Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D17-0299 - CLOUD NINE CREAMERY - TENANT IMPROVEMENT
CLOUD NINE CREAMERY 191 SOUTHCENTER MALL 017-0299 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 9202470130 191 SOUTHCENTER MALL Project Name: CLOUD NINE CREAMERY Permit Number: Issue Date: Permit Expires On: D17-0299 12/4/2017 6/2/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, WA, 92013 ANDREW HAGEE 6617 S 193RD PL, SUITE P-102 , KENT, WA, 98032 OWNER AFFIDAVIT Lender: Name: ANDREW HAGEE Address: 27828 49 AVE S , AUBURN, WA, 98001 Phone: (206) 992-6892 Phone: Expiration Date: DESCRIPTION OF WORK: TENANT IMPROVEMENT - FOR NITROGEN INFUSED ICRE CREAM FOOD SERVICE BUSINESS. Project Valuation: $150,000.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $3,463.44 Occupancy per IBC: M Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Volumes: Cut: 0 Fill: 0 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: No lifPermit Center Authorized Signature: �`% Vt V" lu Date:( 1 hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: a/04/C7 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: New suspended ceiling grid and light fixture installations shall meet the seismic design requirements for nonstructural components. ASCE 7, Chapter 13. 5: Partition walls shall not be tied to a suspended ceiling grid. All partitions greater than 6 feet in height shall be laterally braced to the building structure. Such bracing shall be independent of any ceiling splay bracing. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: All food preparation establishments must have Seattle/King County Department of Public Health sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection shall be made by calling Seattle/King County Department of Public Health, (1-800-325-6165 ext 9-566), at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by the agency on the job site. 8: Fire retardant treated wood shall have a flame spread of not greater than 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 9: Special inspection for sprayed fire-resistant materials applied to structural elements and decks is required. Special inspections shall be based on the fire -resistance design as designated in the approved construction documents. 10: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or greater in height. 11: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 12: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 13: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 14: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisionsof the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 15: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 43: THE INSTALLATION OF THE LIQUID NITROGEN TANK, PIPING AND DISPENSING SHALL STRICTLY COMPLY WITH THE APPLICABLE PROVISIONS OF INTERNATIONAL FIRE CODE CHAPTER 55 (CRYOGENIC FLUIDS). A HARD COPY OF CHAPTER 55 HAS BEEN INCLUDED WITH THIS PERMIT. 19: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (3A, 40B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 5.4) 16: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 17: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 18: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 7.2, 7.3) 20: Maintain fire extinguisher coverage throughout. 21: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1010.1.9) 22: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 23: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 24: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1010.1.9.1) 25: Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30,480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (IFC 1013.1) 26: Every exit sign and directional exit sign shall have plainly legible letters not less than 6 inches (152 mm) high with the principal strokes of the letters not less than 0.75 inch (19.1 mm) wide. The word "EXIT" shall have letters having a width not less than 2 inches (51 mm) wide except the letter "I", and the minimum spacing between letters shall not be less than 0.375 inch (9.5 mm). Signs larger than the minimum established in the International Fire Code shall have letter widths, strokes and spacing in proportion to their height. The word "EXIT" shall be in high contrast with the background and shall be clearly discernible when the exit sign illumination means is or is not energized. If an arrow is provided as part of the exit sign, the construction shall be such that the arrow direction cannot be readily changed. (IFC 1013.6.1) 27: Aisles and aisle access ways serving as a portion of the exit access in the means of egress system shall comply with the requirements of this section. Aisles or aisle access ways shall be provided from all occupied portions of the exit access which contain seats, tables, furnishings, displays and similar fixtures or equipment. The required width of aisles shall be unobstructed. (IFC 1018.1) 28: Exit signs shall be illuminated at all times. To ensure continued illumination for a duration of not less than 90 minutes in case of primary power loss, the sign illumination means shall be connected to an emergency power system provided from storage batteries, unit equipment or on-site generator. (IFC 1013.6.3) 29: Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot-candle (11 lux) and a minimum at any point of 0.1 foot-candle (1 lux) measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot-candle (6 lux) average and a minimum at any point of 0.06 foot-candle (0.6 lux) at the end of the emergency lighting time duration. A maximum-to-minimum illumination uniformity ratio of 40 to 1 shall not be exceeded. (IFC 1008.3.5) 33: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards. (IFC 901.4) 31: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide. (NFPA 13-8.6.5.3.3) 30: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2436). 34: A fire alarm system is required for this project. The fire alarm system shall meet the requirements of N.F.P.A. 72 and City Ordinance #2437. 36: Maintain fire alarm systemaudible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 35: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 37: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 38: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 39: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.11 of the International Building Code. 40: Post address on storefront per approved Westfield standards. 32: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 41: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 42: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0611 EMERGENCY LIGHTING 1400 FIRE FINAL 0409 FRAMING 0606 GLAZING 0502 LATH/GYPSUM BOARD 0406 SUSPENDED CEILING CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. _ Project No. 17)1-000 Date Application Accepted: Date Application Expires: 11-024a_ Ili 1.11 6.1. it (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 191 Southcenter Mall Tukwila, WA Tenant Name: Cloud Nine Creamery King Co Assessor's Tax No.: Suite Number: 700 PROPERTY OWNER Name: Andrew Hagee Name: Andrew Hagee City: Kent State: WA Zip: 98032 Address: 6617 S 193rd P1 Ste P-102 Email: andrew@cloudninecreamery.com City: Kent State: WA zip: 98032 CONTACT PERSON — person receiving all project communication Name: Andrew Hagee Address: 6617 S 193rd P1 Ste P-102 City: Kent State: WA Zip: 98032 Phone: (206) 992-6892 Fax: Email: andrew@cloudninecreamery.com GENERAL CONTRACTOR INFORMATION Company Name: Address: Address: 1111 Cleveland Ave Suite 102 City: Mount Vernon State: WA Zip: 98273 Phone: (206) 354-7100 Fax: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: H:\Applications\Forms-Applications On Linc\201 1 Applications \Permit Application Revised - 8-9-1 I.docx Rcviscd: August 2011 bh New Tenant: Floor: E Yes ❑..No 1 ARCHITECT OF RECORD Company Name: M2 Architects & Planners Architect Name: Mel A. Maertz Address: 1111 Cleveland Ave Suite 102 City: Mount Vernon State: WA Zip: 98273 Phone: (206) 354-7100 Fax: Email: ENGINEER OF RECORD Company Name: Hultz BHU Engineers Inc. Engineer Name: Rick Hultz Address: 1111 Faucet Ave Suite 100 City: Tacoma State: WA Zip: 98402 Phone: (253) 383-3257 Fax: Email: LENDER/BOND ISSUED (required for projects 55,000 or greater per RCW 19.27.095) Name: , Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION-- 206-431-3670 Valuation of Project (contractor's bid price): $ 150,000 Existing Building Valuation: $ Describe the scope of work (please provide detailed information): Convert an existing Master Cuts hair salon busniess to a Nitrogen Infused ice cream food service busniess called Cloud Nine Creamery. Space is 1463sf and is located at Southcenter Mall (space 700) in Tukwila, WA. The scope of construction work includes, Plumbing, Electrical, HVAC, New Wall Construction, Hard Lid Ceiling Construction and Construction of New Store Front Faceade Consisting of Stor Front Assembly With Upper Faceade Structure. Will there be new rack storage? ❑ Yes 0.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Floor area of accessory dwelling: Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes Compact: Handicap: ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: O Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8-1/2"x 11 "paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Linc\201 1 Applications\Permit Application Revised - 8-9-1 I.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1St Floor god Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Floor area of accessory dwelling: Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes Compact: Handicap: ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: O Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8-1/2"x 11 "paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Linc\201 1 Applications\Permit Application Revised - 8-9-1 I.docx Revised: August 2011 bh Page 2 of 4 PUBLIC WORKS PERMIT INFORMATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District 0 ...Tukwila 0...Water District #125 ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila 0 ...Sewer Use Certificate ❑ .. Highline ❑...Valley View ❑ .. Renton ❑ ... Sewer Availability Provided ❑ .. Renton ❑ .. Seattle Septic System: 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond 0 .. Insurance 0 .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use - Nonprofit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way 0 ❑ ...Total Cut cubic yards ❑ ...Total Fill cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Geotechnical Report ❑ .. Maintenance Agreement(s) ❑ ...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) ❑ .. Right-of-way Use - Profit for less than 72 hours ❑ .. Right-of-way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ ...Permanent Water Meter Size... WO # ❑ ...Temporary Water Meter Size .. WO # ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public 0 Private ❑ ❑ ...Water Main Extension Public ❑ Private 0 0 .. Grease Interceptor ❑ .. Channelization 0 .. Trench Excavation ❑ .. Utility Undergrounding WO # 0 ...Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) 0 ...Water 0 ...Sewer 0 ...Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:\Applications\Forts-Applications On Linc\201 I Applications\Permit Application Revised - 8-9-1 I.docx Revised: August 2011 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER-1��� RIZED AGENT: Signature Date: 10/31/2017 Print Name: Andrew Hagee Day Telephone: (206) 992-6892 Mailing Address: 6617 S 193rd P1 Ste P-102 Kent WA 98032 City State Zip H:\ApplicationsWorms-Applications On Line \201 I Applications\Pcrmit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $2,140.96 D17-0299 Address: 191 SOUTHCENTER MALL Apn: 9202470130 $2,140.96 Credit Card Fee $62.36 Credit Card Fee R000.369.908.00.00 0.00 $62.36 DEVELOPMENT $1,979.83 PERMIT FEE R000.322.100.00.00 0.00 $1,975.33 WASHINGTON STATE SURCHARGE 8640.237.114 0.00 $4.50 TECHNOLOGY FEE $98.77 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12934 R000.322.900.04.00 0.00 $98.77 $2,140.96 Date Paid: Monday, December 04, 2017 Paid By: ANDREW HAGEE Pay Method: CREDIT CARD 004512 Printed: Monday, December 04, 2017 9:45 AM 1 of 1 ?SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS I PermitTRAK ACCOUNT QUANTITY PAID $1,546.16 D17-0299 Address: 191 SOUTHCENTER MALL Apn: 9202470130 $1,322.48 Credit Card Fee $38.52 Credit Card Fee R000.369.908.00.00 0.00 $38.52 DEVELOPMENT $1,283.96 PLAN CHECK FEE 1 R000.345.830.00.00 I 0.00 I $1,283.96 M17-0158 Address: 191 SOUTHCENTER MALL Apn: 9202470130 $60.23 Credit Card Fee $1.75 Credit Card Fee R000.369.908.00.00 0.00 $1.75 MECHANICAL $58.48 PLAN CHECK FEE 1 R000.322.102.00.00 1 0.00 l $58.48 PG17-0142 Address: 191 SOUTHCENTER MALL Apn: 9202470130 $163.45 Credit Card Fee $4.76 Credit Card Fee R000.369.908.00.00 0.00 I $4.76 PLUMBING $132.24 PLAN CHECK FEE R000.322.103.00.00 I 0.00 $132.24 TECHNOLOGY FEE $26.45 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12704 R000.322.900.04.00 0.00 $26.45 $1,546.16 Date Paid: Wednesday, November 01, 2017 Paid By: ANDRES HAGEE Pay Method: CREDIT CARD 00591G Printed: Wednesday, November 01, 2017 2:00 PM 1 of 1 CSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit Ai97-a2eici PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Fro ect:Type e6ai iY "g ,i/ of Inspection: ,621/1-011Y6 ,ih(i+L Address: / Wd' /174-11- 1744S/90 Date Called: pecial Instructions: Special &two< ma +7Rc FINAL) Date Wanted: a.m. .-/5-18 Requester: Phone No: Approved per applicable codes. E Corrections required prior to approval. COMMENTS: z'- )3t1iLD/14-s Inspector: Date: 2 _ / 5. /6 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 D17- 62Rq Project: &WA° ,wA'E- C,' Type of Inspection: BOLD/NG- AANA--I-- Address: / 9/ Z'oa 7f oriyr- MAL: Date Called: - Special Instructions: Date Wanted: 8-18 m Requester: Phone No: Approved per applicable codes. D Corrections required prior to approval. COMMENTS: C WeE/ F (6,m1-m-ozDA Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 D17- 02- Prooj�jjct: Type of Inspection: Address: /9%4%11/41 R "LC Date Called: Special Instructions: • $L PFNOD CI/L/� zrn � ,/ EM,0 ie- L16 Date Wanted: 2-7-1B a. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: -2-740 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: 6000 R C' ••'?-019<— -,'s 's/ Type of Inspection: Address: (p SOU r/ Win“Special Date Called: �.m. p.m. e -/2 Instructions: 8 Date Wanted: 1'2.-2.e'-17 Requester: Phone No: Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: 0 K/ 6 � —(%LiIJ/-�7 / CIA,/ 7D1/Z)14C/Q. D�( d`�R1Wd4 1 ^/'iNY- inspector: Date: 2-2-9.J7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit D1? -c '/9 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 61000 *ii.C. £ II,?Z/ Type of I spection: F tVVik G - Address: l V/ '©vr.z /disc. Date Called: Special Instructions: rr _/ Date Wanted` -/% a.m r-rar: _-"1 p.m. Requester: Lat£ G -ft /14/:�R,�'tu a°(2--22Gy-'Ill Phone No: Approved per applicable codes. L_J Corrections required prior to approval. COMMENTS: 6 -re) C ✓ rte, zs K - j !MLA- ) - DisYw c- Inspector: Date: 12 25-'7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Btvd., Suite 100. Catt to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 br7-02-49 Project: cwui) )Y1)14" eRgArvtaal Type of Inspection: > rA-►'4i N,6 Address: 1, i+ Sovr CIATMA Date Called: Special Instructions: Date Wanted: l z -18 .17 a.m. p.m. Requester: e 66- 64-gS7?-. Phone No: ❑ Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: 0s Date: /2—/70 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit N\ ,v; LI/ 7- — 7j7 _5 -Zia PERMIT NUMBERS 'CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: // C�LPJVqd ,/ /e cc -e 0--- Type of Inspection: FrceLoa Address:/Contact Suite #: 7) S c- MA, ( t Person: Special Instructions: f*'- Phone No.: 1 Approved ----- proved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: f*'- Occupancy Type: � f'7(f -'Fir /7-1------ 4 le -- t f ' ri-/1 !ter /.--1 o r CovtdaP.... 6i V.--).40 ° or 6v51,--1 E -SS , -ci 0'04 Zhwi g, Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: Ayi ' 4-- Date: 0 hi ii K Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. CaII to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 INSPECTION NUMBER INSPECTION RECORD_ Retain a copy with. permit PERMIT NUMBERS CITY OF TUKWILA FIRE -DE ARTMENT 206-575-4407 '`- `Typ oe oe f Inspection: ! C 67)(2_,_a sf �,t� Project: / � T a&-t4 iD Ni C -� a&� Address: f,) Suite#: <(: ,n Contact Person: Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: . Fire Alarm: _..s l l M C-4 tib !/ e— (tr-rt---7,:j/!" 4 -- t Pre -Fire: Permits: P12- (f•i k t C:lYL.. -7,,,-, L . j0pliit- li _.._ Needs Shift Inspection: Sprinklers: L/-eS Fire Alarm: ' /.t S Hood & Duct: Monitor: t Pre -Fire: Permits: Occupancy Type: Inspector: C-4------- Date: Z/ ?hce Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit t�- 99 PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project:,-1Type (....:- ia.,1C, / of Inspection: ()L/e r Address:,Contact Suite #: /! SC /14,61/ Person: R Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ocz -1-v Co Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: ? / v? S3 Date: //eV/ Hrs.: /. 0 / $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 Pev14.;4- pu,vke- - Where corrosive materials are dispensed or used, mechanical exhaust ventilation in accordance with Section 5005.2.1.1 shall be provided. 5405.2 Outdoor use. The outdoor use of corrosive materials in amounts exceeding the maximum allowable quantity per control area indicated in Table 5003.1.1(4) shall be in accordance with Sections 5001, 5003 and 5005 and this chapter. 5405.2.1 Distance from use to exposures. Outdoor use of corrosive materials shall be located in accordance with Section 5404.2.2. CCHAPTER-55 (CRYOGENICTLUIDS SECTION 5501 GENERAL 5501.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter and NFPA 55. Cryogenic fluids dassified as hazardous materials shall also comply with the general requirements of Chapter 50. Partially full containers containing residual cryogenic fluids shall be considered as full for the purposes of the controls required. Exceptions: 1. Fluids used as refrigerants in refrigeration systems (see Section 606). 2. Liquefied natural gas (LNG), which shall comply with NFPA 59A. Oxidizing cryogenic fluids, including oxygen, shall comply with Chapter 63, as applicable. Flammable cryogenic fluids, including hydrogen, methane and carbon monoxide, shall comply with Chapters 23 and 58, as applicable. Inert cryogenic fluids, including argon, helium and nitrogen, shall comply with ANSI/CGA P-18. 5501.2 Permits. Permits shall be required as set forth in Section 105.6. 5502.1 Definitions. The following terms are defined in Chapter 2. CRYOGENIC CONTAINER. CRYOGENIC FLUID. SECTION 5502 DEFINITIONS FOL. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tt.ikwilai BUILDING DIVISION CRYOGENIC VESSEL. FLAMMABLE CRYOGENIC FLUID. LOW-PRESSURE TANK. SECTION 5503 GENERAL REQUIREMENTS 5503.1 Containers. Containers employed for storage or use of cryogenic fluids shall comply with Sections 5503.1.1 through 5503.1.3.2 and Chapter 50. 5503.1.1 Nonstandard containers. Containers, equipment and devices that are not in compliance with recognized standards for design and construction shall be approved upon presentation of satisfactory evidence that they are designed and constructed for safe operation. 5503.1.1.1 Data submitted for approval. The following data shall be submitted to the fire code official with reference to the deviation from the recognized standard with the application for approval. 1. Type and use of container, equipment or device. 2. Material to be stored, usecl or transported. 3. Description showing dimensions and materials used in construction. 4. Design pressure, maximum operating pressure and test pressure. 5. Type, size and setting of pressure relief devices. 6. Other data requested by the fire code official. 5503.1.2 Concrete containers. Concrete containers shall be built in accordance with the International Building Code. Barrier materials and membranes used in connection with concrete, but not functioning structurally, shall be compatible with the materials contained. 5503.1.3 Foundations and supports. Containers shall be provided with substantial concrete or masonry foundations, or structural steel supports on firm concrete or masonry foundations. Containers shall be supported to prevent the concentration of excessive loads on the supporting portion of the shell. Foundations for horizontal containers shall be constructed to accommodate expansion and contraction of the container. Foundations shall be provided to support the weight of vaporizers or heat exchangers. 5503.1.3.1 Temperature effects, Where container foundations or supports are subject to exposure to temperatures below -130'F (-90'C), the foundations or supports shall be constructed of materials to withstand the low-temperature effects of cryogenic fluid spillage. 5503.1.3.2 Corrosion protection. Portions of containers in contact with foundations or saddles shall be painted to protect against corrosion. 5503.2 Pressure relief devices. Pressure relief devices shall be provided in accordance with Sections 5503.2.1 through 5503.2.7 to protect containers and systems containing cryogenic fluids from rupture in the event of overpressure. Pressure relief devices shall be designed in accordance with CGA S-1.1, CGA S-1.2 and CGA S-1.3. 5503.2.1 Containers. Containers shall be provided with pressure relief devices. 5503.2.2 Vessels or equipment other than containers. Heat exchangers, vaporizers, insulation casings surrounding containers, vessels and coaxial piping systems in which liquefied cryogenic fluids could be trapped because of leakage from the primary container shall be provided with a pressure relief device. 5503.2.3 Sizing. Pressure relief devices shall be sized in accordance with the specifications to which the container was fabricated. The relief device shall have sufficient capacity to prevent the maximum design pressure of the container or system from being exceeded. 5503.2.4 Accessibility. Pressure relief devices shall be located such that they are provided with ready access for inspection and repair. 5503.2.5 Arrangement. Pressure relief devices shall be arranged to discharge unobstructed to the open air in such a manner as to prevent impingement of escaping gas on personnel, containers, equipment and adjacent structures or to enter enclosed spaces. Exception: DOTn-specified containers with an internal volume of 2 cubic feet (0.057 m3) or less. 5503.2.6 Shutoffs between pressure relief devices and containers. Shutoff valves shall not be installed between pressure relief devices and containers. Exceptions: 1. A shutoff valve is allowed on containers equipped with multiple pressure relief device installations where the arrangement of the valves provides the full required flow through the minimum number of required relief devices at all times. 2. A locking -type shutoff valve is allowed to be used upstream of the pressure relief device for service -related work performed by the supplier when in accordance with the requirements of the ASME Boiler and Pressure Vessel Code. 5503.2.7 Temperature limits. Pressure relief devices shall not be subjected to cryogenic fluid temperatures except when operating. 5503.3 Pressure relief vent piping. Pressure relief vent -piping systems shall be constructed and arranged so as to remain functional and direct the flow of gas to a safe location in accordance with Sections 5503.3.1 and 5503.3.2. 5503.3.1 Sizing. Pressure relief device vent piping shall have a cross-sectional area not less than that of the pressure relief device vent opening and shalI':be arranged so as not to restrict the flow of escaping gas. 5503.3.2 Arrangement. Pressure relief device vent piping and drains in vent lines shall be arranged so that escaping gas will discharge unobstructed to the open air and not impinge on personnel, containers, equipment and adjacent structures or enter enclosed spaces. Pressure relief device vent lines shall be installed in such a manner to exclude or remove moisture and condensation and prevent malfunction of the pressure relief device because of freezing or ice accumulation. 5503.4 Marking. Cryogenic containers and systems shall be marked in accordance with Sections 5503.4.1 through 5503.4.6. 5503.4.1 Identification signs. Visible hazard identification signs in accordance with NFPA 704 shall be provided at entrances to buildings or areas in which cryogenic fluids are stored, handled or used. 5503.4.2 Identification of contents. Stationary and portable containers shall be marked with the name of the gas contained. Stationary above -ground containers shall be placarded in accordance with Sections 5003.5 and 5003.6. Portable containers shall be identified in accordance with CGA C-7. 5503.4.3 Identification of containers. Stationary containers shall be identified with the manufacturing specification and maximum allowable working pressure with a permanent nameplate. The nameplate shall be installed on the container in an accessible location. The nameplate shall be marked in accordance with the ASME Boiler and Pressure Vessel Code or DOTn 49 CFR Parts 100-185. 5503.4.4 Identification of container connections. Container inlet and outlet connections, liquid -level limit controls, valves and pressure gauges shall be identified in accordance with one of the following: 1. Marked with a permanent tag or label identifying the function. 2. Identified by a schematic drawing that portrays the function and designates whether connected to the vapor or liquid space of the container. Where a schematic drawing is provided, it shall be attached to the container and maintained in a legible condition. 5503.4.5 Identification of piping systems. Piping systems shall be identified in accordance with ASME A13.1. 5503.4.6 Identification of emergency shutoff valves. Emergency shutoff valves shall be identified and the location shall be clearly visible and indicated by means of a sign. 5503.5 Security. Cryogenic containers and systems shelf be secured against accidental dislodgement and against access by unauthorized personnel in accordance with Sections 5503.5.1 through 5503.5.4. 