Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M17-0111 - LIDS - AIR HANDLER, CONDENSER AND DIFFUSERS
LIDS 990 SOUTHCENTER MALL M17-0111 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 9202470010 990 SOUTHCENTER MALL Project Name: LIDS MECHANICAL PERMIT Permit Number: M17-0111 Issue Date: 11/1/2017 Permit Expires On: 4/30/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, WA, 92013 KEVIN WEARE 4000 DELRIDGE WAY SW, STE 300 , SEATTLE, WA, 98106 SULLIVAN HEATING & COOLING INC 5373 AUTO CENTER WAY - SUITE 205 , BREMERTON, WA, 98312 SULLIHC063QT Phone: (206) 795-2629 Phone: (360) 405-0723 Expiration Date: 12/27/2018 DESCRIPTION OF WORK: REPLACE EXISTING AIR HANDLER AND CONDENSER, REPLACE AND RELOCATE DIFFUSERS FOR NEW CEILING Valuation of Work: $20,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $475.25 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date: 2014 2014 2014 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agre;ttoo , e; onditions attached to this permit. Signature: Print Name: Date: /l/I 17 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 gauge. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments 15: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 16: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 17: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 18: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 19: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 20: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 21: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 22: ***MECHANICAL PERMIT CONDITIONS*** 23: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 24: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 0609 0705 0701 MECHANICAL FINAL PIPE/DUCT INSULATION REFRIGERATION EQUIP ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.Rov Mechanical Permit No. tV1 t 141 `1 Project No. Date Application Accepted: t� Date Application Expires: ! L 0 (For office ute only)1 MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: Site Address: SOUTHCENTER MALL Suite Number: 446 Floor: Tenant Name: Lids New Tenant:. ❑ Yes ..No PROPERTY OWNER .. Name: 0/057-F1E4. D Address: ii 9d S pw eiRci64 RD GVre S-ebe City: SKO)pe,. State: IL Zip:/_ - 77 `CONTACT PERSON - person receiving all project 'f'communication' Name: i✓iN weARE Cx:4 // .50(..., Address:4/600 zCLRIocrL� Gt//oy Sw S -3e0 City: .+q . State: km Zip:.:, bli ,J Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu "Industrial Floor furnace 1 Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) ` Air handling unit 65'IB(A) <10,000 cfin 1 Noise: Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm "Industrial Evaporator cooler 1 Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) ` Incinerator — domestic 65'IB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser "Industrial Thermostat 1 Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) ` 60 dB(A) , 65'IB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is • created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source .. District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial "Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) •'60'dB(A) Commercial 57 dB(A) 47 dB(A) ` 60 dB(A) , 65'IB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) :70dB(A) *Daytime means 7AM-10PM,.Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam -I Opm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O NET AGENT: Signature: Print Name: k6oN fit/MR.6 gis tel'Lzi Mailing Address: A/dvv .b ei-R w 6t w I/ OA/ 5 460 H:Applications\Forma-Applications On Line\2016 Applications \Mechanical Permit Application Revised 1-4-16.docc Revised: January 2016 bh Date: x//51('7 Day Telephone: ZdO 754s- 2 zT S6A rN4 q69/4 City State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I PermitTRAK ACCOUNT QUANTITY PAID $386.02 M17-0111 Address: 990 SOUTHCENTER MALL Apn: 9202470010 $386.02 Credit Card Fee $11.24 Credit Card Fee R000.369.908.00.00 0.00 $11.24 MECHANICAL $356.93 PERMIT FEE R000.322.100.00.00 0.00 $323.78 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 • TECHNOLOGY FEE $17.85 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12701 R000.322.900.04.00 0.00 $17.85 $386.02 Date Paid: Wednesday, November 01, 2017 Paid By: SULLIVAN HEATING & COOLING INC Pay Method: CREDIT CARD 067599 Printed: Wednesday, November 01, 2017 11:40 1 of 1 AM CRWSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $1,487.62 D17-0222 Address: 990 SOUTHCENTER MALL Apn: 9202470010 $1,283.96 DEVELOPMENT $1,283.96 PLAN CHECK FEE R000.345.830.00.00 I 0.00 $1,283.96 EL17-0631 Address: 990 SOUTHCENTER MALL Apn: 9202470010 $114.43 ELECTRICAL $114.43 PLAN CHECK FEE 1 R000.345.832.00.00 I 0.00 $114.43 M17-0111 Address: Apn: $89.23 MECHANICAL $89.23 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R12137 R000.322.102.00.00 0.00 $89.23 $1,487.62 Date Paid: Tuesday, August 15, 2017 Paid By: KEVIN WEARE Pay Method: CHECK 1891 Printed: Tuesday, August 15, 2017 1:17 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION /1717-0/1/ 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Proje z.J.Ds Type of Inspection: riure S 4(J/C/rL Address: c SOU?%%f"-41,'/ dig ///!& Date Called: S ecial Instructions: /6r '/%1%/✓ .. Date Wanted:�� `� P� - Cain)%�EF p.m. Requester: Phone No:SID? per[ r 0y rglApproved per applicable codes. 0 Corrections required prior to approval. COMMENTS: 6K- cER 1 GX720/11 "1 K ' 44, tl9✓ C /1-e s" -1 Inspector: Date: ty c REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 /7d 17—CS/// Project: /-40-5- Type of Inspection: /ZZs VG/4 -/N MiehliSeat Addr-ss: -D �+ �4U%%/ R/3 Date Called: Special Instructions: Date Wanted: �/ ��-1 % a.m. p.m: Requester: Phone No: 10. Approved per applicable codes. Corrections required prior to approval. COMMENTS: ‘;1"< D)C % /,61SU TI e,✓1 I.< .EC lam► r Inspector: Date: 7 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary 2015 Washington State Energy Code Compliance Forms for Commercial Buildin_gs including R2 & R3 over 3 stories and all R1 MECH-SUM Revised January 2017 Project Information ',P" FiLI...4 Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept. Use Company Name: MPW Engineering, LLC Company Address: 110 W 7th St., Suite 600 Applicant Name: Joseph Czerniewski, P.E. Applicant Phone: 918-582-4088 RFVIF WF_p Fop. Project Description Briefly describe mechanical systems in the text box provided ❑Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and C407 Energy Analysis forms required. ❑ New Building ❑ Building Addition ❑Tenant Improveme C ValtrTialiR LIAN y APPROVED AUG 2 9 2017 • City Of TO 1 k,„Aiita em Changes Design Load Calculations oBUILDI G DIVISION 1 e - Thg hexbuilding,heatingraooling or permit documents that includes all applicable 4 Load calculation summary MECH-LOAD-CALC t Provide design load calculations for all mechanical systems and equip ventilating needs. If a load calculation summary isprovided with the compliance information then the MECH-LOAD-CALC form is not required. Mechanical Schedules ❑ Mechanical Plans ❑ MECH-EQ Forms (TBD) Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate education, library and fire station occupancies) required ventilation air in a manner that does fans cycled off when no heating or cooling is required. lieu of DOAS (C403.6, Exception 1) system per C403.7 in lieu of DOAS (C403.6, Exception office, retail, education, library or fire station) increased to 40% per .C402.4.1.4_with .100% of MECH-ECONO form. • DOAS is required per C403.6 effective July 1, 2017 (office, retail, All occupied, conditioned areas shall be served by a DOAS that delivers not require space conditioning fan operation. Space conditioning ❑ Ventilation provided via natural ventilation per 2015 IMC in ❑ Ventilation and space conditioning provided by a HEVAV DOAS included in project, although not required (occupancy not 4 DOAS related allowances included in project: ❑ Prescriptive vertical fenestration maximum area allowance conditioned floor area in building served by DOAS. ❑ Exception to air economizer per C403.3 Exception 1, include Fan Power and/or cooling all fans in HVAC system system exceeding the and exceptions. exceeds 5hp. 5 horsepower threshold. .i Project includes HVAC air distribution systems that provide heating If yes, provide a MECH-FANSYS -SUM form. ❑ For one or more systems, the total fan motor nameplate hp of If yes, provide a seperate MECH-FANSYS form for each HVAC Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Water -loop heat pump ❑ Hydronic heating water ❑ Geothermal systems ✓ No hydronic C406 Additional Efficiency Options - Mechanical listed in tables C403.2.3(1)-(9) or air -to -water heat C403.2.3(1)-(7) must be 15% more efficient than fans over 1hp must have FEQ a 71 and must be per C403.6 that deliv�repu{rp�l,.ueq(ilation air in a tS G lr C i V C (J CITY OF TU K W I LA and that 60% of annual hot water energy use be systems. AUG i 5 ant% 4 C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment pumps and heat recovery chillers. All equipment listed in tables minimum requirements. All stand alone supply, retum, and exhaust selected within 10% of maximum total or static pressure. ❑ C406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DOAS manner that does not require space conditioning fan operation. ❑ C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C406.7.1 provided by heat pump, waste heat recovery or solar water -heating M11iO111 PERMIT CENTER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 T ec anica ummary, pg. 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 MECH-SUM Revised January 2017 Service Water Heating Systems Equipment Type (s) ❑ Hot water heating tank(s) ❑ Instantaneous ❑ Heat exchange from space heat boiler or central hot water/steam ❑ On -demand water systems .1 No service Dedicated boiler Distribution Type (s) ❑ Circulation System Commissioning Commissioning is required for: per C408.2 ❑ Service water heating systems per C408.4 shall be performed for all applicable systems regardless of individual equipment capacity. requirements: of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h heating. Mechanical systems commissioning not required. water heating system in building does not exceed 200,000 Btu/h. Service water heating not required. 0 Mechanical systems If required, commissioning Exceptions to commissioning II Total output capacity cooling or 300,000 Btu/h ❑ Capacity of largest service systems commissioning Low Energy and Semi -Heated Spaces (Note 6 and 7) Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning Capacity, Btu/h-sf Compliance • Check Notes Note 4 - Provide total installed heating ou put capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C402.1.1 Low Energy Building. lntalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h*sf. Note 7 _ Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btu/h*sf. Only systems electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. without 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Lids Tenant Remodel - Tukwila, WA (Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; identify provisions applicable to this equipment per C403.1 exception Yes C403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include load adjustments to account for energy recovery M1.2 Yes C403.2.2 Equipment and system sizing Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions taken M1.2 Yes C403.2.3 C403.2.3.2 2 C403.2.. 3.1 HVAC equipment performance requirements (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) M1.0 Yes C405.8 C403.2.14 Electric motor efficiency List all motors 2 1/12 hp (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied M1.0 For fractional hp motors (1/12 - 1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exception taken M1.0 For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form Yes C403.2.11.1 Fan power limitation For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system NA C403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken NA C403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is 2 67, or exception taken; indicate these fans are sized so total efficiency is within 15% of the fan maximum total efficiency NA C403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans < 400 cfm in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE -57) NA C403.2.13 Variable flow capacity - fans For fan motors >_ 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements NA C403.2.3 Maximum air cooled chiller capacity For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chiller capacity is s 100 tons, or exception taken NA C403.4 Large capacity cooling systems For buildings with 2 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) NA C403.2.3.1 Non-standard water-cooled centrifugal chillers For water-cooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements - NA C403.2.13.1 C403.4.3.2 Centrifugal fan open -circuit cooling towers For open -circuit centrifugal fan cooling towers with >_ 1,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating bumer C403.4.2 Large capacity boiler systems For boiler system (sin le or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers, or combination) NA C403.2.13 Variable flow capacity - pumps For pump motors 2 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements NA C403.2.3 Gas and oil -fired forced air furnace and unit heaters For forced air furnaces with capacity 2 225,000 Btu/h and all unit heaters, indicate in equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss NA C403.2.4.8 Combustion heating equipment For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating or staged combustion control Yes C403.2.3.3 Packaged electric heating / cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules M1.0 NA C403.2.12 Heating outside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements NA C403.2.7.1 Kitchen exhaust hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC System Controls for additional requirements NA C403.2.4.3 Outdoor supply air, exhaust Indicate and relief dampers rating, locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized, or gravity and exception taken (include leakage cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers NA C403.2.4.3 Indicate Return air dampers dampers eligible locations of return air dampers that are integral to economizer operation; verify are motorized; indicate whether dampers are Class 1, or within packaged equipment for leakage rating exception (include leakage rating, cfm/sf) 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings inclu ,,, _ _. _- _..... Project Title: Lids Tenant Remodel - Tukwila, WA ,wcviacu JOI wary cu I, Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,naL Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NAC403.2.4.3 Stairway and shaft vent dampers Indicate location of stairway and shaft vent dampers on plans; verify dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements NAC403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements NA C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to have air economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible Yes C406.2.1 C403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply M1.0 Yes C406.2.2 C403.2.3 Minimum equipment efficiency To com I with additional efficiencyM1.0 comply package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NA C406.2.3 C403.2.11.3 Minimum fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans is >_ 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency HVAC System Controls Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, including perimeter system zones M1.0, Yes C403.2.4.1 Thermostatic controls (thermostats and humidistats) Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating YES C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less M1.0.. Yes C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling M1.0 NA C403.2.4.1.3 Setpoint overlap restriction (thermostats) If separate heating and cooling systems with separate thermostatic control devices are used to serve a zone, indicate locations of both thermostatic control devices and the zone they serve on plans , Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling Yes C403.2.4.2 C403.2.4.2.1 C403.2.4.2.2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken M1.0 "` Yes C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy M1.1 ' NAC403.2.4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA ! exhaust NAC403.2.4.3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) NA C403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken NAC403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied NAC403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F NAC403.2.4.6 Freeze protection system controls Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing NA C403.2.4.9 Group R1 hotel !motel guest rooms For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at least 5°F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 3 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings includin Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na)Documents Code Section Code ProvisionInformation Required - Must be in permit documents Location in Building Department Notes NA 0403.2.4.10 0403.2.4.11 Group R2 / R3 dwelling units, Group R2 sleeping units For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10°F deadband; or exception taken Indicate method of ventilation air delivery (natural or mechanical) for each zone M1.0 Yes C403.2.6 C403.2.11.4 Ventilation If mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken M1.0 If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces NA C403.2.6.2 Demand controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA > 3,000 cfm, and / or the system has airside economizer or automatic modulating OSA damper, indicate OSA controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception NA 0403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or alternate means provided to automatically reduce OSA when space is partially occupied NA 0403.2.6.4 0403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) NA C403.2.6.4 C403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation / exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken ' NA 0403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, ' indicate that direct make-up air to each hood does not exceed 10% of hood exhaust For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements NA C403.2.13 Variable flow capacity - HVAC system fans For HVAC fan motors a 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 1/3 static design pressure); note exception taken NA C403.3.1 DX air handler variable cooling control (Under Integrated For DX air handlers with economizer and cooling capacity z 65,000 Btu/h, indicate number of- . cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load ; Economizer) Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) For DX air handling units with cooling capacity z 65,000 Btu/h and evaporative and chilled water air handling units with fan z 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) . NA C403.2.11.5 Fan airflow control For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is 5 66% of full speed drawing 5 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken NA C403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 Identify all DDC system input / output control points; indicate capability for trending and graphical display Ducting Systems C403.2.8.1 Indicate on plans that all ductwork is constructed and sealed per IMC M1.0, M1.1 Yes C403.2.8.3 Duct construction For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC Yes C403.2.8.3 Duct pressure classificationsM1.0, Identify location of low, medium and high pressure ductwork on plans M1.1 No C403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings includ Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code ProvisionInformation Required - Must be in permit documents Location in Documents Budding Department Notes yes C403.2.8.1 C403.2.8.2 Duct insulation For supply and return ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken M1.1 For supply ductwork located in conditioned space, identify if design supply temperature is < 55°F or > 105°F and indicate R -value of insulation on this ductwork on plans; note exception taken M1.1 For OSA ductwork, shafts and plenums, indicate R -value of insulation on these elements on plansper Table C402.1.3 for steel -framed walls; note exception taken M1.1 Piping Systems na C403.2.9 Pi in insulation P g Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken na C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Economizers No C403.3 Air economizer required Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA C403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and retum air dampers are configured to provide up to 100% OSA for cooling NA C403.3.1 C403.3.3.2 Integrated air economizer Verify mechanical cooling controls are interlocked with' air economizer controls so the outside - air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is < 45°F < .' For systems with cooling capacity z 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken NA C403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 NA C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may be provided in lieu of air economizer, - indicate system is capable of 100% design cooling capacity at 50°F db / 45°F wb OSA temperatures NA C403.3.4.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit NA C403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity z 65,000 Btu/h, refer to HVAC System Controls for requirements NA C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity s 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Systems Requiring Energy Recovery NAC403.5.1 Energy recovery (ER) - For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations ventilation /exhaust systems For rooms served by multiple systems with aggregate design OSA > 5,000 cfm, or aggregate design supply air dm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by >_ 50% based on delta between OSA and retum air enthalpies at design conditions NA C403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air; ER effectiveness (min 25°F); or alternative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) NA C404.10.4 (under C404.11) Pools and permanent spas exhaust systems For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken (energy recovery) Indicate temperature ER system has the rated effectiveness and is configured to decrease the exhaust air at design conditions by z 36°F NA C403.5.2 Energy recovery - For buildings with on-site steam heating systems, indicate condensate water ER steam condensate systems For buildings that use off-site generated steam where condensate is not returned to the source, indicate on-site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for CommercialBuildings in -- - - -- -"- -... • , • Project Title: Lids Tenant Remodel- Tukwila, WA IwcvIacu ...Hum), LU, / Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable es,no,na) Code Section Code ProvisionInformation Required - Must be in permit documents Location in Documents Building Department Notes NA C403.5.3 Energy recovery - For buildings with food service, meat or deli departments that have z 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) cooler / freezer condensers For buildings with z 40,000 sf conditioned floor area and with _> 1,000,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating NA C403.5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Hydronic System Controls NAexception C403.2.13 C403.4.2.7 Variable flow control - hydronic system pumps For hydronic system pump motors z 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires i' 30% design wattage at 50% design fluid flow); note taken Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature NA C403.2.5 C403.4.2.4 Hydronic system setback and part load controls For heating and chilled water systems >_ 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. If system pump motor hp z 3 hp, also indicate controls automatically reduce flow by z 50%. For chilled water systems (z 300,000 Btu/h, pump motor hp >_ 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken NA C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 NA C403.4.2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) NA C403.4.2.6 Chiller / boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use NA 0403.2.13.1.1 C403.4.3.1.1 Heat rejection equipment flow control For cooling towers with fan motors >_ 7.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) C403.4.3.1.2variable For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans in unison NA C403.4.3.3 Heat rejection equipment - cooling tower flow turndown Indicate open -circuit cooling towers with multiple pumps or'VSD .control are designed so all cells can be run in parallel NA C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken NA C403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed NA C403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop NA C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power > 10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 NA C403.6 C403.6.3 Dedicated outdoor air systems For buildings with office, retail, education, library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 may not utilize exceptions) NA C403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and return air enthalpies at design conditions. NA C403.6.2 Heating /cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to tum down, when there is no call for heating or cooling in the zone they serve If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable es,no,bl (Y ) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C402.4.1.4 C403.6 Increased prescriptive maximum vertical fenestration area with DOAS Indicate that all occupied, conditioned spaces are served by a DOAS per C403.6 Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) NA C406.6 Building provided with DOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied, conditioned spaces are served by a DOAS per C403.6 Multiple Zone Air Systems NA C403.4.4 Air systems serving multiple zones Identify supply air systems serving multiple zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV NA C403.4.4 VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types For each air terminal include: maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans NA C403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling NA C403.4.4.2 Dual duct systems - terminal units For systems with separate warm air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct NA C403.4.1.1 C403.4.1.2 VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verify controller setpoint pressure at each sensor is <_ 1.2 inch w.g. For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives reset logic, and allows building operators to exclude zones from reset logic NA C403.4.4.3 Multiple -zone VAV system ventilation optimization controls For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken NAC403.4.4.4 VAV system supply air reset Indicate controls automatically reset supply air temperature in response to building loads or' , outdoor air temperature; or exception taken - Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Exception 2, must comply with all 16 provisions NA ` C403.7, Item 1 Air economizer Indicate system is configured for 100% air economizer operation and complies with all related economizer requirements per C403.3 (without economizer exceptions) .,:,1.;:,: NA C403.7, Item 2 Direct digital controls (DDC) Provide DDC controls for all components of system; identify all DDC system input / output control points; indicate capability for trending and graphical display NA C403.7, Item 3 Outdoor airflow measurement and reduction For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that measures OSA intake under all load conditions; indicate control sequence that increases or reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C403.7, Item 4 Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply airflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions NA C403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system is 5 50,000 sf, or one entire floor, whichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, indicate zone isolation controls per C403.2.4.4 NA C403.7, Item 6 temperature Interior / exterior zone design supply air temperature Verify that VAV terminals serving interior cooling driven loads are sized per design supply air that is 5°F higher than VAV terminals serving exterior zones NA C403.7, Item 7 Maximum air terminal inlet Identify velocity fpm air terminals with minimum primary airflow setpoints > 50% of maximum setpoint in equipment schedule or MECH-EQ form; indicate air terminal inlet velocity does not exceed 900 NA C403.7, Item 8 Indicate Sequence of operation DDC system sequences of operation are designed and configured per ASHRAE GPC 36 NA C403.7, Item 9 Maximum allowable system brake horsepower Verify fan system bhp is <_ 90% of the bhp limit per Option 2 equation in Table C403.2.11.1(1), provide MECH-FANSYS form for each system NA C403.7, Item 10 Indicate Fan -powered terminal unit motor and control indicate all series and parallel terminal fans have electronically commutated motors; indicate DDC control system is configured to vary air terminal fan speed as a function of the load; fan speed during periods of low heating, low cooling, or ventilation only is <_ 66% of peak design air flow or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial MECH-CHK ---• --.-..-- .......... . . . Project Title: Lids Tenant Remodel - Tukwila, WA neviseu January zu1 / Date 8/9/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the - Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code ProvisionInformation Required - Must be in permit documents Location in Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terminal units Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units _Documents NA C403.7, Item 12 Fan -powered terminal unit primary air reset Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint of all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction NA C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant density z 25 people / 1000 sf, indicate space is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by 2 5°F NA C403.7, Item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, indicate spaces are served by independent HVAC systems that are separate from HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant NA C403.7, Central plant efficiency If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic heating coils served by heating water system with either gas-fired boiler(s) with thermal efficiency z 90%, air -to -water heat pumps, or heat recovery chillers Item 15 If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling , coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 5 20% of total plant capacity, or provide thermal storage sized for s 20% of total plant capacity NA C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to • monitor operation and provide fault reporting of required parameters for all VAV air handlers and VAV air terminal units in the HPVAV system - . HVAC Equipment Energy Use Metering NA C409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of - all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning - Scope of mechanical Indicate that all mechanical systems, equipment, and controls for which the WSEC requires , control functions and / or configuration to perform specific functions are required to be commissioned; M1.'0 M1:1 Yes C408.2 systems commissioning For buildings with 2 240,000 Btulh total output cooling capacity or >_ 300,000 Btu/h total output heating capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception N11,2., Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; NA C403.2.10 C408.1.1 C408.1.2 C408.1.4.2 Commissioning requirements in construction documents Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 - including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of interest plan (if required); C103.6 Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. NA C408.2.2 Air system and hydronic system balancing Indicate in plans -that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions Yes C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing M1.1-. . NA C408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heating and cooling coils and pumps Yes C408.2.3 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems M1.1 Project Close Out Documentation Yes C103.6 Documentation and project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems governed by this code; indicate close out documentation shall include: record documents, 0&M manuals, applicable WSEC compliance forms and calculations M1.1 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Economizer Exceptions MECH-ECONO 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 All cooling systems shall be configured to provide air economizer operation, regardless of system capacity, for new construction and mechanical system alterations. Various exceptions to this requirement are available. Identify all systems that an economizer exception will be applied to and additional information as noted below. For Building Dept. Use Economizer Exception Summary Refer to Section C403.3 for descriptions of economizer provisions and exceptions. For alterations refer to Section C503.4 and Table C503.4. ECONOMIZER EXCEPTIONS - NEW CONSTRUCTION AND ADDITIONS Exp 1 Cooling equipment serving spaces that are provided with a dedicated outdoor air system (DOAS) per C403.6. Spaces served shall have year- round design cooling loads from lights and equipment less than 5 watts per square foot. System ID Lighting + Equipment Loads (W/sf) Exp 2 Single zone unitary or package systems with dehumidification that affect other systems such that air economizer would increase energy consumption. System ID Exp 3 High efficiency single zone unitary or packaged systems. Equipment cooling efficiency shall be better than the WSEC required minimum efficiency by at least 64% in Climate Zone 4C and 59% in Climate Zone 5B per Table C403:37 -- System System ID Exp 4 Equipment that provides hydronic chilled water for chilled beams and chilled ceiling systems that is served by a water economizer system per C403.3.4 in lieu -of -air economizer. System ID Exp 5 Water -source heat pumps with heat recovery. Heat pump efficiency shall be 15% better than WSEC required minimum efficiency. Provide at minimum 60% air economizer. Energy recovery to preheat OSA shall have at least 50% -effectiveness. Additional system requirements apply. System ID Exp 6 Cooling equipment serving Group R occupancies. Per unit limit is less than 20,000 Btu/h cooling capacity for equipment installed outdoors or in a mech room adjacent to the outdoors. For cooling equipment installed in other locations the unit limit is less than 54,000 Btu/h. Efficiency shall be 15% better than WSEC required minimum efficiency. System ID Equipment Location .Cooling Capacity (Btu!h) Exp 7 Variable refrigerant flow (VRF) systems with energy recovery. Outdoor unit shall be a reverse -cycle heat pump with variable speed compressor(s) and condenser fan(s). Outdoor unit cooling capacity shall be not less than 65,000 Btu/h. Energy recovery to preheat outdoor air shall have at least 50% rated effectiveness. System shall be capable of providing simultaneous heating and cooling by tranferring recovered energy from zone(s) in cooling mode to other zone(s) that are in heating mode. Outdoor Unit System ID Cooling Capacity (Btu/h) Exp 8 Cooling equipment serving Controlled Plant Growth Environments. Equipment cooling efficiency shall be better than WSEC required minimum efficiency by at least 20%. Not eligible: unitary and applied heat pumps. System ID SEER, EER, & IEER Exp 9 Cooling equipment with energy recovery. Spaces served shall have year-round design cooling loads from lights and equipment greater than 5 watts per square foot. Energy recovery system shall utilize recovered energy for on-site space heating or preheating of service hot water. Provide calculations to the code official that demonstrate the amount of recovered energy used for on-site heating purposes is equivalent to the annual energy that would be saved by the cooling system with air economizer per C403.3. System ID Lighting + Equipment Loads (W/sf) 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Economizer Exceptions, cont. MECH-ECONO 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Date 8/9/2017 Economizer Exception Summary Refer to Section C403.3 for descriptions of economizer provisions and exceptions. For alterations refer to Section C503.4 and.. Table C503.4. ECONOMIZER EXCEPTIONS - NEW CONSTRUCTION AND ADDITIONS, CONTINUED Exp 10 Cooling equipment for dedicated server, electronic equipment or telecom switch rooms. Per building limit for this exception is 240,000 Btu/h cooling capacity or 10% of required building air economizer capacity, whichever is greater. Part load control required over 85,000 Btu/h. Additional requirements apply. Option a - Cooling equipment efficiency shall be 15% better than the WSEC required minimum efficiency.. Option b - Waterside economizer required. Cooling equipment efficiency shall be 5% better than the WSEC required minimum efficiency. Option c - Waterside economizer required. All cooling equipment is subject to ASHARE Standard 127. System ID Compliance Option Cooling Capacity (Btu/h) Total Claimed Exempt Capacity: Total building air economizer capacity (if claimed > 240 kBtu/h): Alternate Exp 10 Capacity Limit: ECONOMIZER EXCEPTIONS - MECHANICAL SYSTEM ALTERATIONS OR REPLACEMENT C503.4 Pre -approved design alternative to full compliance with air economizer Exp 1 requirement. An alternative for mechanical system alterations where existing building constraints make full compliance with air economizer requirement impractical. Provide calculations to the code official that demonstrate the proposed alternate design strategy provides similar energy savings to the annual energy that would be saved by the cooling system with air economizer per C403.3. — System ID Alt. Strategy ECONOMIZER EXCEPTIONS - SIMPLE SYSTEMS C503.4 Qualifying small equipment. Per unit limit less than 33,000 Btu/h. Per Exp 2 building limit for this exception is 72,000 Btu/h cooling capacity or 5% of required building air economizer capacity, whichever is greater. Cooling equipment efficiency shall be 15% better than WSEC required minimum efficiency. Not eligible: non -unitary equipment, unitary equipment installed outdoors or in.mech room_adjacent to outdoors, equipment installed during new construction, shell -and -core construction, or initial tenant improvement. System; ID AHU-.1 Cooling Capacity (Btu/h) 32,200 Total Claimed Exempt..Capacity: Total building air economizer capacity (if claimed > 72,000: Btu/h): Alternate C503.4 Exp 2 Capacity Limit: 32,200 C503.4 Equipment that provides hydronic chilled water for chilled water terminal Exp 3 units. Equipment part load cooling efficiency (IPLV) shall be better than WSEC required minimum efficiency by at least 25%. Per building limit for this exception is 480,000 Btu/h cooling capacity or 20% of required building air economizer capacity, whichever is greater. Chilled water terminal units serving Group R occupancies are not included in the building capacity total. System -ID= Cooling Capacity (Btuih) Total Claimed Exempt Capacity: Total building air economizer capacity (if claimed > 480,000 Btu/h): Alternate C503.4 Exp 3 Capacity Limit: Table Compliance Options for alteration or replacement of existing C503.4 mechanical cooling equipment per Table C503.4. Refer to table and all applicable table footnotes for full requirements. Applies to the following retrofit conditions: Option a - Option b - Option c - Option d - Any new or replacement equipment Replacement equipment of same type with same or smaller cooling output capacity. Replacement equipment of same type with large cooling output capacity. New equipment added to existing system or replacement equipment that is different than existing being replaced. System ID Equipment Type Compliance Path 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Fan System Power Allowance MECH-FANSYS-SUM 2015 Washington State Energy Code Compliance Forms for Commercial Buil Project Title: Lids Tenant Remodel - Tukwila, WA Date 8/9/2017 For Building Dept. Use HVAC Air Distribution System Schedule List all HVAC systems that have the capability to provide heating and/or cooling to the spaces they serve. System or Primary Supply Fan ID Speed Control (Note 1) Description (Note 2) System Total Nameplate HP (Note 3) Fan Power Calculation Required (Note 4) AHU-1 CV Split System Air Handler 1 No Note:1- Constant Volume (CV), Variable Air Volume (VAV), or Hospital/Lab CV system that qualifies for VAV budget per C403.2.11.1 Exception Single zone VAV systems shall comply as CV. Note 2 -Describe system type and list all fans (or groups of fans) associated with the delivery and removal of conditioned air by the system. all supply, retum/relief, exhaust and exhaust hoods (>1 hp), make-up air, dedicated outside air (DOAS), booster fans, and series , • terminals..VAV parallel fan -powered terminals and economizer relief fans do not need to be included if the fans do not operate at conditions. Note 3 - Enter the total nameplate hp of all fans associated with the delivery and removal of conditioned air by the system. Note 4 - This form automatically identifies whether a MECH-FANSYS form is required to demonstrate compliance with the fan power allowance or this information is not required because the system has a combined total nameplate motor hp that is 5 hp or less (No) 1. Include fan -powered peak (Yes), MECH-FANSYS Forms • A MECH-FANSYS form shall be provided for each system with total nameplate hp greater than 5 hp. Select (Add Fan System Form) to generate an additional form. Added forms can be deleted with button in cell E32 of the added form. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Fan System Power Allowance MECH-FANSYS 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R Project Title: Lids Tenant Remodel - Tukwila, VIS Date 8/9/2017 A separate MECH-FANSYS form must be completed for every HVAC system that exceeds the 5 hp threshold. For Building Dept. Use Fan System ID AHU-1 System Supply Fan y pp y Speed Control CV Constant Volume (CV), Variable Air Volume (VAV), or Hospital/Lab CV system that qualifies for VAV budget per C403.2.11.1, Exception 1 Compliance Option Nameplate HP Compliance is based upon either the fan motor nameplate horse power (Option 1), the fan brake horsepower (Option 2), or C403.7 high efficieny VAV fan brake horsepower (10% less than Option 2). The bhp calculation provides adjustments for special equipment per Table C403.2.11.1(2). Fan System Supply y pp y CFM Total 1,170 In Fan Equipment Schedule below, provide maximum design supply airflow rate (CFM) of all supply fans serving the conditioned space in Fan Equipment Schedule below. Fan System CFM Total is the supply airflow of the central air handler at peak design conditions. Additional volumetric air flow provided at zone fan terminals, booster fans, or through induction is not included in the supply CFM total. However, the fan power of this equipment is included in the HP and BHP calculations. Fan System Supply CFM Total is automatically calculated by the form. Fan Equipment Schedule - Fan ID and Location Fan Type Quantity of Fan Type Total CFM (Note 1) . Total Nameplate HP (Note 2) Total BHP (Note 3) AHU-1 Supply 1 1,170 1 Note 1 - Total CFM is the.maximum CFM of the listed fan(s) when Total Proposed: operating at peak design operating conditions. 1.0 Note 2 - Total namplate hp of the listed fan(s). Total Allowance: Note 3 - Total brake horsepower (bhp) of the listed fan(s) at peak 1.3 #VALUE! design operating conditions. Not required ' :if Nameplate HP compliance option chosen. Compliance Message: COMPLIES Brake Horsepower Allowance Adjustments Device Type Description and Location CFM thorough this device (CFMD) Assigned Pressure Drop, PD in w.c. (Note 6) _ Calculated Pressure Drop, . PD in w.c. (Note 7) Adjustment, ' A in bhp (Note 8) Note 4 - Bhp allowance for energy recovery devices and run around coil loops includes both air Total Adjustment (bhp): streams. so the CFMD is the sum of the ulyFndPhCMa,,Bt CFM if hr th nn thr.,,,,,I, the device. Note 5 - Energy recovery effectiveness is defined as change in the enthalpy of the outdoor air supply divided by the enthaply difference between the outdoor air and retum air at design conditions. Note 6 - Assigned pressure drop (PD) adjustment per Table C403.2.11.1(2). Note 7 - Pressure drop (PD) adjustment shall be calculated per the applicable method defined in Table C403.2.11.1(2) based on specific system conditions. Note 8 - A = PD * CFMD/4131 where A is the allowed system brake horse power adjustment, PD is pressure drop allowance, and CFMD is the cfm through the device. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 General Instructions: A. Include all fans directly associated with the delivery and removal of conditioned air to the zones served by the system. Enter CFM and brake horsepower (bhp) of each fan at peak design conditions and the nameplate horsepower (hp). Include supply, return and relief fans, exhaust and exhaust hood fans (>1 hp), booster fans and fans included as part of make-up air units, dedicated outside air systems (DOAS), energy recovery ventilators (ERV), and series fan -powered terminal equipment. 8. VAV parallel fan -powered terminals and economizer relief fans do not need to be included if the fans do not operate at peak conditions. C. Fans not directly associated with the delivery and removal of conditioned air, such as condenser fans, do not need to be included in the fan power total. D. Fan power calculations are not required for non -central air HVAC systems such as 4 -pipe fan coils and variable refrigerant flow (VRF) systems unless individual fan systems are greater than 5hp. E. In the Brake Horsepower Allowance Adjustments table, if a Device Type is selected that has an Assigned Pressure Drop, this value will autofill into the Assigned Pressure Drop cell and the Calculated Pressure Drop cell will be write -protected. If the Device Type requires a Calculated Pressure Drop, then enter this value into the Calculated Pressure Drop cell and the Assigned Pressure Drop cell with be write -protected. F. Refer to FAQ section of MECH-FANSYS-DOC for additional instructions. PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0111 DATE: 08/16/17 PROJECT NAME: LIDS SITE ADDRESS: 990 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ktoVI /0/A- g-)-3 Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ri (no approval/review required) REVIEWER'S INITIALS: DATE: 08/17/17 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: Approved with Conditions Notation: rpt 09/14/17 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: 12/18/2013 SULLIVAN HEATING & COOLIN(' INC Horne Espanol Contact Safety & Health Claims & Insurance Washington State Department of ki Labor & Industries Search L&I A -Z Index Help Page 1 of 2 Workplace Rights Trades & Licensing SULLIVAN HEATING & COOLING INC Owner or tradesperson Principals SULLIVAN, DANIEL T, PRESIDENT SULLIVAN, JILL M, SECRETARY Doing business as SULLIVAN HEATING & COOLING INC WA UBI No. 601 588 396 5373 AUTO CENTER WAY SUITE 205 BREMERTON, WA 98312 360-405-0723 KITSAP County Business type Corporation Governing persons DANIEL THOMAS SULLIVAN JILL MARLENE SULLIVAN; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. SULLIHC063QT Effective — expiration 11/30/1994-12/27/2018 Bond ................. RLI INSURANCE CO Bond account no. LSM0021773 Received by L&I 11/29/2007 Insurance ........ ................ American Hallmark Ins Co of Te Policy no. 44CL486050 Active. Meets current requirements. $6,000.00 Effective date 11/28/2007 Expiration date Until Canceled $1,000,000.00 Received by L&I Effective date 11/17/2016 11/29/2014 Expiration date 11/29/2017 Insurance history Savings Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601588396&LIC=SULLIHC063QT&SAW= 11/1/2017 PROVIDE NEW CONDENSING UNIT ON ROOF. UNIT TO BE MOUNTED IN EXACT LOCATION OF DEMOLISHED CONDENSING UNIT. FIELD VERIFY LOCATION OF CONDENSING UNIT TO BE DEMOLISHED PRIOR TO BID. RE:3,2/M1.2 ROVIDE NEW REFRIGERANT PIPING TO BE ROUTED IN LOCATION OF DEMO REFRIGERANT PIPING. REFRIGERANT PIPING TO EXTEND DOWN THROUGH ROOF AND OUT TO NEW AIR HANDLING UNIT. RE:2/M1.2. REMOVE ALL ABANDONED PIPING AND SUPPORTS AS REQUIRED. FIELD VERIFY EXACT LOCATION. EXISTING OUTS AIR DUCT E (N) SAD 125 Al X2 (N) (SAD) 300// 0 0 1217 ! o® --'. IECESS.910 X (N) /AHU-1` \Aldi, T T EX STING RETURN DUCT (N) R X2 24/24 CONNECT NEW RETURN DIFFUSER TO EXISTING RETURN DUCTWORK. NEW TRANE AIR HANDLING UNIT ON EXISTING STRUCTURAL PLATFORM. CONNECT TO EXISTING SUPPLY, OUTSIDE AIR, AND RETURN DUCTWORK. CONNECT TO EXISTING CONDENSATE DRAIN LINE. REFER TO TENANT DESIGN CRITERIA. SEE STRUCTURAL DRAWINGS FOR MOUNTING OF UNIT. RE:4,5/M1.2. RE:1.7/M 1 EXISTING SUPPLY DUCT 1 0 2-- 0 RECESSED 00 (N) X2 0 /SAD 300 0 ri t MIN FILE COPY Permit No. M1O1U Plan review € pproval ia subject to errors and omissions. Approval of constru tion t;c.' um nts does not authorize the violation of any adopted code or ordinance. Receipt of approved Fielderand di or. is acknowledged: By: Date: ///i.../ 17 City of Tukwila BUILDING DIVISION rNREVISIONS o changes shall he made to the scope of work without prior approval of Tu ,wtla Building Division. INOTE: Revisions will require a new plan submittal and may include adnionai plan review fees. I -,E Ay,,,,RNI PE T , REQUIRED FOR: „0 Mechanical f Electrical Cif/Plumbing CVGas Piping (.7;i.;.,! of Tukv'Jila Qrtjy'_r +; DlVtSlON ..,. �.. ice• 1 MECHANICAL PLAN M1.0 SCALE: 1/4"=1'-0" MECHANICAL SCHEDULES NOTES: 1) CONTRACTOR TO UTILIZE LANDLORD'S ROOFING CONTRACTOR FOR ALL ROOF PENETRATIONS. REUSE EXISTING ROOF OPENINGS IF POSSIBLE. 2) HAIL GUARD IS REQUIRED ON CONDENSING COIL. 3) COSTAL PROTECTION IS REQUIRED ON CONDENSING COIL. AIR HANDLING UNIT SCHEDULE (PROVIDED BY TENANT INSTALLED BY G.C.) UNIT: FAN: ELECTRICAL: COOLING: ELECTRIC HEATER HEAT MODE SAD MANUFACTURER TAG LOCATION TONS: MIN. OSA CFM HP R.P.M. E.S.P.PER. NO. „W C: TYPE MODEL NO. DIA. VOLTS -PH -Hz MCA MOCP MBHT MBHS EDB EWB kW BTUH EAT LAT WT. MODEL NO. ®ROOF 2.5 208-3-60 11 15 R410A 1 AnSUSPEND FROM 2.5 190 1025 1.0 VAR. 0.5" CENTR. 1 11"X10" 208-1-60 39 40 34.5 24.5 75 62 5.76 19700 77.1 55.5 162 TRANE WSTRUCTURE IN STOCKROOM ECM TAM7A0C36H31 REMARKS: PROVIDE ELECTRIC HEATER BAYEVAC08, 5.76KW BASIS OF DESIGN: AIR HANDLING UNIT , PROVIDE 2 POSITION MOTORIZED O/A DAMPER, NO ECONOMIZER - MIN. OSA. ONLY. VERIFY PRIOR TO BID/ORDERING UNIT, SUSPENSION PACKAGE, FILTER / MIXING BOX WITH 2" THROWAWAY FILTERS, GALVANIZED CONDENSATE DRAIN PAN AND PROGRAMMABLE THERMOSTAT. , NOTES: 1) CONTRACTOR TO UTILIZE LANDLORD'S ROOFING CONTRACTOR FOR ALL ROOF PENETRATIONS. REUSE EXISTING ROOF OPENINGS IF POSSIBLE. 2) HAIL GUARD IS REQUIRED ON CONDENSING COIL. 3) COSTAL PROTECTION IS REQUIRED ON CONDENSING COIL. CONDENSING UNIT SCHEDULE (PROVIDED BY TENANT, INSTALLED BY G.C.) UNIT: ELECTRICAL: COMPRESSOR: FACE SIZE MANUFACTURER REMARKS SAD TITUS OMNI 24"X24" SEE NOTE 1 W/ O.B.D. FAN: COMP: EAT MIN. OSA OPER. MODEL NO. TAG LOCATION TONS: VOLTS -PH -Hz MCA MOCP REFRIG. NO. HP NO. kW TEMP WT. ®ROOF 2.5 208-3-60 11 15 R410A 1 1/8 1 2.54 85 7°Fdb 204 TRANE W 5° wb 4TWA3030A3 REMARKS: SEER = 15.0 BASIS OF DESIGN: CONDENSING UNIT WITH LOW AMBIENT CONTROLS AND 120 VOLT CONVENIENCE OUTLET. NOTES: 1) CONTRACTOR TO UTILIZE LANDLORD'S ROOFING CONTRACTOR FOR ALL ROOF PENETRATIONS. REUSE EXISTING ROOF OPENINGS IF POSSIBLE. 2) HAIL GUARD IS REQUIRED ON CONDENSING COIL. 3) COSTAL PROTECTION IS REQUIRED ON CONDENSING COIL. NOTES: 1) GC TO PAINT D IFFUSERS AND GRILLES TO MATCH CEILING FINSH. REF ARCHITECTURAL SHEETA3.0. DIFFUSER SCHEDULE MARK MFGR MODEL FACE SIZE FINISH REMARKS SAD TITUS OMNI 24"X24" SEE NOTE 1 W/ O.B.D. RET TITUS PAR/3 AS SHOWN SEE NOTE 1 - NOTES: 1) GC TO PAINT D IFFUSERS AND GRILLES TO MATCH CEILING FINSH. REF ARCHITECTURAL SHEETA3.0. LEGEND WORK RESPONSIBILITY T O CO2 ti=1 1 L - CEILING SUPPLY AIR DIFFUSER 24/24 CEILING SUPPLY AIR DIFFUSER 12/12 CEILING RETURN AIR GRILLE 24/24 THERMOSTAT TEMPERATURE SENSOR CARBON DIOXIDE SENSOR NEW DUCTWORK NEW DUCTWORK WITH ACOUSTICAL LINING EXISTING DUCT TO REMAIN VD VOLUME DAMPER IVD1 VOLUME DAMPER W/ REMOTE OPERATOR SAD 100 4W 12" DIA. N X/Y SAD RET TR --- FD --- SD - - - FSD --- BD 2 P 2 (E) (R) (N) ® FC TYPE OF AIR DEVICE AIR QUANTITY (CFM) NECK SIZE, ROUND OR RECTANGULAR DIRECTION OF AIR FLOW X, INCHES, SIDE OF DUCT SHOWING SUPPLY AIR DIFFUSER RETURN AIR GRILLE TOP REGISTER FIRE DAMPER SMOKE DAMPER FIRE / SMOKE DAMPER BACKDRAFT DAMPER SMOKE DETECTOR SUPPLY -PHOTOELECTRIC SMOKE DETECTOR RETURN - IONIZATION EXISTING RELOCATE NEW FLEXIBLE CONNECTION FIELD CONNECTION NOTES NOTES: HVAC UPDATING REQUIREMENTS 1. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING, VERIFY EXISTING CONDITIONS AND NOTIFY ANY PROBLEMS OR CONCERNS. 2. BALANCE SYSTEM AND PROVIDE WRITTEN REPORT. THE LANDLORD "TENANT CRITERIA MANUAL" FORMS A PART OF THESE SPECIFICATIONS. ANY DISCREPANCY BETWEEN THESE SPECIFICATIONS AND THE "TENANT CRITERIA MANUAL" THE MANUAL SHALL SUPERSEDE. ANY EQUIPMENT REQUIRED OF THE MANUAL BUT NOT SHOWN ON THESE SPECIFICATIONS SHALL BE PROVIDED AT THIS CONTRACTOR'S EXPENSE. TENANTS MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE FOLLOWING: 1. THIS CONTRACTOR SHALL INSTALL TENANT PROVIDED ONE (1) NEW 3 -TON SPLIT SYSTEM UNITS, DUCTWORK, DIFFUSERS, REGISTERS, HANGERS, PROGRAMMABLE THERMOSTAT AND ALL ITEMS REQUIRED TO PRODUCE A COMPLETE AND OPERABLE HVAC SYSTEM. 2. DUCTWORK: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST RECENT SMACNA STANDARDS FOR LOW AND MEDIUM PRESSURE, NEW DUCTWORK, INSULATION, FLEX DUCT, GRILLES, REGISTERS, DIFFUSERS, VOLUME DAMPERS, FIRE DAMPERS, SMOKE DETECTORS, SECONDARY CONDENSATE DRAIN, ETC. NECESSARY TO RENDER THE SYSTEM OPERATIONAL AS DESCRIBED IN THESE PLANS AND SPECIFICATIONS AND AS REQUIRED BY THE LANDLORD, LOCAL AND STATE CODES. 3. ALL DUCTWORK SHALL BE HUNG AS HIGH AS POSSIBLE TO MAINTAIN ARCHITECTURAL CEILING HEIGHT REQUIREMENTS. 4. ALL OUTSIDE AIR AND UNEXPOSED DUCTWORK SHALL BE INSULATED WITH 2" THICK FIBERGLASS FIRE RETARDANT VAPOR SEAL INSULATION. DUCTWORK WITHIN 10' OF THE UNIT SHALL BE INTERNALLY LINED WITH 1 1/2" ACOUSTICAL INSULATION. DUCT DIMENSIONS ARE NET FREE AREA ONLY. DUCT SIZE MUST ACCOMMODATE INSULATION THICKNESS. 5. FIRE DAMPERS MUST BE INSTALLED AT ALL LOCATIONS WHERE DUCTWORK PENETRATES A FIRE RATED WALL. PROVIDE ACCESS DOORS AS REQUIRED. FIRE DAMPERS TO BE OF THE TYPE APPROVED BY THE AGENCIES HAVING JURISDICTION. 6. WHEN NEW DUCTWORK CONFLICTS WITH EXISTING DUCTWORK, PIPING, ETC., NEW DUCTWORK SHALL BE SET UP OR DOWN AS REQUIRED. 7. PROVIDE VOLUME DAMPERS ON ALL NEW SUPPLY AIR DUCT SPLITS AND TAPS. 8. PIPING: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST RECENT CODES AND STANDARDS FOR SPLIT REFRIGERATION SYSTEMS, ALL VALVES, STRAINERS, DRYERS, INSULATION ETC. REQUIRED TO MAKE THE SYSTEM FULLY FUNCTIONAL AND OPERATIONAL. ANY OTHER EQUIPMENT REQUIRED TO MAKE THE SYSTEM OPERATIONAL AND NOT SHOWN OR SPECIFIED WILL BE PROVIDED BY THIS CONTRACTOR. 3/4" ARMAFLEX INSULATION IS REQUIRED ON ALL REFRIGERANT PIPING. 9. POWER WIRING: A. THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL EQUIPMENT AND MATERIAL REQUIRED TO PROVIDE POWER TO THE AIR HANDLING UNIT AND CONDENSING UNIT FROM THE TENANTS POWER SUPPLY. B. THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL A DISCONNECT SWITCH AND STARTER ON THE AIR HANDLING UNIT, CONDENSING UNIT AND HEATER. C. THE ELECTRICAL CONTRACTOR IS TO PROVIDE POWER WIRING TO THE EXHAUST FAN. 10. CONTROL WIRING AND CONTROLS: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL NECESSARY WIRING (IN CONDUIT IF REQUIRED) AND CONTROLS REQUIRED TO PROVIDE A COMPLETE AND OPERATING SYSTEM. 11. WHEN THE SMOKE DETECTOR, IN RETURN DUCTWORK, ACTIVATES IT SHALL SHUT DOWN THE AIR HANDLING UNIT. 12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL CEILING DIFFUSERS AND REGISTERS. 13. THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL A CONDENSATE DRAIN SYSTEM PER THE MANUFACTURERS RECOMMENDATIONS AND THE LANDLORD'S REQUIREMENTS. INTERIOR CONDENSATE DRAIN LINE SHALL BE INSULATED WITH 1/2" THICK ARMAFLEX. 14. TENANTS MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL THE LANDLORD'S SPECIFICATIONS FOR THIS INSTALLATION. 15. THIS CONTRACTOR IS TO HIRE LANDLORD'S SPECIFIED CONTRACTOR FOR ALL ROOF PENETRATIONS. 16. THE MECHANICAL CONTRACTOR, AS PART OF THEIR WORK, IS TO STENCIL THE TENANT NAME AND SPACE NUMBER ON ALL ROOFTOP EQUIPMENT WITH 4" HIGH BLOCK LETTERS (2" HIGH BLOCK LETTERS ON ALL SMALL EQUIPMENT WHERE 4" WILL NOT FIT) IN A COLOR APPROVED BY THE BUILDING MANAGER / CONSTRUCTION INDIVIDUAL. 17. IF STRUCTURAL DRAWINGS FOR HVAC EQUIPMENT SUPPORTS ARE NOT ALREADY INCORPORATED INTO THIS SET OF PLANS AND SPECIFICATIONS, THE MECHANICAL CONTRACTOR, AT THEIR OWN COST AND EXPENSE, AND AS PART OF THE BID TO THE G.C., IS TO HIRE A STRUCTURAL ENGINEER TO DESIGN THE SUPPORTS FOR THE NEW HVAC UNIT AND A STRUCTURAL SUBCONTRACTOR TO FURNISH AND INSTALL SUCH HANGERS / SUPPORTS, BRACING, ETC. TO HANG FROM THE STRUCTURE FOR ALL NEW HVAC EQUIPMENT. G.C. TO SUBMIT AS REQUIRED ALL STRUCTURAL SHOP DRAWINGS TO THE LANDLORD'S ARCHITECT, AS REQUIRED, FOR APPROVAL, PRIOR TO STARTING WORK. 4 6 1 FROM ROAD PARAMUS, NJ 07652 973.253.9393 TEL LL STRUCTURA FAX WWW.SARGARCH.COM CONSULTANT (ENGINEER): ARCHITECTURAL SEAL: CONTRACTOR'S NOTES: WRITTEN DIMENSIONS HOLD PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE DRAWINGS. THE CONTRACTORS MUST VISIT JOB SITE TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE SUBMITTING BIDS. REPORTANY DISCREPANCIES OF ANY CONDMONS WHICH MAY INTERFERE WITH THE PROPER EXECUTION OF THE CONTRACT TO THE TENANTS REPRESENTATIVE. REPORT DISCREPANCIES DURING BIDDING PROCESS AND BEFORE START OF CONSTRUCTION. CHANGE ORDERS WILL NOT BE APPROVED FOR ISSUES ARISING FROM THE FIELD CONDITIONS OR CONFLICTS BETWEEN THE PLANS AND THE EXISTING CONDMONS. A DATE ISSUE 8/11/17 PERMIT, BID, L.L. REVIEW REV! CODE COMPLIANCE AF EWED FOR PROVED AUG 29 2017 R.4 City BUILDI 1212 of I UkWIIa NIG DIVISION PROJECT NAME: LIds LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 48218 LOCATION: SOUTHCENTER MALL SPACE # 446 2800 SOUTHCENTER MALL TUKWILA, WA 98188 LIDS # 5102 PROJECT INFORMATION: PROJEC 1998-17 L}RgllttyQY,,p IV444IEWEDBY: K.F. ll++�� I' - 11 TUKWILA AUG 1 5 2017 PERMIT CENTCR TITLE: THERMOSTAT SCHEDULE SHEET NUMBER: THERMOSTAT BY MECHANICAL CONTRACTOR THERMOSTAT SHALL BE MANUFACTURED BY LIGHT STAT, MODEL TME-AVU. THERMOSTAT SHALL BE TOUCHSCREEN PROGRAMMABLE 7 -DAY TYPE WITH 5° DEADBAND. PROVIDE LOCKING GUARD COVER. MOUNT AT 4'-0" AFF. T LEGEND WORK RESPONSIBILITY T O CO2 ti=1 1 L - CEILING SUPPLY AIR DIFFUSER 24/24 CEILING SUPPLY AIR DIFFUSER 12/12 CEILING RETURN AIR GRILLE 24/24 THERMOSTAT TEMPERATURE SENSOR CARBON DIOXIDE SENSOR NEW DUCTWORK NEW DUCTWORK WITH ACOUSTICAL LINING EXISTING DUCT TO REMAIN VD VOLUME DAMPER IVD1 VOLUME DAMPER W/ REMOTE OPERATOR SAD 100 4W 12" DIA. N X/Y SAD RET TR --- FD --- SD - - - FSD --- BD 2 P 2 (E) (R) (N) ® FC TYPE OF AIR DEVICE AIR QUANTITY (CFM) NECK SIZE, ROUND OR RECTANGULAR DIRECTION OF AIR FLOW X, INCHES, SIDE OF DUCT SHOWING SUPPLY AIR DIFFUSER RETURN AIR GRILLE TOP REGISTER FIRE DAMPER SMOKE DAMPER FIRE / SMOKE DAMPER BACKDRAFT DAMPER SMOKE DETECTOR SUPPLY -PHOTOELECTRIC SMOKE DETECTOR RETURN - IONIZATION EXISTING RELOCATE NEW FLEXIBLE CONNECTION FIELD CONNECTION NOTES NOTES: HVAC UPDATING REQUIREMENTS 1. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING, VERIFY EXISTING CONDITIONS AND NOTIFY ANY PROBLEMS OR CONCERNS. 2. BALANCE SYSTEM AND PROVIDE WRITTEN REPORT. THE LANDLORD "TENANT CRITERIA MANUAL" FORMS A PART OF THESE SPECIFICATIONS. ANY DISCREPANCY BETWEEN THESE SPECIFICATIONS AND THE "TENANT CRITERIA MANUAL" THE MANUAL SHALL SUPERSEDE. ANY EQUIPMENT REQUIRED OF THE MANUAL BUT NOT SHOWN ON THESE SPECIFICATIONS SHALL BE PROVIDED AT THIS CONTRACTOR'S EXPENSE. TENANTS MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE FOLLOWING: 1. THIS CONTRACTOR SHALL INSTALL TENANT PROVIDED ONE (1) NEW 3 -TON SPLIT SYSTEM UNITS, DUCTWORK, DIFFUSERS, REGISTERS, HANGERS, PROGRAMMABLE THERMOSTAT AND ALL ITEMS REQUIRED TO PRODUCE A COMPLETE AND OPERABLE HVAC SYSTEM. 2. DUCTWORK: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST RECENT SMACNA STANDARDS FOR LOW AND MEDIUM PRESSURE, NEW DUCTWORK, INSULATION, FLEX DUCT, GRILLES, REGISTERS, DIFFUSERS, VOLUME DAMPERS, FIRE DAMPERS, SMOKE DETECTORS, SECONDARY CONDENSATE DRAIN, ETC. NECESSARY TO RENDER THE SYSTEM OPERATIONAL AS DESCRIBED IN THESE PLANS AND SPECIFICATIONS AND AS REQUIRED BY THE LANDLORD, LOCAL AND STATE CODES. 3. ALL DUCTWORK SHALL BE HUNG AS HIGH AS POSSIBLE TO MAINTAIN ARCHITECTURAL CEILING HEIGHT REQUIREMENTS. 4. ALL OUTSIDE AIR AND UNEXPOSED DUCTWORK SHALL BE INSULATED WITH 2" THICK FIBERGLASS FIRE RETARDANT VAPOR SEAL INSULATION. DUCTWORK WITHIN 10' OF THE UNIT SHALL BE INTERNALLY LINED WITH 1 1/2" ACOUSTICAL INSULATION. DUCT DIMENSIONS ARE NET FREE AREA ONLY. DUCT SIZE MUST ACCOMMODATE INSULATION THICKNESS. 5. FIRE DAMPERS MUST BE INSTALLED AT ALL LOCATIONS WHERE DUCTWORK PENETRATES A FIRE RATED WALL. PROVIDE ACCESS DOORS AS REQUIRED. FIRE DAMPERS TO BE OF THE TYPE APPROVED BY THE AGENCIES HAVING JURISDICTION. 6. WHEN NEW DUCTWORK CONFLICTS WITH EXISTING DUCTWORK, PIPING, ETC., NEW DUCTWORK SHALL BE SET UP OR DOWN AS REQUIRED. 7. PROVIDE VOLUME DAMPERS ON ALL NEW SUPPLY AIR DUCT SPLITS AND TAPS. 8. PIPING: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST RECENT CODES AND STANDARDS FOR SPLIT REFRIGERATION SYSTEMS, ALL VALVES, STRAINERS, DRYERS, INSULATION ETC. REQUIRED TO MAKE THE SYSTEM FULLY FUNCTIONAL AND OPERATIONAL. ANY OTHER EQUIPMENT REQUIRED TO MAKE THE SYSTEM OPERATIONAL AND NOT SHOWN OR SPECIFIED WILL BE PROVIDED BY THIS CONTRACTOR. 3/4" ARMAFLEX INSULATION IS REQUIRED ON ALL REFRIGERANT PIPING. 9. POWER WIRING: A. THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL EQUIPMENT AND MATERIAL REQUIRED TO PROVIDE POWER TO THE AIR HANDLING UNIT AND CONDENSING UNIT FROM THE TENANTS POWER SUPPLY. B. THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL A DISCONNECT SWITCH AND STARTER ON THE AIR HANDLING UNIT, CONDENSING UNIT AND HEATER. C. THE ELECTRICAL CONTRACTOR IS TO PROVIDE POWER WIRING TO THE EXHAUST FAN. 10. CONTROL WIRING AND CONTROLS: THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL NECESSARY WIRING (IN CONDUIT IF REQUIRED) AND CONTROLS REQUIRED TO PROVIDE A COMPLETE AND OPERATING SYSTEM. 11. WHEN THE SMOKE DETECTOR, IN RETURN DUCTWORK, ACTIVATES IT SHALL SHUT DOWN THE AIR HANDLING UNIT. 12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL CEILING DIFFUSERS AND REGISTERS. 13. THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL A CONDENSATE DRAIN SYSTEM PER THE MANUFACTURERS RECOMMENDATIONS AND THE LANDLORD'S REQUIREMENTS. INTERIOR CONDENSATE DRAIN LINE SHALL BE INSULATED WITH 1/2" THICK ARMAFLEX. 14. TENANTS MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL THE LANDLORD'S SPECIFICATIONS FOR THIS INSTALLATION. 15. THIS CONTRACTOR IS TO HIRE LANDLORD'S SPECIFIED CONTRACTOR FOR ALL ROOF PENETRATIONS. 16. THE MECHANICAL CONTRACTOR, AS PART OF THEIR WORK, IS TO STENCIL THE TENANT NAME AND SPACE NUMBER ON ALL ROOFTOP EQUIPMENT WITH 4" HIGH BLOCK LETTERS (2" HIGH BLOCK LETTERS ON ALL SMALL EQUIPMENT WHERE 4" WILL NOT FIT) IN A COLOR APPROVED BY THE BUILDING MANAGER / CONSTRUCTION INDIVIDUAL. 17. IF STRUCTURAL DRAWINGS FOR HVAC EQUIPMENT SUPPORTS ARE NOT ALREADY INCORPORATED INTO THIS SET OF PLANS AND SPECIFICATIONS, THE MECHANICAL CONTRACTOR, AT THEIR OWN COST AND EXPENSE, AND AS PART OF THE BID TO THE G.C., IS TO HIRE A STRUCTURAL ENGINEER TO DESIGN THE SUPPORTS FOR THE NEW HVAC UNIT AND A STRUCTURAL SUBCONTRACTOR TO FURNISH AND INSTALL SUCH HANGERS / SUPPORTS, BRACING, ETC. TO HANG FROM THE STRUCTURE FOR ALL NEW HVAC EQUIPMENT. G.C. TO SUBMIT AS REQUIRED ALL STRUCTURAL SHOP DRAWINGS TO THE LANDLORD'S ARCHITECT, AS REQUIRED, FOR APPROVAL, PRIOR TO STARTING WORK. 4 6 1 FROM ROAD PARAMUS, NJ 07652 973.253.9393 TEL LL STRUCTURA FAX WWW.SARGARCH.COM CONSULTANT (ENGINEER): ARCHITECTURAL SEAL: CONTRACTOR'S NOTES: WRITTEN DIMENSIONS HOLD PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE DRAWINGS. THE CONTRACTORS MUST VISIT JOB SITE TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE SUBMITTING BIDS. REPORTANY DISCREPANCIES OF ANY CONDMONS WHICH MAY INTERFERE WITH THE PROPER EXECUTION OF THE CONTRACT TO THE TENANTS REPRESENTATIVE. REPORT DISCREPANCIES DURING BIDDING PROCESS AND BEFORE START OF CONSTRUCTION. CHANGE ORDERS WILL NOT BE APPROVED FOR ISSUES ARISING FROM THE FIELD CONDITIONS OR CONFLICTS BETWEEN THE PLANS AND THE EXISTING CONDMONS. A DATE ISSUE 8/11/17 PERMIT, BID, L.L. REVIEW REV! CODE COMPLIANCE AF EWED FOR PROVED AUG 29 2017 R.4 City BUILDI 1212 of I UkWIIa NIG DIVISION PROJECT NAME: LIds LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 48218 LOCATION: SOUTHCENTER MALL SPACE # 446 2800 SOUTHCENTER MALL TUKWILA, WA 98188 LIDS # 5102 PROJECT INFORMATION: PROJEC 1998-17 L}RgllttyQY,,p IV444IEWEDBY: K.F. ll++�� I' - 11 TUKWILA AUG 1 5 2017 PERMIT CENTCR TITLE: MECHANICAL PLAN, WORK RESPONSIBILITY, AND SCHEDULES SHEET NUMBER: M 1 1 0 4 6 1 FROM ROAD PARAMUS, NJ 07652 973.253.9393 TEL id5 LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 46275 EL M. ���P0 wasMfi -3 cc oNAL� 0.i1•J7 A. GENERAL CONDITIONS K. GUARANTEE, WARRANTY ARCHITECTURAL SEAL: 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND IF REQUIRED BY THE LANDLORD OR CODES, ABANDONED PIPING AND/OR DUCTWORK 1. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN THE PROPOSAL A ONE YEAR ALARM SYSTEM MAY BE DELETED WHERE NOT REQUIRED BY LANDLORD OR BY 11. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, FIRE / SMOKE 4. ALL INSULATION ON EXISTING PIPING OR DUCTS THAT IS WETTED, DAMAGED, SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS (IF MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION GUARANTEE, WARRANTY ON ALL EQUIPMENT AND MATERIAL INSTALLED OR LOCAL CODE. DAMPERS, CONTROLS AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR DISTURBED OR REMOVED SHALL BE REPLACED. PROVIDED AS PART OF THE CONTRACT) ARE A PART OF THIS CONTRACT. PRIOR TO BID AND INCLUDE IN BID PROPOSAL. REFURBISHED, ALL MATERIALS AND WORK UNDER THE CONTRACT AND SHALL MAKE INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT GOOD, REPAIR, OR REPLACE AT THEIR OWN EXPENSE, ANY DEFECTIVE WORK, A. HEATING, VENTILATION AND AIR CONDITIONING MUST BE APPROVED BY THE TENANTS CONSTRUCTION MANAGER PRIOR TO 5. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN 2. THE TERM "CONTRACTOR" SHALL MEAN THE "MECHANICAL CONTRACTOR HIRED TO 3. ACTIVE LANDLORD OR OTHER TENANT SERVICES ENCOUNTERED IN WORK SHALL MATERIAL OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. COMPLETE THE WORK OUTLINED IN THESE PLANS AND SPECIFICATIONS" UNLESS BE PROTECTED AND SUPPORTED. IF EXISTING SERVICES NOT ANTICIPATED REQUIRE MONTHS FROM THE DATE OF WRITTEN ACCEPTANCE OF THE INSTALLATION BY THE 1. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. INSULATION MUST COMPLY WITH NFPA 90A. OTHERWISE SPECIFIED. RELOCATION, CONTACT THE TENANTS CONSTRUCTION MANAGER IMMEDIATELY. ALL TENANT'S CONSTRUCTION MANAGER. IN CASE OF REPLACEMENT OR REPAIR OF ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND COSTS FOR REPAIR OF DAMAGES TO ACTIVE LANDLORD OR OTHER TENANT EQUIPMENT DUE TO FAILURE WITHIN THE GUARANTEE PERIOD, THE GUARANTEE ON SPECIFICATIONS TO SEQUENCE, COORDINATE AND INTEGRATE THE VARIOUS 12. ALL BRANCHES AND TAKEOFFS SHALL BE EQUIPPED WITH MANUAL VOLUME 6. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A 3. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO REVIEW ALL DRAWINGS FOR SERVICES DURING CONSTRUCTION SHALL BE PAID FOR BY THE CONTRACTOR THAT PORTION OF WORK SHALL BE EXTENDED FOR A PERIOD OF 12 MONTHS FROM ELEMENTS OF THE HVAC SYSTEM, MATERIALS AND EQUIPMENT WITH OTHER CONTROLLING DEVICES HAVING AN INDICATING AND LOCKING DEVICE. SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 WHEN TESTED IN ACCORDANCE ALL OTHER TRADES. CAUSING THE DAMAGE. THE DATE OF SUCH REPLACEMENT OR REPAIR. THIS GUARANTEE, WARRANTY IS TO CONTRACTORS TO AVOID INTERFERENCE'S AND CONFLICTS. WITH ASTM E 84 AND MUST NOT FLAME, GLOW SMOLDER OR SMOKE WHEN TESTED IN INCLUDE ALL LABOR, MATERIAL, PARTS, ETC. NECESSARY TO MAINTAIN THE SYSTEM 13. ALL TAPES AND MASTICS USED TO SEAL DUCTS MUST BE LISTED AND LABELED IN ACCORDANCE WITH ASTM C 411 OR AS REQUIRED BY LOCAL CODES. 4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ITS 4. TIE-INS AND MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE IN SATISFACTORY OPERATION FORA PERIOD OF ONE YEAR STARTING FROM THE B. HVAC EQUIPMENT (REFER TO PLANS FOR SCHEDULE OF EQUIPMENT) ACCORDANCE WITH UL 181A AND BE MARKED "181A -P" FOR PRESSURE SENSITIVE SUBCONTRACTORS WITH A FULL SET OF BID DOCUMENTS INCLUDING ' '' WITH MINIMUM INTERRUPTION OF LANDLORD OPERATION AND DURING HOURS DATE OF ACCEPTANCE OF THE SYSTEM BY THE TENANT.IT SHALL ALSO INCLUDE TAPE, "181A -M" FOR MASTIC, OR "181A -H" FOR HEAT -SENSITIVE TAPE. TAPES AND 7. EXTERIOR SUPPLY AND RETURN DUCT INSULATION SPECIFICATIONS AND MUST COORDINATE ITS WORK AND INSPECTIONS AND THE SPECIFIED BY THE LANDLORD. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ONE SUMMER TO WINTER CHANGEOVER AND ONE WINTER TO SUMMER 1. PRIMARY HVAC UNITS ARE TO BE AS SCHEDULED. EQUIVALENTS MAYBE MASTICS USED TO SEAL FLEXIBLE AIR DUCTS AND CONNECTORS MUST COMPLY WORK AND INSPECTION OF THEIR SUBCONTRACTORS WITH ALL OTHER TRADES ON EXACT WORKING HOURS OF THIS WORK WITH THE LANDLORD PRIOR TO SUBMITTING CHANGEOVER, A NEW SET OF FILTERS AT THE TIME OF STARTUP AND TWELVE (12) SUBSTITUTED WITH WRITTEN APPROVAL ONLY. ALL COMPRESSORS ARE TO INCLUDE WITH UL 181 B AND BE MARKED "181 B -FX" FOR PRESSURE SENSITIVE TAPE OR A. SERVICE: RECTANGULAR, SUPPLY -AIR AND RETURN -AIR DUCTS. SITE TO CONFORM WITH THE GENERAL CONTRACTOR'S TIME SCHEDULE. THEIR BID. THE CONTRACTOR SHALL INCLUDE IN THEIR BID, ALL PREMIUM TIME MONTHLY FILTER CHANGES DURING THE FIRST YEAR. THE NORMAL PREVENTATIVE A 5 YEAR EXTENDED WARRANTY. "1818-M" FOR MASTIC. MECHANICAL FASTENERS USED WITH FLEXIBLE NONMETALLIC 1. MATERIAL: INSULATION BOARD, 6 PSF MINIMUM AND PLAIN FACING. REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN NORMAL WORKING MAINTENANCE WORK SHALL BE PERFORMED AT THE TIME OF THE FILTER CHANGES. AIR DUCTS MUST COMPLY WITH UL 181B AND BE MARKED "181B -C". 2. THICKNESS: 2 INCHES. 5. BY SUBMITTING A QUOTATION OR PROPOSAL THE MECHANICAL CONTRACTOR HOURS. ALL SUCH WORK MUST BE COORDINATED WITH THE LANDLORD. USE ONLY #40 PLEATED TYPE AIR FILTERS. 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, 3. NUMBER OF LAYERS: TWO. TOTAL THICKNESS = 4" EXPRESSLY STATES AND WARRANTS THAT: ALL DRAWINGS AND SPECIFICATIONS APPURTENANCES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND I. FLEXIBLE CONNECTIONS 4. VAPOR RETARDER REQUIRED: YES. HAVE BEEN THOROUGHLY REVIEWED, CONTRACTOR HAS BECOME FAMILIARIZED 5. EQUIPMENT AND MATERIALS IN TRANSIT SHALL UTILIZE FREIGHT ELEVATOR OR L. OPERATIONS MANUALS OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED. A. INORGANIC GLASS FIBERS PREFORMED AND BONDED BY THERMOSETTING WITH JOB SITE CONDITIONS AND IS TOTALLY QUALIFIED TO PERFORM ALL OF THE STAIRS. SAID EQUIPMENT OR MATERIALS SHALL BE DISASSEMBLED AS REQUIRED TO 1. FLEXIBLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN RESIN. MUST COMPLY WITH ASTM C 612, TYPE 1A AND 1B, WORK REQUIRED. MEET THE RESTRICTIONS IMPOSED BY THE BUILDING OR ITS COMPONENT 1. ONE COPY OF EACH OPERATION AND MAINTENANCE MANUAL FOR ALL EQUIPMENT 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, WATER SOURCE HEAT PUMPS, AIR 1. KNAUF INSULATION OR APPROVED EQUIVALENT. CONSTRAINTS AND THEN REASSEMBLED IN THE NEW WORK AREA. FURNISHED ON THE JOB SHALL BE PROVIDED TO THE TENANT BOUND TOGETHER IN MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST HAVE A HANDLERS, FAN POWERED VAV BOXES, ETC.) AND DUCTS OR CASINGS. ALSO 6. BEFORE SUBMITTING A FINAL PROPOSAL THE CONTRACTOR SHALL EXAMINE THE A 3 INCH, THREE RING BINDER. THE BINDER SHALL INCLUDE BUT NOT BE LIMITED TO CONDENSATE DRAM AND BE TRAPPED IN ACCORDANCE WITH MANUFACTURER'S PROVIDE FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION B. INSULATION INSTALLED OUTDOORS: FLAME SPREAD RATING OF 25 OR LESS SITE OF THE PROPOSED WORK TO DETERMINE THE EXISTING CONDITIONS THAT MAY 6. ALL WORK SHALL BE DONE WITH A MINIMUM OF NOISE AND DISTURBANCE TO INSTALLATION, MAINTENANCE AND OPERATING INSTRUCTIONS, PAMPHLETS OR DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. JOINTS. AFFECT THE PROPOSAL. IF DISCREPANCIES ARE NOTED BETWEEN THE DOCUMENTS BROCHURES, REVIEWED SHOP DRAWINGS AND WARRANTIES OBTAINED FROM EACH AND SMOKE DEVELOPED RATING OF 50 OR LESS. BUSINESS ROUTINE. ALL WORK SCHEDULES SHALL BE COORDINATED WITH AND AND THE EXISTING CONDITIONS THE ARCHITECT SHALL BE NOTIFIED AND THE APPROVED BY, THE TENANTS CONSTRUCTION MANAGER. MANUFACTURER OF PRINCIPAL ITEMS OF EQUIPMENT. 4. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL INDOOR 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE -COATED B. APPLY INSULATION AS FOLLOWS: CONTRACTOR SHALL RECEIVE CLARIFICATION BEFORE SUBMITTING A BID. THE AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF AIR TERMINAL BOXES. FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR SUBMISSION OFA PROPOSAL SHALL INDICATE THAT ALL CHARGES AND COSTS MADE 7. SINCE THESE ARE SECURE FLOORS, ALL DELIVERIES, WORKERS, WORK M. SLEEVES SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS AS MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. A. APPLY TWO -LAYER INSULATION WITH JOINTS TIGHTLY BUTTED AND NECESSARY BY EXISTING CONDITIONS ARE INCLUDED AND THAT THE COMPLETE OPERATORS, ETC., REQUIRED BY THE CONTRACTOR FOR WORK PERFORMED IN ANY REQUIRED. CONDENSATE SHALL BE DIRECTED TO MOP SINK, LAVATORY TRAP OR STAGGERED AT LEAST 3 INCHES. SECURE LAYERS WITH ADHESIVE, MECHANICAL SYSTEM AS DESCRIBED HEREIN WILL BE FURNISHED AT THE PROPOSED COST. AREA OR SITE BUILDING SHALL BE IN STRICT CONFORMANCE TO THE RULES AND 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR OTHER APPROVED DRAIN. 3. FLEXIBLE CONNECTIONS ARE TO BE RATED FOR THE OPERATING PRESSURE OF FASTENERS OR BANDING. FASTENERS SHALL BE LOCATED A MAXIMUM OF 3" FROM REGULATIONS OF THE OWNER. FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS THE SYSTEM. EACH EDGE AND NO GREATER THAN 12" APART. 7. WHEN USED, THE TERM "PROVIDED BY CONTRACTOR" SHALL BE INTERPRETED AS RESPECTIVE FLOOR, WALL, OR PARTITION AND SHALL BE CUT FLUSH WITH EACH 5. ALL MECHANICAL EQUIPMENT AND APPLIANCES WHICH CONTAIN REFRIGERANT MEANING "FURNISHED AND INSTALLED BY CONTRACTOR" WITH THE EXCEPTION 8. CONTRACTOR SHALL PROTECT THEIR WORK AND EQUIPMENT FROM DAMAGE, SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2 MUST COMPLY WITH AN APPLICABLE STANDARD (E.G. UL 207, 412, 471). 4. FINAL CONNECTIONS TO EXHAUST FAN(S) SHALL BE WITH A HEAVY AIRTIGHT ACID B. ON EXPOSED APPLICATIONS, FINISH INSULATION WITH A SKIM COAT OF WHERE ITEMS ARE "PROVIDED BY TENANT" SHALL BE INTERPRETED AS MEANING VANDALS, ETC. ANY ITEM THAT IS DAMAGED, VANDALIZED OR STOLEN PRIOR TO INCHES ABOVE THE FLOOR. RESISTANT FIRE RETARDANT FIBERGLASSED NEOPRENE CONNECTOR, A MINIMUM MINERAL -FIBER, HYDRAULIC -SETTING CEMENT TO SURFACE OF INSTALLED INSULATION. "FURNISHED BY TENANT (INSTALLED BY CONTRACTOR)", EXCEPT WHERE NOTED ACCEPTANCE OF BUILDING BY OWNER AND ARCHITECT SHALL BE REPLACED BY C. TOILET EXHAUST FANS OF SIX (6) INCHES IN LENGTH. THE CONNECTOR SHALL BE FASTENED TO EQUIPMENT WHEN DRY, APPLY FLOOD COAT OF LAGGING ADHESIVE AND PRESS ON ONE LAYER OF ., OTHERWISE. RESPECTIVE CONTRACTOR AT NO CHARGE TO TENANT. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS AND DUCT WITH TWO FLEXIBLE REMOVABLE BRASS STRAPS OR ALTERNATE GLASS CLOTH OR TAPE. OVERLAP EDGES AT LEAST 1 INCH (25 MM). APPLY FINISH COAT SHALL BE FIRE SEALED WITH APPROVED SEALANTS RATED FOR THE APPLICATION SO 1. WHERE SHOWN DN DRAWINGS PROVIDE A TOILET EXHAUST FAN COMPLETE WITH APPROVED METHOD. OF LAGGING ADHESIVE OVER GLASS CLOTH OR TAPE. THIN THE FINISH COAT TO B. GENERAL REQUIREMENTS 9. IT SPECIFICALLY THE INTENTION OF THIS SPECIFICATION TO HOLD THE AS TO MAINTAIN THE FIRE RATING OF THE ASSEMBLY. CONFORM TO THE U.L. GRAVITY BACKDRAFT DAMPER. ALL DUCTWORK, ROOF OPENINGS AND CAPS ACHIEVE SMOOTH FINISH. OUTDOOR JACKET: POLYGUARD PRODUCTS, INC. CONTRACTOR RESPONSIBLE FOR ALL DAMAGE DONE TO ANY EXISTING FACILITIES, ASSEMBLY RATING OF THE FLOOR OR WALL. NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM SHALL BE PROVIDED BY J. THERMOSTATS 'ALUMAGUARD 60' OR MFM BUILDING PRODUCTS CORP. 'FLEXCLAD 400". 1. THE MECHANICAL SUBCONTRACTORS QUOTING ON THEIR SPECIFIC SCOPE OF EQUIPMENT, PAINTING, OR ARCHITECTURAL AND STRUCTURAL FEATURES OF THE THE CONTRACTOR REFER TO PLANS FOR APPLICABILITY. WORK/SERVICES TO CONTACT THE LOCAL BUILDING DEPARTMENT/AGENCY TO BUILDING, BY EITHER THEIR OWN WORKMEN OR BY ANY OF THEIR 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS AND PARTITIONS SHALL BE 1. MOUNT THERMOSTATS 4'-0" (ADA COMPLYING), THERMOSTAT SENSORS 5'-0" Q. SYSTEM CLEANOUT DISCUSS CODE ISSUES/IDIOSYNCRASIES REGARDING THEIR SERVICES AND THE SUBCONTRACTORS. THE CONTRACTOR SHALL REPAIR ANY DAMAGE DONE BY THEIR STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN D. BASEBOARD, CABINET AND UNIT HEATERS ABOVE FINISHED FLOORS AND SET DATE, TIME, TEMPERATURE, ETC. TURN OVER QUOTE ASSOCIATED WITH THE SERVICES TO THE GENERAL CONTRACTOR FOR THIS OWN WORKMEN OR SUBCONTRACTORS AND THE OWNER AT THEIR DISCRETION, MAY MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS OR FOR CONCEALED OPERATING INSTRUCTIONS TO TENANT REPRESENTATIVE. 1. UPON COMPLETION OF INSTALLATION, CLEAN ENTIRE SYSTEM BEFORE INSTALLING PROJECT. THIS CONTRACTOR TO BE FAMILIAR WITH THE SITE WHERE SUCH WITHHOLD PAYMENTS EQUAL TO THE REASONABLE COST OF THE REPAIRS. VERTICAL PIPING, SLEEVES SHALL BE 22 GAUGE GALVANIZED STEEL MINIMUM. 1. WHERE SHOWN DN THE DRAWINGS, PROVIDE ELECTRIC HEATERS COMPLETE WITH AIR OUTLETS. CONTRACTOR TO PROVIDE A CERTIFICATION THAT CLEANING WAS SERVICES/WORK WILL BE PERFORMED, THIS SPECIFIC USE AND THE ELECTRIC HEATING COIL, CONTROLS AND INTEGRAL OR REMOTE THERMOSTAT AS 2. THERMOSTATS SHALL BE PROVIDED WITH KEY OPERATED SECURITY COVERS AND ACCOMPLISHED PRIOR TO PROJECT CLOSEOUT. IDIOSYNCRASIES ASSOCIATED WITH THE LIFE, SAFETY AND HEALTH ASSOCIATED 10. THIS CONTRACTOR OR THEIR WORKMEN SHALL NOT BE PERMITTED TO USE ANY 4. DUCT SLEEVES SHALL BE MINIMUM 14 GAUGE STEEL. SHOWN. DESCRIPTIVE NAMEPLATES. WITH THIS WORK AND TO INDICATE ON THE QUOTE ANY ITEMS REQUIRED THAT ARE PART OF THE EXISTING BUILDING AS A SHOP WITHOUT THE APPROVAL OF THE 2. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. NOT NECESSARILY SHOWN ON THE DRAWINGS/SPECIFICATIONS. OWNER AND ARCHITECT. N. HANGERS E. INLINE PUMPS K. FIRE DAMPERS, SMOKE DAMPERS R. SYSTEM TESTING, ADJUSTING AND BALANCING 2. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, 11. WHERE THE WORK MAKES TEMPORARY SHUTDOWN OF SERVICES UNAVOIDABLE, 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, 1. WHERE SHOWN ON DRAWINGS, PROVIDE AN INLINE CLOSE COUPLED PUMP(S), 1. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL FIRE DAMPERS AS REQUIRED SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO THEY SHALL BE MADE AT NIGHT OR AT SUCH TIMES AS WILL CAUSE THE LEAST BANDS, C -CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC. BRONZE FITTED. PUMPS SHALL BE FURNISHED WITH BRONZE CASE WEARING RINGS, BY LANDLORD AND / OR TENANT CRITERIA AND / OR CODES HAVING JURISDICTION. 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE COMPLETED BY AN PROVIDE COMPLETE AND FULLY FUNCTIONAL MECHANICAL SYSTEMS AS SHOWN ON INTERFERENCE WITH THE ESTABLISHED OPERATING ROUTINE. NECESSARY FOR THE INSTALLATION OF WORK. BRONZE SHAFT SLEEVE AND MECHANICAL SHAFT SEALS. PUMPS TO BE SO ALL FIRE DAMPERS SHALL COMPLY WITH THE REQUIREMENTS OF THE BOARD OF INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED BY THE ASSOCIATED AIR THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS (IF SUPPLIED) AND AS CONSTRUCTED THAT THEY MAY BE MOUNTED IN A HORIZONTAL OR VERTICAL PIPE FIRE UNDERWRITERS, THE LOCAL FIRE MARSHAL AND SHALL BE LABELED AND BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY 12. THIS CONTRACTOR SHALL ARRANGE THE WORK SO AS TO ASSURE THAT 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, LINE. MOTOR TO BE 1750 RPM UNLESS NOTED OTHERWISE. APPROVED BY UNDERWRITERS LABORATORIES. (NEBB). NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL THE LANDLORD SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY SERVICES WILL BE SHUT DOWN ONLY DURING THE TIME ACTUALLY REQUIRED TO BUT NOT TO PIPING OR DUCTWORK. DUCTWORK SHALL NOT BE SUPPORTED FROM BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST COORDINATE THE ENTIRE INSTALLATION WITH LANDLORD AS REQUIRED. FIELD MAKE THE NECESSARY CONNECTION TO THE EXISTING WORK. THIS CONTRACTOR ROOF DECKING AND/OR BRIDGING, BUT SHALL BE SUSPENDED FROM THE TOP F. VIBRATION ISOLATION DEVICES 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIR STREAM ANDA 165 RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING SHALL VERIFY THE EXACT TYPE, SIZE, LOCATION, REQUIREMENTS, ETC. OF EXISTING SHALL GIVE AMPLE WRITTEN NOTICE IN ADVANCE TO THE OWNER OF ANY REQUIRED CHORD OF BAR JOISTS, STEEL OR OTHER STRUCTURE. DUCTWORK SHALL CLEAR DEGREE F FUSIBLE LINK. BE MADE BY THE HVAC CONTRACTOR. EQUIPMENT, PIPE AND DUCTS SERVING THE TENANT SPACE PRIOR TO SUBMISSION SHUT DOWN. ALL SPRINKLERS AND OTHER OBSTACLES AND SHALL BE HUNG AS HIGH AS POSSIBLE 1. VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN ALL SUPPORTS BETWEEN 2. THE CONTRACTOR SHALL INSTALL NEW FILTERS IN ALL UNITS PRIOR TO THE AIR OF BID. IN WORK AND STORAGE AREAS. WHERE INTERFERENCE'S OCCUR, IN ORDER TO VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, WATER SOURCE HEAT PUMPS, AIR 3. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER BALANCING. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR 13. ALL MOTORS, FANS, CONTROLS, FIXTURES, HVAC UNIT, DUCTWORK AND OTHER SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANDLERS, FAN POWERED VAV BOXES, ETC.) AND STRUCTURE. UL AND CODE REQUIREMENTS. DAMPERS IN MINIMUM POSITION. 3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH EQUIPMENT FOR USE IN THIS CONTRACT SHALL BE PROTECTED BY TARPAULIN OR BY HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE PROVIDED EVEN BOXING AS SOON AS DELIVERED TO THE SITE AND SHALL BE KEPT CLEAN AND DRY. INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, ACCESS DOORS AND OTHER 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH 4. PROVIDE DUCT ACCESS DOORS IN AN ACCESSIBLE LOCATION FOR ALL FIRE 3. BALANCE AIR AND WATER QUANTITIES TO THIN LU O NT OF THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH EQUIPMENT SERVICE REQUIREMENTS AND/OR OTHER TRADES. HANGER TYPES AND RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DAMPERS. DOOR IS TO BE 20 GAUGE GALVANIZED DOOR WITH QUICK -OPENING Q I PLUS R MINUS 5 AVES, BETS IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, THE MOTORS, UNITS, FIXTURES, FANS, DUCTWORK AND MOVING PARTS SHALL BE INSTALLATION METHODS ARE SUBJECT TO LANDLORD CRITERIA. DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. LATCH AND PIANO HINGE. THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, BUT WHICH IS NECESSARY TO COMPLETE THE WORK OR WHICH IS USUALLY KEPT COVERED SO AS TO ELIMINATE DIRT, DUST AND OTHER MATERIALS ENTERING PULLEYS OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW THE PARTS DURING ERECTION AND CONSTRUCTION WORK ON THE BUILDING. RATES SHALL BE PROVIDED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE PROVIDED AS PART OF THE SHOULD IT BE FOUND THAT ANY PARTS ARE DAMAGED DUE TO CARELESSNESS ON 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE 3. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING 5. WHERE REQUIRED BY LOCAL CODES, LANDLORD AND IF INDICATED ON DRAWINGS, THE TENANT. CONTRACT. THE PART OF THE CONTRACTOR IN NOT PROVIDING PROPER PROTECTION, SUCH OUTER DIAMETER OF INSULATION. INSTALL 6 INCH LONG SPLIT CIRCLE GALVANIZED DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING" THE PROVIDE UL555S SMOKE DAMPER WITH FIRE/HEAT/SMOKE SENSOR, REVERSIBLE PART OR PARTS SHALL BE REPLACED BY THE CONTRACTOR AT THEIR OWN COST SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. ISOLATOR. MOTOR AND INTERLOCK WITH FIRE ALARM SYSTEM. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING 4. WHERE THE DRAWINGS AND / OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED AND EXPENSE. ALL OPENINGS IN DUCTS, PIPING, CONDUITS, ETC., SHALL BE INFORMATION: CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS STILL PROPERLY PROTECTED WITH TEMPORARY CAPS OR PLUGS AT ALL TIMES. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI -ELECTRICALLY 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND L. FLEXIBLE AIR DUCT RESPONSIBLE FOR PROVIDING THE SYSTEM AS DESIGNED AND DESCRIBED ON THE SEPARATED FROM ONE ANOTHER. THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. A) AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. G. DISCREPANCIES IN DOCUMENTS1. FLEXIBLE DUCT FOR CONNECTIONS SHALL BE A FACTORY FABRICATED ASSEMBLY CONTRACTOR. P. ACCESS DOORS 5. CONSULT MANUFACTURER FOR APPLICATION DATA. CONSISTING OF AN INNER SLEEVE, INSULATION AND AN OUTER MOISTURE UR BARRIER. B) INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. 5. THE CONTRACTOR SHALL OBTAIN AND COMPLY WITH DETAILED REQUIREMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS AND DETAILS) ARE DIAGRAMMATIC AND THE INNER SLEEVE SHALL BE CONSTRUCTED OF A CONTINUOUS VINYL COATED C) MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. OF LEASE EXTRACTS FROM THE LANDLORD AND TENANT. GENERAL OF THE MECHANICAL SYSTEMS. 1. FURNISH STEEL ACCESS DOORS AND FRAMES, MINIMUM 16 INCHES BY 20 INCHES G. CURBS AND STEEL FRAMING FOR SUPPORT SPRING STEEL WIRE HELIX FUSED TO A CONTINUOUS LAYER OF FIBERGLASS D) AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS INDICATE THE LOCATION AND INTENT WHERE DRAWING, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES OR AS REQUIRED FOR ADEQUATE ACCESS TO THE GENERAL CONTRACTOR FOR ALL IMPREGNATED AND COATED VINYL. A 1 1/4" THICK LAYER OF INSULATING BLANKET OF MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNITS. 6. COORDINATE LOCATIONS OF ALL AIR OUTLETS WITH ALL WALLS, LIGHTS, CONFLICT OR ARE UNCLEAR ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR LOCATIONS WHERE NECESSARY TO PROVIDE ACCESS TO CONCEALED VALVES AND 1. THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS AND STEEL FRAMING FIBERGLASS WOOL SHALL ENCASE THE INNER SLEEVE AND BE SHEATHED WITH AN E) MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS SPRINKLER HEADS, CEILING TILES AND DECORATIVE CEILING FIXTURES PRIOR TO TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE THE OTHER EQUIPMENT REQUIRING SERVICE OR INSPECTION. LOCATION, TYPE, SIZE AND REQUIRED TO INSTALL ALL HVAC EQUIPMENT. CURBS SHALL BE A MINIMUM OF 14 OUTER MOISTURE BARRIER OF A BIDIRECTIONAL REINFORCED METALIZED VAPOR FOR EACH LEG. INSTALLATION. TENANTS CONSTRUCTION MANAGER, IN WRITING, OF VARIATIONS TO THE NUMBER WILL BE DETERMINED BY THE CONTRACTOR AND APPROVED BY THE INCHES HIGH AND OF THE SAME MANUFACTURER AS THE EQUIPMENT SUPPORTED. BARRIER. THE FLEXIBLE DUCT SHALL BE RATED FORA MAXIMUM WORKING VELOCITY F) MOTOR AND FAN RPM, SHEAVE SIZES AND BELT SIZES AND LENGTHS. CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, TENANT'S TENANT CONSTRUCTION MANAGER TO SUIT EQUIPMENT REQUIREMENTS. GENERAL INSULATE UNDER THE COMPRESSOR SECTION TO PREVENT CONDENSATION. ALL OF 6000 FPM AND SHALL BE LISTED BY THE UNDERWRITERS LABORATORIES UNDER G) OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AT FULL COOLING. "DEAD" 7. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONTRACTOR WILL INSTALL ACCESS DOORS AND FRAMES. CURBS MUST BE INSTALLED SO THAT THE TOP OF CURBS ARE LEVEL. ALL THEIR UL -181 STANDARDS AS A CLASS 1 DUCT AND SHALL COMPLY WITH NFPA H) WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND FOR OPERATION, SERVICE, MAINTENANCE AND REPAIR. THE CONTRACTOR IS CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE WITH STANDARD - 90A. THE FLEXIBLE DUCT SHALL BE THERMAFLEX M -KC OR APPROVED PRESSURE READINGS. RESPONSIBLE FOR PROVIDING SUFFICIENT ACCESS TO ALL EQUIPMENT FOR 2. ACCESS DOORS LOCATED IN FIRE -RATED WALLS, FLOORS, CEILING -FLOOR, OR THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE: ALL CONNECTIONS EQUIVALENT. FLEXIBLE DUCT SHALL ROUTE FROM SHEET METAL DUCTWORK TO I) MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. SERVICE. H. TRADE NAMES AND MANUFACTURERS CEILING -ROOF ASSEMBLIES SHALL BE FIRE RATED, U.L. LISTED AND LABELED. TO ROOFTOP EQUIPMENT SHALL BE INSIDE THE CURB (CONDENSATE DRAIN, POWER CEILING DIFFUSERS ONLY. THERE SHALL BE NO EXPOSED FLEXIBLE DUCT. J) FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). WIRING, CONTROL WIRING, ETC.). 8. THE CONTRACTOR SHALL DO ALL CUTTING, CORE DRILLING, CHASING, OR 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN 3. ACCESS DOORS SHALL BE FLUSH TYPE, MANUFACTURED FROM 14 GAUGE STEEL, 2. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITH PRIOR K) INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS. CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THIS CONTRACT. SHALL MINIMUM COMPLETE WITH FLUSH FLANGE TYPE FRAMES MANUFACTURED FROM 16 GAUGE H. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED APPROVAL FROM THE TENANTS CONSTRUCTION MANAGER. THE SPECIFICATIONS, THE EXACT EQUIPMENT BE USED ASA CUTTING SHALL HAVE PRIOR APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER STANDARD FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUIVALENT STEEL, PROVIDED WITH ANCHORS. ACCESS DOORS SHALL BE SUITABLE FOR 5. ALL CONTROL SEQUENCES SHALL BE TESTED AND OPERATING STATUS RECORDED IN AND THE LANDLORD OR LANDLORD'S REPRESENTATIVE. PATCHING SHALL MATCH INSTALLATION IN WALL OR CEILING MATERIALS SHOWN IN ROOM FINISH SCHEDULES. 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANTS 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5 FEET IN LENGTH AT ANY ONE THE REPORT. OR BETTER IT ALL TENANTSSS O THAT TION MANAGERD WILL BE SUBJECT C REVIEW IN CONSTRUCTION MANAGER. DEVIATIONS FROM DESIGN MUST BE APPROVED BY LOCATION. FINISH OF SURROUNDING AREA. WRITING BY THE CONSTRUCTION PRIOR TO ACCEPTANCE. THE PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, DAMPERS, FIRE 6. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND DAMPERS, EXPANSION JOINTS, PULL BOXES, SHOCK ABSORBERS, DRAINS, MOTORS, TENANTS CONSTRUCTION MANAGER PRIOR TO FABRICATION OR INSTALLATION. ALL GENERAL CONTRACTOR TO THE TENANTS CONSTRUCTION MANAGER FOR REVIEW AND 9. CONTRACTOR SHALL INSTALL ALL MECHANICAL EQUIPMENT AND APPLIANCES REPLACEMENT AT THE CONTRACTOR'S EXPENSE. FANS, PUMPS AND ANY OTHER ITEM REQUIRING SERVICE. DOORS IN PLASTER OR DUCT MAINS ARE TO BE RECTANGULAR. ALL DUCT BRANCHES TO DIFFUSERS ARE TO M. SUPPLY AND RETURN AIR TAKEOFF FITTINGS PURSUANT TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. FINAL CONCRETE SURFACES SHALL HAVE A RECESSED DOOR WITH CONCRETE OR BE ROUND SPIRAL DUCT. COMMENT. APPROVAL THAT THE MANUFACTURER'S INSTALLATION INSTRUCTIONS ARE ON THE I. SHOP DRAWINGS PLASTER FACING. DOORS IN CARPETED OR TILED AREAS SHALL BE RECESSED WITH 1. RECTANGULAR DUCT 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND JOB SITE FOR ALL MECHANICAL EQUIPMENT AND APPLIANCES RESTS WITH THE TILE FACING. NO ACCESS DOORS ARE REQUIRED IN 2' X 2' AND 2' X 4' LAY -IN 2. ALL DUCTWORK SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH GOVERNING CODE OFFICIALS . ACOUSTIC TILE CEILING. PROVIDE COLORED PINS TO DENOTE ACCESS TILES. SMACNA LOW VELOCITY AND "HVAC DUCT CONSTRUCTION STANDARDS MANUAL", A. PROVIDE 45 DEGREE RECTANGULAR TAKEOFFS FROM MAIN DUCTWORK TO BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE DRAWINGS. ERNING CODE() 1. SUBMIT THREE COPIES OF MATERIAL LISTS AND SHOP DRAWINGS FOR ALL THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT THE TENANT DEEMS LATEST EDITION AND ASHRAE USING FURNISH FACTORY MADE METAL ACCESS DOORS, COMPLETELY FLUSH, "ALLAN ' PRIME SHEETS OF GALVANIZED STEEL. RECTANGULAR BRANCHES. EQUIPMENT AND DUCT FABRICATION DRAWINGS TO THE TENANTS CONSTRUCTION NECESSARY AT NO ADDITIONAL COST TO THE TENANT. C. CODES MANAGER FOR REVIEW PRIOR TO ORDERING EQUIPMENT. SUBMISSIONS MUST BE HEAD" SCREWDRIVER OPERATED, WITH FRAMES AND CAM -TYPE CATCH WITH CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR METAL EARLY ENOUGH TO ALLOW THE TENANTS CONSTRUCTION MANAGER EIGHT STAINLESS STEEL STUD. DOORS SHALL BE NOT LESS THAN 12" X 12" FOR HAND THICKNESS, REINFORCING TYPES AND INTERVALS, TIE ROD APPLICATIONS AND 2. SPIRAL DUCT 8. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE 1. ALL WORK SHALL BE PERFORMED IN A NEAT AND PROFESSIONAL MANNER USING WORKING DAYS FOR REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE ACCESS. DOORS IN WALLS AND CEILING SHALL BE PRIME COATED CARBON STEEL. JOINT TYPES AND INTERVALS. ALL SQUARE ELBOWS SHALL BE PROVIDED WITH MANUAL. GOOD CONSTRUCTION PRACTICES. ALL WORK SHALL CONFORM TO THE LATEST JOB'S PROGRESS. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE GENERAL FURNISH FIRE RATED DOORS FOR FIRE RATED CONSTRUCTION. RATING OF DOOR DOUBLE WALLED VANES ON MAXIMUM 3" CENTERS. PROVIDE SEAL CLASS "C" ON ALL A. PROVIDE SADDLE OR DIRECT CONNECTION OF A BRANCH DUCT INTO A LARGER ADOPTED EDITION OF THE LANDLORD'S CRITERIA; STATE, COUNTY AND LOCAL CONDITIONS USING THE MANUFACTURER'S LISTED ON THE DRAWINGS. SHOP MUST BE SAME RATING AS CONSTRUCTION. TRAVERSE JOINTS UNLESS SUPERSEDED BY MORE STRINGENT LOCAL CODES. ALL DUCT. THE DIAMETER OF THE BRANCH SHALL NOT EXCEED TWO THIRDS OF THE S. FINAL HVAC INSPECTIONS CODES AND ORDINANCES; THE LATEST EDITIONS OF ASHRAE STANDARDS, THE LIFE DRAWINGS SHALL INCLUDE ALL DATA THAT PERTAINS TO THE REQUIREMENTS SET DUCT CONNECTIONS ARE TO BE RIGID AND LEAK FREE ASSEMBLIES. DIAMETER OF THE MAIN. PROTRUSIONS INTO THE MAIN ARE NOT ALLOWED. SAFETY CODE, THE APPLICABLE BUILDING CODE, UNDERWRITERS LABORATORIES, FORTH ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE SUBMITTAL SHALL Q. ELECTRIC MOTORS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE TENANT SHALL THE NATIONAL ELECTRICAL CODE, NFPA 70, 90A AND 96 AND ALL OTHER APPLICABLE INCLUDE BUT NOT BE LIMITED TO CUTS OR CATALOGS INCLUDING DESCRIPTIVE 3. DURING THE CONSTRUCTION PHASE OF THE PROJECT, ANY DUCTWORK INSTALLED N. DAMPERS HAVE THE RIGHT TO HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE CODES ENFORCED BY AUTHORITIES HAVING JURISDICTION. THE CHANGES REQUIRED LITERATURE AND CHARACTERISTICS OF EQUIPMENT SHALL SHOW MAJOR 1. FURNISH, INSTALL AND ALIGN ALL MOTORS REQUIRED FOR THIS EQUIPMENT, IS TO BE COMPLETELY SEALED UP OF ANY OPENINGS, EITHER AT THE BEGINNING OR FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, BY ANY APPLICABLE CODES SHALL BE INCLUDED IN THE BID. AFTER THE CONTRACT DIMENSIONS ROUGHING -IN DATA CAPACITY CURVES, PRESSURE DROPS, CODE UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT. ALL STARTERS AND END OFA DUCT RUN OR AT A BRANCH, COLLAR DIFFUSER OR REGISTER TO AVOID 1. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY COMPLIANCE, MOTOR AND DRIVE DATA AND ELECTRICAL DATA. OBSERVE SPECIAL ASSOCIATED WIRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE DIRT OR OTHER CONTAMINANTS FROM ENTERING THE SYSTEM. OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO FACILITATE AIR BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS THE TENANT TO THE CONTRACTOR. INSTRUCTIONS WHEN REQUIRED. SUBMITTALS SHALL BEAR THE STAMP OF THE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. STARTERS SHALL BALANCING. AND SPECIFICATIONS REQUIREMENTS AT NO ADDITIONAL COST TO THE TENANT. GENERAL AND SUBCONTRACTOR SHOWING THAT HE HAS REVIEWED AND MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL SPECIFICATIONS. 4. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO 2 INCH D. LICENSES, PERMITS, INSPECTIONS AND FEES CONFIRMED THAT THEY ARE IN CONFORMANCE WITH THE CONTRACT DOCUMENTS WATER GAUGE PRESSURE CLASSIFICATION (VERIFY WHETHER RETURN OR EXHAUST 2. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED OR IN AREAS WITH SHEET T. INDOOR AIR QUALITY OR INDICATE WHERE EXCEPTIONS TAKE PLACE. LACK OF SUCH CONTRACTOR'S 2. DESIGN, CONSTRUCTION AND PERFORMANCE CHARACTERISTICS OF MOTORS DUCT IS POSITIVE OR NEGATIVE PRESSURE). PRESSURE TEST DUCTS FOR LEAKAGE. ROCK CEILINGS, YOUNG REGULATORS SHALL BE USED. 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, REVIEW WILL BE CAUSE FOR REJECTION WITHOUT REVIEW BY TENANTS SHALL CONFORM TO ALL APPLICABLE PROVISIONS OF LATEST NEMA, ANSI, ISEE REMAKE LEAKING JOINTS AND APPLY SEALANTS AS REQUIRED TO FABRICATE A 1. NO ANALYSIS HAS BEEN MADE WITH REGARD TO SOURCES OR POTENTIAL SOURCES INSPECTIONS AND FEES REQUIRED OR RELATED TO THIS WORK. CONSTRUCTION MANAGER. ALL SHOP DRAWINGS MUST APPEAR IN THE OPERATION STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS SHALL BE SUITABLE FOR SYSTEM THAT DOES NOT EXCEED 5 PERCENT LEAKAGE OR LESS AS STATED BY 3. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR AND RELIEF AIR DUCTS ARE TO BE OF INDOOR OR OUTDOOR AIR CONTAMINANTS OR LEVELS OF CONTAMINATION. AND MAINTENANCE MANUALS LEFT ON SITE AT JOB COMPLETION. OPERATION ON VOLTAGE VARIATION OF PLUS OR MINUS 10 PERCENT, 40 DEGREES C PRESSURE CLASS RATINGS IN SMACNA STANDARDS.OPPOSED BLADE TYPE. ALL RECTANGULAR DAMPERS IN RETURN AIR DUCTS TO BE 2. FURNISH TO THE TENANT'S CONSTRUCTION MANAGER ALL CERTIFICATES OF AMBIENT TEMPERATURE AND HAVE A SERVICE FACTOR OF NOT LESS THAN 1.15. PARALLEL BLADE TYPE. ALL OUTSIDE AIR DUCT DAMPERS MUST ALSO BE OF THE 2. IT IS THE RESPONSIBILITY OF THE GENERAL AND MECHANICAL CONTRACTOR TO INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. 2. TENANT'S CONSTRUCTION MANAGER'S OR ARCHITECT'S REVIEW OF SHOP 5. ASA MINIMUM, CROSSBREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD LOW LEAKAGE TYPE. INFORM THE TENANTS REPRESENTATIVE, LANDLORD AND TENANTS ARCHITECT IF ANY DRAWINGS OR SCHEDULES SHALL NOT RELIEVE THE CONTRACTOR FROM R. LOW VOLTAGE (24 VOLT) WIRING APPROXIMATELY 3/8 INCH WIDE BY 3/16 INCH DEEP ON 12 INCH CENTERS TO SOURCE OR POTENTIAL SOURCE OF INDOOR AIR CONTAMINATION IS IDENTIFIED. E. DRAWINGS RESPONSIBILITY FOR ERRORS, OMISSIONS OR OTHER DEFICIENCIES OR DEVIATIONS PREVENT VIBRATIONS. 4. ALL MOTORIZED DAMPERS NOT FURNISHED WITH EQUIPMENT ARE TO BE IN THE SHOP DRAWINGS FROM THE CONSTRUCTION DOCUMENTS. 1. THE CONTRACTOR IS TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR THEIR HONEYWELL DAMPERS. 3. PRIOR TO ENCLOSING SPACES SUCH AS PLUMBING CHASES, AIR SHAFTS AND 1. DRAWINGS (PLANS AND SPECIFICATIONS) ARE DIAGRAMMATIC AND INDICATE THE EQUIPMENT. THIS WORK INCLUDES ALL TRANSFORMERS AND DEVICES TO MAKE THIS 6. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS RETURN AIR PLENUMS CLEAN ALL AREAS THOROUGHLY. THE CONTRACTOR SHALL GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. BECAUSE OF THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND / OR THEIR A COMPLETE FUNCTIONAL SYSTEM. INDICATED IN SMACNA STANDARDS. NO WOOD SHALL BE USED TO SUPPORT OR 0. DIFFUSERS, GRILLES AND REGISTERS GUARANTEE THAT THE PLENUM CHAMBER USED FOR RECIRCULATING OF AIR WILL BE 3. IT IS THE SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL DUCT AND PIPE SUBCONTRACTORS TO FURNISH SHOP DRAWINGS AND SUBMITTALS ON ANY AND ALL BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND OF TIGHT CONSTRUCTION AND THAT ALL SOURCES OF CONTAMINATION FROM TRAPS, OFFSETS, FITTINGS AND ACCESSORIES THAT MAY BE REQUIRED. THE MECHANICAL2. ALL WORK IS TO CONFORM TO THE ELECTRICAL SPECIFICATIONS AND THE LOCAL CODES OR BY LANDLORD. 1. PROVIDE DIFFUSERS, GRILLES AND REGISTERS AS SCHEDULED. DEVICES TO BE SOIL STACKS, DOWNSPOUTS, VENTS, EXHAUST DISCHARGES AND OTHER SOURCES CONTRACTOR MUST OBTAIN APPROVED CONSTRUCTION DRAWINGS FROM THE EQUIPMENT, DUCT, DAMPERS, CONTROLS ETC. TO THE ARCHITECTFORTHEIR REVIEW PRIOR TO CONSTRUCTION. REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION. COMPLETE WITH FRAMES AND ALL ACCESSORIES. ALL DIFFUSERS, GRILLES AND WILL BE ENCLOSED SO THAT NO CONTAMINATED AIR WILL BE RECIRCULATED. GENERAL CONTRACTOR BEFORE BEGINNING ANY WORK. 7. WHERE DUCTS PASS THROUGH ROOFS, FLOORS AND FIRE RATED PARTITIONS, REGISTERS IN SHEET ROCK CEILINGS TO BE PROVIDED WITH PLASTER FRAMES. 4. PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES SHUT OFF THE HVAC SYSTEM, J. RECORD DRAWINGS 3. ANY CONDUIT REQUIRED BY CODE OR THE LANDLORD WILL BE INSTALLED BY THE PROVIDE AS MINIMUM 1-1/2 INCH BY 1-1/2 INCH BY 1/8 INCH STEEL ANGLE FRAMES AT FINISH TO BE COORDINATED WITH INTERIOR FINISHES. BLOCK OFF ALL AIR GRILLS, DIFFUSERS AND OTHER OPENINGS OUTSIDE THE IMMEDIATE 2. THE LAYOUT SHOWN ON THE DRAWINGS IS BASED ON A PARTICULAR MAKE OF ELECTRICAL SUBCONTRACTOR. EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES EQUIPMENT. IF ANOTHER MAKE OF EQUIPMENT IS USED WHICH REQUIRES 1. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS AND SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY THE 2. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CONSTRUCTION AREA. OPENINGS TO ADJACENT TENANT SPACES SHALL BE COVERED WITH FILTER MEDIA TO PREVENT DUST AND OTHER AIRBORNE CONTAMINANTS FROM MODIFICATION OR CHANGE OF ANY DESCRIPTION FROM THE DRAWINGS OR 4. SMOKE DETECTORS AND REMOTE TEST STATION ASSEMBLY FIRE RATING. CONTRACTOR TO PROVIDE FIRE OR COMBINATION FIRE / CEILING PLAN OR THE MECHANICAL PLAN. SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE AS PART OF THIS SPECIFICATIONS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT SMOKE DAMPERS AT EACH PENETRATION WHERE REQUIRED BY CODE. PASSING TO ADJOINING SPACES. DRAWINGS, SUCH AS LOCATIONS OF CONCEALED PIPING VALVES AND DUCTS, WORK, FOR MAKING ALL SUCH MODIFICATIONS AND CHANGES, INCLUDING THOSE I. IONIZING TYPE ARE TO BE USED ON THE RETURN SIDE OF THE AHU AND P. DUCTWORK INSULATION ADDENDUM'S AND CHANGE ORDERS, SIGNIFICANT DEVIATIONS MADE 5. CONTRACTOR TO INSTALL REVISIONS, TEMPORARY EXHAUST SYSTEM TO VENTILATE INVOLVING OTHER TRADES WITH THE COST THEREOF INCLUDED IN THE BID. IN SUCH PHOTO -TYPE ARE TO BE USED ON THE SUPPLY SIDE. ON ALL OTHER TYPES OF HVAC 8. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY AIR DUCT SHALL BE SEALED AIR NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS AND CONSTRUCTION SITE AND KEEP SITE UNDER SLIGHT NEGATIVE PRESSURE DURING ALL CASE, CONTRACTOR SHALL SUBMIT DRAWINGS AND SPECIFICATIONS PRIOR TO UNITS WHERE SMOKE DUCT DETECTORS ARE REQUIRED, USE FIELD INSTALLED TIGHT WITH DAP CMC DUCT SEALER. JOINTS ALSO SHALL BE RIVETED OR 1. ALL NEW SUPPLY AND RETURN AIR DUCTWORK WITHIN 10' OF HVAC UNIT SHALL BE STARTING WORK SHOWING ALL SUCH MODIFICATIONS AND CHANGES. THE CONTRACTOR'S COORDINATION WATERE WITH OTHER TRADESFOORED EXACT ROUTING OF ALL IONIZING TYPE IN RETURN DUCTWORK AND PHOTO -TYPE ON THE SUPPLY LOCATED CONNECTED WITH SHEET METAL SCREWS. ACOUSTICALLY LINED. DUCT SIZES SHOWN ON THE DRAWING ARE INTERNAL FREE HOURS OF CONSTRUCTION, EVEN IF AFTER NORMAL BUSINESS HOURS. SANITARY AND DOMESTIC PIPING UNDER FLOOR. PROPOSAL SHALL BE SUBJECT TO THE APPROVAL OF THE TENANTS CONSTRUCTION BEFORE THE FIRST TAKEOFF. ONCE ACTIVATED, THE SMOKE DETECTOR WILL SHUT AREA SIZES. INTERNAL LINER SHALL BE 1 1/2" THICK DUCT LINER EQUIVALENT TO 6. CONTRACTOR TO INSTALL TEMPORARY BARRIERS TO PROTECT ADJACENT SPACES MANAGER. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE DOWN HVAC UNIT. 9. SOFT ELASTOMER BUTYL GASKETS WITH ADHESIVE BACKING SHALL BE USED TO JOHNS MANVILLE "PERMACOTE LINACOUSTIC" ("R VALUE" = 6.3) AND SHALL BE FROM DUST, PARTICULATES, VAPORS AND NOISE. WHERE TEMPORARY BARRIERS ARE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY SEAL FLANGED JONES. APPLIED TO THE DUCTWORK WITH FIRE RESISTIVE ADHESIVES AND CADMIUM OR INSTALLED ALWAYS MAINTAIN FIRE EXITS AND EXITWAYS. &2603 F. EXISTING LEASE SPACE CONDITIONS THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. THE DRAWINGS ARE TO BE ii. SMOKE DETECTORS SHALL HAVE THEIR OWN REMOTE KEY TEST STATION SYSTEM COPPER PLATED MECHANICAL FASTENERS. TURNED OVER TO THE TENANT. WITH AUDIBLE AND VISUAL ALARM, SIMPLEX MODEL 4098-9842 OR APPROVED 10. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE EQUIVALENT. ALARM TO HAVE CANDELA SETTING OF 75 AND A HIGH VOLUME HORN SPECIFICALLY NOTED OTHERWISE. 2. ALL OUTSIDE AIR AND UNEXPOSED DUCTWORK WITHIN BUILDING, EXCEPT WHERE DEMOLITION OF EXISTING MECHANICAL WORK IN THE SPACE NOT SHOWN TO BE TONE SETTING. ACOUSTICALLY LINED, SHALL HAVE 2 INCH, FIBERGLASS DUCT WRAP INSULATION REUSED IN THE NEW TENANT SPACE. WITH FSK FACING EQUIVALENT TO JOHNS MANVILLE "MICROLITE XG TYPE 75" (INSTALLED "R VALUE" = 5.6). 2. THE CONTRACTOR SHALL INCLUDE AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC 3. LEADING EDGES OF DUCT INSULATION SHALL BE OVERLAPPED BY ADJOINING UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, DUCTWORK, ETC. AND INSULATION FOR 6" MINIMUM AND THEN SEALED WITH FOIL VAPOR BARRIER ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS ADHESIVE AND DUCT MASTIC SO THAT NO FIBERGLASS INSULATION IS VISIBLE. SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED UNLESS NOTED FOR REUSE OR RECONFIGURATION ON PLANS. ROOF PATCHING SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE BY A ROOFING CONTRACTOR APPROVED BY THE LANDLORD. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF THIS SPACE) NOT APPLICABLE TO THE NEW WORK OR PART OF THE (ABOVE LANDLORD'S OR ANOTHER TENANTS ACTIVE SYSTEM MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH THE EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT REUSED IN THIS PROJECT. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 292017 i of Tukwila G DIVISION FAX WWW.SARGARCH.COM CONSULTANT (ENGINEER): id5 LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 46275 EL M. ���P0 wasMfi -3 cc oNAL� 0.i1•J7 SOUTHCENTER MALL SPACE # 446 2800 SOUTHCENTER MALL TUKWILA, WA 98188 LIDS # 5102 ARCHITECTURAL SEAL: CONTRACTOR'S NOTES: WRITTEN DIMENSIONS HOLD PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE DRAWINGS. THE CONTRACTORS MUST VISIT JOB SITE TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE SUBMITTING BIDS. REPORTANY DISCREPANCIES OF ANY CONDFIIONS WHICH MAY INTERFERE WITH THE PROPER EXECUTION OF THE CONTRACT TO THE TENANTS REPRESENTATIVE. REPORT DISCREPANCIES DURING BIDDING PROCESS AND BEFORE START OF CONSTRUCTION. CHANGE ORDERS WILL NOT BE APPROVED FOR ISSUES ARISING FROM THE FIELD CONDITIONS OR CONFLICTS BETWEEN THE PLANS AND THE EXISTING CONDFIIONS. A DATE ISSUE 8/11/17 PERMIT, BID, L.L. REVIEW PROJECT NAME: id5 LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 46275 LOCATION: SOUTHCENTER MALL SPACE # 446 2800 SOUTHCENTER MALL TUKWILA, WA 98188 LIDS # 5102 PROJECT INFORMATION: PROJEREtel1 ffrv-TiF TUKM'PE"AA°BY: AUG 1 5 2017 PERMIT CENTER TITLE: MECHANICAL GENERAL NOTES SHEET NUMBER: M 1 . 1 INSTALL SUPPORTS TO ALLOW FULL OPENING OF ALL ACCESS PANELS AND FILTERS REFRIGERANT LINES, ROUTE TO CONDENSERS S/A CEILING SPRING ISOLATORS M ALL THREAD ROD & ANGLE FRAME SUPPORTS. TYP SUPPORT FROM STRUCTURE. REFERENCE STRUCTURAL DRAWINGS FOR MOUNTING, TYP INSULATED OUTSIDE AIR DUCT CONNECT TO R/A DUCT. SUPPORT — CHANNEL BELOW PAN & FCU, CONDENSATE DRAIN WITH P -TRAP OPEN SITE VENT CD 0/A ACCESSIBLE O/A MOTORIZED CONTROL DAMPER, RE: FCU SCH. FOR CFM SETTINGS. 1111111 MANUAL BALANCE DAMPER _ V " R/A FLEXIBLE DUCT CONNECTION, TYP. LFLOAT SWITCH FOR EMERGENCY OVERFLOW TO SHUTDOWN UNIT. —11/2" DEEP GALV. AUXILIARY DRAIN PAN W/ FLOAT SWITCH. 4" LARGER THAN THE UNIT OR COIL DIMENSIONS IN WIDTH AND LENGTH. — EQUIPMENT PRIMARY CONDENSATE DRAINS SLOPE TO DRAIN MIN. 1/8"/FT. TO AN APPROVED RECEPTOR. AHU-HORIZONTAL SUSPENDED BOVE CEILING W/ ELEC. HEAT NTS RE: CONDENSING UNIT RE: SCHEDULE PROVIDE FACTORY MTD. W.P. CONNEMENCE OUTLET PROVIDE INSULATION PER SPECIFICATIONS. ROUTE REFRIGERANT LINES (LIQUID t< SUCTION) DOWN THRU ROOF. PIPE PENETRATION RE: DETAIL THIS SHEET 4" PREFABRICATED ROOF PAD SUITABLE FOR ROOF SYSTEMS ROOF MOUNTED CONDENSING UNIT DETAIL NTS • * NOTE: REFER TO ARCHITECTURAL FOR ROOFING DETAILS. WATER PROOF SEALANT AROUND PIPING (TYP.) SHEETMETAL SCREWS w/ NEOPRENE WASHERS. 2 -PIECE CLOSURE BOX W/ RAIN HOOD. 6" OVERHANG SEALANT SHEETMETAL SCREWS w/ NEOPRENE WASHERS (TYP.) SEALANT (TYP) ` FLASH AND COUNTER FLASH EXISTING ROOF ROOF PIPE PENETRATION NTS CONICAL TAP OR 45° LATERAL TAP. NO SCOOPS ALLOWED. RE: 11/M501] STRUCTURE ABOVE RIGID SHT. MTL. 90° ELBOW FLEX DUCT, 5FT 1 MAXIMUM LENGTH CEILING ACCESSIBLE VOLUME CONTROL DAMPER REDUCER IF REQUIRED LINSULATED DUCT MAIN REF SPECS INSULATED BRANCH DUCT 1. USE IN VERTICAL ARRANGEMENT WHERE POSSIBLE. IF BENDING IS NECESSARY, SUPPORT FLEX DUCT TO MAXIMIZE BEND RADIUS AND TURN NO MORE THAN A TOTAL OF 90°. 2. PROVIDE AIRTIGHT CONNECTIONS TO RIGID ROUND DUCT AND AIR DEVICE. 3. USE FLEXIBLE DUCT ONLY IN AREAS WITH ACCESSIBLE LAY -IN CEILINGS. BRANCH TAKE -OFF SUPPLY NTS Air System Sizing Summary for SPLIT SYSTEM LOAD Project Name: LIDZ Tukwila WA Prepared by: MPW Engineering, LLC 08/08/2017 09:05AM Air System Information Air System Name _ _ _ _— SPLIT SYSTEM LOAD Equipment Class SPLT AHU Air System Type SZCAV Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM — _. Individual peak space Toads Central Cooling Coil Sizing Data Total coil Toad 2 3 Tons Total coil load 27.8 MBH Sensible coil Toad 25.1 MBH Coil CFM at Jun 1400 1234 CFM Max block CFM _ 1234 CFM Sum of peak zone CFM 1234 CFM Sensible heat ratio 0 905 ft2/Ton 371.0 BTU/(hr-ft2) 32 3 Water flow © 10.0 "F rise N/A Central Heating Coil Sizing Data Max coil Toad 17 4 MBH Coil CFM at Des Htg — 1234 CFM Max coil CFM 1234 CFM N/A Water flow © 20.0 °F drop Supply Fan Sizing Data Actual max CFM 1234 CFM Standard CFM 1214 CFM Actual max CFM/ft2 1 44 CFM/ft2 Outdoor Ventilation Air Data Design airflow CFM CFM/ft2 187 CFM 0.22 CFM/ft2 Number of zones 1 Floor Area 858.0 ft2 Location Seattle IAP, Washington Calculation Months Jan to Dec Sizing Data Calculated Load occurs at Jun 1400 OADB/WB 835/64.8 Entering DB / WB 747/62.2 Leaving DB / WB 55.5 / 54.3 Coil ADP 53.4 Bypass Factor Resulting RH Design supply temp. Zone T -stat Check Max zone temperature deviation °F °F °F °F 0 100 53 % Load occurs at BTU/(hr-ft2) Ent. DB / Lvg DB 56 0 °F 1 of 1 OK 0 0 °F Des Htg 20 3 626/75.9 °F Fan motor BHP 0 01 BHP Fan motor kW 0 01 kW Fan static 0 03 in wg CFM/person 1554 CFM/person Hourly Analysis Program v4.70 Page 1 of 5 3" MAX TOP BEAM CLAMP TYP TOP CHORD OF JOIST ROOF LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS REF STRUCTURAL BOTTOM OF STRUCTURE RECTANGULAR DUCT RECTANGULAR DUCT PERPENDICULAR TO STRUCTURE THREADED ROD TYP 2"x2"x1/4" ANGLE OR 1 5/8"x1 5/8" UNISTRUT ROOF 2"x2x1/4" ANGLE OR 1 5/8x1 5/8" UNISTRUT HANGER STRA 1" MIN. RECTANGULAR DUCT SUPPORT HANGER NTS 60" MAX. RECTANGULAR DUCT PARALLEL TO STRUCTURE SHEET METAL SCREWS TYP 20 GAGE GALVANIZED STEEL COLLAR (EXPOSED ONLY). SECURE TO WALL ON 6 INCH CENTERS (MINIMUM 4 FASTENERS PER SIDE). INSULATION CMU WALL GROUT 2"x2"x1/4" A. TACKWELDED OR RIVETED TO SLEEVE DUCT 1" CLEARANCE BETWEEN 20 GAGE GALVANIZED STEEL SLEEVE DUCT PENETRATION THROUGH NON -FIRE RATED WALL NTS FAN/COIL UNIT EQUIPMENT CONDENSATE DRAIN PAN PIPE PLUG CLEAN OUT VENT TOP BELOW FAN COIL UNIT PRIMARY DRAIN PAN PROVIDE FLOW SWITCH FOR EMERGENCY OVERFLOW TO SHUTDOWN FAN 1" CONDENSATE PIPE TO DISCHARGE INDIRECT TO SANITARY SYSTEM. SLOPE FOR GRAVITY DRAIN REFER TO MANUFACTURER'S RECOMMENDATIONS FOR TRAP DEPTH. SECONDARY SAFETY PAN PER CODE, EXTEND 4" MIN. PAST UNIT IN ALL DIRECTIONS AND ENCLOSE THE CONDENSATE TRAP ASSEMBLY AS SHOWN. CONDENSATE DRAIN DETAIL NTS 11 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 292017 f Tukwila DIVISION 4 6 1 FROM ROAD PARAMUS, NJ 07652 973.253.9393 TEL IEWED FOR COFAX WWW.SARGARCH.COM CONSULTANT (ENGINEER): t) ,Z,PEtM.Me4-. _,c' OF WAS/f/ tr, -o cc 13 Lc/ ONM - FILTER BOX AHU SUPPORT — CHANNEL BELOW PAN & FCU, CONDENSATE DRAIN WITH P -TRAP OPEN SITE VENT CD 0/A ACCESSIBLE O/A MOTORIZED CONTROL DAMPER, RE: FCU SCH. FOR CFM SETTINGS. 1111111 MANUAL BALANCE DAMPER _ V " R/A FLEXIBLE DUCT CONNECTION, TYP. LFLOAT SWITCH FOR EMERGENCY OVERFLOW TO SHUTDOWN UNIT. —11/2" DEEP GALV. AUXILIARY DRAIN PAN W/ FLOAT SWITCH. 4" LARGER THAN THE UNIT OR COIL DIMENSIONS IN WIDTH AND LENGTH. — EQUIPMENT PRIMARY CONDENSATE DRAINS SLOPE TO DRAIN MIN. 1/8"/FT. TO AN APPROVED RECEPTOR. AHU-HORIZONTAL SUSPENDED BOVE CEILING W/ ELEC. HEAT NTS RE: CONDENSING UNIT RE: SCHEDULE PROVIDE FACTORY MTD. W.P. CONNEMENCE OUTLET PROVIDE INSULATION PER SPECIFICATIONS. ROUTE REFRIGERANT LINES (LIQUID t< SUCTION) DOWN THRU ROOF. PIPE PENETRATION RE: DETAIL THIS SHEET 4" PREFABRICATED ROOF PAD SUITABLE FOR ROOF SYSTEMS ROOF MOUNTED CONDENSING UNIT DETAIL NTS • * NOTE: REFER TO ARCHITECTURAL FOR ROOFING DETAILS. WATER PROOF SEALANT AROUND PIPING (TYP.) SHEETMETAL SCREWS w/ NEOPRENE WASHERS. 2 -PIECE CLOSURE BOX W/ RAIN HOOD. 6" OVERHANG SEALANT SHEETMETAL SCREWS w/ NEOPRENE WASHERS (TYP.) SEALANT (TYP) ` FLASH AND COUNTER FLASH EXISTING ROOF ROOF PIPE PENETRATION NTS CONICAL TAP OR 45° LATERAL TAP. NO SCOOPS ALLOWED. RE: 11/M501] STRUCTURE ABOVE RIGID SHT. MTL. 90° ELBOW FLEX DUCT, 5FT 1 MAXIMUM LENGTH CEILING ACCESSIBLE VOLUME CONTROL DAMPER REDUCER IF REQUIRED LINSULATED DUCT MAIN REF SPECS INSULATED BRANCH DUCT 1. USE IN VERTICAL ARRANGEMENT WHERE POSSIBLE. IF BENDING IS NECESSARY, SUPPORT FLEX DUCT TO MAXIMIZE BEND RADIUS AND TURN NO MORE THAN A TOTAL OF 90°. 2. PROVIDE AIRTIGHT CONNECTIONS TO RIGID ROUND DUCT AND AIR DEVICE. 3. USE FLEXIBLE DUCT ONLY IN AREAS WITH ACCESSIBLE LAY -IN CEILINGS. BRANCH TAKE -OFF SUPPLY NTS Air System Sizing Summary for SPLIT SYSTEM LOAD Project Name: LIDZ Tukwila WA Prepared by: MPW Engineering, LLC 08/08/2017 09:05AM Air System Information Air System Name _ _ _ _— SPLIT SYSTEM LOAD Equipment Class SPLT AHU Air System Type SZCAV Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM — _. Individual peak space Toads Central Cooling Coil Sizing Data Total coil Toad 2 3 Tons Total coil load 27.8 MBH Sensible coil Toad 25.1 MBH Coil CFM at Jun 1400 1234 CFM Max block CFM _ 1234 CFM Sum of peak zone CFM 1234 CFM Sensible heat ratio 0 905 ft2/Ton 371.0 BTU/(hr-ft2) 32 3 Water flow © 10.0 "F rise N/A Central Heating Coil Sizing Data Max coil Toad 17 4 MBH Coil CFM at Des Htg — 1234 CFM Max coil CFM 1234 CFM N/A Water flow © 20.0 °F drop Supply Fan Sizing Data Actual max CFM 1234 CFM Standard CFM 1214 CFM Actual max CFM/ft2 1 44 CFM/ft2 Outdoor Ventilation Air Data Design airflow CFM CFM/ft2 187 CFM 0.22 CFM/ft2 Number of zones 1 Floor Area 858.0 ft2 Location Seattle IAP, Washington Calculation Months Jan to Dec Sizing Data Calculated Load occurs at Jun 1400 OADB/WB 835/64.8 Entering DB / WB 747/62.2 Leaving DB / WB 55.5 / 54.3 Coil ADP 53.4 Bypass Factor Resulting RH Design supply temp. Zone T -stat Check Max zone temperature deviation °F °F °F °F 0 100 53 % Load occurs at BTU/(hr-ft2) Ent. DB / Lvg DB 56 0 °F 1 of 1 OK 0 0 °F Des Htg 20 3 626/75.9 °F Fan motor BHP 0 01 BHP Fan motor kW 0 01 kW Fan static 0 03 in wg CFM/person 1554 CFM/person Hourly Analysis Program v4.70 Page 1 of 5 3" MAX TOP BEAM CLAMP TYP TOP CHORD OF JOIST ROOF LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS REF STRUCTURAL BOTTOM OF STRUCTURE RECTANGULAR DUCT RECTANGULAR DUCT PERPENDICULAR TO STRUCTURE THREADED ROD TYP 2"x2"x1/4" ANGLE OR 1 5/8"x1 5/8" UNISTRUT ROOF 2"x2x1/4" ANGLE OR 1 5/8x1 5/8" UNISTRUT HANGER STRA 1" MIN. RECTANGULAR DUCT SUPPORT HANGER NTS 60" MAX. RECTANGULAR DUCT PARALLEL TO STRUCTURE SHEET METAL SCREWS TYP 20 GAGE GALVANIZED STEEL COLLAR (EXPOSED ONLY). SECURE TO WALL ON 6 INCH CENTERS (MINIMUM 4 FASTENERS PER SIDE). INSULATION CMU WALL GROUT 2"x2"x1/4" A. TACKWELDED OR RIVETED TO SLEEVE DUCT 1" CLEARANCE BETWEEN 20 GAGE GALVANIZED STEEL SLEEVE DUCT PENETRATION THROUGH NON -FIRE RATED WALL NTS FAN/COIL UNIT EQUIPMENT CONDENSATE DRAIN PAN PIPE PLUG CLEAN OUT VENT TOP BELOW FAN COIL UNIT PRIMARY DRAIN PAN PROVIDE FLOW SWITCH FOR EMERGENCY OVERFLOW TO SHUTDOWN FAN 1" CONDENSATE PIPE TO DISCHARGE INDIRECT TO SANITARY SYSTEM. SLOPE FOR GRAVITY DRAIN REFER TO MANUFACTURER'S RECOMMENDATIONS FOR TRAP DEPTH. SECONDARY SAFETY PAN PER CODE, EXTEND 4" MIN. PAST UNIT IN ALL DIRECTIONS AND ENCLOSE THE CONDENSATE TRAP ASSEMBLY AS SHOWN. CONDENSATE DRAIN DETAIL NTS 11 REVIEWED FOR CODE COMPLIANCE APPROVED AUG 292017 f Tukwila DIVISION 4 6 1 FROM ROAD PARAMUS, NJ 07652 973.253.9393 TEL IEWED FOR COFAX WWW.SARGARCH.COM CONSULTANT (ENGINEER): Lids LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 46278 ,Z,PEtM.Me4-. _,c' OF WAS/f/ tr, -o cc 13 Lc/ ONM - r ARCHITECTURAL SEAL: CONTRACTOR'S NOTES: WRITTEN DIMENSIONS HOLD PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE DRAWINGS. THE CONTRACTORS MUST VISIT JOB SITE TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE SUBMITTING BIDS. REPORT ANY DISCREPANCIES OF ANY CONDITIONS WHICH MAY INTERFERE WITH THE PROPER EXECUTION OF THE CONTRACT TO THE TENANTS REPRESENTATIVE. REPORT DISCREPANCIES DURING BIDDING PROCESS AND BEFORE START OF CONSTRUCTION. CHANGE ORDERS WILL NOT BE APPROVED FOR ISSUES ARISING FROM THE FIELD CONDITIONS OR CONFLICTS BETWEEN THE PLANS AND THE EXISTING CONDMONS. A DATE ISSUE 8/11/17 PERMIT, BID, L.L. REVIEW PROJECT NAME: Lids LIDS GENESCO INC. 7555 WOODLAND DRIVE INDIANAPOLIS, IN 46278 LOCATION: SOUTHCENTER MALL SPACE # 446 2800 SOUTHCENTER MALL TUKWILA, WA 98188 LIDS # 5102 PROJECT INFORMATION: C PRQ 6T�NI,IMpFR:-158-17 Err TfUUK L1 A /! I WED BY: AUG 152017 PERMIT CENTER TITLE: MECHANICAL DETAILS AND LOAD CALCULATIONS SHEET NUMBER: