Loading...
HomeMy WebLinkAboutPermit M17-0058 - FOSTER HIGH SCHOOL STADIUM - ELECTRIC HEATERSFOSTER HIGH SCHOOL STADIUM 4242 S 144 ST M17-0058 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 1523049108 4242 S 144TH ST BLDG 1 MECHANICAL PERMIT Project Name: FOSTER HIGH SCHOOL STADIUM Permit Number: M17-0058 Issue Date: 8/14/2017 Permit Expires On: 2/10/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: TUKWILA SCHOOL DISTRICT 4640 S 144TH ST, TUKWILA, WA, 98168 ALEXANDER CLARK AIA 105 SOUTH MAIN ST #323 , SEATTLE, WA, 98116 HOLMBERG COMPANY 15400 SE 30TH PL, STE 100 , BELLEVUE, WA, 98007 HOLMBC*066ME Phone: (206) 624-4222 Phone: (425) 822-2233 Expiration Date: 9/1/2017 DESCRIPTION OF WORK: PROVIDE (3) NEW WALL MOUNTED FAN FORCED ELECTRIC HEATERS WITH INTEGRAL THERMOSTATS AND 1 CEILING STRATIFICATION FAN WITHIN CONCESSIONS BUILDING Valuation of Work: $9,200.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $330.76 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: 125 Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Permit Center Authorized Signature: Date: ql4 (7 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signatur /1 Print Name: ("(�\ Date: C(714/(7 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***MECHANICAL PERMIT CONDITIONS*** 2: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKW,_ Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. M11/00q0 Project No. Date Application Accepted: L Date Application Expires: 10 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: King Co Assessor's Tax No.: 4242 South 144th St., Tukwila, WA 98168 Tenant Name: Tukwila School District PROPERTY OWNER Name: 4j1'7e,--- L -dam Name: Tukwila School District City: P6'477t0 State:00 Zip:10(p y 7 Address: 4640 South 144th St. Email: 1. . aiy,e_,_Clkpz,z,apidmAeiygrvqt,. a City: Tukwila State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: 4j1'7e,--- L -dam Address: A'S - /*Iv cr cGLiZe 32,3 City: P6'477t0 State:00 Zip:10(p y 7 Phone: Fax: Email: 1. . aiy,e_,_Clkpz,z,apidmAeiygrvqt,. a Suite Number: Floor: New Tenant: ❑ Yes ® ..No MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: 4/1 Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Provide (3) new wall mounted fan -forced electric heaters with integral thermostats and (1) ceiling stratification fan within Concessions Building 9,200 Use: Residential: New ❑ Replacement ❑ Commercial: New 21 Replacement ❑ Fuel Type: Electric ® Gas ❑ Other: H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-I6.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 1 Suspended/wall/floor mounted heater 3 Appliance vent Commercial Repair or addition to heatlrefrig/cooling system 1 Air handling unit 65 dB(A) <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm Industrial Evaporator cooler 1 Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 1 Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 1 Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 1 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-1Opm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AU Signature: Date: ii/f4 Z0/001 --- Print Name: / C(1424-- Day Telephone: 2-.06 - rD Zr ya z Z` Mailing Address: --'Ls' 5041- AiAJ 52 NAV. TS//h, City State Zip H:\Applications\Forms-Applications On Line\2016 Applications\Mcchanical Permit Application Revised I-4-16.docx Revised: January 2016 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $5,767.50 M17-0056 Address: 13601 32ND AVE S Apn: 1623049038 $3,557.17 MECHANICAL $3,387.78 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $3,354.63 TECHNOLOGY FEE $169.39 TECHNOLOGY FEE R000.322.900.04.00 0.00 $169.39 M17-0057 Address: 3825 S 128TH ST Apn: 2384200010 $1,943.18 MECHANICAL $1,850.65 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $1,817.50 TECHNOLOGY FEE $92.53 TECHNOLOGY FEE I R000.322.900.04.00 0.00 $92.53 M17-0058 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 $267.15 MECHANICAL $254.43 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $221.28 TECHNOLOGY FEE $12.72 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12125 R000.322.900.04.00 0.00 $12.72 $5,767.50 Date Paid: Monday, August 14, 2017 Paid By: HOLMBERG COMPANY Pay Method: CHECK 65743 Printed: Monday, August 14, 2017 12:02 PM 1 of 1 CIMPSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT PermitTRAK$3,438.09 QUANTITY PAID D17-0110 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 $569.36 DEVELOPMENT $569.36 PERMIT FEE R000.322.100.00.00 0.00 $69.83 PLAN CHECK FEE R000.345.830.00.00 0.00 $499.53 EL17-0308 Address: 13601 32ND AVE S Apn: 1623049038 $868.20 ELECTRICAL $868.20 PLAN CHECK FEE R000.345.832.00.00 0.00 $868.20 EL17-0309 Address: 12801 E MARGINAL WAY S Apn: 2384200010 $407.60 ELECTRICAL $407.60 PLAN CHECK FEE R000.345.832.00.00 I 0.00 $407.60 EL17-0310 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 $109.92 ELECTRICAL $109.92 PLAN CHECK FEE 1 R000.345.832.00.00 0.00 $109.92 M17-0056 Address: 13601 32ND AVE S Apn: 1623049038 $846.95 MECHANICAL $846.95 PLAN CHECK FEE 1 R000.322.102.00.00 I 0.00 $846.95 M17-0057 Address: 12801 E MARGINAL WAY S Apn: 2384200010 $462.66 MECHANICAL $462.66 PLAN CHECK FEE R000.322.102.00.00 I 0.00 I $462.66 M17-0058 Address: 4242 S 144TH ST BLDG 1 Apn: 1523049108 $63.61 MECHANICAL $63.61 PLAN CHECK FEE 1 R000.322.102.00.00 I 0.00 I $63.61 PG17-0048 Address: 12801 E MARGINAL WAY S Apn: 2384200010 $109.79 PLUMBING $109.79 PLAN CHECK FEE R000.322.103.00.00 TOTAL FEES PAID BY RECEIPT: R11350 0.00 $109.79 $3,438.09 Date Paid: Tuesday, April 25, 2017 Paid By: TUKWILA SCHOOL DISTRICT Pay Method: CHECK 95046 Printed: Tuesday, April 25, 2017 12:59 PM 1 of 1 CNN, INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. �. 188 CITY OF TUKWILA BUILDING 6300 Southcenter Blvd., #100, Tukwila. WA 98(206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 6X5Tilic? I4)6 -N ai+bb _ Type of Inspection: r firrt ' -, ROU —t N WWECIA4.1/C L. Address: Date Called: Special Instructions: .ST iOM 3t_O6- 1 Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: to< joz,e) 060 MI Itetez.finitha.--L_ Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Far COOK COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0058 DATE: 04/28/17 PROJECT NAME: FOSTER HIGH SCHOOL STADIUM SITE ADDRESS: 4242 S 144TH ST X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: vAr 011 Building Division Public Works Fire Prevention Structural Planning Division ❑ ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 05/02/17 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) 05/30/17 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 HOLMBERG COMPANY Horne. Espanol Contact Safety & Health Claims & Insurance Washington State Department of ki Labor & Industries Search L&I Page 1 of 3 A -Z Index help My L&I Workplace Rights Trades & Licensing HOLMBERG COMPANY Owner or tradesperson Principals WHITE, JEFF K, PRESIDENT BAILOR, WADE WAYNE, VICE PRESIDENT TOBIN, MARK ALLEN, SECRETARY HOLMBERG, A PHER, VICE PRESIDENT (End: 07/30/2015) WHITE, DIANA, SECRETARY (End: 07/30/2015) HOLMBERG, KANDICE K, SECRETARY (End: 07/30/2015) VARRIANO, JON S, TREASURER (End: 07/30/2015) Doing business as HOLMBERG COMPANY WA UBI No. 174 003 387 15400 SE 30TH PL, SUITE 100 BELLEVUE, WA 98007 425-822-2233 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. HOLMBC*066ME Effective — expiration 07/05/1994— 09/01/2019 Bond ............... HANOVER INSURANCE COMPANY THE Bond account no. 1959086 Received by L&I 07/18/2011 Bond history Insurance ... ..................... American Fire & Casualty Co Policy no. BKA55653106 $12,000.00 Effective date 09/01/2011 Expiration date Until Canceled $1,000,000.00 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=174003387&LIC=HOLMBC*066ME&SAW= 8/14/2017 HOLMBERG COMPANY Received by L&I Effective date 07/24/2017 09/01/2013 Expiration date 09/01/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings Cause no. 15-2-00439-2 Complaint filed by DJ MECHANICAL INC Complaint date 03/13/2015 Dismissed ................................ Complaint against bond(s) or savings 1959086 Complaint amount $49,186.06 L&I Tax debts ......................................... No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. This company has multiple workers' comp accounts. Active accounts L&I Account ID 104,069-02 ................................. Doing business as HOLMBERG CO Estimated workers reported Quarter 2 of Year 2017 "76 to 100 Workers" L&I account contact T1 / JAN BENTLEY (360)902-4652 - Email: STR0235@lni.wa.gov Track this contractor Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes ....................................................... No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/17/2013 Inspection no. 316854116 Location 1906 NE 45th Seattle, WA 98105 Inspection results date 04/03/2012 Inspection no. 315796003 Location 1415 5th Avenue Seattle, WA 98101 Violations No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=174003387&LIC=HOLMBC*066ME&SAW= 8/14/2017 MECHANICAL ABBREVIATIONS 0 A ABV ADA AFF AHJ ALT APPROX ARCH BLDG BLW BOT CAP CFM CLG CONN DIA DIM DN DWG EFF ELEC ELEV EQUIP °F FLR FOIC HP HR HT HVAC IN LB MECH MFR MIN MISC MTD (N) NA NO. POC RCP REQD RM SA SMACNA SPEC TAB TEMP T'STAT TYP V VD VEL VTR W W/O WSEC DIAMETER, PHASE AIR ABOVE AMERICANS WITH DISABILITIES ACT ABOVE FINISHED FLOOR AUTHORITY HAVING JURISDICTION ALTERNATE APPROXIMATE ARCHITECT BUILDING BELOW BOTTOM CAPACITY CUBIC FEET PER MINUTE CEILING CONNECTION DIAMETER DIMENSION DOWN DRAWING EFFICIENCY ELECTRIC ELEVATION EQUIPMENT DEGREES FAHRENHEIT FLOOR FURNISHED BY OWNER, INSTALLED BY CONTRACTOR HEAT PUMP, HORSEPOWER HOUR HEIGHT HEATING, VENTILATION & AIR CONDITIONING INCH POUND MECHANICAL MANUFACTURER MINIMUM MISCELLANEOUS MOUNTED NEW NOT APPLICABLE NUMBER POINT OF CONNECTION REFLECTED CEILING PLAN REQUIRED ROOM SUPPLY AIR SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, INC. SPECIFICATION TESTING, ADJUSTING AND BALANCING TEMPERATURE THERMOSTAT TYPICAL VENT, VOLTS VOLUME DAMPER VELOCITY VENT THRU ROOF WASTE, WATT, WIDTH WITHOUT WASHINGTON STATE ENERGY CODE MECHANICAL LEGEND REFERENCE SYMBOLS 1 MX.X NEW MECHANICAL WORK ENLARGED PLAN BORDER MATCHLINE DETAIL OR DRAWING IDENTIFIER REVISION CLOUD INDICATES WHERE SECTION APPEARS REVISIOP(I NUMBER INDICATES REVISION & NUMBER AHU-XXX ED EQUIPMENT IDENTIFIER NORTH ARROW CONTROLS pT ROOM THERMOSTAT SWITCH MECHANICAL GENERAL NOTES: 1. STANDARD CURRENT TRADE PRACTICES & METHODS APPLY TO THIS PROJECT. ALL WORK IS TO MEET REQUIREMENTS OF ALL CURRENT CODE & LOCAL JURISDICTIONAL REQUIREMENTS AND AMENDMENTS. THESE CODES INCLUDE BUT ARE NOT LIMITED TO WASHINGTON STATE ENERGY CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, UNIFORM PLUMBING CODE, NFPA, INTERNATIONAL FIRE CODE, & LOCAL JURISDICTIONAL REQUIREMENTS. COMPLY WITH ALL MANUFACTURER'S REQUIREMENTS. COORDINATE WITH OWNER'S REPRESENTATIVE FOR ANY VARIANCES. 2. DRAWINGS ARE DIAGRAMMATIC ONLY & NOT INTENDED TO SHOW ALL DETAILS OF THE WORK. VERIFY LOCATION & MEASUREMENTS OF ALL ITEMS ON THE JOB SITE PRIOR TO INSTALLATION. CONTRACTOR SHALL PROVIDE ALL OFFSETS & ADDITIONAL DUCTWORK & PIPING AS NECESSARY TO AVOID STRUCTURAL ELEMENTS ON THE PROJECT. CONTRACTOR SHALL PRODUCE SHOP DRAWINGS & COORDINATE WITH OTHER TRADES. THERE SHALL BE NO ADDITIONAL COST TO THE OWNER FOR THIS COORDINATION OR FOR EXTRA MATERIAL REQUIRED IN ORDER TO ACCOMPLISH THIS TASK. 3. PROVIDE COMPLETE & FULLY -OPERATING SYSTEMS. 4. COORDINATE LOCATIONS OF ALL EQUIPMENT & APPURTENANCES WITH OTHER TRADES. 5. ALL EQUIPMENT SHALL BE REGULARLY CATALOGED ITEMS OF THE MANUFACTURER & SHALL BE SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD SPECIFICATIONS. ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION SHALL BE INCLUDED UNLESS OTHERWISE NOTED. 6. ANY CUTTING, PATCHING & PAINTING OF BUILDING ELEMENTS & FINISHED SURFACES IS TO BE DONE BY THE GENERAL CONTRACTOR. 7. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE. 8. ALL EQUIPMENT SHALL BE LABELED PER PLANS & THE REQUIREMENTS OF THE SPECIFICATIONS. 9. CAULK & FLASH ALL PENETRATIONS PER CODE. 10. ADJUSTING & BALANCING: ADJUST EACH PART OF SYSTEM TO ENSURE PROPER FUNCTIONING OF ALL CONTROLS & SPECIFIED AIR DISTRIBUTION. LEAVE ENTIRE SYSTEM IN OPERATING CONDITION. 11. PROVIDE OPERATING & MAINTENANCE MANUALS (O&MS), RECORD DRAWINGS, & OWNER TRAINING PER WSEC. 12. PROVIDE NATIONAL ELECTRICAL CODE (NEC) MINIMUM WORKING CLEARANCE IN FRONT OF ANY ELECTRICAL PANEL, INCLUDING PANELS ON EQUIPMENT. RE-ROUTE OR OFFSET PIPING AND/OR DUCTWORK AS REQUIRED. 13. PROVIDE COMMISSIONING OF THE HVAC SYSTEM. INCLUDE FUNCTIONAL TESTING SEQUENCE OF OPERATION & TEST PROCEDURES PER WASHINGTON STATE ENERGY CODE. SEE SPECIFICATIONS FOR SPECIFIC EQUIPMENT TESTING REQUIREMENTS. ITEMS TO BE COMMISSIONED ARE: CONTROL SYSTEMS, AIR HANDLERS, HEAT PUMPS, EXHAUST FANS, PUMPS, CHILLERS, COOLING TOWERS, CONDENSING UNITS, MAKE-UP AIR UNITS, BOILERS, POOLS, SPAS, AND WATER HEATERS. AIR AND HYDRONIC SYSTEMS SHALL BE BALANCED SO AS TO FIRST MINIMIZE THROTTLING LOSSES, THEN ADJUSTED TO MEET DESIGN FLOW CONDITIONS. PROVIDE PRELIMINARY AND FINAL COMMISSIONING REPORTS. SUBMIT FIGURE C408.1.2.1 COMPLIANCE CHECKLIST FROM WASHINGTON STATE ENERGY CODE TO AUTHORITY HAVING JURISDICTION UPON COMPLETION OF PRELIMINARY COMMISSIONING REPORT. PROVIDE CLOSEOUT DOCUMENTS IN COMPLIANCE WITH C103.6 14. CEILING FANS, EQUIPMENT, DIFFUSERS, & GRILLES SHALL BE COORDINATED WITH PLACEMENT OF LIGHT FIXTURES. 15. SUPPORT FOR SUSPENDED EQUIPMENT SHALL INCLUDE APPURTENANCES AS NOTED IN ASHRAE AND REQUIRED IN CODE FOR SEISMIC/SWAY BRACING. 16. REFERENCE BUILDING HVAC LOAD CALCULATIONS FOR EQUIPMENT CAPACITIES. NO HUMIDIFICATION PROVIDED. NO SIMULTANEOUS HEATING/COOLING ALLOWED. ELECTRIC WALL HEATER SCHEDULE TAG LOCATION MANUFACTURER / MODEL AIRFLOW (CFM) ELECTRIC HEATING ELECTRICAL DIMENSIONS (LxWxHT) (INxINxIN) WEIGHT (LBS) NOTES CAPACITY (W) STAGES (#) FLA (AMPS) MAX FUSE (AMPS) VOLT./PH. (V/0) WH -01 STADIUM - TOILET 21 Q -MARK AWH4404F - 1500W 1 7.2 15 208V/1 15-3/4x5x19-5/16 22 SEE NOTES WH -02 STADIUM - TICKET BOOTH 18 Q -MARK AWH4404F - 3000W 1 14.4 20 208V/1 15-3/4x5x19-5/16 22 SEE NOTES WH -03 STADIUM - CONCESSIONS 19 Q -MARK AWH4508F - 4800W 1 23.1 15 208V/1 15-3/4x5x19-5/16 22 SEE NOTES 89.5 89.5 88.5 89.5 89.5 7.5 88.5 91.0 90.2 89.5 91.7 91.0 NOTES: 1. ALL MODELS; PROVIDE WITH MODEL AWHS2 SURFACE MOUNTING FRAME AND MODEL LFKSFCNW TAMPER RESISTANT FRONT COVER. THERMOSTAT SHALL BE INTEGRAL. CEILING FAN SCHEDULE TAG LOCATION MANUFACTURER / MODEL AIRFLOW (SPEED) AIRFLOW EFFICIENCY ELECTRICAL DIMENSIONS (DIAxHT) (INxIN) WEIGHT (LBS) NOTES FLA (W) MAX FUSE (AMPS) VOLT./PH. (V/0) CF -01 STADIUM - CONCESSIONS 19 HUNTER CHRONICLE 59236 LO -MED -HI 81 CFM/W @ HI SPEED 82W 15 120V/1 54x44 25 SEE NOTES NOTES: 1. PROVIDE FAN IN MATTE SILVER FINISH, DAMP RATED, PROVIDE WITH 36" DOWN ROD, THREE -SPEED STEPPED WALL CONTROL AND MATTE SILVER ANGLED CEILING ADAPTER FOR INSTALLATION IN PITCHED ROOF. ENERGY EFFICIENT ELECTRIC MOTORS MINIMUM NOMINAL FULL -LOAD EFFICIENCY SCHEDULE SM0.01 MINIMUM NOMINAL FULL -LOAD EFFICIENCIES (%) MOTOR HP OPEN MOTORS ENCLOSED MOTORS MECHANICAL COMPLIANCE FORMS NUMBER POLES 2 4 6 2 4 6 SYNCHRONOUS SPEED (RPM) 3600 1800 1200 3600 1800 1200 1.0 77.0 85.5 82.5 77.0 85.5 82.5 1.5 84.0 86.5 86.5 84.0 86.5 87.5 2.0 85.5 86.5 87.5 85.5 86.5 88.5 3.0 85.5 89.5 88.5 86.5 89.5 89.5 5.0 86.5 89.5 89.5 88.5 89.5 89.5 7.5 88.5 91.0 90.2 89.5 91.7 91.0 NOTES: BE ESTABLISHED IN ACCORDANCE WITH NEMA STANDARD MGI. ELECTRIC MANUFACTURERS ASSOCIATION (NEMA) DESIGN CLASS SMALL AND MEDIUM AC SQUIRREL -CAGE INDUCTION MOTORS. 1. NOMINAL EFFICIENCIES SHALL DESIGNS A AND B ARE NATIONAL DESIGNATIONS FOR FIXED FREQUENCY REVISIONS !o chances shell be made to the scone of wort( without prior approval of Tu!v.-vb Building Division. f‘f TE: f vis ons will require a new plan submittal and may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: D Mdchartiad D' at 1:915IumbIng Clew POMO City of Tukwila BUILDING DIVISION FILE COPY Permit No. (1 FI7.n r vio r = approy Ri is subject to errors and omission. . .,Ircrtvai of cousin odor documents does not authorize t.: violation of lny f:adopted code or ordinance. Receipt oil approved Field Copy andconditions is acknowledged: Date: 1/4-/17 City of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED '. ) MAY 0 4 2017 City of Tukwila BUILDMAN/18ION RECEIVED CITY Or' TUKWILA 152017 CENTER MECHANICAL SHEET LIST: SM0.01 MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES AND SHEET LIST SMCF.01 MECHANICAL COMPLIANCE FORMS SMCF.02 MECHANICAL COMPLIANCE FORMS SM1.01 HVAC FLOOR PLAN rolluda archi4ects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 fr'st• 1.1014 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com I- Lij VJ 0H, J Lt O 4 co O a_ I- = z cU w Q L -1-I J / Q� I- CO 4242 SOUTH 144TH STREET, TUKWILA, WA 98168 w .i m�w o F- "t I- I- -REVISION DATE Design: Drawn: Checked: Project No. RSH RSH DMM 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL LEGEND Drawing Number SMO.O1 COPYRIGHT 0 2015 ROLLUDA ARCHITECTS INC SS LEGEND.DWG Pro j ectSummary PROJ-SUM 2015 WSEC Compliance Forms for Commercial Buildings Including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016 General Infop This PROJ-SUM form shall be provided as a cover sheet for all compliance form submittals. Project Title matches project plans title block. Title: ProjectStadium Services Improvements Date 4/6/2017 6 Project Street Address: 4414 S 144th ST For Building Department Use • Project City, County, Zip: Tukwila, King, 98168 Project Owner or Rep: Tukwila School District Jurisdiction: Tukwila School District Code Provision Project Description Select all that apply to the scope of project. Select Addition + Existing or Alteration + Existing if the existing building will be combined with the addition or alteration to demonstrate compliance per Section C502.1 or C503.1. New Construction ❑ New Building Existing Building ❑ Alteration ❑ Change Building Elements ❑ All ❑ Service Hot and Additions ❑ Building Addition Retrofit ❑ Alteration + Existing of Occupancy ❑ Historic Building Scope - Select all that apply ❑ Addition + Existing -I Change in Space Conditioning Stairway and shaft vent dampers 4 Building Envelope 4 Mechanical Systems Water Systems ❑ Lighting Systems ❑ Electrical Systems Occupancy Type h Y yP 0 All Commercial O Group R - R2, R3, & R4 0 over 3 stories and all R1 Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group R occupancies. • Mixed Occupancy - Building is three stories or less above grade and it has both Commerical and Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. Space Conditioning Categories Select all that apply ❑ Fully Conditioned ❑ Low Energy to the scope of project ❑ Refrigerated Warehouse, Walk-in Cooler/Freezer, Refrigerated Display Case' .1 Semi-heatedz Space Category3 Eligible Low Energy Spaces ❑ Unconditioned ❑ Low energy heating/cooling capacity ❑ Wireless service ❑ Greenhouse4 ❑ Equipment building equipment shelter Floor Area and Stories Floors Above Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area 1 2,884 588.0 General Compliance Path Qe Prescriptive C Total Building Performance Prescriptive - Projects complying prescriptively shall demonstrate compliance with all applicable mandatory and prescriptve requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms to include with a Prescriptive submittal: All applicable ENV, LTG, MECH and C406. Total Building Performance - Projects complying via total building performance (TBP) shall include a summary of results from a whole building energy model per Section C407 and shall demonstrate compliance with all applicable mandatory provisions in this Code. Refer to Section C401.2, item 2 for more information. Compliance forms to include with a TPB submital: PROJ-SUM, C406 -SUM & C406 -DETAIL, ENV -CHK, LTG -EXT, LTG -CHK, and all MECH forms (except MECH-ECONO). 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical ., trat,Y Y,K Y55`v;k=, $ S' u.n?n. m,WS m 2015 Washington State Energy Code Compliance 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 CS s ecin.cal PermitPlansChecklistMECH CHKj. Mechanical 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and afl R1 Revised January 2017 ,- i MECH-SUM Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.4.3 Stairway and shaft vent dampers I s: verify Indicate location of stairway and shaft vent dampers on p an rrty dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements Adding three wall heaters and one ceiling fan. 1 Mechanical systems NA 0403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously, identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements Mechanical Schedules forms are not required, NA C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to have air economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken fire station occupancies) air in a manner that does heating or cooling is required. Exception 1) of DOAS (C403.6, Exception library or fire station) C402.4.1.4 with 100% of U DOAS is required per C403.6 effective July 1, 2017 (office, retai, education, library and Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible NA C406.2.1 C403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply Fan Power • ❑ Project includes HVAC air distribution systems that provide heaing and/or cooling If yes, provide a MECH-FANSYS -SUM form. NA C406.2.2 C403.2.3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% IS Hydronic chilled water ❑ Water -loop heat pump ✓ No hydronic systems NA C406.2.3 0403.2.11.3 Minimum fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans is >_ 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency 0406 Additional Efficiency Options - Mechanical ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment isted in tables C403.2.3(1)-(9) pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must minimum requirements. All stand alone supply, return, and exhaust fans over 1hp must selected within 10% of maximum total or static pressure. HVAC System Controls Yes C403.2.4.1 Thermostatic controls (thermostats and humidistats) Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, including perimeter system zones SM0.01 0403.2.7.1 Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and male -up air, if applicable, indicate that direct make-up air to each hood does not exceed 10% of toad exhaust Economizer heating system impact - air and water If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table 0403.2.7.1 and compliance method (DCV, energy recovery, or transferair that would otherwise be exhausted) NA C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less Refer to Systems Requiring Energy Recovery for requirements NA C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling For HVAC fan motors z 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 113 static desgn pressure); note exception taken NA C403.2.4.1.3 Setpoint overlap restriction (thermostats) If separate heating and cooling systems with separate thermostatic control devices are used to serve a zone, indicate locations of both thermostatic control devices and the