HomeMy WebLinkAboutTIS 2021-11-08 Item 1C - Presentation - 2021 Annual Bridge Inspections and RepairsCity of Tukwila
Allan Ekberg, Mayor
Pit be Works Deportment - Barr Parrnew rntl, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/City Engineer
BY: Adam Cox, Transportation Project Manager
CC: Mayor Allan Ekberg
DATE: November 5, 2021
SUBJECT: Annual Bridge Inspections and Repairs
Project No. 91610402
2021 Presentation on the State of the City's Bridges
ISSUE
Provide the Transportation and Infrastructure Services Committee with information about the status of the City's bridge
program and inventory, showing the overall condition of the City's bridges after completion of the 2021 inspections.
BACKGROUND
The Federal Highway Administration (FHWA) and Washington State Department of Transportation (WSDOT) require
regularly -scheduled inspections of all the City's vehicle -carrying bridge structures. The City extends this effort to include
its pedestrian bridges. This requirement allows for continuity in reporting, as well as the opportunity to identify and
potentially fund bridges in need of replacement and rehabilitation.
ANALYSIS
The City currently owns 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly owned jurisdictional
bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent (S 196th/200). The bridge
structure types vary from steel through truss, pre -cast concrete girders, cast -in-place concrete girders, steel girder, wood
girder, and steel tied arch spans. The discussion will focus on why the City inspects its bridges, where the City stands
with respect to the state and the country, and recommendations for additional steps that can be taken to address known
issues. There were no new key findings or major concerns observed during the 2021 inspections.
The following structures were inspected in 2021:
Bridge Number
Bridge Name
Date Inspected
Tukwila 01
Macadam Road Bridge
4/27/2021
Tukwila 02
42nd Ave S Frank Zepp
4/7/2021
Tukwila 03
Lois T Newton Bridge
5/19/2021
Tukwila 06
Foster 56 Ave S Bridge
4/22/2021
Tukwila 07
51st Ave S Bridge
4/22/2021
Tukwila 08
Grady Way Bridge
4/13/2021
Tukwila 09
East Marginal Way Bridge
4/13/2021
Tukwila 11
Boeing Access Road over Airport Way
8/02/2021
Tukwila 12
Boeing Access Road over BNRR Bridge
4/14/2021
Tukwila 13
Beacon Ave S Bridge
4/8/2021
Tukwila 14
42nd Ave S Bridge
4/20/2021
Tukwila 16
S 119th Street Bridge
4/27/2021
Tukwila 24
Klickitat Bridge
4/22/2021
4001
196th/200th Street Bridge
4/7/2021
https://tukwilawa.sharepoint.com/sites/publicworks/engineeringlPW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 11-08-21/3. 2021 State of Bridges/Info Memo_State of Tukwila's Bridge's_2021 11 08.docx
29
Three bridge's sufficiency rating (SR) increased after the 2021 inspection cycle. The bridges that had an increase in SR
are the Boeing Access over Airport Way (Tuk 11), Boeing Access over BNRR (Tuk 12), and 196th/200th Street (4001).
Please refer to the following table for previous and current SR.
Bridge Number
Bridge Name
Previous SR
Current SR
Tukwila 11
Boeing Access over Airport Way
39.80
47.22
Tukwila 12
Boeing Access over BNRR
37.19
62.15
4001
196th/200th Street
59
89.80
FISCAL IMPACT
The cost for King County to perform the 2021 inspections was $30,469.40.
King County
Expended to date
Remaining Contract
RECOMMENDATION
Discussion only.
