Permit EL17-0349 - BOEING #14-01 YARD - BATTERY HOUSE AND BREAKER
BOEING #14-01 YARD 8701 E MARGINAL WAY S ELI 7-0349 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL PERMIT 0007400033 Permit Number: EL17-0349 8701 E MARGINAL WAY S BLDG 14-01 Issue Date: 1/9/2018 Permit Expires On: 7/8/2018 Project Name: BOEING #14-01 YARD Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 SHANNON FULLER 2400 NW 80 ST #118 , SEATTLE, WA, 98117 FOY GROUP CORPORATION 2400 NW 80TH ST, STE 118 , SEATTLE, WA, 98117 FOYGRGC863LK II I Phone: (206) 437-6381 Phone: (206) 937-6150 Expiration Date: 6/12/2018 DESCRIPTION OF WORK: INSTALL NEW BATTERY HOUSE IN THE 14-01 YARD, ADDING 100AMP BREAKER FOR NEW BATTERY HOUSE Valuation of single family: $0.00 Valuation of mf/comm: $310,000.00 Type of Work: NEW Fees Collected: $5,621.59 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Date: 01 /CV/? I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: II Print Name: • i-a.C& Wt (4O Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS:. 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB community rnity DeF velop ,.. department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 littp://www.TukwilaWA.gov Electrical Per...it No. 61.,0-0 271461 Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 8701 East Marginal Way Suite Number: 14-4191 Floor: 1 Tenant Name: The Boeing Company PROPERTY OWNER Name: Shannon Fuller Name: The Boeing Company City: Seattle State: WA Zip: 98117 Address: PO Box 3707 MC -5R-15 Email: shannon.f@foygroup.net City: Seattle State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: Shannon Fuller Address: 2400 NW 80th Street #118 City: Seattle State: WA Zip: 98117 Phone: (206) 937-6150 Fax: (206) 935-1163 Email: shannon.f@foygroup.net New Tenant: ❑ Yes ❑✓ ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: Foy Group Address: 2400 NW 80th Street #118 Cin': Seattle State: WA Zip: 98117 Phone: (206) 937-6150 Fax: (206) 935-1163 Contr Reg No.: FOYBRGC863LK Exp Date: 06/12/2016 Tukwila Business License No.: BUS -0994437 Valuation of Project (contractor's bid price): $ 310,000 Scope of Work (please provide detailed information): Install new battery house in the 14-01Yard, adding 100AMP breaker for new batter house 14-,o1 lad Will service be altered? ❑ Yes ❑✓ No Adding more than 50 amps?, ❑✓ Yes ❑ No Type of Use: Industrial Type of work: ® New ❑✓ Addition 0 Service Change O Low Voltage 0 Generator 0 Fire Alarm Property Served by: ❑ Puget Sound Energy ❑ Seattle City Light H:\ApplicationsiForms-Applications On Line \2011 Applications\Electrical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh ❑ Remodel 0 Telecommunication O Tenant Improvement ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE O New single family dwellings $152.85 (including an attached garage) O Garages, pools, spas and outbuildings $81.90 ea O Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits • $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change- $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 O Low voltage systems . $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $63.00 0 Temporary service (generator) $78.75 ❑ Manufactured/mobile home service $84.00 (excluding garage or outbuilding) ❑ Carnivals $78.75 Number of concessions $10.50 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Date: 05/09/2017 Print Name: Shannon Fuller Day Telephone: (206) 937-6150 Mailing Address: 2400 NW 80th Street #118 Seattle WA 98117 City H:\Applications\Forms-Applications On Line1201 1 Applications\Electrical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT 1 QUANTITY PermitTRAK " PAID $6,142.38 EL17-0348 Address: 8701 E MARGINAL WAY S BLDG 14-14 Apn: 0007400033 $299.81 Credit Card Fee $8.73 Credit Card Fee 1 R000.369.908.00.00 0.00 $8.73 ELECTRICAL $277.22 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 I 0.00 $277.22 TECHNOLOGY FEE $13.86 TECHNOLOGY FEE 1 R000.322.900.04.00 I 0.00 $13.86 EL17-0349 Address: 8701 E MARGINAL WAY S BLDG 14-01 Apn: 0007400033 $5,621.59 Credit Card Fee $163.74 Credit Card Fee l R000.369.908.00.00 0.00 $163.74 ELECTRICAL $5,247.93 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $4,198.34 PLAN CHECK FEE R000.345.832.00.00 0.00 $1,049.59 TECHNOLOGY FEE $209.92 TECHNOLOGY FEE R000.322.900.04.00 0.00 $209.92 EL17-0350 Address: 7725 EAST MARGINAL WAY S Unit2-88 Apn: 0001600020 $220.98 Credit Card Fee $6.44 Credit Card Fee I R000.369.908.00.00 0.00 $6.44 ELECTRICAL $206.29 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $165.03 PLAN CHECK FEE R000.345.832.00.00 0.00 $41.26 TECHNOLOGY FEE $8.25 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11452 R000.322.900.04.00 0.00 $8.25 ':: $6,142.38 Date Paid: Wednesday, May 10, 2017 Paid By: FOY GROUP CORPORATION Pay Method: CREDIT CARD 410100 Printed: Wednesday, May 10, 2017 12:00 PM 1 of 1 CRWYSTEMS ISSUE LEGEND NOT YET ISSUED ED PREVIOUSLY ISSUED, NOT IN THIS ISSUE IN THIS ISSUE PRELIMINARY ISSUE FOR REVIEW OR INFORMATION ONLY NOT FOR CONSTRUCTION ORIGINAL ISSUE FOR PERMIT, BID, PROCUREMENT OR CONSTRUCTION DRAWING REVISION—SEE SPECIFIC DRAWING FOR NATURE OF REVISION FOR REFERENCE ONLY PREL ORIG A FRO 8/01 THOMPSON SITE 14-22 DUAL STATION POWER SYSTEM BO- \G CM/PAY 8, D \C 14 vD -AST VARG \AL WA SO,T KIN LA WAS \GTO\ 24 r c L EAST, WILL,,; <I\G \TY, WAS I\GTO\ REVISIONS7-7-07-313 , TOW \ S No chances shalt be made to the scope of work without prior approval of i Tukwila Building Division. 1 NOTE: Revisions will require a new plan submittal and may include additional plan review fees. INDEX OF DRAWING INCLUDED IN SET SHEET NO. DRAWING TITLE REV DATE DRAWING NO. GENERAL • 14—YRD—GO GO COVER SHEET -- 09.01.16 CIVIL • I4—YRD—C2D C2D GENERAL PROJECT NOTES -- 09.01.16 • 14—YRD—C3 C3 COMPOSITE SITE PLAN — 09.01.16 • 14—YRD—C227R C227R ENLARGED REMOVAL PLAN — 09.01.16 • 14—YRD—C227 C227 ENLARGED PAVING AND GRADING PLAN -- 09.01.16 • 14—YRD—0531 C531 MISCELLANEOUS SECTIONS AND DETAILS -- 09.01.16 ELECTRICAL • 14-0I—E5R E5R ONE LINE EMERGENCY SYSTEM REMOVAL A 09.01.16 • 14-14—E4R E4R ONE LINE DIAGRAM UNIT SUBSTN T5/T6 REMOVAL D 09.01.16 • 14-22—E4R E4R ONE LINE DIAGRAM REMOVAL B 09.01.16 • 14-22—E503R E503R " BATTERY HOUSE REMOVAL PLAN — 09.01.16 • 14-0I—E5 E5 ONE—LINE 8 09.01.16 • 14-14—E4 E4 ONE LINE DIAGRAM UNIT SUBSTATION T5/T6 D 09.01.16 • 14-14-1E110 1E110 480Y/277V POWER PLAN C 09.01.16 • 14-14—MIE2 MIE2 480Y/277V MAIN FEEDER PLAN — MEZZANINE A 09.01.16 • 14-14—E506 E506 ELECTRICAL DETAILS — 09.01.16 • 14-22—E4 E4 SITE POWER B 09.01.16 • 14-22—E500 E500 GROUNDING DETAILS A 09.01..16 • 14-22—E501 E501 VAULT DETAILS A 09.01.16 • 14-22—E503 E503 BATTERY HOUSE DETAILS — 09.01.16 • 14-22—E505 E505 FIBER OPTIC COMM. PANEL B.O.M. & DETAILS — 09.01.16 • 14-22-7002 T002 T I A 09.01.16 • 14-22—W042 W042 11001J R 7 A 09.01.16 • 14-22—W062 W062 S iii R T LL A 09.01 16 r--- 1 1 1 r„ .1 _J__r_r% Permit No. Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fi3id Copy and conditions is acknowledged: By: Date: 1 I9 11 City of Tukwila BUILDING DIVISION 69 APPROVED 90 REVISION 14-22 DUAL STATION POWER SYSTEM 31677-1 SITTS DCD VICI\ITY NAP AREA NAP ETTE v 981 REVIEWED .FOR MPLIANCE WITH NFPA 70 - NEC JUN 08 2017 WIZ City of Tukwila BUILDING DIVISION THOMPSON SITE PROJECT SITE FROM DOWNTOWN SEATTLE 900 SITE ADDRESS: 8701 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON -1 JORGENSEN CORP O 0 PROJECT SITE 14-01 KENWORTH CORP PARCEL NUMBERS: LAND USE CODE CODE SUMMARY 0001600014, 0007400033 TUKWILA, WASHINGTON ZONING MANUFACTURING INDUSTRIAL CENTER/HEAVY INDUSTRIAL (MIC/H) REPLACED IMPERVIOUS SURFACE: ESTIMATED EARTHWORK QUANTITIES: 0 SF (0.00 AC) N/A PROJECT INFOvATIO\ SCOPE OF WORK: INSTALL CONCRETE PAD FOR MOUNTING OF NEW DUAL STATION POWER SYSTEM IN A MANUFACTURED SHELTER, AND INSTALL DUCT BANK FOR FEEDING NEW EQUIPMENT. SCOPE INCLUDES MINOR REMOVALS AND RESTORATION OF EXISTING SURFACE FEATURES AS NECESSARY. GENERAL NOTES: EXIT 157 ..._. ,', IT ' T^ 599 TUKWILA w co PDRArE PPRK SEPARATE REQUIRE 1. ALL WORK SHALL CONFORM TO THE WSDOT STANDARD SPEC. 2016 EDITION, CURRENT WSDOT STANDARD PLANS, AND CITY OF TUKWILA REGULATIONS. 2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK AND SHALL NOTIFY THE BOEING PROJECT MANAGER OF ALL DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS. 3. ALL MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN RECOMMENDATIONS. FROM KENT & AUBURN 900 L_� ❑ RHONE POULENC c04, ❑ Electrical Q/Piumbi ng teras Pim City of Tu}laSON D"-_slW..D!NO DIVISION BOEING CONTACT: VERTICAL DATUM: JOHN MURDOCH NAVD88 PER FOUND 3" WSDOT BRASS DISK WEST CORRIDOR SITE SERVICES WITH POINT DESIGNATION GP17099-239 CODE COMPLIANCE & PERMITTING (MONUMENT ID 33`29944)( TH ON THE NORTHEAST SIDE TION OF SEATTLE, WA 07 8124- 220788 OF IDAHO STREfT' POBLYSi1 `t0688C ELEVATION TELEPHONE: 253-740-0214 CITY PO1P5' S 3KVVILA 09.01.16 SY REVISION APPROVED DATE SITE ' 0 NO SCALE BOE //VG® ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN B. Rist CHLCKLD 0. Davis DATE 07.11.16 K. Hargrave APPROVED P 0 0 07.11.16 07.11.16 07.11.16 SUBDTLE TITLE rnm SUED FOR CONSTRUCTION SEPTEMBER 1, 2016 MAY 1 I] 2017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 7807 PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNE.COM JOB N0. 161-073 COVER SHEET 14-22 DUAL STATION POWER SYSTEM BUILDING 14-YRD TLJ/11/OCf1AI 1ITC MIA CURRENT REVISION 31677-11 SYMBOL PATE 09.01.16 SHEET GO JOB N0. DWG NO. 31677-11 COMP N0. 14 —VOL\—I`ll SY 480 V SUPPLY FROM EMERGENCY GENERATOR IN BUILDING 14-02 600 A FEED FROM UNIT SUBSTATION T4 SEE SHEET E4D 0- //// X489 800 A M. BKR. 3 PH, 4 W 4B9 600 A/4P AUTO TRANSFER SWITCH X4816 225 A M. BKR, 3 PH, 4 W 150A w\SHUNT -- TRIP TRIP ELEVATOR NO. 1 X4810 225 A M. BKR. 3 PH, 4 W X489 -I X3C9 600 A 100 A M.L.O. M. BKR. 3 PH, 4 3 PH, 4W ELEVATOR NO. 2 CONTROLLER ////// X2C9 100 A M. BKR. 3 PH, 4 W 5 KVA 240/120 30 KVA Lk -JJ 1.5 KVA 208Y/120 V 240/120 V GUARD HOUSE REVISION X4B16-3 100 A M. BKR. I PH, 3W BY APPROVED XAC-I 100 A M. BKR. I PH, 3W DATE SYM X4810 -I 100 A M. BKR. 3 PH, 4W REVISION X4B 0-3 20 A M. BKR. I PH. 3W XIC9.4 100 A M. BKR. 3 PH, 4W BY ,APPROVED OA RECORD DRAWING DLR GROUP JH 07.08.11 A INSTALL DUAL POWER SYSTEM 31677-1 CASNE 09.01.16 (e)LAOE//VG REMOVAL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED OVED BY DEPT. DATE ORA DATE- SUBTITIE REVIEWED FOR COMPLIANCE ITH NFPA NEC JUN 08 2011 City Tukwila BUILDING DIVISION ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE EMERGENCY SYSTEM LEGEND REFER TO SHEET E1 FOR GENERAL SYMBOLS LEGEND T4 FEEDER TYPE DESIGNATION - REFER TO SINGLE LINE DIAGRAM SHEET E4 FOR FEEDER SCHEDULES GENERAL NOTES [>SHUNT TRIP OF ELEVATOR NO. 2 CONTROLLER TO BE INTERLOCKED WITH THE ELEVATOR HEAT DETECTION SHUT DOWN SYSTEM. REFER TO FIRE PROTECTION DRAWING E537. REFERENCE DRAWINGS DEMOLITION NOTES DISCONNECT AND REMOVE TRANSFORMER, RETURN TO BOEING. RETAIN CONDUITS AND CONDUCTORS FOR FUTURE RECONNECTION, SEE SHEET 14-001-E5. RECEIVED CITY OF TUKWILA MAY 102017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 3807 PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNECCM 388 070. 161-073 CURRENT REVISION SYMBOL 31677-11 A DATE 09.01.16 rEITMEER APPROVED APPROVED TITLE INSTALL DUAL POWER SYSTEM BUILDING 14-001 Cir/`TDI/`m AIACTCD TLlf1AlOC/1N1 1AI SHEET E5R JOB N0. 31677-11 COMP N0. DWC N0. 18 -flfl, -ESD SY 13.8 KV FEEDERS FROM 15KV AIR TAP BOX IN BUILDING 14-01 TRUSS SEE DWG. 14-01—E4o 4' RCS (344/0 15110 SHIELDED EPR, 1331: r. FEEDER Y FEEDER X 4' R05 (3)j4/0 15110 SHIELDED EPR, 133% REVISION 13.8110 AMPS 5/6 30 2676 4.43 L -G 2602 4.38 8,0 111 O o/ 600A DUPLEX LOAD O/ BREAK SWITCH O- 15KV SURGE ARRESTOR (TYF) — tooE( 300011° © 12 GROUND BUS 480V - TIE BREAKER CLOSED AMPS X/R 30 33052 5.89 L -G 33566 6.23 3 PTS 3£ 112 KI 111 O 600A DUPLEX LOAD 13.8KV BREAK SWITCH AMPS 0/R 30 2672 4.42 1-0 2598 4.36 KI T5 1565 SURGE ARRESTOR (TYF) IDD ® 111 T6 1500/2000 KVA 1500/2000 KVA 13,8000-4807/2770, 30, 4W, 6OHZ 13,8000-4807/2770, 30, 48, 6OHZ Z=6.16% 3PTS Z=6.16% ® 3t 0 0 0 T5/MAIN 112 3200 AF 2400 AT,/ ;3000:5 SHORTING BLOCK NEUTRAL BUS 1 CPT ® 3E GROUND BUS GROUND BUS SUB 15/T6 BUS 'A' 3200 AMP BUS, 480/2774, 30, 4W 0-15/ 2 1600 Ars 3) 00 ATS AT,, 3"C, 3#350KCMIL T5/3 T5/4 0T5/5 n 1600 AF'\l 1600 AFT '\ 1600 AFT) 800 ATI 800 ATv 300 AT v � v 800A CHILLER #2 MCA 227 123 KW MCC COOLING TOWERS & PUMPS • J5/6 n 1600 AFT\ 800 ATS Y O O O F O 800A 800A 600A 600A U U SPARE O O O N UJ I'1 aG M h M Y] © 3#350KCMIL C 1 480V 30 3W CHILLER #1 MCA 227 123 KW 45KVA T1480-120/208V 