Loading...
HomeMy WebLinkAboutPermit M17-0056 - CASCADE VIEW ELEMENTARY - HVAC, CONDENSING UNITS ETCCASCADE VIEW ELEMENTARY 13601 32 AVE S M17-0056 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 1623049038 Permit Number: M17-0056 13601 32ND AVE S Project Name: CASCADE VIEW ELEMENTARY Issue Date: 8/14/2017 Permit Expires On: 2/10/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: TUKWILA SCHOOL DISTRICT 4640 S 144TH ST , TUKWILA, WA, 98168 ALEXANDER CLARK AIA 105 SOUTH MAIN ST #323 , SEATTLE, WA, 98116 Phone: (206) 624-4222 HOLMBERG COMPANY Phone: (425) 822-2233 15400 SE 30TH PL, STE 100 , BELLEVUE, WA, 98007 HOLMBC*066ME Expiration Date: 9/1/2017 DESCRIPTION OF WORK: PROVIDE NEW ROOF -MOUNTED HVAC, DUCTWORK, PIPING AND CONTROLS FOR A 2257 CAFETERIA ADDITION AND MINOR HVAC REVISIONS TO ADMIN AREA. REMOVE/REPLACE (8) EXISTING ROOF MOUNTED CONDENSNG UNITS. REMOVE/REPLACE EXISTING DX COILS WITHIN EXISTING AIR HANDLING UNITS SERVED BY THE CONDENSING UNITS. CAMPUS WIDE UPGRADE OF THE EXISTING DDC SYSTEM Valuation of Work: $380,859.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $4,404.12 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: 125 Sewer District: NONE,VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Permit Center Authorized Signature: te/it,r, Date: W 11 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signatur Print Name. Ac \- OP ''1 Date:�` 14/1 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ***MECHANICAL PERMIT CONDITIONS*** 11: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 12: Manufacturers installation instructions shall be available on the job site at the time of inspection. 13: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air-moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air-duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 21: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH-IN MECHANICAL 0702 SMOKE DETECTOR TEST CITY OF TU KW Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. IM 1-1-0091., Project No. Date Application Accepted: 4 Date Application Expires: 10 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 13601 32nd Ave. South, Tukwila, WA 98168 Suite Number: Floor: Tenant Name: Tukwila School District — Cioaidej V1e41/ New Tenant: ❑ Yes ®..No PROPERTY OWNER Name:AtrAvvor..g.64412x. Name: Tukwila School District City: ciotrao State: wit- Zip: rem j Address: 4640 South 144th St. Email: 4t6,,.G1...vzi‹ A.*t,uAoi%�GH1recn.cm City: Tukwila State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication • Name:AtrAvvor..g.64412x. Address: /DS S. ,ii r# 577 ovum,323 City: ciotrao State: wit- Zip: rem j Phone: .Phone: veo,,6,7,4/./. Fax: Email: 4t6,,.G1...vzi‹ A.*t,uAoi%�GH1recn.cm MECHANICAL CONTRACTOR INFORMATION Company Name: TSD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 3 0/ Ss9_ Describe the scope of work in detail: Provide new roof -mounted HVAC, ductwork, piping and controls for a 2,257 Cafeteria Addition and minor HVAC revisions to Admin area. Remove/replace (8) existing roof mounted condensing units. Remove/replace existing DX coils within existing air handling units served by the condensing units. Campus -wide upgrade of the existing DDC system. Use: Residential: New ❑ Replacement ❑ Commercial: New Replacement Fuel Type: Electric ® Gas ❑ Other: H:WpplicationsWorms-Applications On Linc\2016 Applications\Mechanical Pcrmit Application Rcviscd 1-4-16.docx Rcviscd: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu 15 Floor furnace 1 Suspended/wall/floor mounted heater 57 dB(A) Appliance vent 1 Repair or addition to heatlrefrig/cooling system 8 Air handling unit 65 dB(A) <10,000 cfm 1 Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm 15 Evaporator cooler 1 Ventilation fan connected to single duct 57 dB(A) Ventilation system 1 Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser 15 Thermostat 1 Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE ST TE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTH O D Signature: Print Name: Mailing Address: l6 7 .5"-Dtit4i Pe A7, eI • 4 H:\Applications\Fortns-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Day Telephone:gob z City `� es �/ Date: t, VN/L, State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $5,767.50 M17-0056 Address: 13601 32ND AVE S Apn: 1623049038 $3,557.17 MECHANICAL $3,387.78 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $3,354.63 TECHNOLOGY FEE $169.39 TECHNOLOGY FEE R000.322.900.04.00 0.00 $169.39 M17-0057 Address: 3825 S 128TH ST Apn: 2384200010 $1,943.18 MECHANICAL $1,850.65 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $1,817.50 TECHNOLOGY FEE $92.53 TECHNOLOGY FEE R000.322.900.04.00 0.00 $92.53 M17-0058 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 $267.15 MECHANICAL $254.43 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $221.28 TECHNOLOGY FEE $12.72 TECHNOLOGY FEE R000.322.900.04.00 TOTAL FEES PAID BY RECEIPT: R12125 0.00 $12.72 $5,767.50 Date Paid: Monday, August 14, 2017 Paid By: HOLMBERG COMPANY Pay Method: CHECK 65743 Printed: Monday, August 14, 2017 12:02 PM 1 of 1 CSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS • I ACCOUNT PermitTRAK QUANTITY PAID $3,438.09 D17-0110 Address: 4242 5 144TH ST BLDG 1 ; °Apn: 1523049108 . $569.36 DEVELOPMENT • $569.36 PERMIT FEE R000.322.100.00.00 0.00 $69.83 PLAN CHECK FEE R000.345.830.00.00 0.00 $499.53 EL17-0308 Address: 13601 32ND AVE S • ;Apn: 1623049038 _ $868.20 ELECTRICAL $868.20 PLAN CHECK FEE I R000.345.832.00.00 0.00 $868.20 EL17-0309 Address: 12801 E MARGINAL WAY S" Apn: 2384200010 $407.60 ELECTRICAL r $407.60 PLAN CHECK FEE I R000.345.832.00.00 0.00 $407.60 EL17-0310 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 . $109.92 ELECTRICAL $109.92 PLAN CHECK FEE I R000.345.832.00.00 0.00 $109.92 M17-0056 Address: 13601 32ND AVE S Apn:-'1623049038 $846.95 MECHANICAL $846.95 PLAN CHECK FEE I R000.322.102.00.00 0.00 $846.95 M17-0057 Address: 12801 E MARGINAL WAY 5 . Apn: 2384200010 $462.66 MECHANICAL $462.66 PLAN CHECK FEE R000.322.102.00.00 0.00 $462.66 M17-0058 Address: 4242 S 144TH ST BLDG 1 tApn: 1523049108 ; . $63.61 MECHANICAL $63.61 PLAN CHECK FEE R000.322.102.00.00 0.00 $63.61 PG17-0048 Address: 12801 E MARGINALWAY 5 Apn: 2384200010 • •$109.79 . • ` PLUMBING $109.79 PLAN CHECK FEE R000.322.103.00.00 TOTAL FEES PAID BY RECEIPT: R11350 0.00 $109.79 $3,438.09 Date Paid: Tuesday, April 25, 2017 Paid By: TUKWILA SCHOOL DISTRICT Pay Method: CHECK 95046 Printed: Tuesday, April 25, 2017 12:59 PM 1 of 1 CArirWSYSTEMS (DO INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: CAscitfpe 01-1111 Rhe% Type of Inspection: EM,1z c_ HANloti.=- eN K - r ►, lis,C46 /s'4V/1 P. r icK, Address: Date Called: Special Instructions: Date Wanted: t 3 -S-/ 7 a. p.m Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ck - s- evtokir Dere‹ 7Vr2S. P/T'CSl"" 75 eN K - r ►, lis,C46 /s'4V/1 P. r icK, OK F ria ct-4AJ'C.4L F'I NA t_.. Inspector: tp" Date: G `/7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 r1417-o65Z0 Project: ielSC4-PE V 11' /4 !7 Type of Inspection: .R FR10-RM7Ofii a -w o Address: /36,6/ 3,2ND C Si Date Called: / Special Instructions: ,0-1-c- 14)1t. +/ 611 S77 Date Wanted: /6-17-7 an p.m. Requester: 6/ -VII 6 -- / /!- Phone No: Phone .(340--..s--7,6-- tnoz Approved per applicable codes. E Corrections required prior to approval. COMMENTS: ?%- / ro/ L,E't) 0 3 &t) D / C 1950/ WO PissUrer% inspector: -5 Date: /0-17 /7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: c C:A 111 Type of Inspection: /R451)iiigCH 1 's C4 L Address:, /34/ 3ltirAV, S Date Called: Special Instructions: MDG- A- Date Wanted: V—Z 2-`% 7 a.m. p.m. Requester: Phone No: C _:.1 Approved per applicable codes. Corrections required prior to approval. COMMENTS: o)K- ? i) ac- -/mo i '/4'J/C4-(___ inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be.; paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit I7 -W Mao PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P ject: VAbe Uri J �H Tyke off Inspection: 64 - Ai, Mai tb4 AL. Address: i 3el TiNb Aug S Date Called: Special Instructions: L%ir'.0 '' 4f151-14-' g.',6 r Date Wa e z:0/17 � � 7 Request Air-A.)01lb kArtaidS Phone No: 21)6— 7 -- 71 7P 2 Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: 0E4- R6064+ lr kcl1WJLc Z - Inspector: ,c.. K5 Date: 8-422-/ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0056 DATE: 04/28/17 PROJECT NAME: CASCADE VIEW ELEMENTARY SITE ADDRESS: 13601 32ND AVE S X . Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works k PM() qV Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable El (no approval/review required) DATE: 05/02/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved DUE DATE: 05/30/17 ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire ❑ Ping ❑ PW 0 , Staff Initials: 12/18/2013 HOLMBERG COMPANY Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & industries Search L&I Al, Index Help Page 1 of 3 My 1.,&[ Workplace Rights Trades & Licensing HOLMBERG COMPANY Owner or tradesperson Principals WHITE, JEFF K, PRESIDENT BAILOR, WADE WAYNE, VICE PRESIDENT TOBIN, MARK ALLEN, SECRETARY HOLMBERG, A PHER, VICE PRESIDENT (End: 07/30/2015) WHITE, DIANA, SECRETARY (End: 07/30/2015) HOLMBERG, KANDICE K, SECRETARY (End: 07/30/2015) VARRIANO, JON S, TREASURER (End: 07/30/2015) Doing business as HOLMBERG COMPANY WA UBI No. 174 003 387 15400 SE 30TH PL, SUITE 100 BELLEVUE, WA 98007 425-822-2233 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ........................ ........................................ Meets current requirements. License specialties GENERAL License no. HOLMBC*066ME Effective — expiration 07/05/1994— 09/01/2019 Bond HANOVER INSURANCE COMPANY THE Bond account no. 1959086 Received by L&1 07/18/2011 Bond history Insurance American Fire & Casualty Co Policy no. BKA55653106 $12,000.00 Effective date 09/01/2011 Expiration date Until Canceled $1,000,000.00 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=174003387&LIC=HOLMBC*066ME&SAW= 8/14/2017 HOLMBERG COMPANY Received by L&I Effective date 07/24/2017 09/01/2013 Expiration date 09/01/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings Cause no. 15-2-00439-2 Complaint filed by DJ MECHANICAL INC Complaint date 03/13/2015 Dismissed, Complaint against bond(s) or savings 1959086 Complaint amount $49,186.06 L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations ................................._..............._... No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. This company has multiple workers' comp accounts. Active accounts L&I Account ID 104,069-02 ................................. Doing business as HOLMBERG CO Estimated workers reported Quarter 2 of Year 2017 "76 to 100 Workers" L&I account contact T1 / JAN BENTLEY (360)902-4652 - Email: STRO235@Ini.wa.gov Track this contractor Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes .................................._..._.............. No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/17/2013 Inspection no. 316854116 Location 1906 NE 45th Seattle, WA 98105 Inspection results date 04/03/2012 Inspection no. 315796003 Location 1415 5th Avenue Seattle, WA 98101 Violations No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=174003387&LIC=HOLMBC*066ME&SAW= 8/14/2017 MECHANICAL ABBREVIATIONS 0 A AAV ABV AD ADA AFF AHJ AHU APPROX ARCH ASHRAE B BDD BF BFF BLDG BLW BOD BOP BOT C CAP CBV CD CFM CL CLG CO COND CONN CU CV CW DB DEPT DF DFU DIFF DIM DN DX DWG (E) EA EAT ECG EF EFF EG ELEC ELEV EMCS ENT ESP EWT EX EXT °F FC FCO FD F/D FLA FLR FLEX FPM FS F/S/D FOIC FV G GAL GC GPM GR GRD GWH HB HC HD HOR HP HVAC HW HWC I.E. KW DIAMETER, PHASE AIR AUTOMATIC AIR VENT ABOVE AREA DRAIN, ACCESS DOOR AMERICANS WITH DISABILITIES ACT ABOVE FINISHED FLOOR AUTHORITY HAVING JURISDICTION AIR HANDLING UNIT APPROXIMATE ARCHITECT AMERICAN SOCIETY OF HEATING, REFRIG. AND AIR-CONDITIONING ENGINEERS, INC. BOILER BACKDRAFT DAMPER BELOW FLOOR BELOW FINISHED FLOOR BUILDING BELOW BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM CONDENSATE PIPING CAPACITY CIRCUIT BALANCING VALVE CEILING DIFFUSER CUBIC FEET PER MINUTE CENTER LINE CEILING CLEANOUT CONDENSATE CONNECTION CONDENSING UNIT, CUBIC CHECK VALVE, CONSTANT VOLUME DOMESTIC COLD WATER DRY BULB DEPARTMENT DRINKING FOUNTAIN DRAINAGE FIXTURE UNIT DIFFERENTIAL DIMENSION DOWN DIRECT EXPANSION DRAWING EXISTING EACH, EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE EXHAUST FAN EFFICIENCY EXHAUST GRILLE ELECTRIC ELEVATION ENERGY MANAGEMENT CONTROL SYSTEM ENTERING EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE EXHAUST EXTERIOR, EXTERNAL DEGREES FAHRENHEIT FLEXIBLE CONNECTOR FLOOR CLEANOUT FLOOR DRAIN FIRE DAMPER FULL LOAD AMPS FLOOR FLEXIBLE FEET PER MINUTE FLOOR SINK COMBINATION FIRE SMOKE DAMPER FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FACE VELOCITY GAS GALLON GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GRILLES, REGISTERS, AND DIFFUSERS GAS WATER HEATER HOSE BIBB HEATING COIL HEAD HORIZONTAL HEAT PUMP, HORSEPOWER HEATING, VENTILATION & AIR CONDITIONING DOMESTIC HOT WATER DOMESTIC HOT WATER CIRCULATING INVERT ELEVATION KILOWATT L LAT LB LL LVR LWT MAT MAX MBH MECH MED MERV MIN MISC MPG MU (N) NA NEG NO NO. NP NTS OA OAT OCC OSA PD PERF PH PIV POC PRESS PRV PSI PU QTY R RA RAF RAG RCP RD REF REL RET RG RH RM ROD RPBA RPBP RPM RTU SA SAD SCH S/D SF SG SL SMACNA SP SPEC SQ SUP TAB TEMP TG TPRV TSP T'STAT TYP UNOCC V VAV VD VEL VENT VFD VTR W WCO W/O WPD WSEC WSFU WT WTD LENGTH LEAVING AIR TEMPERATURE POUND REFRIGERANT LIQUID LINE LOUVER LEAVING WATER TEMPERATURE MIXED AIR TEMPERATURE MAXIMUM THOUSANDS OF BTUH MECHANICAL MEDIUM MINIMUM EFFICIENCY REPORTING VALUE MINIMUM MISCELLANEOUS MEDIUM PRESSURE GAS MAKEUP WATER NEW NOT APPLICABLE NEGATIVE NORMALLY OPEN NUMBER NON -POTABLE NOT TO SCALE OUTSIDE AIR OUTSIDE AIR TEMPERATURE OCCUPIED OUTSIDE AIR PRESSURE DROP PERFORATED PHASE POST INDICATOR VALVE POINT OF CONNECTION PRESSURE PRESSURE REDUCING VALVE POUNDS PER SQUARE INCH PUMP QUANTITY REFRIGERANT PIPING RETURN AIR RETURN/RELIEF AIR FAN RETURN AIR GRILLE REFLECTED CEILING PLAN ROOF DRAIN REFERENCE, RETURN/EXHAUST FAN RELIEF RETURN RETURN GRILLE ROOF HOOD ROOM ROOF OVERFLOW DRAIN REDUCED PRESSURE BACKFLOW ASSEMBLY REDUCED PRESSURE BACKFLOW PREVENTER REVOLUTIONS PER MINUTE ROOFTOP UNIT SUPPLY AIR SUPPLY AIR DIFFUSER SCHEDULE SMOKE DAMPER SUPPLY FAN, SQUARE FOOT SUPPLY GRILLE REFRIGERANT SUCTION LINE SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, INC. STATIC PRESSURE SPECIFICATION SQUARE SUPPLY TESTING, ADJUSTING AND BALANCING TEMPERATURE TRANSFER GRILLE TEMPERATURE/PRESSURE RELIEF VALVE TOTAL STATIC PRESSURE THERMOSTAT TYPICAL UNOCCUPIED VENT, VOLTS VARIABLE AIR VOLUME UNIT VOLUME DAMPER VELOCITY VENTILATION, VENTILATOR VARIABLE FREQUENCY DRIVE VENT THRU ROOF WASTE, WATT, WIDTH WALL CLEANOUT WITHOUT WATER PRESSURE DROP WASHINGTON STATE ENERGY CODE WATER SUPPLY FIXTURE UNIT WEIGHT WATER TEMPERATURE DROP MECHANICAL LEGEND REFERENCE SYMBOLS AHU NEW MECHANICAL WORK ENLARGED PLAN BORDER DETAIL OR DRAWING IDENTIFIER EQUIPMENT IDENTIFIER POINT OF CONNECTION PLUMBING SL LL C DOMESTIC COLD WATER DOMESTIC HOT WATER HOT WATER RECIRC SANITARY SEWER ABOVEGROUND SANITARY SEWER UNDERGROUND VENT PIPING RAIN WATER LEADER OVERFLOW RAIN WATER LEADER HVAC PIPING HWR HWS G REFRIGERATION PIPING - SUCTION REFRIGERATION PIPING - LIQUID CONDENSATE DRAIN HEATING WATER RETURN HEATING WATER SUPPLY GAS FIRE PROTECTION F FIRE SPRINKLER PIPING ELEMENTS D4 VALVE AAV 0 CO VALVE RELIEF/SAFETY VALVE AUTOMATIC AIR VENT (EXTEND DISCHARGE TO DRAIN) DIRECTION OF FLOW STRAINER WITH BLOW OFF VALVE UNION HOSE BIBB FLOOR DRAIN CLEAN-OUT (FLOOR) tPIPE CONTINUES PIPE CAP o PIPE RISING UP PIPE DROPPING DOWN DUCTWORK V av P Y �) COMBINATION FIRE/SMOKE DAMPER (CFSD) MANUAL VOLUME DAMPER MOTOR OPERATED DAMPER DUCT SMOKE DETECTOR RECTANGULAR DUCT UP RECTANGULAR DUCT DOWN ROUND DUCT UP ROUND DUCT DOWN GRD SYMBOLS [E] CONTROLS SUPPLY DIFFUSER RETURN OR RELIEF GRILLE EXHAUST GRILLE VFD 0 VARIABLE FREQUENCY DRIVE DIRECT DIGITAL CONTROL PANEL CONTROL WIRING ROOM THERMOSTAT ROOM SENSOR MECHANICAL GENERAL NOTES: 1. STANDARD CURRENT TRADE PRACTICES & METHODS APPLY TO THIS PROJECT. ALL WORK IS TO MEET REQUIREMENTS OF ALL CURRENT CODE & LOCAL JURISDICTIONAL REQUIREMENTS AND AMENDMENTS. THESE CODES INCLUDE BUT ARE NOT LIMITED TO WASHINGTON STATE ENERGY CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, UNIFORM PLUMBING CODE, NFPA, INTERNATIONAL FIRE CODE, & LOCAL JURISDICTIONAL REQUIREMENTS. COMPLY WITH ALL MANUFACTURER'S REQUIREMENTS. COORDINATE WITH OWNER'S REPRESENTATIVE FOR ANY VARIANCES. 2. DRAWINGS ARE DIAGRAMMATIC ONLY & NOT INTENDED TO SHOW ALL DETAILS OF THE WORK. VERIFY LOCATION & MEASUREMENTS OF ALL ITEMS ON THE JOB SITE PRIOR TO INSTALLATION. CONTRACTOR SHALL PROVIDE ALL OFFSETS & ADDITIONAL DUCTWORK & PIPING AS NECESSARY TO AVOID STRUCTURAL ELEMENTS ON THE PROJECT. CONTRACTOR SHALL PRODUCE SHOP DRAWINGS & COORDINATE WITH OTHER TRADES. THERE SHALL BE NO ADDITIONAL COST TO THE OWNER FOR THIS COORDINATION OR FOR EXTRA MATERIAL REQUIRED IN ORDER TO ACCOMPLISH THIS TASK. 3. PROVIDE COMPLETE & FULLY -OPERATING SYSTEMS. 4. COORDINATE LOCATIONS OF ALL EQUIPMENT & APPURTENANCES WITH OTHER TRADES. 5. ALL EQUIPMENT SHALL BE REGULARLY CATALOGED ITEMS OF THE MANUFACTURER & SHALL BE SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD SPECIFICATIONS. ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION SHALL BE INCLUDED UNLESS OTHERWISE NOTED. 6. ANY CUTTING, PATCHING & PAINTING OF BUILDING ELEMENTS & FINISHED SURFACES IS TO BE DONE BY THE GENERAL CONTRACTOR. 7. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE. 8. ALL EQUIPMENT SHALL BE LABELED PER PLANS & THE REQUIREMENTS OF THE SPECIFICATIONS. 9. RATING OF ACCESS DOORS AND/OR ACCESS PANELS THROUGH FIRE -RATED WALLS, SHAFTS, CEILINGS, ETC., MUST EQUAL THE FIRE RATING OF THE MATERIAL PENETRATED. 10. CAULK & FLASH ALL PENETRATIONS PER CODE. 11. ADJUSTING & BALANCING: ADJUST EACH PART OF SYSTEM TO ENSURE PROPER FUNCTIONING OF ALL CONTROLS & SPECIFIED AIR DISTRIBUTION. LEAVE ENTIRE SYSTEM IN OPERATING CONDITION. 12. PROVIDE OPERATING & MAINTENANCE MANUALS (O&MS), RECORD DRAWINGS, & OWNER TRAINING PER WSEC. 13. PROVIDE NATIONAL ELECTRICAL CODE (NEC) MINIMUM WORKING CLEARANCE IN FRONT OF ANY ELECTRICAL PANEL, INCLUDING PANELS ON EQUIPMENT. RE-ROUTE OR OFFSET PIPING AND/OR DUCTWORK AS REQUIRED. 14. HEAT -TRACED SYSTEMS SHALL MEET THE INSULATION THICKNESS REQUIREMENTS OF THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. UNTRACED PIPING WITHIN A HEAT -TRACED SYSTEM SHALL BE INSULATED WITH NOT LESS THAN 1" OF INSULATION. 15. SERVICE WATER PIPING INSULATION CONDUCTIVITY IS NOT TO EXCEED 0.27 BTU PER INCH/H*SQ.FT*DEGREE F. INSULATION THICKNESS SHALL BE PER TABLE C403.2.9. 16. PROTECT PIPING INSULATION PER REQUIREMENTS OF WSEC C403.2.9.1 17. PROVIDE COMMISSIONING OF THE HVAC SYSTEM. INCLUDE FUNCTIONAL TESTING SEQUENCE OF OPERATION & TEST PROCEDURES PER WASHINGTON. STATE ENERGY CODE SEE SPECIFICATIONS FOR SPECIFIC EQUIPMENT TESTING REQUIREMENTS. ITEMS TO BE COMMISSIONED ARE: CONTROL SYSTEMS, AIR HANDLERS, HEAT PUMPS, EXHAUST FANS, PUMPS, CONDENSING UNITS, MAKE-UP AIR UNITS, BOILERS, AND WATER HEATERS. AIR AND HYDRONIC SYSTEMS SHALL BE BALANCED SO AS TO FIRST MINIMIZE THROTTLING LOSSES, THEN ADJUSTED TO MEET DESIGN FLOW CONDITIONS. PROVIDE PRELIMINARY AND FINAL COMMISSIONING REPORTS. SUBMIT FIGURE C408.1.2.1 COMPLIANCE CHECKLIST FROM WASHINGTON STATE ENERGY CODE TO AUTHORITY HAVING JURISDICTION UPON COMPLETION OF PRELIMINARY COMMISSIONING REPORT. PROVIDE CLOSEOUT DOCUMENTS IN COMPLIANCE WITH C103.6. 18. PROVIDE AIR SYSTEM BALANCING DEVICES, INCLUDING VOLUME DAMPERS, AND ZONE DAMPERS ON TERMINALS AS SHOWN ON PLANS. 19. CEILING FANS, EQUIPMENT, DIFFUSERS, & GRILLES SHALL BE COORDINATED WITH PLACEMENT OF LIGHT FIXTURES. 20. VENTILATION SHALL BE PROVIDED PER IMC CHAPTER 4. MECHANICALLY VENTILATED SYSTEMS SHALL BE CAPABLE OF REDUCING THE OUTDOOR AIR SUPPLY TO THE MINIMUM REQUIRED BY CHAPTER 4 OF THE IMC. 21. OUTSIDE AIR ECONOMIZERS SHALL INCLUDE AUTOMATICALLY MODULATING OUTSIDE & RETURN/RELIEF AIR DAMPERS ARRANGED TO PROVIDE 100% OF THE DESIGN SUPPLY AIR FLOW, & SYSTEM SHALL INCLUDE CONTROLS FOR ECONOMIZER OPERATION. 22. AIR ECONOMIZERS ON SYSTEMS GREATER THAN 65,000 BTUH SHALL PROVIDE PARTIAL COOLING WHEN MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD. 23. PROVIDE COMBINATION FIRE & SMOKE DAMPERS (CFSD) AND/OR FIRE DAMPERS WHERE REQUIRED BY COPE. FIRE SPRINKLER GENERAL NOTES OUTSIDE AIR SUPPLY, EXHAUST OPENINGS, RELIEF OUTLETS, STAIRWAY AND SHAFT VENTS AND RETURN OPENINGS USED FOR AIRSIDE ECONOMIZER SHALL BE PROVIDED WITH CLASS I MOTORIZED DAMPERS IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE C403.2.4.3. CLASS I DAMPERS SHALL HAVE A MAXIMUM LEAKAGE RATE OF 4 CFM/SQ.FT. @ 1.0" W.C. SEE DRAWINGS FOR DAMPER LOCATIONS. 1. INTAKE OPENINGS SHALL BE LOCATED A MINIMUM OF 20 FEET FROM LOT LINES OR BUILDING ON THE SAME LOT. WHERE OPENINGS FRONT ON A STREET OR PUBLIC WAY, THE DISTANCE SHALL BE MEASURED TO THE CENTERLINE OF THE STREET OR PUBLIC WAY. 2. MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE OPENINGS SHALL BE LOCATED NOT LESS THAN 10 FEET HORIZONTALLY FROM ANY HAZARDOUS OR NOXIOUS CONTAMINANT SOURCE. EXCEPT AS NOTED IN ITEM 3. 3. INTAKE OPENINGS SHALL BE LOCATED NOT LESS THAN 3 FEET BELOW CONTAMINANT SOURCES WHERE SUCH OPENINGS ARE LOCATED WITHIN 10 FEET OF THE OPENING. 4. INTAKE OPENINGS ON STRUCTURES IN FLOOD HAZARD AREAS SHALL BE AT OR ABOVE DESIGN FLOOD LEVEL. 5. ENVIRONMENTAL AIR (RELIEF AIR) SHALL BE A MINIMUM OF 3 FT FROM OPERABLE OPENINGS INTO BUILDING FOR ALL OCCUPAISCIES OTHER THAN GROUP U AND 10 FEET FROM MECHANICAL AIR INTAKES. 1. FIRE SPRINKLER SYSTEM ISA PERFORMANCE SPECIFICATION. CONTRACTOR IS RESPONSIBLE FOR FULLY COMPLIANT SYSTEM DESIGN AND INSTALL. 2. DIAGRAMMATIC ROUTING OF CONCEALED PIPING IS FOR REFERENCE ONLY. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE ROUTING WITH OTHER TRADES; PROVIDE PIPE OFFSETS AND COVERAGE AS REQUIRED. PIPING AND HEAD LOCATIONS SHALL NOT OBSTRUCT ACCESS TO MECHANICAL EQUIPMENT ABOVE CEILINGS. 3. PROVIDE SPRINKLER PROTECTION FOR ALL AREAS OF THE BUILDING INCLUDING VOID SPACES, GARAGE, CEILING SPACES, ATTIC SPACES, ETC. IN COMPLIANCE WITH NFPA 13 REQUIREMENTS. 4. SPRINKLER SYSTEM SHALL COMPLY WITH REQUIREMENTS OF NFPA 13 AND AUTHORITY HAVING JURISDICTION (AHJ), CITY OF TUKWILA FIRE MARSHALL. 5. SPRINKLER CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES PRIOR TO INSTALLATION. HVAC WORK SHALL TAKE PRECEDENCE. SPRINKLER PIPING INSTALLED WITHOUT PROPER COORDINATION SHALL BE SUBJECT TO REMOVAL AND REINSTALLATION AT NO COST. 6. FIRE SPRINKLER CONTRACTOR SHALL PROVIDE COMPLETE SHOP DRAWINGS TO THE ARCHITECT FOR APPROVAL PRIOR TO SUBMITTING TO THE JURISDICTION. 7. ALL EXPOSED SPRINKLER PIPING SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. THERE SHALL BE NO EXPOSED PIPING IN OCCUPIED FINISHED SPACES UNLESS APPROVED BY ARCHITECT. SPRINKLER PIPING INSTALLED WITHOUT PROPER COORDINATION AND APPROVAL SHALL BE SUBJECT TO REMOVAL AND REINSTALLATION AT NO COST. 8. PROVIDE SEISMIC FLEXIBLE PIPE CONNECTIONS TO SPRINKLER HEADS IN CEILINGS. 9. MAINTAIN FIRE AND SMOKE RATINGS OF WALLS. 24. TEMPERATURE CONTROLS SHALL BE MINIMUM OF 7 -DAY PROGRAMMABLE TYPE PROVIDING SETPOINT TEMPERATURES, NIGHT SETBACK, MANUAL OVERRIDE, & MINIMUM 5 -DEGREE DEADBAND. CONTROLS SHALL ALLOW FOR OPTIMUM START. 25. HEAT PUMPS WITH AUXILIARY ELECTRIC HEAT SHALL HAVE CONTROLS COMPLYING WITH WSEC C403.2. 26. SEAL & TEST ALL DUCTWORK AS REQUIRED PER IMC, WSEC C403.2.8.3 LEAKAGE REQUIREMENTS, & IBC VAPOR RETARDER REQUIREMENTS. DUCTWORK DESIGN PRESSURE IS 2". 27. ALL SHEET METAL DUCTWORK SHALL BE INSULATED IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE. CONCEALED DUCTWORK LOCATED WITHIN THE CONDITIONED SPACE SHALL BE INSULATED WITH A MINIMUM OF R-3.3. DUCTWORK LOCATED IN UNCONDITIONED SPACES SHALL BE INSULATED WITH A MINIMUM OF R-6. WHERE LOCATED OUTSIDE OF THE BUILDING, DUCTWORK SHALL BE INSULATED WITH A MINIMUM OF R-8. 28. SOUND -LINE ALL SUPPLY, RETURN, OR EXHAUST DUCT WITHIN 10' OF FANS UNLESS NOTED OTHERWISE. 29. ALL SHEET METAL PRODUCTS SHALL COMPLY WITH SMACNA DUCT CONSTRUCTION STANDARDS, CURRENT EDITION. 30. ALL RECTANGULAR DUCTWORK SIZES SHOWN ARE GALVANIZED SHEET METAL UNLESS NOTED OTHERWISE. ROUND DUCT SHALL BE SHEET METAL. PROVIDE TURNING VANES IN ALL ROUND 2 -PIECE AND RECTANGULAR 90 DEGREE ELBOWS. 31. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 32. WHERE FLEXIBLE DUCT IS SHOWN AT GRILLES, REGISTERS, AND DIFFUSERS, PROVIDE 6' MAXIMUM LENGTH OF FLEXIBLE DUCT. 33. PROVIDE FLEXIBLE CONNECTORS AT DUCT CONNECTIONS TO ALL AIR HANDLING EQUIPMENT. 34. SUPPORT FOR SUSPENDED EQUIPMENT SHALL INCLUDE APPURTENANCES AS NOTED IN ASHRAE AND REQUIRED IN CODE FOR SEISMIC/SWAY BRACING. 35. PROVIDE VOLUME DAMPERS AT ALL GRILLES, REGISTERS, & DIFFUSERS. 36. MOTORIZED DAMPERS SHALL BE CLASS 1 AND HAVE A MAXIMUM LEAKAGE RATE OF 4 CFM/SQUARE FOOT AT 1.0" W.G. 37. ALL COMPLEX SYSTEMS EQUIPPED WITH DDC SYSTEMS AND ALL BUILDINGS WITH TOTAL COOLING CAPACITY EXCEEDING 780,000 BTUH SHALL HAVE ALL INPUT AND OUTPUT POINTS ACCESSIBLE FOR TRENDING, AND SHALL INCLUDE A GRAPHIC TRENDING PACKAGE. SYSTEM SHALL INCLUDE DEMAND RESPONSE SETPOINT ADJUSTMENT AS NOTED IN WSEC C403.2.4.10. 38. REFERENCE BUILDING HVAC LOAD CALCULATIONS FOR EQUIPMENT CAPACITIES. NO HUMIDIFICATION PROVIDED. NO SIMULTANEOUS HEATING/COOLING ALLOWED. 39. CONTROLS SHALL CLOSE ALL OSA DAMPERS WHEN EQUIPMENT IS NOT RUNNING IN COMPLIANCE WITH C403.2.4.3 FILE COPY Pernet i®. lv l `-HDOC' 'C Plan re/ia/ c:',.. :1 i s subject to errors and omissions. Approval of c n : ; on documents dogs not authorize the violation of any adopted code or ordinance. Receipt of approved EA Coo y and conditio is acknowledged: / / n Date:. t4 17 City of Tukwila BUILDING DIVISION REVISIONS -� No changes shall he made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions Wiil require a new plan submittal and may inc ude additional pian reviekv fees , SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical EirElectrical SePiumbing Eilas Piping City of Tukwila BUILDING DIVISION architecture planning interior des"gn 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www,treswest.com REVISION MECHANICAL SHEET LIST: CM0.01 MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES & SHEET LIST CM0.02 MECHANICAL SCHEDULES CM0.03 MECHANICAL SCHEDULES CMCF.01 MECHANICAL COMPLIANCE FORMS (WASHINGTON STATE - NREC) CMCF.02 MECHANICAL COMPLIANCE FORMS (WASHINGTON STATE - NREC) CMD1.01 MECHANICAL DEMOLITION - MECHANICAL ROOF PLAN - BUILDINGS A/B CMD1.02 MECHANICAL DEMOLITION - MECHANICAL ROOM & ROOF PLAN - BUILDING C CMD1.03 MECHANICAL DEMOLITION - MECHANICAL ROOM & ROOF PLAN - BUILDING D CMD1.04 MECHANICAL DEMOLITION - MECHANICAL ROOM & ROOF PLAN - BUILDING E CM3.01 DEMOLITION & NEW -HVAC FLOOR PLAN - BUILDINGS A/B CM4.01 MECHANICAL ROOM & ROOF PLAN - BUILDINGS A/B CM4.02 MECHANICAL ROOM & ROOF PLAN - BUILDING C CM4.03 MECHANICAL ROOM & ROOF PLAN - BUILDING D CM4.04 MECHANICAL ROOM & ROOF PLAN - BUILDING E CM5.01 DDC UPGRADES PLAN - BUILDINGS A & C CM5.02 DDC UPGRADES PLAN - BUILDINGS B & D CM5.03 DDC UPGRADES PLAN - BUILDING E CM5.04 DDC UPGRADES - OVERALL ATTIC PLAN - EXISTING CM7.01 PARTIAL FIRE PROTECTION PLAN - BUILDINGS A/B CM9.01 MECHANICAL DETAILS •� Design: Drawn: Checked: Project No. RSH RSH •DMMPECEIVED CITY OF TUKWILA APR 25 2017 Issuance PERMIT S Date: 4/1 OR CODE C*MPLIANC APPROVED MAY 0 9 2017 .,, J FR - 201q of Tukwila UILDING DIVISION Drawing Title MECHANICAL LEGEND, ABBRV. & NOTES Drawing Number CM0.01 CM0.01 MECHANICAL LEGEND.DWG 2 0 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC PACKAGED ROOFTOP HEAT PUMP SCHEDULE TAG AREA SERVED LOCATION MANUFACTURER / MODEL MIN OA AIRFLOW (CFM) SUPPLY FAN EXHAUST FAN HEATING COOLING AUXILIARY/DEFROST HEAT ELECTRICAL FILTERS (MERV 8) (#-LxW) (#-INxIN) DIMENSIONS (LxWxHT) (INxINxIN) UNIT WEIGHT (LBS) REMARKS AIRFLOW (CFM) ESP (IN) MOTOR (#-HP) MAX SPEED (RPM) AIRFLOW (CFM) ESP (IN) MOTOR (#-HP) MAX SPEED (RPM) OUTPUT CAPACITY (MBH) EAT/LAT DB (°F) COP TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH) EAT DB/WB (°F) LAT DB/WB (°F) EER/ IEER SIZE (kW) TOTAL CAPACITY (MBH) EAT/LAT DB (°F) MCA (AMPS) MOP (AMPS) VOLTAGE/ PHASE (V/0) HP -B01 CAFETERIA BUILDING B ROOF DAIKIN APPLIED DPS010A CO2 3800 1.50 4.0 HP 1213 1200 0.50 2.3 HP N/A 102.2 70/96.3 3.42 123.06 108.17 80/64 52.5/52.3 11.7/18.0 36.0 122.86 60/91.5 76.6 80.0 460/3 6 - 18x24 91x97x57 2800 SEE NOTES NOTES: 1) PROVIDE WITH A VISIBLE NAMEPLATE INDICATING THE SHORT CIRCUIT CURRENT RATING (SCCR) IN ACCORDANCE WITH UL REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR MINIMUM RATINGS. UNIT SCCR RATING; 5kAIC 2) DIVISION 26 SHALL PROVIDE DISCONNECTS. 3) UNIT SHALL BE SEISMICALLY ANCHORED TO ROOF. PROVIDE MANUFACTURER'S ROOF CURB. 4) PROVIDE WITH 100% OSA ECONOMIZER, FULLY MODULATING. 5) PROVIDE WITH "SINGLE -ZONE VAV" CONTROL SEQUENCING, SCR CONTROL FOR AUXILIARY HEAT AND BACNET/MSTP CARD. 6) THE FOLLOWING SHALL BE PROVIDED BY MANUFACTURER, JNSTALLED BY CONTRACTOR: LOW LEAK ECONOMIZER KIT, DRY BULB. 7) PROVIDE WITH POWERED EXHAUST FOR RELIEF AIR UNDER ECONOMIZER FUNCTIONS. 8) PROVIDE WITH DUCT SMOKE DETECTOR, MOUNTED ON RETURN SIDE OF FAN. SEE DRAWINGS FOR LOCATION. 9) HEATING SHALL BE STAGED. AUXILARY HEAT SHALL BE EQUIPED WITH OUTSIDE AIR TEMP LOCKOUT ABOVE 40°F • 10) INTEGRATED ECONOMIZER CONTROLS SHALL AUTOMATICALLY MODULATE OUTSIDE AND RETURN/RELIEF DAMPERS. DAMPER ARRANGEMENT SHALL PROVIDE UP TO 100% OF THE DESIGN SUPPLY AIR FLOW. OUTSIDE AIR DAMPER SHALL CLOSE WHEN OUTDOOR AIR TEMPERATURES EXCEEDS 75°F. OUTSIDE AIR DAMPER SHALL BE CLOSED DURING HEATING. AIR-COOLED CONDENSING UNIT SCHEDULE TAG UNIT SERVED LOCATION EXISTING MANUFACTURER/MODEL & MBH CAPACITY MANUFACTURER/MODEL COOLING RATED AIRFLOW COND. FANS (# / CFM) COMP. (# OF) ELECTRICAL DIMENSIONS @ CURB (LxWxHT) (INxINxIN) WEIGHT (LBS) REMARKS COOLING TONNAGE (# OF) COOLING CIRCUITS (# OF) GROSS CAPACITY (MBH) EER COMP. RLA (AMPS) COND. FLA (AMPS), UNIT FLA (AMPS) MCA (AMPS) MOP (AMPS) VOLTAGE/ PHASE V/0 CU -A01 (E) AHU-A01 BUILDING "A" ROOF TRANE TTA - 150B4 (146.0 MBH) AAON CFA-013-B-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 13.0 2 143.1 13.7 2/7500 2 20.3 4.6 25.0 28.0 35.0 460/3 61x46x54 1145 SEE NOTES CU -B01 (E) AHU-B01 BUILDING "B" ROOF TRANE TTA - 120B4 (118.0 MBH) AAON CFA-011-B-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 11.0 2 117.1 14.1 2/4500 2 15.9 2.2 18.0 20.0 25.0 460/3 61x46x54 1080 SEE NOTES CU -B02 (E) AHU-B02 BUILDING "B" ROOF TRANE RUAC - C204E (239.0 MBH) AAON CFA-020-C-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 20.0 2 223.6 14.0 2/8250 2 33.4 4.6 38.0 42.0 50.0 460/3 58x61x52 1450 SEE NOTES CU -001 (E) AHU-001 BUILDING "C" ROOF TRANE RUAC - C204E (239.0 MBH) AAON CFA-020-C-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 20.0 2 223.6 14.0 2/8250 2 33.4 4.6 38.0 42.0 50.0 460/3 58x61x52 1450 SEE NOTES CU -D01 (E) AHU-D01 BUILDING "D" ROOF TRANE RUAC - C204E (239.0 MBH) AAON CFA-020-C-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 20.0 2 223.6 14.0 2/8250 2 33.4 4.6 38.0 42.0 50.0 460/3 58x61x52 1450 SEE NOTES CU -E01 (E) AHU-E01 BUILDING "E" ROOF TRANE TTA - 180B4 (185.0 MBH) AAON CFA-015-B-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 15.0 2 178.9 13.1 2/7500 2 24.8 4.6 29.0 33.0 45.0 460/3 61x46x54 1145 SEE NOTES CU -E02 (E) AHU-E02 BUILDING "E" ROOF TRANE TTA - 24064 (241.0 MBH) AAON CFA-020-C-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 20.0 2 223.6 14.0 2/8250 2 33.4 4.6 38.0 42.0 50.0 460/3 58x61x52 1450 SEE NOTES CU -E03 (E) AHU-E03 BUILDING "E" ROOF TRANE TTA - 150B4 (146.0 MBH) AAON CFA-013-B-A-3-DCOOK:0-H0-00-00-000-L-N000-0000A00-0A0000B 13.0 2 143.1 13.7 2/7500 2 20.3 4.6 25.0 28.0 35.0 460/3 61x46x54 1145 SEE NOTES NOTES: SHALL REPLACE EXISTING COILS AT EXISTING AIR HANDLING UNITS. MECHANICAL DEMOLITION SHEETS MD1.01 THRU MD1.04 FOR ADDITIONAL INFORMATION. • NEW DRAIN PANS UPON INSTALLATION OF NEW COILS. INSULATION, JACKET AND LINE -SET COVERS IN ACCORDANCE WITH SPECIFICATION. ALL SHUTOFF VALVES, LIQUID LINE FILTER DRIER, SUCTION LINE FILTER, EXPANSION VALVES, FROSTAT AND MOISTURE AND LIQUID INDICATOR FOR A FULLY OPERATION REFRIGERANT CIRCUIT 1. COILS 2. SEE 3. PROVIDE 4. PROVIDE 5. PROVIDE NOTES: 1) EFFICIENCIES ARE IN ACCORDANCE WITH AHRI STANDARD 210/240. SYSTEM DESIGN/CAPACITY BASED ON 85°F AMBIENT AND 40°F SUCTION TEMP. LEAD COOLING CIRCUIT EQUIPPED WITH VARIABLE SPEED COMPRESSOR. 2) EQUIPMENT SHALL BE PROVIDED WITH A VISIBLE NAMEPLATE THAT INDICATES THE (SCCR) SHORT CIRCUIT CURRENT RATING IN ACCORDANCE WITH UL REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR MINIMUM RATINGS. 3) CONTRACTOR SHALL REFER TO THE MANUFACTURER'S LISTED RECOMMENDATIONS FOR SUCTION AND LIQUID LINE SIZING. 4) PROVIDE WITH R410A REFRIGERANT, VIBRATION ISOLATION KIT, CONDENSER COIL GUARDS, PHASE FAILURE RELAY, TXV'S AND REFRIGERANT PRESSURE GAUGES. TXV'S SHALL BE INSTALLED ON SITE. 5) DIVISION 26 SHALL PROVIDE DISCONNECTS. 6) 7) COOLING (DX) COIL SCHEDULE COILS MARK LOCATION SERVES MANUFACTURER/ MODEL NO COIL CFM (CFM/EA) COIL SIZE (LxH) TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH) ENT. DB/WB (F°) LVG. DB/WB (F°) REF. TYPE (R) SUCTION TEMP (F°) ROWS (#) COIL MAX APD/ FLUID PD COIL MAX VEL. (FPM) WEIGHT (LBS) REMARKS CC -A01 (E)AHU-A01, BLDG. "A" MECH. ATTIC. BUILDING "A" AAON C304-48.00-42.00-B08SRN-HHOON-8G200N-C1S8-N000-R1ECN 6895 42x48 180.2 129.5 78/65 60.4/56.1 410A 40.0 4 0.35/0.41 500 N/A SEE NOTES CC -B01 (E)AHU-B01, BLDG. "B" ROOF BUILDING "B" AAON C304-32.00-41.00-C12SRN-HHOON-8G200N-C1S7-N000-R1ECN 4500 32x41 153.5 101.4 78/65 56.8/53.1 410A 40.0 4 0.58/0.67 500 N/A SEE NOTES CC -B02 (E)AHU-B02, BLDG. "B" ROOF BUILDING "B" AAON C306-48.00-45.00-B10SRN-HHOON-8G200N-C1S8-N000-R1ECN 7500 45x48 295.9 186.9 78/65 54.6/50.9 410A 40.0 6 0.67/1.53 500 N/A SEE NOTES CC -001 (E)AHU-001, BLDG. "C" MECH. ATTIC. BUILDING "C" AAON C304-60.00-55.00-B08SRN-HHOON-8G200N-C1S8-N000-R1ECN 11300 55x60 290.2 202.7 78/65 61.1/56.3 410A 40.0 4 0.35/0.82 • 500 N/A SEE NOTES CC -D01 (E)AHU-D01, BLDG. "D" MECH. ATTIC. BUILDING "D" AAON C304-60.00-54.00-B08SRN-HHOON-8G200N-C1S8-N000-R1ECN 11090 54x60 284.5 198.6 78/65 61.2/56.3 410A 40.0 4 0.35/0.78 500 N/A SEE NOTES CC -E01 (E)AHU-E01, BLDG. "E" MECH. ATTIC. BUILDING "E" AAON C304-48.00-39.00-B10SRN-HHOON-8G200N-C1S8-N000-R1ECN 6500 39x48 194.9 127.7 78/65 59.5/54.6 410A 40.0 4 0.45/0.47 500 N/A SEE NOTES CC -E02 (E)AHU-E02, BLDG. "E" MECH. ATTIC. BUILDING "E" AAON C304-60.00-49.00-B08SRN-HHOON-8G200N-C1S8-N000-R1ECN 10150 49x60 268.2 184.3 78/65 60.9/56.0 410A 40.0 4 0.35/0.66 500 N/A SEE NOTES CC -E03 (E)AHU-E03, BLDG. "E" MECH. ATTIC. BUILDING "E" MON C304-40.00-40.00-B12SRN-HHOON-8G200N-C1S8-N000-R1ECN 5500 40x40 186.1 117.5 78/65 57.9/53.1 410A 40.0 4 0.55/0.62 500 N/A SEE NOTES NOTES: SHALL REPLACE EXISTING COILS AT EXISTING AIR HANDLING UNITS. MECHANICAL DEMOLITION SHEETS MD1.01 THRU MD1.04 FOR ADDITIONAL INFORMATION. • NEW DRAIN PANS UPON INSTALLATION OF NEW COILS. INSULATION, JACKET AND LINE -SET COVERS IN ACCORDANCE WITH SPECIFICATION. ALL SHUTOFF VALVES, LIQUID LINE FILTER DRIER, SUCTION LINE FILTER, EXPANSION VALVES, FROSTAT AND MOISTURE AND LIQUID INDICATOR FOR A FULLY OPERATION REFRIGERANT CIRCUIT 1. COILS 2. SEE 3. PROVIDE 4. PROVIDE 5. PROVIDE NI oo szp rolluda architects architecture planning i /tenor design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www. treswest.com Z (/) W W - W <C 0 Z >w N L!J J co O O J V w41 0 0 eO< VJ<0 oW veHi�H io'~R • gQ � C.) M REVISION DATE Design: RSH Drawn: RSH RECEIVED Checked: DIM/ OF TUKWILA Project No. APR 2 5 2017 PERMIT CENTER Issuance REVIEWED FOR PERMIT S_ DGPGROVirCE • MAY- 0 9 2011 Date: 4/14/2017 f ifii of TI Ikwila Drawing Title BUILDING DIVISION MECHANICAL SCHEDULES Drawing Number CM0.02 CM0.01 MECHANICAL LEGEND.DWG N COPYRIGHT 0 2015 ROLLUDA ARCHITECTS INC' DUCT CONSTRUCTION SCHEDULE DUCT LOCATION DUCT TYPE DUCT SERVICE PRESSURE CLASS (IN) MIN SMACNA SEAL CLASS DUCT MATERIAL NOTES OUTDOOR EXHAUST EXHAUST FANS 2 C GA DUCT WRAP UNCONDITIONED SUPPLY FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 B GA DUCT WITHIN CONDITIONED SPACE CONSTANT VOLUME AIR HANDLING UNITS 2 B GA 85.5 VARIABLE VOLUME AIR HANDLING UNITS 4 A GA ROUND AND OVAL RETURN FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 B GA RIGID BOARD AIR HANDLING UNITS 2 B GA R-7, 1 LAYER, 3 INCH THICK EXHAUST EXHAUST FANS 2 C GA DUCTS AND PLENUMS WITHIN CONDITIONED SPACE FUNCTIONING AS PART OF BUILDING ENVELOPE . AIR HANDLING UNITS 2 C GA 88.5 OUTDOOR AIR FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 C GA 90.2 AIR HANDLING UNITS 2 C GA 89.5 CONDITIONED SUPPLY FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 C GA 90.2 CONSTANT VOLUME AIR HANDLING UNITS 2 C GA 91.7 VARIABLE VOLUME AIR HANDLING UNITS 4 A GA 91.0 RETURN FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 C GA 93.0 AIR HANDLING UNITS 2 C GA IN ACCORDANCE WITH NEMA STANDARD MGI. MANUFACTURERS ASSOCIATION (NEMA) DESIGN CLASS SMALL AND MEDIUM AC SQUIRREL -CAGE INDUCTION MOTORS. EXHAUST EXHAUST FANS 2 B GA AIR HANDLING UNITS 2 B GA OUTDOOR AIR FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 C GA AIR HANDLING UNITS 2 C GA NOTES 1. ALL DUCTWORK SHALL BE CONSTRUCTED, SEALED AND ERECTED IN ACCORDANCE WITH THE IMC AND C403.2.7. DUCT SYSTEMS INSULATION SCHEDULE LOCATION OF DUCT DUCT SYSTEM TYPE DUCT CONFIGURATION INSULATION TYPE MINIMUM R -VALUE, INSULATION THICKNESS NOTES DUCT NOT WITHIN CONDITIONED SPACE SUPPLY, RETURN, EXHAUST MIXED, OUTSIDE, AND TRANSFER AIR DUCTS RECTANGULAR - EXPOSED RIGID BOARD R-7, 1 LAYER, 2 INCH THICK 4 RECTANGULAR - CONCEALED DUCT WRAP R-7, 1 LAYER, 3 INCH THICK 1800 ROUND AND OVAL DUCT WRAP R-7, 1 LAYER, 3 INCH THICK 1200 DUCT WITHIN CONDITIONED SPACE SUPPLY, RETURN, EXHAUST GENERATOR EXHAUST, RELIEF AND TRANSFER AIR DUCTS RECTANGULAR - EXPOSED RIGID BOARD R-3.3, 1 INCH THICK 85.5 RECTANGULAR - CONCEALED DUCT WRAP R-3.3, 1 LAYER, 1-1/2 INCH THICK 86.5 ROUND AND OVAL DUCT WRAP R-3.3, 1 LAYER, 1-1/2 INCH THICK 87.5 MIXED AND OUTSIDE AIR DUCTS RECTANGULAR - EXPOSED RIGID BOARD R-7, 1 LAYER, 2 INCH THICK 85.5 RECTANGULAR - CONCEALED DUCT WRAP R-7, 1 LAYER, 3 INCH THICK 85.5 ROUND AND OVAL DUCT WRAP R-7, 1 LAYER, 3 INCH THICK 89.5 DUCTS AND PLENUMS WITHIN CONDITIONED SPACE FUNCTIONING AS PART OF BUILDING ENVELOPE ALL DUCT TYPESR-VALUE RECTANGULAR RIGID BOARD EQUAL TO BUILDING ENVELOPE, THICKNESS AS REQ. 88.5 ROUND AND OVAL DUCT WRAP R -VALUE EQUAL TO BUILDING ENVELOPE, THICKNESS AS REQ. 88.5 NOTES: 1. INSULATE OUTSIDE, EXHAUST, AND RELIEF AIR DUCTS FROM BUILDING ENVELOPE TO BACKDRAFT/MOTORIZED DAMPER WITH R -VALUE EQUAL TO BUILDING ENVELOPE THICKNESS. 2. REQUIREMENTS APPLY TO THE DUCT TYPE LISTED, WHETHER HEATED OR MECHANICALLY COOLED DUCTS REQUIRING INSULATION SHALL HAVE A VAPOR RETARDER, WITH A PERM RATING NOT GREATER THAN 0.5 AND ALL JOINTS SEALED. 3. R-3.3; 1.0 INCH TO 3.0 LB/FT3 DUCT LINER, MINERAL OR GLASS FIBER BLANKET OF EQUIVALENT TO PROVIDE AND INSTALLED TOTAL THERMAL RESISTANCE OF AT LEAST R-3.3. 4. R-5.3; 2.0 INCH 0.75LB/FT3 MINERAL OR GLASS FIBER BLANKET, 1.5 INCH 1.5 TO 3.0 LB/FT3 DUCT LINER, MINERAL OR GLASS FIBER BLANKET, 1.5 INCH 3.0 TO 7.0 LB/FT3 MINERAL OR GLASS FIBER BOARD OR EQUIVALENT TO PROVIDE AN INSTALLED TOTAL THERMAL RESISTANCE OF AT LEST R-5.3. 5. R-7; 3.0 INCH 0.75LB/FT3 MINERAL OR GLASS FIBER BLANKET, 2.0 INCH 1.5 TO 3.0 LB/FT3 DUCT LINER, MINERAL OR GLASS FIBER BLANKET, 2.0 INCH 3.0 TO 7.0 LB/FT3 MINERAL OR GLASS FIBER BOARD OR EQUIVALENT TO PROVIDE AN INSTALLED TOTAL THERMAL RESISTANCE OF AT LEAST R-7. ENERGY EFFICIENT ELECTRIC MOTORS MINIMUM NOMINAL FULL -LOAD EFFICIENCY SCHEDULE TAG MINIMUM NOMINAL FULL -LOAD EFFICIENCIES (%) MOTOR HP OPEN MOTORS ENCLOSED MOTORS CEILING RETURN REGISTER: TITUS MODEL 50-F 1/2"x1/2"x1/2" EGGCRATE GRILLE FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 12x24 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. NUMBER POLES 2 4 6 2 4 6 SYNCHRONOUS SPEED (RPM) 3600 1800 1200 3600 1800 1200 1.0 77.0 85.5 82.5 77.0 85.5 82.5 1.5 84.0 86.5 86.5 84.0 86.5 87.5 2.0 85.5 86.5 87.5 85.5 86.5 88.5 3.0 85.5 89.5 88.5 86.5 89.5 89.5 5.0 86.5 89.5 89.5 88.5 89.5 89.5 7.5 88.5 91.0 90.2 89.5 91.7 91.0 10.0 89.5 91.7 91.7 90.2 91.7 91.0 15.0 90.2 93.0 91.7 91.0 92.4 91.7 20.0 91.0 93.0 92.4 91.0 93.0 91.7 25.0 91.7 93.6 93.0 91.7 93.6 93.0 NOTES: IN ACCORDANCE WITH NEMA STANDARD MGI. MANUFACTURERS ASSOCIATION (NEMA) DESIGN CLASS SMALL AND MEDIUM AC SQUIRREL -CAGE INDUCTION MOTORS. 1. NOMINAL EFFICIENCIES SHALL BE ESTABLISHED DESIGNS A AND B ARE NATIONAL ELECTRIC DESIGNATIONS FOR FIXED FREQUENCY DIFFUSER, REGISTER, GRILLE AND LOUVER SCHEDULE TAG AIR TERMINAL - SIZES AS NOTED ON PLANS CD-* CEILING DIFFUSER: TITUS MODEL TDCA ADJUSTABLE DIFFUSER FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 24x12 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. "*" INDICATES THROW PATTERN. CRR CEILING RETURN REGISTER: TITUS MODEL 50-F 1/2"x1/2"x1/2" EGGCRATE GRILLE FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 12x24 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. CRRH CEILING RETURN REGISTER: SHALL BE TITUS MODEL 50-F 1/2"x1/2"x1/2" EGGCRATE GRILLE FOR INSTALLATION IN HARD CEILINGS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. S SUPPLY GRILLE: TITUS MODEL 300FS FOR INSTALLATION ON WALL, 3/4" BLADE SPACING, DOUBLE DEFLECTION, INDIVIDUALLY ADJUSTABLE BLADES, FRONT BLADES PARALLEL TO SHORT DIMENSION. MANUFACTURER'S STANDARD OFF-WHITE FINISH. SG SOFFIT GRILLE: TITUS MODEL 50-F FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 24x12 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. SR SUPPLY REGISTER: TITUS MODEL 300FS FOR INSTALLATION ON WALL, 3/4" BLADE SPACING, DOUBLE DEFLECTION, INDIVIDUALLY ADJUSTABLE BLADES, FRONT BLADES PARALLEL TO SHORT DIMENSION. MANUFACTURER'S STANDARD OFF-WHITE FINISH. TGH TRANSFER GRILLE: TITUS MODEL 50-F 1/2"x1/2"x1/2" EGGCRATE GRILLE FOR HARD CEILINGS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. WTG WALL TRANSFER GRILLE: TITUS MODEL 350RL, WITH HORIZONTAL 35° -DEFLECTION BLADES SPACED 3/4". MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. TURN BLADES UP. WSG WALL SUPPLY GRILLE: TITUS 350RL STEEL GRILLE WITH 0° -DEFLECTION LOUVERS SPACED 3/4". MANUFACTURER'S STANDARD OFF-WHITE FINISH. 1-1/4 INCH AND SMALLER PIPING SYSTEMS INSULATION SCHEDULE TYPE OF PIPE INSTALLATION LOCATION INSULATION (TYPE) PIPE SIZE (INCHES) INSULATION THICKNESS (INCHES) NOTES COLD PLUMBING PIPING INSIDE BUILDING ENVELOPE FIBERGLASS ALL SIZES 1" THICK NOTE 2 OUTSIDE BUILDING ENVELOPE AND BURIED ELASTOMERIC ALL SIZES MULTIPLE LAYERS FOR 1-1/2" TOTAL THICKNESS NOTES 1, 4 HOT PLUMBING PIPING INSIDE BUILDING ENVELOPE FIBERGLASS 1-1/4 INCH AND SMALLER 1" THICK 1 1/2 INCH AND LARGER 1-1/2" THICK NOTE 1 OUTSIDE BUILDING ENVELOPE AND BURIED ELASTOMERIC ALL SIZES MULTIPLE LAYERS FOR 2" TOTAL THICKNESS NOTES 1, 4 COLD HVAC PIPING INSIDE BUILDING ENVELOPE FIBERGLASS 1-1/4 INCH AND SMALLER 1" THICK NOTE 2 1-1/2 INCH AND LARGER 1-1/2" THICK NOTE 2 NOTES: 1. INCREASE THICKNESS OF PIPE INSULATION BY 1/2 INCH WHERE PIPING IS LOCATED OUTDOORS OR OTHERWISE EXPOSED TO AMBIENT AIR. 2. INCLUDE POLYETHYLENE TUBING. 3. INCLUDE MULTI -PLY LAMINATE JACKET. 4. INCLUDE FACTORY APPLIED WEATHERABLE JACKET OR MANUFACTURER RECOMMENDED COATING. AIR TERMINAL SCHEDULE SYMBOL AIR TERMINAL - SIZES AS NOTED ON PLANS A INLET CEILING DIFFUSER: TITUS MODEL TDC WITH FIXED DISCHARGE FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 24x12 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. STEEL CONSTRUCTION. v-YCFM CEILING RETURN/TRANSFER: TITUS MODEL 50-F 1/2"x1/2"x1/2" EGGCRATE GRILLE FOR INSTALLATION IN T -BAR CEILINGS. PROVIDE 12x24 OR 24x24 PANS AS REQUIRED TO SUIT CEILING PANELS. MANUFACTURER'S STANDARD OFF-WHITE FINISH. PAINT DUCT MATTE BLACK BEHIND GRILLE. ©INLET CFM SUPPLY GRILLE: TITUS MODEL 300FL FOR INSTALLATION ON WALL, 3/4" BLADE SPACING, DOUBLE DEFLECTION, INDIVIDUALLY ADJUSTABLE BLADES, FRONT BLADES PARALLEL TO LONG DIMENSION. MANUFACTURER'S STANDARD OFF-WHITE FINISH. ALUMINUM CONSTRUCTION. ©INLET CFM M �os& rolluda architects architecture planning 'inter or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 Iskez. TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- z w -zw W Z p W < 0 W Z W W Lt co o J W Q o< U 0 CI VJ = M V CD I- F - ILA, WA 98168 REVISION DATE Design: RSH Drawn: RSH RECEIVED Checked: sczy OF TUKWILA Project No. APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/ Drawing Title MECHAN SCHEDU CAL LEGEND.DWG E&y of Tukwila BUILDING DIVISIOI Drawing Number CM0.03co 2 0 N N 'COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC ProjectSummary' P ROJ SIJ M` 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016 General Info This PROJ-SUM form shall be provided as a cover sheet for all compliance form submittals. Project Title matches project plans title block. Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 Project Street Address: 13601 32nd Ave S ForDepartment Use Building p Project City, County, Zip: Tukwila, WA 98168 Project Owner or Rep: Tukwila School District Jurisdiction: City Of Tuckwila Company Name: Tres West. Engineers,Inc Project Description Select all that apply to the scope of project. Select Addition + Existing or Alteration + Existing if the existing building will be combined with the addition or alteration to demonstrate compliance per Section C502.1 or C503.1. New Construction ❑ New Building Existing Building ❑ Alteration ❑ Change of Building Elements ❑ All ❑ Service Hot and Additions ❑ Building Addition Retrofit ❑ Alteration + Existing Occupancy ❑ Historic Building Scope - Select all that apply ❑ Building Envelope Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and C407 Energy Analysis forms required. iti Addition + Existing ❑ Change in Space Conditioning [ j Mechanical Systems Water Systems J Lighting Systems ✓ Electrical Systems Design Load Calculations Occupancy Type ® All Commercial 0 Group R - R2, R3, & R4 o over 3 stories and all R1 Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. Mixed Occupancy - Building is three stories or less above grade and it has both Commerical and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Space Conditioning Categories Select all that apply to the scope of project ❑ Semi-heated2 ❑ Refrigerated Warehouse, Walk-in Cooler/Freezer, Space Category3 Refrigerated Display Caset r Fully Conditioned ❑ Low Energy Eligible Low Energy Spaces ❑ Unconditioned ❑ Low energy heating/cooling capacity ❑ Wireless service ❑ Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Stories Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area 1 8,702 2243.0 General Compliance Path ® Prescriptive C Total Building Performance Prescriptive - Projects complying prescriptively shall demonstrate compliance with all applicable mandatory and prescriptve requirements of this code. Refer to C401.2, item 1 for more information. Compliance forms to include with a Prescriptive submittal: All applicable ENV, LTG, MECH and C406. Total Building Performance - Projects complying via total building performance (TBP) shall include a summary of results from a whole building energy model per Section C407 and shall demonstrate compliance with all applicable mandatory provisions in this Code. Refer to Section C401.2, Item 2 for more information. Compliance forms to include with a TPB submital: PROJ-SUM, C406 -SUM & C406 -DETAIL, ENV -CHK, LTG -EXT, LTG -CHK, and all MECH forms (except MECH-ECONO). 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 a Mechanical 2015 Washhinnggton State md7?mi<S axG, Energy Code Commppliance rY MECH-SUM Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January2017 Project. Information Project Title: CASCADE VIEW ELEMENTARY Date 9/6/2017 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept. Use Company Name: Tres West. Engineers,Inc Company Address: 2702 South 42nd St Applicant Name: Tres West Engineers, Inc Applicant Phone: 253-472-3300 Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and C407 Energy Analysis forms required. Commissioning is required ❑ New Building .1 Building Addition IIIA Tenant Improvement ❑ System Retrofit • No System Changes One packaged rooftop unit heat pump. Replacing existing air-cooled condensing units and cooling coil with new condensing unit and new cooling coil. Design Load Calculations ca Total output capacity building heating, cooling or includes all applicable v Load calculation summary ❑ MECH-LOAD-CALC Form Provide design load calculations for all mechanical systems and equipment serving the ventilating needs. If load calculation summary is provided with the permit documents that compliance information then the MECH-LOAD-CALC form is not required. Mechanical Schedules forms are not required, J Mechanical Plans U MECH-EQ Forms (TBD) Indicate location of equipment compliance information. If provided on plans then MECH-EQ however, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate ❑ DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation not require space conditioning fan operation. Space conditioning fans cycled off when no ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, ❑ Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu 2) ❑ DOAS included in project, although not required (occupancy not office, retail, education, fire station occupancies) air in a manner that does heating or cooling is required. Exception 1) of DOAS (C403.6, Exception library or fire station) C402.4.1.4 with 100% of IIIIIi DOAS related allowances included in project: . Compliance ..'Check ; ° U Prescriptive vertical fenestration maximum area allowance increased to 40% per conditioned floor area in building served by DOAS. ❑ Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form. Fan Power Q Project includes HVAC air distribution systems that provide heating and/or cooling If yes, provide a MECH-FANSYS -SUM form. exceeds 5hp. 5 horsepower threshold. 0 For one or more systems, the total fan motor nameplate hp of all fans in HVAC system If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. HVAC Hydronic Systems ❑ Hydronic chilled water • Water -loop heat pump 12 No hydronic systems ❑ Hydronic heating water ❑ Geothermal. C406 Additional Efficiency Options - MechanicalRequires.90% ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must minimum requirements: All stand alone supply, return; and exhaust fans over 1hp must selected within 10% of maximum total or static pressure. ❑ C406.6 Dedicated outdoor air system (DOAS) of conditioned floor area to be served by a DOAS per C403.6 that delivers manner that does not require space conditioning fan operation. or air -to -water heat be 15% more efficient than have FEQ >_7/ and must be required ventilation air in a annual hot water energy use MI C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C406.7.1 and that 60% of be provided by heat pump; waste heat recovery or solar water -heating systems. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 M ch nIc ! SummrYt'pg2 4 MECH-SUM UM Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Service 'Water Heating Systems Equipment Type (s) ❑ Instantaneous Heat exchange ❑ central hot water/steam ❑ No service water systems from space heat boiler or r Hot water heating tank(s) ❑ Dedicated boiler Distribution Type (s) ■ Circulation System ■ On -demand Equipment Commissioning Commissioning is required for: per C408.2 ❑ Service water heating systems per C408.4 shall be performed for all applicable systems regardless of individual equipment capacity. requirements: of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h heating. Mechanical systems commissioning not required. water heating system in building does not exceed 200,000 Btu/h. Service water heating not required. IN Mechanical systems if required, commissioning Exceptions to commissioning ca Total output capacity cooling or 300,000 Btu/h e Capacity of largest service systems commissioning Low Energy and Semi -Heated Spaces. (Note 6 and 7 Space. Type Location in Plan(s) _ " :Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity Btu/h ;- (Note 5) ?< Peak Space Conditioning ! Capacity, _"Btu/h-sf . Compliance ..'Check ; ° _ Notes, Yes C403.2.3 0403:2 3 2 C403.2.13.1 HVAC equipment performance requirements p c q (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) CM0.02 To comply with additional efficiency package option, indicate that all rated heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NAElectric C405.8 C403.2.14 motor efficiency List all motors a 1/12 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied Minimum fan efficiency To comply with additional efficiency package option, Indicate rated FEG of stand alone fans is a 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency For fractional hp motors (1/12 -:1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exceptiontaken HVAC System Controls Yes C403.2.11.1 Fan power limitation For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form CM0.02 NA For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood: exhaust NA 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken C403.2.4.1.1 Heat pump supplementary heat NA 0403:2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify In equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is z 67, or exception taken; indicate these fans are sized so total efficiency is within. 15% of the fan maximum total efficiency C403.2.4.1.2 Deadband Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Bluth. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section 0402.1.1 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h'sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Bfulh*sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 rMechanical Permi Pia` ys;Checklist` MECH-CHK Washington State Energy Code Compliance Fo for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following Washington information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the State Energy Code, Commercial Provisions. ApplicableCode (yes,no,na) Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercialprocesses that do not provide space conditioning; identify provisions applicable to this equipment per C403.1 exception For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; Identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements Indicate method of ventilation air delivery (natural or mechanical) for each zone Yes C403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include load adjustments to account for energy recovery See Attached If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces Yes C403.2.2 Equipment and stem sizing Y Indicate that output capacities, of heating and cooling equipment and: systems are no greater than thesmallest available equipment size: that exceeds the calculated loads; note exceptions taken CM0.02 To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply Yes C403.2.3 0403:2 3 2 C403.2.13.1 HVAC equipment performance requirements p c q (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) CM0.02 To comply with additional efficiency package option, indicate that all rated heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NAElectric C405.8 C403.2.14 motor efficiency List all motors a 1/12 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied Minimum fan efficiency To comply with additional efficiency package option, Indicate rated FEG of stand alone fans is a 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency For fractional hp motors (1/12 -:1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exceptiontaken HVAC System Controls Yes C403.2.11.1 Fan power limitation For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form CM0.02 NA For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood: exhaust NA 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken C403.2.4.1.1 Heat pump supplementary heat NA 0403:2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify In equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is z 67, or exception taken; indicate these fans are sized so total efficiency is within. 15% of the fan maximum total efficiency C403.2.4.1.2 Deadband NA C403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans <400 cfm in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE -57) C403.2.4.1.3 Setpoint overlap restriction (thermostats) NA C403.2.13 Variable flow capacity - fans For fan motors z 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA C403.2.3 Maximum air cooled chiller capacity For chilled Water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chiller capacity is 5:100 tons, or exception taken CM0.01 For DX air handling units with cooling capacity 65,000 Btu/h and evaporative and chilled water air handling units with fan Z 025 hp, indicate whether system Is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) NA C403.4 Large capacity cooling systems For buildings with 2 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) CM0.01 For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken NA C403.2.3.1 Non-standard water-cooled centrifugal chillers For water-cooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements CM0.01 Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 NA C403.2.13.1 0403.4.3.2 Centrifugal fan open -circuit cooling towers For open -circuit centrifugal fan cooling towers with a 1,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers Ducting Systems NA C403.4.2 C403.4.2.5 Large capacity boiler systems Y For single boilers with > 500,000 Btu/h capacity,indicate multi -stage or modulating burner CM0.01, CM0.03 For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio per Table 0403.4:2.5 and method (multiple single input boilers, modulating boilers, or combination) C403.2.12 Heating outside a building NA C403.2.13 Variable flow capacity - pumps For pump motors a 7.5 hp, indicate method of variable flow control (VSD' or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements C403.2.4.5 Snow melt systems NA C403.2.3 Gas and oil -fired forced air fumace and unit heaters For forced air furnaces with capacity Z 225,000 Btu/h and all unit heaters, indicate in equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss C403.2.4.6 Freeze protection system . controls NA C403.2.4.8 Combustion heating equipment For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating or staged combustion control C403.2.4.9 Group R1 hotel /motel guest rooms Yes C403.2.3.3 Packaged electric heating / cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules CM0.02 NA C403.2.12 Heatingoutside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements NA C403.2.7.1 Kitchen hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC. System Controls for additional requirements Yes C403.2.4.3 Outdoor supply air, exhaust and relief dampers Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate. whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers CM0.01 Yes C4032.4.3 Return air dampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) CM0.01 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Mechanical. Permit` Plans„ Checklis MECH....CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State EnergyCode,Commercial Provisions. Wash g n Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.4.3 Stairway and shaft vent dampers Indicate location of stairway and shaft vent dampers on plans; verify dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10°F deadband; or exception taken NA C403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; Identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements Indicate method of ventilation air delivery (natural or mechanical) for each zone CM0.01, CM0.02, CM3.01 NA C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to have air economizer, Indicate humidifier Is adiabatic (direct evaporative or fog atomization), or exception taken If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces Additional, Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible NA C406.2.1 C403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply CM0.01 NA C406.2.2 C403.2.3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all rated heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NA 0406,2.3 0403.2;11:3 Minimum fan efficiency To comply with additional efficiency package option, Indicate rated FEG of stand alone fans is a 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency HVAC System Controls Yes 0403.2.4.1 Thermostatic controls (thermostats and humidistats) Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, including perimeter system zones CM3.01 NA Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood: exhaust if applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) Yes C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less CM0.02 Refer to Systems Requiring Energy Recovery for requirements Yes C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling CM0.01 For HVAC fan motors Z 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 1/3 static design pressure); note exception taken NA C403.2.4.1.3 Setpoint overlap restriction (thermostats) If separate heating and cooling systems with separate thermostatic control devices are used to serve a zone, indicate locationsof both thermostatic control devices and the zone they serve on plans DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity Z 65,000 Btu/h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) Yes C403.2.4.2 C403.2.4.2.1 C403.2.4.2.2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken CM0.01 For DX air handling units with cooling capacity 65,000 Btu/h and evaporative and chilled water air handling units with fan Z 025 hp, indicate whether system Is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) Yes C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy CM0.01 For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken Yes 0403.2:4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA i exhaust CM0.01 Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 NA C403.2.4.3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) Ducting Systems NA C403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken CM0.01, CM0.03 NA C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied C403.2.8.3 Duct pressure classifications NA C403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F C403.2.8.3.3 High pressure duct leakage test NA C403.2.4.6 Freeze protection system . controls Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing NA C403.2.4.9 Group R1 hotel /motel guest rooms For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at least 5°F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 3 of 7 t S Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Ener gv Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017: Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA 0403:2.4.10 G403.2.4.11 Group R2 / R3 dwelling. units, Group R2 sleeping units For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10°F deadband; or exception taken Yes C403.2.6 C403.2.11.4 Ventilation Indicate method of ventilation air delivery (natural or mechanical) for each zone CM0.01, CM0.02, CM3.01 If mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken CM0.02 If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces Yes C403.2.6.2 Demand controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA > 3,000 cfm, and / or the system has airside economizer or automatic modulating OSA damper, indicate OSA controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception CM0.01 NA C403.2.6.3 Occu arc sensors P y For gyms; classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or alternate means provided to automatically reduce OSA when space is partially occupied NA C403.2.6.4 0403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or: occupancy sensors), and control method (staged or modulating) NA C403.2.6.4 C403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation / exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken NA C403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood: exhaust For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C4032.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements NA C403.2.13 Variable flow capacity - HVAC system fans For HVAC fan motors Z 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 1/3 static design pressure); note exception taken NA C403.3.1 DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity Z 65,000 Btu/h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA C403.2.11.5 Fan airflow control For DX air handling units with cooling capacity 65,000 Btu/h and evaporative and chilled water air handling units with fan Z 025 hp, indicate whether system Is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) For mechanical cooling systems (includes. DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is 5 66% of full speed drawing 5 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken NA 0403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 Identify all DDC system input / output control points; indicate capability for trending and graphical display Ducting Systems Yes C403.2.8.1 C403.2.8.3 Duct construction Indicate on plans that all ductwork is constructed and sealed per IMC CM0.01, CM0.03 For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC CM0.01, CM0.03 Yes C403.2.8.3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans CM0.01, CM0.03 NA C403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed '.5 archfitects rolluda arch tecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www. treswest. com >- ct z W z 2O W -- W < 0. W Z r'�/ c+,O a -1W O UO Z r/'� N v, = M dC f'- REVISION DATE Design: Drawn: Checked: Project No. RSH RSH -vmCEIVED CITY OF TUKWiLA APR 252017 PFP1111IT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title WSEC COMP FORM I)FOR ELIANCE ED MAY 09 2011 Drawing Numbe, City of Tukwila BUILDING DIVISION CMCF.01 CM0.01 MECHANICAL LEGEND.DWG 2 0 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 Mechanical Per'mit Plans; Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode (yes,no,na) Section Code Provision Information Required - Must be in permit documents Location In Documents Building Department Notes Yes 0403.2,8,1 C403,2.8,2 Duct insulation For supply and return ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken CM0,03 For supply ductwork locatedin conditioned space; Identify if design supply temperature is < 55°F or> 105°F and indicate R -value of insulation on this ductwork on plans; note exception taken CM0.03. C406.6 For OSA ductwork, shafts and plenums, Indicate R -value of insulation on these elements on plans per Table C402.1.3 forsteel-framed walls; note exception taken. C403.5.4 Energy recovery - condenser systems Piping Systems Yes 0403.2.9 Piping insulation p g Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken CM0.03 Variable flow control- hydronic system pumps NA 0403:2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types NA Economizers Yes C403.3 Air economizer required Identify inequipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls CM0.02 For heating and chilled water systems a 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. system pump motor hp a 3 hp, also indicate controls automatically reduce flow by a 50%. Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) If complying viahigh efficiency chilled water plant: indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least. 25% per Table C40323(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 520% of total plant capacity; or provide thermal storage sized for s 20% of total plant capacity For chilled water systems (a 300,000 Btu/h, pump motor hp a 3hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken Yes 0403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load CM0.02 Indicate automatic controls that sequence operation of multiple boilers Yes 0403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation CM0.02 For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 Yes C403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are configured to provide up to 100% OSA for cooling CM0.01 Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) Yes 0403.3.1 0403:3.3.2 Integrated air economizer Verify mechanical cooling controls are interlocked with air economizer controls so the outside air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is < 45°F CM0.02 Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use For systems with cooling capacity a 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken CM0.01 NA Yes C403.3.3.3 Air economizer controls Indicate high limit shut-off control method and required high limit per Table 0403;3.3.3 CM0.02 i indicate controlsall For multiple -cell heat rejection equipment with VSD, nit cate that ramp fans in unison NA C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may provided In lieu of air economizer„ indicate systemis capable of 100% design cooling capacity at 50°F db I 45°F wb OSA temperatures Heat rejection equipment - cooling tower flow turndown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run In parallel NA 0403:3:4.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken NA 0403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity 5 65,000 Btulh, refer to:HVAC System Controls for requirements Water loop heat pump heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed NA C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity a 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Water loop heat pump heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop Systems Requiring Energy Recovery NA 0403.5.1 Energy recovery (ER) - ventilation ! exhaust systems For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For hydronic heat pump systems with total system power >'10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control 0103.6 For rooms served by multiple systems with aggregate design OSA > 5,000 cfm, or aggregate design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), Indicate exhaust air ER method; or exception taken with supporting calculations Dedicated Outdoor Air Systems (DOAS) -Optional through 6/30/16, Prescriptive 7/1/2016 NA Indicate ER rated effectiveness that increases OSA enthalpy by a 50% based on delta between OSA and return air enthalpies at design conditions Dedicated outdoor air systems For buildings with office, retail, education, library and: fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 may not utilize exceptions) NA C403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air; ER effectiveness (min 25°F); or alternative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by a 50% based on delta between OSA and return air enthalpies at design conditions. NA C404.10.4 (under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken Heating /cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by a 36°F C403.7, Item 10 If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule NA C403.5.2 Energy recovery - steam condensate systems For buildings with on-site steam heating systems, indicate condensate water ER For buildings that use off-site generated steam where condensate is not returned to the source, indicate on-site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 Mechanical Perr Plans Checklist N1EGH CHK. 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA 0403.5.3 Energy recovery - cooler / freezer condensers For buildings with food service, meat or deli departments that have a 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) For buildings with a 40,000 sf conditioned floor area and with a 1,000,000 Btulh of remote. refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating NA C406.6 NA C403.5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Multiple Zone Air Systems NA Hydronic System Controls NAexception C403.2.13 C403.4.2.7 Variable flow control- hydronic system pumps For hydronic system pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires a 30% design wattage at 50% design fluid flow);: note taken NA C403.4.4 Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types NA NAIf C403.2.5 C403.4.2.4 Hydronic setback and part load controls For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature NA C403.4.4.1 For heating and chilled water systems a 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. system pump motor hp a 3 hp, also indicate controls automatically reduce flow by a 50%. Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling If complying viahigh efficiency chilled water plant: indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least. 25% per Table C40323(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 520% of total plant capacity; or provide thermal storage sized for s 20% of total plant capacity For chilled water systems (a 300,000 Btu/h, pump motor hp a 3hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken NA C403.4.4.2 NA C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NA C403.4.1,1 2 0403.4:1.sensors NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives resetlogic, and allows building operators to exclude zones from reset logic NA 0403.4:2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken CM0.01 NA C403.4.2.6 Chiller/boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken -Required for systems utilizing C403.6 DOAS Exception 2; must comply with all 16 provisions NA C403.2.13.1.1 C403.4.3.1.1 0403.4.3.1 ,2 Heat rejection equipment - variable flow control For cooling towers with fan motors 17.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) Air economizer Indicate system Is configured for 100% air economizer operation and complies with all related 9 economizer requirements per C403.3 (without ecdihomizer exceptions) i indicate controlsall For multiple -cell heat rejection equipment with VSD, nit cate that ramp fans in unison Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA NA C403.4.3.3 Heat rejection equipment - cooling tower flow turndown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run In parallel Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions NA NA C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing NA NA C403.4.2.3.2.1 Water loop heat pump heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heatingand cooling coils and pumps NA NA C403.4.2.3.2.2 Water loop heat pump heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop Identify in plans and specifications the Intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems NA NA C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power >'10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control 0103.6 NAequipment Dedicated Outdoor Air Systems (DOAS) -Optional through 6/30/16, Prescriptive 7/1/2016 NA C403.6 C403.6.3 Dedicated outdoor air systems For buildings with office, retail, education, library and: fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 may not utilize exceptions) NA C403.7, Item 8 NA C403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by a 50% based on delta between OSA and return air enthalpies at design conditions. NA C403.7, Item 9 NA C403.6.2 Heating /cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve NA C403.7, Item 10 If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule Indicate all series and parallel terminal fans have electronically commutated motors; indicate DDC control system is configured to vary air terminal fan speed as a function of the load;. indicate fan speed during periods of low heating, low cooling, or ventilation only is 5 66% of peak design airflow' or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 Mechanical'Permi P ans Checklist M ECH=CHK 015Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location In Documents Building Department Notes NA 0402,4,1.4 C403:8 Increased prescriptive maximum vertical fenestration area with DOAS Indicate that all occupied, conditioned spaces are served by a DOAS per C403.6. Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) NA C406.6 Building provided with DOAS To comply with additional efficiency package option, indicate that 9Q% or more of all occupied, conditioned spaces are served by a DOAS per C403.6 NA Multiple Zone Air Systems NA C403.4.4 Air systems serving multiple zones Identify supply air systems serving multiple zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV NA C403.7, Item 14 NA C403.4.4 VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types NA C403,7, Item 15 For each air terminal include: maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant NA C403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling If complying viahigh efficiency chilled water plant: indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least. 25% per Table C40323(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 520% of total plant capacity; or provide thermal storage sized for s 20% of total plant capacity NA C403.4.4.2 Dual duct systems - terminal units For systems with separate warm air and cool air ducts, Indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to monitor operation'and provide fault reporting of required parameters' for all VAV air handlers and VAV air terminal units in the HPVAV system NA C403.4.1,1 2 0403.4:1.sensors VAV system static pressure sensors - and DDC set points Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verify controller setpoint pressure at each sensor is 5 1.2 Inch w.g. HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives resetlogic, and allows building operators to exclude zones from reset logic Documentation and System Specific Requirement To Support Commissioning NA C403.4.4.3 Multiple -zone VAV system ventilation optimization controls For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken CM0.01 NA0403.4.4;4 VAV system supply air reset High Efficiency VAV Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken -Required for systems utilizing C403.6 DOAS Exception 2; must comply with all 16 provisions Commissioning requirements in construction documents Multiple Zone HVAC Systems, NA C403.7, Item 1 Air economizer Indicate system Is configured for 100% air economizer operation and complies with all related 9 economizer requirements per C403.3 (without ecdihomizer exceptions) Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA 0403.7, Item 2 Direct digital controls (DDC) Provide DOC controls for all components of system; identify all DDC system Input / output control points; indicate capability for trending and graphical display Air system and hydronic system balancing Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions NA C403.7, Item 3 Outdoor airflow measurement and reduction For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that measures OSA intake under all load conditions; indicate control sequence that increases or reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing NA C403,7, Item 4 Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply airflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heatingand cooling coils and pumps NA C403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system is 5 50.000 sf, or one entire floor, whichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, indicate zone Isolation controls per C403.2.4.4 Functional performance testing criteria Identify in plans and specifications the Intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems NA 0403.7, Item 6 Interior / exterior zone design supply air temperature Verify that VAV terminals serving interior cooling driven loads are sized per design supply air temperature that is 5°F higher than VAV terminals serving exterior zones Yes 0103.6 NAequipment C403.7, Item 7 Maximum air terminal inlet velocity Identify air terminals with minimum primary airflow setpoints > 50% of maximum setpoint in schedule or MECH-EQ form; indicate air terminal inlet velocity does not exceed 900 fpm NA C403.7, Item 8 Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC 36 NA C403.7, Item 9 Maximum allowable system brake horsepower Verify fan system bhp is 5 90% of the bhp limit per Option 2 equation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system NA C403.7, Item 10 Fan -powered terminal unit motor and control Indicate all series and parallel terminal fans have electronically commutated motors; indicate DDC control system is configured to vary air terminal fan speed as a function of the load;. indicate fan speed during periods of low heating, low cooling, or ventilation only is 5 66% of peak design airflow' or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Mechanical Permit Plans Checklis MECH=CHK. 5 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode (yes,no,na) Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terminal units Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units NAof C403.7, Item 12 Fan -powered terminal unit primary air reset Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling, unit OSA ventilation fraction NA C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant density a 25 people / 1000 sf, indicate space is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by a 5°F NA C403.7, Item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with cooling_ loads > 5 W/sf, indicate spaces are served by independent HVAC systems that are separate from: HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 NA C403,7, Item 15 Central plant effciency Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant Indicate all VAV terminals have hydronic heating coils served by heating water system with either gas-fired boiler(s) with thermal efficiency a 90%, air -to -water heat pumps, or heat recovery chillers If complying viahigh efficiency chilled water plant: indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least. 25% per Table C40323(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 520% of total plant capacity; or provide thermal storage sized for s 20% of total plant capacity NA C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to monitor operation'and provide fault reporting of required parameters' for all VAV air handlers and VAV air terminal units in the HPVAV system HVAC Equipment Energy Use Metering NA C409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning Yes C408.2 Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; CM0.01 For buildings with z 240,000 Btu/h total output cooling capacity or a 300,000 Btu/h total output heating capacity, indicate that all mechanical systems regardless of Individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception Yes C403.2.10 0408,1.1 C408.1.2 C408.1.4.2 C103.6 Commissioning requirements in construction documents Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; CM0.01 Include general summary with at minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation perC103.6, and conflict of interest plan (if required); CM0.01 Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. CM0.01 Yes C408.2.2 Air system and hydronic system balancing Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions CM0.01 Yes 0408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing CM0.01 NA 0408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heatingand cooling coils and pumps Yes 0408:2.3 Functional performance testing criteria Identify in plans and specifications the Intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems CM0.01 Project Close Out Documentation Yes 0103.6 Documentation and project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems governed by this code; indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations CM0.01 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanicals Fan S. stem ;Power Allowance MEG 3 -AFNSYSSUMI 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: CASCADE VIEW ELEMENTARY Date 4/6/2017 For Building Dept.. Use HVAC Air Distribution System Schedule` List all HVAC systems that have the capability to provide heating and/or cooling to the', spaces they serve. System or Primary Supply Fan ID. Speed Control (Note 1) Description (Note 2) System Total Nameplate HP (Note 3) Fan Power Calculation Required (Note 4) HP -B01 CV Packaged Rooftop Heat Pump 4 No Note 1- Constant Volume (CV); Variable Air Volume (VAV), or HospitallLab CV system that qualifies for VAV budget per C403.2.11.1 Exception 1. Single zone VAV systems shall comply as CV Note 2 - Describe system type and list all fans (or groups of fans) associated with the delivery and removal of conditioned air by the system- Include all supply, retumlrelief, exhaust and exhaust hoods (>1 hp), make-up air, dedicated outside air (DOAS), booster fans, and series fan -powered terminals. VAV parallel fan -powered terminals and economizer relief fans do not need to be included if the fans do not operate at peak conditions. Note 3 - Enter the total nameplate hp of all fans associated with the delivery and removal of conditioned air by the system. Note 4 - This form automatically identifies whether a MECH-FANSYS form is required to demonstrate compliance with the fan power allowance (Yes), or this information is not required because the system has a combined total nameplate motor hp that is 5 hp or less (No) MECH-FANSYS Forms A MECH-FANSYS form shall be provided for each system with total nameplate hp greater than 5 hp. Select (Add Fan System Form) to generate an additional form. Added forms can be deleted with button in cell E32 of the added form. Mr 7 0 5 rolluda architects architecture planning;interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- z� W z 20 W � Jp w<C 0 Z > w W C J • 0 O 0 U) _ < U u) V IF- cn • co J Co w O a;13.) rf-- O I- d• N co a) O O ti a)0 oS r-- a)to O 4.74 W r REVISION DATE Design: RSH Drawn: RSH Checked: DMM RECEIVED Project No. CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title WSEC MECH. COMPL FORMS FOR ► gym' LIANCE APPROVED MAY 09 2017 Drawing Number CMC City of Tukwila UI . r IiG DIVISION CM0.01 MECHANICAL LEGEND.DWG a 0) COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC INSTALL O LAMINATED DECK PORTION. C FLOORING- W/IN ATI1C 6'S FLUE''_.. THROUGH ROOF 48X3E6R EXH_' LOUV SOD 24X24 DN TO AHU 602 DISCHARGE 32X24 .DN.. THRU ROOF TO •28X56 W/ Fa,. SEE M4.1r PROVIDE FLEX COLLAR AT SEISMIC . CONNECTIOI RA..PLEN M SILENCER 26"o SU' PLY "(MED. PRESSURE); • PROVIDE. CEDAR WOOD SLEEPERS 0 5' O.C.—, SECURE REFRIGERANT PIPING TO SLEEPERS "WITH SOLID COPPER STRAPS AND. NAILS: • SIZE PIPING PER AHU MFG. RECOMMENDATIONS: DOWN TO. CEILING" DIFFUSER OR." RETURN/EXHAUST GRILLE.: SEE DRAWING . M4.1. • 4'0,. DRYER EXHAUST- DUCT UP TO . GOOSENECK DUCT ; ON ROOF WITH 1"" GALV. MESH ON' OUTLET. PROVIDE FLASHING 'AND CURB SIMILAR TO EXHAUST 'FAN REQUIREMENTS SHOWN ON DETAIL GENE ALL DUCTWORK . EXPOSED TO OUTDOORS IS TO 8E SOUNDLINED WITH THICKNESS IN ACCORDANCE WITH CURRENT STATE ENERGY CODE. MECHANICAL DEMOLITION ROOF/ATTIC PLAN - BUILDINGS A & B SCALE : 1/8" = 1'-0" GENERAL REFERENCE NOTES: 1. ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING PROVIDED FOR REFERENCE PURPOSES FOR BOTH DEMOLITION AND NEW WORK. ALL EXISTING COILS, PIPING AND CONTROLS SHALL BE REPLACED WITH NEW UTILIZING THE EXISTING BUILT-UP AIR HANDLING UNIT AND ROOF PENETRATION. DEMOLITION PLAN NOTES: OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -A01 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.01 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-A01. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.01 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -B01 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.01 FOR NEW WORK IN THIS AREA. REMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-B01. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.01 FOR NEW WORK IN THIS AREA. • OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -B02 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.01 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-B02. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.01 FOR NEW WORK IN THIS AREA. OSHEET M3.01 FOR DEMOLITION AND NEW WORK IN THIS AREA. OEXISTING GENERAL AND OR KEY NOTES DO NOT APPLY. ml 3 OOS KEY PLAN rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com z u) LLI Z 2p LLI J I— w< SO WZ >w W Et op ui Q O e U O O < 0 a v) T I REVISION DATE Design: Drawn: Checked: Project No. AC G41FIVED Cg's' OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DEMOLITION PLAN - ROOF/ATTIC BUILDIN Avg"µ`)N CE Drawing Number CMD1 MAY 09 2017 of Tukwila NG DIVISION 0 0 00 ces0 z 0 -J m z -J n_ z 0 1— J 0 w 0 J U_ z 0 w 0 0 2 0 0 N COPYRIGHT @ 2015 ROLLUDA ARCHITECTS INCA PROVIDE' PT. -WOOD -SLEEPERS .-AT, 5' ` 0.C., SECURE REFRIGERANT. PIPING TO' SLEEPERS. WITH 'SLID COPPER STRAPS', AND NAILS,SIZE PIPING. PER AHU MFG • RECOMMENDATIONS. rfrir# 11211211.107.4 rsxMg 4 o l 1'j� �eaiww = n7647. re � r awraoor finigaMENEW ArAr q1 ..._.._�I MECHANICAL DEMOLITION PLAN - ROOF/ATTIC -BUILDING C i SCALE : 118" = 1'-0" GENERAL REFERENCE NOTES: 1. ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING PROVIDED FOR REFERENCE PURPOSES FOR BOTH DEMOLITION AND NEW WORK. ALL EXISTING COILS, PIPING AND CONTROLS SHALL BE REPLACED WITH NEW UTILIZING THE EXISTING BUILT-UP AIR HANDLING UNIT AND ROOF PENETRATION. DEMOLITION PLAN NOTES: 0 REMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -001 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.02 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-001. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.02 FOR NEW WORK IN THIS AREA. EXISTING DRAWING NOTES DO NOT APPLY. KEY PLAN rolluda architects architecture planning inter or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www. treswest. corn >— L.L.. z� Z 2O W << SO W W WOC co co co wa, << O o U O zg M <C U co LA, WA 98168 I- O ti M ch0 ti 0) 0 ui 0 0 U REVISION DATE Design: Drawn: RSH RSH CProheckjected:No. u;� �jEIVED CITY .FTUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DEMOLITION PLAN ROOF/ BUILDI Drawing Number CMD ED FOR D _ COMPLUANCE WORMED MAY 0 0 2 rI Tukwila DIVISION CM01.02 MECHANICAL DEMOLITION PLAN - BUILDING C.DWG ti r O C•1 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC' PROVIDE.'PT' 'WOOD SLEEPERS AT 5'. O.C.. -; SECURE REFRIGERANT. PIPING TO SLEEPERS WITH' SOLID. COPPER STRAPS : AND: NAILS. SIZE PIPING PER AMU MFG RECOMMENDATIONS. 8X8 DN 161110,1411 IT -008 �16"oDN ELECTRICAL ,. TRANSFORMER epio EglECD-tl O' arAr i3O ifs g I►YiiY41 roof- 00".„002A e1� 40" 0/610 igicmo00,40P3 NECKED 24X12 ON TO RG BELO 20X20 MECHANICAL DEMOLITION PLAN - ROOF/ATTIC - BUILDING D SCALE : 1/8" = 1'-0" GENERAL REFERENCE NOTES: 1. ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING PROVIDED FOR REFERENCE PURPOSES FOR BOTH DEMOLITION AND NEW WORK. ALL EXISTING COILS, PIPING AND CONTROLS SHALL BE REPLACED WITH NEW UTILIZING THE EXISTING BUILT-UP AIR HANDLING UNIT AND ROOF PENETRATION. DEMOLITION PLAN NOTES: OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -D01 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.03 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-D01. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.03 FOR NEW WORK IN THIS AREA. OEXISTING KEY NOTES DO NOT APPLY. Ma7 - o new KEY PLAN rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 'kik/. TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- 1-L Z (i) W z 2O J I_ <C SO W Z 5w. W 0�co 0J � W � QD o>< U O zg Q O CO REVISION DATE Design: Drawn: Checked: Project No. RSH RSH RECEIVED lfiflr OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DEMOLITION PLAN ROOF/ BUILDI Drawing Number CMD E r(j ZD FOR CODE COMPLIANCE G ROVED Mt 0020117 City of Tukwila BU DIVISION CM01.03 MECHANICAL DEMOLITION PLAN - BUILDING D.DWG 2 0 ti N N • COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC IMIMMI S.00f/i ilicrall is:ure. w MECHANICAL DEMOLITION PLAN - ROOF/ATTIC - BUILDING D SCALE : 1/8" = 1'-0" GENERAL REFERENCE NOTES: 1. ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING PROVIDED FOR REFERENCE PURPOSES FOR BOTH DEMOLITION AND NEW WORK. ALL EXISTING COILS, PIPING AND CONTROLS SHALL BE REPLACED WITH NEW UTILIZING THE EXISTING BUILT-UP AIR HANDLING UNIT AND ROOF PENETRATION. DEMOLITION PLAN NOTES: OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -D01 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.03 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-D01. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.03 FOR NEW WORK IN THIS AREA. OEXISTING KEY NOTES DO NOT APPLY. Ma7 - o new KEY PLAN rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 'kik/. TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- 1-L Z (i) W z 2O J I_ <C SO W Z 5w. W 0�co 0J � W � QD o>< U O zg Q O CO REVISION DATE Design: Drawn: Checked: Project No. RSH RSH RECEIVED lfiflr OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DEMOLITION PLAN ROOF/ BUILDI Drawing Number CMD E r(j ZD FOR CODE COMPLIANCE G ROVED Mt 0020117 City of Tukwila BU DIVISION CM01.03 MECHANICAL DEMOLITION PLAN - BUILDING D.DWG 2 0 ti N N • COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC �J „� CU ` E02 *weeI® �%®nmmow _/,/��/,fsr,/Ar.I4'ssss�.,ssr,.��/,r,�.�raar,r,°, ��,y/®;� � �I. /�41, ArAgi � ra r '®iY./r%r%�/I r ra��;Ord `;I;i4 /fip; ®1 �iIiI/` f�!.;" W l is ,�� ^r %� r/Pri POA jrt �v' Ili. C.47., �.I�I�•.i% 6 371 1. Kms! r, - . I 1'0X1.3 � `�'' revue //%,�/®e�►r�� I! aaa>.rr v�I ' �.rsi►i, rw moi/ i�s� „vow... ,_......,,,,„i, 411ift.,,,, IW --... '.r.�...o..�..: �v� tia�rm�ri�///Tri r. ri/�.:►m r s�.es redre41413:44r Sffei `\`r\ ®.aa %nom/Awif � : ®P y F i . 't' ®%s.rrr TWA r4rid...9#' i s,-�PArte' opwArAngrArarArorArAgrAr...c.-Afri ?row :AIWA "t°:.WAr4//.ar" ' 140000 ra 'i . - /, i it % ,JrAPA 1214, d.r.PI.d#: r�.r/r/esi r.�r®.rrrxW4 I !I.`�1d r i r I I : I _ S ' OA I IT of 1 11111 OX60 COMBUSTION. LOUVER PROVIDE ':PT WOOD- SLEEPERS, AT 5' Q.C., - SECURE REFRIGERANT PIPING TO SLEEPERS WITH SOLID COPPER STRAPS AND NAILS:` SIZE PIPING PER AHU MFG RECOMMENDATIONS. f MECHANICAL DEMOLITION PLAN - ROOF/ATTIC - BUILDING E SCALE : 1/8" = t-0" GENERAL REFERENCE NOTES: 1. ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING PROVIDED FOR REFERENCE PURPOSES FOR BOTH DEMOLITION AND NEW WORK. ALL EXISTING COILS, PIPING AND CONTROLS SHALL BE REPLACED WITH NEW UTILIZING THE EXISTING BUILT-UP AIR HANDLING UNIT AND ROOF PENETRATION. DEMOLITION PLAN NOTES: 0 REMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -E01 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.04 FOR NEW WORK IN THIS AREA. O REMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-E01. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.04 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -E02 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.04 FOR NEW WORK IN THIS AREA. O REMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-E02. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.04 FOR NEW WORK IN THIS AREA. 05 REMOVE EXISTING ROOF MOUNTED CONDENSING UNIT CU -E03 AND ALL CORRESPONDING REFRIGERANT PIPING AS SHOWN. COORDINATE WITH DIVISION 26 SO THAT INCOMING POWER TO UNIT SHALL REMAIN IN PLACE FOR RE -USE. SEE M4.04 FOR NEW WORK IN THIS AREA. OREMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED DX COIL WITHIN THE EXISTING AIR HANDLING UNIT AHU-E03. MAINTAIN EXISTING REFRIGERANT PIPING SUPPORT FROM COIL TO EXTERIOR WALL. SEE M4.04 FOR NEW WORK IN THIS AREA. 0 EXISTING KEY NOTES DO NOT APPLY. 005 KEY PLAN rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com REVISION DATE Design: Drawn: Checked: D Project No. C9 TY RSH RSH EIVED TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DEMOLITION PLAN ROOF/AT" BUILDING 11E,WED FOR ODE COMPLIANCE E APPROVED Drawing Number CMD1 1lAY 114 ln9-t City of Tut wila I TING DIVISIOI 0 u.i 0 z 0 J 5 m z J a - z 0 I- 0 w 0 — J 0 z 0 w d- 0 0 U) N - COPYRIGHT @ 2015 ROLLUDA ARCHITECTS INCA C I(E)14x14 I(E)12x12 (E)12"0 i(E)22"0 ((E)16x16 111117 Ars' (E)12"0 (E)10"0 E)10x (E)14"0 A3) i•• I I 0 DN ET) CC CC VAC PARTIAL ATTIC DEMO PLAN - BUILDING A 8"0 DN 8x8 DN 0 10"0 ON 14x14 DN 8x8 III r 12x12 DN 10"0 DN 10110 DNS 0 0 (A2 A3) 10"0 ON HVAC PARTIAL ATTIC PLAN - BUILDING A SCALE : 1/8" = 1-0" (m) CABS CAD ESL CLASS VOLUNTEER RM. M01 JANITOR CLST. 1 A117 OFFICE A113a L MEN'S A102 L- J WOMEN'A103S L ELEC. CLST. A116 C3( LipN r 4 2 o STAFF LOUNGE A104 STAFF WORKROOM A105 OFFICE A108 TOILET A109 HEALTH RM. F A110 AOa"0 150 ©8x8 150 t 0250100 CONF. RM A107 STORAGE A111 480 mc).1° RECEPTION A112 ®0 10" 0 250 SUPPORT STAFF A113 PRINCIPAL OFFICE A114 10" 250 —� L — J 1 3"RL DN 3"RL DN B.9 �J 3"ORL DN SOFFIT c ©10x6 100 20x16 01 PROVIDE VOLUME DAMPERS SUITABLE FOR USE IN SOFFIT APPLICATIONS. TYP AS SHOWN. 26x16 VESTIBULE B101 HP -B01 ©18x8 525 (TYP. OF 7) CAFETERIA EXPANSION B113 SOFFIT J OFFICE A115 ( A5 (A6) BOYS B105 20x12 KITCHEN B107 MULTI-PURPOSE/ CAFETERIA 8103 _GIRLS_......I I B106 1----12x12 VESTIBULE B102 r iF GENERAL NOTES: 1. COORDINATE LOCATION OF ALL GRILLES, REGISTERS AND OR DIFFUSERS WITH ARCHITECTURAL ELEVATION AND INTERIOR DRAWINGS. PLAN NOTES: ONEW HEAT PUMP UNIT ON ROOF. SEE CM4.01. O3" RAINLEADERS UP TO COMBINATION ROOF/OVERFLOW DRAIN. REFER TO ARCHITECTURAL FURRING DETAILS FOR ROUTING WITHIN NEW WALL. 3" OVERFLOW NOZZLE, COORDINATE EXACT LOCATION WITH ARCHITECT. SEE DETAIL, SHEET CM9.01. O3" RAINLEADER, EXTEND AND CONNECT TO STORM, SEE CIVIL DRAWINGS FOR EXACT LOCATION. EXISTING THERMOSTAT SHALL REMAIN IN PLACE FOR RE -USE. OREPLACE EXISTING RETURN GRILLE WITH NEW. 0 AREA OF NEW WORK, SEE PARTIAL DEMO/NEW PLANS THIS SHEET. OWALK-IN BY OTHERS. EXTEND AND CONNECT NEW REFRIGERANT PIPING FROM ROOF MOUNTED CONDENSER. SEE SHEET CM4.01 FOR LOCATION OF NEW UNIT. HVAC FLOOR PLAN - BUILDINGS A & B SCALE : 1/8" = 1'-0" CF -3D M7�os& KEY PLAN rxlluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com ›- Z (I) -z(I) U-1 Z O J W < Q W Z ]w WOC CD J <C 0 00 cn _ <C U v) I- 0 I- co co J co 0 0 Yi W o 0 1-= o w o 1 o QcD Q v2QtiL) off( U) I— 0 2 coJ J_ (yY w dam' -i Q. �H o I- I- H� REVISION DATE Design:. Drawn: Checked: Project No. RSH RSH DMM ECEIVED CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title HVAC DEMO /NEW FLOOR PLANS - BU I LDI Drawing Numb CM3 REVIEWEI • to APPROVED Y092017 City of Tukwila BUILDING DIVISION COPYRIGHT 0 2015 ROLLUDA ARCHITECTS INC CM3.01 BLDG-A B MECH.DWG 2 a- 0) N - 0 N Z:11. '*A) (AB r 1 L L • /r / Anktv., 74.44,404 44,44,444.04'44444,444414 0 0 CU -A01 O • 00 ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. PROVIDE IVEW COOLING COIL WITHIN ORIGINAL AHU UNIT !t) O O CC -A01 - J (E)AHU-A01 L EXISTING HYDRONIC MAINS, TYP. NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORDANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. PROVIDE ROOF MOUNTED PIPE SUPPORT. SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORDANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. PROVIDE ROOF MOUNTED PIPE SUPPORT. TYPICAL OF 3 IN THIS AREA. )oi / BB.1 0 COMBINATION ROOF/OVERFLOW DRAINS, SEE SHEET M3.01 FOR CONTINUATION. / HP -B01 r CU -K01 EXISTING HYDRONIC MAINS, TYP. CONDENSER FOR WALK-IN. CONDENSER BY OTHERS. // / 1._ L o-1 CU -B01 O 0 0 (E)AHU-B01 CC -B01 NEW WALK-IN FREEZER BELOW SEE SHEET M3.01 FOR CONT. NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. TYPICALOF2. CU -B02 rr 0 PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. CC -B02 (EjAH U -B02 NOT ALL EXISTING EQUIPMENT, SUPPORT, PIPING, ETC. IS SHOWN WITHIN THIS AREA FOR CLARITY PURPOSES. REFER TO SHEET MD1.01 FOR EXTENT OF EXISTING. COMBINATION ROOF/OVERFLOW DRAINS, SEE SHEET M3.01 FOR CONTINUATION. lo \r r' OUI 00 MECHANICAL ROOF/ATTIC PLAN - BUILDINGS A & B SCALE : 118" = 1'-0" Q32) GENERAL NOTES: 1. COORDINATE ALL ROOFING WORK AND PENETRATIONS WITH GENERAL CONTRACTOR TO ENSURE EXISTING ROOF WARRANTY IS MAINTAINED. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. PLAN NOTES: ALL EXISTING ROOF MOUNTED EQUIPMENT WITHIN THIS AREA IS OPERATIONAL AND SHALL BE REMOVED FOR NEW ROOFING AND REPLACED UPON COMPLETION OF ROOFING WORK. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO PERFORMING ANY WORK. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES ASSOCIATED WITH THE EXISTING UNITS BY WAY OF TEMPORARY DISCONNECT OF THE EXISTING CONTROLS, HYDRONIC AND REFRIGERANT PIPING, NATURAL GAS SERVICE, ELECTRICAL SERVICE AND DUCTWORK CONNECTIONS. TERMINATE ALL CONNECTIONS PREVIOUSLY DISCONNECTED UPON COMPLETION OF ROOFING WORK. PROVIDE NEW INSULATION AND PIPE SUPPORTS ON ALL HYDRONIC PIPING REQUIRING REMOVAL FOR ROOFING WORK. SEE ARCHITECTURAL DETAILS FOR ADDITIONAL INFORMATION. Mr7 oog KEY PLAN rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 Itt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- z� W T 2O JT w ©C SO W T W co L!J C (13 Q 0 < UOe Io \ P)5 - < _Q U O U) � 2 re 1-- G 0 (— =(jrn C/) ., X 9 oI-4.I- 0 ti M 9 C) ti rn O ui O 0 REVISION DATE Design: Drawn: Checked: Project No. RSH RSH DMMECEIVED CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL ROOF/ATTIC PLAN BUILDINJ (D: C, P IA ,C F Drawing Numl•er M - UVIED MAY 2017 Oty1f Tukwila BUILDING DIVISION CM4.01 BUILDING A & B MECHANICAL ROOF PLAN.DWG 2 CL 0 N ti N N COPYRIGHT @ 2015 ROLLUDA ARCHITECTS INC' (GG (;) architectureplanning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 I' MATCH LINE 0. GAS SEE SHEET CM4.04 / 0 0 \ 'N t o • TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.coln \ /I CU -001 REVISION DATE NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORDANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. PROVIDE ROOF MOUNTED PIPE SUPPORT. ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. (E)AHU-001 CC -001 Design: Drawn: Checked: Project No. RSH RSH RECEIVED DMNMI r y OF TUKWILA APR 2 5 2017 PERMIT CENTER SEE SHEET CM4.01 \ 1 MECHANICAL ROOF/ATTIC PLAN - BUILDING C SCALE : 1/8" = Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL ROOF/ATTIC PLAN BUILDING C Drawing Numb flu oos B CODE COMPLIANCE APPROVED CM4 KEY PLAN . OM7G� 0 9 2011 City of Tukwila BUILDING DIVISION CM4.02 BUILDING C MECHANICAL ROOF PLAN.DWG 2 CL N U) ti N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC' �G) A DA MATCH LINE 1 r' N o 0 / //// // I / NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORDANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. PROVIDE ROOF MOUNTED PIPE SUPPORT. ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. (E)AHU-D01 CC -D01 SEE SHEET CM4.01 i I FILE...CHN......A.L.f.LQ...F... LAN BUILDING D SCALE : 1/8" = 1'-0" Q -31G) e IsiL(7m,,, OOS B KEY PLAN ro9luda architects architecture planning nte(or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 iltot TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409.7315 Phone: 253.472.3300 www.treswest.com >- F - z(,) W 20 J <C 0 W Z WCO w� <C O o 0♦^0 e O U)P_ I- F I- co0 J ao O 0 p� orn o " rn I 0 Q as N L. o F-�r I- I- .c O REVISION DATE Design: Drawn: Checked: Project No. RSH RSH D npECEI\/ED rif OF TUKWILA APR 252017 PERMIT CENTER 1 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL ROOF/ATTIC PLAN BUILDI rprnAMAlFn Fl1R Drawing Number CM4. CODE COMPLIANCE APPROVED AY 09 2017 City of Tukwila BUILDING DIVISION c`., N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC' CM4.03 BUILDING D MECHANICAL ROOF PLAN.DWG 2 0 O N in ti 0 EEL) N — I L 0 w U U (E)AHU-E02 ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORDANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. PROVIDE ROOF MOUNTED PIPE SUPPORT. NEW CONDENSING UNIT, LOCATE IN SAME FOOTPRINT AS ORIGINAL. 0 CC -E01 (E)AHU-E01 .Q. 0 PROVIDE NEW COOLING COIL WITHIN ORIGINAL AHU UNIT. ROUTE PIPING TIGHT TO STRUCTURE. UTILIZE EXISTING ROUTING PATHWAY, HANGERS, STRUCTURAL SUPPORT, ETC. SUCTION/LIQIIJI REFR GERANT PING. ALCOR ANC WITH LISTE P OVIDE ROOF MOUNTED PIPE SUP ORT. CU -E01 o C) NE)A'CONDENSING.UNIT, LOCATE SAME FOOTPRINT'AS ORIGINAL. MECHANICAL ROOF/ATTIC PLAN -BUILDING E SCALE : 1/8" = 1'-0" Q CU -E03 Ir, • M M 0 w v I (E)AHU-E03 SUCTION/LIQUID REFRIGERANT PIPING. SIZE IN ACCORgANCE WITH LISTED MANUFACTURER'S RECOMMENDATIONS. ;' PROVIDE ROOF MOUNTED PIPE SUPPORT./ / \ \ MATCH LINE \ \ \ \ \ \ \ -'1 r f� 0 \ \ 1 �0 0 17 00g& KEY PLAN rolluda architects architecture planning inter or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 tkot TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >•-•�,Ir LL Z C0 W Z MO F- LU < O wZ > w wLt C <C 0 U0 (1) < 0 U U) V I— 0 J 0 U REVISION DATE Design: Drawn: RSH RSH Checked: EtFIVED Project No. CITY OF TUKWILA APR 252017 PF.RMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL q z 0 U- 0 0J 0 2 0 w z 0 -J m 0 2 ROOF/ATTIC PLAN " BUILDING. -E ... RE VI WED Q,R COD °" OMtfMWLII\NC E CM4.0 APPROVED MAY 0 9 2017 a City of Tukwila BUILDING DIVISION N Drawing Number COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC 4 /1 1 /1 1� Y / 41/ \\\\ li \\ \\ 11 11 1\ 11 \\ 11 1\ 11 / 11 1/ \\ 111' ,\ \ 1/ \\ /1 \\ jt vv it vv 11\\ • 11 \\11 i' /I /,\\\\ /1/ \, 11 \i 11 \\ 11 \\ i 11 \\0 11 \\ \\ I // \'\ It. \\ 1/ \\ j1 \\ II '+ j OO \ i \ I/ 1 Ar- i/,/„,/,/ , CU -001 (E)AHU-001 A CU -A01 i 00 (E)AHU-A01 GENERAL NOTES: 1. ANY EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. PROVIDE SOFTWARE UPDATES TO ON-SITE FRONT END COMPUTER AS WELL AS OFF-SITE FRONT END ACCESS, LOCATED AT MAINTENANCE & OPERATIONS, SO AS TO HAVE A COMPLETE AND OPERABLE SYSTEM. 3. PROVIDE REVISIONS TO CURRENT SEQUENCE OF OPERATIONS AS NOTED IN PROJECT SPECIFICATIONS. 4. PROVIDE POINT TO POINT VERIFICATION OF ALL NEW CONTROL SEQUENCES IN ACCORDANCE WITH PROJECT SPECIFICATIONS. PLAN NOTES: OREMOVE AND REPLACE ALL EXISTING TUX CONTROLLERS WITH NEW BACTALK VLC CONTROLLERS. THIS SHALL INCLUDE ALL EXISTING VAV'S, AHU'S AND EMCP CONTROLLERS, TOTAL OF (22). FIELD VERIFY EXACT QUANTITY. REMOVE ALL EXISTING IBEX MICROSET SPACE TEMPERATURE SENSORS AND ALL ASSOCIATED WIRING AND REPLACE WITH NEW BACTALK MICROSET II SPACE TEMPERATURE SENSORS AND NEW WIRING SUITABLE FOR USE WITH NEW SENSORS. TYPICAL OF (19) LOCATIONS, FIELD VERIFY. 3O REMOVE AND REPLACE (1) BCM -TUX CONTROL MODULE WITH (1) NEW BCM-MSTP CONTROL MODULE. 4O REMOVE AND REPLACE THE IBEX TRUNK COMMUNICATION WIRE TO THE BACNET MS/TP. PROVIDE CURRENT COMMUNICATION WIRE STANDARD. DDC UPGRADES PLAN - BUILDINGS A & C - ROOF & MECHANICAL ATTIC - IBEX TRUNK 1 SCALE :1/16” = 1.-0" i , I! ? 111 u ,\ 1\ ,t 5"," ,i I, /1 „ 1L, n1 a _ ?I /' I' I , 1 / I /1' / , I II / / I, II / 1 / I I,/ ti _ J I LI-.. ,_ 7? /' i I I' 4,' 1i 'S I I IN '/ 4, /, W I/ ,,, II 'S IL 14 . I,.. 1p I, II q,, I I I Iry I I w, I/ I /, I, !i n 1, ul W tI Y1 lY 1 ; , YI 5, 5 IjjS. MIM iCI■Yr===.r1 ,1 r LL \\ ,a % L- o o t=—ter__ o o Il p', \ \ rr 1' t M\ ;N ,I '1 �', w , \, w ---�1 , W ,, \, II' 11 \, to ,I ,I W It 'I, W \ t 1 r'" 't C--, % t o. t 1 \ 1 \ t 1 \ _J 1 _ \t II 1I 11 IY w V-7 r' 5- J J LJ L_7 III III III III III rl ❑ 1, li. ir_= 111 111 1I 111 11 II 111 II II I, ii II II II II II' ., .._ L _ dur n c ; _ ,J ,l I, M 111 III III III w IL „- jr M Ir M F9 M III "I III III W II IC 11 II 11 II JI C>11.1• • C "1 w n• M 111 U 1 I hi III IIl III III Fi J 1 II II II 11 II II 11 II 3vavvavmv3 J DDC UPGRADES PLAN - BUILDINGS A & C - FLOOR PLANS - IBEX TRUNK 1 Mb 7 Oosus0 arch tecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com REVISION Design: Drawn: Checked: Project No. RSH RSH DMCEIVED CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DDC UPGRADES PLAN - BUILD_ Drawing Num CM er APPROVED MAY 0 9 2017 Oi1lof Tukwila BUILDING DIVISION CM5.01 OVERALL SITE DDC PLAN.DWG a 0 N i() N- CD N N t COPYRIGHT 0 2015 ROLLUDA ARCHITECTS INC (E)AHU-D01 HP -B01 CU -K01 CU -B01 (E)AHU-B01 C® (E)AHU-B02 DDC UPGRADES PLAN - BUILDINGS B & D - ROOF & MECHANICAL ATTIC - IBEX TRUNK 2 i SCALE : 1116" = 1-0" GENERAL NOTES: 1. ANY EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2.. PROVIDE SOFTWARE UPDATES TO ON-SITE FRONT END COMPUTER AS WELL AS OFF-SITE FRONT END ACCESS, LOCATED AT MAINTENANCE & OPERATIONS, SO AS TO HAVE A COMPLETE AND OPERABLE SYSTEM. 3. PROVIDE REVISIONS TO CURRENT SEQUENCE OF OPERATIONS AS NOTED IN PROJECT SPECIFICATIONS. 4. PROVIDE POINT TO POINT VERIFICATION OF ALL NEW CONTROL SEQUENCES IN ACCORDANCE WITH PROJECT SPECIFICATIONS. PLAN NOTES: 0 REMOVE AND REPLACE ALL EXISTING TUX CONTROLLERS WITH NEW BACTALK VLC CONTROLLERS. THIS SHALL INCLUDE ALL EXISTING VAV'S, AHU'S, PULSE AND EMCP CONTROLLERS, TOTAL OF (18). FIELD VERIFY EXACT QUANTITY. OREMOVE ALL EXISTING IBEX MICROSET SPACE TEMPERATURE SENSORS AND ALL ASSOCIATED WIRING AND REPLACE WITH NEW BACTALK MICROSET II SPACE TEMPERATURE SENSORS AND NEW WIRING SUITABLE FOR USE WITH NEW SENSORS. TYPICAL OF (12) LOCATIONS, FIELD VERIFY. O3 REMOVE AND REPLACE (1) BCM -TUX CONTROL MODULE WITH (1) NEW BCM-MSTP CONTROL MODULE. 0 REMOVE AND REPLACE THE IBEX TRUNK COMMUNICATION WIRE TO THE BACNET MS/TP. PROVIDE CURRENT COMMUNICATION WIRE STANDARD. r, LJ II 11 II 11 LI LI M 111 III III Ill Ill 111 LI 11 1.1 Ill Ill III Ill m IY II Ill III Ill III 111 L T LJ r -I LJ LL T- T ;1 Lit ;1 11 j 11 /1 1 11 1 1 II II II II II 44 'Si I; 'I, ,,, I, rti 1, J` n n II n u IL___JL__JL___ n ,1 1 II II X11 IIIL Ir jr- II ,L III II �I I 11 ,II 11 II I II 111 II ,I I II ,I I L 2---iJL-,;=] C= I u 11 ,11 U 11 II 1111 11 ll II ll II II 11 II 11 11 11 II 11 II 11 11 11 II 11 11 pu 'll 11 T -T T -T Co Ir II II 5 T'T T -T T -T T -T C I- DDC UPGRADES PLAN - BUILDINGS B & D - FLOOR PLANS - IBEX TRUNK 2 SCALE : 1/16" = 1'-0" Mr7L ��S(o rolluda architects arciftecture planning inter or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 It'll. t w TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- Z (/) WZ 20 J � < 0 I• - W Z >W W pJ <C 0 00 (1) < U u) I/-/� V/ o CO —.I 00 O O Coui 0 CO N- uj Ll.l 00 0 I— 00 c3) O CA 1 O QQ V=Qtiv 7; E . . ,. 3 .c, coel D I- O I- V. I- I- .c REVISION DATE Design: Drawn: Checked: Project No. RSH RSH DWIECEIVED CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DDC UPGRADES PLAN - BUILDIN d -§---v - I1 Drawing Number L L)UI_ I:UMPLIANC:E APPROVED MAY 092017 CM5.02 City of Tukwila BUILDING DIVISION CM5.01 OVERALL SITE DDC PLAN.DWG 12 N CO ti 0 N 1 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC } DDC UPGRADES PLAN - BUILDING E - ROOF & MECHANICAL ATTIC - IBEX TRUNK 3 / SCALE: 1/16" = 1'-0" --J _LL C w u 'I u J u II II II II II II II II II II II II II II II II II II II 11 II II JL_ c===ar -_-o 5j . ,I II II II II II ,I 11 II 11 II •1'---------------sL JL Ju - l lIr 331 L1r I===i-----� 00 II II 11 II 11 II II II 11 II II II II II 11 II II II II II 11 II II II II II II II II II II II II II 1III 11 II II II II II II II II s ,___= 5 11 II 11 II 1 I II ..-..,-. II n 11 II I I II d- 41 4 II I I 1 1' 11 ,; ,r irl� II „ ,1 III " '1 iii' II II 1 I �I II II II 11 I' 11 11 III' Ii II II II II I II 'I III: II �I in II IS r--lr JiiIl I 1111 II II it II11 u it 1 II II V II II ,I II 1111 it 1, 11 It I� --.^ II l� ? XIIJII 11 I' II 'I II,III II,I i-AlI1d 'r r II 11 M III I, III IIIIII I, W 11 II II I; III I , IIII' , 1II, 1 IIII. , �r=vim v..e.111 I i, , II 1, 111 , 1 III 1, 1' III 11 II I11 i' it. W 11 I ,, I I r - _I, 0 I I ,r- 11 -J I..".„.. sl 1: 11 II 9 t 1 II II c7 u II ll P C II I II II L=� j • G=J II „ 11 II II II II II II II II II I I II I I II 11 II I' II II II II II I' II I I II I1 II II 11 11 III II 11 11 11 11 I ire■■ II II E JL 1 1 1L 7 L 'i Z f ----- I="-=11 C rr' CO r jJ '1 1 II II 11 II II II II II I11 11111, II II I. 11 C_ 7J II II I L- cr, I NI 11 I t ,1 ii N Ii 11 II II Ii 11 i1 II ' 11 9 1 1 "E_31 I 11 \1 -J 1. Us Usu 11 IH _ t1 ,z-s:Wz.zza: 1,1 11` 1 t1 ' t11 1 \:1 00 IH 11 11 11 tt 11 11 11 11 11 11 11 1t '1'1 111 111 111 \1 1t 11 111 111 11 111 111 U; 11 \1 4.4 11; r1 �1T- 0•�•r eee'``•Y----1 � 1,1 (f 1 1 11 1 1 1 111 It l �'4 1 1 1 11 1 I 1‘:4 11\ 111 IU 111 111 111 111+1\ 111'111 111 111 111 111 111 104 11 1 - - WI t t 1 1 1 I 1 t , \ 11 1 \ tt 1 1 11 .,%1 1 i 1 11 N DDC UPGRADES PLAN - BUILDING E - FLOOR PLANS - IBEX TRUNK 3 SCALE : 1/16" = 1'-0" I4 GENERAL NOTES: 1. ANY EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. PROVIDE SOFTWARE UPDATES TO ON-SITE FRONT END COMPUTER AS WELL AS OFF-SITE FRONT END ACCESS, LOCATED AT MAINTENANCE & OPERATIONS, SO AS TO HAVE A COMPLETE AND OPERABLE SYSTEM. 3. PROVIDE REVISIONS TO CURRENT SEQUENCE OF OPERATIONS AS NOTED IN PROJECT SPECIFICATIONS. 4. PROVIDE POINT TO POINT VERIFICATION OF ALL NEW CONTROL SEQUENCES IN ACCORDANCE WITH PROJECT SPECIFICATIONS. PLAN NOTES: CI REMOVE AND REPLACE ALL EXISTING TUX CONTROLLERS WITH NEW BACTALK VLC CONTROLLERS. THIS SHALL INCLUDE ALL EXISTING VAV'S, AHU'S AND EMCP CONTROLLERS, TOTAL OF (23). FIELD VERIFY EXACT QUANTITY. OREMOVE ALL EXISTING IBEX MICROSET SPACE TEMPERATURE SENSORS AND ALL ASSOCIATED WIRING AND REPLACE WITH NEW BACTALK MICROSET II SPACE TEMPERATURE SENSORS AND NEW WIRING SUITABLE FOR USE WITH NEW SENSORS. TYPICAL OF (18) LOCATIONS, FIELD VERIFY. OREMOVE AND REPLACE (1) BCM -TUX CONTROL MODULE WITH (1) NEW BCM-MSTP CONTROL MODULE. 0 REMOVE AND REPLACE THE IBEX TRUNK COMMUNICATION WIRE TO THE BACNET MS/TP. PROVIDE CURRENT COMMUNICATION WIRE STANDARD. OEXISTING BOILER PLANT. REMOVE AND REPLACE ALL EXISTING EMCP CONTROLLERS AND ASSOCIATED WIRING. PROVIDE NEW CONTROLLERS, MATERIALS, WIRING AND SEQUENCING AS NOTED WITHIN THE PROJECT SPECIFICATIONS. Ma7—OOS`0 architects rolluda architecture planning inter or design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com >- Z U) W Z M0 J W <C LU Z > W/ WCO J w� W 07 Q O QQ 0 O Cn = cc g << U O (/) 12 I— U I_ J ao o O OH orno I O N -V = Q VasLi Ei REVISION DATE Design: RSH Drawn: Checked: Project No. RSH utArtA RECEIVED D OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DDC UPGRADES PLAN - BUILDI Drawing Numbe CODE COMPLIANCE APPROVED CM5NO 1Y 0 9 2011 City of Tukwila BUILDING DIVISION N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INCA CM5.01 OVERALL SITE DDC PLAN.DWG 2 CL0 I) ti \� EE ••SHEET M2 51 F013 CONT; 4" HWS $c: 0 IFrr—EO1 N: 2N; & 3N R' E -A01 ,.-__� DDC U PG_ ._RADES _- OVERALL ATTIC PLAN _ _ ..-_EXISTING f SCALE : 1/16" = GENERAL NOTES: 1. ANY EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS -BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2. DRAWING SHALL BE USED FOR REFERENCE PURPOSES ONLY. Mr7 ��sO roBluda architects arch texture planning' interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 iltkz. TRES WEST ENGINEERS TRES WEST ENGINEERS, INC: 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com LA, WA 98168 0 ti M C C) rn m o LLI J Q. 0 Cl) O 0 U REVISION DATE Design: Drawn: Checked: Project No. RSH RSH DMIVIECEIVED CITY OF TUKWILA APR 2 5 2017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title DDC UPGRADES - OVERALL ATTIC PLAN �~�- ,LLL 0015-11/.91017 Drawing Numb -r APPROVED MAY 0 9 2017 .°4 of Tukwila BUILDING DIVISION CM5 CM5.01 OVERALL SITE DDC PLAN.DWG CI - 0.1 N Criti 0 N N r COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC ESL CLASS VOLUNTEER RM. A101 JANITOR CLST. A117 OFFICE A113a. L � MEN'S A102 WOMEN'S A103 It L ELEC. CLST. A116 STAFF LOUNGE A104 STAFF WORKROOM A105 OFFICE 1 A108 ! i TOILET �......._A109-] CONF. RM A107 STORAGE A111 HEALTH RM. A110 00 RECEPTION I A112 SUPPORT STAFF A113 PRINCIPAL OFFICE A114 zi OFFICE A115 A4 J Li I- I I _ _ FM __ I I L- I CAFETERIA EXPANSION B113 J t KITCHEN B107 BOYS B105 GIRLS B106 VESTIBULE 11 B101 L 1.._ VESTIBULE ......_ _...8102...... L_ .....-_._.19.....__ _, __L.I— Ii L MULTI-PURPOSE/ CAFETERIA B103 U........_.... FOOD STORAGE I B108 P.E. OFFICE/STRG. B109 CUST. B104 - CHAIR STRG. B110 0® L�l J ARTIAL FIRE PROTECTION PLAN - BUILDINGS A & B SCALE : 1/8" = GENERAL NOTES: 1. FIRE SPRINKLER SYSTEM IS A PERFORMANCE SPECIFICATION. CONTRACTOR IS RESPONSIBLE FOR FULLY COMPLIANT SYSTEM DESIGN AND INSTALL. 2. DIAGRAMMATIC ROUTING OF CONCEALED PIPING SHOWN IS FOR REFERENCE ONLY. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE ROUTING WITH OTHER TRADES; PROVIDE PIPE OFFSETS AND COVERAGE AS REQUIRED. PIPING AND HEAD LOCATIONS SHALL NOT OBSTRUCT ACCESS TO MECHANICAL EQUIPMENT IN ATTICS OR ABOVE CEILINGS. 3. PROVIDE SPRINKLER PROTECTION FOR ALL AREAS OF THE BUILDING INCLUDING VOID SPACES, CEILING SPACES, ATTIC SPACES, ETC. NOT PREVIOUSLY PROVIDED WITH FIRE PROTECTION. 4. SPRINKLER SYSTEM SHALL COMPLY WITH REQUIREMENTS OF NFPA 13 AND AUTHORITY HAVING JURISDICTION. 5. SPRINKLER CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES PRIOR TO INSTALLATION. HVAC WORK SHALL TAKE PRECEDENCE. SPRINKLER PIPING INSTALLED WITHOUT PROPER COORDINATION SHALL BE SUBJECT TO REMOVAL AND REINSTALLATION AT NO COST. 6. FIRE SPRINKLER CONTRACTOR SHALL PROVIDE COMPLETE SHOP DRAWINGS TO THE ARCHITECT FOR APPROVAL PRIOR TO SUBMITTING TO THE JURISDICTION. 7. PROVIDE SEISMIC FLEXIBLE PIPE CONNECTIONS TO SPRINKLER HEADS IN CEILINGS. 8. SEE DIV 21 SPECIFICATIONS FOR DESIGN GUIDELINES.. 9. EXTERIOR BUILDING OVERHANGS LESS THAN 4'-0" DO NOT REQUIRE SPRINKLER PROTECTION. 10. MAINTAIN FIRE AND SMOKE RATINGS OF WALLS. PLAN NOTES: 1O EXTENT OF FIRE PROTECTION WORK SHALL BE CONTAINED WITHIN THIS AREA. EXISTING FIRE PROTECTION INCORPORATES THE USE OF BOTH WET & DRY SYSTEMS AND SHALL BE ADDRESSED ACCORDINGLY. ODEMOLITION AND OR RELOCATION OF EXISTING WET/DRY FIRE PROTECTION SYSTEM DRAINS, PENDANTS, ETC. SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR. ALL EXISTING DEVICES, PIPING AND OR EQUIPMENT SHALL BE FIELD VERIFIED PRIOR TO PERFORMING ANY NEW WORK. O3 COORDINATE WITH ARCHITECT FOR FINAL LOCATION OF ALL NEW SPRINKLER HEADS SO AS NOT TO CONFLICT WITH NEW STRUCTURE AND OR REVISED CEILING GRIDS. 0 EXISTING 4" WET FIRE MAIN UP. FIELD VERIFY EXACT LOCATION. FIRE MAIN PIPING SHOWN IS FOR REFERENCE PURPOSES ONLY. ROUTING SHALL BE PROVIDED BY FIRE PROTECTION SPECIALIST AND IN ACCORDANCE WITH NFPA 13. O5 LOCATION OF MAIN SPRINKLER PIPING SHALL BE COORDINATED WITH ARCHITECT SO THAT NO SKYLIGHT AREAS INCLUDE EXPOSED PIPING. rolluda architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com REVISION DATE Design: Drawn: Checked: Project No. RSH RSH DM UM_CEIVED CITY OF TUKWILA APR 252017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 KEY PLAN Drawing Title FIRE PROTECTION PLAN - BUILDINGS A & B Drawing Number, COMPLIANCE APPROVED CM7 I 0 9, 2017 City of Tukwila BUILDING DIVISION CM7.01 BUILDING A & B FIRE PROTECTION PLAN.DWG 4/12/2017 5:20 PM COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC UNISTRUT OPTION PIPE STRAP OPTION SECURE ALL PIPE WITH UNISTRUT CLAMPS - 1-1/2" EXTENSION BLOX OR EQUAL (WHERE NEEDED) SECURE ALL PIPE WITH TWO HOLE PIPE STRAPS 1-1/2" EXTENSION BLOX OR EQUAL (WHERE NEEDED) ROOFTOP BLOX UNIT WITH CUSHIONED BASE OR EQUAL BLOX SECURING BRACKET OR EQUAL. SECURE TO ROOFING WITH STRUCTURAL ADHESIVE / FINISHED ROOF / 1. DO NOT PENETRATE ROOFING MATERIAL. ROOFTOP PIPE SUPPORT SCALE: NONE. EQUIPMENT ANCHORS (MINIMUM 4 PER UNIT, 2 ON EACH SIDE) TO BE PROVIDED BY EQUIPMENT/CURB MANUFACTURER EQUIPMENT ANCHOR EQUIPMENT BASE FRAME TREATED 2x4 NAILER 16" MINIMUM" ATTACH FRAME TO EQUIPMENT ANCHOR STAINLESS STEEL COUNTER FLASHING BY M.C. BUILT UP ROOFING BY OTHERS HP -B01 I PROVIDE INSULATION UNDER UNIT; FILL CAVITY EQUIPMENT ANCHOR FASTEN TO WOOD NAILER FACTORY ROOF CURB CANT STRIP AND FLASHING BY OTHERS ROOF DECK SECURE CURB TO ROOF DECK NOTES: INSULATE PERIMETER OF CURB WITH RIGID INSULATION OPENING FOR DUCTWORK AS NEEDED TYPICAL STRUCTURAL SUPPORT MEMBER. (E) CONDITIONS SHALL BE FIELD VERIFIED, PROVIDE ADDITIONAL SUPPORT AS REQUIRED BY STRUCTURAL. 1. SECURE CURB TO ROOF DECK IN ACCORDANCE WITH SEISMIC ENGINEER'S CALCULATIONS AND DESIGN. 2. ATTACH EQUIPMENT TO CURB IN ACCORDANCE WITH SEISMIC ENGINEER'S CALCULATIONS AND DESIGN USING EQUIPMENT ANCHORS SIMILAR TO DETAIL ABOVE. ROOF MOUNTED EQUIPMENT CURB SCALE: NONE FINISHED ROOF -1 ROOFTOP MOUNTED EQUIPMENT 3/4" WAFFLE PAD. SECURE TO CURB WITH STAINLESS STEEL FASTENERS. CAULK AT FASTENERS— �– MOP ROOFING UP SIDES OF SLEEPER (TYPICAL) ROOF DECK END VIEW NOTES: I PRESSURE TREATED 4 x LEVELING SLEEPER BEARING ON ROOF DECK WITH CANT ALL SIDES (TYPICAL) (VERIFY EXACT SIZE AND LOCATION WITH EQUIPMENT SUPPLIED) \\– STAINLESS STEEL CAP ON SLEEPER; FLASH OVER ROOFING (TYPICAL). SECURE WITH STAINLESS STEEL FASTENERS FINISHED ROOF SIDE VIEW 1. GENERAL CONTRACTOR TO PROVIDE SLEEPERS, CANTS, AND ROOFING. 2. MECHANICAL CONTRACTOR TO PROVIDE STAINLESS STEEL CAPS, FASTENERS, AND WAFFLE PADS. ROOF MOUNTED EQUIPMENT W/O CURB SCALE: NONE THREADED ROD, ATTACH TO STRUCTURE; SEE NOTE 1 TRANSVERSE BRACE, (TYPICAL); SEE NOTE 1 STANDARD CLEVIS HANGER SIZED TO GO AROUND RIGID INSULATION INSERT, WITH CLEVIS CROSS BRACE PIPING FINISHED WALL HANGER ROD (TYPICAL) 1� METAL WALL SLEEVE FLUSH WITH WALL, AROUND PIPE PACK GAP WITH FIBERGLASS BATT INSULATION ACOUSTICAL CAULK AROUND PIPE PER SPECIFICATIONS METAL PIPE INSULATION AS REQUIRED AND AS SPECIFIED (TYPICAL) RIGID INSULATION INSERT AS SPECIFIED ESCUTCHEON IF NOT CONCEALED (TYPICAL) INSULATED PIPE PENETRATION - NON -RATED WALL SCALE: NONE TYPE 25 BEAM CLAMP OR OTHER SPECIFIED ATTACHMENT MAY REQUIRE ROD STIFFENER; SEE NOTE 1 NUT AND WASHER 11"41.1111111111110M RIGID INSULATION INSERT WITH SHIELD AS SPECIFIED INSULATION AS SPECIFIED NOTES: 1. SEISMIC BRACING, RIGID OR CABLE, SIZE, SPACING, CABLE ANCHORAGE TO BE SPECIFIED BY MECHANICAL CONTRACTOR'S SEISMIC ENGINEER, FOLLOWING SMACNA RESTRAINT MANUAL. INSULATED PIPE HANGER SCALE: NONE EXTERIOR WALL FLANGE, SECURE TO WALL, CAULK AND SEAL ALL AROUND OVERFLOW ROOF DRAIN NOZZLE WITH SS BIRDSCREEN HEIGHT PER ARCHITECTURAL ELEVATIONS, SEE ARCH DWGS FINISHED GRADE OVERFLOW DOWNSPOUT NOZZLE SCALE: NONE OVERFLOW ROOF DRAIN PIPE FROM ROOF DRAIN INTERIOR WALL FINISHED FLOOR } PIPE INSULATION AND METAL JACKET BIRD SCREEN CLAMP SIZED TO GO AROUND RIGID INSERT 0 — SLOPE L PIPING; SIZE AND QUANTITY AS NOTED ON PLANS RIGID INSULATION INSERT PER SPECIFICATIONS PIPE SUPPORT iT!1.TlT�!E I!; O O d^ EXISTING ROOF ^� FRAMING -▪ r- SIZE TO PROVIDE 1/2" CLEARANCE ALL AROUND SHEET METAL CAN PACK WITH FIBERGLASS INSULATION (E)WOOD CURB (E)FLASHING (E)FLASHING MEMBRANE PLATE AND SCREW SEAM CAULK RISER CLAMP ROOF CAP - INSULATED PIPING SCALE: NONE ROOF DRAIN (RD) ROOF FLASHING ROOF CONSTRUCTION, SEE ARCHITECTURAL DRAWINGS #4 SHEET LEAD BASE, SET IN PLASTIC CEMENT, OR EQUIVALENT. ROOF DRAIN LEADER, SEE PLANS FOR SIZE ROOF DRAIN SCALE: NONE NOTES 1. LOCATE ROOF DRAINS AT LOWE POINTS OF ROOF, AS SHOWN ON PLAN. 2. ALL ROOF FLASHING WORK AND MATERIALS ARE THE RESPONSIBILITY OF THE ROOFING CONTRACTOR. 3. ROOFING CONTRACTOR MAY USE AN ALTERNATE FLASHING ARRANGEMENT PROVIDED IT HAS BEEN SUBMITTED TO AND APPROVED BY THE ARCHITECT. r+llud,::rchitects arch tectum planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com REVISION DATE Design: Drawn: Checked: Project No. RSH RSH RECEIVED DMIVpI fV OF TUKVVILA APR 252017 PERMIT CENTER Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL DETAILS Drawing Num CM r-CC�Vlfrvv :u U I'. ;ODE COMPLIANCE APPROVED City of Tukwila BUILDING DIVISION CM0.01 MECHANICAL LEGEND.DWG 2 0 Li) N- N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC'