Loading...
HomeMy WebLinkAboutTIS 2021-11-08 Item 1C - Presentation - 2021 Annual Bridge Inspections and RepairsCity of Tukwila Allan Ekberg, Mayor Pit be Works Deportment - Barr Parrnew rntl, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Adam Cox, Transportation Project Manager CC: Mayor Allan Ekberg DATE: November 5, 2021 SUBJECT: Annual Bridge Inspections and Repairs Project No. 91610402 2021 Presentation on the State of the City's Bridges ISSUE Provide the Transportation and Infrastructure Services Committee with information about the status of the City's bridge program and inventory, showing the overall condition of the City's bridges after completion of the 2021 inspections. BACKGROUND The Federal Highway Administration (FHWA) and Washington State Department of Transportation (WSDOT) require regularly -scheduled inspections of all the City's vehicle -carrying bridge structures. The City extends this effort to include its pedestrian bridges. This requirement allows for continuity in reporting, as well as the opportunity to identify and potentially fund bridges in need of replacement and rehabilitation. ANALYSIS The City currently owns 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly owned jurisdictional bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent (S 196th/200). The bridge structure types vary from steel through truss, pre -cast concrete girders, cast -in-place concrete girders, steel girder, wood girder, and steel tied arch spans. The discussion will focus on why the City inspects its bridges, where the City stands with respect to the state and the country, and recommendations for additional steps that can be taken to address known issues. There were no new key findings or major concerns observed during the 2021 inspections. The following structures were inspected in 2021: Bridge Number Bridge Name Date Inspected Tukwila 01 Macadam Road Bridge 4/27/2021 Tukwila 02 42nd Ave S Frank Zepp 4/7/2021 Tukwila 03 Lois T Newton Bridge 5/19/2021 Tukwila 06 Foster 56 Ave S Bridge 4/22/2021 Tukwila 07 51st Ave S Bridge 4/22/2021 Tukwila 08 Grady Way Bridge 4/13/2021 Tukwila 09 East Marginal Way Bridge 4/13/2021 Tukwila 11 Boeing Access Road over Airport Way 8/02/2021 Tukwila 12 Boeing Access Road over BNRR Bridge 4/14/2021 Tukwila 13 Beacon Ave S Bridge 4/8/2021 Tukwila 14 42nd Ave S Bridge 4/20/2021 Tukwila 16 S 119th Street Bridge 4/27/2021 Tukwila 24 Klickitat Bridge 4/22/2021 4001 196th/200th Street Bridge 4/7/2021 https://tukwilawa.sharepoint.com/sites/publicworks/engineeringlPW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 11-08-21/3. 2021 State of Bridges/Info Memo_State of Tukwila's Bridge's_2021 11 08.docx 29 Three bridge's sufficiency rating (SR) increased after the 2021 inspection cycle. The bridges that had an increase in SR are the Boeing Access over Airport Way (Tuk 11), Boeing Access over BNRR (Tuk 12), and 196th/200th Street (4001). Please refer to the following table for previous and current SR. Bridge Number Bridge Name Previous SR Current SR Tukwila 11 Boeing Access over Airport Way 39.80 47.22 Tukwila 12 Boeing Access over BNRR 37.19 62.15 4001 196th/200th Street 59 89.80 FISCAL IMPACT The cost for King County to perform the 2021 inspections was $30,469.40. King County Expended to date Remaining Contract RECOMMENDATION Discussion only. Contract Amount $34,210.00 - 30,469.40 Attachments: Annual Bridge Inspection Report Summary 2021 City of Tukwila Bridge Inspection Letter Map of Tukwila's Bridges Annual Bridge Repair & Maintenance CIP page $3,740.60 2021 Budget $75,000 Phone; 2O6-433-1200 • Email: Mayor@TukwillaWA.gov + Website: TukwilaWA.gov 30 CITY OF TUKWILA CITY ENGINEER'S BRIDGE INSPECTION REPORT November 2021 Tukwila Urban Center Pedestrian Bridge 31 City of Tukwila Public Works Department 6300 Southcenter Blvd Tukwila, WA 98188 CITY ENGINEER'S BRIDGE INSPECTION REPORT November 2021 Hari Ponnekanti, P.E., PW Director/City Engineer 32 Table of Contents Executive Summary Forward ii Quick Bridge Reference iv Bridges Recommended for Replacement/Rehabilitation 1 Bridges recommended for Major Maintenance 2 Posted Bridges 3 Bridges Recommended for Rail Retrofit 4 Bridges Repair Recommendations for Repair S ADT (Average Daily Traffic) 6 Bridges Maintenance and Repair History 7 Annual Bridge Maintenance and Repair In-house Labor Hours 8 33 Executive Summary The City currently has ownership of 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly owned jurisdictional bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent (S 196th/200). The different types of bridge configuration vary from steel through truss, pre -cast concrete girders, cast -in-place concrete girders, steel girder, wood girder, and steel tied arch spans. Currently the City has a total of six (6) bridges that have a sufficiency rating between 80 to 100; seven (7) bridges that have a sufficiency rating between 60 to 79; two (2) bridges that have a sufficiency rating between 40 to 59; and one (1) bridge (42nd Ave S Bridge) that have a sufficiency rating of 39 or less. Note, pedestrian bridges do not receive a sufficiency rating. Please refer to the Quick Bridge Reference sheet for the break down of city owned bridges and the assigned sufficiency rating. The sufficiency rating formula provides a method of evaluating highway bridge data by calculating four (4) separate factors to obtain a numeric value which is indictive of bridge sufficiency to remain in service. The result of this method is a percentage in which 100 percent would represent an entirely sufficient bridge and zero (0) percent would represent an entirely insufficient or deficient bridge. The formula considers the structural adequacy, functional obsolescence, level of service and essentiality for public use. ii 34 Forward The City Engineer's Bridge Inspection Report, dated November 2021, is published by the City of Tukwila Public Works Department, and the information contained herein is the best available at the time of publication. It is to be used as an information tool for planning and maintenance activities, and reflects the general condition of the City's bridges. The repairs indicated are summarized for brevity from actual bridge inspection reports. Background The FHWA (Federal Highway Administration) issued the NBIS (National Bridge Inspection Standards) in 1971. These standards established a comprehensive inspection for all federal highway system bridges. Minimum qualifications were set forth for bridge inspectors. Specific types and frequencies of inspections for bridges were established, and the reporting of certain standard information about each bridge was required. In 1978, these requirements were extended to all public bridges carrying vehicular traffic. A national bridge inspection program has been in place ever since, and state and local agencies have performed bridge inspection in accordance with these guidelines. Inspections for the City of Tukwila's bridges are conducted every two years unless conditions warrant additional inspections or frequencies as dictated by the NBIS. iii 35 Bridge Quick Check Informational Sheet Bridge Number Name Year Built Suff. Rating WSDOT Bridge ID ADT Next ADT Reqd Last Inspection Next Inspection Date UBIT Required Last UBIT Inspection Next UBIT Insp Reqd Fracture Critical Special Notes Tukwila 01 Macadam Road 1997 80.58 08674200 3,600 2024 4/27/2021 2023 N - - N Tukwila 02 Frank Zepp 1968 75.37 08561400 36,000 2022 4/7/2021 2023 Y 2021 2025 N Tukwila 03 Lois T Newton 1973 79.56 08544400 18,900 2021 4/27/2021 2023 Y 2017 2023 N Tukwila 05 South -center Blvd 1994 4 96.98 00142690 10,616 2023 8/4/2020 2022 Y 2020 2026 N Tukwila 06 Foster 56th Ave 1985 58.05 08166200 2,850 2024 4/22/2021 2023 Y 2017 2023 N Tukwila 07 51st Ave South 1996 69.09 08634500 4,600 2024 4/22/2021 2023 N - - N Tukwila 08 Grady Way 1986 6F06 08543600 26,000 2024 4/13/2021 2023 Y 2018 2023 N Jointly owned with City of Renton Tukwila 09 E Marginal Way 1989 89.83 08110200 13,000 2024 4/13/2021 2023 Y 2017 2023 N Tukwila 11Way BAR Airport 1952 47.22 SD 08001800 40,000 2024 4/14/2021 2023 N - - N *See note below Tukwila 12 BAR BNSF 1945 62.15 FO 08002500 40,000 2021 4/14/2021 2023 Y 2017 2023 N *See note below Tukwila 13 Beacon Ave S 1971 78.36 7996800 500 2020* 4/8/2021 2023 N 2017 2019 Y Tukwila 14 42nd Ave S 1949 7.56 SD 86.36 08651500 10,300 2023 4/20/2021 2022 Y 2021 2023 Y Awarded $1.5M for design in June 2021 and $12M for construction in July 2021 Tukwila 15 Pacific Hwy 2000 08651500 30,300 2021 8/4/2020 2022 Y 2020 2026 N Tukwila 16 S 119th 1965 -- 08104300 NA NA 4/27/2021 2023 N - - N Tukwila 17 Foster Golf Course 1987 -- 08584100 NA NA 4/11/2019 2024 N - - N Tukwila 18 Green River Ped & Utility 1983 -- 08584200 NA NA 8/18/2020 2026 N - - N Tukwila 19 Inter-urban Trail 2006 -- 08742500 NA NA 9/11/2018 2023 N - - N Tukwila 20 180th Street Trail 2001 -- 08742600 NA NA 8/19/2020 2026 Y 2016 2022 Y Tukwila 21 Fort Dent Road 1975 63.00 08328300 1,115 2023 8/19/2020 2022 Y 2014 2020* N *Unable to perform UBIT inspection in 2020 due to COVID availability, will reschedule Tukwila 22 Fort Dent Trail 2002 -- 8718400 NA NA 8/19/2020 2026 N - - N Tukwila 24 Klickitat 2012 lir 9FO93 08853600 14,024 2023 4/25/2019 2021 N - - N Tukwila 25 TUC Ped Bridge 2018 - 8919000 - - 2020 2025 Y 2019 2024 Y 4001 196-200th 1998 SFOO Joi 08712100 17,406 2023 4/7/2021 2023 Y 2021 2027 N Jointly owned with City of Kent NOTES: Sufficiency Rating is out of 100. SD - Indicates the bridge structure is "Structural Deficient" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. The structure is still safe for use by the public and the condition is being monitored. FO - Indicates the bridge structure is "Functionally Obsolete" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. This designation only indicates the roadway geometrics do not meet current standards for bridge design. UBIT - Under Bridge Inspection Truck. This indicates the bridge needs special equipment in order to reach portions of the structure for inspection. ADT - Average Daily Traffic NA - Sufficiency ratings are not given on pedestrian facilities since they are not a part of the NBI system, a Suff. Rating of NA is given in that location. All pedestrian bridges do not have a calculated sufficiency rating - they are not traffic loaded bridges and the rating numbers are not calculated per Federal Requirements. *Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes. iv 36 Bridges Recommended for Replacement or Rehabilitation Bridge Number Bridge Name Location Reason Tukwila 14 42nd Ave South* Allentown (42nd Ave) Deteriorating Structural Condition of the steel superstructure Note: See individual bridge reports in Public Works for detailed repair work. * The City has been awarded two federal grants from PSRC and the Local Bridge Program for a total of $13.5M 1 37 Bridges Recommended for Major Maintenance Bridge Number Bridge Name Location Reason Tukwila 16 South 119th Pedestrian Bridge 119th Str (Allentown) Painting/Epoxy of entire structure with possible rot repair as encountered Tukwila 18 Green River Pedestrian and Utility Interurban Trail near 180th Rehabilitation of structure coating and timber rot repair and replacement 2 38 Posted Bridges Bridge Number Bridge Name Location Reason Tukwila 14 42nd Ave South Allentown Bridge is posted for reduced truck speed and posted for reduced loading on AASHTO Type 3 trucks and 6 and 7 axle vehicles. Note: See individual bridge reports in Public Works for detailed repair work. 3 39 Bridges Recommended for Rail Retrofit Bridge Number Bridge Name Location Reason Tukwila 1 Macadam Macadam Road Provide Guardrail, terminal and transitions that meet current standards Tukwila 2 Frank Zepp 180th Street Provide bridge rail that meet current standards Tukwila 3 Lois T Newton Stander Boulevard Provide bridge rail, guardrail, terminal and transitions that meet current standards Tukwila 6 Foster 56th Ave South 56th Avenue South Provide bridge rail, guardrail, terminal and transitions that meet current standards Tukwila 8 Grady Way Grady Way Provide Guardrail, terminal and transitions that meet current standards Tukwila 9 East Marginal Way East Marginal Way Provide bridge rail, guardrail, terminal and transitions that meet current standards Tukwila 11 Boeing Access Road - Airport Way Boeing Access Road Provide bridge rail, guardrail, terminal and transitions that meet current standards Tukwila 13 Beacon Ave South Victor Street Provide bridge rail, guardrail, terminal and transitions that meet current standards Tukwila 14 42nd Avenue South 42nd Avenue South Provide Guardrail, terminal and transitions that meet current standards Note: See individual bridge reports in Public Works for detailed repair work. 4 40 Bridges Repair Recommendations PRIORITY CODE 'A' Highest Priority - Structural integrity and safety involved. PRIORITY CODE 'B' Regular Priority - General bridge structural repair work not requiring immediate response. PRIORITY CODE 'C' Low Priority - General minor maintenance or other work to be accomplished as time and money permit. PRIORITY CODE 'M Monitor - The repair or item described needs to be monitored at the rate indicated. Note: See individual bridge reports in Public Works for detailed repair work. Bridge Number Bridge Name Location Repair Recommendations Priority Inspection Date Tukwila 1 Macadam Macadam 1. No repairs recommended at this time. NA 27 -Apr -21 Tukwila 2 Frank Zepp 180th Street 1. Remove timber planks and plywood between stringers at span 3. 2. Replace bearings at Pier 3 girders I, J, and K B B 7 -Apr -21 Tukwila 3 Lois Newton Strander Blvd 1. No repairs recommended at this time. NA 27 -Apr -21 Tukwila 5 South center Blvd SC Blvd 1. Rreplace missing block spacer on guardrail post 2. Fix broken light above pile 2c 3. Trim the trees on the north side of the bridge. C B B 4 -Aug -20 Tukwila 6 Foster 56th Ave S 56th Ave S 1. Fill scour void under SE wingwall 2. Replace expansion joint material 3. Repair damaged guardrail terminal end 4. Develop scour action plan B B B B 22 -Apr -21 Tukwila 7 51st Ave S 51st Ave S 1. Apply deck sealer to prevent ponding water to leak in to the box girders 2. Repair spalls at north expansion joint 3. Investigate waterline in box girder 4. Repair northwest rail terminal 5. Remove trees at Pier 2 B B A B B 22 -Apr -21 Tukwila 8 (Renton -Tukwila Joint Ownership) Grady Way Grady Way 1. Repair vertical sliding surfaces on columns 2. Repair damage bridge rail (spalling and delamination's) 3. Clean plugged Drains at NW approach 4. Repair pedestrian fencing 5. Clear out material between bearings at Abutment 1 6. Repair metal bridge rail at NW approach 7. Remove vegetation on retaining wall 8. Clear sidewalk debris B B B B B B C C 13 -Apr -21 Tukwila 9 E Marginal Wa y E Marginal Way 1. Replace compression seals at expansion joints 2. Develop scour plan 3. Secure access hatch at south side B C A 13 -Apr -21 Tukwila 11 BAR Airport Way Boeing Access Road 1. Repair bridge rail damage 2. Roughen approach slabs B C 14 -Apr -21 Tukwila 12 BAR BNSF Boeing access road 1. Repair the southeast approach rail. 2. Clean bridge deck and sidewalk B M 14 -Apr -21 Tukwila 13 Beacon Ave South At Victor Street 1. Repair interior lighting. B 8 -Apr -21 Tukwila 14 42nd Ave S 42nd Ave 5 1. Clean out open joints over floor beams thoroughly and fill with a flexible sealant, priority 1 due to corrosion at top flanges of floor beams from leaking joints. 2. Rework the sliding plate expansion joint so it is smooth with sidewalk and patch spalls near panel points, seal open cracks. 3. Replace missing guard rail and terminal at SW corner, replace damaged rail at SE corner, reset NW rail and posts to bring rail up to standard height. 4. Thoroughly pressure wash clean truss of all dirt/algae/guano, prepare surface, paint bridge to encapsulate pack rust and protect truss members. Add bird deterrent at all panel points, upper and lower chords. 5. Replace steel sliding plate expansion joints with either a strip seal with steel header or modular joint to eliminate water intrusion onto steel bearings. 6. Recommend design seismic retrofit steel collar and construct around bearing columns, anchored to cap, then fill tight with epoxy. 7. FRP wrap columns 4 A -C. Reinforce west wingwall. Add quarry spall along abutment 4 and under span 3 to retain fill and discourage transient activity. 8. Replace missing riprap along banks and in front of piers. 9. Recommend raising portals and sways due to the high volume of truck traffic and existing damage to sway members. 10. Replace sliding plates with elastomeric dynamic isolation bearings. 11. Chip any delaminated concrete from exposed rebar, clean and seal exposed bar and patch spalls. Sack honeycombed areas throughout soffit. Shotblast deck surface, patch spelled areas and apply epoxy overlay. 12. Replace broken gas pipe couplers. h CO CO CO 03 CO 03 CO 03 CO CO 03 CO 20 -Apr -21 Tukwila 15 Pacific Hwy Pacific/TIB at Duwamish 1. Repair leaky pipe inside the west girder 2. Arrest channel erosion along the south bank 3. Repair the approach guardrails at the southwest, southeast, and northeast ends 4. Apply epoxy overlay on the bridge deck 5. Spot paint at slice locations to extend paint life < < 03 U CO 4 -Aug -20 Tukwila 16 S 119th Pedestrian 5 119th Street 1. Repair warped and twisted deck planks, deck has non-skid coating but timber is still weathered 2. Major rehabilitation or replacement in near future 3. Special inspection requested to inspect the underside of the superstructure 4. Replace areas of top boards B A A A 27 -Apr -21 Tukwila 17 Foster Golf Course Foster GC 1. Monitor bearing movement at Abutment 1 2. Remove blackberry bushes under the bridge M C 11 -Apr -19 Tukwila 18 Green River Interurban trail near 180th 1. Monitor utility pipe alignment 2. Repair chord patching material debonding 3. Repair and replace rotting timber pedestrian rail 4. Paint entire superstructure 5. Perform in-depth inspection M B B B M 19 -Aug -20 Tukwila 19 Interurban Trail Interurban Trail 1. No repairs noted 11 -Sep -18 Tukwila 20 180th Ped Interurban trail at 180th 1. Monitor leaching cracks in abutment and retaining walls 2. Remove debris from bearing seat 3. Repair approach settlement 4. Repair broken conduit splices 5. Replace and repair approach bollards M C B B B 19 -Aug -20 Tukwila 21 Fort Dent Road Fort Dent Road 1. Trim vegetation overhanging along sidewalk 2. Repair/replace wire cover plate at the NE approach 3. Post clearance at trail undercrossing under Span 3 C C C 19 -Aug -20 Tukwila 22 Fort Dent Trail Interurban trail 1. Trim overgrowing vegetation at approaches 2. Remove debris on chords of bridge girders 3. Replace missing safety chains at corners of bridge 4. Replace popped bolts at diagonal bracing 5. Smooth out approach pathway at approach header C M B B B 19 -Aug -20 Tukwila 24 Klickitat Drive Klickitat Drive 1. No repairs noted NA 22 -Apr -21 Tukwila 25 Tuk Urban Ped Bridge Green River Trail 1. No repairs noted NA 27 -Oct -20 4001 (Kent- Tukwila Joint Ownership) 196 -200th 196th Street 1. Repair joints and seals 2. Clean deck drains B B 7 -Apr -21 5 41 Bridge Average Daily Traffic (ADT) Bridge Number Name Year Built Structure ID ADT Next ADT Reqd (5 yr Cycle) Tukwila 01 Macadam Road 1997 08674200 3,600 2024 Tukwila 02 Frank Zepp 1968 08561400 36,000 2022 Tukwila 03 Lois T Newton 1973 08544400 18,900 2021 Tukwila 05 South -center Blvd 1994 0014269D 10,616 2023 Tukwila 06 Foster 56th Ave 1985 08166200 2,850 2024 Tukwila 07 51st Ave South 1996 08634500 4,600 2024 Tukwila 08 Grady Way 1986 08543600 26,000 2024 Tukwila 09 E Marginal Way 1989 08110200 13,000 2024 Tukwila 11 BAR Airport Way 1952 08001800 40,000 2024 Tukwila 12 BAR BNSF 1945 08002500 40,000 2021 Tukwila 13 Beacon Ave S 1971 7996800 550 2020* Tukwila 14 42nd Ave S 1949 08651500 10,300 2023 Tukwila 15 Pacific Hwy 2000 08651500 30,300 2021 Tukwila 21 Fort Dent Road 1975 08328300 1,115 2023 Tukwila 24 Klickitat 2012 08853600 14,024 2023 4001 196 -200th 1998 08712100 17,406 2023 *Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes. 6 42 2010 - 2020 Bridges Maintenance and Repair History Bridge Number Bridge Name Year Amount Repair/Maintenance Tukwila 2 Frank Zepp 2015 $2.6M Paint steel, deck overlay, replace deck joint, seismic protection Tukwila 8 Grady Way 2015 $350K Seismic protection Tukwila 11 Boeing Access Road - Airport Way 2021 $1.6M Siesmic Retro Fit Tukwila 12 Boeing Access Road BNRR 2019 $10M Siesmic Retrofit and deck repair Tukwila 13 Beacon Ave South 2015 $1.1M Replace bridge deck and paint steel Tukwila 14 42nd Avenue South 1994 * Paint Truss Tukwila 14 42nd Avenue South 2017 $17k 42nd Ave S Bridge Structural Assessment Tukwila 14 42nd Avenue South 2020 $39K In-depth inspection beyond the King County inspections Tukwila 16 S 119th St 2015 $100K Paint and timber repair, Tukwila 18 Green River 2007 $100K Paint and timber repair Tukwila 18 Green River 2008 $126K Paint and timber repair 4001 196th/200th 2019 $500K Approach Slab repair * Unable to verify cost as project cost data is typical kept for 6 years and project was performed before the City's current project tracking system 7 43 Annual Bridge Maintenance and Repair In- house Labor Hours Year Hours 2011 45 2012 35 2013 167 2014 108 2015 131 2016 283 2017 121 2018 126 2019 151 2020 62 Annual Average 122.9 Total 1229 8 44 DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E King County Road Services Division Department of Local Services 201 South Jackson Street KSC-LS-0315 Seattle, WA 98104-3856 www.metrokc.gov/roads September 3, 2021 Hari Ponnekanti Public Works Director 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188-2544 RE: Inspection of City of Tukwila Bridges Dear Mr. Ponnekanti: King County bridge engineers inspect the bridges owned by the City of Tukwila, in accordance with agreements between the City of Tukwila and King County Depai linent of Local Services. The bridge inspections were conducted as follows: Under Bridge Inspection Truck (UBIT) April 7, 2021 No. TUKxNx02, Frank Zepp Bridge No. 4001 196th — 200th Street Bridge April 20, 2021 No. TUKxNx14, 42nd Ave South Bridge (FC) Fracture Critical (FC) Inspections April 08, 2021 No. TUKxNx13, Beacon Ave South Bridge (FC) Routine Inspections April 13, 2021 No. TUKxNx09, East Marginal Way Bridge No. TUKxNx08, Grady Way Bridge April 14, 2021 No. TUKxNx12, Boeing Access Road No. TUKxNx11, S Bar Over Airport Way April 22, 2021 No. TUKxNx24, Klickitat Bridge No. TUKxNx06, Foster 56th Ave South Bridge No. TUKxNx07, 51' Ave South Bridge April 27, 2021 No. TUKxNx01, Macadam Road Bridge No. TUKxNx03, Lois T Newton Bridge No. TUKxPx16, South 119th Ped Bridge August 02, 2021 No. TUKxNx11, S Bar Over Airport Way 45 DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E Hari Ponnekanti September 3, 2021 Page 2 Enclosed are the reports from the bridge inspections and the actions we recommend you take to maintain the bridges. We submit the data in the report to Washington State Department of Transportation (WSDOT), in accordance with state and federal laws, to inform them of the bridge's condition and to assure them the bridge has been inspected on a timely basis. The information is incorporated into state and federal databases. The bridge inspection report is divided into three main sections. The first section consists of three parts: the National Bridge Inspection Standards (NBIS) elements, Load Capacity Information, and Inspections Performed. The NBIS fields, which are numbered 1657 to 1687 are used for rating the components of the bridge. In general, the codes rate the components from eight (best) to one (worst); however, other rating scales apply to some of the fields in this first section. Explanations of these codes are found in the Washington State Bridge Inspection Manual (http://www.wsdot.wa.gov/TA/Operations/BRIDGE/BIC.html). The second section of the report, Bridge Management System (BMS) Elements, lists quantities and rates them, breaking down the condition of each component into categories that indicate how widespread a component is deteriorated. State 1 is best; State 4 is worst. The third section consists of three parts: Notes, Repairs, and Inspection Resources Required. The Notes section is comprised of information that provides details of the numbered fields in the first two sections. Please note that any deficiencies listed in the "Repairs" section are prioritized between 1 - High priority, and 3 - Low priority. The Resources Required section indicates any special equipment or tools used to inspect the bridge. I hope this letter helps you in reviewing these inspection reports. We recommend that the City of Tukwila bridges continue to be inspected on a 24 -month schedule. Our next scheduled inspections of the City of Tukwila Bridges will be in spring 2022. Please call Margaret Germeaux at 206-477-3539 if you need any additional information. We appreciate assisting your city with bridge engineering and inspection services. Sincerely, DocuSigned by: '''' 1 j ra U`` 38420FF2A3BC444... Larry Jaramillo, P.E. Managing Engineer Bridge and Structural Design Unit LJ:MH:mr Enclosures cc: Rey Sugui, Program Analyst, Road Services Division (RSD), Department of Local Services (DLS) Margaret Germeaux, Engineer III, Bridge and Construction Unit, RSD, DLS (w/ enclosures) 46 f III s SEATTLE L Nth 414L, B URIEN S 128th H I S 160th Ste) e) 5164 aIS 161s 1 IIF 168th St Wig BlvdCorporat Crporat Minkler Blk'd Js � = i 3 1 RENTON Upland Dr Midland D Costco Dr Triland Dr 0 180th St Dr U:\PW Eng \ GIS \General Maps\Bridges_24x36_Aug2018.mxd Date: 09/04/18 By: R. Lingo KENT City of Tukwila Bridges S Not to Scale NBIS Vehicle Bridges 1) Macadam Road 2) Frank Zepp Bridge (S 180th St) 3) Louis T. Newton Bridge (Strander Blvd) 4) Southcenter Green River Bridge 5) Foster 56th Ave S 6) 51st Ave S 7) East Marginal Way 8) Boeing Access Road Bridge over Airport Way 9) Boeing Access Road Bridge over BNSF 10) Beacon Ave S 11)42nd Ave S 12) Pacific Highway/TIB 13) Fort Dent Park Bridge 14) Klickitat Drive Jointly Owned NBIS Vehicle Bridges 15) Grady Way (Renton) 16) S 196th SLS 200th St (Kent) Pedestrian Bridges 17) S 119th Pedestrian Bridge 18) Foster Golf Course Bridge 19) Green River Pedestrian and Utility Bridge 20) Interurban Trail Bridge 21) S 180th Pedestrian Bridge 22) Fort Dent Trail Bridge 23) TUC Pedestrian Bridge 24) Klickitat Elevated Walkway Vicinity Map Disclaimer: The location of features and boundaries are approximate and are intended for reference only. Data is based on best information available. CITY 0 TUKW LA CAPITAL PRO ECT SUM RY 2021 o 026 PRO ECT: nnual Bridge Inspections and Repairs Project No. 9XX10402 DESCRIPTION: 0 going program of bi-annual inspections, repairs, painting and rehabilitation of the 22 City bridges. Federally required program identifies safety or repair needs in the early stages to m nim ze hazards and JUSTIFICATIO : costs. The num er of bridge inspections necessary each year can vary year to year. Inspection frequencies vary from bridge to bridge and King County has provided som inspection services. STATUS: Construction projects will be determ ned from inspection reports and noted deficiencies/problem . M INT. IM ACT: Reduces m intenance costs. CO NT: 0 going project, only one year actuals are shown in the first colum . FINANCIAL (in $000's) hrough stim ted 2019 2020 021 022 023 024 025 026 BEYO D 0 AL EXPENSES Inspections 111 5 5 5 10 15 20 25 30 906 Land (R/W 0 Const. M . 3 0 5 5 5 5 5 158 Construction 314 50 5 0 5 0 5 889 TO AL EXPENSES 68 35 5 5 00 00 00 00 00 ,953 FUND SO RCES Awarded G ant Proposed G ant 0 M tigation Actual 0 M tigation Expected 0 City 0 er. Revenue 68 35 5 5 00 00 00 00 00 ,953 TO AL SO RCES 68 35 5 5 00 00 00 00 00 ,953 2021 - 2026 Capital Im rovem nt Program 13 48