1/2' - 401/0 B1 2087/120 30, 4W UNIT SUBSTATION T5 PRIMARY FUSE = GOULD—SHAWMUT AMP—TRAP CS -4, #A1550X100E 3200 AF = SIEMENS—ALLIS RL -3200 1600 AF = SIEMENS—ALLIS RL -1600 SUBSTATION T5 BREAKER SETTINGS — SIEMENS—ALLIS STATIC TRIP 0 BREAKER SENSOR BREAKER SETTINGS INST. P.U. LONG P.U. LONG DELAY SHORT P.U. SHORT DELAY C.F. P.U. G.F. DELAY T5/MAIN 2400A N/A E (2400A) 2 (2.25s) 3X MAX 50% MAX T5/2 300A 12X D (700A) 3 (4.50s) 8X INT N/A N/A T5/3 800A 12X E (800A) 3 (4.50s) 5X INT N/A N/A T5/4 800A 12X E (800A) 3 (4.50s) 5X INT N/A N/A T5/5 300A 120 D (700A) 3 (4.50s) 8X INT N/A N/A T5/6 800A 12X E (800A) 3 (4.50s) 8X INT N/A N/A T5—T6/TIE ' 2400A N/A E (2400A) 2 (2.255) 3X MAX 25% INT BY APPROVED DATE 5Y REVISION 8( APPROVED DATE A REDRAWN ON CAD & UPDATED DC 12/3/90 B UPDATE PER SITE VISIT J0 981051 KR KR 1/11/99 C REPLACE 14-14 CHILLERS 13623 CASNE 08.03.12 D INSTALL DUAL POWER SYSTEM 31677-11 CASNE 09.01.16 3200 AF 2400 AT T5—T6/TIE 0 3000A 1 CPT( 3£ SUB T5/T6 BUS 'B' 3200 AMP BUS, 488)((2i14W T6/ 1600 AFT 700 AT 05 M LJ 1T6/5 1600 A xl 110- mrinT O 600A T6/MAIN) T112 3200 AF 2400 ATS (3) 3000:5 SHORTING BLOCK (TYP) 6 7 �TT6/4 �J6/3 • T6/2 AF' 1600 JY' 1600 AFT` AO 800 AL 600 AT �/ C3 4805 30. 3W AHU-14 AHU-15 AHU-16 AHU-21 O 800A In C2 480V 30. 3W AHU-18 AHU-17 AHU-19 800A MCC 6D 14-01 COL. 0/6 O 800A 480V - 112 BREAKER CLOSED AMPS 0/R 30 33052 5.89 L -G 2598 4.36 UNIT SUBSTATION T6 PRIMARY FUSE = GOULD—SHAWMUT AMP—TRAP CS -4, #A1550X100E 3200 AF = SIEMENS—ALLIS RL -3200 1600 AF = SIEMENS—ALLIS RL -1600 SUBSTATION T6 BREAKER SETTINGS — SIEMENS—ALLIS STATIC TRIP II BREAKER SENSOR BREAKER SETTINGS INST. P.U. LONG P.U. LONG DELAY SHORT P.U. SHORT DELAY G.F. P.U. G.F. DELAY T6/MAIN 2400A N/A E (2400A) 2 (2.255) 3X MAX 50% MAX T6/2 800A 12X C (600A) 3 (4.50s) 8X INT N/A N/A T6/3 800A 12X E (800A) 3 (4.50s) 5X INT N/A N/A :n' .. T6/5 800A 8X E (800A) 3 (4.50s) 5X MIN N/A N/A r:• • 1.• 1s 1 T N A REMOVAL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED OVER BY DEPT. DATE DRAWN JE�NNNSRRESND 2LNU'IRtr, JENSON RH TUCKER APPROVED ATE 8/20/86 SUBTITLE LEGEND: 13.8110 VOLTAGE FOR FAULT CALCULATION AMPS X/R 30 2752 4.82 L -G 2687 4.73 FAULT CALCULATION VALUES GENERAL NOTES: DEMOLITION NOTES 12> COORDINATE SHUTDOWN W/BOEING. DISCONNECT AND REMOVE BREAKER TRIP UNIT FROM CIRCUIT BREAKER, RETURN TO BOEING. D DISCONNECT AND REMOVE 800A AMMETER FROM SUB SECTION, RETURN TO BOEING. PROVIDE AND INSTALL BLANK METAL PLATE TO COVER AMMETER OPENING. REVIEWED .FOR COMPLIANCE WITH NFPA 70 NEC JUN 08 2017 City of Tukwila BUILDING DIVISION ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 APPROVED r 8 20 86 8/22/86 TITLE C1 C'TOI(`AI 11ACTCO ONE -LINE DIAGRAM UNIT SUBSTATION T5/T6 INSTALL DUAL POWER SYSTEM BUILDING 14-014 RECEIVED CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW.CASNE.00M .428 N0. I61-073 CURRENT REVISION 31677-11 SYMBOL D DATE 09.01.16 (`01 V -V /V—V TUU(1110C(1AI CITC SHEET E4R JOB N0. 31677-11 COMP N0. 060 N0. IA-1A—PAP LE 5Y ARRESTOR 1540 STATION CUSS BCL FEEDER PER TRARBFDRMER RTY1 26kV-11.8kv, 5.55 IMPED. 1000/5 DEAD POM BREAK ELBOWS OF EERNCE 2 VI ® X 1 POSER JJ OCIPANY METERING / CONTROL z4a POWER TRANSF. /49 52-8 200 BREAKER000 1200A 5001/VA 1200/585 E 1200/5MR it 4-22 BATTERY HOUSE REVISION AISCIROtAc 52-1 FEEDER 200/5 'X 100/5 100/5 20OA 52-2 FEEDER 200/5 Y 3000/5 100/5 001 4 �i n' 3 1200A 52-3 FEEDER 200/5 SPARE 100/510/5 'T 0 «10» DA m . T 4 ROO 1 Iz9FUTURE IPS BUS TIE 750' TO PANEL %4816/1185 TO 104D5 & BATTERIES BY ARRESTOR 1500 STATION CLASS APPROVED DATE sr REVISION 1 T1 11 111500/2000 kVA . 48Dr/zrn T2 0 111111500/2000 kVA 4201/2774 UNIT SUBSTATION TI/T2 BUILDING 14-01 APPROVED DA DRAWN FROM WESTINGHOUSE 0&M D. OTTEN 09.07.13 A REPLACE 15KV SWITCHGEAR D. OTTEN DLO 01.07.15 INSTALL DUAL POWER SYSTEM 31677-11 CASNE CEC 09.01.16 180' 180' r T R r --T �E- 7 1 ILL13 1 1500/2000 kVA -4 4800/2770 BOE/AVG® 80' 180' T4 1 1 1 1 111500/2000 kVA -0.11T T1 1 4800/2770 UNIT SUBSTATION 13/14 BUILDING 14-01 YAP BUB IN SPACE r 1 L --J 630' TO 14-02 STUB 90' 90 REMOVAL ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION 15 APPROVED OVEO BY DEPT. DATE DRAWN D. OTTEN CNEC6L0 DATE 07.10.13 SVBUTLE 45' 45 5 TB 1500/2000 KVA 1500/2000 KVA 4801/277V 1 4804/277V UNIT SUBSTATION 15/76 REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC JUN 0 8 2017 City of Tukwila BUILDING DIVISION ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE DIAGRAM LEGEND GENERAL NOTES REFERENCE DRAWINGS 14-22- E503 14-22-E4 DEMOLITION NOTES COORDINATE SHUTDOWN WITH BOEING PROJECT MANAGER. DISCONNECT AND REMOVE WALL MOUNTED TRANSFORMER, RETURN TO BOEING. RETAIN CONDUITS, CONDUCTORS AND BARE COPPER GROUNDING CONDUCTOR FOR FUTURE RECONNECTION. DISCONNECT AND REMOVE 100A MAIN CIRCUIT BREAKER FROM PANELBOARD, RETURN TO BOEING. RECEIVED CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER j CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 N£ 38th PL. 5011E 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNE.0014 X10 N0. 161-073 CURRENT REVISION 5'19801 31677-11 B DATE 09.01.16 APPROVED APPROVED CI Cf1TDIf1A1 11ACTCD INSTALL DUAL POWER SYSTEM SITE POWER TI3/1k1OCf1Kl MI SHEET E4R JOB N0. 31677-11 COMP N0, DWG N0. 1A_OO_CAD W 01.132 E OW ORGER E ® ® o El SPACE FDR FDR TIE FOR CHARGER UTILITY METER MAIN X Y BATTERIES r T R r --T �E- 7 1 ILL13 1 1500/2000 kVA -4 4800/2770 BOE/AVG® 80' 180' T4 1 1 1 1 111500/2000 kVA -0.11T T1 1 4800/2770 UNIT SUBSTATION 13/14 BUILDING 14-01 YAP BUB IN SPACE r 1 L --J 630' TO 14-02 STUB 90' 90 REMOVAL ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION 15 APPROVED OVEO BY DEPT. DATE DRAWN D. OTTEN CNEC6L0 DATE 07.10.13 SVBUTLE 45' 45 5 TB 1500/2000 KVA 1500/2000 KVA 4801/277V 1 4804/277V UNIT SUBSTATION 15/76 REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC JUN 0 8 2017 City of Tukwila BUILDING DIVISION ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE DIAGRAM LEGEND GENERAL NOTES REFERENCE DRAWINGS 14-22- E503 14-22-E4 DEMOLITION NOTES COORDINATE SHUTDOWN WITH BOEING PROJECT MANAGER. DISCONNECT AND REMOVE WALL MOUNTED TRANSFORMER, RETURN TO BOEING. RETAIN CONDUITS, CONDUCTORS AND BARE COPPER GROUNDING CONDUCTOR FOR FUTURE RECONNECTION. DISCONNECT AND REMOVE 100A MAIN CIRCUIT BREAKER FROM PANELBOARD, RETURN TO BOEING. RECEIVED CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER j CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 N£ 38th PL. 5011E 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNE.0014 X10 N0. 161-073 CURRENT REVISION 5'19801 31677-11 B DATE 09.01.16 APPROVED APPROVED CI Cf1TDIf1A1 11ACTCD INSTALL DUAL POWER SYSTEM SITE POWER TI3/1k1OCf1Kl MI SHEET E4R JOB N0. 31677-11 COMP N0, DWG N0. 1A_OO_CAD ings\14-22—E503R.d 61-073 B CD 0 a CU 0 0 0 CO CO w 9 w / w / w PNL AC#1 100A, 120/240V, 1 ¢ / w 20A NF W/ox BATTERY CHARGER 7 �A�TIA� 3OWH DLA\ SCALE: 3/8" = 1'-0" 14-22 BLDG REMOVAL REVIEWEDFOR H COMPLIANCE 70 - NEC JUN 0 8 2011 City of Tukwila BUILDING DIVISI®N. ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 r1] XX CO rO XX NF LEGEND ENCLOSED CIRCUIT BREAKER (SIZE AS NOTED) 120/240V PANELBOARD TRANSFORMER EQUIPMENT DISCONNECT (NON FUSED) GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES DISCONNECT AND REMOVE ENERSYS BATTERY CHARGER AND ALL ASSOCIATED WIRING BACK TO PANEL. DISCONNECT AND REMOVE DC WIRING TO TERMINALS 1 & 2 IN UPPER VERTICAL SWITCHGEAR SECTION #6. RETAIN AND PALLETIZE BATTERY CHARGER AND RETURN TO CUSTOMER. DISCONNECT AND REMOVE 60A ENCLOSED CIRCUIT BREAKER AND ENCLOSURE. RETURN TO CUSTOMER. DISCONNECT AND REMOVE BATTERY RACK. RETAIN AND PALLETIZE BATTERIES AND RETURN TO CUSTOMER. DISCONNECT AND REMOVE EXISTING 5KVA TRANSFORMER, RETURN TO BOEING. RETAIN PRIMARY AND SECONDARY CONDUITS AND CONDUCTORS FOR FUTURE RECONNECTION. SEE SHEET 14-022-E503 FOR DETAILS. DISCONNECT AND REMOVE ABANDONED RECEPTACLE ON NORTH FENCE. DISCONNECT AND REMOVE CONDUIT AND RCENDUCOT FLCOMEffty BACK TO SOU CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER CASNE ENGINEERING, INC. EELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 3895 PL, SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNE.COM .KIS NO. 161-073 SY REVISION BY APPROVED DATE SY REVISION BY APPROVED DATE A INSTALL DUAL STATION POWER SYSTEM 31677-11 CASNE DAT 09.01.16 ?ff4U�7IW® ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED 0VE0 BY DEPT. DRAWN K. READ ATE 6/20/99 CHECKED SUBTITLE BATTERY HOUSE REMOVAL PLAN CURRENT REVISION 31677-11 SYMBOL DATE 09.01.16 ERCIREER DATE K. READ CHECK D 20 99 C. STEWART 6/21/99 APPR0060 TITLE INSTALL DUAL STATION POWER SYSTEM 14-22 MAIN SUBSTATION EI CrTOIr`41 1,/4CTC0 V405 TIJr111PC1IAI CITE SHEET E503R JOB N0. DWG NO. COMP No. 31677-11 1d-00-GVI1P 480 V SUPPLY FROM EMERGENCY GENERATOR IN BUILDING 14-02 600 A FEED FROM UNIT SUBSTATION T4 SEE SHEET E4o 0- ///// X4B9 800 A M. BKR. 3 PH, 4 W 489 600 A/4P AUTO TRANSFER SWITCH 0- 4816 225 A M. BKR 3 PH, 4 150A w\SHUNT TRIP E ELEVATOR N0. 1 X4810 225 A M. BKR. 3PH, 4W X X489-1 600 A M.L.O. 3 PH, 4 N X3C9 100 A M. BKR. 3 PH, 4 W ELEVATOR NO. 2 LL—JJ 30 KVA l� U 1.5 KVA 240/120 V 208Y/120 V : 240/120 V GUARD HOUSE REVISION X4816-3 100 A M. BKR. 1 PH. 3W BY APPROVED OATS sr X4810 —I 100 A M. BKR. 3 PH. 4W REVISION APPROVED DATE RECORD DRAWING DLR GROUP JH 07.08.11 INSTALL DUAL POWER SYSTEM 31677-11 CASNE 09.01.16 /// X2C9 100 A M. BKR. 3 PH, 4W XIC9.4 100 A M. BKR. 3 PH, 4 W g)LAFAFEAVG ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED OWED BY DEPT DATE ORAWN DA SUBTITLE REVIEWED .FOR COMPLIANCE WITH TPA 70- NEC JUN 0 8 2017 City of -Tukwila BUILDING DIVISION ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE EMERGENCY SYSTEM LEGEND REFER TO SHEET E1 FOR GENERAL SYMBOLS LEGEND 0,FEEDER TYPE DESIGNATION — REFER TO SINGLE LINE DIAGRAM SHEET E4 FOR FEEDER SCHEDULES GENERAL NOTES SHUNT TRIP OF ELEVATOR NO. 2 CONTROLLER TO BE INTERLOCKED WITH THE ELEVATOR HEAT DETECTION SHUT DOWN SYSTEM. REFER TO FIRE PROTECTION DRAWING E537. REFERENCE DRAWINGS CONSTRUCTION NOTES RECEIVED CITY OF TUKW'ILA MAY 102017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 380 PL. SUITE 205 K186L49D. WA 98033 (425) 522-1000 WW .CASNECOM JOB N0. 76I-073 CURRENT REVISION 31677-11 09.01.16 tERCIREER APPROVED TIRE CI CPT01601 IACTCO INSTALL DUAL POWER SYSTEM BUILDING 14-001 TunuOcnN UTA SHEET E5 JOB N0. DWG N0. COMP N0. 31677-11 1A_nni_6 5YM SCL FEEDER 0 LLo SIL POWER TRANSFORMER I 2 - .SLV, 5.5S DIPED. ARRESTOR 1540 IIF» STATION CLASS CONTROL POVIER TRANSF, )000/5 800/5 52-M MIN BREAKER 12000 5001,NA 1200/5MR 1200/5MR DEAD-OREAN ELBOWS POINT OF SEWAGE ® 7EUT 1 POWER Jj COMPANY METERING 750' 180' 180' NR NITA& 90' 45' L__ 630' TO 14-02 SNB IQI 0 I 1 1 1 1 1500/2000 kVA T1 x.11111 bl 4807/2770 TO 14-01 151 FIR. OCN CLOSET SRI HUB 1-1/511. (1) 12 PAIRW (0< BOEING W FIBER OP1,5 BUILDING 14-22 14-22 BATTERY HOUSE REVISION BY APPROVED DATE 57 REVISION 1 1 tIqI 72 111500/2W0 INA --(+I 1111 1 4807/2770 UNIT SUBST AT ION TI/T2 BUILDING 14-01 APPROVED DATE DRAWN FROM WESTINGHOUSE 0&M D. OT1EN DAT 09.07.13 A REPLACE 15KV SWITCHGEAR D. OTTEN DLO 01.07.15 D INSTALL DUAL STATION POWER SYSTEM 31677-11 CASNE DAT 09.01.16 1T3 l 1 1 1 1500/2000 kVA - .1TJ11 480Y/277V 6 111 /1500/2000 kVA 4800/2774 UNIT SUBSTATION 13/T4 BUILDING 14-01 ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED D BY DEPT DATE DRAWN KBD L - 6/20/99 TS ,1500/2000 KVA L3.AAJ 1500/2000 KVA -..11111 -0..17 11 4807/277V l 4807/2178 - UNIT SUBSTATION 15/16 REVIEWED PLA FORCNMC FPA 70 - NEC JUN 0 8 2017 0 LEGEND GENERAL NOTES 1. PROVIDE AND INSTALL ALL CONDUITS, CONDUCTORS, BOXES, HANGERS, SUPPORTS AND ANY ANCILLARY EQUIPMENT AS REQUIRED FOR A COMPLETE INSTALLATION. REFERENCE DRAWINGS 14-22—E501 14-22—E501 14-22—E503 [)14-01—E5 EMERGENCY ONE—LINE [)14-22—E503 BATTERY HOUSE DETAILS 14-22—E505 COMM'S EQUIP. DETAILS CONSTRUCTION NOTES PROVIDE CONDUIT AND CONDUCTORS FROM VENDOR PROVIDED 100A RATED 120/240V PANELBOARD INSIDE BATTERY HOUSE ENCLOSURE TO X1 & X4 TERMINALS ON 15KVA CPT LOCATED IN VS4. SEE DRAWING MN718S2—W042 FOR CONNECTION POINT. PROVIDE CONDUIT AND CONDUCTORS FROM SOURCE PANEL TO BATTERY CHARGER 'B' INSIDE VENDOR PROVIDED BATTERY HOUSE. STUB PVC CONDUIT UP INSDIE MV SWITCHGEAR ENCLOSURE AND TRANSITION TO EMT. ROUTE CONDUIT OVERHEAD TO PANEL AC#1 EQUIPMENT PROVIDED BY OTHERS. ® PROVIDE CONDUIT AND CONDUCTORS FROM BATTERY ISOLATER INSIDE VENDOR PROVIDED BATTERY HOUSE TO 48VDC TERMINALS 1 & 2 INSIDE UPPER SECTION OF VS6. SEE DRAWING MN718S2—W062 FOR 48VDC CONNECTION POINT. >. PROVIDE AND INSTALL COMM.'S MODULE IN