5503.5.1 Security of areas. Containers and systems shall be secured against unauthorized entry and safeguarded in an approved manner. 5503.5.2 Securing of containers. Stationary containers shall be secured to foundations in accordance with the Intemational Building Code. Portable containers subject to shifting or upset shall be secured. Nesting shall be an acceptable means of securing containers. 5503.5.3 Securing of vaporizers. Vaporizers, heat exchangers and similar equipment shall be anchored to a suitable foundation and its connecting piping shall be sufficiently flexible to provide for the effects of expansion and contraction due to temperature changes. 5503.5.4 Physical protection. Containers, piping, valves, pressure relief devices, regulating equipment and other appurtenances shall be protected against physical damage and tampering. 5503.6 Electrical wiring and equipment. Electrical wiring and equipment shall comply with NFPA 70 and Sections 5503.6.1 and 5503.6.2. 5503.6.1 Location. Containers and systems shall not be located where they could become part of an electrical circuit. 5503.6.2 Electrical grounding and bonding. Containers and systems shall not be used for electrical grounding. Where electrical grounding and bonding is required, the system shall comply with NFPA 70. The grounding system shall be protected against corrosion, including corrosion caused by stray electric currents. 5503.7 Service and repair. Service, repair, modification or removal of valves, pressure relief devices or other container appurtenances shall comply with Sections 5503 7.1 and 5503.7.2 and the ASME Boiler and Pressure Vessel Code, Section VIII or DOTn 49 CFR Parts 100-185. 5503.7.1 Containers. Containers that have been removed from service shall be handled in an approved manner. 5503.7.2 Systems. Service and repair of systems shall be performed by trained personnel. 5503.8 Unauthorized use. Containers shall not be used for any purpose other than to serve as a vessel for containing the product that it is designed to contain. 5503.9 Leaks, damage and corrosion. Leaking, damaged or corroded containers shall be removed from service. Leaking, damaged or corroded systems shall be replaced, repairet1 or removed in accordance with Section 5503.7. 5503.10 Lighting. Where required, lighting, including emergency lighting, shall be provided for fire appliances and operating facilities such as walkways, control valves and gates ancillary to stationary containers. SECTION 5504 STORAGE 5504.1 General. Storage of containers shall comply with this section. 5504.2 Indoor storage. Indoor storage of containers shall be in accordance with Sections 5504.2.1 through 5504.2.2.3. 5504.2.1 Stationary containers. Stationary containers shall be installed in accordance with the provisions applicable to the type of fluid stored and this section. 5504.2.1.1 Containers. Stationary containers shall comply with Section 5503.1. 5504.2.1.2 Construction of indoor areas. Cryogenic fluids in stationary containers stored indoors shall be located in buildings, rooms or areas constructed in accordance with the International Building Code. 5504.2.1.3 Ventilation. Storage areas for stationary containers shall be ventilated in accordance with the International Mechanical Code. 5504.2.2 Portable containers. Indoor storage of portable containers shall comply with the provisions applicable to the type of fluid stored and Sections 5504.2.2.1 through 5504.2.2.3. 5504.2.2.1 Containers. Portable containers shall comply with Section 5503.1. 5504.2.2.2 Construction of indoor areas. Cryogenic fluids in portable containers stored indoors shall be stored in buildings, rooms or areas constructed in accordance with the International Building Code. 5504.2.2.3 Ventilation. Storage areas shall be ventilated in accordance with the International Mechanical Code. 5504.3 Outdoor storage. Outdoor storage of containers shall be in accordance with Sections 5504.3.1 through 5504.3.1.2.3. 5504.3.1 Separation from hazardous conditions. Cryogenic containers and systems in outdoor storage shall be separated from materials and conditions that pose exposure hazards to or from each other in accordance with Sections 5504.3.1.1 through 5504.3.1.1.5. 5504.3.1.1 Stationary containers. Stationary containers shall be separated from exposure hazards in accordance with the provisions applicable to the type of fluid contained and the minimum separation distances indicated in Table 5504.3.1.1. TABLE 5504.3.1.1 SEPARATION OF STATIONARY CONTAINERS FROM EXPOSURE HAZARDS EXPOSURE MINIMUM DISTANCE (feet) Buildings, regardless of construction type , 1 Building exits 10 Wall openings 1 Air intakes 10 Lot lines 5 Places of public assembly 50 Nonambulatory patient areas .50 Combustible materials such as paper, leaves, weeds, dry grass or debris 15 Other hazardous materials In accordance with Chapter 50 For SI: 1 foot = 304.8 mm. 5504.3.1.1.1 Point -of -fill connections. Remote transfer points and fill connection points shall not be positioned closer to exposures than the minimum distances required for stationary containers. 5504.3.1.1.2 Surfaces beneath. containers. Containers shall be placed on surfaces that are compatible with the fluid in the container. 5504.3.1.1.3 Location. Containers of cryogenic fluids shall not be located within diked areas containing other hazardous materials. 5504.3.1.1.4 Areas subject to flooding. Stationary containers located in areas subject to flooding shall be securely anchored or elevated to prevent the containers from separating from foundations or supports. 5504.3.1.1.5 Drainage. The area surrounding stationary containers shall be provided with a means to prevent accidental discharge of fluids from endangering personnel, containers, equipment and adjacent structures or to enter enclosed spaces. The stationary container shall not be placed where spilled or discharged fluids will be retained around the container. Exception: These provisions shall not apply where it is determined by the fire code official that the container does not constitute a hazard, after consideration of special features such as crushed rock utilized as a heat sink, topographical conditions, nature of occupancy, proximity to structures on the same or adjacent property, and the capacity and construction of containers and character of fluids to be stored. 5504.3.1.2 Outdoor storage of portable containers. Outdoor storage of portable containers shall comply with Section 5503 and Sections 5504.3.1.2.1 through 5504.3.1.2.3. 5504.3.1.2.1 Exposure hazard separation. Portable containers in outdoor storage shall be separated from exposure hazards in accordance with Table 5504.3.1.2.1. TABLE 5504.3.1.2.1 SEPARATION OF PORTABLE CONTAINERS FROM EXPOSURE HAZARDS EXPOSURE MINIMUM DISTANCE (feet) Building exits 10 Wall openings 1 Air intakes 10 Lot lines 5 Combustible materials such as paper, leaves, weeds, dry grass or debris Other hazardous materials In accordance with Chapter 50 For SI: 1 foot = 304.8 mm. 5504.3.1.2.2 Surfaces beneath containers. The surface of the area on which stationary containers are placed, including the surface of the area located below the point where connections are made for the purpose of filling such containers, shall be compatible with the fluid in the container. 5504.3.1.2.3 Drainage. The area surrounding portable containers shall be provided with a means to prevent accidental discharge of fluids from endangering adjacent containers, buildings, equipment or adjoining property. Exception: These provisions shall not apply where it is determined by the fire code official that the container does not constitute a hazard. SECTION 5505 USE AND HANDLING 5505.1 General. Use and handling of cryogenic fluid conttainers and systems shall comply with Sections 5505.1.1 through 5505.5.2. 5505.1.1 Cryogenic fluid systems.. Cryogenic fluid systems shall be suitable for the use intended and designed by persons competent in such design. Equipment, machinery and processes shall be listed or approved. 5505.1.2 Piping systems. Piping, tubing, valves and joints and:fittings conveying cryogenic fluids shall be installed in accordance with the material -specific provisions of Section 5501.1 and Sections 5505.1.2.1 through 5505.1.2.6. 5505.1.2.1 Design and construction. Piping systems shall be suitable for the use intended through the full range of pressure and temperature to which they will be subjected. Piping systems shall be designed and constructed to provide adequate allowance for expansion, contraction, vibration, settlement and fire exposure. 5505.1.2.2 Joints. Joints on container piping and tubing shall be threaded, welded, silver brazed or flanged. 5505.1.2.3 Valves and accessory equipment. Valves and accessory equipment shall be suitable for the intended use at the temperatures of the application and shall be designed and constructed to withstand the maximum pressure at the minimum temperature to which they will be subjected. 5505.1.2.3.1 Shutoff valves -on containers. Shutoff valves shall be provided on all container connections except for pressure relief devices. Shutoff valves shall be provided with access thereto and located as close as practical to the container. 5505.1.2.3.2 Shutoff valves on piping. Shutoff valves shall be installed in piping containing cryogenic fluids where needed to limit the volume of liquid discharged in the event of piping or equipment failure. Pressure relief valves shall be installed where liquid is capable of being trapped between shutoff -valves in the piping system (see Section 5503.2). 5505.1.2.4 Physical protection and support. Piping systems shall be supported and protected from physical damage. Piping passing through walls shall be protected from mechanical damage. 5505.1.2.5 Corrosion protection. Above -ground piping that is subject to corrosion because of exposure to corrosive atmospheres, shall be constructed of materials to resist the corrosive environment or otherwise protected against corrosion. Below -ground piping shall be protected against corrosion. 5505.1.2.6 Testing. Piping systems shall be tested and proven free of leaks after installation as required by the standards to which they were designed and constructed. Test pressures shall be not less than 150 percent of the maximum allowable working pressure where hydraulic testing is conducted or 110 percent where testing is conducted pneumatically. 5505.2 Indoor use. Indoor use of cryogenic fluids shall comply with the material -specific provisions of Section 5501.1. 5505.3 Outdoor use. Outdoor use of cryogenic fluids shall comply with the material specific provisions of Sections 5501.1, 5505.3.1 and 5505.3.2. 5505.3.1 Separation. Distances from lot lines, buildings and exposure hazards shall comply with Section 5504.3 and the material -specific provisions of Section 5501.1. 5505.3.2 Emergency shutoff valves. Manual or automatic emergency shutoff valves shall be provided to shut off the cryogenic fluid supply in case of emergency. An emergency shutoff valve shall be located at the source of supply and at the point where the system enters the building. 5505.4 Filling and dispensing. Filling and dispensing of cryogenic fluids shall comply with Sections 5505.4.1 through 5505.4.3. 5505.4.1 Dispensing areas. Dispensing of cryogenic fluids with physical or health hazards shall be conducted in approved locations. Dispensing indoors shall be conducted in areas constructed in accordance with the International Building Code. 5505.4.1.1 Ventilation. Indoor areas where cryogenic fluids are dispensed shall be ventilated in accordance with the requirements of the International Mechanical Code in a manner that captures any vapor at the point of generation. Exception: Cryogenic fluids that can be demonstrated not to create harmful vapors. 5505.4.1.2 Piping systems. Piping systems utilized for filling or dispensing of cryogenic fluids shall be designed and constructed in accordance with Section 5505_1.2. 5505.4.2 Vehicle loading and unloading areas. Loading or unloading areas shall be conducted in an approved manner in accordance with the standards referenced in Section 5501.1. 5505.4.3 Limit controls. Limit controls shall be provided to prevent overfilling of stationary containers during filling operations. 5505.5 Handling. - Handling of cryogenic containers shall comply with Sections 5505.5.1 and 5505.5.2. 5505.5.1 Carts and trucks. Cryogenic containers shall be moved using an approved method. Where cryogenic containers are moved by hand cart, hand truck or other mobile device, such carts, trucks or devices shall be designed for the secure movement of the container. Carts and trucks used to transport cryogenic containers shall be designed to provide a stable base for the commodities to be transported and shall have a means of restraining containers to prevent accidental dislodgement. 5505.5.2 Closed containers. Pressurized containers shall be transported in a closed condition. Containers designed for use at atmospheric conditions shall be transported with appropriate loose -fitting covers in place to prevent spillage. --C-HA-PTER-56 -EXPLOSIVES--AND-FIREWORKS SECTION -5601 GENERAL._ 5(01.1 Scope. Thi p,rovisions of this chapter shall govern the possession, manufacture, storage, handling, sale and use of explosives, explosive materials, fireworks and small arms ammuThti.n. The manufacture, storage, handling, sale and use of fireworks shall be governed by Chapter 70.77 RCW and by Chapter 212-17 WAC and local ordinances consistent - Chapter 212-17 WAC. Exceptions: 1. The Armed Forces of the n' ed States, Coast Guard or National Guard. 2. Explosives in forms prescribed by the tialUnited States Pharmacopoeia. 3. The possession, storage and use of small arms alta unition where package - cordance with DOTn packaging requirements. 4. The possession, storage and use of not more than 1 poun of commercially manufactured sporting black powder, 20 pounds (9 kg) of smokeless powder and 10,000 small arms primers for hand loading o arms ammuniT6Thfor personal consumption. 5. The use of explosive materials b mal, state and local regulatory, law enforcement and envies acting in their official capacities. 6. Special industrial e I sive devices that in the aggregate contain less than 50 pounds (23 kg) of explosi aterials. 7. The po ssion, storage and use of blank industrial -power load cartridges where packaged in accordancewit�'pockaging regulations. Transportation in accordance with DOTn 49 CFR Parts 100-185. •1 Environmental Health Services Division 401 Fifth Avenue, Suite 1100 Seattle, WA 98104-1818 206-263-9566 Fax 206-296-0189 TTY Relay: 711 www.kingcounty.gov/health October 10, 2017 Andrew Hagee Ally Plumbing 27828 49th Ave S Auburn, WA 98001 206-992-6892 F� Public Health Li Seattle & King County Also Transmitted Via Electronic Mail RECEIVED CITY OF TUKWILA r 1 2017 PERMIT CENTER RE: Plans and Specifications for the proposed new food service estaklishRf tjEWED FOR CODE COMPLIANCE Cloud Nine Creamery APPROVED 191 Southcenter Mall #700, Tukwila, WA 98188 DEC Q 1 2017 SR1402841 PIE - 6713 City of Tukwila Dear Mr. Hagee , BUILDING DIVISION The plans and specifications for the above new project have been reviewed and, in accordance with the provisions of Title 5, the Code of the King County Board of Health Rules and Regulations 05-06 (The Food Code) are hereby APPROVED and subject to the following conditions: • Provide a splash barrier between the 3 -compartment ware -wash sink and the food prep sink in the back room. • Be advised that a "dump sink" is required at the front counter area for dumping waste liquids from barista station and blender activity. There are currently two hand wash sinks proposed in this area ..,one of which can be converted to be a dump sink. The sink in the "Ice Cream Prep' zone should remain the designated hand wash sink. Or, provide an additional sink separate from the existing two hand wash sinks. Your establishment has been assigned the following plan review service number SR1402841. Please use this SR# in all future contact with us. As required in The Food Code, upon completion of the construction and before opening for business, the food service establishment operator/owner shall: 1. Complete the enclosed application for the annual operations permit if you don't have a current permit. Include a copy of this letter when applying for the annual permit. Please call me prior to paying for your permit to verify the correct fee. Be advised that the penalty for commencing operation of a food service establishment without the required permit is 50% of the applicable permit fee. D 11-oti9q 2. Obtain a preoperational inspection approval. Contact Michael Bratcher (206-477-8144) at least one week in advance to schedule a preoperational inspection. Be advised that the permit application/permit fee submittal must be verified before this inspection can take place. It would be best to submit the app/fee at the Eastgate Public Health Center prior to making the appointment. Be sure all other inspections (plumbing, building, etc.) are done before you call the Health Department for an inspection. Your application for a food service establishment permit from Public Health Seattle & King County may be approved during this inspection. However, it is the responsibility of the food service establishment operator/owner to obtain all necessary permits and approvals from other agencies. Operating the establishment without these required permits or approvals may subject the operator/owner to legal action by the appropriate agencies. If the establishment is opened without the Health Department preoperational inspection, it may be subject to closure. Failed preoperational inspections will require a $430.00 fee (+$215.00/hr after 2 hours) for a repeat inspection. Please be aware that additional hourly fees will be charged if the total plan review and preoperational inspection goes beyond the base plan fee for this project. An invoice may be sent to you after the preoperational inspection. Your permit to operate will be sent to you after this fee has been paid. Please also be advised that, once your plans are approved, you will be charged for a plan resubmittal fee of $215.00 per hour should you decide to subsequently change the equipment floor plan. If you have any questions, please don't hesitate to contact me. Thank you for your compliance in this matter and I look forward to seeing you soon. Please refer to the following website for information about the new Food Safety Rating System in King County. http://www. kingcountv.gov/depts/health/environmental-health/food-safety/inspection- s stem/food-safet-ratin•.as•x . 4rcererp11 - Y Aill4 C viewer Senior Health & Environmental Investigator 206-477-8144 Eastgate Public Health Center, 14350 SE Eastgate Way, Bellevue, WA 98007 www.michael.bratcherakinocountv.gov cc: Michelle Herring, HEI, SKCDPH CORRECTION LTR# U Ax6O-1. C3 Multi -gas Safety Monitor X60. AXGO• 0 (WI liigi'1/2 60 is ^a -i .lnt.b wkAtiklogAitiQ ( i onn 901k,e4A f.Oritlkdioxide. . • kgk ga; tic (C 0' Q. - c • 1„ VQK7.4.V ' x 60 ( ,. s pli • W sy o Wes t bra Id Axalyll�/ W M -Aft gal 3gee.�n Mifig4 V14:4 c]+j '►•• I •a •e =c ioncitJ akik dep etion n egra ed +oma ec�1kJM)43LAVA e as at onAmu t1 tat s. e: CrEe GOO i W Twat lo, 4t.Q-0 •jdefa• tt0.) •• I• • mg gbirm3eukftio 19.5% c7 iii �c'7Gcit•1e71 i• - •oingco m (tut ai-- •-• `J 9 arnings6:10 •*itiov4greltit o•elftij Scam• etpoi s nno•n6 FEATURES Central Display Multi -point, multi - gas, distributed monitoring system 4 -channel flexibili allowing any fi sensor combin Central displa for remote ope and control User-configura alarms, setpoin relay outputs Built-in softwa for operation a maintenance tasks Relay output 1 --O. Relay output 2 `• 0 Optional Beacon 0.5% ed REVIEWED FOR tbDE COMPLIAN unit APPROVED ation DEC 01 2011 Universal PSU 100 V to 240. V 50-60 Hz AC input CO2 Sensor CO2 Sensor 02 Sensor k Connect INDUSTRIES You can have 4 alarms per sensor, to a maximum of 8 alarms per system. PROVIDING NICHE CUSTOM GAS DETECTION SINCE 1981 02 Sensor Ft VE.D CITY OF TUKWILA NOV 20 2011 S Manufactured 117, in Great Britain iNALoX Sensor Technology 2, SPECIFICATIONS 6.9'7175mm 5.1'71322mmm 1.7'/45mm 3'772mm Warm-up time: 40 seconds Operating temperature range: -5 'C to +50 'C, +23 °F to +122 °F Approvals: CE, EN50270, IEC 61010 (UL). DIN 6653 (TUV) Warranty: 5 years electronics Central Display Display: LCD dot matrix (backlit) Relays: 2 x configurable relays. rated for 1 A/30 V AC/DC IP Rating: 1P54 Maximum power consumption: <24 W Power supply accepts inputs from: 100 - 200V - 1A Alarm set points can be changed by the user. Strobe: white LED strobe > 100 cd (optional blue, red and amber filters) Sounder: min 80 dBA @3 m (9.8 feet) IP Rating: IP55 Gas detected: carbon dioxide Measurement technique: infrared Range: 0.1% to 5% Default alarm setpoints: 0.5% (8 hour TWA), 1.5%, 3.0% IP Rating: 1P55 Warranty: 5 years Response time: (T9o) <30 seconds Gas detected: oxygen Measurement technique: electrochemical cell Range: 0.1% to 25% Default alarm setpoints: 18.0% (low goin•,R':EGE'IVED CI OF . I KWILA going), 23.0% {high going) IP Rating: IP55 Warranty: 5 years graded Response time: (T90) <30 seconds Analox has a policy of continuous improvement and we reserve the right to upgrade or change specifications without prior notice. ' GRIT CENTER Full technical specifications are available upon request and can be found in the User Manual. • If you require a datasheet in another language please contact us. www.analoxsensortechnology.com eUK: +44 (0) 1642 711400 US: (714) 891-4478 0 info@analox.biz 4NALOX Sensor Technology Po159.861-06 ra..2 REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 MVIP PRD® RIGID PIPE City of Tukwila MODULAR VACUUM INSULATED RIGID PIPE BUILDING DIVISION Technical Specifications Smart inner Number Pipe Size PR -08 -PP, PR -16 -PR PR -24 -PR PR -32 -PR 1" .l 1,2, Outer Jacket Diameter` 3 ,r2: Actual Row Diameter Standard OMerall engtbs "A" .B, Hole Required to Accommodate Pump Out" 0.710" 1.185" 1.770" * Not including pump out. Pump out with no Thermocouple (TC) 3 1/2" 2.245" 2, 3, 4, 5, 6, 15, 13. 20, 30, 2,3, 4,5,6, 10,15,13,20,30' , 4', ',6',10', 15',18',20',30' 5.75" 6.75" 7.500" 7.75" Bayonet FLG O.D. (no clamp; 2.755" 3.761" 4.396" 4.923" Weight! Length 3.0 Ib/ft (3.4 kg!rn) 4.5 lb/ft (6.2 kg/m) 5.5 lb! ft (7.4 kg/m) 6.01b/ft (8.4 kg/m) Approx. 3" Performance Data Smart Number kltm PR -08 -PR - - 39 PR -16 -PR PP, -24 -PR PR -32 -PR * LNa at one bar. 53 55 107 LN2 Flow Guideline Smart Number Pipe Size PR -08 -PR PR -16 -PR Cool Doom Bayonet FLG O.D. (no damp) Hole Required Min. MAWP (pal) 150 150 150 150 ORRE TION .:TR# Static Heat Leak LN, Bayonet Pair Heat Leak kg/rn* lb of LNJft 0.20 0.13 0.29 0.43 0.19 029 0.54 0.36 BTU/hr/it 032 0.48 0.58 0.79 Wattlm 0.31 0.46 0.56 0.76 BTUIhr 14.1 2.0.8 22.1 14.3 Watt 4.13 6.09 6.47 5.65 100ft u" PS 1' PS PR -24 -PR FR -32-88 11" PS 4.8 gpm 29.0 gpm 63.0 gpm 110.0 gpm 200 ft 3.5 gpm 20.0 gpm 50.0 gpm 300 ft 2.9 gpm 16.0 gpm 80.0 gum 42.0 gpm 70.0 gpm Pressure Drop (psi/ftr - Ro+n t9a!lmin} Smart Number 2 ---- - - 88-08-88 0.006 PR -16-88 PR -24 -PR 0.039 O.003 10 0.154 0.011 25 0.964 0.063 50 0.262 400 ft 2.6 apm 12.0 gprn 38.0 gprn 500ft 2.2-gpm 11.0 gpm 62 : jyitFtEC Y 36.0 •m OF ° if�WiLA NOV 20 2017 75 PERMIT 0.570 0.001 0.008 0.002 0.040 0.009 PR -32 -PR *Pressure drop numbers listed do not account for ele 'ation changes. Chart recommends pressure d op be kept to 5 psi or less. 0.070 0.193 1.014 :NTE 0.125 0.034 0.280 0.077 R Your Local Representative US Cryogenics, Inc. Sales • Service • Design • Installation PO Box 57 Washougal, WA 98671 Innovation. Experience. Performance.. 0 2015 Chart Inc. Chart Inc. U.S.:1-888-877-3093 Worldwide:1-952-758-4484 www.MVIPpra.com PN 20819443 MVIP PRO® RIGID PIPE MODULAR VACUUM INSULATED RIGID PIPE All MVIP Pro® Vacuum Insulated Pipe rigid products come with Chart's renowned customer service, from conceptual design to implementation, and are backed by a ten year warranty.* MVIP Pro rigid is an all stainless steel coaxial vacuum insulated piping system. Modular by design, MVIP Pro rigid spools are joined together with shrink fit bayonet connections. Each section is evacuated, sealed and then. tested for vacuum integrity. This advanced piping system minimizes heat gain between the inner carrier pipe and the outer jacket. Chart offers a complete line of components including in-line venting devices, phase separators and gas traps to maximize the system performance. MVIP Pro rigid pipe's smooth bore inner with periodic internal bellows, minimizes pressure drop and improves flow characteristics. By incorporating strategically located flexible sections when required, MVIP Pro rigid is easy to install for both indoor and outdoor installations. MVIP Pro rigid is used in a wide variety of installations including food and beverage, MBE's, environmental temperature chambers, test handlers, nanotechnology and R&D. MVIP Pro Rigid Installation MVIP Pro Rigid Pipe RIGID BENEFITS • MVIP Pro rigid pipe is durable, easy to install and practically maintenance free • Excellent flow characteristics make MVIP Pro rigid ideal for pipe mains MVIP Pro rigid can mate to MVIP Pro flex's bend- able pipe for inside drops • Multilayer superinsulation and chemical Better- ing assures long term vacuum integrity* • Fabricated by an ASME B31.3 code shop by certified welders (TIG Welded) • Rigid sections are less expensive, have better heat leak and less pressure drop than flexible vacuum insulated pipe • Rigid section will not dip between hangers and will minimize gas traps • Rigid sections have a long life and have been known to last as long as 30 years *Chart Vacuum Technology'"" (CVT 10/20): 10 year limited vacuum insulated pipe warranty, 20 year design life. Innovation. Eve ice. Performance.• Chart acuum X11 °logy RECEIV CITY OF TLJKW NOV 20 2011 PERMIT CENTER 7\5- } N 1 2 8 g 8 8 8 5 $68 5 8 2 0 0 0 s 8 8 b 8 5 8 a 8 3 8. D 8 3 3 6 i b 6 8 8 �g 5 8 • 0 8 8 a 8 Y 8 8 8 0 8 8 6 0 0 8 8 p� Y 0 3 8 8 8 8 8 i qY 0 1 0 8 5 E 8 8 8 VALVE. }WM IN FVI Y 0 3 8 8 8 0 8 8 3 8 • 8 8 a a 8 8 3 4 5 8 s • • 0 S 8 b S 8 • S • 0 O_ w 0 go -J 5- Q� o W O� ¢ W0 Li N 5 6 8 0 A O 1e 3 8 88 0 8 0 8 0 0a 4 0 0 8 5 3 8 2 @8 4 REVISION DESCRIPTION • K L.1 c u • • z 0 c c O� -cryqq LIOUIO VALVE ■ OAS USE VALVE VENTWUll TRYCOCN VE ESS.%CO. VALVE 0 Y 3y15 �SSa g� s 124/VP y f. 3 i_ GGS; x803150003 il > i i i i i :,a- a a m < o u O °' t-mlb , =IP 1.7.14 0 r 00'8Sb 99 :ON OMO 3i1s 981.86 VM 'el!M'Inl IIeW Jaluao4lnoS 1.61. adld M kaweaI0 aulN Pno10 31111 oul uoilnqulsla nexe)d DNB L 1.0711.18 f3 avo 31\10 STV111NI 9511.1.1. 'ON 103f021d 3]VOS 1ON 00 31VOS 0930 310n0 ial enssl Ieul690 A9 f3 538 0 '031181038d SI SOIN300AN0 Sn dOS NOISSIWM3d N3111NM 3H11fOHiW\ 31OHM tl Stl NO ISSd NI NOLLOSOONd3N .NV SOIN30OAN0 Sn iO A1N3dONd 3105 3H1 SI ONlMtlNO SIHl NI 03N151NO3 NOI1tlWNOdNI 351 1\111N30IJNOO 0NV A5V131NdOdd -Out `sOiva601 0 fn w 0 W .0 x w J LL 0 S cc r I- 0 q W LU - —J 1— EL- '0 O w J a 0 w zzc 1- J W< N ° Oo O (1) z Z W Q a w a J > d > Z CC W r 0.w a H On . C ? m Y < JD P U Z W 0 0 > C w a) a O 0 o 0 0 aa)) 0 c v c O J U J — 3 Q > a) TsE a) 11 0 PERMVIrF CENTER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 V°01 Luu PEWIT CENTER P11- 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 evi d'J�nu n)1117Project Information ' Project Title: Cloud 9 Creamery CQ ; , {g Com cet�./�r 1pii�0.1�1. Applicant Information, Provide contact information for individual who can respond to inquiries about compliance form information provided. For Wi gp .W:I��SeD DEC 01 2017 off Tukwila Company Name: I Company Address: Applicant Name: Applicant Phone: Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes alt mandatory provisions per C401.2 Option 2. MECN-SUM, MECH-CHK, and C407 Energy Analysis forms required. 0 New Building • Building Addition ✓ ff ��ffCity Tenant Improvement ❑ Syst r ft�" iVd eThlC gtt4 Existing rooftop HVAC unit serves space. Exhaust fans added to serve space. Design Load Calculations o Load calculation summary ❑✓ MECH-LOAD-CALC Form Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or ventilating needs. 1f a load calculation summary is provided with the permit documents that includes all applicable compliance information then the MECH-LOAD-CALC form is not required. Mechanical Schedules ✓ Indicate however, Mechanical Plans ❑ MECH-EQ Forms (TBD) location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated System Requirements High Efficiency Alternate Outdoor Air and VAV • All not II ❑ DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and fire station occupancies) occupied, conditioned areas shall be served by a DORS that delivers required ventilation air in a manner that does require space conditioning fan operation. Space conditioning fans cycled off when no heating or cooling is required. ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, Exception 1) ElV) Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS (6403.6, Exception DOAS included in project, although not required (occupancy not office, retail, education, library or fire station) DOAS related allowances included in project: ❑ Prescriptive vertical fenestration maximum area allowance increased to 40% per C402.4.1.4 with 100% of conditioned floor area in building served by DOAS. ❑ Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form. Fan Power ❑ Project includes HVAC air distribution systems that provide heating and/or coaling lfyes, provide a MECH-FANSYS-SUM form. ❑ For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds Shp. If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. Refer to Section C403.2.11 and MECN-FANSYS-DOC for requirements and exceptions. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Hydronic heating water ❑ II Water -loop heat pump Q No hydronic systems Geothermal C406 Additional Efficiency Options - Mechanical VI; o; `� T/ OF /1.3 K' d C. �RA�a ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) or air -to -water heat pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must be 15% more efficient than minimum requirements. All stand alone supply, return, and exhaust fans over 1hp must have FEQ z 71 and must be selected within 10% of maximum total or static pressure. ❑ C406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a manner that does not require space conditioning fan operation. t�, ❑ C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C406.7.1 and that CO% of annual hot water energy use be provided by heat pump, waste heat recovery or solar water -heating systems. V°01 Luu PEWIT CENTER P11- 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary, pg. 2 MECH-SUM Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Service Water Heating Systems Equipment Type (s) ❑ Instantaneous ❑ No service water systems ❑beat exchange from space heat boiler or central hot water/steam ❑ On -demand 4 Hot water heating tank(s) ❑ Dedicated boiler Distribution Type (s) • Circulation System Commissioning Commissioning is required ❑ Mechanical systems If required, commissioning Exceptions to commissioning O Total output capacity cooling or 300,000 Btu/h for: per C408.2 shall be performed requirements: of all mechanical heating. Mechanical water heating not required. water heating systems per C408.4 systems regardless of individual equipment capacity. systems in the building do not exceed 240,000 Bluth commissioning not required. does not exceed 200,000 Btu/h. Service water heating II Service for all applicable space conditioning systems system in building • Capacity of largest service systems commissioning Low Energy and Semi -Heated Spaces (Note 6 and 7) Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning Capacity, Btu/h-sf Compliance Check Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. En er0 if no cooling. Note 6 - Refer to Section C402.1.1 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btu/h*sf. Only systems without electric resistance heating and no cooling am eligible for the wall insulation exception under semi -heated. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; identify provisions applicable to this equipment per C403.1 exception Yes C403,2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include load adjustments to account for energy recovery Attached NA C403.2.2 Equipment and system sizing Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions taken Existing NA C403.2.3 C403.2.3.2 0403.2.13.1 HVAC equipment performance requirements (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) NA 0405.8 0403.2.14 Electric motor efficiency List atl motors a 1/12 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied For fractional hp motors (1/12 -1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exception taken NA 0403.2.11.1 Fan power limitation For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system ............ NA 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken NA C403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is a 67, or exception taken; indicate these fans are sized so total efficiency is within 15% of the fan maximum total efficiency NA 0403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans < 400 cfrn in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE -57) NA C403.2.13 Variable flow capacity - fans For fan motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements NA 0403.2,3 Maximum air cooled chiller capacity For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chiller capacity is 5100 tons, or exception taken NA C403.4 Large capacity cooling systems For buildings with a 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) NA 04032.3.1 Non-standard water-cooled centrifugal chillers For water-cooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements NA C403.2.13.1 C403.4.3.2 Centrifugal fan open -circuit cooling towers For open -circuit centrifugal fan cooling towers with a 1,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers NA C403.4.2 C403.4.2.5 Large capacity boiler systems For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating burner For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers, or combination) NA C403.2.13 Variable flow capacity - pumps For pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements NA C403.2.3 Gas and oil -fired forced air fumace and unit heaters For forced air furnaces with capacity a 225,000 Bluth and all unit heaters, indicate in equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss NA 0403.2.4.8 Combustion healing equipment For combustion heating equipment with output capacity > 225,000 Blu/h, indicate modulating or staged combustion control NA C403.2.3.3 Packaged electric heating / cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules NA C403.2.12 Heating outside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements Yes 0403.2,7.1 Kitchen exhaust hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC System Controls for additional requirements M0.2 Yes C403.2.4.3 Outdoor supply air, exhaust and relief dampers Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers M4.1 NA C403.2.4.3 Retum air dampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) Existing 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and alt R1 Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,n able Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA 0403,2.4.3 Stairway and shaft vent dampers Indicate location of stairway and shaft vent dampers on plans; verify dampers are Crass 1 motorized; refer to HVAC System Controls for additional requirements NA C403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements NA C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to have air economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible NA 0406.2.1 C403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply NA 0406.2.2 C403.2,3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC fisted efficiency by at least 15% NA C406.2.3 0403.2.11.3 Minimum fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans is _k 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency HVAC System Controls Yes C403.2.4.1 Thermostatic controls (thermostats and humidistats) Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, including perimeter system zones M4.1 Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating NA C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less NA 0403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling NA 0403.2.4.1.3 Selpoint overlap restriction (thermostats) If separate heating and cooling systems with separate thermostatic control devices are used to serve a zone, indicate locations of both thermostatic control devices and the zone they serve on plans indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling NA C403.2.4.2 C403.2.4.2.1 C403.2.4.2.2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken NA 0403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy NA C403.2.4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA / exhaust NA 0403.2.4.3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) NA 0403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken NA 0403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured 10 automatically shut off heating system when area served is unoccupied NA C403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds -40°F NA 0403.2.4.6 Freeze protection system controls Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing NA 0403.2.4.9 Group R1 hotel / motel guest rooms For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at feast 5°F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 3 of 7 Mechanical Permit Plans Checklist ashington State Energy Code Compfiance Forms for Commercial Buildings including R2 & R3 over 3 stories and ali R1 MECH-CHK Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.4.10 C403.2.4.11 Group R2 / R3 dwelling units, Group R2 sleeping units For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10°F deadband; or exception taken Yes C403.2.6 C403.2.11.4 Ventilation Indicate method of ventilation air delivery (natural or mechanical) for each zone M4.1 If mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken M0.1 If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces NA C403.2.6.2 Demand .controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA > 3,000 cfm, and tor the system has airside economizer or automatic modulating OSA damper; indicate OSA controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception NA C403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or alternate means provided to automatically reduce OSA when space is partially occupied NA C403.2.6.4 C403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) NA C403.2.6.4 C403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation 1 exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken NA C403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air, if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood exhaust For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements NA C403.2.13 Variable Bow capacity - HVAC system fans For HVAC fan motors >_ 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50%at 1/3 static design pressure); note exception taken NA C403.3.1 DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity 2 65,000 Btu/h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed % compressors); indicate minimum displacement (capacity reduction) asof full load Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA C403.2.11.5 Fan airflow control For DX air handling units with cooling capacity_ 65,000 Btu/h and evaporative and chilled water air handling units with fan >_ 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is 5 66% of full speed drawing <_ 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is s 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken NA C403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 Identify all DDC system input / output control points; indicate capability for trending and graphical display Ducting Systems Yes C403.2.8.1 C403.2.8,3 Duct construction Indicate on plans that all ductwork is constructed and sealed per IMC M4.1 For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC Yes C403.2.8.3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M0.1 NA C403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 MECH-CHK Revised January 2017 Project Title: Cloud 9 Creamery Date 10/29/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.8.1 C403.2.8.2 Duct insulation For supply and return ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken For supply ductwork located in conditioned space, identify if design supply temperature is < 55°F or> 105°F and indicate R -value of insulation on this ductwork on plans; note exception taken For OSA ductwork, shafts and plenums, indicate R -value of insulation on these elements on plans per Table C402.1.3 for steel -framed walls; note exception taken Piping Systems NA C403.2.9 Piping insulation Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken NA C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage !degradation on hydronic piping plans Economizers NA C403.3 Air economizer required Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) . NA C403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are configured to provide up to 100% OSA for cooling NA C403.3.1 C403.3.3,2 Integrated air economizer Verify mechanical cooling controls are interlocked with air economizer controls so the outside air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is < 45°F For systems with cooling capacity 2 65,000 Bluth, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken NA C403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 NA C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may be provided in lieu of air economizer, indicate system is capable of 100% design cooling capacity at 50°F db / 45°F wb OSA temperatures NA C403.3.4.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit NA C403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity Z G5,000 Btu/h, refer to HVAC System Controls for requirements NA C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity z 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Systems Requiring Energy Recovery NA C403.5.1 Energy recovery (ER) - ventilation !exhaust systems For systems with design OSA > 5,000 cfm, or design supply air ctm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For rooms served by multiple systems with aggregate design OSA > 5,000 ctm, or aggregate design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by a 50% based on della between OSA and return air enthalpies at design conditions NA C403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air, ER effectiveness (min 25T); or alternative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) NA C404.10.4 (under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by z 36°F NA C403.5.2 Energy recovery - steam condensate systems For buildings with on-site steam heating systems, indicate condensate water ER For buildings that use off-site generated steam where condensate is not returned to the source, indicate on-site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 NIECH-CHK Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.5.3 Energy recovery - cooler / freezer condensers For buildings with food service, meat or deli departments that have a 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) For buildings with > 40,000 sf conditioned floor area and with >_ 1,000,000 Btu/h of rewrote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space healing, or dehumidification reheating NA 0403,5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Hydronic System Controls NA C403.2.13 C403.4.2.7 Variable (low control - hydronic system pumps For hydronic system pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires;' 30% design wattage at 50% design fluid flow); note exception taken Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) NAIf C403.2.5 C403.4.2.4 Hydropic system setback and part load controls For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature For heating and chilled water systems a 300,000 Btufh, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. o system pump motor hp z 3 hp, also indicate controls automatically reduce flow by a 50/o. For chilled water systems (a 300,000 Btu/h, pump motor hp a 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heet rejection loop that reduce pump flow so that one control valve is nearly wide open, or b maintain a minimum differential pressure; or exception taken NA C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 NA C403.4.2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) NA 0403.4.2.6 Chiller/ boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use NA C403.2.13.1.1 C403.4.3.1.1 C403.4.3.1.2 Heat rejection equipment - variable clow control For cooling towers with fan motors 2 7.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans in unison NA 0403.4.3.3 Heat rejection equipment - cooling tower flow turndown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run in parallel NA C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken NA C403.4.2.3.2.1 Water loop heat pump heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed NA 0403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop NA C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power> 10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 NA 0403.6 C403.6.3 Dedicated outdoor air systems For buildings with office, retail, education, library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with 0402.4.1.4 or C406.6 may not utilize exceptions) NA 0403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with suppoilingo calculations. Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and return air enthalpies at design conditions. NA 0403.6.2 Heating /cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans; hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stones and all R1 MECH=CHK Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes ' NA 0402.4.1.4 C403.6 Increased prescriptive maximum vertical fenestration area with DOAS indicate that all occupied, conditioned spaces are served by a DOAS per C403.6 Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) NA C406.6 Building provided with DOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied, conditioned spaces are served by a DOAS per C403.6 Multiple Zone Air Systems NA C403.4.4 Air systems serving multiple zones Identify supply air systems serving multiple zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV NA C403.4.4 VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types For each air terminal include; maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing: minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans _ NA 0403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling NA C403.4.4.2 Dual duct systems - terminal units For systems with separate warm air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct NA 0403.4.1.1 C403.4.1.2 VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verify controller setpoint pressure at each sensor is 5 1.2 inch w.g. For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives reset logic, and allows building operators to exclude zones from reset logic NA C403.4.4.3 Multiple -zone VAV system ventilation optimization controls For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken NA C403.4.4.4 VAV system supply air reset Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Exception 2, must comply with all 16 provisions NA 0403.7, Item 1 Air economizer Indicate system is configured for 100% air economizer operation and complies with all related economizer requirements per C403.3 (without economizer exceptions) NA C403.7, Item 2 Direct digital controls (DDC) Provide. DDC controls for all components of system; identify all DDC system input / output control points; indicate capability for trending and graphical display NA C403.7, Bern 3 Outdoor airflow measurement and reduction For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that measures OSA intake under all load conditions; indicate control sequence that increases or reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C403.7, Item 4 Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply airflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions NA 0403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system is 5 50,000 sf, or one entire floor, whichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, indicate zone isolation controls per C403.2.4.4 NA C403.7, Item 6 Interior / exterior zone design supply air temperature Verify that VAV terminals serving interior cooling driven loads are sized per design supply air temperature that is 5°F higher than VAV terminals serving exterior zones NA C403.7, Item 7 Maximum air terminal inlet velocity Identify air terminals with minimum primary airflow setpoints > 50% of maximum selpoirtt in equipment schedule or MECH-EQ form; indicate air terminal inlet velocity does not exceed 900 fpm NA 0403.7, Item 8 Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC 36 NA 0403.7, Item 9 Maximum allowable system brake horsepower Verify fan system bhp is 5 90% of the bhp limit per Option 2 equation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system NA C403.7, Item 10 Fan -powered terminal unit motor and control Indicate all series and parallel terminal fans have electronically commutated motors; indicate DDC control system is configured to vary air terminal fan speed as a function of the load: indicate fan speed during periods of low heating. low cooling, or ventilation only is 5 66% of peak design air flow or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Mechanical Permit Plans Checklist lance Forms for Commercial Buildings including R2 & R3 over 3 stones and all Ri MECH-CHK Revised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode (yes,no,na) Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terminal units indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units NA C403.7, Item 12 Fan -powered terminal unit primary air reset Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint of all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction NA C403.7, Item 13 High occupancy space controls For spaces > 150 sr with occupant density >_ 25 people / 1000 sf, indicate space is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by t 5eF NA C403.7, item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, indicate spaces are served by independent HVAC systems that are separate from HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 NA C403.7, Item 15 Central plant efficiency Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic heating cols served by heating water system with either gas-fired boiler(s) with thermal t 90%, air -to -water heat pumps, or heat recovery chillers It complying via high efciency chilled water plant: Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is s 20% of total plant capacity, or provide thermal storage sized for <_ 20% of total plant capacity NA C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to monitor operation and provide fault reporting of required parameters for all VAV air handlers and VAV air terminal units in the HPVAV system HVAC Equipment Energy Use Metering NA C469.