Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M17-0067 - BOEING #2-81 - VAV BOXES, DUCTWORK, DIFFUSERS ETC
BOEING #2-81 8123 E MARGINAL WAY S M17-0067 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov MECHANICAL PERMIT 0001600020 Permit Number: Project Name: BOEING #2-81 Issue Date: Permit Expires On: M17-0067 5/25/2017 11/21/2017 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 JOYCE COPLEY Phone: (206) 407-2614 7717 DETROIT AVE SW , SEATTLE, WA, 98106 MACDONALD/MILLER FAC SOL INC Phone: (206) 768-4180 PO BOX 47983 , SEATTLE, WA, 98146- 7983 MACDOFS980RU Expiration Date: 1/4/2019 DESCRIPTION OF WORK: SELECT DEMO OF DUCTWORK AND DIFFUSERS AND HYDRONIC HEATING PIPING, RELOCATION OF (2) VAV BOES. INSTALL OF (2) NEW VAV BOXES WITH HYDRONIC HEATING COILS, INSTALLATION OF MISC DUCTWORK AND DIFFUSERS. HYDRONIC HEATING PIPING TO SUPPORT NEW VAV BOXES, AIR BALANCE Valuation of Work: $30,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $597.26 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Permit Center Authorized Signature: '"--W 2014 2014 2014 2015 Date: - 7 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Y \"_ `"'LQJ r �e� Date:as , 7 Print Name: \( V\Qlr`'e'e -Pc-re tart - This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST ...CITY OF TUKW _ .4 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov 1 (1 Mechanical Permit No. IVOff. Project No. Date Application Accepted: Date Application Expires: 11 (For office usednly) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: 000160-0020 Site Address: 8123 E Marginal Way, Tukwila, WA 98108 Suite Number: 1 Floor: 1 Tenant Name: BOEING PLANT 2 /21 New Tenant: ❑ Yes ® ..No PROPERTY OWNER Name: Joyce Copley Name: BOEING COMPANY THE City: Seattle State: WA Zip: 98106 Address: 8123 E Marginal Way, Email: joyce.copley@MACMILLER.COM City: TUKWILA State: WA Zip: 98108 CONTACT PERSON — person receiving all project communication Name: Joyce Copley Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 406-2614 Fax: (206) 905-3749 Email: joyce.copley@MACMILLER.COM MECHANICAL CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 905-3748 Fax: (206) 905-3749 Contr Reg No.:MACDOFS980RU Exp Date: 04/01/2019 Tukwila Business License No.: BUS -0994318 Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Select demolition of ductwork and diffusers and hydronic heating piping, Relocation of qty (2) vav boxes, Installation of qty (2) new vav boxes with hydronic heating coils, Installation of miscellaneous ductwork and diffusers, Hydronic heating piping to support qty (2) new vav boxes, Air balance 30,000 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications\Forms-Applications On Line\20I 6 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu 20 Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 2 <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit >10,000 cfm Residential, Nighttime Evaporator cooler 20 Ventilation fan connected to single duct 55 dB(A) Ventilation system 57 dB(A) Hood and duct Commercial Incinerator — domestic 47 dB(A) Incinerator — comm/industrial 2 Unit Type Qty Fire damper Residential, Nighttime Diffuser 20 Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) Fan Power VAV 2 Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For More details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-I OPM, Monday through Friday and 8AM-IOPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Date: 05/18/2017 Print Name: Joyce Copley Day Telephone: (206) 407-2614 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City State Zip H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 2 of 2 DESCRIPTIONS ACCOUNT QUANTITY : ; PAID • PermitTRAK $745.11 M17-0067 Address: Apn:0001600020 $597.26 MECHANICAL $574.29 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $426.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $114.86 TECHNOLOGY FEE $22.97 TECHNOLOGY FEE R000.322.900.04.00 0.00 $22.97 PG17-0069 Address: ,Apn:0001600020 $147.85 PLUMBING $142.16 PERMIT FEE R000.322.100.00.00 0.00 $80.58 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PLAN CHECK FEE R000.322.103.00.00 0.00 $28.43 TECHNOLOGY FEE .$5.69 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11513_' R000.322.900.04.00 0.00 .$5.69 $745.11 Date Paid: Thursday, May 18, 2017 Paid By: MACDONALD-MILLER Pay Method: CHECK 4658 Printed: Thursday, May 18, 2017 12:16 PM 1 of 1 CRWSYSTEMS cv) INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 M11-0 0(007 Proje PPE/N6-- a -8i Type of Inspection: /lcH Q/Q -L A N. -L Address: Date Called: Special Instructions: Date Wanted:0��� vi7 (ap.m. m. Requester: PfliJL Phone No: Approved per applicable codes. 1] Corrections required prior to approval. COMMENTS: c u- ,cqui Prvwittr- g`fI!t Aug yng<'r�rtcfL F1YA-1.- OK-- vicetP / Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: -&49 6- 2 61 Ty e of Inspection: AAA) iC L i�ir+ 4L Address: Date Called: Special Instructions: � . CCALL�,' r Date Wanted' 07 )7 / Request Phone No: ZuCC- S -7I-23 a / Approved per applicable codes. Corrections required prior to approval. COMMENTS: y/j+ A41.774 -Da �F. LL144 L 2- , Na- m F r, :cWM (4- L_ - Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit FFC-7 PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Proj IJ //ti% f I". 6/ T e of Ins ection: iPg , - (0 TU)J Address: Date CaIIe'd7 Special Instructions: Date Want .a. 6 ip "'� m;P.m. Request . � DY Phone N0: 2. - S % P -243-r I Approved per applicable codes. Corrections required prior to approval. COMMENTSpg cS K ‘EY -J -/i 1(1 e:3kDK (143-01-friMiti Inspector: Date: 8-1 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. AIRIEST Co., Inc. Preliminary TAB Report PROJECT: Boeing 2-81 - Densification LOCATION: Tukwila, WA PROJECT #: 17-1028-1 DATE: 10/25/2017 CONTACT: Mike Kehoe AUTHOR: Dustin Polly FIRM: AIRTEST Co., Inc. PHONE: 425-313-0172 PO Box 86 FAX: 425-313-5735 Issaquah, WA 98027 PROJECT: Boeing 2-81 - Densification 8123 E Marginal Way NOTES: Tukwila, WA 98108 DATE: 10/25/2017 PROJECT #: 17-1028-1 CONTACT: Kehoe, Mike AIRTEST issues preliminary TAB reports as a courtesy to contractors and building officials as verification that TAB is in progress. Any other use of this report should be carefully considered, as the document is PRELIMINARY and is not complete. It has NOT been reviewed for accuracy or compliance with project requirements. Engineering review of this document should not occur until the FINAL TAB report is issued. If it is necessary to conduct a thorough review of the report at this time please call AIRTEST to discuss what information is ready for review before proceeding. Mn - o6 67 RECEIVED CITY of TUKWILA OCT 2 6 2017 PERMIT CENTER AIRTEST Co., Inc. Preliminary TAB Report AIRIEST Co., Inc. Table Of Contents PROJECT: Boeing 2-81 - Densification LOCATION: Tukwila, WA PROJECT #: 17-1028-1 DATE: 10/25/2017 CONTACT: Mike Kehoe AUTHOR: Dustin Polly Table Of Contents 1 Air Handling Unit 1 1.1 AHU-01 1 1.2 AHU-01 /FT -2-30 1 1.3 AHU-01 /FT -2-32 2 1.4 AHU-01/FT-2-66 2 1.5 AHU-01/FT-2-67 3 RECEIVED CITY OF TUKWILA OCT 262011 PERMIT CENTER AIRTEST Co., Inc. Preliminary TAB Report 111! AIRTEST Co., Inc. Air Handling Unit PROJECT: Boeing 2-81 - Densification LOCATION: Tukwila, WA PROJECT #: 17-1028-1 DATE: 10/25/2017 CONTACT: Mike Kehoe AUTHOR: Dustin Polly SYSTEM/UNIT: AHU-01/FT-2-30 AREA: 21E5 Unit Data Manufacturer Controls System VAV Type VAV Address Box Inlet Size K Factor Tempmaster Siemens Series 14 12 FO .75 Test Data Fan Speed Heat Works ADJ. @ MIN. Yes AHU-01/FT-2-30 Supply Outlet Summary Tested By: Mike Kehoe Date: 10/19/2017 Air Test Data Design Fan 720 CFM Actual Fan 765 CFM Design Primary Max CFM 720 CFM Actual Max Primary CFM 725 CFM Design Primary Min. CFM 288 CFM Actual Primary Min. CFM 275 CFM System/Unit Outlet -01 Outlet -02 Outlet -03 Outlet -04 Area Served 21E5 21E5 21E5 21E5 Totals: Outlet Size LxW / . Design Type D CD CD CD CD 8 RD 8 RD 8 RD 8 RD CFM 180 180 180 180 720 Prelim Reading 360 420 385 360 1525 Final Reading 190 190 195 190 765 % Final 106 106 108 106 106 RECEIVED CITY OF TUKWILA OCT 2 6 2011 PERMIT CENTER AIRTEST Co., Inc. Page 1 of 3 Preliminary TAB Report 1111! AIRTEST Co., Inc. Air Handling Unit PROJECT: Boeing 2-81 - Densification LOCATION: Tukwila, WA PROJECT #: 17-1028-1 DATE: 10/25/2017 CONTACT: Mike Kehoe AUTHOR: Dustin Polly SYSTEM/UNIT: AHU-01/FT-2-32 AREA: 21E5 Unit Data Manufacturer Controls System VAV Type VAV Address Box Inlet Size K Factor Tempmaster Siemens Series 16 12 FO .62 Test Data Fan Speed Heat Works ADJ. @ MIN. Yes Log: Tested By: Mike Kehoe Date: 10/19/2017 Air Test Data Design Fan 720 CFM Actual Fan 895 CFM Design Primary Max CFM 720 CFM Actual Max Primary CFM 725 CFM Design Primary Min. CFM 288 CFM Actual Primary Min. CFM 276 CFM AHU-01/FT-2-32 10/19/2017 Mike Kehoe Both fan speed potentiometers at min. AHU-01/FT-2-32 Supply Outlet Summary System/Unit Outlet -01 Outlet -02 Outlet -03 Outlet -04 Area Served 21E5 21E5 21E5 21E5 Totals: Outlet Size LxW / Design Type D CFM CD CD CD CD 8 RD 8 RD 8 RD 8 RD 180 180 180 180 720 Prelim Reading 325 325 375 360 1385 Final Reading 215 215 240 225 895 Final 119 119 133 125 124 SYSTEM/UNIT: AHU-01/FT-2-66 AREA: 21E5 Unit Data Manufacturer Controls System VAV Type VAV Address Box Inlet Size K Factor Titus Siemens Series 20 10 RD .68 Test Data Fan Speed Heat Works F48 Yes AHU-01/FT-2-66 Supply Outlet Summary System/Unit Area Served Tested By: Mike Kehoe Date: 10/20/2017 Air Test Data Design Fan Actual Fan Design Primary Max CFM Actual Max Primary CFM Design Primary Min. CFM Actual Primary Min. CFM 635 CFM 640 CFM 635 CFM 635 CFM 115 CFM Outlet Size LxW / Design Type D CFM Prelim Reading CITY OF TUKWILA OCT 2 6 2011 Final Reading Outlet -01 21 E5 Outlet -02 21E5 CD CD 10 x 10 315 290 320 10 x 10 315 440 320 Totals: 630 730 640 % Final 102 ;ENTER 102 102 AIRTEST Co., Inc. Preliminary TAB Report • Page 2 of 3 PI AIRTEST Co., Inc. 1 Air Handling Unit PROJECT: Boeing 2-81 - Densification LOCATION: Tukwila, WA PROJECT #: 17-1028-1 DATE: 10/25/2017 CONTACT: Mike Kehoe AUTHOR: Dustin Polly SYSTEM/UNIT: AHU-01/FT-2-67 Unit Data Controls System VAV Type VAV Address Box Inlet Size Siemens Series 15 10 RD AHU-01/FT-2-67 Supply Outlet Summary Tested By: Mike Kehoe Date: 10/20/2017 Air Test Data Design Fan Design Primary Max CFM Design Primary Min. CFM 735 CFM 735 CFM 135 CFM System/Unit Outlet Size LxW / Design Type D CFM Outlet -01 Outlet -02 Outlet -03 CD CD CD 12x12 12x12 12 x 12 370 370 370 1110 Prelim Final Reading Reading / Final 0 0 0 RECEIVED CITY OF TUKWILA OCT 262017 PERMIT CENTER AIRTEST Co., Inc. Page 3 of 3 Preliminary TAB Report PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0067 DATE: 05/22/17 PROJECT NAME: BOEING #2-81 SITE ADDRESS: 8123 E MARGINAL WAY X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ❑ /4- 1111-P Fire Prevention Structural 1 Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 05/23/17 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved DUE DATE: ❑ Approved with Conditions Corrections Required ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: T '-, 06/20/17 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOI TNC Home Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1 of 3 A -Z Index Help Nly L&i Workplace Rights Trades & Licensing MACDONALD/MILLER FAC SOL INC Owner or tradesperson Principals SIMONDS, DERRICK R, PRESIDENT WEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH, TREASURER NOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011). TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01/04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. 602 254 260 PO BOX 47983 SEATTLE, WA 98106 206-768-4180 KING County Business type Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. MACDOFS980RU Effective — expiration Active. Meets current requirements. Help us improve https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 5/25/2017 MACDONALD/MILLER FAC SOL INC Page 2 of 3 12/31/2002— 01/04/2019 Bond ................. LIBERTY MUTUAL INS CO Bond account no. 023006951 $12,000.00 Received by L&I Effective date 12/31/2002 12/11/2002 Expiration date Until Canceled Insurance .............................. Liberty Mutual Ins Co Policy no. TB7-661-066178-033 $2,000,000.00 Received by L&I Effective date 10/24/2016 12/31/2013 Expiration date 12/31/2017 Insurance history Savings ......._......._. No savings accounts during the previious 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 252,457-05 ................................. Doing business as MACDONALD MILLER FACILITY Estimated workers reported Quarter 1 of Year 2017 "Greater than 100 Workers" L&I account representative T4 / MELVINA RAMSDELL (360)902-4814 - Email: RAMM235@Ini.wa.gov Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 08/24/2015 Inspection no. 317936840 Location 14360 SE Eastgate Way Bellevue, WA 98007 Inspection results date 08/04/2015 Inspection no. 317937121 Location 530 Fairview Ave N Seattle, WA 98103 Inspection results date 06/18/2012 Violations No violations No violations Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 5/25/2017 TH COMPANY B UILDING 2-81 ENSITY IMPROVEMENTS 7775 E MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98'108 B UILDING 2-81 PROJECT # ` `:4833402 ion i\ RI- G o\ ISSAQUAH PROJECT SITE vc \ITY A D 2-45 GATE B-18 SITE ACCESS 2-55 0 • PROJECT SITE SCALE: NONE 2-84 2-117 2-116 CODES AND PERMITS PERMITS REQUIRED & FOR REVIEW: BUILDING ❑ GRADING PLUMBING * ❑ LANDSCAPE MECHANICAL* ❑ DEMOLITION • ELECTRICAL * ❑ CIVIL • FIRE PROTECTION* ❑ STRUCTURAL ►,1 ►�1 *TO BE REVIEWED UNDER SEPARATE PERMIT WASHINGTON STATE NON—RESIDENTIAL ENERGY CODE COMPLIANCE OPTION • PRESCRIPTIVE e LPA ❑ ANALYSIS ❑ N/A SPECIAL INSPECTIONS REQUIRED: ❑ WELD ❑ CONCRETE ❑ REBAR ❑ ANCHOR BOLTS ❑ STRUCTURAL BOLTING ❑ STRUCTURAL OBSERVATION ❑ OTHER CALCULATIONS TYPE: NRGC ATTACHED (YES) (NO) TAX PARCEL NUMBER: 3324049002 LFGAL DFSCRIDTIO\ APN: 000160-0020 A TRACT OF LAND BETWEEN THE DUWAMISH WATERWAY AS ESTABLISHED BY COMMERCIAL WATERWAY DISTRICT #1 OF KING COUNTY, WASHINGTON AND EAST MARGINAL WAY IN SECTION 33, TOWNSHIP 24 NORTH, RANGE 4 EAST, W.M., AND IN THE JOHN BUCKLEY DONATION CLAIM NO. 42; SAID TRACT ALSO BEING THE SOUTHERLY PORTION OF A LARGER TRACT COMMONLY CALLED THE BOEING COMPANY'S PLANT NUMBER TWO SITE, DESCRIBED AS FOLLOWS: BEGINNING AT THE SECTION CORNER COMMON TO SECTIONS 28, 29, 32, AND 33; THENCE SOUTH 88'08'07" EAST ALONG THE NORTH LINE OF SAID SECTION 33, A DISTANCE OF 982.00 FEET TO AN INTERSECTION WITH THE SOUTHWESTERLY MARGIN OF EAST MARGINAL WAY; THENCE SOUTH 47'51'53" EAST ALONG SOUTHWESTERLY MARGIN 684.62 FEET TO THE TRUE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED; THENCE SOUTH 4725'24" WEST 1215.02 FEET MORE OR LESS TO A POINT ON THE NORTHEASTERLY MARGIN OF SAID DUWAMISH WATERWAY, SAID POINT BEING ON A CURVE FROM WHENCE THE CENTER BEARS SOUTH 42'16'23" WEST 1969.12 FEET; THENCE SOUTH- EASTERLY ALONG SAID CURVE, A DISTANCE OF 397.99 FEET TO THE POINT OF INTERSECTION WITH A LINE LYING 825.00 FEET SOUTH, AS MEASURED AT RIGHT ANGLES, OF THE NORTH LINE OF THE JOHN BUCKLEY DONATION LAND CLAIM NO. 42. THENCE SOUTH 89'09'36" EAST ALONG SAID LINE, PARALLEL WITH THE NORTH LINE OF SAID DONATION LAND CLAIM NO. 42, A DISTANCE OF 1387.45 FEET TO THE WESTERLY MARGIN OF EAST MARGINAL WAY; THENCE NORTH 2732'15" WEST 160.30 FEET, FOLLOWING SAID WESTERLY MARGIN TO THE POINT OF CURVATURE OF A CURVE HAVING A RADIUS 2828.00 FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, A DISTANCE OF 1250.10 FEET TO THE POINT OF TANGENCY OF SAID CURVE; THENCE NORTH 47'51'53" WEST 76.82 FEET TO THE TRUE POINT OF BEGINNING: THIS TRACT CONTAINING AN AREA OF 2,897,955 SQUARE FEET, MORE OR LESS. SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical Ltectricai dumbing as Piping City of Tukwila Buils'ING DIVISION FILE C Permit No 11 Plan review opproav9i is subject to errors and omissions. Approval of constrEuciion documents does not auihoiiza the violation of any adopted code or ordinance. Receipt of approved Fiaid Copy and conditions is acknowiedCed: )00\J Puw 5 -as By: Date: City of Tukwila BUILDING DIVISION REVISIONS No chances shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new p!an submittal and may in:;'uda additional p!an review fees. .a CODE SUMMARY TYPE OF APPLICATION: NEW ❑ ALTERATION ❑ ADDITION ❑ TENANT IMPROVEMENT NARRATIVE: 42,915 SF OF TENANT IMPROVEMENT OF THE INTERIOR ONLY ON THE SECOND FLOOR OF THE 02-81 BUILDING. DEMOLITION WILL INCLUDE THE REMOVAL OF FLOOR/CEILING FINISH MATERIALS, NON—LOAD BEARING WALLS, PLUMBING FIXTURES AND PORTIONS OF THE HVAC, ELECTRICAL AND PLUMBING SYSTEMS. TENANT IMPROVEMENT WILL INCLUDE NEW WALLS, CEILING TILES, AND FLOOR COVERINGS. ELECTRICAL POWER, LIGHTING, MECHANICAL, COMMUNICATION AND DATA SYSTEMS AND PLUMBING TO SUPPORT THE NEW LAYOUT. CODES: 2015 INTERNATIONAL BUILDING CODE (WAC 51-50) 2015 INTERNATIONAL FIRE CODE (WAC 51-54) 2015 INTERNATIONAL MECHANICAL CODE (WAC 51-52) 2015 UNIFORM PLUMBING CODE (WAC 51-56 AND WAC 51-57) 2015 WASHINGTON STATE ENERGY CODE (WAC 51-11) 2009 ICC/ANSI A117.1 CURRENT CITY OF TUKWILA ZONING ORDINANCES ORIGINAL CODE: ►1 OWNER. THE BOEING COMPANY CONTRACTOR & STATE NUMBER: THE BOEING COMPANY / BOEING*294ML EXP. 1/18/2015 BOEING PROJECT MANAGER: STACEY PARSON 206-304-0027 PROJECT DESIGN ARCHITECT / ENGINEER: LISA ROBERTS, BUFFALO DESIGN 206-467-6306 BOEING CONTACT: JOHN MURDOCH PHONE. 