UPPER AREA OF SWITCHGEAR SECTION 7. SEE SHEET 14-022—E505 FOR DETAILS. © PROVIDE AND INSTALL 2-3/8" DEEP, 2—GANG DEVICE BOX WITH FLAT MUD RING AND RJ45 DUPLEX CONNECTOR PLATE ON BATTERY HOUSE WALL NEAR BATTERY HOUSE FOR SIEMENS DATA DROP, CONFIRM ANY ADDITIONAL CMCS REQUIREMENTS W/SIEMENS' DON KELLY. PROVIDE AND INSTALL CAT 6 CABLE FROM COMM.'S MODULE IN SUB SECTION BACK TO DATA DROP BOX IN BATTERY HOUSE VIA TRENCH COMM'S CONDUIT. © PROVIDE AND INSTALL NEW SEALED, SINGLE PHASE, 7.5KVA, 480 — 120/240 VAC TRANSFORMER, SQ D CAT. NO. 7S1F, OR APPROVED EQUAL, IN LOCATION OF REMOVED 5KVA XFMR. SEE SHEET 14-022—E500 FOR GROUNDING DETAILS. RECONNECT PREVIOUSLY DISCONNECTED CONDUITS, CONDUCTORS AND BARE COPPER GROUNDING CONDUCTOR TO NEW 7.5KVA XFMR. PROVIDE AND INSTALL NEW 40A, 240V, 10KAIC, 2—POLE, EATON TYPE 'BAB' MAIN CIRCUIT BREAKER IN VACATED PANELBOARD SPACE. RECONNECT PREVIOUSLY DISCONNECTED PANELBOARD FEEDERS. D> PROVIDE AND INSTALL CONDUIT AND CONDUCTORS FROM NEW SUB MOUNTED COMM.'S MODULE BACK TO SOURCE PANELBOARD. 122> PROVIDE AND INSTALL 100A, 250VDC, 2—POLE CIRCUIT BREAKER, SO D CAT. NO. HDL26100, OR EQUAL IN ENCLOSURE, SQ D CAT NO. J250S, OR EQUAL. MOUNT ON WALL NEAR BATTERY SELECTOR. City of Tukwila BUILDING DIVISION_ ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE CITY OF TUKWILA MAY 102017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., DATE 205 KRKLAND, WA 98033 (425) 522-1000 WWWCASNE.COM 108 N0. 161-073 CURRENT REVISION 31677-11 SYMBOL B 09.01.16 CND 08 K. READ 62099 APPR0V C. STEWART 6/21/99 E0 11100 INSTALL DUAL STATION POWER SYSTEM SITE POWER CI 77101701 44ACT70 VAOT1 TIJF111OC11N1 0170' SHEET E4 JOB N0. 0WG N0. 31677-11 COMP 700. 1A—OO—GA r BrrER m 1RWle Imn1 ® 7® • Eli1 711® s® SPACE FDR FDR TIE UTILITY METER MAIN X Y 180' NR NITA& 90' 45' L__ 630' TO 14-02 SNB IQI 0 I 1 1 1 1 1500/2000 kVA T1 x.11111 bl 4807/2770 TO 14-01 151 FIR. OCN CLOSET SRI HUB 1-1/511. (1) 12 PAIRW (0< BOEING W FIBER OP1,5 BUILDING 14-22 14-22 BATTERY HOUSE REVISION BY APPROVED DATE 57 REVISION 1 1 tIqI 72 111500/2W0 INA --(+I 1111 1 4807/2770 UNIT SUBST AT ION TI/T2 BUILDING 14-01 APPROVED DATE DRAWN FROM WESTINGHOUSE 0&M D. OT1EN DAT 09.07.13 A REPLACE 15KV SWITCHGEAR D. OTTEN DLO 01.07.15 D INSTALL DUAL STATION POWER SYSTEM 31677-11 CASNE DAT 09.01.16 1T3 l 1 1 1 1500/2000 kVA - .1TJ11 480Y/277V 6 111 /1500/2000 kVA 4800/2774 UNIT SUBSTATION 13/T4 BUILDING 14-01 ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED D BY DEPT DATE DRAWN KBD L - 6/20/99 TS ,1500/2000 KVA L3.AAJ 1500/2000 KVA -..11111 -0..17 11 4807/277V l 4807/2178 - UNIT SUBSTATION 15/16 REVIEWED PLA FORCNMC FPA 70 - NEC JUN 0 8 2017 0 LEGEND GENERAL NOTES 1. PROVIDE AND INSTALL ALL CONDUITS, CONDUCTORS, BOXES, HANGERS, SUPPORTS AND ANY ANCILLARY EQUIPMENT AS REQUIRED FOR A COMPLETE INSTALLATION. REFERENCE DRAWINGS 14-22—E501 14-22—E501 14-22—E503 [)14-01—E5 EMERGENCY ONE—LINE [)14-22—E503 BATTERY HOUSE DETAILS 14-22—E505 COMM'S EQUIP. DETAILS CONSTRUCTION NOTES PROVIDE CONDUIT AND CONDUCTORS FROM VENDOR PROVIDED 100A RATED 120/240V PANELBOARD INSIDE BATTERY HOUSE ENCLOSURE TO X1 & X4 TERMINALS ON 15KVA CPT LOCATED IN VS4. SEE DRAWING MN718S2—W042 FOR CONNECTION POINT. PROVIDE CONDUIT AND CONDUCTORS FROM SOURCE PANEL TO BATTERY CHARGER 'B' INSIDE VENDOR PROVIDED BATTERY HOUSE. STUB PVC CONDUIT UP INSDIE MV SWITCHGEAR ENCLOSURE AND TRANSITION TO EMT. ROUTE CONDUIT OVERHEAD TO PANEL AC#1 EQUIPMENT PROVIDED BY OTHERS. ® PROVIDE CONDUIT AND CONDUCTORS FROM BATTERY ISOLATER INSIDE VENDOR PROVIDED BATTERY HOUSE TO 48VDC TERMINALS 1 & 2 INSIDE UPPER SECTION OF VS6. SEE DRAWING MN718S2—W062 FOR 48VDC CONNECTION POINT. >. PROVIDE AND INSTALL COMM.'S MODULE IN UPPER AREA OF SWITCHGEAR SECTION 7. SEE SHEET 14-022—E505 FOR DETAILS. © PROVIDE AND INSTALL 2-3/8" DEEP, 2—GANG DEVICE BOX WITH FLAT MUD RING AND RJ45 DUPLEX CONNECTOR PLATE ON BATTERY HOUSE WALL NEAR BATTERY HOUSE FOR SIEMENS DATA DROP, CONFIRM ANY ADDITIONAL CMCS REQUIREMENTS W/SIEMENS' DON KELLY. PROVIDE AND INSTALL CAT 6 CABLE FROM COMM.'S MODULE IN SUB SECTION BACK TO DATA DROP BOX IN BATTERY HOUSE VIA TRENCH COMM'S CONDUIT. © PROVIDE AND INSTALL NEW SEALED, SINGLE PHASE, 7.5KVA, 480 — 120/240 VAC TRANSFORMER, SQ D CAT. NO. 7S1F, OR APPROVED EQUAL, IN LOCATION OF REMOVED 5KVA XFMR. SEE SHEET 14-022—E500 FOR GROUNDING DETAILS. RECONNECT PREVIOUSLY DISCONNECTED CONDUITS, CONDUCTORS AND BARE COPPER GROUNDING CONDUCTOR TO NEW 7.5KVA XFMR. PROVIDE AND INSTALL NEW 40A, 240V, 10KAIC, 2—POLE, EATON TYPE 'BAB' MAIN CIRCUIT BREAKER IN VACATED PANELBOARD SPACE. RECONNECT PREVIOUSLY DISCONNECTED PANELBOARD FEEDERS. D> PROVIDE AND INSTALL CONDUIT AND CONDUCTORS FROM NEW SUB MOUNTED COMM.'S MODULE BACK TO SOURCE PANELBOARD. 122> PROVIDE AND INSTALL 100A, 250VDC, 2—POLE CIRCUIT BREAKER, SO D CAT. NO. HDL26100, OR EQUAL IN ENCLOSURE, SQ D CAT NO. J250S, OR EQUAL. MOUNT ON WALL NEAR BATTERY SELECTOR. City of Tukwila BUILDING DIVISION_ ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 ONE -LINE CITY OF TUKWILA MAY 102017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., DATE 205 KRKLAND, WA 98033 (425) 522-1000 WWWCASNE.COM 108 N0. 161-073 CURRENT REVISION 31677-11 SYMBOL B 09.01.16 CND 08 K. READ 62099 APPR0V C. STEWART 6/21/99 E0 11100 INSTALL DUAL STATION POWER SYSTEM SITE POWER CI 77101701 44ACT70 VAOT1 TIJF111OC11N1 0170' SHEET E4 JOB N0. 0WG N0. 31677-11 COMP 700. 1A—OO—GA E SY REVISION BY [500 TYP OF 3 GATE POSTS SPLIT BOLT (TY #2 BARE COPPER TO BARB WIRE 2" OR 4" FENCE POST DRILL & TAP 1/2" DIA. HOLES (13 THREADS PER INCH) (FOR YGA LUGS ONLY BURNDY #YGA28-2N (4" POST) BURNDY #GAR1829 (2" POST POWER DUCTBANK 4x2 0 • E500 TYP ALL OTHER FENCE POSTS PARTIAL GROUNDING PLAN N SCALE: 1/4" = 1'-0" A.(3 APPROVED OATE SYM REVISION APPROVED DATE INSTALL DUAL STATION POWER SYSTEM 31677-1 CASNE DAT 09.01.16 -6" MAXIMUM CURB FINISHED STATION GRADE #4/0 COPPER TO GROUND GRID. CONNECT WITH BURNDY TYPE YGHC-C HYTAP CONNECTOR FENCE POST GROUNDING DETAIL SCALE: NONE E500 #2 TO BARB WIRE ON FENCE PER DETAIL 2 4" GATE POS DRILL & TAP 1/2" DIA. HOLE (13 THREADS PER INCH1— #2 TO BARB WIRE ON GATE PER DETAIL 2 BURNDY #YGA28-2N COMPRESSION LU G- 2 MAXIMUM BURNDY #YGA2C-2N COMPRESSION LUG METAL FENCE FABRIC UNRAVEL #4/0 CONDUCTOR AND CRIMP EACH ONE TO FENCE FABRIC (TYP) BURNDY #YGC8C8 CRIMPIT CONNECTOR 6" #4/0 COPPER 70 GROUND GRID. CONNECT WITH BURNDY TYPE YGHC-C HYTAP CONNECTO FENCE GROUNDING DETAIL n SCALE: NONE E500 CURB LEGEND GENERAL NOTES REVIEWED .FIR COMPLIANCE WITH NEPA 70 - NEC JUN 0 8 2011 City of Tukwila BUILDING DIVISION BURNDY #BDI8N 18" FLEXIBLE COPPER BRAID FINISHED STATION GRADE 3/4" BURNDY STRUCTURAL STEEL GROUNDING CONNECTOR, TYPE GSTUD HY DECK PLATE BURNDY GROUND ROD ,,�% TAP CONNECTOR, TYPE YGHR C BASE CHANNEL FINISHED GRADE CONSTRUCTION NOTES PROVIDE 4/0 BARE STRANDED COPPER GROUND CONDUCTER. BOND TO EXISTING GROUND GRID AND/OR GROUNDED STRUCTURE FRAME. PROVIDE 3/4" X 30' COPPER CLAD GROUND ROD IN BOTTOM OF VAULT. PROVIDE 4/0 BARE STRANDED COPPER GROUND CONDUCTOR. BOND CONDUCTOR TO GROUND ROD IN VAULT. ® BOND GROUND CONDUCTOR TO GROUNDING LUG ON VENDOR PROVIDED BATTERY HOUSE. #4/0 COPPER TO GROUND GRID. CONNECT WITH BURNDY TYPE YGHC-C HYTAP CONNECTOR GATE GROUNDING DETAIL SCALE: NONE E500 ?LLAOE,Aft 4/0 STRANDED COPPER GROUND CONDUCTOR. CONNECT WITH BURNDY TYPE YGHC-C HYTAP CONNECTOR BUILDING GROUNDING DETAIL SCALE: NONE ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED OVED BY DEPT. DATE DRAWN K. READ CHECKED 620/99 TOTER - K. READ 6 20 99 C.STEWART 6/21/99 APPROVED SUBTITLE ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 GROUNDING DETAILS PROVIDE IRREVERSIBLE GROUND CONNECTION TO EXISTING MANHOLE GROUND CONDUCTOR. PROVIDE AND INSTALL #8 BARE COPPER GROUND CONDUCTOR FROM NEW 7.5KVA TRANSFORMER BACK TO EXISTING GROUND GRID AND/OR GROUNDED STRUCTURE FRAME. CONFIRM EXACT XFMR LOCATION AND NOTE ON REDLINES FOR RECORD DRAWINGS. CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 3810 PL., SUITE 205 0900.4ND, WA 98033 (425) 522-1000 WWW.CASNE.COM JOB N0. 161-073 CURRENT REVISION 31677-11 SYMBOL A E 09.01.16 11TLE INSTALL DUAL STATION POWER SYSTEM 14-22 MAIN SUBSTATION CI0.5T01501 AAACTCA VAAII TI.10610C0K1 01B7 SHEET E500 JOB NO. DWG N0. COMP NO. 991026-00 1A-00 _rcnn 6 E SY TO 14-01 BLDG (2)4" PVC (2)2" PVC L 31-0" TRENCH AREA UNISTRUT CONCRETE INSERTS LOCATED TO MATCH TRAY SUPPORTS (TYP.) J 11,-0' DETAILrTh SCALE: 3/8"=1'-0" E2 E501 TRENCH AREA L_ REVOION TRENCH LEVEL SCALE: 3/8"=1'-0" 6Y APPROVED rTh E601 DATE SY REVISION BY APPROVED DATE A INSTALL DUAL STATION POWER SYSTEM 31677-11 CASNE DAT 09.01.16 E501 g)LAWL7E,AW SECTION LOOKING NORTH n SCALE: 3/8"=1'-0" E501 PENETRATION DETAIL SCALE: NONE Afa E 01 BOTTOM PLATE OF SWITCHGEAR INSULATED BUSH; NG (REMOVABLE) INSTALLATION DETAIL TYPICAL • CONDUIT SCALE: NTS ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED WED BY DEPT DRAWN K. READ /EREREER DATE K. READ D6/20/99 O REVIEWED FOR MPLI oC ��CITH NFPA JUN 08 2017 City of Tukwila BUILDING DIVISION SUBTITLE LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE DIRECT BURIED CONDUIT DUCT BANK BENEATH CONCRETE SLAB. SEE CIVIL DRAWINGS FOR DUCT BANK DETAILS. STUB CONDUIT INTO BATTERY HOUSE ENCLOSURE AND UNDERGROUND VAULT PER ELECTRICAL DETAILS. PROVIDE 4/0 BARE STRANDED COPPER GROUND CONDUCTOR. BOND TO EXISTING GROUND CONDUCTOR IN MANHOLE. ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 VAULT DETAILS RECEIVED CITY OF TUKWILA MAY 102017 PERMIT CENTER CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 3876 PL, SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWWCASNECOIA 308 N0. 167-073 CURRENT REVISION 31677-11 A 09.01.16 62099 C. STEWART 6/21/99 38F TIRE INSTALL DUAL STATION POWER SYSTEM SWITCHGEAR CI CPTPIr AI 14ACTCG VAOGI TIJn11OCT1M CITC SHEET E50 1 J08 N0. 31677-11 COMP NO. DWG NO. 1 A_99_ctn1 5 /NEW 3' TELE CONDUIT - FOR / CON'T SEE 14-YRD-E360 ®(1)1-1/2"PVC. 2I8, IIOCND( ®(1)1-1/2'PVC, ./2. 180140 -1/2'PVC SPARE TO 14-01 BLDG. - FOR CONT SEE 14-YRD-15KV 4-4"C & 4-2"C i - - BP -.BP I-1/2' SPARE \\\\\\\'E-' PN AC/1 \I\\\\\\\\ i"C TO ?? i"C TO ?? VS -6 52-3 \I \ VS -5 52-2 SCL SWITCH ABANDONED TELE CONDUIT FIRE MAIN BURIED CONDUIT PLAN SCL 2-4"C BY APPROVED SCALE: 1/4"-1'-O" DATE SY REVISION INSTALL DUAL STATION POWER SYSTEM 31677-11 CASNE 09.07.16 BOE/iV6' DUCT BANK SECTION SCALE: NONE EMBBED STRUT ,,,,,-120V SUMP RECEPTACLE 1-I/2• SPARE �,-I/2• PVC, 210, #10CND (BATTERY CHARGER) 1-I/2• PVC, COMMS <2}© ,-,/2• PVC, 218, #10GND (48VDC) `1-I/2• PVC, 3/2, #8GND (PANEL ACe2) GALVANIZED PIPE CLAMP, TYPE P2037 E503 CONDUIT DETAIL n SCALE: NONE [503 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN OCR CM N LNCWLl0 CHECKED APPROVED APPROVED DATE 11.06.13 SUBTITLE LEGEND 120/240V PANELBOARD GENERAL NOTES 1.) ALL CONDUIT TO BE 1/2 EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE j12 THHN/THIN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/4800 • A• PHASE (LEFT BUS IN PANEL) BLACK BROWN B' PHASE (CENTER BUS IN PANEL) RED ORANGE • C• PHASE (RIGHT BUS IN PANEL) BLUE YELLOW NEUTRAL WHITE GRAY EQUIPMENT GROUND GREEN 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG-IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SNATCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF J08. 9.) VERIFY ROTATION OF ALL 3 PHASE MOTORS. 10.) PROVIDE AND INSTALL ALL CONDUIT. CONDUCTORS, BOXES, HANGERS, SUPPORTS AND ANY ANCILLARY EQUIPMENT AS REQUIRED FOR A COMPLETE INSTALLATION. REFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE DIRECT BURIED CONDUIT DUCT BANK BENEATH CONCRETE SLAB. SEE CML DRAWINGS FOR DUCT BANK DETAILS. STUB CONDUIT INTO BATTERY HOUSE ENCLOSURE AND UNDERGROUND VAULT PER ELECTRICAL DETAILS. PROVIDE NEMA 3R SURFACE MOUNTED PULL BOX TO TRANSITION FROM DUCT BANK CONDUITS TO SURFACE MOUNTED RACEWAY. © ROUTE CONDUITS BEHIND MANHOLE LADDER. ® PROVIDE SPARE CONDUIT 410 NYLON PULL STRING. STUB CONDUIT UP INSIDE MV SWITCHGEAR ENCLOSURE. PLUG AND CAP CONDUIT AT FINISHED FLOOR. © PROVIDE CONDUIT AND CONDUCTORS FROM SOURCE PANEL TO BATTERY CHARGER 'A' INSIDE VENDOR PROVIDED BATTERY HOUSE. STUB PVC CONDUIT UP INSIDE MV SWITCHGEAR ENCLOSURE AND TRANSITION TO EMT. ROUTE CONDUIT OVERHEAD TO PANEL ACfl1. © PROVIDE CONDUIT AND CONDUCTORS FROM BATTERY ISOLATER INSIDE VENDOR PROVIDED BATTERY HOUSE TO 48VDC TERMINALS 1 & 2 INSIDE UPPER SECTION OF VS6. SEE DRAWING MN718S2-W062 FOR 48VDC CONNECTION POINT. PROVIDE CONDUIT AND BELDEN 9341 DATA CABLE FROM VENDOR PROVIDED BATTERY HOUSE TO UPPER SECTION OF VS6. COORDINATE WITH BOEING'S MEL NELSON FOR CONNECTION POINT INSIDE COMPARTMENT. ® PROVIDE CONDUIT AND CONDUCTORS FROM VENDOR PROVIDED 1004 RATED 120/240V PANELBOARD INSIDE BATTERY HOUSE ENCLOSURE TO TERMINALS 35 & 36 FOR 15KVA CPT LOCATED IN V54. SEE DRAWING MN718S2-W042 FOR CONNECTION POINT. REVIEWED .FOR COMPLIANCE WITH NFPA 70 - NEC JUN 08 2017 City of Tukwila BUILDING DIVISION._ 60% DESIGN REVIEW SEPTEMBER 7, 2016 MAIN SUBSTATION BURIED CONDUIT PLAN CONTRACTOR TO PROVIDE AND INSTALL NEW EATON BATTERY HOUSE. SEE SPECIFICATIONS FOR ADDITIONAL DETAILS. PROVIDE AND INSTALL COMM.'S EQUIPMENT IN UPPER COMPARTMENT OF VS7. SEE SHEETS E505, MN718S2-T002 FOR DETAILS. CONTRACTOR TO COORDINATE WITH DON KELLY AT SIEMENS FOR All CMCS SYSTEM REQUIREMENTS. Efilj, E PHASE, CAT. R VE UOF REMOVEMR. ECONN PPREVIOSLY7.5NA,4800-$,oSO DISCONNECTED CONDUITS AND CONDUCTORS AND BARE COPPER GROUNDRAFrU$TO TO, .9 SEE SHEET 14-022- R 0001 �, d' LS. PROVIDE AND IN PERMIT CENTER j CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38113 PL, SONE 205 q,90AND, WA 98033 (425) 522-1000 WWA:CASNE.00M J08 NO 161-100 CURRENT REN50N 31677-11 SYN80L 09.07.16 TLE INSTALL DUAL STATION POWER SYSTEM FI FCTRI('AI MASTER SWITCHYARD 14-22 THOMPSON SITE ET E503 00B N0. 31677-11 COMP N0. 0W0 N0. 14-22-F503 L1 NEUT GND T r T EXACT 13 /Db— I \o DS L_ — - L1 LI -A TPS SURGE PROTECTION FA1 3A FA1 COMM.'S = POWER ON \O/ A FA2 FA2 3A FA3 10A FA3 FA4 FA4 5A FA5 .—o-4C,o 5A FA6 FA5 FA6 CISCO E NET SWITCH CISCO SFP GIGABIT TRANSCEIVER SPARE SPARE SPARE SPARE SOLA POWER SUPPLY 24VDC 1OA N -A SIEMENS 24VDC UPS 1OA +24VDC REVISION FB1 2A o FB2 5A COM FB1 FB2 SPARE FB3 FB3 0 5A FB4 0 2A 0 FB4 FB5 FB5 5A FB1COM FB2COM COOLING FAN SPARE SPARE SPARE FB3COM FB4COM FB5COM POWER DISTRIBUTION SCALE: NONE BY APPROVED DATE SYM REVISION BY BILL OF MATERIALS ITEM MANUFACTURER PART # DESCRIPTION QUANTITY 1 HOFFMAN HF0424413 HF04 - 21 CFM SIDE MOUNT FILTER FAN, 24 VDC, BLACK 1 2 HOFFMAN HG0400403 HG04 FILTER FAN EXHAUST GRILL, BLACK 1 3 ALLEN -BRADLEY 800H-PRH16A PILOT LIGHT, AMBER, LED W/ XFMR 1 4 ALLEN -BRADLEY 800H -W401 LEGEND PLATE - "POWER ON" 1 5 TOTAL PROTECTION SOLUTIONS TK-LTE-120-30A-DIN2 LOAD TRACK SURGE PROTECTION/POWER FILTRATION, 30A 1 6 SOLA/NEVI-DUTY SDN 10-24-100P POWER SUPPLY, 24VDC, 10A 1 7 SIEMENS 6EP1933-2EC51 UNINTERRUPTIBLE POWER SUPPLY, 24VDC, CAPACITOR STYLE, DIN RAIL MOUNT 1 8 CISCO IE 3000-8TC INDUSTRIAL ETHERNET SWITCH, 8 PORT 10/100, 120 VAC 1 9 CISCO GLC-LX-SM-RGD SFP GIGABIT TRANSCEIVER MODULE 1 10 ALLEN -BRADLEY 199-DR1 DIN RAIL, 35MM AS REQ'D 11 ALLEN -BRADLEY 1492 -J4 -W TERMINAL BLOCK, WHITE 6 12 ALLEN -BRADLEY 1492 -J4 -B TERMINAL BLOCK, BLUE 5 13 ALLEN -BRADLEY 1492-EBJ3 END BARRIER FOR J4 TYPE BLOCKS 2 14 ALLEN -BRADLEY 1492-EAHJ35 END ANCHOR, HEAVY DUTY AS REQ'D 15 ALLEN -BRADLEY 1492-MR6X12 MARKING SYSTEM, FOR J4 TYPE BLOCKS, BOTH SIDES AS REQ'D 16 ALLEN -BRADLEY 1492-WFB424 FUSE BLOCK, 24VDC W/ LED BLOWN FUSE INDICATOR (1 SPARE) 6 17 COOPER BUSSMAN FUSE, 5 X 20 MM, GLASS, FOR 1492-WFB424 TYPE (PROVIDE 2 SPARES AT EACH AMPERAGE) g 18 PANDUIT WIREWAY AS REQ'D 19 PANDUIT CLTXXF-C20 CORRUGATED LOOM TUBING, BLACK, SPLIT WALL, XXX=DIAMETER AS REQ'D 20 21 LAMCOID NAMEPLATES, SEE DETAIL THIS SHEET AS REQ'D 22 APPROVED DATE COMM.'S POWER ON 1 3/4" J9/16 BLACK LABEL WITH WHITE TEXT 1 /8" LETTERING DRAWN ACCEPTABILITY H. CIL THIS DESIGN ANO/OR CHECKED SPECIFICATION IS APPROVED A. KUHARSKE 0NGINLLR OVED BY DEPT. DATE T. BAILEY DATE 08.12.16 08.12.16 REVIEWED .FOR COMPLIANCE WITH NFPA 70 . NEC JUN 08 2017 City of Tukwila BUILDING DIVISION SUBTITLE ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 FIBER OPTIC COMMUNICATION PANEL BILL OF MATERIALS & DETAILS LEGEND: GENERAL NOTES: 1. ALL CONSTRUCTION METHODS SHALL COMPLY WITH NFPA 79. 2. ALL WIRING SHALL COMPLY WITH ALL APPLICABLE LOCAL CODES AND STANDARDS. 3. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS' INSTALLATION INSTRUCTIONS. 4. SHIP ALL SPARE PARTS WITH PANEL. REFERENCE DRAWINGS: CONSTRUCTION NOTES: INSTALL EQUIPMENT IN TOP COMPARTMENT OF 14-22 SUB SECTION VS -7. PROVIDE AND INSTALL CONDUCTORS FROM POWER SOURCE IN SECTION VS -8 TO EQUIPMENT. SEE DWG. MN7182ST-T002 FOR ADDITIONAL DETAILS. CONNECT BOEING PROVIDED MULTI -FIBER CABLE IRE PIV E D CAnEuN gyLII° IN INSTALL aJjfY1��I,V O1,AT 66 1F, PHENOL VF�'lelt�iiI B LO L�+dp�l1 77 MOUNT PERMIT CENTER IE: CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 380? PC. SUITE 205 KIRKLAND. WA 98033 (425) 522-1000 WWWCASNECOM J09 N0. I61-073 CURRENT REVISION 31677-11 SYMBOL DATE 09.01.16 D. TOWNSEND APPROVED APPROVED 08.12.16 08.12.16 ITLE INSTALL DUAL POWER SYSTEM BUILDING 14-22 01 0PTDIrAI IIACTCO TIJf1110C11NI CITC SHEET E505 JOB N0. 31677-11 COMP N0. DWG N0. 1 A -T1'1')-0005 P F E D C B A 8 I 7 6 I 5 4 3 2 01 _ VS #5 02 13800V 30 60HZ (200A 01 VS #6 02 • • 03 L17 L19 018 L0 • 03 52-2 1200A i i 1B➢2 �� 1800 1B➢3 - 018 - LO 1 Z 3 Z05 70 7014 706 1 N ), ( — GI �sflll H GD 0 1 1 5 C 6 C E 012 E 3 E04 1851 1852 1BD3 IHDO 011 G10 207 208 TS SEL -751A 52-2 SEL -751A FDR Y 1200A 1602 1801 L18 - LO - TIE BKR • TTT - LO 202 Z04 Z06 E04 52-3 12000 i 1000 1803 11 ARRO 0 6 9 9 0 01 BUS TIE 02 03 VS #7 TS SEL -7510 SEL -751A ISSUED FOR CONSTRUCTION SEPTEMBER 01, 2016 PHASOR ROTATION 1-2-3 3 CAGE CODE 341756464 DFTR CHAD NGO DATE 08/19/2014 AP D DATE GUTIERREZ 08/19/2014 PRODUCT CODE 60B5 REVISION 3 S.O. MN718S2 VS #8 F E REVIEWED .FOR ° COMPLIANCE WITH NFPA70NEC JUN 0 8 2017 City of Tukwila BUILDING DIVISION WORK AREA RECEIVED CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER j CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., 57111E 205 KIRKLAND, WA 98033 (425) 522-1000 WWW.CASNEC014 AM N0. 