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning NA C408.2 Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; For buildings with t 240,000 Btulh total output cooling capacity ort 300,000 Btu/h total output heating capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception NA C403.2.10 C408.1.1 C408.1.2 C408.1.4.2 C103.6 Commissioning requirements in construction documents Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA C408.2.2 Air system and hydronic system balancing indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions NA C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing NA C408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability 10 isolate, balance and measure flow across all hydronic equipment requiring system balancing including heating and cooling coils and pumps NA C408.2.3 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems Project Close Out Documentation Yes C103.6 Documentation and project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems governed by this code; indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations M0.1 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 2 Service Water Heating Permit Plans Checklist SWH-CHK eEnerCode Com fiance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 - gy p Project Title:Cloud 9 Creamery Date 10/29/2017 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents _ Location in Documents Building Department Notes Equipment - Sizing, Performance and Type Yes C404.2 SWH equipment type and efficiency Provide equipment schedule on plans indicating type and capacity; indicate efficiency complies with required federal standard FS Plans NA C404.2.1 High input -rated SWH systems For individual SWH equipment serving an entire building with a 1,000,000 Btu/h capacity, indicate thermal efficiency >_ 90%; or exception taken For buildings with aggregate capacity of all SHW equipment z 1,000,000 Btu/h (exclude < 100,000 Btu/h equipment from threshold calculation), indicate average capacity weighted thermal efficiency a 90%; or exception taken If applying Exception 1 for site -solar or site -recovered energy, provide calculations and source of annual service water heating energy use estimate Yes C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply and discharge M0.1 Yes C404.5 Insulation under electric water heater For electric water heaters located in unconditioned spaces or on concrete floors, indicate R-10 insulation under equipment M3.1 Piping Systems Yes C404.6 Insulation of piping Indicate thickness of piping insulation on plans per Table C403.2.9; verify insulation is provided - from the water heater to the final fixture in a line, from the inlet / outlet piping at water heater to heat trap (up to 6 feet), and on piping that is heat traced; note exceptions taken M0.1 Yes C404.3 Efficient SWH supply piping Indicate method of compliance on plans for all piping runs connecting service hot water source to hot water fixture (maximum pipe length or maximum pipe volume method per Table C404.3.1); provide calculations for all piping runs documenting the total length and / or volume Service Water Heating System Controls Yes 0404.7.1 .-water circulating systems systems For circulation systems with dedicated return piping, indicate controls are configured 10 automatically start pump based on demand for hot water and shut-off pump when there is no demand and when the desired water temperature is met M3.1 For circulation systems with cold water supply piping serving as the return, indicate controls are configured to automatically start pump based on demand for hot water and shut-off pump when there is no demand, or when temperature of water entering the cold water supply pipe is z 104'F NA C404.7.2 Heat trace system controls For heat trace systems provided to maintain temperature of service hot water in piping, indicate controls are configured to de -energize system when there is no demand for hot water and when the desired water temperature is met NA C404.7.3 Controls for hot water storage For systems with separate water heater and storage tank, indicate controls are configured to limit operation time of pump after end of healing cycle to 5 5 minutes NA C403.2.13 C403.4.2.7 Variable flow control - pumps For SWH, pool / spa and pressure boosting pump motors z 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires z 30% design wattage at 50% design fluid flow); note exception taken Identify basis of pump speed control (differential or static pressure setpoint, pressure, zone load demand, etc) Pools and Permanent Spas - Equipment and Controls (Sections are under C404.11) NA C404.10.1 Pool heating equipment efficiency Provide equipment schedule on plans indicating type and capacity for all pool heating equipment; indicate efficiency complies with required federal standard; for heat pump water heaters indicate COP >_ 4 NA C403.2.13 Variable flow control pumps Refer to Service Water Heating System Controls NA C404.10.1 C404.10.2 Pool heater on / off controls Indicate automatic on / off control based on scheduling and readily accessible on / off switch on heater that operates independent of thermostat setting; note exceptions taken NA C404.10.3 Pool covers For all pools and in -ground permanent spas, indicate a vapor retardant cover on plans For all pools and in -ground spas heated to > 90°F, indicate cover shall include insulation z R- 12 NA 0404.10.3 Pool assemb insulation _ ry For all pools and in -ground spas heated to > 90°F, Indicate on plans that sides and bottom are provided with insulation 5 R-12 NA C404.12 Energy consumption of portable spas Indicate portable spa complies with Association of Pool and Spa Professionals APSP-14 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 2 Energy Recovery (ER) Systems - Service Water Heating and Pool Systems NA C404.10.4 (Section under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or permanent spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by t 36°F NA C403.5.3 Energy recovery - cooler/ freezer condensers For buildings with food service, meat or deli departments that have >_ 500,000 Btulh of remote refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat service water For buildings with Z 40,000 sf conditioned floor area and with a 1,000,000 Bluth of remote refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat service water NA C403.5.4 Energy recovery - condenser systems - For buildings with 24-hour operation and > 1,500,000 Btulh of heat rejection capacity and design SWH load > 250,000 Btulh, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection toad or pre -heat service water to 85°F). NA C404.10 Drain water heat recovery units For systems incorporating drain water ER, indicate system design complies with CSA 855.2 (or CSA 55.1 for Group R); indicate potable waterside pressure loss at design flow is < 10 psi Service Water Heating Energy Use Metering NA C404,9 SWH energy usage in dwelling units For Group R-2 multi -family buildings with central SWH systems, provide metering of hot water energy usage per dwelling unit; indicate metering and data reporting method NA C409.3.2 SWH equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, with total SWH equipment capacity a 50 kW ( 170,600 Btu/h), verfiy energy use metering of all SWH equipment will be provided per C409 Additional Efficiency Package Option, Reduced Energy Use In Service Water Heating - Must comply with both provisions to be eligible NA C406.7.1 Eligible building type To comply with additional efficiency package option, verify that_ 90% of the conditioned floor area of the building is one or more of the occupancies identified in this section, OR; Provide whole building energy analysis per C407 that demonstrates the SWH load in the building is t 10% of total building energy loads NA C403.. C403.55,44 Load fraction To comply with additional efficiency package option, provide documentation that verifies a 60% of building annual SWH energy is provided by high efficiency sources (heat pump water heater with COP z 3, waste heat recovery, solar water -heating system); For buildings with 24-hour operation and with > 1,500,000 Btulh of heat rejection capacity and design service hot water load > 250,000 Btu/ll (per C403.5.4); provide documentation that verifies z 100% of building annual SWH energy is provided by condenser energy recovery or other high efficiency source Documentation and Specific System Requirements to Supporting Commissioning NA C408.4 Scope of service water heating systems commissioning Indicate that all SWH equipment and controls for which the WSEC requires control functions and / or configuration to perform speck functions are required to be commissioned;+D7 For buildings where the largest SWH system has ? 200,000 Btu/h total output capacity, indicate that all SWH systems regardless of individual capacity are required to be commissioned. NA C408.4.1.3 Scope of pool and permanent spa systems commissioning Indicate that all pool and permanent spa water heating systems regardless of individual capacity are required to be commissioned; Indicate that energy recovery equipment that heats pool water regardless of capacity is required to be commissioned; Identify all pool heating and energy recovery equipment and controls that the WSEC defines as being capable of and / or configured to perform specific functions. NA C404.13 C408.1.1 C408.1.2 C408.1.4.2 C103.6 Commissioning requirements in construction documents Indicate in plans and specifications that Cx per C408 is required for all applicable service water heating systems; Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activites, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA C408.4.1 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems Project Close Out Documentation NA C103.6 Documentation and project Gose out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required far all SWH components, equipment and systems governed by this code; indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Design Load Calculation Summary MECH-LOAD-CALC 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all RRevised January 2017 Project Title: Cloud 9 Creamery Date 10/24/2017 The following information shall be included in the load calculation program summary submitted with the permit documents. If a load calculation summary is not available, provide the required information below. For Building Dept. Use Equip. ID Area(s) Served Heating Design Load in Btu/h (Note 1) Cooling Design Load in Btu/h (Note 1) Calculation Method (Note 2) Notes RTU -1 Cloud 9 Creamery 38,404 77,863 Computer (Trace 700) Existing HVAC Unit Note 1 - Design load shall account for the building envelope, lighting, ventilation and occupancy loads of the space(s) served by the mechanical system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer Load calculation program, worksheet (identify source), or equivalent computation procedure in accordance with ASHRAE Standard 183. Zone Checksums By Hultz/BHU Creamery COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADBM/B/HR: Space Sens. + Lat. Btu/h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Plenum Sens. + Lat Btu/h 6/14 80/67/81 CLG SPACE PEAK Mo/Hr: 7 / 16 OADB: 81 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0 0 0 0 0 0 0 2,776 2,776 4 0 o o 0 0 0 0 0 0 0 0 216 50 267 0 524 0 0 0 0 0 0 0 0 0 0 0 0 0 751 751 1 854 967 2,826 3,793 5 1,377 4,550 1,138 55,550 0 10,239 0 70,339 1,138 5,688 7 4,550 55,550 71 27,775 10,239 13 10,239 71,477 92 42,564 668 -668 0 0 781 0 0 3,691 5 0 0 0 0 0 0 0 0 0 0 -1,098 -1,098 0 0 0 0 0 0 0 0 0 0 0 0 0 71,974 2,198 77,863 100.00 44,722 Percent Of Total (%) 0 0 0 0 0 1 0 0 0 2 3 10 62 23 95 2 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 -486 0 0 0 -6,135 -6,620 Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 ' Grand Total => 0 0 0 0 -378 0 0 0 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0 -2,123 0 0 -605 0 0 0 -6,135 -8,863 0.00 0.00 5.53 0.00 0.00 1.58 0.00 0,00 0.00 15.97 23.08 0 0.00 0 0.00 0 0.00 0 0.00 0 -30,162 0 0 621 0 0 0 0 0 0 0.00 78.54 0 0.00 -1.62 0.00 0.00 0.00 0.00 0.00 0.00 -6,998 -38,404 100.00 Total Capacity ton MBh Main Clg 6.5 77.9 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 6.5 77.9 COOLING COIL SELECTION Sens Cap. MBh 49.4 0.0 0.0 Coil Airflow cfm 2,032 0 0 Enter DB/WB/HR °F °F gr/Ib 77.4 66.1 79.6 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.6 60.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Cloud Nine Creamery Loads.trc AREAS Gross Total Glass Floor 1,515 Part 0 Int Door 0 ExFlr 0 Roof 1,515 Wall 240 ft2 (%) 0 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.4 Return 76.4 Ret/OA 77.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 73.1 69.2 69.2 56.0 0.0 0.0 0.0 AIRFLOWS Cooling 2,032 2,032 2,032 0 596 596 121 0 2,153 717 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent lnfil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 Heating 2,032 2,032 2,032 0 596 596 121 0 2,153 717 0 0 0 0 ENGINEERING CKS Cooling Heating 29.3 29.3 1.34 1.34 313.20 233.49 51.39 -25.35 101 % OA cfm/ft2 cfm/ton ft2/ton Btulhr•ft2 No. People HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -38.4 0.0 Lvg °F 2,032 56.0 73.1 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -38.4 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 05:18 PM on 10/24/2017 Alternative -1 System Checksums Report Page 1 of 1 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories an b Project Info Compliance forms do not require a password to use. Instructional and calculating cells are write- riteprotected. protected. Project Title_ CLOUD NINE CREAMERY D . !L. w (r-. N , 1 _C2+_'F-G 11-q—` tCODE COMP/Eel/AVE • , 1 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For BuildincAl MED DEC 0 1 2017 • City of Tukwila BUILDING DIVISION Company Name: LU S DESIGN ASSOCIATES Company Address: 6402 S VERDE ST TACOMA WA. 98409 Applicant Name: LU SCHILDMEYER PRINCIPAL 1 OWNER Applicant Phone: 206-354-7200 Applicant Email: lusuciusdesignassociates.com Project Description ❑ New Building ❑ Addition ❑✓ Alteration include PROJ-SUM form (included in envelope forms workbook) ' Plans Included with lighting compfliance forms. Building Additions Refer to Section C502.2.6 for additional requirements. _ .. , Compliance Method Interior lighting i Exterior lighting Lighting systems in addition area comply with all applicable ❑ ❑ provisions as a stand alone new construction project --_--.. _ _ .._ ....._. ;... ......._ ._..__. Lighting systems in addition are combined with existing ❑ ❑ building lighting systems to demonstrate compliance Addition is combined with existing: For interior lighting projects, include new + existing interior lighting fixture wattage in Proposed lighting Wattage table in LTG-iNT-BLD orLTG-INT-SPACE form. For exterior lighting projects, include new + existing exterior lighting fixture wattage in Proposed Tradable and Proposed Non -Tradable Lighting Wattage tables in LTG -EXT fort. Interior and Exterior Lighting Alterations Select all Lighting Power and Lighting Control elements that apply to the scope of the retrofit project. If project includes a combination of spaces where less than 50% of the existing fixtures are replaced in some spaces, and 50% or more of the fixtures are replaced in others, then provide separate lighting power compliance forms for the two retrofit conditions. Spaces undergoing the same type of retrofit may be combined into one lighting power compliance form. Refer to Section C503.6 for additional requirements_ All alteration lighting controls shall be commissioned per C408.3. ❑ No changes are being made to the inferior or exterior lighting systems and existing space uses and configuration are not changed. Lighting Power 50% or more of existing are replaced Less than 50% of existingreplaced are paced _ . _ Lamp and/or ballast replacement only existing total wattage not increased 50% or more replaced Total lighting power LPA per Sections C4054.2 and C405.5.2. Lighting Wattage table in LTG -INT -BLD, Less than 50% replaced - Total lighting total lighting power prior to alteration. Include Wattage table in LTG -INT -BLD, LTG-iNT-SPACE 50% threshold applies to number of luminaires installed wattage for exterior luminaires. Interior lighting Parking garage ❑ ❑ El• -to -remain fixtures shall -to -remain fixtures EXT form. -to -remain fixtures -remain fixtures in the form. and parking garages, 1 Exterior lighting ❑ ❑ ❑ . _ .. _, ; ■ of new + existing include new + existing LTG -INT -SPACE orLTG power of new + existing new + existing -to or LTG -EXT for interior spaces comply with total in Proposed shall not exceed the Proposed Lighting and total Lighting Controls New wiring installed to serve added fixtures and/or fixtures relocated to new circuit(s) New or moved lighting panel Interior space is reconfigured - luminaires unchanged or relocated only ? New wiring or circuit - For inferior lighting, sensor controls per C405.2.1, daylight responsive controls per C405 2.5. For exterior lighting, New or moved panel - Provide all applicable time switch controls per C405.2.2. Reconfigured interior space - Provide Application specific lighting control provisions Interior lighting g g I I] j ❑ ❑ 3 Parking garage ❑ Exterior lighting ❑ ❑ • r occupancy specific lighting and automatic new interior .space. spaces. provide required manual controls per C405.2.3, controls per C405.2.4 and application provide required controls per C405.2.7. lighting controls as noted for New Wiring all required lighting controls that apply to a per C405.2.5 do not apply to reconfigured Change of Space Use RECEIVED CITY OF T U K W I L A ❑ Existing interior lighting systems in areas under -going a change in space use are upgraded to comply with LPAs for the new space types per Tables C405.4.2(1) or C405.4.2(2). Identify interior spaces requiring LPD upgrade to the current Code in Proposed Lighting Wattage table in LTG -INT -BLD or LTG -INT -SPACE form. i' V 1 2017 PERMIT CENTER t11o1A�i LghtingS=ummaj Cane 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised August 2016 Project Title: CLOUD NINE CREAMERY Date 10/23/2017 Interior Lighting System ALL NEW LED LIGHTING SYSTEM AND ALL NEW LED FIXTURES. ALL FIXTURES ARE DescriptionON DIMMERS EXCEPT PUBLIC RESTROOMS WHICH ARE ON OCCUPANCY SENSOR CONTROLS. Interior Lighting Power Allowance Method ❑ Building Area Method -/ Space -by -space Method Select method used in project. Interior ! II N Lighting Controls4 All C405.2.1 - C405.2.8 Controls L C405.2 Exception 5 Luminaire Level Lighting Control (LLLC) El Additional Efficiency Package Option C406.4 Enhanced digital fighting controls To comply with C406.4, no less than 90% of the total installed interior lighting power shall comply with the required controls per C406.4. Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA O C406.3 High Efficacy Lighting 0 Exterior Lighting System Description NONE Interior Light�n:g rt Space -By -Space Method 2015 Washington State Energy Code Com fiance Forms for Commercial Buildings induding R2 R3 R4 c ILTG=INT-.SPACE Project Title: CLOUD NINE CREAMERY rcevisea August 2016 Date 10/23/2017 Calculation Ar ea NOTE 9 ® Q Addition - Q Addition stand alone + existing Q Spaces where < 50% of O Spaces where a 50% of Q luminaires are replaced luminaires are replaced For Building Department Use LPA Calculation Type Q Standard Q Additional Efficiency Package Option Q C406.3 Reduced Interior Lighting Power To comply with C406.3, the Proposed LPD shall be 25% lower than the Target LPA. Refer to C406.3 for addition! requirements. Maximum Allowed Lighting Wattage ""TE, 75 Location (plan #, room #) Space Type Ceiling Height NOTE 2 Gross Interior Area in ft2 Allowed Watts per ft2 Watts Allowed (watts/ft2 x area) DINING Dining area: Family dining area 12 603 0.710 428 FOOD PREP Food preparation 12 476 . 0.790 376 RESTROOMS Restroom: all other 8 104 0 780 81 CORRIDOR Electrical/mechanical 10 62 • 0.760 47 NITROGEN TANK DISPLAY Sales area 10' 6" 74 1 .270 94 CORRIDOR & VIEWING Corridor: all other 16 144 0.530 76 . Lobby Art/Exhibit Display Allowance from LTG-iNT-DISPLAY NOTE B Total Area Retail Display 1463 LTG -INT -DISPLAY Allowed Watts Allowance from 1103 Proposed Lighting Wattage "1" Location (plan #, room #) Fixture Description NOTE 4, 5, 6 Number of Fixtures Watts/ Fixture NOTE '" • - a -' • 1 , Watts Proposed FOOD PREP TYPE A RECESSED LED 2' X 4' TROFFER 3 25 75 RESTROOMS TYPE B RECESSED LED DOWN LITE 2 44 88 EXIT SIGN TYPE C LED EXIT SIGN 3 4 11 DINING & FOOD PREP TYPE I TRANSFORMER DRIVEN LED LIGHTING SYSTEM 1 150 150 FOOD PREP & DINING TYPE K TRANSFORMER DRIVEN LED LIGHTING SYSTEM 6 60 .. • 360 DINING &FOOD PREP TYPE L CUSTOM LED PENDANT LIGHT 20 10• . .. - 2200 PREPG & FOOD TYPE M CUSTOM LED CHANDELIER 3 50 150 DiNING & FOOD PREP TYPE N CUSTOM LED VANITY LIGHT 2 20 = • 40 HALLWAY TYPE P RECESSED LED 2' X 2' TROFFER 1 18 r 18 Proposed Retail Disp ay Lighting from LTG -INT -DISPLAY Total Proposed Watts may not exceed Total Allowed Watts for Interior Lighting Total Proposed Watts 1093 Interior Lighting Power Allowance C®P,6ES Note 1 - Lrst all unique space types per Table (405.4.2(2) that occur in the project scope. Select space type category per from drop down menu. Note 2 - Indicate ceiling height for atriums and spaces utilizing the ceiling height adjustment per Table C405.4.2(2), Footnotes d thru f. Note 3 - List all proposed lighting fixtures including exempt lighting equipment and existing -to -remain fixtures. Note 4 - For proposed Fixture Description, indicate fixture type, tamp type (e.g. T-8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. Note 5 - For lighting equipment eligible for exemption per C405.4.1, note exception number and leave Watts/Fixture blank. Note 6 - Existing -to -remain fixtures shall be included in the Proposed Lighting Wattage table in the same manner as new fixtures. Identify as existing in fixture description. Note 7 - For proposed Watts/Fixture enter the luminaire wattage for installed lamp and ballast using manufacturer or other approved source. For luminaires with screw-in lamps, enter the manufacturer's listed maximum input wattage of the fixture (not the lamp wattage). For low voltage lighting, enter the wattage of the transformer. For line voltage track/busway systems, enter the larger of the attached luminaire wattage or 50 watts/lineal foot, or enter the wattage limit of permanent current limiting device. Note 8 - 1.nhhv Art/Fxhihit Disnlav Allnwanr.e is independent of the Maximum Allowed 1 iahfinn Wattage City of Tukwila Department of Community Development November 13, 2017 ANDREW HAGEE 6617 S 193RD PL, SUITE P-102 KENT, WA 98032 RE: Correction Letter # 1 DEVELOPMENT Permit Application Number D17-0299 CLOUD NINE CREAMERY - 191 SOUTHCENTER MALL Dear ANDREW HAGEE, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Provide new plan set produced by the architect or engineer where all sheets contain stamp, signature and date of signature of that design professional in charge. Plan sheets provided were not all stamped and stamped sheets did not have date of signature. See General Information Note above. 2. Provide a life safety plan that identifies means of egress. Dimension egress paths. Identify the specific common paths of egress that shall be provided with emergency illumination. Emergency illumination shall have at least an average 1 foot-candle and a minimum at any point of 0.1 -foot candle measured along the path of egress at the floor level. Emergency lighting shall also be required for exit discharge doorways. Egress paths shall be continuous to each exit. Designated egress paths are those that shall be light meter inspected for egress illumination requirements. (IBC Section 107.2:3, 1006 & 1008.1.6) 3. On the floor plan sheet ID -1.0 shows some elevation referenced markers, S-2 & S-3 that appear to not reference the correct elevations on sheet ID -6.0. Please verify those and other markers for referencing the correct details and make necessary corrections or provide clarification. Note: Contingent on response to these corrections, further plan review may request for additional corrections. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 FIRE DEPARTMENT: Al Metzler at 206-971-8718 if you have questions regarding these comments. • Provide details on the liquid nitrogen tank and dispensing system to verify compliance with International Fire Code Chapter 55, CRYOGENIC FLUIDS. Include the manufacturer's data sheets of the tank, piping and dispenser. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. Sincerely, Bill Rambo Permit Technician File No. DI7-0299 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT C LORD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D17-0299 DATE: 11/20/17 PROJECT NAME: CLOUD NINE CREAMERY SITE ADDRESS: 191 SOUTHCENTER MALL Original Plan Submittal X Response to Correction Letter # 1 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: PJ ACWWG II O1 Building Divisi�t1 �! Public Works Fire Prevention Structural U Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 11/23/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 12/21/17 ❑ Approved with Conditions ❑ ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: 12/18/2013 PLAN OUTING SLIP PERMIT NUMBER: D17-0299 DATE: 11/01/17 PROJECT NAME: CLOUD NINE CREAMERY SITE ADDRESS: 191 SOUTHCENTER MALL X Original Plan Submittal • Response to Correction Letter #, Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: As (*AL- ivs- fl Building Division AP i-047 Public Works AtA coya Fire Prevention Structural , -13-1 Mai /A- -x-17 Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 11/02/17 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) DUE DATE: 11/30/17 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire' Ping ❑ PW ❑ Staff Initials: 12/18/2013 Date: City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Plan Check/Permit Number:. "Dt T Vogl ❑ Response to Incomplete Letter # El Response to Correction Letter # .. ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: C\oIKA AA v\Greawner 1. Project Address: ICI 5Utn-Y\CV1AQC, f' I�t� Ulk'z J 11\ A Contact Person: Andcre..0 tt�N42 Phone Number: Summary of Revision: C) tc Plains wee �^� i��l Soe c1 av1 4e& agQ y . 7rA f p „4 "k new VA/4 pd.002f'ia q$)Ag C�rY) qq; - 642 5 c a-kure5 din Sia w; Alt 11I L'CIVGLJ CITY nF Ti I(WU A Rt -au aaa p U I I' PFR .?!T CF!TFF Sheet Number(s): A\\ 91v -eV') "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: I-)je — Entered in TRAKiT on - W:\Permit Center\Templates\Forms \Revision Submittal Form doe. Revised: August 2015: - - - R.( CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665, E-mail: tukplan@ci.tukwila.wa.us Permit Center/Building Division 206 431-3670 Public Works Department 206 433-0179 Planning Division 206 431-3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION PERMIT NO: Ph"— O STATE OF WASHINGTON) ) ss. COUNTY OF KING Andra))r � ., , [please printYname] , states as follows: 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit..I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number i3, and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. Owner/Owner's Agent* Signed and sworn to before me this 13\1h day of pe(Qtnn ' , 20 )7 NOTARY PUBLI in and r. r the State of Washington Residing at Name as commissioned: My commission expires: 18.27.090 Exemptions. The registration provisions of this chapter do not apply to: 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds.,a valiTelectrical contractor's license under chaptee19:28:RCW that'employs a certified journeyman ``'' j yman electrician; a certfied_residential specialty electrician, or anyelictrical`tralnee•meeting„the requirements of='thapter;'19: 28' RCW' to; perform plumbing work that is incidentally; directly, and immediately appropriate to the like -in-kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections: ;A i electrical; trainee must be supervised by a certified, electrician,while performing plumbing work. * Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions. PROJECT I\FOR V ATIO\ OWNER CONTACT CLOUD NINE CREAMERY LLC 6617 S 193RD STE P-102 KENT, WA. 98032-2197 ANDREW HAGEE OWNER CONTACT: 206-992-6892 SITE ADDRESS SOUTHCENTER MALL SPACE # 700 TUKWILLA, WA. 98188 PROJECT DESIGNER LU S DESIGN ASSOCIATES 6402 S VERDE ST TACOMA, WA. 98409 CONTACT: LU SCHILDMEYER PRINCIPAL / OWNER TEL. 206-354-7200 PROJECT ARCHITECT M2 ARCHITECTS & PLANNERS 1111 CLEVELAND AVENUE, SUITE 102 MOUNT VERNON, WA. 98273 CONTACT: MEL A. MAERTZ, A.I.A. PRINCIPAL TEL. 206-354-7100 PROJECT ME ENGINEERS HULTZ BHU ENGINEERS INC 1111 FAUCET AVENUE SUITE 100 TACOMA, WA. 98402 CONTACT: RICK HULTZ PE PRINCIPAL TEL. 253-383-3257 N OTE: PUBLIC HEALTH - KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. CO\TACTOR G-\ ERAL \OILS C091- I\ FORVATIO\ PARCEL NUMBER: CONSTRUCTION TYPE: OCCUPANCY TYPE: OCCUPANCY LOAD FACTOR: 9202470130 2-A SPRINKLED A-2 SPRINKLED STANDING SPACE 5 SF PER PERSON KITCHEN/FOOD PREP 200 SF PER PERSON UNCONCENTRATED (TABLES & CHAIRS) 15 SF PER PERSON OCCUPANCY LOAD: 59 TOTAL LOAD TOTAL PROJECT AREA: 1,463 SQUARE FEET EXITS REQUIRED: 2 TOILET FACILITIES: D PUBLIC TOILET FACILITIES: 2 TOILET, 2 SINK. OJECT DISCIDTIO\ CONVERT AN EXISTING MASTER CUT HAIR SALON BUSINESS TO A NITROGEN INFUSED ICE CREAM FOOD SERVICE BUSINESS CALLED CLOUD NINE CREAMERY. 15 IB DAWI\G LIST COVER COVER SHEET ID -1.0 FLOOR PLAN ID -1.1 DIMENSIONED WALL & WALL TYPE PLAN ID -4.0 FLOOR FINISH/WALL FINISH PLAN ID -6.0 INTERIOR ELEVATIONS & SECTIONS ID -8.0 INTERIOR LIGHTING = RCP CLG FINISH PLAN SF -1.0 STOREFRONT ELEVATION AND DETAILS M0.01 MECHANICAL LEGEND & NOTES M0.02 MECHANICAL SCHEDULE M1.0 MECHANICAL DEMOLITION PLAN. M2.0 MECHANICAL FOUNDATION PLAN M3.0 PLUMBING PLAN M4.0 HVAC PLAN E0.1 ELECTRICAL LEGEND & NOTES E2.1 ELECTRICAL LIGHTING PLAN E3.1 ELECTRICAL POWER PLAN E4.1 ELECTRICAL SCHEDULES SECTION 008 MEANS OF EGRESS ILLUMINATION REQUIRED The means of egress serving a room or space shall be illuminated at all times that the room or space is occupied; illumination level shall be not less than 1 footcandle at the waiking'surface. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles, 2. Corridors, 3. Exit access stairways and ramps. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways & ramps, 3. Exit passageways, 4. Vestibules at level of discharge, 5. Exterior landings and areas used for exit discharge. 1. THIS SET REPRESENTS THE PERMIT DRAWINGS AND IS INTENDED TO SHOW MINIMUM REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND HIS SUB -CONTRACTORS TO PROVIDE ALL CONSTRUCTION NECESSARY FOR THE COMPLETE INSTALLATION OF ALL OPERATING SYSTEMS, MATERIALS AND FINISHES IN ACCORDANCE WITH MFR'S RECOMMENDATIONS. CONTRACTOR SHALL THOROUGHLY REVIEW DRAWINGS, SPECIFICATIONS AND OWNER'S REQUIREMENTS. 2. GENERAL CONTRACTOR AND HIS SUB -CONTRACTORS SHALL FIELD VERIFY ALL EXISTING DIMENSIONS PRIOR TO BIDS AND DURING CONSTRUCTION. ANY DISCREPANCIES IN DRAWINGS, GRAPHIC REPRESENTATIONS AND ACTUAL FIELD DIMENSIONS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER & OWNER. 3. CONSTRUCTION SHALL BE BASED ON THE CITY OF TUKWILA APPROVED PLANS AND OWNER'S COMMENTS. THE APPROVED PLANS ARE TO REMAIN ON SITE AT ALL TIMES FOR USE BY ALL INVOLVED TRADES AND INSPECTORS. 4. THIS SET OF DRAWINGS SHALL NOT BE COPIED IN WHOLE OR IN PART WITHOUT PRIOR WRITTEN CONSENT FROM THE OWNER. THIS DOCUMENT IS CONSIDERED AS ONE UNIT AND SHALL NOT BE CONSIDERED COMPLETE OR WHOLE IF DOCUMENTS ARE SEPARATED IN ANY MANNER. DOCUMENTS SHALL NOT BE SEPARATED FOR THE PURPOSES OF SUBMITTING PROPOSALS OR FOR SEPARATE PHASES OF CONSTRUCTION. 5. THESE DOCUMENTS ARE PREPARED FOR THE USE OF THE CONTRACTOR AND IN NO WAY, EITHER IN WHOLE OR IN PART CONSTITUTE ANY DIRECTION OR INSTRUCTION TO ANY CONTRACTOR WITH REGARD TO CONSTRUCTION METHOD, MEANS OR TECHNIQUE. 6. ALL WORK SHALL COMPLY WITH CURRENT INTERNATIONAL BUILDING CODE; ANSI ICC A117.1-2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES CODE; CITY OF TUKWILA MUNICIPAL AND BUILDING CODES; KING COUNTY HEALTH DEPARTMENT; AND SHALL INCLUDE ALL THE LATEST APPLICABLE CODE AMENDMENTS. 7. "NO ROOFTOP EQUIPMENT OF ANY KIND SHALL BE ADDED TO THE STRUCTURE WITHOUT A REVIEW BY A WASHINGTON STATE REGISTERED PROFESSIONAL ENGINEER & BUILDING OWNER APPROVAL. DEFERRED PERMIT SUBMITTAL REQUIRED. ABSOLUTELY NO CHANGES TO THE EXTERIOR ENVELOPE (WALLS AND ROOF) OR STRUCTURE SHALL BE MADE WITHOUT APPROVAL OF THE BUILDING OWNER" 8. EACH CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL REQUIRED, NECESSARY AND PRUDENT SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES AND PROCEDURES REQUIRED TO PERFORM THE WORK. 9. ALL PLUMBING & DRAIN SYSTEMS, GREASE TRAP SYSTEM, MECHANICAL & GAS PIPING SYSTEMS, HVAC SYSTEMS, LIQUID NITROGEN SYSTEMS, MUSIC SYSTEMS, POS SYSTEMS, SECURITY/SURVAILANCE SYSTEMS, ALL SITE DEVELOPMENT & SITE IMPROVEMENTS, CONSTRUCTION & PERMITING. SHALL BE BIDDER DESIGNED UNDER SEPERATE PERMITS AS REQUIRED BY CITY AND STATE CODES. CLOUD \I\E CEAvEY SITE ADDRESS° 191 SOUTHCE\TE SPACE #700 TU '<WILA, WA. 98188 A WILL REQUIRE THE. ADDRESS FOR MIS SPACE WHICH IS FS -1.0 FOOD SERVICE EQUIPMENT PLAN FS -2.0 FOOD SERVICE EQUIPMENT SCHEDULE FS -4.0 FOOD SERVICE EQUIPMENT ROUGH -IN PLUMBING & DRAIN PLAN FS -5.0 FOOD SERVICE EQUIPMENT ROUGH -IN ELECTRICAL PLAN FS -6.0 FOOD SERVICE EQUIPMENT ELEVATIONS & WALL BACKING. EMERGENCY ILLUMINATION FOR BUILDINGS AND DURATION OF ILLUMINATION (1008.3.2--1008.3.5) In the event of power supply failure in Rooms and spaces, an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms, 2. Fite command centers, 3. Fire pump rooms, 4. Generator rooms, 5. Public restrooms with an area greater than 300 square feet. The emergency power system shall provide power for to duration of not less than 90 minutes and shall consist bf storage batteries, unit equipment or an on-site generator. Illumination level under emergency power, the lighting facilities shall be arranged to provide initial illumination that is not less than an average of 1 footcandle and a minimum at any point of 0.1 footcandle measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0;6 footcandle average and a minimum at any point of 0.06 footcandle at the end of the emergency lighting time duration. A maximum -to -minimum illumination uniformity ratio of 40 to 1 shalt not be exceeded. LA\ 3LORD GI- \ ERAL \ OT -S COPY Pe ^,itNo. DrIv 0(06\ approval is to of construction documents not authorize of any adopted code or ordnance. Receipt FIBId • s ; c>n3 is aclmowledgsd: City of Tukwila BUILDING DIVISION SEPARATE PERMIT REQUIRED FOR: M dchanical i..! Electrical iri)Lsmbing Gas Piping City of Tukwila BUILD! G DIVISION REVISIONS • No changes shall h made to the scoot - of work without prior approval of Tukwila Building Division. NOTE: Revisions viii require a new plan subnr and may include additional plan review fee- - 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH LANDLORD'S TENANT DESIGN AND TECHNICAL CRITERIA AND CENTER'S RULES AND REGULATIONS. ALL CONTRACTORS SHALL OBTAIN A COPY FROM LANDLORD'S TENANT COORDINATOR OR MALL FACILITIES MANAGER AND BECOME FAMILIAR WITH THE REQUIREMENTS CONFLICT WITH CODES OR ORDINANCES, THE STRICTEST INTERPRETATION SHALL APPLY. 2. TENANT IS REQUIRED TO PERFORM A SITE SURVEY OF THE ENTIRE PREMISES PRIOR TO COMMENCEMENT OF TENANT'S CONSTRUCTION. ANY VARIANCES BETWEEN THESE APPROVED PLANS, LANDLORD PROVIDED LOD AND ACTUAL SITE CONDITIONS SHALL BE THE SOLE RESPONSIBILITY OF THE TENANT. ALL COSTS ASSOCIATED WITH REVISIONS AND CHANGE ORDERS SHALL BE THE SOLE RESPONSIBILITY OF TENANT. 3. TENANT GENERAL CONTRACTOR IS REQUIRED TO CONDUCT A PRE -CONSTRUCTION MEETING AT A MINIMUM 3 DAYS PRIOR TO START OF CONSTRUCTION WITH FACILITIES MANAGER AND ABIDE BY ALL CURRENT "TENANT CONTRACTOR SAFETY STANDARDS" AS ISSUED BY THE LOCAL CENTER MANAGEMENT TEAM. 4. TENANT GENERAL CONTRACTOR REQUIRED TO PROVIDE ONE FINAL SET OF DRAWINGS CONTAINING ALL COMMENTS INCLUDING WESTFIELD, CITY OF TUKWILA AND TENANT AS WELL AS WESTFIELD TC APPROVAL STAMP AND CITY OF TUKWILA PERMIT STAMP AT PRE -CONSTRUCTION MEETING AND MAINTAINED AT WORK SITE AT ALL TIMES. 5. TENANT MUST MAINTAIN ACCESS, AS REQ'D, TO ALL UTILITY SYSTEMS SERVING THE BASE BUILDING OR ADJACENT TENANTS. 6. ALL REUSED ITEMS/FINISHES MUST BE RETURNED TO LIKE NEW CONDITION APPROVED BY WESTFIELD REQUIRED. 7. NO ADDITIONAL SIGNAGE,GRAPHICS OR MERCHANDISE FIXTURES ARE PERMITTED TO BE AFFIXED TO OR ON THE APPROVED DESIGN, DISPLAYED OUTSIDE OF THE PREMISES OR PLACED WITHIN OR ON TOP OF COUNTERS AND SNEEZE GUARDS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE LANDLORD. ALL LANDLORD APPROVED SIGNAGE, PROMOTIONAL OR OTHERWISE, SHALL BE PROFESSIONALLY PRINTED AND MOUNTED. 8. WESTFIELD TC APPROVAL REQUIRED PRIOR TO BARRICADE TAKE DOWN. TENANT GENERAL CONTRACTOR TO SCHEDULE PRELIMINARY PUNCH WALK THRU WITH WESTFIELD TC ONE WEEK PRIOR TO SCHEDULED BARRICADE TAKE DOWN. NOTE: EMERGENCY ILLUMINATI❑\ SHALL HAVE AT LEAST AN AVERAGE 1 FOOT-CANDLE AND A MINIMUM AT ANY P❑INT OF 0,1 FOOT CANDLE MEASURED ALONG THE PATH IF EGRESS AT THE FLOOR LEVEL, EXIT ///////////// / EXITI o� 0 ]o 0 x 36' 24' x 48' 0 ,0 0 0 0 24' 48" `-6o 24 x 8' 0 1 I 1 1 0 0 bid C ....... 00•00000 0 go CCI ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////%% EXIT \G PLA\ GDGD NOTE: 59 OCCUPANTS 2 CORRETI.ON LTR#�. RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER EXITS REQUIREDblit'029 z z z 5 LU U LU CI O 2 INTERIOR DESIGN Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 O m cn z FOODS .iLVlf GL4NSULTANTS T�. PROJECT NAME CLOUD NINE CREAMERY SOUTHCENTER MALL SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.: 01-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10-24-17 ISSUE FOR ARCHITECT REVIEW 10-30-17 ISSUE FOR TI SUBMITTAL 11-16-17 RE -ISSUE CORRECTION #1 PROJECT CONSULTANTS Ia-VltmfEC FCR CGDE COMPLIANCE APPROVED DEC 01 2017 k 12F" City of Tukwila BUILDING DIVISION SHEET TITLE COVER SHEET SHEET NO. COVER EXISTING EXISTING ELECTRICAL EXIT I PANELS EMPLOYEE LOCKERS 4' 1" 5'-0" • 5'-0" 4' 6" 3.-4" 011'-6" r MEN 2_ 6 4' 0" 0 / WOMEN —- 0 N � A L 4'-0" H'L ii ii 1 1j11411"1 IPE SCULPTURE ' 4 0 1'-6" �c- COAT HOOKS O NITROGEN TANIb ROO NITROGEN TANK VIEW ROOM CLOUD NINE SQUARE FOOTAGE: 1,463 CLOUD \I\E C� -AV L y 24x36. EXISTI \G DI \ TAI F 24x48' O DW / PREP \G L FEATURE WALL 42" HIGH CTR. ERY EE00� 42" HIGH CTR. COUNTER SEATING 30" HIGH CTR. DLA\ 25 SEATS 42" HIGH CTR. 71 Fr - J L� 30" HIGH CTR. -STAURA\T DIGITAL MENU BOARDS ORDER/ PICK-UP 34" HC CTR HT /42" HIGH DIVIDER RAIUNG jGDGD 3o� 42" HIGH CTR. 30" HIGH CTR. F9- 0000 0000 ooba 1 J 0 ICE CREAM / PREP II \II 00000000 00 03000 Qoc9p000 aoo 000 oa000 joa 000"000"aoo 00000 0 0 42" HIGH CTR. N EXISTI\G SF ASS STOKE SCALE: 1/4-"=1'-0" NOTE: PUBLIC HEALTH — KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. 0 t • DISABLED RECD TOWEL DISPENSER/ N rs WASTE RECEPTACLE C) • 6" 36" MIN. co M " TY SEAT OVER NTS 12" 3'-6" TOILET TISSUE SEAT COVER DISPENSER NOTE: FLUSH OPERATION HANDLE TO BE LOCATED ON ACCESSIBLE SIDE OF WATER CLOSET 10 WATER CLOSET - STANDARD NTS TICAL HA\DICADP -3 0 X NTS MIRROR NTS ESTROOV SWITCH ❑ OUTLET 10 ELEV. TO Q SWITCHES AND Q OUTLETS NTS 17" MAX. TOP OF COUN z N 0 w W Z z N —J U Litt Y W U H LAVATORY CLEARANCES NTS FIXTUF 17" INSULATE EXPOSED PIPES MAX. TOE CLEARANCE TOTAL CLEARANCE DETAILS SCALE: NTS KEY 0 0 0 0 0 0 OYES PROVIDE WALL BACKING IN EXISTING WALL END FOR BLADE SIGN AS REQUIRED GENERAL CONTRACTOR SHALL COORDINATE WITH SIGN COMPANY. FIRE RATED SCREEN TENANT SHALL PROVIDE ALL SPECIFICATIONS OF NITROGEN TANK AND NITROGEN SYSTEM T0, LANDLORD. NITROGEN TANK SUPPLIER SHALL PROVIDE ANY AND ALL CODE COMPLIANCE & ADA WALL SIGNAGE NOTE: ALL SIGNAGE TO COMPLY WITH ICC/ANSI A117.1 —2009 SECTION 703.3.11 FOR LOCATION PROVIDE WALL BACKING IN NEW STOREFRONT FOR SIGN AS REQUIRED GENERAL CONTRACTOR SHALL COORDINATE WITH SIGN COMPANY. SEE SHEET FS -1.0 FOR PUBLIC RESTROOM FINISHES SEE APPROVED KING COUNTY HEALTH DEPARTMENT SHEET FS -1.0 INCLUDED IN THE PERMIT SUBMITTAL PLAN SET. GE 0 0 0 0 \EAL \OTES 00 0 r0 ENTRANCE BLADE SIGN BY SIGN COMPANY LOUD NINE CREAMERY SIGN BY 40 SIGN COMPANY WAFFLE BOWL PREP CERTIFICATIONS 900R TYD E S 8c <EY DIN TAI FUNG CLOUD NINE =X1 STI C O IV V \OTES \G 0 AS REQUIRED. V A ALL REA NEW 3'-0" X 7-0" SOLID CORE DOOR WITH LEAVER DOOR HANDEL AND SELF CLOSER PER CURRENT ADA CODE REQUIREMENTS. NEW 6'-0" X 8'—O" AUTOMATIC SLIDING DOOR WITH OPENING SENSOR EXISTING 3'-0" X 7'-0" METAL DOOR & METAL FRAME REAR EXIT DOOR. REPLACE OR REPAIR EXISTING PANIC HARDWARE AS REQUIRED. EXISTING 3'-0" X 7'-0" FIRE RATED METAL DOOR AND METAL FRAME NEW 6'-0" X 12'-0" COOKSON MOTORIZED ROLLING SECURITY GRILL RECESSED ABOVE CEILING. PROVIDE BIDDER DESIGNED SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAILS NEW 3'-0" X 7'-0" SOLID CORE EZ SWING SCP8 RESTAURANT DOOR ITEM # 16 SEE SPEC SHEET FOR DOOR TYPE. CONTRACTOR TO VERIFY ALL DIMENSIONS W/ THE LOD IF ANY DISCREPENCIES ARISE, CONTRACTOR HAS 24 HOURS TO INFORM LANDLORD, NO PROJECTIONS BEYOND THE LEASE LINE GENERAL CONTRACTOR TO NOTIFY MALL MANAGEMENT OF ANY SPRINKLER REWORK TWO BUSINESS DAYS IN ADVANCE. SPRINKLER DRAIN DOWN FEE MUST BE PAID IN ADVANCE DURING PRE—CONSTRUCTION MEETING. GENERAL CONTRACTOR TO ENSURE THAT DURING CONSTRUCTION DUST DOES NOT TRAVEL THROUGH THE COMMON PLENUM TO ADJACENT TENANT SPACES OR MALL COMMON AREA. GENERAL CONTRACTOR SHALL PROTECT ALL MALL FINISHES—PATCHBACK AND REPAIR AS NECESSARY. CONTACT FACILITIES FOR MALL TILES. REFER TO CONSTRUCTION MANUAL FOR CEILING AND NEUTRAL PIER PAINT SPEC. GENERAL CONTRACTOR TO CONDUCT DEMOLITION WALK—THROUGH WITH TC AND MALL FACILITIES PRIOR TO START OF ANY NEW WORK. COORDINATE CEILING ACCESS PANEL LOCATIONS WITH WALL FACILITIES PRIOR TO INSTALLING NEW CEILING. RECEIVED CITY OF TUKWILA NOV 20 2011 PERMIT CENTER CU z z 5 w W 0 O O LL INTERIOR DESIGN Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY SOUTHCENTER MALL SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10-24-17 ISSUE FOR ARCHITECT REVIEW 10-30-17 ISSUE FOR TI PERMIT PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FLOOR PLAN SHEET NO. 1 D-1.0 9' 8" — 5" 6' 9" — 5" 6' 9" — 5" 13'-7" — 5" 8'-11" 3' 0" i 0 7' 5" O 3' 0" 3" 6'-1" 5" 3'-0" 4'-6" ///////////////////////////////////////////// v//////////7-77//7-77-./ 14'-5" 39,-3" 5' 6" VFY //T/77/7777/7T///Z/7 /ZJT// /1777//777//777//7777/7777/7777/7777/7777/7777/7777/1777/ // Y//////// 1'-4" 4" ///////% 8'-3" MINE OF STOREFRONT FACADE ABOVE 6'-0" CLOUD \I\E Cif- A SCALE: 1/4"=1'- 0" WALL TYKES 8c O EY DI KEY \OT J \SIO\E9 WALL WALL TYKE & WALL QAC 3-5/8" METAL STUDS 16" 0.C. WITH ONE LAYERS OF 5/8" TYPE "X" GWB ON BOTH SIDES. NOTE: SECURE BOTTOM METAL TRACK TO EXISTING SLAB WITH POWER ACTUATED FASTENERS © 16" 0.C. SECURE TOP OF WALL TO EXISTING STRUCTURE AS REQUIRED. INSULATE WALLS WITH A MIN OF 3-1/2" INSULATION. O1" METAL HAT CHANNEL WITH 5/8" TYPE "X" GWB ONE SIDE FIRE TAPE AND SEAL AS REQUIRED TO CREATE A 1 HR RATED ASSEMBLY. O 3-1/2" METAL STUDS 16" 0.C. WITH ONE LAYER OF 5/8" TYPE "X" GWB ON ONE SIDE. NOTE: SECURE BOTTOM METAL TRACK TO EXISTING SLAB WITH POWER ACTUATED FASTENERS © 16" 0.C. SECURE TOP OF WALL TO EXISTING STRUCTURE AS REQUIRED. O PARTIAL HEIGHT WALL 3-1/2" METAL STUDS 16" 0.C. WITH ONE LAYER OF 5/8" TYPE "X" GWB ON ONE SIDE. NOTE: SECURE BOTTOM METAL TRACK TO EXISTING SLAB WITH POWER ACTUATED FASTENERS © 16" 0.C. SEE ELEVATION 1 SHEET ID -6.0 FOR VARIABLE HEIGHTS.. EDEXISTING DEMISING WALL 5/8" TYPE "X" GWB ONE SIDE. PATCH, REPAIR, AND FIRE TAPE AS REQUIRED TO CREATE A I HR FIRE RATED ASSEMBLY. OF NEW STOREFRONT ASSEMBLY SEE S-1 SHEET ID -6.0 & STOREFRONT ELEVATIONS & DETAILS SHEET SF -1.0 O SOFFIT ABOVE STOREFRONT ROOMS 3-5/8" METAL STUDS 16" 0.C. WITH ONE LAYERS OF 5/8" TYPE "X" GWB ON BOTH SIDES. NOTE: SEE SHEET ID -6.0 ELEVATIONS AND SHEET ID -8.0 REFLECTED CEILING PLAN. SECURE TOP OF SOFFIT WALL TO EXISTING STRUCTURE AS REQUIRED. INSULATE WALLS WITH A MIN OF 3-1/2" INSULATION. EDNEW STOREFRONT ROOM ASSEMBLIES ELEVATIONS SHEET ID -6.0 WALL LEGE\ D DIV E\SIO\ EXISTING DEMISING WALLS & PIERS NEW WALLS \OHS OCONTRACTORS AND SUB -CONTRACTORS SHALL VERIFY ALL EXISTING HELD DIMENSIONS FOR THERE INDIVIDUAL SCOPE OF WORK. O DIMENSIONS ARE FROM FACE OF EXISTING OR NEW GWB UNLESS OTHERWISE NOTED ON PLAN. WALL QAC KI\G <EY \CTIS 61 3/4" FIRE TREATED PLYWOOD WALL BACKING BETWEEN STUDS FOR SS WALL SHELVES, SS WT, SINKS, PRE -RINSE & WALL MOUNTED SHELVING FROM +30" AFF TO 11" AFF TYPICAL SEE SHEET FS -6.0 ELEVATIONS FOR LOCATIONS. 0 3/4" FIRE TREATED PLYWOOD WALL BACKING BETWEEN STUDS FOR WALL HUNG PUBLIC RESTROOM SINKS & GRAB BARS VERIFY HEIGHTS. 0 3/4" FIRE RATED PLYWOOD WALL BACKING BETWEEN STUDS FOR DIGITAL MENU BOARDS VERIFY MOUNTING HEIGHT AND LOCATIONS WITH OWNER. KI\G PLA\ 5/8' TYPE "X' GWB BOTH SIDES METAL STUD FRAMED WALLS 016" 0.C. SEE PLAN THIS SHEET FOR LOCATIONS. EXISTING ROOF EXISTING ROOF STRUCTURE SECURE NEW WALL TOP PLATE TO EXISTING STRUCTURE AS REQUIRED ALL NEW WALLS SHALL BE INSULATED WITH A MIN OF 3-1/2" INSULATION. \EW WALL TYPE A CO SCALE:3/4" = 1'-0" SECURE ALL NEW WALLS TO EXISTING SLAB WITH POWER ACUATED FASTNERS @ 16' OC \STUCTIO 3 -TAIL TYP C SY V 1" METAL HAT CHANNEL 0 16' O.C. SECURED TO IXISIING SEARS OUTSIDE WALL AS REQUIRED. 5/8' TYPE "X' GWB ONE SIDE VARIES X1/2" SOLID SURFACE COUNTERTOP MATERIAL 3/4" PLYWOOD COUNTERTOP SUB BASE FIRE TREATED 2 X 4 WOOD BUCKS LAG BOLT TO 1" X 1" TUBE STEEL SUPPORTS SEE SHEET ID -1.0 FOR LOCATIONS \EW WALL TYKE SCALE:3/4" = 1'-0" B METAL STUD FRAMED WALLS @ 16" OC. SEE PLAN THIS SHEET FOR LOCATIONS. SECURE NEW PARTIAL HT WALL TO EXISTING SLAB WITH POWER ACUATED FASTNERS ®16" OC CO\S-R.,CTIO\ DETAIL bs (7- o2ict RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER t9 z z z S INTERIOR DESIGN FOODSERVICE z G) z Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 FOOdi% ICECG'P SULTAUTS SOCI {: TEkt1AE'JONA1. `L$ r" ,AmeNIC,",aS PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 aWASHEINFITzP:71 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10-24-17 ISSUE FOR ARCHITECT REVIEW 10-30-17 ISSUE FOR TI SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE DIMENSIONED WALL / WALL TYPE PLAN WALL BACKING PLAN SHEET NO. ID -1.1 0 0 0 0 ST -1 SF -1 SF -1 SF -1 101. '\)011 ST -1 RB -1 ST -1 ST -1 RB -1 RB -1 E SF -1 0 CLO..9 C� -AV �Y FL00� FI\IS PLA SCALE: 1/4"=1'-0" CLOUD \I\E „EAVEY WALL FI\ ISI SCALE: 1/4"=1'-0" PLA\ FLOOR F S FS ST -1 CUSTOM CONCRETE STAIN FINISH BY PARADISE STUDIOS. STAINED AND SEALED AS REQUIRED. SF -1 ALTRO CLASSIC 25 COVE UP ALL WALLS & MILLWORK CABINET BASES 6". COLOR: GRAPHITE # X2546R11 NOTE: HEAT WELD ALL SEAMS WITH ALTRO WELDING ROD # WR86 PER MANUFACTURERS RECOMMENDATIONS. RB -1 ROPPE PINNACLE RUBBER 6" COVED WALL BASE COLOR: 100 BLACK FLOOR Fl\ \OT -S 0 PER WESTFIELD REQUIREMENTS TENANT TO INSTALL WATERPROOF MEMBRANE THIS AREA AND UP THE WALL 12" TO ISOLATE LEAKS AND SPILLS. ()EXISTING MALL FLOOR TILES PROVIDE METAL TRANSITION STRIP AS REQUIRED BETWEEN NEW STAINED CONCRETE FLOOR AND MALL TILE. O PROVIDE METAL FLOOR TRANSITION STRIP BETWEEN SF -1 & ST -1 AS REQUIRED WALL fl\S PT -1 CT -1 GT -1 ins SHERWIN-WILLIAMS COLOR: SW 7006 EXTRA WHITE SEMI -GLOSS ACRYLIC ENAMEL FINISH UNITED TILE BELLAVITA-METRO 3" X 6" COLOR: SUPERWHITE GLOSSY NOTE: TILE ABOVE FLOORING 6" COVED BASE 48" A.F.F. UNITED TILE INTERSTYLE GLASS TILES 4" X 12" PATTERN: DUNE COLOR: CHINCHILLA NOTE: SEE SHEET FS -6.0 ELEVATION 1 FOR LOCATION. FRP-1 MARLITE FRP SMOOTH FINISH PATTERN: SMOOTH SURFACE COLOR: S 100G WHITE NOTE: PROVIDE ALL TRIM AS REQUIRED. START ABOVE 6" COVED BASE TO 8' A.F.F. VWC-1 TYPE II VINYL WALL COVERING MURAL / GRAPHICS BY OWNER. WALL I-1\ S FY \OTFS OSEE SHEET SF -1.0 ELEVATION 1 FOR PAINT LOCATION ®SEE SHEET ID -1.0 ELEVATION 1 FOR PAINT AND WALL MURAL / GRAPHICS LOCATIONS O SEE SHEET FS -6.0 ELEVATION 1 FOR PAINT AND GLASS TILE LOCATIONS RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER z z g LLI oc W INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 G) ^^z z PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10-30-17 ISSUE FOR TI PERMIT SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FLOOR FINISH & WALL FINISH PLAN SHEET NO. D-4.0 S-1 SECTION ID -6.0 SCALE 1/4-1'-O' GC SHALL PROVIDE 3-5/8' METAL SRA WITH 5/8' TYPE 'X' ONE /.. SIDE MD BACK TO USING STRUCTURE AS RECTI RED BY CODE WAW SOFFIT SFE SHEET IO -8.0 FOR SHAPE 5/8' TWEE 'X' GM °BUNG CONS1RUCRON PER CODE REOIURBIENTS 12'-0" EXTG. SLAB 14'-0" 12'-0" 5/8' TYPE 'X' GWB GB UNG CONSTRUCTION PER CGDE IECI1IiELENTS STORE FRONT SYSTEM ASSEIBI.Y SHALL BE BIDDER DESIGNED. PROVIDE SHOP DRAMINGS FOR FINAL CONSTRUCTION DETAIS 1 4" / / • 4" / 4" / K— 8 2 \ ELEVATION 10'-6" • 12'-0" ID -6.0 GC SWILL PROVIDE 3-5/8' METAL STUD PATH 5/8' TWE '2 OIE SIDE RED BACK TO DOSING STRUCTURE AS REWIRE) BY CCDE. 0 / 0 / • 10'-6" 14'-0" 5/8' TYPE 'X' GWB CB NG CONSTRUCTION PER CODE RECUREMENTS / DIM. SLAB 8'-0" BACK UT FEATURE WALL -..____ 1 GC SHALL PROVIDE 3-5/8' METAL STUD WITH 5/8' TYPE T ONE SIDE 11ED BAD( TO r-_ DOSING STRUCTURE AS REQUIRED BY CODE juoT�ozmRaLuP SECURITY XL RECESSED ABOVE ? \ROIL 'RAW SHAPED STOREFRONT OPENING REFER 10 BIDDER DESIGIED SHCP,....... DRUM UP SECURITY GATE GUIDE POST REFER TO BIDER DESGLTED SHOP DRAMS 2'-0" WAW SOFFIT SEE SHEET ID -8.0 FON SHAPE DESIGN REFER TO BOER DESIGNED Sle WINGS FOR FINAL T1RUCION DETAILS - \ \ / 5/8' TYPE 'X' GMB CUING CONSTRUCTION PER CODE RECUIRBENTS 5/8' TYPE '1(' GIB MG CONSTRUCTION PER CODE RECUREVIERTS / SUE FRONT SYSiBA ASSBELY 9'-6" HEADER 12'-0" CLG HT 14'-0" TO EXTG. WEB TRUSS OF NEW WAVY BOTTOM OF & TOP SOFFIT ROLL UP SECUlY GATE GUIDE POST REFER TO B/)OR DESIGNED SHOP DRAM SHALL BE BIDDER DESIGNED PROVIDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAILS \ / DK SLAB / S-1 SECTION ID -6.0 SCALE 1/4-1'-O' GC SHALL PROVIDE 3-5/8' METAL SRA WITH 5/8' TYPE 'X' ONE /.. SIDE MD BACK TO USING STRUCTURE AS RECTI RED BY CODE WAW SOFFIT SFE SHEET IO -8.0 FOR SHAPE 5/8' TWEE 'X' GM °BUNG CONS1RUCRON PER CODE REOIURBIENTS 12'-0" EXTG. SLAB 14'-0" 12'-0" 5/8' TYPE 'X' GWB GB UNG CONSTRUCTION PER CGDE IECI1IiELENTS STORE FRONT SYSTEM ASSEIBI.Y SHALL BE BIDDER DESIGNED. PROVIDE SHOP DRAMINGS FOR FINAL CONSTRUCTION DETAIS 1 4" / / • 4" / 4" / K— 8 2 \ ELEVATION 10'-6" • 12'-0" ID -6.0 GC SWILL PROVIDE 3-5/8' METAL STUD PATH 5/8' TWE '2 OIE SIDE RED BACK TO DOSING STRUCTURE AS REWIRE) BY CCDE. 0 / 0 / • 10'-6" 14'-0" 5/8' TYPE 'X' GWB CB NG CONSTRUCTION PER CODE RECUREMENTS / DIM. SLAB 8'-0" 4' X 12" DECORATIVE GLASS MIMES PT -1 4 X 12' DECORATIVE CLASS TIES .- WAVY SOFFIT SFE SHEET— D-8.0 FOR SHAPE PT -1 — 3'-8" '/ 2'-4" SGA 3'-0" NPL -1/ \RB -1 PH 1'-2" 4'-2" 3,-6" SOLD SURFACE TOP GARZA INC. MATE CARRARA-1791/2" RICK TYPICAL. ALL MILLWOPo( TOPS & SIT UP COUNTER TOPS rv...,,, 2'-6" SLOE FRONT SYSTEM ASSEMBLY 011H MOTION ACTIVATED SIDING DOOR SHALL BE BIDDER DEWED. PROVDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAIS PT -1 14'-0" 12'-0" 10'-6" 14'-0" 9'-6" HEADER 6 RD -1 BACK UT FEATURE WALL -..____ STORE FRONT SYSTEM ASSEMBLY SHALL BE BIDDER DESICED PROVDE SHOP DRAWS FOR FINAL CONSTRUCTION DETAILS. ? \ROIL 'RAW SHAPED STOREFRONT OPENING REFER 10 BIDDER DESIGIED SHCP,....... DRUM UP SECURITY GATE GUIDE POST REFER TO BIDER DESGLTED SHOP DRAMS \ \ / 4' X 12" DECORATIVE GLASS MIMES PT -1 4 X 12' DECORATIVE CLASS TIES .- WAVY SOFFIT SFE SHEET— D-8.0 FOR SHAPE PT -1 — 3'-8" '/ 2'-4" SGA 3'-0" NPL -1/ \RB -1 PH 1'-2" 4'-2" 3,-6" SOLD SURFACE TOP GARZA INC. MATE CARRARA-1791/2" RICK TYPICAL. ALL MILLWOPo( TOPS & SIT UP COUNTER TOPS rv...,,, 2'-6" SLOE FRONT SYSTEM ASSEMBLY 011H MOTION ACTIVATED SIDING DOOR SHALL BE BIDDER DEWED. PROVDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAIS PT -1 14'-0" 12'-0" 10'-6" 14'-0" 9'-6" HEADER 6 RD -1 • PT -1\ 12'-0" 6" 5'-6" SOLD SURFACE TOP GARZA INC. WIT CARRARA Fa -1791/2' DICK TYPICAL ALL VLLWO I( TOPS & SIT UP COUN1ER TOPS 2'-4" ELEVATION SCALE: 1/4-1'-O' 4 X 12' DECORATIVE / RB -1 CUSS TILES 3'-0" i RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10/30/17 ISSUE FOR TI SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE INTERIOR ELEVATIONS SHEET NO. ID -6.0 BACK UT FEATURE WALL 3FORM WAVE ELBOSS-,................... • PT -1\ 12'-0" 6" 5'-6" SOLD SURFACE TOP GARZA INC. WIT CARRARA Fa -1791/2' DICK TYPICAL ALL VLLWO I( TOPS & SIT UP COUN1ER TOPS 2'-4" ELEVATION SCALE: 1/4-1'-O' 4 X 12' DECORATIVE / RB -1 CUSS TILES 3'-0" i RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10/30/17 ISSUE FOR TI SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE INTERIOR ELEVATIONS SHEET NO. ID -6.0 CLG HT_ 10'-0" W cv CL -1' CLG HT 12'-0„ \CLG1 8'-0" \PT-1�, 6 ACL-2�, Q CLGBHT 8'-O 9 c\ eE E H H T CL-2� H H�PT-1 CLOUD \I\ SCALE: 1 /4"=1'-0" CF- L \G CLG HT 10'-6" CEA FI\ PT -1 0-1 60W T "CLG HT 12'-0 A CL -1 rA E E CL -2 eE is)E G� K PT -2 CL -3 sow K _-i 60W 1.