zone they serve on plans For DX air handlers with economizer and cooling capacity z 65,000 Btu.h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load Air economizer high limit controls Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA C403.2.4.2 C403.2.4.2.1 C403.2.4.2.2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken For DX air handling units with cooling capacity z 65,000 BtuT and evaporative and chilled water air handling units with fan z 0.25 hp, indicate whether system is angle zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) NA C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controllinc capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing s 30% of full speed fan powerduring periods of low cooling or ventilation only; or exception taken NA C403.2.4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA / exhaust Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table 0403.2.4.12.1 NA C403.2.4.3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) Ducting Systems NA NA C403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC NA C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans NA C403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed NA C403.2.4.6 Freeze protection system controls Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken NA C403.2.4.9 Group R1 hotel! motel guest rooms For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at least 5°F; indicate control method - activated by room entry or occupancy sensor R CO[ NA C403.5.2 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical ., trat,Y Y,K Y55`v;k=, $ S' u.n?n. m,WS m 2015 Washington State Energy Code Compliance t f Y Y Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 ,- i MECH-SUM Revised January 2017 Project Information Project Title: Stadium Services Improvements Date 4/6/2017 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept. Use Company Name: Tres West Engineers, Inc Company Address: 2702 South 42nd St, Ste 301 Applicant Name: Shawn Rodriguez Applicant Phone: 253-328-7890 Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and C407 Energy Analysis forms required. Group R2 I R3 dwelling units, Group R2 sleeping units ❑ New Building ❑ Building Addition ■ Tenant Improvement - System Retrofit • No System Changes Adding three wall heaters and one ceiling fan. 1 Mechanical systems Design Load Calculations building heating, cooling or includes all applicable J Load calculation summary ❑ MECH-LOAD-CALC Form Provide design load calculations for all mechanical systems and equipment serving the ventilating needs. If a load calculation summary is provided with the permit documents that compliance information then the MECH-LOAD-CALC form is not required. Mechanical Schedules forms are not required, -' Mechanical Plans ❑ MECH-EQ Forms (TBD) Indicate location of equipment compliance information. If provided cn plans then MECH-EQ however, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate If delivered via natural ventilation. identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces fire station occupancies) air in a manner that does heating or cooling is required. Exception 1) of DOAS (C403.6, Exception library or fire station) C402.4.1.4 with 100% of U DOAS is required per C403.6 effective July 1, 2017 (office, retai, education, library and All occupied, conditioned areas shall be served by a DOAS that delvers required ventilation not require space conditioning fan operation. Space conditioning fats cycled off when no ❑ Ventilation provided via natural ventilation per 2015 IMC in feu of DOAS (C403.6, ❑ Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu 2) U DOAS included in project, although not required (occupancy not office, retail, education, [I DOAS related allowances included in project: • Prescriptive vertical fenestration maximum area allowance increased to 40% per conditioned floor area in building served by DOAS. ❑ Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form. Fan Power • ❑ Project includes HVAC air distribution systems that provide heaing and/or cooling If yes, provide a MECH-FANSYS -SUM form. exceeds 5hp. 5 horsepower threshold. 0 For one or more systems, the total fan motor nameplate hp of al fans in HVAC system If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the Refer to Section C403.2.11 and MECH-FANSYS-DOC forregiirements and exceptions. HVAC Hydronic Systems IS Hydronic chilled water ❑ Water -loop heat pump ✓ No hydronic systems C403.2.6.4 C403.2.6.4.1 Enclosed loading dock ventilation • Hydronic heating water ❑ Geothermal 0406 Additional Efficiency Options - Mechanical ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment isted in tables C403.2.3(1)-(9) pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must minimum requirements. All stand alone supply, return, and exhaust fans over 1hp must selected within 10% of maximum total or static pressure. or air -to -water heat be 15% more efficient than have FEQ z 71 and must be required ventilation air in a annual hot water energy use ■ C406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DOAS per C403.6 that delivers manner that does not require space conditioning fan operation. • C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C4C6.7.1 and that 60% of be provided by heat pump, waste heat recovery or solar water -testing systems. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 .:', •" ;:" ,r,..,L ,... 3' :, ,,f i ,,: ., t y l Machan ca .,.Summa . 2 2015 Washington State EnergyCode Compliance Forms for Commercial, R2 and R3 over 3stories and all R1 - Page 3 of 7 9 P ?. "`C`7,}Vf 1�Y.•...„Y{{Fi}�4.YXZ�..ry"3t1$i>n4h�� i�£il$tiY,Y$.S.Y{. S}: nY�t;.,:(vJ:.:3Y ,. tE S u 3= ; Mechanical P,ermrt�Plans �LChecklist F MECH CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3stories and all R1 Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessaryto check a permit application for compliance with the mechanical systems and equipment rsqui rements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documerts Location in Documents Building Department Notes NA 0403.2.4.11 Group R2 I R3 dwelling units, Group R2 sleeping units For primarys ace conditioning system, indicate 5-2 programmable themostats capable of twoC403.2.4.10 setback periods per day; for all thermostats indicate purpose (heating oily, cooling only, or both), required temperature range and at minimum a 10°F deadband; cr exception taken water heating systems per C408.4 systems regardless of individual equipment capacity. systems in the building do not exceed 240,000 Btu/h commissioning not required. does not exceed 200,000 Btu/h. Service water heating 1 Mechanical systems NA C403.2.6 C403.2.11.4 Ventilation Indicate method of ventilation air delivery (natural or mechanical) for ea:h zone systems commissioning Low Energy and Semi -Heated Spaces (Note 6 and 7 If mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken Location in Plan(s) Space(s) Served If delivered via natural ventilation. identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) NA C403.2.6.2 Demand controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA> 3,000 cfm, and / or the system has airside economizer or automatic modulating OSA damper; indicate OSA controls are configured to provide demand controlled ventilation or protide supporting documentation for applied exception NA C403.2.9.1 NA C403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms> 500 sf, indcate occupancy -based OSA control when space is unoccupied and method (closes OSA dam ter or shuts -off equipment); or alternate means provided to automatically reduce OSA vhen space is partially occupied Economizers NA NA C403.2.6.4 C403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer, indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA C403.2.6.4 0403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation / exhaust system actvated by gas detection system for CO and NO2, and control method (staged or modulating); orexception taken Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA 0403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and male -up air, if applicable, indicate that direct make-up air to each hood does not exceed 10% of toad exhaust Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table 0403.2.7.1 and compliance method (DCV, energy recovery, or transferair that would otherwise be exhausted) NA NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements NA NA C403.2.13 Variable flow capacity - HVAC system fans For HVAC fan motors z 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 113 static desgn pressure); note exception taken For systems with cooling capacity z 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken NA C403.3.1 DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity z 65,000 Btu.h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA NA C403.2.11.5 Fan airflow control For DX air handling units with cooling capacity z 65,000 BtuT and evaporative and chilled water air handling units with fan z 0.25 hp, indicate whether system is angle zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) NA For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is <_ 66% of full speed drawing 540% of ful speed fan power during periods of low cooling or ventilation only Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controllinc capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing s 30% of full speed fan powerduring periods of low cooling or ventilation only; or exception taken NA NA C403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table 0403.2.4.12.1 NA Identify all DDC system input / output control points; indicate capability for trending and graphical display DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity z 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Ducting Systems NA 0403.2.8.1 C403.2.8.3 Duct construction Indicate on plans that all ductwork is constructed and sealed per IMC Energy recovery (ER) - ventilation /exhaust systems For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC For rooms served by multiple systems with aggregate design OSA> 5,000 cfm, or aggregate design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations NA C403.2.8.3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans NA NA C403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed NA C404.10.4 (under C404.11) 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 .:', •" ;:" ,r,..,L ,... 3' :, ,,f i ,,: ., t y l Machan ca .,.Summa . 2 „ = MECH-SUM Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Service Water Heating Systems Equipment Type (s) ❑ Instantaneous ❑ Heat exchange from space heat boiler or central hot water/steam ❑ On -demand Project Title: StadiumServicesImprovements water systems U Hot water heating tank(s) El No service ❑Dedicated boiler Distribution Type (s) ❑ Circulation System Code Provision Commissioning Commissioning is required for: per C408.2 shall be performed requirements: of all mechanical heating. Mechanical water heating not required. NA water heating systems per C408.4 systems regardless of individual equipment capacity. systems in the building do not exceed 240,000 Btu/h commissioning not required. does not exceed 200,000 Btu/h. Service water heating 1 Mechanical systems • Service If required, commissioning Exceptions to commissioning ❑ Total output capacity cooling or 300,000 Btu/h for all applicable space conditioning systems system in building El Capacity of largest service systems commissioning Low Energy and Semi -Heated Spaces (Note 6 and 7 Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning ' Capacity, Btu/h-sf Compliance Check Notes NA C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Economizers NA C403.3 Air economizer required Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer, indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA 0403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are confgured to provide up to 100% OSA for cooling NA Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C402.1.1 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btulh°sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btu/h sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. f'3f:.0EIVED OF TUKWiLA APR 252017 PERMIT CENTER EVIEWED FOR )E COMPLIANCE APPROVED MAY 04 2o11 atty c Tultz 0.454 otvisioN V VS a rolluda arctitects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www. treswest. corn E— W U (f) cf) � 0 J O O O O. — Z O W C� W V( i 0 ct r� 4242 SOUTH 144TH STREET, TUKWILA, WA 98168 V co o� J W c0 o 0I—co f) rn V = Q cn fig w O Y D as 0 I—d-I— O f—S (1) C) a) i` ()) CO O CV J w I— REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.01 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC SS LEGEND.DWG O O 2 to N- 0 2015 Washington State Energy Code Compliance Forms for Commercial, al, R2 and R3 over 3 stories and all R1 Page 4 of 7 . r echanical Permi Plans Ch 2015 Washington State Energy Code Compliance Forms , � klisfit ec t .'MECH=CHK' for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: StadiumServicesImprovements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA 0403.2.8.1 C403.2.8.2 Duct insulation For supply and return ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken For supply ductwork located in conditioned space, identify if design supply temperature is < 55°F or> 105°F and indicate R -value of insulation on this ductwork on plans; note exception taken For OSA ductwork, shafts and plenums, indicate R -value of insulation on these elements on plans per Table C402.1.3 for steel -framed walls; note exception taken Piping Systems NA G403.2.9 Piping insulation Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken NA C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Economizers NA C403.3 Air economizer required Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer, indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA 0403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are confgured to provide up to 100% OSA for cooling NA C403.3.1 C403.3.3.2 Integrated air economizer Verify mechanical cooling controls are interlocked with air economizer controls so the outside air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is < 45°F For systems with cooling capacity z 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken NA C403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 NA C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may be provided in lieu of air economizer, indicate system is capable of 100% design cooling capacity at 50°F db 145°F wb OSA temperatures NA 0403.3.4.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit NA C403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity z 65,000 Bluth, refer to HVAC System Controls for requirements NA C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity z 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Systems Requiring Energy Recovery NA 0403.5.1 Energy recovery (ER) - ventilation /exhaust systems For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For rooms served by multiple systems with aggregate design OSA> 5,000 cfm, or aggregate design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and return air enthalpies at design conditions NA C403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air, ER effectiveness (min 25°F); or alterative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) NA C404.10.4 (under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by z 36°F R CO[ NA C403.5.2 Energy recovery - steam condensate systems For buildings with on-site steam heating systems, indicate condensate water ER For buildings that use off-site generated steam where condensate is not returned to the source, indicate on-site condensate water ER @��MM i • a C ( E3f�,� N1it7.4nn, f'3f:.0EIVED OF TUKWiLA APR 252017 PERMIT CENTER EVIEWED FOR )E COMPLIANCE APPROVED MAY 04 2o11 atty c Tultz 0.454 otvisioN V VS a rolluda arctitects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www. treswest. corn E— W U (f) cf) � 0 J O O O O. — Z O W C� W V( i 0 ct r� 4242 SOUTH 144TH STREET, TUKWILA, WA 98168 V co o� J W c0 o 0I—co f) rn V = Q cn fig w O Y D as 0 I—d-I— O f—S (1) C) a) i` ()) CO O CV J w I— REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.01 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC SS LEGEND.DWG O O 2 to N- 0 M(7-00.9 RECEIVED IiYOF TUK'WiLA APR 252017 PERMIT (.:TER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 04 2[111 9. • of Tukt1M1a rolluda arc tects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r = !Litt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com W i-0 U > Et I i- CO W O Ou� OO a_ �- -1� z UJ O w W -J > 0 O it Q � N ✓ I - co �w O re O 1- o U CO O I- d - CN- Ch 00 O) gN LU _I 1- 1 - _REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.02 SS LEGEND.DWG O 2 N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 Plans .: Mechanical ,Permlt Checklist MECH=GHK Project Title: Stadium Services Improvements includingRevised2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings R2 & R3 over 3 stories and allR1January Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; Identify provisions applicable to this equipment per C403.1 exception For buildings with a 40,000 sf conditioned floor area and with >-1,000,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating Yes C403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include load adjustments to account for energy recovery See Attached For buildings with 24-hour operation and with > 1,500,000 Btulh of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water, or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Yes C403.2.2 Equipment and system sizing Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions taken See Attached Variable flow control - hydronic system pumps NA C403.2.3 C403.2.3.2 0403.2.13.1 HVAC equipment performance requirements (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) For each air terminal include: maximum airflow rates for primer/ supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans NA C405.8 C403.2.14 Electric motor efficiency List all motors a 1/12 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling For fractional hp motors (1112 -1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exception taken NA NA C403.2.11.1 Fan power limitation For all HVAC fan systems that provide heating and ! or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form C403.42 Boiler sequencing For all applicable HVAC systems with total fan motor hp> 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; inctide at least one sensor per major duct branch; verify controller setpoint pressure at each wnsor is 5 1.2 inch w.g. NA 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken NA NA C403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is Z 67, or exception taken; indicate these fans are sized so total efficiency is within 15 % of the fan maximum total efficiency Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; NA NA C403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans <400 cfm in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE -57) Yes Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Excepton 2, must comply with all 16 provisions NA C403.2.13 Variable flow capacity - fans For fan motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); SM0.01 NA C403.2.3 Maximum air cooled chiller capacity For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chiller capacity is 5100 tons, or exception taken 0403.4:3.3 Heat rejection equipment - cooling tower flow turndown NA C403.4 Large capacity cooling systems For buildings with z 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) C403.4.2.3.1 Water loop heat pump - deadband NA C403.2.3.1 Non-standard water-cooled centrifugal chillers For water-cooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements 0403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Zone 4 NA C403.2.13.1 C403.4.3.2 Centrifugal fan open -circuit cooling towers For open -circuit centrifugal fan cooling towers with a 1,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers C403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 NA C403.4.2 C403.4.2.5 Large capacity boiler systems For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating burner C403.4.2.3.3 Water loop heat pump - isolation valves For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers, or combination) C403.7, Item 7 Maximum air terminal inlet velocity NA C403.2.13 Variable flow capacity - pumps For pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements For buildings with office, retail, education. library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with 0402.4.1.4 or C406.6 may not utilize exceptions) Sequence of operation NA C403.2.3 Gas and oil -fired forced air furnace and unit heaters t allunit heaters,indicate in For forced air furnaces with capacity 225,000 Btulh and equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpyby a 50% based on delta between OSA and return air enthalpies at design conditions. Maximum allowable system brake horsepower NA C403.2.4.8 Combustion heating equipment For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating or staged combustion control Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve terminal unit motor and control NA C403.2.3.3 Packaged electric heating ! cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules NA C403.2.12 Heating outside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements NA C403.2.7.1 Kitchen exhaust hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC System Controls for additional requirements NA C403.2.4.3 Outdoor supply air, exhaust and relief dampers Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers NA C403.2.4.3 Return air dampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1. or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) M(7-00.9 RECEIVED IiYOF TUK'WiLA APR 252017 PERMIT (.:TER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 04 2[111 9. • of Tukt1M1a rolluda arc tects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r = !Litt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com W i-0 U > Et I i- CO W O Ou� OO a_ �- -1� z UJ O w W -J > 0 O it Q � N ✓ I - co �w O re O 1- o U CO O I- d - CN- Ch 00 O) gN LU _I 1- 1 - _REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.02 SS LEGEND.DWG O 2 N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC Mechanical 2015 Washington 2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 Page 5 of 7 li .a p f 1 x u ,: , , ,. PermltPlans Checklist' MECHCHK Project Title: Stadium Services Improvements State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all RI Revised January 2017 Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.5.3 Energy recovery - cooler / freezer condensers For buildings with food service, meat or deli departments that have z 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) For buildings with a 40,000 sf conditioned floor area and with >-1,000,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating Building provided with DOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied. conditioned spaces are served by a DOAS per C403.6 NA 0403.5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Btulh of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water, or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). C403.4.4 Air systems serving multiple zones Hydronic System Controls NA C403.2.13 C403.4.2.7 Variable flow control - hydronic system pumps For hydronic system pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires a 30% design wattage at 50% design fluid flow); note exception VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) For each air terminal include: maximum airflow rates for primer/ supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans NA 0403.2.5 C403.4.2.4 Hydronic system setback and part load controls For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling For heating and chilled water systems a 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. If system pump motor hp a 3 hp, also indicate controls automatically reduce flow bye 50%. NA For chilled water systems (5 300,000 Btu/h, pump motor hp z 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken Dual duct systems - terminal units For systems with separate warm air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with ar from the other duct NA C403.42 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; inctide at least one sensor per major duct branch; verify controller setpoint pressure at each wnsor is 5 1.2 inch w.g. NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 NA NA C403.4.2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating ! cooling mode scheduling and changeover temperature range (limit 30°F) Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; NA NA C403.4.2.6 Chiller / boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use Yes Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Excepton 2, must comply with all 16 provisions NA C4032.13.1.1 C403.4.3.1.1 C403.4.3.1.2 Heat rejection equipment- variable flow control For cooling towers with fan motors a 7.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); SM0.01 For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans in unison 0403.7, Item 2 Direct digital controls (DDC) NA 0403.4:3.3 Heat rejection equipment - cooling tower flow turndown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run in parallel C403.7, Item 3 Outdoor airflow measurement and reduction NA C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes: or exception taken C403.7, Item 4 Supply airflow measurement NA 0403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed C403.7, Item 5 Zone isolation and maximum area served NA C403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop C403.7, Item 6 Interior / exterior zone design supply air temperature NA C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power> 10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control C403.7, Item 7 Maximum air terminal inlet velocity Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 NA C403.6 C403.6.3 Dedicated outdoor air systems For buildings with office, retail, education. library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with 0402.4.1.4 or C406.6 may not utilize exceptions) Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC 36 NA C403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpyby a 50% based on delta between OSA and return air enthalpies at design conditions. Maximum allowable system brake horsepower Verify fan system bhp is 5 90% of the bhp limit per Option 2 eepation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system NA C403.6.2 Heating !cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve terminal unit motor and control Indicate all series and parallel terminal fans have electronicallycommutated motors; indicate DDC control system is configured to varyair terminal fan speed as a function of the load; Y 9 P indicate fan speed during periods of low heating. low cooling, cr ventilation only is 5 66% of peak design air flow or provide supporting documentation for applied exception If applying Exception to heating I cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule M(7-00.9 RECEIVED IiYOF TUK'WiLA APR 252017 PERMIT (.:TER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 04 2[111 9. • of Tukt1M1a rolluda arc tects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r = !Litt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com W i-0 U > Et I i- CO W O Ou� OO a_ �- -1� z UJ O w W -J > 0 O it Q � N ✓ I - co �w O re O 1- o U CO O I- d - CN- Ch 00 O) gN LU _I 1- 1 - _REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.02 SS LEGEND.DWG O 2 N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 F't Mechanicals Permit. Plans ChecklisECH-C 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 7 of 7 MECH-CHK Revised January 2017 Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA 0402.4.1.4 C403.6 Increased prescriptive maximum vertical fenestration area with DOAS Indicate that all occupied, conditioned spaces are served by a DOAS per C403.6 Application of single duct and fan -powered terminal units Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) C406.6 Building provided with DOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied. conditioned spaces are served by a DOAS per C403.6 Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction Multiple Zone Air Systems NA C403.4.4 Air systems serving multiple zones Identify supply air systems serving multiple zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV NA C403.4.4 VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types For each air terminal include: maximum airflow rates for primer/ supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans C4Q3.7' Item 15 Central plant efficiency NA C403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling NA C403.4.4.2 Dual duct systems - terminal units For systems with separate warm air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with ar from the other duct C403.7, Item 16 Fault detection and diagnostics NA C403.4.1.1 C403.4:1.2 VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; inctide at least one sensor per major duct branch; verify controller setpoint pressure at each wnsor is 5 1.2 inch w.g. NA C409.3.1 For systems with zone level DDC, indicate controls are configued to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives reset logic, and allows building operators to exclude zones from reset logic For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409: indicate equipment eligible for exception NA C403.4.4.3 Multiple -zone VAV system ventilation optimization controls For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; NA C403.4.4.4 VAV system supply air reset Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken Yes Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Excepton 2, must comply with all 16 provisions NA 0403.7, Item 1 Air economizer Indicate system is configured for 100% air economizer operaticn and complies with all related economizer requirements per C403.3 (without economizer excptions) Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); SM0.01 NA 0403.7, Item 2 Direct digital controls (DDC) Provide DDC controls for all components of system; identifyallDDC system input / output control points; indicate capability for trending and graphical display NA 0408.2.2 NA C403.7, Item 3 Outdoor airflow measurement and reduction For systems with minimum OSA > 2,500 cfm, indicate outdoorairflow monitoring station that measures OSA intake under all bad conditions; indicate contrcl sequence that increases or reduces system OSA cfm based on VAV terminal feedback of ientilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C408.2.2.1 NA C403.7, Item 4 Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply arflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions NA C408.2.2.2 NAwhichever C403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system is 5 5),000 sf, or one entire floor, is greater; in addition if a system serves > 25,000 sff that includes areas that are expected to be occupied non -simultaneously, indicate zone isdation controls per C403.2.4.4 Yes C408.2.3 NA C403.7, Item 6 Interior / exterior zone design supply air temperature Verify that VAV terminals serving interior cooling driven loads ere sized per design supply air temperature that is 5°F higher than VAV terminals serving exterior zones Project Close Out Documentation Yes NA C403.7, Item 7 Maximum air terminal inlet velocity Identify air terminals with minimum primary airflow setpoints > S0% of maximum setpoint in equipment schedule or MECH-EQ form; indicate air terminal bet velocity does not exceed 900 fpm NA C403.7, Item 8 Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC 36 NA C403.7, Item 9 Maximum allowable system brake horsepower Verify fan system bhp is 5 90% of the bhp limit per Option 2 eepation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system NAP C403.7,Fan-powered Item 10 terminal unit motor and control Indicate all series and parallel terminal fans have electronicallycommutated motors; indicate DDC control system is configured to varyair terminal fan speed as a function of the load; Y 9 P indicate fan speed during periods of low heating. low cooling, cr ventilation only is 5 66% of peak design air flow or provide supporting documentation for applied exception M(7-00.9 RECEIVED IiYOF TUK'WiLA APR 252017 PERMIT (.:TER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 04 2[111 9. • of Tukt1M1a rolluda arc tects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r = !Litt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com W i-0 U > Et I i- CO W O Ou� OO a_ �- -1� z UJ O w W -J > 0 O it Q � N ✓ I - co �w O re O 1- o U CO O I- d - CN- Ch 00 O) gN LU _I 1- 1 - _REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.02 SS LEGEND.DWG O 2 N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page Mechanical Permit Plans C hecklist „ 7 of 7 MECH-CHK Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and at R1 Project Title: Stadium Services Improvements Date 4/6/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terminal units Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units NAof C403.7, Item 12 Fan powered terminal unit' primary air reset Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction - NA C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant density a 25 people / 1000 sf, indicate space is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by a 5°F NA 0403.7, Item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, indicate spaces are served by independent HVAC systems that are separate from HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 NA C4Q3.7' Item 15 Central plant efficiency Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic heating coils served by heating water system with either gas-fired boiler(s) with thermal efficiency a 90%, air -to -water heat pumps, or heat recovery chillers If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 5 20% of total plant capacity, or provide thermal storage sized for 5 20% of total plant capacity NA C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to monitor operation and provide fault reporting of required parameters for all VAV air handlers and VAV air terminal units in the HPVAV system HVAC Equipment Energy Use Metering NA C409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409: indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning Yes 0408.2 Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; SM0.01 For buildings with 5 240,000 Btu/h total output cooling capacity or a 300,000 Btu/h total output healing capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception Yes C403.2.10 C408.1.1 0408.1.2 C408.1.4.2 C103.6 Commissioning requirements in construction documents Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; SM0.01 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); SM0.01 Include in general summary that a Cx project report or Compliance Checklist (Figure 0408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. SM0.01 NA 0408.2.2 Air system and hydronic system balancing Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions NA C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing NA C408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heating and cooling coils and pumps Yes C408.2.3 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems SM0.01 Project Close Out Documentation Yes 0103.6 Documentation and project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems governed by this code; indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations SM0.01 M(7-00.9 RECEIVED IiYOF TUK'WiLA APR 252017 PERMIT (.:TER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 04 2[111 9. • of Tukt1M1a rolluda arc tects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r = !Litt TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com W i-0 U > Et I i- CO W O Ou� OO a_ �- -1� z UJ O w W -J > 0 O it Q � N ✓ I - co �w O re O 1- o U CO O I- d - CN- Ch 00 O) gN LU _I 1- 1 - _REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title MECHANICAL COMPLIANCE FORMS Drawing Number SMCF.02 SS LEGEND.DWG O 2 N N COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC Q2.5) WH -01 - ELECTRIC WALL HEATER, 1500W (5 FLAN NOTES 0 INTERLOCK CEILING FAN CF -01 WITH WALL HEATER WH -03 TO OPERATE UPON HEATER ACTIVATION. l5 d \ r 0 WOMEN'S RESTROOM 15 I 0 MECH./ELEC. CHASE N MEN'S RESTROOM J WH -02 - ELECTRIC WALL HEATER, 3000W i (((,: I rj iiii I I TICIIET BOTH IL 5 i O TOILET _. I CONCESSION STORAGE J CONCESSION STAND ICE KAT ,ER MIGRJ HICRO1 FIELD STORAGE 22 U' Pop CORN HOT DC'S 0 !BEV BEV CF -01- CEILING CIRCULAT ON FAN ;t WH -03 LECTR'C WALL HEATER) 4800W ENLARGED PLAN - CONCESSION STAND HVAC SCALE : 1/4" = M RECEIVED CITY OF TUKWILA APR 2 5 2017 PEHI Ii tiscilTER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 942017 City of Tukwila B rolled+. architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r4/4"J\Ai=5 Itz, TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com L W CO u) Q O O u) O a. I— I LLS USW < LU J > 0 5 C 4242 SOUTH 144TH STREET, TUKWILA, WA 98168 TUKWILA, WA 98168 TEL: (206) 979-9370 REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title ENLARGED HVAC PLAN Drawing Number SMI.O1 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC Ml.01 SS HVAC FLOORPLAN.DWG ELOr �: r:1 0/0 -� EFL o>- , N4& .0 MIGRJ HICRO1 FIELD STORAGE 22 U' Pop CORN HOT DC'S 0 !BEV BEV CF -01- CEILING CIRCULAT ON FAN ;t WH -03 LECTR'C WALL HEATER) 4800W ENLARGED PLAN - CONCESSION STAND HVAC SCALE : 1/4" = M RECEIVED CITY OF TUKWILA APR 2 5 2017 PEHI Ii tiscilTER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 942017 City of Tukwila B rolled+. architects architecture planning interior design 105 S. Main Street Suite 323 Seattle, WA 98104 t: 206-624-4222 f: 206-624-4226 r4/4"J\Ai=5 Itz, TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com L W CO u) Q O O u) O a. I— I LLS USW < LU J > 0 5 C 4242 SOUTH 144TH STREET, TUKWILA, WA 98168 TUKWILA, WA 98168 TEL: (206) 979-9370 REVISION DATE Design: RSH Drawn: RSH Checked: DMM Project No. 331-16-01 Issuance PERMIT SET Date: 4/14/2017 Drawing Title ENLARGED HVAC PLAN Drawing Number SMI.O1 COPYRIGHT © 2015 ROLLUDA ARCHITECTS INC Ml.01 SS HVAC FLOORPLAN.DWG