Contract Amount
$34,210.00
- 30,469.40
Attachments: Annual Bridge Inspection Report Summary
2021 City of Tukwila Bridge Inspection Letter
Map of Tukwila's Bridges
Annual Bridge Repair & Maintenance CIP page
$3,740.60
2021 Budget
$75,000
Phone; 2O6-433-1200 • Email: Mayor@TukwillaWA.gov + Website: TukwilaWA.gov
30
CITY OF TUKWILA
CITY ENGINEER'S BRIDGE INSPECTION REPORT
November 2021
Tukwila Urban Center Pedestrian Bridge
31
City of Tukwila
Public Works Department
6300 Southcenter Blvd
Tukwila, WA 98188
CITY ENGINEER'S BRIDGE
INSPECTION REPORT
November 2021
Hari Ponnekanti, P.E., PW Director/City Engineer
32
Table of Contents
Executive Summary
Forward
ii
Quick Bridge Reference iv
Bridges Recommended for Replacement/Rehabilitation 1
Bridges recommended for Major Maintenance 2
Posted Bridges 3
Bridges Recommended for Rail Retrofit 4
Bridges Repair Recommendations for Repair S
ADT (Average Daily Traffic) 6
Bridges Maintenance and Repair History 7
Annual Bridge Maintenance and Repair In-house Labor Hours 8
33
Executive Summary
The City currently has ownership of 23 bridges (16 traffic bearing and 7 pedestrian). Of those, two are jointly
owned jurisdictional bridges with shared ownership between the City of Renton (Grady Way) and the City of Kent
(S 196th/200). The different types of bridge configuration vary from steel through truss, pre -cast concrete girders,
cast -in-place concrete girders, steel girder, wood girder, and steel tied arch spans.
Currently the City has a total of six (6) bridges that have a sufficiency rating between 80 to 100; seven (7) bridges
that have a sufficiency rating between 60 to 79; two (2) bridges that have a sufficiency rating between 40 to 59;
and one (1) bridge (42nd Ave S Bridge) that have a sufficiency rating of 39 or less. Note, pedestrian bridges do not
receive a sufficiency rating. Please refer to the Quick Bridge Reference sheet for the break down of city owned
bridges and the assigned sufficiency rating.
The sufficiency rating formula provides a method of evaluating highway bridge data by calculating four (4)
separate factors to obtain a numeric value which is indictive of bridge sufficiency to remain in service. The result
of this method is a percentage in which 100 percent would represent an entirely sufficient bridge and zero (0)
percent would represent an entirely insufficient or deficient bridge. The formula considers the structural
adequacy, functional obsolescence, level of service and essentiality for public use.
ii 34
Forward
The City Engineer's Bridge Inspection Report, dated November 2021, is published by the City of Tukwila Public
Works Department, and the information contained herein is the best available at the time of publication. It is to
be used as an information tool for planning and maintenance activities, and reflects the general condition of the
City's bridges. The repairs indicated are summarized for brevity from actual bridge inspection reports.
Background
The FHWA (Federal Highway Administration) issued the NBIS (National Bridge Inspection Standards) in 1971.
These standards established a comprehensive inspection for all federal highway system bridges. Minimum
qualifications were set forth for bridge inspectors. Specific types and frequencies of inspections for bridges were
established, and the reporting of certain standard information about each bridge was required. In 1978, these
requirements were extended to all public bridges carrying vehicular traffic.
A national bridge inspection program has been in place ever since, and state and local agencies have performed
bridge inspection in accordance with these guidelines. Inspections for the City of Tukwila's bridges are
conducted every two years unless conditions warrant additional inspections or frequencies as dictated by the
NBIS.
iii 35
Bridge Quick Check Informational Sheet
Bridge Number
Name
Year Built
Suff.
Rating
WSDOT Bridge
ID
ADT
Next
ADT
Reqd
Last Inspection
Next Inspection
Date
UBIT
Required
Last UBIT
Inspection
Next UBIT
Insp Reqd
Fracture
Critical
Special Notes
Tukwila 01
Macadam Road
1997
80.58
08674200
3,600
2024
4/27/2021
2023
N
-
-
N
Tukwila 02
Frank Zepp
1968
75.37
08561400
36,000
2022
4/7/2021
2023
Y
2021
2025
N
Tukwila 03
Lois T Newton
1973
79.56
08544400
18,900
2021
4/27/2021
2023
Y
2017
2023
N
Tukwila 05
South -center
Blvd
1994
4
96.98
00142690
10,616
2023
8/4/2020
2022
Y
2020
2026
N
Tukwila 06
Foster 56th Ave
1985
58.05
08166200
2,850
2024
4/22/2021
2023
Y
2017
2023
N
Tukwila 07
51st Ave South
1996
69.09
08634500
4,600
2024
4/22/2021
2023
N
-
-
N
Tukwila 08
Grady Way
1986
6F06
08543600
26,000
2024
4/13/2021
2023
Y
2018
2023
N
Jointly owned with City of Renton
Tukwila 09
E Marginal Way
1989
89.83
08110200
13,000
2024
4/13/2021
2023
Y
2017
2023
N
Tukwila 11Way
BAR Airport
1952
47.22
SD
08001800
40,000
2024
4/14/2021
2023
N
-
-
N
*See note below
Tukwila 12
BAR BNSF
1945
62.15
FO
08002500
40,000
2021
4/14/2021
2023
Y
2017
2023
N
*See note below
Tukwila 13
Beacon Ave S
1971
78.36
7996800
500
2020*
4/8/2021
2023
N
2017
2019
Y
Tukwila 14
42nd Ave S
1949
7.56
SD
86.36
08651500
10,300
2023
4/20/2021
2022
Y
2021
2023
Y
Awarded $1.5M for design in June 2021 and
$12M for construction in July 2021
Tukwila 15
Pacific Hwy
2000
08651500
30,300
2021
8/4/2020
2022
Y
2020
2026
N
Tukwila 16
S 119th
1965
--
08104300
NA
NA
4/27/2021
2023
N
-
-
N
Tukwila 17
Foster Golf
Course
1987
--
08584100
NA
NA
4/11/2019
2024
N
-
-
N
Tukwila 18
Green River
Ped & Utility
1983
--
08584200
NA
NA
8/18/2020
2026
N
-
-
N
Tukwila 19
Inter-urban
Trail
2006
--
08742500
NA
NA
9/11/2018
2023
N
-
-
N
Tukwila 20
180th Street
Trail
2001
--
08742600
NA
NA
8/19/2020
2026
Y
2016
2022
Y
Tukwila 21
Fort Dent Road
1975
63.00
08328300
1,115
2023
8/19/2020
2022
Y
2014
2020*
N
*Unable to perform UBIT inspection in 2020
due to COVID availability, will reschedule
Tukwila 22
Fort Dent Trail
2002
--
8718400
NA
NA
8/19/2020
2026
N
-
-
N
Tukwila 24
Klickitat
2012
lir
9FO93
08853600
14,024
2023
4/25/2019
2021
N
-
-
N
Tukwila
25
TUC Ped
Bridge
2018
-
8919000
-
-
2020
2025
Y
2019
2024
Y
4001
196-200th
1998
SFOO
Joi
08712100
17,406
2023
4/7/2021
2023
Y
2021
2027
N
Jointly owned with City of Kent
NOTES:
Sufficiency Rating is out of 100.
SD - Indicates the bridge structure is "Structural Deficient" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. The structure is still safe for use by the public and the condition is being
monitored.
FO - Indicates the bridge structure is "Functionally Obsolete" as defined by the WSDOT (Washington State Department of Transportation) bridge inspection program. This designation only indicates the roadway geometrics do not meet
current standards for bridge design.
UBIT - Under Bridge Inspection Truck. This indicates the bridge needs special equipment in order to reach portions of the structure for inspection.
ADT - Average Daily Traffic
NA - Sufficiency ratings are not given on pedestrian facilities since they are not a part of the NBI system, a Suff. Rating of NA is given in that location.
All pedestrian bridges do not have a calculated sufficiency rating - they are not traffic loaded bridges and the rating numbers are not calculated per Federal Requirements.
*Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes.
iv
36
Bridges Recommended for Replacement or Rehabilitation
Bridge Number
Bridge Name
Location
Reason
Tukwila 14
42nd Ave South*
Allentown (42nd Ave)
Deteriorating Structural Condition of the steel superstructure
Note: See individual bridge reports in Public Works for detailed repair work.
* The City has been awarded two federal grants from PSRC and the Local Bridge Program for a total of $13.5M
1 37
Bridges Recommended for Major Maintenance
Bridge Number
Bridge Name
Location
Reason
Tukwila 16
South 119th Pedestrian Bridge
119th Str (Allentown)
Painting/Epoxy of entire structure with possible rot repair
as encountered
Tukwila 18
Green River Pedestrian and Utility
Interurban Trail near 180th
Rehabilitation of structure coating and timber rot repair
and replacement
2 38
Posted Bridges
Bridge Number
Bridge Name
Location
Reason
Tukwila 14
42nd Ave South
Allentown
Bridge is posted for reduced truck speed and posted for
reduced loading on AASHTO Type 3 trucks and 6 and 7
axle vehicles.
Note: See individual bridge reports in Public Works for detailed repair work.
3 39
Bridges Recommended for Rail Retrofit
Bridge Number
Bridge Name
Location
Reason
Tukwila 1
Macadam
Macadam Road
Provide Guardrail, terminal and transitions that meet current
standards
Tukwila 2
Frank Zepp
180th Street
Provide bridge rail that meet current standards
Tukwila 3
Lois T Newton
Stander Boulevard
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 6
Foster 56th Ave South
56th Avenue South
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 8
Grady Way
Grady Way
Provide Guardrail, terminal and transitions that meet current
standards
Tukwila 9
East Marginal Way
East Marginal Way
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 11
Boeing Access Road - Airport Way
Boeing Access Road
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 13
Beacon Ave South
Victor Street
Provide bridge rail, guardrail, terminal and transitions that meet
current standards
Tukwila 14
42nd Avenue South
42nd Avenue South
Provide Guardrail, terminal and transitions that meet current
standards
Note: See individual bridge reports in Public Works for detailed repair work.
4
40
Bridges Repair Recommendations
PRIORITY CODE 'A'
Highest Priority - Structural integrity and safety involved.
PRIORITY CODE 'B'
Regular Priority - General bridge structural repair work not requiring immediate response.
PRIORITY CODE 'C'
Low Priority - General minor maintenance or other work to be accomplished as time and money permit.
PRIORITY CODE 'M
Monitor - The repair or item described needs to be monitored at the rate indicated.
Note: See individual
bridge reports in Public Works for detailed repair work.
Bridge Number
Bridge Name
Location
Repair Recommendations
Priority
Inspection
Date
Tukwila 1
Macadam
Macadam
1. No repairs recommended at this time.
NA
27 -Apr -21
Tukwila 2
Frank Zepp
180th Street
1. Remove timber planks and plywood between stringers at span 3.
2. Replace bearings at Pier 3 girders I, J, and K
B
B
7 -Apr -21
Tukwila 3
Lois Newton
Strander Blvd
1. No repairs recommended at this time.
NA
27 -Apr -21
Tukwila 5
South center
Blvd
SC Blvd
1. Rreplace missing block spacer on guardrail post
2. Fix broken light above pile 2c
3. Trim the trees on the north side of the bridge.
C
B
B
4 -Aug -20
Tukwila 6
Foster 56th
Ave S
56th Ave S
1. Fill scour void under SE wingwall
2. Replace expansion joint material
3. Repair damaged guardrail terminal end
4. Develop scour action plan
B
B
B
B
22 -Apr -21
Tukwila 7
51st Ave S
51st Ave S
1. Apply deck sealer to prevent ponding water to leak in to the box girders
2. Repair spalls at north expansion joint
3. Investigate waterline in box girder
4. Repair northwest rail terminal
5. Remove trees at Pier 2
B
B
A
B
B
22 -Apr -21
Tukwila 8
(Renton -Tukwila
Joint Ownership)
Grady Way
Grady Way
1. Repair vertical sliding surfaces on columns
2. Repair damage bridge rail (spalling and delamination's)
3. Clean plugged Drains at NW approach
4. Repair pedestrian fencing
5. Clear out material between bearings at Abutment 1
6. Repair metal bridge rail at NW approach
7. Remove vegetation on retaining wall
8. Clear sidewalk debris
B
B
B
B
B
B
C
C
13 -Apr -21
Tukwila 9
E Marginal
Wa y
E Marginal Way
1. Replace compression seals at expansion joints
2. Develop scour plan
3. Secure access hatch at south side
B
C
A
13 -Apr -21
Tukwila 11
BAR Airport
Way
Boeing Access
Road
1. Repair bridge rail damage
2. Roughen approach slabs
B
C
14 -Apr -21
Tukwila 12
BAR BNSF
Boeing access
road
1. Repair the southeast approach rail.
2. Clean bridge deck and sidewalk
B
M
14 -Apr -21
Tukwila 13
Beacon Ave
South
At Victor Street
1. Repair interior lighting.
B
8 -Apr -21
Tukwila 14
42nd Ave S
42nd Ave 5
1. Clean out open joints over floor beams thoroughly and fill with a flexible sealant, priority 1 due to corrosion at top flanges of floor beams from leaking
joints.
2. Rework the sliding plate expansion joint so it is smooth with sidewalk and patch spalls near panel points, seal open cracks.
3. Replace missing guard rail and terminal at SW corner, replace damaged rail at SE corner, reset NW rail and posts to bring rail up to standard height.
4. Thoroughly pressure wash clean truss of all dirt/algae/guano, prepare surface, paint bridge to encapsulate pack rust and protect truss members. Add bird
deterrent at all panel points, upper and lower chords.
5. Replace steel sliding plate expansion joints with either a strip seal with steel header or modular joint to eliminate water intrusion onto steel bearings.
6. Recommend design seismic retrofit steel collar and construct around bearing columns, anchored to cap, then fill tight with epoxy.
7. FRP wrap columns 4 A -C. Reinforce west wingwall. Add quarry spall along abutment 4 and under span 3 to retain fill and discourage transient activity.
8. Replace missing riprap along banks and in front of piers.
9. Recommend raising portals and sways due to the high volume of truck traffic and existing damage to sway members.
10. Replace sliding plates with elastomeric dynamic isolation bearings.
11. Chip any delaminated concrete from exposed rebar, clean and seal exposed bar and patch spalls. Sack honeycombed areas throughout soffit. Shotblast
deck surface, patch spelled areas and apply epoxy overlay.
12. Replace broken gas pipe couplers.
h CO CO CO 03 CO 03 CO 03 CO CO 03 CO
20 -Apr -21
Tukwila 15
Pacific Hwy
Pacific/TIB at
Duwamish
1. Repair leaky pipe inside the west girder
2. Arrest channel erosion along the south bank
3. Repair the approach guardrails at the southwest, southeast, and northeast ends
4. Apply epoxy overlay on the bridge deck
5. Spot paint at slice locations to extend paint life
< < 03 U CO
4 -Aug -20
Tukwila 16
S 119th
Pedestrian
5 119th Street
1. Repair warped and twisted deck planks, deck has non-skid coating but timber is still weathered
2. Major rehabilitation or replacement in near future
3. Special inspection requested to inspect the underside of the superstructure
4. Replace areas of top boards
B
A
A
A
27 -Apr -21
Tukwila 17
Foster Golf
Course
Foster GC
1. Monitor bearing movement at Abutment 1
2. Remove blackberry bushes under the bridge
M
C
11 -Apr -19
Tukwila 18
Green River
Interurban trail
near 180th
1. Monitor utility pipe alignment
2. Repair chord patching material debonding
3. Repair and replace rotting timber pedestrian rail
4. Paint entire superstructure
5. Perform in-depth inspection
M
B
B
B
M
19 -Aug -20
Tukwila 19
Interurban Trail
Interurban Trail
1. No repairs noted
11 -Sep -18
Tukwila 20
180th Ped
Interurban trail
at 180th
1. Monitor leaching cracks in abutment and retaining walls
2. Remove debris from bearing seat
3. Repair approach settlement
4. Repair broken conduit splices
5. Replace and repair approach bollards
M
C
B
B
B
19 -Aug -20
Tukwila 21
Fort Dent Road
Fort Dent Road
1. Trim vegetation overhanging along sidewalk
2. Repair/replace wire cover plate at the NE approach
3. Post clearance at trail undercrossing under Span 3
C
C
C
19 -Aug -20
Tukwila 22
Fort Dent Trail
Interurban trail
1. Trim overgrowing vegetation at approaches
2. Remove debris on chords of bridge girders
3. Replace missing safety chains at corners of bridge
4. Replace popped bolts at diagonal bracing
5. Smooth out approach pathway at approach header
C
M
B
B
B
19 -Aug -20
Tukwila 24
Klickitat Drive
Klickitat Drive
1. No repairs noted
NA
22 -Apr -21
Tukwila 25
Tuk Urban Ped
Bridge
Green River
Trail
1. No repairs noted
NA
27 -Oct -20
4001 (Kent-
Tukwila Joint
Ownership)
196 -200th
196th Street
1. Repair joints and seals
2. Clean deck drains
B
B
7 -Apr -21
5
41
Bridge Average Daily Traffic (ADT)
Bridge
Number
Name
Year Built
Structure ID
ADT
Next ADT Reqd
(5 yr Cycle)
Tukwila 01
Macadam Road
1997
08674200
3,600
2024
Tukwila 02
Frank Zepp
1968
08561400
36,000
2022
Tukwila 03
Lois T Newton
1973
08544400
18,900
2021
Tukwila 05
South -center Blvd
1994
0014269D
10,616
2023
Tukwila 06
Foster 56th Ave
1985
08166200
2,850
2024
Tukwila 07
51st Ave South
1996
08634500
4,600
2024
Tukwila 08
Grady Way
1986
08543600
26,000
2024
Tukwila 09
E Marginal Way
1989
08110200
13,000
2024
Tukwila 11
BAR Airport Way
1952
08001800
40,000
2024
Tukwila 12
BAR BNSF
1945
08002500
40,000
2021
Tukwila 13
Beacon Ave S
1971
7996800
550
2020*
Tukwila 14
42nd Ave S
1949
08651500
10,300
2023
Tukwila 15
Pacific Hwy
2000
08651500
30,300
2021
Tukwila 21
Fort Dent Road
1975
08328300
1,115
2023
Tukwila 24
Klickitat
2012
08853600
14,024
2023
4001
196 -200th
1998
08712100
17,406
2023
*Traffic counts were not recorded in 2020 due to inconsistencies in traffic volumes.
6
42
2010 - 2020 Bridges Maintenance and Repair History
Bridge
Number
Bridge Name
Year
Amount
Repair/Maintenance
Tukwila 2
Frank Zepp
2015
$2.6M
Paint steel, deck overlay, replace deck joint,
seismic protection
Tukwila 8
Grady Way
2015
$350K
Seismic protection
Tukwila 11
Boeing Access
Road - Airport
Way
2021
$1.6M
Siesmic Retro Fit
Tukwila 12
Boeing Access
Road BNRR
2019
$10M
Siesmic Retrofit and deck repair
Tukwila 13
Beacon Ave
South
2015
$1.1M
Replace bridge deck and paint steel
Tukwila 14
42nd Avenue
South
1994
*
Paint Truss
Tukwila 14
42nd Avenue
South
2017
$17k
42nd Ave S Bridge Structural Assessment
Tukwila 14
42nd Avenue
South
2020
$39K
In-depth inspection beyond the King County
inspections
Tukwila 16
S 119th St
2015
$100K
Paint and timber repair,
Tukwila 18
Green River
2007
$100K
Paint and timber repair
Tukwila 18
Green River
2008
$126K
Paint and timber repair
4001
196th/200th
2019
$500K
Approach Slab repair
* Unable to verify cost as project cost data is typical kept for 6 years and project was performed before the City's
current project tracking system
7 43
Annual Bridge Maintenance and Repair In-
house Labor Hours
Year
Hours
2011
45
2012
35
2013
167
2014
108
2015
131
2016
283
2017
121
2018
126
2019
151
2020
62
Annual Average
122.9
Total
1229
8
44
DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E
King County
Road Services Division
Department of Local Services
201 South Jackson Street
KSC-LS-0315
Seattle, WA 98104-3856
www.metrokc.gov/roads
September 3, 2021
Hari Ponnekanti
Public Works Director
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188-2544
RE: Inspection of City of Tukwila Bridges
Dear Mr. Ponnekanti:
King County bridge engineers inspect the bridges owned by the City of Tukwila, in
accordance with agreements between the City of Tukwila and King County Depai linent of
Local Services. The bridge inspections were conducted as follows:
Under Bridge Inspection Truck (UBIT)
April 7, 2021 No. TUKxNx02, Frank Zepp Bridge
No. 4001 196th — 200th Street Bridge
April 20, 2021 No. TUKxNx14, 42nd Ave South Bridge (FC)
Fracture Critical (FC) Inspections
April 08, 2021 No. TUKxNx13, Beacon Ave South Bridge (FC)
Routine Inspections
April 13, 2021
No. TUKxNx09, East Marginal Way Bridge
No. TUKxNx08, Grady Way Bridge
April 14, 2021 No. TUKxNx12, Boeing Access Road
No. TUKxNx11, S Bar Over Airport Way
April 22, 2021 No. TUKxNx24, Klickitat Bridge
No. TUKxNx06, Foster 56th Ave South Bridge
No. TUKxNx07, 51' Ave South Bridge
April 27, 2021 No. TUKxNx01, Macadam Road Bridge
No. TUKxNx03, Lois T Newton Bridge
No. TUKxPx16, South 119th Ped Bridge
August 02, 2021 No. TUKxNx11, S Bar Over Airport Way
45
DocuSign Envelope ID: 197832D5 -6C1 E-45C0-A9A2-4A4C3281 BC3E
Hari Ponnekanti
September 3, 2021
Page 2
Enclosed are the reports from the bridge inspections and the actions we recommend you take
to maintain the bridges. We submit the data in the report to Washington State Department of
Transportation (WSDOT), in accordance with state and federal laws, to inform them of the
bridge's condition and to assure them the bridge has been inspected on a timely basis. The
information is incorporated into state and federal databases.
The bridge inspection report is divided into three main sections. The first section consists of
three parts: the National Bridge Inspection Standards (NBIS) elements, Load Capacity
Information, and Inspections Performed. The NBIS fields, which are numbered 1657 to 1687
are used for rating the components of the bridge. In general, the codes rate the components
from eight (best) to one (worst); however, other rating scales apply to some of the fields in
this first section. Explanations of these codes are found in the Washington State Bridge
Inspection Manual (http://www.wsdot.wa.gov/TA/Operations/BRIDGE/BIC.html).
The second section of the report, Bridge Management System (BMS) Elements, lists
quantities and rates them, breaking down the condition of each component into categories that
indicate how widespread a component is deteriorated. State 1 is best; State 4 is worst.
The third section consists of three parts: Notes, Repairs, and Inspection Resources Required.
The Notes section is comprised of information that provides details of the numbered fields in
the first two sections. Please note that any deficiencies listed in the "Repairs" section are
prioritized between 1 - High priority, and 3 - Low priority. The Resources Required section
indicates any special equipment or tools used to inspect the bridge.
I hope this letter helps you in reviewing these inspection reports. We recommend that the City
of Tukwila bridges continue to be inspected on a 24 -month schedule. Our next scheduled
inspections of the City of Tukwila Bridges will be in spring 2022. Please call Margaret
Germeaux at 206-477-3539 if you need any additional information. We appreciate assisting
your city with bridge engineering and inspection services.
Sincerely,
DocuSigned by: ''''
1 j ra U``
38420FF2A3BC444...
Larry Jaramillo, P.E.
Managing Engineer
Bridge and Structural Design Unit
LJ:MH:mr
Enclosures
cc: Rey Sugui, Program Analyst, Road Services Division (RSD), Department of
Local Services (DLS)
Margaret Germeaux, Engineer III, Bridge and Construction Unit, RSD, DLS
(w/ enclosures)
46
f
III
s
SEATTLE
L
Nth
414L,
B URIEN
S 128th
H
I
S 160th Ste)
e)
5164
aIS 161s
1
IIF
168th St
Wig BlvdCorporat
Crporat
Minkler Blk'd
Js
� = i
3
1 RENTON
Upland Dr
Midland D
Costco Dr
Triland Dr
0
180th St
Dr
U:\PW Eng \ GIS \General Maps\Bridges_24x36_Aug2018.mxd
Date: 09/04/18 By: R. Lingo
KENT
City of
Tukwila
Bridges
S
Not to Scale
NBIS Vehicle Bridges
1) Macadam Road
2) Frank Zepp Bridge (S 180th St)
3) Louis T. Newton Bridge (Strander Blvd)
4) Southcenter Green River Bridge
5) Foster 56th Ave S
6) 51st Ave S
7) East Marginal Way
8) Boeing Access Road Bridge over Airport Way
9) Boeing Access Road Bridge over BNSF
10) Beacon Ave S
11)42nd Ave S
12) Pacific Highway/TIB
13) Fort Dent Park Bridge
14) Klickitat Drive
Jointly Owned NBIS Vehicle Bridges
15) Grady Way (Renton)
16) S 196th SLS 200th St (Kent)
Pedestrian Bridges
17) S 119th Pedestrian Bridge
18) Foster Golf Course Bridge
19) Green River Pedestrian and Utility Bridge
20) Interurban Trail Bridge
21) S 180th Pedestrian Bridge
22) Fort Dent Trail Bridge
23) TUC Pedestrian Bridge
24) Klickitat Elevated Walkway
Vicinity Map
Disclaimer:
The location of features and boundaries
are approximate and are intended for
reference only. Data is based on best
information available.
CITY 0 TUKW LA CAPITAL PRO ECT SUM RY
2021 o 026
PRO ECT: nnual Bridge Inspections and Repairs Project No. 9XX10402
DESCRIPTION: 0 going program of bi-annual inspections, repairs, painting and rehabilitation of the 22 City bridges.
Federally required program identifies safety or repair needs in the early stages to m nim ze hazards and
JUSTIFICATIO : costs. The num er of bridge inspections necessary each year can vary year to year. Inspection frequencies
vary from bridge to bridge and King County has provided som inspection services.
STATUS: Construction projects will be determ ned from inspection reports and noted deficiencies/problem .
M INT. IM ACT: Reduces m intenance costs.
CO NT: 0 going project, only one year actuals are shown in the first colum .
FINANCIAL
(in $000's)
hrough stim ted
2019 2020
021 022 023 024 025 026 BEYO D 0 AL
EXPENSES
Inspections
111
5
5
5
10
15
20
25
30
906
Land (R/W
0
Const. M .
3
0
5
5
5
5
5
158
Construction
314
50
5
0
5
0
5
889
TO AL EXPENSES
68
35
5
5
00
00
00
00
00
,953
FUND SO RCES
Awarded G ant
Proposed G ant
0
M tigation Actual
0
M tigation Expected
0
City 0 er. Revenue
68
35
5
5
00
00
00
00
00
,953
TO AL SO RCES
68
35
5
5
00
00
00
00
00
,953
2021 - 2026 Capital Im rovem nt Program
13
48