Loading...
HomeMy WebLinkAboutPermit D17-0324 - PARKWAY VILLAGE - BUILDING B REROOFPARKWAY VILLAGE BUILDING B 17197 SOUTHCENTER PKWY Dl 7-0324 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 2623049069 Permit Number: D17-0324 17197 SOUTHCENTER PKWY Project Name: PARKWAY VILLAGE BUILDING B Issue Date: 12/8/2017 Permit Expires On: 6/6/2018 Owner: Name: Address: KTM GROUP LLC 2810 EASTLAKE AVE E , SEATTLE, , 98102 Contact Person: Name: GARY GILMER Address: Contractor: Name: FIELDS ROOF SERVICE INC Address: 25924 78TH AVE S , KENT, WA, 98032 -7364 License No: FIELDRS262L1 Lender: Name: FIELDS ROOF SERVICE INC Address: 25924 78TH AVE S , KENT, WA, 98032 -7364 Phone: (206) 730-8498 Phone: (253) 852-4974 Expiration Date: 9/25/2019 DESCRIPTION OF WORK: TPO ROOF MEMBRANE OVERLAY EXPIRED PERMIT D17-0087 Project Valuation: $127,100.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: Electrical Service Provided by: TUKWILA Fees Collected: $3,038.30 Occupancy per IBC: Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping; Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: r� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0103 PRE-REROOF CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. p- of/ Y - Project No: Date Application Accepted: ' ''1 Date Application Expires: J l w (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: Irl I 41"1 Tenant Name: King Co Assessor's Tax No.: Zee 2.30LI-L6(0 01 FINN y Suite Number: Floor: New Tenant: ❑ Yes ❑..No PArlwq Villa 11444 PROPERTY OWNER �J Name: l 6142_600 L1-� Address: State: Zip: Phon iol City: State: Zip: CONTACT PERSON — person receiving all project communication Name: 6 r kt I, tine W ' Address: Phone: jg LLienFix: "1 City: State: Zip: Phon iol o t "l•el2Fax: �^ Emailvl (�[q f v � Y73Uc_xCX1/l ce 1'l p6 GENERAL CONTRACTOR INFORMATION , Company Name: e ✓vnS atsb�- � s€V , C. Address: 7,6'L2(4 --78111City: 1. WT— State: of A_ Zip/26-3 Q Phone: jg LLienFix: "1 Contr Reg No.t",. 1 IO txp mate: Tukwila Business License 1 t A,c, nOr al r%, H:\Applin l ions\Forms-Applirn ions On Line \2111 I Applicnt ionsTermii Applicut ion Revised - R-9-1 I .dues Revised: August 2011 hh ARCHITECT OF RECORD Name: Address: Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Address: Company Name: Engineer Name: 'VVddress: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page I of 4 BUILDING PERMIT INFORMATION— 206-431-3670 Valuation of Project (contractor's bid price): $ /27a 100 Describe the scope of work (please provide detailed information): --r-pc, Roa4 AA,e- avf21 y Will there be new rack storage? ❑ Yes Existing Building Valuation: $ ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below. PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Arca (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0 None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No 1f "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H;\Applical ions \Forms-Appl kat ions On Line 2111 I Applicet ions\Pennit Appl ical ion Revised - 8-9-I Ldocx Revised: August 2011 bit Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC l5t Floor 2"d Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Arca (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0 None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No 1f "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H;\Applical ions \Forms-Appl kat ions On Line 2111 I Applicet ions\Pennit Appl ical ion Revised - 8-9-I Ldocx Revised: August 2011 bit Page 2 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE • I R A 0 Z Signature: //"‘� Print Nanie: Mailing Address: s S 4 (L/frt tat H:\Appl ientions\rurns-Apel kat ions On Line\2011 Applications\Permit Application Revised - $-9-I I.docx Revised: August 201 I 611 Date: 26/7 Day Telephone: 05-3 1%2— q9 7 City state Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $5,629.86 D17-0324 Address: 17197 SOUTHCENTER PKWY Apn: 2623049069 $3,038.30 DEVELOPMENT $2,949.07 PERMIT FEE R000.322.100.00.00 0.00 $1,784.59 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,159.98 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $89.23 TECHNOLOGY FEE R000.322.900.04.00 0.00 $89.23 D17-0325 Address: 17065 SOUTHCENTER PKWY Apn: 2623049070 $2,591.56 DEVELOPMENT $2,515.47 PERMIT FEE R000.322.100.00.00 0.00 $1,521.80 PLAN CHECK FEE R000.345.830.00.00 0.00 $989.17 WASHINGTON STATE SURCHARGE 8640.237.114 0.00 $4.50 TECHNOLOGY FEE $76.09 TECHNOLOGY FEE R000.322.900.04.00 0.00 $76.09 TOTAL FEES PAID BY RECEIPT: R12928 $5,629.86 Date Paid: Friday, December 01, 2017 Paid By: FIELDS ROOF SERVICE Pay Method: CHECK 91360 Printed: Friday, December 01, 2017 1:03 PM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: PARK OW 0 144610. Type of inspection: ;60/1-D►l(G FINAL Address: 17(97 Sou►n Nra'i4 140`1 Date Called: Special Instructions: 731.1x..a Date Wanted: 12-13'17 a.m., p.m. Requester: Cefiq Y Phone No: 206? — 716- 5-iffeS .Approved per applicable codes. ElCorrections required prior to approval. COMMENTS: — BO1 L_pf Inspector: Date: 2 /3 '/7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100: Call to schedule reinspection. CARLISLE GOLDEN SEAL TOTAL ROOFING SYSTEM WARRANTY SERIAL NO. 10155025 971 BUILDING OWNER: PARKWAY PARTNERS NAME OF BUILDING: PARKWAY VILLAGE BLD B BUILDING ADDRESS: 17197 SOUTHCENTER PARKWAY, TUKWILA, WA DATE OF COMPLETION OF THE CARLISLE TOTAL ROOFING SYSTEM: 09/04/2017 DATE OF ACCEPTANCE BY CARLISLE: 10/23/2017 CMD1225539 Carlisle Roofing Systems, Inc., (Carlisle) warrants to the Building Owner (Owner) of the above described building, that; subject to the terms, conditions, and limitations stated in this