Loading...
HomeMy WebLinkAboutPermit M17-0050 - SOUND MENTAL HEALTH - VAV BOXES, THERMOSTATS, DIFFUSERS, GRILLES, ETCSOUND MENTAL HEALTH 6400 SOUTHCENTER BLVD M17-0050 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0003200003 6400 SOUTHCENTER BLVD SOUND MENTAL HEALTH Permit Number: M17-0050 Issue Date: 4/19/2017 Permit Expires On: 10/16/2017 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: , Address: SOUND MENTAL HEALTH 1600 E OLIVE ST , SEATTLE, WA, 98122 JOYCE COPLEY Phone: (206) 407-2614 7717 DETROIT AVE SW , SEATTLE, WA, 98106 MACDONALD/MILLER FAC SOL INC Phone: (206) 768-4180 PO BOX 47983 , SEATTLE, WA, 98146- 7983 MACDOFS980RU Expiration Date: 1/4/2019 DESCRIPTION OF WORK: DEMO ALL EXISTING VAV BOXES. INSTALL (24) NEW PARALLEL VAV BOXES WITH ELECTRIC HEAT. INSTALL (24) NEW THERMOSTATS (CONTROLS BY OTHERS). INSTALL (71) NEW DIFFUSERS (REUSE EXISTING IF POSSIBLE). INSTALL (101) RETURN/TRANSFER GRILLES. MISCELLANEOUS DUCTWORK, AIR BALANCE (25) VAV ZONES. Valuation of Work: $259,781.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $3,216.50 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Permit Center Authorized Signature: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditiona` Jacphee/d�t�o�this permit. Signature: 6,,� I " "` " I Date: q r ` ` 1 Print Name: C `qA 1-e__(.\ 2z'\ i This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0701 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWIL. Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.Tukwila W A. gov Mechanical Permit No. �L t 1 C.S Project No. Date Application Accepted: Date Application Expires: iv -<<-,7 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 0003200003 6400 Southcenter Blvd, Tukwila, WA 98188 SOUND MENTAL HEALTH Suite Number: Floor: 1 New Tenant: ❑ Yes ..No PROPERTY OWNER Name: Joyce Copley Name: SOUND MENTAL HEALTH City: Seattle State: WA Zip: 98106 Address: 6400 Southcenter Blvd Email: joyce.copley@macmiller.com Cin': TUKWILA State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Joyce Copley Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 407-2614 Fax: (206) 905-3749 Email: joyce.copley@macmiller.com MECHANICAL CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 905-3748 Fax: (206) 905-3749 Contr Reg No.: MACDOFS980RU Exp Date: 04/01/2019 Tukwila Business License No.: BUS -0994318 Valuation of project (contractor's bid price): $ 259,871 Describe the scope of work in detail: Demo all existing VAV boxes. Install (24) new parallel VAV boxes with electric heat. Install (24) new thermostats (controls by others) Install (71) new diffusers (reuse existing if possible) Install (101) return/transfer grilles. Misc. Ductwork, Air balance (25) VAV Zones. Air b Use: Residential: New ❑ Replacement 121 Commercial: New ❑ Replacement ❑ Fuel Type: Electric 121 Gas ❑ Other: N:\Applications\rorms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4.16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu 71 Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 101 <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfin 71 Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) Incinerator — domestic 101 Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser 71 Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) Grilles 101 Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65.dB(A) 70 dB(A) *Daytime means 7AM-1 OPM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam-lOpm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official niay grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature:_ -®- n a' ��- Date: 04/10/2017 Print Name: Joyce M. Copley Day Telephone: (206) 407-2614 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City State Zip H:\Applications\Forint-Applications On Line \20I6 Applications \Mechanical Permit Application Revised I-4-16.docx Revised: January2016 bh Page 2 of 2 Cash Register Receipt City of Tukwila Receipt -Number R1244 DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK a PAID $3,216.50 M17-0050 Address: 6400 SOUTHCENTER BLVD Apn: 0003200003 $3,216.50 MECHANICAL $3,092.79 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $2,441.08 PLAN CHECK FEE R000.322.102.00.00 0.00 $618.56 TECHNOLOGY FEE $123.71 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11244 R000.322.900.04.00 0.00 t° $123.71 $3,216.50 Date Paid: Tuesday, April 11, 2017 Paid By: MACDONAL-MILLER FACILITY SOLUT Pay Method: CHECK 4615 Printed: Tuesday, April 11, 2017 8:25 AM 1 of 1 CAMPWYSTEMS INSPECTION RECORD 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -36tRetain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 43;1-367 Permit Inspection Request Line (206) 438-9350 Ai7-0o50 Project: 1 -S6UJ ' 410V771-1-- // Type of Inspection: / C1 4CJS- F NIr'L_ Address: In qbo SoLY774C T -R Date Called: Special Instructions: �1,. Date Wanted: 7-62—i7 C m' p. rf'i Requester: _ III Phone No:/ -8 61111111 -21 Approved per applicable codes. Corrections required prior to approval. COMMENTS: ro-c- /M4/f4/ Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit I7C0 a PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr ject:fr k At 1I 7 Type of Inspection: 4=CHH frQ P 6F Address: Date Called: Special Instructions: Date Wanted:,. O i �7 / J Tt4T" p.m. Requester: , !'iN Phone No: 206 Z 325-0 Approved per applicable codes. E Corrections required prior to approval. COMMENTS: Inspector: Date -/7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Catt to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 MI 7- Oog Prpject: b /4/6411:4c- % cr 1 TyRe of Inspection: KAZ14 - id filgaft.wicAL Address: (•OCA . r7tifl %fib Date Called: Special Instructions: Date Wanted s' 26/,7 a.m Requester Phone No: 4,11 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 15K,�fJCT rtS0E-7j�Al Inspector: *.< Date: 5'2—/7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION' 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P ject: .1'/Aich . 6.1A -L- 1-)e.41114 a of Ins ection: i-iPg t =ler ii+J(In4e/Olj Address: „IyClr S 1nAe6 r'l2 l Date Cal ed: Special Instructions: SVAX 41.--1— Date Wanted: 53 i 7 0.m - -p.m. Re uester: q /N 73' Phone No: ge6 - X32s0 1 ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: 71/4 44!4/.0 SVAX 41.--1— /CASA/ 744 ".Xi,$'77A/G_ :Dve—r— A- .5;e4--/-44, /N 73' F2_ ..„$::NfNiy Inspector: Date: S`3 /% REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Xerox Building Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density -specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling load methodology Heating load methodology 6400 Southcenter Blvd George Graham MacDonald Miller Facility Soloutions MACDONALD MILLER FACILITY SOLUTIONS C:1Users\graham1DocumentslTRACE 700 Projects\Sound Mental Health\SMH.TRC 10:34 AM on 04/04/2017 6.3.3 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 Ib/cu ft 0.2444 Btu/Ib•°F 1.0988 Btu/h-cfm•°F 4,836.9 Btu•min/h•cu ft 4.4953 Ib•min/hr•cu ft 83.0 66.0 24.0 0.95 0.95 0.20 0.20 400 °F °F °F ppm January - December CLTD-CLF IASHRAE TFM1 UATD M(7oo5o REVIEWED FOR CODE COMPLIANCE APPROVED APR 17 2017 City of Tukwila BUILDING DMSI RECEIVED CITY OF TUKWILA APR 112017 PERMIT CENTER I RACE oo somprehensive building analysis oftware from Trane• AC -1 INTERIOR System Checksums MACDONALD MILLER FAOIIJTY S& O IONS Parallel Fan Powered VAV, Htg Coil on Mixing Box Outlet COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 85 / 67 / 73 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 12,739 22,050 38,506 73,295 Net Percent Total Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 O 0 0 O 0 0 O 0 0 O 0 0 0 O 0 0 O 0 0 0 0 3,185 15,924 17 O 22,050 23 0 38,506 41 3,185 76,479 82 794 -794 0 0 O 0 9,973 11 O 0 0 O 0 O 0 0 -617 -617 -1 6,668 7 1,334 1,334 1 0 0 0 O 0 O 0 0 74,089 3,107 93,836 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 86 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 12,739 12,250 38,506 63,495 794 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 20 19 60 99 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underfir Sup Ht Pkup Supply Air Leakage 64,289 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 Coil Peak Percent Tot Sens Of Total Btu/h (%). 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -37,717 100.00 0 0 1 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -37,716 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 7.8 93.8 0.0 0.0 0.0 0.0 7.8 93.8 COOLING COIL SELECTION Sens Cap. Coil Airflow MBh cfm Enter DB/WB/HR Leave DB/WB/HR °F °F gr/lb °F °F gr/Ib 82.6 4,501 77.4 64.2 70.4 60.7 57.5 66.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH BLOCK.TRC AREAS Gross Total Glass ft2 (%) Floor 5,184 Part 0 Int Door 0 ExFir 0 Roof 0 Wall 0 Ext Door 0 O 0 0 0 O 0 TEMPERATURES Cooling Heating 62.0 70.0 y + :75.5 70.0 '75.8 70.0 77.4 46.0 0.1. 0.0 `03 0.1 _`0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict -- AIRFLOWS Cooling 4,501 4,501 4,501 0 746 746 0 1,428 4,501 746 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 2,856 2,856 1,428 1,428 746 746 0 1,428 1,428 746 0 0 0 0 ENGINEERING CKS Cooling Heating 16.6 17.4 0.87 0.55 575.54 662.94 18.10 -8.63 49 % OA cfm/ftp cfm/ton ft2/ton Btu/hr•ft2 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -14.7 0.0 -30.1 -14.7 0.0 0.0 -44.7 2,856: -746 1,428 0 0 Lvg °F 65.3 - 70.0 0.0 0:0 24.6. 60.7 0.0 0.0 66.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 01:36 PM on 04/07/2017 Alternative - 1 System Checksums Report Page 1 of 4 System Checksums By MACDONALD MILLER FACILITY SOLUTIONS AC -1 PERIMETER Parallel Fan Powered VAV, Htg Coil on Mixing Box Outlet COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 16 Outside Air: OADB/WB/HR: 85 / 66 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h CLG SPACE PEAK Mo/Hr: 7 / 17 OADB: 84 Plenum Net Percent Space Sens. + Lat Total Of Total Sensible Btu/h Btu/h (%) Btu/h o o 0 0 0 0 0 0 0 0 0 0 0 0 0 213,316 0 213,316 43 221,405 25,815 0 25,815 5 23,954 362 8,084 8,446 2 399 0 0 0 0 O 0 0 0 O 0 0 0 0 6,862 6,862 1 3,606 246,355 8,084 254,439 51 249,364 23,940 5,985 29,925 6 23,940 57,150 0 57,150 12 31,750 93,124 0 93,124 19 93,124 174,214 5,985 180,199 36 148,814 1,779 -1,779 0 0 1,878 O 0 30,134 6 0 0 0 0 0 0 0 0 0 0 0 -1,809 -1,809 0 27,973 6 5,702 5,702 1 0 0 0 0 0 0 0 0 422,348 16,182 496,638 100.00 Percent Of Total (%) 0 0 0 55 6 0 0 0 0 1 62 6 8 23 37 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 400,055 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -141,431 -141,431 47.87 -701 -19,376 6.56 O 0 0.00 -17,157 -17,157 5.81 O 0 0 -18,249 -18,249 6.18 -177,538 -196,213 66.41 0 0 0.00 O 0 0.00 -21,238 -21,238 7.19 -21,238 -21,238 7.19 -3,092 0 0.00 O -80,134 27.12 0 0 0 O 0 0.00 2,143 -0.73 0 0.00 0 0.00 0 0.00 -201,868 0 0.00 0 0.00 -295,442 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 41.4 496.6 0.0 0.0 0.0 0.0 41.4 496.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 456.5 18,882 76.7 61.1 56.6 54.7 51.7 53.4 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH BLOCK.TRC AREAS Gross Total Glass ft' (%) Floor 9,742 Part 0 Int Door 0 ExFlr 746 Roof 0 Wall 9,433 Ext Door 38 0 0 5,847 62 0 0 TEMPERATURES Cooling 56.0 75.6 75.9 76.7 0.1 0.3 0.9 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict Heating 83.3 69.0 69.0 58.7 0.0 0.1 0.2 AIRFLOWS Cooling 19,162 19,162 19,162 0 1,585 1,585 361 6,897 19,523 1,946 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 13,795 13,795 6,897 6,897 1,585 1,585 361 6,897 7,258 1,946 0 0 0 0 ENGINEERING CKS Cooling Heating 8.3 7.7 1.97 1.42 463.00 235.39 50.98 -38.92 127 OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Lvg °F -325.8 13,795 61.8 83.3 0.0 0 0.0 0.0 -53.4 1,585 24.0 54.7 -116.3 6,897 54.7 70.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -379.2 TRACE® 700 v6.3.3 calculated at 01:36 PM on 04/07/2017 Altemative -1 System Checksums Report Page 2 of 4 System Checksums By MACDONALD MILLER FACILITY SOLUTIONS AC -3 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 85 / 67 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o o 0 0 0 0 o 0 0 0 0 0 o 14,105 14,105 5 0 0 83,712 0 83,712 29 97,982 46 8,520 0 8,520 3 1,780 1 O 1,423 1,423 1 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 2,429 2,429 1 429 0 94,661 15,528 110,189 39 100,190 47 18,997 4,749 23,746 8 18,997 9 44,055 0 44,055 16 25,204 12 64,639 0 64,639 23 64,639 30 127,690 4,749 132,439 47 108,839 51 3,462 -3,462 0 0 3,163 1 O 0 23,630 8 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -2,346 -2,346 -1 17,318 6 2,805 2,805 1 O 0 0 0 0 O 0 0 225,813 17,274 284,035 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 212,192 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 -40,748 21.51 O 0 0.00 -52,297 -52,297 27.61 O -3,112 1.64 O 0 0.00 O 0 0.00 O 0 0 -5,346 -5,346 2.82 -57,643 -101,503 53.58 0 0 0.00 O 0 0.00 -6,610 -6,610 3.49 -6,610 -6,610 3.49 -6,568 0 0.00 O -52,007 27.45 0 0 0 O 0 0.00 3,813 -2.01 0 0.00 -33,125 17.49 0 0.00 0 0.00 0 0.00 -70,821 -189,431 100.00 Total Capacity ton MBh Main Clg 23.4 280.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 23.4 280.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 248.6 9,362 77.8 61.7 57.8 53.7 51.1 52.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 - Project Name: ' Dataset Name: Xerox Building SMH BLOCK.TRC AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFlr Roof Wall Ext Door 6,778 0 0 0 6,778 2,667 0 0 2,179 82 0 0 0 Series Fan -Powered VAV TEMPERATURES Cooling Heating 55.0 75.9 76.6 66.9 76.9 66.9 77.8 53.5 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 10,991 10,991 9,655 10,991 1,029 1,029 106 3,297 9,761 1,135 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 10,991 10,991 3,297 10,991 1,029 1,029 106 3,297 3,403 1,135 0 0 0 0 ENGINEERING CKS Cooling Heating 10.7 31.2 1.42 1.62 412.94 289.88 41.40 -27.95 101 % OA cfm/ft cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -155.9 0.0 -33.5 -59.2 0.0 0.0 -189.4 Lvg °F 10,991 63.0 75.9 0 0.0 0.0 1,029 3,297 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACED 700 v6.3.3 calculated at 01:36 PM on 04/07/2017 Alternative - 1 System Checksums Report Page 4 of 4 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV 101 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 14,348 -200 0 0 0 0 133 14,281 1,030 2,700 3,275 7,004 Mo/Hr: 7 / 11 OADB/WB/HR: 76 / 63 / 67 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 14,348 60 O -200 -1 188 188 1 O 0 O 0 0 0 0 133 1 188 14,470 61 257 0 0 257 1,287 5 2,700 11 3,275 14 7,262 31 58 -58 0 0 O 0 413 2 O 0 0 O 0 O 0 0 -57 -57 0 1,421 6 289 289 1 O 0 0 0 0 O 0 0 21,343 621 23,798 100.00 CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 14,348 72 -200 -1 0 0 0 0 0 0 0 0 14 0 14,161 71 1,030 5 1,500 7 3,275 16 5,804 29 58 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Dlff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 20,024 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -6,943 0 0 -1,122 0 -900 -8,966 0 0 -1,048 -1,048 -164 0 0 0 -10,178 Coil Peak Tot Sens Btu/h 0 0 0 0 -6,943 -1,290 0 -1,122 0 -900 -10,255 0 0 -1,048 -1,048 0 -2,787 0 0 99 0 0 0 319 0 0 Percent Of Total (%) 0.00 0.00 0.00 0.00 50.78 9.43 0.00 8.21 0.00 6.58 75.01 0.00 0.00 7.66 7.66 0.00 20.39 0 0.00 -0.73 0.00 0.00 0.00 -2.33 0.00 0.00 -13,672 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.0 23.8 0.0 0.0 0.0 0.0 2.0 23.8 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 22.1 959 75.7 60.9 57.4 54.7 52.1 54.9 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 419 Part 0 Int Door 0 ExFlr 49 Roof 0 Wall 659 Ext Door 0 fl' (%) 0 0 419 64 0 0 TEMPERATURES Cooling Heating 56.0 86.1 75.4 68.8 75.7 68.8 75.7 60.2 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 959 959 959 0 55 55 18 288 977 73 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 575 575 288 288 55 55 18 288 306 73 0 0 0 0 ENGINEERING CKS Cooling Heating 5.7 6.4 2.29 1.37 483.62 211.28 56.80 -41.24 6 % OA cfm/ft2 cfm/ton ft'/ton Btu/hr•ft2 No. People HEATING COIL SELECTION Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -15.4 0.0 -1.9 -4.9 0.0 0.0 -17.3 Coil Airflow Ent cfm °F 575 0 55 288 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 86.1 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 1 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 02 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h 0 0 0 12,832 -125 0 0 0 0 111 12,818 858 1,800 1,619 4,277 Mo/Hr: 7 / 11 OADB/WB/HR: 76 / 63 / 67 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 12,832 67 O -125 -1 196 196 1 O 0 O 0 O 0 0 111 1 196 13,014 68 214 0 0 214 1,072 6 1,800 9 1,619 8 4,491 23 48 -48 0 0 O 0 306 2 O 0 0 O 0 O 0 0 -43 -43 0 1,153 6 235 235 1 O 0 0 O 0 O 0 0 17,143 554 19,157 100.00 CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 73 Space Sensible Btu/h 0 0 0 13,231 -356 0 0 0 0 -41 12,834 Percent Of Total (%) 0 0 0 81 -2 0 0 0 0 0 78 858 5 1,000 6 1,619 10 3,477 21 45 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 16,356 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -4,268 -4,268 45.52 0 -793 8.46 O 0 0.00 -690 -690 7.36 O 0 0.00 -750 -750 8.00 -5,708 -6,501 69.33 0 0 0.00 0 0 0.00 -873 -873 9.31 -873 -873 9.31 -137 0 0.00 O -2,069 22.07 0 0 0 O 0 0.00 76 -0.81 O 0.00 O 0.00 O 0.00 -10 0.10 0 0.00 O 0.00 -6,717 -9,377 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 1.6 19.2 0.0 0.0 0.0 0.0 1.6 19.2 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 18.0 778 75.7 60.9 57.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/lb 54.7 52.2 0.0 0.0 0.0 0.0 55.1 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 349 Part 0 Int Door 0 ExFIr 30 Roof 0 Wall 405 Ext Door 0 0 0 257 64 0 0 TEMPERATURES Cooling Heating 56.0 82.9 75.4 68.8 75.7 68.8 75.7 61.0 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 783 783 783 0 41 41 15 237 798 56 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 475 475 237 237 41 41 15 237 252 56 0 0 0 0 ENGINEERING CKS % OA cfm/fW cfm/ton ft2/ton Btu/hr•ft2 No. People Cooling 5.2 2.24 490.73 218.62 54.89 4 Heating 5.7 1.36 -35.59 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -11.0 0.0 -1.4 -4.0 0.0 0.0 -12.4 475 0 41 237 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 82.9 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 2 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV103 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 12,861 -125 0 0 0 0 118 12,854 914 1,800 1,659 4,373 51 0 0 0 17,279 Mo/Hr: 7 / 11 OADB/WB/HR: 76 / 63 / 67 Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 73 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 O 0 0 0 0 0 0 0 O 12,861 67 13,270 O -125 -1 -356 196 196 1 0 O 0 0 O 0 0 0 0 0 0 118 1 -43 196 13,051 68 12,870 229 0 0 229 -51 0 -45 237 0 0 565 1,143 1,800 1,659 4,601 0 317 0 0 0 -45 1,162 237 0 0 0 6 9 9 24 0 2 0 0 0 0 6 1 0 0 0 19,323 100.00 914 1,000 1,659 Percent Of Total (%) 0 0 0 80 -2 0 0 0 0 0 78 6 6 10 3,573 22 48 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Gond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 16,491 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -4,268 -4,268 44.62 O -793 8.29 O 0 0.00 -690 -690 7.21 0 0 0.00 -799 -799 8.35 -5,758 -6,550 68.48 O 0 0.00 O 0 0.00 -930 -930 9.72 -930 -930 9.72 -146 0 0.00 O -2,139 22.36 0 0 0 O 0 0.00 79 -0.83 O 0.00 O 0.00 O 0.00 -25 0.26 O 0.00 O 0.00 -6,833 -9,566 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. . Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib 1.6 19.3 18.1 0.0 0.0 0.0 0.0 0.0 0.0 1.6 19.3 784 75.7 60.9 57.4 O 0.0 0.0 0.0 O 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.7 52.2 0.0 0.0 0.0 0.0 55.1 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 372 Part 0 Int Door 0 ExFIr 30 Roof 0 Wall 405 Ext Door 0 0 0 257 64 0 0 TEMPERATURES Cooling Heating 56.0 83.0 75.4 68.8 75.7 68.8 75.7 60.8 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 790 790 790 0 42 42 16 239 806 58 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 478 478 239 239 42 42 16 239 255 58 0 0 0 0 ENGINEERING CKS Cooling % OA 5.4 cfm/ft2 2.12 cfm/ton 490.54 ft2/ton 231.02 Btu/hr•ft2 51.94 No. People 4 Heating 5.9 1.29 -33.92 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -11.2 478 61.7 83.0 Aux Htg 0.0 0 0.0 0.0 Preheat -1.4 42 24.0 54.7 Reheat -4.0 239 54.7 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -12.6 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Aitemative - 1 System Checksums Report Page 3 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 04 COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 13 Outside Air: OADB/WB/HR: 79 / 65 / 72 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wail Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 15,347 299 0 0 0 0 232 15,878 894 1,800 1,133 3,828 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 15,347 68 O 299 1 385 385 2 O 0 O 0 O 0 0 232 1 385 16,263 72 224 0 0 224 1,118 5 1,800 8 1,133 5 4,051 18 59 -59 0 0 O 0 627 3 0 0 0 0 0 O 0 0 -49 -49 0 1,334 6 271 271 1 O 0 0 0 0 0 0 0 19,764 772 22,498 100.00 CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Space Sensible Btu/h 0 0 0 15,844 41 0 0 0 0 40 15,925 894 1,000 1,133 3,028 52 0 0 0 Percent Of Total (%) 0 0 0 83 0 0 0 0 0 0 84 5 5 6 16 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 19,005 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -6,943 0 0 -1,122 0 -782 -8,848 0 0 -910 -910 -143 0 0 0 -9,900 Coil Peak Tot Sens Btu/h 0 0 0 0 -6,943 -1,290 0 -1,122 0 -782 -10,137 Percent Of Total (%) 0.00 0.00 0.00 0.00 54.67 10.15 0.00 8.84 0.00 6.16 79.81 0 0.00 0 0.00 -910 7.16 -910 7.16 0 -2,115 0 0 78 0 0 0 383 0 0 0.00 16.65 0 0.00 -0.61 0.00 0.00 0.00 -3.02 0.00 0.00 -12,701 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh Main Clg 1.9 22.5 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.9 22.5 MBh cfm °F °F gr/Ib 21.1 901 75.9 61.0 57.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.7 52.2 0.0 0.0 0.0 0.0 55.1 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft� (%) Floor 364 Part 0 Int Door 0 ExFIr 49 Roof 0 Wall 659 Ext Door 0 O 0 419 64 O 0 TEMPERATURES Cooling Heating 56.0 86.5 75.5 68.8 75.8 68.8 75.9 61.9 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Retum Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 910 910 910 0 42 42 15 273 926 57 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 546 546 273 273 42 42 15 273 289 57 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft= No. People Cooling 4.6 2.50 485.54 194.15 61.81 4 Heating 5.1 1.50 -44.74 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -14.9 0.0 -1.4 -4.6 0.0 0.0 -16.3 546 0 42 273 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 86.5 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 4 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV105 COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 13 Outside Air: OADB/WB/HR: 77 / 63 / 66 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 12,713 -54 23 0 0 0 280 12,962 2,059 2,700 2,454 7,213 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 0 0 0 0 12,713 55 O -54 0 128 151 1 0 0 0 0 O 0 0 280 1 128 13,090 57 515 0 0 515 2,574 11 2,700 12 2,454 11 7,728 34 106 -106 0 0 0 0 632 3 0 0 0 0 0 0 0 0 -85 -85 0 1,339 6 278 278 1 O 0 0 0 0 O 0 0 20,281 730 22,981 100.00 CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Space Sensible Btu/h 0 0 0 12,713 -54 23 0 0 0 61 12,743 Percent Of Total (%) 0 0 0 67 0 0 0 0 0 0 68 2,059 11 1,500 8 2,454 13 6,013 32 106 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Gond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 18,863 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3,500 -3,500 26.05 -299 -1,130 8.41 O 0 0.00 -715 -715 5.32 0 0 0.00 -1,800 -1,800 13.40 -6,315 -7,145 53.17 O 0 0.00 O 0 0.00 -2,095 -2,095 15.59 -2,095 -2,095 15.59 -329 0 0.00 0 -4,058 30.20 0 0 0 O 0 0.00 158 -1.17 0 0.00 O 0.00 0 0.00 -297 2.21 0 0.00 O 0.00 -8,739 -13,437 100.00 Total Capacity ton MBh Main Clg 1.9 23.0 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.9 23.