253-740-0214 FAX NUMBER: E—MAIL. JOHN.S.MURDOCH©BOEING.COM ZONING: CITY OF TUKWILA OCCUPANCY GROUP. B OFFICE CONSTRUCTION TYPE• II -B ALLOWABLE AREA INCREASE. - OCCUPANT LOAD: (ALLOWABLE) SEE A3 FOR OCCUPANT LOAD: (ACTUAL) PROJECT CODE INFO OFFICES OCC. - STORAGE OCC.= ASSEMBLY OCC. - CANOPY OCC. - OTHER OCC.= PENTHOUSE OCC.= BUILDING HEIGHT: (ACTUAL) 41'-2" STORIES: FLOOR AREA: 62,828 SF/ FLOOR (PER SECTION 502 DEFINITION OF BUILDING AREA) BLDG GROSS 125,656 SQ FT BASEMENT SQ FT FIRST FLOOR 62,828 SQ FT SECOND FLOOR 62,828 SQ FT THIRD FLOOR SQ FT FOURTH FLOOR SQ FT FIFTH FLOOR SQ FT SIXTH FLOOR SQ FT PENTHOUSE SQ FT PROJECT AREA 42,915 SQ FT 2 MEZZANINE ? ® (YES) ❑ (NO) SQ FT 1,265 SF FIRE PROTECTION: SPRINKLERED THROUGHOUT ® (YES) ❑ (NO) NFPA 13 AUTOMATIC SPRINKLER SYSTEM IS INSTALLED WITH QUICK RESPONSE HEADS. SEPARATION 2 HOUR AT EXISTING BUILDINGS AND GRID 17 (02-80/02-81) EXTERIOR WALL (NON-BEARING) HOUR RATING EXTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING SEISMIC CATEGORY: ZONE DESIGN LOADS: ROOF: LIVE (SNOW) FLOOR: OFFICE MECH/STOR STAIRS PENTHOUSE CONCENTRATED. WIND: EXPOSURE REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 A-7 4 2017 Cit BUILD1 iia DIVISION (PSF) (PSF) (PSF) (PSF) (PSF) NOTE: FOR ADDITIONAL CODE INFORMATION SEE COMPOSITE CODE PLAN SERIES A3 RE CITU O 7.:EIVED TUKWILA 182017 W4833402 PERMIT CENTS UED FOR CONSTRUCTION 05.12.17 J SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG CDC RELOCATION — WIRE SHOP RELOCATION J#19670 RECORD DRAWING J#19670 A 2-81 DENSITY IMPROVEMENTS W4833402 DLR GROUP DLR GROUP BUFFALO ECA ECA 11.11.13 04.07.14 05.12.17 3973 REGISTERED \ ARCHITECT CHRIS EDWARD CARLSON STATE OF WASHINGTON ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN M.CARMIER CHECKED L.ROBERTS DATE 05.12.17 05.12.17 SUBTITLE COVER SHEET CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE 2-81 DENSITY IMPROVEMENTS ARCHITECTURAL MASTER BUILDING 2-81 PLANT2, WA SHEET GO JOB NO. 19760 COMP NO. DWG NO. 2 -81 -GO EAN G U L0: 4/10/2014 11:55:51 AM A 3 C D E� F PARTIAL PLAN VIEW SCALE: 1 /8"=1'-0" Mt7 1) TRUCTIO \ \ OTES LEGE\D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. / o CENTRAL A SSU 165 1/2" 5.6 BR. o CENTRAL GB RECESSED 155 1/2" 5.6 CHR. 2" 2" — 1 1/2" CENTRAL 1 1/2" 1 1/4" SSU 1" 1" 1/2" COV BR. 1" 1" 1 1/4" 1 1/2" 1 1/2" 1" 1" ® 1"o 1" 1 1/4" 1 1/2" 1 1/2" 15'-8" TYP ELEV. 2" 2" 1 1/2" 1 1/2" 1 1/4" ® 1" 1" 1 1/4" 1 1/2" 1 1/2" o 2" 2" �, 1 1/2" 1 1/2" ® 1 1/4" 1" 1" 1. EXISTIN SHOWN DRAWIN THE EX VERIFY PERFOR > MODIFY, ® oLOCATIC ® — N 0 — oo — 2" 2" 1 1/2" — - 1 1/2" 1 1/4" 3. PROVIDE DESIGN RECORC 1" 1" 1 1/4" 1 1/2" 1 1/2" 1" 1" 1 1/4" 1 1/2" 1 1/2" 2" 2" v, - 1 1/2" 1 1 /2" 1 1/4" 1" 1 1 1 1/2"1 1/2" 2 2" � 1/ 1 1/2" ® 1 1/4 U Ti f S rn MAT o ® 2» IF 2„ • A 1/2" •» 2" 2 1/2 2" 2" 2" 2, 2» 0 1 1/2" 1 1/4" 1„ 1» " 1" 1 1/4" 1 1/2" . 1 1/2" , _ 1 MATCHLINE SEE SHEET 2M262 18'-0„ -..... -. ._.. 15'-8" i TVI7 ri CV 18'-O" Tvr% 1-1r, i PARTIAL PLAN VIEW SCALE: 1 /8"=1'-0" Mt7 1) TRUCTIO \ \ OTES LEGE\D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. FINISH o CENTRAL A SSU 165 1/2" 5.6 BR. o CENTRAL GB RECESSED 155 1/2" 5.6 CHR. o CENTRAL A SSU 212 1/2" 5.6 BR. G SPRINKLER SYSTEM PIPING AND LAYOUT WAS TAKEN FROM AVAILABLE RECORD GS AND BASED ON SITE OBSERVATIONS TO TEND AVAILABLE, CONTRACTOR SHALL FIELD ALL PIPE SIZES, ROUTING, DIMENSIONS, HEAD ONS AND OTHER CONDITIONS AS REQUIRED TO RM THE WORK. SPY! KLER HEADS FOR ALL NEW SPACES. AS -BUILT DRAWING TO FINAL SPRINKLER TO SAZAN. SAZAN WILL THEN PROVIDE DRAWINGS TO OWNER. W4833402 ISSUE FOR CONSTRUCTION 05.12.17 GENERAL \OTES 1. DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA #13, AND FACTORY MUTUAL. 2. THE CITY OF TUKWILA FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS UNLESS SPECIAL PERMISSION IS GRANTED BY THE FIRE CHIEF. 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE MUST BE SIGNED OFF BY THE CITY OF EVERETT FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT PRIOR TO COMMENCEMENT OF WORK ON THE FIRE SYSTEM. 4. FIRE PROTECTION SPRINKLER CONTRACTOR SHALL ACQUIRE SHOP DRAWING APPROVAL FROM THE CITY OF TUKWILA FIRE MARSHAL AND BOEING FIRE PROTECTION ENGINEERING PRIOR TO PURCHASE, FABRICATION OR INSTALLATION OF ANY FIRE PROTECTION SYSTEM. 5. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40, ASTM A-53, GRADE B, BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM, GRADE B, BLACK STEEL SCH 40 FOR VERTICAL RISERS AND WITH PERMISSION FROM BOEING FIRE PROTECTION ENGINEERING MAY BE SCH 10 FOR HORIZONTAL CROSS MAINS. 6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE BLACK 150 LB. THREADED MALLEABLE IRON FOR 1 1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR 2 1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED. 7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE 07 ZERO -FLEX (OR EQUAL) UNLESS OTHERWISE NOTED. 8. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR WATER-BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS. 9. SPRINKLER SYSTEM DESIGN SHALL BE FOR ORDINARY HAZARD, GROUP 2 OCCUPANCY (HC -2) 0.20 GPM/SF OVER 2500 SF UNLESS OTHERWISE NOTED. 10. SPRINKLER HEADS SHALL BE STANDARD RESPONSE TYPE HEADS UNLESS OTHERWISE NOTED; ORDINARY TEMPERATURE RATED, UNLESS SPACE CONDITIONS WARRANT THE INSTALLATION OF HIGHER TEMPERATURE RATED HEADS. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2011 City of Tukwila E3LIILDING DIVISION 0 0 2M260 SAZAN® GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 // 0 2M261 2M262 2M263 HECEI tL) 2-81 BUILDIII Tyr OF T KWILA KEY PLAN SCALE: NTS 4 2 0 182017 PERMIT CENTER 4 8 12 I6 20 ■E. SCALE :(FEET) I/8"=I '-0" SYM REVISION - RECORD DRAWING J#972197-00 A 2-81 & DENSITY IMPROVEMENTS W4833402 BY HGI/KLC SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE 8.7.01 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. COLE DATE 7.19.02 *CHECKED S. FRANKLIN 7.31.01 SUBTITLE FIRE PROTECTION PLAN CURRENT REVISION W4833402 SYMBOL DATE A 05.12.17 APPROVED BY DEPT. DATE ENGINEER COSCO 9.4.98 CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/1-3 PLANT 2, WA. SHEET 2M260 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-2M260 9 STORAGE CABINETS - 2H 1" 1" 1" 1" 1 1/4" 4" 9 STORAGE CABINETS - 2H 1 1/2"1_0 1 1/2" 1 1/2" 1 1/2" 9 STORAGE CABINETS - 2H 2" 2" 1 1/2" ISI 2" If ICI 0 1 1/ 1 1/2" 0 1 1/ " 9 STORAGE CABINETS - 2H 1 1/4" 1" 3 STORAGE CABI - 2�' 01 1 1 1/4" 1" 11 11 11 1 1/2" 1 1/2" I,I 11 11 1 1/2" 1 1/ " 1 1/4" If 1" 1 1/4" 1 1/2" 1 1/2" 2" ,, 1 1/2" 1 1/ fl 1 1/4" 1" ft �r- 1" 1" 4" 1 1/2" 1 1/2" 11 ff 1 1/2" 1 1/ 11 1 1/4" 1" 1" MATCHLINE SEE 1/4" ................................... 5'- 8 ELEV. wl 18'-0 TYP ELEV. INE SEE SHEET 2M263 PA TIAL PJ\\ VIEW SCALE: 1/8"=1'-0" MATCHLINE SEE SHEET 2-80-2M265 CO\ LEGE \ D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. FINISH o CENTRAL A SSU 165 1/2" 5.6 BR. 0 CENTRAL GB RECESSED 155 1/2" 5.6 CHR. o CENTRAL A SSU 212 1/2" 5.6 BR. STUCTIO\ \OTES GE\PAL \OTES 1 EXISTING SPRINKLER SYSTEM PIPING AND LAYOUT1. DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM SHOWN WAS TAKEN FROM AVAILABLE RECORD SHALL BE IN ACCORDANCE WITH NFPA #13, AND DRAWINGS AND BASED ON SITE OBSERVATIONS TO FACTORY MUTUAL. THE EXTEND AVAILABLE, CONTRACTOR SHALL FIELD VERIFY ALL PIPE SIZES, ROUTING, DIMENSIONS, HEAD -HE CITY OF TUKWILA FIRE MARSHAL AND THE BOEING LOCATIONS AND OTHER CONDITIONS AS REQUIRED TCFIRE INSPECTION DEPARTMENT SHALL BE NOTIFIED 24 PERFORM THE WORK. HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE MODIFY SPRINKLER HEADS FOR ALL NEW SPACES. PROTECTION SYSTEM. THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS UNLESS SPECIAL 3. PROVIDE AS -BUILT DRAWING TO FINAL SPRINKLER PERMISSION IS GRANTED BY THE FIRE CHIEF. DESIGN TO SAZAN. SAZAN WILL THEN PROVIDE RECORD DRAWINGS TO OWNER. W4833402 ISSUE FOR CONSTRUCTION 05.12.17 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE MUST BE SIGNED OFF BY THE CITY OF EVERETT FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT PRIOR TO COMMENCEMENT OF WORK ON THE FIRE SYSTEM. . FIRE PROTECTION SPRINKLER CONTRACTOR SHALL ACQUIRE SHOP DRAWING APPROVAL FROM THE CITY OF TUKWILA FIRE MARSHAL AND BOEING FIRE PROTECTION ENGINEERING PRIOR TO PURCHASE, FABRICATION OR INSTALLATION OF ANY FIRE PROTECTION SYSTEM. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40, ASTM A-53, GRADE B, BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM, GRADE B, BLACK STEEL SCH 40 FOR VERTICAL RISERS AND WITH PERMISSION FROM BOEING FIRE PROTECTION ENGINEERING MAY BE SCH 10 FOR HORIZONTAL CROSS MAINS. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE BLACK 150 LB. THREADED MALLEABLE IRON FOR 1 1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR 2 1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE 07 ZERO -FLEX (OR EQUAL) UNLESS OTHERWISE NOTED. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR WATER-BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS. SPRINKLER SYSTEM DESIGN SHALL BE FOR ORDINARY HAZARD, GROUP 2 OCCUPANCY (HC -2) 0.20 GPM/SF OVER 2500 SF UNLESS OTHERWISE NOTED. .SPRINKLER HEADS SHALL BE STANDARD RESPONSE TYPE HEADS UNLESS OTHERWISE NOTED; ORDINARY TEMPERATURE RATED, UNLESS SPACE CONDITIONS WARRANT THE INSTALLATION OF HIGHER TEMPERATURE RATED HEADS. REVIEWED FOR CODEAPPROVED COMPLIANCE PLAY 2 4 2011 • City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2-81 BUILDINl3ECEIVE CCTV OF TU►44 ILA KEY PLAN SC.AIE: NTS 4 2 0 2�7 4 8 PIELRMITI �ENT2�R SCALE :(FEET) I/8"=I '-0" SYM REVISION - RECORD DRAWING J#972197-00 A 2-81 & DENSITY IMPROVEMENTS W4833402 BY HGI/KLC SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE 8.7.01 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. COLE DATE 7.20.01 CHECKED S. FRANKLIN 7.31.01 SUBTITLE FIRE PROTECTION PLAN CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER COSCO 9.4.98 CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F -L/1-3 PLANT 2, WA. SHEET 2M261 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-2M261 C3 E F ES LEGE\D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. FINISH o CENTRAL MATCHLINE SEE SHEET 2M261 18'-0» TYP ELEV.— 165 15'-8" ELEV. 5.6 BR. o CENTRAL ..1 RECESSED 155 1/2" 5.6 CHR. o CENTRAL A SSU 212 1/2" 5.6 BR. » » ,/ 1 1" 1 /4" 1 1 /2" 1 1 /2„ �., �, ' �» _92.1„..._2_ -x.18'-0"� A_ r r o o IE r CO\STUCTIO\ \O .. CO: » RIN§ - _ 1. EXISTING SPRINKLER SYSTEM PIPING SHOWN WAS TAKEN FROM AVAILABLE DRAWINGS AND BASED ON SITE OBS 1 " 1 " 1 1/ " : 1 1/2". _ :1 1/2" 2" 2" 2" _ 2 /2" °O i 1 /2" 1 1 /4" 1 " I THE EXTEND AVAILABLE, CONTRACTOI I I I_I I I T o 0 1 1 ► VERIP :LL PIPE SIZES, ROUTING, D r r — r r r 2- I • IIAT N` AND OTHER CONDITIONS . , V 7 \ Y.� - 8" 8 �- PER 0R1 THE WORK. SHT. 1 -262Mil © MODIFY SPRINKLER HEADS FOR ALL r 2 1/2" - 8„ II 8 3. PROVIDE AS -BUILT DRAWING TO FIN) � r ► 1 1 4" /_ I ■.:.:.•:: :• ' DESIGN TO SAZAN. SAZAN WILL THEI 1 " 1 1/2" _ 2" 2" 2" 2" 2 1/2" 2 1/2" 1 " — RECORD DRAWINGS TO OWNER. s- CO r ' �..' -1 1' r. (I r r 2 1/2" IP • » ,7 1 /4" 1 1/2" — 2, 2„ 2„ 2» 1 ---- - I_I r .i--i � r tt lls,�,'"�i4 _ _ .71t imii _illant 1" 1" 1 1 4" 1 1/2" 1 1/2' 2" 2" 2" _ 1 1011 ,0ME1 1 /4" • , ..........f r 1 1/2" : • 1" HLINE SEE SHEET 2M263 1" 1" 1 1/4" 1 1/2" 1 1/2" 2" 2"2" i 1 1/4, 1" I} r „� 1 1 /2" 8 I tts 1 1 1 1/4 1 1/2 1 1/2 ma1it_ 1 1/ 1" I II I r..�i'i: MI I I I I wI a I Q .-- 1" 1"© 0 '41,11117 1 1/4" / 1 1/4" 1" 1" /0 0 I ... d r 1 1/2" 1" •• - 1" T 1 1/4" _ 1 1/4" 1" 1O r 1 14"_ I_i1 1 1/4" 1" 1" H1" — 1 /2„ 1 1/4" .... _ 1 1/4" 1" 1" ..1" 1" 1" r .. 1 1/2 1 1 /4" _ 1 1 /4" 1" 1" - „ 1» 1 1/4» 15-8» ••ELEV. •.• 1/4" " » 18'-0" 18'-0" gas833402 PARTIAL P—A\ VIEW VP ISSUE FOR CONSTRUCTION 05.12.17 SCALE: 1/8"=1' -0 ES LEGE\D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. FINISH o CENTRAL A SSU 165 1/2" 5.6 BR. o CENTRAL GB RECESSED 155 1/2" 5.6 CHR. o CENTRAL A SSU 212 1/2" 5.6 BR. GENERAL \OTES AND LAYOUT 1 RECORD ERVATIONS TO SHALL FIELD IMENSIONS, HEAL AS REQUIRED TO NEW SPACES. L SPRINKLER PROVIDE . DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA #13, AND FACTORY MUTUAL. . THE CITY OF TUKWILA FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS UNLESS SPECIAL PERMISSION IS GRANTED BY THE FIRE CHIEF. 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE MUST BE SIGNED OFF BY THE CITY OF EVERETT FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT PRIOR TO COMMENCEMENT OF WORK ON THE FIRE SYSTEM. 4. FIRE PROTECTION SPRINKLER CONTRACTOR SHALL ACQUIRE SHOP DRAWING APPROVAL FROM THE CITY OF TUKWILA FIRE MARSHAL AND BOEING FIRE PROTECTION ENGINEERING PRIOR TO PURCHASE, FABRICATION OR INSTALLATION OF ANY FIRE PROTECTION SYSTEM. 5. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40, ASTM A-53, GRADE B, BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM, GRADE B, BLACK STEEL SCH 40 FOR VERTICAL RISERS AND WITH PERMISSION FROM BOEING FIRE PROTECTION ENGINEERING MAY BE SCH 10 FOR HORIZONTAL CROSS MAINS. 6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE BLACK 150 LB. THREADED MALLEABLE IRON FOR 1 1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR 2 1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED. 7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE 07 ZERO -FLEX (OR EQUAL) UNLESS OTHERWISE NOTED. 8. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR WATER-BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS. 9. SPRINKLER SYSTEM DESIGN SHALL BE FOR ORDINARY HAZARD, GROUP 2 OCCUPANCY (HC -2) 0.20 GPM/SF OVER 2500 SF UNLESS OTHERWISE NOTED. 10. SPRINKLER HEADS SHALL BE STANDARD RESPONSE TYPE HEADS UNLESS OTHERWISE NOTED; ORDINARY TEMPERATURE RATED, UNLESS SPACE CONDITIONS WARRANT THE INSTALLATION OF HIGHER TEMPERATURE RATED HEADS. REVIEWED FOR CODE COMPLIANCE APPROVED W242011 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2M60 0 2M61 2M63 2-81 BUILDING CIT KEY PLAN SCALE: NTS 4 2 0 4 RECE VED OF TUKWIL „AI 1 8, 2017 8 12PEFliBIT CITE ■� SCALE :(FEET) I/8"=I '-0" SYM REVISION RECORD DRAWING A 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 BY HGI/KLC SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE 8.7.01 05.12.17 BOE/iYG° 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K.COLE CHECKED S. FRANKLIN DATE 7.23.01 7.31.01 SUBTITLE FIRE PROTECTION PLAN CURRENT REVISION W4833402 SYMBOL DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER COSCO 9.4.98 CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/3-8 PLANT 2, WA. SHEET 2M262 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-2M262 + 3 MATCHLINE SEE SHEET 2M261 18'-0" TYP ELEV. LEGE D SYM SPRINKLERS MODEL TYPE TEMP. NPT K FAC. FINISH o CENTRAL A SSU 165 1/2" 5.6 BR. o CENTRAL GB RECESSED 155 1/2" 5.6 CHR. o CENTRAL A SSU 212 1/2" 5.6 BR. " CO\S-RUCTIO\ \ EXISTING SPRINKLER SYSTEM PIPING AND LAYOUT SHOWN WAS TAKEN FROM AVAILABLE RECORD DRAWINGS AND BASED ON SITE OBSERVATIONS TO THE EXTEND AVAILABLE, CONTRACTOR SHALL FIELD 2 ALL PIPE SIZES, ROUTING, DIMENSIONS, HEAD �O NS AND OTHER CONDITIONS AS REQUIRED TO P IRM THE WORK. MODIFY SPRINKLER HEADS FOR ALL NEW SPACES. PROVIDE AS -BUILT DESIGN TO SAZAN. RECORD DRAWINGS DRAWING TO FINAL SPRINKLER SAZAN WILL THEN PROVIDE TO OWNER. 5 )f 1 1 /4" (61- I 1 1/4" 7,I 1 1/2" F HAL \OTES DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA #13, AND FACTORY MUTUAL. . THE CITY OF TUKWILA FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS UNLESS SPECIAL PERMISSION IS GRANTED BY THE FIRE CHIEF. 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE MUST BE SIGNED OFF BY THE CITY OF EVERETT FIRE MARSHAL AND THE BOEING FIRE INSPECTION DEPARTMENT PRIOR TO COMMENCEMENT OF WORK ON THE FIRE SYSTEM. 4. FIRE PROTECTION SPRINKLER CONTRACTOR SHALL ACQUIRE SHOP DRAWING APPROVAL FROM THE CITY OF TUKWILA FIRE MARSHAL AND BOEING FIRE PROTECTION ENGINEERING PRIOR TO PURCHASE, FABRICATION OR INSTALLATION OF ANY FIRE PROTECTION SYSTEM. 5. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40, ASTM A-53, GRADE B, BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM, GRADE B, BLACK STEEL SCH 40 FOR VERTICAL RISERS AND WITH PERMISSION FROM BOEING FIRE PROTECTION ENGINEERING MAY BE SCH 10 FOR HORIZONTAL CROSS MAINS. 6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE BLACK 150 LB. THREADED MALLEABLE IRON FOR 1 1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR 2 1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED. 7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE 07 ZERO -FLEX (OR EQUAL) UNLESS OTHERWISE NOTED. 8. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR WATER-BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS. 9. SPRINKLER SYSTEM DESIGN SHALL BE FOR ORDINARY HAZARD, GROUP 2 OCCUPANCY (HC -2) 0.20 GPM/SF OVER 2500 SF UNLESS OTHERWISE NOTED. 10. SPRINKLER HEADS SHALL BE STANDARD RESPONSE TYPE HEADS UNLESS OTHERWISE NOTED; ORDINARY TEMPERATURE RATED, UNLESS SPACE CONDITIONS WARRANT THE INSTALLATION OF HIGHER TEMPERATURE RATED HEADS. 7 15-8" ELEV. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 4 2D11 I City of Tukwila BUILDING DIVISION 18'-0 TYP ELEV. 18'-0 TYP ELEV. PARTIAL PLA\ SCALE: 1/8"=1'-0" VIEW REVISION APPROVED REVISION APPROVED RECORD DRAWING J#972197-00 HGI/KLC 1" DN TO INSPECTORS TEST VALVE 3 '-0" AFF. DISCHARGE OUTSIDE AT 1'-0" AFF. ON THE 1ST FLOOR. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/DJ 05.12.17 APPROVED BY DRAWN K. COLE DATE 7.24.01 CHECKED S. FRANKLIN ENGINEER COSCO CHECKED 7.31.01 W4833402 ISSUE FOR CONSTRUCTION 05.12.17 J AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 2-81 BUILDING RECEIVED CITY OF TUKWILA OAY 1 8 2017 48 12 PWIT -LATER KEY PLAN SCALE: NTS Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 4 2 0 SCALE :(FEET) /8"=I'-0" TITLE FIRE PROTECTION PLAN 2-81 & DENSITY IMPROVEMENTS CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 APPROVED BUILDING 02-081 COL. F -L/3-8 05/11/2017 APPROVED MECHANICAL MASTER 2M263 JOB NO. 972197-00 COMP NO. PLANT 2, WA DWG NO. 2-81-2M263 A� C� C 3 OO FO CGD BLC G. 2-81 C 8TWS (CA PED) RFM3 M500 8" TWR CA PED —._ ---i ■—._— BLDG. 2-80 ACCESS DOOR 120/120 INTAKE HOOD FOR AHU 5 & 6 SEE DETAIL RFM3 I M501 A1111110. 41111111w. 2"HWS DN :T. iiiii 6) `Lcc ©�--T- I L v I -J 01. DU DUCTWN < A\D HVAC HP\C SCALE: 1/16"=1'-0" MCI CC HC RL RS RHG LEGE\D COOLING COIL HEATING COIL REFRIGERANT LIQUID REFRIGERANT SUCTION REFRIGERANT HOT GAS GE\EAL \OTES 1. INSULATE AND HEAT TRACE CTWS, CTIA/R, PW, CHWS, CHWR CHWR, HWS & HWR ON THE ROOF OUTSIDE THE HEATED BUILDING ENVELOPE INCLUDING THE AIR HANDLING UNIT VESTIBULE, PER SPECIFICATIONS. 2. SEE MECHANICAL DRAWING 2-81—M1 a FOR PENTHOUSE SCHEDULE. AHU-2 SHALL HAVE 3—WAY CHILLED WATER CONTROL VALVE. EFE E\ CE [aAWI\ GS CO\STRUCTION \OTES PROVIDE TEST, ADUJST & BALANCE (TAB). REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 • City of Tukwila BUILDING DIVISION W4833402 ISSUE FOR CONSTRUCTION 05.12.17 .• .. EAZA RC1=iVE G R 0 jjC YOFTUK 600 Stewart St., Ste- '40Q 2I Seattle, Washingt ; .? 1 -TEN Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 EJ WILA 317 T SYM REVISION - RECORD DRAWING J#972197-00 A B C RECORD DRAWING CDC RELOCATION - WIRE SHOP RELOCATION 2-81 & DENSITY IMPROVEMENTS J#982190-00 J#19760 W4833402 BY HGI/SHS HGI/RB WH SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE MBL 11.12.99 03.15.01 11.11.13 05.12.17 giBOE/NG° 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN H. WARDELL CHECKED A.NAPIER DATE 1.30.98 5.15.98 SUBTITLE DUCTWORK AND HVAC PIPING CURRENT REVISION W4833402 SYMBOL DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. MCNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET RFM3 JOB NO. 972197-00 COMP NO. DWG NO. 2-81—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`FAULT' INDICATION IS RECEIVED FROM THE VFD OR IF THE SYSTEM DIFFERENTIAL DROPS BELOW 1 PSID (SET AS REQUIRED) FOR 10 MINUTES THEN ENABLE THE LAG PUMP. THE SECONDARY PUMPS VFD WILL MODULATE TO MAINTAIN SYSTEM SUPPLY PRESSURE DOWNSTREAM AS SENSED BY THE DIFFERENTIAL PRESSURE SENSOR. THE DDC SYSTEM WILL POLL THE TRANSMITTER FOR THE MINIMUM DIFFERENTIAL. THIS MINIMUM WILL BE USED FOR CONTROLLING THE SECONDARY PUMPS. TO PREVENT DEAD HEAD OF THE PUMPS AND TO MAINTAIN CHILLED WATER CIRCULATION, AHU-2 WILL BE PROVIDED WITH A 3 -WAY VALVE. SECONDARY CHILLED WATER SUPPLY IS MONITORED FOR FLOW AND TEMPERATURE. THE SECONDARY CHILLED WATER RETURN IS MONITORED FOR TEMPERATURE. II. CHILLED WATER SUPPLY TEMPERATURE CONTROL: A. CHILLED WATER SUPPLY TEMPERATURE SET -POINT TO BE RESET BY THE DDC SYSTEM. THE SET -POINT WILL BE RESET BASED ON AHU MAX VALVE POSITION AND LOAD. THE CHILLED WATER VALVES WILL BE MONITORED FOR MAXIMUM POSITION EVERY 5 MINUTES. IF THE MAXIMUM VALVE POSITION IS 100% THEN THE TEMPERATURE SET -POINT WILL BE ADJUSTED DOWN BY 0.5 DEG F. IF THE MAXIMUM VALVE POSITION IS LESS THAN 80% THEN THE SET -POINT WILL BE ADJUSTED UP BY 0.5 DEG F. B. THE CMCS (DDC) SHALL MODULATE THE TWO-WAY CHWR CONTROL VALVE TO MAINTAIN CHWS TEMPERATURE SET -POINT. HOT WATER HEATING SYSTEM 1 THE HOT WATER HEATING SYSTEM CONSISTS OF A CONVERTER (HEX -1, SHELL & TUBE HEAT EXCHANGER), HOT WATER HEATING PUMPS (P-9 AND P-10) AND THE HOT WATER HEATING PIPING LOOP EXTENDING TO FAN TERMINAL UNITS, HEATING COILS IN AIR HANDLING UNITS , UNIT HEATERS AND HOT WATER FAN COIL UNITS. SYSTEM TO OPERATE ON A CALL FOR HEATING. ONE HOT WATER HEATING PUMP IS A STANDBY PUMP WITH 100% SYSTEM REDUNDANCY. 2. ONE PUMP IS DESIGNATED AS LEAD AND THE SECOND PUMP IS LAG. ONCE A MONTH THE PUMPS WILL BE SWITCHED BASED UPON THE LEAST RUN TIME, TO PROVIDE EQUAL SERVICE OF THE PUMPS. THE PUMPS WILL BE MONITORED FOR STATUS AND FAULT VIA THE VARIABLE FREQUENCY DRIVE (VFD). UPON LOSS OF STATUS OR FAULT INDICATION FROM THE LEAD PUMP THE LAG PUMP WILL BE STARTED AUTOMATICALLY VIA THE DDC SYSTEM. 3. A DIFFERENTIAL PRESSURE TRANSMITTER, LOCATED ON THE 2ND FLOOR, WILL BE USED TO CONTROL THE SPEED OF THE HEATING WATER VFD PUMPING SYSTEM. DIFFERENTIAL PRESSURE SET POINT IS RESET BASED ON MAXIMUM VALVE POSITION. 4. HEATING SUPPLY WATER TEMPERATURE WILL BE MAINTAINED VIA 1/3 AND 2/3 HEATING VALVE SERVING HEX -1. THE STEAM VALVES WILL REMAIN CLOSED (SPRING RETURN CLOSED) WHEN BOTH PUMP P-9 AND P-10 ARE OFF. UPON PROOF OF OPERATION OF ONE PUMP THE STEAM VALVES WILL BE STAGED TO MAINTAIN DISCHARGE TEMPERATURE SET -POINT. A) B) C) D) DEMAND 0% 33% 34% 100% OPENING 1/3 VALVE 2/3 VALVE 0% 0% 33% 34% 100% 33% 34% 100% DEMAND 0% 25% 75% 100% CLOSING 1/3 VALVE 2/3 VALVE 0% 0% 75% 25% 100% 0% 25% 100% 5. THE HEATING SUPPLY WATER TEMPERATURE WILL BE RESET FROM 140 DEG F TO 180 DEG F BASED UPON VALVE POSITION. THE TERMINAL UNIT VALVES AND AIR HANDLING UNIT HEATING VALVES WILL BE SAMPLED EVERY FIVE MINUTES FOR THE MAXIMUM VALVE POSITION. THIS MAXIMUM POSITION WILL RESET THE SET -POINT EVERY 5 MINUTES BY .05 PSI. IF THE MAXIMUM IS GREATER THAN 95% THE SET -POINT WILL BE RAISED, IF THE MAXIMUM IS LESS THAN 80% THAN THE SET -POINT WILL BE LOWERED. 6. DURING LOW LOAD CONDITIONS THE VFD PUMP WILL BE OPERATING AT A MINIMUM FREQUENCY. ONE BY-PASS VALVE LOCATED IN MECHANICAL ROOM ADJUSTED TO CONTROL DIFFERENTIAL PRESSURE AT MIN FREQUENCY. THIS WILL MAINTAIN A MINIMUM FLOW REGARDLESS OF HEATING LOAD. LANDIS & STAEFA BOEING 2-81 BLDG. REFERENCE ONLY REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 4 2017 City of Tukwila BUILDING DIVISION W4833402 ISSUE FOR CONSTRUCTION 05.12.17 SAZAN GROUP 600 Stewart St., S©ED Seattle, Washingt6M Tel 206.26.X‘1 7�OO20r Fax 20s g1(lT7@aNT SAZAN # 206-1777 SYM REVISION A B C ISSUE FOR CONSTRUCTION BLDG. 2-81 RECORD DRAWING CDC RELOCATION - WIRE SHOP RELOCATION 2-81 & DENSITY IMPROVEMENTS J#972197-00 J#982190-00 J#19760 W4833402 BY LS/JMW HGI/RB WH SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE MBL 5.22.98 03.15.01 11.11.13 05.12.17 ff.tE/NG 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN H. WARDELL DATE 2.4.98 CHECKED SUBTITLE HVAC CONTROL SEQUENCES CURRENT REVISION W4833402 SYMBOL DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER J. GAVINO 2.4.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.8.98 APPROVED TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M310 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M310 ILA ER O CFM MIN 36305 CFM MAX OSA 3195 CFM MIN 39500 CFM MAX ROOF LINE ROOF LINE 12605 CFM MIN 36305 CFM MAX RA ' 2-1§ 2865 CFM 2-111- 1380 -141380 CFM 1380 CFM 2-1� 3180 CFM pT V 2-12 3180 CFM U � � © © © V 1575 CFM 3180 CFM 3180 CFM 3180 CFM 2-69 1590 CFM 2\ 2-07 1575 CFM D FLOC 15800 CFM MIN 39500 CFM MAX \OATH OPE\ OFFICE AEA 2-02 1590 CFM 2-0p ► 2-01- 3180 -043180 CFM 530 CFM 1 —W 3180 CFM 1575 CFM 3180 CFM O CFM MIN 39520 CFM MAX ROOF LINE OSA 3040 CFM MIN v 42560 CFM MAX <AHU> 2 ROOF LINE 13985 CFM MIN 39520 CFM MAX 1 RA —3y5 1-34 1380 CFM 2070 CFM 2130 CFM 21 D5 1610 CFM —3; 2840 CFM —39 21 D5 1610 CFM 2-29 V 2-29 1380 CFM 2130 CFM 2-27 2070 CFM 2-2§ 2840 CFM 2430 CFM 2\D FLOOR S UTH OPE\ 17025 CFM MIN 42560 CFM MAX 2840 CFM OFFICE AREA V-2� 2430 CFM T V 2840 CFM 2430 CFM 2-29 2840 CFM 2430 CFM 2840 CFM 1420 CFM 0 CFM MIN EA 18650 CFM MAX ROOF LINE 5600 CFM MIN 18650 CFM MAX OSA 3100 CFM MIN 21750 CFM MAX ROOF LINE 255 CFM V 2-62 21C4 305 CFM ter. V 2-69 22C3 615 CFM 2-6$- 575 -64 575 CFM V 21C2 325 CFM 22C2 250 CFM J —5� 21C3 670 CFM P 2-61 21 B4 450 CFM 22C4 270 CFM 540 CFM 22D2 270 CFM 21D2 270 CFM —580 CFM 670 CFM 171._ 2105 335 CFM 22C5 335 22C5 335 CFM 23D2 245 CFM 21 E2 530 CFM —54 21 F2 610 CFM V-5 22F2 430 CFM 21G2 450 CFM 2-5,1 695 CFM hem. 22G2 385 CFM 21G3 310 21 G3 310 CFM RA 620 CFM 22H3 900 CFM 2\D FLOO PROCESS AREA 8700 CFM MIN 21750 CFM MAX —1925 CFM 1-4� 21H5 2320 CFM 75 CFM 2-42 780 CFM h21H3 350 CFM aw_ 21H2 430 CFM —2345 CFM —620 CFM 2-4,1 21 K3 900 CFM 1760 CFM — 385 CFM 2-49 21J1 450 CFM 325 CFM 265 CFM 315 CFM 22J2 21DB22 22DB22 880 CFM 325 CFM 580 CFM 555 CFM 1-39 21DA22 750 CFM 1760 —305 CFM —515 CFM 115 CFM 2-44 V 2-4p V -4p 21KJ5 21KJ5 21KJ5 2740 CFM 2055 CFM 780 CFM 2-47 ' 2-4§ 22E5 430 CFM 610 CFM 23F6 125 CFM REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 City of Tukwila BUILDING DIVISION 1 22F6 220 CFM 21F6 85 CFM W4833402 ISSUE FOR CONSTRUCTION 05.12.17 23E4 195 CFM AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 RECEIVED Tel 206.26n -170@F T UKWILA Fax 206.267.170p1( 8 2017 SAZAN # 206-1777 PERMIT ENTER REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 HGI/SHS SAZAN/DJ 11.12.99 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN R. TOPNESS DATE 11.3.97 CHECKED S. FRANKLIN 3.30.98 SUBTITLE HVAC FLOW DIAGRAM CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 11.3.97 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M312 JOB NO. 972197-00 COMP NO. DWG NO. 2-81—M312 3"x3/4" 3/4" JI 3"x3/4" "'t), 3" HWR 4" HWS 4"x3/4" 4"x1" 0, 01 3/4" 4"x3/4" 3"x3/4" 4"x3/4J:\ 3/4" r. 3/4" 4"x3/4" r. r. r. iclf-'="44:r3X ro r. 41. ro 4"x2" 4"x3/4" 4"x3/4" 4"x3/4" 3/4" 3/4" Po 3/4" '0 3/4" ot 3/4" 4"x3/4" - HAI! 3/4" 4"x3/4" 3"x3/4" T T T C C If 3/4" 3/4" 3/4" 4"x3/4" 6"x4" 4-19 5.0 GPM 0.8 GPM 2.6 GPM • TO FIRST FLOOR < 3" HWS < >3" HWR > 2-81-M321 FROM FIRST FLOOR 3" HWS 3" HWR <FROM < 2-80-M323 > TO > 3/4" 4"x3/4" 3"x3/4" 3/4" 4"x3/4" 3/4" 3"x3/4" CC ro 4"x3/4" io r. ro ro ro 3/4" 3"x3/4" 3/4" oi oi oi 4"x 0 r>r\ L4"x3/4\- 3/4" tct- /AHU\ 04 26.3 GPM HC 1.0 GPM 0.7 GPM 0.7 GPM 2 3/4" 4"x3/4" W4833402 ISSUE FOR CONSTRUCTION 05.12.17 r. ro r. r. /AHU\ 03 26.5 GPM 4"x3/4" 3/4" HC 3/4" 3/4" 3/4" io 10K 10H _ � 10 ►� 4"x3/4" 1" VALVED & CAPPED FUTURE CONNECTIONS 01 3/4" 3/4" 3/4 3/4" 3/4" 4"x3" HWS 10 r. 2rSa 4"x3/4" EAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 0 ro re) ro ro t.t\-4" 4"x3/4" ro 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" • REVIEWED FOR ODE COMPLIANCE APPROVED MAY 2 4 20i7 City of Tukwila BUILDING DIVI CITY OF TUKVVI MAY 1 8 2017 PERMIT CENTE SYM A REVISION RECORD DRAWING 2-81 & DENSITY IMPROVEMENTS W4833402 BY HGI/SHS SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE 11.12.99 05.12.17 ”® 05/11/2017 ACCEPTABILITY . THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN G. KREWIN DATE 3.10.98 CHECKED S. FRANKLIN 5.18.98 SUBTITLE SECOND FLOOR HEATING WATER PIPING DIAGRAM CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 APPROVED BY DEPT. DATE ENGINEER E. YOOSEFIAN 3.10.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSFY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M320 JOB NO. 972197-00 COMP NO. DWG NO. LABEL: "FAN TERMINAL UNIT ON/OFF SWITCH. TURN SWTICH TO OFF DURING TESTS CRITICAL TO SOUND." TYPICAL SERIES FAN POWERED BOX WITH HOT WATER REHEAT START DDC TERMINAL CONTROLLER COOLING COIL DISCH TEMP AI ROOM TEMP L HEATING COIL TCV106 TCV107 TCV108 TYPICAL CABINET HEATER __E>t(H_e C TT105 FAN COOLING FCU -1-01 COIL mos i TC103 TC 102 DDC TERMINAL CONTROLLER AIR FLOW DAMPER DM DM102 DDC TERMINAL CONTROLLER START HEAT COIL ROOM TEMP F FATI L TCV104 HEATING COIL TYPICAL UNIT HEATER rt -Ti TT103 "A" = PL2.081.1SGO2 "C" = PL2.081.RFE04.XFN "B" = PL2.081.1 SJO2 CO OUTSIDE DMPR CO LEVEL COOAD "A".COALEV 13.1 32.1 AI CO LEVEL UNIT SWITCH START PROOF "B".COBLEV "B".06WS "C".06SS "C".06SS 32.2 8.3 11.1 8.2 FATI DM105 DM106 DM107 DM108 CARBON MONOXIDE METER CO -1 CARBON MONOXIDE METER CO -2 LOCATE METERS 5' ABOVE FLOOR. TES El MANUAL START ROOM TEMP TYPICAL VAV COOLING ONLY LEGE D GE\PAL \OTES HFHE\CE D 171 i moz AWI\GS CO \STUCTIO\ \OYES PROVIDE DUCT TEMPERATURE SENSOR SIEMENS #536-811 FOR ALL TERMINAL UNITS IN REMODEL AREA. \AL EQUIPNE SCALE: 1/8"=1'-0" T PBcID ITEM QTY MATERIAL LIST PART NUMBER SUPPLIER SERIES FAN POWERED TERMINAL UNIT OPERATION 1. THE DDC SYSTEM SHALL CONTROL THE OPERATION OF THE FAN, VOLUME OF PRIMARY AIR AND THE HOT WATER REHEAT COIL IN THE TERMINAL UNITS TO MAINTAIN THE HEATING AND COOLING SET -POINTS AT THE ROOM TEMPERATURE SENSOR. THE FAN SHALL RUN DURING THE OCCUPIED PERIOD, NIGHT OVERRIDE AND NIGHT LOW LIMIT MODE. THE ROOMS WILL HAVE ADJUSTABLE SET -POINTS BY THE OCCUPANTS. THE SET -POINTS WILL BE COMMANDABLE THROUGH THE DDC SYSTEM. 2. UNOCCUPIED PERIODS, NIGHT OVERRIDE. A PUSH BUTTON AT EACH THERMOSTAT SHALL ENABLE THE LOCAL FAN AND HEATING COIL FOR 2 HOURS (ADJUSTABLE) TO MAINTAIN ROOM TEMPERATURE. THE AHU WILL BE STARTED DURING THIS MODE. FOR EACH AHU ZONE ONE THERMOSTAT WILL BE DESIGNATED FOR NIGHT OVERRIDE. IF THIS UNIT IS ENERGIZED THE AHU AND ALL TERMINAL UNITS WILL BE STARTED. 3. UNOCCUPIED PERIOD, NIGHT LOW LIMIT. THE LOCAL FAN WILL BE STARTED AND THE HEATING COIL WILL MODULATE TO MAINTAIN ROOM TEMPERATURE. AHU WILL REMAIN OFF. 4. ALL THE FAN POWERED TERMINAL UNITS SHALL BE STARTED PRIOR TO STARTING THE CENTRAL AHU TO ENSURE PROPER ROTATION OF SERIES FANS. 5. AIR SHUT OFF SWITCH - IF THE WALL MOUNTED AIR SHUT OFF SWITCH IS IN THE "ON" POSITION, TERMINAL BOX CONTROL OPERATES AS DESCRIBED ABOVE. IF THE SWITCH IS IN THE "OFF" POSITION, THE TERMINAL BOX FAN WILL SHUT OFF AND THE CONTROL DAMPER WILL CLOSE. COMPUTER ROOM UNIT MONITORING 1. THE DDC SYSTEM SHALL ALARM ROOM TEMPERATURE SENSORS FOR FT -2-59 SERVING ROOM 22C4 AND FT -2-37 ROOM 22DB22 IF THE TEMPERATURE IN EITHER ROOM EXCEEDS 78 DEGF. VAV TERMINAL UNIT OPERATION 1. THE DDC SYSTEM SHALL CONTROL THE OPERATION OF THE AIR VOLUME DAMPER IN THE TERMINAL UNITS TO MAINTAIN THE COOLING SET -POINT AT THE ROOM TEMPERATURE SENSOR. THE UNIT SHALL HAVE AN OCCUPIED AND UNOCCUPIED SET -POINT FOR TEMPERATURE AND AIR FLOW. THE ROOMS WILL HAVE ADJUSTABLE SET -POINTS BY THE OCCUPANTS. THE SET -POINTS WILL BE COMMANDABLE THROUGH THE DDC SYSTEM. 2. UNOCCUPIED PERIODS, NIGHT OVERRIDE. A PUSH BUTTON AT EACH THERMOSTAT WILL BRING ON THE RESPECTIVE AHU FOR 2 HOURS (ADJUSTABLE). UNIT HEATERS 1. THE DDC SYSTEM SHALL CONTROL THE FAN AND HEATING WATER VALVE TO MAINTAIN ROOM TEMPERATURE. UPON A CALL FOR HEATING THE FAN SHALL BE ENABLED AND THE HEATING WATER VALVE WILL BE MODULATED TO MAINTAIN ROOM TEMPERATURE 70 DEGF (ADJ.). 2. UNOCCUPIED MODE: THE UNIT HEATER WILL CONTROL TO MAINTAIN 60 DEGF. 3. NIGHT OVERRIDE: A PUSH BUTTON AT EACH THERMOSTAT WILL RETURN THE UNIT TO THE DAY SETPOINT FOR 2 HOURS (ADJUSTABLE). FAN COIL UNIT FCU -1-01 1. FCU -1-01 SERVES THE ELECTRICAL ROOM. THE DDC SYSTEM SHALL CONTROL THE SUPPLY FAN AND CHILLED WATER VALVE TO MAINTAIN ROOM TEMPERATURE. UPON A CALL FOR COOLING THE FAN SHALL BE ENABLED AND THE COOLING WATER VALVE WILL BE MODULATED TO MAINTAIN ROOM TEMPERATURE. CABINET HEATERS 1. THE CABINET HEATERS SHALL BE A PACKAGED UNIT WITH NO DDC INTERFACE. A LINE VOLTAGE THERMOSTAT OPENS THE VALVE AND RUNS THE FAN WHEN THE ROOM TEMPERATURE FALLS BELOW 60 DEGF. VALVE CLOSES AND FAN SHUTS DOWN WHEN THE TEMPERATURE RISES ABOVE 62 DEGF. CARBON MONOXIDE MONITORING 1. THE CO METERS MONITOR THE CO LEVEL IN THE SPACE. IF EITHER METER DETECTS A HIGH CO LEVEL, THE DAMPERS WILL OPEN AND THE FAN WILL START. GENERAL NOTES TYPICAL OF 3: FT -1-18, FT -1-21, FT -1-23 ONLY. TYPICAL OF 1: FT -1-23 ONLY. INTERPOSING RELAY FOR EXHAUST FAN LOCATED AT DISCONNECT INTERPOSING RELAY FOR EXHAUST FAN LOCATED AT MCC REFERENCE DRAWINGS 2-81-E516 2-81-1E210 2-81-1E213 2-81-2E211 2-81-2E215 2-81-E519 2-81-1E211 2-81-1E215 2-81-2E212 2-81-RFE210 2-81-E536 2-81-1E212 2-81-2E210 2-81-2E213 2-81-E538 CSR 06-07 2 H800 VERIS, CURRENT SENSING RELAY DM 101 95 349 0100 LANDIS & STAEFA, DAMPER ACTUATOR DM 102 1 349 0100 LANDIS & STAEFA, DAMPER ACTUATOR DM 105-108 4 GCA121.1P LANDIS & STAEFA, DAMPER ACTUATOR T-106 2 134-1086 LANDIS & STAEFA, LINE VOLT STAT TC 101-102 105 540 100 LANDIS & STAEFA, VAV CONTROLLER TC 103-104 7 540 110 LANDIS & STAEFA, CONDITIONER CONTROLLER TCV 101 2 VMP42.09 2 SQS82 LANDIS 8c STAEFA, GPM .5, 5.0 PD TCV 102 2 VMP42.10 2 SQS82 LANDS & STAEI-A, GPM .9, 5.0 PD TCV 103 2 VMP42.11 2 SQS82 LANDIS & STAEFA, GPM 1.4, 5. # PD TCV 104 2 VMP42.14 2 SQS82 LANDIS & STAEFA, GPM 4.7-6.3 5.0# PD TCV 105 2 WI43.20- . SQS82 LANDIS & STAEFA, GPM 15, 5.0# PD TCV 106 3 MTF1215 LANDIS & STAEFA, ZONE VALVE 1/2"NPT TCV 107 1 MTE12.15 I ANDIS gr STAFFA, 7CNF VAI VF 1 /7"NPT TCV 108 1 MTE12.15 LANDIS & STAEFA, ZONE VALVE 1 2"NPT TT 101-104 112 540 670A LANDIS & STAEFA, 10K OHM ROOM SENSOR TT 105 2 535 741 LANDIS & STAEFA, SINGLE POINT 100K OHM CO 1-2 2 CM -2B MACURCO INC. CARBON MONOXIDE MONITOR M17 W4833402 ISSUE FOR CONSTRUCTION 05.12.17 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP \ 600 Stewart St., Ste 1400 Seattle, Washington 98101 RECEIVE Tel �Qf7T1 7 lL Fax 206.4 7.1701 SAZAN # 206-W77 8 t` 17 SYM REVISION A B AS -BUILT CDC RELOCATION - WIRE SHOP RELOCATION 2-81 & DENSITY IMPROVEMENTS J#972197 J#19760 W4833402 BY ASC WH SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE TP MBL 06.23.99 11.11.13 05.12.17 .ff',E740:Mff® 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN J. WEGLINSKI DATE 04.09.98 CHECKED SUBTITLE TERMINAL EQUIPMENT P&ID CURRENT REVISION W4833402 SYMBOL 3 DATE PERMIT CENTER 05.12.17 APPROVED BY DEPT. DATE ENGINEER J. WEGLINSKI 04.09.98 CHECKED G. SPRAGUE 06.03.98 APPROVED L. COSTELLO 06.03.98 APPROVED TITLE 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 MECHANICAL MASTER PLANT 2, WA. SHEET M330 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M330 WOMEN 1PAN LIff MirairAMMEMINIIM11111111E111/911011111111111111b. k g -w" -W I` -� . » ������z- ;�3�3�qk 4"SANA��,�ii�iiMIME RP •I1.1 SAN, rharAiwor /2"CW 1 /2"CW T(1 TO ©n��rn n — 7"CACI _ •f 2"SAN PARTIAL PLA\ ABOVE FL00—SEGO SCALE: 3/8"=1'-0" \D FLOO TOILETS 2M M952 REF WATER L _ J /2"V, UP D F-2 O WOMEN 21 F4 P-4 2"SAN P-4 P-2 P-2 2"FD 2 P-2 2SAN. P-2 r-smbR P-4 P-2 P-2 P-4 P-1 1 /2"TP,UP "V,UP 4"SAN,DN/UP 2"SAN 2"FD-2 2"SAN P-3 P-3 P-3 MEN 22F4 PATTIAL . P A\ U\DEQ FLOC) SCALE: 3/8"=1'-0" (SEE NOTE) �—SEGO P-4 P-4 P-4 P-4 O\O 0 COO 2"SAN , UP \D FLOO ToiLErs� 2M11}�M452 NOTE: FOR FIRST FLOOR TOILETS SANITARY VENTS AND DOMESTIC WATER LOCATED UNDER SECOND FLOOR, SEE PARTIAL PLAN ON DWG M451. LEGE \D G E N E SAL \OTES REFE�E\CE D�AWI\GS C \ STUCTIO\ \OTES PROVIDE NEW SINK . CONNECT NEW CW, HW, WASTE AND VENT TO EXISTING CW, HW, WASTE AND VENT. W4833402 ISSUE FOR CONSTRUCTION 05.12.17 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 WI City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel C2i`i TRI& L Fax 206.267.1701 SAZAN # 206t 7f 7I U 2817 SYM REVISION RECORD DRAWING A 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 BY HGI/SHS SAZAN/NA APPROVED DATE SYM REVISION BY APPROVED DATE 11.12.99 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN M. HOLT DATE 1.19.98 CHECKED S. FRANKLIN 3.30.98 SUBTITLE PARTIAL PLANS CURRENT REVISION W4833402 SYMBOL A DATE CENTER 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.19.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F -G/4-5 PLANT 2, WA. SHEET M452 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M452 SEE DUCT FLASHING DETAIL FOR FLASHING AND ROOF CURB -� ROOF EA r / \ / ROOF EXHAUSTER N EA Co BACKDRAFT DAMPER / U CE\TIFJGAL .00F EX HAU STEL DETAIL SCALE: NTS CEILING FRAMING SUSPENSION SYSTEM CEILING TILE SUPPORT RETURN AIR CEILING GRILLE. SEE SCHEDULE. RA M505 FASTENERS CEILIING TILE HINGE/LATCH REMOVABLE FACE LAY -I\ 'ETU.\ GRILLE � SCALE: NTS M505 CEILING TILE SUPPORT EGG CRATE CEILING GRILLE. SEE SCHEDULE. LAY -I\ SCALE: NTS RA ETU CEILIING TILE REMOVABLE EGG CRATE FACE GRILLE � M505 EXHAUST FAN SEE DUCT FLASHING DETAIL 3 THIS SHEET FOR FLASHING AND ROOF CURB ROOF EA • EA 0 BACKDRAFT DAMPER I cV z 03 / \ U EXHAUST FA\ DETAIL SCALE: NTS THE CEILING SUPPORT SYSTEM SHALL SUPPORT DIFFUSER. THE DIFFUSER DOES NOT SUPPORT THE TILE. FLEXIBLE DUCTWORK DUCT CLAMP OR DRAWBAND AT COLLAR CEILING FRAMING SUSPENSION SYSTEM — CEILING TILE SUPPORT 107- DUCT HANGER M505 DIFFUSER _AY -I\ DIFFUSE� SCALE: NTS 1/2" SUPPORTING ROD (2 TIP) 1 1/2 X 1 1/2 X 1/3 ANGLE BRACING TWO DIRECTIONS HORIZONTAL UNIT HEATER 0 CEILIING TILE HINGE/LATCH (4)PATTERN CONTROLLERS (ADJUSTABLE) UNIT HEATH DETAIL SCALE: NTS M505 M505 SEE ARCH FOR BASE FLASHING AND ROOF CURB ROOF�a OUTSIDE ROOM DUCT 16 GA. GALV. S -T. METAL FLASHING, USE SHT. METAL SCREWS AND CAULK WEATHER TIGHT. FOR ANGLE SUPPORT REFER TO S..M.A.C.N.A. STD. DUCT F_ASHI SCALE: NTS \G DETAIL n M505 OUTER WALL AIR GAP INSULATION INTERIOR WALL INSIDE ROOM 1111111 11111111 FLEX CONNECTION DUCTWOR< THRU ULTI WALLED OOV SCALE NTS SEE ARCH FOR BASE FLASHING AND ROOF CURB — OSA ROOF MOD 36/48 M505 i i i u OSA o 36/48 48/36 1 1 INTAKE HOOD F0� AHU-5 8c AHU-6 MOD 36/48 SCALE: NTS M505 FLEX CONNECTION LEGE\D GE\PAL \OTES 'EFE;E\CE DAWI\GS CO\ST UCTIO\ OYES REFERENCE ONLY W4833402 ISSUE FOR CONSTRUCTION 05.12.17 J REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 4 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 20640, Fax 206.267.17 SAZAN # 206-1777E AY 1 8 20 ED Kt SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING A 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 HGI/SHS SAZAN/DJ 11.12.99 05.12.17 ??.� BOE/N- 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN C. DeLAPP CHECKED G. FRANEK DATE 04.14.98 04.14.98 SUBTITLE HVAC DETAILS CURRENT REVISION W4833402 SYMBOL A DILA 7 ER DATE PEMAIT CEN - 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 04.14.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TTTLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M505 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M505 CLEARANCE: 1/8" PER LINEAR FOOT BOTH DIRCTIONS RETAINING 1 1/2" X REVISION /%SECURE RETAINING ANGLES TO SLEEVE C\KII V rKI O» /1 rA ITrr, r' ,,,ITI 1_ ANGLES: MINIMUM..1. 1 1/2" X 0.054(16 GA.)2. I •- VIILI, VII 0 ULIIILR3 1/2" LONG WELDS C 1/4" BOLTS AND NU 3. NO. 10 STEEL SCREV ; , 4. MINIMUM 3/16" STEE I I 6" '. a. • SECURE DL MIN EACH SIDE FIDE/S SCALE NONE vo JAN PES R JS, OR IS, OR L RIVETS. STEEL SLEEVE: PER S.M.A.C.N.A. FIRE DAMPER: BLADE TYPE SECURE DAMPER TO SLEEVE ON 8" CENTERS WITH: 1. 1/2" LONG WELDS OR 2. 1/4" BOLTS AND NUTS IN HOLES PROVIDED, OR 3. NO. 10 STEEL SCREWS, OR 4. MINIMUM 3/16" STEEL RIVETS. CT TO SLEEVE WITH A CONNECTION PER S.M.A.C.N.A. (TYPICAL) M506 CONTROL PANEL VIEW SCALE: NONE SEE ARCH FOR BASE FLASHING AND ROOF CURB 1 OSA EA -.01--1\i- M506 OSA EA T ROOF J TYPICAL I\TA SCALE: NONE BY NOTICE: "APPROVED" INSTALLATION INSTRUCTIONS GOVERN. <E/EXHAUST PE\THOUSE � M506 APPROVED DATE SYM REVISION BY APPROVED DATE PRIMARY SUPPLY AIR CLEARANCE W J INDUCED AIR SUPPLY `-HOT WATER SUPPLY/RETURN CONTROL PANEL 24" CLEARANCE HOT WATER SUPPLY/RETURN RECORD DRAWING 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 HGI/SHS SAZAN/DJ 11.12.99 05.12.17 M506 FA\ TPMI AL SCALE: NONE DUCT CLAMP OR DRAWBAND AT COLLAR DIFFUSER 30X DETAIL M506 DUCT HANGER OU\D SUSPE\DED DIFFUSES SCALE: NONE VD FLEX DUCT SECTIC\ M506 INDUCTED AIR INLET 81'0 PRIMARY DUCT 20x14 SUPPLY DUCT \AL 30X DETAIL SCALE: NONE SUPPLY AIR DUCT BLANK PANEL INSULATED PLENUM BOX W/ SIDE CONNECTION SUPPLY DIFFUSER B SCALE: NONE 2M10, 2M11, 2M12, 2M13 M506 05/11 /2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN C. DELAPP DATE 4.14.98 CHECKED A.NAPIER 5.15.98 SUBTITLE Mt LEGE\D G EN E SAL \OTES DUCT TAP WITH VOLUME DAMPER, FLEXIBLE DUCT, AND INSULATED SUPPLY DIFFUSER PLENUM BOX WITH SIDE TAP. LOCATIONS OF HEATING COILS. FLEX CONNECTION. EFERE\CE NAWI\GS CO \S -RU CTIO\ \OYES W4833402 ISSUE FOR CONSTRUCTION 05.12.17 HVAC DETAILS CURRENT REVISION W4833402 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 • City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 2063-1PT:MO Fax al 267T.WMILA SAZAN # 206-0:77 1 8 237 SYMBOL A DATE Etitil I I UtN I ER 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 4.14.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M506 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M506 a 12 DIA MIN J EXPANSION ANCHORS AT CENTER OF RIBS MACHINE BOLT AT END OF BRACE NOTE: • • • 1e1 SEE SMACNA SEISMIC RESTRAINT MANUAL TABLE 8-1 FOR SIZING REQUIREMENTS. TYPICAL DUCT SEISMIC BRACING ANGLE ATTACHMENT TO BUILDING STRUCTURAL MEMBER DETAIL SCALE: NTS 22.5' MIN 2 1/2"x12 GA SHT METAL STRAP M508 VERTICAL ANGLE BRACE DIAGONAL (TRANSVERSE) ANGLE BRACE MACHINE BOLT W/ 1/8"mK FLAT WASHER (TYP) - L3x3x1/4x0'-3"LG VERTICAL ANGLE WITH TRANSVERSE BRACE FOR ROUND DUCT DETAIL 4 SCALE: NTS M507IM508 CONCRETE FILL ON STEEL DECK LENGTHEN ANGLE IF REQUIRED TO SPAN BETWEEN RIBS BRACE MACHINE BOLT AT END OF BRACE 1" TYP VERTICAL AND DIAGONAL BRACES VERTICAL ANGLE BRACE DIAGONAL (TRANSVERSE) ANGLE BRACE LONGITUDINAL ANGLE BRACE 2 1/2"x12 GA SHT METAL STRAP 12'-0" MAX LONGITUDINAL BRACES NOTE: SEE SMACNA SEISMIC RESTRAINT MANUAL TABLE 8-1 FOR SIZING REQUIREMENTS. TYPICAL DUCT SEISMIC BRACING ANGLE ATTACHMENT TO BUILDING STRUCTURAL MEMBER DETAIL (2 - SCALE: NTS MACHINE BOLT W/ 1 /8"THK FLAT WASHER (TYP) BOLTS & ANGLES (TYP) L3x3x 1 /4x0'-3"LG DIAGONAL CABLE BRACE 2 1/2"x12 GA SHT METAL STRAP M508 VERTICAL ANGLE WITH COMBINATION BRACE FOR ROUND DUCT DETAIL 5 SCALE: NTS M507IM508 BUILDING STRUCTURAL STEEL BEAM LONGITUDINAL CABLE BRACE TYPICAL CABLE CONNECTION TO DUCT FRAME DETAIL 6 SCALE: NTS M507IM508 BUILDING STRUCTURAL STEEL BEAM STEEL BEAM CLAMP BRACE NOTE: SEE SMACNA SEISMIC RESTRAINT MANUAL TABLE 8-1 FOR SIZING REQUIREMENTS. TYPICAL DUCT SEISMIC BRACING ANGLE ATTACHMENT TO BUILDING STRUCTURAL MEMBER DETAIL SCALE: NTS 2"SQ. x 1/8" Ft_ WASHER, TYPICAL GALV. HEAVY WIRE ROPE THIMBLE M508 BOLT CABLE WITH WIRE ROPE CLIPS TYPICAL CABLE END CONNECTION DETAIL SCALE: NTS M507 M508 REFERENCE ONLY LEGE\D GE\FRAC \OTES 1. SEISMICALLY BRACE RECTANGULAR DUCTS 6 SQUARE FEET AND LARGER. BRACE ROUND AND OVAL DUCTS WITH DIAMETER OF 28 INCHES AND LARGER. EXCEPTION: SEISMIC BRACING IS NOT REQUIRED IF THE DUCT IS SUSPENDED BY HANGERS 12 INCHES OR LESS IN LENGTH. AS MEASURED FROM BUILDING STRUCTURAL ATTACHMENT TO DUCT ATTACHMENT. 2. USE SEISMIC HAZARD LEVEL (SHL) B FOR SEISMIC RESTRAINT DETAILS SHOWN ON THIS DRAWING AND AS APPLICABLE TO SMACNA SEISMIC RESTRAINT MANUAL. REFERE\CE NAWI\GS CO\ STRUCTIO\ \OTES W4833402 ISSUE FOR CONSTRUCTION 05.12.17 J REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 2B4. � •ta' I Fax 206.267.1 11 SAZAN # 206-1 tM 1 8 2.317 SYM REVISION RECORD DRAWING A 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 BY HGI/SHS SAZAN/DJ APPROVED DATE SYM REVISION BY APPROVED DATE 11.12.99 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN C. DELAPP DATE 4.14.98 CHECKED A.NAPIER 5.15.98 SUBTITLE HVAC DETAILS CURRENT REVISION W4833402 SYMBOL A DATE 05.12.17 PERMIT CCP 4TE A R APPROVED BY DEPT. DATE ENGINEER G. FRANEK 4.14.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TRLE 2-81 & DENSITY IMPROVEMENTS MECHANICAL MASTER BUILDING 02-081 PLANT 2, WA. SHEET M508 JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M508 SYM THERMOMETER (TYP) 0-100F UNION (TYP) FLEX CONNECTOR (TYP) PRESSURE GAUGE 0-100 PSIG (TYP.) rAUTOMATIC AIR VENT (NP.) CONTROL VALVE* CONDENSATE DRAIN PAN TRAP CONDENSATE DRAIN PIPE SEE DETAIL 5 SHEET M513 *NOTE AHU-2 3 -WAY CONTROL VALVE BALANCING VALVE o. I IT' iz STRAINER OI Iii .0/1 2 CHWR T//-- DRAIN VALVE W/ HOSE CONNECTION u & CAP (TYP.) AHU COOLI\G COIL CO\\ECTIO SCALE: N.T.S. THERMOMETER (TYP) 0-300*F UNION (TYP) FLEX CONNECTOR (TYP) M530 PRESSURE GAUGE 0-100 PSIG (TYP.) AUTOMATIC AIR VENT (TYP.) 01 01 AHU HEATI\ OI CONTROL VALVE* � r-o-1IGoi --I �� BALANCING VALVE) ,0 ISOLATION VALVE CHWS HWR ISOLATION VALVE `�\ STRAINER T/7-- DRAIN VALVE W/ HOSE CONNECTION `-' & CAP (TYP.) *NOTE AHU-6 3 -WAY CONTROL VALVE G COIL CO\ REVISION SCALE: N.T.S. BY APPROVED �Ecrio\ n DATE SYM M530 REVISION HWS BY APPROVED THERMOMETER (T(P) 0-100F PRESSURE GAUGE 0-100 PSIG (TYP.) AUTOMATIC AIR VENT (TYP.) UNION (TYP) FLEX CONNECTOR (TYP) 0� iii rCONTROL VALVE BALANCING VALVE j0/\ Z CHWR ISOLATION VALVE LBALANCING VALVE CONDENSATE DRAIN PAN TRAP CONDENSATE DRAIN PIPE SEE DETAIL 5 SHEET M513 AHU DUAL COOLI\G COIL CO\ SCALE: N.T.S. MOTORIZED ON/OFF CONTROL VALVE 0� T \ECTIO DATE RECORD DRAWING J#972197-00 HGI/SHS 11.12.99 A 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/DJ 05.12.17 UGIT HEATH CO BALANCING VALVE OI i CHWS ISOLATION VALVE STRAINER DRAIN VALVE W/ HOSE CONNECTION & CAP (TYP.) M530 I STRAINER TA/-- DRAIN VALVE W/ HOSE CONNECTION u & CAP (TYP.) ECTI O \ SCALE: N.T.S. DETAIL n M530 05/11/2017 HWR •t HWS ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN G. KREWIN MOTORIZED ON/OFF CONTROL VALVE BALANCING VALVE CA3I\ ET WALL HEATH CO\NECTIO\ SCALE: N.T.S. �• HWR HWS DETAILn M530 & CAP (TYP.) REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION Mt`/ DATE 2.18.98 CHECKED S. FRANKLIN ENGINEER E. YOOSEFIAN 5.18.98 SUBTITLE W4833402 ISSUE FOR CONSTRUCTION 05.12.17 STANDARD CONNECTION DETAILS GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.2a -MEAD SAZAN # 20EP1ThOF TUKW CURRENT REVISION W4833402 SYMBOL A DATE 2.18.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M530 Bial CENT JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M530 LA R PIPE FITTING SYMBOLS 5I —+0 0 It It! PIPING SYMBOLS REDUCER, CONCENTRIC REDUCER, ECCENTRIC UNION, SCREWED ELBOW, TURNING DOWN OR AWAY ELBOW, TURNING UP OR TOWARD TEE, OUTLET DOWN OR AWAY TEE, OUTLET UP OR TOWARD CAP, SCREWED OR SOLDER JOINT BLIND FLANGE PLUG CAP, WELDED OR GROOVED ELBOW, 90' TEE CROSS WASTE FITTING SYMBOLS LATERAL \ FCO °VTR El RD ®FD ® FS FFD ® FUD wco VALVE A00 [).q 1{B WASTE PIPING QUARTER BEND SANITARY WYE AND 1/8 BEND ELBOW, 45' CLEAN OUT, FLOOR CLEAN OUT, WALL VENT THRU ROOF ROOF DRAIN FLOOR DRAIN FLOOR SINK FUNNEL FLOOR DRAIN FUNNEL DRAIN SYMBOLS GATE VALVE, OUTSIDE SCREW AND YOKE GATE VALVE, (NORMALLY OPEN) GATE VALVE, (NORMALLY CLOSED) GATE VALVE WITH HOSE CONNECTION BALL VALVE, (NORMALLY OPEN) BALL VALVE, (NORMALLY CLOSED) BUTTERFLY VALVE GLOBE VALVE, (NORMALLY OPEN) GLOBE VALVE, (NORMALLY CLOSED) ANGLE GLOBE VALVE, PLAN ANGLE GLOBE VALVE, ELEVATION PLUG VALVE/STOP COCK CHECK VALVE 3 WAY VALVE BALANCING VALVE WITHOUT METERING PORTS BALANCING VALVE WITH METERING PORTS AUTOMATIC FLOW CONTROL VALVE NUMBER INDICATES GPM FLOAT VALVE NEEDLE VALVE HOSE BIB PRESSURE REDUCING REGULATING VAVE WITH EXTERNAL PRESSURE TAP PRESSURE REDUCING/REGULATING VALVE SELF CONTAINED VALVE SYMBOLS CONT. —t PRESSURE RELIEF/SAFETY VALVE MOTOR OPERATED VALVE SOLENOID OPERATED VALVE 3 WAY CONTROL VALVE c�a CONTROL VALVE QUICK OPENING QUICK CLOSING, FUSIBLE LINK -�+- VALVE IN RISER MISCELLANEOUS PIPING SYMBOLS AHU 100 *MAV IBJ C I� U 0 EQUIPMENT MARK NUMBER POINT OF CONNECTION AIR VENT, AUTOMATIC (WITH DRAIN) AIR VENT, MANUAL (WITH DRAIN) BACKFLOW PREVENTER COOLING COIL HEATING COIL EXPANSION JOINT FLOWMETER, ORIFICE FLOWMETER, VENTURI PRESSURE GAGE WITH VALVE STRAINER, WYE WITH BLOW OFF STRAINER, WYE STRAINER, BASKET STRAINER, DUPLEX TEST PLUG (PETE'S PLUG) TRAP SEAL PRIMER VALVE STEAM TRAP VALVE BOX PIPE GUIDE PIPE SUPPORT HANGER SPRING HANGER PIPE ANCHOR ® NITROGEN GAS OUTLET, HARD PIPE NITROGEN GAS DROP, HOSE VACUUM OUTLET, HARD PIPE VACUUM DROP, HOSE © VACUUM CLEANING OUTLET SIMPLEX AIR DROP, HOSE DUPLEX AIR DROP, HOSE O SIMPLEX AIR OUTLET, HARD PIPE DUPLEX AIR OUTLET, HARD PIPE AIR CONDITIONING, REFRIGERATION AND COOLING SYMBOLS — CHWS — CHWR — CLWS — CLWR CTFS CTFR CTWS CTWR HPWS HPWR CLD RS PIPING IDENTIFICATION SYMBOLS CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN COOLING TOWER FILTER SUPPLY COOLING TOWER FILTER RETURN DOLING TOWER WATER SUPPLY FROM COOLING TOWER) DOLING TOWER WATER RETURN TO COOLING TOWER) HEAT PUMP WATER SUPPLY HEAT PUMP WATER RETURN CLEAR WATER DRAIN (CONDENSATION) REFRIGERANT SUCTION (GAS) RL REFRIGERANT LIQUID RHG REFRIGERANT HOT GAS HEATING SYMBOLS HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN STM STEAM SUPPLY HPS MPS LPS HPR C PC CD HPC MPC LPC BBD BFW HIGH PRESSURE STEAM SUPPLY (125 - 250 PSIG) MEDIUM PRESSURE STEAM SUPPLY (15 - 125 PSIG) LOW PRESSURE STEAM SUPPLY (0 - 15 PSIG) CONDENSATE RETURN (PRESSURE), STEAM CONDENSATE RETURN (GRAVITY), STEAM CONDENSATE (PUMPED), STEAM CONDENSATE DRAIN CONDENSATE, STEAM (HIGH PRESSURE) CONDENSATE, STEAM (MEDIUM PRESSURE) CONDENSATE, STEAM (LOW PRESSURE) BOILER BLOW DOWN BOILER FEED WATER FUEL OIL SYMBOLS FO FUEL OIL FOD FOG FOS FOR FOV FOF PLUMBING A IA CF F S G LPG LN2 GN2 FUEL OIL DISCHARGE FUEL OIL GAUGE FUEL OIL SUPPLY FUEL OIL RETURN FUEL OIL VENT FUEL OIL FILL LINE AND MISCELLANEOUS SYMBOLS COMPRESSED AIR (100 PSIG NOMINAL) INSTRUMENT AIR CHEMICAL FEED FIRE LINE (AHEAD OF ALARM VALVE) SPRINKLER LINE (DOWNSTREAM OF ALARM VALVE) NATURAL GAS LIQUID PETROLEUM GAS LIQUID NITROGEN GASEOUS NITROGEN PLUMBING AND MISCELLANEOUS SYMBOLS CONT. VAC CLV VPD CW HW HWC DI DW PW, AW CRV CRW ID IW SAN STS RWL -V- VACUUM VACUUM CLEANING VACUUM PUMP DISCHARGE COLD WATER, DOMESTIC HOT WATER, DOMESTIC HOT WATER, CIRCULATING DOMESTIC DEIONIZED WATER DISTILLED WATER PROCESS WATER ACID WASTE CORROSION RESISTANT VENT CORROSION RESISTANT WASTE INDIRECT DRAIN INDUSTRIAL WASTE SANITARY WASTE STORM DRAIN RAIN WATER LEADER VENT HVAC SYMBOLS BASIC DUCTWORK SYMBOLS 0 240 ,M RECTANGULAR DUCT (FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN) ROUND DUCT (NUMBER INDICATES DIAMETER) SUPPLY AIR DUCT, RECTANGULAR ELBOW TURNING TOWARD SUPPLY AIR DUCT, RECTANGULAR ELBOW TURNING AWAY EXHAUST AIR OR RETURN AIR DUCT RECTANGULAR ELBOW TURNING TOWARD EXHAUST AIR OR RETURN AIR DUCT RECTANGULAR ELBOW TURNING AWAY RECTANGULAR DUCT, SQUARE ELBOW, SHOWN WITH TURNING VANES ROUND DUCT, ELBOW TURNING TOWARD ROUND DUCT, ELBOW TURNING AWAY FLEXIBLE DUCT FLEXIBLE DUCT CONNECTION DUCTWORK AIRFLOW DIRECTION ACCESS DOOR (AD) ACCESS PANEL (APj GRILLES, LOUVERS, CFM "CFM RR RG ER EG SD SG SR TG SD 12/6 100 CFM DIFFUSERS, AND OPENING SYMBOLS SUPPLY OR OUTSIDE AIR FLOW DIRECTION AIR UROWTDARECTIONOR EXHAUST RETURN REGISTER RETURN GRILLE EXHAUST REGISTER EXHAUST GRILL SUPPLY DIFFUSER SUPPLY GRILLE SUPPLY REGISTER TRANSFER GRILLE SIDEWALL SUPPLY AIR DIFFUSER, GRILLE OR REGISTER .1012/6 CFM SCREENED OPENING RG 12/6 SIDEWALL RETURN EXHAUST 100 CFM AIR GRILLE OR REGISTER HVAC SYMBOLS CONT. GRILLES, LOUVERS, DIFFUSERS, AND OPENING SYMBOLS CONT. SD 12/12 400 CFM �SD 12/12 L"` 400 CFM SD 12 0 400 CFM RG 24X24 V 100 CFM I!I 100 CFM CG 24/24 V 100 CFM SUPPLY OUTLET DIFFUSER, GRILLE OR REGISTER SUPPLY OUTLET DIFFUSER, GRILLE OR REGISTER SUPPLY OUTLET ROUND DIFFUSER RETURN/EXHAUST REGISTER OR GRILLE FAN, AXIAL FLOW LINEAR DIFFUSER RETURN/RELIEF GRILLE, CEILING TYPE NON -DUCTED DUCT MOUNTED EQUIPMENT SYMBOLS L CENTRIFIGAL FAN CENTRIFIGAL FAN, INLET GUIDE VANES UNIT HEATER TERMINAL UNIT INSTRUMENTATION AND CONTROL SYMBOLS STI DUCT TYPE HEAT DETECTOR DUCT TYPE SMOKE DETECTOR DUCT TYPE TEMPERATURE SENSOR TEMPERATURE TRANSMITTER THERMOSTAT HUMIDISTAT DAMPER SYMBOLS VD VOLUME DAMPER FSD OPPOSED BLADE DAMPER PARALLEL BLADE DAMPER BACK DRAFT DAMPER (ALLOWS FLOW IN DIRECTION OF ARROW) FIRE DAMPER (1 HOUR) FIRE DAMPER (2 HOUR) SMOKE DAMPER FIRE/SMOKE DAMPER REVIEWED FOR 'CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION GE \EVL CO\STRUCTIO \ \OTES 1. PLANS ARE DIAGRAMMATIC & DO NOT SHOW ALL BRANCHES, VALVES, SPECIALTIES & EQUIPMENT. 2. ALL PIPING, VALVES & EQUIPMENT ARE TO BE REMOVED IN DEMOLITION AREAS. 3. VALVES INDICATED FOR SHUT-OFF ISOLATION ARE SHOWN IN APPROXIMATE LOCATIONS. REFER TO REFERENCED BUILDING DRAWINGS FOR DETAILED SYSTEMS. 4. FIELD VERIFY EXACT LOCATIONS VALVES, EQUIPMENT & PIPING. 5. CONTRACTOR TO VERIFY SYSTEM SHUT DOWN PRIOR TO ANY REMOVAL WORK. 6. CONTRACTOR TO RE -OPEN VALVES AFTER COMPLETION OF REMOVAL, CAP, & CUT TO RESTORE SYSTEM OPERATION WHERE REQUIRED. 7. SYSTEM SHUT DOWN REMOVAL, CUT & CAP SHALL ONLY BEGIN AFTER NEW, RE-ROUTED SYSTEM IS IN PLACE FOR SERVICE CONTINUITY WHERE REQUIRED. 8. ALL SYSTEMS SHALL BE DRAINED & DISPOSAL OF FLUIDS HANDLED AS REQUIRED PER BOEING STANDARDS. 9. MECHANICAL DRAWINGS SHOW DISCONNECT AND RECONNECT POINTS AT THE PROJECT'S BOUNDARIES. AN ATTEMPT WAS MADE TO SHOW MAJOR MECHANICAL UTILITY WORK WITHIN THE PROJECT'S BOUNDARIES. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL/DISPOSAL OF ALL MECHANICAL WORK WITHIN THE PROJECT'S BOUNDARY. 2015 WASHI\GTO\ STATE E\EKY CODE \OTES 1. HVAC EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE C403.2.3(1)A THROUGH C403.2.3(9) OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. 2. PROVIDE DEADBAND BETWEEN HEATING/COOLING SPACE SENSOR SET POINTS OF 5 DEGREES AS REQUIRED BY SECTION C403.2.4.1.2 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF ACCOMPLISHING SETBACK OR SHUTDOWN DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4.2.3 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. 4. PROVIDE BALANCING DEVICES IN ALL BRANCH PIPE RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTION C408.2.2.1 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. 5. PIPING SHALL BE THERMALLY INSULATED IN ACCORDANCE WITH TABLE C403.2.9 OF THE WSEC. REFER TO SECTION C403.2.9 FOR COMPLIANCE. 6. MOTOR EFFICIENCY SHALL NOT BE LESS THAN THE MINIMUM CALLOUTS PER TABLE C405.8(1) THROUGH C405.8(4) OF THE WSEC FOR FULL LOAD EFFICIENCIES. 7. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2 OF THE WSEC. 8. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER WITHIN 180 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE AS REQUIRED BY SECTION C103.6.1 OF THE WSEC. THE DRAWINGS SHALL INDICATE THE LOCATION AND PERFORMANCE DATA OF EQUIPMENT, GENERAL CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION SYSTEMS, INCLUDING FLOW RATES AS A MINIMUM. 9. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION C103.6.2 OF THE WSEC. AS A MINIMUM, THE MANUALS SHALL INCLUDE: 9.1. SUBMITTAL DATA. 9.2. OPERATION AND MAINTENANCE DATA FOR EQUIPMENT. 9.3. NAMES AND ADDRESSES OF SERVICE AGENCIES. 9.4. HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION. 9.5. NARRATIVE OF HOW SYSTEM IS INTENDED TO OPERATE. 10. SYSTEMS SHALL BE BALANCED AND EQUIPMENT OPERATION VERIFIED PRIOR TO PROJECT CLOSEOUT. PROVIDE DOCUMENTATION AS INDICATED IN THE SPECIFICATIONS. AZAN GROUP 600 Stewart St., Ste 1400 W4833402 Seattle, Washington 98101 ISSUE FOR CONSTRUCTION 05.12.17 Tel 206.26VPMEC Fax 20.26''79r76Y K VJ SAZAN # 206-1777 r f '( 1 0 201 7 S REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE - RECORD DRAWING A 2-81 & DENSITY IMPROVEMENTS J#972197-00 W4833402 HGI/SHS 11.12.99 SAZAN/DJ 05.12.17 c° 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN S. FRANKLIN DATE 2.18.98 CHECKED A. NAPIER 3.30.98 SUBTITLE LEGEND CURRENT REVISION W4833402 SYMBOL A DATE PERM11 CENT 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 2.18.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET MO JOB NO. 972197-00 COMP NO. DWG NO. 2 -81 -MO ILA R AIR HANDLERS MARK NO. SERVICE/LOCATION SUPPLY FAN RETURN FAN FILTERS CHILLED WATER COIL REMARKS SENSIBLE BTUHROWS COOLING COIL CFM 1 `. w. CFM , .. •1 TOTAL SP , , - ESP :,. I ! - FAN - . ., . . .. - MOTOR . - .. FAN ► - , . V- LWT DEC F ESP . - FAN - - . . MOTOR - - FAN '. . I . % EFFICIENCY VELICITY EAT NEAT 1.. WBLAT • DB _AT WB / i EWT t " - LWT CAPACITY ;, f ; - FACE 1, , . ,, CONTROL VALVE ; - - WPD 7 1v" . APD - „ • .I •1W 53 45 .. .. .'ter"..,..,, ;p.'' - AHU-1 2ND FLR NORTH/ROOF 43,450 39,500 5.25 2.15 .25 .5 60 PLUG BELT 39,035 1.0 CENTRIFUGAL FAN PENN -VENTILATOR, DYAMO-D12 STAINLESS STEEL CONSTRUCTION 15 PLUG BELT 30 85 500 75.5 61.1 52.9 51.5 45 55 1084 500 210 5 PSIG 6.8 0.70 8 6 2 AHU-2 2ND FLR SOUTH/ROOF 46,815 42,560 4.25 1.12 - - 60 PLUG BELT 43,470 0.75 HYDRAULIC RM WALL 15 PLUG BELT 30 85 500 75.1 61.0 52.9 51.5 45 55 1019 500 204 5 PSIG 7.6 0.78 8 6 AHU-3 2ND FLR CORE/ROOF 23,925 21,750 4.50 1.27 40 PLUG BELT 20,515 1.0 7.5 PLUG BELT 30 85 500 77.1 62.3 52.9 51.5 45 55 673 500 135 5 PSIG 3.9 0.68 8 6 AHI -4 S L' •00 , v . 0 .46 7 ' $G : L 4 , ' 1. 1 b. . ; L :s . .; _ • . - 4 -eI - • .- .• • . AHU-5 1ST FLOOR SE/MEZZ. 8,385 8,385 4.00 3.46 1944 7.73 10 PLUG BELT 7,440 0.5 598 1.03 3 PLUG BELT 30 85 500 81.2 66.3 53.4 52.8 45 55 283 500 56 5 PSIG 4.9 0.61 8 6 AHU-6 1ST FLOOR SE/MEZZ. 8,440 7,350 1.54 1150 4.3 7.5 CENT BELT - - - - - - - 30 - 500 85 - 55 - 45 55 441 500 88 5 PSIG 3.8 0.74 8 6 NOTE 1 NOTES: 1. REMOVE EXISTING MOTOR AT AHU-6 AND PROVIDE NEW INVERTER DUTY MOTOR OF EQUAL SIZE, HORSEPOWER AND RPM, COMPATIBLE WITH VFD OPERATION. FAN COIL SCHEDULE MARK NUMBER LOCATION SERVICE CFM ESP IN W.G. MIN OA CFM TOTAL BTUH SENSIBLE BTUHROWS COOLING COIL MOTOR (QTY)HP VOLTAGE FILTERS REMARKS EDB DEG F EWB DEG F LDB DEG F LWB DEG F EWT DEG F LWT DEC F GPM WPD FTWG 1/30 MEDIA TYPE EFF MAX MAX DECTAP IN W.G. % FPM CLEAN DIRTY FCU -1-01 E.1/4.0 ELECTRICAL ROOM 14E3 850 0.2 0 33,300 23,400 78 65 55 53 45 55 6.6 6.3 4 (2)1/10 120 1"30 DISPOSABLE 0.28 400 .25 .5 TITUS HBP10 2 -PIPE FAN COIL WITH PLENUM CABINET UNIT HEATERS MARK NO. SERVICE FAN HOT WATER HEATING MANUFACTURER/MODEL REMARKS OUTSIDE MINIMUM RETURN MAXIMUM CFM MOTOR HP DRIVE COIL CAPACITY MBH EWT DEG F LWT DEG F GPM MAX WPD FT 36,305. EF -01 CUH-01 LOBBY VESTIBULE 50 1/30 DIRECT 2.76 180 160 0.28 0.1 INTERNATIONAL FSY-C2 NOTE 1 CUH-02 NORTHWEST VESTIBULE 50 1/30 DIRECT 2.76 180 160 0.28 0.1 INTERNATIONAL FSY-C2 NOTE 1 CUH-03 NORTHEAST VESTIBULE 50 1/30 DIRECT 2.70 180 160 0.28 0.1 INTERNATIONAL FSY-C2 NOTE 1 NOTES: 1. ALL FAN MOTORS ARE: 120 VOLTS, 1 -PHASE, 60Hz. EXHAUST FANS MARK NO. SERVICE LOCATION FAN PE MANUFACTURER/MODEL REMARKS OUTSIDE MINIMUM RETURN MAXIMUM RETURN MINIMUM CFM E.S.P. in W.C. FAN RPM BHP MOTOR HP DRIVE 3,195 36,305. EF -01 TOILETS, 1ST AND 2ND FLOORS ROOF 4880 1.0 625 0.65 3/4 BELT ROOF EXHAUSTER PENN -VENTILATOR, DX3OB 39,520 EF -05 AHU-6 RELIEF/MEZZ ROOF 7350 2.25 765 5.39 7.5 BELT RELIEF AIR FAN FOR AHU-6 GRFFNHFCK, CURF 3611 HP NOTE 2 EF -08 NOT USED CEILING 85 0.125 1500 - 0.1 DIRECT CEILING EXHAUSTER ZEPHYRS, MODEL Z3H PROVIDE 277/115V TRANSFORMER EF -09 NOT USED MEZZ 1000 1.0 1410 0.27 1/3 BELT CENTRIFUGAL FAN PENN -VENTILATOR, DYAMO-D12 STAINLESS STEEL CONSTRUCTION EF -10 ELECTRICAL SHOP 1ST FLR CEILING 500 3.18 - - 1/2 DIRECT NEDERMAN 5000 EXTRACTOR 5 FOOT EXTRACTOR ARM EF -12 TRANDUCER & CALIBRATION FAC. ROOF 335 4.0 - - 1/3 BELT 2 PROVIDED BY BOEING EF -13 ELECTRICAL SHOP 1ST FLR CEILING 500 4.08 - - 1.0 DIRECT NEDERMAN 5000 EXTRACTOR 7 FOOT EXTRACTOR ARM EF -14 HYDRAULIC RM WALL 100 0.125 1500 - 0.1 DIRECT CENTRIFUGAL FAN ZEPHYRS, MODEL Z3H PROVIDE 277/115V TRANSFORMER EF -15 DATA RMS & ELECT RMS ROOF 2150 0.25 634 0.20 1/4 BELT ROOF EXHAUSTER PENN -VENTILATOR, DX16B TEMTROL NOTES: 1. FAN MOTORS GREATER THAN 3/4 HP ARE: 480 VOLTS, 3-PHASE, 60Hz. FAN MOTORS EQUAL TO OR LESS THAN 3/4 HP ARE: 120 VOLTS, 1 -PHASE, 60Hz. 2. REMOVE EXISTING MOTOR AT EF -05 AND PROVIDE NEW INVERTER DUTY MOTOR OF EQUAL SIZE, HORSEPOWER AND RPM, COMPATIBLE WITH VFD OPERATION. PRESENT DESIGN AIRFLOWS MARK NO. CFM WEOIPHT SUPPLY MAXIMUM SUPPLY MINIMUM OUTSIDE MAXIMUM OUTSIDE MINIMUM RETURN MAXIMUM RETURN MINIMUM RELIEF MAXIMUM RELIEF MINIMUM AHU-1 39,500 15,800 39,500 3,195 36,305. 12,805 36,305 0 AHU-2 42,560 17,025 42,560 3,040 39,520 13,385 39,520 0 AHU-3 21,750 8,700 21,750 3,100 18,650 6,800 18,650 0 AHU-4 62,335 17,400 52,335 9,310 43,025 8,080 43,025 0 AHU-5 8,385 3,000 8,385 3,000 7,085 7,180 7,085 1,160 AHU-6 7,350 2,250 7,350 2,250 5,100 0 7,350 2,250 AIR HANDLERS MARK NO. HOT WATER HEATING COIL WEOIPHT MANUFACTURER REMARKS REMARKS EAT DEG F LAT DEG F EWT DEG F LWT DEG F CAPACITY MBH vIAX FACE VELOCITY GPM CONTROL VALVE DELTA P WPD FT WTR APD FT WTR FPI ROWS LBS. UH -03 INSTRUMENTATION VAN STAGING AHU-1 56 87 180 160 290.2 500 29.0 5 PSIG 5.4 0.13 6 2 32,500 TEMTROL NOTE 1, 2 AHU-2 56 87 180 160 287.6 500 28.8 5 PSIG 4.3 0.13 6 2 32,500 TEMTROL NOTE 1, 2 AHU-3 56 87 180 160 205.7 500 20.6 5 PSIG 2.5 0.11 6 2 27,000 TEMTROL NOTE 1, 2 AHU-4 56 87 180 160 193.3 500 19.3 5 PSIG 4.8 0.13 6 2 34,000 TEMTROL NOTE 1, 2 AHU-5 56 87 180 160 246.3 500 15.0 5 PSIG 1.6 0.11 6 2 10,000 TEMTROL NOTE 1 AHU-6 21 59 180 160 292.2 500 30.0 5 PSIG 1.1 0.11 6 2 13,000 TEMTROL NOTE 1 NOTES: 1. ALL FAN MOTORS ARE: 1760 RPM, 480 VOLTS, 3-PHASE, 60Hz. 2. AHU 1, 2, 3 & 4- SUPPLY AND RETURN AIRFLOWS INCLUDE 10% FUTURE CAPACITY. UNIT HEATERS MARK NO. SERVICE FAN HOT WATER HEATING MANUFACTURER/MODEL REMARKS RPM HP CFM RPM MOTOR HP DRIVE COIL CAPACITY MBH EWT DEG F LWT DEG F GPM MAX WPD FT VAN STAGE INSTRUMENTATION SUMP UH -03 INSTRUMENTATION VAN STAGING 1340 1625 1/8 DIRECT 59.5 180 160 6.3 1.4 MODINE, MODEL HS -86 NOTE 1, 2 UH -04 INSTRUMENTATION VAN STAGING 1340 1625 1/8 DIRECT 59.5 180 160 6.3 1.4 MODINE, MODEL HS -86 NOTE 1, 2 UH -05 INSTRUMENTATION VAN STAGING 1340 1625 1/8 DIRECT 59.5 180 160 6.3 1.4 MODINE, MODEL HS -86 NOTE 1, 2 UH -06 NOT USED UH -07 SHIPPING AND RECEIVING 1120 1550 1/12 DIRECT 42.3 180 160 4.7 0.8 MODINE, MODEL HS -63 NOTE 1, 2 NOTES: 1. UNIT HEATERS WERE SIZED BASED ON MODINE, MODEL HS -XX. EQUIVALENT OR GREATER THAN UNIT HEATERS MAY BE SUBMITTED FOR APPROVAL BY THE ENGINEER. 2. ALL UNIT HEATER FANS ARE: 120 VOLTS, 1 -PHASE, 60Hz. PUMP SCHEDULE PUMP NO. LOCATION SERVES FUNCTION GPM HEAD FEET RPM HP ELECTRICAL WEIGHT LBS. MANUFACTURER MODEL REMARKS VOLTS PHASE Hz P-10 VAN STAGE INSTRUMENTATION SUMP SUMP PUMP 10 25 - 4/10 120 1 60 - LITTLE GIANT 9E -CIA -RFS 20' POWER CORD NOTES: 1. PUMP WEIGHT DOES NOT INCLUDE THE INERTIA BASE. 2. PUMPS WITH VFD DRIVES SHALL HAVE VFD COMPATIBLE MOTORS. PROVIDE TEST, ADJUST & BALANCE (TAB). COMPUTER ROOM COOLING UNIT (CRU) SCHEDULE MARK NUMBER LOCATION (ROOM NUMBER) TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER HUMIDIFIER ELECTRIC REHEAT COIL AIR FILTER REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP CAPACITY MBH ROOM TEMP 'F FLOW GPM EWT 'F MAX. PD © MAX FLOW FT. H2O CAP #/HR KW TYPE & DEPTH EFFICENCY PER ASH RAE 52-76 MAX FINAL SP WG SENSIBLE . TOTAL DB WB CRU -2D4 LIEBERT UH147C 7 BELT 5250 .3 2.0 88 88 75 61 '18.6 45 33.8 - - - 20 4-18X24 FILTERS CRU -2 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 City of Tukwila BUILDING DIVISION W4833402 ISSUE FOR CONSTRUCTION 05.12.17 J SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.Rg131 ( SAZAN 2677 F T U K W I L SYM REVISION A B C RECORD DRAWING INSTALL POWER & COOLING CDC RELOCATION - WIRE SHOP RELOCATION 2-81 & DENSITY IMPROVEMENTS J#972197-00 J#577800-01 J#19760 W4833402 BY HGI/SHS WDB WH SAZAN/DJ APPROVED MBL DATE SYM REVISION BY APPROVED DATE 11.12.99 10.25.07 11.11.13 05.12.17 g.EarierBO”® i 05/11 2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN R. TOPNESS CHECKED S. FRANKLIN DATE 11.12.97 3.30.98 SUBTITLE EQUIPMENT SCHEDULE ENGINEER G. FRANEK CHECKED G. SPRAGUE APPROVED L. COSTELLO APPROVED R. MCNIESH 11.12.97 6.3.98 6.3.98 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. CURRENT REVISION W4833402 SHEET SYMBOL M1A C DATE MAY 1 v 2011 05.12.17 Pa.PMIT CL -NTE JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M 1 A TEVI\AL U\ITS EQUIPMENT TAG INLET SIZE IN. SUPPLY AIR CFM REQ'D MAX. FAN HP CAPACITY MBH GPM MAX WPD FT OF WTR MAX APD IN OF WTR CONTROL PANEL ACCESS REMARKS MAX MIN INLET SP IN OF WTR FT -1-01 6 345 140 0.50 1/10 --- --- --- --- LEFT FT -2-47 FT -1-02 16 3205 1285 0.50 (2)1/2 0.70 .1 .02 RIGHT LEFT DUAL FANS FT -1-03 10 1270 510 0.50 1/3 --- --- --- --- LEFT FT -2-49 FT -1-04 12 1830 735 0.50 1/3 29.6 3.00 .1 .02 LEFT FT -2-50 FT -1-05 12 1740 695 0.50 3/4 28.1 2.80 .2 .08 RIGHT FT -2-51 FT -1-06 6 530 215 0.50 1/10 8.6 0.90 .1 0.02 RIGHT FT -2-52 FT -1-07 NOT USED --- --- --- --- --- --- --- --- 36/36 FT -2-53 FT-1-08 8 900 360 0.50 1/4 14.6 1.40 .1 .02 LEFT FT -2-54 FT -1-09 10 1310 525 0.50 1/3 21.2 2.10 .1 .01 RIGHT FT -2-55 FT -1-10 10 1250 500 0.50 1/3 20.3 2.00 .1 .06 RIGHT FT -2-56 FT -1-11 12 1635 655 0.50 3/4 26.5 2.6 .2 .08 LEFT FT -2-57 FT -1-12 6 275 110 0.50 1/10 4.5 0.5 .1 .01 LEFT FT -2-58 FT -1-13 10 1360 545 0.50 1/3 22.0 2.20 .2 .07 LEFT FT -2-59 FT -1-14 16 2310 925 0.50 (2)1/2 37.4 3.75 .2 .15 LEFT DUAL FANS FT -1-15 12 1620 650 0.75 3/4 26.2 2.6 .2 .23 LEFT FT -2-61 FT -1-16 8 780 315 0.75 1/4 12.6 1.2 .1 .06 LEFT FT -2-62 FT -1-17 12 1840 735 0.50 3/4 29.8 3.00 .1 .06 LEFT FT -2-63 FT -1-18 16 2810 1125 0.50 (2)1/2 45.5 4.50 .2 .21 LEFT DUAL FANS FT -1-19 16 2480 990 0.50 (2)1/2 40.2 4.00 .2 .12 LEFT DUAL FANS FT -1-20 16 2480 990 0.50 (2)1/2 40.2 4.00 .2 .12 LEFT DUAL FANS FT -1-21 16 2810 1125 0.50 (2)1/2 45.5 4.50 .2 .21 LEFT DUAL FANS FT -1-22 8 740 295 0.50 1/4 12.0 1.20 .1 .05 LEFT 850 FT -1-23 6 510 205 0.50 1/10 8.3 0.80 .1 .03 LEFT (7)24/36, (1)12/12 FT -1-24 16 2745 1100 0.50 (2)1/2 44.5 4.50 .1 .14 RIGHT DUAL FANS FT -1-25 8 900 360 0.50 1/4 14.6 1.40 .1 .02 LEFT NOTES #6,7 FT -1-26 8 740 295 0.50 1/4 12.0 1.20 0.1 0.05 LEFT (7)24/36, (1)12/12 FT -1-27 12 1845 740 0.50 3/4 29.9 3.00 .2 .1 LEFT 26.5 FT -1-28 10 1230 490 0.50 1/3 19.9 2.00 .1 .14 LEFT 950 FT -1-29 10 1230 490 0.50 1/3 19.9 2.00 .1 .14 LEFT (7)24/36, (1)12/12 FT -1-30 10 1300 520 0.50 1/3 --- --- --- --- LEFT 29.5 - 1 • 450 '0 0. ' I SA -21 0 : IAC-5LFM .1 .T a S 4 • 7 FT -1- 2 10 1200 4 0 1.50 1/3 19.9 .00 .1 .14 LEFT OT WS #4,5,6, >FT -2-01 16 3180 1270 0.50 (2)1/2 25.8 2.60 .2 .26 LEFT DUAL FANS >FT -2-02 12 1575 630 0.50 3/4 12.8 1.30 .3 .08 LEFT >FT -2-03 16 3180 1270 0.50 (2)1/2 25.8 2.60 .2 .22 LEFT DUAL FANS +T-2-04 6 530 210 0.50 1/10 8.6 0.9 .1 .03 RIGHT >FT -2-05 16 3180 1270 0.50 (2)1/2 25.8 2.60 .2 .22 LEFT DUAL FANS >FT -2-06 12 1590 635 0.50 3/4 25.8 2.60 .2 .08 LEFT >FT -2-07 12 1575 630 0.50 3/4 25.8 2.60 .3 .08 LEFT >FT -2-08 16 3180 1270 0.50 (2)1/2 51.5 5.00 .2 .22 LEFT DUAL FANS >FT -2-09 16 3180 1270 0.50 (2)1 /2 51.5 5.00 .2 .22 LEFT DUAL FANS >FT -2-10 16 3180 1270 0.50 (2)1/2 51.5 5.00 .2 .22 LEFT DUAL FANS >FT -2-11 12 1575 630 0.50 3/4 25.5 2.50 .3 .08 LEFT >FT -2-12 16 3180 1270 0.50 (2)1/2 51.5 5.00 .2 .22 LEFT DUAL FANS >FT -2-13 16 3180 1270 0.50 (2)1/2 51.5 5.00 .2 .22 LEFT DUAL FANS >FT -2-14 10 1380 550 0.50 1/3 22.4 2.20 .1 .16 LEFT >FT -2-15 10 1380 550 0.50 1/3 22.4 2.20 .1 .16 LEFT >FT -2-16 16 2865 1145 0.50 (2)1/2 46.4 4.60 .2 .12 LEFT DUAL FANS >FT -2-17 10 1420 570 0.50 1/3 23.0 2.30 .1 .17 RIGHT >FT -2-18 14 2840 1135 0.50 1/3 46.0 4.60 .2 .22 RIGHT >FT -2-19 14 2430 970 0.50 (2)1/3 39.4 4.00 .2 .16 LEFT DUAL FANS >FT -2-20 14 2840 1135 0.50 (2)1/3 46.0 4.60 .2 .22 LEFT DUAL FANS >FT -2-21 14 2430 970 0.50 (2)1/3 39.4 4.00 .2 .16 LEFT DUAL FANS >FT -2-22 14 2840 1135 0.50 (2)1/3 46.0 4.60 .2 .22 LEFT DUAL FANS >FT -2-23 14 2430 970 0.50 (2)1/3 39.4 4.00 .2 .16 LEFT DUAL FANS >FT -2-24 14 2840 1135 0.50 (2)1/3 46.0 4.60 .2 .22 LEFT DUAL FANS >FT -2-25 14 2430 970 0.50 (2)1/3 39.4 4.00 .2 .16 LEFT DUAL FANS >FT -2-26 14 2840 1135 0.50 (2)1/3 46.0 4.60 .2 .22 LEFT DUAL FANS >FT -2-27 14 2070 830 0.50 (2)1/3 33.5 3.30 .2 .12 LEFT DUAL FANS >FT -2-28 14 2130 850 0.50 (2)1/3 34.5 3.50 .2 .13 RIGHT DUAL FANS >FT -2-29 10 1380 550 0.50 1/3 22.3 2.20 .1 .16 LEFT >FT -2-30 12 1610 645 0.50 1/4 26.1 2.60 .2 .09 RIGHT >FT -2-31 16 2840 1135 0.50 (2)1/2 46.0 4.60 .2 .22 LEFT DUAL FANS >FT -2-32 12 1610 645 0.50 1/4 26.1 2.60 .2 .09 LEFT >FT -2-33 14 2130 850 0.50 (2)1/3 34.5 3.50 .2 .13 LEFT DUAL FANS >FT -2-34 14 2070 830 0.50 (2)1/3 33.5 3.30 .2 .12 LEFT DUAL FANS >FT -2-35 10 1380 550 0.50 1/3 22.4 2.20 .1 .16 LEFT >FT -2-39 8 880 350 0.50 1/4 14.3 1.40 .1 .07 RIGHT >VCC-2-40 12/12 1600 180 0.50 .5 TITUS DESV-3000 >FT -2-41 8 900 360 0.50 1/4 14.6 1.50 .1 .08 RIGHT >FT -2-42 8 780 310 0.50 1/4 12.6 1.30 .1 .06 RIGHT >FT -2-43 14 2320 930 0.50 (2)1/3 37.6 3.70 .2 _ .15 LEFT DUAL FANS >FT -2-44 14 2740 1095 0.50 (2)1/3 44.4 4.50 .2 .2 LEFT DUAL FANS >FT -2-45 12 2055 820 0.50 3/4 33.3 3.30 .2 .12 LEFT 0 OL 'A E LI `TI I I I :A 1. F NG IU a ` T I 5. A N , MI r L r FS. 2. FAN POWERED VAV BOXES WERE SIZED BASED ON TEMPMASTER, MODEL HVFS, EXCEPT WHERE NOTED. 6. BALANCE AIRFLOW AT TERMINAL UNIT TO VALUE INDICATED IN SCHEDULE. 3. SOUND NOISE CRITERIA (NC) IS BASED ON ARI STANDARD 880-89. 7. REFER TO EXISTING CONTROL SEQUENCE ON SHEET M330. 4. 277V / 1PH / 60HZ TERMINAL U\ITS EQUIPMENT TAG INLET SIZE IN. SUPPLY AIR CFM REQ'D MAX. INLET SP FAN HP CAPACITY GPM MAX WPD MAX APD CONTROL PANEL REMARKS MAX MIN FT -2-46 8 780 310 0.50 1/10 12.6 1.20 .1 .06 RIGHT 42/12 FT -2-47 6 540 220 0.50 1/10 7.0 0.70 .1 .02 RIGHT 102 FT -2-48 8 610 245 0.50 1/4 9.9 1.00 .1 .04 RIGHT 24.6 FT -2-49 6 500 300 0.50 1/10 3.2 0.60 .1 .01 RIGHT 24/18 FT -2-50 8 900 360 0.50 1/4 14.3 1.50 .1 .08 LEFT 87 FT -2-51 8 560 280 0.50 1/4 11.3 1.20 .1 .05 LEFT 24.5 FT -2-52 6 450 180 0.50 1/10 7.3 0.70 .1 .02 RIGHT 36/36 FT -2-53 6 430 170 0.50 1/10 7.0 0.70 .1 .02 RIGHT 150 FT -2-54 8 705 245 0.50 1/4 9.9 1.00 .1 .04 LEFT 23.0 FT -2-55 6 530 210 0.50 1/10 8.6 0.80 .1 .03 LEFT 24/24 FT -2-56 6 245 100 0.50 1/10 4.0 0.60 .1 .02 LEFT 93 FT -2-57 6 540 215 0.50 1/10 8.7 0.90 .1 .03 RIGHT 23.0 FT -2-58 8 670 270 0.50 1/4 10.9 1.00 .1 .05 RIGHT 24/24 FT -2-59 6 270 110 0.50 1/10 4.4 0.60 .1 .1 RIGHT 102 FT -2-60 8 615 245 0.50 1/4 10.0 1.00 .1 .03 RIGHT 16.0 FT -2-61 6 450 180 0.50 1/10 7.3 0.70 .1 .02 RIGHT 24/24 FT -2-62 6 305 125 0.50 1/10 4.9 0.60 .1 .03 RIGHT 89 FT -2-63 8 585 270 0.50 1/4 10.9 1.00 .1 .05 RIGHT 16.0 FT -2-64 6 455 230 0.50 1/10 9.3 1.00 .1 .01 LEFT 24/24 FT -2-65 12 1590 635 0.50 3/4 25.8 2.60 .2 .08 LEFT 89 FT -2-66 10 635 115 0.50 1/4 19.1 2.00 .1 .52 LEFT 5,6,7,8 FT -2-67 10 735 135 0.50 1/4 22.2 2.20 .2 .52 LEFT 5,6,7,8 NO E: 1. CO TRO PA L CES LO TIO IS ASE ON ACI ► G 0 TLET OF N RMI L X. 2. FAN POWERED VAV BOXES WERE SIZED BASED ON TEMPMASTER, MODEL HVFS. 3. SOUND NOISE CRITERIA (NC) IS BASED ON ARI STANDARD 880-89. 4. 277V / 1PH / 60HZ 5. ECM MOTOR 6. FAN POWERED VAV BOXES WERE SIZED BASED ON TITUS, MODEL DTFS-F. 7. 1 ROW HEATING COIL, 180-160, WITH AUTO FLOW AND HOSE KITS 8. 120V / 1PH / 60HZ SOUND AIIENUATOR SCHEDULE MARK NO SERVICE BASIS OF DESIGN MAN UFACTOR & MODEL NUMBER CFM SIZE IN. WXH ATTENUATOR MIN. DYNAMIC INSERTION LOSS WEIGHT LBS REMARKS MAX .VEL. FPM LENGTH FT. MAX.P.D. IN. WG, 63 125 250 500 1K 2K 4K 8K SA -1 MODEL TEST FACILITY, RETURN IAC-5LFMs 1,475 42/12 450 5 .05 10.6 13.6 24.6 29.6 28.0 16.5 13.0 13.0 102 (1)42/12 SA -2 MODEL TEST FACILITY, RETURN IAC-5LFMs 1,475 42/12 450 5 .05 10.6 13.6 24.6 29.6 28.0 16.5 13.0 13.0 102 (1)42/12 SA -3 MODEL TEST FACILITY, SUPPLY IAC-5LFMs 1,405 24/18 500 5 .05 10.5 13.5 24.5 29.5 28.0 16.5 13.0 13.0 87 (1)24/18 SA -4 MODEL TEST FACILITY, SUPPLY IAC-5LFMs 1,405 24/18 500 5 .05 10.5 13.5 24.5 29.5 28.0 16.5 13.0 13.0 87 (1)24/18 SA -5 SOUND DEMO CRITICAL LISTENING, SUPPLY IAC -SCEs 900 36/36 200 5 .05 14.6 19.8 32.6 37.6 39.8 27.0 21.2 16.0 150 (1)24/24, (1)12/12 SA -6 SOUND DEMO CRITICAL LISTENING, SUPPLY IAC-3LFs 900 36/36 200 3 .05 8.4 12.2 23.0 26.2 25.2 19.6 16.2 13.2 93 (1)24/24, (1)12/12 SA -7 SOUND DEMO CRITICAL LISTENING, RETURN IAC-3LFs 450 24/24 200 3 .05 8.4 12.2 23.0 26.2 25.2 19.6 16.2 13.2 93 (1)24/24, (1)12/12 SA -8 SOUND DEMO CRITICAL LISTENING, RETURN IAC-3LFs 450 24/24 200 3 .05 8.4 12.2 23.0 26.2 25.2 19.6 16.2 13.2 93 (1)24/24, (1)12/12 SA -9 SOUND DEMO CONTROL ROOM, SUPPLY IAC-5LFMs 1,310 24/24 400 5 .05 10.6 13.6 24.6 29.6 28.0 16.4 13.0 13.0 102 (1)24/24 SA -10 SOUND DEMO CONTROL ROOM, RETURN IAC-3LFMs 1,310 24/24 500 3 .05 5.0 7.5 16.0 19.0 17.0 12.5 10.5 10.5 89 (1)24/24 SA -11 SOUND DEMO CONTROL ROOM, RETURN IAC-3LFMs 1,310 24/24 500 3 .05 5.0 7.5 16.0 19.0 17.0 12.5 10.5 10.5 89 (1)24/24 SA -12 DYNAMIC CALIBRATION AREA, SUPPLY IAC-3LFMs 780 24/18 500 3 .05 5.0 7.5 16.0 19.0 17.0 12.5 10.5 10.5 52 (1)24/18 SA -13 DYNAMIC CALIBRATION AREA, RETURN IAC-3LFMs 780 24/24 500 3 .05 5.0 7.5 16.0 19.0 17.0 12.5 10.5 10.5 89 (1)24/24 SA -14 DYNAMIC CALIBRATION AREA, RETURN IAC-3LFMs 780 12/18 500 3 .05 5.0 7.5 16.0 19.0 17.0 12.5 10.5 10.5 34 (1)12/18 SA -15 AHU-1, RETURN IAC-5LFs 37,390 180/36 850 5 .44 13.3 19.3 31.3 36.3 39.3 27.3 22.3 16.3 1046 (7)24/36, (1)12/12 SA -16 AHU-2, RETURN IAC-5LFs 33,510 180/36 750 5 .34 13.5 19.5 31.5 36.5 39.5 27.5 22.5 16.5 1046 (7)24/36, (1)12/12 SA -17 AHU-3, RETURN IAC-5LFs 18,335 180/36 500 5 0.10 14.0 20.0 32.0 37.0 40.0 28.0 23.0 17.0 1046 (7)24/36, (1)12/12 SA -18 AHU-4, SUPPLY IAC-3LFs 53,500 144/108 500 3 .15 9.0 12.5 23.0 26.5 25.5 20.5 16.5 13.5 1224 (9)48/36 3 ROWS HIGH SA -19 AHU-4, RETURN IAC-5LFs 42,155 180/36 950 5 .55 13.1 19.1 31.1 36.1 39.1 27.0 22.0 16.0 1046 (7)24/36, (1)12/12 SA -20 FT -1-O8, RETURN IAC-5LFM 900 24/24 500 5 .05 10.5 13.5 24.5 29.5 28.0 16.5 13.0 13.0 87 (1)24/24 SA -21 FT -1-09, RETURN IAC-5LFM 1,310 24/24 500 5 .05 10.5 13.5 24.5 29.5 28.0 16.5 13.0 13.0 87 (1)24/24 SA -22 FT -1-18, RETURN IAC-5LFM 1,405 24/18 500 5 .05 10.5 13.5 24.5 29.5 28.0 16.5 13.0 13.0 87 (1)24/18 SA -23 MODEL TEST FACILITY, SUPPLY IAC-5LS 1,405 24/18 5 .20 SA -24 MODEL TEST FACILITY, SUPPLY IAC-5LS 1,405 24/18 5 .20 SA -25 MODEL TEST FACILITY, RETURN IAC-5LS 2,245 48/18 5 .10 SA -26 CONFERENCE ROOM, SUPPLY 44/18 TE�VI\AL U\ITS EQUIPMENT TAG INLET SIZE IN. SUPPLY AIR CFM REQ'D MAX. INLET SP IN. OF WATER REMARKS MAX MIN W-1-01 8 700 140 0.49 W-1-02 7 550 110 0.52 W-1-03 7 500 100 0.45 W-1-04 10 1070 214 0.48 W-1-05 14 1400 280 0.50 W-1-06 8 700 140 0.47 W-1-07 14 2280 456 0.50 W-1-08 10 1620 324 0.50 W-1-09 10 1230 246 0.50 W-1-10 10 1230 246 0.50 W-1-11 8 550 250 0.52 W-1-12 24x16 5700 1140 0.50 NOTES #3,4,5 NOTES: 1. VAV BOXES WERE SIZED BASED ON TEMPMASTER, MODEL S, EXCEPT WHERE NOTED 2. SOUND NOISE CRITERIA (NC) IS BASED ON ARI STANDARD 880-2011. 3. VAV BOXES WERE SIZED BASED ON TITUS, MODEL DESV. 4. BALANCE AIRFLOW AT TERMINAL UNIT TO VALUE INDICATED IN SCHEDULE. 5. REFER TO EXISTING CONTROL SEQUENCE ON SHEET M330. PROVIDE TEST, ADJUST & BALANCE (TAB). W4833402 ISSUE FOR CONSTRUCTION 05.12.17 REVIEWED FOR ODE COMPLIANCE APPROVED SAY242017 City of Tukwila __BUILDINC1 DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-177PECEIVEE CITY OF TUKWILA SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A B RECORD DRAWING CDC RELOCATION - WIRE SHOP RELOCATION 2-81 & DENSITY IMPROVEMENTS J#972197-00 J#19760 W4833402 HGI/SHS WH SAZAN/DJ MBL 11.12.99 11.11.13 05.12.17 - BOE 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN R. TOPNESS CHECKED S. FRANKLIN DATE 11.12.97 3.30.98 SUBTITLE EQUIPMENT SCHEDULE CURRENT REVISION W4833402 SYMBOL 3 DATE 05.1[241(71 8 al APPROVED BY DEPT. DATE ENGINEER G. FRANEK 11.12.97 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. MCNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M1B PERMIT CENT JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M1B 7 ER SUPPLY DIFFUSERS, RETURN, EXHAUST, AND TRANSFER GRILLES NOISE CRITERIA SCHEDULE ROOM NAME / ROOM NUMBER NOISE CRITERIA (NC) MODEL TEST FACILITY / 13C3 25 MODEL BUILDUP STAGING / 11B1 35 TO 40 SOUND DEMO CONTROL ROOM / 14G4 25 ARF FACILITY / 11G5 35 OPEN OFFICES AREA / 21C1 35 WAVE GUIDE FACILITY / 12G5 35 WAVE GUIDE CONTROL ROOM / 11J5 35 ELECTRICAL SHOP / 12G3 35 TO 40 MTC CONTROL ROOM / 11G7 35 MTC FLOW ROOM / 11H7 35 MTC Z -TUBE ROOM / 12H7 35 HI -TEMP TEST / 12G7 35 TO 40 MODEL LSAF FACILITY / 11F7 35 TO 40 FACILITY COMPONENTS AND TEST PARTS / 13G5 35 TO 40 DATA ROOM / 14E5 35 LAB / 11G4 35 TRANSDUCER & RECORDER CALIBRATION FACILITY / 13F3 30 CONFERENCE ROOM / 21D5 30 TO 35 PRIVATE OFFICES, WORK ROOMS, VISIBILITY ROOMS 30 TO 35 INSTRUMENTATION VAN STAGING AREA / 11F3 40 TO 45 SHIPPING AND RECEIVING / 11B4 40 TO 45 WIRE SHOP / 11C3 40 TO 45 FIELD TEST BUILDUP / 13B4 35 TO 40 TRANSDUCER RECORDING CALIBRATION / 12B4 30 TO 35 DINING AREA / 12E7 35 TO 40 CORRIDORS 38 TO 42 DYNAMIC INSTRUMENTATION LAB / 21KJH5 35 TO 40 DYNAMIC CALIBRATION AREA / 21G5 35 TO 40 DYNAMIC INSTRUMENTATION LAB / 21H5 38 TO 42 PLUMBING FIXTURE SCHEDULE SYMBOL DESCRIPTION CONNECTION SIZE SAN V CW HW P-1 HANDICAPPED WATER CLOSET 4" 2' 1" -- P-2 WATER CLOSET 4" 2" 1" -- P-3 URINAL 2" 1-1/2" 3/4" -- P-3(H) HANDICAPPED URINAL 2" 1-1/2" 3/4" -- P-4 LAVATORY 1-1/2" 1-1/2" 1/2" 1/2" P-5 WASH FOUNTAIN 2" 1-1/2" 1/2" 1/2" P-6 SHOWER 2" 1-1/2" 1/2" 1/2" P-7 SERVICE SINK 2" 2" 1/2" 1/2" P-8 KITCHEN SINK 2" 2" 1/2" 1/2" P-9 WATER CLOSET 4" 2" 3/4" -- P-10 LAVATORY 2" 2" 1/2" 1/2" P-11 JANITOR SINK 3" 1-1/2" 1/2" 1/2" DF -1 DRINKING FOUNTAIN 1-1/2" 1-1/2" 1/2" -- DF-2 DRINKING FOUNTAIN 1-1/2" 1-1/2" 1/2" -- FD-1 FLOOR DRAIN 2" 2" -- -- FD-2 FLOOR DRAIN 2" 2" 1/2" -- FD-3 FLOOR DRAIN 4" 2" 1/2" -- FS FLOOR SINK 2" 2" 1/2" -- TP TRAP PRIMER -- -- 1/2" -- EEW EMERGENCY EYEWASH 1-1 /4" 1-1/2" 1/2" -- INTAKE AIR PENTHOUSE SCHEDULE MARK NO. LOCATION SERVICE DIM. INCH CFM MANUFACTURER/MODEL REMARKS LENGTH WIDTH HEIGHT REMARKS FSD-2 y" y" CFM NOT INSTALLED FSD-3 N.E. CORRIDOR 10/10 PH -1 ROOF E/5 AHU-5&6 72 48 40 14,370 RUSKIN NOTE 1 12/12 RUSKIN, MODEL FSD-60 COMPUTER ROOM FSD-7 MAIN CORRIDOR 16/16 RUSKIN, MODEL FSD-60 11 FSD-7A MAIN CORRIDOR 12/12 RUSKIN, MODEL FSD-60 55 FSD-8 W. CORRIDOR 14/14 RUSKIN, MODEL FSD-60 LEIBERT, MODEL BUO67A NOTE: 1. PROVIDE ACCESS DOOR(S) ON EAST SIDE FOR ACCESS TO MOTOR OPERATED DAMPERS LOCATED AT ROOF. FIRE / SMOKE DAMPERS MARK NO. SERVICE SIZE MANUFACTURER / MODEL REMARKS WXH(IN) FSD-1 N.W. CORRIDOR 12/12 RUSKIN, MODEL FSD 60 REMARKS FSD-2 y" y" CFM NOT INSTALLED FSD-3 N.E. CORRIDOR 10/10 RUSKIN, MODEL FSD-60 % RH FSD-4 LOBBY 24/24 RUSKIN, MODEL FSD-60 Hz FSD-5 JANITORS ROOM 12/12 RUSKIN, MODEL FSD-60 COMPUTER ROOM FSD-7 MAIN CORRIDOR 16/16 RUSKIN, MODEL FSD-60 11 FSD-7A MAIN CORRIDOR 12/12 RUSKIN, MODEL FSD-60 55 FSD-8 W. CORRIDOR 14/14 RUSKIN, MODEL FSD-60 LEIBERT, MODEL BUO67A FSD-9 ELEVATOR MACHINE RM 12/12 RUSKIN, MODEL FSD-60 - FSD-11 WOMEN'S LOCKER RM 16/16 RUSKIN, MODEL FSD-60 - FSD-12 MEN'S LOCKER ROOM 16/16 RUSKIN, MODEL FSD-60 3 FSD-13 WOMEN'S TOILET 12/24 RUSKIN, MODEL FSD-60 DX -2 FSD-14 MEN'S TOILET 12/24 RUSKIN, MODEL FSD-60 0.5 FSD-19 N.E. CORRIDOR 18/18 RUSKIN, MODEL FSD-60 15.0 FSD-20 N.E. CORRIDOR 16/10 RUSKIN, MODEL FSD-60 26.7 FSD-21 N.E. CORRIDOR 10/8 RUSKIN, MODEL FSD-60 ROOF FSD-22 JANITOR'S ROOM 22/22 RUSKIN, MODEL FSD-60 - FSD-23 INST ST AREA 36/16 RUSKIN, MODEL FSD-60 277 FSD-24 INST ST AREA 20/18 RUSKIN, MODEL FSD-60 SPLIT SYSTEM. HORIZONTAL COND. UNIT W/ PROP FAN FSD-25 INST ST AREA 36/16 RUSKIN, MODEL FSD-60 FSD-26 INST ST AREA 52/14 RUSKIN, MODEL FSD-60 FSD-27 INST ST AREA 10/10 RUSKIN, MODEL FSD-60 FSD-28 INST ST AREA 26/26 RUSKIN, MODEL FSD-60 REFRIGERATION/CONDENSER UNITS MARK NO. SERVICE LOCATION FAN HUMIDIFIER FILTERS ENTERING AIR LEAVING AIR ELECTRICAL MANUFACTURER/MODEL REMARKS 1Y" y" y" CFM HP E.S P. IN WC.LB/HRDEG % EFFICIENCY T F % RH TOTAL MBH T DEC F VOLTS PHASE Hz FLA DX -1 COMPUTER ROOM COMPUTER J_OOM COL D.5/ E.5 2800 2.0 0.5 11 30 72 50 58.0 55 480 3 60 28.9 LEIBERT, MODEL BUO67A ELECTRIC REHEAT CND -1 SERVES DX -1 ROOF - 0.5 - - - - - 65.0 - 480 3 60 13.4 LEIBERT, MODEL PFC067A SPLIT SYSTEM. HORIZONTAL COND. UNIT W/ PROP FAN DX -2 DATA VAULT DATA VAULT 750 0.2 0.5 2.5 30 72 50 15.0 55 277 1 60 26.7 LEIBERT, MODEL MMD18E ELECTRIC REHEAT CND -2 SERVES DX -2 ROOF - 0.2 - - - - - 19.5 - 277 1 60 10.7 LEIBERT, MODEL PFCO20A SPLIT SYSTEM. HORIZONTAL COND. UNIT W/ PROP FAN NOTE: CONDENSER UNITS DESIGN: SUMMER 95°F/ WINTER 0°F PLUMBING FIXTURE SCHEDULE MARK FIXTURE SERVICE SIZE REMARKS W V CW HW P-12 SINK 2" 1Y" y" y" FIXTURE: ELKAY MODEL CR2522, SEAMLESS #20 GAUGE TYPE 304, 18-8 STAINLESS STEEL, POLISHED FINISH, FULLY UNDERCOATED, 3" RADIUS CORNERS, STRAIGHT SIDES, SELF RIMMING, 3 HOLE CENTERED PUNCH. 22" FRONT -TO -BACK X 17" WIDE OVERALL, 21" X 15 3/4" X 7" BOWL. FAUCET: DELTA FAUCET MODEL 472 -DST, 3 HOLE DECK MOUNTED, 8" CAST BRASS SPOUT, METAL LEVER HANDLE, DIAMOND COATED CERAMIC CARTRIDGE, 3/8" COPPER SUPPLY TUBE INLETS, POLISHED CHROME FINISH. DIFFUSER -GRILLE SCHEDULE EQUIP MARK MANUFACTURER MODEL TYPE MATERIAL DESCRIPTION SG -1 THERMA-FUSER TF -HC 24 X 24 FACE, MODULAR CORE DIFFUSER STEEL VAV CEILING DIFFUSERS,8" INLET DIAMETER, FOR VAV HEATING AND VAV COOLING, THERMALLY ACTIVATED WITH BUILT IN THERMOSTATE AND MODULATING DAMPER, RANGE 95 CFM - 210 CFM SG -2 TITUS MCD 24 X 24 FACE, MODULAR CORE DIFFUSER STEEL ADJUSTABLE FOR 1, 2, 3, OR 4 -WAY THROW PATTERN, PROVIDE 24X24 FACE. FOR LAY -IN CEILING MOUNTING. SEE PLAN FOR NECK SIZE. EG -1 TITUS 50FSTEEL 24 X 24 EGGCRATE RETURN GRILLE 22 X 22 NECK. DUCT CONNECTION SIZE AS SHOWN ON DRAWINGS. FOR LAY -IN CEILING MOUNTING. RUSKIN, MODEL CD 60 INSTALL WITHIN NEW RA DUCT ATTACHED TO EXISTING OSA DUCT REMARKS: 1. MANUFACTURERS AND MODELS ARE BASIS OF DESIGN. 2. PROVIDE WITH BAKED OFF-WHITE ENAMEL FINISH. 3. N.C. LEVELS NOT TO EXCEED N.C. LEVEL OF SPACE SERVED. CONTROL DAMPERS MARK NO. SERVICE SIZE MANUFACTURER / MODEL REMARKS WXH(IN) CD -EF -5 WIRE SHOP 30/20 RUSKIN, MODEL CD 60 INSTALL WITHIN EXISTING EXHAUST DUCT CD-AHU-6-OSA WIRE SHOP 48/36 RUSKIN, MODEL CD 60 INSTALL WITHIN EXISTING OSA DUCT CD-AHU-6-RA-1 WIRE SHOP 36/36 RUSKIN, MODEL CD 60 INSTALL WITHIN NEW RA DUCT ATTACHED TO EXISTING OSA DUCT CD-AHU-6-RA-2 WIRE SHOP 36/36 RUSKIN, MODEL CD 60 INSTALL WITHIN NEW RA DUCT ATTACHED TO EXISTING OSA DUCT NOTE: PROVIDE 24 VOLT ACTUATOR W4833402 ISSUE FOR CONSTRUCTION 05.12.17 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-177AECEIVED REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING J#972197-00 HGI/SHS 11.12.99 CDC RELOCATION - WIRE SHOP RELOCATION J#19760 WH MBL 11.11.13 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/NA 05.12.17 05/11/2017 • ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN R. TOPNESS CHECKED S. FRANKLIN DATE 11.12.97 3.30.98 SUBTITLE EQUIPMENT SCHEDULE CURRENT REVISION W4833402 SYMBOL DATE o5.1.21171 71 8 201; Crri OF TUKV. ILA APPROVED BY DEPT. DATE ENGINEER G. FRANEK 11.12.97 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. MCNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 PLANT 2, WA. SHEET M1C PERMIT CENTER JOB NO. 972197-00 COMP NO. DWG NO. 2-81-M 1 C CAD �JJ SD 10/10 525 CFM (TYP OF 4) 14 1 140 140 -14 BOD 12' FOB • • fir 0O VDI 240 11111=4, VD 2-1 �5 VD 19. 58/30 / BOD 12'-4" N 00 N V) w w w U RG 24/24 (TYP OF 41) 160 53 7 180 18 2'-4" / 300 I dt �. i 4 12VD 240 CFM ��ri• IR. UFA 8 �Ir����=111��:�1�����lll�%� a■ RG 10 -- r -- -- �il,1,I 4111131 �`� 185 C M VDVD VD •<00 lisco 1000 VD VD MATCH LINE SEE SHEET 2-81-2M12 SD88 250 CFM PARTIAL P _A\ VIEW SCALE: 1/8"=1'-0" /Fr 5\ 7 SD 8/8 270 CFM (TYP OF 2) i RG 10/10„� 395 CFM 140N SD 8%8 245 CFM V SD 10/10 530 CFM REMOVAL C W4833402 ISSUE FOR CONSTRUCTION 05.12.17 LEGE\ D GENE \OTES I. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2 -81 -MIC, EFERE\CE NAWI\GS CO\S-RUCTIO\ \OTES DEMO DIFFUSERS, DUCTWORK AND ASSOCIATED APPURTENANCES. RELOCATE T -STAT TO NEW LOCATION SHOWN ON 2M10. REMOVE RETURN GRILLE AND SAVE TO REINSTALL. SAVE TO STOCK. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2-81 BUILDING KEY PLAN SONE: NTS 4 2 0 0 4 8 12 I6 20 SCALE :(FEET) 1/8"=I'-0" RECEIVED CITY OF TUKWIL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING J#972197-00 HGI/SHS 11.12.99 A REDUCE DIFFUSER NOISE 32624 BOLLIG 6/23/00 B IMPROVE DATA ROOM COOLING 917487 B. DARRIN W. HENCLEL 10.22.01 C 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/SS 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. ELLIOTT DATE 1.30.98 CHECKED A. NAPIER 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL DATE 05r 1; .173 217 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/1-3 PLANT 2, WA. SHEET 2MIOR PERMIT CENTE JOB NO. 972197-00 COMP NO. DWG NO. 2-81-2M1OR 4021 SD 10/10 525 CFM (TYP OF 5) VD 140 P.O.C. 20x12 200 180 7 SD 14/14 795 CFM (TYP OF 16) O J 180 ( 'VD 240 yD VD VD VD i VD VD 2M11 M504 80/30 34/30 VD 7540 CFM 0 SD 14/1 430 CF (TYP OF 2) 14/10 U 10/10 V RG 24/24 (TYP OF 41) 140 07 2-04 f'VD\\ RG 12 12 460 CFM SD 10/10 610 CFM RG 10/10 325 CFM IRG 10/10 [77i 320 CFM \ 33/141 MATCHLINE SEE SHEET 2-81-2M RG 10/10 340 CFM 33/14 /6 C SD 18/18 1600 CFM 180 FLEX RG 1 /- 1200 1200 SD 18/18 880 CFM 180 FLEX EMOVAL f 3 W4833402 ISSUE FOR CONSTRUCTION 05.12.17 LEGE\D GE \HAL OTES 1. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DRAWING 2-81-M1 C. INSTALL TURNING VANES IN 138/30 RETURN DUCT. 'EFHE\CE HAWI\GS DEMO DIFFUSERS, DUCTWORK AND ASSOCIATED APPURTENANCES. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2111 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2-81 BUILDING KEY PLAN SCALE: NTS 4 2 0 4 8 12 16 20 SCALE: (FEET) 1/8"= l '-0" RECEIVED SYM REVISION RECORD DRAWING J#972197-00 A PROVIDE ADEQUATE COOLING C 2-81 & DENSITY IMPROVEMENTS J#555994-00 W4833402 BY HGI/SHS WDB SAZAN/SS APPROVED DATE SYM REVISION BY APPROVED DATE 11.12.99 03.17.05 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. ELLIOTT DATE 1.30.98 CHECKED A. NAPIER 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL DATE'I-rY OF I UKVVILP 05.12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F -L/1-3 PLANT 2, WA. SHEET 2MIIR a n 1431 Eu9�• I u Asia PERMIT CENTER JOB NO. 555994-00 COMP NO. DWG NO. 2-81-2M11R SYM REVISION 3 -1§ MATCHLINE '.EE SHEET 2-81-2M10 p.. 80 CFMI 160 VD ` VD 60 VD SD 12/12 690 CFM 60 (TYP OF 2) - V VD SD 14/14 795 CFM (TYP OF 2) V GkortE SD 12/12 690 CFM (TYP OF 5) VD VD G 12/12 EG 6/12 4001CFM .% Fla" mlo III 1 Illifk. 24`� / IVII!��.. M 240 UP ___•w;1‘k TO F-01 Azi Pj MirDN API. Ull r• - - (TYP.4) 0/10 FM VD RA 48/24 8350 CFM D 66 0 CFMI �,�� 160 i VD F V VD- `V - 6A ✓V vn 160 220 2M12 M506 780 V 42 moi/ SD 12/12 690 CFM (TYP OF 5) VW\ SD 14/14 810 CFM (TYP OF 4) VD 100 ,\ W4833402 ISSUE FOR CONSTRUCTION 05.12.17 A B C D RECORD DRAWING REDUCE DIFFUSER NOISE RELOCATE KSC LAB 18-24 TO PLANT 2 IMPROVE DATA ROOM COLING INSTALL POWER & COOLING 972197-00 32624 711344 817487 J#557800-01 BY HGI/SHS BOLLIG B. DARRIN B.DARRIN WDB APPROVED DATE 11/12/99 06/23/00 SYM REVISION PA TIAL PLA\ VIEW SCALE: 1 /8"=1'-0" BY APPROVED DATE E 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/SS 05.12.17 W.HENCKEL 03/22/01 10/22/01 09.18.07 ,�BOE/NG® d� 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K. ELLIOTT CHECKED A. NAPIER DATE 02/02/98 03/30/98 SUBTITLE @IRE LEGE\D GE\FRAC \OTES 1. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2-81-M 1 C. INSTALL TURNING VANES IN 160/34 RETURN DUCT. REFEK\CE NAWI\GS CO\SRUCTIO\ \OTES DEMO DIFFUSERS, DUCTWORK AND ASSOCIATED APPURTENANCES. REMOVE FIT BOXES AND LOW PRESSURE DUCTWORK AND SAVE TO BE REINSTALLED ON 2M12. CAP DUCT. REMOVE DUCT AND SAVE TO BE REINSTALLED ON 2M12. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 4 2011 City of Tukwila BUILDING DIVISION M17 SAZAN G R O U 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 (OVAL DUCTWORK PLAN 2-81 BUILDING KEY PLAN SCALE: NTS 4 2 0 4 8 12 16 20 NI SCALE: (FEET) 1 /8"=1'-0" CURRENT REVISION W4833402 SYMBOL E RECEIVED DATE CITY OF TUKWIL 05.12.17 ENGINEER G. FRANEK CHECKED G. SPRAGUE APPROVED L. COSTELLO APPROVED R.MCNIESH 02/02/98 06/03/98 06/03/98 06/03/98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/3-8 PLANT 2, WA. SHEET 2M12R r " �T MAI U 2 7 PERMIT CENTER JOB NO. COMP NO. DWG NO. 2-081-2M12R Er) SD 8/8 430 CFM 160 140 SD 10/10 450 CFM 10/6 33/14 120 310 CFM 8/6 VD 8/6 MATCHLINE SEE SHEET —81—. 11 SD 18/18 800 CFM TYP. OF 12"0 180 FLEX SD 18 880 CF [7::(1X7 SD 12/12 r.F 12 2 350 CFM 1 260 CFM 1 48 SA N FROA —4 BELOW G 24 24 KG 24 24 26/18 misty- I F TG 24/12 1000 CFM (TYP OF 2) 240 140 2M13 G 24/24 503 RA 18 12 1000 CFM 34/16 VD EG 24/24 995 CFM (TYP OF 4) 8/8 6 100 TG 14/14 (BELOW) - 260 I ■ 240 R BOD EL. 14'-8" N 00 MATCHLINE SEE S BOD 15'-6" AFF 56/30 8475 CFM ►-'� RA BOD 12'-4" AFF M506 180 VD 180 - VD VD SD 14/14 810 CFM (TYP OF 8) M17. W4833402 ISSUE FOR CONSTRUCTION Tel 206.267.1700 05.12.17 Fax 206.267.1701 SAZAN # 206-1777 LEGEN D GE\FRAC NOTES I. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DAC 2-81—MIC. VAV TERMINAL UNIT, W-2-01, W-2-02, W-2-03, W-2-04: TEMPMASTER MODEL V, VAV TERMINAL UNIT, SIZE D, 8" INLET, 600 CFM (MAX. SETTING)/0.0 CFM (MIN SETTING), 0.50 IN. W.G. MIN. INLET PRESSURE. DUCT TO BE LINED WITH 1" INSULATION FOR SOUND ATTENUATION. IN 18x12 RETURN AND 12x12 RELIEF DUCTWORK ONLY. PROVIDE A FLEXIBLE CONNECTION IN DUCT BEFORE PENETRATING A MULTI—WALL. PROVIDE A FLEXIBLE CONNECTION UPSTREAM AND DOWNSTREAM OF SOUND ATTENUATORS. REFERENCE D AWI\GS CO\S-RUCTIO\ \OTES DEMO DIFFUSERS, APPURTENANCES. RELOCATE T—STAT ON SHEET 2M13. DUCTWORK AND ASSOCIATED TO NEW LOCATION SHOWN REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 PA TIAL PLAN VIEW SCALE: 1/8"=1'-0" REMOVAL 2-81 BUILDING KEY PLAN SatEM 4 2 0 D 4 8 12 16 20 SCALE :(FEET) I/8"=I '-0" �+ RECEIVEDDATECITY OF TUMVILII-3 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A B C RECORD DRAWING RELOCATE DIFFUSER/T—STAT PROVIDE ADEQUATE COOLING 2-81 & DENSITY IMPROVEMENTS J#972197-00 J#1000600329 J#555994-00 W4833402 HGI/SHS BOLLIG WDB SAZAN/DJ 11.12.99 2.25.03 02.17.05 05.12.17 Q� ffE RrM ( 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. ELLIOTT CHECKED A. NAPIER DATE 1.2.98 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.2.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F—L/3-8 PLANT 2, WA. SHEET 2M13R PERMIT CENTER JOB NO. COMP NO. DWG NO. 2-81-2M13R (A) 17 140 tSD 10/10 525 CFM (NP OF 4) 140 140 2-14 2M10 VD M506 30x18 VD j VD 140 2-07 EsiNs%) SD 12/12 690 CFM (TYP OF 5) VDD 240 VD. VD RG 10 1 195 C C 160 X18 180 MATCHLINE SEE SHEET 2-8 PARTIAL PLA\ VIEW SCALE: 1/8"=1'-0" SD 8/8 195 CFM (TYP OF 2) SD 88 195 CFM SD 10/10 430 CFM W4833402 ISSUE FOR CONSTRUCTION 05.12.17 LEGE\D GE\PAL \OTES 1. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2-81—M 1 C. REFERE\ CE DRAW I \GS CO\ STRUCTIO\ \OTES PROVIDE VAV DIFFUSER, DUCTWORK AND ASSOCIATED APPURTENANCES. 2. CLEAN ALL DIFFUSERS AND RETURN GRILLES BEFORE TAB BEGINS, ON THIS SHEET. 3. REPLACE ALL VAV BOX FILTERS BEFORE TAB BEGINS, ON THIS SHEET. 4. REBALANCE ALL DIFFUSERS AND VAV BOXES FOR NEW CFM VALUES, ON THIS SHEET. SEE SEQUENCE OF OPERATION FOR VAV DIFFUSER ON M330. RELOCATED TSTAT. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2M10 2-81 BUILDING KEY PLAN Scala: m 4 2 0 0 4 8 12 16 20 ■• SCALE :(FEET) I/8"=I '-0" REVISION RECORD DRAWING REDUCE DIFFUSER NOISE IMPROVE DATA ROOM COOLING 2-81 & DENSITY IMPROVEMENTS J#972197-00 32624 917487 W4833402 BY HGI/SHS BOLLIG B. DARRIN SAZAN/SS APPROVED DATE SYM REVISION BY APPROVED DATE W. HENCLEL 11.12.99 6/23/00 10.22.01 05.12.17 Q�BOE/NGm 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. ELLIOTT DATE 1.30.98 CHECKED A. NAPIER 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL R F' P1 \I ( r) DATE C� � 9gyi<WIL APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A—F/1-3 PLANT 2, WA. SHEET 2M10 A MAY 1 3 2U1/ PERMIT CENTER JOB Na 972197-00 COMP NO. DWG NO. 2-81-2M10 � � /// 'o` 58/30 / /// BOD 12'-4" RG 10 1 195 C C 160 X18 180 MATCHLINE SEE SHEET 2-8 PARTIAL PLA\ VIEW SCALE: 1/8"=1'-0" SD 8/8 195 CFM (TYP OF 2) SD 88 195 CFM SD 10/10 430 CFM W4833402 ISSUE FOR CONSTRUCTION 05.12.17 LEGE\D GE\PAL \OTES 1. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2-81—M 1 C. REFERE\ CE DRAW I \GS CO\ STRUCTIO\ \OTES PROVIDE VAV DIFFUSER, DUCTWORK AND ASSOCIATED APPURTENANCES. 2. CLEAN ALL DIFFUSERS AND RETURN GRILLES BEFORE TAB BEGINS, ON THIS SHEET. 3. REPLACE ALL VAV BOX FILTERS BEFORE TAB BEGINS, ON THIS SHEET. 4. REBALANCE ALL DIFFUSERS AND VAV BOXES FOR NEW CFM VALUES, ON THIS SHEET. SEE SEQUENCE OF OPERATION FOR VAV DIFFUSER ON M330. RELOCATED TSTAT. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2M10 2-81 BUILDING KEY PLAN Scala: m 4 2 0 0 4 8 12 16 20 ■• SCALE :(FEET) I/8"=I '-0" REVISION RECORD DRAWING REDUCE DIFFUSER NOISE IMPROVE DATA ROOM COOLING 2-81 & DENSITY IMPROVEMENTS J#972197-00 32624 917487 W4833402 BY HGI/SHS BOLLIG B. DARRIN SAZAN/SS APPROVED DATE SYM REVISION BY APPROVED DATE W. HENCLEL 11.12.99 6/23/00 10.22.01 05.12.17 Q�BOE/NGm 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN K. ELLIOTT DATE 1.30.98 CHECKED A. NAPIER 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL R F' P1 \I ( r) DATE C� � 9gyi<WIL APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A—F/1-3 PLANT 2, WA. SHEET 2M10 A MAY 1 3 2U1/ PERMIT CENTER JOB Na 972197-00 COMP NO. DWG NO. 2-81-2M10 0 N SD 10/10 525 CFM (TYP OF 5) 9 STORAGE CABINETS - 2H 140 9 STORAGE CABINETS - 2H 17 17 J 14014� VD r ,� rte. 17 9 STORAGE CABINETS - 2H F71 140 IL J I JL I VD 2M11 M506 30x\ 8- -0 9 STORAGE CABINETS - 2H VD F71 140 r--71 IL-1 VD140 - P.O.C. UP TO AHU-1 20x12 200 320 V 3 STORAGE CABI - 2H 7 SD 14/14 795 CFM (TYP OF 16) VD 4� VDre- 2M 11 M504 = c.) 34/30F77 7540 CFM (TYP OF 2) MATCHLINE SEE SHEET 2-80-2M15 ............................... ............................... 140 tO 10 150 CFM 33/14 MATCHLINE SEIt SHE 2-81-2M13 SD 10/10 RG 10/10 295 CFM 325 CFM RG 10/10 340 CF 18/18 1600 CFM 180 FLEX C PARTIAL PJ\\ VIEW SCALE: 1/8"=1'-0" C SD 18/18 880 CFM 180 FLEX 120f W4833402 ISSUE FOR CONSTRUCTION 05.12.17 e LEGE\D GE\HAL \OTES 1. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DRAWING 2-81-M1 C. INSTALL TURNING VANES IN 138/30 RETURN DUCT. REFERENCE DRAM \GS CO\ST CTI O\ \OTES PROVIDE VAV DIFFUSER, DUCTWORK AND ASSOCIATED APPURTENANCES. RELOCATE T -STAT. 3. CLEAN ALL DIFFUSERS AND RETURN GRILLES BEFORE TAB BEGINS, ON THIS SHEET. 4. REPLACE ALL VAV BOX FILTERS BEFORE TAB BEGINS, ON THIS SHEET. 5. REBALANCE ALL DIFFUSERS AND VAV BOXES FOR NEW CFM VALUES, ON THIS SHEET. SEE SEQUENCE OF OPERATION FOR VAV DIFFUSER ON M332, TYP. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2-81 BUILDING KEY PLAN muEm 4 2 0 0 4 8 12 16 20 ■ ■T SCALE: (FEET) 1/8"= 1 - 0" RECEIVED SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A C RECORD DRAWING PROVIDE ADEQUATE COOLING 2-81 & DENSITY IMPROVEMENTS J#972197-00 J#555994-00 W4833402 HGI/SHS WDB SAZAN/SS 11.12.99 03.17.05 05.12.17 el___mEiriew09 06/11/2017 ACCEPTABILITY THIS DESIGN AND/OR , SPECIFICATION IS APPROVED DRAWN K. ELLIOTT CHECKED A. NAPIER DATE 1.30.98 3.30.98 SUBTITLE DUCTWORK PLAN CURRENT REVISION W4833402 SYMBOL ATL OF 05 12.17 APPROVED BY DEPT. DATE ENGINEER G. FRANEK 1.30.98 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F -L/1-3 PLANT 2, WA. SHEET 2M11 P ERMIT CENTER JOB NO. 555994-00 COMP NO. DWG NO. 2-81-2M11 SYM REVISION (3) 3 RG -1 10X10 115 CFM 80 MATCHLINE SEE SHEET 2-81-2M10 80 CFM 180 VD 60 160- \/5 60SD 12/12 690 CFM VD V `(TYP OF 2) VD SD 14/14 795 CFM (TYP OF 2) V D:8 335 CFM (TYP2) 120 ■ 1 7-62 120 SD8/.; 300C' N RG 10 335 C PVECZ SD 12/12 690 CFM (TYP OF 5) SD 8/8 225 EG 12/12 400 CFM TG 1 400 2/12 CFM TO EF -0 140 UP TO EF -1 0 UP -05 200 DN UP F-01 VD� r DN EG 0/10 315 CFM C3-) IVD I� 7---\ 5 G-2 Ox10 15 (TYP 2 SG -2 8x8 180 (TYP 4) 30/24 12/12 SG -2 8x8 180 CFM 60 100 SD 6/6 80 CFM 2M12 M503 CFM �— SG -2 8x8 180 (TYP 4) 24/24 P OF 38 w w •w Q 2-2$ -� VD VDD -27 400 220 1I . X i 2M121M506 180 VD L` 42 <AHU> A B C D RECORD DRAWING REDUCE DIFFUSER NOISE RELOCATE KSC LAB 18-24 TO PLANT 2 IMPROVE DATA ROOM COLING INSTALL POWER & COOLING 972197-00 32624 711344 817487 J#557800-01 BY HGI/SHS BOLLIG B. DARRIN B.DARRIN WDB APPROVED W.HENCKEL DATE 11/12/99 06/23/00 03/22/01 10/22/01 SYM REVISION E 2-81 & DENSITY IMPROVEMENTS W4833402 SD 12/12 690 CFM (TIP OF 5) PARTIAL PLAN SCALE: 1 /8"=1'-0" BY SAZAN/SS APPROVED DATE 05.12.17 09.18.07 SD 14/14 810 CFM (TYP OF 4) VD � VIEW 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K. ELLIOTT Mtn 833402 ISSUE FOR CONSTRUCTION Tel 206.267.1700 05.12.17 Fax 206.267.1701 SAZAN # 206-1777 LEGE \D O E \ E SAL \OTES 1 SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2-81-M1 C. INSTALL TURNING VANES IN 160/34 RETURN DUCT. EFE�E\ CE DAWI\GS CO\S-RUCTION \OTES PROVIDE NEW VAV BOX, DUCTWORK AND ASSOCIATED APPURTENANCES. CONTROL DIAGRAM ON 1/M330, VAV BOX DETAIL ON 6/M506. CLEAN ALL DIFFUSERS AND RETURN GRILLES BEFORE TAB BEGINS, ON THIS SHEET. 3. REPLACE ALL VAV BOX FILTERS BEFORE TAB BEGINS, ON THIS SHEET. 4. REBALANCE ALL DIFFUSERS AND VAV BOXES FOR NEW CFM VALUES, ON THIS SHEET. 5. MODIFY DUCTWORK, ADD DIFFUSERS. 6 NOT USED. PROVIDE VAV, DIFFUSERS, DUCTWORK, AND ASSOCIATED APPURTENANCES. INSTALL EXISTING RETURN GRILLE FROM STOCK. REINSTALL TERMINAL UNITS AND PROVIDE NEW DUCTWORK AND APPURTENANCES. 1> SEE SEQUENCE OF OPERATION FOR VAV DIFFUSER ON M332, TYP. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 4 2017 City of Tukwila ' BUILDING DIVISION 2M10 2M10 SAZAN ® GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 DATE 02/02/98 CHECKED A. NAPIER ENGINEER G. FRANEK CHECKED G. SPRAGUE APPROVED L COSTELLO APPROVED R.MCNIESH 03/30/98 02/02/98 06/03/98 06/03/98 06/03/98 SUBTITLE DUCTWORK PLAN 2M11 2M13 O 2-81 BUILDING KEY PLAN SCALE MS 4 2 0 4 8 12 16 20 111111M 1111!11111111111111111111. 1E1E11 SCALE: (FEET) 1 /8"=1'-0" CURRENT REVISION W4833402 SYMBOL E TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/3-8 PLANT 2, WA. SHEET 2M12 RECEIVED DATTITY05OF.12TUKWILA.17 V 20 PERMIT CENTER JOB NO. COMP NO. DWG NO. 2-081-2M12 LEGE\D CE\RAL \OTES I. SEE SUPPLY DIFFUSER, RETURN, EXHAUST AND TRANSFER GRILLE SCHEDULE ON DWG 2 -81 -MIC, VAV TERMINAL UNIT, W-2-01, W-2-02, W-2-03, W-2-04: TEMPMASTER MODEL V, VAV TERMINAL UNIT, SIZE D, 8" INLET, 600 CFM (MAX. SETTING)/0.0 CFM (MIN SETTING), 0.50 IN. W.G. MIN. INLET PRESSURE. DUCT TO BE LINED WITH 1" INSULATION FOR SOUND ATTENUATION. IN 18x12 RETURN AND 12x12 RELIEF DUCTWORK ONLY. PROVIDE A FLEXIBLE CONNECTION IN DUCT BEFORE PENETRATING A MULTI -WALL. PROVIDE A FLEXIBLE CONNECTION UPSTREAM AND DOWNSTREAM OF SOUND ATTENUATORS. EFERE\CE DAWI\GS CO\STUCTIO\ \OTES PROVIDE DIFFUSER, DUCTWORK AND ASSOCIATED APPURTENANCES. RELOCATE T -STAT. PROVIDE NEW VAV BOX, DUCTWORK, DIFFUSERS AND ASSOCIATED APPURTENANCES. CONTROL DIAGRAM ON 1/M330, VAV BOX DETAIL ON 6/M506 4, CLEAN ALL DIFFUSERS AND RETURN GRILLES BEFORE TAB BEGINS, ON THIS SHEET. 5. REPLACE ALL VAV BOX FILTERS BEFORE TAB BEGINS, ON THIS SHEET. 6. REBALANCE ALL DIFFUSERS AND VAV BOXES FOR NEW CFM VALUES, ON THIS SHEET. MODIFY DIFFUSER AND DUCTWORK. SD 8/8 430 CFM 160 140 10/6 VD SD 10/10 450 CFM SD 12/12 310 CFM 310 CFM 8/6 SD 18/18 800 CFM TYP. OF 180 FLEX C/0 SD 18/T8- 880 8 18880 CFM -7 10/6 1 40 VD 14 120 12" MATCHL E SEE SHEET 2-81-2M11 10X10 \\ 230 RG 10 310 CFM RG 10/10 10X10 9 410 '1G 24 24 TG 24/12 1000 CFM (TYP OF 2) 240 140 2-80 BLDG (INTF) L EG 24/24 995 CFM (TYP OF 4) 580 CFM (TIP OF 4) 100 TG 14/14 (BELOW) 2-49 _ 120 VD 14/14 tu�� 30/24 20 SD 8 305 CFM 140 (2 TYP) R BOD EL. 14'-8" 160 •� I� _ J._sf= ter+ LLO CFM w�� '° RG 18 1 • ' iiLt III© 750 CFM 161 %1111111■P, I W 4I��SA24 2 24 1:■ 12x12 RG 18/18 P OF 6 6 BOD 15-6" AFF 56/30 V 8475 CFM 160 SD 12/12 710 CFM VD (iYP OF 16) tion VD 7 BOD 12'-4" AFF I� 3201111I v i • -23 180 ■ 180 VD ay VD� VD I 30x2 •'"�'�\ 1R� I SD 14/14 810 CFM P OF 8) PARTIAL PLA\ VIEW SCALE: 1/8"=1'-0" REVISION APPROVED REVISION APPROVED RECORD DRAWING A RELOCATE DIFFUSER/T—STAT B PROVIDE ADEQUATE COOLING J#972197-00 J#1000600329 HU/SHS BOLLIG 11.12.99 2.25.03 J#555994-00 C 2-81 & DENSITY IMPROVEMENTS W4833402 02.17.05 05.12.17 Q�BOE/ G° c -- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY 05/11/2017 DRAWN K. ELLIOTT CHECKED A. NAPIER ENGINEER G. FRANEK W4833402 ISSUE FOR CONSTRUCTION 05.12.17 � J REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2017 City of Tukwila BUILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 DATE 1.2.98 3.30.98 DUCTWORK PLAN Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 TITLE 2-81 & DENSITY IMPROVEMENTS CHECKED G. SPRAGUE APPROVED L. COSTELLO APPROVED R. McNIESH BUILDING 02-081 6.3.98 MECHANICAL MASTER COL. F -L/3-8 PLANT 2, WA 2-81 BUILDING KEY PLAN SCALE: 4 2 0 N 4 8 12 I6 20 1111 11 SCALE :(FEET) I/8"=I '-0" RECEIVED SYMBOL ,. . Y O F C U K W I L A DATE CURRENT REVISION W4833402 SHEET JOB NO. DWG NO. 2M13 '12)1?917 PERMIT CENTER COMP NO. 2-81-2M13 SYM — RECORD DRAWING A INSTALL POWER & COOLING C 2-81 & DENSITY IMPROVEMENTS REVISION r) MATCHLINE SEE SHEET 2M6 (17 2M62 M5311 3/4" T • L u u 1" FUTURE CONNECTION { { UP TO CONDENS ON ROOF 3/4" CHWR CHWS 4" DN TO 1ST FL OR ft VALVES RISER HWS 3 HWR BY APPROVED DATE SYM REVISION —31 3/4" =2 r� MATCHLINE 3/4" Fr T T 3/4" r�I ¶i I HWR 3/4" 4"x3" 2" 2" UP c 2-26 45HO 3/4" 3/4 MP) ALL FAN � 2 TERMINAL UNITS u I I PARTIAL PLA\ VIEW SCALE: 1/8"=1'-0" BY APPROVED DATE J#972197-00 J#577800-01 W4833402 HGI/SHS WDB SAZAN/DJ 11.12.99 10.25.07 05.12.17 u 05/11/2017 • ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN S. FRANKLIN APPROVED BY DEPT. DATE CHECKED A. NAPIER ENGINEER E. YOOSEFIAN DATE 12.12.97 6.1.98 t 6) (7) 833402 ISSUE FOR CONSTRUCTION 05.12.17 J C LEGE\D RHG REFRIGERANT HOT GAS RL REFRIGERANT LIQUID GE\ERAS \OTES SEE COIL CONNECTION DETAILS ON SHEET M530. 2. ALL HVAC PIPING SHALL BE A MINIMUM OF 14'-4" ABOVE FINISHED FLOOR. 3. SEE DRAWING 2-81-M525, M526 FOR PIPE HANGER DETAILS 4. SEE DRAWING 2-81-M319, M320, M321 FOR SYSTEM PIPING DIAGRAM REFPE\CE D AWI\GS CO\ ST;UCTIO \OTES PROVIDE PIPING AND APPURTENANCES FOR NEW TERMINAL UNIT SEE 6/M530 AND TYPICAL FIT CONTROLS ON M330. REVISE PIPING DUE TO RELOCATION OF EXISTING TERMINAL UNIT. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242017 City of Tukwila BUILDING DIVISION SAZAN GROUP . 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 206-1777 2M60 2M62 2M61 2M63 0 2-81 BUILDING KEY I�S PLANSCALE: N 4 2 0 4 8 I2 I6 20 III 11•11111111111111 SCALE :(FEET) 1/8m=1'-0" SUBTITLE HVAC PIPING PLAN CURRENT REVISION W4833402 SYMBOL 12.12.97 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO APPROVED R. MCNIESH 6.3.98 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. A -F/3-8 PLANT 2, WA. SHEET 2M62 RFC;EIVED DATTITYOOVILA 12. 7 MI 1 UIl� PERMIT CENTER JOB NO. 972197-00 COMP NO. DWG NO. 2-81-2M62 4 141111111111 COFFEE / —5 C) MATCHLINE SEE SHEET 2M61 FT —5? —5) -59 CHWS CHWR 3" 3/4 �J IT II , I AHU-3 � II �+ THWR®„' ,+o -T3 UP HWS 1 • L „ r (f1-11 HWS HWR 3/4" /FT\713:_i- MATCHLINE SEE SHEET 2M62 3/4" i Cl 3/4" -4 3/4" 4"x1” CHWS "x1" rr iYP) ALL FAN TERMINAL UNITS 1" FUTURE CONNECTION VBS 112011 47 ICI 3/4" 1Cl 1Y1 I ISI -24 1(51-- 10- (51- 10- 3/4"— 3/4" \-3/4" Q 11 I II) I- I III)I- I (t) 3/4" -1()I -I(pI -2? 3/4 I�1 I"I 4" IT 1' '4» T. T 1'`s Le —tc ) -e Z-45 11 11 Le -e- Le 3/4"-/ -e. HWS HWR 1" FUTURE CONNECTION ?-21 3/4" T c 3/4" 01 ij-3/4" + 3/4" TT -17 3/4" I -X T 2-80 BLDG (INTF) 00 C7D r (8) A LEGE\D GE\E�AL \OTES SEE COIL CONNECTION DETAILS ON SHEET M530. 2. ALL HVAC PIPING SHALL BE A MINIMUM OF 14'-4" ABOVE FINISHED FLOOR. 3. SEE DRAWING 2-81—M525, M526 FOR PIPE HANGER DETAILS 4. SEE DRAWING 2-81—M319, M320, M321 FOR SYSTEM PIPING DIAGRAM 'EFPE\CE DAWI\GS CO \STUCTIO\ \OTES PROVIDE PIPING AND APPURTENANCES FOR NEW TERMINAL UNIT. SEE 6/M530 AND TYPICLA FIT CONTROL ON M330. REVIEWED FOR CODE COMPLIANCE APPROVE© HAY 24 2017 City of Tukwila BUILDING DIVISION .• .• SAZAN GROUP 600 Stewart St., Ste 1400 W4833402 Seattle, Washington 98101 ISSUE FOR CONSTRUCTION Tel 206.267.1700 05.12.17 Fax 206.267.1701 SAZAN # 206-1777 2-81 BUILDING KEY PLAN som.Em 4 2 0 0 4 8 I2 I6 20 ■>• SCALE :(FEET) I/8"=I '-0" SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAWING J#972197-00 HGI/SHS 11.12.99 A 2-81 & DENSITY IMPROVEMENTS W4833402 SAZAN/DJ 05.12.17 05/11/2017 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN S. FRANKLIN CHECKED A. NAPIER DATE 12.12.97 6.1.98 SUBTITLE HVAC PIPING PLAN CURRENT REVISION W4833402 SYMBOL A DATE cop p TU KW LA APPROVED BY DEPT. DATE ENGINEER E. YOOSEFIAN 12.12.97 CHECKED G. SPRAGUE 6.3.98 APPROVED L. COSTELLO 6.3.98 APPROVED R. McNIESH 6.3.98 TITLE MECHANICAL MASTER 2-81 & DENSITY IMPROVEMENTS BUILDING 02-081 COL. F—L/3-8 PLANT 2, WA. SHEET 2M63 MAY 1 0 2017 PERMIT CENTER JOB NO. 972197-00 COMP NO. DWG No. 2-81-2M63