Loading...
HomeMy WebLinkAboutPermit M17-0083 - BOEING #9-50 - BOILER #1BOEING #9-50 9725 E MARGINAL WAY S BLDG 9-050 MI 7-0083 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0003400018 Permit Number: M17-0083 9725 E MARGINAL WAY S BLDG 9-050 Issue Date: Permit Expires On: BOEING #9-50 7/12/2017 1/8/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 LAURI THODAY PO BOX 249 , AUBURN, WA, 98071 AUBURN MECHANICAL INC PO BOX 249 , AUBURN, WA, 98071 AUBURMI163BA Phone: (253) 255-4996 Phone: (253) 838-9780 Expiration Date: 9/12/2018 DESCRIPTION OF WORK: LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO REPLACE BOILER#1 PER MECHANICAL DRAWINGS DATED 11-30-2016 Valuation of Work: $1,172,177.00 Type of Work: REPLACEMENT Fuel type: GAS Fees Collected: $12,013.72 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Permit Center Authorized Signature: . _.)41 Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit an. ,agI i to the conditions attached to this permit. Signature: Agliu_a// Print Name: Date: ! -IL l This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKW)_ Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 bttp://www.TukwilaWA.gov Mechanical Permit No. M 1-7-- 00 03 Project No. Date Application Accepted: (8-17 Date Application Expires: 1)--0`(7 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: 9725 East Marginal Way S Bldg 9-50 King Co Assessor's Tax No.: 0003400018 Suite Number: Floor: Tenant Name: Boeing Developmental Center PROPERTY OWNER Name: Lauri Thoday Name: The Boeing Company City: Auburn State: WA Zip: 98071 Address: 9905 East Marginal Way S Email: laurithoday@auburnmechanical.com City: Seattle State: WA Zip: 98108 CONTACT PERSON — person receiving all project communication Name: Lauri Thoday Address: 2623 West Valley Hwy N City: Auburn State: WA Zip: 98071 Phone: (253) 255-4996 Fax: (253) 833-1384 Email: laurithoday@auburnmechanical.com New Tenant: ❑ Yes ..No MECHANICAL CONTRACTOR INFORMATION Company Name: Auburn Mechanical Address: 2623 West Valley Hwy N City: Auburn State: WA Zip: 98071 Phone: (253) 838-9780 Fax: (253) 833-1384 Contr Reg No.: AUBURMI163BA Exp Date: 09/12/2018 Tukwila Business License No.: 0994349 Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Labor, materials, supervision and equipment to replace Boiler #1 per mechanical drawings dated 11-30-2016. 1,172,177 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric ❑ Gas ® Other: Fuel Oil H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-416.docx Revised: January 2016 Ith Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent 1 Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfin 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system 1 Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator 1 Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu Residential, Nighttime 3-15 hp/500,000 btu Industrial 15-30 hp/1,000,000 btu 55 dB(A) 30-50 hp/1,750,000 btu 57 dB(A) 50+ hp/1,750,000 btu 1 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-1 OPM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam -I Opm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN fs!' NER OR AUTHORIZED AGENT: Signatu Print Name: Lauri Thoday Mailing Address: 2623 West Valley Hwy N \Applications\Forms-Applications On Linc\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Date: 06/07/2017 Day Telephone: (253) 255-4996 Auburn City WA 98071 State Zip Page 2 of 2 Cash Register Receipt City of Tukwila s DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $9,703.39 M17-0083 Address: 9725 E MARGINAL WAY S BLDG 9-050 Apn: 0003400018 $9,703.39 MECHANICAL $9,241.32 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $9,208.17 TECHNOLOGY FEE $462.07 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11896 R000.322.900.04.00 0.00 $462.07 $9,703.39 Date Paid: Wednesday, July 12, 2017 Paid By: AUBURN MECHANICAL INC Pay Method: CHECK 0012215 Printed: Wednesday, July 12, 2017 8:35 AM 1 of 1 SYSTEMS Receipt Number DESCRIPTIONS ACCOUNT I QUANTITY PAID PermitTRAK $2,310.33 M17-0083 Address: 9725 E MARGINAL WAY S BLDG 9-050 Apn: 0003400018 $2,310.33 MECHANICAL $2,310.33 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R11665 R000.322.102.00.00 0.00 $2,310.33 2.310.33 Date Paid: Thursday, June 08, 2017 Paid By: AUBURN MECHANICAL Pay Method: CHECK 0012202 Printed: Thursday, June 08, 2017 11:34 AM 1 of 1 CM/SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-367W Permit Inspection Request Line (206) 438-9350 H17-00ed Pro' ct: \ —1140 Oe-1n&#9A5® Type of Inspection: 1%/‘,1cat- Ft 14,AL (17 Date Called: OAC- f OGS -/N k'''',11/44/N1,) p41 up Wit PA/1 S Special Instructions: \ e,% Instructiolo tt- n,�i �S ` '� Date Wanted: �..13- aa.m_ Phone No: ! � � ElApproved per applicable codes. Corrections required prior to approval. `` COMMENTS: O(Q" 730— 991 1 gv8ibr ieli . oft_ OAC- f OGS -/N k'''',11/44/N1,) p41 up Wit PA/1 S APER 5 its Zc c450 Ruc I to Pry& firAckba Inspector: dire- ir Date: 1 7� /� L2 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. FOR REFERENCE ONLY FACILITY DESIGN BY cei DATE 1 1.30.16 REVIEWED FOR CODAPPCOMPLIANCE ROVED JUL 0 '7 2011 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 0 8 2011 PERMIT CENTER M1'0007 GENERAL SYMBOL DESCRIPTION RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN NUM 1 24/74 1 24/12- �I DUCT SHOWN IN SECTION, ARROW POINTS TO SIDE CALLED OUT FIRST EXTRACTION GRID 6 240 9 ROUND DUCT, NUMBER INDICATES DIAMETER 1_22tref OVAL DUCT, MAJOR DIAMETER, FIRSTINDICATES NUMBER SECONDNUMBER INDICATES MINOR DIAMETER 24/12 1{ 24/12m 1 j 11- —y too CFM URECTANGULARSUPPLYAIR DUCT, ELBOWSQFACAREINGOR TOWARDS RIM .f-7'-'"-1,- 100 CFM ` SUPPLY AIR DUCT, SQUARE OR RECTANGULAR ELBOW FACING AWAY SUPPLY OUTLET, CEILING TYPE, DIFFUSER OR GRILLE, SQUARE OR RECTANGULAR AND CFM AIR FLOW (4 TYP) II TEMPERATURE DU -SENSOR, HUMIDITYSENNSOR, DUCT PUNTED SUPPLY OUTLET, CEILING TYPE, ROUND AND CFM AIR FLOW (SEE NOTE 4) EXHAUST, RETURN OR SUPPLY AIR DUCT ROUND, ELBOW FACING TOWARDS mr_'i "1 lunbing as Piping LINEAR DIFFUSER AND CFM AR FLOW (SEE NOTE 4) EXHAUST, RETURN OR SUPPLY AIR DUCT ROUND, ELBOW FACING AWAY MID RETURN/EXHAUST REGISTER OR GRILLE, CEILING DUCT TYPE AND CFM AIR FLOW ;.�EXHAUST AIR OR RETURN AR DUCT, SQUARE OR RECTANGULAR, ELBOW FACING TOWARDS /-..--"V RETURN/RELIEF GRILLE, CEILING TYPE, NON -DUCTED EXHAUST AIR OR RETURN AIR DUCT, SQUARE OR RECTANGULAR, ELBOW FACING AWAY I . \O1 1/4 1-111 TRANSITION RECTANGULAR TO RECTANGULAR LINED DUCT AT TAKE OFF L gp \l ---TRANSITION 6-0 TRANSITIONSQUARE OR RECTANGULAR TO ROUND OR OVAL UP DUCT OFFSET UP OR DOWN LINED DUCT WITH AXIAL FLOW FAN �- DOWN -rill OPPOSED BLADE DAMPER BLADE DAMPER InnPARALLEL EXHAUST FAN VOLUME DAMPER . -1'y I1 \ I1 DUCT DAMPER, MOTOR OPERATED (ELECTRIC OR PNEUMATIC) i 4 L SI 3roval of sion BACK DRAFT DAMPER (ALLOWS FLOW IN DIRECTION OF ARROW) N plan submittal 1 review fess BDD AD ORAD ACCESS DOOR (AD) OR ACCESS PANEL (AP) I I LIL SFD SMOKE FIRE DAMPER (1 HOUR) 1 + 1 I SFD 1 5E02 SMOKE FIRE DAMPER (2 HOUR) y i l 1 ;SFD2 1 No REVISIONS chances shall he nc�lcig of 1 pork writhoLA p; for as LA •-Ma Ettildinci D ‘ NOT:: and f z3 ':ons tviil require a r may inc:ode additional pI- REVISION By GENERAL SYMBOL DESCRIPTION NI W TH T RN NG DVANES SQUARE ELBOW ' IL 1 N RECTANGULAR DUCT, RADIUS VANED ELBOW QH EXTRACTION GRID HUMIDISTAT, WALL 144----14-1 FLEXIBLE DUCT Oil FLEXIBLE DUCT CONNECTION SIDEWALL SUPPLY AIR DIFFUSER, GRILLE OR REGISTER AND CFM AIR FLOW 11- —y too CFM ILI tA,- 100 CFM SIDEWALL RETURN/EXHAUST AIR GRILLE OR REGISTER AND AIR FLOW .f-7'-'"-1,- 100 CFM SCREENED OPENING AND CFM AIR FLOW PRESSURE REGULATOR SUPPLY OUTLET, CEILING TYPE, DIFFUSER OR GRILLE, SQUARE OR RECTANGULAR AND CFM AIR FLOW (4 TYP) II TEMPERATURE DU -SENSOR, HUMIDITYSENNSOR, DUCT PUNTED SUPPLY OUTLET, CEILING TYPE, ROUND AND CFM AIR FLOW (SEE NOTE 4) I I .si I �i lunbing as Piping LINEAR DIFFUSER AND CFM AR FLOW (SEE NOTE 4) t THERMOSTAT, WALL RETURN/EXHAUST REGISTER OR GRILLE, CEILING DUCT TYPE AND CFM AIR FLOW r-,/RETURN/EXHAUST Ir -J NIGHT THERMOSTAT /-..--"V RETURN/RELIEF GRILLE, CEILING TYPE, NON -DUCTED �/ ` UNIT HEATER, HORIZONTAL \O1 1/4 UNIT HEATER, VERTICAL PROJECTION I 1 IC LINED DUCT ISA SYMBOL L gp \l EnSOUND ATTENUATOR LINED DUCT WITH ACCESS DOOR AND SMOKE DAMPER o AD SD LINED DUCT WITH AXIAL FLOW FAN �- Ci]0-1 CENTRIFUGAL FAN CENTRIFUGAL FAN, INLET GUIDE VANES n 111-8 ��u UUU EXHAUST FAN SUPPLY AIR FLOW DIRECTION . -1'y RETURN, OUTSIDE OR EXHAUST AIR FLOW DIRECTION ___..] o the scone 3roval of sion N plan submittal 1 review fess i APPROVED DATE SVM REVISION VAV BOX LEGEND GENERAL SYMBOL DESCRIPTION ® CM THERMOSTAT, REMOTE, CEILING QH HUMIDISTAT, WALL 0 HUMIDISTAT CEILING SID DUCT TYPE SMOKE DETECTOR 4 D DUCT TYPE HEAT DETECTOR SRSTATIC Mechanical PRESSURE REGULATOR II TEMPERATURE DU -SENSOR, HUMIDITYSENNSOR, DUCT PUNTED IE III lunbing as Piping Q (. '" THERMOSTAT, WALL °N iG=_ NIGHT THERMOSTAT ❑T THERMOSTAT, CEILING E TEMPERATURE TRANSMITTER I 1 IC 1 I ISA SYMBOL L gp \l VAV BOX LEGEND W=VARIABLE AIR VOLUME TERMINAL UNIT MARK NUMBER CM SE.'FRA`ai P`'QUIRED E PERMIT FOR: Mechanical II lectrical IE III lunbing as Piping (. '" ' . of Tukwila iG=_ Z. G DIVISION APPROVED DA DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 SUGGESTED ABBREVIATIONS ABBREVIATION DESCRIPTION A AAV AD ADD AF AFF AP APPROX ARCH AUD AVG BI BDD BEP BFP BHD BHP BLDG BOD BOP BOS BPV BPVC BTU BTUH BW C Cv 'C CAP CC CCW CFM CI COND CONN CONT CPLG CPVC CW DA DB DBD DIA 0 DIS DIR DN DS DWG dB EA EAT EFF ELL ELEC ELEV, EL ESP EVAP EWT EXH EXIST EXT FC FD FLR FCO FGR FOB FOF FOIC FOT FPM FRP FS FT FV GAL GPM GALV GA HC HD HORIZ HP HPC HR HVAC HPU HTG ID IE IGV INSUL IN ANCHOR AUTOMATIC AIR VENT ACCESS DOOR ANGULAR DOWN DISCHARGE AIR FOIL WHEEL ABOVE FINISHED FLOOR ACCESS PANEL APPROXIMATELY ARCHITECTURAL ANGULAR UP DISCHARGE AVERAGE BACKWARD INCLINED WHEEL BACK DRAFT DAMPER BOILER EXTERNAL PIPING BACKFLOW PREVENTER BOTTOM HORIZONTAL DISCHARGE BRAKE HORSE POWER BUILDING BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM OF STEEL BOILER AND PRESSURE VESSEL BOILER AND PRESSURE VESSEL CODE BRITISH THERMAL UNIT BRITISH THERMAL UNIT PER HOUR BUTTWELD COMMON FLOW COEFFICIENT TEMPERATURE - DEGREES CELSIUS CAPACITY COOLING COIL COUNTER CLOCKWISE ROTATION CUBIC FEET PER MINUTE CAST IRON CENTER LINE CONDENSATE CONNECTION CONTINUED/CONTINUATION COUPLING CHLORINATED POLYVINYL CHLORIDE CLOCKWISE ROTATION DIRECT ACTING DRY BULB TEMPERATURE DOWN BLAST DISCHARGE DIAMETER DEIONIZED WATER SUPPLY DEIONIZED WATER RETURN DOWN DOWNSPOUT DRAWING DECIBELS EXHAUST AIR / EACH ENTER AIR TEMPERATURE CO EFFICIENCY ELBOW ELECTRICAL ELEVATION EXTERNAL STATIC PRESSURE EVAPORATOR ENTERING WATER TEMPERATURE EXHAUST EXISTING EXTERIOR / EXTERNAL TEMPERATURE - DEGREES FAHRENHEIT FORWARD CURVE WHEEL FIRE DAMPER FLOOR FLOOR CLEAN OUT FLUE GAS RETURN FLAT ON BOTTOM FACE OF FLANGE FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FLAT ON TOP FEET PER MINUTE GLASS FIBER REINFORCED PLASTIC FLOW SWITCH FEET FACE VELOCITY FPM GALLONS GALLONS PER MINUTE GALVANIZED GAGE, GAUGE HEATING COIL HEAD - FEET OF WATER HORIZONTAL HORSEPOWER HIGH PRESSURE CONDENSATE HOUR HEATING, VENTILATING AND AIR CONDITIONING HEAT PUMP UNIT HEATING INSIDE DIAMETER INVERT ELEVATION INLET GUIDE VANE INSULATION INCHES BOE/A/6® ACCEPTABILITY THIS DESIGN AND/0R .CIFIDATION IS APPROVED APPROVED BY DEPT. DATE SUGGESTED ABBREVIATIONS ABBREVIATION DESCRIPTION KW KVA LAT LBS, # LWT MA MAX MBH MCC MECH MIN MOV MTD, MTG NC NIC NO NTS NPSH OA OBD OF OS&Y OD OVHD PBD PD/AP PDI POC POS PRESS PRV PS PSIG PSV PVC RA RECT REF REV RH RM ROT RPM RQD RTN RV SA SCFH SCFM SFD SHC SHF SHT SL SO SOV SP SO SS STL STRUC SW SUCT TDH TEMP TH THC THD THRD TOD TOS TOP TP TS TSP TV TYP UBD VAV VB VD VP VERT VTA VTR WB WCO WG WHA W/ KILOWATT KILOVOLT -AMPERE LEAVING AIR TEMPERATURE CO POUNDS LEAVING WATER TEMPERATURE ('F) MIXED AIR MAXIMUM }�� re Tri •.t, HEAT CAPACITY BTU PER HOU13- eolor'O. +.r r r MOTOR CONTROL CENTER MECHANICAL MINIMUM MOTOR OPERATED VALVE MOUNTED, MOUNTING Pemi NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN / NUMBER NOT TO SCALE NET POSITIVE SUCTION HEAD OUTSIDE AIR OPPOSED BLADE DAMPER OVERFLOW OUTSIDE SCREW AND YOKE OUTSIDE DIAMETER OVERHEAD Approval of c( the violation a; of approved Fi By: Date: PARALLEL BLADE DAMPER PRESSURE DROP OR DIFFERENTIAL PRESSURE PLBG. & DRAINAGE INSTITUTE POINT OF CONNECTION POSITION PRESSURE PRSSURE REGULATING VALVE PRESSURE SWITCH PRESSURE - POUNDS PER SQUARE INCH, GAUGE PRESSURE RELIEF (SAFETY) VALVE POLYVINYL CHLORIDE REVERSE ACTING (CONTROLLER) / RETURN AIR RECTANGULAR REFERENCE REVISED RELATIVE HUMIDITY ROOM ROTATION REVOLUTIONS PER MINUTE REQUIRED RETURN ROOF VENT SUPPLY AIR STANDARD CUBIC FEET/HR STANDARD CUBIC FEET/MIN COMBINATION SMOKE & FIRE DAMPER SENSIBLE HEAT CAPACITY SENSIBLE HEAT FACTOR SHEET SOUND LINE SCREENED OPENING SOLENOID OPERATED VALVE STATIC PRESSURE SQUARE STAINLESS STEEL STEEL STRUCTURAL SOCKET WELD SUCTION TOTAL DYNAMIC HEAD (FEET OF WATER) TEMPERATURE TOTAL HEAD (FEET OF WATER) TOTAL HEAT CAPICITY TOP HORIZONTAL DISCHARGE THREADED TOP OF DUCT TOP OF STEEL TOP OF PIPE TOTAL PRESSURE TEMPERATURE SWITCH TOTAL STATIC PRESSURE TURNING VANE TYPICAL UP BLAST DISCHARGE VARIABLE AIR VOLUME VACUUM BREAKER VOLUME DAMPER VELOCITY PRESSURE VERTICAL VENT TO ATMOSPHERE VENT THROUGH ROOF MI WET BULB TEMPERATURE WALL CLEAN OUT WATER GAUGE (INCHES OF WATER) WATER HAMMER ARRESTOR WITH DRAWN RECITE N M.SOTURA LNI,INELN APPROVED APPROVED 11.30.16 11.30.16 SUBTITLE FILE COPY it Mo. �((1- 00 3 prcval is subject to errors and omissions, ns ruciion documents does not authorize any adopted code or ordinance. Receipt id Cop _ (; - • nditions is acknowledged: 7-/L.-/7 City of Tukwila BUILDING DIVISION MECHANICAL LEGENDS REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2017 A--s- City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 082017 PERMIT CENTER 0083 OFFMAN NGINEERS 1601 FM Avenue. Stile 9001 Searle, WA 98101 pN206.6a&O7171166 20E1324.3TY6 cenmanean USING =.spm sq www ISSUE FOR CONSTRUCTION 11.30.16 TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT urruAMIrAl IJACTCO BUILDING 9-50 nN rrnITro CURRENT REVISION W4154398 SYMBOL DATE 11.30.16 SHEET MIA JOB N0. COMP N0. C N0. 0_Sn_u1A GENERAL SYMBOL DESCRIPTION —( (— BREAK IN PIPE I CROSSING LINES, NO CONNECTION I ELECTRIC WATER COOLER DIRECTION OF FLOW LAVATORY, ROUND COUNTER MOUNT SLOPE __ DIRECTION OF SLOPE, DOWN u EQUIPMENT MARK NUMBER 7 -EXIST EXISTING WORK O EXISTING TO BE REMOVED iiiiiii ----- HIDDEN OR BELOW GRADE —0— IN-LINE RECIRCULATING PUMP —6 9— INSULATED PIPE -6 i- INSULATED PIPE WITH ELECTRIC HEAT TRACING 7 -NEW NEW WORK .-POC POINT OF CONNECTION —G- PUMP COOLING TOWER WATER RETURN —CTWS— FIXTURES SYMBOL DESCRIPTION 0 CIRCULAR WASHFOUNTAIN —AR— SEMI -CIRCULAR WASHFOUNTAIN —11 CO ELECTRIC WATER COOLER Q LAVATORY, ROUND COUNTER MOUNT ® LAVATORY, RECTANGULAR COUNTER OR WALL MOUNT ORD (OFD) ROOF DRAIN (OVERFLOW DRAIN - ROOF) e SAFETY EYE WASH FOUNTAIN O SAFETY SHOWER AND EYE WASH D SERVICE SINK, FLOOR MOUNT • SERVICE SINK, WALL HUNG IIIIM SHOWER STALL AND FIXTURE D URINAL, WALL HUNG WASTE RECEPTOR, ROOF WATER CLOSET, WALL HUNG J WATER CLOSET, FLOOR MOUNT — CTFS— COOLING TOWER FILTER SUPPLY —CTWR— COOLING TOWER WATER RETURN —CTWS— COOLING TOWER WATER SUPPLY WASTE FITTINGS SYMBOL DESCRIPTION + 1/4 BEND —AR— CLEAN OUT, EXPOSED —11 CO FCC CLEAN OUT, FLOOR O —CD— CLEAN OUT, WALL —1 WOO 0 FFD FUNNEL FLOOR DRAIN 0 FUD FUNNEL DRAIN o FD FLOOR DRAIN O FS FLOOR SINK LATERAL \ 1111(57111 TRENCH DRAIN © wR WASTE RECEPTOR, ROOF --IICO WYE AND 1/8 BEND, SHOWN WITH CLEAN OUT COOLING TOWER FILTER RETURN — CTFS— COOLING TOWER FILTER SUPPLY —CTWR— REVISION BY APPROVED DATE PIPE IDENTIFICATION SYMBOL DESCRIPTION —A— COMPRESSED AIR, PLANT —AR— ARGON GAS —AW— ACID WASTE — C— CONDENSATE RETURN (GRAVITY) —CD— CHEMICAL DRAIN —CF— CHEMICAL FEED —CHWR— CHILLED WATER RETURN —CHWS— CHILLED WATER SUPPLY —CLD— CLEAR WATER DRAIN —CLWR— COOLING WATER RETURN —CLWS— COOLING WATER SUPPLY — CRV— CORROSION RESISTANT VENT —CRW— CORROSION RESISTANT WASTE — CTFR— COOLING TOWER FILTER RETURN — CTFS— COOLING TOWER FILTER SUPPLY —CTWR— COOLING TOWER WATER RETURN —CTWS— COOLING TOWER WATER SUPPLY —CW— DOMESTIC COLD WATER — DI — DEIONIZED WATER —DW— DISTILLED WATER —F— FIRE LINE, AHEAD OF ALARM VALVE —Fhl— FIRE HOSE CABINET PIPING —FOR— FUEL OIL RETURN — FOS— FUEL OIL SUPPLY — FOV— FUEL OIL VENT —G— NATURAL GAS — GN2— GASEOUS NITROGEN — HGD — REFRIGERANT HOT GAS DISCHARGE — HPC — CONDENSATE, STEAM (HIGH PRESSURE) — HPR— CONDENSATE RETURN (HIGH PRESSURE) — HPS— STEAM SUPPLY (HIGH PRESS, 125-250 PSIG) —HPW — HOT PROCESS WATER —HPWC— HOT PROCESS WATER CIRCULATING — HW— DOMESTIC HOT WATER SUPPLY — HWC— DOMESTIC HOT WATER CIRCULATING —HWR— HEATING WATER RETURN —HWS— HEATING WATER SUPPLY —IA— INSTRUMENT AIR — ID — INDIRECT DRAIN — IW — INDUSTRIAL WASTE — IWP— INDUSTRIAL WASTE PUMPED —LN2— LIQUID NITROGEN — LPC — CONDENSATE, STEAM (LOW PRESSURE) —LPG — LIQUID PETROLEUM GAS — LPS — STEAM SUPPLY (LOW PRESS, 0-15 PSIG) — MPC — CONDENSATE, STEAM (MEDIUM PRESSURE) — MPS — STEAM SUPPLY (MEDIUM PRESS, 15-125 PSIG) —OFD— OVERFLOW DRAIN — PA — PAINT BOOTH SERVICE AIR —PCWS— PROCESS COOLING WATER SUPPLY —PCWR— PROCESS COOLING WATER RETURN —PC— CONDENSATE RETURN (PUMPED) SY RBISI PIPE IDENTIFICATION SYMBOL DESCRIPTION —PW— PROCESS WATER —RD— ROOF DRAIN — RDS— REFRIGERANT DISCHARGE — RHG— REFRIGERANT HOT GAS —RL— REFRIGERANT LIQUID — RS— REFRIGERANT SUCTION (GAS) — RWL— RAIN WATER LEADER —S— SPRINKLER LINE — SAN— SANITARY WASTE ABOVE GRADE OR FLOOR -- SAN-- SANITARY WASTE BELOW GRADE OR FLOOR — SPD— SUMP PUMP DISCHARGE — STM— STEAM SUPPLY --- STS--- STORM DRAIN BELOW GRADE — TP — TRAP PRIMER --- V--- VENT — VAC— VACUUM — VPD— VACUUM PUMP DISCHARGE PIPE FITTINGS SYMBOL DESCRIPTION DCI BELL & SPIGOT > > SOLVENT CEMENT BLIND FLANGE �I --1 1— BUSHING —1(1— ---11P--- EXPANSION JOINT -IF --I- FLANGED FITTING -EOM- FLEXIBLE PIPE CONNECTION -9-9- GROOVED COUPLING He HOSE BIBB NFHB HOSE BIBB - NON FREEZE BALANCE VALVE W/0 METERING PORTS PIPE ANCHOR X BALL VALVE, OPEN / CLOSED PIPE CAP SCREWED OR SOLDER JOINT BUTTERFLY VALVE PIPE CAP, WELDED OR GROOVED D FLOAT VALVE PIPE CROSS I$1 PIPE ELBOW, 90' SHORT RADIUS +sB -- PIPE ELBOW, 90' LONG RADIUS -44 PIPE ELBOW, REDUCING —F-\ PIPE ELBOW, 45' MONITOR SWITCH PIPE ELBOW, TURNED UP OR TOWARD —+0 41G4 -/H PIPE ELBOW, TURNED DOWN OR AWAY —0 HEATING COIL PIPE GUIDE = 7MAV PIPE HANGER f x 1 " PIPING MATERIAL CHANGE, X TO Y NEEDLE VALVE PIPE PLUG —14 NITROGEN DROP PIPE REDUCER CONCENTRIC p THRUST BLOCK PIPE REDUCER ECCENTRIC —o— EHSIE PIPE SUPPORT 1}I PIPE TEE, STRAIGHT --HOS ,T. PIPE TEE, UP OR TOWARD 101 PRESSURE REGULATING VALVE W/EXT PRESS TAP REDUCING PIPE FLANGE —IP 81 PIPE TEE, DOWN OR AWAY 01 QUICK OPENING VALVE SCREWED FITTING OR AS SPECIFIED F f SEISMIC HANGER APPROVED DATE DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 PIPE FITTINGS SYMBOL DESCRIPTION DCI 2 WAY CONTROL VALVE W/PNEUMATIC ACTUATOR t SOLVENT CEMENT 11 SPRING HANGER --1 1— UNION, FLANGED —1(1— UNION, SCREWED ANGLE GLOBE VALVE, ELEVATION / PLAN WELDED FITTING • $ 0 SOLDERED FITTING -9-9- PIPING SPECIALTIES SYMBOL DESCRIPTION DCI 2 WAY CONTROL VALVE W/PNEUMATIC ACTUATOR A 3 WAY CONTROL VALVE W/PNEUMATIC ACTUATOR * ,L /A AIR DROP - HOSE, SIMPLEX / DUPLEX e /e AIR OUTLET - HARD PIPE, SIMPLEX / DUPLEX T MD ANGLE GLOBE VALVE, ELEVATION / PLAN 400 AUTOMATIC FLOW CONTROL VALVE (NUMBER INDICATES GPM) 0 MA" AUTOMATIC AIR VENT (WITH DRAIN) -(BFP)— BACKFLOW PREVENTER Ifil BALANCE VALVE WITH METERING PORTS O BALANCE VALVE W/0 METERING PORTS DI4 10F1-1.1- BALL VALVE, OPEN / CLOSED -jfl— BUTTERFLY VALVE COOLING COIL CHILLED WATER FIRE HYDRANT - 2 HOSE OUTLET FLOAT VALVE DGj © FLOWMETER, VENTURI TYPE CCI —1 1 1 FLOWMETER ORIFICE -0o-/ GATE VALVE, OPEN / CLOSE A GATE VALVE, OUTSIDE SCREW AND YOKE MONITOR SWITCH GATE VALVE, WITH HOSE CONNECTION —Dm 41G4 -/H GLOBE VALVE, OPEN / CLOSED —F=i— HEATING COIL -TSI- / 4 LIFT CHECK VALVE 7MAV MANUAL AIR VENT (WITH DRAIN) j MOTOR OPERATED VALVE .'; NEEDLE VALVE D-0 A NITROGEN DROP Q NITROGEN OUTLET THRUST BLOCK PETCOCK * EHSIE PETE'S PLUG, WITH BALL VALVE PLUG VALVE/STOP COCK --HOS ,T. PRESSURE GAUGE WITH VALVE Al-, PRESSURE REGULATING VALVE W/EXT PRESS TAP ;' PRESSURE REGULATING VALVE (SELF CONTAINED) 81 PRESSURE RELIEF VALVE / SAFETY VALVE (>1 QUICK OPENING VALVE 1:4 QUICK CLOSING VALVE, FUSIBLE LINK A SOLENOID OPERATED VALVE —1: STEAM TRAP =Fr— SWING CHECK VALVE WITH FLOW FLOW METER Ill PIPE HANGER /— gLAOE/A/6® PIPING SPECIALTIES SYMBOL��yy DESCRIPTION 'I TEST PLUG A THERMOMETER, LINE MOUNT I0 ALV THERMOMETER, SEPARABLE WELL MOUNT 0 TRAP, FLOAT El TRAP SEAL PRIMER VALVE PLUG OR SLOT WELD UNCLASSIFIED VALVE SQUARE WELD VACUUM BREAKER Qv VACUUM DROP (LAB VAC) O VACUUM OUTLET (LAB VAC) HARD PIPED El VACUUM CLEANING OUTLET O VALVE BOX FIRE DEPARTMENT CONNECTION, WALL TYPE VALVE IN RISER (TYPE SPECIFIED) -I�� T WATER HAMMER ARRESTOR LI WYE STRAINER (WITH DRAIN VALVE) FIRE PROTECTION SYMBOL DESCRIPTION 1 2 WAY EARTHQUAKE BRACING X 4 WAY EARTHQUAKE BRACING I0 ALV ALARM VALVE, WET ® ASR AUTOMATIC SPRINKLER RISER ICA DRY PIPE VALVE PLUG OR SLOT WELD ELECTRIC BELL SQUARE WELD O EXISTING SPRINKLER HEADS (TO REMAIN) -,----•- EXISTING SPRINKLER HEADS (REMOVE) X X El FIRE HOSE CABINET FDC Y FIRE DEPARTMENT CONNECTION, WALL TYPE ..-&Fix V FIRE DEPARTMENT CONNECTION, YARD TYPE FIRE DEPARTMENT CONNECTION, FLUSH LI 4H FH FIRE HYDRANT - 2 HOSE OUTLET y-1 'T I FIRE HYDRANT - 2 HOSE OUTLET AND PUMPER CONNECTION © FLOW SWITCH O HALON SYSTEM AUTOMATIC DISCHARGE STATION A HALON SYSTEM, MANUAL DISCHARGE STATION _054 GROOVED COUPLING, GROOVED CAP MONITOR SWITCH PN POST INDICATOR VALVE, YARD • SPRINKLER HEAD, DRY PENDENT a SPRINKLER HEAD, OVER AND UNDER SPRINKLER HEAD, PENDENT, IN LINE, NEW f j SPRINKLER HEAD, PENDENT, OFFSET, NEW • SPRINKLER HEAD, SIDEWALL, PENDENT, NEW V SPRINKLER HEAD, SIDEWALL, UPRIGHT, NEW 0 SPRINKLER HEAD, UPRIGHT, NEW THRUST BLOCK 64N WALL INDICATOR VALVE, PLAN / ELEVATION T WMG WATER MOTOR GONG TAMPER SWITCH AI 10011] ACCEPTABILITY -COFFMAN 11.30.16 TATE suertnE THIS DESIGN ANO/OR "MITRED SPECIFICATION IS APPROVED M.SOTURA 11.30.16 LNGINELN TITLE APPROVED BY DEPT DATE 'CHECKED APPROVED APPROVED WELDING SYMBOL DESCRIPTION ROOT OPENING DEPTH OF FILLINGFILLINGFINISHNISH FOR PLUG AND SLOT WELDS EFFECTIVE THROAT SIZE STRENGTH FOR CERTAIN WELDS ` T�S BASIC DETAIL TAIL REFERENCE SPECIFICATIONS, OR CONTOUR SYMBOL SYMBOL\ \ F A R ` IR (E){g gg}L-P GROOVE ANGLE, INCLUDED ANGLE OF COUNTERSINK FOR PLUGWELD LENGTH OF WEN / PITCH (CENTER TO CENTE / OF WELDSPACING) FIELD WEN SYMBOL ARROW CONNECTING 7. ARROW TO ARROW SIDE OR ARROW SIDE MEMBER OF JOINT WEN ALL AROUND SYMBOL REFERENCE UNE NUMBER OF SPOT OR PROJECTION WELDS l i 1 % } (N) ELEMENTS IN THIS AREA REMAIN AS SHOWN WHEN 101 AND ARROW ARE R6ERSED WEN SYMBOL OR REFERENCE (MAY BE OMMITTED WHEN IS NOT USED PROCESS OTHER REFERENCE p BACK WELD L. FILLET WELD O PLUG OR SLOT WELD II SQUARE WELD O SPOT OR PRO rTION WFI0 REVIEWED FOR CODE COMPLIANC! APPROVED GENERAL NOTES: PIPING LEGENDS 1. SOME ABBREVIATIONS LEGEND MAY NOT BE FOUND ON ANY DRAWINGS. THEY ARE INCLUDED HERE AS PART OF A STANDARD LEGEND AND MAY BE UTILIZED IN THE FUTURE. 'JUL 07 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 082017 PERMIT CENTER AFOFFMAN NGINEER 1601 RM Avenue, SOW B00I Seale, WA 98101 PA 301G310111I 1030561&3605 c.11mancmn LASING w.lM ry w.m. ISSUE FOR CONSTRUCTION 11.30.16 DEVELOPMENTAL CENTER BOILER REPLACEMENT IICrIJAAIN`AI LVACTCP BUILDING 9-50 n0‘/ rrlITCD wA CURRENT REVISION W4154398 SYMBOL DATE 11.30.16 SHEET MIB JOB NO. COMP NO. DWG NO. 0—KCI-1,111C1 INSTRUMENT IDENTIFICATION SYMBOL DESCRIPTION O LOCAL FIELD MOUNTED INSTRUMENT INCLUDING TRANSMITTER FOR SINGLE MEASURED VARIABLE \ EXISTING INSTRUMENT 00 LOCAL FIELD MOUNTED INSTRUMENT FOR TWO MEASURED VARIABLES OR MORE THAN ONE FUNCTION e PANEL MOUNTED INSTRUMENT FOR SINGLE MEASURED VARIABLE e PANEL MOUNTED INSTRUMENT LOCATED ON FACE OF LOCAL CONTROL PANEL 00 PANEL MOUNTED INSTRUMENT FOR TWO MEASURED VARIABLES OR MORE THAN ONE FUNCTION ENERGY MANAGEMENT CONTROL SYSTEM FUNCTION (EMCS) i ' __1 \Oi • INDICATING LIGHT I DIRECT CONNECTION PRESSURE SYMBOL DESCRIPTION DIAPHRAGM SEAL CONNECTION TEMPERATURE SYMBOL DESCRIPTION 4-1)1— TEMPERATURE ELEMENT W/ THERMO-WELL 0 FLOWS SYMBOL DESCRIPTION 4-1)1— ORIFICE PLATE OR RESTRICTION DEVICE 0 IN LINE FLOW ELEMENT DASHED LINE INDICATES BEHIND PANEL MOUNTINGS CONTROL METHODS SYMBOL DESCRIPTION Al ANALOG INPUT, SIGNAL TO EMCS AO ANALOG OUTPUT, SIGNAL FROM EMCS eS CONTROL AIR SOURCE DI DIGITAL INPUT, SIGNAL TO EMCS DO DIGITAL OUTPUT, SIGNAL FROM EMCS E ELECTRIC ACTUATED E/P ELECTRIC TO PNEUMATIC I/P ELECTRONIC TO PNEUMATIC OI INTERLOCK M MOTOR ACTUATED MCC MOTOR CONTROL CENTER P PNEUMATIC ACTUATED VSD VARIABLE SPEED DRIVE CMCS CENTRAL MANAGEMENT CONTROL SYSTEM CONTINUED ON SHEET NO. LINES SYMBOL DESCRIPTION SUCCEEDING LETTERS CAPILLARY TUBING, (FILLED SYSTEM) X )< READOUT OR PASSIVE FUNCTION CONNECTION TO PROCESS MECHANICAL LINK OR INSTRUMENT INPUT MODIFIER "-'\...../- ' ELECTRIC HEAT TRACE \_., ALARM ELECTRICAL SIGNAL EQUIPMENT PACKAGE WHERE NOTED BURNER, COMBUSTION MAIN PROCESS USER'S CHOICE USER'S CHOICE PNEUMATIC SIGNAL // ,f' SECONDARY PROCESS CONTROL POWER (VOLTAGE INDICATED) 0 o REFERENCE NO. ilIMI CONTINUED ON SHEET NO. INSTRUMENT SOCIETY OF AMERICA TABLE 560510N APPROVED DATE SYM ROASION APPROVED DA DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 ?)LIOE/A/G® GlEL s j' c15ra1�' ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED V.111i0OY COAD DA11130.16 suenTLE M.SOTURA 11.30.16 TNG'INLEH APPROVED BY DEPT DATE CONTROLS LEGENDS REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 08 2017 PERMIT CENTER �O_FFMAN 1501 NM Avenue, Sale 8001 Searle, WA98101 PA 206623071110A 0066262115 conmancom USING er.mw.M..e...a ISSUE FOR CONSTRUCTION 11.30.16 CURRE W4154398 YM80L DATE 11.30.16 LD APPROVED PROVED TRIS DEVELOPMENTAL CENTER BOILER REPLACEMENT 11CrIJANIIrAI LIACTEO BUILDING 9-50 nn/ rrMTEP MIA SHEET MIC JOB N0. COMP N0. DWG N0. 0_571_1111' IDENTIFICATION LETTERS FIRST LETTER SUCCEEDING LETTERS MEASURED OR INITIATING VARIABLE MODIFIER READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER A ANALYSIS ALARM B BURNER, COMBUSTION USER'S CHOICE USER'S CHOICE USER'S CHOICE C USER'S CHOICE CONTROL D USER'S CHOICE DIFFERENTIAL E VOLTAGE SENSOR (PRIMARY ELEMENT) F FLOW RATE RATIO (FRACTION) G USER'S CHOICE GLASS, VIEWING DEVICE H HAND HIGH 1 CURRENT (ELECTRICAL) INDICATE J POWER SCAN K TIME, TIME SCHEDULE TIME RATE OF CHANGE CONTROL STATION L LEVEL LIGHT LOW M USER'S CHOICE MOMENTARY MIDDLE, INTERMEDIATE N USER'S CHOICE USER'S CHOICE USER'S CHOICE USER'S CHOICE 0 USER'S CHOICE ORIFICE, RESTRICTION P PRESSURE, VACUUM POINT (TEST) CONNECTION Q QUANTITY INTEGRATE, TOTALIZE R RADIATION RECORD S SPEED, FREQUENCY SAFETY SWITCH T TEMPERATURE TRANSMIT U MUL11VARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION V VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER, LOUVER W WEIGHT, FORCE WELL X UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED Y EVENT, STATE OR PRESENCE Y AXIS RELAY, COMPUTE CONVERT Z POSIT ON, DIMENSION Z AXIS DRIVER LASSIFIED R' FINAL CONTROL ELEMENT 560510N APPROVED DATE SYM ROASION APPROVED DA DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 ?)LIOE/A/G® GlEL s j' c15ra1�' ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED V.111i0OY COAD DA11130.16 suenTLE M.SOTURA 11.30.16 TNG'INLEH APPROVED BY DEPT DATE CONTROLS LEGENDS REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 08 2017 PERMIT CENTER �O_FFMAN 1501 NM Avenue, Sale 8001 Searle, WA98101 PA 206623071110A 0066262115 conmancom USING er.mw.M..e...a ISSUE FOR CONSTRUCTION 11.30.16 CURRE W4154398 YM80L DATE 11.30.16 LD APPROVED PROVED TRIS DEVELOPMENTAL CENTER BOILER REPLACEMENT 11CrIJANIIrAI LIACTEO BUILDING 9-50 nn/ rrMTEP MIA SHEET MIC JOB N0. COMP N0. DWG N0. 0_571_1111' DUAL FUEL INDUSTRIAL STEAM BOILER SCHEDULE MARK NUMBER MFR / MODEL EFF PRESSURE CAPACITIES UNIT POWER REQUIREMENTS CONNECTIONS (IN.) REMARKS DESIGN (PSI) OPERATING (PSI) GAS INPUT OIL INPUT GROSS OUTPUT STEAM OUTPUT VOLTS PHASE FLA MCA MOCP STEAM FEED WATER SLOWDOWN CHECK STOP PSV GAS STACK 750 CLEAVER BROOKS D -STYLE 82% 300 125 37,500 MBH 270 GPH 13,390 MBH 30,000 LBS/HR 480 3 - - - 6" 2" 1-1/2" 6" (2) 2 X 3" - 3010 PROVIDE WITH FACTORY ECONOMIZER, FACTORY ACCESS LADDERS, FACTORY ACCESS PLATFORMS, FACTORY STACK SUPPORT, 9.0 PPM NOx, WITH FGR. VERIFY ALL SIZES AND ELECTRICAL LOADS WITH CERTIFIED BOILER DRAWINGS. FACTORY SUPPLEMENTAL HEATING COIL IN STEAM DRUM I B-09-50.1 I 480 412.0 602 2987 0.549 0.371 9-123 1500 1800 51.95 42.00 2 22.08 2200 80.00 89.52 2 21.26 TRANE CVHF0770 CH -5003 CENTRIFUGAL 750 480 412.0 602 2987 0.549 0.371 R-123 1500 1800 51.95 42.00 2 22.08 2200 80.00 89.52 2 21.26 TRANE CVHF0770 CH -5004 CENTRIFUGAL 750 480 555.0 911.0 CHILLER (CH) SCHEDULE MARK NUMBER TYPE CAPACITY TONS VOLTAGE NAMEPLATE KW NAMEPLATE RLA MTR LOCKED ROTOR AMPS PRIMARY kW/TON NPLV kW/TON REFRIG. TYPE REFRIG. LBS EVAPORATOR CONDENSER REMARKS FLOW GPM EWT 'F LWT 'F NO PASS MAX PD AT W FT H20 FLOW GPM EWT 'F LWT 'F NO PASS MAX PD W AT FT HOW CH -5001 CENTRIFUGAL 750 480 412.0 602 2987 0.549 0.371 R-123 1500 1800 51.95 42.00 2 22.08 2200 80.00 89.52 2 21.26 TRANE CVHF0770 CH -5002 CENTRIFUGAL 750 480 412.0 602 2987 0.549 0.371 9-123 1500 1800 51.95 42.00 2 22.08 2200 80.00 89.52 2 21.26 TRANE CVHF0770 CH -5003 CENTRIFUGAL 750 480 412.0 602 2987 0.549 0.371 R-123 1500 1800 51.95 42.00 2 22.08 2200 80.00 89.52 2 21.26 TRANE CVHF0770 CH -5004 CENTRIFUGAL 750 480 555.0 911.0 4872 0.74 - R-11 1075 1800 52.00 42.00 2 - 2200 85 95 2 - TRANE CVHE 080 (WAS CH -5) CH -5005 CENTRIFUGAL 750 480 408.6 569.7 3675 0.545 0.370 R-123 1100 1800 51.95 42.00 2 21.14 2200 80.00 89.53 2 22.50 TRANE CVHF0770 CH -5006 CENTRIFUGAL 750 480 392.6 529.4 - .523 .357 R-123 1200 1800 51.95 42.00 2 20.62 2200 80.00 89.50 2 26.35 TRANE CVHF0770 COOLING TOWER (CT) SCHEDULE MARK NUMBER GPM 'F LWT AMBIENT AIR FANS FAN MOTORS SUMP HEATERS REMARKS F DB F WB N0. RPM CFM NO. HP VOLTS NO. Kw CT -5001 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD CT -5002 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD CT -5003 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD CT -5004 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD CT -5005 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD CT -5006 2200 90.04 80.04 - 70.00 1 272 205,200 1 50 480 1 12 MARLEY NC8309H-2 CROSSFLOW COOLING TOWER WITH VFD EXPANSION TANK SCHEDULE EQUIP NO SERVICE TYPE VOLUME GALLONS WORKING PRESSURE PSIG MAXIMUM OPERATING TEMPERATURE CONSTRUCTION NATIONAL BOARD NUMBER REMARKS 0 ET -5001 CHILLED WATER REPLACEABLE BLADDER 528 125 240 °F ASME NB 144872 AMTROL MDL 2000-L W/SEISMIC BOLT DOWN OPTION 1765 I ... .,:/ 30 480 1 ° , .• I'. :11 :• !0 "'O. ET -5003 BOILER STEAM REPLACEABLE BLADDER 132 175 240 °F ASME 480 AMTROL L -500L W/SEISMIC BOLT DOWN OPTION, 12 PSI PRE -CHARGE, PUMP SCHEDULE EQUIP NO SERVICE TYPE FLOW GPM TOTAL DYNAMIC HD FT H2O RPM MIN EFF APPROX. IMPELLER DIA. INCHES MOTOR REMARKS HP V PH CHWP-5001 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 CHWP-5002 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 CHWP-5003 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 CHWP-5004 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 CHWP-5005 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 CHWP-5006 PRIMARY CHILLED WATER HORIZ SPLIT CASE 1800 45 1765 75% 9.9 30 480 3 B&G MODEL HSC3 6x8x13 STEEL 6" ELECTRIC CLEAVER BROOKS RE -USE EXISTING BOEING VALVE ACTUATOR ON BOILER PROVIDED VALVE YV-400 9-50 BOILER #1 INST. AIR 78 SCFM 3.2 CHWP-5011 SECONDARY CHILLED WATER DOUBLE SUCTION VERT. DISCHARGE 3000 150 1770 84% 12.625 200 480 3 B&G MODEL VSCS 10x12x13 CHWP-5012 SECONDARY CHILLED WATER DOUBLE SUCTION VERT. DISCHARGE 3000 150 1770 84% 12.625 200 480 3 B&G MODEL VSCS 10x12x13 CHWP-5013 SECONDARY CHILLED WATER DOUBLE SUCTION VERT. DISCHARGE 3000 150 1770 84% 12.625 200 480 3 B&G MODEL VSCS 10x12x13 CHWP-5014 SECONDARY CHILLED WATER DOUBLE SUCTION VERT. DISCHARGE 3000 150 1770 84% 12.625 200 480 3 B&G MODEL VSCS 10x12x13 BOILER #1 COMB AIR HTR STEAM 318 #/HR FNPT CAST IRON 1-1/2" SELF FISHER REGULATOR MR 95 H 100 PSI INLET, 15 PSI OUTLET PRV-450 CWP -5021 COOLING WATER DOUBLE SUCTION VERT. DISCHARGE 4400 50 1770 75% 10.5 100 480 3 B&G MODEL VSCS 12x14x12-1 2 / CWP -5022 COOLING WATER DOUBLE SUCTION VERT. DISCHARGE 4400 50 1770 75% 10.5 100 480 3 B&G MODEL VSCS 12x14x12-1 2 / CWP -5023 COOLING WATER DOUBLE SUCTION VERT. DISCHARGE 4400 50 1770 75% 10.5 100 480 3 B&G MODEL VSCS 12x14x12-i 2 / CWP -5024 COOLING WATER DOUBLE SUCTION VERT. DISCHARGE 4400 50 1770 75% 10.5 100 480 3 B&G MODEL VSCS 12x14x12-1 2 / SYM A D REVISION BY APPROVED PHASE 2A CHILLED WATER UPGRADE 522589-01 9-50 CHILLED WATER UPGRADE PH 2C 522589-03 REPLACE CHILLER CH -5006 13500 DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 RWS RWS RWS CD RWS RWS MS DATE 06.24.02 12.02.02 10.12.11 11.30.16 5YM REVISION STEAM UNIT HEATER SCHEDULE UNIT NO. AREA SERVED AIR VOLUME STEAM ELECTRICAL HP CONTROL BASIS OF DESIGN REMARKS CFM STEAM PRESS. (PSI) STEAM (LBS/HR) CAPACITY (MBH) V/PH/Hz UH -01 BOILER #1 AREANOTES: 1,320 15 91 88 115/1 0.75 1740 GQ--AHSG T12 SE 3 NOTES 1, 1. ELECTRICAL TO PROVIDE STARTER REVIEWED FOR 2. INSTALL UNIT FOR VERTICAL DISCHARGE WITH 10 DEGREE TILT INWARDS TO FACILITY (AWAY FROM COVER�PLIAf\ICE 3. UNIT HEATER CORE SHALL BE FABRICATED WITH 12 GAUGE STEEL TUBE AND STEEL L -FINS SPAC M 4. FACTORY TO APPLY CORROSION RESISTANT COATING TO HEATER CORE APPROVED 5. UNIT SHALL BE EQUIPPED WITH ONE CAST ALUMINUM FAN 460 AIR COMPRESSOR TAG 'JUL 07 0 EQUIPNO SERVICE TYPE FLOWCF TOTAL PRESSURE PSIG RpM ASME RECEIVER GAL. NATIONAL BOARD NUMBER MOTOR REMARKS tl . GRAVITY INTAKE HOOD HP V PH C01F1A REFRIGERATION ROOM CONTROL VALVE AIR RECIPROCATING 6.5 80 1740 60 120099 1.5 460 3 QUINCY QC01506S3A SER. NO. 20030707-00 ._" City of Tukwila ... •ra It1% /1"1/r AIR INTAKE HOOD SCHEDULE TAG TYPE SERVICE SCFM FREE AREA (SF) PRESSURE DROP (IN) FRAME TYPE SIZE BASIS OF DESIGN NOTES MFR MODEL AIH -9.50-1 GRAVITY INTAKE HOOD BOILER #1 COMBUSTION AIRALUM. 7,600 10 0.09 EXTRUDED THROAT 30x48 GREENHECK FGI PROVIDE WITH GREENHECK 36x54 ROOF CURB CAP ADAPTER TAG SERVES QUANTITY LOCATION STEAM TRAP SCHEDULE- (TRAPS PROVIDED WITH BOILER NOT SHOWN) COLD PRESSURE T -B1-01 T -B1-02 T -B1 -03 T B1 04 T -B1-05 T -B1-06 PRE -HEAT COIL LPS SUPPLY LPS SUPPLY DRUM HEATER DRUM HEATER UH -01 MEZZANINE MEZZANINE MEZZANINE BOILER #1 BOILER #1 OVERHEAD INLET (PSIG) 15 15 15 90 125 15 OUTLET (PSIG) 5 5 5 5 5 5 OPERATING DESIGN LOAD (#/HR) 318 10 10 318 10 91 BASIS OF DESIGN START-UP LOAD SIZE (#/HR) MFGR MODEL 640 3/4" TLV J3X 16 3/4" TLV J3X 16 3/4" TLV J3X 640 3/4" - - 16 1/2" TLV J3X 91 3/4" TLV J3X REMARKS FREE FLOAT & THEMROSTATIC FREE FLOAT & THEMROSTATIC FREE FLOAT & THEMROSTATIC PROVIDED WITH BOILER FREE FLOAT & THEMROSTATIC FREE FLOAT & THEMROSTATIC EXHAUST FAN SCHEDULE EQUIP NO LOCATION AREA SERVED (ROOM N0.) TYPE FLOW (CFM) TOTAL SP (IN.WG) RPM DRIVE SIDE FAN WHEEL SIZE (INCHES) MOTOR HP V PH REMARKS EF -1 U.5/3 FREEZER RM. U/2.5 HEATING COIL SCHEDULE EQUIP NO LOCATION PROPELLER FAN AREA SERVED CFM 3,209 ENTER AIR 0.188 1160 LEAVING AIR HC -01 6/2.1 MEZZANINE BOILER #1 COMBUSTION AIR 7,600 24' F 70' F DIRECT DRIVE APD STEAM (IN) MAX MBH LBS/HR 0.30 382 318 ROWS 1 1/3 115 1 GREENHECK SE2-20-423-B3 IN/ 4" FRAME 28X28, 35' BLADE LOUVER ESD -435 FINS PER SIZE WEIGHT INCH REMARKS 8 45x30 70 Lbs VERTICAL STEAM COIL, BASIS OF DESIGN "SUPER RADIATOR COILS" JPS: CONTROL VALVE/DAMPER SCHEDULE (SEE DRAWING M360 FOR ADDITIONAL REQUIRMENTS.) PERMIT {iEiV't'1 TAG LOCATION EQUIPMENT SERVED SERVICE FLOW Cv END CONNECTION BODY - SIZE ACTUATOR BASIS OF DESIGN REMARKS MANUFACTURER MODEL LCV -100 9-50 BOILER #1 FEEDWATER CLASS 150 FLANGED STEEL 3" PNEUMATIC CLEAVER BROOKS PROVIDED BY BOILER SUPPLIER FCV-180 9-50 BOILER #1 FLUE GAS FLANGED STEEL 14" ELECTRIC CLEAVER BROOKS PROVIDED BY BOILER SUPPLIER FCV-200 9-50 BOILER 1 FLUE GAS MATCH STACK STAINLESS 30" PNEUMATIC CLEAVER BROOKS PROVIDED BY BOILER SUPPLIER TCV-450 9-50 COMBUSTION AIR HEATER STEAM 318 #/HR CLASS 150 FLANGED STEEL 1-1/2" ELECTRIC BELIMO FAIL OPEN 15 PSI INLET, 10 PSI OUTLET YV-200 9-50 FCV VALVE INST. AIR 78 SCFM 3.2 FNPT BRASS 1/2" 120 VAC ASCO 83160024 3 -WAY SOLENOID VALVE, NORMALLY CLOSED FCV-300 9-50 BOILER NON -RETURN VALVE STEAM 30,000#/HR CLASS 300 FLANGED STEEL 6" ELECTRIC CLEAVER BROOKS RE -USE EXISTING BOEING VALVE ACTUATOR ON BOILER PROVIDED VALVE YV-400 9-50 BOILER #1 INST. AIR 78 SCFM 3.2 FNPT BRASS 1/2" 120 VAC ASCO 63160024 3 -WAY SOLENOID VALVE, NORMALLY CLOSED FCV-400 9-50 BOILER #1 COMBUST. AIR 7,600 SCFM FLANGED GALV. STEEL 48"X30" PNEUMATIC RUSKIN CD60 FAIL OPEN (SPRING RETURN), 20 PSI AIR SUPPLY, W/OPEN & CLOSED LIMIT SW. TCV-800 9-50 BOILER #1 DRUM HEATER STEAM 318 #/HR CLASS 150 FLANGED STEEL 1-1/2" ELECTRIC BELIMO - FAIL OPEN, 15 PSI INLET, 10 PSI OUTLET YV-600 9-50 BOILER #1 SURFACE BLOW - FNPT STAINLESS 3/4" ELECTRIC REUSE EXISTING PRV-450 9-50 BOILER #1 COMB AIR HTR STEAM 318 #/HR FNPT CAST IRON 1-1/2" SELF FISHER REGULATOR MR 95 H 100 PSI INLET, 15 PSI OUTLET PRV-450 9-50 BOILER #1 DRUM HEATER STEAM 3181/HR FNPT CAST IRON 1-1/2" SELF FISHER REGULATOR MR 95 H , 100 PSI INLET, 15 PSI OUTLET By APPROVED DATE 14' ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DA DRAWN RWS RWS CHECKED APPROVLD SUBTITLE TRLE L ISN aOFFMAN 1601 Fifth Avenue, Stile 900 ISeatt9, WA 98101 PN ]06.61].0711 ITV 2064121.3775 coHnumporn LASTNO w.n xd"7 o.+, EQUIPMENT SCHEDULES ISSUE FOR CONSTRUCTION 11.30.16 DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 11rrLIAIII0AI IIACTED n67 rCAITCD W CURRENT REVISION W4154398 SYMBOL D DATE 11.30.16 SHEET M360 J08 N0. COMP N0. 702416 DWG N0. O_an-Iran 01-1/2" C.A. 1" TEE W/ VALVE 1/2" C.A. TO DUPLEX 3" COMP. AIR 2" COND. FROM 9-99 BLDG. 1" C.A. TEE W/ VALVE DOWN TO TRENCH SEE SHT 1M454. 2° COND. FROM 9-99 BLDG. 4" 150 LB STEAM TO 9-99 BLDG. CONT. ON DWG. 109-099-4000 -OM1 DEAERATOR - CONTROL VALVE 1/4" CTL AIR H 1/2" CONTROL AIR 1/2" CTL AIR DOWN. CONT SHT 1M454 1/2" COND TO SAMPLE COOLERS BELOW CONDENSATE ECEIVER 0 3" STEAM TO DEAERATOR, ALSO SE M555 2" MAKEUP 1/2" COND TO SAMPLE COOLER BELOW !!!!!!" _ 00E1 m lemmi 111111111eirrou LEVEL CON OL1 CONTROL VALVE C CI VLV4 EQUIPMENT PLATFORM 1-1/2" GRAVITY FLOW CONDENSATE . 4" PUMPED CONDENSATE . REVIEWED IAN 'CODE COM APPROVED JUL �1UI MORMENLO'I PLATF _Ma irml 1/2" SS SULFI AT COND MAK 2" PUMPED CONDENSATE FOR MEZZANINE I 1 1M60 M555 BOILER SLUG FEED CONTROL STATION DTL A, SHT M500 AND SHT IM454"" 3/4" BOILER SLUG FEED 3/4" BOILER SLUG FEED 3/4" BOILER © SLUG FEED 1M60 1M500 EQUIPMENT PLATFORM 3" CONDENSATE RETURN LINE FROM 9-50 2" MAKEUP 2-1/2" 5 LB STEAM. 3" COND. 1-1/2" FROM BOILER HOUSE HTG. BOILER STACK TYP. 4" COND. 4" VENT 2" MAKEUP DOWN & BACK TO HEAT EXC. 3/4 CONTINUOU 3" COND. Y4" CONTINUOUS °LOWDOWN CUT AND CAF' Y4" COPTINUOUS BLOWDCWN CONTINUOU BLOWDOWN 6" 150 LB STEAM HEADER SUPPLY. 6" 150 LB STEAM HEADER SUPPLY. REMOVE SAMPLE COOLER 3/4" BOILER - SLUG FEED CONTINUOUS BLOWDOWN HPS MOTORIZED NON - RETURN VALVE TYP. 4" CLWS&R FROM TUNNEL 12 4" COND. FROM 9-90 COMPLEX TRENCH HPS 111 HPS —101— 11/2" PUMPED CONDENSATE FROM 9-50 BLDG. 2" PUMPED FROM CONDENSATE TANK IN TRENCH. 4" COND. FROM 9-101 BLDG. RECEIV CITY OF TUKWILA LEGEND ------HPS----HIGH PRESSURE STEAM SUPPLY — LPS— LOW PRESSURE STEAM SUPPLY (0 - 15 PSIG) — HPR— PRESSURED CONDENSATE RETURN — C — GRAVITY FLOW CONDENSATE RETURN • 150 LB GATE VALVE ✓ GATE VALVE IN ELEVATION q uer—FLOW METER GENERAL NOTES 1 > FOR PLANT STEAM FLOW METERS, SEE 1M452. REFERENCE DRAWINGS SEE DWG. PR -184D 580-1 FOR NON STEAM AND CONDENSATE PIPING PLAN MEW. CONSTRUCTION NOTES REMOVE ENTIRE EXISTING BOILER #1 AND ALL ASSOCIATED PIPING, PSVS, VALVES, CONTROLS, SUPPORTS AND MISCELLANEOUS CONNECTIONS. TURN VALVES AND ACTUATORS OVER TO BOEING. PROVIDE FILTERED VENTILATION, FRAMEWORK AND PLASTIC SHEETING TO CONTAIN DEMOLITION DUST TO THE WORK AREA. [22> REMOVE EXISTING STEAM SUPPLY LEAD, SPRING HANGERS, SUPPORT AND MISCELLANEOUS EQUIPMENT, BACK TO EXISTING CLASS 300 STEAM HEADER SUPPLY VALVE. REMOVE ENTIRE EXISTING BOILER EXHAUST STACK UP THRU ROOF. .REROUTE SURFACE BLOWDOWN PIPING TEMPORARILY FOR BOILER REPLACEMENT. 1> REMOVE ORIFICE, ORIFICE FLANGES, AND DIFFERENTIAL PRESSURE TRANSMITTER. SAVE TRANSMITTER FOR REINSTALLATION. RESERVE ORIFICE & FLANGES TO MATCH REPLACEMENT ORIFICE AND FLANGES. © RESERVE BLOWDOWN CONTROL ASSEMBLY FOR RE -INSTALLATION ON NEW BOILER. 11> REMOVE BOILER CONTROL PANEL. PRESERVE ETHERNET CABLE FOR REUSE BY NEW PANEL. ®REMOVE AND DISPOSE OF (0) STEAM UNIT HEATER IN THIS LOCATION. [>- REMOVE, SAVE, AND RE -INSTALL EXISTING SS OS& Y VALVE FOR CHEMICAL FEED QUILL ON TO NEW SS BOILER CHEMICAL FEED LINE. i HPS-101 101— HPS HPS —101 TRENCH TO TUNNEL JUN 0 8 2017 IT CE BLOWDOWN CONTROL 1M60 M500 (. 4 BOILERS) 2" MAKE-UP TO COND. RECEIVER & DEAERATOR SYM REVISION 3" 150 LB STEAM DEAERATOR. 8" STEAM TO 9-90 COMPLEX. w s 0 BY APPROVED DATE SYM UPPER LEVEL FLOOR PLAN SCALE: /4"=1 -0" BY APPROVED DAR A INSTALL (5) CONDENSATE UNES 910739-00 PAXTON RWS/EJC 09.18.92 F BOILER MAKE—UP WATER 775704—LO S;B RWS/EIC 11.26.97 8 INSTALL ISOLATION VALVES 747221-00 SLB RWS/EJC G 9-50 SAMPLE COOLERS 786274—LO SLB RWS/DOT 01.07.99 C INSTALL CHEMICAL SLUG FEED SYS 767402-00 SLB RWS/EJC 05.06.96 H NALCO 30 CHEMICAL CONTROLLER 7401 RWS RWS 03.04.10 D CURE WATER SYS DISTURBANCES F 8011 FR FUFRCFMPY AIR 767402-00 SLB 775704—In 518 RWS/EJC AWC /F.Ir 07.10.97 J STEAM FLOW METERS (NO IFC) W633937 HARR 10/12/11 11 95 07 10 82401 noUFMAI r0M00 Ann FR 9401 Ar4UFM W61547010 on 11 An 16 GINEERS 1601 FRh Avenue. Sule 900 ISea11U, WA 98101 ph 106623.0717 Ifaa 2066243773 LAR,n.n. ALAM.h..."6.,,,"F.Mn L REMOVAL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN EDDIE P. DUARTE 08604ED ENGINEER CHECKED DAIL O • 0 ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE TITLE HVAC PIPING - CEILING LEVEL DEVELOPMENTAL CENTER BOILER REPLACEMENT IACr12AAII/AI 4488100 BUILDING 9-50.1 KEY PLAN SCALE: NONE N 4' • 2' 0 2' 4' 10 8' SCALE: 1/4"=1'-0" CURRENT REASON W4154398 SYMBOL K DATE 11.30.16 SHEET 1M6OR JOB N0. COMP NO. rap A_0 /10_01 000/ rrA1Tr0 WA D'040. 0_Sn_1uRn0 RENSION BY PROVED DATE SY 0 LOUVERED 2'x3' TRANSFER GRILLE IMMEDIATELY ABOVE © ® Vf JUNCTION BOX 7 20x20 EXH. DUCT (22 GA.) UP TO ROIF .c 0 / L 3x3 CROSS BRACING ® PURLIN ROOF T / EXHAUST FAN- ✓ lit: E� -"n PURLIN . TRANSFORMER 1M10 A M558 H — E EXH. DUCT & TRANSFORM iiiiiiIIIII _,dii �� �I �� 30x48 COMBU SUPPLY DUCT TION AIR UP THRU ROOF ROOF TRUSS STRUCTURAL SUPPORT 11 o © OCl UH UH01 7v,I'LL Q 1 ROOF TRUSS M10 M558 4,I0 �To.: I1rr milii 0 BOILER #1 REVISION 8Y APPROVED PARTIAL HVAC PLAN 0 SCALE: 1/8" = 1'-0" DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 g;LATZFE.IAIG® ggFFMAN NGINEEAS 1601 Ffl8 Avenue, Suite 9001 Se968, WA 98101 01206.6210m 116a ]06.630.1]16 euRmenxnm LABTNG ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE LEGEND GENERAL NOTES 1. BOILER EXTERNAL PIPING IS BY THE BOILER MANUFACTURE AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWIL JUN OS 2017 PERMIT CENTERVIA/ 0 SI/ REFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE COMBUSTION SUPPLY AR DUCT FROM ROOF LOCATION TO FORCED DRAFT INLET FAN CONNECTION ON BOILER. INSULATE WITH 2" RIGID FOAMGLASS. SEE DWG M558 FOR DETAIL. PROVIDE VERTICAL STEAM COIL. SEE STRUCTURAL SHEETS S534 & S535 FOR DUCT SUPPORT DETAILS. ® PROVIDE FLEXIBLE CONNECTOR AT BOILER FORCED DRAFT FAN INLET CONNECTION (DURODYNE DURALON, 250° F RESISTANT MATERIAL) SEE STRUCTURAL DRAWING 1S455 FOR DUCT AND COIL SUPPORT DETAILS. PROVIDE AND INSTALL NEW STEAM UNIT HEATER NEAR THIS LOCATION. RE -CONNECT STEAM SUPPLY AND CONDENSATE RETURN FROM PREVIOUS HEATER LOCATION. FIELD VER FY PIPE SIZE . ISSUE FOR CONSTRUCTION 11.30.16- DRAWN C. HARRAH CHECKED /ENGINEER APPROVED APPROVED 15 05.05.01 SUBTITLE FIRST FLOOR H-IVAC PLAN 0 0 0 KEY PLAN O SCALE: NONE 8' 4' 0 4' 8' 16' SCALE: 1/8"=1'-O" CURRENT REVISION W4154398 SYMBOL DATE 11.30.16 RIE DEVELOPMENTAL CENTER BOILER REPLACEMENT I I C(`IJ A A l I Y`A I 11 A CT C D BUILDING 9-50 0611 A—C„ /1 0_V 1 6141/ 069106 IMA SHEET 1M10 J08 NO. W4154398 COMP N0. G NO 0-SY1-111161 ATMOS TOTAL ELEVATION - 54'-6" ROOF -4 30"0 ID DOUBLE WALL EXHAUST STACK, TO BE CONFIRMED BY MANUFACTURES CERTIFIED DRAWINGS. EPA TEST PORTS (E) 14"CHWS & R ATMOS TOTAL ELEVATION - 54'-6" 30"0 ID DOUBLE WALL EXHAUST STACK, TO BE CONFIRMED BY MANUFACT CERTIFIED DWGS ATMOS ATMOS 0 COMBUSTION AIR GRAVITY INTAKE HOOD _\/- 6, 1 AIH -9.50-1 1 SUPPORT FROM ROOF (TYP) r ROOF TO CONC. PANEL EL. 44'-6" EPA TEST PORTS PIPE HANGER 14"FLU GAS RECIRCULATION PIPE ECONOMIZER TO STACK TRANSITION 30x48 SUPPLY AIR DUCT, 7600 SCFM ©800 FPS CODE COMPLIANCE APPROVED JUL 07 2011 3"FEEDWATER FO STEAM PRE -HEAT FCV 400 30x48 SUPPLY AIR DUCT, 7600 SCFM ® 800 FPS EW 3" FEEDWATER TIE-IN 30x48 SUPPLY AIR DUCT, 7600 SCFM ©800 FPS FILL POT 30x48 0 FAN MOTOR F---7 2'-10" ECON WIDTH 6"HPS COMBUSTION AIR/FORCED DRAFT FAN MOTORIZED DA SEE TYPICAL STEAM COIL DIAGRAM STEAM DRUM FF EL. 15'-6" STACK BOTTOM DRAIN Imo. Q ll_ip�'Ilois � p- �� �� Y_riE1e . _ I 1 �►!`� LCV _ I 1 1100 99'!1 ---il i4" o. D 1�SII/ II �.*! WATER DRUM �Clj,�� `� P I'l RAIN ■ SY d 3� WATER DRUM LOOKING SOUTH SECTION - BOILER END VIEW SCALE: 3/8"=1' REVISION BY APPROVED 1M10,1M60,1M452 M558 DATE 6TM REVISION APPROVED 16'-0" WATER DRUM TUBE PULL CLEARANCE DRUM HEATER RECEIVED CITY OF TUKWILA DA ORIG DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 JUN 08 201? RMIT CENTEP ce;LArzw-45v0 "BOILER FEEDWATER INLET S00T8L0 TIE-IN NEW 6"HP STEAM SUPPLY TO EXISTING VALVE LOCATION. 1EI-50031 FF EL. 15'-6" TO DRAIN LOOKING EAST SECTION - BOILER SIDE VIEW SCALE: 3/8"=1' ACI 1001 FIN Avenue. Nuke 600 ISeattb. WA 68101 ph 2064210)11 Itea 2064b.3176 LAUD.° e.s•Vk ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE CONSTRUCTION NOTES, CONT. ECONOMIZER PLATFORM BY BOILER MANUFACTURER (D� 1M10,1M60,1M452 M558 ISSUE FOR CONSTRUCTION 11.30.16 DRAWN R.LEITNER CHECKED L.BAWEJA LNI"INLLH M.SOTURA CHECKED APPROVED APPROVED TATE 11.30,16 11.30.16 11 30.16 SUBTITLE TIT SECTIONS DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 IICY`IJAAII!`AI 1100000 PPII O /0 0 GENERAL NOTES 1. BOILER EXTERNAL PIPING IS BY THE BOILER MANUFACTURER AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD ASSEMBLY OF ALL BOILER COMPONENTS, TRIM, INTERCONNECTION PIPE/TUBING, CONTROLS, VALVES, ETC., PROVIDED UNDER THE BOILER SPECIFICATIONS. CONSTRUCTION NOTES i'PROVIDE AND INSTALL NEW BOILER WITH FACTORY ACCESS LADDERS AND ACCESS PLATFORMS. PROVIDE AND INSTALL NEW 30"0 ID DOUBLE WALLED BOILER STACK THRU ROOF. SIZE TO BE CONFIRMED WITH MANUFACTURERS CERTIFIED DWG. PROVIDE AND INSTALL ROOF THIMBLE. SEE ARCH'L. ® PROVIDE AND INSTALL STACK TERMINUS. PROVIDE AND INSTALL NEW 6" CL 300 HP STEAM SUPPLY PIPING TO EXISTING HEADER VALVE AS INDICATED. ©PROVIDE AND INSTALL NEW SET OF ORIFICE FLANGES AND RE -INSTALL EXISTING FLOW ORIFICE MEASURING EQUIPMENT. PROVIDE AND INSTALL NEW PIPE HANGER. ®PROVIDE AND INSTALL 5"FIBERGLASS INSULATION WITH ALUMINUM JACKET TYPICAL. ROUTE BOILER VENTS UP THRU ROOF ROUTE ECONOMIZER PSV VENT UP THRU ROOF PROVIDE AND INSTALL DRIP PAN ELBOW AND ROUTE PAN DRAIN TO NEAREST FLOOR DRAIN. ri>.IN- LINE STACK DRAIN SECTION WITH 1"DRAIN TRAP [-_,2-POSITION STACK DAMPER WITH PNEUMATIC ACTUATOR. MOTORIZED NON -RETURN VALVE. RE -USE EXISTING BOILER MOTORIZED VALVE ACTUATOR ASSEMBLY. PROVIDE AND INSTALL COMBUSTION AIR GRAVITY INTAKE HOOD WITH FACTORY ROOF CURB. SEE SCHEDULE. PROVIDE AND INSTALL PNEUMATICALLY ACTUATED DAMPER WITH MANUAL OVER -RIDE VALVE. DAMPER TO FAIL IN OPEN POSmON. OFFSET VERTICAL SUPPLY AIR DUCT FOR OPTIMUM ROOF PENETRATION LOCATION. PROVIDE AND INSTALL HEAVY DUTY FLEXIBLE CONNECTION TO SUPPLY FAN INLET DUCT. 1�PROVIDE AND INSTALL ANGLED CONNECTION FROM HORIZONTAL TO VERTICAL EXHAUST STACK TRANSITION. PROVIDE AND INSTALL SS PNEUMATIC TUBING FOR DAMPER ACTUATOR FROM INSTRUMENT AIR SOURCE. 25 PSIG REQUIRED. SEE DWG 1 M60. PROVIDE AND INSTALL ADDITIONAL 1/2" CLASS 300 BLEED VALVE. STACK TEST PORTS 2X DIA. MINIMUM FROM STACK DRAIN SECTION. ECONOMIZER, ECONOMIZER SUPPORT FRAME, AND ECONOMIZER TO STACK TRANSITION TO BE PROVIDED BY BOILER MANUFACTURER AND INSTALLED BY CONTRACTOR. ROUTE 1" STACK DRAIN DOWN TO FF AND TO TRENCH. SEE STRUCTURAL DRAWINGS FOR DUCT SUPPORT. PROVIDE AND INSTALL 2" RIGID FOAMGLASS DUCT INSULATION. SEE STRUCTURAL SHEET 1S455 FOR DUCT SUPPORT STRUCTURE. SEE STRUCTURAL SHEET S534 & S535 FOR DUCT SUPPORT DETAILS. Di -BOILER PLACEMENT COULD SHIFT IF REQUIRED WHEN CERTIFIED BOILER DRAWINGS ARE SUBMITTED. nn, r ERITCA W CURRENT REVISION W4154398 SYMBOL DATE ORIG 11.30.16 SHEET JOB NO M558 W4154398 COMP N0. DWG N0. O—FTl—,Acca 01-1/2" C.A. 1" TEE W/ VALVE 1.9 2" COND. FROM 9-99 BLDG. 1" C.A. TEE W/ VALVE DOWN TO TRENCH SEE SHT 1M454. 2" COND. FROM 9-99 BLDG. 4" 150 LB STEAM TO 9-99 BLDG. CONT. ON DWG. 109-099-4000 -OM1 ..F 1/2" CTL AIR DOWN. CONT 0 SHT 1M454 1/2" COND TO SAMPLE COOLERS BELOW 3" STEAM TO DEAERATOR, ALSO SE 145W,KEUP 1/2" COND TO SAMPLE COOLER BELOW 2"HPS PRE -HEAT COIL SUPPLY TIE-IN 1"HPR 4" PUMP CONDENSATE 2" MAKEUP 2" MAKEUP DOWN & BACK TO HEAT EXC. 0 U DEA."A VLV2 C C 1/2" C.A. TO DUPLEX 3" COMP. AIR QUIPMENT PLATFORM 2"RIGID FOAMGLASS DUCT INSULATION ON ALL DUCTWORK STEAM PRE -HEAT COIL 0 1-1/2" GRAVITY FLOW CONDENSATE . HPR CI , OF TUKWILA ECEIVED JUN 081011 PERMIT CENTER VLV4 0- Y4" CONTINUOU BLOWDOWN 4" COND. FROM 9-90 COMPLEX LEVEL CO JoIL CONTROL SALVE 1/2" SS SULFIDE AT COND MAKE -U4 �n BOILER SLUG FEED CONTROL STATION SEE DTL A, S M500 AND SHT IM45 4" PUMPED CONDENSATE . 2" PUMPED CONDENSATE . D FOR OMPLIANCE MOVED 7 2017 Tukwila IVISION 3" CONDENSATE RETURN LINE FROM 9-50 2-1/2° 5 LB STEAM, 3" COND. PIT o o 0 O 1—t 1� _-o_ A Y4" BE1OW CO INU WN H RIZ ED NON - R VALVE TYP. 4" CLWS&R FROM TUNNEL 12 1 1/2" PUMPED CONDENSATE FROM 9-50 BLDG. 2" PUMPED FROM CONDENSATE TANK IN TRENCH. 4 COND. FROM 9-101 BLDG. TRENCH TO TUNNEL U 2" MAKE-UP TO COND. RECEIVER & DEAERATOR 8" STEAM TO 9-90 COMPLEX cn i 05 0 3" 150 LB STEAM DEAERATOR SY A 8 C D 0 0 0 O 0 O CO w CO) CO 0 rn 0 O 07 0 UPPER LEVEL FLOOR PLAN SCALE: 1/4"=1'-0" REVISION INSTALL (5) CONDENSATE UNES INSTALL ISOLATION VALVES INSTALL CHEMICAL SLUG FEED SYS 910739-00 747221-00 767402-00 CURE WATER SYS DISTURBANCES 767402-00 9011 [D rurprsuI`V AIR PAX10N SLB SLB SLB 7791111—III 1919 APPROVED RWS/EJC RWS/EJC RWS/EJC RWS/EJC DA 09.18.92 05.06.96 07.10.97 G REVISION BOILER MAKE-UP WATER 9-50 SAMPLE COOLERS NALCO 3D CHEMICAL CONTROLLER STEAM FLOW METERS (90 IFC) 775704 -LO 786274 -LO 7401 W633937 S;8 SLB RWS HARR 61w9 /F.IP 111501 10 0NF1061M061091 0[MT[9 90111061 61[91 PM/ GUT WA15416R 0F1 APPROVED RWS/EJC RWS/DOT RWS uc DATE 11.26.97 01.07.99 03.04.10 10/12/11 111016 IOV66. Y� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 1M60 g f OFP1AN 1601 Pith Avenue, Suite 900 ISealtb, WA 90101 ph 306.623.070 Ila. 2069269715 .08090.p00, UST,. o..h .mss 1.P"r9 0RAWN DATE EDDIE P. DUARTE CHECKED M500 (TY vg GENERAL NOTES p% FOR PLANT STEAM FLOW METERS, SEE 1M452. 2 > 6" CLASS 300 GATE VALVE. SEE DWG. PR -184D 580-1 FOR NON STEAM AND CONDENSATE PIPING PLAN VIEW. 1-1 2"CLASS 300 PRV 1-i BOILER EXTERNAL PIPING (BEP) TO BE FABRICATED AND STAMPED BOILER AND PRESSURE VESSEL CODE "PP" STAMP. DO NOT FIELD MODIFY. INCLUDES STEAM, FEEDWATER, AND BLOWDOWN PIPING TO SECOND VALVE. 5. BOILER EXTERNAL PIPING IS BY THE BOILER MANUFACTURE AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. CON TRUCTION NOTES I] PROVIDE NEW BOILER, w/ ECONOMIZER, FACTORY ACCESS LADDERS AND ACCESS PLATFORMS, BOILER BREECHING, COMBUSTION AIR DUCT, GAS TRAIN, FUE OIL TRAIN, AND TRIM AND RECONNECT ALL PIPING. PROVIDE DRIP PAN ELBOW AND ROUTE PAN DRAIN TO NEAREST FLOOR DRAIN. ROUTE 4"PSV VENT UP THRU ROOF AND SUPPORT AS REQUIRED. UTILIZE EXISTING ROOF PENETRATIONS WHERE APPLICABLE. REMOVE PORTION OF BOILER STACK #4 INSULATION TO CLEAR BOILER INSTALLATION PATHWAY. DISCONNECT AND MOVE THIS BOILER #3 CONTROL PANEL, TO CLEAR BOILER INSTALLATION PATHWAY. RESTORE TO FULL FUNCTIONALITY AFTER BOILER #1 MOVE. PROVIDE NEW ORIFICE AND NEW SET OF ORIFICE FLANGES. RE -INSTALL EXISTING DIFFERENTIAL PRESSURE TRANSMITTER. MATCH EXISTING EQUIPMENT. © PROVIDE PIPE HANGER ROUTE 2"VENT THRU ROOF AND SUPPORT AS REQUIRED. UTILIZE EXISTING ROOF PENETRATIONS WHERE APPLICABLE. ® PROVIDE 30°0 ID DOUBLE WALLED BOILER EXHAUST STACK UP THRU ROOF & 14"0 FGR DUCT TO FAN. PROVIDE HPS AND LPS STEAM COIL SUPPLY LINE AND FIELD ROUTE ON MEZZANINE LEVEL TO COIL. SEE DETAIL 1/M559 STEAM SUPPLY TIE-IN REQUIREMENTS AND FOR COIL TRIM REQUIREMENTS. 11:3110 - 0 REMOVE BOILER #3 GAS TRAIN AND LADDER TO CLEAR PATH FOR NEW BOILER MOVE -IN. RESTORE BOILER #3 TO COMPLETE OPERATING CONDITION AFTER MOVE -IN IS COMPLETE. CONNECT ATOMIZING STEAM TO FUEL OIL BURNER. NATURAL GAS CONNECTION SEE 1M452 RELOCATE FIRE SPRINKLERS AS REQUIRED. PROVIDE AND INSTALL NEW COMPRESSED AIR SUPPLY FOR BOILER ACTUATORS W/ 3/4" (FILED ROUTE). FILTER/REGUALTOR W/AUTO-DRAIN AND PRESSURE GAUGE. SET AT 25 PSIG. PROVIDE AND INSTALL CONTROL PANEL NEW NON -RETURN VALVE SUPPLIED W/BOILER. USE AND INSTALL EXISTING ACTUATOR. RE-ROUTE & SUPPORT ALL 3/4" CONTINUOUS BLOWDOWN LINES AROUND NEW ECONOMIZER RE -INSTALL 3/4" SS OS&Y VALVE FOR CHEMICAL INJECTION PORT AT THIS LOCATION 1M61 1 1M62 ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE HVAC PIPING - CEILING LEVEL KEY PLAN SCALE: NONE O 4' 2' 0 2' 4' SCALE: 1/4"=1'-0" CURRENT REVISION W4154398 BOL 8' DATE 11.30.16 CHECKED APPROVED APPROVED TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT 11C/`LIAMIT AI 0ACTCD BUILDING 9-50.1 /`01 A-1/1 0-11 011/ cr4ITID WA SHE 1 M60 JOB NO. COMP N0 DWG 140. 0_511-1 URI) I"PROCESS WATE 3/4" CW II' ABOVE FL SEE DWG 1M60 FOR CONTINUATION TO MEZZANINE AREA 3" CA FROM ABOVE 1-1/2" UP TO EQUIP PLATFORM SEE DRW 1M453 FOR CONTINUATION AD30 CONVERTER & Cx30 PULSER Ha I SCALE INHIBITOR I" C.A. DN & INTO TRENCH TO BOILERS 2" PUMPED DRAIN TO EXISTING 6" FUNNEL DRAIN I/2"SS OIL FILTER REFRIGERATED AIR DRYER COMPRESSOR & -/ STORAGE TANKEMGENCY /'AIR COMPRESSOR 1/2" SS SULfTE`�, TO COND RECEIVER 1/2" CONTROL AIR UP TO CONDENSATE RECEIVER CONTROL VALVE 3" PUMPED CONDENSATE UP TO DEAERATOR SEE DWG IM453 FOR CON 2" PUMPED DRAI TO SI SAMPLE COOLER AT SI TO SAMPLE COOLE lig i!iI I�� . I " III 2" VORTEX YF -105 FLOWMETER IN ''h��� a1s KE -U 'N KE -UP TO TO AND FROM HEAT EXCHANGER CONTINUOUS BLOWD SAMPLE COOLER 1 2"SS OND6ISATE 1 RECEIVER PUMPS_ _. 1M60AM501 EXISTING 3" CA EL. 11' A.F.L. CONDENSATE SYS LEVEL CONTROLLER AND STEAM HEADER TEMPERATURE AND PRESSURE READOUT PANEL 3/4" FEED WATER & TO CHEMICAL FEED 1/2" SS SULFITE UP CONTROL STATION, SEE DTL A, SHT M500 6" PUMP SUCTION VORTEX YF -ALL REMOTE CONVERTER ® 5' AFF 1/2" SS CAUSTIC UP TO CHEMICAL FEED CONTROL STATION, SEE DTL A, SHT M5 JUL 07 2011 3" PUMPED CONDENSATE FROM PUMPS UNDER PLATFORM LEGEND — HPS— HIGH PRESSURE STEAM SUPPLY —LPS— LOW PRESSURE STEAM SUPPLY (0 - 15 PSG) — HPR— PRESSURED CONDENSATE RETURN —C— GRAVITY FLOW CONDENSATE RETURN • 150 LB GATE VALVE p GATE VALVE IN ELEVATION GENERAL NOTES 1. SEE DWG. PR -184D 580-1 FOR NON STEAM AND CONDENSATE PIPING PLAN VIEW. 2. BOILER EXTERNAL PIPING (BEP) IS BY THE BOILER MANUFACTURE AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. BLOWDOWN PIPING TO SECOND VALVE IS BOILER EXTERNAL PIPING (BEP) PER BPVC. DO NOT FILED MODIFY. ALL BLOWDOWN PIING TO BE SCH. 80 WITH CLASS 300 SOCKET WELD FITTINGS. EMERGENCY EYE CONTINUOUS BLOWDOWN HEAT EXCHANGER CONTINUOUS BLOWDOWN FLASH TANK 3" VTR 3/4" WATER FOR SAMPLE COOLERS AND CHEMICAL MIX TANK I" CLW EFFLUENT DRAIN TO FiECE,I TO D.f. I"COND. DRAIN FROM HEAT EXH, TIED TO B.D.TA SUMP PUMP I" PUMPED DRAIN TO SANITARY 1-1/2" METE 410 TEE W/ HOSE CONNECTIO 2" SOFTENED WATER UP TO FEEDWATE CONT. IM60 FILTE 1/2"CW SEE FEEDWATER ISOMET C BOILER CONTROL PANEL 3" FEEDWATER TO BOILERS ASBESTOS NOTIFICATION: A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS NOT DISCOVERED THAT WOULD BE INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. DO NOT REMOVE, DAMAGE OR DISTURB ANY ASBESTOS MATERIAL ADJACENT TO THE WORK AREA. PLEASE CONTACT BOEING FACILITIES DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS DAMAGED OR DISCOVERED THAT IS REQUIRED TO BE REMOVED TO SUPPORT WORK. TRENCH 1M60A M55 2-5 LINE LINE DEAERATO STEAM TO •R 2" RMI TT TANK LEVEL CONTROL VALVE ASSEMBLY WATER TREATMENT CHEMICAL TOTE FUNNEL DRAI U w Z Z I- I- I— 1— CONSTRUCTION NOTES • PROVIDE AND INSTALL NEW BOILER WITH FACTORY ACCESS LADDERS AND ACCESS PLATFORMS. • PROVIDE NEW FEED WATER ISOLATION VALVE AT ROOT OF BRANCH. ROUTE NEW FEEDWATER TO NEW BOILER LEVEL CONTROL VALVE. E>WATER DRUM CENTERLINE LOCATION IS CRITICAL. COORDINATE WITH STRUCTURAL FOOTINGS AND MAINTAIN TUBE PULL CLEARANCE. BOILER PLACEMENT COULD SHIFT IF REQUIRED WHEN CERTIFIED BOILER DRAWINGS ARE SUBMITTED AND REVIEWED. ®CONNECT NEW BOILER PANEL TO EXISTING EMCS INTERFACE PANEL. EXTEND EXISTING ETHERNET CABLE AS REQUIRED. SEE DWG M316 FOR INTERFACE REOUIRED. . 2 2" BOILER MAKE-UP TO & FROM SOFTENER 4" WATER LINE BELOW GRADE SY REVISION ffi805-EEAM TO 9-90 COMPLEX I/2" DN WATER TO DRINKING FOUNTAIN AT COL WAVER LINE BELOW GRADE 6Y APPROVED SITZ 150 LB. STEAM HEADER REVISION NEW 6" FLG. CONNECTION TO EXIST. 12" STEAM HEADER APPROVED 4" BLIND FLANGE FOR FUTURE USE LOWER FLOOR PLAN SCALE: 1/4"=1'—O" DATE A CURE WATER SYSTEM DISTURBANCES 772218 SLB RWS EJC 7.1.97 REPLACE FEEDWATER PUMPS 4 & 5 5791963 HARR 09/18/08 BOILER EMERGENCY AIR 775703 -LO SLB RWS EJC 11.25.97 G REPL. BD TANK PUMP W/ SILLWELL SUMP PUMP W535381 HARR 09/01/11 BOILER MAKE-UP WATER 775704 -LO SLB RWS EJC 11.29.97 H DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 INSTALL EYEWASH 784454 -LO SLB RWS EJC 8.26.98 0_0n CAM61 [ Mnl [RC 7130770—In CI RWC INT 1700 gFFMAN NGINEERS PUMP IN PIT. SEE DIAGRAM SHTill A 1601 Ffih Avenue, Suie 650 ISeat16, WA 9010 pn 0,6623m17. l lee 00661140M ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN R. RIVERA 0REDRED S BEROSIK CHECKED APPROVED APPROVED GATE 4.29.96 5.8.96 ' IIIIIII�IT�7 0 z0; 10 ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE HVAC PIPING PLAN - FLOOR LEVEL DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 KEY PLAN SCALE: NONE N 4' 2' 0 2' 4' 8' SCALE: 1/4"=V -o" CURRENT REVISION W4154398 SYMBOL SHEET JOB NO. 1 M60A DATE 11.30.16 WCPWANI/CAI IIACTEA rnl A_E/1 0_7 1 nru rrMTEP um O_0n_1u0nA F.0,S 4" F.O.S F.O.R I )f" F FOS BY—PAS! REGULATOR 2" F.O.R. TO U.G. STORAGE TANKS. CONTINUED 01 1 KAM001 S.DWL CONT1ry BLOWDO EXCHAN PU 3.1 SYM 3" CA FROM ABOVE LEGEND —FOS—FUEL OIL SUPPLY — HPS— HIGH PRESSURE STEAM SUPPLY ON BY APPROVE) 991E SY REVISION APPROVED DATE A REPLACE FUEL OIL LINES 10176499 RWS RWS 01.25.10 DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 ce;LATLIEAING® ACCEPTABILITY THIS DESIGN AND/09 SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE MU NN RWS CHECKED DATE 01.25.10 SUBRR.E FUEL OIL PIPING PLAN CURRENT REVISION W4154398 11.30.16 10) T ED 00 RWS CRLCK APPROVED APPROVED 5.8.96 TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 IICPWAMIPAI uACTCG rl11 A—C/1 0C\/ CCMTCP MIA SHEET �ND 1M60C COMP N0. G NO 0—rJ1-111Rf1(` /c v,,, SEE DRW 1M453 FOR CONTINUATION — ----- —Lr3— IA/0 rnmaunC 31C/VII Jurru \v — IJ r. — HPR— PRESSURED CONDENSATE RETURN / \ �\ / i i — — — — C — GRAVITY FLOW CONDENSATE RETURN \ / i DG GATE VALVE \ _ _ j' SULFITEGATE V VALVE IN ELEVATION ef #1 ) -® 43 1 �- rTCALE INHIBITOR \„\/ } ,� 9 GENERAL NOTES E� \ ' In- #2 i �:-.� El SEE DWG. PR -184D 580-1 FOR NON STEAM AND CONDENSATE PIPING PLAN VIEW. ••\ FUEL 00_� � PUMPS] BOILER FEEDWATER PUMPS ASBESTOS NOTIFICATION: 141 II \ ' #� i '�- �_ _____ ____ (TYP) ___ _________ ________________________ _- 9 AITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS NC DISCOVERED THAT WOULD BE INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. DO NOT REMOVE, DAMA IIi EQUIPMENT OR DISTURB ANY ASBESTOS MATERIAL ADJACENT TO THE ^ PLATFORM \ / WORK AREA. PLEASE CONTACT BOEING FACILITIES �; #4 c ABOVE \\ DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS DAMAG -411I I %/ i SDISCOVERED THAT IS REQUIRED TO BE REMOVED TO ' SUPPORTWORK. D �FO.S.;IN�1 TRENCH' \, / II)¢=F.O.R. 5 / , EIUIPMEGT FUEL OIL PIPING MATERIALS PLA\ QIM / 1. FUEL OIL PIPING 1/2' to 2” SHALL BE SEAMLESS / /I j \ \ , ONDENSATE /\ I / \ / \ CARBON STEEL BLACK SCH 80 ASTM A53 GRADE B. 2 FUEL OIL FITTINGS 1/2" TO 2" SHALL BE FORGED CHARBON STEEL, CLASS 3000 SOCKET WELDED OR 2( SCREWED, ASTM A105, ANSI 816.11 RECEIVER PUM9S j \ -111 -' \1. REFERENCE DRAWINGS ® WASHER DRIER i TRENCH / \ EQUIPMENT \ , PLATFORM F.O.S. 3/4" FOS Tn BnIIFR ��Y" FOS / TO 3 " / FOS TO I-)" F.O.S. IN X" FOS TO 6A1C �i R VIE VEDTO �1-Y�" IN TRENCH •I BOIL BOILER TRENCH "BOILER HEAT , o/ CODE COMPLIA CE O BON NOUWONUS ►PPRVED0 / \ 65 7 0t11 % 4UL N CONSTRUCTION NOTES e FLASH TANK / \ / \ , / City of Tukwl > RECONNECT NEW BOILER FOS IN EXISTING TRENCH AS REQUIRED. , BUILDING -Di -NI ON - _� AMINE c.' z EXT'G I 9 o PIT 11/2" p rINTERMITTENT RMi BD ETANK RECEIVED CITY OF TUKWILA 10-.--____-3/4" 3"VTR o JUN 0 8 2017 zz AP lal c PERMIT CEN -. © 0 Nom. 1 V8V g V V8 W V ) rr 0 150 LB. STEAM HEADER 4" BLIND FLANGE FOR FUTURE USE ' , ,�'//z/ NEW 6" FLG. CONNECTION TO 11P EXIST. 12" STEAM HEADER KEY PLAN Q LOWER FLOOR PLAN FFRYI AR s 1601FFthAvenue,Sac900'Sca11b,WA98101 ISSUE FOR CONSTRUCTION SCALE: NONE 4' 2' 0 2' 4' 8 0 ph 206.623.......0717 I. 20,0124.377s 11.30.16 SCALE: 1/4"=1'-0.' SCALE: 1/4"=1'-0" ON BY APPROVE) 991E SY REVISION APPROVED DATE A REPLACE FUEL OIL LINES 10176499 RWS RWS 01.25.10 DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 ce;LATLIEAING® ACCEPTABILITY THIS DESIGN AND/09 SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE MU NN RWS CHECKED DATE 01.25.10 SUBRR.E FUEL OIL PIPING PLAN CURRENT REVISION W4154398 11.30.16 10) T ED 00 RWS CRLCK APPROVED APPROVED 5.8.96 TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 IICPWAMIPAI uACTCG rl11 A—C/1 0C\/ CCMTCP MIA SHEET �ND 1M60C COMP N0. G NO 0—rJ1-111Rf1(` SY IW COND. FROM BCOOILER HOUSE HEATING • 3' STM /114,, 3/4' 3/4' ave / SEE DETAILED 1 STEAM COIL ISUPPLY DIAGRAM 150/15 PSI PRV THERMOSTATIC AIR VENT CD CHEMICAL FEED TIE—I I 0 CO CD i 067 1Y,' 1 � CD CD 3' GRAVITY FROM 9-50 1X2' FROM 9-101 C 3' FRO 4' FROM 'C' AREA CO IA' FROM 9-50 1 %' X 0.035' TUBE,- rb m AIf me, +<P3 44343 43 41 1 © B' U� )8000,/HR 10-12 PSI 2 L2 150/5 PSI PORTA— FEED MOTORIZED STOP 6',. CHECK VALVE 1' 150, STEAM TO OIL HEATER BALI. CHECK VALVE INTEGRAL TO INJECTION QUILL VALVE FEED WATER /CHECK REGULATOR 3;' VENT3' VENT ANGLE STOP VALVE NALCO PORTA— FEED STOP VALVE SIMPLEX PUMP CONDENSATE RECEIVER 0 -300F -- SIMPLEX PUMP 1X-BLOW—OFF VALVE BLOW—OFF VALVE )I'BLOW—OFF VALVE BLOW—OFF VALVE SIMPLEX PUMP SIMPLEX PUMP CONDENSATE PUMPS & RECEIVER BOILER CONTROL PANEL BOILER CONTROL PANEL PW BOILER CONTROL PANEL BOILER CONTROL PANEL 0-100 PSI TV? FEED 0-600# 36' PUMP CLWR (TYP)- 14'i FEED PUMP BFW 2 5 PSIS 0-600, BBD BBD BBD BBD BFW - LPS LPS /HR PSIG, FEED PUMP FEED PUMP 0-600 Y' PUMP CLWS (TYP) VALVES W/ MICROMETER DIALS CONTINUOUS B.D. SAMPLE COOLER 36' COOLING WATER EFFLUENT �—HI—LEVEL meg/` ALARM SWITCH CONTINUOUS J31 OWDOWN FLASH TANK CD PW FOR - 12GPM 0 150, 2' MAKE—UP WATER 3;' COOLING WATER CLWS 3;' TRAP CONDENSATE BBD BBD 1' 150, STEAM FROM 3' LINE TO 150/5 PRV 76' DUPLEX M 0-300 30-240? FUEL OIL PUMP FUEL OIL METERS MOUNTED INSIDE BOILER ROOM WALL 30-160F 0-30'00 DUPLEX 0-30"HG 2 FOS FOS FOS FOR FOR F05 FOS FUEL OIL TANK FUEL OIL TANK REVISION BY FOR APPROVED DATE FOR FOR FOR FUEL OIL FLOW DIAGRAM 5Y SCALE: NONE REVISION PW SEE 109-101-4316—M1 'ADDMONAL STORAGE' BY APPROVED J BBD BB DATE MMXE—UP WATER METER A AS BUILT 4957 HARR 09/14/09 ADD LAYUP CHEM FEED LINES W3768686 D.STRICKER 11/2/15 DEVELOPMENTAL CENTER BOILER REPLACEMENT 044154398 CO MS 11.30.16 SOFTENERS 2 BBD 3: SOLENOID LEVEL CONTROL VALVE ASCO 6267C23, N.O., 1200 AC, 15, MAX PRESS. DROP SUMP PUM 0 COL A/2.9 SUMP PUM 0 COL. A/3.1 BBD 000 ,AKVENT FILTER RECEIVER PUMP TO •— 0 HEATING 6' 5: TO 9-50 T ,c4 150/5 ,( 0-15 R.V. 8 8 TF� Icoola- 12•L1I0V471 I$4 ce;LAi &SW/IVG® 'DRAIN 2"DRAIN 1 2' 74 TO 9-50 150/75 0-160 RV. REVIEWED FOR\ii. A DE APPROVED JUL 07 2017 City of Tukwila BUILDING DIVISION FROM DISTRIBUTION TRAPS FLOAT SW. ALTERNATOR ACNGOF17MAINEERSN 1601 F'Df Avenue,So 900 'SAMOA WA 98101 P6206623471)1W206.62481)5 collmantan LASING a✓.n l®el...wr. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT DATE DRAWN M.WONG ,FECRED 50-400F 7.5 GAL RECEIVER 2' 3. 1 09.12.05 • COD : L IWO LEGEND co CONDENSATE (PUMPED OR GRAVITY) BBD BOILER BLOWDOWN BFW BOILER FEEDWATER CF CHEMICAL FEED CLWR COOLING WATER RETURN cLWS COOLING WATER SUPPLY EQUIPMENT FOR FUEL OIL RETURN Fos FUEL OIL SUPPLY — • — — INSTRUMENT NATURAL GAS PW PROCESS WATER (MAKEUP WATER) SAN SANITARY SEWER LPs LOW PRESSURE STEAM STM MEDIUM OR HIGH PRESSURE STEAM VENT YFLOOR DRAIN GAUGE GLASS m ORIFICE Q PRESSURE GAUGE A PRESSURE REGULATOR AT PRESSURE RELIEF VALVE W STEAM TRAP i,71 STRAINER 1, TEST PLUG 4 THERMOMETER PI- CHECK VALVE A GATE VALVE OS&Y If GLOBE VALVE NC O BALL VALVE NO Pa GATE VALVE NO • SOLENOID VALVE 4, NEEDLE VALVE • STOPCOCK GENERAL NOTES O REFERENCE DRAWINGS 9-50–M316 BOILER NO. 1 P&ID CONSTRUCTION NOTES PROVIDE AND INSTALL NEW BOILER AND ASSOCIATED TRIM, BOILER EXHAUST STACK, AND NEW SUPPLY AIR DUCT AND RECONNECT ALL PIPING, PROVIDE AND INSTALL ADDITIONAL ISOLATION VALVE. FOR DETAILED PIPING AND INSTRUMENT DIAGRAM FOR BOILER #1 SEE SHEET M316. ® BALL CHECK INTEGRAL TO INJECTION QUILL ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE FLOW DIAGRAM RECEIVED CITY OF TUKWILA JUN 08 2017 PERMIT CENTER CURRENT REVISION W4154398 BOL 11.30.16 100161LR M.WONG CHECKED APPROVED 09.12.05 TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT urruAMIr AI uACTED BUILDING 9-50 TIN rrnITEO LV SHEET M311 JOB N0. COMP NO. DWG N0. 0—B(1-1.11 1 1 STM ORIC LEVEL ALARM C INDICATING CONTROLLER ✓ --J C PRESS ALARM INDICATING CONTROL C E PA DIY L___T TEMP. TEMP. INDICATOR INDICATOR TI E t7� C TI E t7i � C INDICATING ATMOS CONTROLLER S S <�7C T T L z N L_ _ ATMOS ROOF ATMOS ATMOS ATMOS T r BURNER CONTROL C C J AIT 175 AIT WET LAYUP SERVICE ONLY 3 4" SEE FILL POT DETAIL L 150 PSI INDICATING FLOW INDICATING CONTROLLER INDICATOR CONTROLLER T L TO DRAIN BOILER FEEDWATER 1 1 BOILER FEEDWATE >NATURAL GAS >FUEL OIL SUPPLY> EXISTING WATER COLUMN HPS CONDENSATE POT BURNER 3/4" QUILL 6" LG. NALCO 3/4"NPT 1"FLG. CONNECT W/1"x3/4"FNP RED. FLG La ��M316 M500 -Ref (E) STEAM HEADER ▪ 3/▪ 4"OS&Y RELOCATED LEGEND X VALVE (GENERAL) Del GLOBE VALVE ® PIPE MAIN ANCHOR E STEAM TRAP 101 IN-LINE FLOW METER • PRESSURE REDUCING VALVE 41 PRESSURE SAFETY VALVE IV- ANGLE CHECK VALVE ANGLE VALVE -D.- GLOBE VALVE IM FLEXIBLE HOSE INTERLOCK xx xx E 3 xxx i C PLC "C" INDICATES "W" INDICATES 4 BFS CA HPS IA IW W NG CONNECTION TO BOILER BOILER FEEDWATER SUPPLY COMPRESSED AIR HIGH PRESSURE STEAM INSTRUMENT AIR INDUSTRIAL WATER WASTE NATURAL GAS PC PUMPED CONDENSATE NC NORMALLY CLOSED FO FAIL OPEN VB VACUUM BREAKER C BLOWDOWN CONDUCTIVITY PROBE ASSEMBLY // //PNEUMATIC TUBE (INSTRUMENT AIR) BOILER CONTROL PANEL WATER TREATMENT CONTROL PANEL ITEMS NOT PROVIDED UNDER BOILER - _ SPECIFICATION. ALL OTHER ITEMS TO BE PROVIDED BY BOILER SUPPLIER. GENERAL NOTES 1. STEAM OPERATING PRESSURE IS 125 PSIG. BOILER MAX. RELIEF PRESSURE IS 150 PSIG. 2. BURNER MANAGEMENT AND COMBUSTION CONTROLS ARE NOT SHOWN. SEE BOILER 0&M MANUAL FOR THESE CONTROLS 3. SEE DRAWING 09-050-M317 FOR SEQUENCE OF OPERATIONS AND EM CS POINTS LIST. 4. BOILER EXTERNAL PIPING IS BY THE BOILER MANUFACTURER AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. CONTINUOUS > TO BLOWDOWN TANK BLOWDOWN N.-1-1/2" (LAYUP STEAM) FUEL OIL RETURN< >H PS SUPPLY > C 4 1 1 1 1 LPS SUPPLY D< < 3/4" LPC >COMBUSTION AIR MA MA (ATOMIZING STEAM) ►. ►4 g " REVIEWED' FOR CODE COMPLIA APPROVED •4 3.".. T -B1-02 r 1 E LI? 400 48x30 DUCT LPC REVISION N O IM DUCT DAMPE DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 Bf COFFMAN APPROVED DATE SYM HC -950.1▪ -▪ 001 PREHEAT COIL 375 MBH REVISION FD -FAN & DRIVE PROVIDED WITH BOILER BY APPROVED DATE SIC LD C FGR DUCT MS 11.30.16 1 ----- BOILER I/O 480V POWER SUPPLY 2 B-9-50.1-001 BOILER 30,000 LB/HR (BY CLEAVER BROOKS) 0)LArdsmazAvc.a \ JUL 0 7 2011 City of Tukwila BUIL NG DIVISION ETHERNET CP -9-50.1-001 BOILER CONTROL PANEL FP -9-50.1-001 FILL POT 6" PIPE FABRICATION 6"IDx29"LG taut 10'N ie -{#Ne etaes— INTERFACE (PROTONODE) MODBUS TO BACNET OVER MSTP. SEE POINTS LIST ON DWG. 9-50-317 ET -5003 EXPANSION TANK 150 MAOP/132 GAL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAVM R. LEITNER CHECKED M. SIPE CEI CHECKED APPROVED UNTE 113016 113016 113016 113016 3/4„ 3/4„ .. g .. ►t T -B1-05 RECEIVED CITY OF TUKWILA JUN 082017 PERMIT CENTER CHEMICAL FEED <FROM HEADER AT 'MEZZANINE CONDENSATE TO COND. RECEIVER !ON MEZZANINE INTERMITTENT BLOWDOWN >TO BLOWDOWN TANK WET LAYUP OPERATION 1. WHEN BOILER IS SHUT DOWN AND COOLED TO A SAFE TEMPERATURE, CORROSION INHIBITING CHEMICAL WILL BE MANUALLY DOSED DIRECTLY INTO THE STEAM DRUM. 2. DAMPERS FCV-200 AND FCV-400 SHALL BE CLOSED. 3. THE VENT VALVES AND FILL POT VALVES WILL BE MANUALLY OPENED. 4. THE BOILER WILL BE MANUALLY FILLED UNTIL THE FILL POT LEVEL GLASS INDICATES IT IS TOPPED OFF WITH WATER. CONSTRUCTION NOTES 1>RE-USE EXISTING PROVIDED WITH BOILER E-> PROVIDE FILTER/REGULATOR SET FOR 25 PSIG INSTRUMENT AIR SUPPLY. ® NEW ISOLATION VALVE AT ROOT OF BRANCH 14"0 STEEL FGR DUCT PROVIDED BY CONTRACTOR SUBTITLE BOILER NO. 1 PIPING AND INSTRUMENT DIAGRAM CURREW REASON W4154398 sYmmORI DAM 11.30,16 APPROVED TITLE DEVELOPMENTAL CENTER BOILER RERACEMENT BUILDING 9-50 SHEET M316 JOB Na COMP NO. nry PFNTFR WA DWG ND. 0-50-M316 5Y REVISION BY APPROVED DATE SIM REVISIDN APPROVED DATE ORIG DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 g)LISFA7E,AIG 9-50 BOILER NO. 1 REPLACEMENT EMCS POINTS LIST INPUT TO EMCS TAG UNIT BOILER LEVEL CONTROL VALVE LCV -100 5 OPEN BOILER LEVEL LT -100 INCH BOILER LEVEL OPERATOR UT -105 INCH BOILER LEVEL SWITCH LOW LOW ALARM LSLL-100 ALARM BOILER PRESSURE PIT -125 PSIG BOILER HIGH PRESSURE ALARM PSHH-125 ALARM STACK DAMPER POSRION OPEN Z50-200 Y/N STACK DAMPER POSRION CLOSED ZSC-200 Y/N BOILER STACK TEMPERATURE TIT -175 DEG F BOILER STACK OXYGEN AIT -175 02 5 BOILER STACK CARBON MONOXIDE NT -175 CO 5 BOILER STACK NITROGEN OXIDES AIT -175 NOX 5 BOILER STEAM PRODUCTION DPT -300 LBS/HR BOILER TEMPERATURE TT -800 DEG F BOILER NATURAL GAS FLOW FIT -190 CFH BOILER FUEL SELECTOR OIL Y/N BOILER FUEL SELECTOR NATURAL GAS GAS Y/N BOILER COMBUSTION AIR FLOW FS -150 CFM BOILER COMBUSTION AIR TEMPERATURE TT -450 DEG F BOILER COMBUSTION AIR DAMPER OPEN ZSO-400 Y/N BOILER COMBUSTION AIR DAMPER CLOSED ZSC-400 Y/N BOILER FLUE GAS RETURN (FGR) DAMPER FCV-180 5 OPEN ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE BOILER CONTROL DESCRIPTION: 1. SEE POINTS LIST (THIS SHEET) AND P&ID ON DWG 9-50-M316. 2. BOILER CONTROLS SHALL FOLLOW THE SEQUENCE REQUIRED BY NFPA 85 BOILER AND COMBUSTION SYSTEMS HAZARDS CODE AND ADDITIONAL RECOMENDATIONS OF FM -GLOBAL DATA SHEETS FOR OIL- AND GAS-FIRED SINGLE -BURNER BOILERS. 3. THE PACKAGED BURNER MANAGEMENT SYSTEM SHALL BE DESIGNED IN STRICT ACCORDANCE WITH THE APPLICABLE CODE REQUIREMENTS OF NFPA 85 AND FOLLOW THE SEQUENCE OF OPERATION FOR SHUTDOWN. 4. COMBUSTION CONTROL SYSTEM SHALL BE THE MANUFACTURER'S STANDARD SEQUENCE OF OPERATION WITH ALL CONTROL PRODUCTS LISTED FOR SERVICE IN BOILER CONTROL. 5. IF ANY SAFETY SUTDOWN OCCURS THE CONTROL PANEL SHALL INITIATE A VISUAL AND AUDIBLE ALARM WITH MANUAL ACKNOWLEDGE/RESET FUNCTION. 6. THE BOILER OPERATORS WILL SELECT AN OPERATING PRESSURE. THE BOILER CONTROL SYSTEM WILL MAINTAIN FIRING RATE TO MAINTAIN THAT PRESSURE. THE BOILER CONTROLS WILL AUTOMATICALLY MAINTAIN WATER LEVEL FOR SAFE OPERATION. SINGLE ELEMENT LEVEL CONTROL IS ACCEPTABLE. 7. IF THE PRESSURE EXCEEDS THE HIGH LIMIT THE BOILER WILL GO INTO SHUT DOWN AND BURNER WILL BE SHUT DOWN. 8. IF PRESSURE CANNOT BE MAINTAINED AT MAXIMUM FIRING RATE THE BOILER PANEL SHALL INITIATE A VISUAL AND AUDIBLE ALARM WITH MANUAL ACKNOWLEDGE/RESET FUNCTION. 9. FUEL CHANGE -OVER (FUEL OIL OR NATURAL GAS) SHALL BE MANUAL. THERE IS NO MASTER CONTROL. 10. BOILER OPERATING SELECTION WILL BE MANUAL. 11. WET LAYUP OPERATION: 12. WHEN BOILER IS SHUT DOWN AND COOLED TO A SAFE TEMPERATURE CORROSION INHIBITING CHEMICAL WILL BE MANUALLY DOSED DIRECTLY INTO THE STEAM DRUM. 13. DAMPERS FCV-200 AND FCV-400 SHALL BE CLOSED. 14. THE VENT VALVES AND FILL POT VALVES WILL BE MANUALLY OPENED. 15. THE BOILER WILL BE MANUALLY FILLED UNTIL THE FILL POT LEVEL GLASS INDICATES IT IS TOPPED OFF WITH WATER. 16. THE STEAM SUPPLY TO THE DRUM HEATERS WILL BE MANUALLY OPENED. THE OPERATOR WILL INITIATE LAYUP TEMPERATURE CONTROL AT THE BOLER CONTROL PANEL. THE BOILER CONTROL PANEL WILL CONTROL BOILER TEMPERATURE TO THE OPERATOR SELECTED SETPOINT (180 DEG. F TO 250 DEG. F) AS MEASURED AT THE STEAM DRUM, BY MODULATING THE STEAM SUPPLY TO THE DRUM HEATING COILS. 17. WHEN THE BOILER IS TO RETURN TO OPERATING SERVICE IT IS TO BE MANUALLY DRAINED TO OPERATING LEVEL. THE VENT VALVES AND FILL POT VALVES ARE TO THEN BE CLOSED. 18. EMCS SEQUENCE OF OPERATION: 19. PLANTWIDE EMCS SHALL MONITOR BOILER STATUS AS SHOWN IN THE POINTS LIST. 20. PLANTWIDE EMCS SHALL NOT MAKE ANY CONTROL INPUT TO THE BOILER. 21. BOEING EMCS CONTRACTOR SHALL DEVELOP DISPLAY SCREENS AND ADDRESS THE BOILER PANEL OUTPUTS FROM THE MODBUS-TO-BACNET PROTONODE PANEL LOCATED AT THE 9-50 BOILER ROOM. REVIEWED FOR 'CODE COMPLIANCE APPROVED JUL 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 08 2017 PERMIT CENTER OFFMAN N G I N E E A S 1601 F'M Avenue, Suie 900 15ee16, WA 98101 ph 206.62307171133 266.6266716 cprtmpn.cpm IY3SI DRAWN -DATE: 5000/711 CEI 11.30.16 DREDRE6 SEQUENCE OF OPERATION LNN4INLEII 11.30.16 NttH CHECKE ISSUE FOR CONSTRUCTION 11.30.16 CURRENT REVISION W4154398 SYMBOL OATS ORIG 11.30.16 APPROVED APPROVED TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT urruA5IlrAl 11ACTCD BUILDING 9-50 116V/ rENITCD WA SHEET M317 JOB N0. W4154398 COMP N0. DWG NO. 0_Sn_u717 GENERAL NOTES IU ®, 48x30 COMBUSTION AIR SUPPLY DUCT DUCT UP THRU ROOF EXTEND (E) 3/4 LPC 1M452 M559 PERMIT CENTER UH -01 16'-0" CLEAR TUBE PULL CLEARANCE EXTEND (E) 3/4 LPS 1M452 1M500 1M452 M558 SEE FEEDWATER ISOMETRIC 4" CD FROM R NEW CONTROL PANEL 1M452 M558 30"ID BOILER STACK UP THRU ROOF ECONOMIZER ECONOMIZER PLATFORM 3" CD FROM 9 101 REMOVE GAS PIPING FOR BOILER MOVIE -IN. 2-1/2" GAS - TYP 11 1/4" CD PUMPED iFROM BLDG 9-50 2" TRAP CD RTN FROM SERVICE TUNNEL 3" PC FROM 9-101 ACCESS LADDER - SEE FEEDWATER ISOMETRIC, 1M452 M557 1M452 M559 SY FUTURE: 4° COND. FROM 9-90 COMPLEX 8" STEAM TO 9-9P- OMPLEX. 1M452 M558 1� � 6° TO 9-101 AC -3, LN2 �I �0 ' o$ j � 4" TO 9-120 1+� 6" TO 9-101.2 no II Y n� C1 R© 4" CD FROM C -AREA Ir 11���1I_ . �l �,• mai. BMW "ice%.1111= pN i �_ �ICC•ua ' �-... . 611==�ii7;ii:�.,, _ _77.11=-7711 ENEEMEEkl=b—IEWei"-TEME=Era=MIE Await vA 1M511 3" TO 9-50 PRVS 2-1/2" GAS 8" TO 9-101 ANNEX 4" TO 9-101.1 3" CD FROM 9-10 REVISION CONVERSION FROM MYLAR TO CAD DWG#109-050-4019-N1 A INSTALL GAS & STEAM FLOW METERS (CANCELED) W199236 8 INSTALL GAS & STEAM FLOW METERS 12158-10 C RELOC TRANSMITTERS; ADD TUBE/FITTING CALLOUT 12158-10 enn 0LT4II 9 (.6111111T 6610 CTVAU UETCPINC 19106_1A BY CCSI gMA N GOFF I N E E R N S 1601 FIIH Avenue, SJ1e 900 ISe60E, WA 98101 ph 3064334717 Nu 206.6243776 coflmansom LAST. cev.".r"1+ n APPROVED 61066 DATE 12.10.00 09/15/10 04/07/11 06/07/11 00/19/11 SY E 00 14.109 03 PARTIAL PIPING PLAN SCALE: 1/4" = 1'-0" 1M60 1M452 REVISION PLANT STEAM FLOW METERS 13449-10 F UPGRADE CONTROLS BOILERS #3 & #4 12770 G DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 BY APPROVED HARR DATE 10/28/11 12/01/11 11.30.16 _BOE/A/G® ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE MAKE UP WATER METER: HERSEY #562, S/N 0505755. FITTED WITH HERSEY SP-HD357915640G TRANSLATOR & SP-HAMRCOM3PM PULSER MODULE. POWER SUPPLY: 7-32 VDC, 50 MA. CONCENTRIC ORIFICE PLATE, FLANGE TAP; BOILER #1 & #2: 4.382" DIA, BOILER #3: 4.369" DIA, BOILER #4: 4.025" DIA. DIFFERENTIAL PRESSURE TRANSMITTER: HONEYWELL STD120-E1H-00000-AN,SM,TG,S2,MB,9X+XXXX. POWER SUPPLY: 10.8-42.2 VDC, 3.0-21.8 MA OUTPUT: 4-20 MA. NATURAL GAS FLOW METER: MAGNETROL TA2-2161-430 MASS FLOW TRANSMITTER, TER -A110-035 PROBE. POWER SUPPLY 120 VAC. OUTPUT: 4-20 MA. MEASURED PRESSURE AT INSTALLATION POINT: 30 PSI (8/17/2010). 3" VORTEX STEAM FLOW METER, 300# RF FLANGE: HONEYWELL VM01-4-ABAA5-101-000-00-113V0-00000. TOTAL QUANTITY 1. 16 > 4" VORTEX STEAM FLOW METER, 300# RF FLANGE: HONEYWELL VM01-4-BBAB5-101-000-00-113V0-00000. TOTAL QUANTITY 3. 17 > 6" VORTEX STEAM FLOW METER, 300# RF FLANGE: HONEYWELL VM01-4-DBAD5-101-000-00-113V0-00000. TOTAL QUANTITY 2. 18 > 8" VORTEX STEAM FLOW METER, 300# RF FLANGE: HONEYWELL VM01-4-EBAE5-101-000-00-113V0-00000-03. TOTAL QUANTITY 2. 19 > FUTURE: 4" ELECTROMAGNETIC FLOW METER, 150# RF FLANGE: HONEYWELL MM10-4-BA-01-C01-11-0000-10V00-0000 (METER) & MM90-4-4-A-0-43-00-1-V100-000-0 (TRANSMITTER). QUANTITY ONE THIS SHEET. (ADDITIONAL CONDENSATE METERS SHOWN ON 9-50-1M500 & 9-98-1M61.) CONSTRUC ION NOTES PROVIDE 6"HPS TIE-IN TO NEW BOILER SUPPLY VALVE. PROVIDE NEW ORIFICE AND NEW SET OF ORIFICE FLANGES. RE -INSTALL EXISTING ORIFICE DIFFERENTIAL PRESSURE TRANSMITTER. PROVIDE DRIP PAN ELBOW WITH 4" VENT THRU ROOF ' PROVIDE 2" MANUAL VENT LINE THRU ROOF E> PROVIDE NEW 3" NATURAL GAS FROM (E) PLUG VALVE TO GAS TRAIN. © RE -USE EXISTING MOTORIZED ANGLE STOP VALVE ACTUATOR ASSEMBLY. SEE STRUCTURAL SHEETS S534 & S535 FOR DUCT SUPPORT DETAILS PROVIDE AND INSTALL NEW STEAM UNIT HEATER IN THIS LOCATION. RE -CONNECT STEAM SUPPLY AND CONDENSATE RETURN FROM PREVIOUS UNIT HEATER LOCATION. FIELD VERIFY PIPE SIZES. ISSUE FOR CONSTRUCTION 11.30.16 DRAWN DATE S. ZAROUDNY 10.24.85 SUBTITLE PARTIAL STEAM & CONDENSATE PIPING PLAN KEY PLAN SCALE: NONE Q 4' 2' 0 2' 4' 8' 0 SCALE: 1/4"=1'-0" CURRENT REVISION W4154398 11.30.16 ENO19110 S. 040000NY 'CHECKED U. R. BEHRING APPROVED 08060600 0.24.85 0.28.85 IRE DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 CT`LIAAIInAI IUACTCD /`n1 A-6- /1 0_11 n[3/ f CAITCD SHEET 1M452 JOB N0. COMP NO. DWG NO O-Sn_113e59 UNIT HEATER STEAM SUPPLY -- GATE VALVE (TVP.) UNION (TYP) F&T TRAP (2 TIMES UNIT CAPACITY) T–B1-06 DRIP LEG L) (FULL SIZE) STRAINER W/ SCREWED END RE–LOCATED EXISTING 3/4" SS OS & Y VALVE 3/4" SS NPT ELBOW 3/4" SS NPT PIPE (TYP) 3/4" QUILL 6" LG. NALCO 3/4"NPT BOILER DRUM 3/4" SS CLASS 400 SWING CHECK VALVE L__J 1"x3/4" CLASS 300 SS FNPT REDUCING FLANGE 1" CLASS 300 FLANGE ON BOILER DRUM 3/4" SS TUBING /- TO SOURCE TYPICAL UNIT HEATER DETAIL (T' CHEMICAL INJECTION PORT DETAIL - BOILER #1 ("3 - SCALE: NONE M559 PRESSURE GAUGE – TURN FACE AS REQUIRED FOR BEST VISIBILITY— THRED–O–LET 1/2" TEE 1/4"COUPLING SYPHON 1/2"x1/4" BUSHING 1/2" "TELL TALE" GATE VALVE 1/2" SW/THR'D GATE VALVE 1/2" PIPE NIPPLE 1/2" SW ELBOW (WHEN REQ"D) 1/2" SW PIPE NIPPLE–LENGTH TO SUIT CLEARANCE FOR GAUGE TYPICAL GAUGE DETAIL SCALE: NONE VENT, MATCH BOILER CONNECTION SIZE MM599 1"GLOBE VALVE SCALE: NONE M559 DISCHARGE PIPE THRU ROOF PROVIDE PIPE ■ SUPPORT PSV PIPE FROM SLEEVE SUPPORTED FROM ROOF ABOVE OR ROOF ROOFS STRUCTURE BELOW. SS BELL CAP FLASHING TACK TO PSV PIPE AND SEAL WEATHER TIGHT DISCHARGE PIPE ONE PIPE SIZE LARGER THAN DRIP PAN INLET FLANGED CLASS 150 DRIP PAN ELBOW BY MECH. CONTRACTOR. MATCH PSV OUTLET SIZE ROUTE 3/4"COPPER DRAIN LINE TO DRAIN TYPICAL PSV DETAIL SCALE: NONE GAUGE GLASS ASSEMBLY "JOHN C. ERNST", BRONZE BODY, 3/4"NPT, 5/8"GLASS, 250 PSI, 400'F, W/ ASME BALL CHECKS AND RODS. GLASS TO BE 30" LG 1'THRE–O–LET, TYP, 2–/2" ABOVE CAP WELD 6"PIPE CAP, WELDED, TVP. 3/4" HALF CPLG, CLASS 3000 TYP. SY FILL POT DETAIL SCALE: NONE REVISION BY APPROVED ROUTE TO DRAIN 3/4" TO ET -5003 3/4"x3/4" BRONZE BODY PRESSURE SAFETY VALVE SET AT 150 1/2" ROUTE TO TRENCH DRAIN 3/4" ROUTE TO TRENCH DRAIN 1 ' 1 M559 DATE SY REVISION APPROVED DA ORIG DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 MM�59 0-200 PSI ROOF PENETRATION 1 � 1 MM�59 VENT TO ATMOS. 3/4" 1-1/2" BYPASS SET 20 PSI 2-1/2" D 10 DIA 1/4" 1 ECCENTRIC REDUCER (FOB) 0-45 TYPICAL PSI, I► 2 POSITION -0-45 AUTOMATIC PSI VACUUM BREAKER SHUT–OFF VALVE 3/4" 3' 3/4" ISI " OFFSET PIPING AT UNIT TLV TO FACILITATE COIL T–B1-02 AND FILTER REMOVAL 1/2" 3/4" THERMOSTATIC AIR VENT 3/4" LPC �a SII F&T Y T–B1-01 T" MAIN SHUT–OFF VALVE x (150 PSIG) (1272 LBS/HR © 4 BOILERS RUNNING) oa IIM IE- — LPS (15 PSI) 3/4" LPC I>c TLV T–B1-03 g)LAsus (E) 4"HPR (E) 3"HPS STEAM STEAM PRE -HEAT COIL COMBUSTION AIR INTAKE STEAM SUPPLY AND STEAM COIL DETAIL - BOILER #1 EE SCALE: NONE LEGEND OPVG epi 1. 831.1 PIPING TO BE FABRICATED PER ASME B31.1 2. BPVC PIPING TO BE FABRICATED PER ASME BPV CODE AND SHALL BE STAMPED AS SUCH. DO NOT FIELD MODIFY. iE M559 RPL PSEis°l BRACING 3/4" 370 MBH STEAM COIL FLEXIBLE CONNECTOR INSTALLED PARALLEL TO COIL HEADER AND AS CLOSE AS POSSIBLE TO COIL CONDENSATE REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2011 ANGER 5PRINGNCity of Tukwila B I . ING DIVISION NOTE: BOILER EXTERNAL PIPING (BEP) IS BY THE BOILER MANUFACTURE AND SHALL BE COORDINATED WITH FEEDW SCALE: NONE AFOFFMAN N G I N E E II S 1601 FM Avenue, Su'Ie 900ISeatt6, WA 98101 ph 106410411/ Bax 1064113715 2A671.10 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN R.LEITNER CHECKED L.BAWEJA ING1NttA M.SOTURA CHECKED APPROVED DATE 11.30.16 11.30.16 11.30.16 TE ET NTROL i015ONToROS OR 00ER ROOD EL o 80ILE �PLyE RECEIVED CITY OF TUKWILA JUN 08 2011 ALL OTHEPERMITM IOENTER ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE DETAILS CURRENT REVISION W4154398 "'OR DATE IG 11.30.16 APPROVED TITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-50 I/CruAMI Al TIACTCA rnl V_V /V_V nCv rrhITCA NI SHEET M559 JOB NO. W4154398 COMP O. DWG N0. o_Fn_usSD CD Q 24" CHWS 24 CHWR O O 4" DS RD 01 c2EPTEDEDIT 00 04'V 4"V 14 CHWS 00 Rg 14" CHWR R0 EMERG- GEN E8H 48"0 BOILER 1 STACK (3 TYP) EL -2' - ABOVE R00 4� RD D 0 3 3.1"D SY O 30"0ID BOILER TERMINUS CAP ACK WIT 14" STM 3"RD 2V REOSION 2V 2V BY 18° CH 18" Ci 0' EL -2'-8" 1 ABOVE ROOF 18" CHWS&R APPROVED 8'-6 X 24 DN 3 I Es RD I I ®Rl CHWS&R1 4" REFI VENT C 16"&32" DUCT CAPPED PARAPET 12 "V 1"-3 8"V 8"V DATE 4" YIV 4"V 2"VTR IG. PPED ®RD 4" REFRIG. VENT CAPPED _ -2" VTR UP o' ---,-THROUGH EXIST., 6" PIPE PENETRATION. C\ 1 0 (5) CAPPED 0 SLEEVES o-*—ITHRU ROOF 8"0 CHWS 18"0 CHWR 1-1/2" LOW POINT DRAIN VALVES (CAPPED) SY REV1510N 13 RD ROOF PLAN SCALE: 1/16" = 1'-0" APPROVED DATE A DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398. CEI M5 1.30.16 3"RD 3"RD® IG 2'"A 3"RD ACOFFMAN NGIN EERS 1601 Fflh Avewc, Sulo 6001008160, WA 98101 ph 664]24717 7022064113116 LOWn LAST.. w.n ti.e r."ur 3'V FREEZER COMP. 2"DS O 1 1/2" y!-1/2�REFRIG LINES FREEZER REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2011 City of Tukwila BUILDING DIVISION Mil' OY'1 ISSUE FOR CONSTRUCTION 11.30.16 DRAWN ACCEPTABILITY DAVE PRETARE THIS DESIGN AND/OR CHl,,RLD SPECIFICATION IS APPROVED NONLIN APPROVED BY DEPT. DATE APPROVED -- *8f PROVED DATE 7/02/13 SUBTITLE ROOF PLAN LEGEND OT TEMP. TRANSMITTER GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW 30"ID DIAMETER BOILER STACK AND SUPPORT AS REQUIRED. SEE DWG. S534 RECEIVED CITY OF TUKWILA JUN 0 8 2017 PERMIT CENTER O O KEY PLAN SCALE: NONE CURRENT REVISION W4154398 BOL A DATE 11.30.16 ITLE DEVELOPMENTAL CENTER BOILER REPLACEMENT BUILDING 9-050.R urrHnKllrAl 11ACTOP col A-,//-1-11 nn/ rrAaro w SHEET RFM01 JOB NO. W4154398 COMP N0. DWG N0. n0-non-orun1 FO" CONTINUATION BELOW 5E6 DWG 09-YRD-8501 2" V „ V OM LEGEND / RD © RD RD 7 RD z -6" HIGH COVERED ELEC CHASE (REF) 24' CHWS & CHWR DOWN INTO CHILLER ROOM, SEE DWG 9-50-1M457 FOR CONTINUATION RD APPROX. 12" OFFSET 4N VERTICAL NEW 14" CHWS O O EMERGENCY 13•-3" 14" CHWS 14" CHWR x x NEW 14" CHWR 24" CHWS 24" CHWR RV • 11/•V., SEE DWG. 09-050-S403 FOR PIPE SUPPORTS (IYP) COMBUSTION GRAVITY SUPP W/ FACTORY "GREENHECK" 10 SQ.FT. MINI THROAT AREA. R Y HOOD OOF CURB, GI UM EXIST. CAPPED SLEAVE THROUGH ROOF TEMP. TRANSMITTER CENTERUNE ELEV. -2•-8" ABOVE ROOF SURFACE 694 0, 68888 612 ,Ix 8,880 6 l e. 4' v --P 1-1/4 V'" casT. re, 18" CHWS - 18" CHWR-� 4" REFRIGERANT VENT BOILER VENT BOILER #1 STACK BOILER STACK (3 TYP) CF RIGERANT VENT iRD 2" VTR UP THROUGH EXIST. 6" PIPE PENETRATION. DS RD STORM SEWER DOWN SPOUT ROOF DRAIN $ POINT OF CONNECTION GENERAL NOTES 1. PIPE INSULATION SHALL BE FOAM GLASS WITH ALUMINUM JACKET IN EXTERIOR SPACES AND FICERGLASS ASJ/SSL FOR INTERIOR SPACES. REFERENCE DRAWINGS CONSTRUCTION NOTES PROVIDE NEW 30"010 DIAMETER BOILER STACK. PROVIDE COMBUSTION AIR GRAVITY SUPPLY HOOD WITH FACTORY ROOF CURB, GREENHECK FGI WITH 10 SQ.FT. MINIMUM THROAT AREA. BOILER PSV VENTS AND BOILER VENT. EXIST. CAPPED SLEAVE THROUGH ROOF 8,-6" 11' 3" -- 4" REFRIGERANT VENT RISE ON 40 ANGLE - REVIE VED FOR CODE COMPLIANCE APPROVED JUL 07 2011 RECEIVED CITY OF TUKWILA EXIST. CAPPED SLEA\ E THROUGH ROOF City of Tukwila JUN 08 2011 PERMIT CENTER 3" R V 2" V 18"0 CHWS 18"0 CHWR RFM10 RFM101M520 1-1/2" LOW POINT DRAIN VALVES (CAPPED) 18" CHWR 18" CHWS ROOF PLAN Mil l SCALE: 1/8" = V-0" FFMAN NGINEERS 1601 08111Avenue, Su'e 900 16010, WA 98101 pA 25.623.0717 Ma 306.660775 COP,APAcwn lAST6eG w.,c 1,W. l..ennr A RENSION REPLACEMENT PARTS 9-50 TOWERS CONVERSION FROM YLAR PH 1 CHILLED WTR UPGRADE CAD J8790082 702416-01 UPGRADE CHILLER PLANT 702416-03 RISC mum, CflBPEPl1f4C APPROVED SLB RWJ CCS/ RWS DLD 7n7A1R-Dns Din RWS AWC 2.17.99 C 12.10.00 0 03/22/01 E 12.21.01 F REVISION 9-50 CHILLED WATER UPGRADE PH 2C CHILLED WATER UPGRADE 522589-03 DCA -9-08-021 CHILLED WATER UPGRADE ADDENDUM #2 DCA -9-08-021 STEAM VENT PIPE & SILENCER 12770 n1 97 n7 !7 nFVFI 02901JTAI PFMTFA ADI/ FA 9081 APFMFNT APPROVED RWS 11.27.02 COFFMAN M. SOTURA 10.22.08 COFFMAN HARR WA1R47GR PFI M. SOTURA PC 01.07.09 12/15/11 11 In 1R g)LAPICZEING ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED APPROVED BY DEPT. DRAWN H. G. ZALLKLD ISSUE FOR CONSTRUCTION 11.30A6 KEY PLAN O SCALE NONE DAZE 1.14.86 SUBTITLE ROOF PLAN CURRENT REVISION W4154398 SYMBOL G DATE 11,30.16 GATE B. C. REA CHECKED 22.86 DEVELOPMENTAL CENTER BOILER REPLACEMENT APPROVED J. JOHNSTONE APPROVED 1.22.86 BUILDING 9-50 RFM10 JOB NO. COMP N0. IIEPIJAAIIPAI 11ACTCP A in 11 / _1 in 7 nn/ rGAITED UTA DWG N0. D_Sn_PrII l n SY REV1010N BY APPROVED DATE SY 30"0 ID BOILER EXHAUST STACK, TO BE CONFIRMED BY MANUFACTURES CERTIFIED DRAWINGS. ECONOMIZER < CI) D D r T1 48x30 SUPPLY AIR DUCT WITH 2"RIGID FOAMGLASS DUCT INSULATION BOILER#1 CONTROL PANEL COMBUSTION AIR CONNECTIOIN ATOMIZING STM PIPE HANGER 6" 150 LB HPS REVISION BOILER ; 1 INSTRUMENTATION PLAN SCALE: 1/2"=1'-0 APPROVED DA ORIG DEVELOPMENTAL CENTER BOILER REPLACEMENT W4154398 CEI MS 11.30.16 g..___Arg7EAfArge® PIPE HANGER AFOFFMAN NG1NEERS 1601 FRn Avenue, Sule 900'Sea.E, WA 98101 01 106523.0717 Hu 20652407I6 LASTNG ACCEPTABILITY THIS DESIGN AND/OR :CIRCATION IS APPRO� APPROVED BY DEPT. DATE DRAWN COAD M.SOTURA ENGINEER APPROVED APPROVED DATE 11.30.16 11.30.16 REVIEWED FOR COD APPROVED CE JUL 0 7 2017 City of Tukwila BUILDING DIVISION 1102 1► 0 LEGEND GENERAL NOTES 1. BOILER EXTERNAL PIPING IS BY THE BOILER MANUFACTURE AND SHALL BE COORDINATED WITH ALL OTHER MECHANICAL ELEMENTS. CONSTRUCTION NOTES THE 14" FLUE GAS RETURN (FGR) DUCT IS TO BE FABRICATED AND INSTALLED BY THE CONTRACTOR IN COORDINATION WITH THE BOILER MANUFACTURER CONNECTION REQUIREMENTS. INSTALL FGR CONTROL DAMPERS AND SENSORS PROVIDED WITH BOILER. RECEIVED CITY OF TUKWILA JUN 0 8 2017 PERMIT CENTER 0 0 0 ISSUE FOR CONSTRUCTION 11.30.16 SUBTITLE TIRE BOILER #1 INSTRUMENTATION PLAN DEVELOPMENTAL CENTER BOILER REPLACEMENT AIG!`IJA AIIf AI 1IACTCD BUILDING 9-50 01/ /`GAITED INA CURRENT REVISION W4154398 SHEET STMBOLO R I G DAIT: 11.30.16 1102 JOB N0. W4154398 COMP N0. DWG NO 0_511_1 in 6/1/2018 City of Tukwila Department of Community Development LAURI THODAY PO BOX 249 AUBURN, WA 98071 RE: Permit No. M17-0083 BOEING #9-50 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 7/8/2018. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or fmal inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 7/8/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, y Permit Technician File No: M17-0083 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director January 4, 2018 Lauri Thoday Auburn Mechanical PO Box 249 Auburn, WA 98071 RE: Request for Extension 111 Permit Number M17-0083 Dear Ms. Thoday, This letter is in response to your written request for an extension to Permit M17-0083. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through July 8, 2018. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, Rachelle Ripley Permit Technician File: Permit No. M17-0083 Tukwila City Hall • 6200 Souticenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov City of Tukwila Depaztnient of Community Development 6300 Southcenter Boulevard Suite #100 Tukwila, WA 98188 RE: Permit No. M17-0083 Attn Rachelle Ripley December 11, 2017 Auburn /Mechanical When prrfornmm•e- ronnis We would like to have our mechanical permit extended for a period of 180 days. Due to the lengthy submittal approval process and the upcoming holiday we will be installing the boiler during the last week in December and will not be ready for a final inspection until mid to late January. If you have any questions, please do not hesitate to call. Thank -you, Lauri Thoday Project Engineer 253-255-4996 Request for Extension # 1 Current Expiration Date: Extension Request: gApproved for / iKC) days Denied (provide explanation) Signature/Initials ( www.aubummechanical.com 2623 W Valley Hwy N PO Box 249 Aubum, Washington 98071 P 253.838.9780 F 253.833.1384 12/1/2017 City of Tukwila Department of Community Development LAURI THODAY PO BOX 249 AUBURN, WA 98071 RE: Permit No. M17-0083 BOEING #9-50 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 1/8/2018. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 1/8/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, the le " ipl Permit Technician File No: M17-0083 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 June 19, 2017 City of Tukwila Department of Community Development LAURI THODAY PO BOX 249 AUBURN, WA 98071 RE: Correction Letter # 1 MECHANICAL Permit Application Number M 17-0083 BOEING #9-50 - 9725 E MARGINAL WAY S Dear LAURI THODAY, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 1.1x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by.a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front'page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Boiler and Pressure Vessel are Regulated by the State Of Washington and inspected under L & I permit. Installation or reinstallation permits are required before any new or existing boiler/unfired pressure vessel is installed, reinstalled, or moved in the state of Washington. This following link shall provide you with the website where this information can be obtained. http://www.lni.wa.gov/TradesLicensingBoilers/Permitlnspect/default.asp#1 Provide documentation on the plan that the L&I permit, inspections signed off by the L&I inspector, shall be submitted to the building official at final inspection of this mechanical permit. Note: In response to these corrections for this permit -plan -review, other corrections may be needed. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will notbe accepted through the mail or by a messenger service. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3.670 • Fax 206-431-3665 If you have any questions, I can be reached at 206-431-3655. Sincerely, 'bW Bill Rambo Permit Technician File No. M17-0083 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-366.5 PERMIT COORD COPY: PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0083 DATE: 06/30/17 PROJECT NAME: BOEING #9-50 SITE ADDRESS: 9725E MARGINAL WAY S Original Plan Submittal X Response to Correction Letter # 1 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: �s AW 1-1-11 Building Division MI Public Works Fire Prevention Structural Planning Division ❑ ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 07/04/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08/01/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0083 DATE: 06/08/17 PROJECT NAME: BOEING #9-50 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: �3 Co'IrZ 6o`1*di'7 Building Division 1111 Public Works ❑ A - A 6)-9,( -7 Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 06/13/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 07/11/17 Notation: REVIEWER'S INITIALS: DATE: Permit. Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Ping ❑ PW ❑ Staff Initials: Ai±1. 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us RECEIVED JUN 3 0 2017 Community Development Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 60 je9.3/a0 s `7 Plan Check/Permit Number: M17-0083 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Boeing #9-50 Project Address: 9725 E Marginal Way S Contact Person: 1 -2,1,1P: 5 -r..). Phone Number: aS`J''MG Summary of Revision:' O(_ Ct rato. L V C Xv try. Asevv., kyvt. \„sr_4(..„‘„aso jo,,\\ tciuva-t-4- c%Ara. bc'‘Vt-N-- \412- =0`cp'.-4z)L- C - .kt.- CGS a.eA v`0-Arv‘k - 1S Sheet Number(s): "Cloud" or highlight all areas of revision including date of revisi n c i Received at the City of Tukwila Permit Center by: I-- Entered in TRAKiT on (0'w^17 \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: AUBURN MECHANICAL INC Washington State Department Of 116,40 Labor & Industries Page 1 of 2 Home Espanol Contact Search L&I j A -'I. index Help My L&I Safety & Health Claims & Insurance Workplace Rights Trades & Licensing AUBURN MECHANICAL INC Owner or tradesperson Principals THODAY, DAVID V, PRESIDENT JOHNSON, STACY ANNE, PRESIDENT JOHNSON, KIM PAUL, SECRETARY Doing business as AUBURN MECHANICAL INC WA UBI No. 600 074 968 PO BOX 249 AUBURN, WA 98071 253-838-9780 KING County Business type Corporation Governing persons KIM JOHNSON RYAN HOWARD MCMAHAN; STACY A JOHNSON; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. AUBURMI163BA Effective — expiration 01/01/1984— 09/12/2018 Bond ............... FIDELITY & DEPOSIT CO OF MD Bond account no. LPM8047218 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 09/12/2001 09/01/2001 Expiration date Until Canceled Insurance ............... Continental Western Ins Co $1,000,000.00 Policy no. CPA6015336 Received by L&I Effective date 09/28/2016 10/01/2016 Expiration date 10/01/2017 Insurance history Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600074968&LIC=AUBURMI163BA&SAW= 7/12/2017 AUBURN MECHANICAL INC flisk Savings No savings accounts during the previous 6 y__r period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. This company has multiple workers' comp accounts. Active accounts L&l Account ID 169,854-00 Doing business as AUBURN MECHANICAL INC Estimated workers reported Quarter 1 of Year 2017 "Greater than 100 Workers" L&I account contact T3 / DAVID PRYOR (360)902-4804 - Email: PRYD235@Ini.wa.gov Track this contractor 0 Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have boen issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/14/2012 Inspection no. 316342369 Location 2623 W Valley H;ghway Auburn, WA 980.2 Violations Page 2 of 2 ©Washington State Dept, of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600074968&LIC=AUBURMI163BA&SAW= 7/12/2017