--160W —CLG HT 12'-0" 0 L PT -1 T 0 L Tt' T CL -2 EY LIGHTI\G SCP SLA\ PT -1 PT -2 F-- IL SHERWIN WILLIAMS COLOR: SW7006 EXTRA WHITE FINISH: SEMI -GLOSS ACRYLIC ENAMEL SHERWIL WILLIAMS COLOR: SW 6990 CAVIAR FINISH: SATIN G TYDES CL -1 CL -2 CL -3 2' X 4' CEILING GRID SYSTEM WITH 1/2" LAY IN VINYL COATED GWB PANELS. CEILING GRID PER CODE REQUIREMENTS. 5/8" TYPE "X" GWB CEILING CONSTRUCTION PER CODE REQUIREMENTS. OPEN CEILING TO EXISTING STRUCTURE ABOVE PAINT OUT ALL EXPOSED SURFACES PT -2 AS REQUIRED. eE \ ,6)E �E �E CL-2- CL -3 PT -3 K60W T v?)E 0 L P1 x W eL CLG HT 12'-0" L T°I ° L ROLL UP SECURITY GATE RECESSED IN CEILING REFER TO BIDDER DESIGNED SHOP DRAWINGS. G LIGHTI\G LEGE\ D FIXTURE TYPE 2' X 4' LED DROP IN TROFFER 25 WATTS 013 6" RECESSED LED DOWN LIGHT 44 WATTS EXIT .12D H OL i0 N 0' 100W I & K 0 T EXIT LIGHT FIXTURE WITH BATTERY BACK—UP AND EMERGENCY LIGHTING EXEMPT LESS THAN 5 WATTS PER FIXTURE. EMERGENCY LIGHTING FIXTURE WITH BATTERY BACK—UP EXEMPT. LOW VOLTAGE SINGLE CIRCUIT MONORAIL SYSTEM. TRANSFORMER CONTROLLED. 150 WATTS PER TRANSFORMER WATTAGE DESIGNATED ON PLAN. LOW VOLTAGE SINGLE CIRCUIT MONORAIL SYSTEM. TRANSFORMER CONTROLLED. 150 WATTS PER TRANSFORMER WATTAGE DESIGNATED ON PLAN. CUSTOM DECORATIVE LED PENDANT LIGHT 10 WATTS NOTE: OFCI OWNER FURNISHED CONTRACTOR INSTALLED CUSTOM DECORATIVE LED CHANDELIER 50 WATTS. NOTE: OFCI OWNER FURNISHED CONTRACTOR INSTALLED. CUSTOM LED VANITY LIGHT 20 WATTS NOTE: OFCI OWNER FURNISHED CONTRACTOR INSTALLED. LED RGB LIGHTING SYSTEM SEE DETAILS FOR LOCATIONS EXEMPT 2' X 2' LED DROP IN TROFFER 18 WATTS REMOTE TRANSFORMER SEE PLAN FOR ACTUAL TRANSFORMER WATTAGES NOTE: ALL PUBLIC AREA LIGHTING SHALL BE ON DIMMERS. NOTE: SEE LIGHTING ENERGY CALCULATION SHEETS FOR LIGHTING POWER ALLOWANCE CODE COMPLIANCE. TOTAL WATTS ALLOWED 1103 WATTS TOTAL WATTS USED 1093 WATTS TOTAL WATTS UNDER ALLOWED 10 WATTS INTERIOR LIGHTING POWER ALLOWANCE COMPLIES. GE\E AL NOTES ELECTRICAL CONTRACTOR SHALL PROVIDE ONE EMPTY 1/2" EMT CONDUIT RUN WITH PULL STRING FOR EACH SUB—TRADE AS FOLLOWS: MUSIC & SOUND SYSTEM; & SECURITY SYSTEM. MEANS OF EGRESS AND THE EXIT DISCHARGE SHALL BE ILLUMINATED AT ALL TIMES THE BUILDING IS OCCUPIES (15 IBC 1006.1). iLLUMINATION EMERGENCY POWER SHALL PROVIDE FOR 90 MINUTE DURATION AND SHALL CI=ONSIST OF STORAGE BATTERIES, UNIT EQUIPMENT OR ON—SITE GENERATOR. (15 IBC 1006.3) EXIT SIGNS MUST INCLUDE A TACTILE SIGN STATING EXIT COMPLYING WITH ICC. A117.1-2009 AND SHALL BE ADJSCENT EACH DOORWAY, EXIT PASSAGEWAY & EXIT DISCHARGE. (15 IBC 1001.3) /KEY \OTES NOTE: A.F.F.=ABOVE FINISHED FLOOR. CI LINE OF CURVED SOFFIT O CENTER NEW EXIT/EMERGENCY LIGHT OVER DOOR AS REQUIRED. NEW EMERGENCY PATHWAY LIGHT MOUNT +11'-0" A.F.F. O BOTTOM OF MONORAIL TRACK LIGHTING 10'-0" A.F.F. @ CL -3 ONLY. b 02.9 RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 1 —1z 6) 0 m cn G) z. FOODS VICE CO +i5LIY.T.4NT5;3OCI 'Y.I1-4T1; ttATIQN Tfif;A me11111Ag PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 9-13-17 ISSUE FOR FIRE SPRINKLER DES 9-14-17 ISSUE FOR FIRE SPRINKLER DES 10-24-17 ISSUE FOR ARCHITECT REVIEW 10-30-17 ISSUE FOR TI PERMIT SET PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE INTERIOR LIGHTING RCP PLAN SHEET NO. 1 D-8.0 EXISTING SEARS STORE GC SHALL PROVIDE 3-5/8" METAL STUD WITH 5/8" TYPE "X" ONE SIDE FACADE ABOVE STOREFRONT ASSEMBLY. TIE BACK TO EXISTING STRUCTURE AS REQUIRED 4" X 12" DECORATIVE GLASS TILES 1 CLOUD NINE CREAMERY STOREF 6'" TYPICAL "FLASK" SHAPED STOREFRONT OPENING REFER TO BIDDER DESIGNED SF OP DRAWINGS • SIGN BY SIGN COMPANY VERIFY FINAL SIZE AND LOCATION. GC SHALL PROVIDE BACKING AND ELECTRICAL AS REQUIRED. STORE FRONT SYSTEM ASSEMBLY SHALL BE BIDDER DESIGNED PROVIDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAILS. OPEN • ROLL UP SECURITY GATE GUIDE POSTS BEYOND REFER TO BIDDER DESIGNED SHOP DRAWINGS 6'-0" 0\1T ELEVATION SF -1. SCALE: 1 /2"=1'-0" HIGH GLOSS PAINTED FINISH 4" X 12" DECORATIVE GLASS TILES CLOUD NINE CREAMERY NEUTRAL PIER BLADE SIGN :Y SIGN COMPANY GC SHALL PROVDE BACKING AND ELECTRICAL AS REQUIRED. 10'-0" 2'-2" • fl 8" EXISTING DIN TAI FUNG RESTAURANT 3'-2" 1 2'-0" 15'-6" • 12'-0" S— • 5/8" TYPE "X" GWB CEILING CONSTRUCTION PER CODE REQUIREMENTS GC SHALL PROVIDE 3-5/8" METAL STUD WITH 5/8" TYPE "X" ONE SIDE FACADE ABOVE STOREFRONT ASSEMBLY. 11E BACK TO EXISTING STRUCTURE AS REQUIRED STORE FRONT SYSTEM ASSEMBLY SHALL BE BIDDER DESIGNED PROVIDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAILS. MILLWORK COUNTER AND CABINETRY BIDDER DESIGNED HIGH GLOSS PAINTED FINISH 3/4 " FIRE TREATED PLYWOOD INSERT 1/4" CEMENT BACKER BOARD 4" X 12" DECORATIVE GLASS TILES S TO REFRON T SECTION SF -1. SCALE: 1 /2"=1'-0" GC SHALL PROVIDE 3-5/8" METAL STUD WITH 5/8" TYPE "X" ONE SIDE FACADE ABOVE STOREFRONT ASSEMBLY. TIE BACK TO EXISTING STRUCTURE AS REQUIRED 5/8" TYPE "X" GWB CEILING CONSTRUCTION PER CODE REQUIREMENTS 1 2'-0" ROLL UP SECURITY GATE GUIDE' POST REFER TO BIDDER DESIGNED SHOP DRAWINGS STORE FRONT SYSTEM ASSEMBLY SHALL BE BIDDER DESIGNED PROVIDE SHOP DRAWINGS FOR FINAL CONSTRUCTION DETAILS. MILLWORK COUNTER AND CABINETRY BIDDER DESIGNED 3/4 " FIRE TREATED PLYWOOD INSERT 1/4" CEMENT BACKER BOARD 4" X 12" DECORATIVE GLASS TILES S-2 STOREFRONT SECTION SF -1.0 SCALE: 1 /2"=1'-0" II-- oi99 RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10/25/17 ISSUE FOR ARCHITECT REVIEW 10/30/17 ISSUE FOR TI SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE STOREFRONT ELEVATIONS AND DETAILS SHEET NO. SF -1.0 ( 29 ) EXISTING EXIT 0 ( 55 ) RE(SSED GREASE INTERCEPTOR 43 ) MEN 0 TT 7 WOMEN 54 ) --r EXIST! ( OVER0 ) ( )( 41 4 \G DI\ TAI FU\G RFSTALA\T 30 UNDER ( 31 30 1- L • 9 OVER 7 A( 2 DW 'REP 56 52 UNDER OVER 1 ICE CREAM / PREP ( 42 ) ( 26 35 21 ) OVER. L_ L 1 18 62 UNDER IL J1 ORDER/ 63 ) PICK-UP UNDER 45 ( 65 ) 20 ) ( 29 ) UNDER 37 36 GATE ENTRANCE CLOUD NINE SQUARE FOOTAGE: 1,408 CLO,3 \I\E C EA VERY FOODSEVICE FQ„IP v EXISTI\G SEAS STOKE E\T PLA\ SCALE: 1/4"=1'-0" KI\G COU\TY HEALTH DE3ATVE\T G \EAL \CT -s 1. KING COUNTY HEALTH PERMIT REQUIRED PRIOR TO OPENING OF OPERATION FOR BUSINESS. 2. AN INDIRECT WASTE IS REQUIRED FOR FOOD PREPARATION SINKS. 3. WATER HEATER MUST BE OF SUFFICIENT SIZE TO PROVIDE HOT WATER TO POT & PAN SINK, PREP SINK, MOP SINK AND AT THE SAME TIME PROVIDE HOT WATER TO ALL HAND WASH SINKS.. 4. A PRE—OPERATIONAL KING COUNTY HEALTH DEPT. INSPECTION IS REQUIRED PRIOR TO OPENING OF THE BUSINESS. 5. NO CHANGES WILL BE MADE WITHOUT KING COUNTY HEALTH DEPARTMENT APPROVAL. 6. MINIMUM HOT WATER TEMPERATURE ALLOWED AT ALL HAND SINKS SHALL BE 100 DEGREES F AT THE TAP THROUGH A MIXING VALVE. IDEAL TEMPERATURE RANGE IS 100-120 DEGREES F. SELF—CLOSING OR METERING FAUCETS SHALL PROVIDE A FLOW OF WATER FOR A MINIMUM OF 15 SECONDS 7. WATER HEATER CAPACITY SIZING BY PLUMBER. SHALL BE LARGE ENOUGH TO MEET THE PEEK HOT WATER NEEDS OF CLOUD NINE CREAMERY LEASED SPACE #700 FACILITY. 8. ALL FLOOR, WALL, & CEILING MATERIALS IN FOOD SERVICE PREPARATION & SERVICE AREAS SHALL BE SMOOTH, DURABLE & EASILY CLEANABLE. SEE SHEET FS -1.0 FOR TYPICAL FOOD SERVICE FINISHES ON FLOORS, WALLS, & CEILINGS. 9. ALL PLUMBING WORK SHALL BE DONE BY A COMMERCIAL PLUMBER UNDER A PLUMBING PERMIT FROM THE APPROPRIATE JURISDICTION. PLUMBING SYSTEM SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED ACCORDING TO ALL APPLICABLE CURRENT CODES & ORDINANCES. 10. ALL FOOD STORAGE SHALL BE A MINIMUM OF 6" OFF THE FLOOR. 11. THERE SHALL NOT BE ANY EXPOSED PLUMBING OR WIRING IN THIS FOODSERVICE FACILITY THAT DOES NOT MEET ALL LOCAL CODE REQUIREMENTS. 12. ALL FOODSERVICE EQUIPMENT AND CABINETRY SHALL BE FLUSH MOUNTED (OR SMOOTH AND SEALED) TO COUNTERS, WALLS OR FLOORS, OR BE RAISED / LOCATED TO ALLOW FOR CLEANING. 13. ALL LIGHTING FIXTURES MUST BE SHIELDED IN FOODSERVICE AREAS. P00 0 0 0 0 0 0 0 DSI- -Y \OTCs ALL HAND SINKS SHALL BE EQUIPPED WITH MIXING FAUCETS OR COMBINATION FAUCET, HAND SOAP AND PAPER TOWELS. PROVIDE INDIRECT WASTE FLOOR SINK AT PREP SINK ITEM #13 PROVIDE INDIRECT WASTE FLOOR SINK AT MIXING BOWL THAW SINKS ITEM #27 PROVIDE FLOOR DRAINS IN ALL AREAS WHERE FLOORS ARE SUBJECT TO WETTING. ITEM #26 DIPPER WELL DOES NOT REQUIRE RUNNING WATER OR INDIRECT DRAIN PER NSF & UL LISTINGS FOR THIS PIECE OF FOODSERVICE EQUIPMENT EMPLOYEE LOCKERS ITEM #37 SNEEZE GUARDS SHALL BE 64" ABOVE FINISHED FLOOR. NSF CODE MINIMUM IS 60" ABOVE FINISHED FLOOR. SEE SPECIFICATIONS SHEET FOR ITEM #37. IFXISTI\G COVVO\ V A ALL EA NOTE: PUBLIC HEALTH — KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL. FI\ISH SC EDW._ ALL FLOORS, WALLS AND CEILINGS MUST BE SMOOTH, DURABLE AND EASY TO CLEAN. ALL FLOORS,WALLS, AND CEILINGS MUST BE SMOOTH, NON-TOXIC, NON-ABSORBENT, DURABLE AND EASILY CLEANABLE. FLOORS ALL FLOORS IN DW / PREP & ICE CREAM PREP AREAS SHALL BE ALTRO SHEET GOODS FLOORING COVED UP WALLS & CABINET BASES 6" ALL ALTRO FLOORING SEAMS SHALL BE HEAT WELDED. ALL OTHER FLOOR AREAS IN THE CLOUD NINE SPACE SHALL BE STAINED AND SEALED CONCRETE WITH 6" COVED RUBBER BASE AT ALL WALLS AND CABINET BASES. WALLS ALL WALLS IN PUBLIC RESTROOMS SHALL BE TILED UP 48" WITH COVED TOLE BASE AND SEMI -GLOSS PAINT ABOVE TILE TO CEILING ALL FOODSERVICE AREA WALLS SHALL BE PAINTED WITH SEMI -GLOSS PAINT OR HAVE WASHABLE GLASS TILES. ALL PUBLIC AREA WALLS SHALL HAVE SEMI -GLOSS PAINT OR WASHABLE TYPE II VINYL WALL COVERINGS. CEILINGS GRID CEILING IN DW / PREP AREA SHALL BE WASHABLE VINYL COATED 2' X 4' LAY -IN PANELS. ALL CEILINGS IN ICE CREAM PREP AREAS, PUBLIC AREAS, & PUBLIC RESTROOMS SHALL BE SEMI -GLOSS PAINT.. CLOUD \I 191 SOUT \E CEAV CE\TE E ll I7- 02?? 4 W ILL REQUIRE THE ADDRESS FOR THIS SPACE WHICH 15 t,• RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER t9 z z z g a W U W ui O NTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 ^� z 1 FOODS -UM E(CIN U LT ITS SOCIL LI .; S PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILLA, WA. 98188 DESIGN TEAM PROJECT NO.: 01-2016 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 7-20-17 ISSUE FOR CLIENT REVIEW 7-26-17 8-25-17 8-28-17 REV. ISSUE FOR CLIENT REVIEW REV. ISSUE FOR CLIENT REVIEW REV. ISSUE FOR CLIENT MEETING 9-6-17 ISSUE FOR HEALTH DEPT PERMIT PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE EQUIPMENT FLOOR PLAN SHEET NO. FS -1.0 FOODSI- RV SC-FDLF Cl- FQRVF\T NO. QTY. DESCRIPTION ELECTRICAL WATER WASTE GAS EQUIPMENT NOTES VOLTS PHASE AMPS KW HP CONNECTION HOT COLD DIRECT INDIRECT CONNECTION SIZE BTU'S 1 1 UPRIGHT REFRIGERATOR TRUE #STM1 R-1 S -HC 115 1 3.8 1/4 NEMA 5-15P SEE SHEET FS -5.0 2 1 S/S FLOOR MOP SINK ADVANCE TABCO #9 -OP -20 W UTILITY SHELF #K-245 2" 3 1 12" HIGH X S/S SPLASH GUARD @ PREP SINK ADVANCE TABCO #93-1-24-18R W #K-454 S/S SP GUARD 4 2 WALL HUNG SS HAND SINK W SS SPLASH GUARDS, TOWEL 7 & SOAP DISPENSER ADVANCE TABCO #7 -PS -73 1/2" 1/2" 2" 5 1 S/S CLEAN DISHTABLE ADVANCE TABCO # DTC -S70 -48L 6 1 LOW TEMP DISH MACHINE AUTO -CHLOR #A5 LEASED 115 1 20 J -BOX IN WALL FS -1 CONNECT DRAIN AND RUN TO FLOOR SINK FS -1 SEE SHEET FS -4.0 & FS -5.0 7 1 PRE -RINSE FAUCET FISHER #27332 1/2" 1/2" 8 1 S/S SOILED DISHTABLE ADVANCE TABCO #DTS-S70-36R 2" CONNECT DIRECT DRAIN. RUN DRAIN TO RECESSED GREASE TRAP ITEM #55 AS REQUIRED BY CODE. SEE SHEET FS -4.0 9 1 MOBILE DISH GLASS RACK DOLLY LAKESIDE #337 W HANDEL 10 1 S/S 3 -COMP SINK ADVANCE TABCO #K7 -CS -21 2" CONNECT TO DIRECT WASTE DRAIN RUN DRAIN TO RECESSED GREASE TRAP ITEM# 55 AS REQUIRED BY CODE SEE SHEET FS -4.0 11 1 FAUCET FISHER #3254 1/2" 1/2" 12 2 S/S WALL SHELVES ADVANCE TABCO #WS -12-16 13 1 S/S 1 -COMPARTMENT PREP SINK ADVANCE TABCO #93-1-24-18R FS -2 CONNECT DRAIN AND RUN TO FLOOR SINK SEE SHEET FS -4.0 14 1 FAUCET FISHER #3254 1/2" 1/2" 15 1 UPRIGHT TWO DOOR FREEZER TRUE #STM2F-2S 115 1 9.0 3/4 NEMA 5-15P SEE SHEET FS -5.0 16 1 E -Z SWING KITCHEN DOOR ELIASON #SCP -8 17 1LOT POS SYSTEM BY OWNER 115 1 15 NEMA 5-15P SEE SHEET FS -5.0 18 1LOT COCA-COLA FREESTYLE CTR. TOP BEV. DISP.#7000 115 1 20 NEMA 5-15P 1 /2"• FS -3 CONNECT DRAIN AND RUN TO FLOOR SINK SEE SHEET FS -4.0 & FS -5.0 19 1 PIE CASE CAL -MIL #1202 20 1 DROP-IN REFRIG. COLD PAN DELFIELD #N8118B 115 1 3.7 1/5 NEMA 5-15P FD CONNECT DRAIN AND RUN TO FLOOR DRAIN WITH INDIRECT FUNNEL DRAIN SEE SHEET FS -4.0 & FS -5.0 21 4 S/S WALL DISPLAY SHELVES ADVANCE TABCO #WS -12-48-16 22 1 U/C CART NEW AGE INDUSTRIAL #090517BM 23 2 WAFFLE BOWL MAKERS WARING #WWCM200 120 1 11.6 ELECTRICIAN SHALL PROVIDE ADDITIONAL 208-240/1/20A SEE SHEET FS -5.0 24 SPARE NUMBER 25 1 CUSTOM PLEXIGLAS FLAVOR SHOT HOLDER 26 3 DIPPER WELL SERVER #CW -DI 87770 115 1 1 NEMA 5-15P SEE SHEET FS -5.0 27 3 S/S MIXING BOWL THAW SINKS VOLLRATH #201260 1/2" FS -4 CONNECT DRAINS AND RUN TO FLOOR SINKS FS -4, FS -5, & FS -6 SEE SHEET FS -4.0 28 3 COUNTER TOP MIXER KITCHENAID #KSM8990ER 120 1 4.1 1.3 NEMA 5-15P ELECTRICIAN SHALL PROVIDE ADDITIONAL CIRCUITS FOR LIQUID NITROGEN SYSTEM VERIFY ALL REQUIREMENTS SEE SHEET FS -5.0 29 4 TRASH CAN RUBBERMAID #FG354000 BLA 30 2 S/S DROP-IN HAND SINK W S/S SIDE SPLASHES ADVANCE TABCO #DI-1-10SP 1/2" 1/2" 2" SEE SHEET FS -4.0 31 1 CREAM DISPENCER OMEGA #OSD30 120 1 4.1 NEMA 5-15P SEE SHEET FS -5.0 32 3 FLAVORINGS RAIL SERVER #SR -4-82550 W PORTION PUMPS CP -F #83330 33 1 UNDERCOUNTER ICE MAKER MANITOWOC #RNS-0385A 115 1 10 1/4 NEMA 5-15P 3/8" FD CONNECT DRAIN AND RUN TO FLOOR DRAIN WITH INDIRECT FUNNEL DRAIN SEE SHEET FS -4.0 & FS -5.0 34 1 SELF CONTAINED CTR.TOP FRYER PERFECT FRY #PFC375 240 1 16 NEMA 6-20P SEE SHEET FS -5.0 35 1LOT CUSTOM MILLWORK CABINETS & COUNTERS 36 1LOT CUSTOM MILLWORK CABINETS & COUNTERS 37 1LOT CUSTOM S/S & TEMP GLASS SNEEZE GUARDS ADM SNEEZGUARDS 38 1LOT CUSTOM PLEXIGLAS "BEAKER" ADD-IN'S CONDIMENT HOLDER 39 1 TOPPING WARMER SERVER #IS -1 /3-86090 120 1 4.2 NEMA 5-15P SEE SHEET FS -5.0 40 1LOT CUSTOM MILLWORK OVERHEAD STORAGE 41 1 FAUCET FISHER #8261 1/2" 1 /2" SEE SHEET FS -4.0 42 1 SPINDLE DRINK MIXER WARING #WDM240T 120 1 15 NEMA 5-15P SEE SHEET FS -5.0 43 1 LOCKERS KELMAX #4K0090/GANG3 W COAT HANGING ROD 44 1 S/S RACK SHELF ADVANCE TABCO #DT -6R-12 45 1 ICE CREAM MERCHANDISER BEV -AIR #NC34-1-W 120 1 4.8 1/4 NEMA 5-15P SEE SHEET FS -5.0 46 1 AUTO ESPRESSO BREWER KORINTO #2 BY PURVEYOR 120 1 12 NEMA 5-15P SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 47 1 AIR POT BREWER BUNN #CW15-APS BT PURVEYOR 120 1 11.4 NEMA 5-15P SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 48 1 3.OL AIR POT BUNN #32130.0000 BY PURVEYOR 49 1 AIR POT CADDY BUNN #UNIV-4 APR 50 6 CUP DISPENSERS SAN JAMAR #C22100 51 1 U/C REFRIGERATOR TRUE #TUC-27G-ADA-HC-SPEC1 115 1 2 1/6 NEMA 5-15P SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 52 1 2DR U/C REFRIG. TRUE #TUC-48G-ADA-HC-SPEC1 115 1 3 1/5 NEMA 5-15P SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 53 1 120 GAL ELECTRIC WATER HEATER RHEEM #EGS120-9-G 240 3 22 J -BOX IN WALL FD CONNECT DRAIN AND RUN TO FLOOR DRAIN WITH INDIRECT FUNNEL DRAIN SEE SHEET FS -4.0 & FS -5.0 54 1 NITROGEN ON-SITE STORAGE SYSTEM PERMA-CYL #2000L BY PURVEYOR 55 1 RECESSED GREASE INTERCEPTOR WATTS #WD -25 PLUMBER SHALL CONNECT ALL REQUIRED DRAINS AND RUN TO NEW IN GROUND GREASE INTERCEPTOR AS REQUIRED BY CODE. FS -4.0 56 1 FRY DUMP STATION HATCO #GRFFB 120 1 6.3 NEMA 5-15P SEE SHEET FS -5.0 57 1LOT CUSTOM S/S ICE CREAM CUP TRANSPORTER TRACK 58 SPARE NUMBER 59 1LOTSTORAGE SHELVING SYSTEM METRO SUPPORTS #1WD24C & #2WD24C SHELVES #2448NC 60 1LOTSTORAGE SHELVING SYSTEM METRO SUPPORTS #1WD24C SHELVES #2436NC 61 SPARE NUMBER 62 1 COCA-COLA BIB RACK BY PURVEYOR 63 1 COCA-COLA CARBONATOR BY PURVEYOR 115 1 3 NEMA 5-15P SEE SHEET FS -5.0 64 1 COCA-COLA CO2 TANKS BY PURVEYOR 65 1LOT CUSTOM METAL RAILING 66 4 CHAIRS 67 2 18" X 30" TABLE TOP 68 2 TABLE BASE 69 21 BAR STOOLS 70 1LOT CUSTOM SIT UP COUNTER 71 1LOT CUSTOM SIT UP COUNTER NOTE: PUBLIC HEALTH - KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL. D ►7� o2.91 RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER z z z W U W cfs O 2. Design Associates 6402 S VERDE ST. TACOMA, WA.98409 PH 206-354-7200 FOOD5E CECCINSULTAt4TS SOCIET 1 1 ! Tarr AMVIIICAc PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 014 MEL AMOM rral OF WASHINGTON I VW (1 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 9-6-17 ISSUE FOR HEALTH PERMIT 9-26-17 ISSUE FOR MEP ENGINEERING 10-30-17 ISSUE FOR TI PERMIT SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE EQUIPMENT SCHEDULE SHEET NO. FS -2.0 25'-3" a CL 5" 4" i 3' 5" / 2' 7" 4" 1' 7")' % 6'-11" 4" — 1'-0" 4" 1'-2" La a Fa 'J) % / 3' 6" —1 8' 11" 31'-3" "J —4" 14'-5" 5'-5" 10'-1" —1i CLOUD SCALE: 1/4"--r-0" E CREA EKY FOODSEVICF 12" X 12" FLOOR SI\ /< DETAIL 58' 3" SCALE: NTS 6'0 1 6' •.. I\3HECT FU\\EL 3AI\ WASTE DETAIL SCALE: NTS 1 1 JA 9'0 6'0 /.1 1' K 1' 2-7/8' \DRECT FL00. DAI\ 6 1/16' WAST 6-17/32' 2"-3" IP DFTAI L SCALE: NTS -QUPNE\T 'Ol,Gll-1\ I\ ALU V3I\G 4" as — 4" 8c 3 AI\ FLOO PLA\ GOU\PSI CETIFIED G�EAS \THCI-PTO SCALE: NTS �LJV3I\G L 0 DRAIN LINE IN WALLS HOT WATER LINE COLD WATER LINE 12"x 12" FLOOR SINK WITH SEDIMENT BUCKET AND S/S SCREEN STRAINER. 0 FLOOR DRAIN FD FLOOR DRAIN WITH FUNNEL 0 STUB UP 6" HOT & COLD WATER LINES DRAIN LINE TO FLOOR SINK OR FLOOR DRAIN WITH FUNNEL DRAIN. GE\EAL DLUVBI\G \OTES 1. ALL DIMENSIONS SHOWN ARE FROM FINISHED BUILDING SURFACES TO CENTER LINE OF DRAINS (Sc WATER SUPPLY LINES 2. PLUMBER TO FURNISH ALL VALVES, TRAPS, FLOOR SINKS, FLOOR DRAINS, GREASE TRAP, & BACKFLOW PREVENTION DEVICES UNLESS FURNISHED BY EQUIPMENT MFG. MACHINES. 3. PLUMBER TO FURNISH LINE STRAINER FOR ICE MACHINE. 4. PLUMBER SHALL VERIFY REQUIREMENTS OF ALL OWNER AND VENDOR FURNISHED EQUIPMENT. 5. THIS PLAN RELATES TO FOOD SERVICE EQUIPMENT ONLY. PLUMBER SHALL VERIFY ANY ADDITIONAL PLUMBING THAT MAY BE REQUIRED BY THE TENANT OR BUILDING OWNER. 6. THIS INSTALLATION SHALL BE MADE IN ACCORDANCE WITH ALL APPLICABLE CODES. 7. 3 COMP POT / PAN SINK THAT WILL GENERATE GREASE TYPE WASTE MATERIALS SHALL DISCHARGE INTO THE WATTS GREASE INTERCEPTOR. LUV31\G KEY \OTES NOTE: A.F.F.=ABOVE FINISHED FLOOR, HW=HOT WATER LINE, CW=COLD WATER LINE. CD ALIGN FLOOR SINKS 0 2"IPS DRAIN PIPE STUB UP 2-3/4" FOR ITEM #2 FLOOR MOP SINK O2" DR +14" A.F.F. 1/2" HW / CW +17" A.F.F. FOR ITEM #4, ITEM #8, ITEM #10, ITEM #30 (Sc PUBLIC RESTROOM HAND SINKS. O1/2" NPT FEMALE HOT WATER CONNECTION 60" A.F.F FOR ITEM #6 DISHMACHINE. BACKFLOW PROTECTION PROVIDED ASSE 1001 VACUUM BREAKER INCLUDED WITH MACHINE SEE SPECIFICATION SHEET. BY CD RUN INDIRECT DRAIN LINE FOR ITEM #6 DISHWASHER TO FLOOR SINK FS -1 AS REQUIRED. O RUN THREE COMP SINK DRAINS ITEM #10 TO GREASE INTERCEPTOR AS REQUIRED BY CODE. O 1/2" HW / CW +17" A.F.F. O RUN INDIRECT DRAIN LINE FOR ITEM #13 PREP SINK TO FLOOR SINK FS -2 AS REQUIRED. 1/2" CW DEDICATED COPPER SUPPLY LINE. STUB UP +6" A.F.F RUN TO ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER AS REQUIRED. SEE COCA—COLA FREESTYLE 7000 INSTALLATION GUIDELINES FOR FURTHER INFORMATION. 10 RUN INDIRECT DRAIN LINE FOR ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER TO FLOOR SINK FS -3 AS REQUIRED. 11 WATER FILTRATION SYSTEM FOR ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER SHALL MEET NSF STANDARD 42. 12 ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER ARE PROVIDED WITH ASEE 1022 BACKFLOW PREVENTION DEVICES. 13 ITEM #20 DROP—IN COLD PAN RUN 1" INDIRECT DRAIN LINE AS REQUIRED TO FLOOR DRAIN WITH 6" FUNNEL DRAIN TO CREATE CODE REQUIRED 2" AIR GAP. 14 3/4" HW +17" A.F.F. FOR ITEM #27 S/S MIXING BOWL THAW SINKS. RUN LINES IN CABINETRY TO SINKS AS REQUIRED. 15 RUN 2" INDIRECT DRAIN LINE FOR ITEM #27 S/S MIXING BOWL THAW SINKS TO FLOOR SINKS FS -4, FS -5, & FS -6 AS REQUIRED. 16 3/8" CW +14" A.F.F. RUN TO WATER FILTRATION SYSTEM ITEM #73 MANITOWOC ARCTIC PURE #AR -10000 AS REQUIRED. FROM 1s WATER FILTER RUN 3/8" LINE TO ITEM #33 UNDER COUNTER ICE MAKER AS REQUIRED. 17 ITEM #33 U/C ICE MAKER RUN 1/2" INDIRECT DRAIN LINE AS REQUIRED TO FLOOR DRAIN WITH 6" FUNNEL DRAIN TO 17 CREATE CODE REQUIRED 2" AIR GAP. 1s 3/4" CW +48" A.F.F. FOR ITEM #46 AUTOMATIC ESPRESSO BREWER. RUN TO BREWER AS REQUIRED. PLUMBER SHALL VERIFY PURVEYOR MAKE AND MODEL # PRIOR TO INSTALLATION OF AUTOMATIC ESPRESSO BREWER. ® 1/2" HW / CW +36" A.F.F. 20 HW +72" A.F.F. FOR 1-1/2" HOT WATER INLET FROM ITEM #53 ELECTRIC HOT WATER HEATER. RUN HW SUPPLY LINES TO ALL EQUIPMENT & FIXTURES REQUIRING HW AS REQUIRED BY CODE. 21 1-1/2" CW +5" A.F.F. FOR ITEM #53 ELECTRIC WATER HEATER. 22 FLOOR DRAIN WITH FUNNEL FOR ITEM #53 ELECTRIC HOT WATER DRAINAGE. 23 PLUMBER SHALL VERIFY MAKE AND MODEL OF TOILET TO BE USED AND VERIFY THE TOILET DRAIN SIZE REQUIRED AT TIME OF ROUGH—IN DRAIN INSTALLATION. ® 1 /2" CW +8" A.F.F. 25 NOTE: ALL ROUGH—IN PLUMBING DRAIN LINES & WATER LINES SHALL START FROM INSIDE FINISHED FACE OF EXISTING REAR EXIT DOOR. NOTE: PUBLIC HEALTH — KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL. RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 F00Ii?5U VICE CON UttLCLEEYIEETER Tl0tt ti PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.:. 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 9-12-17 ISSUE FOR STRUCT SLAB REVIEW 10-30-17 ISSUE FOR TI PERMIT SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE EQUIPMENT ROUGH -IN PLUMBING & DRAIN PLAN SHEET NO. FS -4.0 PD1 Certified Grease AilliL® WD Series Interceptor Tag. WD -25 SPECIFICATION: Watts Drainage WD Series PDI Certified recessed or floor mounted epoxy coated steel grease interceptor with Basketed epoxy coated steel skid -proof cover secured with hex head center bolt(s), removable baffle assembly, deep seal trap with cleanout, external cast iron flow control fitting, and no hub (standard) connections. , ISO 3002Flow_ Rate (Salsa One t CERTIFIED. . phon +/3 trU't 4 4 GPM ■ A 7 7 GPM • 10 10 GPM ■ ■ ®� 15 15 GPM 20 20 GPM ■ 25 25 GPM ■ 35 35 GPM ■ t D (Length) x E (Width) �{ 50 50 GPM ■ 1111 7" -� xi II si -�" C C tions'.(SelectOne or More) SufFx Desai on .: A— - r -II — —r -B Sediment Bucket II Ex Extension ■ cezzar,tension Inlet Flow Restrictor w/Vent Connection OutletF g -E -FC Flange & Clamp Device ■ -HD Heavy Duly (10,000 lb.)Traffic Cover` ■ -O Inlet & Outlet other than Standard Size ■ -SS Stainless Steel ■ -THD Threaded Connections ■ *HD Options Requires Minimum 3" Extension Interne r Cato Number Flow Rafe .GPM - Grease' Cpp crly Lbs '.. A Inlet & ` Ctutt B Base to Center C Top to Cerner D. Length E. Width F Height WD -4 4 8 2"(51) 7-3/41'(197) 3-1/4"(83) 16"(406) 10"(254) 11"(279) WD -7 7 14 2151) 8-1/21216) 3-1/2"(89) 181457) 131330) 12"(305) WD -10 10 20 2"(51) 8-1/2")216) 3-1/2"(89) 21-3/4"(552) 141356) 121305) WD -15 15 30 211(51) 10-1/21267) 3-1/2"(89) 221559) 151381) 141356) WD -20 20 40 3176) 11-1/21292)" 3-1/2189) 241610) 15-3/4"(400) 151381) WD -25 25 50 3176) 12"(305) 4-1/21114) 261660) 16-1/21419) 16-1/21419) WD -35 35 70 3"(76) 14"(356) 51127) 30"(762) 181457) 19"(483) WD -50 50 100 41102) 161406) 5-1/21140)` 32"(813) 221559) 21-1/21546) NOTICE The information contained herein is not intended to replace the full product installation and safety information available or the experience of a trained product installer. You are required to thoroughly read all installation and product safety information before beginning the installation of this product. Job Name CLOUDNINE,CREAMERY Contractor ALLY PLUMBING Job Location SOUTHCENTER MALL SPACE #700 Contractor's P.O. No Engineer Representative Watts product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements, please contact Watts Technical Service. Watts reserves the right to change or modify product design, construction, specifications, or materials without prior notice and without incurring any obligation to make such changes andwA modifications on Watts products previously or subsequently sold. USA: Tel: (800) 338-2581 • Fax: (828) 248-3929 • Watts.com Canada: Tel: (905)332-4090 • Fax: (905) 332-7068 • Watts.ca Latin America: Tel: (52) 81-1001-8600 • Fax: (52) 81-8000-7091 • Watts.com ES -WD -WD -SERIES -USA 1713 0 2017 Watts GOU\PSI CETIFIED G�EAS \THCI-PTO SCALE: NTS �LJV3I\G L 0 DRAIN LINE IN WALLS HOT WATER LINE COLD WATER LINE 12"x 12" FLOOR SINK WITH SEDIMENT BUCKET AND S/S SCREEN STRAINER. 0 FLOOR DRAIN FD FLOOR DRAIN WITH FUNNEL 0 STUB UP 6" HOT & COLD WATER LINES DRAIN LINE TO FLOOR SINK OR FLOOR DRAIN WITH FUNNEL DRAIN. GE\EAL DLUVBI\G \OTES 1. ALL DIMENSIONS SHOWN ARE FROM FINISHED BUILDING SURFACES TO CENTER LINE OF DRAINS (Sc WATER SUPPLY LINES 2. PLUMBER TO FURNISH ALL VALVES, TRAPS, FLOOR SINKS, FLOOR DRAINS, GREASE TRAP, & BACKFLOW PREVENTION DEVICES UNLESS FURNISHED BY EQUIPMENT MFG. MACHINES. 3. PLUMBER TO FURNISH LINE STRAINER FOR ICE MACHINE. 4. PLUMBER SHALL VERIFY REQUIREMENTS OF ALL OWNER AND VENDOR FURNISHED EQUIPMENT. 5. THIS PLAN RELATES TO FOOD SERVICE EQUIPMENT ONLY. PLUMBER SHALL VERIFY ANY ADDITIONAL PLUMBING THAT MAY BE REQUIRED BY THE TENANT OR BUILDING OWNER. 6. THIS INSTALLATION SHALL BE MADE IN ACCORDANCE WITH ALL APPLICABLE CODES. 7. 3 COMP POT / PAN SINK THAT WILL GENERATE GREASE TYPE WASTE MATERIALS SHALL DISCHARGE INTO THE WATTS GREASE INTERCEPTOR. LUV31\G KEY \OTES NOTE: A.F.F.=ABOVE FINISHED FLOOR, HW=HOT WATER LINE, CW=COLD WATER LINE. CD ALIGN FLOOR SINKS 0 2"IPS DRAIN PIPE STUB UP 2-3/4" FOR ITEM #2 FLOOR MOP SINK O2" DR +14" A.F.F. 1/2" HW / CW +17" A.F.F. FOR ITEM #4, ITEM #8, ITEM #10, ITEM #30 (Sc PUBLIC RESTROOM HAND SINKS. O1/2" NPT FEMALE HOT WATER CONNECTION 60" A.F.F FOR ITEM #6 DISHMACHINE. BACKFLOW PROTECTION PROVIDED ASSE 1001 VACUUM BREAKER INCLUDED WITH MACHINE SEE SPECIFICATION SHEET. BY CD RUN INDIRECT DRAIN LINE FOR ITEM #6 DISHWASHER TO FLOOR SINK FS -1 AS REQUIRED. O RUN THREE COMP SINK DRAINS ITEM #10 TO GREASE INTERCEPTOR AS REQUIRED BY CODE. O 1/2" HW / CW +17" A.F.F. O RUN INDIRECT DRAIN LINE FOR ITEM #13 PREP SINK TO FLOOR SINK FS -2 AS REQUIRED. 1/2" CW DEDICATED COPPER SUPPLY LINE. STUB UP +6" A.F.F RUN TO ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER AS REQUIRED. SEE COCA—COLA FREESTYLE 7000 INSTALLATION GUIDELINES FOR FURTHER INFORMATION. 10 RUN INDIRECT DRAIN LINE FOR ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER TO FLOOR SINK FS -3 AS REQUIRED. 11 WATER FILTRATION SYSTEM FOR ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER SHALL MEET NSF STANDARD 42. 12 ITEM #18 COCA—COLA FREESTYLE BEVERAGE DISPENSER ARE PROVIDED WITH ASEE 1022 BACKFLOW PREVENTION DEVICES. 13 ITEM #20 DROP—IN COLD PAN RUN 1" INDIRECT DRAIN LINE AS REQUIRED TO FLOOR DRAIN WITH 6" FUNNEL DRAIN TO CREATE CODE REQUIRED 2" AIR GAP. 14 3/4" HW +17" A.F.F. FOR ITEM #27 S/S MIXING BOWL THAW SINKS. RUN LINES IN CABINETRY TO SINKS AS REQUIRED. 15 RUN 2" INDIRECT DRAIN LINE FOR ITEM #27 S/S MIXING BOWL THAW SINKS TO FLOOR SINKS FS -4, FS -5, & FS -6 AS REQUIRED. 16 3/8" CW +14" A.F.F. RUN TO WATER FILTRATION SYSTEM ITEM #73 MANITOWOC ARCTIC PURE #AR -10000 AS REQUIRED. FROM 1s WATER FILTER RUN 3/8" LINE TO ITEM #33 UNDER COUNTER ICE MAKER AS REQUIRED. 17 ITEM #33 U/C ICE MAKER RUN 1/2" INDIRECT DRAIN LINE AS REQUIRED TO FLOOR DRAIN WITH 6" FUNNEL DRAIN TO 17 CREATE CODE REQUIRED 2" AIR GAP. 1s 3/4" CW +48" A.F.F. FOR ITEM #46 AUTOMATIC ESPRESSO BREWER. RUN TO BREWER AS REQUIRED. PLUMBER SHALL VERIFY PURVEYOR MAKE AND MODEL # PRIOR TO INSTALLATION OF AUTOMATIC ESPRESSO BREWER. ® 1/2" HW / CW +36" A.F.F. 20 HW +72" A.F.F. FOR 1-1/2" HOT WATER INLET FROM ITEM #53 ELECTRIC HOT WATER HEATER. RUN HW SUPPLY LINES TO ALL EQUIPMENT & FIXTURES REQUIRING HW AS REQUIRED BY CODE. 21 1-1/2" CW +5" A.F.F. FOR ITEM #53 ELECTRIC WATER HEATER. 22 FLOOR DRAIN WITH FUNNEL FOR ITEM #53 ELECTRIC HOT WATER DRAINAGE. 23 PLUMBER SHALL VERIFY MAKE AND MODEL OF TOILET TO BE USED AND VERIFY THE TOILET DRAIN SIZE REQUIRED AT TIME OF ROUGH—IN DRAIN INSTALLATION. ® 1 /2" CW +8" A.F.F. 25 NOTE: ALL ROUGH—IN PLUMBING DRAIN LINES & WATER LINES SHALL START FROM INSIDE FINISHED FACE OF EXISTING REAR EXIT DOOR. NOTE: PUBLIC HEALTH — KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL. RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 F00Ii?5U VICE CON UttLCLEEYIEETER Tl0tt ti PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.:. 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 9-12-17 ISSUE FOR STRUCT SLAB REVIEW 10-30-17 ISSUE FOR TI PERMIT SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE EQUIPMENT ROUGH -IN PLUMBING & DRAIN PLAN SHEET NO. FS -4.0 5'-0" CLOJD SCALE: 1 /4"=1'-0" \I\F CFAV GE\- SAL \OTES. 3'-0" 27 3,-5" 1'-4" 27 1'-3" 2'-6" —1 34'-1" EY FOODSFWCI- EQUIPVE\T 1. ALL DIMENSIONS SHOWN ARE FROM FINISHED BUILDING SURFACES. 2. ALL OUTLETS SHALL BE GROUNDING TYPE. 3. ELECTRICIAN SHALL FURNISH DISCONNECT SWITCHES AT EQUIPMENT WHERE REQUIRED. 4. THIS PLAN RELATES TO KITCHEN EQUIPMENT ONLY. ELECTRITIAN SHALL FURNISH ADDITIONAL CIRCUITS FOR HVAC SYSTEM, AREA LIGHTS, EMERGENCY LIGHTS, SIGNAGE, ETC., AND AS MAY OTHERWISE BE REQIRED BY THE OWNER. 5. THIS INSTALLATION SHALL BE MADE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES. 6. ELECTRICAL CONTRACTOR SHALL PROVIDE ONE 1/2' EMT CONDUIT WITH PULL STRING FOR EACH OF THE FOLLOWING: SECURITY SYSTEM, MUSIC & SOUND SYSTEM, & COMCAST CABLE SYSTEM, VERIFY WITH DESIGNER LUSDA & TENANT IF ANY ADDITIONAL BLANK CONDUIT LINES ARE NEEDED & PROVIDE AS REQUIRED. 7. ELECTRICIAN SHALL EVALUATE EXISTING ELECTRICAL SYSTEM, RE—USE EXISTING CIRCUITS AND OUTLETS IF POSSIBLE. 8. ELECTRICIAN SHALL FURNISH MOTION ACTIVATED LIGHTING SENSORS IN MENS & WOMENS PUBLIC RESTROOMS. ALL STUB UP TYPICAL 9'-1" 1'-5" 6" ��// 7" 0 o V 1'-0" 6" STUB UP +6"' STUB UP +6" ELECT 1' 8" — 10" —1 I 6' 9" III Ill Ill ,4) 3r I CAL FLOO PLA\ ELECTRICAL L GE\ 3 iDCO DUPLEX CONVENIENCE OUTLET. 115/1/60 O RUN POWER FROM J—BOX IN WALL TO EQUIPMENT. ELECTRICIAN SHALL PROVIDE WIPS FOR MILLWORK FIXTURES WHERE POWER IS NEEDED FOR PLUGS OR LIGHTING. DATA PROVIDE DATA CABLING FOR CREDIT CARD READING SYSTEM & DIGITAL MENU BOARDS DEDICATED CIRCUIT. 115/1/60 15 AMP CIRCUIT UNLESS SPECIFIED DIFFERENT ON THIS SHEET AND SHEET FS -2.0. DOTTED LINE REPRESENTS POWER RUN TO FOODSERVICE — EQUIPMENT IN CABINETRY. °STUB UP STUB UP ELECTRICAL CONDUIT +6" RUN TO FOODSERVICE EQUIPMENT IN & UNDER CABINETRY AS REQUIRED. ELECTRICIAN SHALL PROVIDE WIPS FOR MILLWORK FIXTURES WHERE POWER IS NEEDED FOR PLUGS OR LIGHTING. <EY \OTES NOTE: A.F.F.=ABOVE FINISHED FLOOR O PROVIDE 240/60/3 DEDICATED CIRCUIT +24" AFF FOR ELECTRIC WATER HEATER. 0 0 0 0 0 0 10 PROVIDE 115/60/1 CIRCUIT +64" AFF PROVIDE J—BOX 115/60/1 +62" AFF RUN TO DISHWASHER ITEM #6 AS REQUIRED. PROVIDE 115/60/1 +64" AFF PROVIDE STUB UP CONDUIT WITH TWO CIRCUITS ONE FOR ITEM #18 115/60/1 & ONE FOR ITEM #63 CARBONATOR 115/60/1. PROVIDE STUB UP CONDUIT FOR ITEM #20 115/60/1 RUN TO DUPLEX PLUG AS REQUIRED. PROVIDE TWO J—BOXS STACKED +17" AFF 208-240/60/1 & +24" A.F.F. 120/60/1 FOR ITEM # 23 WAFFLE BOWL MAKER. ELECTRICIAN SHALL RUN TO DUPLEX OUTLET AS REQUIRED PROVIDE 115/60/1 CIRCUIT +17" AFF FOR ITEM #26 PROVIDE STUB UP CONDUIT FOR ITEM #26 115/60/1 RUN TO DUPLEX PLUG AS REQUIRED. PROVIDE DUPLEX CONVENIENCE OUTLET 115/60/1 +48" AFF NOTE: MOUNT PLUG HORIZONTALLY. 11 PROVIDE DUPLEX CONVENIENCE OUTLET 115/60/1 +17" AFF 12 PROVIDE TWO J—BOXS STACKED +17" AFF 120/60/1 & +24" A.F.F. 120/60/1 FOR EACH ITEM # 28 STAND MIXER AND LIQUID NITROGEN VALVE AND CONTROL SYSTEM. ELECTRICIAN SHALL RUN TO DUPLEX OUTLET AS REQUIRED. ELECTRICIAN VERIFY ALL ELECTRICAL REQUIREMENTS FOR NITROGEN CONTROLS WITH OWNER PROVIDE STUB UP CONDUIT PROVIDE (2) CIRCUITS 120/60/1 FOR ITEM # 28 STAND MIXER AND LIQUID NITROGEN VALVE AND CONTROL SYSTEM. 13 ELECTRICIAN SHALL RUN TO DUPLEX OUTLET AS REQUIRED. ELECTRICIAN VERIFY ALL ELECTRICAL REQUIREMENTS FOR NITROGEN CONTROLS WITH OWNER 14 PROVIDE DUPLEX CONVENIENCE OUTLET 115/60/1 +48" AFF FOR ITEM #31 NOTE: MOUNT PLUG HORIZONTALLY. 15 PROVIDE DUPLEX CONVENIENCE OUTLET 120/60/1 +48" AFF FOR ITEM #56 NOTE: MOUNT PLUG HORIZONTALLY. 16 PROVIDE DUPLEX CONVENIENCE OUTLET 240/60/1 +48" AFF FOR ITEM #34 NOTE: MOUNT PLUG HORIZONTALLY. 17 PROVIDE 120/1/60 +48" AFF FOR ITEM #39 NOTE: RUN PLUG HORIZONTALLY. 18 PROVIDE DUPLEX CONVENIENCE OUTLET 115/60/1 +48" AFF FOR ITEM #42 NOTE: MOUNT PLUG HORIZONTALLY. 19 PROVIDE STUB UP CONDUIT FOR ITEM #45 120/60/1 RUN TO DUPLEX PLUG AS REQUIRED. 20 PROVIDE 120/1/60 +48" AFF FOR ITEM #46 NOTE: RUN PLUG HORIZONTALLY. 21 PROVIDE 120/1/60 +48" AFF FOR ITEM #47 NOTE: RUN PLUG HORIZONTALLY. 22 PROVIDE DUPLEX CONVENIENCE OUTLET FOR ITEM #51 115/60/1 +17" AFF 23 PROVIDE STUB UP CONDUIT 115/60/1 FOR ITEM #52 RUN TO DUPLEX PLUG AS REQUIRED 24 PROVIDE STUB UP CONDUIT FOR (2) DATA LINES ITEM #17 POS SYSTEM RUN TO DATA PORTS AS REQUIRED. VERIFY SYSTEM REQUIREMENTS WITH OWNER. 25 PROVIDE STUB UP CONDUIT FOR (2) CIRCUITS ITEM #17 POS SYSTEM 120/60/1 RUN TO DUPLEX PLUG AS REQUIRED. VERIFY SYSTEM REQUIREMENTS WITH OWNER. PROVIDE STUB UP CONDUIT 115/60/1 FOR CUSTOM LED BACK LIGHTING IN CABINET FACE RUN TO DUPLEX PLUGS IN CABINET AS REQUIRED. PROVIDE J BOX +60" A.F.F. FOR 120/60/1 CIRCUIT FOR LOW VOLTAGE LED LIGHT COVE © FEATURE WALL. RUN TO LED TRANSFORMERS AS REQUIRED. 0 PROVIDE 120/1/60 +140" A.F.F. FOR AUTOMATIC SLIDING GLASS DOOR. RUN TO DOOR POWER CONTROLS & DOOR MOTION SENSOR AS REQUIRED. 29 PROVIDE 120/1/60 +40" A.F.F. FOR AUTOMATIC LIGHTING MOTION DETECTORS AS REQUIRED BY CODE. 0 PROVIDE J BOR ABOVE 12'-0" CEILING FOR AUTOMATIC ROLL UP SECURITY ROLLING GRILLE. RUN TO MOTOR AND CONTROLS AS REQUIRED. 31 PROVIDE 120/1/60 +108" A.F.F. FOR DIGITAL MENU BOARDS. 32 PROVIDE DATA LINES +108" A.F.F. FOR DIGITAL MENU BOARDS. RUN TO DATA PORTS AS REQUIRED. VERIFY SYSTEM REQUIREMENTS WITH OWNER. 0267/ RECEIVED CITY OF TUKWILA NOV 20 2011 PERMIT CENTER INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILA, WA. 98188 DESIGN TEAM PROJECT NO.: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 9-26-17 ISSUE TO MEP FOR ENGINEERING 10-30-17 ISSUE FOR TI PERMIT SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE EQUIPMENT ROUGH -IN ELECTRICAL PLAN SHEET NO. FS -5.0 GC SHALL PROVIDE WALL BACKING NOTE: ALL EXPOSED MILLWORK CABINETS SHALL AS REQUIRED BE WILSONART # D354-60 DESIGNER WHILE I-- —1 PT -1 . 7 -0 / DIGITAL MENU BOARDS / 7 NOTE: ALL S DTF$CD354ES �F60I ( 27 — ( 20 ) I SHAM BE WILSON DESIGNER WHITERK SOLID SURFACE TOP GARZA INC. WHITE - CARRARA 1/2" THICK TYPICAL ALL 4" X 12" DECORATIVE GLASS TILES GT -1 30 30 #GDI-179 INTERSTYLE GLASS11NTS DUNE CHINCHILLA MILLWORK TOPS & SIT UP COUNTER TOPS � L _ \ _ L J L, A- B \ /0 TI.) I I ZI.) ADJ SHELVING'/ '' 1'-0" OPEN ELEVATION .r— 2'-3" OPEN RB -1 2'-5" -, OPEN NOTE: ALL EXPOSED FACES OF l' -O" FOODSERVICE MILLWORK CABINETS SHALL OPEN BE WILSONART # D354-60 DESIGNER WHITE 6•�/ sc ALE: 1 /2"=1'-0" NOTE: ALL EXPOSED FACES OF FOODSERVICE MILLWORK CABINETS SHALL BE WILSONART # D354-60 DESIGNER WHITE 10" SOLID SURFACE TOP GARZA INC. WHITE CARRARA #GDI-179 1/2" THICK TYPICAL ALL MILLWORK TOPS & SIT UP COUNTER TOPS SKIRT RB -1 PROVIDE 21" CLEAR AREA WITH S/S RACK SUDES l' -O" / FOR 5 QT MIXING BOWL HOLDERS VERIFY RACK OPEN SLIDE SPACING BEFORE INSTALLATION. 3 ELEVATION FS -6.0 SCALE: 1 /2"=1'-0" * 1'-3" 1'-3" 1'-3" 6'-7" •te ,te PROVIDE 21" CLEAR AREAS WITH S/S RACK SLIDES FOR 5 QT MIXING BOWL HOLDERS VERIFY RACK SLIDE SPACING BEFORE INSTALLATION. 1'-0" OPEN OPEN ADJ SHELVING FRP-1 GC SHALL PROVIDE WALL BACKING AS REQUIRED r 59 59 L- 12 13 0 0 rzi:ELEVATION \SF S-6.0 GATE N 21 ) PT -1 It ELEVATION FS 6 • o/ SCALE: 1 /2"=1'-0" SCALE: 1 /2"=1'-0" NOTE: ALL EXPOSED FACES OF FOODSERVICE MILLWORK CABINETS SHALL BE WILSONART # D354-60 DESIGNER WHITE SOLID SURFACE TOP GARZA INC. WHITE CARRARA #GDI-179 1/2" THICK TYPICAL ALL MILLWORK TOPS & SIT UP COUNTER TOPS NOTE: ALL EXPOSED FACES OF FOODSERVICE MILLWORK CABINETS SHALL BE WILSONART # D354-60 DESIGNER WHITE 3'-6" 2'-3" 2'-0" 1'-0" 1-0" 2'-6" 1 2'-8" OPEN ELEVATION 5'-6" PT -1 2'-0" 6" 2" 5'-6" 3' - 0" SOLID SURFACE TOP GARZA INC. WHITE CARRARA #GDI-179 1/2" THICK TYPICAL ALL MILLWORK TOPS & SIT UP COUNTER TOPS F 6' o/ SCALE: 1/2"=1%-O" 2" 3'-0" ( 27 ) 00 / 0 . 7 -0 / 7 / 7 2-4 ( 27 )0 ( 20 ) .11 1 0" ---- SKIRT J RB -1 PROVIDE 21" CLEAR AREA WITH S/S RACK SLIDES FOR 5 QT MIXING BOWL HOLDERS VERIFY RACK SLIDE SPACING BEFORE INSTALLATION. ELEVATION -6)) SCALE: 1 /2"=1'-0" FRP-1\ 3' X 3' SS VAPOR HOOD 12 ) 10 8 5 \SF -1 ELEVATION FS -6.0 SCALE: 1 /2"=1'-0" 6' 6" )re 4" owe ( 52 ) 4'-1" l' -O" OPEN OPEN NOTE: ALL EXPOSED FACES OF FOODSERVICE MILLWORK CABINETS SHALL BE WILSONART # D354-60 DESIGNER WHITE 9" ( 45 ) SOLID SURFACE TOP GARZA INC. WHITE CARRARA #GDI-179 1/2" THICK TYPICAL ALL MILLWORK TOPS & SIT UP COUNTER TOPS ( 50 ) OPEN 3' " ),/ OPEN 1 OPEN OPEN GATE N 2'-10" GC SHALL PROVIDE WALL BACKING AS REQUIRED ELEVATION 6' o/ SCALE: 1 /2"=1'-0" b11. 0249q• RECEIVED CITY OF TUKWILA NOV 20 2017 PERMIT CENTER INTERIOR DESIGN z z z W U cc ut cn O OC z .6) v m N Design Associates 6402 S VERDE ST TACOMA, WA. 98409 PH 206-354-7200 PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TU KW I LA, WA. 98188 DESIGN TEAM PROJECT NO: 05-2017 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 10/30/17 ISSUE FOR TI SUBMITTAL PROJECT CONSULTANTS REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION SHEET TITLE FOODSERVICE ELEVATIONS & WALL BACKING SHEET NO. FS -6.0 J 1 2 3 5 6 8 10 B C ENERGY CODE NOTES EQUIPMENT SIZING AND PERFORMANCE 1. LOAD CALCULATIONS HAVE BEEN PERFORMED IN ACCORDANCE WITH WSEC. 2. EXISTING EQUIPMENT IS OF ADEQUATE SIZE. 3. EQUIPMENT HAS BEEN SELECTED PER WSEC. 4. VENTILATION AND THE ABILITY TO REDUCE OUTSIDE AIR TO IMC MINIMUMS SHALL BE PROVIDED PER WSEC. 5. MOTORS SHALL BE ENERGY EFFICIENT TYPE PER WSEC; MOTORS 1/12 HP TO 1 HP SHALL BE ECM TYPE OR MEET MINIMUM EFFICIENCY REQUIREMENTS PER WSEC C403.2.10.3. HVAC SYSTEM CONTROLS & CRITERIA 6. TEMPERATURE CONTROL SYSTEM SHALL HAVE A MINIMUM DEAD BAND OF 5 DEGREES AS REQUIRED BY WSEC. 7. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF PROVIDING NIGHT SETBACK, SEVEN DIFFERENT DAILY SCHEDULES, AND OPTIMUM START PER THE REQUIREMENTS OF WSEC. 8. OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SHALL BE PROVIDED WITH DAMPERS THAT COMPLY WITH WSEC. DAMPER SHALL AUTOMATICALLY CLOSE WHEN SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING WARM-UP, COOL -DOWN, AND SETBACK. DAMPER MAXIMUM LEAKAGE RATE SHALL NOT EXCEED MAXIMUM ALLOWED BY WSEC. DUCTING SYSTEMS 9. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN ACCORDANCE WITH IMC, WSEC AND IBC REQUIREMENTS. DUCT PRESSURE CLASS SHALL BE 1". 10. DUCTWORK SHALL BE INSULATED TO THE APPROPRIATE R -VALUE AS REQUIRED BY WSEC. PIPING SYSTEMS 11. PIPING SHALL BE INSULATED AS REQUIRED BY WSEC, AS FOLLOWS: PIPE SIZE (INCHES) FLUID TEMP COND* > 350 0.32 - 0.34 251 - 350 0.29 - 0.32 201 - 250 0.27 - 0.30 141 - 200 0.25 - 0.29 105 - 140 0.21 - 0.28 40-60 0.21 -0.27 < 40 0.20 - 0.26 MRT** <1 1 TO < 1.5 1.5 TO <4 250 4.5 5.0 5.0 200 3.0 4.0 4.5 150 2.5 2.5 2.5 125 1.5 1.5 2.0 100 1.0 1.0 1.5 75 0.5 0.5 1.0 75 0.5 1.0 1.0 *CONDUCTIVITY (BTU-IN/(HR-SF-DEG F) **MEAN RATING TEMPERATURE (DEG F) GENERAL 12. AIR SYSTEMS SHALL BE BALANCED AS REQUIRED BY WSEC. 13. THESE "ENERGY CODE NOTES" ARE LISTED TO SATISFY THE BUILDING DEPARTMENT'S REQUIREMENT THAT CERTAIN INFORMATION BE PLACED ON THE PLANS, BUT DO NOT DIMINISH THE FULL PROJECT REQUIREMENTS. A B C D E F MECHANICAL GENERAL NOTES 1. ALL EXISTING SYSTEMS SHOWN ARE APPROXIMATE, AND BASED ON OWNER'S AS-BUILTS. FIELD VERIFY EXACT LOCATIONS & SIZES. 2. PROVIDE ALL OFFSETS/ELBOWS AS REQ'D TO ALLOW ROUTING NEW WORK AROUND STRUCTURE, ELECTRICAL & OTHER BUILDING FEATURES/SYSTEMS. 3. SUPPLY AIR FLEXIBLE DUCT LENGTH SHALL NOT EXCEED 8 FEET, AND MAY ONLY BE USED WHERE SPECIFICALLY SHOWN ON THE PLANS. RETURN AIR FLEXIBLE DUCT LENGTH SHALL NOT EXCEED 4 FEET, AND MAY ONLY BE USED WHERE SPECIFICALLY SHOWN ON THE PLANS. 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE & SELECT FINAL LOCATIONS OF ALL AIR INLETS/OUTLETS. SHIFT AIR INLETS/ OUTLETS FROM LOCATIONS SHOWN AS REQ'D TO AVOID CONFLICTS W/ STRUCTURE, LIGHTS, & OTHER ITEMS. SUCH SHIFTS SHALL MAINTAIN SYMMETRY OF AIR TERMINALS & SHALL HAVE PRIOR APPROVAL OF ARCHITECT/ENGINEER. 5. UNSIZED DUCTS SHALL MATCH THE SIZE OF THE LARGEST ADJACENT DUCT THAT IS SIZED. WHERE THE ADJACENT DUCT SIZE IS NOT SHOWN, PROVIDE DUCTS SIZED FOR THE CFM INDICATED W/A MAXIMUM PRESSURE DROP OF 0.1"/100 FEET. 6. UNSIZED PLUMBING SHALL MATCH THE SIZE OF THE LARGEST ADJACENT PIPE THAT IS SIZED. 7. SEE FOOD SERVICE DRAWINGS FOR ALL FOOD SERVICE ITEMS AND FOR REQ'D PLUMBING CONNECTIONS. GENERAL DEMOLITION NOTES 1. DEMOLITION DRAWINGS ARE INTENDED TO ONLY GIVE A GENERAL REPRESENTATION OF THE DEMOLITION INVOLVED, AND DO NOT CONSTITUTE A FULL LISTING OF ALL ITEMS REQUIRING REMOVAL. SEE GENERAL NOTES & SPECIFICATIONS FOR FULL REQUIREMENTS. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW SITE CONDITIONS AND TO IDENTIFY ALL DEMOLITION WORK, AND INCLUDE IN HIS BID ALL COSTS FOR DEMOLITION & DISPOSAL. 3. EXISTING DUCTS, EQUIPMENT, PIPING SHOWN DASHED REPRESENT MAJOR MECHANICAL ITEMS TO BE REMOVED. SEE GENERAL NOTES, DRAWING NOTES & KEYED NOTES WHICH COVER OTHER MISCELLANEOUS MECHANICAL ITEMS TO BE REMOVED. 4. ALL EXISTING ITEMS ASSOCIATED WITH DEMO'D NOT BEING REUSED SHALL BE REMOVED. THIS INCLUDES SUCH ITEMS AS CONTROL DEVICES, PIPING, SUPPORTS, VALVES, AND RELATED ACCESSORIES. 5. PROVIDE TEMPORARY CAP -OFF OF ALL EXISTING SYSTEMS WHERE DEMO HAS OCCURRED TO ALLOW CONTINUED USE OF REMAINDER OF SYSTEMS UNTIL THE FINAL SYSTEM COMPONENTS ARE INSTALLED AND CONNECTED. 6. HOLD ALL REMOVED ITEMS FOR OWNERS REVIEW. ITEMS SELECTED BY OWNER FOR SALVAGE SHALL BE MOVED BY THE OWNER. ITEMS NOT SELECTED BY OWNER FOR SALVAGE SHALL BE DISPOSED OF OFF SITE BY CONTRACTOR. 7. REMOVE BUILDING ELEMENTS (CEILING, DOORS, ETC.) AS REQUIRED TO ALLOW FOR DEMOLITION AND FOR WORK. D I E I G H J K MECHANICAL LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION WASTE OR SOIL (W) AHJ APPROX ARCH BLDG BTU BTUH CAP CFM CONN CONT DEG F, °F DIA, 0 DN DWG (E), EXIST EA EER EFF ELEC EOL ESP EXH FS FLA FLEX GAL GALV. HP IN IMC KW MAX MBH MCA MECH MFR MIN NC NO NO. NTS OA PD PH R RA REF REQ'D RM RPM S SA TD TG TYP UNO V W/ WSEC AUTHORITY HAVING JURISDICTION APPROXIMATELY ARCHITECTURAL BUILDING BRITISH THERMAL UNIT BRITISH THERMAL UNIT/HOUR CAPACITY CUBIC FEET PER MINUTE CONNECTION CONTINUE, CONTINUATION DEGREE FAHRENHEIT DIAMETER DOWN DRAWING EXISTING EACH ENERGY EFFICIENCY RATIO EFFICIENCY ELECTRICAL END OF LINING EXTERNAL STATIC PRESSURE EXHAUST FOOD SERVICE FULL LOAD AMPS FLEXIBLE GALLON GALVANIZED HORSE POWER INCH INTERNATIONAL MECHANICAL CODE KILOWATT MAXIMUM THOUSAND BTU MINIMUM CIRCUIT AMPS MECHANICAL MANUFACTURER MINIMUM NORMALLY CLOSED NORMALLY OPEN NUMBER NOT TO SCALE OUTSIDE AIR PRESSURE DROP PHASE RETURN RETURN AIR REFERENCE REQUIRED ROOM REVOLUTIONS PER MINUTE SUPPLY SUPPLY AIR TRANSFER DUCT TRANSFER GRILLE TYPICAL UNLESS NOTED OTHERWISE VOLTS, VOLTAGE, VENT WITH WASHINGTON STATE ENERGY CODE - - - - - - VENT (V) IMPROVEMEN TUKWILA, WA COLD WATER (CW) HOT WATER (HW) HOT WATER CIRCULATING (HWC) - ISOLATION VALVE -1><I II- UNION SHEET TITLE: MECHANICAL LEGEND & NOTES DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: CONCENTRIC REDUCER -t '%I 1%/zI I'///%/i//i DUCT (FIRST FIGURE, SIDE SHOWN) - 20/12 LINED DUCT (DIM. FOR NET FREE AREA) 20/12L - RISE (R) OR DROP (D) ARROW IN DIRECTION OF FLOW R (D)_ • DUCT SECTION (SUPPLY) >< DUCT SECTION (EXHAUST OR RETURN) 0 ROUND DUCT VOLUME DAMPER (MANUAL) . L - INI MOTORIZED DAMPER , FLEXIBLE CONNECTION FLEXIBLE DUCT ELBOW WITH TURNING VANES -�-' CEILING OUTLET ffA'SIZE,SYMBOL MO CFM CEILING INLET / SIZE,SYMBOL CFM O THERMOSTAT 0 SWITCH 2 DETAIL IDENTIFICATION NUMBER M3.1 SHEET ON WHICH DETAIL IS SHOWN NOTE: SEE SCHEDULES FOR ADDITIONAL ABBREVIATIONS. G H LIST OF DRAWINGS M0.1 MECHANICAL LEGEND & NOTES M0.2 MECHANICAL SCHEDULES M1.0 MECHANICAL DEMOLITION PLAN M2.0 FOUNDATION PLAN M3.0 PLUMBING PLAN M4.0 HVAC PLAN J REVIEWED FOR CODEAPPROVED COMPLIANCE. DEC 01 2011 City of Tukwila BUILDING DIVISON.., .. RECEIVED CITY OF TUKWILA C 2017 PERMIT CENTER K 1 2 3 4 5 6 7 8 splOsi th\AD IMPROVEMEN TUKWILA, WA 10-25-2017 SHEET TITLE: MECHANICAL LEGEND & NOTES DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: 0" MOal 1 1" 2" '%I 1%/zI I'///%/i//i SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED � A 1 B 1 � 1 I E 1 3 4 5 6 7 8 9 10 A 1 e I I D 1 E F G H J K FAN SCHEDULE SYMBOL BASIS OF DESIGN MANUFACTURER AND SERIES NO. TYPE AREA SERVED CFM ESP MAX RPM WHEEL DIA ELECTRICAL DRIVE CONTROL MAX WEIGHT LBS REMARKS POWER VOLTS / PH EF -1 GREENHECK SP -A190 CEILING EXHAUST MEN'S RESTROOM 75 .375" 1400 - 54.5 WATTS 115/1 DIRECT LIGHT SWITCH 30 1O 2O n ` 0 EF -2 SP -A190 GREENHECK CEILING EXHAUST WOMEN'S RESTROOM 75 .375" 1400 - 54.5 WATTS 115/1 DIRECT LIGHT SWITCH 30 O OO EF -3 GREENHECK CUE -060 ROOFTOP UPBLAST DISHWASHER HOOD 500 .5" 1550 - 1/20 HP 115/1 DIRECT WALL SWITCH 100 EF -4 GREENHECK SQ-85VG INLINE KITCHEN 340 .375" 1550 - 1/12 HP 115/1 DIRECT WALL SWITCH 50 1 2 W/ VIBRATION O O ISOLATORS ACCESSORIES: = W/ SPEED CONTROL = W/ BACKDRAFT DAMPER 0 = W/ TIME DELAY RELAY TO KEEP FAN RUNNING FOR 5 MINUTES AFTER LIGHT SWITCH IS OFF. F PUMP SCHEDULE SYMBOL SPECIFIED MANUFACTURER AND SERIES NO. TYPE SERVICE GPM HEAD FT. H2O ELECTRICAL REMARKS POWER VOLTS/PH CP -1 BELL & GOSSETT CIRCULATOR WET ROTOR CIRCULATOR DOMESTIC HW 3 10 125W 115/1 W/ AQUASTAT & TIME CLOCK 1/2" WALL MOUNT, ADA ACCESSIBLE "* P -11A FLOOR DRAIN 2" 2" - - W/ TRAP PRIMER CONNECTION G PLUMBING FIXTURE SCHEDULE SYMBOL DESCRIPTION W V CW HW REMARKS P -1A WATER CLOSET 4" 2" 1/2" - FLOOR MOUNT - ADA ACCESSIBLE - TANK TYPE P -3A LAVATORY 2" 1-1/2" 1/2" 1/2" WALL MOUNT, ADA ACCESSIBLE "* P -11A FLOOR DRAIN 2" 2" - - W/ TRAP PRIMER CONNECTION P -11C FLOOR RECEPTOR 2" * 2" * - - W/ TRAP PRIMER CONNECTION * UNO ON PLAN ** PROVIDE METERING FAUCET & TEMPERATURE LIMITING VALVE PER CODE. AIR INLET & OUTLET SCHEDULE SYMBOL TYPE MANUFACTURER AND SERIES NUMBER REMARKS CD-# CEILING DIFFUSER TITUS MCD CURVED BLADES MODULAR CORE, SQUARE NECK CEG CEILING EXHAUST GRILLE KRUEGER SERIES EGC-5 1/2"x1/2"x1/2" CUBE CORE TG TRANSFER GRILLE KRUEGER SERIES EGC-5 1/2"x1/2"x1/2" CUBE CORE NOTES: DIFFUSERS (CD) SHALL HAVE NO. & DIRECTION OF THROWS AS INDICATED ON (E.G. CD -3 = 3 WAY THROW). INLETS/OUTLETS SHALL HAVE FACTORY FINISH, COLOR AS SELECTED BY ARCHITECT. FOR TERMINOLOGY USED IN AIR INLETS/OUTLETS CALL -OUTS ON DRAWINGS. FINISH SCHEDULE FOR CEILING TYPES, PROVIDE AIR TERMINALS TO CEILING CONSTRUCTION INSTALLED IN. FIELD VERIFY EXISTING CEILING TYPES AS 1. CD-# CEILING PLANS 2. ALL AIR 3. SEE LEGEND 4. SEE ARCHITECTURAL MATCH NEEDED. H REVIEWED FOR CODE PCOMPLIANCE EtGVED �P DEC 01 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA t` 1 C'. 2 ci PERMIT CENTER K oPtq.10 9:0400 1 2 3 4 5 6 7 8 IMPROVEMEN TUKWILA, WA 10-25-2017 SHEET TITLE: MECHANICAL SCHEDULES DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: M 0 • 2 0 1" 2" /(71 WA I :/"/%Ax;/ SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED J A 1 B 1 1 I E I F 1 � H J K � 1 2 2 3 4 5 6 7 8 9 10 -1 A 1 B C (E) 8"0 REMOVE (E) CEILING AIR INLET/OUTLET (TYP) (E) 20/18 17,-71 (E) 20/20 \\ (E) 8"0 -• REMOVE (E) DUCT (TYP) <1--(E) 14/12 r L J `) (E) 20/16 - 7 I )1, I (E) 10"0 (TYP) (E) 16/14 D REMOVE (E) EXHAUST FAN MECHANICAL DEMOLITION PLAN SCALE: 1/4 " = 1'-0" E F 1' REMOVE BRANCH DUCTS AS NEEDED TO ACCOMMODATE NEW WORK 4' 0' 2' SCALE 1/4" = 1'-0" 8' G GENERAL NOTES: 1. SEE NOTES SHEET M0.1. 2. EXISTING BRANCH DUCTS MAY BE REUSED WHERE OF ADEQUATE SIZE AND SUITABLE LOCATION FOR NEW AIR INLET/OUTLET. 3. DEMO (E) UNUSED PLUMBING, SEE SHEETS M2.0 & M3.0. H J REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION 4 5 6 7 8 9 RECEIVED CITY OF TUKWIL/— PERMIT CENTER sePWN ?silraw cksc- K � IMPROVEMEN TUKWILA, WA 10-25-2017 SHEET TITLE: MECHANICAL DEMOLITION PLAN DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: M 1 • 0 0" 1" 2" ' / I J//%I I' //////// / /,/ SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED J A 1 e 1 2 3 4 5 6 7 8 10 (E) 4"W A B 1 � 4"W, CONNECT TO EXISTING D PLUMBING FIXTURES ABOVE SHOWN DASHED (TYP) 2"V E - GREASE INTERCEPTOR F 2"W UP PROVIDE SAWCUTTING TO ACCOMMODATE WORK (TYP) 4"W 2"W UP H =4711/- 1 1 I I- 111 I 4TV1- i 0 (E) 4"W L r, }r9 3„r, REMOVE PIPING UP, CAP BELOW FLOOR 2"W ri LU%• D FOUNDATION PLAN SCALE: 1/4 " = 1'-0" E 1' 4' F 0' 2' SCALE 1/4" = 8' /i G / - F 11 L 2"V (TYP) 2"W (T(P) GENERAL NOTES: 1. SEE NOTES SHEET M0.1. J 2. SEE STRUCTURAL DWGS FOR LOCATIONS OF FOUNDATION COMPONENTS. NOT ALL SHOWN THIS DRAWING. 3. FOR PIPING SIZES TO INDIVIDUAL PLUMBING FIXTURES SEE "PLUMBING FIXTURE SCHEDULE", SHEET M0.2. 4. VERIFY INVERT ELEVATION OF (E) WASTE PIPING BEING CONNECTED TO BEFORE BEGINNING WORK. 5. VERIFY LOCATIONS OF CLEANOUTS W/ FINAL FURNITURE/CASEWORK/EQUIPMEN1 PLANS TO CONFIRM PROPER CLEARANCES. 6. PROVIDE TRAP PRIMER LINES TO ALL FLOOR DRAINS & FLOOR RECEPTORS. KEYED NOTES: 0 CAP (E) PIPING, AND ABANDON IN PLACE. DEMO UNDERGROUND AS NECESSARY TO ACCOMMODATE NEW WORK. H J K REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION K 1 2 3 4 5 6 7 8 RECEIVED CITY OF TUKWILA-- 27 PERMIT CENTER SVPIktet VFW (1� �1- 0:41,..., QU\O IMPROVEMEN TUKWILA, WA 10-25-2017 SHEET TITLE: FOUNDATION PLAN DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: M2.0 ___._____ __._ __ 0,• 1" 2" '//i1 V/%I r'/ //:/'/r / '7 SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED _J A 1 B 1 3 4 5 7 8 9 10 A 1 e 1 WATER HEATER, SEE FS PLANS D PROVIDE W/ HEAT TRAP & R-10 INSULATED BASE PER WSEC, & EXPANSION TANK (3 GAL) P-1 A P-1 A E P-11 C F 41110 G 1`';!If'l P-11 A —�-_ � —�— P-11 A I' EN 3"VTR ,= 3/4"HWC TO CP -1 P -11A 1 "HW -- O,O L L I, -3A 1 "CW' P -3A i 1 "cw P-11A —" I O NO 1-1/4"CW, CONNECT 3/4"HWC TO (E) CW SERVICE MAIN C D (E) PIPING ABANDONED IN PLACE DEMO & CAP UNUSED PIPING AS SHOWN P-11 C PLUMBING PLAN 1"HW SCALE: 1/4 " = 1'-0" E 1 P-11 C 1' 4"VTR r Tar rr UI 4' 0' 2' SCALE 1/4" = 1'-0" F 8' ,/\ 3"V F IO 01 Ib H P-11 C rr G — P -11C VERIFY LOCATION OF PIPE DROP TO CLEAR WINDOW GENERAL NOTES: 1. SEE NOTES SHEET M0.1. J 2. SEE FOOD SERVICE (FS) PLANS & SPECIFICATIONS FOR ADDITIONAL MECHANICAL WORK. ALL ITEMS REQUIRING PLUMBING CONNECTIONS SHALL BE COMPLETELY CONNECTED BY PLUMBING CONTRACTOR. 3. PROVIDE INDIRECT DRAINS FOR ITEMS AS NOTED ON FS PLANS. 4. ROUTE CIRCULATED HW PIPING AS CLOSE TO DROP TO HAND WASH SINKS AS POSSIBLE (TO MEET CODE REQ'D TIMING FOR HW AT FIXTURE). 5. CAP OFF ALL UNUSED PLUMBING. 6. PROVIDE CW PIPING TO TRAP PRIMER VALVES TO SERVE FLOOR DRAINS & FLOOR RECEPTORS. KEYED NOTES: 0 PROVIDE W/ SEISMIC STRAPS TO WALL. PIPE RELIEF VALVE FULL SIZE TO ADJACENT FLOOR DRAIN. H Oalq J K REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2011 City of Tukwila BUILDING DIVISION K RECEIVED CITY OF TUKWILA E'< 1 u 2g17 PERMIT CENTER NCR 1 2 3 4 5 6 7 8 9 IMPROVEMEIN TUKWILA, WA 10-25-2017 SHEET TITLE: PLUMBING PLAN DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: M350 0" 1,• 2" %,/I I//z i r%//% z//% SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED J A 1 e 1 2 4 5 6 7 8 9 10 A 1 B I----10x10 CD -3 100 D CLASS I DAMPER, INTERLOCK W/ EF SO THAT DAMPER IS OPEN WHEN EF IS ON 10/10 DUCT UP TO EF -3 ON ROOF; LOCATED MINIMUM 10' AWAY FROM HVAC UNIT INTAKE; TERMINATE DISCHARGE MINIMUM 30" ABOVE ROOF SLOPE BACK TO HOOD E 3'x3' TYPE 11 DISHWASHER HOOD, CONSTRUCTED PER IMC (E) ROOFTOP HVAC UNIT RTU -1, NOMINAL 7.5 TON; BALANCE FOR SA CFM NOTED & 650 CFM OA 22x10 CEG 90 22x10 CEG 250 G EIN BDD -22x22 TG W/ 12"0 TD - 10"0 TYP) 8" 0-;(TYP) r p ,A 12x12 CD -4 350 (TYP) H (E) 10/10 (E) 16/14 CONNECT TO EXISTING (TYP) 6x6 CD -3 50 1-1.73 (E) 20/16 FLEX CONNECTOR (TYP) 3-::; 6"0 r.: J. CLASS I DAMPER, INTERLOCK W/ EF'S SO THAT DAMPER IS OPEN WHEN EITHER EF -1 OR EF -2 IS ON D (E) EXHAUST DUCT UP TO (E) ROOF CAP HVAC PLAN SCALE: 1/4 " =11-0" E v O 8"0 UP TO ROOF CAP CLASS 1 DAMPER, INTERLOCK W/ EF SO THAT DAMPER IS OPEN WHEN EF IS ON 1' 4' 0' 2' SCALE 1/4" = 1'-0" - 10"0 (TYP) 10x10 CD -4 275 l \ (TYP 4) 8' GENERAL NOTES: 1. SEE NOTES SHEET M0.1. J K F7 o19_c, 2. FIELD VERIFY SIZE & LOCATION OF EXISTING DUCTWORK. 3. EXISTING AIR INLETS/OUTLETS MAY BE REUSED WHERE OF PROPER SIZE/LOCATION. 4. CONSTRUCT & SEAL DUCTWORK PER SMACNA & IMC. 5. CAP OFF ALL (E) UNUSED DUCT CONNECTIONS. 