warranty, Carlisle will repair any leak in the Carlisle Golden SealtTotal Roofing System (Carlisle Total Roofing System) installed by a Carlisle Authorized Roofing applicator for a period of 20 years commencing with the date of Carlisle's acceptance of the Carlisle Total Roofing System installation. However, in no event shall Carlisle's obligations extend beyond 20.5 years subsequent to the date of substantial completion of the Carlisle Total Roofing System. See below for exact date of warranty expiration. The Carlisle Total Roofing System is defined as the following Carlisle brand materials: Membrane, Flashings, Adhesives and Sealants, Insulation, Cover Boards, Fasteners, Fastener Plates, Fastening Bars, Metal Work, Insulation Adhesives, and any other Carlisle brand products utilized in this installation. DATE OF ISSUE: October 23, 2017 p I�� 03z9 TERMS, CONDITIONS, LIMITATIONS 1. Owner shall provide Carlisle with written notice via letter, fax or email within thirty (30) days of the discovery of any leak in the Carlisle Total Roofing System. Owner should send written notice of a leak to Carlisle's Warranty Services Department at the address set forth at the bottom of this warranty. By so notifying Carlisle, the Owner authorizes Carlisle or its designee to investigate the cause of the leak Should the investigation reveal the cause of the leak to be outside the scope of this Warranty, investigation and repair costs for this service shall be paid by the Owner. 2. If, upon inspection, Carlisle determines that the leak is caused by a defect in the Carlisle Total Roofing System's materials, or workmanship of the Carlisle Authorized Roofing Applicator in installing the same, Owner's remedies and Carlisle's liability shall be limited to Carlisle's repair of the leak. 3. This warranty shall not be applicable if, upon Carlisle's inspection. Carlisle determines that any of the following has occurred: (a) The Carlisle Total Roofing System is damaged by natural disasters, including, but not limited to, lightning, fire, insect infestations, earthquake, tornado, hail, hurricanes, and winds of (3 second) peak gust speeds of fifty-five mph or higher measured at 10 meters above ground: or (b) Loss of integrity of the building envelope and, or structure including, but not limited to partial or complete loss of roof decking, wall siding, windows, doors or other envelope components or from roof damage by wind-blown objects, or: (c) The Carlisle Total Roofing System is damaged by any intentional or negligent acts, accidents, misuse, abuse, vandalism, civil disobedience, or the like. (d) Deterioration or failure of building components, including, but not limited to, the roof substrate, walls, mortar, HVAC units, non -Carlisle brand metal work, etc., occurs and causes a leak, or otherwise damages the Carlisle Total Roofing System: or (e) Acids, oils, harmful chemicals and the like come in contact with the Carlisle Total Roofing System and cause a leak, or otherwise damage the Carlisle Total Roofing System. (f) The Carlisle Total Roofing.System encountersleaks or is.otherwise.damaged by..condensation.resulting.from-any.condition within.the-building that may.generate moisture. 4. This Warranty shall be null and void if any of the following shall occur: (a) If, after installation of the Carlisle Total Roofing System by a Carlisle Authorized Roofing, Applicator there are any alterations or repairs made on or through the roof or objects such as, but not limited to, structures, fixtures, solar panels, wind turbines, roof gardens or utilities" are placed upon or attached to the roof without first obtaining written authorization from Carlisle: or (b) Failure by the Owner to use reasonable care in maintaining the roof, said maintenance to include, but not be limited to, those items listed on Carlisle's Care & Maintenance Information sheet which accompanies this Warranty. - f • 5. Only Carlisle brand insulation products are covered by this warranty. Carlisle speafically disdains liability, under any theory of law, for damages sustained by or caused by non -Carlisle brand insulation products. 6. During the term of this Warranty, Carlisle shall have free -access to the roof during regular business hours. 7. Carlisle shall have no obligation under this Warranty while anybills for installations supplies, service, -and warranty charges have not been paid in full to the Carlisle Authorized Roofing Applicator, Carlisle, or material suppliers. 8. Carlisle's failure at any time to enforce any of the terms or conditions stated herein shall not be construed to be a waiver of such provision. , _ 9. Carlisle shall not be responsible for the cleanliness or discoloration of the Carlisle Total Roofing System caused by environmental conditions including, but not limited to, dirt, pollutants, or biological agents. 10. Carlisle shall have no liability under any theory of law for any claims, repairs, restoration, or other damages including, but not limited to, consequential or incidental damages relating, directly or indirectly, to the presence of any irritants, contaminants, vapors, fumes, molds, fungi, bacteria, spores, mycotoxins, or the like in the building or in the air, land, or water serving the building. 11. This warranty shall be transferable upon a change in ownership of the building when the owner has completed certain procedures including a transfer fee and an inspection of the Roofing System by a Carlisle representative. CARLISLE DOES NOT WARRANT PRODUCTS UTILIZED IN THIS INSTALLATION WHICH IT HAS NOT FURNISHED; AND SPECIFICALLY DISCLAIMS LIABILITY, UNDER ANY THEORY OF LAW, ARISING OUT OF THE INSTALLATION AND PERFORMANCE OF, OR DAMAGES SUSTAINED BY OR CAUSED BY, PRODUCTS NOT FURNISHED BY CARLISLE OR THE PRIOR EXISTING ROOFING MATERIAL OVER WHICH THE CARLISLE ROOFING SYSTEM HAS BEEN INSTALLED THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR FAILURE OF THE CARLISLE TOTAL ROOFING SYSTEM OR ITS COMPONENTS. THERE ARE NO WARRANTIES EITHER EXPRESSED OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY, WHICH EXTEND BEYOND THE FACE HEREOF. CARLISLE SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR OTHER DAMAGES INCLUDING, BUT NOT LIMITED TO, LOSS OF PROFITS OR DAMAGE TO THE BUILDING OR ITS CONTENTS UNDER ANY THEORY OF LAW. BY: Robert H. McNeill AUTHORIZED SIGNATURE TITLE: Vice President, Technical and Warranty Services This Warranty Expires: October 22, 2037 r'.0. Rox 7000 Carlisle. PA 17013 Phone: 800,233.0551 Fax: 717.245.7121 www,carlislesynlec.ccxn RECEIVED CITY OF TUKWILA DEC 13 2011 PERMIT....C.ENTER----.__........._..._... WA -F0001 (1/15) a) 0. F3 1 er, <1.5 > cC.5 ISEPAREITE FOR: 17197 South Center Parkway, Entire Roof Over Lay FILE COPY PerrnEt No. Pil'092 Plan revie:.7 i eubject to errors and omissions. Approval of con:c,rcsqion documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged:. By: Date: e City ,of Tukwila • BUILDING DIVISION g/Mechanical Electrical le Plumbing Piping City at 'Tukwila BUILDli,r',"„; DAIISION North RECEIVED _ CITY OF TUKWILA DEC 01 2017 PERMIT CE VIEWED FOR CODE COMPLIANCE PPROVED DEC 0 6 2017 C y of Tukwila ING DIVISION EXPERIENCE THE CARLISLE DIFFERENCE ISure -Weld' TPO 1111.1= Reinforced Membrane Overview Carlisle's Sure -Weld TPO reinforced membrane is a premium, heat - weldable, single -ply thermoplastic polyolefin (TP01 sheet designed for new roof construction and re -roofing applications. Sure -Weld High Slope (HS) membrane is formulated with additional flame retardant for higher -slope fire code approvals. Sure -Weld EXTRA is 801 mils thick for significantly higher strength and weatherability. Sure -Weld TPO membranes use advanced polymerization technology that combines the flexibility of ethylene -propylene (EP) rubber with the heat weldability of polypropylene. All Sure -Weld TPO membranes include OctaGuard XT-, an industry-leading, state-of-the-art weathering package. OctaGuard XT technology enables Sure -Weld TPO to withstand the extreme weatherability testing that is intended to simulate exposure to severe climates. Physical properties of the membrane are enhanced by a strong polyester fabric that is encapsulated between the TPO-based top and bottom plies. The combination of the fabric and TPO plies provides high breaking and tearing strength, as well as excellent puncture resistance. The relatively smooth surface of the membrane produces a total surface fusion weld that results in a consistent, watertight, monolithic roof assembly. The membrane is environmentally friendly and safe to install. Carlisle's standard and HS TPO membranes are available in highly reflective white, tan, and gray, in both 45 -mil and 60 -mil thicknesses. 80 -mil Sure - Weld EXTRA (including HS) is also offered in white, gray, and tan colors. Sixteen special colors are also available (see Carlisle's TPO Color Palette brochure). Carlisle's TPO is offered in 4-, and 6 -ft perimeter sheets and 8-, 10-. and 12-tt Sure -Weld sheets. Sure -Weld HS and special color TPO membranes are available in limited sizes. » RL/SLE Carlisle's tan and white TPO membranes ar California Title 24 compliant and can contri in Energy and Environmental Design) credit GREVAEINE-070R CODE COMPLIANCE APPROVED DEC 062011 ENER it tB U i L DRI -•-m al1�1G�L RV I'ION Optional APEEL`" Protective Film Carlisle's Sure -Weld TPO reinforced membrane is available with an optional APEEL Protective Film, saving time and labor by eliminating the need for roof cleaning upon project completion. Carlisle's innovative APEEL Protective Film can be left in place for up to 90 days without affecting the integrity of the film, guarding the TPO membrane's surface from scuffs arid dirt accumulation during installation. Durable and easy to remove, APEEL Protective Film improves aesthetics and long-term reflectivity and is ideal for re -roofing, re-cover, and new construction projects. OCTRGURRD XT WEATHERING PACKAGE Features and Benefits PROLECTIVE,rlu Outstanding puncture resistance Chlorine -free with no halogenated flame retardants » Plasticizer -free; does not contain liguid or polymeric plasticizers » Excellent resistance to impact and low temperatures Excellent chemical resistance to acids, bases and restaurant exhaust emissions UL 2218 Class 4 hail rating Exceptional resistance to heat, solar UV, ozone and oxidation Manufactured using a hot -melt extrusion process for complete scrim encapsulation 100% recyclable (see Carlisle's Recyclability Statement) Enhanced with the OctaGuard XT weathering package APEEL Protective Film application guards the TPO membrane's surface from scuffs and dirt accumulation during installation, improving the roof system's appearance and long-term performance APEEL Protective Film can be left in place for up to 90 days without degrading due to its excellent heat- drediii re`si'starace CITY OF T UKWILA 11EC r 1 2017 PERMIT CENTER 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7953 I www.carlislesyntec.com TypicalyProperties and,Characteristic XPER IENCE THET'CAR LJSLEDIFF °ERENCE ISure -Weld Reinforced Membrane Installation 1, Sure -Weld TPO roofing systems are quick to install, as minimal labor and few components are required. TPO systems are installed using an Automatic Heat Welder, making sheet welding fast, clean, consistent, and easy to learn, while reducing strain on the roofing technician. 2. APEEL Protective Film should be removed from within areas that are to be heat -welded together. in areas that do not require heat - welding, the APEEL Protective Film can be left in place for up to 90 days. When the installation of the entire TPO roofing system is complete, remove and discard the APEEL Protective Film. Physical. Property Tolerance on Nominal Thickness, % ASTM D751 test method 3. The Carlisle Mechanically Fastened Roof System installation starts by fastening the insulation with a minimum of 4 fasteners per 4' by 8' board. The membrane is mechanically fastened to the deck using HP -X'' Fasteners and Piranha Plates~ or HP-XTRA Fasteners and Piranha XTRA Plates. Adjoining sheets of membrane are overlapped over the fasteners and plates and joined together with a minimum 1(4" -wide (4 cm) hot-air weld. ASTM D6878 Requirement +15, -10 Thickness Over Scrim, in. (mm) ' 0.015 min ASTM 07635 optical method,: average of 3 areas Breaking Strength Ibf (kN) ASTM D751 grab Elongation Break of Reinforcement. % ASTM D751 grab method Tearing Strength, Ibf (N) ASTM D751• proc. B 81n. x 8 in. Brittleness Point OF (oCY ASTM D2137 Linear Dimensional Change. % ASTM 01204.6 hours at 158'F. Ozone Resistance no cracks 7X ASTM D1149, 100 pphm, 168 hrs Water Absorption Resistance, mass % ASTM 0471 top surface only 166 hours :at 1580E water Factory Seam Strength, Ibf/in (kN/m)'ASTM 0751 grab method Field Seam Strength;lbf/in (kN/m); ASTM 01876 tested in peel Water Vapor Permeance, Perms ASTM; E96 proc'8 Puncture Resistance Ibf (kN) FTM 101C, method 2031 (see supplemental section) Properties After Heat Aging ASTM D573, 5376 hours Q 2400F Breaking strength Elongation Retnf. Tearing Strength Weight Change, % Typical Weights Ib/ft2 (kg/m2) (0.380) 15 min ± 1 max PASS ± 3.0 max 66 (290) min No requirement 45 -mil ±10 0.018 typical (0.457) .................... 225 (1.0) min 320 (1.4) typical 15 min 25 typical ............................ 55 (245) min 130 (578) typical -40 (-40) max -50 (-46) typical 1 max -0.2 typical PASS ± 3.0 max 0.90 typical 66 (290) min 25 (4.4) min 50 (8.8) typical No requirement 0.10 max 0.05 typical 250 (1.1) min 325 (1.4) typical No requirement 198 (881) 90% min 13.5 (90%) min 33 (60%) min ± 1.0 max Typical properties and characteristics are based on samples tested and are not specification range for any particular property of this product. 205 (912) rain 13.5 min 33 min 1.0 max 0.23 (1.1) guaranteed for all samples of this product. This data and information i 60 -mil ± 10 0.024 typical (0,610) 250 (1.1) min 360 (1.6) typical 15 min 25 typical 55 (245) min 130 (578) typical ........................... 40 (-40) max -50 (-46) typical ± 1 max -0.2 typical PASS -----__._ ± 3.0 max 0.90 typical 66 (290) min 25 (4.4) min 60 (10.5) typical 0.10 max 0.05 typical 300 (1.3) min 350 (1.6) typical 225 (1000) min 13.5 min 33 min 1.0 max 0.29 (1.4) .............................................................. S intended as a guide a 80 -mil EXTRA ±10 0.034 typical (0.864) 350 (1.6) min 425 (1.9) typical 15 min 25 typical 55 (245) min 130 (578) typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical PASS ± 3.0 max 0.90 typical 66 (290) min 40 (7.0) min 70 (12.3) typical 0.10 max 0.05 typical 400 (1.8) min 450 (2.0) typical 315 (1400) min 13.5 min 33 min 1.0 max 0.40 (2.0) mi does not reflect the Sure -Weld Reinforced Membrane 4. The Carlisle Fully Adhered Roofing System installation begins by fastening the insulation at the required density necessary to meet the appropriate warranty or wind load requirement. The substrate and membrane are then coated with an appropriate Sure -Weld TPO bonding adhesive and the membrane is rolled into place. Review Carlisle specifications and details for complete installation information. Precautions » » Sunglasses that filter out ultraviolet light are strongly recommended, as tan and white surfaces are highly reflective. Roofing technicians should dress appropriately and wear sunscreen. Surfaces may become slippery due to frost and ice buildup. Exercise caution during cold conditions to prevent falls. Care must be exercised when working close to a roof edge when the surrounding area is snow-covered, as the roof edge may not be clearly visible. Use proper stacking procedures to ensure sufficient stability of the rolls. » Exercise caution when walking on wet membrane. Membranes may be slippery when wet. Store membrane in the original undisturbed plastic wrap in a cool, shaded area and cover with light-colored, breathable, waterproof tarpaulins. Membrane that has been exposed to the weather must be prepared with Weathered Membrane Cleaner prior to hot-air welding. » Take care not to stand or place heavy objects on the edge of folded - over membrane, as this could cause a hard crease in the membrane. » Maximum sustained temperature not to exceed 160°F (71°C) for TPO membrane. » Do not use razor blades or other sharp tools to cut the APEEL Protective Film while it is still adhered to the TPO membrane as damage to the underlying membrane may occure. Pull the protective film away from the membrane prior to cutting. » Remove APEEL Protective Film by pulling towards the center of the roof. Do not remove the film by pulling towards the roof edge. » A static electric charge may develop when removing APEEL Protective Film from the surface of the membrane sheet. To avoid the possibility of ignition, lids must be closed on any flammable products and a fire extinguisher should be readily available. » Color membranes will 'fade' over time mainly due to the ultraviolet portion of sunlight. Since most roof surfaces are exposed to variable sunlight, some areas will be more susceptible to color changes caused by UV fading. Warranties for color membranes do not cover fading of colors. EXTREME Testing for Severe Climates ASTM Standard D6878 is the material specification for Thermoplastic Polyolefin -Based Sheet Roofing. It covers material property requirements for TPO roof sheeting and includes initial and aged properties after heat and xenon -arc exposure. As stated in the scope of the standard, the tests and property limits used to characterize the sheet are values intended to ensure minimum quality for the intended purpose." Carlisle's goal is to produce TPO that delivers maximum performance for the intended purpose of roofing membranes. Maximum performance requires the membrane to far exceed the requirements of ASTM D6878. Heat Aging accelerates the oxidation rate that roughly doubles for each 18°F (10°C) increase in roof membrane temperature. Oxidation (reaction with oxygen) is one of the primary chemical degradation mechanisms of roofing materials. Carlisle Testing - Heat Aging ASTM TEST 240°F ASTM Requirement 32 weeks" Sure -Weld Requirement 52 weeks "Comparable to 1.024 weeks (20 years) at 185°F for 6 hours/day. Test specimen is a 1" by 4" piece of 45 -mil membrane unbacked, placed in circulating hot-air oven. Criterion — no visible cracks after bending aged test specimen around 0.25" -diameter mandrel. Xenon -arc exposes the membrane samples to the combined effect of UV, visible and infrared radiation as well as ozone, heat and water spray to greatly accelerate the effects of outdoor weathering. The radiation dose is measured in kilojoules per square meter (kJ/m') at 340 nm machine UV wavelength. The irradiance power of the xenon -arc lamp is measured in watts per square meter (W/m2). Carlisle Testing °- `Xenon -Arc » ASTM TEST kJ/m2 at 340 nm ASTM D6878 Requirement ................. _...................... 10,080 Sure -Weld Results ........................ 45 -mil 60 -mil 17,640 20,160 80 -mil 27,720 Test specimen is a 2.75" by 5.5" piece of membrane, unbacked, weathering side facing arc lamp. Criterion — no visible cracks when viewed under 10x magnification while wrapped around 3" -diameter mandrel. 800-479-6832 I P.O. Box 7000 I Carlisle. PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com ISure -Weld Reinforced Membrane Environmental Cycling subjects the membrane to repeated cycles of heat aging, hot-water immersion, and xenon -arc exposure. ASTM requirement - none » Carlisle EXTREME test*: - 10 clays heat aging at 240°F (116°C) followed by - 5 days water immersion at 158°F (70°C) followed by - 5,040 kJ/m2 (2000 hours at 0.70 W/m2 irradiance) xenon -arc exposure *Test specimen is 2.75" by 5.5" piece of membrane with edges sealed. *Criterion - after 3 complete cycles, test specimens shall remain flexible and not have any cracking under 10x magnification while wrapped around a 3" -diameter mandrel. Supplemental Approvals, Statements and Characteristics: Sure -Weld TPO meets or exceeds the requirements of ASTM D6878 Standard Specification for Thermoplastic Polyolefin -Based Sheet Roofing. 2. Radiative Properties for ENERGY STAR, Cool. Roof Rating Council (CRRC) and LEED. 3. Sure -Weld TPO membranes conform to requirements of the US E.P.A. Toxic Leachate Test (40 CFR part 136) performed by an independent analytical laboratory. 4. Sure -Weld TPO was tested for dynamic puncture resistance per ASTM D5635-04 using the most recently modified impact head. 45 - mil was watertight after an impact energy of 12.5 J (9.2 ft-lbf) and 60 -mil was watertight after 22.5 J (16.6 ft-lbf). 80 -mil EXTRA was watertight after an impact energy of 30.0 J (22.1 ft-Ibf). 02.03.17 © 2017 Carlisle. REPRINT CODE: 600515 - "Sure -Weld TP0 Reinforced Membrane Product Data Sheer Radiative Properties for ENERGY STAR 'and LEED Test Method White Tan Gray TPO TPO TPO ENERGY STAR - Initial solar Solar Spectrum 0.79 0.71 NIA reflectance Reflectometer Solar Spectrum 0.70 0.64 N/A Reflectometer (uncleaned) ASTM C1549 0.79 0.71 0.46 r ENERGY 'STAR '- Initial solar reflectance after 3 years CRRC:--initial solar reflectance CRRC = Solar reflectance ` ASTM C1549 0.70 0.64 0.43 after 3 years:. (uncleaned) CRRC Initial thermal • ASTM C1371 0.90 0.86 0.89 emittance CRRC - Thermal emittance after 3 years LEED Thermal emittance SRI - Initial (Solar Reflectance Index) SRI 3 year aged • (Solar Reflectance Index) ASTM C1371 0.86 0.87 0.88 (uncleaned) r PASS 0.90 0.86 0.85 99 86 53 85 77 48 Solar Reflectance Index (SRI) is calculated per ASTM E1980. The SRI is a measure of the root's ability to reject solar heat, as shown by a small temperature rise. It is defined so that a standard black (reflectance 0.05. emittance 0.90) is 0 and a standard white (reflectance 0.80, emittance 0.90) is 100. Materials with the highest SRI values are the coolest choices for roofing. Due to the way SRI is defined, particularly hot materials can even take slightly negative values and particularly cool materials can even exceed 100. *ENERGY STAR recommends that using the Roof Savings Calculator (rsc.ornl.gov), which factors in both heating and cooling costs, to determine whether a cool root will be an energy efficient choice for your geographic climate and building type. LEED Information Pre consumer Recycled Content Post -consumer Recycled Content Manufacturing Location Solar Reflectance Index (SRI) 10% 0% Senatobia, MS Tooele, UT Carlisle, PA 99 (white) 86 (tan) 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com Carlisle, Sure -Weld, OctaGuard XT, APEEL, Piranha Plates and HP -X are trademarks of Carlisle. ENERGY STAR is a registered trademark owned by the U.S. Government. `ENERGY STAR qualification is only valid in the U.S. LEES is a registered trademark of the U.S. Green Building Council. y EXPERIENCE THE CARLISLE DIFFERENCE IR -Tech° Fanfold Recover Board Overview R -Tech Fanfold Recover Board is a high-performance rigid insulation consisting of a superior closed -cell, lightweight and resilient expanded polystyrene (EPS) with advanced polymeric laminate facers. R -Tech is available with factory -adhered metallic -reflective facers, white facers or a combination of the two. The EPS core of R -Tech Fanfold Recover Board meets or exceeds the requirements of ASTM C578, Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation. R -Tech Fanfold Recover Board has excellent dimensional stability, compressive strength and water- resistant properties. R -Tech Fanfold Recover Board contributes toward LEED" certification credits. R -Tech Fanfold Recover Board is manufactured by Insulfoam, a division of Carlisle Construction Materials Incorporated with ten manufacturing facilities in North America. Features and Benefits » Labor-saving, accordion -style fanfold product allows installers to carry 400 square feet at one time versus 13 sheets of conventional 4' x 8' cover board » Reduced fastening patterns and lightweight handling reduces labor costs by up to 50% » Water-resistant cover board does not break down like alternative cover boards if leaks occur Reduces installed costs compared to wood fiber or gypsum by 40% to 60% » Unique polymeric laminate facers permit PVC to be used without slip sheets _' L » SYNTEC: S YSTEMS Metallic facer permits usage under mechanically fastened EPDM in northern locations (Contact Carlisle Design Services for guidance) Nationwide stocking locations UL code approval for numerous recover applications Approximately 8x higher R -value tha higher R -value than 1" wood fiber b Product Characteristics » Panel thickness: 1" Panel density: 1.25 pcf (available ran Bundle size: 4' x 50' (200 ft.2) Applications R -Tech Fanfold Recover Board is designed r f OR ds CODE COMPLIANCE APPROVED ell 101' ,e: 1-2 pCT} t 0 6 2011 City of Tukwila UILDING DIVISION •e :c, • numerous commercial and industrial re -roofing applications. Installation Loose Laid Install R -Tech Fanfold Recover Board with continuous side joints, and end joints staggered so they are offset by a minimum of 12" from the end joints in adjacent rows. R -Tech Fanfold Recover Board should abut tightly against adjacent boards. Joints greater than Y" should be filled with the same insulation that is being used in the field of the roof. If R -Tech Fanfold Recover Board is being installed over an existing layer of insulation, all joints must be offset a minimum of 6" between layers. Mechanically Attached Install R -Tech Recover Board with continuous side joints, and end joints staggered so they are offset by a minimum of 12" from the end joints in adjacent rows. Insulation should abut tightly against adjacent boards. Joints greater than /2" should be filled with the same insulation that is being used in the field of the roof. If R -Tech Fanfold Recover Board is being installed over an existing layer of insulation, all joints must be offset a minimum of 6" between layers. Use an approved mechanical fastener of sufficient length to penetrate into or through the deck by the amount prescribed for the specific fastener. Fasteners should never be closer than 6" from the edges of the insulation boarREdVa1NMed in a pattern to achieve the desired approvairraro�mrrptej-itinQLtA with the fasteners. Care must be taken to avoid over -driving or under - driving the fastener and plate assembly. 1 2017 PERMIT CENTER 800-479-6832 I P.O. Box 7000 I Carlisle. PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com EXPERIENCETHE CARLISLE DIFFERENCE R -Tech Fanfold Recover Board S Carlisle -Approved Fastening Pattern • • • 111111111111111111111111111111111111 08.04.14 rf. 2014 Carlisle. Carlisle is a trademark of Carlisle. R -Tech is a trademark of lusulfoani. ENERGY STAR is a registered trademark owned by the U.S. Government. REPRINT CODE: 605070 - "R -Tech Fanfold Recover Board Product Data Sheet" LEED Is a registered trademark of the U.S. Green Building Council. S Typical Properties and Characteristics Physical Property Nominal Density (pcf) ASTM C303 C=Value (Conductance) 'BTUI(hr • ft2 • 'F) (per inch) @125°F ' ASTM C518 .22 040°F or .24 @75°F ASTM C177 .26 Test Method Typical ................. 1.25 R -Value (Thermal Resistance) (hr • ft° • °F)/RTU (per inch) @25°F ASTM C518 @40"F or ASTM Ci77 ASTM D1621 @175°F Compressive Strength (psi, 10% deformation) • Flexural Strength (psi) Dimensional Stability (maximum %) Water Vapor Transmission (perms) ......................................... Absorption (% vot) Capillarity Flame Spread ASTM E84 Smoke Developed ASTM E84 ASTM C203 ASTM D2126 ASTM C272 LEED° Information'' Post-industrial Recycled Content i Up to to 25% Manufacturing Locations Anchorage, AK Puyallup, WA Dixon, CA Chino, CA Phoenix, AZ Tooele, UT Aurora, CO Mead, NE Lakeland, FL Smithfield, PA 4.54 4.25 3.92 13-18 32 — 38 none <20 ................................... 150-300 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com Fields Roof Service, Inc. 25924 — 78th Ave. So. Kent, Tacoma 253-852-4974 206-367-2564 253-952-3744 Main Office Seattle Steve Bozorth Washington 98032 Bellevue 425-644-7128 Roofing Proposal and Sales Agreement Sumitted to Metro Property Services 2810 Eastlake Ave E Seattle WA 98102 (206) 686-2891 Kevin Mcnulty Fax (253)852-4999 Bremerton Olympia 360-479-0650 360-754-4099 12/01/2017 Job Site Parkway Village Bldg B 17197 Southcenter Parkway Tukwilla WA 98188 161438 We hereby propose to supply materials and labor to complete the following: Fields Roof Service appreciates the opportunity for the following proposal at Parkway Center in Tukwila, WA. All work per scope below. Set up site specific safety per WSLNI and OSHA requirements. Remove existing cap metal and recycle at side walls. Newer cap metal on the front will be reused. Install one layer of 1/2" EPS Fanfold cover board Carlisle HP -X screws with Rhinobond Plates per manufactures specifications for a modified fully adhered system. Install TPO clad starter metal at gutter edge. Install Carlisle 045 TPO single ply membrane per manufactures specifications.(GREY) Heat weld seams. Probe all work when cool. Run Carlisle 045 TPO single ply membrane per manufactures specifications up and over top of walls on sides and where old cap metal is located. Terminate with term bar at intersection with newer TPO roof. Fully adhere with Carlisle Low VOC adhesive. Install Carlisle TPO pipe boots. Caulk and clamp per specifications. Run TPO up under existing skirt of HVAC units. We recommend that the property manager retain their HVAC contractor to work with us and provide a tune up and possible repairs of units. This is not included in the base bid. Electrical Conduits will be sealed by either TPO field wraps and clamped or by TPO pitch pockets and pourable sealant. Any satellite equipment or penetrations which are in the way of new roof installment may need to be relocated or re -calibrated -not included in base bid. Wrap furnace pipes per manufactures specifications. Plus sales tax and permit fees, if required. Prices subject to change after 15 days RECEIVED CITU OF TUKW'ILA IJEC n 1 2017 PERMIT CENTER Contract Amount ... $ 127,100.00 A 3% surcharge will be added for credit card processing on the total including tax. We accept Visa and Master Card. CONDITIONS OF SALE: The Tei ms and Conditions a: e Ocorporated and made a part of this Agreement. By signing below, you are agreeing to this Roofing Proposal and Sales Agreement. cost and the Term and Conditions. Payments shalt be made to Fields Roof Se:vice. Inc. Contractor Req. No. FIELDRS2E2L I Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date Fields Roof Service, Inc. 25924 — 78th Ave. So. Kent, Main Office Seattle Tacoma 253-852-4974 206-367-2564 253-952-3744 Steve Bozorth Washington 98032 Bellevue 425-644-7128 Roofing Proposal and Sales Agreement Sumitted to Metro Property Services 2810 Eastlake Ave E Seattle WA 98102 (206) 686-2891 Kevin Mcnulty Fax (253)852-4999 Bremerton Olympia 360-479-0650 360-754-4099 12/01/2017 Job Site Parkway Village Bldg B 17197 Southcenter Parkway Tukwilla WA 98188 161438 We hereby propose to supply materials and labor to complete the following: Install new 24ga cap metal with exterior cleat and neo screws on interior face per Carlisle specifications. Clean up and remove all job related debris. Carlisle 045 Mil TPO(grey) with 15 year material warranty -$120,100.00 ADD for Carlisle 15 year NDL System Warranty -$4,600.00 Carlisle 060 Mil TPO(grey) with 20 year material warranty -$127,100.00 ADD for Carlisle 20 year NDL System Warranty -$6,500.00 Notes and exclusions:Pricing plus WSST and any required permits. Approximate roof area is 37,900 square feet. Asbestos Abatement, engineering services, electrical, plumbing or HVAC services are excluded. All pricing based on scope of work above. Any items outside of scope above will be additional time and materials. Fields Roof Service workmanship warranty is 5 years and Carlisle 060 membrane warranty is 20 years. $200 warranty registration fee for membrane warranty required. Plus sales tax and permit fees, if required. Prices subject to change after 15 days Contract Amount ... $ 127,100.00 A 3% surcharge will be added for credit card processing on the total including tax. We accept Visa and Master Card. CONDITIONS OF SALE: The Terms and Conditions are incorporated and made a part of this Agreement, By signing below. you are agreeing to this Roofing Proposal and Sales Agreement, cost and the Terra and Conditions. Payments shall be made to Fields Roof Service Inc. Contractor Reg. No, FIELDRS262L Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date • Fields Roof Service, Inc. — Terms and Conditions 1. Relationship of Parties. The statement of work on the front page together with these Terms and Conditions make up the Contract between Fields Roof Service, Inc. and the property owner or client designated on the front page ("Client"). This contractual relationship is an independent contractor relationship and not a partnership, joint venture, employee -employer or other type of relationship. 2. Payment. Payment is due immediately upon completion of the job. A down -payment may be required to secure material and equipment prior to project initiation. If the work requires more than 30 days to complete, then FRS shall invoice client on monthly basis for work performed during the prior month and payment shall be due upon receipt of invoice. Payments not received within 30 days of their due date shall incur interest at 1.5% per month until paid. Any costs incurred by FRS to collect delinquent accounts, including reasonable attorneys fees, court costs, lien costs and other collection related expenses shall be recoverable from the Client addition to the deliquent payment. 3. Limited Warranty. FRS warrants that the installation of the roof will be performed in a workmanlike manner consistent with the standard of care of the roofing industry. For a period of one (1) year [or period of time stated on proposal] following the installation or other work involving the roof, FRS will, at no cost to the client, repair or replace any roof failure caused by a defective installation. in addition, FRS will provide Client with any manufacturers' warranites that might apply to the roofing materials that are installed, provided that Client understands that it must enforce these manufacturers warranties directly against the manufacturer; FRS will assist Client in this process. 4. Warranty Exclusions. The limited warrany above explicity excludes damages caused by or due to (i) pre-existing conditions, such as defective roof support systems and defective construction materials; (ii) improper building or residential construction (iii) mold, dry rot, mildew, or other conditions caused by moisture an dimproper ventilation; (iv) termites and pests; and (v) hazardous substances and materials. 5. Client's Responsibilities. Client shall be responsible for (i) providing an area for the storage of equipment and materials; (ii) obtaining permission from neighboring landownwers if FRS's work requires the temporary use of such neighboring landowner's property; and (iii) correcting any existing defects, such as dry rol and structural and code defects. (FRS may agree to correct these defects pursuant to a Change Order as provided below). 6. Change Orders. Should the Client request any modifications to the work, or if FRS agrees to repair any existing defective conditions that are discovered during construction, such as dry rot, code, or structural defects, this work shall be in addition to the statement of work on the front page of this Contract and shall be documented in a Change Order signed by both parties. 7. Title to Materials. Title to the roofing materials shall pass to the Client upon installation. Any surplus roofing materials that are not installed or used remain the property of FRS and are not subject to any credit or refund in the contract price. 8. Clean Up. Upon completion of the project, FRS will remove any surplus materials and debris and shall leave the exterior of the site in neat, broom clean appearance. Any materials that fall from the ceiling within the building, including cathedral ceilings and any other materials that fall within the confines of the interior of the building are the responsibility of the Client. 9. Existing Conditions. FRS is not responsible for conditions existing before coming on to the site, including (i) ceiling damage due to the installation of the roof or any repair of dry rot or other defective materials; (ii) existing chimney problems due to poor flashing or waterproofing and (iii) any damage to driveways or pavement subsidence due to the vehicles required by FRS to transport an dinstall the roofing materials. 10. License, Insurance and Bonding. FRS is properly licensed as a roofing contractor in the State of Washington (Lic # FEILDRS262L I ), and is bonded and insured as required by law. 11. Limitation of Remedies. Client understands that its sole remedy for any defective work performed by FRS shall be enforcement of the warranty in parapgraph 3. In addition, Client agrees that FRS's maximum aggregate liability to Client for any and all claims relating to FRS's work, including claims for negligence and breach of contract shall be limited to the total amount of compensation paid to FRS under this Contract. If Client desires an extended warranty or higher limitation of liability, FRS may agree to such for additional consideration paid to FRS, and provided that such extended warranty or increased limitation of liability is documented in a Change Order signed by both parties. Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date 'EMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D17-0324 DATE: 12/04/17 PROJECT NAME: PARKWAY VILLAGE BUILDING B SITE ADDRESS: 17197 SOUTHCENTER PKWY X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: f%10 Building Division Public Works A-rn . Nix Fire Prevention Lw. Planning Division ri Structural ❑ Permit Coordinator ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 12/05/17 Structural Review Required REVIEWERc6 INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/02/18 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWERcS INITIALS: DATE: :Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 FIELDS ROOF SERVICE INC Home Espanol Contact Safety & Health Claims & Insurance CioWashington State Department of Labor & Industries Page 1 of 3 Search L&I A -Z Index Help My L&l Workplace Rights Trades & Licensing FIELDS ROOF SERVICE INC Owner or tradesperson Principals GILMER, GARY STEVEN, PRESIDENT PATNODE, TERRY MARK, DIRECTOR MANDELAS, MICHAEL J, SECRETARY (End: 08/25/2017) GOEMAN, DALE JESSE, DIRECTOR (End: 08/25/2017) GILMER, THOMAS A, PRESIDENT (End: 12/09/2002) PEAK, DUANE, VICE PRESIDENT (End: 12/09/2002) PEPPER, SCOTT, TREASURER (End: 12/09/2002) Doing business as FIELDS ROOF SERVICE INC WA UBI No. 600 125 673 25924 78TH AVE S KENT, WA 98032 253-852-4974 KING County Business type Corporation Governing persons GARY S GILMER DALE J GOEMAN; TERRY J PATNODE; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties ROOFING License no. FIELDRS262L1 Effective — expiration 06/21/1974— 09/25/2019 Bond CBIC Bond account no. SH3047 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 03/01/2008 04/04/2008 Expiration date Until Canceled Insurance Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600125673&LIC=FIELDRS262L 1 &SAW= 12/8/2017