Loading...
HomeMy WebLinkAboutPermit EL17-0981 - STURGEON/INDEMAND - 1-HR LOAD BANK TESTS OF EMERGENCY GENERATORSTURGEON/INDEMAND 555 ANDOVER PARK W BLDG 4 ELI 7-0981 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 2623049144 Permit Number: EL17-0981 555 ANDOVER PARK W BLDG 4 Project Name: STURGEON/INDEMAND Issue Date: 12/6/2017 Permit Expires On: 6/4/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SOUTHCENTER CORPORATE SQUAR 635 ANDOVER PARK W #107 , TUKWILA, WA, 98188 AMANDA NOKES 5808 S 196 ST , KENT, WA, 98032 PACIFIC POWER GROUP LLC 805 BROADWAY ST STE 700 , VANCOUVER, WA, 98660 PACIFPG867D7 Phone: (253) 395-9077 Phone: (360) 887-7400 Expiration Date: 3/27/2018 DESCRIPTION OF WORK: 1 HOUR LOAD BANK TESTS OF EMERGENCY STANDBY GENERATOR Valuation of single family: $0.00 Valuation of mf/comm: $125.00 Type of Work: GENERATOR Fees Collected: $71.71 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 Permit Center Authorized Signature:WO National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date: 2017 2017 2017 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit . -d agree to the conditions attached to this permit. Signature: Print N /Ad y,dir This permit shall become null .nd the work is suspended or aband Date: (Z76 7/ 7 the work is not commenced within 180 days for the date of issuance, or if d for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.g.,ov Electrical Permit No. Project No. 01(6 I Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 555 Andover Park W Bldg 4 King Co Assessor's Tax No.: Suite Number: Tenant Name: Sturgeon/ Indemand 891391 PROPERTY OWNER Name: Amanda Nokes Name: Sturgeon/ Indemand 891391 City: Auburn State: WA Zip: 98001 Address: 555 Andover Park W Bldg 4 Email: City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Amanda Nokes Address: 1221 29TH ST NW City: Auburn State: WA Zip: 98001 Phone: (253) 395-9077 Fax: (253) 395-2408 Email: Floor: New Tenant: ❑ Yes ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: Pacific Power Group Address: 805 Broadway St City: Vancouver State: WA Zip: 98660 Phone: (253) 395-9077 Fax: Contr Reg No.: PACIFPG867D7 Exp Date: 03/27/2018 Tukwila Business License No.; BUS -0995185 Valuation of Project (contractor's bid price): $ 125 Scope of Work (please provide detailed information): 1 hour load bank tests of emergency standby generator Will service be altered? ❑ Yes m No Adding more than 50 amps? ❑ Yes m No Type of Use: Type of work: ❑ New ❑ Addition ❑ Service Change ❑ Remodel ❑ Tenant Improvement ❑ Low Voltage ® Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service Property Served by: 2 Puget Sound Energy ❑ Seattle City Light H:\Applications\Forms-Applications On Line\2014 Applications\Electrical Permit Application Revised 1-1-14.docx Revised: January 2014 bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $65.00 m Temporary service (generator) $80.90 ❑ Manufactured/mobile home service $86.25 (excluding garage or outbuilding) ❑ Carnivals $80.60 Number of concessions $10.80 ea Each ride and generator truck $10.80 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: Kacy Trojcak Mailing Address: 805 Broadway St H:\Applications\Forms-Applications On Line\2014 ApplicationsTlectrical Permit Application Revised l-I-14.docx Revised: January 2014 bh Date: 12/06/2017 Day Telephone: (253) 395-9077 Vancouver City WA 98660 State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK I ACCOUNT QUANTITY PAID $71.71 EL17-0981 Address: 555 ANDOVER PARK W BLDG 4 Apn: 2623049144 $71.71 Credit Card Fee $2.09 Credit Card Fee 1 R000.369.908.00.00 0.00 $2.09 ELECTRICAL $66.30 PERMIT FEE MULTI-FAM/COMM 1 R000.322.101.00.00 I 0.00 $66.30 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12954 R000.322.900.04.00 0.00 $3.32 $71.71 Date Paid: Wednesday, December 06, 2017 Paid By: PACIFIC POWER GROUP LLC Pay Method: CREDIT CARD 057234 Printed: Wednesday, December 06, 2017 10:30 1 of 1 AM SYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:C.) & Ap A��n & [ r� pe of Inspection: A Address:n f!/ '/' Date Called: Special InstrJftion % 6►e L' 0 T►" Date Wanted: Requester: `� 1 Phone No: 3 7f o ? 7 )\PProved per applicable codes. Corrections required prior to approval. COMMENTS: (-N Inspector: Date: 1L('((, 7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD 647 Retain a copy with permit 4g1 INSPECTION NO. PERMIT NO. /)I' CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36 Permit Inspection Requgst Line (206) 438-9350 Project: ('[a r( GT 1 dNf.‘ Type of Inspection: ��•--- Q/9/{9�{p/ 7. / Y Address: �5� �� Date Called: Special Instructions: r– �'�" 27C3 11) � � Date Wanted: a. /2401C_:>'11>m Requester: / Phone No: i -S N3 '1477 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Ltts),(,ekAk› Inspector: /1/-7 .WAitK_ Date: 40 717 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. PACIFIC POWER GROUP LLC Washington State Department of /Labor & Industries Page 1 of 3 Horne Espanol Contact Search L&I A A -Z IrKlex Help Safety & Health Claims & Insurance Workplace Rights PACIFIC POWER GROUP LLC Owner or tradesperson Principals Dawkins, Mark, PARTNER/MEMBER Bunday, Dennis, PARTNER/MEMBER SW&W Legal Services, AGENT Doing business as PACIFIC POWER GROUP LLC WA UBI No. 602 886 195 805 Broadway St Ste 700 VANCOUVER, WA 98660 360-887-7400 CLARK County Business type Limited Liability Company Governing persons ENT LLC PACIFIC POWER PRODUC ENT, LLC PACIFIC POWER PRODUC; KERRY BUNDY; MARK A. DAWKINS; DIESEL ALLISON INC PACIFIC DETROIT; DAN NORDSTROM; JAMES NORDSTROM; S, INC. PACIFIC POWER PRODUC; JERRY R. TYRRELL; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. ...._...................._............................... Meets current requirements. License specialties GENERAL License no. PACIFPG867D7 Effective — expiration 03/27/2014— 03/27/2018 Designated administrator Adsero, Jody R License type Electrical Administrator Bond .............. Travelers Cas and Surety Co of America Bond account no. 104893446 Active. Meets current requirements. License no. ADSERJR871J2 $4,000.00 Received by L&I Effective date 03/27/2014 04/10/2009 ' Expiration date Until Canceled My Lim - Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602886195&LIC=PACIFPG867D7&SAW= 12/6/2017 PACIFIC POWER GROUP LLC SavingspNo savings accounts during theprevious 6 ye. eriod. License Violations Infraction no. ETUCP00482 Issue date 11/02/2017 Violation city VANCOUVER Type of violation ELECTRICAL CITATION Description Failing to request an inspection within 3 business days after completion of the installation or 1 business day after energizing, whichever occurs first as referenced in WAC 296-46B-901. Satisfied ........................... RCW/WAC 19.28.101 RCW Violation amount $500.00 Infraction no. ETUCP00485 Satisfied .................... Issue date RCW/WAC 11/02/2017 19.28.101 RCW Violation city Violation amount VANCOUVER $500.00 Type of violation ELECTRICAL CITATION Description Failing to request an inspection withiin 3 business days after completion of the installation or 1 business day after energizing, whichever occurs first as referenced in WAC 296-46B-901. Infraction no. ECLET00565 Satisfied .....tisfi . RCW/WAC Issue date 08/07/2017 Violation city VANCOUVER Type of violation ELECTRICAL CITATION Description Failing to request an inspection within 3 business days after completion of the installation or 1 business day after energizing, whichever occurs first as referenced in WAC 296-46B-901. 19.28.101 RCW Violation amount $250.00 Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 483,926-08 Doing business as PACIFIC POWER PRODUCTS COMPANY Estimated workers reported Quarter 3 of Year 2017 "Greater than 100 Workers" L&I account contact T3 / KAYLENE MONIER (360)902-6627 - Email: BRKB235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602886195&LIC=PACIFPG867D7&SAW= 12/6/2017