161-073 THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED. TITLE BOEING THOMPSON SITE MAIN SUB TYPE MEDIUM VOLTAGE SWITCHGEAR C.O. LSE0012506-001 E:T•N THREE -LINE DWG MN718S2-T SHEET 002 8 1 7 I 6 5 1 4 3 2 1 COEFIDL-R6 B A F E D 7E 8 7 6 5 4 3 2 1 SHIPPING BREAK 060606 VERTICAL SECTION # 4 UPPER COMPARTMENT HINGED PANEL (REAR VIEW) LEFT SIDE SHEET A COMPARTMENT (FRONT VIEW) (H) DWH SP IAI043 J J a 000 2 N N N P10.1 MW 613 CU ,Aj. J W W 5. ow rux GA 3 sa s -1a (L) CT) RT Co ti RT 000010111111 RI7FWFIRR W RRFaRFI AF/mm v)«11)21mm m U1 Y Y ') x J W x) x x x x J J J 111111111111 mminmmmmm N NOTE TO CUSTOMER, REMOVE THESE WIRES BEFORE SWGR. IS ENERGIZED 10 O 10 001111011111 EIEIMMIM 9WFIF'alFlI I All CO 111 m m m 10 9'l N N Y') (11 N Q il` I , v RRHFHRRWF1RHF IR DRAWING MN7113S2-W000 HR2 ( T ) NOTE, SHOP, TO DISCONNECT 8 TAPE WIRES FOR SHIPPING CUSTOMER, TO RECONNECT BEFORE ENERGIZING. CB) NOTE TO SHOP1 WIRES COMING FROM FACE PLATE. m `YELLOW— `VO I LE T- -BLUE TBI — TBI TB2 — TB2 TB3 — 11 TB4 — 12 A B H 12 C 5 13 —7B 21 11 28 — 9 CS N TB - 0 1- ti 10#0 46 =10 m CO I (W) (REAR) 0) 02 HR2 Z ) HR11�1 Z l 1 I VERTICAL SECTION # 4 1 23 2 a � a N ti 5 11 12 12 11 5 RIGHT SIDE SHEET CR) O TB2( T) T131( T) 9( J) 12(H) 78( H) 5( H) HR11(J) HRIA( T) HR1( H) 35( T) 46A(K) 44((1) MVIRA( 0) 2A1( H) 1A1( K) 12( J) 11(T) 6( J) 3( J) 36( T) 1( T) 2( T) ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 CAGE CODE 341756464 DF TR SR DATE 10/18/2014 AP'D DATE GUTIERREZ 10/18/2014 PRODUCT CODE 60B5 REVISION 2 S.O. MN718S2 CONSTRUCTION NOTES PROVIDE CONDUCTORS FOR VENDOR PROVIDED 120/240V PANELBOARD IN BATTERY HOUSE. SEE DRAWING E503 FOR CONDUIT AND CONDUCTOR ROUTING. REVIEWED .FOR COMPLIANCE WITH NEPA 70 o NEC JUN 0 8 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWIL MAY 102017 PERMIT CENTER RT= #10 WIRE WITH RING TERMINAL _ K j CASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 36th PL.. SUITE 205 KIRKLAND. WA 960J3 (425) 522-1000 WWW.CASNECOM JOB N0. 161-073 z i THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED. TITLE BOEING THOMPSON SITE MAIN SUB TYPE MEDIUM VOLTAGE SWITCHGEAR G.0. LSE0012506-001 E_T•N CONN DIAG VERT SECT 4 5W6 MN718S24042 SHEET 001 8 7 6 5 4 3 2 1 COEFtDL R6 F E D C B A E D 8 7 6 5 4 3 2 1 SHIPPING BREAK VERTICAL SECTION # 6 UPPER COMPARTMENT HINGED PANEL (REAR VIEW) LEFT SIDE SHEET A COMPARTMENT (FRONT VIEW) (H) i DWCi 8SP W063 L J • n 0 CA 0 0 z E E a m� z a NI ^ OL ,S2 vi -I La w R ,- z o'w ,ux z rn nc LI sa sna 8 (L) (T) RT CO 1_ RT ti 2 Y Y 00001101111111 RF_1F IFIF7F'lWF_aF_aFIFl47 carat - 01 0 61 0 0 61 if/ Ill Ill 10 0 _ 2 2 2 2 2 2) Y Y) Q¢ S 1 S x x x x¢¢ RL7F7FiFiF_7 W RaILaHR47 10 01 In U) 0 0 0 61 2)61 2) 61 61 1- 00011111111111: FRIAMF9FaF:iWLIF_ANF IN. N n n 00000000 Ill as O NOTE TO CUSTOMER, co REMOVE THESE WIRES BEFORE SWGR. IS ENERGIZED Q (A) 1 23 2 NOTE TO SHOP WIRES COMING FROM FACE PLATE. L-YELLOW— '-VOILET- -BLUE— TBI TB2 TB3 TB4 A B 12 13 21 28 CS — TB1 — TB2 — 11 — 12 5 — 7C =11 — 9 TB (W) HR 01 HRI1�1 Z ) (REAR) 02 HR2 I Z ) 5 11 12 TB2( T) TBI( T) 9( J) 12(H) 7C( T) 5(H) HR 11( J) HR A( T) HR1(H) 2l 6 N m 35(T) P m N !7 N ^. N 46A(K) 44( D) ) 12 MV A1RACH) 11 1A1(K) 5 12(J) --, 110T) 6( J) 3( J) 36( T) Q v .2 min 6 70 10T) v = . 70 '" 2(T) i ISSUED FOR CONSTRUCTION SEPTEMBER 1, 2016 DF TR SR DATE (R) RIGHT SIDE SHEET CONSTRUCTION NOTES DISCONNET AND REMOVE DC CONDUCTORS FROM EXISTING BATTERY ISOLATOR. PROVIDE NEW DC CONDUCTORS TO VENDOR PROVIDED BATTERY ISOLATOR IN BATTERY HOUSE. SEE DRAWING E503 FOR CONDUIT AND •ONDUCTOR" I N _.:r ..._ .. CONFPA OC N NECITH JUN 0 8 2017 City of Tukwila BUILDING DIVISION 10/18/2014 AP'D DATE GUTIERREZ 10/18/2014 PRODUCT CODE 60B5 CAGE CODE 341756464 REVISION 2 S.O. MN718S2 RECEIVED CITY OF TUKWILA MAY 1 0 2017 PERMIT CENTER RT= 410 WIRE WITH RING TERMINAL j CASNE ENGINEERING, INC. ELECTRICAL ANO TECHNOLOGY CONSULTANTS 10604 NE 38th PL, SUITE 205 KIRKLAND, WA 98033 (125) 512-1000 WWW.CASNGCOM .108 N0. 161-073 THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED. TITLE BOEING THOMPSON SITE MAIN SUB TYPE MEDIUM VOLTAGE SWITCHGEAR G.O. LSE0012506-001 E:T•N CONN DIAG VERT SECT 6 DWG MN718S24062 7 6 5 4 3 2 1 SHEET 001 COEFtDL R6 F E D C B A INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3 Permit Inspection Request Line (206) 438-9350 Project:' 6 �4 ( r, / Of Type of Inspection: 6 Address: ® 6.- ZI 4141 Date Called: Special Instructions: Date Wanted: Z:..3 .. m. Requester: Phone No: Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: 9 Inspector: Date: 2-3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL17-0349 DATE: 05/08/17 PROJECT NAME: BOEING #14-01 YARD SITE ADDRESS: 8701 E MARGINAL WAY S BLDG 14-01 X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: J� AAA g Building Division Public Works ❑ Fire Prevention Structural Planning Division ❑ Permit Coordinator El PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 05/04/17 Structural Review Required REVIEWER'S INITIALS: DATE: El APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 06/08/17 ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: Dir REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire ❑ Ping 0 PW ❑ Staff Initials: 12/18/2013 FOY GROUP CORPORATION Home Espanol Contact. Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1 of 2 A -Z Index Help My ESA Workplace Rights Trades & Licensing FOY GROUP CORPORATION Owner or tradesperson Principals FOY, SHAWN L, PRESIDENT VAN DER VEEN, ERIC, VICE PRESIDENT FOY, SHAWN, AGENT FOY, DONNY, PRESIDENT (End: 06/21/2016) FOY, DONNY, AGENT (End: 06/21/2016) Doing business as FOY GROUP CORPORATION WA UBI No. 601 930 924 2400 NW 80TH ST STE 118 SEATTLE, WA 98117 206-937-6150 KING County Business type Corporation Governing persons DONNY CHARLES FOY SHAWN LA RAE FOY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor License specialties GENERAL License no. FOYGRGC863LK Effective — expiration 06/12/2014- 06/12/2018 Designated administrator JORDAN, JAMES W License type Electrical Administrator Bond Contractors Bonding & Insurance Co Bond account no. SD8393 Active. Meets current requirements. Active. Meets current requirements. License no. JORDAJ W922LB $4,000.00 Received by L&I Effective date 06/12/2014 05/20/2014 Expiration date Until Canceled Savings No savings accounts during the previous 6 year period. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601930924&LIC=FOYGRGC863LK&SAW= 6/8/2017 FOY GROUP CORPORATION License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 864,952-01 Doing business as FOY GROUP CORPORATION Estimated workers reported Quarter 1 of Year 2017 "Greater than 100 Workers" L&I account contact Employer Services Help Line — 360-902-4817 Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Page 2 of 2 Washington State Dept. at Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601930924&LIC=FOYGRGC863LK&SAW= 6/8/2017