Loading...
HomeMy WebLinkAboutPermit D17-0325 - PARKWAY VILLAGE - BUILDING A REROOFPARKWAY VILLAGE BUILDING A 17065 SOUTHCENTER PKWY DI 7-0325 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 2623049070 17065 SOUTHCENTER PKWY Project Name: PARKWAY VILLAGE BUILDING A Permit Number: D17-0325 Issue Date: 12/8/2017 Permit Expires On: 6/6/2018 Owner: Name: Address: KTM GROUP LLC 2810 EASTLAKE AVE E , SEATTLE, , 98102 Contact Person: Name: GARY GILMER Address: Contractor: Name: FIELDS ROOF SERVICE INC Address: 25924 78TH AVE S , KENT, WA, 98032 -7364 License No: FIELDRS262L1 Lender: Name: FIELDS ROOF SERVICE INC Address: 25924 78TH AVE S , KENT, WA, 98032 -7364 Phone: (206) 730-8498 Phone: (253) 852-4974 Expiration Date: 9/25/2019 DESCRIPTION OF WORK: TPO ROOF MEMBRANE OVERLAY EXPIRED PERMIT D17-0086 Project Valuation: $97,025.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: Electrical Service Provided by: TUKWILA Fees Collected: $2,591.56 Occupancy per IBC: Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No I Permit Center Authorized Signature: (1 AI I hearby certify that I have read and examined this permit and tnow the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. Date: r21117 The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature:_ Print Name: Date: AD—P:—/? This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0103 PRE-REROOF CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Soulhcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. VII 01/iX) Project No. Date Application Accepted: j � 1 lel- Date Application Expires: ' ( 4 b (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 2 'Ti Site Address: I (XeS-- S ,/ Gtn. j� Suite Number: Tenant Name: Me�rcj q' 6jU-C-% New Tenant: Yes ..N o YfAt%4N (tt f5o4dw\ K Floor: PROPERTY OWNER -- Name: t-0nVl 6afeeivp wL City: State: Zip: Address: p,,- Em q 0 T lvt!� SYZ) Uf gyvo o • (Q Y City: State: Zip: CONTACT PERSON — person receiving all project communication Name:/�L cei Address: City: State: Zip: Pham lw '? v Fax:_ p,,- Em q 0 T lvt!� SYZ) Uf gyvo o • (Q Y GENERAL CONTRACTOR INFORMATION Company Name:riga.).5 y� ,� F- g�_n - _ C� Addres�7 � e rL4 114+1 0l/Q SQL (�� ��r City: Stadem_ Zip 9$032 Y Phoned �3 a-2 (,C, / aax:: Conti- Reg NoFteup asu?;L V_ tte: Tukwila Business License Nees 0 qq,-/ 2...1 IDApplicnt ions \Forms -Applications On Line \20I I Applicatiuns\Permit Application Revised - 11-9-I I.docx Revised: August 2011 hi, ARCHITECT OF RECORD Name: Address: Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Address: Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page I of 4 BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): S !� C7? S Existing Building Valuation: S Describe the scope of work (please provide detailed information): -r-f)0200 ✓ ft t3(241 a-4 6 e:)‘/4/24 --Al Will there be new rack storage? ❑ Yes 0.. No if yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers 0 Automatic Fire Alarm ❑ None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No if "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applieel ions \Forms-AppiicnI ions On Line \2011 Applications\Permit Applical ion Revised - 0-9-I Ldocx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1 s' Floor 2"d Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers 0 Automatic Fire Alarm ❑ None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No if "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applieel ions \Forms-AppiicnI ions On Line \2011 Applications\Permit Applical ion Revised - 0-9-I Ldocx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES - Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 OR TH AGENT: Signature: Print Name: J (L/V Mailing Address: Z- 2-."'t -7 , -Ue S. H:\Applications\Forms-Applications On Line\201 1 Applications\Permit Application Revised - 8-9-I I .docx Revised: August 2011 hh Day Telephone: City Date: / -20/7 2c-3 - 8-52,-jl �L ?8 o' State Zip -2.46L PAM Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT I QUANTITY ( PAID PermitTRAK $5,629.86 D17-0324 Address: 17197 SOUTHCENTER PKWY Apn: 2623049069 $3,038.30 DEVELOPMENT $2,949.07 PERMIT FEE R000.322.100.00.00 0.00 $1,784.59 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,159.98 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $89.23 TECHNOLOGY FEE R000.322.900.04.00 0.00 $89.23 D17-0325 Address: 17065 SOUTHCENTER PKWY Apn: 2623049070 $2,591.56 DEVELOPMENT $2,515.47 PERMIT FEE R000.322.100.00.00 0.00 $1,521.80 PLAN CHECK FEE R000.345.830.00.00 0.00 $989.17 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $76.09 TECHNOLOGY FEE _ TOTAL FEES PAID BY RECEIPT: R12928 R000.322.900.04.00 0.00 $76.09 $5,629.86 Date Paid: Friday, December 01, 2017 Paid By: FIELDS ROOF SERVICE Pay Method: CHECK 91360 Printed: Friday, December 01, 2017 1:03 PM 1 of 1 CSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: prnz NI/JO v'tuA&C Type of Inspection: N)}LD/N.G FILL Address: /7 5 -5oV°lkzvm e Date Called: Special Instructions:/� BLD6- A -rpd Rcof- mem, g z- 64 j Date Wanted: I2--13-17 tett p.m. equester: G Phone No: ,264 -730— 8'f fo 2 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 01k- t3a!LDiti6— . Inspector: Date: I2�'3-/7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. CARLISLE GOLDEN SEAL TOTAL R00FING SYSTEM WARRANTY SERIAL NO. 10154339 971 BUILDING OWNER: PARKWAY PARTNERS NAME OF BUILDING: PARKWAY VILLAGE BUILDING ADDRESS: 17065 SOUTHCENTER PARKWAY, TUKWILA, WA DATE OF COMPLETION OF THE CARLISLE TOTAL ROOFING SYSTEM: 07/31/2017 DATE OF ACCEPTANCE BY CARLISLE: 10/10/2017 DATE OF ISSUE: October 10, 2017 b\-7 os -2S CMD1222942 Carlisle Roofing Systems, Inc., (Carlisle) warrants to the Building Owner (Owner) of the above described building, that; subject to the terms, conditions, and limitations stated in this warranty, Carlisle will repair any leak in the Carlisle Golden Seal"Total Roofing System (Carlisle Total Roofing System) installed by a Carlisle Authorized Roofing applicator for a period of 20 years commencing with the date of Carlisle's acceptance of the Carlisle Total Roofing System installation. However, in no event shall Carlisle's obligations extend beyond 20.5 years subsequent to the date of substantial completion of the Carlisle Total Roofing System. See below for exact date of warranty expiration. The Carlisle Total Roofing System is defined as the following Carlisle brand materials: Membrane, Flashings, Adhesives and Sealants, Insulation, Cover Boards, Fasteners, Fastener Plates, Fastening Bars, Metal Work, Insulation Adhesives, and any other Carlisle brand products utilized in this installation. TERMS, CONDITIONS, LIMITATIONS 1. Owner shall provide Carlisle with written notice via letter, fax or email within thirty (30) days of the discovery of any leak in the Carlisle Total Roofing System. Owner should send written notice of a leak to Carlisle's Warranty Services Department at the address set forth at the bottom of this warranty. By so notifying Carlisle, the Owner authorizes Carlisle or its designee to investigate the cause of the leak. Should the investigation reveal the cause of the leak to be outside the scope of this Warranty, investigation and repair costs for this service shall be paid by the Owner. 2. If, upon inspection, Carlisle determines that the leak is caused by a defect in the Carlisle Total Roofing System's materials, or workmanship of the Cad'sle Authorized Roofing Applicator in installing the same, Owner's remedies and Carlisle's liability shall be limited to Carlisle's repair of the leak. 3. This warranty shall not be applicable if, upon Carlisle's inspection, Carlisle determines that any of the following has occurred: (a) The Carlisle Total Roofing System is damaged by natural disasters, including, but not limited to, lightning, fire, insect infestations, earthquake, tomado, hail, hurricanes, and winds of (3 second) peak gust speeds of fifty-five mph or higher measured at 10 meters above ground; or (b) Loss of integrity of the building envelope and, or structure including, but not limited to partial or complete loss of roof deddng, wall siding, windows, doors or other envelope components or from roof damage by wind-blown objects, or: (c) The Carlisle Total Roofing System is damaged by any intentional or negligent acts, accidents, misuse, abuse, vandalism, civil disobedience, or the like. (d) Deterioration or failure of building components, including, but not limited to, the roof substrate, walls, mortar, HVAC units, non -Carlisle brand metal work, etc., occurs and causes a leak, or otherwise damages the Carlisle Total Roofing System; or (e) Acids, oils, harmful chemicals and the like come in contact with the Carlisle Total Roofing System and cause a leak, or otherwise damage the Carlisle Total Roofing System. (f) The Carlisle Total Roofing System encounters leaks -oris otherwise damaged by condensation resultingfrom any condition-within.the building that may generate.moisture. 4. This Warranty shall be null and void if any of the following shall occur: (a) If, after installation of the Carlisle Total Roofing System by a Carlisle Authorized Roofing Applicator there are any alterations or repairs made on or through the roof or objects such as, but not limited to, structures, fixtures, solar panels, wind turbines, roof gardens or utilities are placed upon or, attached to the roof without first obtaining written authorization from Carlisle; or (b) Failure by the Owner to use reasonable care in maintaining the roof, said rtieintegance to indude, but not be limited to, those items listed on Carlisle's Care 8 Maintenance Information sheet which accompanies this Warranty ; " J 5. Only Carlisle isle brand insulation products are covered bylhis warranty. Carlislelspecifically disdaims liability, under any theory of law, for amages sustained by or caused by non-Cartisle brand insulation products. L, _ ) 6. During the term of this Warranty, Carlisle shall have -free access to the roof during regular business hour's. ✓ - ) 7. Carlisle shall have no obligation underthis-Warranty while any bilis for' installation, supplies;-service;-and,warranty charges have not been paid tri full to the Carlisle Authorized Roofing Applicator, Carlisle, or material suppliers. 8. Carlisle's failure at any time to enforce any of the terms or conditions stated herein shall not be construed to be a waiver of such provision. - - 9. Carlisle shall not be responsible for the cleanliness or discoloration of the Carlisle Total Roofing System caused by environmental conditions including, but not limited to, dirt, pollutants, or biological agents. 10. Carlisle shall have no liability under any theory of law for any daims, repairs, restoration, or other damages including, but not limited to, consequential or incidental damages relating, directly or indirectly, to the presence of any irritants, contaminants, vapors, fumes, molds, fungi, bacteria, spores, mycotoxins, or the like in the building or in the air, land, or water serving the building. 11. This warranty shall be transferable upon a change in ownership of the building when the owner has completed certain procedures including a transfer fee and an inspection of the Roofing System by a Carlisle representative. CARLISLE DOES NOT WARRANT PRODUCTS UTILIZED IN THIS INSTALLATION WHICH IT HAS NOT FURNISHED; AND SPECIFICALLY DISCLAIMS LIABILITY, UNDER ANY THEORY OF LAW, ARISING OUT OF THE INSTALLATION AND PERFORMANCE OF, OR DAMAGES SUSTAINED BY OR CAUSED BY, PRODUCTS NOT FURNISHED BY CARLISLE OR THE PRIOR EXISTING ROOFING MATERIAL OVER WHICH THE CARLISLE ROOFING SYSTEM HAS BEEN INSTALLED THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR FAILURE OF THE CARLISLE TOTAL ROOFING SYSTEM OR ITS COMPONENTS. THERE ARE NO WARRANTIES EITHER EXPRESSED OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY, WHICH EXTEND BEYOND THE FACE HEREOF. CARLISLE SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR OTHER DAMAGES INCLUDING, BUT NOT LIMITED TO, LOSS OF PROFITS OR DAMAGE TO THE BUILDING OR ITS CONTENTS UNDER ANY THEORY OF LAW. BY: Robert H. McNeill AUTHORIZED SIGNATURE TITLE: Vice President, Technical and Warranty Services This Warranty Expires: October 09, 2037 RD. Box 7000 Carlisle. I'0 17013 ('hone: 800.233.0551 Fay: 717.245.7121 www.cartislosyntec.com RECEIVED CITY OF TUKWILA DEC 13 2017 _ -PERMIT ...CENTER WA -F0001 (1/15) 17065 South Center Parkway, Entire Roof OWQ Lr Psora r;11/r)g12-t) Plan review approval is suited to aim End omissions. Approval of construction documents doss not authorize the vioidion of any adopted codeor ordinance. Receipt of approved Field Copy and conditions is acknowledged: By: Date: City of Tukwila BUILDING DWISIO ! rREVISIONS No changes shall he made to the scope of work without ('prior approval of Tukw la Building Division. NOTE: Revisions will rEqu;re a naw plan submittal and may in ;,ude additional plan review fees North SEP, ' e62r1PE2 Orli REQi 17.1) FOR: LJ ��echanical i lectrical ,U,,/Plumbing gi Gas Piping ity of Tukwila nING DIVISION RECEIVED ITN' OF TUKWIL A DEC C 1 2017 ER I D FOR CODE COMPLIANCE APPROVED DEC o 6 2017 12T) City of Tukwila BUILDING DIVISION EXPERIENCE THE CARLISLE DIFFERENCE Sure -Weld G Reinforced Membrane Overview Carlisle's Sure -Weld TPO reinforced membrane is a premium, heat - weldable, single -ply thermoplastic polyolefin (TP0) sheet designed for new roof construction and re -roofing applications. Sure -Weld High Slope (HS) membrane is formulated with additional flame retardant for higher -slope fire code approvals. Sure -Weld EXTRA is 80 mils thick for significantly higher strength and weatherability. Sure -Weld TPO membranes use advanced polymerization technology that combines the flexibility of ethylene -propylene (EP) rubber with the heat weldability of polypropylene. All Sure -Weld TPO membranes include OctaGuard XT' an industry-leading, state-of-the-art weathering package. OctaGuard XT technology enables Sure -Weld TP0 to withstand the extreme weatherability testing that is intended to simulate exposure to severe climates. Physical properties of the membrane are enhanced by a strong polyester fabric that is encapsulated between the TPO-based top and bottom plies. The combination of the fabric and TPO plies provides high breaking and tearing strength, as well as excellent puncture resistance. The relatively smooth surface of the membrane produces a total surface fusion weld that results in a consistent, watertight. monolithic roof assembly. The membrane is environmentally friendly and safe to install. Carlisle's standard and HS TPO membranes are available in highly reflective white, tan, and gray, in both 45 -mil and 60 -mil thicknesses. 80 -mil Sure - Weld EXTRA (including HS) is also offered in white, gray, and tan colors. Sixteen special colors are also available (see Carlisle's TPO Color Palette brochure). Carlisle's TPO is offered in 4-, and 6 -ft perimeter sheets and 8-, 10-. and 12 -ft Sure -Weld sheets. Sure -Weld HS and special color TP membranes are available in limited sizes. Carlisle's tan and white TPO membranes are ENERGY STAR'S" -qualified and California Title 24 compliant and can contribute toward LEED` (Leadership in Energy and Environmental Design) credits. Optional APEEL'" Protective Film Carlisle's Sure -Weld TPO reinforced membrane is available with an optional APEEL Protective Film, saving time and labor by eliminating the need for roof cleaning upon project completion. Carlisle's innovative APEEL Protective Film can be left in place for up to 90 days without affecting the integrity of the film, guarding the TPO membrane's surface from scuffs and dirt accumulation during installation. Durable and easy to remove, APEEL Protective Film improves aesthetics and long-term reflectivity and is ideal for re -roofing, re-cover, and new construction projects. OCTRGURRD XT WEATHERING PACKAGE Features and Benefits » » » » Outstanding puncture resistance Chlorine -free with no halogenated flame retardants Plasticizer -free; does not contain liquid or polymeric plasticizers Excellent resistance to impact and low temperatures Excellent chemical resistance to acids, bases and restaurant exhaust emissions UL 2218 Class 4 hail rating » Exceptional resistance to heat, solar UV, ozone and oxidation » » » Manufactured using a hot -melt extrusion process for complete scrim encapsulation 100% recyclable (see Carlisle's Recyclability Statement) Enhanced with the OctaGuard XT weathering package APEEL Protective Film application guards the TPO membrane's surface from scuffs and dirt accumulation during installation, improving the roof system's appearance and long-term performance p> APEELPirpteotiye Titin can.be left in pficaRGEtp\90031ays without ggrOl ig titre tq,'its-Ixceflen herl' 7siitin 4c' .f : 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com EXPERIENCE THE CARLISLE DIFFERENCE ISure -Weld 4p0 Reinforced Membrane Installation 1. Sure -Weld TPO roofing systems are quick to install, as minimal labor and few components are required. TPO systems are installed using an Automatic Heat Welder, making sheet welding fast, clean, consistent, and easy to learn, while reducing strain on the roofing technician. 2. APEEL Protective Film should be removed from within areas that are to be heat -welded together. In areas that do not require heat - welding, the APEEL Protective Film can be left in place for up to 90 days. When the installation of the entire TPO roofing system is complete, remove and discard the APEEL Protective Film. 3. The Carlisle Mechanically Fastened Roof System installation starts by fastening the insulation with a minimum of 4 fasteners per 4' by 8' board. The membrane is mechanically fastened to the deck using HP -X'° Fasteners and Piranha Plates" or HP-XTRA Fasteners and Piranha XTRA Plates. Adjoining sheets of membrane are overlapped over the fasteners and plates and joined together with a minimum 1W -wide (4 cm) hot-air weld. Typical Properties and Characteristics Physical Property ASTM D6878 Requirement +15, -10 45 -mil ± 10 60 -mil ± 10 80 -mil EXTRA ± 10 Tolerance on Nominal Thickness, % ASTM D751 test method Thickness Over Scrim, in. (mm) ASTM D7635 optical method, average of 3 areas Breaking Strength, lbf (kN) ASTM 0751 grab 0.015 min (0.380) 220 (976 N) min 0.018 typical (0.457) 225 (1.0) min 320 (1.4) typical 0.024 typical (0.610) 250 (1.1) min 360 (1.6) typical 0.034 typical (0.864) 350 (1.6) min 425 (1.9) typical Elongation Break of Reinforcement. % ASTM 0751 grab method Tearing Strength, lbf (N) ASTM D751 proc. B 8 in. x 8 in. 15 min 55 (245) min 15 min 25 typical 55 (245) min 130 (578) typical 15 min 25 typical 55 (245) min 130 (578) typical 15 min 25 typical 55 (245) min 130 (578) typical Brittleness Point. °F (°C) ASTM D2137 Linear Dimensional Change, % - ASTM 01204, 6 hours at 158°F -40 (-40) max ± 1 max -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical Ozone Resistance, no cracks 7X ASTM D1149, 100 pphm, 168 hrs Water Absorption Resistance, mass % ASTM 0471 top surface only 166 hours at 158°F water PASS ± 3.0 max PASS ± 3.0 max 0.90 typical PASS ± 3.0 max 0.90 typical PASS ± 3.0 max 0.90 typical Factory Seam Strength, lbf/in (kN/m) ASTM D751 grab method 66 (290) min No requirement 66 (290) min 25 (4.4) min 50 (8.8) typical 66 (290) min 25 (4.4) min 60 (10.5) typical 66 (290) min 40 (7.0) min 70 (12.3) typical • Field Seam Strength, lbf/in (kN/m) ASTM D1876 tested in peel Water Vapor Permeance. Perms ASTM E96 proc. B Puncture Resistance, lbf (kN) FTM 101C, method 2031 (see supplemental section) No requirement No requirement 0.10 max 0.05 typical 250 (1.1) min 325 (1.4) typical 0.10 max 0.05 typical 300 (1.3) min 350 (1.6) typical 0.10 max 0.05 typical 400 (1.8) min 450 (2.0) typical Properties After Heat Aging ASTM D573, 5376 hours Q 240°F Breaking strength Elongation Reinf. Tearing Strength Weight Change, % 198 (881) 90% min 13.5 (90%) min 33 (60%) min ± 1.0 max 205 (912) min 13.5 min 33 min 1.0 max 0.23 (1.1) 225 (1000) min 13.5 min 33 min 1.0 max. 0.29 (1.4) 315 (1400) min 13.5 min 33 min 1.0 mar 0.40 (2.0) Typical Weights lb/f12 (kg/m2) Typical properties and characteristics are based on samples tested and are not guaranteed for altsamples of this product. This data and information is intended as a guide and does not reflect the specification range for any particular property of this product. • r I Sure -Weld � Reinforced Membrane 4. The Carlisle Fully Adhered Roofing System installation begins by fastening the insulation at the required density necessary to meet the appropriate warranty or wind load requirement. The substrate and membrane are then coated with an appropriate Sure -Weld TPO bonding adhesive and the membrane is rolled into place. • Review Carlisle specifications and details for complete installation information. Precautions » » Sunglasses that filter out ultraviolet light are strongly recommended, as tan and white surfaces are highly reflective. Roofing technicians should dress appropriately and wear sunscreen. Surfaces may become slippery due to frost and ice buildup. Exercise caution during cold conditions to prevent falls. • Care must be exercised when working close to a roof edge when the surrounding area is snow-covered, as the roof edge may not be clearly visible. >3 » Use proper stacking procedures to ensure sufficient stability of the rolls. Exercise caution when walking on wet membrane. Membranes may be slippery when wet. Store membrane in the original undisturbed plastic wrap in a cool, shaded area and cover with light-colored, breathable, waterproof tarpaulins. Membrane that has been exposed to the weather must be prepared with Weathered Membrane Cleaner prior to hot-air welding. Take care not to stand or place heavy objects on the edge of folded - over membrane, as this could cause a hard crease in the membrane. Maximum sustained temperature not to exceed 160°F (71°C) for TPO membrane. » Do not use razor blades or other sharp tools to cut the APEEL Protective Film while it is still adhered to the TPO membrane as damage to the underlying membrane may occure. Pull the protective film away from the membrane prior to cutting. Remove APEEL Protective Film by pulling towards the center of the roof. Do not remove the film by pulling towards the roof edge. » A static electric charge may develop when removing APEEL Protective Film from the surface of the membrane sheet. To avoid the possibility of ignition, lids must be closed on any flammable products and a fire extinguisher should be readily available. Color membranes will 'fade' over time mainly due to the ultraviolet portion of sunlight. Since most roof surfaces are exposed to variable sunlight, some areas will be more susceptible to color changes caused by UV fading. Warranties for color membranes do not cover fading of colors. EXTREME Testing for Severe Climates ASTM Standard D6878 is the material specification for Thermoplastic Polyolefin -Based Sheet Roofing. It covers material property requirements for TPO roof sheeting and includes initial and aged properties after heat and xenon -arc exposure. As stated in the scope of the standard, "the tests and property limits used to characterize the sheet are values intended to ensure minimum quality for the intended purpose." Carlisle's goal is to produce TPO that delivers maximum performance for the intended purpose of roofing membranes. Maximum performance requires the membrane to far exceed the requirements of ASTM D6878. Heat Aging accelerates the oxidation rate that roughly doubles for each 18°F (10°C) increase in roof membrane temperature. Oxidation (reaction with oxygen) is one of the primary chemical degradation mechanisms of roofing materials. Carlisle Testing Heat Aging » » ASTM TE 240°F ASTM Requirement 32 weeks** Sure -Weld Requirement 52 weeks "Comparable to 1,024 weeks (20 years) at 185°F for 6 hours/day. Test specimen is a 1" by 4" piece of 45 -mil membrane unbacked, placed in circulating hot-air oven. Criterion — no visible cracks after bending aged test specimen around 0.25" -diameter mandrel. Xenon -arc exposes the membrane samples to the combined effect of UV, visible and infrared radiation as well as ozone, heat and water spray to greatly accelerate the effects of outdoor weathering. The radiation dose is measured in kilojoules per square meter (kJ/m2) at 340 nm machine UV wavelength. The irradiance power of the xenon -arc lamp is measured in watts per square meter (Wm"). Carlisle Testing Xenon -Arc ASTM D6878 Requirement kJ7612 at 340 rim 10:080 Sure -Weld Results 45 -mil 60 -mil 80 -mil 17,640 20,160 27,720 » Test specimen is a 2.75" by 5.5" piece of membrane, unbacked, weathering side facing arc lamp. » Criterion — no visible cracks when viewed under 10x magnification while wrapped around 3" -diameter mandrel. 800-479-6832 I P.O. Box 7000 I Carlisle. PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com • EXPERIENCE THE CARLISLE DIFFERENCE ISure -Weld TPO Reinforced Membrane Environmental Cycling subjects the membrane to repeated cycles of heat aging, hot-water immersion, and xenon -arc exposure. • ASTM requirement - none » Carlisle EXTREME test*: - 10 days heat aging at 240°F (116°C) followed by - 5 days water immersion at 158'F (70°C) followed by - 5,040 kJ/m2 (2000 hours at 0.70 W/m2 irradiance) xenon -arc exposure ' Test specimen is 2.75" by 5.5" piece of membrane with edges sealed. *Criterion - after 3 complete cycles, test specimens shall remain flexible and not have any cracking under 10x magnification while wrapped around a 3" -diameter mandrel. Supplemental Approvals, Statements and Characteristics: 1. Sure -Weld TPO meets or exceeds the requirements of ASTM D6878 Standard Specification for Thermoplastic Polyolefin -Based Sheet Roofing. 2. Radiative Properties for ENERGY STAR, Cool Roof Rating Council (CRRC) and LEED. 3. Sure -Weld TPO membranes conform to requirements of the US E.P.A. Toxic Leachate Test (40 CFR part 136) performed by an independent analytical laboratory. 4. Sure -Weld TPO was tested for dynamic puncture resistance per ASTM D5635-04 using the most recently modified impact head. 45 - mil was watertight after an impact energy of 12.5 J (9.2 ft-lbf) and 60 -mil was watertight after 22.5 J (16.6 ft-lbf). 80 -mil EXTRA was watertight after an impact energy of 30.0 J (22.1 ft-lbf). 02.03.17 05 2017 Carlisle.. Carlisle, Sure -Weld, OctaGuard XT, APEEL, Piranha Plates and HP-% are Trademarks of Carlisle. REPRINT 0000: 600515 - "Sure -Weld TPO Reinforced Membrane Product Data Sheet' ENERGY STAR is a registered trademark owned by the U.S. Government. 'ENERGY STAR qualification is only valid in the U.S. LEED is a registered trademark of the U.S. Green Building Council, SYNTEC SYSTEMS Radiative Properties for ENERGY STAR*, and LEED r ENERGY STAR - Initial solar - Solar Spectrum 0.79 reflectance Reflectometer Test Method White TPO [ENERGY STAR - Initial solar reflectance after 3 years CRRC- Initial solar reflectance CRRC - Solar reflectance after 3 years Tan TPO 0.71 Gray TPO N/A Solar Spectrum 0.70 0.64 N/A Reflectometer (uncleaned) ASTM C1549 0.79 0.71 0.46 ASTM C1549 0.70 0.64 0.43 (uncleaned) CRRC - Initial thermal ASTM C1371 0.90 0.86 0.89 emittance CRRC - Thermal emittance ASTM C1371 after 3 years LEED - Thermal emittance SRI - Initial (Solar Reflectance Index) SRI - 3 year aged (Solar Reflectance Index) 0.86 0.87 0.88 (uncleaned) PASS 0.90 0.86 0.85 99 86 53 85 77 48 Solar Reflectance Index (SRI) is calculated per ASTM 01980. The SRI is a measure of the roof's ability to reject solar heat, as shown by a small temperature rise. It is defined so that a standard black (reflectance 0.05. emittance 0.90) is 0 and a standard white (reflectance 0.80, emittance 0.90) is 100. Materials with the highest SRI values are the coolest choices for roofing. Due to the way SRI is defined. particularly tot materials can even take slightly negative values and particularly cool materials can even exceed 100. 'ENERGY STAR recommends that using the Roof Savings Calculator (rsc.ornl.gov). which factors in both heating and cooling costs. to determine whether a cool roof will be an energy efficient choice for your geographic climate and building type. LEED Information ( Pre -consumer Recycled Content Post -consumer Recycled Content Manufacturing Location • Solar Reflectance Index (SRI) 10% 0% Senatobia, MS Tooele, UT Carlisle, PA 99 (white) 86 (tan) 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com EXPERIEN CE TIIE"-CARLISLE THE"-CARLISLEDIFFERENCE R -Tech Fanfold Recover Board afl Overview R -Tech Fanfold Recover Board is a high-performance rigid insulation consisting of a superior closed -cell, lightweight and resilient expanded polystyrene (EPS) with advanced polymeric laminate facers. R -Tech is available with factory -adhered metallic -reflective facers, white facers or a combination of the two. The EPS core of R -Tech Fanfold Recover Board meets or exceeds the requirements of ASTM C578, Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation. R -Tech Fanfold Recover Board has excellent dimensional stability, compressive strength and water- resistant properties. R -Tech Fanfold Recover Board contributes toward LEED°' certification credits. R -Tech Fanfold Recover Board is manufactured by Insulfoam, a division of Carlisle Construction Materials Incorporated with ten manufacturing facilities in North America. Features and Benefits » » Labor-saving, accordion -style fanfold product allows installers to carry 400 square feet at one time versus 13 sheets of conventional 4' x 8' cover board Reduced fastening patterns and lightweight handling reduces labor costs by up to 50% » Water-resistant cover board does not break down like alternative cover boards if leaks occur Reduces installed costs compared to wood fiber or gypsum by 40% to 60% Unique polymeric laminate facers permit PVC to be used without slip sheets » » DEC 062017 City of Tukwila Metallic facer permits usage una rN em" VISIQN EPDM in northern locations (Co ras3.Gartisle-BesignRSer aiees for guidance) Nationwide stocking locations UL code approval for numerous recover applications Approximately 8x higher R -value than' h" gypsum cover boards and 3x higher R -value than 1/2" wood fiber boards Product Characteristics » Panel thickness:'' h" Panel density: 1.25 pcf (available range: 1-2 pcf) Bundle size: 4' x 50' (200 ft.2) Applications R -Tech Fanfold Recover Board is designed as a recovery board for numerous commercial and industrial re -roofing applications. Installation Loose Laid Install R -Tech Fanfold Recover Board with continuous side joints, and end joints staggered so they are offset by a minimum of 12" from the end joints in adjacent rows. R -Tech Fanfold Recover Board should abut tightly against adjacent boards. Joints greater than ?!" should be filled with the same insulation that is being used in the field of the roof. If R -Tech Fanfold Recover Board is being installed over an existing layer of insulation; all joints must be offset a minimum of 6" between layers. Mechanically Attached Install R -Tech Recover Board with continuous side joints, and end joints staggered so they are offset by a minimum 0112" from the end joints in adjacent rows. Insulation should abut tightly against adjacent boards. Joints greater than',- should be filled with the same insulation that is being used in the field of the roof. If R -Tech Fanfold Recover Board is being installed over an existing layer of insulation, all joints must be offset a minimum of 6" between layers. Use an approved mechanical fastener of sufficient length to penetrate into or through the deck by the amount prescribed for the specific fastener. Fasteners shout.'cf n6 t4Elleycl.6ei; than 6" from the edges of the insulation bop:ClpA sap' 746?Ai ' pattern to achieve the desired approval. Use appropriate insulation plates with the fasteners. Care must be taken to avoid over pdfivi o unrf driving the fastener and plate assembly.' ��� PERMIT CENTER 800-479-6832 1 P.O. Box 7000 1 Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com 4-4 EXPERIENCE THE CARLISLE DIFFERENCE IR -Tech EPS Fanfold Recover Board Carlisle -Approved Fastening Pattern • • • $ GIRL/SLE SYNTEC SYSTEMS Typical Properties and Characteristics Physical Property Nominal Density (pcf) Test Method ASTM C303 Typical 1.25 C -Value (Conductance) BTU!(hr • ft2 • °F) (per inch) @25°F ASTM C518 .22 @40°F or .24 @75`F ASTM C177 .26 R -Value (Thermal Resistance) (hr • ft2 • °F)/BTU (per inch) @25°F ASTM C518 4.54 @40°F or 4.25 @75°F ASTM C177 3.92 Compressive Strength (psi, 10% deformation) ASTM D1621 13 —18 I Flexural Strength (psi) Dimensional Stability (maximum %) Water Vapor Transmission ASTM E96 (perms) Absorption (% vol.) ASTM C203 ASTM 02126 Capillarity .. Flame Spread Smoke Developed ASTM C272 ASTM E84 ASTM E84 32-38 <2% 1.5 - 3.5% <3% none <20 150 300 LEED° Information Post-industrial Recycled Content Manufacturing Locations Up to to 25% Anchorage, AK Puyallup, WA Dixon, CA Chino, CA Phoenix, AZ Tooele, UT Aurora. CO Mead, NE Lakeland, FL Smithfield, PA 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com 08.04.14 C 2014 Carlisle. Carlisle is a trademark of Carlisle. R -Tech Is a trademark of Insult -Dan ENERGY STAR is a registered trademark owned by the U.S. Government. REPRINT CODE 605076 - `R -Tech Fanfold Recover Board Product Data Sheet" LEED is a registered trademark of the U.S. Green Building Council. Fields Roof Service, Inc. 25924 — 78th Ave. So. Kent, Tacoma 253-852-4974 206-367-2564 253-952-3744 Main Office Seattle Steve Bozorth Washington 98032 Bellevue 425-644-7128 Roofing Proposal and Sales Agreement Sumitted to Metro Property Services 2810 Eastlake Ave E Seattle WA 98102 Fax (253)852-4999 Bremerton Olympia 360-479-0650 360-754-4099 12/01/2017 Job Site Parkway Village Bldg A 17065 south center pkwy tukwila WA 98188 161446 We hereby propose to supply materials and labor to complete the following: Fields Roof Service appreciates the opportunity for the following proposal at Parkway Center in Tukwila, WA. All work per scope below. Set up site specific safety per WSLNI and OSHA requirements. Remove existing cap metal and recycle at side walls. Newer cap metal on the front will be reused. Install one layer of 1/2" EPS Fanfold cover board Carlisle HP -X screws with Rhinobond Plates per manufactures specifications for a modified fully adhered system. Install TPO clad starter metal at gutter edge. Install Carlisle 045 TPO single ply membrane per manufactures specifications.(GREY) Heat weld seams. Probe all work when cool. Run Carlisle 045 TPO single ply membrane per manufactures specifications up and over top of walls on sides and where old cap metal is located. Terminate with term bar at intersection with newer TPO roof. Fully adhere with Carlisle Low VOC adhesive. Install Carlisle TPO pipe boots. Caulk and clamp per specifications. Run TPO up under existing skirt of HVAC units. We recommend that the property manager retain their HVAC contractor to work with us and provide a tune up and possible repairs of units. This is not included in the base bid. Electrical Conduits will be sealed by either TPO field wraps and clamped or by TPO pitch pockets and pourable sealant. Any satellite equipment or penetrations which are in the way of new roof installment may need to be relocated or re -calibrated -not included in base bid. Wrap furnace pipes per manufactures specifications. Plus sales tax and permit fees, if required. Prices subject to change after 15 days Contract Amount ... $ 97,025.00 A 3% surcharge will be added for credit card processing on the total including tax. We accept Visa and Master Card. CONDITIONS OF SALE: The Terms and Conditions are incorporated and made a part of this Agreement. By signing below, you are agreeing to this Roofing Proposal and Sales Agreement. cost and the Term and Conditions. Payments shall be made to: Fields Roo Service. Inc. Contractor Reg. No. FIELDRS262L Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date 25924 Main Office 253-852-4974 Fields Roof Service, Inc. 78th Ave. So. Kent, Washington 98032 Seattle Tacoma Bellevue 206-367-2564 253-952-3744 425-644-7128 Roofing Proposal and Sales Agreement Steve Bozorth Sumitted to Metro Property Services 2810 Eastlake Ave E Seattle WA 98102 Job Site Parkway Village Bldg A 17065 south center pkwy tukwila WA 98188 Fax (253)852-4999 Bremerton Olympia 360-479-0650 360-754-4099 We hereby propose to supply materials and labor to complete the following: Install new 24ga cap metal with exterior cleat and neo screws on interior face per Carlisle specifications. Clean up and remove all job related debris. Carlisle 045 Mil TPO(grey) with 15 year material warranty -$74,300.00 ADD for Carlisle 15 year NDL System Warranty -$2,850.00 Carlisle 060 Mil TPO(grey) with 20 year material warranty -$78,100.00 ADD for Carlisle 20 year NDL System Warranty -$3,900.00 ADD for TWO Maxam 30x36 roof hatchs with Alaco ladders -$5,500.00 ADD for City of Tukwila permit for both buildings -$2,925.00 ADD for 24ga 6" V -Box or 6" Facia gutter on both buildings -$6,600.00 12/01/2017 161446 Notes and exclusions:Pricing plus WSST and any required permits. Approximate roof area is 19,800 square feet. Asbestos Abatement, engineering services, electrical, plumbing or HVAC services are excluded. All pricing based on scope of work above. Any items outside of scope above will be additional time and materials. Fields Roof Service workmanship warranty is 5 years and Carlisle 060 membrane warranty is 20 years. $200 warranty registration fee for membrane warranty required. Plus sales tax and permit fees, if required. Prices subject to change after 15 days Contract Amount ... $ 78,100.00 A 3% surcharge will be added for credit card processing on the total including tax. We accept Visa and Master Card. CONDITIONS OF SALE The Terms and Conditions are incorporated and made a part of this Agreement. By signing below. you are agreeing to this Roofing Proposal and Sales Agreement. cost and the Tenn and Conditions. Payments shall be made In: Fields Roof Se:vice. Inc. Contractor Req. No. FIELDRS262L I Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date Fields Roof Service, Inc. — Terms and Conditions 1. Relationship of Parties. The statement of work on the front page together with these Terms and Conditions make up the Contract between Fields Roof Service, inc. and the property owner or client designated on the front page ("Client"). This contractual relationship is an independent contractor relationship and not a partnership, joint venture, employee -employer or other type of relationship. 2. Payment. Payment is due immediately upon completion of the job. A down -payment may be required to secure material and equipment prior to project initiation. If the work requires more than 30 days to complete, then FRS shall invoice client on monthly basis for work performed during the prior month and payment shall be due upon receipt of invoice. Payments not received within 30 days of their due date shall incur interest at 1.5% per month until paid. Any costs incurred by FRS to collect delinquent accounts, including reasonable attorneys fees, court costs, lien costs and other collection related expenses shall be recoverable from the Client addition to the deliquent payment. 3. Limited Warranty. FRS warrants that the installation of the roof will be performed in a workmanlike manner consistent with the standard of care of the roofing industry. For a period of one (I) year [or period of time stated on proposal] following the installation or other work involving the roof, FRS will, at no cost to the client, repair or replace any roof failure caused by a defective installation. In addition, FRS will provide Client with any manufacturers' warranites that might apply to the roofing materials that are installed, provided that Client understands that it must enforce these manufacturers warranties directly against the manufacturer; FRS will assist Client in this process. 4. Warranty Exclusions. The limited warrany above explicity excludes damages caused by or due to (i) pre-existing conditions, such as defective roof support systems and defective construction materials; (ii) improper building or residential construction (iii) mold, dry rot, mildew, or other conditions caused by moisture an dimproper ventilation; (iv) termites and pests; and (v) hazardous substances and materials. 5. Client's Responsibilities. Client shall be responsible for (i) providing an area for the storage of equipment and materials; (ii) obtaining permission from neighboring landownwers if FRS's work requires the temporary use of such neighboring landowner's property; and (iii) correcting any existing defects, such as dry rol and structural and code defects. (FRS may agree to correct these defects pursuant to a Change Order as provided below). 6. Change Orders. Should the Client request any modifications to the work, or if FRS agrees to repair any existing defective conditions that are discovered during construction, such as dry rot, code, or structural defects, this work shall be in addition to the statement of work on the front page of this Contract and shall be documented in a Change Order signed by both parties. 7. Title to Materials. Title to the roofing materials shall pass to the Client upon installation. Any surplus roofing materials that are not installed or used remain the property of FRS and are not subject to any credit or refund in the contract price. 8. Clean Up. Upon completion of the project, FRS will remove any surplus materials and debris and shall leave the exterior of the site in neat, broom clean appearance. Any materials that fall from the ceiling within the building, including cathedral ceilings and any other materials that fall within the confines of the interior of the building are the responsibility of the Client. 9. Existing Conditions. FRS is not responsible for conditions existing before coming on to the site, including (i) ceiling damage due to the installation of the roof or any repair of dry rot or other defective materials; (ii) existing chimney problems due to poor flashing or waterproofing and (iii) any damage to driveways or pavement subsidence due to the vehicles required by FRS to transport an dinstall the roofing materials. 10. License, Insurance and Bonding. FRS is properly licensed as a roofing contractor in the State of Washington (Lic # FEILDRS262L1), and is bonded and insured as required by law. 11. Limitation of Remedies. Client understands that its sole remedy for any defective work performed by FRS shall be enforcement of the warranty in parapgraph 3. In addition, Client agrees that FRS's maximum aggregate liability to Client for any and all claims relating to FRS's work, including claims for negligence and breach of contract shall be limited to the total amount of compensation paid to FRS under this Contract. If Client desires an extended warranty or higher limitation of liability, FRS may agree to such for additional consideration paid to FRS, and provided that such extended warranty or increased limitation of liability is documented in a Change Order signed by both parties. Owner or Representative Date Fields Roof Service, Inc - Sales Approval Date PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D17-0325 DATE: 12/04/17 PROJECT NAME: PARKWAY VILLAGE BUILDING A SITE ADDRESS: 17065 SOUTHCENTER PKWY X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: IBJ PAl / Building Division Public Works AM NIA' WI Fire Prevention Structural Planning Division ❑ ❑ Permit Coordinator n PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 12/05/17 Structural Review Required REVIEWERoS INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved DUE DATE: 01/02/18 ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWERcS INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 FIELDS ROOF SERVICE INC Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & industries Page 1 of 3 Search L&I .A -'l., Index Help My L&i Workplace Rights Trades & Licensing FIELDS ROOF SERVICE INC Owner or tradesperson Principals GILMER, GARY STEVEN, PRESIDENT PATNODE, TERRY MARK, DIRECTOR MANDELAS, MICHAEL J, SECRETARY (End: 08/25/2017) GOEMAN, DALE JESSE, DIRECTOR (End: 08/25/2017) GILMER, THOMAS A, PRESIDENT (End: 12/09/2002) PEAK, DUANE, VICE PRESIDENT (End: 12/09/2002) PEPPER, SCOTT, TREASURER (End: 12/09/2002) Doing business as FIELDS ROOF SERVICE INC WA UBI No. 600 125 673 25924 78TH AVE S KENT, WA 98032 253-852-4974 KING County Business type Corporation Governing persons GARY S GILMER DALE J GOEMAN; TERRY J PATNODE; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties ROOFING License no, FIELDRS262L1 Effective — expiration 06/21/1974— 09/25/2019 Bond CBIC Bond account no. SH3047 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 03/01/2008 04/04/2008 Expiration date Until Canceled Insurance Help us improve https://secure.lni.w-a.gov/verify/Detail.aspx?UBI=600125673&LIC=FIELDRS262Ll&SAW= 12/8/2017