HomeMy WebLinkAboutPermit M17-0096 - SAFARI - BATHROOM EXHAUST VENTSAFARI
2867 SOUTHCENTER MALL
MI 7-0096
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
9202470010
2867 SOUTHCENTER MALL
Project Name: SAFARI
Permit Number:
Issue Date:
Permit Expires On:
M17-0096
8/30/2017
2/26/2018
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
WESTFIELD PROPERTY TAX DEPT
PO BOX 130940 , CARLSBAD, WA,
92013
GLORIA CHIEN
1420 NW GILMAN BLVD #23463 ,
ISSAQUAH, WA, 98027
J E M CONSTRUCTION INC
29506 8TH AVE S , ROY, WA, 98580
JEMCOI*033DD
Phone: (206) 335-4199
Phone: (253) 843-2765
Expiration Date: 5/15/2019
DESCRIPTION OF WORK:
ADDING BATHROOM EXHAUST VENT. ADJUSTING MINIMUM OUTSIDE AIR FOR VENTILATION.
Valuation of Work: $4,500.00
Type of Work: REPLACEMENT
Fuel type:
Fees Collected: $264.12
Electrical Service Provided by: PUGEST SOUND ENERGY
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2014
2014
2014
2015
Permit Center Authorized Signature:
Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
Print Name
U -n
Date: 8/3(3//7
/7
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
2: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
3: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
4: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
6: ***MECHANICAL PERMIT CONDITIONS***
7: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
8: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
9: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
CITY OF TUKV,, A
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Mechanical Permit No.
Project. No.
ffi
Date Application Accepted:
Date Application Expires:
(For gffice use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
King Co Assessor's Tax No.: q 20 2 /- - 0 0 % 0
Site Address: Z 6 7' So 14+1114+11e�,w�>r / 11 , L4 fro act W/rl gl Sgite Number: Floor: 2 -
Tenant
Tenant Name:
PROPERTY OWNER
Name:
Wes f eG,( SoN+hCerrter.
Address: (233 SoialtLla e✓ Parkway
City: TIAtAiibtState: 1NA Zip:it 1$a
CONTACT PERSON — person receiving all project
communication
Name:
�IoriA Glti2h , rs Pest./",
Address: ) (t20 Ai W ci iwt0t." g b/d . it 234-3
City: i rssapa State: wA Zip: pia 0 27
Phone: lP,� o 6 3 3 et p Fax:
Email:
gloriac@ v -s--desiakc . tow,
New Tenant: gf Yes ❑.. No
MECHANICAL CONTRACTOR INFORMATION
Company Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contr Reg No.:
Exp Date:
Tukwila Business License No.:
Valuation of project (contractor's bid price): $ Z{- S7-,5 0
Describe the scope of work in detail: Ad4.146.1 120cHn Yborin a ach a V e k1 . A dj to dM9 M/11).1 ►+M uM,
o t&t rte t 4-o r VeA,- f"Art t . u vA C. sys-te. -Eo rem/1,41A a S 1 f.
Use:
Residential: New
Commercial: New
Fuel Type: Electric ❑
Replacement
Replacement
Gas ❑
o
Other: N l
H:\Applications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx
Revised: January 2016
bh
Page 1 of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Residential, Nighttime
Furnace >100k btu
Industrial
Floor furnace
55 dB(A)
Suspended/wall/floor
mounted heater
57 dB(A)
Appliance vent
Commercial
Repair or addition to
heat/refrig/cooling
system
47 dB(A)
Air handling unit
65 dB(A)
<10,000 cfm
60 dB(A)
Unit Type
Qty
Air handling unit
Residential, Nighttime
>10,000 cfm
Industrial
Evaporator cooler
55 dB(A)
Ventilation fan
connected to single duct
57 dB(A)
Ventilation system
Commercial
Hood and duct
47 dB(A)
Incinerator — domestic
65 dB(A)
Incinerator —
comm/industrial
60 dB(A)
Unit Type
Qty
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Noise:
Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is
created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed.
For more details, see TMC 8.22
*Daytim
District of Sound
Producing Source
District of Receiving Property
Residential, Daytime*
Residential, Nighttime
Commercial
Industrial
Residential
55 dB(A)
45 dB(A)
57 dB(A)
60 dB(A)
Commercial
57 dB(A)
47 dB(A)
60 dB(A)
65 dB(A)
Industrial
60 dB(A)
50 dB(A)
65 dB(A) '
70 dB(A)
A few sounds are exempt from the noise code, including:
• Warning devices;
• Construction and property maintenance during the daytime hours (7am-lOpm);
• Testing of backup generators during the day.
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR UTHORIZED AGENT:
Signature: Date: 00— y/2o / �-
Print Name: C h t 145.61
Day Telephone:
Mailing Address: 6 2- 7 / L i 3i, A- v.V e -Alf- ASIC e
City
H:\Applications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx
Revised: January 2016
bh
206 2Z 43S
Ain qg a s�
State Zip
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS I
PermitTRAK
ACCOUNT
QUANTITY (
PAID
$2,289.25
D17-0177 Address: 2877 SOUTHCENTER MALL
Apn: 9202470010
$1,896.53
DEVELOPMENT
$1,806.43
PERMIT FEE
R000.322.100.00.00
0.00
$1,801.93
WASHINGTON STATE SURCHARGE
B640.237.114
0.00
$4.50
TECHNOLOGY FEE
$90.10
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$90.10
M17-0096 Address: 2867 SOUTHCENTER MALL
Apn: 9202470010
$213.33
MECHANICAL
$203.17
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$33.15
PERMIT FEE
R000.322.100.00.00
0.00
$170.02
TECHNOLOGY FEE
$10.16
TECHNOLOGY FEE
I
R000.322.900.04.00
I
0.00
$10.16
PG17-0080 Address: 2867 SOUTHCENTER MALL
Apn: 9202470010
$179.39
PLUMBING
$170.85
PERMIT FEE
R000.322.100.00.00
0.00
$137.70
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$33.15
TECHNOLOGY FEE
$8.54
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R12230
R000.322.900.04.00
0.00
$8.54
$2,289.25
Date Paid: Wednesday, August 30, 2017
Paid By: JEM CONSTRUCTION
Pay Method: CHECK 15277
Printed: Wednesday, August 30, 2017 9:36 AM 1 of 1
CRWSYSTEMS
Cash Register Receipt
City of Tukwila
DESCRIPTIONS I
PermitTRAK
ACCOUNT I QUANTITY I
PAID
$1,264.75
D17-0177 Address: 2867 SOUTHCENTER MALL
Apn: 9202470010
$1,171.25
DEVELOPMENT
$1,171.25
PLAN CHECK FEE 1
R000.345.830.00.00 I
0.00
$1,171.25
M17-0096 Address: 2867 SOUTHCENTER MALL
Apn: 9202470010
$50.79
MECHANICAL
$50.79
PLAN CHECK FEE
R000.322.102.00.00
0.00
I
$50.79
PG17-0080 Address: 2867 SOUTHCENTER MALL
Apn: 9202470010
$42.71
PLUMBING
$42.71
PLAN CHECK FEE
TOTAL FEES PAID BY RECEIPT: R11832
R000.322.103.00.00
0.00
$42.71
$1,264.75
Date Paid: Thursday, June 29, 2017
Paid By: RAINIER ACTIVE LLC
Pay Method: CHECK 1007
Printed: Thursday, June 29, 2017 1:48 PM 1 of 1
CIISYSTEMS
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:q
Type` of Inspection:
firm-L_
Address:
'Z -81e'7 SC't}71CJ4firg 1141414—
Date Called:
Special Instructions:
Date Wanted:
/6s'516 -i 7
a.m.
P.m.
Requester:
Phone No:
Approved per applicable codes. D Corrections required prior to approval.
COMMENTS: _ pm1-t McCi, „009-L_
Inspector:
215
Date:
/o —33-1 7
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M17-0096 DATE: 06/30/17
PROJECT NAME: SAFARI
SITE ADDRESS: 2867 SOUTHCENTER MALL
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
A-3 AlAi C 7
11111
Building Division
Public Works ❑
\I -r Ay -to-17
Fire Prevention
Structural
Planning Division
❑ Permit Coordinator
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
REVIEWER'S INITIALS:
DATE: 07/04/17
Structural Review Required
DATE:
APPROVALS OR CORRECTIONS:
Approved
DUE DATE:
❑ Approved with Conditions
Corrections Required ❑ Denied
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
4110
08/01/17
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials:
12/18/2013
J E M CONSTRUCTION INC
Home. Espaiiol Contact Search L&I
Page 1 of 2
A -Z Index Help My L&1
Safety & Health Claims & Insurance Workplace Rights
Washington State Department of
40 Labor & Industries
J E M CONSTRUCTION INC
Owner or tradesperson
Principals
MILLER, JAMES E, PRESIDENT
Doing business as
J E M CONSTRUCTION INC
WA UBI No.
601 770 782
29506 8TH AVE S
ROY, WA 98580
253-843-2765
PIERCE County
Business type
Corporation
Governing persons
JAMES
E
MILLER
LORI K MILLER;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
JEMCOI*033DD
Effective — expiration
03/04/1997— 05/15/2019
Bond
.................
CBIC
Bond account no.
SA7695
$12,000.00
Received by L&I Effective date
03/19/2002 03/01/2002
Expiration date
Until Canceled
Insurnace
............. -..... ....
American States Insurance Co
Policy no.
01C12205496
$1,000,000.00
Received by L&I Effective date
03/23/2017 04/16/2015
Expiration date
04/16/2018
Insurance history
Savings
No savings accounts during the previous 6 year period.
Lawsuits against the bondor savings
.. ........ ....
No lawsuits against the bond or savings accounts during the previous 6 year period.
Trades & Licensing
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601770782&LIC=JEMCOI*033DD&SAW= 8/30/2017
J E M CONSTRUCTION INC
L&I Tax debts
No L&I tax debts are recorded for this contra.__. license during the previous 6 year period, but some L
may be recorded by other agencies.
License Violations
... _................................................
No license violations during the previous 6 year period.
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
L&I Account ID
968,907-00
.................................
Doing business as
J E M CONSTRUCTION INC
Estimated workers reported
Quarter 2 of Year 2017 "4 to 6 Workers"
L&I account contact
T2 / SUSAN BETTS (360)902-4828 - Email: BETT235@Ini.wa.gov
Account is current.
Public Works Strikes and Debarments
Verify the contractor is eligible to perform work on public works projects.
Contractor Strikes
No strikes have been issued against this contractor.
Contractors not allowed to bid
No debarments have been issued against this contractor.
Workplace safety and health
No inspections during the previous 6 year period.
Page 2 of 2
CI Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601770782&LIC=JEMCOI*033DD&SAW= 8/30/2017
GENERAL NOTES
1) COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE MOST CURRENT BUILDING, MECHANICAL,
ENERGY, PLUMBING, F1RE AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTIONS.
2) ALL AIR-CONDITIONING UNITS WITHOUT INTERNAL TRAP SHALL HAVE A P -TRAP FOR THE CONDENSATE PAN WITH
PLUG TEES FOR CLEANING AND CONDENSATE PIPES SHALL BE DISCHARGED TO EXISTING CONDENSATE WASTE
PIPING. VERIFY SIZE AND LOCATION AT SITE.
3) MECHANICAL CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS AND DUCT ROUTING CLEARANCES WITH THE
STRUCTURAL, REFLECTED CEIUNG AND LIGHTING PLANS.
4) ALL F1RE RATED STRUCTURE SHALL BE F1RE DAMPERED. VERIFY WITH THE ARCHITECTURAL AND INSTALL
PER THE LOCAL JURISDICTIONS.
5) ALL AIR DISTRIBUTION OUTLETS SHALL HAVE VOLUME CONTROL DEVICES.
6) ALL VOLUME DAMPERS IN NON -ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM EXTENDED TO AN ACCESSIBLE
LOCATION ("YOUNG" REGULATIONS OR EQUAL). EXACT LOCATION OF CONTROL DEVICES VISIBLE IN FINISHED SPACES
SHALL BE COORDINATED WITH THE ARCHITECT.
7) ALL 90 DEGREE TRUNK DUCT ELBOWS SHALL BE SMOOTH -ROUND OR SQUARE WITH TURNING VANES.
8) MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT LOCATION OF PIPING AND DUCTWORK
AND PENETRATIONS WITH THE STRUCTURE.
9) MAXIMUM LENGTH OF FLEXIBLE DUCTS SHALL BE 6' OR AS SHOWN ON DRAWINGS.
10) ALL DUCTWORK, EQUIPMENT AND PIPING SHALL BE SEISMICALLY SUPPORTED PER SMACNA AND LOCAL
REGULATIONS.
11) ALL MECHANICAL EQUIPMENT SHALL CONFORM TO SMACNA AND LOCAL REGULATIONS FOR SEISMIC
RESTRAINT (INCLUDING PIPING AND DUCTWORK).
12) ALL EQUIPMENT AND ACCESSORIES IN CONCEALED SPACES REQUIRING ACCESS SHALL HAVE ACCESS
DOORS.
13) TOTAL SYSTEM SHALL BE WARRANTED FOR ONE YEAR; STARTING FROM THE TIME OF OWNER/ENGINEER'S
FINAL ACCEPTANCE.
14) HVAC NOTES:
A) PROVIDE FLEXIBLE CONNECTION IN ALL DUCTS CONNECTING TO AIR MOVING EQUIPMENT AS CLOSE TO FAN
AS POSSIBLE. FLEXIBLE CONNECTION SHALL CONSIST OF 6" OR MORE OF AIR TIGHT, FIREPROOF FLEXIBLE
NEOPRENE COATED WOVEN FIBROUS GLASS MATERIAL. VENT FABRICS, INC. OR APPROVED EQUAL
B) ALL DUCTWORK SHALL BE SHEET METAL SOUND UNE RECTANGULAR SUPPLY AND RETURN DUCTS
WITHIN 10 FEET FROM THE UNIT OPENINGS.
C)
D)
E)
F)
PROVIDE LOCKABLE VOLUME DAMPERS IN ALL AIR DISTRIBUTION OUTLETS.
DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION SHALL CONFORM TO ASHRAE AND
SMACNA RECOMMENDATIONS.
DUCT SIZES SHOWN ON PLANS INDICATE INSIDE FREE AREA.
ALL DUCTWORK SHALL BE CLASS 1 AIR DUCT AS APPROVED BY U.L-181.
15) THE CONTRACTOR SHALL NOT OPERATE THE EQUIPMENT FOR TEMPORARY HEATING OR VENTILATION DURING THE
CONSTRUCTION. (ALL EQUIPMENT SHALL RUN FOR TESTING AND BALANCING PURPOSES ONLY). NOTIFY THE ENGINEER
48 HOURS (MINIMUM) IN ADVANCE TO ARRANGE A FINAL FIELD INSPECTION PRIOR TO COVERING UP THE CEIUNG.
16) CONTRACTOR IS TO BRING UP THE DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED FOR OR
SHOWN BUT ARE REQUIRED FOR A COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT PRIOR TO ENTERING
AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH ITEMS REQUIRED FOR A COMPLETE SYSTEM
READY FOR THE OWNER'S BENEFICIAL USE SHALL BE FURNISHED AND INSTALLED INCLUDING ALL SUCH DISCREPANCY
ITEMS MENTIONED ABOVE, AT NO ADDITIONAL COST TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S
RECOMMENDATIONS AND APPLICABLE STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL
17) ALL EQUIPMENT SUPPUED FOR THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, WORKMANSHIP,
AND TITLE, AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT APPEARS WITHIN ONE YEAR FROM
DATE OF FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE WARRANTIES ABOVE, THE CONTRACTOR SHALL
IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE THE SYSTEM TO THE ORIGINAL SATISFACTORY CONDITIONS
AT HIS EXPENSE. THE FOREGOING WARRANTY IS EXCLUSIVE AND IN UEU OF OTHER WARRANTIES, WHETHER WRITTEN,
ORAL, IMPLIED OR STATUTORY. NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY.
(THE WARRANTY SHALL START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.)
18) ENTIRE INSTALLATION OF ALL EQUIPMENT, CONTROL, PIPING, DUCTWORK AND RELATED ACCESSORIES SHALL BE PER
BASIC OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WITH THESE STANDARDS.
19) MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ROUTING AND INSTALLATION FEASIBILITY OF ALL
EQUIPMENT, PIPING AND DUCTWORK PRIOR TO SUBMITTING HIS BID AND INCLUDE IN HIS BID ADDITIONAL PIPING,
DUCTWORK, FITTINGS, OFFSETS, ETC. WHICH MIGHT BE REQUIRED FOR A COMPLETE SYSTEM READY FOR OWNER'S
BENEFICIAL USE.
20) COORDINATE THE CONSTRUCTION SCHEDULE WITH THE ARCHITECT AND PERFORM ALL REQUIRED WORK IN STRICT
ACCORDANCE WITH THE OWNER'S SCHEDULE.
21) MECHANICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES
REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
22) ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE AIR -BALANCING AND PUT ALL MECHANICAL SYSTEMS
IN OPERATION AND SUBMIT MINIMUM 4 COPIES OF BALANCING REPORTS TO THE OWNER/ARCHITECT.
E RGY CODE NOTES:
1) THERMOSTATS SHALL BE A 7 DAY PROGRAMMABLE TYPE WITH A 5 DEGREE DEADBAND AND
AUTOMATIC SETBACK CONTROL PER C403.2.4.3.2 & C403.2.4.2 WSEC.
2) HVAC EQUIPMENT SHALL MEET THE MINIMUM ENERGY EFFICIENCY RATINGS PER TABLES C403 WSEC.
3) DUCT INSULATION AND SEALING SHALL MEET WSEC SECTION 403.2.7 REQUIREMENTS.
4) SUPPLY AND RETURN DUCTS IN UNCONDITIONED SPACES SHALL BE INSULATED TO MIN.
R-6.ROOFTOP HVAC DUCTWORK SHALL HAVE A WEATHER BARRIER AND INSULATED TO R-8
PER C403.2.7.2 WSEC.
5) SUPPLY AND RETURN DUCTS IN CONDITIONED SPACES SHALL BE INSULATED TO MIN. R-3.3
PER C403.2.7.2 WSEC.
6) PIPING INSULATION SHALL MEET THE REQUIREMENTS OF TABLE 403.2.8 WSEC.
7) OUTSIDE AIR DUCTS SHALL BE INSULATED PER WSECC403.2.7. OUTSIDE AIR DUCTS SHALL HAVE
A MOTORIZED DAMPERS OR AUTOMATIC DAMPER FOR ALL OUTSIDE AIR INTAKES 403.2.4.4 WSEC.
8) HVAC SYSTEMS SHALL BE COMMISSIONED PER C408 WSEC.
9) FRACTIONAL HORSEPOWER MOTORS 1 HP AND LESS SHALL MEET THE EFFICIENCIES PER
C403.2.10.3.
EXHAUST FAN SCHEDULE
SYNX1.
EF -1
WM
TOILET ROOM
MAttr.:
BROAN
KOELI
L100
TYPE
CEILING
MB
DIRECT
Cffi
109
ESP. )
0.125"
EXXES
0.9
li'RA:
€1.1/
WX.TACe
120
PHAM
1
FD
FEMAMS
(1)(2)
(1) SOURCE SPECIFIC FAN SHALL BE AMCA 210 OR HVI 916.
(2) CONTROLLED BY LIGHT SWITCH.
DESIGN CODES:
ALL CODES WITH WASHINGTON STATE AMENDMENTS
2015 WASHINGTON STATE ENERGY CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 UNIFORM PLUMBING CODE
2015 INTERNATIONAL FIRE CODE
LEGEND
SYNX1.
AIESEVIAIXIN
DES ON
0/Cs
T'STAT/SENSOR
THERMOSTAT/SENSOR
Zone
Population.
Number of
people in
space.*
e1
Occupant
Density
(#/1000sf)
__
DUCTWORK W/ TURNING
VANE AND FLEX CONN.
—,
VD
VOLUME DAMPER
Proposesd
Design
Outdoor Air
Intake Flow
Vot/(CFM)
--
RIGID DUCT
--
FLEXIBLE DUCT
143
--
ROUND SPIN -IN WITH V.D.
FD
FIRE DAMPER
-4
SFD
SMOKE FIRE DAMPER
-4
®
CFD
CEILING RADIATION FIRE DAMPER
C*
CD
ROUND CEIUNG DIFFUSER
•
CG
ROUND CEILING GRILLE
785
>;g
CD
SQUARE CEIUNG DIFFUSER
Offices*
VI
CG
SQUARE CEIUNG GRILLE
CD
CD
CONDENSATE DRAIN UNE
1.00
121.00
41
--
SMOKE DUCT DETECTOR
A.F.F.
ABOVE FINISHED FLOOR
REVISIONS
No chances shell be made to the scope
of riorl< !"'ith,� ;? prior approval of
Tti! Iiia f3u! ding Division.
e .ions itAl require a new plan submittal
and may include additional plan reviewfees
Permit . Y(, f 7-- QO'!
Plan review r9prcI.wl is subject to errors and omissions.
Approval of con L cilon documents does not authorize
the violation of any adopted code or ordinance. Receipt
of approved F; id Copy and conditions is acknowledged:
LAAA 1
�)/.)I i'7
City of Tukwila
BUILDING DIVISION
By
Date:
Minimum Outside Air Ventilation Schedule
Ventilation Rate per 2015 IMC 403 (based on ASHRAE Std. 62.1-2010)
Equip. Tag
Zone
Occupancy
Category
Area (sf)
People Outdoor
Air Rate
(dm/person)
Table 403.3
Zone
Population.
Number of
people in
space.*
Area Outdoor
Air Rate
(cfm/sf)
(Table 403.3)
Occupant
Density
(#/1000sf)
Breathing
Zone
Outdoor Air
Flow
Vbz/(CFM)
Zone Air
Distribution
Effectiveness
Ez (Table
403.3.1.2)
Zone
Outdoor Air
Flow
(Voz/(CFM)
System
Ventilation
EfficiencyEv
(Table
403.3.2.3.2
Minimum
Outdoor Air
Intake Flow
Vot/(CFM)
Proposesd
Design
Outdoor Air
Intake Flow
Vot/(CFM)
Safari Place
Play Area/Vestibule
Education
3100
10.0
50
0.12
35
872.00
1.00
872.00
0.90
785
785
Party Room
Offices*
350
5.0
20
0.06
5
121.00
1.00
121.00
0.90
109
110
* In some cases occupancy is Tess than maximums as allowed per 403.3 exception, in no case shall the occupancy be Tess than one half per Table 403.3.
\1
EXISTING VAY BOX TO REMAIN
EXISTING VAV BOX TO REMAIN
6"0 TO EXIS11IIG EXHAUST
PROVIDED FOR FUTURE
TENANTS WITH B.D.D. VERIFY
AT SITE FOR EXACT LOCATION
& ROUTING. COORDINATE WITH
LANDLORD
!SEPARATE PERMIT
PEQ''JIRED FOR:
0 Machanical
Pglectrical
Lre'`numbing
was Piping
tyi of Tukwila
Libt!ILDP:.IG DIVISION
G
0
0
0
0
(E)
0
/
0
E)
(E)
(E)
(E)
(E)
(E)
NOTE:
EXISTINi HVAC SYSTEM TO REMAIN.
VERIFY T -HC Mf -UM OUTSIDE�A R-
PER SCHEDULE ON THIS- SHEET AND ° o
FOR "CO2" SENSOR. VERIFY AT SITE
AND WITH LANDL–OR-D—Sc PER LOCAL
JURISDICTION
(E)
(E)
(FMB
2
(E)
777
(E)
+ +
+
";++ +
_ EXISTING JO JREMAIN',
co 0 (E)
NEW-
` 16x16
LOUVER
0
R
(E)
(E)
1
r
(E) -
(r) to
(E)
0
o F. E.
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 11 2011
City
of Tukwila
BUILDING DIVISION
CO2 MONITOR FOR DEMAND
VENTILATION TO CONTROL
MINIMUM OUTSIDE AIR PER
W.S.E.0 VERIFY EXACT
LOCATION & COORDINATE WITH
LANDLORD FOR HVAC UNIT
MODIFCA11ON
c>^lv
GI `` OF TUKWILA
JUN 2 9 2017
PERMIT CENTER
COORDINATE MTH G.C.
TO STOP WALL BELOW
CEILING
FLOOR PLAN - HVAC
SCALE= 1/4'4-0'
EXISTING TRANSFORMER TO BE VENTILATED
NORTH
ABOSSEIN
ENGINEERING
L.L.0
MECHANICAL - ELECTRICAL
CIVIL - LEED - STRUCTURAL
FIRE PROTECTION
2100 112TH AVE. NE
BELT.F,VUE, WA 98004
OFFICE: (425) 462-9441
FAX: (425) 462-9451
EMAIL:
CService@abossein.com
WEBSITE:
www.abos 1'in.com
2867 SOUTHCENTER MALL
TUKWILA, WA 98188
REVISIONS:
NO. DESCRIPTION
0
1
z
0
0
w
PERMIT SET 6/28/17
JOB NO.:
217077
DATE: 06/28/2017
1 OF 2
0
SPECIFICATIONS
EVISIONS:
0. DESCRIPTION
PERMIT SET 6/28/17
HVAC SPECIFICATIONS - DIVISION #23
PART 100 GENERAL
1.01 LOCAL CONDITIONS: VISIT AND INSPECT THE PREMISES TO ASCERTAIN THE EXISTING CONDITIONS BEFORE
SUBMITTING A BID. NO EXTRA PAYMENT SHALL BE ALLOWED FOR THE LACK OF KNOWLEDGE OF THESE
CONDITIONS.
1.02 CODES: STRICTLY COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
IMC - MECHANICAL CODE
IPC - PLUMBING CODE
IFGC - FUEL GAS CODE
1.03 STANDARDS: THE FOLLOWING PUBLICATIONS (LATEST EDITION) FORM A PART OF THESE REQUIREMENTS TO
THE EXTENT INDICATED BY THE REFERENCES THERETO:
SHEET METAL AND AIR CONDITIONING CONTRACTOR NATIONAL ASSOCIATION (SMACNA)
LATEST "HVAC DUCT CONSTRUCTION STANDARDS" MANUAL
1.04 PLANS AND SPECIFICATIONS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN CHARACTER INTENDED TO
COVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT, DUCTS, PIPING, ETC.,
AND APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS. DETERMINE THE EXACT LOCATION OF
THE ELEMENTS OF THE SYSTEM FROM THE STRUCTURE AND FROM THE EQUIPMENT, NOT FROM THE DRAWINGS.
DO NOT SCALE DRAWINGS FOR MEASUREMENTS NOR USE AS SHOP DRAWINGS.
1.05 PROVIDE ALL ITEMS, EQUIPMENT, MATERIALS, OPERATIONS, OR METHODS LISTED, MENTIONED OR SCHEDULED
ON THE DRAWINGS, AND/OR HEREIN INCLUDING ALL INCIDENTALS AND ACCESSORIES NECESSARY AND REQUIRED
FOR INSTALLATION OR MOUNTING, OR NORMALLY SUPPLIED BY COMMON PRACTICE WHETHER SPECIFICALLY
MENTIONED OR NOT, TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS.
1.06 BRING ANY NON -COMPLIANCES WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS,
CONFLICTS AND DISCREPANCIES TO THE ENGINEER'S ATTENTION BEFORE SUBMITTING BID. A CORRECT,
COMPLETE AND EASILY MAINTAINED SYSTEM IS INTENDED.
1.07 THE CONTRACTOR'S BID WILL BE CONSTRUED AS AN AGREEMENT TO COMPLETE THE WORK WITHOUT ADDITIONAL
COST TO THE OWNER. WHERE CONFLICTS BETWEEN PLANS AND SPECIFICATIONS OR CONFLICTING INFORMATION
ON THE PLANS OCCURS, THE CONFLICTS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO BIDDING. THE
MORE COSTLY ALTERNATIVE SHALL BE INCLUDED IN THE BID PRICE.
1.08 MAKE NO CHANGES IN THE WORK SPECIFIED, UNLESS SUCH CHANGES ARE AUTHORIZED IN WRITING BY THE
OWNER, ARCHITECT AND/OR ENGINEER. NO CHARGES FOR EXTRA WORK WILL BE PAID UNLESS SUCH EXTRA
WORK HAS BEEN AUTHORIZED AND THE AUTHORIZATION CONTAINS A STATEMENT OF THE WORK TO BE
ACCOMPLISHED AND THE CHARGES TO BE MADE FOR THE WORK.
1.09 IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A MECHANICAL SYSTEM COMPLETE, FULLY
ADJUSTED, AND READY TO USE.
1.10 IT IS THE INTENTION OF THESE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, TESTED,
AND READY FOR OPERATION. WHEREVER THE WORK "PROVIDE" IS USED, IT SHALL MEAN "FURNISH
AND INSTALL COMPLETE AND READY TO USE."
MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR THE PROPER INSTALLATION
AND OPERATION, SHALL BE INCLUDED IN THE WORK, THE SAME AS IF HEREIN SPECIFIED OR SHOWN.
1.11 THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL
GOVERNMENT SALES TAXES, FEES AND OTHER COSTS, INCLUDING UTILITY CONNECTIONS OR
EXTENSIONS, IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DOCUMENTS
AND OBTAIN ALL NECESSARY APPROVALS OF ALL GOVERNMENTAL DEPARTMENTS HAVING
JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF HIS WORK AND DELIVER SAME
TO THE ARCHITECT BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR WORK.
1.12 THE CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST TO THE OWNER, ANY LABOR,
MATERIALS, SERVICES, APPARATUS, DRAWINGS, IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS,
ORDINANCES, RULES AND REGULATIONS, WHETHER OR NOT SHOWN ON DRAWINGS AND/OR SPECIFIED.
PART 2.00 PRODUCTS
2.01 MATERIALS AND EQUIPMENT SUBSTITUTIONS:
THE BID PRICE SHALL BE BASED ON THE MATERIALS, EQUIPMENT AND/OR SERVICES AS SCHEDULED ON THE
DRAWINGS AND/OR SPECIFIED HEREIN, AND/OR AS ACCEPTED PRIOR TO BIDDING.
2.02 REQUESTS FOR ACCEPTANCE OF ALTERNATIVES SHALL BE SUBMITTED TEN (10) DAYS PRIOR TO BID.
2.03 ACCEPTANCE OF ALTERNATE OR SUBSTITUTE EQUIPMENT IN NO WAY VOIDS MATERIAL OR PERFORMANCE
REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ANY MATERIAL OR
EQUIPMENT SUBSTITUTED FOR SPECIFIED ITEMS ACCEPTED BY THE ARCHITECT AND/OR ENGINEER BEFORE OR
AFTER THE BID DATE. CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING ANY SUBSTITUTE EQUIPMENT
IN THE SYSTEM DESIGN.
2.04 CONTRACTOR SHALL PAY FOR ALL EXTRA COSTS BY ANY TRADE FOR CHANGES NECESSITATED BY MATERIAL OR
EQUIPMENT SUBSTITUTIONS REGARDLESS OF ACCEPTANCE WITHOUT FURTHER COST TO THE CLIENT.
2.05 REVIEW OF MATERIALS AND EQUIPMENT: WITHIN 30 DAYS OF CONTRACT AWARD, SUBMIT FIVE COPIES OF EACH
2.06 GENERAL MATERIALS AND EQUIPMENT: ALL MATERIAL AND EQUIPMENT SHALL BE NEW AND OF THE BEST OF
CATALOG GRADE INDICATED AND/OR SPECIFIED AND SHALL BE FREE FROM ALL DEFECTS.
2.07 MATERIAL AND EQUIPMENT SPECIFIED HEREIN SHALL BE GUARANTEED BY THE MANUFACTURER TO PERFORM TO
STANDARDS INDICATED OR INFERRED IN PUBLISHED LITERATURE OR CATALOG DATA. MANUFACTURER'S
RECOMMENDATIONS SHALL BE CLOSELY FOLLOWED ON INSTALLATION.
2.08 REFRIGERANT PIPING: TYPE "L" OR TYPE "K" WITH BRAZED HIGH TEMPERATURE SOLDER JOINTS. PIPE
SHALL BE CLEAN AND TESTED FOR LEAKS. INSULATE SUCTION PIPING WITH 1 INCH THICK FIBERGLASS WITH
FRJ JACKET SEALED WATER TIGHT. COVER OUTDOOR INSULATION WITH ALUMINUM OR PLASTIC JACKET
APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
2.09 ALL INSULATION SHALL HAVE A COMPOSITE (INSULATION, JACKET OR FACING, AND ADHESIVE) FIRE
HAZARD RATING AS TESTED BY ASTM E-84, NFPA 255, OR UL 723, NOT TO EXCEED 25 FLAME SPREAD AND
50 SMOKE DEVELOPED. ACCESSORIES SUCH AS COATINGS, TAPES, AND ADHESIVES SHALL HAVE THE
SAME COMPONENT RATINGS. ALL INSULATING MATERIALS OR THEIR CONTAINERS SHALL HAVE A
LABEL INDICATING COMPLIANCE WITH THE ABOVE RATING. REFERENCE STANDARDS: NFPA D-255,
A.S.T.M. E-84, UL -723, ASHRAE 90-75 AND THE STATE ENERGY CODE. ACCEPTABLE MANUFACTURERS:
CERTAINTEED, OWENS-CORNING, KNAUF AND MANVILLE.
PART 3.00 EXECUTION
3.01 PERMITS AND INSPECTIONS: APPLY AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED
FOR THE WORK, AND AT COMPLETION, PRESENT THE OWNER WITH THE SIGNED CERTIFICATES OF FINAL
INSPECTION.
3.02 UTILITIES: CHARGES BY UTILITY COMPANIES FOR PROVIDING SERVICES SHALL BE PAID BY OWNER AND WILL
NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL DO INSTALLATION WORK NORMALLY PROVIDED IN
THIS CONTRACT.
3.03 PLACE AND ARRANGE EQUIPMENT, PIPING, DUCTS, CONTROLS, ETC., TO FIT THE SPACE AVAILABLE.
INCLUDING ALL OFFSETS IN PIPING OR DUCTS, DUCT TRANSFORMATIONS, ETC. REQUIRED.
3.04 SUBMIT SHOP DRAWINGS FOR TEMPERATURE CONTROL SYSTEMS, MECHANICAL EQUIPMENT WIRING, MECHANICAL
EQUIPMENT AND MATERIALS WHICH CANNOT BE ADEQUATELY DESCRIBED BY MANUFACTURER'S PRINTED SHEETS,
AND FOR SUCH ADDITIONAL ITEMS AS THE ARCHITECT/ENGINEER MAY DIRECT.
3.05 CLEARLY MARK SUBMITTALS AS TO PLAN CODE, SPECIFIC ITEM PROPOSED, CATALOG NUMBERS, RECESS
OPENINGS, DIMENSIONS, CAPACITIES, ELECTRICAL CHARACTERISTICS, ETC.. SUBMITTALS WHICH ARE
INCOMPLETE WILL BE REJECTED.
3.06 THE ENGINEER'S CHECK SHALL BE GENERAL, AND DOES NOT RELIEVE THE CONTRACTOR OF FINAL
RESPONSIBILITY OF COMPLIANCE TO THE INTENT OF THE PLANS AND SPECIFICATIONS.
3.07 SUPERVISION AND WORKMANSHIP: QUALIFIED SUPERVISION FOR EACH TRADE SHALL BE IN CHARGE OF THE
WORK AT ALL TIMES AND SHALL BE ON THE JOB SITE WHENEVER WORK IN THAT TRADE IS BEING
ACCOMPLISHED.
3.08 ALL WORK SHALL BE DONE IN A FIRST-CLASS MANNER BY WORKMEN SKILLED IN THE TRADE AFFECTED.
3.09 CLEANING PIPING, DUCTS, EQUIPMENT: THOROUGHLY CLEAN ALL DUCTS AND EQUIPMENT OF DIRT, CUTTINGS,
AND OTHER FOREIGN SUBSTANCES. REMOVE FROM PREMISES ALL FUBBISH AND DEBRIS, LEAVING THE AREA
CLEAN AND READY FOR USE.
3.10 EQUIPMENT START-UP: ADJUST ALL BELTS, OR OTHER DRIVES AND CHECK MOTOR ROTATIONS.
3.11 INSTALL TEMPORARY AIR FILTERS IN AIR HANDLING EQUIPMENT THAT IS BEING USED FOR HEATING OR
VENTILATION DURING CONSTRUCTION. INSTALL A NEW SET OF THE SPECIFIED AIR FILTERS FOR THE
EQUIPMENT AT THE COMPLETION OF THE JOB.
3.12 COMPLETION: OPERATE ALL MECHANICAL SYSTEMS, INCLUDING ALL EQUIPMENT FURNISHED UNDER THIS
DIVISION FOR A PERIOD OF TIME NOT TO EXCEED 5 DAYS OR AS MNY BE REQUIRED AT THE DIRECTION ON
THE ARCHITECT/ENGINEER TO PROVE THAT ALL COMPONENTS ARE PROPERLY OPERATING AND THAT THE
COMPLETE INSTALLATION IS FUNCTIONING SMOOTHLY AND NOISELESSLY TO THE FULL EXTENT OF PLANS AND
SPECIFICATIONS, ANY REBALANCING, READJUSTING OF SYSTEM ELEMENTS FOUND NECESSARY WHEN THE
SYSTEMS ARE SUBJECT TO ACTUAL OPERATING CONDI TIONS SHALL BE DONE BY THE CONTRACTOR AT NO EXTRA
COST TO THE OWNER.
3.13 OPERATING INSTRUCTIONS: SUBMIT 30 DAYS PRIOR TO COMPLETION DF THE PROJECT, FOUR (4) SETS OF
OPERATING BROCHURES. EACH BROCHURE SHALL INCLUDE OPERATING INSTRUCTIONS, MAINTENANCE
INSTRUCTIONS, INSTALLATION INSTRUCTIONS, PARTS LISTS AND WIRING DIAGRAMS FOR EACH ITEM OF
MECHANICAL EQUIPMENT WITH MIXING OR MOVABLE PARTS. THE BROCHURE SHALL ALSO INCLUDE
OPERATIONAL AND DIAGRAMS OF TEMPERATURE CONTROL SYSTEMS.
3.14 PROVIDE TYPEWRITTEN OPERATING INSTRUCTIONS IN THE BROCHURE COVERING EACH PIECE OF MOTORIZED
MECHANICAL EQUIPMENT, GIVE NORMAL STARTING AND STOPPING PROCEDURES, ALONG WITH PROPER PARTIES
TO CONTACT IN THE EVENT OF EMERGENCY, FAILURE OF CONTROLS OR EQUIPMENT. OUTLINE OF
INSTRUCTIONS AS FOLLOWS:
NORMAL STARTING, STOPPING AND EMERGENCY SHUT -DOWN CF EACH PIECE OF MOTORIZED EQUIPMENT.
PROVIDE LUBRICATION INSTRUCTIONS FOR EACH MOTOR BEARING OR OPERABLE PIECE OF EQUIPMENT.
GIVE FREQUENCY OF LUBRICATION, TYPE AND BRAND OF OIL DR GREASE.
INCLUDE CALIBRATION, CLEANING AND ADJUSTMENT SCHEDULES AND PROCEDURES.
INCLUDE COPIES OF MANUFACTURER'S LITERATURE ON MAINTENANCE AND OPERATION OF EACH PIECE OF
EQUIPMENT, INCLUDING INSTALLATION INSTRUCTIONS, DIAGRAMS, AND PARTS LISTS, IN EACH
BROCHURE.
315 AS -BUILT DRAWINGS: SUBMIT AS -BUILT DRAWINGS AT COMPLETION DF WORK.
3.16 GUARANTEE: THE MECHANICAL SYSTEM SHALL BE LEFT IN PROPER WORKING ORDER. REPLACE ANY WORK,
MATERIAL OR EQUIPMENT PROVIDED UNDER THIS CONTRACT WHICH D VELOPS DEFECTS WITHIN ONE (1) YEAR
FROM DATE OF SUBSTANTIAL COMPLETION WITHOUT ADDITIONAL CHARGES. A NEW ONE (1) YEAR GUARANTEE
ON THE AFFECTED ITEM OR ITEMS SHALL BE PROVIDED COMMENCING ON THE DATE OF THE APPROVED REPAIR
OR REPLACEMENT.
3.17 MECHANICAL EQUIPMENT WIRING AND CONNECTIONS:
ITEM
EQUIPMENT MOTORS
MOTOR CONTROLLERS, PUSHBUTTON
STATIONS, PILOT LIGHTS, ETC.
MULTI -SPEED SWITCHES
LINE VOLTAGE THERMOSTATS
BY
MC
FURNISHED
MC
MC
OR MOUNTED BY
MC
INSTALLED EY
EC
EC
DISCONNECT SWITCHES, (FUSED
OR UNFUSED), HP RATED SWITCHES,
THERMAL OVERLOAD SWITCHES, ETC. MC EC
LOW VOLTAGE THERMOSTATS,
CONTROL RELAYS, TIME CLOCKS,
CONTROL TRANSFORMER, CONTROL
PANELS, PRESURESTATS, MOTOR
VALVES, DAMPER MOTORS, SOLENOID
VALVES, EP & PE SWITCHES, ETC.
AND ALL INTERLOCK WIRING MC MC
MC - MECHANICAL CONTRACT
EC - ELECTRICAL CONTRACT
CONNECTED BY
EC
WIRED AND/OR
EC
THE MECHANICAL CONTRACTOR SHALL FURNISH ALL MAGNETIC STARTERS OR CONTACTORS.
EC
EC
MC
3.18 ALL MANUAL OR AUTOMATIC CONTROL AND PROTECTIVE OR SIGNAL DEVICES REQUIRED BUT NOT INDICATED ON
ELECTRICAL PLANS SHALL BE FURNISHED AND INSTALLED UNDER THIS DIVISION OF THE SPECIFICATIONS.
THE WIRING INSTALLATION SHALL CONFORM TO ELECTRICAL DIVISION.
3.19
3.20
3.21
3.22
3.23
3.24
3.25
ALL WIRING CONNECTIONS TO CONTROLS ATTACHED TO DUCT WORK, DR MECHANICAL EQUIPMENT SHALL BE MADE
WITH FLEXIBLE CONNECTIONS TO PREVENT VIBRATION.
COORDINATE WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING MOTORS AND/OR OTHER ELECTRICAL
EQUIPMENT TO ASSURE ELECTRICAL EQUIPMENT BEING OF PROPER ELECTRICAL CHARACTERISTICS.
FURNISH PROPER NEMA TYPE ENCLOSURES FOR ALL STARTERS AND/OR CONTACTORS AS REQUIRED BY USAGE OR
CODE.
PROVIDE HEAVY DUTY SPEED SELECTOR SWITCHES, THERMAL MAGNETIC SWITCHES, START STOP PUSH BUTTON
STATIONS ETC. AS REQUIRED.
CUTTING AND PATCHING: CAREFULLY PERFORM ALL WORK WHERE CUTTING, CHANNELING, CHASING, OR
DRILLING OF FLOORS, WALLS, PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR PROPER
INSTALLATION OR SUPPORT OF DUCTS, PIPINGS, OR OTHER MECHANICAL EQUIPMEN T.
ANY DAMAGE TO BUILDING, PIPING, EQUIPMENT, PLASTER, WOODWORK OR METAL WORK SHALL BE REPAIRED BY
SKILLED MECHANICS OF TRADES INVOLVED, AT NO ADDITIONAL COST TO THE OWNER.
DO NOT CUT, CHANNEL, CHASE OR DRILL MASONRY OR TILE; OR CUT, DRILL OR WELD STRUCTURAL MEMBERS
OF THE BUILDING, ETC., WITHOUT FIRST OBTAINING ARCHITECT'S PERMISSION, IF PERMISSION IS
GRANTED, PERFORM THIS WORK IN A MANNER APPROVED BY THE ARCHITECT.
3.26 CAULKING & WATERPROOFING: CAULK AROUND ALL PIPES, ETC. TO PREVENT AIR AND MOISTURE LEAKAGE
WITH COMPOUND APPROVED BY ARCHITECT/ENGINEER.
3.27
3.28
3.29 INSERTS, SLEEVES & BLOCKOUTS: FURNISH AND INSTALL, PRIOR TO CONCRETE POURING OR OTHER
CONSTRUCTION, INSERTS, SLEEVES, OR BLOCKOUTS IN WALLS, FLOOR SLABS, ROOFS AND PARTITIONS FOR
PASSAGE OF ALL WORK INSTALLED UNDER THIS .DIVISION.
SEAL AROUND ALL PIPES AND DUCTS WITH FIREPROOF CAULKING OR GROUT WHERE THEY PASS THROUGH
FLOORS, FIREWALLS, AND SHAFTS.
PROVIDE FLASHINGS WHERE ALL PIPES AND DUCTS PIERCE OUTSIDE WALLS OR ROOF AS NECESSARY TO
PREVENT MOISTURE ENTRY.
3.30 PROVIDE GALVANIZED IRON AND STEEL PIPE SLEEVES FOR IRON PIPES. USE COPPER SLEEVES FOR COPPER
PIPES. PROVIDE WOOD OR STEEL BLOCKOUTS FOR LARGE OPENINGS. SECURE ALL SUCH ITEMS FIRMLY IN
POSITION.
3.31 VIBRATION -ABSORBING MOUNTINGS AND CONNECTIONS: ISOLATE EACH ITEM OF EQUIPMENT WITH MOVING
PARTS FROM THE BUILDING STRUCTURE ALONG WITH ANY PIPING, CONDUITS, OR DUCTS ATTACHED THERETO.
UNLESS OTHERWISE INDICATED, UNITS ISOLATING EQUIPMENT FROM STRUC TURE SHALL BE PROPERLY
DESIGNED SPRING -TYPE ISOLATORS.
3.32 BELT DRIVE GUARDS: PROVIDE BELT DRIVE GUARDS FOR ALL EQUIPMENT AND SAFETY SCREENS ON EXPOSED
FAN INLETS.
3.33 VALVES: NIBCO BALL VALVES OR EQUAL.
3.34 NOT USED.
3.35 NOT USED.
3.36 PROVIDE PRODUCTS OF COMBUSTION DETECTOR IN SUPPLY AND RETURN AIR IN ALL UNITS 2000 CFM OR OVER
TO SHUT DOWN UNIT ON ALARM CONDITION.
3.37 EXHAUST FANS: FANS SHALL MEET CAPACITIES SCHEDULED AND NOT EXCEED SOUND LIMITATIONS SPECIFIED.
3.38 GRILLES & REGISTERS: SCHEDULED ON DRAWINGS. TITUS OR EQUAL.
3.39 DUCT LINING: 1/2" THICKNESS, 3 PCF DENSITY, NEOPRENE COATED DUCT LINER MEETING FIRE HAZARD
RATING REQUIREMENTS FOR INSULATION. INSTALL WITHIN MINIMUM 10' DUCT LENGTH FROM FANS.
3.40 DUCTWORK: SHEET METAL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL. DUCTS SHALL CONFORM
ACCURATELY TO THE DIMENSIONS INDICATED AND SHALL BE STRAIGHT AND SMOOTH ON THE INSIDE WITH
JOINTS NEATLY FINISHED. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH SMACNA LOW PRESSURE DUCT
MANUAL, 2" WG FOR SUPPLY & 1" WG FOR EXHAUST DUCTS. ELBOWS, FITTINGS AND BRANCH TAKE -OFFS
SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED AS RECOMMENDED IN SMACNA "DUCT CONSTRUCTION
STANDARDS" WITH THE USE OF TURNING VANES OR RADIUS ELBOWS. FLEXIBLE RUNOUTS FROM BRANCHES,
RISERS OR MAINS TO AIR TERMINAL UNITS, AND OUTLETS SHALL BE FACTORY -FABRICATED, CLASS I, VAPOR
BARRIER INSULATED FLEXIBLE CONNECTORS COMPLYING WITH NFPA STANDARD NO. 90A AND UL 181. FLEXIBLE
CONNECTORS SHALL NOT EXCEED 10' IN LENGTH. PRESSURE RATING SHALL BE 4" W.G. FLEXIBLE DUCT
CONNECTIONS TO EQUIPMENT AND OTHER DUCTS SHALL BE MADE WITH DRAW BANDS. PROVIDE DAMPER IN RUN
OUT TO AIR OUTLETS.
3.41 HINGED DUCT ACCESS DOORS SHALL BE PROVIDED AT ALL AUTOMATIC DAMPERS, FIRE DAMPERS, AND OTHER
APPARATUS REQUIRING SERVICE AND INSPECTION IN THE DUCT SYSTEM. DOORS SHALL BE 15 X 18 INCHES
UNLESS OTHERWISE INDICATED. WHERE SIZE OF DUCT WILL NOT ACCOMMODATE THIS SIZE, THE DOOR SHALL
BE MADE AS LARGE AS PRACTICAL. DOORS SHALL BE PROVIDED WITH AIRTIGHT GASKETS, GALVANIZED
HINGES AND APPROVED BRASS FASTENERS. DOORS IN INSULATED DUCTS SHALL BE OF THE INSULATED TYPE.
DOORS SHALL SO SWING THAT FAN PRESSURE OR SUCTION HOLD DOOR CLOSED.
3.42 PROVIDE NON-COMBUSTIBLE APPARATUS FLEXIBLE CONNECTIONS OF NOT LESS THAN 15 OUNCE WOVEN FABRIC
APPROVED MATERIAL WHERE SHEET METAL DUCTS ARE CONNECTED TO FANS OR OTHER MOVING EQUIPMENT.
THE FLEXIBLE CONNECTIONS SHALL BE SECURELY FASTENED.
3.43 DUCT LINER INSULATION: INSULATE INTERIOR SURFACES OF ALL HP -1, HP -2 SUPPLY DUCTS FROM AIR
CONDITIONING UNIT SUPPLY FANS TO AIR OUTLETS AND INDICATED RETURN OR EXHAUST DUCTS WITH
ACOUSTICAL MATERIAL.
3.44 APPLY AND SECURE INSULATION AS RECOMMENDED BY MANUFACTURER AND AS APPROVED. ANY LOOSENING OF
INSULATION LINER WILL REQUIRE REMOVAL AND REINSTALLATION OF ALL DUCT WORK, AT NO EXTRA COST.
3.45 INCREASE INDICATED DUCT SIZES TO COMPENSATE FOR THICKNESS OF DUCT UNER INSULATION.
SEALING: ALL TRANSVERSE JOINTS ON THE LOW PRESSURE SYSTEM SHALL BE SEALED WITH "HARDCAST" DUCT
TAPE SYSTEM APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS OR OTHER APPROVED SYSTEM.
3.46 IN LIEU OF RECTANGULAR LINED DUCT, RECTANGULAR DUCT INSULATED WITH 1" VAPOR BARRIER DUCT WRAP
OR ROUND DUCT OF EQUIVALENT CROSS SECTIONAL AREA AND INSULATED WITH 1" VAPOR BARRIER
INSULATION, MAY BE USED.
3.47 NOT USED
3.48 DESCRIPTION: PERFORM TESTING AND BALANCING IN ACCORDANCE WITH THE PROCEDURE OF THE ASSOCIATED
AIR BALANCE COUNCIL'S "NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION TOTAL
SYSTEM BALANCE."
3.49 USE ACCURATE INSTRUMENTS FOR BALANCING AIR SYSTEMS THAT HAVE BEEN CALIBRATED WITHIN 6 MONTHS
PRIOR TO BALANCING. TYPES, SERIAL NUMBERS, AND DATE OF CALIBRATION OF ALL INSTRUMENTS SHALL BE
LISTED IN THE FINAL AIR BALANCE REPORTS.
3.50 MAKE AIR QUANTITY MEASUREMENTS IN MAIN AND BRANCH DUCTS BY PITOT TUBE TRAVERSE OF THE ENTIRE
CROSS SECTIONAL AREA OF THE DUCT. DUCTS HAVING VELOCITIES OF 1000 OR MORE FEET PER MINUTE
SHALL BE MEASURED WITH INCLINED MANOMETERS (DRAFT GAUGE) OR MAGNEHELIC GAUGES. DUCTS HAVING
VELOCITIES OF LESS THAN 1000 FT. PER MINUTE SHALL BE MEASURED WITH MICROMANOMETERS, HOOD GAUGES
OR SIMILAR LOW PRESSURE INSTRUMENTS. OPENINGS IN DUCTS FOR PITOT TUBE INSERTION SHALL BE
SEALED WITH SNAP -IN PLUGS AFTER AIR BALANCE IS COMPLETE. OUTLET AND INLET AIR QUANTITIES SHALL
BE DETERMINED BY AN APPROVED METHOD.
3.51 TOTAL AIR QUANTITIES SHALL BE OBTAINED BY ADJUSTMENT OF FAN SPEEDS. THE BALANCING CONTRACTOR
SHALL FURNISH AND INSTALL ANY REQUIRED FAN DRIVE CHANGES AS PART OF THIS CONTRACT.
3.52 VOLUME ADJUSTERS MAY BE USED TO BALANCE AIR QUANTITIES AT OUTLETS AND INLETS PROVIDING FINAL
ADJUSTMENTS ARE MINOR AND DO NOT PRODUCE OBJECTIONABLE DRAFTS OR EXCESSIVE SOUND LEVELS.
3.53 CERTIFIED BALANCE REPORTS: THREE (3) COPIES OF THE AIR AND WATER BALANCE REPORT, CERTIFIED BY
THE BALANCING FIRM, SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER SEVEN (7) DAYS PRIOR TO FINAL
ACCEPTANCE OF THE PROJECT. THE REPORT SHALL INCLUDE ALL AIRAND WATER BALANCE DATE AND HEAT
TRANSFER EQUIPMENT TEST DATA LISTED BELOW, AND OTHER DATA AS REQUIRED BY THE "NATIONAL
STANDARD FOR FIELD MEASUREMENTS AND INSTRUMENTATION".
3.54
3.55
NOT USED.
INDIVIDUAL OUTLET AND INLET TEST RESULTS: OUTLET AND INLET IDENTIFICATION (LOCATION AND NUMBER
DESIGNATION).
3.56 FOLLOWING FINAL ACCEPTANCE OF THE SYSTEM BALANCE BY THE OWNER, THE CONTRACTOR SHALL PERMANENTLY
MARK THE SETTINGS OF ALL VALVES, SPLITTERS, DAMPERS, AND OTHER ADJUSTMENT DEVICES SO THAT
ADJUSTMENT CAN BE RESTORED IF DISTURBED AT ANY TIME. DEVICES SHALL NOT BE MARKED BEFORE FINAL
ACCEPTANCE.
3.57 NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ARCHITECT, AND ALL
SUCH CUTTING SHALL BE DONE IN A MANNER DIRECTED BY HIM.
3.58 PROVIDE WEATHER-PROOF FLASHING AT ALL DUCT, PIPE, ETC. MECHANICAL PENETRATIONS
THROUGH THE BUILDING WALLS AND ROOF. FLASHING SHALL BE DESIGNED AND INSTALLED PER
SMACNA AND SHALL BE GUARANTEED WEATHER PROOF FOR THE DURATION OF THE GUARANTEE.
Mtl 00
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 11 2017
City of Tukwila
BUILDING DIVISION
RECE=IVED
CITY OF TUKWILA
JUN 29 2017
PERMIT CENTER
ABOSSEIN
ENGINEERING
L.L.0
MECHANICAL - FT,FCTRICAL
CIVIL - LEED - STRUCTURAL
FIRE PROTECTION
2100 112TH AVE. NE
BEI.T,FVUE, WA 98004
OFFICE: (425) 462-9441
FAX: (425) 462-9451
EMAIL:
CService@abossein.com
WEBSITE:
www.abos , in.com
2867 SOUTHCENTER MALL
TUKWILA, WA 98188