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 21.1 903 75.8 61.0 57.6 54.7 52.0 54.3 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 838 Part 0 Int Door 0 ExFir 31 Roof 0 Wall 420 Ext Door 0 ft2 (%) O 0 211 50 O 0 TEMPERATURES Cooling Heating 56.0 84.4 75.4 68.8 75.7 68.8 75.8 55.7 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 903 903 903 0 80 80 36 276 939 116 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 552 552 276 276 80 80 36 276 311 116 0 0 0 0 ENGINEERING CKS Cooling Heating 8.9 9.7 1.08 0.66 471.77 437.57 27.42 -19.65 6 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People HEATING COIL SELECTION Ent °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -13.8 0.0 -2.7 -4.7 0.0 0.0 -16.5 Coil Airflow cfm 552 0 80 276 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 84.4 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 5 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 06 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumld. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 8 / 12 OADB/WB/HR: 77 / 65 / 72 CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o o 0 0 0 0 o o 0 0 0 0 o o 0 0 0 0 9,338 0 9,338 71 9,338 84 31 0 31 0 31 0 26 187 213 2 26 0 O o 0 0 0 o o 0 0 0 o o 0 0 0 0 96 96 1 19 0 9,491 187 9,678 74 9,414 84 430 108 538 4 430 4 900 0 900 7 500 4 811 0 811 6 811 7 2,141 108 2,248 17 1,741 16 25 -25 0 0 25 0 O 0 265 2 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -22 -22 0 793 6 161 161 1 0 0 0 0 0 0 0 0 11,657 408 13,124 100.00 11,180 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -4,731 -4,731 59.67 -118 -997 12.57 O 0 0.00 -752 -752 9.49 0 0 0.00 -376 -376 4.74 -5,977 -6,855 86.46 0 0 0.00 0 0 0.00 -438 -438 5.52 -438 -438 5.52 -69 0 0.00 O -1,036 13.07 O 0 0 0 0 0.00 38 -0.48 0 0.00 0 0.00 0 0.00 363 -4.57 0 0.00 0 0.00 -6,483 -7,928 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh 1.1 13.1 12.4 0.0 0.0 0.0 0.0 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 536 75.8 60.9 57.4 O 0.0 0.0 0.0 Leave DB/WB/HR °F °F grllb 54.7 52.3 55.5 0.0 0.0 0.0 O 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 175 Part 0 Int Door 0 ExFIr 33 Roof 0 Wall 403 Ext Door 38 O 0 218 54 O 0 TEMPERATURES Cooling Heating 56.0 88.4 75.5 68.8 75.7 68.8 75.8 63.1 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 536 536 536 0 21 21 7 161 543 28 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 321 321 161 161 21 21 7 161 168 28 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 3.8 4.3 cfm/ft2 3.06 1.84 cfm/ton 489.64 ft2/ton 160.01 Btu/hrft' 74.99 -57.72 No. People 2 HEATING COIL SELECTION Coil Airflow Ent Lvg cfm °F °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -9.4 0.0 -0.7 -2.7 0.0 0.0 -10.1 321 61.7 88.4 0 0.0 0.0 21 161 0 0 24.0 54.7 0.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 6 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV 107 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 9 / 14 OADB/WB/HR: 78 / 63 / 65 CLG SPACE PEAK Mo/Hr: 9 / 14 OADB: 78 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O o 0 0 0 O 0 0 0 0 O 0 0 0 0 15,630 0 15,630 60 15,630 65 0 65 0 65 0 300 300 1 0 O 0 0 0 O 0 0 0 O 0 0 0 0 204 204 1 73 15,898 300 16,199 63 15,768 1,347 337 1,683 6 1,347 2,700 0 2,700 10 1,500 2,983 0 2,983 12 2,983 7,030 337 7,366 28 5,830 80 -80 0 0 80 0 0 550 2 0 0 0 0 0 0 0 O 0 0 0 -69 -69 0 1,538 6 315 315 1 O 0 0 0 0 O 0 0 23,008 802 25,899 100.00 Percent Of Total (%) 0 0 0 72 0 0 0 0 0 0 73 6 7 14 27 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underfir Sup Ht Pkup Supply Air Leakage 21,677 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -4,567 -4,567 37.85 O -848 7.03 O 0 0.00 -738 -738 6.12 0 0 0.00 -1,177 -1,177 9.76 -6,483 -7,331 60.76 O 0 0.00 O 0 0.00 -1,370 -1,370 11.35 -1,370 -1,370 11.35 -215 0 0.00 O -3,178 26.34 0 0 0 0 0 0.00 117 -0.97 O 0.00 O 0.00 O 0.00 -304 2.52 0 0.00 O 0.00 -8,068 -12,066 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.2 25.9 0.0 0.0 0.0 0.0 2.2 25.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 24.2 1,038 75.9 60.9 57.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.7 52.1 54.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 548 Part 0 Int Door 0 ExFlr 32 Roof 0 Wall 433 Ext Door 0 ft2 (%) 0 0 275 64 0 0 TEMPERATURES Cooling Heating 56.0 81.0 75.5 68.8 75.7 68.8 75.9 60.3 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,038 1,038 1,038 0 63 63 23 333 1,062 86 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 666 666 333 333 63 63 23 333 356 86 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm/ton ft2/ton Btu/hr•ft2 No. People Cooling 6.1 1.89 481.09 253.91 47.26 6 Heating 6.3 1.22 -29.66 HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -14.1 0.0 -2.1 -5.6 0.0 0.0 -16.3 666 0 63 333 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 81.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Alternative - 1 System Checksums Report Page 7 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 08 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 9 / 14 OADB/WB/HR: 78 / 63 / 65 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 16,567 81 0 0 0 0 188 16,836 1,241 1,800 2,910 5,951 74 0 0 0 22,860 0 0 0 0 0 370 0 370 310 0 0 310 -74 0 -58 318 0 0 866 Net Total Btu/h 0 0 0 16,567 81 370 0 0 0 188 17,206 1,551 1,800 2,910 6,261 0 440 0 0 0 -58 1,557 318 0 0 0 Percent Of Total (%) 0 0 0 64 0 0 0 67 6 7 11 24 0 2 0 0 0 0 6 1 0 0 0 25,724 100.00 CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Space Sensible Btu/h 0 0 0 16,861 -91 0 0 0 0 37 16,807 Percent Of Total (%) 0 0 0 77 0 0 0 0 0 0 76 1,241 6 1,000 5 2,910 13 5,151 23 64 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 22,021 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -5,869 -5,869 46.22 0 -1,090 8.59 O 0 0.00 -949 -949 7.47 O 0 0.00 -1,085 -1,085 8.54 -7,903 -8,993 70.82 0 0 0 0 -1,263 -1,263 -1,263 -1,263 -198 0 O -2,542 0 0 O 0 98 0 0 0 2 0 0 0.00 0.00 9.94 9.94 0.00 20.02 0 0.00 -0.77 0.00 0.00 0.00 -0.02 0.00 0.00 -9,363 -12,698 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 2.1 25.7 0.0 0.0 0.0 0.0 2.1 25.7 COOLING COIL SELECTION Sens Cap. MBh 24.5 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 1,051 75.8 60.9 57.2 O 0.0 0.0 0.0 O 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.7 52.3 55.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 505 Part 0 Int Door 0 ExFlr 41 Roof 0 Wall 557 Ext Door 0 ft2 (%) 0 0 354 64 0 0 TEMPERATURES Cooling Heating 56.0 83.5 75.5 68.8 75.7 68.8 75.8 61.7 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,055 1,055 1,055 0 50 50 21 316 1,076 72 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 633 633 316 316 50 50 21 316 338 72 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 4.8 5.3 cfm/ft2 2.09 1.25 cfm/ton 492.05 ft2/ton 235.58 Btu/heft= 50.94 -33.32 No. People 4 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -15.1 633 61.7 83.5 Aux Htg 0.0 0 0.0 0.0 Preheat -1.7 50 24.0 54.7 Reheat -5.3 316 54.7 70.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -16.8 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 8 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 09 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h Mo/Hr: 9 / 13 OADB/WB/HR: 77 / 63 / 66 Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o o 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 9,139 0 9,139 68 9,139 80 -39 0 -39 0 -39 0 O 133 133 1 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 136 136 1 30 0 9,237 133 9,370 69 9,131 80 1,003 251 1,253 9 1,003 9 900 0 900 7 500 4 749 0 749 6 749 7 2,652 251 2,902 22 2,252 20 52 -52 0 0 52 0 O 0 271 2 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -38 -38 0 811 6 167 167 1 0 0 0 11,941 0 461 O 0 O 0 13,484 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 11,434 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -2,504 -2,504 35.20 O -465 6.54 O 0 0.00 -405 -405 5.69 O 0 0.00 -876 -876 12.32 -3,785 -4,251 59.75 O 0 0.00 O 0 0.00 -1,020 -1,020 14.34 -1,020 -1,020 14.34 -160 0 0.00 O -1,743 24.50 0 0 0 0 0 0.00 70 -0.99 0 0.00 O 0.00 0 0.00 -171 2.40 0 0.00 O 0.00 -4,965 -7,114 100.00 Total Capacity ton MBh Main Clg 1.1 13.5 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.1 13.5 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 12.8 548 75.7 60.9 57.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/lb 54.7 52.2 55.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 408 Part 0 Int Door 0 ExFIr 18 Roof 0 Wall 238 Ext Door 0 0 0 151 64 0 0 TEMPERATURES Cooling Heating 56.0 83.6 75.4 68.8 75.7 68.8 75.7 59.5 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating 548 333 548 333 548 166 0 166 34 34 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 34 34 17 17 166 166 565 184 52 52 0 0 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 6.3 6.9 cfm/ft' 1.34 0.82 cfm/ton 487.39 ft2/ton 363.09 Btu/hr•ft2 33.05 -22.45 No. People 2 HEATING COIL SELECTION Coil Airflow Ent Lvg cfm °F °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -8.0 0.0 -1.2 -2.8 0.0 0.0 -9.2 333 61.7 83.6 0 0.0 0.0 34 166 0 0 24.0 54.7 0.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Alternative - 1 System Checksums Report Page 9 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-110 COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 77 / 65 / 72 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o o 0 0 0 0 o o 0 0 0 0 o o 0 0 0 0 9,736 0 9,736 71 9,736 84 27 0 27 0 27 0 65 203 268 2 65 1 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 99 99 1 20 0 9,928 203 10,130 74 9,849 85 442 111 553 4 442 4 900 0 900 7 500 4 819 0 819 6 819 7 2,161 111 2,272 17 1,761 15 26 -26 0 0 26 0 O 0 269 2 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -23 -23 0 826 6 167 167 1 O 0 0 0 0 O 0 0 12,115 432 13,642 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 11,636 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -3,827 -3,827 52.72 -284 -1,175 16.19 0 0 0.00 -764 -764 10.52 0 0 0.00 -387 -387 5.33 -5,261 -6,153 84.76 0 0 0.00 O 0 0.00 -450 -450 6.20 -450 -450 6.20 -71 0 0.00 O -1,051 14.48 0 0 0 0 0 0.00 39 -0.53 O 0.00 O 0.00 O 0.00 356 -4.90 0 0.00 0 0.00 -5,782 -7,260 100.00 Main Clg Aux Cig Opt Vent Total Total Capacity ton MBh 1.1 13.6 0.0 0.0 0.0 0.0 1.1 13.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 13.0 557 75.8 60.9 57.4 5.4.7 52.3 55.5 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 180 Part 0 Int Door 0 ExFlr 33 Roof 0 Wall 448 Ext Door 0 ft2 (%) 0 0 231 51 0 0 TEMPERATURES Cooling Heating 56.0 85.7 75.5 68.8 75.7 68.8 75.8 63.2 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 557 557 557 0 21 21 8 167 565 28 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 334 334 167 167 21 21 8 167 175 28 0 0 0 0 ENGINEERING CKS Cooling Heating 3.7 4.1 3.10 1.86 490.25 158.34 75.79 -52.94 2 % OA cfm/ft2 cfm/ton ft'/ton Btu/hr•ft2 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -8.8 0.0 -0.7 -2.8 0.0 0.0 -9.5 334 61.7 0 0.0 21 24.0 167 54.7 0 0.0 0 0.0 85.7 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 10 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-111 COOLING COIL PEAK Peaked at lime: Outside Air: Envelope Loads Skylite Solar Skylite Gond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 9 / 14 OADB/WB/HR: 78 / 63 / 65 CLG SPACE PEAK Mo/Hr: 9 / 15 OADB: 78 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o 0 0 0 0 0 o 0 0 0 0 0 O 0 0 0 0 0 11,684 0 11,684 66 11,659 77 46 0 46 0 96 1 0 183 183 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 109 109 1 45 0 11,838 183 12,022 67 11,799 78 718 179 897 5 718 5 1,800 0 1,800 10 1,000 7 1,522 0 1,522 9 1,522 10 4,040 179 4,219 24 3,240 21 43 -43 0 0 48 0 O 0 328 2 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -40 -40 0 1,068 6 217 217 1 O 0 0 0 0 O 0 0 15,921 497 17,814 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 15,087 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -3,287 -3,287 42.43 O -610 7.88 O 0 0.00 -531 -531 6.86 0 0 0.00 -627 -627 8.10 -4,445 -5,056 65.26 O 0 0.00 0 0 0.00 -730 -730 9.42 -730 -730 9.42 -115 0 0.00 O -1,896 24.48 0 0 0 0 0 0.00 68 -0.88 0 0.00 0 0.00 0 0.00 -133 1.71 0 0.00 0 0.00 -5,290 -7,747 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.5 17.8 0.0 0.0 0.0 0.0 1.5 17.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/Ib 16.7 721 75.8 60.9 57.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 --"Leave DB/WB/HR °F °F gr/lb 54.7 52.2 55.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 292 Part 0 Int Door 0 ExFIr 23 Roof 0 Wall 312 Ext Door 0 0 0 198 64 0 0 TEMPERATURES Cooling Heating 56.0 80.7 75.5 68.8 75.7 68.8 75.8 61.3 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 723 723 723 0 38 38 12 225 735 50 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 450 450 225 225 38 38 12 225 237 50 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm/ton ft2/ton Btu/hr•ft' No. People Cooling 5.2 2.47 486.79 196.70 61.01 4 Heating 5.6 1.54 -36.48 HEATING COIL SELECTION_ Ent Lvg °F °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity Coil Airflow MBh cfm -9.4 450 0.0 0 -1.3 -3.8 0.0 0.0 -10.7 38 225 0 0 61.7 0.0 24.0 54.7 0.0 0.0 80.7 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 11 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV112 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 62 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 15,993 425 0 0 0 0 69 16,487 818 900 1,080 2,799 81 0 0 0 19,367 Plenum Sens. + Lat Btu/h 0 0 0 0 0 455 0 455 205 0 0 205 -81 0 -50 273 0 0 802 Net Total Btu/h 0 0 0 15,993 425 455 0 0 0 69 16,942 1,023 900 1,080 3,003 0 146 0 0 0 -50 1,345 273 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Percent Space Of Total Sensible (%) Btu/h O 0 0 0 O 0 74 15,993 2 425 2 0 0 0 O 0 O 0 O 64 78 16,482 5 4 5 14 0 0 0 0 0 6 1 0 0 0 21,661 100.00 818 500 1,080 2,399 81 0 0 0 Percent Of Total (%) 0 0 0 84 2 0 0 0 0 0 87 4 3 6 13 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 18,961 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -5,293 -5,293 49.32 0 -983 9.16 O 0 0.00 -1,534 -1,534 14.30 0 0 0.00 -715 -715 6.67 -7,542 -8,525 79.44 0 0 0.00 O 0 0.00 -833 -833 7.76 -833 -833 7.76 -131 0 0.00 O -1,515 14.12 0 0 0 O 0 0.00 60 -0.56 O 0.00 O 0.00 O 0.00 82 -0.76 O 0.00 O 0.00 -8,505 -10,732 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.8 21.7 0.0 0.0 0.0 0.0 1.8 21.7 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 21.2 908 76.1 60.9 56.9 54.7 52.5 56.4 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 333 Part 0 Int Door 0 ExFIr 67 Roof 0 Wall 502 Ext Door 0 ft2 (%) 0 319 0 0 64 0 TEMPERATURES Cooling Heating 56.0 84.0 75.8 68.8 76.0 68.8 76.1 63.9 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Retum Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 908 908 908 0 30 30 14 276 922 44 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 553 553 276 276 30 30 14 276 291 44 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft2/ton Btu/hrft2 No. People Cooling 3.3 2.73 503.15 184.48 65.05 2 Heating 3.6 1.66 -43.70 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -13.5 0.0 -1.0 -4.7 0.0 0.0 -14.6 553 0 30 276 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg 84.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 12 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV113 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply AIr Leakage Grand Total ==> Space Sens. + Lat. Btu/h Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 62 / 57 Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O o 0 0 0 0 o 0 0 0 0 0 o o 0 0 0 0 16,872 0 16,872 39 16,872 51 409 0 409 1 409 1 O 409 409 1 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 86 86 0 79 0 17,368 409 17,777 41 17,361 52 2,514 628 3,142 7 2,514 8 13,500 0 13,500 31 7,500 23 5,506 0 5,506 13 5,506 17 21,519 628 22,148 51 15,519 47 248 -248 0 0 248 1 O 0 1,032 2 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -260 -260 -1 2,349 5 475 475 1 0 0 0 0 0 0 0 0 39,135 1,004 43,521 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 33,128 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -4,937 0 0 -798 0 -894 -6,629 0 0 -1,040 -1,040 -401 0 0 0 -8,070 Coil Peak Tot Sens Btu/h 0 0 0 0 -4,937 -917 0 -798 0 -894 -7,546 0 0 -1,040 -1,040 0 -10,684 0 0 311 0 0 0 -806 0 0 Percent Of Total (%) 0.00 0.00 0.00 0.00 24.98 4.64 0.00 4.04 0.00 4.52 38.18 0.00 0.00 5.26 5.26 0.00 54.06 0 0.00 -1.58 0.00 0.00 0.00 4.08 0.00 0.00 -19,765 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 1,586 76.4 61.1 56.9 O 0.0 0.0 0.0 O 0.0 0.0 0.0 Total Capacity Sens Cap. ton MBh MBh 3.6 43.5 37.4 0.0 0.0 0.0 0.0 0.0 0.0 3.6 43.5 Leave DB/WB/HR °F °F gr/Ib 54.7 51.3 51.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ftz (%) Floor 1,023 Part 0 Int Door 0 ExFlr 35 Roof 0 Wall 468 Ext Door 0 0 0 298 64 0 0 TEMPERATURES Cooling Heating 56.0 77.7 75.8 68.8 76.0 68.8 76.4 48.9 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Retum Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,587 1,587 1,587 0 211 211 18 477 1,604 229 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 955 955 477 477 211 211 18 477 495 229 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 13.3 14.8 cfmlft2 1.55 0.93 cfm/ton 437.52 ft'/ton 282.07 Btu/hr•ftz 42.54 -23.35 No. People 30 HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -16.8 0.0 -7.1 -8.1 0.0 0.0 -23.9 955 0 211 477 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 77.7 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 13 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV 114 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 12,224 291 0 0 0 0 56 12,571 1,629 9,900 4,209 15,738 Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 62 / 57 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 12,224 39 O 291 1 261 261 1 O 0 O 0 O 0 0 56 0 261 12,831 41 407 0 0 407 2,037 6 9,900 31 4,209 13 16,145 51 161 -161 0 0 0 0 731 2 0 0 0 O 0 0 0 0 -183 -183 -1 1,706 5 345 345 1 O 0 0 O 0 0 0 0 28,469 669 31,576 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 12,224 291 0 0 0 0 52 12,566 Percent Of Total (%) 0 0 0 51 1 0 0 0 0 0 52 1,629 7 5,500 23 4,209 17 11,338 47 161 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 24,064 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -3,514 -3,514 25.27 0 -653 4.69 O 0 0.00 -568 -568 4.08 0 0 0.00 -580 -580 4.17 -4,662 -5,315 38.22 0 0 0.00 O 0 0.00 -675 -675 4.85 -675 -675 4.85 -260 0 0.00 O -7,571 54.44 0 0 0 0 0 0.00 219 -1.58 0 0.00 O 0.00 O 0.00 -565 4.07 0 0.00 O 0.00 -5,597 -13,907 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Main Clg 2.6 31.6 27.1 1,152 76.4 61.0 56.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 2.6 31.6 Leave DB/WB/HR °F °F gr/lb 54.7 51.3 51.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: , Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 663 Part 0 Int Door 0 ExFIr 25 Roof 0 Wall 333 Ext Door 0 ft2 (%) O 0 212 64 O 0 TEMPERATURES Cooling Heating 56.0 77.4 75.8 68.8 76.0 68.8 76.4 49.4 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,153 1,153 1,153 0 150 150 11 347 1,164 161 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 693 693 347 347 150 150 11 347 358 161 0 0 0 0 ENGINEERING CKS Cooling Heating 13.0 14.4 1.74 1.05 438.05 251.96 47.63 -25.58 22 % OA cfm/ft' cfm/ton ft'/ton Btulhr•ft2 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -11.9 0.0 -5.0 -5.9 0.0 0.0 -17.0 693 0 150 347 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 77.4 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 14 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-115 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 62 / 57 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu/h (%) o o 0 0 o o 0 0 o 0 0 0 15,291 0 15,291 55 427 0 427 2 O 379 379 1 0 0 0 0 0 0 0 0 0 0 72 72 0 15,790 379 16,169 58 1,460 365 1,825 7 3,150 0 3,150 11 4,597 0 4,597 16 9,207 365 9,572 34 144 -144 0 0 O 0 345 1 0 0 0 0 0 O 0 0 -97 -97 0 1,684 6 341 341 1 O 0 0 0 0 O 0 0 25,141 844 .28, 013 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 15,291 427 0 0 0 0 66 15,784 Percent Of Total (%) 0 0 0 64 2 0 0 0 0 0 67 1,460 6 1,750 7 4,597 19 7,807 33 144 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Gond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 23,735 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coll Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -5,307 -5,307 41.60 0 -986 7.73 0 0 0.00 -1,201 -1,201 9.41 0 0 0.00 -745 -745 5.84 -7,253 -8,239 64.58 0 0 0.00 O 0 0.00 -868 -868 6.80 -868 -868 6.80 -233 0 0.00 O -3,571 27.99 0 0 0 0 0 0.00 116 -0.91 0 0.00 0 0.00 O 0.00 -196 1.54 O 0.00 O 0.00 -8,354 -12,757 100.00 Total Capacity ton MBh Main Clg 2.3 28.0 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.3 28.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 26.6 1,136 76.2 61.0 56.9 54.7 52.3 55.4 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 594 Part 0 Int Door 0 ExFIr 52 Roof 0 Wall 504 Ext Door 0 0 0 320 64 0 0 TEMPERATURES Cooling Heating 56.0 81.1 75.8 68.8 76.0 68.8 76.2 59.5 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Retum Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating 1,137 683 1,137 683 1,137 342 0 342 71 71 71 71 15 15 342 342 1,152 356 85 85 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 0 ENGINEERING CKS Cooling Heating % OA 6.2 6.9 cfm/ft2 1.91 1.15 cfm/ton 487.00 ft2/ton 254.45 Btu/hrft2 47.16 -28.55 No. People 7 HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -14.6 0.0 -2.4 -5.8 0.0 0.0 -17.0 Lvg °F 683 61.7 81.1 0 0.0 0.0 71 24.0 54.7 342 54.7 70.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 15 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV116 COOLING COIL PEAK Peaked at lime: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 2,311 422 0 0 0 0 169 2,903 560 1,350 1,413 3,323 46 0 0 0 Mo/Hr: 7 / 15 OADB/WB/HR: 83 / 66 / 69 Plenum Sens. + Lat Btu/h Net Total Btu/h CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Percent Space Percent Of Total Sensible Of Total (%) Btu/h ((Ye) 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 O 2,311 31 2,311 41 O 422 6 422 8 131 131 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 169 2 85 2 131 3,033 41 2,819 50 140 700 9 560 10 O 1,350 18 750 13 0 1,413 19 1,413 25 140 3,463 47 2,723 49 -46 0 -38 82 0 0 0 501 0 0 0 -38 397 82 0 0 0 0 7 0 0 0 -1 5 1 0 0 0 46 1 0 0 0 0 0 0 6,272 269 7,438 100.00 5,588 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -3,472 -3,472 50.97 0 -645 9.47 0 0 0.00 -561 -561 8.24 0 0 0.00 -490 -490 7.19 -4,523 -5,167 75.87 0 0 0.00 O 0 0.00 -570 -570 8.37 -570 -570 8.37 -89 0 0.00 0 -1,450 21.28 0 0 0 O 0 0.00 52 -0.77 0 0.00 O 0.00 O 0.00 324 -4.76 0 0.00 O 0.00 -5,182 -6,811 100.00 Main Cig Aux Cig Opt Vent Total Total Capacity ton MBh 0.6 7.4 0.0 0.0 0.0 0.0 0.6 7.4 COOLING COIL SELECTION Sens Cap. Coll Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 6.5 268 76.7 61.4 58.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.7 51.6 52.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: . Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft' (%) Floor 228 Part 0 Int Door 0 ExFir 24 Roof 0 Wall 329 Ext Door 0 O 0 209 64 O 0 TEMPERATURES Cooling Heating 56.0 99.4 75.6 68.8 75.9 68.8 76.7 52.8 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 268 268 268 0 29 29 10 80 277 38 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 161 161 80 80 29 29 10 80 90 38 0 0 0 0 ENGINEERING CKS Cooling Heating 10.7 11.9 1.17 0.70 431.77 367.83 32.62 -33.38 3 % OA cfm/ft2 cfm/ton ft'/ton Btu/hrft2 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.7 0.0 -1.0 -1.4 0.0 0.0 -7.6 Lvg °F 161 61.7 99.4 0 0.0 0.0 29 80 0 0 24.0 54.7 0.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 16 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-117 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 13,279 446 0 0 0 0 82 13,807 971 900 782 2,652 96 0 0 0 16,555 Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 62 / 57 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 13,279 72 O 446 2 381 381 2 0 0 0 0 0 0 0 82 0 381 14,188 76 243 0 0 243 1,213 7 900 5 782 4 2,895 16 -96 0 0 0 165 1 O 0 0 0 0 0 -57 -57 0 1,146 6 234 234 1 0 0 0 O 0 0 0 0 705 18,570 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Percent Sensible Of Total Btu/h (%) O 0 O 0 O 0 13,279 82 446 3 0 0 0 0 O 0 0 0 75 0 13,800 85 971 6 500 3 782 5 2,252 14 96 1 O 0 0 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Gond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 16,148 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -5,506 -5,506 51.54 0 -1,023 9.57 0 0 0.00 -890 -890 8.33 0 0 0.00 -849 -849 7.94 -7,245 -8,268 77.39 0 0 0.00 O 0 0.00 -988 -988 9.24 -988 -988 9.24 -155 0 0.00 0 -1,703 15.94 0 0 0 0 0 0.00 69 -0.64 0 0.00 O 0.00 O 0.00 206 -1.93 0 0.00 O 0.00 -8,387 -10,683 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.6 18.6 0.0 0.0 0.0 0.0 1.6 18.6 COOLING COIL SELECTION Coll Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 18.2 773 76.2 60.9 56.9 54.7 52.5 56.2 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft' (%) Floor 395 Part 0 Int Door 0 ExFIr 39 Roof 0 Wall 522 Ext Door 0 0 0 332 64 0 0 TEMPERATURES Cooling Heating 56.0 86.3 75.8 68.8 76.0 68.8 76.2 62.3 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 773 773 773 0 34 34 17 235 790 50 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 470 470 235 235 34 34 17 235 252 50 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 4.4 4.8 cfm/ft' 1.96 1.19 cfm/ton 499.81 ft'/ton 255.25 Btu/hr•ft' 47.01 -34.94 No. People 2 HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -12.7 0.0 -1.1 -4.0 0.0 0.0 -13.8 Lvg °F 470 61.7 86.3 0 0.0 0.0 34 235 0 0 24.0 54.7 0.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative -1 System Checksums Report Page 17 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-118 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 62 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumld. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 5,065 0 5,065 42 5,065 378 0 378 3 378 O 222 222 2 0 O 0 0 0 O 0 0 0 O 0 0 0 0 122 122 1 113 5,565 222 5,788 48 5,556 1,450 1,800 1,570 4,820 143 0 0 0 10,528 362 0 0 362 -143 0 -91 145 0 0 496 1,812 1,800 1,570 15 15 13 5,182 43 0 271 0 0 0 -91 690 145 0 0 0 0 2 0 0 0 -1 6 1 0 0 0 11,984 100.00 1,450 1,000 1,570 Percent Of Total (%) 0 0 0 52 4 0 0 0 0 1 57 15 10 16 4,020 41 143 0 0 0 0 0 0 9,718 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -4,524 -4,524 39.86 O -840 7.40 O 0 0.00 -731 -731 6.44 O 0 0.00 -1,267 -1,267 11.17 -6,523 -7,364 64.88 0 0 0.00 O 0 0.00 -1,475 -1,475 13.00 -1,475 -1,475 13.00 -231 0 0.00 O -2,800 24.67 0 0 0 O 0 0.00 109 -0.96 0 0.00 O 0.00 O 0.00 180 -1.59 0 0.00 O 0.00 -8,230 -11,350 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 12.0 0.0 0.0 0.0 0.0 1.0 12.0 COOLING COIL SELECTION Sens Cap. MBh Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/lb 11.2 465 76.4 61.0 56.9 54.7 51.9 54.1 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 590 Part 0 Int Door 0 ExFlr 32 Roof 0 Wall 429 Ext Door 0 O 0 273 64 O 0 TEMPERATURES Cooling Heating 56.0 95.8 75.8 68.8 76.0 68.8 76.4 51.7 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Retum Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 465 465 465 0 55 55 25 145 491 80 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 290 290 145 145 55 55 25 145 170 80 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm/ton ft2/ton Btu/hr•ft° No. People Cooling 11.9 0.79 466.12 590.79 20.31 4 Heating 12.7 0.49 -21.60 HEATING COIL SELECTION Ent °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -10.9 0.0 -1.9 -2.5 0.0 0.0 -12.7 Coil Airflow cfm 290 0 55 145 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 95.8 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 18 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV 119 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Rat. Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h 0 0 0 19,964 738 0 0 0 0 129 20,831 1,526 2,700 3,619 7,846 150 0 0 0 28,827 Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 62 / 57 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 0 0 0 0 19,964 62 O 738 2 530 530 2 O 0 O 0 0 0 0 129 0 530 21,362 66 382 0 0 382 1,908 6 2,700 8 3,619 11 8,227 26 -150 0 0 0 328 1 O 0 0 0 O 0 -106 -106 0 1,960 6 400 400 1 O 0 0 0 0 O 0 0 1,055 32,170 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 19,964 738 0 0 0 0 119 20,821 Percent Of Total (%) 0 0 0 72 3 0 0 0 0 0 75 1,526 6 1,500 5 3,619 13 6,646 24 150 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 27,617 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -9,049 0 0 -1,463 0 -1,334 -11,846 0 0 -1,553 -1,553 -244 0 0 0 -13,642 Coil Peak Tot Sens Btu/h 0 0 0 0 -9,049 -1,681 0 -1,463 0 -1,334 -13,527 0 0 -1,553 -1,553 Percent Of Total (%) 0.00 0.00 0.00 0.00 50.19 9.32 0.00 8.11 0.00 7.40 75.03 0.00 0.00 8.61 8.61 O 0.00 -3,400 18.86 0 0 0 0.00 127 -0.71 0 0.00 O 0.00 0 0.00 322 -1.79 0 0.00 O 0.00 -18,029 100.00 Main Clg Aux Clg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm °F °F gr/lb °F °F gr/lb 2.7 32.2 30.9 1,323 76.2 61.0 56.9 54.7 52.4 55.8 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 2.7 32.2 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft' (%) Floor 621 Part 0 Int Door 0 ExFIr 64 Roof 0 Wall 859 Ext Door 0 0 0 546 64 0 0 TEMPERATURES Cooling Heating 56.0 85.6 75.8 68.8 76.0 68.8 76.2 61.2 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,323 1,323 1,323 0 67 67 26 397 1,349 94 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 794 794 397 397 67 67 26 397 423 94 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btulhr•W No. People Cooling 5.1 2.13 493.43 231.64 51.80 6 Heating 5.6 1.28 -37.26 HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -20.9 0.0 -2.3 -6.7 0.0 0.0 -23.1 794 0 67 397 0 0 61.7 0.0 24.0 54.7 0.0 0.0 Lvg °F 85.6 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 19 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 20 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 62 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O o 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 9,070 0 9,070 41 9,070 50 482 0 482 2 482 3 O 294 294 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 175 175 1 161 1 9,728 294 10,022 45 9,714 53 2,076 519 2,596 12 2,076 11 3,150 0 3,150 14 1,750 10 4,514 0 4,514 20 4,514 25 9,740 519 10,259 46 8,340 46 205 -205 0 0 205 1 0 0 418 2 0 0 0 0 0 0 0 O 0 O 0 0 0 0 -138 -138 -1 1,296 6 270 270 1 0 0 0 O 0 0 0 0 19,673 740 22,127 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 18,259 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -5,762 -5,762 36.27 O -1,070 6.74 O 0 0.00 -932 -932 5.86 0 0 0.00 -1,815 -1,815 11.43 -8,509 -9,579 60.29 0 0 0.00 0 0 0.00 -2,113 -2,113 13.30 -2,113 -2,113 13.30 -331 0 0.00 0 -4,332 27.26 0 0 0 O 0 0.00 165 -1.04 O 0.00 O 0.00 0 0.00 -30 0.19 0 0.00 0 0.00 -10,953 -15,888 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 1.8 22.1 20.7 875 76.3 61.0 56.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.8 22.1 Leave DB/WB/HR °F °F gr/lb 54.7 52.1 0.0 0.0 0.0 0.0 54.7 0.0 0.0 Project Name: , Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 845 Part 0 Int Door 0 ExFIr 41 Roof 0 Wall 547 Ext Door 0 0 0 347 64 0 0 TEMPERATURES Cooling Heating 56.0 88.8 75.8 68.8 76.0 68.8 76.3 54.3 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 875 875 875 0 86 86 36 265 910 122 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 530 530 265 265 86 86 36 265 301 122 0 0 0 0 ENGINEERING CKS Cooling Heating 9.8 10.8 1.03 0.63 474.30 458.26 26.19 -22.09 7 OA cfm/ft2 cfm/ton ft®lton Btu/hr•ft= No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -15.8 0.0 -2.9 -4.5 0.0 0.0 -18.7 Lvg °F 530 61.7 88.8 0 0.0 0.0 86 265 0 0 24.0 54.7 0.0 0.0 54.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative -1 System Checksums Report Page 20 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 21 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 0 0 0 Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 72 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu/h (%) O 0 0 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 3,231 808 4,039 22 4,950 0 4,950 27 6,541 0 6,541 36 14,722 808 15,530 85 241 -241 0 0 O 0 1,280 7 O 0 0 0 0 O 0 0 -136 -136 -1 1,324 7 265 265 1 0 0 0 0 0 O 0 0 14,963 696 18,263 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 3,231 25 2,750 22 6,541 51 12,522 98 241 0 0 0 2 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 12,763 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 -7,396 100.00 0 0 0 0 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O -7,396 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.5 18.3 0.0 0.0 0.0 0.0 1.5 18.3 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 16.0 893 76.9 64.4 71.7 60.7 57.8 68.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft' (%) Floor 1,315 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 62.0 70.0 75.6 70.0 75.9 70.0 76.9 46.2 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 893 893 893 0 146 146 0 283 893 146 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent tnfil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 565 565 283 283 146 146 0 283 283 146 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 16.4 0.68 587.08 864.05 13.89 11 Heating 17.3 0.43 -6.69 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -2.9 0.0 -5.9 -2.9 0.0 0.0 -8.8 565 0 146 283 0 0 65.3 0.0 24.0 60.7 0.0 0.0 Lvg °F 70.0 0.0 60.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 21 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 22 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 72 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) 0 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 0 0 O 0 0 695 174 869 11 3,600 0 3,600 45 2,366 0 2,366 30 6,661 174 6,835 86 52 -52 0 0 O 0 499 6 O 0 0 0 0 O 0 0 -53 -53 -1 530 7 106 106 1 O 0 0 0 0 O 0 0 6,713 175 7,917 100.00 CLG SPACE PEAK Mo/Hr. 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 695 2,000 2,366 5,061 52 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 14 39 46 99 0 0 0 5,113 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 -2,880 100.00 0 0 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 O 0.00 -2,880 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.7 7.9 0.0 0.0 0.0 0.0 0.7 7.9 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 6.3 358 76.9 64.3 71.7 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 60.7 57.2 65.6 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 283 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 ft2 (%) O 0 O 0 O 0 TEMPERATURES Cooling Heating 62.0 70.0 75.6 70.0 75.9 70.0 76.9 45.6 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 358 358 358 0 57 57 0 107 358 57 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 215 215 107 107 57 57 0 107 107 57 0 0 0 ENGINEERING CKS Cooling Heating 15.9 17.7 1.26 0.76 542.53 428.97 27.97 -12.01 8 % OA cfm/ft' cfm/ton ft'/ton Btu/hrfN No. People HEATING COIL SELECTION Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity Coil Airflow Ent Lvg MBh cfm °F °F -1.1 0.0 -2.3 -1.1 0.0 0.0 -3.4 215 65.3 70.0 O 0.0 0.0 57 24.0 60.7 107 60.7 70.0 O 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 22 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV-1 23 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 72 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 0 0 0 0 0 5,421 1,355 6,776 24 8,100 0 8,100 28 9,382 0 9,382 33 22,903 1,355 24,259 85 404 -404 0 0 O 0 1,946 7 O 0 0 0 0 O 0 0 -207 -207 -1 2,044 7 409 409 1 0 0 0 0 0 O 0 0 23,307 1,153 28,450 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 5,421 4,500 9,382 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 28 23 48 19,303 98 404 0 0 0 2 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Gond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 19,707 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coli Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O -11,239 100.00 O 0 0 1 1 0.00 O 0.00 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 1 -11,239 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.4 28.5 0.0 0.0 0.0 0.0 2.4 28.5 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/lb 24.7 1,380 76.9 64.3 71.7 60.7 57.7 67.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass Floor 2,206 Part 0 Int Door 0 ExFir 0 Roof 0 Wall 0 Ext Door 0 ft2 (%) 0 0 0 0 0 0 TEMPERATURES Cooling Heating 62.0 70.0 75.6 70.0 75.9 70.0 76.9 45.5 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,380 1,380 1,380 0 222 222 0 418 1,380 222 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 836 836 418 418 222 222 0 418 418 222 0 0 0 0 ENGINEERING CKS Cooling Heating 16.1 17.7 0.63 0.38 581.91 930.48 12.90 -6.01 18 % OA cfm/ft2 cfm/ton ft=/ton Btu/hr•ft2 No. People HEATING COIL SELECTION Coil Airflow Ent cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total Capacity MBh -4.3 0.0 -9.0 -4.3 0.0 0.0 -13.3 836 65.3 0 0.0 222 418 0 0 24.0 60.7 0.0 0.0 Lvg °F 70.0 0.0 60.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 23 of 50 Zone Checksums By MACDONALD MILLER FACILITY SOLUTIONS VAV 124 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 0 0 0 Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 72 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 O o 0 O 0 0 0 0 0 O 0 O 0 0 0 0 O 0 O 0 0 3,391 848 4,239 23 5,400 0 5,400 29 6,108 0 6,108 33 14,899 848 15,746 85 253 -253 0 0 0 0 1,433 8 0 0 0 O 0 0 0 0 -152 -152 -1 1,322 7 264 264 1 0 0 0 O 0 O 0 0 15,151 707 18,614 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 3,391 3,000 6,108 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 27 24 48 12,499 98 253 0 0 0 2 0 0 0 12,751 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O -8,276 100.00 0 0 0 0 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 O 0.00 O -8,276 100.00 Main Cig Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 1.6 18.6 16.1 893 77.1 0.0 0.0 0.0 0 0.0 64.4 0.0 0.0 0.0 0.0 0 0.0 0.0 1.6 18.6 71.7 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 60.7 57.7 67.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building SMH.TRC AREAS Gross Total Glass ft2 (%) Floor 1,380 Part 0 Int Door 0 ExFir 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 62.0 70.0 75.6 70.0 75.9 70.0 77.1 44.2 0.1 0.0 0.3 0.1 0.9 0.2 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 893 893 893 0 164 164 0 292 893 164 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 584 584 292 292 164 164 0 292 292 164 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 18.3 0.65 575.48 889.67 13.49 12 Heating 18.7 0.42 -6.95 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -3.0 0.0 -6.6 -3.0 0.0 0.0 -9.6 584 0 164 292 0 0 65.3 0.0 24.0 60.7 0.0 0.0 Lvg °F 70.0 0.0 60.7 70.0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 10:34 AM on 04/04/2017 Altemative - 1 System Checksums Report Page 24 of 50 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0050 DATE: 04/11/17 PROJECT NAME: SOUND MENTAL HEALTH SITE ADDRESS: 6400 SOUTHCENTER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: �rJ POO Building Division Public Works AYA—`t- '1 Fire Prevention mi Structural ❑ Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 04/13/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05/11/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: !Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOI TNC Horne Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1 of 3 A -Z Index Help My L&1 Workplace Rights Trades & Licensing MACDONALD/MILLER FAC SOL INC Owner or tradesperson Principals SIMONDS, DERRICK R, PRESIDENT WEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH, TREASURER HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01/04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. 602 254 260 PO BOX 47983 SEATTLE, WA 98106 206-768-4180 KING County Business type Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor . Active. Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration 12/31/2002— 01/04/2019 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 4/18/2017 MACDONALD/MILLER FAC SOI.. TNC Bond LIBERTY MUTUAL INS CO Bond account no. 023006951 $12,000.00 Received by L&I Effective date 12/31/2002 12/11/2002 Expiration date Until Canceled Insurance Liberty Mutual Ins Co Policy no. TB7-661-066178-033 $2,000,000.00 Received by L&I Effective date 10/24/2016 12/31/2013 Expiration date 12/31/2017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 252,457-05 Doing business as MACDONALD MILLER FACILITY Estimated workers reported Quarter 4 of Year 2016 "Greater than 100 Workers" L&I account representative T5 / (360)902-6266 Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 08/24/2015 Inspection no. 317936840 Location 14360 SE Eastgate Way Bellevue, WA 98007 Violations Inspection results date 08/04/2015 Inspection no. 317937121 Location 530 Fairview Ave N Seattle, WA 98103 No violations Inspection results date 06/18/2012 Inspection no. No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 4/18/2017 ABBV A AC AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS FULL NAME COMPRESSED AIR LINE AIR CONDITIONING UNIT ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM ABBV FULL NAME ESP EXH EXTR FAC FD FLA FOB FOT FSD G GALV GC GPM GR GWB HG HP HWR HWS ID INT LIQ M -M MBH MC MCA MD MIN MT MUA NOM EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD-MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE-UP AIR NOMINAL ABBV OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP T'STAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 FULL NAME OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START/STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER DUCT LEGEND DESCRIPTION BARE SHEETMETAL SYMBOL DESCRIPTION ROUND SHEETMETAL WRAPPED W/ INSULATION (2") SYMBOL 1 4x 12 120W SOUNDLINE SHEETMETAL (1" LINING) CLEANROOM QUALITY DUCTWORK WT 1 4x1 2SL 14x12C AREA SERVED MFG & MODEL NO. SHEETMETAL WRAPPED W/ INSULATION (2") BARE ROUND SHEETMETAL EXPOSED QUALITY SHEETMETAL EXAMPLE OF NEW CFM BARE FLAT OVAL SHEETMETAL FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2") DUCTBOARD (1" FIBERGLASS) EXAMPLE OF NOT IN CONTRACT (NIC) RPM 14x 12W 14x120 VOLT/PH BDD 120 14x 120W EF -1 GENERAL EXHAUST 14x12Q 14x12DB 2250 0.75 1 4x12 14x12 1.5 460/3 EXAMPLE OF DEMO - FLEX DUCT EF -2 X X X X X X X EXAMPLE OF EXISTING ROOF FLEX CONNECTOR 0.375 14X 12 f 0.25 115/1 EXISTINI 1ST FLOOR PAR EL VAV BOX SCHEDULE SYMBOL SIZE \/CFM DIFFUSE MANUFACTURER & MODEL NUMBER GRILLE SCHEDU SIZE TYPE NOTES SHOEMAKER 701 -MA ©SIZE CFM SIZE CFM 19 AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER SHOEMAKER MA -DCF SHOEMAKER 600 M -M METAL EGGCRATE M -M METAL EGGCRATE AS NOTED AS NOTED 12/24 24/24 SURFACE MT MODULAR CORE DIFFUSER SURFACE MT LATTICE RETURN AIR GRILLE RETURN/EXH RETURN/EXH 1:03:16 PM Friday. April 07. 2017 Site Location outhcenter Blvd Tukwila Pkwy VICINITY MAP NO SCALE UNIT NO. 404 404A MFG & MODEL NO. INLET SIZE 49 49 VALVE CFM MAX MIN 4206 4286 402 _ 44 2249 +03 CARRIER ACT/ \AT Al +746 494 49 4659 495 _ 49 668 496 499 44.0 444 442 143 444 445 446 44F 449 429 4224 423 424_ 4225 426 427 CARRIER ACT/ \nT 6 6 40 49 49 42 42 9 42 49 6 9 CARRIER ACT/ tAT-____. An . CARRICR ACTt/\/t/T/\�T _-8 rn�RIER 46TV_VVT GARRI E...-.46...._._.__...._.._ CARRIER 36DV VAT V ITZiTrCT�'S7H[.T�1TI' CARRIER ACT/ \AT CARRIER 5T/ \AT NOTES: 1. DEMO ALL EXISITNG 1ST FLOOR VAV BOXES. 9 49 +0 9 49 49 5 466 660 4096 1490 4200 4690 4.699 699 DT 26 HEATER CFM 606 606 4420 979 525 460 VOLT/PH 277/4 277/1 277/4 277/1 277/4 277/4 277/1 27711 277/1 277/1 STGS HP 4.14 114 3/4 412 414 414 1/4 4.14 1+46 4+2 FAN VOLT/PH 277/1 277/1 277/1 277/4 277/4 277/1 277/1 SPD NOTES DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO 4298 409 669 660 4496 680 _nm 660 1120 4429 eee 4429 4429 249 277/1 277/1 277/4 277/1 277/4 277/1 277/4 277/1 277/1 277/1 __._...._. 277/1 277/1 27714 ------ 277/1 277/1 277/4 • • • DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO __________ DEMO DEMO DEMO DEMO DEMO DEMO DEMO DEMO EXHAUST FAN SCHEDULE UNIT WT NO. AREA SERVED MFG & MODEL NO. TYPE CFM ESP RPM FLA HP VOLT/PH BDD LBS NOTES EF -1 GENERAL EXHAUST EXITAIRE GX-2493 ROOF 2250 0.75 - - 1.5 460/3 - - EXISTING, 8 EF -2 BATHROOMS 227 & 228 GREENHECK GB -091 ROOF 700 0.375 1250 5.8 0.25 115/1 N 88 EXISTING, 3,4,6 EF -3 BREAK ROOM GREENHECK BSQ-080 INLINE 350 0.25 1725 5.8 0.25 115/1 - 80 EXISTING, 4 EF -4 IDF 273 GREENHECK CSP -A700 INLINE 555 0.25 1100 350W 115/1 N 35 EXISTING, 5,6,7 EF -101 RESTROOMS 127,128 GREENHECK BSQ-80-4X-QD INLINE 220 0.25 1/4 N EXISTING, 8 TF -101 ELECTRICAL ROOM 124 GREENHECK SP -264 CEILING EXISTING NOTES: 1. POWER WIRING AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. 2. MOTOR STARTER BY ELECTRICAL CONTRACTOR. 3. MOTORIZED DAMPER THAT MEETS 2012 WSEC SECTIONS C402.4.5.2 AND C403.2.4.4. 4. FAN CONTROLLED VIA TIMECLOCK, PROVIDED AND INSTALLED BY EC. 5. FAN SIZED AT 20 DEG DELTA T, AMBIENT COULD REACH 93 DEG F. 6. HIGH EFFICIENCY MOTORS. 7. TSTAT (MT. AT 48" AFF, SET AT 80° F) 8. AIR BALANCE. FILE CO PAY . Per it ®.M (ft7- 005-0 Pian reviaw ap1,:.+ro j is subject to errors and or issionc. Approval of Com -ii cion documents does not authorizo the violation of ariy adopted code or ordinance. Regi, i of approved Feld Copy and con By: 6A - inions is acknowledged: f�-i,UUlail Date: � - City of Tukwila BUILDING DIVISION REVISIONS C'- anges shell be made to the scope of r.,,o-', 11,i ho).it prior approval of ;".,.743 Sz.glding Division. will require a new plan submittal 6 -Ki may include additional plan review fees. FOR: I� P,"zchanical +.octrical dumbing i frO S Piping 1 ot Tukwila • n DIVISION 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2015 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2015 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS - DUCT WRAP, WHERE INDICATED, SHALL BE 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER. - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB/CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM. - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT. - SUPPLY DUCT WHICH CONVEYS SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER THAN 105 DEG F WHEN LOCATED IN CONDITIONED SPACE SHALL BE INSULATED WITH A MINIMUM OF R-3.3 , WHEN LOCATED IN UNCONDITIONED SPACE R-6 AND WHEN LOCATED OUTSIDE THE BUILDING R-8 (CLIMATE ZONE 4) OR R-12 (CLIMATE ZONE 5) PER WSEC C403.2.8.2. - OUTSIDE AIR DUCT INSULATION SHALL MATCH BUILDING ENVELOPE INSULATION VALUES UNLESS SERVING INDIVIDUAL SUPPLY AIR UNITS WITH LESS THAN 2800 CFM OF TOTAL SUPPLY AIR CAPACITY, PROVIDED THESE ARE INSULATED TO R-7 MINIMUM PER WSEC C403.2.8.1. 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2015 IBC. 8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 717.5 OF THE 2015 IBC. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 717.6.2.1 OF THE 2015 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 9. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 10. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2015 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. BAS TO MONITOR FIRE ALARM CONTROL PANEL AND SHUT DOWN ALL FAN TERMINAL UNITS DURING ANY BUILDING FIRE ALARM EVENT, IN ACCORDANCE WITH IMC 606.2.2. 11. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18". 12. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE HVAC CONTRACTOR. THE HVAC CONTRACTOR IS TO COORDINATE THE HEAT TRACE POWER WIRING WITH ELECTRICAL CONTRACTOR. 13. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 14. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 15. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 16. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL PROVISIONS AND SECTION C408. 17. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER 18. SHAFT WALLS CONSTRUCTED TO SUPPORT AIR MOVEMENT FOR RETURN AIR SYSTEMS AND STAIR & ELEVATOR PRESSSURIZATION SYSTEMS SHALL BE CONSTRUCTED TO THE FOLLOWING STANDARDS: A. SHAFTS (RATED FOR MAXIMIUM 2" WC) SHALL BE CONSTRUCTED TO WITHSTAND 15 PSF LOADING WITH A DEFLECTION OF L/360 (UNO). B. SHAFTS SHALL BE SEALED SUBSTANTIALLY AIR -TIGHT USING THE CRITERIA FROM THE INTERNATIONAL BUILDING CODE: 1. SECTION 715.6 FIRE RESISTANT JOINT SYSTEMS IN SMOKE BARRIERS: LEAKAGE SHALL NOT EXCEED 5 CFM PER LINEAR FOOT OF JOINT AT 0.3" WC. 2. SECTION 909.5 SMOKE BARRIER CONSTRUCTION FOR INTERIOR EXIT STAIRWAYS AND EXIT PASSAGEWAYS: MAXIMUM ALLOWABLE LEAKAGE AREA PER SHAFT SHALL NOT EXCEED (0.00035 SF/SF) C. STAIR AND ELEVATOR PRESSURIZATION SHAFTS SHALL BE PRESSURE TESTED DURING COMMISIONING. CONTRACTOR SHALL MAKE MODIFCATIONS TO INSTALLATION UNTIL SHAFT IS IN COMPLIANCE. 19. DAMPERS USED FOR OUTDOOR AIR INTAKE, EXHAUST, OR RELIEF SHALL HAVE THE FOLLOWING MAXIMUM LEAKAGE RATES AT 1" W.G. (PER AMCA STANDARD 500D): MOTORIZED DAMPERS: 4 CFM/S.F. GRAVITY DAMPERS: 20CFM/S.F. (40 CFM/S.F. FOR DAMPERS SMALLER THAN 24" IN EITHER DIMENSION). 20. OUTSIDE AIR INTAKE, EXHAUST, AND RELIEF DAMPERS SERVING CONDITIONED SPACES MUST BE MOTORIZED (FAIL CLOSED) PER WSEC, COMMERCIAL PROVISIONS, SECTION C403.2.4.3 EXCEPT AS ALLOWED BY WSEC. APN# 000320-003 LEGAL DESCRIPTION: GILLIAM W H -D C # 40 BEG 1336.78 FT W AND 1501.5 FT N OF SE COR OF SEC 23-23-4 TH E 250 FT TH S 325.5 FT TO N LN OF CO RD # 622 TH WLY ALG SD N LN TO PT S OF BEG TH N TO BEG LESS CO RD TITLE PROJECT ENGINEER ACCOUNT MANAGER PRODUCTION MANAGER SHEET METAL SUPERINTENDENT CSP AIR BALANCE FOREMAN CSP REFRIGERATION FOREMAN GENL PROJ MANAGER NAME GEORGE GRAHAM BROCK LEE MIKE REICHERT NATHAN WAAGEN STEVE BAKER TIM ANDERSON DAVE GOVER COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER UNIMARK PHONE NUMBER 206-768-4288 206-768-3838 206-768-4216 206-786-8157 206-768-3824 206-768-4168 206-315-3715 EMAIL GEO RGE.GRAHAM@MACMI LLER.COM BROCK.LEE@MACMILLER.COM MIKE.REICHERT@MACMILLER.COM NATHAN.WAAGEN@MACM I LLER.COM STEVE. BAKER@MACM I LLER.COM TIM.ANDERSON@MACMILLER.COM DAVIDG @UNIMARKCG.COM NAME TITLE NAME TITLE TM0.01 TMO.OS DM2.01 TM2.01 TM2.02 SCHEDULES - HVAC SITE PLAN 1ST FLOOR DEMO PLAN - HVAC 1ST FLOOR PLAN - HVAC 2ND FLOOR PLAN - HVAC REVIEWED FOR CODE COMPLIANCE APPROVED I APR 17 2011 'IT Cllr of Tukwila RECEIVED CITY OF TUKWILA APR 112g17 PERMIT CENTER BUILDING SCOPE OF DEMO ALL EXISTING VAV BOXES. INSTALL (24) NEW PARALLEL VAV BOXES WITH ELECTRIC HEAT. INSTALL (24) NEW THERMOSTATS (CONTROLS BY OTHERS) INSTALL (2) NEW OCCUPANCY SENSORS (CONTROLS BY OTHERS) INSTALL (71) NEW DIFFUSERS (REUSE EXISITNG IF POSSIBLE) INSTALL (101) RETURN / TRANSFER GRILLES MISC DUCTWORK AIR BALANCE (25) VAV ZONES. AIR BALANCE GENERAL EXHAUST SYSTEM AND BOOSTER FAN FOR ADDITION OF NEW RESTROOMS L♦ W c O 0 c CD As RN - Co CD CT) � ¢o CO aio N (0 CI) v) ti O �o c C) rn Qo N- °o N N 0 N- c 0 tia .macmiller.com I I I O I O In 0 0_ LU U- I� N O O CHEMO SET 1 1 1 1 1 l< 1 C\I W (/) a. _ _ F - Q Q WW __ J ZZm WWF W o0 o`-0 oo=4 Z Z F- DDP 0 0 o vJ vJ I -- ENGINEER: G GRAHAM CHECKED BY: B GEZON WA Lic No: MACDOFS980RU W 0 REVISIONS: LU 0 REVISIONS: Z 0 F- U �-- C!) z 0 U 0 LL 0 W (!) U) LAST REVISED: 04-07-17 DATE PLOTTED: 04-07-17 CAD: ISSUE DATE: D LAMBERT 04-07-17 DRAWING NUMBER: 0-2129-72172092-00 SHEET NUMBER: TM0.01 a' i rn N 0 0 m c 'C 0 0 N 0 0 L a 0 x C m C 0 N rn N N N AHU-1, AHU-3: ROOFTOP AHU SERVES: OFFICE AREAS SCHEDULE: MON - FRI 6:00 AM - 6:00 PM, SAT 8:00 AM - 2:00 PM, SUN OFF (ADJUSTABLE) DISCHARGE AIR TEMPERATURE SETPOINT: 55°F WITH RESET TO 62°F (56°F AT 80°F OSA TEMP, 62°F AT 50°F OSA TEMP, ADJUSTABLE) DISCHARGE STATIC PRESSURE SETPOINT: 1.5" WITH RESET TO 1.0" BASED ON CRITICAL ZONE FIRE ALARM CONNECTION: YES FIRE ALARM SEQUENCE: SHUT DOWN DURING A FIRE ALARM. SEQUENCE (VAV COOLING & ECONOMIZER): SUPPLY FAN: SUPPLY FAN SHALL RUN CONTINUOUSLY DURING NORMAL MODE. DURING UNOCCUPIED MODE, THE SUPPLY FAN SHALL BE OFF. VFD SHALL MODULATE FAN SPEED TO MAINTAIN DISCHARGE STATIC PRESSURE SETPOINT COOLING: UNIT SHALL MODULATE COMPRESSORS ON AND OFF TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT. OSA DAMPER: NORMAL MODE: THE OSA AND RETURN DAMPERS SHALL MODULATE LINEARLY ACCORDING TO OSA DAMPER RESET SCHEDULE. TWO OSA DAMPER POSITIONS SHALL BE DETERMINED DURING BALANCING, ONE POSITION AT MINIMUM FAN SPEED (1810 CFM), AND ONE POSITION AT MAXIMUM FAN SPEED (1510 CFM). DURING NORMAL OPERATION, THE OSA AND RELIEF DAMPERS SHALL MODULE LINEARLY BETWEEN THE TWO POSITIONS, BASED ON FAN SPEED ECONOMIZER MODE: DURING ECONOMIZER MODE, THE OSA AND RELIEF DAMPERS SHALL MODULATE TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT, ACCORDING TO THE DISCHARGE AIR TEMPERATURE RESET SCHEDULE. TYPICAL PARALLEL FAN -POWERED VAV TERMINAL UNITS SERVES: OFFICE AREAS SCHEDULE: OCCUPIED HOURS SPACE TEMPERATURE SETPOINT: 70°F HEATING, 75°F COOLING (OCCUPIED); 60°F HEATING, 85°F COOLING (UNOCCUPIED) SEQUENCE (SINGLE DUCT FAN -POWERED VAV WITH HEAT): COOLING: THE PRIMARY AIR VALVE SHALL MODULATE BETWEEN MINIMUM AND MAXIMUM AIRFLOW TO MAINTAIN SPACE TEMPERATURE. WHEN SPACE TEMPERATURE IS 2°F ABOVE COOLING SETPOINT, THE VALVE SHALL BE AT MAXIMUM AIRFLOW. WHEN SPACE TEMPERATURE IS 2°F BELOW SETPOINT, THE VALVE SHALL BE AT MINIMUM AIRFLOW. HEATING: WHEN SPACE TEMPERATURE FALLS 2°F BELOW SETPOINT, THE RETURN FAN AND ELECTRIC HEATER SHALL STAGE ON TO MAINTAIN SPACE TEMPERATURE. DEADBAND: DURING DEADBAND, THE PRIMARY AIR VALVE SHALL MAINTAIN THE COOLING MINIMUM AIRFLOW SETPOINT. RETURN FAN SHALL BE OFF. RETURN FAN: DURING OCCUPIED HOURS, THE FAN SHALL BE OFF DURING PERIODS OF DEADBAND OR COOLING DEMAND. THE FAN SHALL TURN ON DURING A CALL FOR HEATING. DURING UNOCCUPIED HOURS, THE SUPPLY FAN SHALL BE OFF (EXCEPT FOR DURING MORNING WARMUP AS NOTED BLEOW) SEQUENCE DURING MORNING WARMUP: PRIMARY AIR VALVE SHALL BE CLOSED. FAN SHALL BE ON. ELECTRIC HEATER SHALL BE ON UNTIL SPACE IS BROUGHT UP TO OCCUPIED TEMPERATURE. DEMAND CONTROL VENTILATION (DCV) ADDED SEQUENCE FOR VAV BOXES WITH OCCUPANCY SENSORS (SEE SCHEDULE FOR BOX NUMBERS) OCCUPANCY: THE PRIMARY AIR VALVE SHALL BE CLOSED WHEN OCCUPANCY SENSOR DETECTS SPACE HAS BEEN UNOCCUPIED FOR A DURATION OF 5 MINUTES. WHEN SPACE IS OCCUPIED, PRIMARY AIR VALVE SHALL BE AT SCHEDULED MINIMUN VALVE POSITION FOR MIN AIRFLOW COOLING DEMAND SHALL OVERRIDE DEMAND CONTROL VENTILATION AND OPEN PRIMARY AIR VALVE TO MAINTAIN SPACE TEMPERATURE. EF -1: GENERAL EXHAUST FAN SERVES: CORE RESTROOMS, TENANT RESTROOMS, AND GENERAL EXHAUST SCHEDULE: OCCUPIED HOURS SEQUENCE: EXISTING CONTROLS AND SEQUENCE TO REMAIN. FAN SHALL OPERATE AT DESIGN SPEED TO DELIVER SCHEDULED AIRFLOW DURING OCCUPIED HOURS. FAN SHALL BE OFF DURING UNOCCUPIED HOURS. EF -101: RESTROOM EXHAUST BOOSTER FAN SERVES: TENANT RESTROOMS SCHEDULE: OCCUPIED HOURS SEQUENCE: EXISTING CONTROLS AND SEQUENCE TO REMAIN. FAN SHALL BE INTERLOCKED WITH EF -1 TO DELIVER SCHEDULED AIRFLOW DURING OCCUPIED HOURS. 1ST FLOOR PARALLEL VAV BOX SCHEDULE UNIT NO. MFG & MODEL NO. INLET SIZE VALVE CFM HEATER FAN RTU NOTES MAX MIN KW DT CFM VOLT/PH STGS HP VOLT/PH CFM VAV-101 NAILOR D37NE 310 10 960 220 6.0 26 800 460/3 2 1/4 277/1 580 AC -1 NEW, 1, 2, 4 VAV-102 NAILOR D37NE 308 8 795 145 4.5 26 600 277/1 2 1/4 277/1 455 AC -1 NEW, 1 2 4 VAV-103 NAILOR D37NE 308 8 795 145 4.5 26 600 277/1 2 1/4 277/1 455 AC -1 NEW, 1, 2, 4 VAV-104 NAILOR D37NE 310 10 910 220 5.5 25 750 460/3 2 1/4 277/1 530 AC -1 NEW, 1, 2, 4 VAV-105 NAILOR D37NE 310 10 855 270 6.0 25 825 460/3 2 1/4 277/1 555 AC -1 NEW, 1,2,4 ..__....,......- VAV-106 NAILOR D37NE 308 8 535 125 3.5 25 480 277/1 1 1/4 277/1 355 AC -1 NEW, 1, 2, 5 VAV-107 NAILOR D37NE 310 10 1115 220 5.5 21 900 460/3 2 1/4 277/1 680 AC -1 NEW, 1, 2, 4 VAV-108 ------._...-.___.-__._...---- NAILOR D37NE 310 10 1055 _---------------------------------- 220 6.0 ---------.. 24 •--------------- 870 460/3 --------- 2 ------------------- 1/4 277/1 ._----.-_--------------------- 650 AC -1 ---- ------- NEW, 1, 2, 4 ----------__..------------ VAV-109 NAILOR D37NE 3088 580 125 3.5 24 500 277/1 1 1/4 277/1 375 AC -1 NEW, 1, 2, 5 VAV-110 NAILOR D37NE 308 8 575 125 3.5 27 450 277/1 1 1/4 277/1 325 AC -1 NEW, 1, 2, 4 VAV-111 NAILOR D37NE 308 8 750 125 3.5 22 550 277/1 1 1/4 277/1 425 AC -1 NEW, 1, 2, 4 VAV-112 NAILOR D37NE 310 10 925 220 4.5 26 600 277/1 2 1/4 277/1 380 AC -1 NEW, 1, 2, 5 VAV-113 NAILOR D37NE 424 14X10 1600 375 7.5 23 1100460/3 2 1/2 277/1 725 AC -1 NEW, 1,2,4,7 VAV-114 NAILOR D37NE 310 10 1160 230 5.5 22 850 460/3 2 1/4 277/1620 AC -1 NEW, 1,2,4,7 VAV-115 NAILOR D37NE 310 10 1145 230 5.5 22 850 460/3 2 1/4 277/1 620 AC -1 NEW, 1, 2, 4 VAV-116 NAILOR D37NE 206 6 350 100 3.0 29 350 277/1 1 1/6 277/1 250 AC -1 NEW, 1, 2, 4 VAV-117 NAILOR D37NE 308 8 795 125 4.5 28 550 277/1 2 1/4 277/1 425 AC -1 NEW, 1, 2, 4 VAV-118 NAILOR D37NE 308 8 550 190 4.5 28 550 277/1 2 1/4 277/1 360 AC -1 NEW, 1, 2, 5 VAV-119 NAILOR D37NE 310 10 1290 270 7.0 24 1000 460/3 2 1/4 277/1 730 AC -1 NEW, 1, 2, 4 VAV-120 NAILOR D37NE 310 10 875 220 6.0 26 800 460/3 2 1/4 277/1 580 AC -1 NEW, 1, 2, 4 VAV-121 NAILOR D37NE 308 8 900 190 2.5 13 650 277/1 1 1/4 277/1 460 AC -1 NEW, 1, 2, 4, 6 VAV-122 NAILOR D37NE 206 6 360 65 1.0 14 240 277/1 1 1/6 277/1 175 AC -1 NEW, 1,2,4,6 VAV-123 NAILOR D37NE 310 10 1235 330 4.0 15 900 277/1 2 1/4 277/1 570 AC -1 NEW, 1, 2, 5, 6 VAV-124 NAILOR D37NE 308 8 830 175 3.0 14 750 277/1 1 1/4 277/1 575 AC -1 NEW, 1, 2, 5, 6 19850 4660 NOTES: (VAV BOX NUMBERING AND ADDRESS TO BE UPDATED AT THE TIME OF AS -BUILT.) 1. POWER WIRING AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. 2. LOW PROFILE PARALLEL FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, DISCONNECT BY E.C. FACTORY OPTIONS INCLUDE - - INLET FLOW SENSOR - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1" THROW -AWAY FILTERS - FAN RELAY - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. - 24V CONTROL TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS - AUTO RESET 120°F HIGH LIMIT TSTAT - QUIET MAGNETIC CONTACTOR - 1/2" MATT -FACED UNIT INSULATION 3. SINGLE DUCT COOLING ONLY TERMINAL UNIT W/O HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, CONTROLS BY OTHERS. FACTORY OPTIONS INCLUDE: - INLET FLOW SENSOR - 1" MATT -FACED UNIT INSULATION - 24V TRANSFORMER, 50 VA MIN RATING 4. RIGHT HAND CONFIGURATION (AIR HITTING BACK OF HEAD) 5. LEFT HAND CONFIGURATION (AIR HITTING BACK OF HEAD) 6. CFM BASED ON 62°F TEMP RESET VERSUS NORMAL 55°F S.A.T. 7. PROVIDE VAV WITH OCCUPANCY SENSOR FOR DEMAND CONTROL VENTILATION (SEE SEQUENCE OF OPERATION) HEATER CFM LISTED IS SUM OF VALVE MINIMUM PLUS BOX FAN CFM. NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1PH POWER TO THE FAN MOTOR. UNIT NO. MFG & MODEL NO. INLET SIZE MAX MIN KW 2ND FLOOR PARA VALVE CFM HEATER BOX SCHEDUL FAN 201 CARRIER 35DV VVT 12 880 325 DT CFM VOLT/PH STGS HP VOLT/PH 202 NAILOR 35PE-0312 12 1200 200 7 21 203 204 205 206 207 208 209 210 211 212 213 214 215 216 NAILOR 35PE-0312 12 1170 200 6 NAILOR 35PE-0208 NAILOR 35PE-0312 NAILOR 35PE-0312 CARRIER 35DV VVT NAILOR 35PE-0310 NAILOR35PE 0312 NAILOR 35PE-0312 NAILOR 35PE-0310 NAILOR 35PE-0208 CARRIER 35DV VVT CARRIER 35DV VVT NAILOR 35PE-0310 217 218 219 220 NAILOR 35PE-0210 8 520 150 4 12 1145 200 6 12 1100 200 6 12 850 325 10 820 200 12 1220 200 12 1145 10 830 8 375 10 530 8 10 10 250 1050 920 4.5 6.5 .. 200 5.5 200 4.5 125 3.5 230 150 - 200 5.5 NAILOR 35PE-0312 NAILOR 35PE-0312 -------------------------- CARRIER 35DV VVT 12 12 8 1280 1305 375 150 4.5 200 6.5 200 6.5 150 21 21 21 21 22 22. 22 22 29 22 22 22 22 1050 900 600 900 900 650 950 800 650 375 460/3 460/3 277/1 460/3 460/3 277/1 460/3 460/3 277/1 277/1 800 460/3 2 2 277/1 277/1 NOTES EXISTING ------------------- EXISTING, 2 EXISTING, 2 1 2 2 1 2 2 1 1 2 277/1 277/1 277/1 277/1 -277/1-- __.__. 277/1 277/1 27711 277/1 VAR VAR VAR VAR VAR EXISTING, 2 EXISTING, 2 EXISTING, 2 EXISTING EXISTING, 2 EXISTING, 2 EXISTING, 2 EXISTING, 2 EXISTING, 2, 3 EXISTING NOT USED EXISTING EXISTING, 2 650 277/1 950 460/3 950 460/3 2 2 277/1 VAR EXISTING, 2 277/1 VAR EXISTING, 2 277/1 VAR EXISTING, 2 EXISTING 221 222 223 224 225 226 227 228 NAILOR 35PE-0210 NAILOR 35PE-0208 CARRIER 35DV VVT NAILOR 35PE-0310 NAILOR 35PE-0210 CARRIER 35DV VVT CARRIER 35DV VVT 10 8 8 10 10 10 10 640 310 250 1080 640 680 150 4 150 2 150 21 21 200 6 150 3.5 230 230 21 22 600 300 900 500 277/1 277/1 277/1 277/1 VAR VAR NOT USED EXISTING, 2 EXISTING, 2 EXISTING 460/3 2 277/1 VAR EXISTING, 2 277/1 1 277/1 VAR EXISTING, 2 EXISTING__ -----_._..-._ EXISTING NOTES: 1. DISCONNECT BY ELECTRICAL. 2. PARALLEL FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1" THROW -AWAY FILTERS - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. - 1" MATT -FACED UNIT INSULATION - VARIABLE SPEED FAN CONTROL - 24V TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS -AUTO RESET 120°F HIGH LIMIT TSTAT - NON MAGNETIC QUIET ACTING HEATER CONTACTOR - FN2 90 DEG CONTROLS ENCLOSURE 3. EXISTING BOX TO BE REBALANCED TO SPECIFIED CFM. NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1PH POWER TO THE FAN MOTOR. REVIEWED FOR CODE COMPUA ICE APR 17 2017 City of Tukwila BUILDING DI ✓i�: o er .; RECEIVED CITY OF TUKWILA APR 112017 PERMIT CENTER Mr/ OO5o ■- 1 E O U Q) E 0 tU E I I I I I I I I I I I I I I I I O co rn 0 U- 0 2 Z REVISIONS: I I I 1.2I TI UJ I I I- 0 0 0 I I -4- -4- 0 0 1 1 1 1 1 l< ZI J .J W W I J J QI-F-0 Z z m WWW 2 2 Z o0 oo=a ZZ?� D 00:1s) u)(7)-P. REVISIONS: 0 U I.L �F- ( J Z 0 U 0 LL 0 W '� V J ENGINEER: LAST REVISED: G GRAHAM 04-07-17 CHECKED BY: DATE PLOTTED: B GEZON 04-07-17 CAD: ISSUE DATE: D LAMBERT 04-07-17 DRAWING NUMBER: 0-2129-72172092-00 SHEET NUMBER: TMO.02 A7217\2092 Sound Mental Health Phase 2 11:35:25 AM 0 cv S TI - \O SCALE V A ID REVIEWED FOR CO`DE COMPLINICE At:7PROVLD APR 17 2017 City of Tukwila BUILDING DIVISION RECEWED CITY OF TUKWILA APR 1 1 2017 PERMIT CENTER 0056 CO C) 0 N CO CI) CO CO < OD 0 CNI CD a) u_ o C > < CO 2 (ct, 1,15,1 0 I's a 0 r -- .macmiller.com I I I I I I I I I I I I 1 I 0 0 Iii a 0Id 8 Iii (/) 0 aL7J 1 C\I w Co 0_ I I F— F— < < uJw II< Z LLJ W 22 00 Z D D 00 CO CC co LLI co F— Zco L1J 0 < I- 0 — c (I) ENGINEER: G GRAHAM CHECKED BY: B GEZON CAD: D LAMBERT DRAWING NUMBER: C-2129-72172092-00 SHEET NUMBER: r., WA Lic No: MACDOFS980RU REVISIONS: REVISIONS: z 0 F— C2F- z 0 0 U_ w (f) LAST REVISED: 04-07-17 DATE PLOTTED: 04-07-17 ISSUE DATE: 04-07-17 TM0.01 S J:\7217\2092 Sound Mental Health Phase 2 aJL\00\2 — 72092TM2_01.dwo PRIVATE OFFICE 1-1 5 I RI VA! E 01-1IC 1.l 1 116 — Fr: - :.1f 2 . 50. I 0 FF10 I H;;:mu r 0 FTI C F 110 PRIVAIE OFFICF 10:.; EL. PR I\!AF OFFIOF 105 15/ IV fl 12"0 9" 16" PPIVATP OFFICE. 1 1 ! Friday. April 07. 2017 11:31:04 AM VAV VAV 1.26 6" 411111. `IVAV 11.25 OFTIC,F, 1.2 24x14 8"0 FOR 200 C 5!0 rx° 9"� 10"0 VAV 0' 1.16 "9 IT'. IVA I 1_ (1)1 r.iCrT LI A1:71,1 ,)(,Ail ..... ...... _ ..... \NAY P Fl IVAT F I I AV 1.177 VAV 1.27 RNIVAi CI MASTER THERMOSTAT FOR AC/6 ( AC 1 151 --- 01-1, (2/50H 7B ) N\ . . ..... .. . "/,<I1 :77._.. II 1.1 10"� VAV 1.12 REMOTE SENSOR THERMOSTAT IN RETURN AIR DUCT \,AV 1? 48x10 OPEN 011. ICL 1 551 1 ; 1(1'..1; Li Jo II -RNA !I, OFFICE LIIL • Pv'vi girt° Anr 111OR 61 2 *1kAI 40x20 LkTicox 01111/111 15/ 55x11.5 /11 DEMO NOTES LG. MTD. TYPICAL SMOKE FIRE DAMPER VAV 1.1 I V _J. PHIVA 1 L. 01 1- ICI: 126 8'10 TYP. FO.0 CF AC/58 pRivia CLI COW.. IC IC. 018 _ AC 5A COPY/ Pk11,111 1. DEMO ALL EXISTING RE–INSTALLATION IN 2. DEMO ALL EXISTING 3. DEMO ALL EXISTING TENANT SPACE PHVATH Ci ICL 111 C4. •) DI Icn1VA Fri 0 IHEICH 15:5] PRIVATE OFFICE 12 PlC VA! OFFICE. DIFFUSERS AND SAVE FOR NEW CEILING GRID. VAV BOXES. SPLIT SYSTEMS CURRENTLY SERVING 1Vg*r+M.fr, REVIEWED FOR 'CODE COMPLIANCE- PROV APR 17 2011 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA APR 1 1 2017 PERMIT CENTER G) INIMONIM • 0 Co I I I I I I I I I I I CNI 00 I I 00 I l< II _J UJ II _J—J H a Z Z wuJcc2 000 Z Z D D 0 0 rD (/) CO2 co co CO 03) 5 ENGINEER: G GRAHAM CHECKED BY: B GEZON CAD: D LAMBERT In 0 111 0 WA Lic No w 0 REVISIONS: 0 z 0 DRAWING NUMBER: C-2129-721 SHEET NUMBER: LAST REVISED: 04-07-17 DATE PLOTTED: 04-07-17 ISSUE DATE: 04-07-17 72092-00 IDIM2.01 J:\7217\2092 Sound Mental Health Phase 2 BJL\00\2 — Engineering\DWG\Shts\72172092TM2-01.dwg 11:30:40 AM PRIVATE OFFICE F1IVAiL C)Fi-1Cf. 116 1. I' 1'F E'IA E ')FFICH P 111//1,1 PPEOI' T E OFFICE 11 0 PRIVAT F OFFICE 108 'RIVATE O FELE 10,1 41 12X12—� --� 545 ,1' 12X12 \cp �! 415 flill =11 -jl A 12X12 11. 380 12X12 12X12 530 \ 140 VAV-101 I VAV-102,1 .12X12 "} 440 17x9SL VAV-121 i \180 P1xSOS. F VAV-122 1 102. I/I (7,I. 1).1ICI 101 12X12 -1-2X 12 (A1 ICL VAV-105 PF,i`✓ATF. OFFICE 1 PRIVATE (OF F EEL i' , ((-I1C[. VAV-118 VAV-107 CAP 1.1 —f1 r\ -.-v 12X12 600. –VAV-123 VAV-108II sX8 ® 220 E/EVr, I O1 I III)I 1.40 0 ' FN OI FICE 19 8X8 x165 VAV-109 12X12 455 17x1OSL 8X8 165 250 'CP 150 CFM 40x20 O 150 CFM 55x11.5 F 36x18 L 12X12 575 10X10 265 PRIVATE OH ICL 116 8X8. 225 VI VAV-110 10X10 "380 (IIS 79SL VAV-111 17X9SL VAV-113 17x1OS :01) `10X10 • u 370 VAV-1115 12X12 A 650 • A 10X10 275 IHIFIVAI L (,)1-1.1C,11 CONI FM. 1:181 loo COPY/ PRINT 'I SO SHEET NOTES 1. MM FIELD TO VERIFY EXISTING STRUCTURE AND ADD ALL NECESSARY DUCT TRANSITIONS. 2. ALL VAV BOXES WITH TAPS ON TOP DISCHARGE PLENUM GOING TO A SINGLE SUPPLY DIFFUSER SHALL BE SUPPLIED WITH VOLUME DAMPERS. LOCATE PLENUM SO TAP IS NOT LOCATED DIRECTLY BELOW TRUSSES. ALTERNATIVELY, A SIDE TAP WITH TRANSITION TO DUCT SIZE SHOWN CAN BE USED. MM FIELD TO VERIFY. 3. TYPICAL BOTTOM OF TRUSS IS APPROXIMATELY 9'-8.5" KEYED NOTES O EXISTING EXHAUST FAN AND TRANSFER AIR FOR ELECTRICAL ROOM TO REMAIN. VERIFY TRANSFER AIR IS BEING MAINTAINED FROM THE COMMON AREAS. 0 EXISTING RESTROOM AND JANITOR CLOSET EXHAUST TO REMAIN. VERIFY TRANSFER AIR IS BEING MAINTAINED FROM THE COMMON AREAS. 0 PROVIDE OCCUPANCY SENSOR FOR DEMAND CONTROL VENTILATION (SEE SEQUENCE OF OPERATION) FIT,U,IF O1 LICE 1541- OFFICE 151_ i REVIEWED FOR CODE COQ<JIPLIANCE AP P ECN Via} APR 1:7 2017 City of Tukwila BUILDING DIMS iON CITY OF TUKWILA APR 11 2017 PERMIT CENTER 0.050 1/8" = 1'-0" Law (D Cr) o r- , ;� cfl Qco . �' N. a) 0 N 4w� N • f0 R U) LL C O • O O 101 ¢ O G 00 2 ▪ N ca . j4 C . 0 .macmiller.com I I I I I I I I I I I I I I �I N O I 4 0 NI N 0 1 0 0 0 w w 0 I I 1 1 l< N W 9— II _! J W W \I J J Q ZZm WW% 22`1°, °O 00`6“:c \Z=3 Dog X000 v ! CO MACDOFS980RU W a REVISIONS: W 0 REVISIONS: z 0 F U F z 0 U ct 0 LL 0 W v, ENGINEER: LAST REVISED: G GRAHAM 04-07-17 CHECKED BY: DATE PLOTTED: B GEZON 04-07-17 CAD: ISSUE DATE: D LAMBERT 04-07-17 DRAWING NUMBER: 0-2129-72172092-00 SHEET NUMBER: TM2.01 J:\7217\2092 Sound Mental Health Phase 2 BJL\00\2 — Engineering\DWG\Shts\72172092TM2_02.dwg Friday, April 07. 2017 9:05:38 AM ON[ 1 I2000I 201 PPFVAv11. �)FFIC11 12 x 12 395 0111(;1. 2001 12x12 355 F''IiIVAIC. a HFCFF- 077 7. 11202 1395 0111C1 I ftI''✓J\ f: ()(I.1C1 211 212 OF ['ICI'. r 1 I cj 1 2x1 2 355 r C 1v11;:1 f; F:1,1C F ROOM 215 1,20 '`4p LJ ,,I f] H 10x10 260 (TYP 2) 10x10 195 (TYP 6) u 1.1 [. 11 it VAV- 206 12x12 410 (TYP 2) 0- VAV-204 I VAV- 208 100 10x10 3,70'LI . H F`. I rill 111111 an 100 12�SL J 24x24 TY 10x10 375 RFST `x)01;1 12x12 475 PPFORTE OFkii SHEET NOTES 1. TIME CLOCK LOCATION TO BE CONFIRMED BY OWNER. LOW VOLTAGE WIRING AND ROUTING TO EF -2 BY EC. 2. 120 EXHAUST DUCT UP TO EF -2 ON ROOF. FIELD VERIFY EXACT LOCATION AND ROUTING. /7 VAV- 209 10x10 365 (TYP 2) VAV- 202 P001.2 01, 1x145 VAV-2110 DCF 12'F OFF ICC 12x12 415 12x12 0!?F ElII70II VAV-226 16x12SL 160 CAPE 18x12SL ?I7 10X1 18x12SL 1 Ox10 ,140 10x10 270 (TYP4 NEW STAIR LOCATION I'f;IV/ICI.. LIC 12x12 475 10x10 AV -223 VAV-224 �I HD)I INC 1_ 10x10. 10x10 �l 2�0 VAV-215 VAV-)216 I ;IVATI FICE 60 1(0ki'OR E 350 N VAV 2227:71_ VAV-1218 VAV-219 VAV-217 CCM 1':11:.:N CF. 20121 1'x.12; 460 (TYP 2) 10x10 0320 (TYP 2) ThAPED OFFICE 24(1 12x12 44DIVATE OFFICE .....-.-.......-. 247 im 12x12 445 PRF✓/. i -F OFFICE C)1'41-5 OFFICE 12x12 12x1 445 '249 1 253 PRIVATE OFFICE 254 12x12 �'420\TE OFFICE 2513 REVIEWED FOR CODECCl� rb " PLIANCE A PP ,p ` s .D APR 17 2017 CAW oi Tukwila BUILDING DIVISION CITY OF TUKWILA APR 11 2017 PERMIT CENTER IT 0 �d 1/8" = 1'-0" 0• 0 ON- N - COO 0 < �~ 0 o 743 N f0 �c) ,_ C* Q� .. N.O 0 1-13 N 0 0 rd .macmiller.com N vJ I9 - II F- J _I W W Q Q 0 zZm W W� zo �a=a DDP 0 �0 o ENGINEER: G GRAHAM CHECKED BY: B GEZON CAD: D LAMBERT DRAWING NUMBER: C-2129-721 SHEET NUMBER: 1 1 1 1 1 1 I;1'INI n N 0 0 I I 0 0 0 w IC 0 w 0 MACDOFS980RU w 0 REVISIONS: w F- 0 0 REVISIONS: ISSUED FOR CONSTRUCTION LAST REVISED: 04-07-17 DATE PLOTTED: 04-07-17 ISSUE DATE: 04-07-17 72092-00 TM2.02