949,992 $ - $ 25,949,992 $ 25,936,198 $ 25,936,198 $ - $ 13,794 TOTAL -COMBINED PROJECT $ 35,700,000 $ - $ 35,700,000 $ 33,075,922 $ 31,090,860 $ 1,985,062 $ 2,624,079 3 TUKWILA PUBLIC SAFETY PROJECTS Public Works SOJ Construction Management Monthly Report October 2021 Report Reviewed by: Justine Kim Owner's Representative: Shiels Obletz Johnsen (SOJ) Architect: SH KS Architects Development Progress: • Offices and bathrooms ceiling grid installed • Office fleet offices framed & upper-level storage stair installed • Office carpet tile installed • Hazardous material shed roof framed • Lunchroom counters installed • Majority of slab pour -backs complete Upcoming Construction Activities: • Complete machine and welding shop partition walls • Frame floor of surplus parts storage space • Complete framing of file storage and telecom • South parking lot slab pour -backs over re-routed sewer line Budget Status: • Revised contract amount now $4,842,645 Change Order Status: • Total Change Orders (1-5) approved to date: $415,424 • Change Order No. 6 is pending approval for $42,068 Schedule Status: • See attached 5 -week schedule. Final completion date remains unchanged. Critical Issues: • None Tukwila Public Safety Plan - Public Works - Monthly Report 1 4 Framing in West Building Tukwila Public Safety Plan - Public Works - Monthly Report 2 5 Framing in West Building Tukwila Public Safety Plan - Public Works - Monthly Report 3 6 Hallway to Lunch Room Tukwila Public Safety Plan - Public Works - Monthly Report 4 7 Installing Upper Level Storage Staircase Tukwila Public Safety Plan - Public Works - Monthly Report 5 8 Framing Fleet Offices Tukwila Public Safety Plan - Public Works - Monthly Report 6 9 Office Room Carpeted Tukwila Public Safety Plan - Public Works - Monthly Report 7 10 Office Space in Northwest Side of Building Tukwila Public Safety Plan - Public Works - Monthly Report 8 11 South Side of Building — Shed Roof Tukwila Public Safety Plan - Public Works - Monthly Report 9 12 Lunchroom Counters Tukwila Public Safety Plan - Public Works - Monthly Report 10 13 FIVE WEEK CONSTRUCTION SCHEDULE Project: Tukwila Fleet #1239 Date: 10/18/2021 Period: 10/18 - 11/19 CONTRACTOR: LINCOLN CONSTRUCTION INC SUPERINTENDENT: Casey Neuman PREPARED BY: Casey Neuman ACTIVITY MTWT FSSMTWT FSSMTWTFSSMTWT FSSMTWT F 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 Seahurst - Fleet office rough in X X X X X Seahurst - Bath/Locker lighting rough in X X X X X Seahurst - 1st floor trim X X X X X X X X X X Seahurst - Backup Generator rough -in X X X X X Smith Fire - Rough in 1st floor X X X X X Rubenstein's - 1st floor base/transitions Rubenstein's - Fleet Office Resolve Industrial - Fall Arrest install X X X X X splay Mfg - FRP bath/shower X X X X X Cabinets/countertops X X X X X Pipe - Air/Water reinstall X X X X X X X X X X X X X X X Pipe - Unistrut install X X X X X X X X X X X X X X X Pipe - Bathroom Fixture Installation Pipe - Trench drain install X X X X X Overhead Innovations - OH door install Todd Robinson Paint - 2nd Floor Walls X X X X X Todd Robinson Paint - 1st Floor ceilings Todd Robinson Paint - Iron Beams W. shop X X X X X X X X X X Acoustics NW - 1st floor tile install X X X X X Acoustics NW - Fleet Office X X X X X Stanely Security - 1st floor offices Cascade Const. - CMU Header X X X X X Lci - Rebar Epoxy East shop X X X X X Lci - Framing on grid line #4 X X X X X Lci - Fleet Office Framing X X X X X Lci - Concrete Slab pours Grizzly Bar - Trench Drain X X l 14 FIVE WEEK CONSTRUCTION SCHEDULE Project: Tukwila Fleet #1239 Date: 10/18/2021 Period: 10/18 - 11/19 CONTRACTOR: LINCOLN CONSTRUCTION INC SUPERINTENDENT: Casey Neuman PREPARED BY: Casey Neuman ACTIVITY MTWT FSSMTWT FSSMTWTFSSMTWT FSSMTWT F Northshore Exteriors - Louvers 2nd floor X X X X X Northshore Exteriors - Shed roof X X X X X Northshore Exteriors - Exterior Walls X X X X X Moe's Welding - Column/I-beam East Shop X X X X X Moe's Welding - Shed roof pandecking X X X X X X X XX X Capitol H&C - Rough in 1st/2nd Floors X XXX X Capitol H&C - Overhead Piping shop area X X XXX CIS - Exterior walls X X XX X CIS - Gridline #4 X X X X X CIS - Fleet Office X X X X X WBF - (4) Exterior walls Framing X X XX X WBF - 2nd floor Telecom ceiling Framing X XXXX WBF - Gridline #4 & fleet office GWB X X XXX X X X XX WBF - Bath/Locker ceiling GWB X X X X X 15 The Watershed Company Tukwila Public Works March 25, 2021 15' BUILDING SETBACK 300' WETLAND BUFFER (APPROXIMATELY) Figure 7. Extent of combined wetland buffers/setbacks on the TPW parcels (with existing conditions shown on the TPW parcels). 16 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Public Works Shops Project No. 91630601 DESCRIPTION: Construct a new City Public Works maintenance and operations center, combining all operational functions at one location. Facility may also include a City Clerk & Police Records Center and Police evidence storage. Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler Shops, and George Long Shops to acquire the real estate to build an equipment operations center that meets current codes. STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility. MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations. COMMENT: Based on usage and benefits, it is estimated that the Water, Sewer, and Surface water enterprise funds will fund 50% of the Public Works Shops with the other 50% funded by Streets, Facilities, & Equipment Rental. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location : -Al Design/PM 722 300 _ 500 , Ai- 1,, moi : N 1,522 Land (R/W) 25,462 I r r, 11111111k %\.1 25,462 Const. Mgmt. 11 1,050 ` dR� +�'' j GIS / rgt.. `AIN 1,061 Construction 14 624 7,517 20,000 20,000 48,155 TOTAL EXPENSES 26,209 924 8,567 0 500 20,000 20,000 0 0 76,200 FUND SOURCES Enterprise Funds 8,572 462 4,284 250 20,000 33,568 Councilmatic Bond 5,572 20,000 25,572 REET/ Funds 3,000 3,000 6,000 General Fund 462 1,283 250 1,995 306 Fund Balance 9,065 0 0 0 0 (20,000) 20,000 0 0 9,065 TOTAL SOURCES 26,209 924 8,567 0 500 20,000 20,000 0 0 76,200 2021 - 2026 Capital Improvement Program 56 17 Project Location : -Al NV _ , Ai- 1,, moi : N 14 q I r r, 11111111k %\.1 ` dR� +�'' j GIS / rgt.. `AIN 30 St i"" • `' / \* 2021 - 2026 Capital Improvement Program 56 17