1 2 3 4 5 6 7 REVIEWED F t CODE COMPLIA le APP DEC 01 2011ROVED CE Project: 1Ctoud 9 Creamery No: €17149 1 OA VENTILATION CALCULATION PER IMC 2015 Az= zone area if= square feet Rp= OA per person* zone population Ps=(actual concurrent pop z=: breathing zone OA Rp*P/1000 + Ra*Az = OA before corrections accounts for diff OA per zone) v = 1.0 for single zone systems) Zp=lzone OA fraction =VozNpz Vpz=;zone suppyar Voz= zone OA = Vbz/Ev Vot=lunit total OA =Voz for single: zone units =Vou/Ev for multiple zones occupant diversity= Ps/sum Pz HVAC` Unit ;Zone # Name Occup Category Az (sf) People OA Rp P/1000 sf i • Pz Rp*Pz Area OA Ra Ra*Az OA Vbz Ez Voz (cfm) Ev Vpz 1 Zp Ev D D x _ Vou sum(Rp*Pz) Vot Calc OA % of Vot HVAC -1 1 1 3Food Prep>Area Food Sales Dishwash/Clean Area 1 System Actual Population Ps 130 No Zones .3 F Retail Sales Retail Sales Retail Sales 360 ........... 860 135 1355 7.5 15 7.5 15 7.5 15 ........... 6 45.0 13 97.5 3 22.5 0.12 43.2 0.18 154.8 0.12 16.2 G 22.0 165.0 88.2 252.3 38.7 379.2 110.3 315.4 48.4 700 I 0.16 0.86 1100 l 0.29 300 0.16 508.7 650 28% City of Tukwila BUILDING DIVISION 9 RECEIVED CITY OF TUKWIL c.� o <� 2 ivyo g PERMIT CENTER 2100 0.29 Max Zp J K IMPROVEMEN TUKWILA, WA 10-25-2017 SHEET TITLE: HVAC PLAN DRAWN: NH CHECKED: RH DATE: 10.25.17 REVISIONS: M 4 • 0 0 1' 2" '.4../1 U/: I r.•.//%W>/:X. ' SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED A A B C D E F G H J K 1 2 3 4 5 6 7 8 9 ABBREVIATIONS SOME ABBREVIATIONS MAY NOT BE USED ON DRAWINGS) ELECTRICAL SYMBOL LEGEND (SOME SYMBOLS MAY NOT BE USED ON DRAWINGS) GENERAL ELECTRICAL NOTES- ABBREV DESCRIPTION ABBREV DESCRIPTION SYMBOL DESCRIPTION 1. SEE ARCHITECTURAL PLANS FOR LOCATION OF FIRE RATED CONSTRUCTION. 2. BRANCH CIRCUIT NOTES: A. VERIFY BRANCH CIRCUIT WIRE COUNT BEFORE PULLING CONDUCTORS. PROVIDE REQUIRED CONDUCTORS TO EACH OUTLET AND DEVICE FOR PHASE, NEUTRAL AND EQUIPMENT GROUND BASED ON CIRCUIT DESIGNATIONS SHOWN AND AS OTHERWISE INDICATED ON PLANS OR NOTE BELOW. B. PROVIDE SEPARATE NEUTRAL CONDUCTOR FOR ALL BRANCH CIRCUITS. 3. MINIMUM CONDUIT SIZE FOR HOMERUNS AND UNDERGROUND FOR CONDUIT INSTALLED SHALL BE 3/4 INCH. 4. REFER TO ARCHITECTURAL PLANS FOR LIGHT FIXTURE LOCATIONS AND FOR MOUNTING HEIGHT OF SUSPENDED AND WALL MOUNTED LIGHT FIXTURES. REFER TO REFLECTED CEILING PLANS, INTERIOR ELEVATIONS, EXTERIOR ELEVATIONS, ROOM SECTIONS, AND DETAILS SHOWN ON ARCHITECTURAL CONTRACT DOCUMENTS PRIOR TO ROUGH—IN. REPORT CONFLICTS TO ARCHITECT/ENGINEER FOR RESOLUTION. 5. REFER TO ARCHITECTURAL ELEVATIONS FOR LOCATION AND MOUNTING HEIGHT OF WIRING DEVICES. REPORT CONFLICTS TO ARCHITECT/ENGINEER FOR RESOLUTION. 6. VERIFY EXACT LOCATION OF FLOOR BOXES AND STUB—UPS. OBTAIN ARCHITECT APPROVAL PRIOR TO ROUGH—IN. 7. VERIFY BACK BOX REQUIREMENTS OF EQUIPMENT FURNISHED UNDER OTHER THAN DIVISION 26 SECTIONS AND EQUIPMENT FURNISHED BY OWNER. 8. SEE MECHANICAL PLANS FOR QUANTITY AND LOCATION OF FIRE / SMOKE DAMPERS. PROVIDE 120 VOLT CONNECTION TO EACH DAMPER. A or AMP AC A/C AIC AL ARCH ATC ATS AWG BKR BLDG C C.O. 'C CB CCTV CFM CKT CL CLG COMB CONC CT CU CW DC DIA DISC DIV DPDT DPST DWG EGC ELEC EMT EXST, (E), 'F FA FC FLA FLEX GALV GFCI G, GND H—O—A HP HPF H & V HVAC HZ J—BOX KV KVA KVAR KW KWH LT LTG LV MAX MCA MCB MCC MCM, KCM MDF MECH AMPERES ALTERNATING CURRENT AIR CONDITIONING AMPERE INTERRUPTING CAPACITY ALUMINUM ARCHITECTURAL AUTOMATIC TEMPERATURE CONTROL AUTOMATIC TRANSFER SWITCH AMERICAN WIRE GAUGE BREAKER BUILDING CONDUIT CONDUIT ONLY DEGREES CELSIUS CIRCUIT BREAKER CLOSED CIRCUIT TELEVISION CUBIC FEET PER MINUTE CIRCUIT CENTER LINE CEILING COMBINATION CONCRETE CURRENT TRANSFORMER COPPER COLD WATER DIRECT CURRENT DIAMETER DISCONNECT DIVISION DOUBLE POLE, DOUBLE THROW DOUBLE POLE, SINGLE THROW DRAWING EQUIPMENT GROUND CONDUCTOR ELECTRIC ELECTRICAL METALLIC TUBING EXISTING DEGREES FAHRENHEIT FIRE ALARM FOOTCANDLE FULL LOAD AMPS FLEXIBLE CONDUIT GALVANIZED GROUND FAULT CIRCUIT INTERRUPTER GROUND HAND — OFF — AUTO HORSEPOWER HIGH POWER FACTOR HEATING AND VENTILATION HEATING, VENTILATION & AIR CONDITIONING HERTZ JUNCTION BOX KILOVOLTS KILOVOLT AMPERES REACTIVE KILOVOLT AMPERES KILOWATTS KILOWATT HOURS LIGHT LIGHTING LOW VOLTAGE MAXIMUM MINIMUM CIRCUIT AMPS MAIN CIRCUIT BREAKER MOTOR CONTROL CENTER THOUSAND CIRCULAR MILS MAIN DISTRIBUTION FRAME MECHANICAL MH MIN MLO MOP, MOCP MTD MTG NC N, NEUT NIC NO NTS OC OD OH PB PF 0 or PH PNL PIV PR PRI PT PVC RECPT REQ RF RM RMS SEC SHT SMR SN SP SPD SPDT SPST SS STD SW SWBD TEL TTB TYP UL UG V VA VAC VAR VAV VD VDC VFD VT W WP W/ W/0 XFER XFMR XLP XP Z MANHOLE MINIMUM MAIN LUGS ONLY MAXIMUM OVERCURRENT PROTECTION MOUNTED MOUNTING NORMALLY CLOSED NEUTRAL NOT IN CONTRACT NORMALLY OPEN NOT TO SCALE ON CENTER OUTSIDE DIAMETER OVERHEAD PULLBOX POWER FACTOR PHASE PANEL POST INDICATOR VALVE PAIR PRIMARY POTENTIAL TRANSFORMER POLYVINYL CHLORIDE RECEPTACLE REQUIRED RADIO FREQUENCY ROOM ROOT MEAN SQUARE SECONDARY SHEET SURFACE METAL RACEWAY SOLID NEUTRAL SINGLE POLE SURGE PROTECTIVE DEVICE SINGLE POLE, DOUBLE THROW SINGLE POLE, SINGLE THROW STAINLESS STEEL STANDARD SWITCH SWITCHBOARD TELEPHONE TELECOMMUNICATIONS TERMINAL BOARD TYPICAL UNDERWRITERS LABORATORY UNDERGROUND VOLTS VOLT AMPERES VOLTS ALTERNATING CURRENT REACTIVE VOLT AMPERES VARIABLE AIR VOLUME VOLTAGE DROP VOLTS DIRECT CURRENT VARIABLE FREQUENCY DRIVE VAPORI1GHT WATTS WEATHERPROOF WTH WITHOUT TRANSFER TRANSFORMER CROSS—LINKED POLYETHYLENE EXPLOSION PROOF IMPEDANCE ® GENERAL BUBBLE NOTE TAG SYMBOL: # — IDENTIFYING NUMBER SCHEDULED EQUIPMENT CONNECTION (INCLUDE ALL WIRING, DISCONNECTING MEANS, CONTROL AND OTHER REQUIREMENTS SCHEDULED) LIGHTING CONTROL S $ $WP, S3 SOS OS SINGLE POLE TOGGLE SWITCH DIGITAL SWITCH STATION SWITCH SUBSCRIPTS: 2 DOUBLE POLE 3 THREE WAY 4 FOUR WAY D DIMMER EP EXPLOSION PROOF K KEY OPERATED LV LOW VOLTAGE LVM LOW VOLTAGE MASTER M MANUAL MOTOR STARTER W/OVERLOADS MC MOMENTARY CONTACT P SWITCH W/PILOT LIGHT T TIMER WP WEATHERPROOF a, b, c MULTIGANG SWITCH STATION OCCUPANCY SENSOR — WALL SWITCH OCCUPANCY SENSOR POWER LIGHTING CONTROL NOTES. 1. PROVIDE QUANTITY OF RELAY POWER PACKS, ROOM CONTROLLERS, AUTOMATIC SENSORS, AND INTERFACE ACCESSORIES REQUIRED FOR COMPLETE LIGHTING CONTROL SYSTEM BASED ON GENERAL AREA LIGHTING, DAYLIGHT ZONES, AND MANUAL SWITCH CONTROL INDICATED ON PLANS. ROOMS AND BUILDING SPACES WHERE OCCUPANCY SENSORS ARE NOT INDICATED SHALL BE CONNECTED FOR AUTOMATIC TIME SWITCH CONTROL AS SCHEDULED. 2. WHERE OCCUPANCY SENSORS ARE INDICATED, PROVIDE ONE OR MORE SENSORS AS REQUIRED FOR FULL AREA COVERAGE. LOCATE OCCUPANCY SENSORS IN ROOM TO MINIMIZE FALSE ACTIVATION THROUGH OPEN DOORS. 3. INSTALL ROOM CONTROLLERS IN ACCESSIBLE CEILING OR ATTIC SPACES AND WITHIN 6 FEET OF FIRST LIGHTING OUTLET SERVING LIGHTS TO BE CONTROLLED UNLESS OTHERWISE INDICATED. 4. INSTALL RELAY POWER PACK ON BOX OF FIRST LIGHTING OUTLET ABOVE ACCESSIBLE CEILINGS. FOR INACCESSIBLE CEILING SPACES, INSTALL RELAY POWER PACK IN COMMON OUTLET BOX WITH CEILING SENSOR. PROVIDE EXTENDED BOX DEPTH WITH SUITABLE TRIM AND INSTALLATION TO COMPLY WITH NEC 725.136 REQUIREMENTS FOR LINE VOLTAGE/CLASS 2 CIRCUIT SEPARATION USING DIVIDER AND/OR MINIMUM CONDUCTOR SPACE SEPARATION. 6. PROGRAM ROOM CONTROLLERS FOR SEPARATE ON/OFF MANUAL CONTROL OF ROOM LIGHTS PER PLAN (a, b, ...) AND MASTER DIMM CONTROL UNLESS OTHERWISE DIRECTED BY OWNER. 7. PROGRAM ROOM CONTROLLERS FOR AUTOMATIC CONTROL OF ROOM LIGHTS AS FOLLOWS: OCCUPANCY SENSOR(S) AUTOMATIC OFF UNLESS OTHERWISE SCHEDULED. DAYLIGHT SENSOR(S) SEPARATE AUTOMATIC DIM OF PRIMARY AND SECONDARY DAYLIGHT ZONES. DAYLIGHT RESPONSIVE CONTROLS SHALL BE CONFIGURED TO COMPLETELY SHUT OFF ALL CONTROLLED LIGHTS IN THAT ZONE. 9. PROVIDE DIGITAL WALL SWITCH STATIONS WITH A PUSHBUTTON FOR EACH CONTROL CIRCUIT INDICATED (a, b, c ...) PLUS A LABELED 'ALL OFF' PUSHBUTTON AND LABELED DIMMING CONTROL SWITCH, UNLESS OTHERWISE INDICATED. 10. LOW VOLTAGE WIRING SHALL BE INSTALLED IN 3/4" DIAMETER CONDUIT EXCEPT OPEN CABLING MAY BE INSTALLED ABOVE ACCESSIBLE CEILINGS AND IN ATTIC SPACES UNLESS OTHERWISE INDICATED ON PLANS. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA `J'i r" ! 7 PERMIT CENTER p WO 0 109 1$ep�R f\?pr'- GFCI DUPLEX RECEPTACLE (NEMA 5-20R) ASTERISK INDICATES COUNTER HEIGHT OUTLET (DUPLEX RECEPTACLE SHOWN) DISCONNECT SWITCH FUSED DISCONNECT SWITCH JUNCTION BOX MOTOR CONNECTION PANELBOARD WRING IzE * EP 0 0 ��`/.� CROSS LINES INDICATE NUMBER OF CONDUCTORS IF MORE THAN TWO WIRE CIRCUIT. LONG DENOTES NEUTRAL. DOT DENOTES GROUND. CONDUIT IS 1/2" AND CONDUCTOR IS #12 AWG UNLESS OTHERWISE NOTED OR SCHEDULED. WIRING CONCEALED IN CEILING OR WALL WIRING HOMERUN WIRING CONCEALED UNDERGROUND OR BELOW FLOOR COMMUNICATIONS ---' — TTB TELECOMMUNICATIONS TERMINAL BOARD DOUBLE GANG BOX WITH 1.25"C TO ACCESSIBLE SPACE AND SINGLE GANG MUD RING Q C D E F G H J K 1 2 3 4 5 6 7 8 9 L. V LJ 1. n g i n e e r (1) LL W CLO! ENAN `°1p . A. �Q�i.aWASINCA 11948 34, "A'otsrtwo' ,,..< ,SIONAL 0 -- *10NA SIGNED ... 10-31-2017 SHEET TITLE: ELECTRICAL LEGEND & NOTES DRAWN: AD CHECKED: NAH DATE: 10.31.17 REVISIONS: Eal0" 1" 2" SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED — EXISTING TIME CLOCK B COVE DISPLAY L-1 COVE DISPLAY L-1 '59 ,c,d,e,f,g,h �.- �3- E L-3 60W L L F L-1 L-3 150W H /G CI CI L-3 60W C 4 H/G � I I1 L 60W E/G V/////////////////, SIGN A NORTH CI) ELECTRICAL LIGHTING PLAN B SCALE: I' 0' 4' 2' s' C D E F G G H GENERAL NOTES: 1. SEE NOTES SHEET E0.1. J 2. SEE FOOD SERVICE (FS) PLANS & SPECIFICATIONS OR ADDITIONAL ELECTRICAL WORK. ALL ITEMS REQUIRING LINE VOLTAGE POWER CONNECTIONS SHALL BE COMPLETELY CONNECTED BY ELECTRICAL CONTRACTOR. 3. LIGHTING TO BE CONTROLLED BY EITHER TIME CLOCK OR OCCUPANCY SENSOR TO COMPLY WITH ENERGY CODE. LIGHTING LEGEND FIXTURE TYPE 2' X 4' LED DROP IN TROFFER 25 WATTS OOB 6" RECESSED LED DOWN LIGHT 44 WATTS CS EXIT LIGHT FIXTURE WITH BATTERY BACK—UP AND EMERGENCY ® LIGHTING EXEMPT LESS THAN 5 WATTS PER FIXTURE. H/G nl .+L EMERGENCY LIGHTING FIXTURE WITH BATTERY BACK—UP EXEMPT. LOW VOLTAGE SINGLE CIRCUIT MONORAIL SYSTEM. TRANSFORMER CONTROLLED. TRANSFORMER WATTAGE DESIGNATED ON PLAN. LOW VOLTAGE SINGLE CIRCUIT MONORAIL SYSTEM. TRANSFORMER CONTROLLED. TRANSFORMER WATTAGE DESIGNATED ON PLAN. CUSTOM DECORATIVE LED PENDANT LIGHT 10 WATTS NOTE: OFCI OWNER FURNISHED CONTRACTOR INSTALLED CUSTOM DECORATIVE LED CHANDELIER 50 WATTS. NOTE: OFCI �M OWNER FURNISHED CONTRACTOR INSTALLED. CUSTOM LED VANITY LIGHT 20 WATTS NOTE: OFCI OWNER FURNISHED CONTRACTOR INSTALLED. I S) P IN o LED RGB LIGHTING SYSTEM SEE DETAILS FOR LOCATIONS EXEMPT 2' X 2' LED DROP IN TROFFER 18 WATTS REMOTE TRANSFORMER SEE PLAN FOR ACTUAL TRANSFORMER WATTAGES H b ri 0 J K REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION RECEIVED crry OF TUKWILA K PERMIT CENTER SEpP Wrctetso tas 1 2 3 4 5 6 7 8 n g i n e e r; IMPROVEMEN TUKWILA, WA � A 0 of WAsy .4,,,,41. f / / , , •11948 iy OSA, `rF,GISTERE 1J. -%ONAL V,‘ SIGNED 10-31-2017 SHEET TITLE: ELECTRICAL LIGHTING PLAN DRAWN: AD CHECKED: NAH DATE: 10.31.17 REVISIONS: E 2 . 1 0" 1" 2" SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED EXISTING EXI1 EMPLOYEE LOCKERS L-7 L-7 ❑ +17" L-9 MEN L-1 0 L-9 17-7 0 L-9 WOMEN NITROGEN TANK VIEW ROOM L-7 g+17 Q I/ -I- -}- -- I1 +17" x L-7 0 0 0 0 0 o 24' x 48' DW / PREP (ONI,R�OOF) 0(EXISTING) • 0 24' 48� 24 x S' 0 ( 47 UNDER 33 I ) L-17 g U U POS ( 17 15 EF L-7 4 25 SEATS 18A II. 11 AL ( 63 ) UNDER L + 4`- IlL-17 11 JII I II 31 ORDER/ PICK-UP( 45 Da L-17 JI1 F ( 42 ) 26 ) " 48 L-113 ICE CREAM / PREP ( 26 r 7l IL ooOoD000 00 0 000 oo 00 oo0 NO. 20 C 28 ) L-19 © H Ir +144 ENTRANCE L-7 g+17" 1 -4 39 ANORTH ELECTRICAL POWER PLAN \ SCALE: I' 4' o' 2' 8' G H GENERAL NOTES: 1. SEE NOTES SHEET E0.1. J 2. SEE FOOD SERVICE (FS) PLANS & SPECIFICATIONS OR ADDITIONAL ELECTRICAL WORK. ALL ITEMS REQUIRING LINE VOLTAGE POWER CONNECTIONS SHALL BE COMPLETELY CONNECTED BY ELECTRICAL CONTRACTOR. FOOD SERVICE EQU I P IV EN T SCHEDULE NO. QTY. DESCRIPTION ELECTRICAL EQUIPMENT NOTES VOLTS PHASE AMPS HP OUTLET CIRCUIT FEEDER 1 1 UPRIGHT REFRIGERATOR TRUE #STM1 R-1 S -HC 115 1 3.8 1/4 NEMA 5-15R GFI L-4 .5"C-2#12 +#12G SEE SHEET FS -5.0 6 1 LOW TEMP DISH MACHINE AUTO -CHLOR #A5 LEASED UPRIGHT TWO DOOR FREEZER TRUE #STM2F-2S 115 115 1 1 20 9.0 3/4 J -BOX IN WALL NEMA 5-15R GFI L-6 L-8 .5"C-2#12 +#12G .5"C-2#12 +#12G SEE SHEET FS -5.0 15 1 17 1LOT POS SYSTEM BY OWNER 115 1 15 NEMA 5-15R GFI L-10 .5"C-2#12 +#12G SEE SHEET FS -5.0 18 1LOT COCA-COLA FREESTYLE CTR. TOP BEV. DISP.#7000 115 1 20 NEMA 5-20R GFI L-12 .5"C-2#12 +#12G 18A 1 COCA-COLA FREESTYLE ICE MAKER 115 1 20 NEMA 5-20R GFI L-2 .5"C-2#12 +#12G 20 1 DROP-IN REFRIG. COLD PAN DELFIELD #N8118B 115 1 3.7 1/5 NEMA 5-15R GFI L-14 .5"C-2#12 +#12G 23 2 WAFFLE BOWL MAKERS WARING #WWCM200 120 1 11.6 L-16, L-18 .5"C-2#12 +#12G ELECTRICIAN SHALL PROVIDE ADDITIONAL 208-240/1/20A SEE SHEET FS -5.0 26 3 DIPPER WELL SERVER #CW -DI 87770 115 1 1 NEMA 5-15R GFI L-21 .5"C-2#12 +#12G SEE SHEET FS -5.0 28 3 COUNTER TOP MIXER KITCHENAID #KSM8990ER 120 1 4.1 1.3 NEMA 5-15R GFI L-23, L-25, L-27 .5"C-2#12 +#12G ELECTRICIAN SHALL PROVIDE ADDITIONAL CIRCUITS FOR LIQUID NITROGEN SYSTEM VERIFY ALL REQUIREMENTS SEE SHEET FS -5.0 31 1 CREAM DISPENCER OMEGA #OSD30 120 1 4.1 NEMA 5-15R GFI L-29 .5"C-2#12 +#12G SEE SHEET FS -5.0 33 1 UNDERCOUNTER ICE MAKER MANITOWOC #RNS-0385A 115 1 10 1/4 NEMA 5-15R GFI L-31 .5"C-2#12 +#12G 34 1 SELF CONTAINED CTR.TOP FRYER PERFECT FRY #PFC375 240 1 16 NEMA 6-20R GFI L-33,35 .5"C-2#12 +#12G SEE SHEET FS -5.0 39 1 TOPPING WARMER SERVER #IS -1/3-86090 120 1 4.2 NEMA 5-15R GFI L-20 .5"C-2#12 +#12G SEE SHEET FS -5.0 42 1 SPINDLE DRINK MIXER WARING #WDM240T 120 1 15 NEMA 5-15R GFI L-22 .5"C-2#12 +#12G SEE SHEET FS -5.0 45 1 ICE CREAM MERCHANDISER BEV -AIR #NC34-1-W 120 1 4.8 1/4 NEMA 5-15R GFI L-24 .5"C-2#12 +#12G SEE SHEET FS -5.0 46 1 AUTO ESPRESSO BREWER KORINTO # BY PURVEYOR 120 1 12 NEMA 5-15R GFI L-26 .5"C-2#12 +#12G SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 47 1 AIR POT BREWER BUNN #CW15-APS BT PURVEYOR 120 1 11.4 NEMA 5-15R GFI L-28 .5"C-2#12 +#12G SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 51 1 U/C REFRIGERATOR TRUE #TUC-27G-ADA-HC-SPEC1 115 1 2 1/6 NEMA 5-15R GFI L-30 .5"C-2#12 +#12G SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 52 1 2DR U/C REFRIG. TRUE #TUC-48G-ADA-HC-SPEC1 120 GAL ELECTRIC WATER HEATER RHEEM #EGS120-9-G 115 240 1 3 3 22 1/5 NEMA 5-15R GFI J -BOX IN WALL L-32 L-38,40,42 .5"C-2#12 +#12G .75"C-3#10 +#10G SEE SHEET FS -5.0 VERIFY ALL PURVEYOR PROVIDED EQUIPMENT POWER REQUIREMENTS 53 1 56 1 FRY DUMP STATION HATCO #GRFFB 120 1 6.3 NEMA 5-15R GFI L-36 .5"C-2#12 +#12G SEE SHEET FS -5.0 63 1 COCA-COLA CARBONATOR BY PURVEYOR 115 1 3 NEMA 5-15R GFI L-34 .5"C-2#12 +#12G SEE SHEET FS -5.0 F K REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION 1 2 3 4 5 6 7 RECEIVED CITY OF TUKWILA PERMIT CENTER VPRcc P Ck 9 n g i n e e r IMPROVEMEN TUKWILA, WA ti0A'i/ ...---• �,� OF tYASyi lc,, - A. f / . - 44t! � ✓a11948 S� ek '''ECI STEREO ' '' �S SI ONA L GC'\. SIGNED 10-31-2017 SHEET TITLE: ELECTRICAL POWER PLAN DRAWN: AD CHECKED: NAH DATE: 10.31.17 REVISIONS: E 3 • 1 ." 1 2" SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED A A NO. PANEL L VOLTAGE: 208/120 VOLT 3-PHASE 4 -WIRE LOCATION: BUSSING: 150/3 AMPS MAIN BKR ENCLOSURE: SURFACE NEUTRAL: 100% ASSEMBLY AIC: OTHER FEATURES: SERVICE ENTRANCE RATED FEED-THRU LUGS SURGE PROTECTIVE DEVICE ISOLATED GROUND AREA SERVED CFM MAX ELECTRICAL DISCONNECT CONTROL REMARKS DESCRIPTION VA BKR CKT MEN'S RESTROOM CKT BKR VA DESCRIPTION INTEGRAL SWITCHLIGHT O O NO CEILING EXHAUST NO 75 1400 WATTS LTG - GENERAL LIGHTS,EF-1/EF-2 880 20/1 1 2,080 2 20/1 1,200 ITEM 18A ICE MAKER LTG - DISPLAY TRACK 510 20/1 3 1,177 4 20/1 667 ITEM 1 REFRIGERATOR BLADE SIGN 1,200 20/1 5 2,005 6 20/1 805 ITEM 6 DISH MACHINE LOW -TEMP RECP - GENERAL, CP -1, EF -3,4 1,310 20/1 7 2,460 8 20/1 1,150 ITEM 15 FREEZER TWO DOOR RECP - RESTRMS, NIT SLIDING DR 1,000 20/1 9 1,600 10 20/1 600 ITEM 17 POS SYSTEM RECP - ICE CREAM PREP . 540 20/1 11 1,840 12 20/1 1,300 ITEM 18 BEV DISP, CTR TOP RECP - ICE CREAM PREP 540 20/1 13 966 14 20/1 426 ITEM 20 DROP-IN REFR COLD PAN ENTRY SIGN 1,200 20/1* 15 2,592 16 20/1 1,392 ITEM 23A WAFFLE BOWL MAKER RECP - MENUBOARD 720 20/1* 17 2,112 18 20/1 1,392 ITEM 23B WAFFLE BOWL MAKER SECURITY ROLLING GRILLE 1,200 20/1 19 1,704 20 20/1 504 ITEM 39 Topping Warmer Server ITEM 26 DIPPER WELL SERVER 360 20/1 21 636 22 20/1 276 ITEM 42 Spindle Drink Mixer ITEM 28A COUNTER TOP MIXER 492 20/1 23 1,068 24 20/1 576 ITEM 45 Ice Cream Merchandiser ITEM 28A COUNTER TOP MIXER 492 20/1 25 1,932 26 20/1 1,440 ITEM 46 Auto Espresso Brewer ITEM 28A COUNTER TOP MIXER 492 20/1 27 1,860 28 20/1 1,368 ITEM 47 Air Pot Brewer ITEM 31 CREAM DISPENCER 492 20/1 29 852 30 20/1 360 ITEM 51 U/C REFRIGERATOR ITEM 31 UNDERCTR ICE MAKER 1,150 20/1 31 1,510 32 20/1* 360 ITEM 52 U/C 2DR REFRIGERATOR ITEM 34 CTR TOP FRYER 1,664 20/2* 33 2,024 34 20/1* 360 ITEM 63 COCA-COLA C arbonator 1,664 35 2,414 36 20/1* 750 ITER 56 FRY DUMP STATION RTU -1 (EXISTING) ** 4,300 100/3 37 7,300 38 35/3 3,000 ITEM 53 WATER HEATER 4,300 39 7,300 40 3,000 4,300 41 7,300 42 3,000 17,952 17,189 17,591 TOTAL PHASE LOAD LIGHTING 3,790 VA 125% LIGHTING 4,738 VA REMARKS: TOTAL RECEP 3,520 VA FIRST 10KVA RECEP 3,520 VA * PROVIDE NEW CKT BKR 50% RECEP OVER 10KVA 0 VA LG MOTOR ** 0 VA 125% LARGEST MOTOR 0 VA ** LARGEST MOTOR INCLUDED OTHER MOTORS 1,790 VA OTHER MOTORS 1,790 VA IN EXISTING RTU -1 LOAD. KITCHEN 30,732 VA 65% KITCHEN 19,976 VA COMPUTERS 0 VA COMPUTERS 0 VA HEAT 0 VA HEAT 0 VA MISC ** 12,900 VA MISC 12,900 VA TOTAL CONN 52.73 KVA TOTAL CALCULATED 42.92 KVA 146.37 AMPS 119.15 AMPS FAN SCHEDULE SYMBOL TYPE AREA SERVED CFM MAX ELECTRICAL DISCONNECT CONTROL REMARKS POWER VOLTS / PH EF -1 CEILING EXHAUST MEN'S RESTROOM 75 1400 54.5 WATTS 115/1 INTEGRAL SWITCHLIGHT O O EF -2 CEILING EXHAUST WOMEN'S RESTROOM 75 1400 WATTS 115/1 INTEGRAL SWITCHLIGHT 0O EF -3 ROOFTOP UPBLAST DISHWASHER HOOD 500 1550 1/20 HP 115/1 WP TOGGLE SWITCH EF -4 INLINE KITCHEN 340 1550 1/12 HP 115/1 WALL SWITCH 0 0 = WIRE SPEED CONTROL (FURNISHED BY MECH.) 0 = WIRE TIME DELAY RELAY (FURNISHED BY MECH.) PUMP SC ED LE SYMBOL TYPE SERVICE ELECTRICAL REMARKS POWER VOLTS/PH DISCONNECT CP -1 WET ROTOR CIRCULATOR DOMESTIC HW 125W 115/1 TOGGLE W/ AQUASTAT & TIME CLOCK B C D E LEASELINE (E) C-4#1/0 +#6 GND (E) EXISTING 200A, 30 DISC 150A FUSES G (E) 45KVA 480:120/208V, 30, 4W XFMR (E) #6 GND EXISTING UTILITY METER TO LANDLOARD 480V 30 SERVICE TENANT SPACE TC 1 150A 208V 30 PNL 'L' (E) 24-HOUR TIME CLOCK PARTIAL EXISTING ONE -LINE DIAGRAM H J K 1 2 3 REVIEVVED FOR CODE COMPLIANCE APPROVED DEC 01. 2017 City of Tukwila BUILDING DIVISION +: RECEIVED CITY OF TUKWILA rj r n1 ci a PERMIT CENTER K 4 5 6 7 8 9 n g i n e e r IMPROVEMEN TUKWILA, WA 0A•II 4Q,' oc wn s,,,,), ,? / / ti, +-p 11948 w� `'i� , kh'Ct STEREO A ' LS ' ONA L V\ C'\ SIGNED 10-31-2017 SHEET TITLE: ELECTRICAL SCHEDULES DRAWN: AD CHECKED: NAH DATE: 10.31.17 REVISIONS: E4 s 1 0" 1" 2" SHEET SIZE IS TRUE SCALE WHEN ABOVE LINE MEASURES AS NOTED ( 43 ) PLUMBING SYSTEMS SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED ACCORDING TO LAW (APPLICABLE LOCAL, STATE ANL) FEDERAL STATUTES; REGULATIONS AND ORDINANCES). 'STROOM &'KITCHEN HAND WASH SINKS SHALL BE !DIPPED TO PROVIDE WATER ATA TEMPERATURE 'AT LEAST HO DEGREES FAHRENHEIT THROUGH A KING VALVE OR COMBINATION FAUCET. SELF OSING OR METERING FAUCETS SHALL PROVIDE A OW OF WATER FOR AT LEAST 15 SECONDS. HOT WATER GENERATION AND DISTRIBUTION SYSTEMS SHALL BE SUFFICIENT TO MEET THE PEAK HOT ' I FWATER DEMANDS OOD ESTABLISHMENT. THROUGHOUT THE is strongly recommended that hot water for e restroom hand wash sinks be plumbed am the matin hot water heater ...instead of :ing an instant warm type water heater unit ider each :pink. A handwashing sink must be maintained so that it is accessible at all times for employee use ...and may not be used for purposes other than handwashing. 1 EXISTING \ EXIT FOOD, FOOD PREPARATION AND FOOD & SERVICE EQUIPMENT STORAGE AREAS ARE PROHIBITED UNDER SEWER LINES THAT ARE NOT SHIELDED TO INTERCEPT POTENTIAL DRIPS, OTHER UTILITIES MAY NOT BE UNNECESSARILY EXPOSED NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL !!I Light bulbs/tubes must be shielded, coated, or otherwise shatter -resistant in areas where there, is exposed food, clean equipment, utensils, linens or unwrapped single service/single use articles. ( 53 R «® SE INTERCEPTOR ( MEN ( 54 ) 0 WOMEN BE ADVISED THAT THE NEW WASHINGTON STATE FOOD CODE REQUIRES COMMERCIAL REFRIGERATION TO HOLD FOOD AT 41 DEGREES FAHRENHEIT OR BELOW !!! (DOWN FROM 45 DEGREES) EXISTI\C 71\ 60 OVER) )( OVER ) 41 FOOD SERVICE OPERATION AREA FLOORS, FLOOR COVERINGS, WALLS, WALL COVERINGS, AND CEILINGS SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED SO THEY ARE SMOOTH, DURABLE AND EASILY CLEANABLE. TAI Food equipment that is certified for sanitation by an American National Standards Institute (ANSI) - accredited certification program will comply with the food code equipment & u tensil material, construction and design requirements. STAA\T 35 ( 32 DW 'PREP OVER )1k. =parliARum 1 ICE CREAM / PREP ,-C 8 oot6o 00 0000 00 18 ) 62 UNDER 2 ( 21 25 SEATS OVER 17 > ORDER/ 63 ) PICK—UP UNDER 45 3 19 37 ) 28 D 37 ( 26 ) ENTRANCE UD NINE SQUARE FOOTAGE: 1,408 CLOJD \I\ SCALE: 1/4"=1'-0" CEA VERY F=OODSEWCF '<I\G COL\TY HEALTH DEDAT -QUI VI \T GE\ -RAL D V -XIST1 G S =ASS STC) E\T FL00� LA\ \OT -s 1. KING COUNTY HEALTH PERMIT REQUIRED PRIOR TO OPENING OF OPERATION FOR BUSINESS. 2. AN INDIRECT WASTE IS REQUIRED FOR FOOD PREPARATION SINKS. 3. WATER HEATER MUST BE OF SUFFICIENT SIZE TO PROVIDE HOT WATER TO POT & PAN SINK, PREP SINK, MOP SINK AND AT THE SAME TIMIE PROVIDE HOT WATER TO ALL HAND WASH SINKS.. 4. A PRE—OPERATIONAL KING COUNTY HEALTH DEPT. INSPECTION IS REQUIRED PRIOR TO OPENING; OF THE BUSINESS. 5. NO CHANGES WILL BE MADE WITHOUT KING COUNTY HEALTH DEPARTMENT APPROVAL. 6. MINIMUM HOT WATER TEMPERATURE ALLOWED AT ALL HAND SINKS SHALL BE 100 DEGREES F AT THE TAP THROUGH A MIXING VALVE. IDEAL TEMPERATURE RANGE IS 100-120 DEGREES F. SELF—CLOSING OR METERING FAUCETS SHALL PROVIDE A FLOW OF WATER FOR A MINIMUM OF 15 SECONDS 7. WATER HEATER CAPACITY SIZING BY PLUMBER. SHALL BE LARGE ENOUGH TO MEET THE PEEK HOT WATER NEEDS OF CLOUD NINE CREAMERY LEASED SPACE #700 FACILITY. 8. ALL FLOOR, WALL, & CEILING MATERIALS IN FOOD SERVICE PREPARATION & SERVICE AREAS SHALL BE SMOOTH, DURABLE & EASILY CLEANABLE. SEE SHEET FS -1.0 FOR TYPICAL FOOD SERVICE FINISHE:S ON FLOORS, WALLS, & CEILINGS. 9. ALL PLUMBING WORK SHALL BE DONE BY A COMMERCIAL PLUMBER UNDER A PLUMBING PERMIT FROM THE APPROPRIATE JURISDICTION. PLUMBING SYSTEM SHALL BE DESIGNED, CONSTRUCTED AND INSTALLE:D ACCORDING TO ALL APPLICABLE CURRENT CODES & ORDINANCES. 10. ALL FOOD STORAGE SHALL BE A MINIMUM OF 6" OFF THE FLOOR. 11. THERE SHALL NOT BE ANY EXPOSED PLUMBING OR WIRING IN THIS FOODSERVICE FACILITY THAT DOES NOT MEET ALL LOCAL CODE REQUIREMENTS. 12. ALL FOODSERVICE EQUIPMENT AND CABINETRY SHALL BE FLUSH MOUNTED (OR SMOOTH AND SEALED) TO COUNTERS, WALLS OR FLOORS, OR BE RAISED / LOCATED TO ALLOW FOR CLEANING. 13. ALL LIGHTING FIXTURES MUST BE SHIELDED IN FOODSERVICE AREAS. FOODSEWCE KEY OT -s OALL HAND SINKS SHALL BE EQUIPPED WITH MIXING FAUCETS OR COMBINATION FAUCET, HAND SOAP AND PAPER TOWELS. 0 2 PROVIDE INDIRECT WASTE FLOOR SINK AT PREP SINK ITEM #13 0 PROVIDE INDIRECT WASTE FLOOR SINK AT MIXING BOWL THAW SINKS ITEM #:27 OPROVIDE FLOOR DRAINS IN ALL AREAS WHERE FLOORS ARE SUBJECT TO WE:TTING. OITEM #26 DIPPER WELL DOES NOT REQUIRE RUNNING WATER OR INDIRECT DIRAIN PER NSF & UL LISTINGS FOR THIS PIECE: OF FOODSERVICE EQUIPMENT LOCKERS OR OTHER SUITABLE FACILITIES SHALL BE PROVIDED FOR THE ORDERLY STORAGE OF EMPLOYEES' CLOTHING AND OTHER POSSESSIONS. OEMPLOYEE LOCKERS OITEM #37 SNEEZE GUARDS SH ALL BE 64" ABOVE FINISHED FLOOR. NSF CODE MINIMUM IS 60" ABOVE FINISHED; FLOOR. SE:E SPECIFICATIONS SHEET FOR ITEM #37. WAREWASHIN(s/DISHWASHING SINK COMPARTMENTS SHALL BE LARGE ENOUGH TO ACCOMMODATE IMMERSION OF THE LARGEST EQUIPMENT AMID UTENSILS. DRAINBOARDS, UTENSIL RACKS, OR TABLES LARGE ENOUGH TO ACCOMMODATE ALL SOILED AND CLEANED ITEMS SHALL BE PROVIDED FOR NECESSARY UTENSIL HOLDING ...BEFORE CLEANING AND AFTER SANITIZING. XIST1\G V X10 \ CO VALL AREA NOTE: PUBLIC HEALTH —• KING COUNTY INSPECTION REQUIRED ON COMPLETION OF WORK PRIOR TO OPENING. NO CHANGES WILL BE MADE WITHOUT HEALTH DEPARTMENT APPROVAL. E KEY PLAN FI\IS SCH AUL ALL FLOORS, WALLS AND CEILINGS MUST BE SMOOTH, DURABLE AND EASY TO CLEAN. ALL FLOORS,WALLS, AND CEILINGS MUST BE SMOOTH, NON—TOXIC, NON—ABSORBENT, DURABLE AND EASILY CLEANABLE. FLOORS ALL FLOORS IN DW / PREP & ICE CREAM PREP ALL ALTRO FLOORING SEAMS SHALL BE HEAT WELDED. ALL OTHER FLOOR AREAS IN THE CLOUD NINE SPACE SHALL BE STAINED AND SEALED CONCRETE WITH 6" COVED RU AND CABINET BASES. AREAS SHALL BE ALTRO SHEET GOODS FLOORING COVED UP WALLS WALLS ALL WALLS IN PUBLIC RESTROOMS SHALL BE TILED UP 48" WITH COVED TOLE BASE AND SEMI—GLOSS PAINT ABOVE ALL FOODSERVICE AREA WALLS SHALL BE PAINTED WITH SEMI—GLOSS PAINT OR HAVE WASHABLE GLASS TILES. ALL PUBLIC AREA WALLS SHALL HAVE SEMI—GLOSS PAINT OR WASHABLE TYPE II VINYL WALL COVERINGS.. CEILINGS GRID CEILING IN DW / PREP AREA SHALL BE WASHABLE VINYL COATED 2' X 4' LAY—IN PANELS. ALL CEILINGS IN ICE CREAM PREP AREAS, PUBLIC AREAS, & PUBLIC RESTROOMS SHALL BE SEMI—GLOSS PAINT.. CLOUD \I\E CEAVEY 191 SOUTH CE\ TES & CABINET BASES 6" BBER BASE AT ALL WALLS TILE TO CEILING SPAGE "-frD(D vLcINITY MPAE • . I S j,1'st St WILL REQUIRE THE ADDRESS FOR THIS SPACE WHICH 1S. N MY%, '• -.rte+ h1..w....-+ a REVIEWED FOR CODE COMPLIANCE APPROVED DEC 01 2017 City of Tukwila BUILDING DIVISION z z 3 FOODSERVICE INTERIOR DESIGN Design Associates 6402 S Verde St Tacoma, WA. 98409 PH 206-354-7200 F0005 i;MCC CONSU LTM'(F.S SOCIETY ItiTZMATIO t4M. PROJECT NAME CLOUD NINE CREAMERY 191 SOUTHCENTER SPACE #700 TUKWILLA, WA. 98188 'ros. :5 4J SUL CT TO ORDI 1ANi:; CIANNc'E.V1 1-�I'EAt�T� �Eyd�T��te�T M p%P ROvpL!.. APP DESIGN TEAM PROJECT NO.: 01-2016 PRINCIPAL: LU SCHILDMEYER DRAWN BY: LS CHECKED BY: LAS ISSUED/REVISIONS 7-20-17 ISSUE FOR CLIENT REVIEW 7-26-17 REV. ISSUE FOR CLIENT REVIEW 8-25-17 REV. ISSUE FOR CLIENT REVIEW 8=28-17 REV. ISSUE FOR CLIENT MEETING 9-6-17 ISSUE FOR HEALTH DEPT PERMIT PROJECT CONSULTANTS RECEIVED CITY OF TUKWILA r� ti: o E�Es'aE PERMIT CENTER SHEET --TI TLE FOODSERVICE EQUIPMENT FLOOR PLAN SHEET NO. FS -1.0