Loading...
HomeMy WebLinkAboutPermit M17-0101 - LUSH HANDMADE COSMETICS - ROOFTOP UNIT, DIFFUSERS, EXHAUST FANSLUSH HANDMADE COSMETICS 221 SOUTHCENTER MALL M17-0101 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 9202470130 221 SOUTHCENTER MALL MECHANICAL PERMIT Project Name: LUSH HANDMADE COSMETICS Permit Number: Issue Date: Permit Expires On: M 17-0101 10/12/2017 4/10/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, WA, 92013 APRIL HOUSE 3617 SW CHARLESTON ST , SEATTLE, WA, 98126 PRECISE HEATING & COOLING LLC PO BOX 1455 , MONROE, WA, 98272 PRECIHC891L9 Phone: (206) 478-0844 Phone: (206) 861-2525 Expiration Date: 6/29/2019 DESCRIPTION OF WORK: INSTALL ROOFTOP UNIT, DIFFUSERS, EXHAUST FANS & MISCELLANEOUS DUCTWORK Valuation of Work: $36,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $697.53 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date: 2014 2014 2014 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. j/) �% ° l Date: lv!/ i Signature: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 2: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished., by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 4: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 5: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 6: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 7: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 8: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 9: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 10: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 11: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 12: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 13: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 14: Readily accessible access to roof mounted equipment is required. 15: Allconstruction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 16: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 17: 18: 19: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 20: ***MECHANICAL PERMIT CONDITIONS*** 21: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 22: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 0703 1800 0609 0705 0701 0702 FIRE FINAL MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION REFRIGERATION EQUIP ROUGH -IN MECHANICAL SMOKE DETECTOR TEST a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWIi Community Development Department Permit Center - 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 lutp://www.TukwilaWA.gov Mechanical Permit No. Project No. fto'oi Date Application Accepted:: Date Application Expires: `7.12--1 f 7r --/B (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION aaSite Address: '" South Center Mall Suite Number: 221 Floor: 2 New Tenant: ® Yes ❑..No King Co Assessor's Tax No.: Tenant Name: Lush Fresh Handmade Cosmetics PROPERTY OWNER Name: prp (.114404(ASQ Address: fib' _) 5.4) Onct ✓ !IP s+, Loi,, s+ Name: GOe-,51 -Ci. k 4 T Email: 60(rt., PAVDIi ne r' ,c41P 5 Tukwila Business License No.: Address: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: prp (.114404(ASQ Address: fib' _) 5.4) Onct ✓ !IP s+, Loi,, s+ City,l+, Statew nZip:q/ .2k !^ PhoneD(0 q 7 q _ � Fax: Email: 60(rt., PAVDIi ne r' ,c41P 5 MECHANICAL CONTRACTOR INFORMATION Company Name: T6 9 Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 319) 000 Describe the scope of work in detail: To 4cc.1 \ t''ctE t -op �v1 rk j eS; L.SetrSt eschausA 'FPttnS 3 Use: Residential: Commercial: New New Fuel Type: Electric 10 Replacement Replacement Gas ❑ Other: H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised I -4-I 6.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <1 OOk btu Residential, Nighttime Furnace >1 OOk btu 19 Floor furnace 1 Suspended/wall/floor mounted heater 57 dB(A) Appliance vent 2 Repair or addition to heat/refrig/cooling system 1 Air handling unit 65 dB(A) <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm 19 Evaporator cooler 1 Ventilation fan connected to single duct 57 dB(A) Ventilation system 2 Hood and duct 1 incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper - Residential, Nighttime Diffuser 19 Thermostat 1 Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 1 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 1 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam -I Opm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: (�„t_-Q Print Name: NO(l..t 1 40fDt, Mailing Address: �� (% s'-0 C' ct✓ (es -our S - H:\Applications\Forms-Applications On Line \2016 Applications \Mechanical Permit Application Revised I.4.16.docx Revised: January 2016 bh Date: 7/I 21( 7 Day Telephone: ?4Ie 1A.144 '1 2/7 City State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID $563.39 PermitTRAK M17-0101 Address: 221 SOUTHCENTER MALL Apn: 9202470130 $563.39 Credit Card Fee $16.41 Credit Card Fee R000.369.908.00.00 0.00 $16.41 MECHANICAL $520.93 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $487.78 TECHNOLOGY FEE $26.05 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12555 R000.322.900.04.00 0.00 $26.05 $563.39 Date Paid: Thursday, October 12, 2017 Paid By: MISTY MOORE Pay Method: CREDIT CARD 08094G Printed: Thursday, October 12, 2017 10:29 AM 1 of 1 ert-1EfSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY ' PAID $1,469.99 D17-0191 Address: 221 SOUTHCENTER MALL Apn: 9202470130 $1,241.22 Credit Card Fee $36.15 Credit Card Fee R000.369.908.00.00 0.00 I $36.15 DEVELOPMENT $1,205.07 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,205.07 EL17-0530 Address: 221 SOUTHCENTER MALL Apn: 9202470130 $94.63 Credit Card Fee ' $2.76 Credit Card Fee R000.369.908.00.00 0.00 I $2.76 ELECTRICAL $91.87 PLAN CHECK FEE R000.345.832.00.00 0.00 $91.87 M17-0101 Address: 221 SOUTHCENTER MALL Apn: 9202470130 $134.14 Credit Card Fee $3.91 Credit Card Fee I R000.369.908.00.00 I 0.00 . $3.91 MECHANICAL $130.23 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R11899 R000.322.102.00.00 0.00 $130.23 $1,469.99 Date Paid: Wednesday, July 12, 2017 Paid By: APRIL HOUSE Pay Method: CREDIT CARD 412122 Printed: Wednesday, July 12, 2017 12:22 PM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit /1117-0101 INSPECTION NO. PERMIT NO.4/11 CITY OF TUKWILA BUILDING DIVISION 1 (206) 431-3670 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 Project: 1 -d -5-1Y / VIDI IDE (3 " 77cr Type of Inspection: c' f3 'C + L Ok -- .£4 r47 (, Address:Date 222 Baan 'N4RMai- II . Called: rvt Nf 0C4 -l_ tivt-L0-fr Special Special Instructions: Date Wanted: �'ft Ogg Requester: Ns -11),A-1104) r04 ,r7 .T`P/,POE /INs'U 77W »o/1'' 7)r c7t Phone NCI: - Zs -22-73 625`, Approved per applicable codes. if 7O (e'4--/45 - zs 1] Corrections required prior to approval. COMMENTS: Ok -- .£4 r47 (, . IC - Siivioi•oz acTlec:ej -re. - d)l°C - rvt Nf 0C4 -l_ tivt-L0-fr �'ft Ogg )'vim --1 Ns -11),A-1104) r04 i Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD I Retain a copy with permit x'117- 61° PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: L.GQ9L IMAID /li a C dvi Type of Inspection: r r'W 6/f -1N fripaylAho Address: Date Called: 72 / L`) e me 4 -Lt._ Special Instructions: Date Wanted:a.m.} /Z-77 / p itf Requester: airD r3 Phone No: 3Ge!)— 9 -- 7 ' Approved per applicable codes. Corrections required prior to approval. COMMENTS: o 1< Rc u6# i N /vi, eMIWtCA- p ( /°it- / / Ms77 O/A 7' Inspector: Date: 7—/ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 2L'$A' / DMrA Casr n IC5 Type of Inspection: AM/64-F /N/V1.60-AAJ/Cilt. Address: 22/ S6077/6r✓� R /14 -1 - Date Called: Special Instructions: Date Wanted: /O—/7I7 a.rri: p.m. Requester: Phone No: zb4- 21j-2..77/ LJApproved per applicable codes. EJ Corrections required prior to approval. COMMENTS:jt, Inspector: �S Date:/25 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 PAIT-c 1,©1 Project: i...0.51-1 IMAMO MA -Pe easmEnC5 Type of Inspection: R60644 AAEC,-ASN'iCA- L - Address: ZZ_ / 6.8077-1C.E4fr 2 MA-iJ-- Date Called: Special Instructions: Date Wanted: r0-1(.0-17 a f Requester: n Phone No: EiApproved per applicable codes. I Corrections required prior to approval. COMMENTS: Inspector: Date: jO .4/7 1 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 6/1/2018 City of Tukwila Department of Community Development APRIL HOUSE 3617 SW CHARLESTON ST SEATTLE, WA 98126 RE: Permit No. M17-0101 LUSH HANDMADE COSMETICS 221 SOUTHCENTER MALL Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 7/4/2018. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or fmal inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 7/4/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, ac e .., Permit Technician File No: M17-0101 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 July 27, 2017 City of Tukwila Department of Community Development APRIL HOUSE 3617 SW CHARLESTON ST SEATTLE, WA 98126 RE: Correction Letter # 1 MECHANICAL Permit Application Number M17-0101 LUSH HANDMADE COSMETICS - 221 SOUTHCENTER MALL Dear APRIL HOUSE, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Comcheck software is not acceptable for City of Tukwila. Only Washington State Energy forms are allowed for energy code compliance. Provide a completed 2015 Washington State Energy Code "MECHANICAL SUMMARY" Compliance Forms for Commercial Buildings available online at: http://www.neec.net/energy-codes (scroll down to center of page "2015 WSEC Commercial Provisions - Compliance Forms"). 2. Provide an engineer's analysis of the roof structural system to verify the roof is sufficient for the total weight of all new and existing mechanical units. Include a "roof -plan" to show where the new mechanical units are to be placed and identify other units that may be in the close vicinity where the necessary clearances are met. Note: Contingent on response to these corrections, further plan review may request for additional corrections. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. Sincerely, i C Ile Ripley Permit Technician File No. M17-0101 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-.366.5 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0101 DATE: 08/18/17 PROJECT NAME: LUSH HANDMADE COSMETICS SITE ADDRESS: 221 SOUTHCENTER MALL Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: Buildintwc ivision Public Works Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) REVIEWER'S INITIALS: DATE: 08/22/17 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: 09/19/17 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW 0 Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0101 DATE: 07/12/17 PROJECT NAME: LUSH HANDMADE COSMETICS SITE ADDRESS: 221 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: m CoySZ'M“1-H7 Building Division IN Public Works n Fire Prevention Structural Planning Division n nPermit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 07/13/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 08/10/17 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: dgFire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 Date: 08-07-2014 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Plan Check/Permit Number: M17 -010f ❑ Response to Incomplete Letter # Response to Correction Letter # 1 ❑ Revision # after Permit is Issued • Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: LUSH HAMDMADE COSMETICS Project Address: 221 SOUTHCENTER MALL Contact Person: lP(Lc; ( -14001.4 s� Summary of Revision: Phone Number: Zeit 4") ?f-Og'k Lf SHEET M3.1 - REVISED ROOF PLAN SHOWING NEW AND EXISTING EQUIPMENT. SHEET M5.1 AND 5.2 - REVISED SHEET TO REPLACE COMCHECK WITH 2015 WASHINGTON STATE ENERGY CODE -MECHANICAL Sheet Number(s): M3,1, M5.1 AND M5.2 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by:0416N- COM ❑ Entered in TRAKiT on W:\Permit Center\Templates\Forms\Revision Submittal Form.doc Revised: August 2015 PRECISE HEATING & COOLING T T C Washington State Department of Labor & industries Page 1 of 3 Horne Espanol Contact Search L&I A -Z Index Safety & Health Claims & Insurance Workplace Rights PRECISE HEATING & COOLING LLC Owner or tradesperson Principals MOORE, LAMAR RALPH, PARTNER/MEMBER STRINGER, MICHAEL LEE, PARTNER/MEMBER (End: 04/24/2015) Doing business as PRECISE HEATING & COOLING LLC WA UBI No. 603 122 887 PO BOX 1455 MONROE, WA 98272 206-861-2525 SNOHOMISH County Business type Limited Liability Company Governing persons LAMAR MOORE MICHAEL L STRINGER; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. PRECIHC891 L9 Effective — expiration 06/29/2011— 06/29/2019 Bond Active. Meets current requirements. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603122887&LIC=PRECIHC891 L9&SAW= 10/12/2017 PRECISE HEATING & COOLING LLC Wesco Insurance Co Bond account no. 46WB043501 $6,000.00 Received by L&I Effective date 04/07/2014 04/20/2014 Expiration date Until Canceled Bond history Insurance Ohio Security Ins Co Policy no. BKS55371340 $1,000,000.00 Received by L&I Effective date 12/02/2016 11/29/2016 Expiration date 11/29/2017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts Page 2 of 3 No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations Infraction no. EJACH00852 Issue date 08/06/2015 Violation city MONROE Type of violation ELECTRICAL CITATION Description Offering, bidding, advertising, or performing electrical installations, alterations or maintenance outside the scope of the firm's specialty electrical contractors license. (Installing low voltage conductors at a commercial site) Satisfied RCW/WAC 19.28.041 RCW Violation amount $500.00 Infraction no. ECHAE00750 Issue date 02/01/2012 Violation city MONROE Type of violation Satisfied RCW/WAC 19.28.041 RCW Violation amount $500.00 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603122887&LIC=PRECIHC891 L9&SAW= 10/12/2017 MECHANICAL NOTES GENERAL NOTES MECHANICAL SYLMBOLS LEGEND 1. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL CEILING DIFFUSERS, LINEAR DIFFUSERS, RETURN GRILLES AND EQUIPMENT ACCESS PANELS. COORDINATE ANY DISCREPANCIES BETWEEN DRAWINGS BEFORE PROCEEDING IN THE FIELD. 2. CONTRACTOR SHALL LAYOUT THE DRAWING PER CONTRACT DOCUMENT AS MUCH AS POSSIBLE. ANY LARGE DEVIATION IN LAYOUT SHALL BE APPROVED BY THE ARCHITECT PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL SUBMIT ONE (1) SET OF VELLUM AS-BUILTS AND TWO (2) SETS OF BLUE LINE AS-BUILTS TO THE BUILDING OWNER AND ONE SET OF VELLUMS AND ELECTRONIC FILES TO THE ENGINEER. 4. DUCT DIMENSIONS SHOWN ARE NET INSIDE DIMENSIONS. 5. INSTALL CFSD & FIRE DAMPER ON ALL DUCTS PENETRATING FIRE RATED ENCLOSURES, PARTITIONS, AND TUNNEL CEILINGS. PROVIDE ACCESS PANELS FOR ALL CFSD & FD ABOVE INACCESSIBLE CEILINGS. PROVIDE SMOKE DETECTOR DEVICE IN DUCTWORK CONNECTED TO CSFD. INSTALL DUCT S.D. PER MANUFACTURER'S APPROVED LISTING & INSTALLATION INSTRUCTIONS. 6. ALL FIRE OR COMBINATION FIRE SMOKE DAMPERS ARE NEW UNLESS OTHERWISE NOTED. EXISTING FIRE OR COMBINATION FIRE SMOKE DAMPERS THAT ARE NOT TO BE UTILIZED SHALL BE REMOVED. 7. WHERE CONNECTING FLEXIBLE DUCTWORK TO CEILING DIFFUSERS AND CEILING REGISTERS, SIZE OF FLEXIBLE & PER SMACNA "HVAC METAL DUCT CONSTRUCTION STANDARDS" LATEST EDITION. ALL 45 -DEGREE LEADING EDGES, CONICAL TAP -IN FITTINGS, EXTRACTORS, TURNING VANES (WHERE APPROPRIATE), PROPERLY DESIGNED PLENUMS, AND OTHER SHEET METAL FITTING AND AIR FLOW DEVICES SHALL BE INSTALLED PER THESE SMACNA GUIDELINES. 8. WHERE CONNECTING FLEXIBLE DUCTWORK TO CEILING DIFFUSERS AND CEILING REGISTERS, SIZE OF FLEXIBLE & BRANCH DUCT SHALL BE SAME SIZE AS NECK OF CEILING DIFFUSER OR CEILING REGISTER. MAXIMUM LENGTH TO BE 5'-0" LONG. ALL SUPPLY, RETURN, AND EXHAUST DIFFUSERS & GRILLES (NOT INCLUDING TOILET EXHAUST) SHALL HAVE A MINIMUM OF (1) 6'-0" LONG ACOUSTICAL DUCT. 9. EXISTING DUCTWORK ACTUAL LENGTH AND SIZE MAY BE DIFFERENT THAN WHAT IS INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND PROVIDE ALL OFFSETS AND TRANSITIONS, AS REQUIRE FOR A COMPLETE INSTALLATION. 10. PROVIDE A VOLUME DAMPER IN EACH BRANCH DUCT TO OUTLET WHETHER SHOWN ON DRAWING OR NOT. DAMPERS SHALL BE AS FAR AWAY FROM DIFFUSER AS POSSIBLE, PREFERABLY AT THE BRANCH TAKE -OFF. CONTRACTOR SHALL TAG VOLUME DAMPERS WITH RED OR YELLOW RIBBONS. 11. A MINIMUM OF 30" WIDE BY 30" HIGH CLEAR WORKING SPACE SHALL BE PROVIDED IN FRONT OF THE ACCESS PANELS TO ALL A/C UNIT'S COMPRESSOR, BLOWER ASSEMBLY, & THE AIR FILTER. 12. A MINIMUM OF 36" CLEAR WORKING SPACE, NOT LESS THAN 30" WIDE, SHALL BE MAINTAINED IN FRONT OF ALL SWITCHES, OVERCURRENT DEVICES AND ELECTRIC CONTROL COMPONENTS. 13. INTERLOCK ALL MOVING AIR EQUIPMENT SUCH AS FANS WITH THE FIRE LIFE SAFETY SYSTEM ALL A/C UNITS & EXHAUST FANS SHALL SHUT OFF WITH THE AIR HANDLING UNIT UPON DETECTION OF SMOKE BY THE FLS SYSTEM. 14. CONTRACTOR SHALL PROVIDE POWER, ELECTRICAL WIRING, CONDUITS, FOR ALL NEW, EXISTING AND RELOCATED AC UNITS AND SMOKE DETECTORS INTERLOCKS. 15. ALL PIPING AND ASSOCIATED FITTINGS AND VALVES SHALL BE OF SIMILAR MATERIAL PER CODE, UNLESS APPROVED OTHERWISE. PROVIDE DIELECTRIC COUPLING BETWEEN JOINTS OF DISSIMILAR MATERIALS. 16. ALL PIPING SHALL BE LABEL EVERY 10 FT. MFR.. SHALL BE MSI OR APPROVED EQUAL. 17. ALL PIPING& DUCT PENETRATION THROUGH RATED CONSTRUCTION SHALL BE PROPER FIRE STOP WITH UL -LIST FIRE STOPPING PRODUCTS. CONSULT WITH UL FIRE RESISTANCE DIRECTORY FOR ADDITIONAL REQUIREMENTS. 18. ALL PIPING & DUCTS PENETRATION THROUGH NON -RATED CONSTRUCTION SHALL BE PROPERLY AND GENEROUSLY CAULKED WITH SOUND RESISTANT MATERIAL SUCH AS SILICONE. USE ACOUSTICAL SEALANT AROUND DUCTS INSTALLED INTO ACOUSTICAL PARTITIONS. 19. CONTRACTOR TO PROVIDE TRANSFER DUCTS, SIZED PER OUR DETAIL, FOR ALL ROOMS ENCLOSED BY FULL HEIGHT WALLS ON ALL SIDES. 20. ALL EXISTING INSULATION ON THE MAIN DUCTWORK THAT IS LOOSE OR DAMAGED SHALL BE REPLACED BY THE CONTRACTOR. 21. CONTRACTOR SHALL PATCH AND REPAIR ANY AIR LEAKAGES AND HOLES ON EXISTING DUCTWORK. 22. CONTRACTOR SHALL LABEL ALL THERMOSTAT BY ITS CORRESPONDING TERMINAL AIR UNIT OR AC UNIT. 23. ALL COMBINATION FIRE/SMOKE DAMPERS SHALL COMPLY WITH LOCAL CODES. 24. CONTRACTOR TO FURNISH FULL SIZE SHOP DRAWINGS SHOWING ALL DUCT ROUTING, EQUIPMENT LOCATIONS, DIFFUSER, & THERMOSTAT LOCATIONS, AND ANY OTHER PERTINENT HVAC ITEMS. FLANGES SHALL BE SUBMITTED AS SHOP DRAWINGS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PAYMENT OF ALL CHARGES RESULTING FROM ANY ADDITIONS OR CHANGES IN THE WORK OF OTHER TRADES DUE TO DEVIATIONS FROM THE CONTRACT DOCUMENTS. ANY AND ALL CHANGES SHALL BE SHOWN ON RECORD AND AS -BUILT DRAWINGS. 25. PROVIDE DUCT FLEX CONNECTORS ON ALL SUPPLY AND RETURN DUCT CONNECTIONS TO A/C UNITS OR EXHAUST FANS. 26. AREAS ABOVE NONE DUCTED RETURN AIR GRILLED SHALL BE PAINTED FLAT BLACK TO MASK "SEE THROUGH" EFFECT. 27. ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED AND INSTALLED IN ACCORDANCE WITH LOCAL CODES 28. THIS PROJECT SHALL COMPLY WITH LOCAL AND STATE ENERGY CONSERVATION REQUIREMENTS. 29. THE FIRE RATED CORRIDORS ARE NOT TO BE USED TO CONVEY AIR TO OR FROM ROOMS. 30. THERE ARE NO ENVELOPE ALTERATIONS TO BE DONE ON THE BUILDING. 31. AIR & WATER BALANCE TO BE PERFORMED BY AN INDEPENDENT AABC CONTRACTOR. AIR BALANCE TO INCLUDE ALL A/C UNITS, VAV'S, BATHROOM EXHAUST FANS AND SUPPLY GRILLES AS REQUIRED. UTILIZE APPROVED BUILDING AIR BALANCE COMPANY. ALL AIR AND WATER BALANCE TO BE IN ACCORDANCE WITH AABC STANDARDS. 32. ALL PIPING AND ASSOCIATED FITTINGS AND VALVES SHALL BE OF SIMILAR MATERIAL PER CODE, UNLESS APPROVED OTHERWISE. PROVIDE DIELECTRIC COUPLING BETWEEN JOINTS OF DISSIMILAR MATERIALS. 33. RUN ALL DUCTS AS TIGHT AS POSSIBLE TO STEEL BEAMS. ALL PIPINGS OTHER THAN CONDENSATE SHALL BE ROUTED ABOVE THE DUCTWORK UNLESS APPROVED OTHERWISE. 34. SPACE THERMOSTATS SHALL BE PER BUILDING STANDARDS AND COMPATIBLE WITH TERMINAL AIR UNIT OPERATORS. ADJUSTABLE RANGE SHALL BE 10°F BETWEEN FULL HEATING AND FULL COOLING, OPERATING IN SEQUENCE, SET AT 70°F HEATING AND 74°F COOLING. COORDINATE FINAL LOCATION WITH ARCHITECT PRIOR TO INSTALLATION. 35. CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING. 36. CONTRACTOR SHALL PROVIDE WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR AT NO COST TO OWNER FOR A PERIOD OF ONE YEAR FROM DATE OF OWNER ACCEPTANCE. 37. UPON COMPLETION OF WORK, CONTRACTOR SHALL CLEAN AND REMOVE ALL DEBRIS ASSOCIATED WITH HIS/HER WORK AND DISPOSE OF AREA SHALL BE LEFT IN A CONDITION ACCEPTABLE TO OWNER. 38. PROVIDE ACCESS PANELS FOR ALL NEW OR EXISTING EQUIPMENT AND VALVES LOCATED ABOVE HARD LID CEILING. 39. CONTRACTOR SHALL SEAL ALL UNUSED DUCT OPENINGS AND REPAIR ALL LEAKING DUCTS AS PART OF THIS WORK. 40. CEILING SPACES USED AS RETURN AIR PLENUMS SHALL FULLY COMPLY WITH ALL THE PROVISIONS OF LOCAL CODES. 41. SEAL ALL DUCTS AND JOINTS WITH HIGH VELOCITY, WATER BASED, UL -FIRE RATED DUCT SEALER. 42. CONTRACTOR SHALL SEAL ANY AIR LEAKAGES OR HOLES ON EXISTING DUCTWORKS. REPLACE ANY DAMAGE OR MISSING INSULATION. 43. RUN 1" TYPE L COPPER CONDENSATE DRAIN LINES FROM EACH A/C UNIT TO NEAREST CODE APPROVED RECEPTOR. 44. CONDENSATE DRAIN PIPING INSTALLED WITHIN A RETURN PLENUM SHALL BE NON-COMBUSTIBLE MATERIAL. 45. COMBUSTIBLE WITHIN THE PLENUM SPACE MUST COMPLY WITH LOCAL CODES. 1. LOCATION OF DUCTWORK IS APPROXIMATE. ALL DRAWINGS AND LAYOUTS ARE DIAGRAMMATIC TO SHOW DESIGN INTENT ONLY. CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS SHOWING ALL DUCTWORK, PIPING CABLE TRAY AND BUILDING STRUCTURE. IF FIELD CONDITIONS DIFFER SIGNIFICANTLY FROM SHOWN ON THE DRAWINGS AND AFFECT MECHANICAL WORK, INFORM ARCHITECT IMMEDIATELY BEFORE PROCEEDING WITH THAT AREA. 2. CONTRACTOR SHALL NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES, AS REQUIRED TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE. PROVIDE EQUIVALENT DUCT SIZE TO THE DIAMETER SHOWN. COORDINATE CLOSELY WITH OTHER SECTIONS TO REDUCE NECESSITY OF TRANSITION TO A MINIMUM. NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED TRANSITIONS OR OTHER SPECIAL CHANGE SHAPE PIECES. 3. CONTRACTOR IS TO PROVIDE MATERIAL AND LABOR TO PHYSICALLY TEST ALL FIRE AND COMBINATION FIRE / SMOKE DAMPERS AND RESET THEM FOR ITS DESIGN FUNCTION. TESTING PROCEDURES AND TEST RESULTS SHALL BE WITNESSED AND APPROVED BY THE AUTHORITIES HAVING JURISDICTION. 4. IN CASES WHERE SHEET METAL DUCTS INTERSECT FIRE -RATED WALLS AT OTHER THAN RIGHT ANGLES, CONTRACTORS SHALL OFFSET THE RATED WALL ABOVE CEILING SUCH THAT THE OFFSET WALL WILL BE PERPENDICULAR TO THE DUCT. FIRE DAMPER SHALL BE PROVIDED AT THE WALL ACCORDINGLY. 5. ALL NON -RATED DOORS REQUIRING UNDER -CUT SHALL BE 3/4 INCH MINIMUM, UNLESS NOTED OTHERWISE. ALL FIRE -RATED DOORS REQUIRING UNDERCUT SHALL BE: DOUBLE DOORS NOT TO EXCEED 1/4" AND SINGLE DOORS NOT TO EXCEED 3/8". ALL UNDER CUTS TO BE COORDINATED WITH THE ARCHITECTURAL DOOR SCHEDULE AND SPECS. 6. FIRE DAMPERS, COMBINATION FIRE / SMOKE DAMPERS AND THE NECESSARY ACCESS PANELS SHALL BE PROVIDED FOR ALL DUCTS PENETRATING FIRE AND/OR SMOKE PARTITIONS AS REQUIRED BY CODE. SEE ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION OF FIRE AND/OR SMOKE RATED PARTITIONS. 7. COMBINATION FIRE/SMOKE DAMPERS SHALL BE PROVIDED FOR SUPPLY AND RETURN AIR DUCTS PENETRATING RATED WALLS/CORRIDORS PER UBC AND UMC. EACH COMBINATION FIRE/ SMOKE DAMPER SHALL BE PROVIDED WITH DUCT SMOKE DETECTORS THAT ARE INSTALLED WITHIN 5'-0" OF THE DAMPER. 8. DUCT SMOKE DETECTORS SHALL BE INSTALLED PER MANUFACTURER'S WRITTEN RECOMMENDATIONS AND SHALL BE TIED -IN TO THE BUILDING FIRE ALARM SYSTEM. 9. ALL DUCTWORK SHALL BE SUPPORTED PER LOCAL CODES REQUIREMENTS. 10. ALL REQUEST FOR ACCESS OR CONNECTIONS, INCLUDING THOSE NOTED BELOW MUST BE MADE IN WRITING 48 HOURS IN ADVANCE OF WORK ACTIVITY THROUGH THE BUILDING MANAGER. 11. DO NOT MODIFY ANY EXISTING HVAC SYSTEM OR COMPONENT WITHOUT CONTACTING THE BUILDING ENGINEER. 12. PROTECT AND MAINTAIN ALL RETURN AIR DUCT OPENING WITH PROPER FILTER MEDIA DURING ALL CONSTRUCTION ACTIVITY. SYMBOLS DESCRIPTION L. UP OSD CFSD DN 0 0 0 CD -1 100 CR -1 100 EG -1 100 FO (E) SINGLE LINE DUCTWORK (NEW) SINGLE LINE DUCTWORK (EXISTING) SINGLE LINE DUCTWORK (EXISTING TO BE DEMOLISHED) DOUBLE LINE DUCTWORK (NEW) DOUBLE LINE DUCTWORK (EXISTING) DOUBLE LINE DUCTWORK (EXISTING TO BE DEMOLISHED) DUCTWORK WITH ACOUSTIC LINING AUTOMATIC SMOKE DAMPER COMBINATION FIRE AND SMOKE DAMPER RISE IN DUCTWORK (IN DIRECTION OF AIRFLW DROP IN DUCTWORK (IN DIRECTION OF AIRFLW CEILING SUPPLY, TYPE 1, THROW PATTERN 4 -WAY, 100CFM CEILING RETURN, TYPE 1, 100CFM CEILING EXHAUST, TYPE 1, 100CFM LINEAR EXHAUST AIR. SEE SCHEDULE VOLUME DAMPER ELECTRIC DUCT HEATER POINT OF CONNECTION POINT OF DISCONNECTION THERMOSTAT SMOKE DETEDCTOR FLAT OVAL DUCT EXISTING TO REMAIN REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 2D17 .#3 -- City Of TUkwila BUILDWGZIVISION NOTES TO CONTRACTOR LANDLORD NOTES 1. VERIFY ANY DEMOLITION WORK, AND ANY NEW WORK WITH THE LANDLORD , PRIOR TO BID. 2. VERIFY ANY WORK REQUIRED TO PROTECT FIRE ALARM/LIFE SAFETY SYSTEM WIRING & DEVICES, SPRINKLER PIPING, LANDLORD DUCTWORK, ETC. DURING DEMOLITION AND NEW CONSTRUCTION WITH LANDLORD PRIOR TO BID. 3. VERIFY LANDLORD REQUIREMENTS FOR ATTACHING TO BUILDING STRUCTURE WHEN HANGING / SUPPORTING EQUIPMENT, FIXTURES, CONDUIT, PIPING, ETC FROM THE BUILDING STRUCTURE PRIOR TO BID. ALL MEP INSTALLATION SHALL BE HUNG, IF REQUIRED, FROM TOP CHORD OF STEEL OR SHALL BE HUNG FROM ROOF DECK. 4. PROVIDE ACCESS TO ANY LANDLORD AND TENANT EQUIPMENT, VALVES, DAMPERS, CONTROLS, CLEANOUTS, J -BOXES, ETC. LOCATED ABOVE, ETC. BOARD CEILING AND ANY OTHER INACCESSIBLE CEILING AREAS AS REQUIRED VERIFY/COORDINATE WITH LANDLORD PRIOR TO BID/START OF WORK. 5. LANDLORD APPROVED AIR BALANCING CONTRACTOR IS REQUIRED. REPORT SHALL INCLUDE AC UNIT'S MAKE, MODEL, SIZE, 6. ALL MATERIALS AND WORK IN CEILING RETURN AIR PLENUM SHALL BE "PLENUM APPROVED" AS PER LOCAL CODE. VERIFY ANY/ALL REQUIREMENTS WITH THE BUILDING DEPT. PRIOR TO BID. 7. LOCATION OF ROOFTOP EQUIPMENT MUST BE COORDINATED AND APPROVED BY THE LANDLORD BEFORE ANY PENETRATIONS ARE MADE. 8. TENANT'S GENERAL CONTRACTOR MUST COORDINATE WITH THE LANDLORD ALL ROOF REPAIR AND FINISHING OF PENETRATIONS AND EQUIPMENT CURBS. A. CONTRACTORS TO PREPARE SHOP DRAWINGS AFTER CONDUCTING SITE SURVEY. THE SHOP DRAWINGS MUST PROVIDE THE NECESSARY INSTALLATIONS , CUSTOMIZED ACCORDING TO ACTUAL SITE CONDITIONS. PROVIDE A COPY TO THE CLIENT, ARCHITECT & ENGINEERS A WEEK PRIOR TO MOBILIZATION. B. C. D. E. F. CONTRACTOR TO PREPARE TWO COPIES OF RED LINE AS -BUILT DRAWINGS. USE THE SHOP DRAWINGS AS THE BASE PLAN, RED PENCIL (NOT PEN) TO UPDATE THE SAID AS -BUILT EVERYDAY. THE FIRST COPY IS FOR TECHNICIAN REFERENCE WHILE WORKING. THE SECOND COPY SHOULD BE KEPT CLEAN, NEAT, & LEGIBLE. THIS SHALL BE USE FOR INSPECTION, MEETING, RFI PREPARATION, AND OTHER APPLICATIONS WHEREON A CLEAN, NEAT, & LEGIBLE COPY IS NECESSARY. PRIOR TO RELEASE OF FINAL PAYMENT, THE SECOND COPY MUST BE CERTIFIED BY THE CONTRACTOR'S LICENSEE AS COMPLETE & CORRECT. SCAN AND PROVIDE ELECTRONIC COPY TO THE CLIENT, ARCHITECT, & ENGINEERS. THE HARD COPY MUST BE KEPT BY THE CONTRACTOR DURING WARRANTY PERIOD AND MUST BE SUBMITTED TO STORE MANAGER ON THE LAST DAY OF WARRANTY. THE GENERAL CONTRACTOR MUST DISCUSS & SUPPORT THEIR SUBCONTRACTOR. IF THE SUBCONTRACTOR NEEDS INFORMATION THAT NEEDS ENGINEER'S SUPPORT, THE GENERAL CONTRACTOR MUST, USING ITS OFFICIAL FORM, SEND REQUEST FOR INFORMATION (RFI) TO THE ARCHITECT OF RECORDS, COPY FURNISH THE ENGINEERS. THE RFI MUST BE CONCISE & SUPPORTED W/ SKETCH, DRAWINGS, CUT SHEET AND/OR OTHER MATERIALS THAT WILL HELP THE ENGINEERS RESPOND PRECISELY AND QUICKLY. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH THE LANDLORD'S "ENGINEERING DESIGN CRITERIA". ALL CONTRACTORS SHALL OBTAIN A COPY FROM THE LANDLORD'S TENANT COORDINATOR OR OPERATIONS MANAGER: AND BECOME FAMILIAR WITH THE REQUIREMENTS CONTAINED WITHIN PRIOR TO BIDDING THE JOB. WHERE LANDLORD'S REQUIREMENTS CONFLICT WITH CODES OR ORDINANCES, THE STRICTEST INTERPRETATION SHALL APPLY. C LSEPARATE PERMIT REQUIRED FOR: ❑ Mechanical cal tubing as Piping City of Tukwila CUILMIG DIVISION IMMO REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila wila Building Division. !OT7:: RSviSioris will require a new plan submittal and may include additional plan review fees. PILE COPY Permit ,, (.� 7'OIOJ Plan review approval is subject to errors and omi ' ns. Approval of construction documents does not authorize the violation of any $ • , r t , or ordinance. R# # '; of approved Field • $ and k' nditions is acknowledged: By: %..rl► / ! 1 Date: ' l' City of Tukwila BUILDING DIVISION MECHANICAL SHEET INDEX SHEET # SHEET TITLE M0.1 GENERAL NOTES SYMBOLS LEGEND AND SHEET INDEX M0.2 MECHANICAL SCHEDULES M2.1 MECHANICAL FLOOR PLAN REMARKS/ISSUE PERMIT SET PERMIT SET PERMIT SET M3.1 MECHANICAL ROOF PLAN M4.1 MECHANICAL DETAILS - SHEET ONE M4.2 MECHANICAL DETAILS - SHEET TWO M5.1 MECHANICAL COMCHECK DRAWN BY : RP CHECKED BY : RH STAMPED/SIGNED: KK PERMIT SET PERMIT SET PERMIT SET PERMIT SET M17- 010 DATE: 07.07.17 JOB N0: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 0 •- 0 U N 0 0 L I - SOUTHCENTER 0 J W L.� N W J W N Z N 0 W = I- O 0 0 00 CN 00 00 00 0) Q W J W /14-0 17001-10 WA SEATTLI TSOUTH CENTER MALL) REVISIONS RECEIVED TY OF TUKWILA JUL 12 2017 ERMIT CENTER GENERAL NOTES SYMBOLS LEGEND AND SHEET INDEX SHEET NUMBER M0.1 HIGH EFFICIENCY COOLING ONLY / ELECTRIC HEAT WITH ENERGYX SYSTEM ROOFTOP UNIT SCHEDULE MARK MANUFACTURER & MODEL NO. LOCATION AREA SERVED NOMINAL CAPACITY (TONS) MIN OSA (CFM) TOTAL OPERATING WEIGHT (LBS.) FAN MOTOR DATA COOLING HEATING ELECTRICAL EERIIEER FILTERS (QTY) SIZE REMARKS SUPPLY FAN TOTAL (MBTUH) TOTAL (MBTUH) COMPRESSOR FLA MCA MOCP ELEC HEATER POWER CFM ESP (IN.) BHP WATTS RLA LRA NOM KW FLA MCA VOLTS PHASE HERTZ 0.1 CARRIER 50HC-D08A2A5 ROOF OFFICE/STORE 7.5 1,575 860 LBS 3,000 1.0 1.94 88.0 90.0 325 25.0 164 1.5 51 60 18.6 / 24.8 51.7 / 59.7 76 / 85 208 3 60 11.2/11.4 2 MERV 8 SEE NOTES RO CD -13 NOTES: 1. PROVIDE FACTORY INSTALLED SUPPLY AIR SMOKE DETECTOR AND CO2 SENSOR 2. PROVIDE VIBRATION ISOLATOR ROOF CURB BY SAUSSE OR EQUAL. 3. PROVIDE SINGLE DRY BULB TEMPERATURE SENSOR FOR ECONOMIZER AND OUTDOOR AIR DAMPER AND BAROMETRIC RELIEF. 4. PROVIDE T-24 APPROVED PROGRAMMABLE THERMOSTAT. 5. PROVIDE MOTORMASTER HEAD PRESSURE CONTROLLER FOR LOW AMBIENT CONTROL. 6. PROVIDE 6. 2" THICK MERV 8 AIR FILTERS. DIFFUSER SCHEDULE MARK CFM RANGE TYPE MAX. SP (IN.) FRAME SIZE (IN.) NECK SIZE (IN.) MAX N.C. REMARKS CD -1 0 -120 SQUARE 0.1 24X24 6X6 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -2 121 - 220 SQUARE 0.1 24X24 8X8 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -3 221- 350 SQUARE 0.1 24X24 10X10 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -4 351 - 500 SQUARE 0.1 24X24 12X12 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -5 501 - 750 SQUARE 0.1 24X24 16X16 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -6 751 - 900 SQUARE 0.1 24X24 18X18 25 TITUS MODEL TSW, PERFORATED SUPPLY, MODULAR CORE CD -13 0 - 500 SQUARE 0.1 12X12 8X8 35 TITUS MODEL 300FS, ALUMINUM SUPPLY GRILLE CR -1 0 -100 SQUARE 0.1 24X24 6X6 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -2 101 - 200 SQUARE 0.1 24X24 8X8 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -3 201 - 320 SQUARE 0.1 24X24 10X10 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -4 321 - 450 SQUARE 0.1 24X24 12X12 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -5 451 - 700 SQUARE 0.1 24X24 16X16 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -6 701 -1250 SQUARE 0.1 24X24 18X18 25 TITUS MODEL PMR, DUCTED PERFORATED RETURN CR -7 0 -1250 SQUARE 0.1 24X24 - 25 TITUS MODEL PXP, NON -DUCTED PERFORATED RETURN EG -1 0-300 SQUARE 0.1 12X12 8X8 30 TITUS MODEL 355RL, EXHAUST GRILLE EG -2 0-1000 SQUARE 0.1 24X24 22X22 30 TITUS MODEL 35ORLF, EXHAUST GRILLE RD -1 0 -120 ROUND 0.1 18"0 6"0 30 EC MODEL SUPPLY RD -2 121 - 240 ROUND 0.1 24"0 8"0 30 EC MODEL SUPPLY RD -3 241 - 400 ROUND 0.1 29"0 10"0 30 EC MODEL SUPPLY RD -4 401 - 600 ROUND 0.1 35"0 12"0 30 EC MODEL SUPPLY RD -5 601 - 800 ROUND 0.1 41"0 14"0 30 EC MODEL SUPPLY RD -6 801-1000 ROUND 0.1 47"0 16"0 30 EC MODEL SUPPLY RR -2 121 - 240 ROUND 0.1 24"0 8"0 30 TITUS MODEL TMRA, RETURN/EXHAUST RR -3 241 - 400 ROUND 0.1 24"0 10"0 30 TITUS MODEL TMRA, RETURN/EXHAUST RR -4 401 - 600 ROUND 0.1 24"0 12"0 30 TITUS MODEL TMRA, RETURN/EXHAUST RR -5 601 - 800 ROUND 0.1 24"0 14"0 30 TITUS MODEL TMRA, RETURN/EXHAUST RR -6 801 -1000 ROUND 0.1 24"0 16"0 30 TITUS MODEL TMRA, RETURN/EXHAUST LD -1 0-300 LINEAR SLOTTITUS SUPPLY 0.1 48 X 6-3/4" 8"0 25 MODEL FL -30 (FLOW -BAR DIFFUSER, ONE SLOT, 3" SLOT W/ 4' FACTORY FABRICATED PLENUM) NOTES: FINAL DIFFUSER LOOK, LOCATION, AND COLOR SCHEME SHALL BE COORDINATED AND APPROVED WITH / BY ARCHITECT. PROVIDE OBD FOR ACCESS TO VOLUME DAMPERS ABOVE A HARD LID CEILING. VERIFY PULLEY COORDINATE DIFFUSER BORDER TYPE WITH REFLECTED CEILING PLAN. DUCT SIZING SCHEDULE FOR LOW VELOCITY SUPPLY RETURN & EXHAUST DUCT CFM RANGE ROUND DUCT DIAMETER OR EQUIVALENT RECTANGULAR DUCT CFM RANGE ROUND DUCT DIAMETER OR EQUIVALENT RECTANGULAR DUCT 0-110 6" OR 8"X4" 1400-1900 18" OR 24"X12" 101-220 8" OR 10"X6" 1900-2500 20" OR 24"X14" 221-400 10" OR 10"X8" 2500-3300 22" OR 32"X14" 401-600 12" OR 12"X10" 3300-4100 24" OR 36"X14" 601-900 14" OR 16"X10" 4100-5000 26" OR 40"X16" 901-1400 16" OR 18"X12" 5000-6200 28" OR 48"X16" ® GREENHECK SP -B110 CEILING RESTROOM REMARKS: DUCT SIZES INDICATED ARE INSIDE DIMENSIONS WHICH MAY BE ALTERED BY CONTRACTOR TO OTHER DIMENSIONS TO AVOID INTERFERENCES AND CLEARANCE REQUIREMENTS. USE EQUAL FRICTION METHOD, 0.1"WG PER 100 FT. OF DUCT TO DETERMINE DUCT SIZES. EXHAUST FAN SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION SERVICE FAN TYPE CFM SP (IN. W G ELECTRICAL DATA TOTAL OPERATING WEIGHT (LBS) REMARKS HP VOLT PH HZ ® GREENHECK CUE -161 -VG ROOF STORE UP BLAST 2500 0.75 1 120 1 60 200 SEE NOTES: 1 0 ® GREENHECK SP -B110 CEILING RESTROOM CENT. 100 0.35 1 / 6 120 1 60 10 SEE NOTES: 2 Q 1. FACTORY PROVIDED ROOF CURB, BACKDRAFT DAMPER, SPEED CONTROL AT THE FAN FOR BALANCING, VARI GREEN MOTOR, HINGE KIT AND BIRD SCREEN.000RDINATE WITH LANDLORD. 2 FACTORY PROVIDED VIBRATION ISOLATOR HANGERS, BACKDRAFT DAMPER, SPEED CONTROL AT THE FAN FOR BALANCING, VARI GREEN MOTOR AND STANDARD GRILLE..CONTROLED VIA LIGHT SWITCH. 3. PROVIDE WITH VIBRATION ISOLATOR HANGERS, STANDARD GRILLE, SPEED CONTROL AT THE FAN AND VARI GREEN MOTOR. FAN SHALL BE CONTROLLED VIA TIME CLOCK. 1575 CFM ROOF LEVEL RTU 3000 CF 3000 1425 CFM CFM 1ST LEVEL EF -1 2500 CFM EF -2 100 CFM 1025 CFM AIR BALANCE EXHAUST AIR : 2500 + 100 = 2600 CFM OUTSIDE AIR : 1575 =1575 CFM MAKE-UP AIR : 2600 -1575 =1025 CFM NEG. PRESSURE : 1025 / 2600 = 39.42% AIR BALANCE SCHEMATIC 1 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 212017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUL 12 2017 PERMIT CENTER DATE: 07.07.17 JOB NO: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 0 -0 W -1 I- -I Q 00 W 00 U = w o0 Q) D N OWN W I D O (n F- W LI- 001- /W O V J � 17001-10 WA SEATTLE (SOUTH CENTER MALL) REVISIONS MECHANICAL SCHEDULES SHEET NUMBER X0.2 SPECIAL BID NOTES 1 CONTRACTOR TO SURVEY THE ENTIRE TENANT AFTER DEMOLITION OF THE (E) CEILING AND INSPECT THE (E) SYSTEM FOR ANY (E) MECHANICAL DEVICES LOCATED ABOVE ANY NEW HARD LID AREAS, REQUIRING ARCHITECTURAL ACCESS PANELS FOR ACCESS AND SERVICE. NOTIFY THE ARCHITECT AND ENGINEER IMMEDIATELY UPON DETECTION OF ANY SUCH SITUATIONS. 2. CONTRACTOR SHALL PROVIDE PRICING TO DEMOLISH, CAP AND REMOVE EXISTING DUCTWORK, PIPING, AC UNITS, EXHAUST FANS AND OTHER EQUIPMENT NOT REQUIRED FOR REUSE FOR NEW SCOPE. SEE FLOOR PLANS FOR ADDITIONAL INFORMATION. 3. PRIOR TO BIDING CONTRACTOR SHALL CAREFULLY DETERMINE THE AREA WHICH THE CEILING WILL BE REMOVED AND INCLUDE IN HIS BID TO REPLACE THE DAMAGED MAIN DUCT INSULATION. INSULATION SHALL BE BUILDING STANDARD WITH ALUMINUM FOIL FACE. 4. ALL ROOF PENETRATIONS AND REPAIR SHALL BE DONE BY LANDLORD'S ROOFING CONTRACTOR AT THIS TENANT'S EXPENSE. 5. SUBMIT STRUCTURAL STEEL SUPPORT DETAILS AND CALCULATIONS FOR NEW EXHAUST FAN ON ROOF TO LANDLORD, FOR REVIEW BY LANDLORD'S STRUCTURAL ENGINEER. MECHANICAL GENERAL NOTES 1. CONTRACTOR SHALL INSTALL THE HVAC EQUIPMENT ON CENTER IN BETWEEN BEAMS, WHENEVER POSSIBLE. 2. THERMOSTATS SHALL BE INSTALLED 48" ABOVE FINISHED FLOOR. FINAL THERMOSTAT LOCATION(S) SHALL BE COORDINATED AND APPROVED BY THE ARCHITECT. 3. CONTRACTOR SHALL COORDINATE ALL DUCT ROUTING WITH THE CABLE TRAY, FULL HEIGHT WALLS AND ALL STRUCTURAL BEAMS. 4. CONTRACTOR SHALL INSTALL UNITS IN SUCH A MANNER AS TO ALLOW FOR 36" IN FRONT OF THE CONTROLLERS, COMPONENT ACCESS AND ELECTRICAL DISCONNECTS. 5. CONTRACTOR SHALL INSTALL TRANSITION MAIN/BRANCH DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURAL MEMBERS SO AS TO MAINTAIN A BOTTOM OF DUCT AS HIGH AS POSSIBLE. IF ANY DISCREPANCIES NOTIFY THE ARCHITECT/ENGINEER. 6. CONTRACTOR SHALL PROVIDE 1 1/2" THICK INSULATION FOR ALL REFRIGERANT LINES.(IF APPLICABLE) 7. CONTRACTOR SHALL VERIFY ALL WALL PARTITIONS TYPES/CEILING TYPES AND RATING IN ORDER TO PROVIDE COMBINATION SMOKE FIRE DAMPERS / FIRE STOPPING AT PENETRATIONS TO FIRE RATED AREAS (IN ACCORDANCE WITH MECHANICAL CODE). 8. CONTRACTOR SHALL COORDINATE MECHANICAL EQUIPMENT LAYOUT IN ORDER TO AVOID FIRE SPRINKLER LINES. 9. FINAL DIFFUSER TYPES AND LOCATIONS SHALL BE COORDINATED AND APPROVED BY ARCHITECT. 10. CONTRACTOR SHALL COORDINATE FINAL MECHANICAL DISTRIBUTION AND NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CLEARANCE ISSUES. 11. CONTRACTOR SHALL PROVIDE AND INSTALL RETURN AIR OPENINGS/GRILLES ON ALL FULL HEIGHT WALLS AS REQUIRED FOR PROPER RETURN AIR FLOW/PATH BACK TO THE AC UNITS MAIN RETURN. 12. PROVIDE A VOLUME DAMPER IN EACH BRANCH DUCT TO OUTLET, WHETHER SHOWN DRAWING OR NOT. DAMPERS SHALL BE AS FAR AWAY FROM DIFFUSER AS POSSIBLE, PREFERABLY AT THE BRANCH TAKEOFF. CONTRACTOR SHALL TAG ALL VOLUME DAMPERS WITH RED OR YELLOW RIBBONS. 13. CONTRACTOR SHALL PROVIDE AIR BALANCE AND SHALL BE PERFORMED BY AN INDEPENDENT AABC CONTRACTOR. AIR BALANCE TO INCLUDED ALL EXISTING AND NEW OF AIR MOVING EQUIPMENT SUCH AS, RESTROOM EXHAUST FANS/GRILLES, AC UNITS AND SUPPLY DIFFUSERS AS REQUIRED. REFERENCE NOTES 0 PROVIDE NEW RTU -1 ROOF TOP UNIT. VERIFY AND COORDINATE EXACT LOCATION WITH BUILDING ENGINEER AND ARCHITECT. O PROVIDE NEW EF -2 BATHROOM/TOILET EXHAUST IN CEILING SPACE. VERIFY EXACT LOCATION IN THE FIELD. O3 PROVIDE 8"0 DUCT UP THRU THE ROOF AND TERMINATE WITH ROOF JACK. ® PROVIDE 22"0 DUCT UP THRU THE ROOF AND TO THE EF -1 UPBLAST FAN. VERIFY EXACT LOCATION IN THE FIELD AND WITH BUILDING ENGINEER. O PROVIDE CR -6 24X24 RETURN DIFFUSER FOR RETURN AIR. © PROVIDE TRANSFER GRILLE TO ALLOW AIR FLOW TO CIRCULATE FOR VENTILATION. SCOPE OF WORK 1. UNLESS OTHERWISE NOTED IT IS THE MECHANICAL CONTRACTORS RESPONSIBILITY TO INSTALL, A COMPLETE AND OPERATIONAL HVAC SYSTEM. IT IS NOT THE INTENT OF THESE DRAWINGS TO CALL OUT EACH AND EVERY COMPONENT NECESSARY TO MAKE THE RESPONSIBILITY TO FURNISH AND INSTALL ALL NECESSARY ITEMS. 2. DUCTWORK, THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL NEW LOW PRESSURE DUCTWORK COMPLYING WITH THE MOST RECENT SMACNA STANDARD, INSULATION, GRILLES REGISTERS, DIFFUSERS, VOLUME DAMPERS, FIRE DAMPERS, SMOKE DETECTORS, TOILET AREA EXHAUST FAN ETC., NECESSARY TO RENDER THE SYSTEM OPERATIONAL AS DESCRIBED IN THESE PLAN AND SPECIFICATIONS AND REQUIRED BY THE LANDLORD, LOCAL AND STATE CODES. 3. CONTROLS, WIRING AND PIPING, THE MECHANICAL CONTRACTOR SHALL REFURBISH AND/OR REPLACE AS NECESSARY ALL CONTROLS, CONTROLLERS, DAMPERS MOTORS, DAMPERS OR CONTROL PANEL COMPONENTS REQUIRED TO PROVIDE A COMPLETE OPERATING SYSTEM. THE WORK SHALL ALSO INCLUDE THE EXTENSION OR CONNECT ALL CONTROL COMPONENTS AND MAKE THE SYSTEM OPERATION AS PER LANDLORD'S SEQUENCE OF OPERATION. (REFER TO LANDLORD'S DESIGN MANUAL.) MECHANICAL FLOOR PLAN XED SHELVES 4' PPP FIXE] SHELVES 47 x 24' PIPP FIXED SH 47 x 24' LV OBILE ,'SLE 36' L OA 0-18"0 OA OA CR -6 1425 OA 0 O o�B A 22"0 UTR O 14"0 C1 NON • ■ ■` ER DEMO CART C1 MEN 16"0 —o DEMO CART DEMO CART E O Al LD -1 180 O Al O Al O Al O Al O Al tea O 0131 8"0 DEMO CART ®A1 0131 C1 0 BI 0131 7- REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2,1 2011 City of'Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUL 12 2017 PERMIT CENTER SCALE: 1/4" =1'-0" 1 DATE: 07.07.17 JOB NO: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 U N O U N -a -0 V) L Li - SOUTHCENTER 0 J L.� (1) w LTJ N Z N LTJ U w O (f)O 0 00 WA 98188 W Ld ;744 17001-10 WA SEATTLE'(S`OUTH CENTER MALL) REVISIONS MECHANICAL FLOOR PLAN SHEET NUMBER M2.1 REFERENCE NOTES 0 PROVIDE NEW RTU -1 ROOF TOP UNIT. VERIFY AND COORDINATE EXACT LOCATION WITH BUILDING ENGINEER AND ARCHITECT. 0 PROVIDE NEW EF -2 BATHROOM EXHAUST TERMINATE WITH ROOF JACK. LOCATE 10 FT AWAY FROM ANY AIR INTAKE OF THE BUILDING. VERIFY AND COORDINATE EXACT LOCATION IN THE FIELD. 30 PROVIDE NEW EF -1 UPBLAST EXHAUST FAN. VERIFY AND COORDINATE EXACT LOCATION WITH BUILDING ENGINEER AND ARCHITECT. LOCATE 10 FT AWAY FROM ANY AIR INTAKE FROM THE BUILDING. © MECHANICAL ROOF PLAN 0 0 WILA 1 ER N SCALE: 1/8" =1'-0" 1 DATE: 08.07.17 JOB NO: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5666 FAX: (817) 635-5699 0 O 0 0 THCENTER 0 �y 0 00 00 00 LLJ V d 17001-10 WA SEATTLE (SOUTH CENTER MALL) S A 08.07.17 - REV PER CITY COMMENTS i MECHANICAL ROOF PLAN j / // / / /// // SIJ _ / / / Vii ) //j; /' / j � V f ,` CATWALK CATWALK / • • EXISTING EXISTING EXISTING EXISTING EXISTING ) REVIEWED FOR CODE COMPLIANCE APPROVED AUG 212011 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKV 1 6 201 PERMIT CEN" CORRtECTIQ I TPt © MECHANICAL ROOF PLAN 0 0 WILA 1 ER N SCALE: 1/8" =1'-0" 1 DATE: 08.07.17 JOB NO: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5666 FAX: (817) 635-5699 0 O 0 0 THCENTER 0 �y 0 00 00 00 LLJ V d 17001-10 WA SEATTLE (SOUTH CENTER MALL) S A 08.07.17 - REV PER CITY COMMENTS i MECHANICAL ROOF PLAN 10' DOWNSTREAM 1 w g ¢ HEET METAL/ S DRAIN, FROM TRAP C.O. EQUIPMENT DRAIN PAN PITCH DOWNWARD TOWARDS DRAIN @ 1/4" PER FOOT 611 7 , -_ 1 45° L3 C.O. III- gpia ElfiliZc"--)1 C.O. ./,. D FLEXIBLE DUCT AS SPECIFIED VOLUME DUCT TAP SIZE L1=1.5 BRANCH/ DUCT DIAMETER !J!/ROUND B A NOTE: 21-17,, DAMPER, SQUARE TO ROUND SQUARE DUCT I TRANSITION USE FOR SYMBOL WHERE BRANCH DUCT IS ROUND FROM ROUND MAIN AND BRANCH I,,I alib SEE DETAIL LATERAL TAP �'‘'- DI -ELECTRIC COUPLING/ DIMENSION D x D 1.. -y 311 111 �~ 1 UNION (AS REQUIRED) .. 0 R=D DUCT AIR QUANTITY IS 50% OR LESS OF TOTAL AIR FLOW. MAIN DUCT SPILL OVER RECEPTACLE @ 2" ABOVE FLOOR OR CONN INTO FIXTURE TAILPIECE A=S.P.x 1.5+2 11 B = S.P. x 0.5 +2" S.P. MAX.=NEGATIVE STATIC 2" MIN DRAIN LINES SHALL BE- SIZED AS FOLLOWS TONS SIZE 45° 1U" . • 411 d 6" "'� 411 L3-_ LARGER OF OR 0.75D 1 #10 SCREW AT EACH CORNER #10 SCREW EVERY 3"C. ON 1" FLANGE 1 #10 SCREW EVERY 4"C. ON 2" FLANGE PRESSURE - INCHES1 0-3 3/411 * 4-20 1" 21-90 1-1/4" * BUT NOT LESS THAN THE FULL SIZE EQUIPMENT CONN. DRAW THRU 6 RECTANGULAR TO ROUND BRANCH TAP 4 CIRCULAR DUCT CONICAL TAP WITH VOLUME DAMPER DETAIL 2 CONDENSATE DRAIN CONNECTION DETAIL CLAMP 3/8" SQUARE ROD ' IL--- 1/4"0 SET SCREW 111x1/811 GALVANIZED STRAPS SPOTWELD TO BLADE 16 GAUGE GALVANIZED BLADE MAXMIUM 6 FT LENGTH FLEXIBLE/' _JI u �% ...............:,4..4,««��.%............, DUCT FULLY EXTENDED 3/8"SQUARE ROD 1/4" LESS THAN DUCT ....„.... DIAMETER �-- VENTLOCK GASKET NO. 609 END BEARING (TYP. 2) ROUND DUCT CONNECTOR D LINING 111 ACOUSTIC r------�-.-- r SUPPLY DUCT IS DIFFUSER NECK SIZETi:\ SUPPLY AIR PLENUM - : �A t CEILING ACOUSTICAL LINING 6" MIN - DIFFUSER 6"MINIMUM SIDE CONNECTION MAXIMUM 6 FT LENGTH FLEXIBLE litll1 VOLUME DAMPER � REVIEWED FOR DUCT FULLY EXTENDED -�-'r- �I� 1 CODE COMPLIANCE . FLEXIBLE DUCT 61-011) (MAX. INDICATING HANDLE VENTLOCK N0.607 END ti- „„,„„ VENTLOCK NO. 638 REGULATOR FOR INSULATED DUCT,City UNINSULATED DUCT. APPROVED AUG 21 2011 of I I+BION D MINIMUM `` ROUND DUCT ADAPTOR - RD LINEAR DIFFUSER CEILING FOR RECTANGULAR I THERMAL INSULATION DIFFUSER I 2-3/4 IN. MINIMUM -- INSULATED DUCT RECEIVED CITY OF JUL PERMIT TUKV 12 20t CEN' CEILING —," \— DIFFUSER TOP CONNECTION DIFFUSER CONNECTION DETAIL 5 LINEAR DIFFUSER DETAIL 3 ROUND VOLUME DAMPER UP TO 14"DIA. i en — .... m ) ILA ER DATE: 07.07.17 JOB NO: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 U • - -I- 0 O w Uza U -0 IT_ li 0 F - 0Z �j W U w 0 a O W N N ~ O 0 w N J WA 98188 w LU 17001-10 WA SEATTLE (SOUTH CENTER MALL) REVISIONS MECHANICAL DETAILS - SHEET ONE SHEET NUMBER M4.1 WILA 17 ITER DATE: 07.07.17 JOB N0: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 e- 0 OBJ Uza w� 0 O w N —0 V w =�ON w(1) Ngo 0w� WA 98188 w w 17001-10 WA SEATTLE (SOUTH CENTER MALL) REVISIONS MECHANICAL DETAILS - SHEET TWO SHEET NUMBER M4.2 NOTES MAXIMUM SPACING 16" EACH FOR NOSING AT DAMPERS, TURNING VANES, ACCESS DOORS AND EQUIPMENT, SEE ACOUSTIC LINING NOSING DETAIL..; LINING EDGES AT TRANSVERSE AND LONGITUDINAL JOINTS`� SHALL BE COATED AS SPECIFIED. ENTERING AND TRAILING EDGES SIMILAR TO ACCESS DOOR DETAIL. SEE EI-} ACOUSTIC LINING NOSING DETAIL. NOT LESS THAN TWO PINS ON ( EACH FACE OF DUCT... w4$0 , '�; �''► ;+ "i., '►m .., : . _ 1 .11..-1l'% II '' , � � 41 p // l� WAY (TYPICAL) DUCT LINING a ALL EDGES OF LINING COATED WITH ADHESIVE TYPICAL STUD -WELDED PINS AND SPEED CLIP WASHER SEE DETAIL A NOT MORE THAN 3" FROM EDGES OF LINING SPEED CLIP WASHER ( 1 I I NEOPRENE BUSHING 120V-10-60 ° C B. ALL AROUND \--1 1111 DRAIN 12" INSULATED •EXPOSED FACTORY CAP FLASHING ROOF CURB I; - FINISHED ROOF / 4.. .,r_,,, � ::•.:%s :rti•,u•:+:::.• ROOFING *60 BACKDRAFT DAMPER lily DOWN TO LINING LINING (THICKNESS AS SPECIFIED) PRESSED DOWN OVER GRIP-PIN0 ROOF FLASHING /\/ _PRESSED DUCT • NOTES: LIGHT SW. ° LIGHT �.� 1 ' A ��44 ADHESIVE OVER ENTIRE INNER SURFACE OF DUCT WELD STUD WELDED TO DISC. SW. -PIN DUCT (PINS FASTENED TO DETAIL A DUCT WITH ADHESIVE NOT 1. DUCT SHALL BE 1" SMALLER THAN ROOF OPENING. 2. ROOF OPENING SHALL CONFORM TO MANUFACTURERS CURB SIZE APPROVED) \4) 3. STENCIL TENANT'S NAME AND SPACE NUMBER ON FAN 4. VERIFY ENCLOSURE REQUIREMENTS PRIOR TO BID. CONTRACTOR MUST HAVE LANDLORD APPROVAL FOR ROOF TOP LOCATION AND DUCT ROUTING FOR THIS EXHAUST FAN. IJ C ) ROOF MOUNTED UPBLAST FAN DETAIL 6 ACOUSTICAL LINING INSTALLATION DETAIL 4 EXHAUST FAN CONTROL DIAGRAM( CONTROLED VIA LIGHT SWITCH) 2 18 GA. G.I. STRAP HANGER LOAD BAND (2)1 x18 GA HANGER RODS STANDING SEAM 1/4" THICK NEOPRENE GASKET FABRICATED CURB CAP, (MIN.) COUNTERFLASHING OR EQUIPMENT' BASE. MASTIC SEALANT 2 X 4 WOOD NAILER FASTEN TO WOOD NAILER WITH SCREWS @ 6" O.C. PREFABRICATED INSULATED GALVANIZED ROOF CURB WITH = • 3"MINIMUM SHEET METAL - ••4 N 18 GA. GALV LINER. WILL BE WELDED •*0 �•••i NSULATION_, & ROOFING J I AIR DUCT FOR SIZES CURBS TO STRUCTURE BY •ii4 z ROOF INSULATION 12 SEE FLOOR PLAN GENERAL CONTRACTOR ����' • 4• CANT 20 GAGE SHEET METAL FLASHING SHEET BY MECH. CONTRACTOR. II,.,. 3°MIN. LAG SCREWS MODEL NO. BD2/A2 - - - - - RATED FASTENER RUSKIN DAMPER LOCATION, IF •••! AUG 21 2017 City of Tukwila BUILDING DIVISION EIVED TUKWILA 162017 CENTER DATE: 08.07.17 1617 DRA :RP CHECKED: EA 711 N. FIELDER RD. ARUNOTON. TX 76012 PH: (817) 633-5666 FAX: (817) 635-5666 4d' N 0 O � J � Z Q W � U U 0 D Q0 � v D J W I. W SOUTHCENTER 00 17001-10 WA SEATTLE (SOUTH CENTER MALL) A 08.07.17 - REV PER CITY COMMENTS MECHANICAL COMPLIANCE FORM 1 2 W hill 1 as 9 awau vauawwrww•uzw{wwv rota'Crorr.rmaxuaR�aw4aCwswdwrR,: w !M n ical Summar u<.... ,P.. \..iia .. :.. ..... n R yr tN n II R1 r mm r I I R2 d 3o e iso esa da„ t m h o Form f o eco a t n t En r de Co ace s o C o Sae e co P 9 Y +4 fl n „ : T }i ,. t z +R� �', ,t, "'�� '.�; S Y,} ,Y ," �, ,� � � t i � ,, � t" � ,. , {` , t . � r + ,�`^ ,y..H- � M � , , ,< ,: { , �t o :� t � t ��} { , , S, MEC SU sy,�,ka.YxFti'a tk�4"w."�'aR4ai,x'`�, �f.'. ,.t'v`y��:5+�i^3�; r`,w.}a�;��r��:tio�',.3"',:a`�;lF:>s�• ,,.m'��a����,df�` au�x`,`a��;��a,'sx.,;Yi.v` �,a�t�; ��sv`vt°!� .. ... & ,�.�:. ... ..., .. i v n n f r mm r I I R2 n R r t e a da t En r d m II n F rm eco a d 3o a iso s W hon t n e Co ace o s o Co 2 1 o Sta e e co 0 5 as 9 9Y P ° �, r { , r ° ;;va Y+ar xir wr> P fvr, rrw r �,,,, a Y,, >uY n «r gra sir ^wear m rR rss , h rR ,t, , Yif . �t �!ka.t, .,,r,., „ t" ,Y'',t+,,�f-• ,.rF ^?f' t �,�',. u.,t ?�.. v.. 4.r � � t�� ,,,'�snr' z ,; w ..7�3��iY, >. ; .,� 'i `{r.. ,"^ :, x i ., F, �" `�`� ,� a'. 3 r a '`isr„-, t rxi. ,,.rk .i t, �'(.,, . nn Y Y � ^ �` { G,�. s � "^ rt � f' Mechanical .Summar a t� MEC _ r\j ,, � � �t��,��������~}�������,���I����1��������������{���F����� ,,..... .. ,. .J, p9 II R1 �,, H -SUM .. d �� � . 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 2015 Washington State Energy Code Compliance Forms for Commercial R2 and R3 over 3 stories and all R1 Page 2 of 7 ...., .. ,. ,. �.�, ., ...... .. ... ..r ... .. ,,, ,w �., ,".., ,. ,�. , w , v e , u .» ... „� ,,, +, .: „ o a x ,. x . ,a u }. , P 2 i n < H «•u"r w, », Mro r ..r, v n ez , a a , c, Y v +. Y, u 1 Yu, , 7 ..t Y Hf fl ,.3 -,~5P f f v r .. ~<,, , ., , , t ,�, , ;, 5.. � IN n s i m u. a �� � . � n Ya�e �� � � �, �� � � � pax n, r, y,,, ,rr {� 3,, ?� � ?�� � � � ,, � � � � f � � t � ( �f. t} � � �.. � zr � '� q r„, � � , � � � �� � { , > ; 4 �� `�, Y {. � f� � � t-. ,w �. r uR Y t r ,Y jf S a t, a � � Uf } � � ti< r "r � � : t ,� � x, M aG; L.. i P. i *,7 u, $ 2 a .� , �r,, t . , . , '� vzr A , , � • t - � 4 ,.,?� �l� .�� P ,} 3�,P,�,�,r ,. / f � , „f,P t, � MECH CHK Mechan�calPermwtPlans,�G.hecklist��i����1��tij�����������������,����a��+Yp,1��,���.,�,x�i{�i���a4i���,�,,�F�a���������� ��... � 1, .. { 3 I h N ,' t z {l t J is } "J., i �( r a , , u .1R 1. n. ,. ,UY ,:t $ ..}4r .r Y ✓ , N h `YF ?I #N , , 'Y'} ,..) xl as t u i ,f , , ~�`turR: azi, fr NY�,'2 . + v+Y r x `h . Y. ... \ :: ?zt rra�.o-,,, wa �. �Rro r,, � `t d i 7u , .+u `! :...?. �'^J dr. fY^:'� rte° "u""? • i s Y} t i i ,1 . , � 3 } .. :. . ,� Ru"1 . l . ?+t, t{ � .. S tom.., tt. , ���i r"z ... I - �. , J. ,. 1 . a. i! x. , v ,. } sS4, P 7 {. .+ � t 4, ..,� 4 t }, F r� � Y 4 �s }i a f ,� � r Y � h f � � 2 1" , � 4. > �h � `i � � } � � x},z f t a: � t.., r t } � K � � � MECH. CH .L., s, ^s~. U Y F s".0 ecklist � , c I ermit Plan h a � � 4f� r��� ,.x?,r �� , ,I>hr Mecham a P .� ����,��.���rih�„��,yrsf�;�}i�,?�rll� ,?h „Y»,;;{rf ",r,,_,:.tu,��� f,�.t+.>�P� ,� + � � � � �w _ v 2015 Washington State Energy Code Compliance Forms for CommercialBuildings including R2 & R3 over 3 stories and all R1 Revised January 2017 _ _ 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 ProjectTltle: Fill this line out on MECH-SUM Date 1/1/2015 ProjectTltle: Fill this line out on MECH-SUM Date 1/1/2015 e r la ce with the mechanicals stems and a u1 ment re uirements of the The followin Information is necessa to check a p rmlt application fo compo n y q p q 9 ry .. Washington State Energy Code. Commercial Provisions. a the e ui ment re uirements f or com Ilancewiththemechanicals stems and q The followin information is necessa [o check a ermit a Iication f Y q P 9 ry P Pp P d o erci I Provisions. Washin ton State Ener Co e C mm a 9 9Y , A Iicable PP (yes,no,na) Code Section Code Provision Information Required -Must be in permit documents Location In Documents Building Department Notes Applicable (yes,no,na ) Code Section Code Provision Information Required Must be in permit documents Location In Documents Building Department Notes 2015 Washington State Energy Code Com P liance Forms for Commercial Buildings Including R2 & R3 over 3 stories and all R1 Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Information Protect Title: 1 -This title will copy onto other forms Date 1/1/2015 Equipment Type (s) Equipment - Sizing, Performance and Type For systems serving areas > 25,000 si or spanning more than one floor, that include areas that identify isolation zone areas on and Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept. Use Service Water Heatin ■ Hot water heating tanks) ■ Instantaneous ■ No service water systems No 0403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; identify provisions applicable to this equipment per C403.1 No C403.2.4.4 Zone isolation dampers are expected to be occupied non -simultaneously; plans are exile teassociated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements Company Name: LUSH Fresh Handmade Cosmetics g cJ ■ Dedicated boiler ■ Heat exchange from space heat boiler or central hot water/steam exception have Com an Address: 2800 South Center Mali Suite 221 Seattle, WA 98188 P Y y Stems Distribution Type (s) No 0403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include load adjustments to account for energy No C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to air econot iiz r, Indicate humidifier is adiabatic (direct evaporative or fog atomization), or Applicant Name: ■ Circulation System ■ On -demand recovery Applicant Phone: Yes 0403.2.2 Equipment and system Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions Additional Must comply Efficiency Package with all 3 provisions Option, More Efficient to be eligible HVAC Equipment &Fan Per ormance - Project Description Briefly describe mechanical systems In the text box provided ■ Total Bldg PerfORTlanCe (TBP) This path includes off mandatory provisions per C401,2 Option 2. MECH-SUM, MECH-CHK, and 0407 Energy Analysis forms required. ■New Building ■Building Addition Tenant Improvement ■System Retrofit ■ No System Changes Commissionin g Commissioning is required for: ■ Mechanical systems per C408.2 ■ Service water heating systems per C408.4 If required, commissioning shall be performed for all applicable systems regardless of individual equipment capacity. Exceptions to commissioning requirements: ■ Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h cooling or 300,000 Btulh heating. Mechanical systems commissioning not required. Capacity of lar est service water heatin s stem in buildin does not exceed 200,000 Btu/h. Service water heatin ■ 9 9 Y 9 9 sizing taken To comp) with additional efficiency packs e o tion, calculate the percentage of heatin and Y 9 P 9 0403.2.3 HVAC equipment Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, heating Include Yes 0406.2.1 C403.2.3 HVAC s stem selection Y coolin a ui meet in the ro'ect based on out ul ca act that do not have a corres ondin 9 q A P l ( P P ty) P 9 WSEC listed efficiency; shall be less than 10% to comply Yes 0403.2.3.2 0403.2.13.1 performance requirements (efficiency) rated and WSEC minimum efficiencies for all and cooling equipment; supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corres ondin WSEC minimum efficient manufacturer rated P 9 y ( ) Yes 0406.2.2 0403.2.3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NO 40 ElecMc motor efficiency List all motors z 1112 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied Yea 0406.2.3 0403.2.11.3 Minimum fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans isz 71; indicate these fans are sized so the fan efficiency at design conditions is within 10 % of the maximum total or static efficiency El Load El MECH-LOAD-CALC Form systems commissioning not required. 0403.2.14 .2.1 _ __ _ - For fractional hp motors (1/12 -1 hp), indicate whether they are en electronically commutated taken _ _ _ _ HVAC System Controls Desi n Load Calculations g calculation summa ry Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or Low Energy and Semi -Heated Spaces (Note 6 and 7 motor, have rated efficiency of at least 70%, or exception For all HVAC fan systems that provide heating and / or cooling, provide system total Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, including perimeter system zones ventilating needs. If a load calculation summary Is provided with the permit documents that includes all applicable compliance Information then the MECH-LOAD-CALC form is not required. Heatin 9 Coolie 9 Peak Space Conditionin 9 No 0403.2.11.1 Fan power limitation nameplate hp in MECH-FANSYS-SUM form For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bh com lie p p' s with fan power limits per equations in Table 0403.2.11.1(1), provide MECH- FANSYS form for each system The mostatic controls Where adjacent {neighboring) zones are controlled by separate thermostats (including perimeter systems used fo offset heat gain or loss), and are connected by permanent openings > 10 % of either zone sf area, indicate controls configured to prevent adjacent zones Meeltanieal Schedules � Mechanical Plans 0 MECH-EQ Forms (TBD) Space Type Location in Plans) Spaces) Served Area Served, square feet Capacity, Btu/h (Note 4) Capacity, Btu/h (Note 5) Capacity, Btu/h-sf Compliance Check Notes NA 0403.2.11.2 Motor nameplate hp > For all applicable HVAC systems with total fan motor hp 5hp, Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken Yes C403.2.4.1 (thermostats and humidistats) from operating In conflicting modes (one In heat, other In cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones s are not re uired indicate location of equipment compliance information. If provided on plans then MECH-EQ form q however, include on plans all applicable compliance information listed in MECH-EQ tables. 0403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify In equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG isz 67, or exception taken; indicate these fans are sized so total efficiency is within 15 % of the fan maximum total efficiency If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling In a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent in heating ■ DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and fire station occupancies) All occupied, conditioned areas shall be served by a DORS that delivers required ventilation air in a manner that does not require space conditioning tan operation. Space conditioning fans cycled off when no heating or cooling is required. di a d trio r Air De c to Ou o S stem Re uirements and y q High Efficiency VAV eu f DOAS 0403.6 Exce tion 1 v' u al ventilation er 2015 IMC in li o Ventilation rovided la nal r P P ■ Ventilation and space conditioning provided by a HEVAV system per 0403.7 in lieu of DOAS (0403.6, Exception 2) ■ DOAS Included in project, although not required (occupancy not office, retail, education, library or fire station) Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. - o i - e in Low Ener s ace s in Bfu/h. N of allowed for semi heated s aces. Enter 0 if no c o1 n o e 5 P Ovide total installed coolin ca exit of s stem s ry 9 N t r 9 () P 9 p Y Y 9 Y p Note 6 -Refer to Section 0402.1. f Low Energy Building. IntaOed peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h'sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btu/h"sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception undorcemi-heated. 4 C 03.2.114 Grou R occu enc exhaust A P Y a e ice f n ff cY < a cies indicate In a ul ment schedule the 4 cfrri i Grou R occu n For all exhaust fans 00 n p P q A fan flow rate and efficac cimlwatt or ex ce tion taken refer to Table 0403.2.11.4 CE -57 Y ( ) P ( ) No 040 .2.4.1.1 3 I m Heat um su a ante P P PP ry heal perimeter zone temperature n h i t f heatin and i w' r io as t o frst s a e o In i at to ed heatin o Brat on iib com ass d o e s P 9 9 9 9 P o irelled with outdoor lack -out tem erature set to 40°F or less su lemental heatin c n P Pp 9 Variable flow capacity - For fan motors z 7.5 hp, indicate method of variable Bow control (VSD or equivalent method) in " for HVAC to Yes 0403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling NA 0403.2.13 fans a e fore uivalent method an s stem refer equipment schedule, or exception t k n, q y HVAC System Controls for additional requirements If separate heating and cooling systems with separate thermostatic control devices are used to devices the Alternate ■ DOAS related allowances included in project: ■ Prescriptive vertical fenestration maximum area allowance increased to 40% per C402.4.1.4 with 100% of conditioned floor area In building served by DOAS. ■ Exception to air economizer per 0403.3 Exception 1, include MECH-ECONO form. NA 0403.2.3 Maximum air cooled chiller For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled is tons, taken Yes 0403.2.4.1.3 Setpoinl overlap restriction trol and the zone serve serve a zone, indicate locations of both thermostatic con y on plans capacity Large capacil coolin y g chiller capacity 5100 or exception sings wi l m thod o ly of any single unit ble % (thermostats) Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling NA 0403.4 systems orte capac ty (VSD, mtult p coaled compressors of of the total) C403.2.4.2 Automatic setback and Indicate zone thermostatic controls configured with required automatic setback and manual Non-standard water-cooled For water-cooled centrifugal chillers not designed for operation at standard conditions, provide documenting full load load Yes 0403.2.4.2.1 C403.2.4.2.2 shutdown override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken Fan Power Pro ect includes HVAC air distributions stems that provide heatin and/or cooling j y g lfyes, provide a MECH-FANSYS -SUM form. For one or more systems, the total fan motor nameplate hp of all fans in HVAC s tem exceeds Shp. ys If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. Refer to Section 0403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. NA 0403.2.3.1 centrifugal chillers calculations maximum and part rated equipment performance requirements Yes C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up NA 0403.2.13.1 0403.4.3.2 Centrifugal fan open -circuit cooling towe s For open -circuit centrifugal fan cooling towers with z 1,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers NA 0403.2.4.3 Outdoor supply air dampers to design temperature just prior to scheduled occupancy Indicate automatic controls configured 10 close OSA damper during unoccupied equipment OSA / operation; not including economizer cooling, night flush or IMC required exhaust For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating burner Stai way and shaft vent Indicate method of activation of stat way and shaft vent dampers (fire alarm or interruption of NA C403.4.2 Large capacity boiler For boilers stem sin le or multi le with > 1,000,000 Btu/lt ca act indicate turndown ratio Y t 9 P) P tY, NA C403.2.4.3 dampers power) HVAC Hydronic Systems ■ Hydronic chilled water ■ Water -loop heat pump No hydronic systems ■ Hydronic heating water ■ Geothermal 0403.4.2.5 systems per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers, or combination) NA 0403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; Indicate controls that allow for Independent Variable flow capacity- For pump motors z 7.5 hp, Indicate method of variable flow control (VSD or equivalent method) space conditioning of isolation zones; or exception taken NA 0403.2.13 pumps in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to H dronic S stem Controls for additional re uirements Y Y 9 Yes C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied 0406 Additional Efficiency Options - Mechanical ■ 0406.2 More effcient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) or air -to -water heat pumps and heat recovery chillers. All equipment listed In tables C403.2.3(1)-(7) must be 15% more efficient than minimum requirements. Alt stand alone supply, return, and exhaust fans over 1hp must have FEQ z 71 and must be Selected w thin 10% of maximum total or static pressure. ■ 0406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DORS per C403.6 that delivers required ventilation air in a manner that does not require space conditioning fan operation. ■ 0406.7 Reduced energy in service water heating Requires 90% of floor area be In occupancy types listed In C406.7.1 and that 60% of annual hot water energy use be provided by heat pump, waste heat recovery or solar water -heating systems. NA C403.2.3 Gas and oil -fired forced air furnace and unit heaters For forced air iumaces with capacity z 225,000 Btu/h and all unit heaters, Indicate in equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss No 0403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature NA 0403.2.4.8 Combustion heating For combustion heating equipment with output capacity > 225,000 Btu/h, Indicate modulating exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F equipment or staged combustion control Freeze protection system Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or Yes 0403.2.3.3 Packaged electric heat ng / Verify all packaged electric equipmenlwith > 6,000 Bluth cooling capacity and any amount of No 0403.2.4.6 controls conditions protect fluid from freezing cooling equipment heating is a heat pump; include in equipment schedules For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest No 0403.2.12 Healing outside a building Indicate systems providing heating in non•enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements NA 0403.2.4.9 Group R1 hotel !motel 9 oast rooms rooms that are capable of setback (heating) and set-up (coaling} of temperature setpoint by al least 5°F; Indicate control method -activated by room entry or occupancy sensor No 0403.2.7.1 Kitchen exhaust hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC System Controls for additional requirements Yes 0403.2.4.3 Outdoor supply air, exhaust and relief dampers Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate `Whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers Yes C403.2.4.3 Return air dampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) NA 0403.2.4.3 Stairway and shaft vent dampers Indicate location of stairway and shaft vent dampers on plans: verify dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements rcial R2 and R3 over 3 stories and all R1 - Pa e 3 of 7 2015 Washington State Energy Code Compliance Forms for Comma 9 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 2015 Washington State Energy Code Compliance Forms for Commercial R2 and R3 over 3 stories and all R1 Page 6 oT 7 ,,.�..„„ ... ., .,� ,......., ..,; .,,,, .,: ,.. ._. , ,:. r r t, x w+: r.. ,,,,, ., i t. °,.° .f ^x}.. ,... "R14�t51 ,.,Ndtt¢$r4%tida aY. 'kJrYQ'a}$;wwYQa "f+7<s9'"y3J,Ml M •xRRw ti �� � y",r� "%t UfYt{;�, "aS i' �!R'R, t�tiva�f�'1'CXFt�)uk,}YS{�Ji%fv�,£'E�iti�{9 }r�3`YFz�,.��rvni\� "�e,. ,.,„ "7 4},`,YA 15"i z ?ti r d £'jrf3 ^�CS,i ,""CPf', 1sYs.-., nrYd„shtt£?n'.... �EYftYi"fi' Fi'd .w4Nk'&�Yfi�MM1VC^�,.n r,. .....'pw4rv�a±wt PaRYMvwS;tffii„..,^.Y' >a �. ,;aRZS ,. 9 lYR �1,"PY45 U i"i `? l'} t �.: i"J 4 . FY 4„ :Ifs' h S 3 � C 3Y. i. A° , ��', U:�1�3 �2:-�R� f',t )'}{'3p" rel (f"`�'4F', xr 3F $' �};�.M 'ire«....,��+,.. ,3flWSW"sr i"#uYr9P,"r„",. Mechanical ,,, y q , § .. .,_, „ .w r. ...„.. ,. "... W.., ...""6kY rSv°l,R&.'R,R?"•"t ,.,.l tt""..., .'�SeSf9R,,"""3!ta". tiNy a°y ', ,,s k., „ dY ,„ (y t ,'{'` + � " � ~� w 4 - � , ,� r x f e f� , _ fl pt � i r r ,f } �R . ,,� � �, Permit"Plans Checklist, P.i , �„� ,h , } ,. � } R , � , ? � r����MECH. CHK ��P����� i���sR��� .. .. ,., x, ».. .. .„, ...:„,",. .. ,,..,.....,-.. �., , ��.. ^,e ,,: r '� `; � tl 1� ,r , !$Sa4ANkRe":k"sS�tlF'v':R""aar 1A;tlPnw%"PX4W'",.,n, .,, 1tYA,3"flC5(PS.�y.. .. st iRi;',x?f)Uq'.. fr.. d 4L'r YY 4tiif fi' Y 4�Sfl j}'1`{ij}{} Sf} �Kq''�u ij. h Y�?z�fl it 't Y .ry aroiJ 4`j ib ^},^ , �'4; ", �,+� h,Yr y Y 3 I � , } � � r � f � , � �4 � ECH CHK. a R M ,. Y 1 . 't kl�st Mechan,tcal�Permit Pians.Chec � . � ° w.N_-.. .. �f _.�, ,, _ �«,.,.t,��,r��,z,�>��?���c4��������� � ������,������ � �f - t}fii3Y<' l ,t'`'}if�illY .d t'Y y � 3Y� £"PT'S }�,,,�,;.t ! t}, ,srb,ly ..t W Yl` \j?t f � „� � xr a 4� � " , �f - � „ � ,. � � f M CHK � 1 6, f ECH (Perm s C ecklwst 1 £ x I Mechanics h i + „ , t � f t, � � � t r 1 , . 4}+ . u,,:, P "aU 9.rh �jilli @:r., „a}t.:.ti?'u`,r,+,,... .. �� n �� � ,li}I���� �v��, �i�� �v � ��� _. .� „ m..., _.w �. _ �, ._... _. _ r�e���„�i��,�y���~a������ ��� , 'ante o over 3 stories and all R1 Revised Janus 2017 2015 Washington State Energy Code Compli Fres for Commercial Buildings including t 2 & R3 ry Mechanical , . _ 2015 Washin ton State Ener ,{:}ttt;P} �yt,a l ;}.RRtr} y zF ', SY 't��P st�f1'�'}�I H�G Perm ions Checkl� �, EC - HK � � � I � , ,, +� _ R���hn,�tP,Us, �. ,,, , �. �,ia � �. - �� � Code Com liance Forms for Commercial Buildin s including R2 & R3 over 3 stories and all R1 Revised January 2017 9Y P 9 2 _m„ M 2015 Washington Stale ". ._. �. _,. . a��a , � Ener "., .-,_._ t li , .. . _i Energy Cade Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and ail R1 Revised January 2017 __.. _. _. ` " ' 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and ail R1 Revised January 2017 Project Title: Fill this line out on MECHSUM Date 1/1/2015 . Project Title: FIII thls lone out on MECH-SUM Date 1/1/2015 ,Milton Project Title: Foil this line out on MECH-SUM Date 1/1/2015 Project Title: FIl1 thls Ione out on MECHSUM Date 1/1/2015 The following Information Is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. The fallowing information Is Washington State Energy Code, necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Commercial Provisions. the o check a melt a lication for com liance with the mechanicals sterns and a ul ment re uirements of the The following information Is necessary t p pp A Y q P q The fallowing Information Is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of Washington State Energy Code, Commercial Provisions. Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be In permit documents Location In Documents Building Department Notes Applicable (yes,no,na) Code Section Cade Provision Information Required - Must be /n permit documents Location In Documents Building Department Notes Applicable Code Section Code Provision Information Required - Musf be In permit documents Location in Documents Buildin Department 9 Notes Applicable (yes,no,na) Code Section Code Provision Information Required - Must be In permit documents Location In Documents Building Department Notes Energy recovery - For buildings with food service, meat or dell departments that have 2 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) No 0402.4.1.4 C403.6 Increased prescriptive maximum vertical fenestration area with DORS Indicate that all occupied, conditioned spaces are served by a DORS per C403.6 (yes,no,na) Group R2 / R3 dwelling For p imary space conditioning system, indicate 5.2 programmable thermostats capable of two For supply and retum ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken NA C403.2.4.10 0403.2.4.11 units, Group R2 sleeping units setback periods per day; for ail thermostats Indicate purpose (heating only, cooling only, or both , required temperature ran a and at minimum a 10°F deadband; or exce tion taken 9 P Yes 0403.2.8.1 C403.2.8.2 Duct insulation For su ply ductwork located In conditioned space, idents if desi n su I tem erature Is < P fY 9 PP Y P 55°For > 105°F and indicate R -value of insulation on this ductwork on plans; note exception NA 0403.5.3 cooler / Treezer condensers > For buildings with z 40,000 sf conditioned floor area and with _ 1,000,000 BIu/h of remote Additional Efficiency Package Option, Dedicated Outside Air Systems (DORS) taken Indicate method of ventilation air delivery (natural or mechanical) for each zone _ refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating Yes 0406.6 Buildin rovided with 9 P DORS To com I with additional effcien� P Y y package option, indicate that 90 % or more of alt occupie , conditioned spaces are served by a DORS per C403.6 If mechanically delivered, indicate that systems are configured to provide not more than 150% For OSA ductwork, shafts and plenums, indicate R -value of insulation on these elements on tans er Table C402.1.3 for steel -framed walls; note exce tion taken P P P Yes 0403.2.6 0403.2.11.4 Ventilation oi, but at leas[ the minimum required volume of outdoor air to each zone per IMC, ASHRAE G2.1 or other applicable code (WAC, OSHA, etc); or exception taken Piping Systems For buildings with 24-hour operation and with> 1,500,000 Btu/h of heat rejection capacity and Multiple Zone Air Systems If delivered via natural ventilation, identif re uired elements er IMC includin minimum y q p g openable area to the outdoors or qualifying adjoining spaces NA 0403.2.9 Piping Insulation Indicate desi n tem erature ran a of fluid conve ed in i in and thickness of insulation in 9 P 9 Y P P 9 ( Inches) on hydronic piping plans; or exception taken NA C403.5.4 Energy recovery - condenser systems design service hot water toad > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heal that is , utilized (60 / of peak heat rejection load or pre -heat service water to 85°F). NA 0403.4.4 Air systems serving multiple zones Identif su I y g p y p y pp y airs stems servin multi le zones and the zones the serve on tans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space Indicate whether it is served by an HVAC system with total design OSA> 3,000 cfm, and! or NA 0403,2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Hydronic System Controls Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types C403.2.6.2 Demand controlled ventilation the system has airside economizer or automatic modulating OSA damper; indicate OSA Economizers NA C403.2.13 Variable flow control - For hydronic system pump motors z 7.5 hp, indicate method of variable flow control (VSD or a uivalent method that requires z 30% desi n wattage at 50 % desi n fluid flow nate q 9 g )' exception taken NA C403.4.4 VAV systems serving multiple zones For each air terminal Include: maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, retooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception Identify In equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls Yes C403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or alternate means provided to automatically reduce OSA when space is partially Yes C403.3 Air economizer required Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer In lieu of air economizer: indicate on plans eligible exceptions) taken and measures to comply with exceptions) 0403.4,2.7 hydronic system pumps Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature NA 0403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or retooling occupied Integrated economizer Indicate alr and water -side economizers are configured for partial cooling operation even 0403.2.6.4 Enclosed loading dock For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas Yes 0403.3.1 operation -air and water where additional mechanical cooling is required to meet the load Nq 0403.2.5 Hydronic system setback For heating and chilled water systems z 300,000 Btu/h, indicate systems are configured to aulomaticall reset su 1 water tem erature based u on demand; or exce lion taken. Y PP Y P P P if system pump motor hp z 3 hp, also indicate controls automatically reduce flow by ? 50%, NA 0403.4.4.2 Dual duct systems -terminal units Fors stems with se orate warm air and cool air ducts, indicate terminal units are conn orad to y P 9 reduce the flow from one duct to minimum before mixing w th air from the other duct No C403.2.6.4.1 ventilation detection system for CO and NO2, or occupancy sensors), and control method (staged or modulatln) 9 No 0403.3.2 Economizer heating system impact -air and water Veriy control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA 0403.2.6.4 0403.2.6.4.2 Enclosed parking garage For enclosed parking garages, Indicate ventilation I exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken Yes 0403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are configured to provide up to 100% OSA for cooling 0403.4.2.4 and part load controls For chilled water systems (z 300,000 Btuih, pump motor hp z 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat Indicate locations of duct static ressure sensors on tans; include at least one sensor er p P p major duct branch; verify controller setpoint pressure at each sensor is 5 1.2 Inch w.g. ventilation Vert mechanical coolin controls are interlocked with air economizer controls so the outside y g rejection loop that reduce pump flow so that ane control valve is nearly wide open, or to maintain a minimum differential ressure; or exce tion taken P P NA 0403.4.1.1 VAV s stem static y pressure sensors- Fors stems with zone level DDC, Indicate controls are configured to monitor zone damper Y Provide calculations that show a balanced accounlin of total kitchen exhaust include all 9 ( hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, Yes 0403.3.1 Integrated air economizer air damper remains in 100 % open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is <45°F NA 0403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers 0403.4.1.2 sensors and DDC set points ositions and reset static ressure set Dint based on the zone re uirin most ressure; include P P P q 9 p if drives NA 0403.2.7.1 Kitchen exhaust hoods Indicate that direct make-up air to each hood does not exceed 10% of hood exhaust 0403.3.3.2 For systems with cooling capacity>_ 65,000 Btu/h, verity that wntrol of economizer dampers is not based only on mixed air temperature; or exception taken NA 0403.4.6 Ho[ gas bypass limitation For tooling equipment with hot gas bypass, provide either er tiple step unloading or continuous capacity modulation; Indicate bypass capacity per Table 0403.4.6 control logic that aufomatically detects and generates an alarm any zone excessively reset logic, and allows building operators to exclude zones from reset logic For kitchens with total hood exhaust exceeding 2,000 cfm, Indicate exhaust air rate per Table 0403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would Yes 0403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table 0403.3.3.3 NA 0403.4.2.2 Twe-pipe changeover systems Indicate changeover deadband (min 15°F), heating 1 cooling mode scheduling and changeover temperature range (limit 30°F) NA C403.4.4.3 Multiple -zone VAV system ventilation optimization For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception othe wise be exhausted) For eligible systems where water -side economizer may be provided In lieu of air economizer, Chiller / boiler plant pun) Indicate controls are configured to automatically reduce overall plant flow and shut-off flow controls taken NA 0403.2.7.2 ust s stems Laboratory exha y Refer to 5 stems Re uirin Ener Recove for requirements Y q 9 9Y ry NA C403.3.4.1 Water economizer capacity indicate system is capable of 100% design cooling capacity at 50°F db ! 45°F wb OSA temperatures NA 0403.4.2.6 isolation throw h individual chillers and boilers when not in use 9 Indicate controls automatically reset supply air temperature in response to building loads or For cooling towers with fan motors z 7,5 hp, indicate VSD and method to adjust fan speed NA 0403.4.4.4 VAV system supply air reset outdoor air temperature; or exception taken NA 0403.2.13 Variable flow capacity - HVAC system fans For HVAC fan motors z 7.5 hp, Indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50 % at 113 static design pressure); note NA 0403.3.4.2 Water economizer maximum pressure drop Indicate pressure drop across preceding coils and heat exchangers in water economizer system do not exceed pressure drop limit C403.2.13.1.1 Heat rejection a ulpment- q ad usted based on leavin fluid tem erature or condenser tem erature ! ressure of heat ( t 9 P P P Multi le Zone HVAC S stems, Hi h Efficient VAV - Re uired fors stems utllizin 0403.6 DOAS Exte tion 2, must tom I with all 16 rovlsions P Y g Y q Y g P p Y p exception taken DX air handlin a ui ment 9 q p For DX air handlers with economizer and coolin capacity? 65,000 Btu/h, refer to HVAC 9 NA C403.4.3.1.1 0403.4.3.1.2 variable flow control rejection device) For multi le -cell heat re ection equipment with VSD, Indicate controls that ramp all Tans In P I __ NA C403.7, Item 1 Air economizer Indicate system is configured for 100 % air economizer operation and complies with all related economizer requirements per 0403.3 (without economizer exceptions) handler For DX air handlers with economizer and cooling capacity z 65,000 Btu/h, indicate number of NA C403.3.1 control System Controls for requirements NA C403.3.1 DX air variable cooling control cooling stages provided end method (multiple compressors and! or variable speed com ressors ' indicate minimum dis lacement capacity reduction) as /o of full load P ). P ( NA C403.2.4.7 DX equipment economizer fault detection and For DX air handlers with economizer end cooling capacity z 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report Heat rejection equipment- unison Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all NA C403.7, Item 2 Direct digital controls (DDC) Provide DDC controls for ail components of system; identiy all DDC system input / output control points; indicate capability for trending and graphical display (Under Integrated Economizer) Indicate control method (cooling capacity controlled In response to space temperature, space die nostics 9 faults NA 0403.4.3.3 cooling lower flow turndown cells can be run in parallel For systems with minimum OSA> 2,500 cfm, indicate outdoor airflow monitoring station that increases temperature controlled by modulating supply airflow, or both) NA 0403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken NA C403.7, Item 3 Outdoor airflow measurement and reduction measures OSA intake under all.load conditions; indicate control sequence that or reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per 0403.2.6.2) 65,000 Btu/h and evaporative and chilled Systems Requiring Energy Recovery For DX air handling units with cooling capacity? water air handling units with fan z 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space tem erature, s ace tem erature is controlled b modulatin su I airflow, or both Y 9 PP Y ) For systems with design OSA > 5,000 cfm, or design supply air cfm and %OSA exceeding the values in Tables 0403.5.1 1 or 2 () (), indicate exhaust air ER method; or exception taken with supporting calculations NA 0403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection Is not needed NA 0403.7, Item 4 Supply airflow measurement For systems with minimum OSA> 2,500 cfm, indicate supply airflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions Fan p p P For mechanical nse to systems (Includes DX and chilled water coils) that control cooling ca exit in res once to space temperature - Provide a minimum of two stages of fan control; P y P s ° f IIs eed drawin 5 40 % of fulls eed fan ower Indicate speed Is e6 ti fu 9 P P Yes 0403.5.1 Energy recovery (ER) - ventilation !exhaust s stems Y For rooms served by multiple systems with aggregate design OSA> 5,000 cfm, or aggregate design supply air cfm and %OSA exceeding the values in Tables 0403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations NA 0403.4.2.3.2.2 Zone 4 Water loop heat pump - ZonerSjection equipment, For open- orclosed-circuit cooling towers, provide a heat exchangerlhat separates the cooling tower and heat pump loop NA C403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system Is s 50,000 sf, or one entire floor, whichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, Indicate zone Isolation controls per C403.2.4.4 Yes 0403.2.11.5 airflow wntrol eriods of own it t during periods of low cooling or ventilation only Indicate ER rated effectiveness that increases OSA enthalpy by z 50 % based on delta NA 0403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power > 10 hp, Indicate 2 -way Isolation valves on each heat pump and variable flow system control NA 0403,7, Item 6 Interior f exterior zone design supply air temperature Verify that VAV terminals serving inter or cooling driven loads are sized per design supply air temperature that is 5°F higher than VAV terminals serving exterior zones DX chilled water coils) that control space between OSA and return air enthalpies at design conditions For other mechanical cooling systems (includes and temperature by modulating alrfiow (In Ileo of, or in addition to, controlling capacity In response to space temperature) -Provide fan controls for modulating supply war d ;indicate minimum fan speed is 5 50% of full speed drawing 5 30 % of full speed fan power during periods of low NA 0403.2.7.2 Laboratory exhaust systems (energy recovery) For buildin s with total lab exhaust> 5,000 cfm, Indicate method of ener recove used to 9 gY rY re -condition laborato make -u air; ER effectiveness min 25°F or alternative method er P ry P ( ): P exception (VAV exhaust, semi -conditioned makeup, or GERM calculation) _ Dedicated Outdoor Air 5 stems DOAS 0 ttonal throw h 6 Y ( )' P g /30/16, Prescriptive 7/1 2016 Identify air terminals with minimum primary airflow setpoints > 50 % of maximum setpoint in . 0403.6 Dedicated outdoor air For buildings with office, retail, education, library and fire station spaces, identify these spaces on plans; Indicate that ventilation air In each occupied space Is provided via a DORS system; NA Item 7, Item 7 Maximum air terminal inlet velocity equipment schedule er MECH-EO form; Indicate air terminal Inlet velocity does not exceed 900 fpm cooling or ventilation only; or exception taken For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER Provide central and zone level DDC controls as required based on system application, thresholds other Table C403.2.4.12.1 NA C404.10.4 (under Pools and permanent spas exhaust systems method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken Yes C403.6.3 systems or document compliance with 0403.6.3 Impracticality; or exception taken (buildings complying with 0402.4.1.4 or 0406.6 may not utilize exceptions) NA C403.7, Item 8 Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC 36 Yas 0403.2.4.12 DDC system capabilities capacity or size and qualification per Identify all DDC system input! output control points; indicate capability for trending and display 0404.11) (energy recovery) Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by z 36°F No 0403.6.1 Energy recovery ventilation For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by z 50 % based on NA 0403.7, Item 9 Maximum allowable system brake horsepower Verify fan system bhp is < 90% of the bhp limit per Option 2 equation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system graphical ER For buildings with on-site steam heating systems, indicate condensate water with DOAS della between OSA and return air enthalpies at design conditions. Indicate all series and parallel terminal fans have electronically commutated motors; Indicate R E C Ducting Systems NA 0403.5.2 Energy recovery- is to the Heating /cooling system Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is to tum down, there Is for heating In the they NA 0403.7, Item 10 Fan -powered terminal unit motor and control DDC control system is configured io vary air terminal fan speed as a function of the load; o indicate fan speed during periods of low heating, low cooling, or ventilation only is5 66 / of peak design air flow or provide supporting documentation or applie exception CITY OF Indicate on plans that all ductwork is constructed and sealed per IMC steam condensate systems For buildings that use off-site generated steam where condensate not returned source, indicate on site condensate water ER 0403.2.8.1 0403.2.8.3 Duct construction For OSA ductwork, also Indicate on plans that ductwork moats air leakage requirements per 0402.5 and vapor retarder requirements per the IBC No 0403.6.2 controls with DOAS configured when no call or cooling zone serve C403.2.8.3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule AUG 0403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed REVIEWED FOR CODE COMPLIANCE 1n PAP% IPA �„ ,riark PERMIT AUG 21 2017 City of Tukwila BUILDING DIVISION EIVED TUKWILA 162017 CENTER DATE: 08.07.17 1617 DRA :RP CHECKED: EA 711 N. FIELDER RD. ARUNOTON. TX 76012 PH: (817) 633-5666 FAX: (817) 635-5666 4d' N 0 O � J � Z Q W � U U 0 D Q0 � v D J W I. W SOUTHCENTER 00 17001-10 WA SEATTLE (SOUTH CENTER MALL) A 08.07.17 - REV PER CITY COMMENTS MECHANICAL COMPLIANCE FORM 1 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 21 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 162017 PERMIT CENTER DATE: 08.07.17 N0: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARUNOTON, TX 76012 PH: (617) 635-5696 FAX: (517) 635-5699 0 gdm•co Cosm SOUTHC€\T=R 0 cn 0 Q P WESTESELD 0 00 N oo oo oo Q LTJ 1- 1- (f) 17001-10 - 1- 17001-10 WA SEATTLE (SOUTH CENTER MALL) REVISIONS A 08.07.17 - REV PER CITY COMMENTS MECHANICAL COMPLIANCE FORM 2 4111111116.. .11111111.h. .41111.111i.. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 't`�S7X Ch"eu'14'e�NS�2c°l''7,W k„ lisk�k: t'dJ;"li3V,,�f N`,it J?JY�7�)k�Y' FA7iMtJf,11tr\ iud' "l,i i%}i1ki}}44,Vp M.,..E,.CH�, =C,.. Hd, K MechanAY,ciicakrY➢x,l,.Per3;3!mtitie`*Y,9.'�i`.t,x Plans 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Fill this line out on MECH-SUM Date 1/1/2015 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terminal units Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units NA C403.7, Item 12 Fan -powered terminal unit primary air reset Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint of all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction NA C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant density >_ 25 people 11000 sf, Indicate space is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero end sets back room heating and cooling setpoints by z 5°F NA C403.7, Item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, indicate spaces are served by Independent HVAC systems that are separate from HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 NA C403.7, Item 15 Central plant efficiency Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic heating coils served by heating water system with either gas-fired boller(s) with thermal efficiency z 90%, alr-to-water heat pumps, or heat recovery chillers If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor In plant is 5 20% of total plant capacity, or provide thermal storage sized for 5 20% of total plant capacity NA 0403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to monitor operation and provide fault reporting of required parameters for all VAV air handlers and VAV air terminal units in the HPVAV system HVAC Equipment Energy Use Metering NA 0409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning NA C408.2 Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; For buildings with z 240,000 Btu/h total output cooling capacity or z 300,000 Btulh total output heating capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception NA 0403.2.10 0408.1.1 0408.1.2 0408.1.4.2 C103.6 Commissioning requirements in construction documents Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per 0103.6, and conflict of interest plan (if required); Include in general summary that a Cx project report or Compliance Checklist (Figure 0408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA 0408.2.2 Air system and hydronic system balancing Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions NA 0408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing NA 0408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heating and cooling coils and pumps NA 0408.2.3 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems Project Close Out Documentation Yes 0103.6 Documentation and project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems governed by this code; Indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations REVIEWED FOR CODE COMPLIANCE APPROVED AUG 21 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 162017 PERMIT CENTER DATE: 08.07.17 N0: 1617 DRAWN: RP CHECKED: EA 711 N. FIELDER RD. ARUNOTON, TX 76012 PH: (617) 635-5696 FAX: (517) 635-5699 0 gdm•co Cosm SOUTHC€\T=R 0 cn 0 Q P WESTESELD 0 00 N oo oo oo Q LTJ 1- 1- (f) 17001-10 - 1- 17001-10 WA SEATTLE (SOUTH CENTER MALL) REVISIONS A 08.07.17 - REV PER CITY COMMENTS MECHANICAL COMPLIANCE FORM 2 4111111116.. .11111111.h. .41111.111i..