Loading...
HomeMy WebLinkAboutPermit M17-0122 - PINK - FAN TERMINAL UNITS, VAV BOXES, EXHAUST FANS ETCPINK 646 SOUTHCENTER MALL M17-0122 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 9202470010 646 SOUTHCENTER MALL Project Name: PINK MECHANICAL PERMIT Permit Number: Issue Date: Permit Expires On: M17-0122 11/29/2017 5/28/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940, CARLSBAD, MN, 92013 TIM SCHENK 1120 E 80 ST #211, BLOOMINGTON, MN, 55420 Phone: (952) 345-6040 CAVALRY MECHANICAL LLC Phone: (253) 216-3878 24414 154TH AVE E , GRAHAM, WA, 98338 CAVALML871RT Expiration Date: 12/30/2017 DESCRIPTION OF WORK: INSTALL 3 NEW FAN TERMINAL UNITS; 2 NEW VAV BOXES; 2 BATHROOM EXHAUST FANS; DUCTWORK; DIFFUSERS AND CONTROLS. Valuation of Work: $40,000.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $730.51 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Permit Center Authorized Signature: Date: I I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development r ermi .1 d agree to t o ditions attached to this permit. - Signature 4/ Date: 11 kc'e. Print Name: 17 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open: to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0705 0701 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION REFRIGERATION EQUIP ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htti://www.TukwilaWA.gov Mechanical Permit No. Project No. Ml1-0121. Date Application Accepted: q1.0 Date Application Expires: 3.110 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: 6`4 soli kiarir Tenant Name: FI "t K PROPERTY OWNER Name: W ESTF•1 EW Address: 2800 S r1T IZ, (4 AL City:TvkWllJA State: W9 Zip:9s(98 CONTACT PERSON — person receiving all project communication Name: 1. $Ch1@r iv Address: A ao E • 9 0 t1. sr. SY t - z i ‘ City: istwoomiri r State: fyi>✓ Zip: SS`aA Phoneg51•345••04Q Fax: qsz, .es -4. rI�'1 Email: ÷; Ins @ e tOkerj odes/.,0A--. King Co Assessor's Tax No.: q 2.03gR30iO Suite Number: 1 MS Floor: New Tenant: ❑ Yes i No MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 400°0 • Describe the scope of work in detail: K dpe2_ ar TUC 6(ig(7,l6. d I & SITELE 114 TL1( AV. LL 3 NEIJ f, , r(, c Orrirs. Z n�:w Via 03xE1, Z Asnu A 6+(NAJSr FA VS . OVL.rwo(Uc. Di Fr: JSE2S 4-CC/Hai/AZ. Use: Residential: New Commercial: New Replacement Replacement Fuel Type: Electric ® Gas ❑ Other: H: A'pplicationsTonns-Applications On Line \2016 Applications\Mechanical Permit Application Revised I.416.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater le Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct le Ventilation system Commercial Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 *Daytim District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER O A HORIZED AGENT: Signature: Print Name: ?i MM s�-k�e�11G- Date: 1To� i7 Day Telephone: q2.- • N .60‘10 Mailing Address: I ZQ E • $0 Sr. SV irE Zi 1 . &Dam "Arm -vs Mr/ ('4ZQ City State HMpplications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 14-16.docx Revised: January 2016 bh Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK I ACCOUNT QUANTITY ; PAID $803.36 M17-0122 Address: 646 SOUTHCENTER MALL Apn: 9202470010 $590.03 MECHANICAL $561.93 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $528.78 TECHNOLOGY FEE $28.10 TECHNOLOGY FEE R000.322.900.04.00 I 0.00 $28.10 M17-0137 Address: 2800 SOUTHCENTER MALL Apn: 3597000150 $213.33 MECHANICAL $203.17 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $170.02 TECHNOLOGY FEE $10.16 TECHNOLOGY FEE R000.322.900.04.00 0.00 $10.16 TOTAL FEES PAID BY RECEIPT: R12896 $803.36 Date Paid: Wednesday, November 29, 2017 Paid By: CAVALRY MECHANICAL Pay Method: CHECK 5066 Printed: Wednesday, November 29, 2017 2:28 PM 1 of 1 CSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS I PermitTRAK ACCOUNT QUANTITY . PAID $3,577.77 D17-0237 Address: 646 SOUTHCENTER MALL Apn: 9202470010 $3,368.90 DEVELOPMENT $3,368.90 PLAN CHECK FEE R000.345.830.00.00 0.00 $3,368.90 M17-0122 Address: 646 SOUTHCENTER MALL Apn: 9202470010 $140.48 MECHANICAL $140.48 PLAN CHECK FEE R000.322.102.00.00 0.00 $140.48 PG17-0108 Address: 646 SOUTHCENTER MALL Apn: 9202470010 $68.39 PLUMBING $56.99 PLAN CHECK FEE R000.322.103.00.00 0.00 $56.99 TECHNOLOGY FEE $11.40 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12249 R000.322.900.04.00 0.00 $11.40 $3,577.77 Date Paid: Friday, September 01, 2017 Paid By: ELDER -JONES Pay Method: CHECK 78811 Printed: Tuesday, September 05, 2017 11:31 AM 1 of 1 CRfSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Pit Type of Inspection: tyre 'c tt- I NI -c-, Address:,��j 62 44) i./r kTf r R %' �' ,f -L Date Called: Special Instructions: Date Wanted: I -2,3-l8 1.1. pTi. . Requester: Phone No: EdApproved per applicable codes. Corrections required prior to approval. COMMENTS: K- 'mac Rehhircit L ill I�t9'L_ Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: Type of Ins ection: Address: 6P CP 5daRe4aie-r;G Date Called: Special Instructions: Date Wanted: /-4448 C° a.mm p.m. Requester: Phone No: ElApproved per applicable codes. f`J Corrections required prior to approval. COMMENTS: Inspector: Date: /6 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0122 DATE: 'I 09/01/17 PROJECT NAME: PINK SITE ADDRESS: 646 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ❑ q(16, Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/05/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/03/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Perrnit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 Cavalry Mechanical LLC Home Espafiol Contact Safety & Health Claims & Insurance C4Washington State Department of Labor & Industries Page 1 of 2 Search L&I A -Z Index Help My I..&T Workplace Rights Trades & Licensing Cavalry Mechanical LLC Owner or tradesperson Principals Pence, Derek Keith, PARTNER/MEMBER Pence, Brenda Marcell, PARTNER/MEMBER Doing business as Cavalry Mechanical LLC WA UBI No. 603 275 082 24414 154th Ave E GRAHAM, WA 98338 253.216-3878 PIERCE County Business type Limited Liability Company Governing persons BRENDA M PENCE DEREK K PENCE; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. CAVALML871RT Effective — expiration 12/30/2013— 12/30/2017 Bond ................ Contractors Bonding & Insurance Co Bond account no. SK0333 $6,000.00 Received by L&I Effective date 12/30/2013 12/27/2013 Expiration date Until Canceled Insurance .............. _....... American Family Mutual Insuran $1,000,000.00 Policy no. 46X3681101 Received by L&I .Effective date 05/22/2017 05/15/2017 Expiration date 05/15/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts N ...._.... No L&I I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603275082&LIC=CAVALML871 RT&SAW= 11/29/2017 Cavalry Mechanical LLC No license violations during the previous "' 'r period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account Is current. 209,877.01 Doing business as CAVALRY MECHANICAL LLC Estimated workers reported Quarter 3 of Year 2017 "4 to 6 Workers" L&I account contact T4 / MELVINA RAMSDELL (360)902-4814 - Email: RAMM235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes .................................. No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. Page 2 of 2 ef Washington State ii)ept. of Labor Use of this site is subject to the ia;os of the state oP',ti;Rshington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603275082&LIC=CAVALML871 RT&SAW= 11/29/2017 B 02/22/201. GENERAL NOTES ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER TRADES. 2. THE ABBREVIATION LSD&C WHEREVER IT APPEARS IN THE DRAWINGS, SHALL REFER TO "LBRANDS DESIGN AND CONSTRUCTION". ANY REFERENCE TO TENANT, BRAND SPECIFIC (VICTORIA'S SECRET, ETC.) OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD&C. 3. ANY DISCREPANCY BETWEEN LSD&C DRAWINGS AND TENANT CRITERIA, LSD&C DRAWINGS SHALL TAKE PRECEDENCE. 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED AND ARE NOT TO BE SCALED. 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. 6. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS INCLUDING LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER REQUIREMENTS WILL PREVAIL. 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSITE AND/OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. A. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. FOR THE PURPOSE OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED' TO THE GENERAL CONTRACTOR, LSD&C OR THE LANDLORD'S FIELD REPRESENTATIVE FOR CLARIFICATION. B. AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO BE DIRECTED AS RFI'S THROUGH THE LSD&C PROJECT MANAGER. C. SHOULD THE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. 8. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO LANDLORD'S CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NFPA STANDARDS. 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A COMPLETE UST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT DEVIATE FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS REMOVAL OFF THE LANDLORD'S PREMISES. 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR FROM THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT SHALL CORRECT ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL APPROVAL OF THIS WORK WILL BE ISSUED BY LSD&C PROJECT MANAGER. 14. PROVIDE ONE SETS OF "AS -BUILT" DRAWINGS INTO PLAN TUBE AND ONE BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE CONTRACTS AND GUARANTEES IN BINDER TO STORE MANAGER. A REPORT PREPARED IN ACCORDANCE WITH MECHANICAL SPECIFICATIONS BY AN INDEPENDENT AIR BALANCE CONTRACTOR, HIRED BY GC, MUST BE INCLUDED IN THE CLOSE-OUT PACKAGE. HVAC GENERAL NOTES 1. THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL PLAN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DUCT, ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSD&C FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE/MAINTENANCE EASE. 8. PRIOR TO STARTUP OF HVAC EQUIPMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO LSD&C PROVIDED HVAC UNITS AND HAS BEEN TURNED ON FOR A MINIMUM OF 24 HOURS. LSD&C RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 HRS BEFORE START-UP. 9. IF WORK IS REQUIRED BY LSD&C IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE DIRECTED BY LSD&C TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS AND SPECIFICATIONS. 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS AS REQUIRED. 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY BY THE LSD&C PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF THE CONTRACTOR AND CHANGES BILLED TO THE CONTRACTOR. 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE". WHERE THE WORD "FURNISH" IS USED, SOME FIELD INSTALLATION IS REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES OR ACCESSORIES ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE RESPONSIBILITY SCHEDULE ON SHEET M04.01. 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURB(S) FOR CURB ADAPTER(S), WHERE APPLICABLE, AND SHALL SUPPLY DIMENSIONS TO LSD&C HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND UNIT DESIGNATION AND SHALL BE STENCILED IN 4" HIGH BLACK LETTERS. 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND BEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH LABELING APPLIES. B. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A MINIMUM OF 1" THICK, 0.75 LB/CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPLITTERS, DAMPERS OR SIMILAR BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. UL LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO EXCEED 4'-0" IN LENGTH (THERMAFLEX, GLASFLEX, OR APPROVED EQUAL). E. SUPPLY AND RETURN DUCTWORK SHALL BE LINED AND WITH CODE COMPLYING BLANKET INSULATION. ACOUSTICAL LINER MAY BE PROVIDED. ALL MATERIALS SHALL COMPLY WITH N.F.P.A. 90A AND 90B. SEE SPECIFICATIONS ON SHEET M05.01. F. HANGER WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASTENED TO THE STEEL JOISTS AND/OR BEAMS ABOVE. DO NOT ATTACH ANY SUCH ITEMS DIRECTLY TO FLOOR SLABS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK ABOVE. G. ADDITIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REQUIRED BY ANY APPLICABLE CODES AND/OR JURISDICTIONAL AUTHORITIES. 17. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL. ONLY LISTED AND APPROVED SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. 18. MECHANICAL CONTRACTOR SHALL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PLAN (VERIFY LOCAL CODES. IF PLAN LOCATION IS NOT ACCEPTABLE, IMMEDIATELY CONTACT LSD&C PROJECT MANAGER FOR DIRECTION.) 19. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED). 20. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF AN INDEPENDENT, AIR/WATER BALANCING COMPANY THAT IS A NEBB CERTIFIED CONTRACTOR OR HAS AN AABC CERTIFIED TEST & BALANCE ENGINEER. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR/WATER SYSTEM(S) AND MAKE ANY REQUIRED ADJUSTMENTS TO ENSURE PROPER WORKING ORDER. UPON COMPLETION, THE, BALANCING COMPANY SHALL PROVIDE A COMPLETE SYSTEM REPORT. FILE COPY Permit No. Mil ()V1'12- Plan review approval is subject to errors and omissions. Approval of construction documents does not authato the violation of any • ,# or ordinance of approved Field Cop1y and conditions is ackno By: Date: 1/9-9 / 1? City of Tukwila BUILDING DIVISION [----REVISIONS No changes shah be made to the scope of work kn'ithou..it prior approval of Tukwila Eluilding Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. SEPARATE PERMIT I REQUIRED D FCR: 0 Mschanical E �/Electrical i L iurSbing ler Gas Piping City of Tukwila •.II MECHANICAL GENERAL NOTES NTS 00N -140101 -J00 -NOTE N 02/22/16 ABBREVIATIONS - MECHANICAL MBC AFF AHU APD ASHRAE BDD BHP BLDG BOD BOP BTUH CAP CD CFM CHWR CHWS CO2 CONTR COP CWR CWS DB DEG DIA DWG DX EA EAG EAT EC EER EF EFF EOD ESP EWT F FCU FLA FLEX AMERICAN AIR BALANCE COUNCIL ABOVE FINISH FLOOR AIR HANDLING UNIT AIR PRESSURE DROP AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS BACK DRAFT DAMPERS BRAKE HORSEPOWER BUILDING BOTTOM OF DUCT BOTTOM OF PIPE BRITISH THERMAL UNIT PER HOUR CAPACITY CEILING DIFFUSER OR CONDENSATE DRAIN CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY CARBON DIOXIDE CONTRACTOR COEFFICIENT OF PERFORMANCE CONDENSER WATER RETURN CONDENSER WATER SUPPLY DRY BULB, DECIBEL DEGREE DIAMETER DRAWING DIRECT EXPANSION EXHAUST AIR EXHAUST AIR GRILLE ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR ENERGY EFFICIENCY RATIO EXHAUST FAN EFFICIENCY ELECTRICALLY OPERATED DAMPER EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE FAHRENHEIT FAN COIL UNIT FULL LOAD AMPS FLEXIBLE FPM FPS FV GAL GALV GC GPM HD HP HTR HVAC HWR HWS ID IN KW LL LB LD LF LWT MAX MBH MCA MECH MFR MOCP MTD MTR FEET PER MINUTE FEET PER SECOND FACE VELOCITY GALLONS GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE HEAD HORSEPOWER HEATER HEATING VENTILATING AND AIR CONDITIONING HOT WATER RETURN HOT WATER SUPPLY INSIDE DIAMETER INCH KILOWATT LANDLORD LONG POUND LINEAR DIFFUSER LINEAR FEET LEAVING WATER TEMPERATURE MAXIMUM THOUSAND BTU PER HOUR MINIMUM CIRCUIT AMPACITY MECHANICAL MANUFACTURER MAXIMUM OVER CURRENT PROTECTION MOUNTED MOTOR NEBB NATIONAL ENVIRONMENTAL BALANCING BUREAU N.C. NORMALLY CLOSED N.I.C. NOT IN CONTRACT N.O. NORMALLY OPEN N/A NOT APPLICABLE NTS NOT TO SCALE XSUPPLY AIR DIFFUSER 1 RETURN AIR GRILLE COMBINATION FIRE/SMOKE DAMPER - FD FIRE DAMPER NS ACCESS PANEL AUTOMATIC BACKDRAFT DAMPER • VSEF1204 • oD CD -,-'- UNDERCUT DOOR EXHAUST AIR REGISTER CARBON DIOXIDE SENSOR O HUMIDISTAT O 5 OR R LINEAR DIFFUSER S=SUPPLY, R=RETURN THERMOSTAT C = _ DUCT SMOKE DETECTOR ......---1S- POINT OF CONNECTION NEW DUCTWORK 24' , 4" MINIMUM AIR FLOW (CFM) 800 1,200 EXISTING DUCTWORK TO REMAIN IL IL FAN PERFORMANCE 'W.:#-4 EXISTING DUCTWORK TO BE REMOVED WWW- FLEXIBLE AIR DUCT 4'-0" MAX. NOTE: (N)=NEW, (R)=RELOCATED, (E)=EXISTING OA OAT OBD OD OPNG P PD PLBG PSI RA RG RH RPM SA SENS SF SMACNA SP SQ SQ FT SS TEMP TSP TSTAT TYP UC UH UON VAV VENT VFD VTR W WB WG WPD WT OUTDOOR AIR OUTDOOR AIR TEMPERATURE OPPOSED BLADE DAMPER OUTSIDE DIMENSION OR DIAMETER OPENING PUMP PRESSURE DROP PLUMBING POUNDS PER SQUARE INCH RETURN AIR RETURN GRILLE RELATIVE HUMIDITY REVOLUTIONS PER MINUTE SUPPLY AIR SENSIBLE SUPPLY FAN SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION STATIC PRESSURE SQUARE SQUARE FEET STAINLESS STEEL TEMPERATURE TOTAL STATIC PRESSURE THERMOSTAT TYPICAL UNDERCUT UNIT HEATER UNLESS OTHERWISE NOTED VARIABLE AIR VOLUME VENTILATION, VENTILATOR VARIABLE FREQUENCY DRIVE VENT THRU ROOF WATT WET BULB WATER GAUGE WATER PRESSURE DROP WEIGHT ABBREVIATIONS AND SYMBOLS LEGEND NTS 00N-M0101-JOO-LGND J 8/26/15 FAN TERMINAL UNIT SCHEDULE MANUAL VOLUME DAMPER 1 CFSD COMBINATION FIRE/SMOKE DAMPER SD -4 FD FIRE DAMPER NS ABD AUTOMATIC BACKDRAFT DAMPER Q VSEF1204 ELECTRONICALLY OPERATED DAMPER oD CD -,-'- UNDERCUT DOOR co CARBON DIOXIDE SENSOR O HUMIDISTAT O TEMPERATURE SENSOR O THERMOSTAT X-C) DUCT SMOKE DETECTOR ......---1S- POINT OF CONNECTION 975 24' , 4" MINIMUM AIR FLOW (CFM) 800 ABBREVIATIONS AND SYMBOLS LEGEND NTS 00N-M0101-JOO-LGND J 8/26/15 FAN TERMINAL UNIT SCHEDULE MARK (FPVAV-#) 1 2 3 SD -4 TRANE PACKAGE NUMBER NS NS NS TITUS MODEL VSEF1204 VSEF1405 VSEF1003 OMNI FAN SIZE 04SQ 06SQ 03SQ SEE PLAN INLET SIZE 12" DIA. 14" DIA. 10" DIA. FRAME SIZE (L"XW") MAXIMUM PRIMARY AIR FLOW (CFM) 1,500 2,200 975 24' , 4" MINIMUM AIR FLOW (CFM) 800 1,200 450 N FAN PERFORMANCE MAXIMUM AIR FLOW (CFM) 1,500 1,200 975 NOTES EXTERNAL STATIC (IN W.C.) 0.5 0.5 0.5 ELECTRIC HEAT FAN MOTOR HP 1/3 1/2 1/3 2,6 FAN MOTOR VOLTAGE 277/1/60 277/1/60 277/1/60 1 ELECTRIC HEAT POWER INPUT (WATTS) 12,000 12,000 10,000 ELECTRIC HEATER VOLTAGE HEAT OUTPUT (BTU/HR) 40,956 40,980 34,150 ELECTRICAL STAGES 2 2 2 TITUS ELECTRIC HEATER VOLTAGE 460/3/60 460/3/60 460/3/60 OMNI ELECTRICAL VOLTS/0/HZ (WIRES) 460/3/60 (4) 460/3/60 (4) 460/3/60 (4) MCA (AMPS) FAN MOTOR AMPS (VOLTS/0) 1.2 (277/1) 2.4 (277/1) 1.2 (277/1) MOCP (AMPS) ELECTRIC HEATER AMPS (VOLTS/0) 16.4 (460/3) 18.2 (460/3) 13.63 (460/3) APPROX. WEIGHT (LBS) MCA (AMPS) 20.5 22.8 17.0 ACCESSORIES MOCP (AMPS) 25 25 20 NOTES APPROX. WEIGHT (LBS) 121 121 109 ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S -FACTORY PROVIDED DISCONNECT SWITCH. 2. S -FACTORY PROVIDED CONTROL TRANSFORMER. 3. S -FACTORY FURNISHED HEATING/COOLING CHANGEOVER SENSOR. ACCESSORIES 1-2 1-2 1-2 4,6 NOTES 1 1 1 1 ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S -FACTORY PROVIDED DISCONNECT SWITCH. 2. S -FACTORY PROVIDED CONTROL TRANSFORMER. NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. VAV TERMINAL UNIT SCHEDULE MARK (VAV-#) 1 2 SD -3 SD -4 TRANE PACKAGE NUMBER D19 NS TITUS TITUS MANUFACTURER TRANE TRANE OMNI OMNI MODEL VCCF008 VCCF014 NECK SIZE (L"XW") SEE PLAN INLET SIZE 8 14 S. P FRAME SIZE (L"XW") MAXIMUM AIR FLOW (CFM) 200 900 40 24' , 4" MINIMUM AIR FLOW (CFM) 100 200 0.35 N ACCESSORIES 1-3 1-3 4,038 TI S ;' 6 NOTES 1 1 120/1/60 120/1/60 ELECTRIC HEAT POWER INPUT (WATTS) --- 10,000 33 2,6 HEAT OUTPUT (BTU/HR) --- 37,560 5.5 1 STAGES --- 2 RESTROOM ELECTRIC HEATER VOLTAGE --- 208/3/60 1 SD -9 ELECTRICAL VOLTS/0/HZ (WIRES) --- 208/3/60 (3) TITUS TITUS FAN MOTOR AMPS (VOLTS/0) --- --- OMNI OMNI ELECTRIC HEATER AMPS (VOLTS/0) --- 30.5 (208/3) 20"X4" SEE PLAN MCA (AMPS) --- 38.1 FRAME SIZE (L"XW") 22"X6" MOCP (AMPS) --- 40 12"X12" ;, FRAME TYPE APPROX. WEIGHT (LBS) --- 60 N TYPE 3 / G2 ACCESSORIES --- 1-2 TI S :4 TI S :4 NOTES --- 1 <30 <30 ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S -FACTORY PROVIDED DISCONNECT SWITCH. 2. S -FACTORY PROVIDED CONTROL TRANSFORMER. 3. S -FACTORY FURNISHED HEATING/COOLING CHANGEOVER SENSOR. NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. TERMINAL UNIT SCHEDULE MARK ( 1 1 SD -3 SD -4 TRANE PACKAG BER D19 FANTECH TITUS TITUS MANUFACTURER TRANE FG 4 OMNI OMNI MODEL VCCF008 INLINE FAN NECK SIZE (L"XW") SEE PLAN INLET SIZE 8 DIRECT S. P FRAME SIZE (L"XW") MAXIMUM AIR FLOW (CFM) •:-,. 240 40 24' , 4" MINIMUM AIR FLOW (CFM) 10 0.35 0.35 N ACCESSORIES -3 2,542 4,038 TI S ;' 6 NOTES 1 VOLTS/0/HZ 120/1/60 120/1/60 ACCESSORIES ("5" INDICATES - ` ANDARD; "0" INDICATES OPTIONA 1. S -FACTORY PROVIDED D `%' NECT SWITCH. 2. S -FACTORY PROVID_ " ONTROL TRANSFORMER. 3. S -FACTORY F HED HEATING/COOLING CHANGEOVER SENSOR. " NOTES: 1. R TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALL EXHAUST AND VENTILATION FAN SCHEDULE MARK (EF-#) 1 1 SD -3 SD -4 MANUFACTURER FANTECH FANTECH TITUS TITUS MODEL FG 6 FG 4 OMNI OMNI TYPE INLINE FAN INLINE FAN NECK SIZE (L"XW") SEE PLAN DRIVE TYPE DIRECT DIRECT S. P FRAME SIZE (L"XW") PERFORMANCE AIR FLOW (CFM) 240 40 24' , 4" FRAME TYPE EXT. STATIC (IN W.C.) 0.35 0.35 N N FAN SPEED (RPM) 2,542 4,038 TI S ;' 6 TI S ;' 6 ELECTRICAL VOLTS/0/HZ 120/1/60 120/1/60 <30 <30 FAN MOTOR WATTS 122 33 2,6 2 APPROX. WEIGHT (LBS) 15 5.5 1 1 SERVES RESTROOM RESTROOM MARK ACCESSORIES 1 1 SD -9 SD -10 NOTES 1,2 1,2 TITUS TITUS ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S-BACKDRAFT DAMPER 2. S -DISCONNECT PLUG. NOTES: 1. INTERLOCK WITH LIGHTS. 2. DISCONNECT SWITCH PROVIDED BY EC. MECHANICAL EQUIPMENT SCHEDULES NTS 00N-M0101-E01-SCHD E 02/22/16 GRILLE, REGISTER, AND DIFFUSER SCHEDULE MARK SD -1 SD -2 SD -3 SD -4 SD -5 MANUFACTURER TITUS TITUS TITUS TITUS TITUS MODEL OMNI OMNI TMSA OMNI OMNI NECK SIZE (L"XW") SEE PLAN SEE PLAN S: P • S. P S. P FRAME SIZE (L"XW") 24"X24" 24"X24" 24:' , 4" 12' , 2" 24' , 4" FRAME TYPE LAY -IN LAY -IN N N N FINISH* TITUS #26 TITUS #26 TI S ;' 6 TI S ;' 6 TI S ' :4 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 2 2,6 2 2 2 NOTES 1 1 1 1 1 MARK SD -6 SD -7 SD -8 SD -9 SD -10 MANUFACTURER TITUS TITUS TITUS TITUS TITUS MODEL S300 OMNI OMNI OMNI TDC NECK SIZE (L"XW") 20"X4" SEE PLAN S. P S. P N 9"X9" / 8"0 FRAME SIZE (L"XW") 22"X6" 12"X12" 12 ' , 2" 24' , 4" 12"X12" ;, FRAME TYPE SURFACE LAY -IN N N TYPE 3 / G2 FINISH* TITUS #26 TITUS #26 TI S :4 TI S :4 TITUS #26; NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 1,9 4,6 4,6 2,6 4,6 NOTES 3 1 1 1 6 MARK SD -11 SD -12 SD -13 MANUFACTURER TITUS TITUS TITUS MODEL TDC TDC TDC NECK SIZE (L"XW") . 9" •" / :"95 9" " / :"93 9" " / ;"0 FRAME SIZE (L"XW") 12' , 2" 12 , 2" 12' , 2" FRAME TYPE TYPE A3 TYPE G2 TYPE A3 FINISH* TI S ,•' 6 TI S ; :4 TI S :4 NOISE CRITERIA LEVEL <30 <30 <30 ACCESSORIES 4,6 4,6 4,6 NOTES 6 6 6 MARK LD -1 LD -2 LD -3 MANUFACTURER PRICE PRICE PRICE MODEL AS210 AS210 AS220 NECK SIZE (L"XW") S. P N S. P N FRAME SIZE (L"XW") 4' X (2 SLOTS 4' X (2 SLOTS 4' X (1 " SLOT FRAME TYPE TYP 2P TYP' 2P TYP' 2P FINISH* PR E #:17 PR E #:12 PR E # 17 NOISE CRITERIA LEVEL <30 <30 <30 ACCESSORIES 4,5,7 4,5,7 8 NOTES MARK RG -1 RG -2 RG -3 RG -4 RG -5 MANUFACTURER TITUS TITUS TITUS TITUS TITUS MODEL 355RL 355RL 355RL 50F 355RL NECK SIZE (L"XW") "Xis "Xi 0 10"X10" 22"X22" "X1 s FRAME SIZE (L"XW") 24 , 2" 24 , 2" 12"X12" 24"X24" 24 , 2" FRAME TYPE N N LAY -IN LAY -IN SU CE FINISH* TI S 6 TI S 6 TITUS #26 TITUS #26 TI S 6 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 6 6 NOTES 2 2 2,5 2 MARK RG -6 RG -7 RG -8 RG -9 RG -10 MANUFACTURER TITUS TITUS TITUS TITUS TITUS MODEL 355RL 355RL 355RL 355RL 355RL NECK SIZE (L"XW") "X1 s "X2 "X1 s "X1 . "X2. FRAME SIZE (L"XW") 24 , 2" 24 , 4" ' , 2" 24 , , 4" FRAME TYPE N N N N FINISH* TI S ' 6 TI S ' 6 S ' :4 TI S : S :4 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 ACCESSORIES 2 6 6 2,6 6 NOTES 2 2 2 2 2 MARK RG -11 EAG -1 EAG -2 EAG -3 MANUFACTURER TITUS TITUS TITUS TITUS MODEL 355RL. 355RL 355RL 355RL NECK SIZE (L"XW")� OX1 s 10"X10" '"X1 s '"X1 FRAME SIZE (L"XW") 1 , 2" 12"X12" 12', ', 2" FRAME TYPE N LAY -IN N FINISH* TI S ' 6 TITUS #26 TI S ' : S ;' 6 NOISE CRITERIA LEVEL <30 <30 <30 <30 ACCESSORIES 1,6 1,6 1 NOTES 2 2,5 2,5 2,5 ACCESSORIES: 1. OBD -OPPOSED BLADE DAMPER. 2. LQD-LOCKING QUADRANT VOLUME DAMPER (PROVIDED BY MECHANICAL CONTRACTOR). SEE MECHANICAL SPECIFICATIONS SECTION 233300.D.1. 3. CFD-RUSKIN MODEL CFD OR CFR FIRE DAMPER WITH VOLUME CONTROL 4. YRD-YOUNG'S REGULATOR REMOTE DAMPER WITH CABLE CONTROL SYSTEM (MODEL 5020 -CC) (PROVIDED BY MECHANICAL CONTRACTOR). 5. ASPI-INSULATED ENGINEERED LINEAR SLOT PLENUM FOR CONCEALED MOUNTING PROVIDED BY FACTORY. 6. TRM-RAPID, MOUNT FRAME FOR GYPSUM CEILINGS. 7. FURNISH WITH TYPE WW ENDCAPS AND PATTERN CONTROLLERS. 8. FURNISH WITH RB220 SIGHT BAFFLE, TYPE WW ENDCAPS, AND PATTERN CONTROLLERS. NOTES: 1. 4 -WAY DIFFUSER (UNLESS 1 -WAY, 2 -WAY OR 3 -WAY AS INDICATED ON PLAN). 2. INSTALL BLADES FACING THE BACK OF STORE, CABINET, OR WALL. 3. GC TO FIELD PAINT DIFFUSERS TO MATCH CEILING OR WALL WITH ENAMEL FINISH. 4. PROVIDE WITH GYP BOARD FRAME. 5. MC SHALL PROVIDE SQUARE TO ROUND ADAPTOR. 6. BORDER TYPE 3 IS LAY -IN STYLE. PATTERN TYPE G2 IS 2 -WAY ADJACENT THROW PATTERN FOR SQUARE DIFFUSERS. PATTERN A3 IS A 3 -WAY THROW PATTERN. INSTALL DIFFUSERS SO THROW IS AWAY FROM NEAREST WALLS. * FINISH REFERENCE: TITUS #26 IS WHITE; TITUS #84 IS BLACK; PRICE #B12 IS WHITE; PRICE #B17 IS BLACK AIR DEVICE SCHEDULE-VS/PINK NTS 05 N-M0101-BOO-SCHD NATIONAL ACCOUNTS HVAC SUPPLIER GENERAL NOTES HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED BY L BRANDS STORE DESIGN & CONSTRUCTION. WITHIN THE FIRST WEEK OF CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL. THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO WEEKS SCHEDULED. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSD&C AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT.. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND/OR MECHANICAL CONTRACTOR MUST COORDINATE YECEIVED MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. CITY OF TUKWILA TRANE CONTACT INFORMATION SEP 01 2017 PERMIT CENTER JODY SOWERS ROLLAND SCOTT JOHN D'AGOSTINO SCOTT DAVIS TRANE TECHNICAL SUPPORT, PRIMARY TRANE TECHNICAL EQUIPMENT SUPPORT PROJECT MANAGER AND EMAIL: JSOWERSOTRANE.COM SUPPORT, SECONDARY EMAIL: JOHN.DAGOSTINOL TRANE.COM :° HVAC COMMISSIONING PHONE NO: 866.415.2499 EMAIL: ROLLAND.SCOTT@TRANE.COM PHONE NO: 866.415.2499'= EMAIL: SCOTT.DAVISOTRANE.COM PHONE NO: 866.415.2499. PHONE NO: 866.415.2499 11 0122 NATIONAL ACCOUNTS INFORMATION NTS 00N -M0101 -A00 -NOTE A 08/26/15 M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 vvww.mengineering.us.com AUG .2 5 2017 z 0 1- 0 I-` z 0 0 W rrznn V W 0 w 0 cn CV) d' M IM L . 2 Cr 0 r „co N z E U co E . J o )- H e O O O LC CO • yCe TO w ■ J - J l!Lo:,,, O= !ja:=L":: YU<WW�UOp_�Oy= Zit0o< KOt�n0. NUUOj UyO O< JU WWO m,- O W ~ Z2 0 4 OU-• d<Z Hz ~'_ jUO.' O =W O' C U O 2V OtW-U O. m < 3��!:E0-11i;O OW ~ =-zs <ric�i:i3Swr4 ii =30HU'FW�-WDT U J Z COJ 1=-a ,-=W PROJECT INFORMATION: 1- Z C) 0 -3 w j O Y W a. aW� CL a J Y o) O Z 00 0 0- L() M O W w 0- 0 U N w 0 CD N W ca REVISIONS: REQUIRED BY: DATE .t s OR CODE COMPLIANCE AP " SEP 0 7 201 City of Tukwila • DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: 08/25/17 GMT GMT BMM MECHANICAL NOTES AND SCHEDULES DRAWING NUMBER: �a 1 PROCESS/ RECEIVING Nxx s HALLWAY 2 ADJACENT TENANT - N.I.C. 36"X12" CED Fa ==--I1-=Ill----=J 1b FPVAV-2 FPVAV-1 CLOSET - 285 CFM ECTRIC rd•K1 � — ioi 18" X 12"I 150 CFM SD -10 1 200 CFM 1 8" rs 1 111 1 .b� 11 v RESTROOM 8"0 DN "' �Tj j r - - - — 10"0 50 CF RG -3 8"� 15 CFM SD -6 260 CFM 24" X 14" OVAL 9'-8" B.O.D. PINK 3 150 CFM 24"X24' WOMEN'S In,1__� SD -10 150 CFM 8"0 EAG -2 -120 CFM 1! OEAG-1 1111F9 4■■=��-120 CFM C 24"X24"7 v MEN'S N y RESTROO W A 111 CC 1103.01 W J 2 STO C ® 200 CFM HALLWAY 1 224"X24" FPVAV-3 Os SD -2 285 CFM n� nu SD -2 250 CFM II rt's SD -6 240 CFM 0 TYP Eh 7 SD -6 240 CFM 4 1 - r - 18" X 12" OVAL 9'-10" B.O.D. = �L� = _ _ = 1II� 111 TYP 0® v BR • K AREA EAG -1 -40 CFM AT rJIIt_ ii F R 5 � � ii— FR\ 6 24" X 14" i OVAL M03.01 RG/3 17,1ST fi'=''`t --- — SD -7 160 CFM 225 CFM ■■ 8'0 RR SD -7 12 "• 160 CFM TRANS #5 VAV-1 00 -_�AFR 1 i 074 SD -7 L('.."" 200 CFM F RG -3 ��- 10"X10"10 M03.01 TYP II r -7— RG-3 RG -3 M03.01 TYP 2 PERSON OFFICE ir 11 11 11 SD -7 12i 160 CFM =� I I RG -3 TRANS #4 ADJACENT TENANT - N_I_C NOTE: DUCTWORK IN SALES AREA TO BE FLAT OVAL, SPIRAL WOUND INTERNALLY LINED DUCT. SIZES NOTED ON DUCTWORK ARE TO INTERNAL FREE AREA. "VERIFY ALL FIELD CONDITIONS PRIOR TO BID" SD -6 240 CFM 0 TYP n I I I IP PINK 1 SD -6 260 CFM /=1' SD -6 240 CFM Ir = RG -3 =,,1Ir- _ cc n >l - I NOTE: ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. i 1— MALL CONCOURSE NOTE: SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS RECEIVED CITY OF TUKWILA SEP 012017 PERMIT CENTER N M1-7%, 012.2w 1/4" = 1'-0" MECHANICAL PLAN A INSTALL TEMPERATURE AND CARBON DIOXIDE SENSORS AT 48" AFF. TEMPERATURE SENSOR SHALL BE KELE ST -BP SERIES FLUSH MOUNT, PAINTED TO MATCH ADJACENT FINISHES. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. EXTEND EXHAUST DUCT TO LANDLORD EXISTING EXHAUST DUCT. CONNECT TO EXISTING LANDLORD EXHAUST DUCT PER LANDLORD SPECIFICATIONS. INSTALL GRILLE ADOVE THE COILING Of TIIC SALES SPACC, . 12' 8" Aff TO DOTTOM Of GRILLC. ACCESS PANEL BY GC IN THIS LOCATION FOR ACCESS TO EQUIPMENT ABOVE CEILING. REFER TO ARCHITECTURAL PLANS. INSTALL SUPPLY AIR TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. INSTALL MONITORING SENSOR AT 48" AFF. SEE SHEET M04.0 FOR RESPONSIBILITY SCHEDULE. RETURN AIR THROUGH OPENING IN BACK OF VALANCE ABOVE CABINET. REFER TO ARCHITECTURAL PLANS. PROVIDE RETURN AIR GRILLE DUCT BOOT FOR REDUCED SOUND AND LIGHT TRANSMISSION. CONSTRUCT BOOT FROM 1" DUCT BOARD WHERE ALLOWED BY LANDLORD. SEE DETAIL E/M03.01 FOR ADDITIONAL CONSTRUCTION INFORMATION. CI PROVIDE YOUNG REGULATOR CABLE CONTROLLED BALANCING DAMPER, BOWDEN CABLE CONTROL KIT, CONTROL WIRE AND CASING, OR LSD&C APPROVED EQUAL. INSTALL CABLE CONTROLLER IN CEILING NEAR DIFFUSER, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, OR OTHER APPROVED LOCATION. TYPICAL OF ALL INACCESSIBLE MANUAL VOLUME DAMPERS LOCATED ABOVE GYP. BOARD CEILINGS OR DAMPERS WHICH ARE OTHERWISE INACCESSIBLE. REFERENCE DETAIL F/M03.1 FOR ADDITIONAL INFORMATION. 13 14 15 16 LOCATION OF ELECTRICAL AND CONTROL PANELS. DO NOT ROUTE DUCTWORK OR PIPING ABOVE THIS AREA. DUCTWORK BETWEEN TERMINAL UNIT AND LANDLORD'S DUCTWORK SHALL BE MEDIUM PRESSURE. MECHANICAL PLAN KEYNOTES 17 18 1-I 21 INSTALL MONITORING CONTROLLER AT IFS. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. WALL TO BE LEFT DOWN IN THIS AREA FOR ACCESS TO FPVAV-2. NTS 03/27/15 14 0 0. M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 www.mengineering.us.com 4 O AT -84? 1 WAS'., i 36240 %:P4bISTERS9, szo -ALi i"+✓• - AUG. 2 5 2017 z 0 U D 1- Z 0 V 03 z 0 (i) W W Lt 0 O C) C) 0 O .Q E O (-)o . 0 >+ 3 • ct a - r • O ▪ E � _i 0 a) m m 1— I— - O !L°:!;! O Z W V U O v W7m:: Z- Z OU - K Z 3 Z O W m U S 0 4 W O � �wWa= H y W � O � o W ~ W W o w p C O y 0NW=zz Q 1 F Z m 4 U ~ H y 4 .:;"34oz � Z j ~ ¢ /� W 4 y a W Z = y o F 3 p Z Zo - W Z OK Oy U N= - O i V 0 0 mWWW000 S y � � d' 2 p O W Z O a F (� CQ. IS -U1 C Q L ■ PROJECT INFORMATION: - J J Mco LLI co La Z o W,W F.. OQ*Y J Y cn ▪ -- DO O w O O 0 U J REVISIONS: REQUIRED BY: DATE REVIEWED FOR CODE COMPLIANCE APProvED SEP 0 7 2017 City of Tukwila BU!! DING nix/ISI DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: 08/25/17 GMT GMT BMM MECHANICAL PLAN DRAWING NUMBER: M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 www.mengineering.us.com FLASHING BY G. DUCT SUPPORT FASTENED TO NEAREST ROOF STRUCTURAL MEMBER. SIZE PER SMACNA GUIDELINES. AUG 2 5 2017 EXH. DUCT FROM RESTROOM AUST AIR DUCT ASSEMBLY DETAIL 00D-M0301-D00-EXDT 09/13/1 BEAD TO SECUR FLEX DUCT. CTANGULAR TO ROUND ADAPTER WITH 1/2" 3LB LINER. BREAK FOR STRENGTH. 6" STARTER COLLAR 4" MIN. WHERE STRUCTURE ALLOWS z 0 U D ce Z 0 U 06 z V W 0 W ct 0 SEAL TO GRILLE AND SECURE WITH MIN. TWO(2) SCREWS PER SIDE. DIFFUSER/REGI GRILLE DETAIL 00D -M0301 -COO -GRIL 08/26/ LOCKING QUADRANT ROUND DAMPER EXTENDED ADJUSTMENT HANDLE YOUNG REGULATOR MODEL 5020CC (830ACC FOR RECTANGULAR) RIGID DUCTWORK, INSULATED PER SPECIFICATIONS DUCT STRAP AND FOIL TAPE RIGID 90' ELBOW Duct Main — Transitions Duct Main — Take—offs RECTANGULAR DUCT —�► AIR FLOW DUCT STRAP AND FOIL TAPE ORANGE FLAG CONCENTRIC TRANSITION FLEXIBLE CASING AND WIRE (30'-0" MAXIMUM) FLEXIBLE DUCTWORK NO LONGER THAN 3'-0" 0 — MAX. 45' DIVERGING, 60' CONVERGING —±— AIR FLOW RECTANGULAR TO ROUND ROUND TO ROUND RACK & PINION OPERATOR AIR FLOW RECTANGULAR DUCT MEDIUM PRESSURE MOUNTING CLIP CEILING DIFFUSER SOCKET WRENCH CONICAL FITTING, SEAL AIRTIGHT W/ MASTIC ROUND DUCT NOTE: FOR REMOTE DAMPER ADJUSTMENT CONCEALED REGULTOR KIT — LOCATE NEAR REMOVABLE DIFFUSER OR GRILLE NOTE:. COORDINATE EXACT LOCATION OF CEILING MOUNTED CONCEALED REGULATOR WITH ARCHITECT PRIOR TO INSTALLATION. YOUNG REGULATOR REMOTE DAMPER 0 — MAX. 30' (EXCEPT 45' IS PERMITTED AT ROUND TO FLAT OVAL). ECCENTRIC TRANSITION BRANCH DUCT VAV BOX RECTANGULAR TO RECTANGULAR RECTANGULAR TO ROUND WHEN SHOWN TAPS TO VAV TRUNK ONLY 00D -M0301 -FOO -DAMP DUCT DETAILS 12/11/13 NOTE: USE PLAN AS GUIDE TO FITTING TYPE. OOD-M0301-B00-DUCT 10/4/16 ROUND DUCT SUPPORT FROM STRUCTURE ABOVE DAMPER HANDLE TO BE INSTALLED MAXIMUM OF 3'-0" ABOVE CEILING. '//////////////////////////////// ////////// 1" DUCT BOARD SOUND BOOT TO MATCH SIZE OF GRILLE ///////////////////////// / / 18" LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION. INSULATED FLEXIBLE CONNECTION (MIN 4 FT., MAX. 8 FT.). FIRE DAMPER WHERE INDICATED ON PLANS. CEILING ** 10" OR AS CLEARANCE ALLOWS RETURN GRILLE SOUND BOOT DETAIL RECEIVED CITY OF TUKWILA SEP 012017 =MINT CENTER RETURN AIR GRILLE PROVIDE VOLUME DAMPER ASSEMBLY IN ACCORDANCE WITH SPECIFICATION 233300.D.1. REFERENCE M02.XX FOR LOCATION. PROVIDE RIGID 2 PIECE ROUND ELBOW WITH 1.5 RADIUS RATIO WHERE CLEARANCES ALLOW. WHERE CLEARANCES ARE RESTRICTED PROVIDE ELBOW WITH RADIUS RATIO OF 1.0. SECURELY TAPE VINYL FLEX DUCT TO SHEET METAL W/ MIN. OF (2) CONTINUOUS WRAPS OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION & VINYL TO SHEET METAL. TAPE INSULATION TO DUCT TO FORM A GOOD SEAL 8" LONG SHEET METAL SECTION SECURED TO DIFFUSER COLLAR W/ MIN. (3) SHEET METAL SCREWS, DUCT TAPE AND MASTIC. TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY. INSULATE DIFFUSER BACKPAN WHEN RETURN IS FULLY DUCTED. THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. REVISIONS: REQUIRED BY: PEVIEWED FOR CODE COMPLIANCE APPROVED SEP 0 7 2017 TITUS MODEL "DB" DIRECTIONAL BLOW PLATE CLIPPED ON DIFFUSER RODS. SEE NOTE BELOW. CEILING MOUNTING FRAME FOR GYP. BD. 7.01PPLICATION TITUS MODEL TRM. SUPPLY AIR DIFFUSER (LAY—IN FRAME) WITH MANUAL VOLUME DAMPER DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: E: A L DIFFUSERS ARE 4—WAY BLOW UNLESS NOTED OTHERWISE. PROVIDE OPTIONAL DIRECTIONAL BLOW, TITUS MODEL "DB" TO CONVERT DIFFUSER FROM STANDARD 4—WAY TO 1—WAY, 2—WAY OR 3—WAY BLOW AS •DESIGNATED ON PLANS BY SHADED AREA. 08/25/17 GMT GMT BMM MECHANICAL DETAILS DRAWING NUMBER: 00D410301 -E00 -GRIL 06/26/15 CEILING DIFFUSER MOUNTING DETAIL 00D -M0301 -A00 -DIFF 02/22/16 C SECTION 230000: BASIC MECHANICAL REQUIREMENTS A. NOTE 1. THE ABBREVIATION LSD&C WHEREVER IT APPEA HESE MECHANICAL DRAWINGS AND/OR SPECIFICATIONS SHALL REFER TO "LIMITED STORE DESIGN AND CONSTRUCTION". ANY REFERENCE TO TENANT'S PROJECT MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD&C. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTION' APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 3. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 4. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK TO COMPLY WITH THE LSD&C SCHEDULE AN I THE PROJECT COMPLETION DATE. 5. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NO COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF HIS WORK. 6. REFER TO RESPONSIBILITY SCHEDULE ON SHEET M04.01 OF THIS SET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT THE BID. B. GENERAL REQUIREMENTS 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR LSD&C SHALL BE PROVIDED BY THIS CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE LSD&C PROJECT MANAGER, AS REQUIRED. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THI CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITER'S LABORATORIES/UNDERWRITER'S LABORATORIES OF CANADA LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE/PROVINCE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. 7. THIS CONTRACTOR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS DIVISION. CUTTING SHALL HAVE PRIO APPROVAL BY LSD&C PROJECT MANAGER AND THE LANDLORD. ALL PATCHING SHALL BE BY G.C. AND SHALL MATCH THE SURROUNDING SURFACES. 8. THE MECHANICAL CONTRACTOR SHALL MAKE ALL FINAL MECHANICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. a. THE MECHANICAL CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR TO CONTACT LSD&C'S DESIGNATED COMPANY (EMS) FOR START-UP. (REFER TO SHEET M01.01). C. CODES 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S/PROVINCE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA/NFPAC CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHA INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO CODE ISSUES WILL NOT BE ACCEPTED BY LSD&C. D. UCENSES, PERMITS, INSPECTIONS do FEES 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. 2. FURNISH TO THE LSD&C'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. E. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING BY LSD&C'S PROJECT MANAGER THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE PRIOR TO INSTALLATION. TH USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 2. GENERAL CONTRACTOR SHALL SUBMIT ALL EQUIPMENT AND DEVICES TO LSD&C PROJECT MANAGER FOR APPROVAL SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR LSD&C PROJECT MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP AND/OR THE SIGNATURE OF THE GENERAL CONTRACTOR AND THE SUBCONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. F. GUARANTEE 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY LSD&C'S PROJECT MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 2. THE EQUIPMENT MANUFACTURER SHALL GUARANTEE AND PROVIDE A 12 MONTH GUARANTEE TO LSD&C FROM THE DATE OF ACCEPTANCE. THIS CONTRACTOR SHALL WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE RESPONSIBLE FOR ANY DAMAGE AND/OR MALFUNCTION CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM. G. RECORD DRAWINGS 1. THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD ALL DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: a. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. b. REVISIONS, ADDENDUM, AND CHANGE ORDERS. c. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THIS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. FAILURE TO KEEP THESE RECORDS WILL ALLOW LSD&C TO DIRECT THE GENERAL CONTRACTOR TO PROVIDE THESE RECORDS AT HIS EXPENSE PRIOR TO FINAL PAYMENT. H. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE LSD&C'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, LSD&C PROJECT MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. I. PHASING REQUIREMENTS 1. THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBIN AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN WRITING WITH LSD&C'S PROJECT MANAGER AND THE LANDLORD ONE WEE PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. J. DEMOLITION 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 2. THIS CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING HVAC UNITS, HYDRONIC PIPING, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, AND DUCTWORK PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NE WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL K. SLEEVES 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FO' OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L SCOPE OF WORK 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE HVAC SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: a. HVAC UNITS, ALL RELATED EQUIPMENT AND ACCESSORIES (UNLESS NOTED OTHERWISE). b. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. c. HYDRONIC PIPING. (AS APPLICABLE, REFER TO PLANS). d. REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). e. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). f. TESTING, ADJUSTING, AND BALANCING. g. KEEPING A RECORD SET AND PREPARE AS -BUILT DRAWINGS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL M. HVAC EQUIPMENT 1. PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY LSD&C AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS FO' REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. N. EQUIPMENT FURNISHED BY UMITED STORE DESIGN AND CONSTRUCTION 1. THE FOLLOWING EQUIPMENT IS FURNISHED BY LSD&C AND INSTALLED BY THIS CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER TO RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. a. HVAC UNITS. b. TOILET EXHAUST FANS. c. DIFFUSERS, GRILLES AND REGISTERS. d. TEMPERATURE CONTROLS. 11 "1•', 'I1 THIS CONTRACTOR. 0. CURBS FOR SUPT 1. THIS CONTRACTOR SHALL FURNISH AND INSTALL CURB ADAPTORS ON EXISTING CURBS WHERE ALLOWED BY LANDLORD. CURB ADAPTORS MUST BE MANUFACTURED BY THYBAR, MICROMETL, OR LSD&C APPROVED EQUAL. 2. WHERE EXISTING CURBS ARE NOT AVAILABLE OR WHERE CURB ADAPTORS ARE NOT ALLOWED THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY CURBS REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14" HIGH (SEE M04.01 "LOCAL AREA REQUIREMENTS" ITEM # 5), OF THE SAME MANUFACTURER OF THE EQUIPMENT UNLESS NOTED OTHERWISE. 3. ALL CURBS AND CURB ADAPTORS SHALL BE INSTALLED SUCH THAT TOP OF CURBS ARE LEVEL. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE WITH THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. THIS CONTRACTOR SHALL RECEIVE LSD&C PROJECT MANAGER'S WRITTEN APPROVAL BEFORE ANY WORK TAKES PLACE. THIS CONTRACTOR IS ALSO RESPONSIBLE FOR ALL SEISMIC, HURRICANE OR OTHER SECURING DEVICES REQUIRED BY LOCAL OR OTHER CODES. P. LABELS/PIPE MARKERS 1. FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS ON ALL PIPES INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BE A MINIMUM OF 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI). 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CHILLED WATER RETURN, CHILLED WATER SUPPLY, CONDENSATE, HOT WATER RETURN, HOT WATER SUPPLY, CONDENSER WATER RETURN, CONDENSER WATER SUPPLY, REFRIGERANT LIQUID, REFRIGERANT SUCTION, AND DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT. Q. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, LSD&C SHALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. 1 • • • . • 1 1 ••1'1 1T' 1 I•` • 1 •,1 1 1. SECTION 2305M: COMMON WORK RESULTS FOR HVAC A. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C -CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR AND IN ORDER TO SUPPORT DUCTWORK OR PIPING THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI -ELECTRICALLY SEPARATED. B. VIBRATION ISOLATION DEVICES 1. SPRING VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND STRUCTURE. ISOLATORS TO BE SIZED ACCORDING TO LOAD WITH A MIN. 1" DEFLECTION. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 2. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING" THE ISOLATOR. 3. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS EQUIPMENT, ETC. 4. CONSULT MANUFACTURER FOR APPLICATION DATA. C. TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO IS A CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE INCLUDED IN THE BID. HOWEVER, IT WILL BE THE G.C. THAT WILL CONTRACT DIRECTLY WITH THE AIR BALANCING COMPANY. 2. FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND SUBMITTED WITH FINAL CLOSE-OUT DOCUMENTS TO LSD&C 1 WEEK PRIOR TO MERCHANDISING DATE. 3. THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES (WITH CONTROLS VENDOR REMOTELY SUPPORTING THE SEQUENCES) AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS ONE DAY PRIOR TO MERCHANDISING. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION: A. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. B. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. C. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. D. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. E. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. F. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. G. OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AT FULL COOLING. H. WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND PRESSURE READINGS (WHERE APPLICABLE). I. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. J. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). K. INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS. L. MAXIMUM AND MINIMUM SET POINTS FOR DEMAND CONTROL VENTILATION SYSTEMS INCLUDING CFM, FAN SPEED, AND OUTDOOR AIR DAMPERS POSITIONS. 5. BALANCE ALL MEDIA QUANTITIES TO WITHIN 5% OF THAT INDICATED ON THE DRAWINGS WITH STORE IN OPERATING CONDITION (SALES/NON-SALES, OFFICE, AND RESTROOM DOORS CLOSED). ANY REQUIRED CHANGES IN SHEAVES, BELTS OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO LSD&C. 6. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE BALANCE REPORT. 7. AIR BALANCING CONTRACTOR IS TO CONFIRM OVERRIDE OF MINIMUM OUTSIDE AIR INTAKE UPON CO2 MONITORING CONFIRMATION. FOR CO2 MONITORING CONTACT, SEE CONTACT INFORMATION ON SHEET M01.01. 8. THREE COPIES (ELECTRONIC COPIES ARE ACCEPTABLE) OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO LSD&C FOR APPROVAL. THE GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO LSD&C. SUBMIT ONE COPY OF FINAL APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. 9. TRANE SHALL BE RESPONSIBLE FOR ENSURING PROGRAMMING FOR ALL OUTDOOR AIR DAMPERS REFLECTS THE APPROVED CERTIFIED AIR BALANCE. CONTROLS VENDOR SHALL PROVIDE REMOTE SUPPORT AS NEEDED TO TAB CONTRACTOR TO ENSURE DAMPER SETPOINT. 10.THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO LSD&C THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT LSD&C DEEMS NECESSARY AT NO ADDITIONAL COST TO LSD&C. D. VALVES 1. GATE VALVES, 2 -INCH AND SMALLER: CLASS 150, BODY AND UNION BONNET OF ASTM B 62 CAST BRONZE WITH THREADED OR SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE -PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. 2. GATE VALVES, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY, RENEWABLE BRONZE SEATS AND SOLID WEDGE DISC, RISING STEM, FLANGED ENDS, AND RE -PACKABLE UNDER PRESSURE. 3. SWING CHECK VALVES, 2 -INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING, Y -PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. 4. SWING CHECK VALVE, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. 5. COMBINATION BALANCING AND SHUTOFF VALVES: BELL & GOSSETT CIRCUIT SETTER WITH LOCKING SET POINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 & M MANUAL. TACO OR GRISWOLD ARE CONSIDERED AS EQUAL SECTION 230700: HVAC INSULATION A. DUCTWORK INSULATION 1. FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA/NFPAC 90A. 2. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84-05, OR AS REQUIRED BY LOCAL CODES. 3. DUCTWORK SHALL BE INSULATED ACCORDING TO THE ENERGY CODE ADOPTED BY LOCAL AHJ. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM CODE AND PROVIDE ADEQUATE INSULATION AS INDICATED BELOW (WITHIN ASSUMED PARAMETERS).THIS SPEC DOES NOT INCLUDE REQUIREMENTS FOR DUCTWORK LOCATED WITHIN A VENTILATED ATTIC OR OUTSIDE. IN SUCH INSTANCES, REFER DIRECTLY TO CODE ADOPTED BY LOCAL AHJ. a. RECTANGULAR SUPPLY AND RETURN AIR DUCTS - PLENUM OR DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE EXTERNALLY INSULATED TO THICKNESS LISTED BELOW. (1) ASHRAE 90.1-2007, 2010 & 2013. IECC-2009, 2012 & 2015. OREGON ENERGY CODE -2014. WASHINGTON STATE ENERGY CODE -2015: PROVIDE 2" THICK, 1.0 LB/FT�3 (R=7.6, R=6.1 INSTALLED) DUCT WRAP WITH VAPOR BARRIER 4. ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED AS INDICATED: a. PLENUM AND DUCTED RETURN AIR SYSTEMS: ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A DUCT WRAP WITH VAPOR BARRIER. REFER TO THICKNESS BELOW. VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE OVERLAPPED AND TUCKED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND OTHER PENETRATIONS. (1) ASHRAE 90.1-2007, 2010 & 2013. INTERNATIONAL ENERGY CODE -2009, 2012 & 2015. OREGON ENERGY CODE -2014: PROVIDE A MINIMUM OF 2" THICK, 1.0 LB/FT-3 (R=7.6, R=6.1 INSTALLED) DUCT WRAP WITH VAPOR BARRIER. (2) 2015 WASHINGTON STATE ENERGY CODE: (a) SUPPLY AND RETURN AIR ROUND AND OVAL DUCTWORK INSULATION: ROUND/OVAL SUPPLY AND RETURN AIR DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 2" THICK DUCT WRAP, 1.0 LB/FT-3 (INSTALLED R-6.1). (b) OUTSIDE AIR DUCTWORK INSULATION FOR UNITS SUPPLYING LESS THAN 2800 CFM: ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 2-1/2" THICK DUCT WRAP, 0.75 LB/FT'3 (INSTALLED R-7.1). (c) OUTSIDE AIR DUCTWORK INSULATION FOR UNITS SUPPLYING MORE THAN 2800 CFM: PROVIDE TWO LAYERS OF 2.5" THICK, 2.25 LB/FT" 3, EXTERNAL BOARD INSULATION (CONDUCTIVITY 0.24 O 75'F; R-20.8). B. HYDRONIC PIPING INSULATION 1. ALL HYDRONIC PIPING FOR CHILLED WATER AND/OR HOT WATER (NOT INCLUDING CONDENSER WATER UNLESS SPECIFICALLY NOTED OTHERWISE), VALVES, FITTINGS, AND ACCESSORIES SHALL BE INSULATED ACCORDING TO THE ENERGY CODE ADOPTED BY LOCAL AHJ. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM CODE AND PROVIDE ADEQUATE INSULATION AS INDICATED BELOW (WITHIN ASSUMED PARAMETERS). CHILLED WATER TEMPERATURE IS ASSUMED TO BE NO LESS THAN 40'F AND HOT WATER TEMPERATURE NO GREATER THAN 200'F. IN THE CASE THAT ACTUAL PROJECT CONDITIONS EXCEED THESE VALUES, REFER DIRECTLY TO THE CODE ADOPTED BY LOCAL AHJ FOR REQUIREMENTS. a. PER ASHRAE 90.1-2007: (1) WHEN ALL PIPE SIZES ARE LESS THAN 8 INCHES: INSULATE WITH 1 INCH THICK FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATION SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.28 BTUIN/HFT2'F ©75'F WHEN TESTED IN ACCORDANCE WITH ASTM C 547. (2) WHEN PIPE SIZES EXCEED 8 INCHES: INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATION SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.28 BTUIN/HFT2'F AT 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. INSULATE PIPES SIZED LESS THAN 8 INCHES WITH 1 INCH THICK INSULATION. INSULATE PIPES SIZED 8 INCHES AND LARGER WITH 1-1/2" THICK INSULATION. b. PER ASHRAE 90.1-2010: 1 WHEN ALL PIPE SIZES ARE LESS THAT 1-1 2 INCHES: INSULATE WITH 1-1 2 INCH THICK FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATION SHALL HAVE A (CONDUCTIVITY NOT TO EXCEED 0.26 BTUIN/HFT2'F ©75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. (2) WHEN PIPE SIZES EQUAL OR EXCEED 1-1/2 INCHES: INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATE PIPES SIZED LESS THAN 1-1/2 INCHES WITH 1-1/2 INCH THICK INSULATION. INSULATE PIPES SIZED 1-1/2 INCHES AND LARGER WITH 2" THICK INSULATION. INSULATION SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.26 BTUIN/HFT2'F ©75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. c. 2009 INTERNATIONAL ENERGY CONSERVATION CODE: (1) INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATION SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.27 BTUIN/HFT2'F O 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. INSULATE PIPES SIZED 1-1/2 INCHES AND SMALLER WITH 1 INCH THICK INSULATION. INSULATE PIPES SIZED LARGER THAN 1-1/2 INCHES WITH 1-1/2 INCH THICK INSULATION. d. 2012 INTERNATIONAL ENERGY CONSERVATION CODE: (1) INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATE CHILLED WATER PIPES WITH 1 INCH THICK INSULATION HAVING A CONDUCTIVITY NOT TO EXCEED 0.28 BTUIN/HFT2'F © 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. INSULATE HOT WATER PIPES WITH 2 INCH THICK INSULATION HAVING A CONDUCTIVITY NOT TO EXCEED 0.28 BTUIN/HFT2'F 0 125'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. e. 2013 CALIFORNIA ENERGY CODE: (1) INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATE CHILLED WATER PIPES WITH 1 INCH THICK INSULATION WITH A CONDUCTIVITY NOT TO EXCEED 0.27 BTUIN/HFT2'F AT 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C335. INSULATE HOT WATER PIPES WITH 2" THICK INSULATION WITH A CONDUCTIVITY NOT TO EXCEED 0.29 BTUIN/HFT2'F AT 125'F WHEN TESTED IN ACCORDANCE WITH ASTM C335. f. 2012 WASHINGTON STATE ENERGY CODE: (1) INSULATE' WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATE CHILLED WATER PIPES WITH 1-1/2 INCH THICK INSULATION WITH A CONDUCTIVITY NOT TO EXCEED 0.26 BTUIN/HFT2'F AT 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C335. INSULATE HOT WATER PIPES (UP TO 200'F) SIZED LESS THAN 1.5 INCHES WITH 1-1/2" THICK INSULATION WITH A CONDUCTIVITY NOT TO EXCEED 0.29 BTUIN/HFT2'F AT 125'F WHEN TESTED IN ACCORDANCE WITH ASTM C335. INSULATE HOT WATER PIPES SIZED 1.5 INCHES OR LARGER WITH 2" THICK INSULATION WITH A CONDUCTIVITY NOT TO EXCEED 0.29 BTUIN/HFT2'F AT 125'F WHEN TESTED IN ACCORDANCE WITH ASTM C335. g. 2010 OREGON ENERGY EFFICIENCY SPECIALTY CODE: (1) INSULATE WITH FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. INSULATION SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.27 BTUIN/HFT2'F L' 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C547. INSULATE PIPES SIZED 1-1/2 INCHES AND SMALLER WITH 1 INCH THICK INSULATION. INSULATE PIPES SIZED LARGER THAN 1-1/2 INCHES WITH 1-1/2 INCH THICK INSULATION. 2.INSULATION AT ALL HANGERS FOR PIPING 2-1/2 INCHES AND LARGER SHALL BE HARD AND NON-COMPRESSIBLE. 3. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 TO CONFORM WITH THE REQUIREMENTS OF THE NFPA/NFPAC. 4. PROVIDE ZESTON OR EQUAL INSULATION FITTINGS FOR ALL TEES, ELLS OR SPECIALTY FITTINGS. REFRIGERANT PIPING INSULATION 1. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES WITH 1 1/2" PIPE INSULATION SIMILAR TO FLEXTHERM SEAM_SEAL OR INSUL-LOCK. INSULATION SHALL BE A CLOSED CELL FIBER FREE ELASTOMERIC FOAM IN ACCORDANCE WITH ASTM C 534, TYPE I TUBULAR, GRADE 1; SHALL HAVE A CONDUCTIVITY NOT TO EXCEED 0.26 BTUIN/HFT2'F AT 75'F WHEN TESTED IN ACCORDANCE WITH ASTM C 177 OR C 518; SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84; AND SHALL HAVE A MAXIMUM WATER ABSORPTION % OF 0.2 BY VOLUME WHEN TESTED IN ACCORDANCE WITH ASTM C 209. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS. ECTION 230800: COMMISSIONING OF HVAC DETAILED HVAC COMMISSIONING INFORMATION IS INCLUDED IN THE LSD&C SITE MANUAL PROVIDED TO THE CONTRACTOR AT THE START OF THE PROJECT. MANUFACTURER WILL CONTACT THE CONTRACTOR EARLY IN THE PROJECT TO SET PRELIMINARY DATES FOR HVAC INSPECTION, COMMISSIONING AND HVAC CONTROLS COMMISSIONING. WORK REQUIRED PRIOR TO HVAC INSPECTION / COMMISSIONING (TO BE COMPLETED BY MECHANICAL SUBCONTRACTOR) 1. CONNECT AND BLEED CONDENSATE, DUCTWORK, NATURAL GAS, CHILLED WATER PIPING, AND/OR CONDENSER WATER PIPING. 2. CHARGE HVAC SYSTEMS WITH REFRIGERANT FOLLOWING MANUFACTURERS' GUIDELINES AND INSTRUCTIONS. COLD WEATHER CONDITIONS REQUIRE SPECIFIC PROCESSES, CONTACT MANUFACTURER FOR TECHNICAL SUPPORT. 3. CONNECT POWER TO THE HVAC EQUIPMENT FOR A MINIMUM OF 24 HOURS. a. IN COLD WEATHER SITUATIONS, DO NOT OPERATE THE UNITS PRIOR TO COMMISSIONING! 1. HVAC EQUIPMENT SHOULD BE STARTED UP EARLY IN THE PROJECT. COORDINATE EARLY STAT UP OF EQUIPMENT WITH THE MANUFACTURER. THE GC MAY BE BACK CHARGED FOR ADDITIONAL AC SITE VISITS BEYOND THE FIRST THREE (3) NECESSARY TO DOCUMENT THE RESOLUTION OF THE HVAC PUNCHLIST ITEMS. • HVAC COMMISSIONING PROCESS 1. VISIT 1: HVAC EQUIPMENT START UP - CONTRACTOR SHALL HAVE THE MECHANICAL AND ELECTRICAL SUBCONTRACTOR ON SITE DURING THE HVAC INSPECTION AND COMMISSIONING. BUDGET 5 HOURS FOR THE HVAC INSPECTION AND COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) a. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE HVAC EQUIPMENT STAT UP SURVEY TO MANUFACTURER PRIOR TO THE HVAC STARTUP. b. MANUFACTURER COORDINATES THE HVAC EQUIPMENT COMMISSIONING. CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES TO MANUFACTURER AND SUBCONTRACTORS. c. PROVIDED THERE ARE NO HVAC INSTALLATION ISSUES SYSTEMS SHALL BE STARTED FOR TEMPORARY OPERATION ON LOCAL CONTROL. d. IF THERE ARE HVAC INSTALLATION PUNCHLIST ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE COMMISSIONING WITH MANUFACTURER. 2. VISIT 2: HVAC CONTROLS COMMISSIONING - THE CONTROLS COMMISSIONING IS PERFORMED BY THE MANUFACTURER IN CONJUNCTION WITH THE GENERAL CONTRACTOR AND THE MECHANICAL AND ELECTRICAL SUBCONTRACTORS. ALLOW FOR 4 HOURS TO COMPLETE THE CONTROLS COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) FOLLOW THE CONSTRUCTION DRAWINGS AND MANUFACTURER'S DETAILS AND DRAWINGS DURING THE INSTALLATION OF THE HVAC CONTROL EQUIPMENT. a. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE CONTROLS COMMISSIONING SURVEY TO MANUFACTURER PRIOR TO THE CONTROL COMMISSIONING. b. CONNECT THE HVAC CONTROLS TO AN OPERATIONAL ANALOG PHONE LINE OR ETHERNET CONNECTION TO ALLOW COMMUNICATION. IF NECESSARY, UTILIZE SITE FAX LINE TO CONNECT TO THE CONTROLS MODEM IN THE IFS PANEL. c. CONTACT MANUFACTURER AT THE SCHEDULED TIME FOR THE CONTROLS COMMISSIONING. d. PROVIDED THERE ARE NO OPEN ISSUES, VISIT. 2 IS COMPLETE. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE THE CONTROLS COMMISSIONING. 3. VISIT 3: FINAL HVAC INSPECTION - THIS VISIT IS TO DO A FINAL INSPECTION OF THE HVAC EQUIPMENT AND CONTROL INSTALLATION. THE CONTRACTOR IS RESPONSIBLE FOR HAVING THE MECHANICAL SUBCONTRACTOR AND THE ELECTRICAL SUBCONTRACTOR ON SITE DURING THE FINAL INSPECTION. BUDGET 4 HOURS FOR THE FINAL INSPECTION. THIS VISIT MUST TAKE PLACE PRIOR TO CONSTRUCTION COMPLETION. THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO THE INSPECTION: (1) THE GC MUST COMPLETE TRANE'S SITE VISIT #3 SURVEY PRIOR TO THE VISIT BEING SCHEDULED. (2) HVAC SYSTEM INSTALLATION IS COMPLETE - NO OPEN PUNCHLIST ITEMS EXCEPT FOR POSSIBLY THE PERMANENT PHONE LINE. (3) AIR BALANCE IS COMPLETE. NOTE: AIR BALANCE IS IN THE CONTRACTOR'S SCOPE OF WORK. b. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES FOR THE FINAL INSPECTION. c. FILTERS ARE TO BE REPLACED DURING THIS VISIT. FILTERS ARE TO BE PROVIDED BY THE CONTRACTOR AND SHALL BE ON SITE WHEN THE TRANE TECHNICIAN ARRIVES. d. WHEN COMPLETE AND ALL OPEN CONTRACTOR HVAC ISSUES ARE RESOLVED A CONTROL NUMBER IS ISSUED BY THE MANUFACTURER. IT IS RECORDED INSIDE THE CONTROL PANEL DOOR IN THE IFS ELECTRICAL PANEL AND ON THE FINAL VISIT CHECK LIST. e. IN THE EVENT THERE ARE OPEN ITEMS, THE CONTRACTOR MUST CORRECT THEM AND RESCHEDULE THE FINAL INSPECTION WITH THE MANUFACTURER. GC IS RESPONSIBLE FOR REPLACEMENT OF SHEAVES, PULLEYS, AND BELTS, IF NEEDED. f. THE HVAC CONTROL NUMBER WILL BE ISSUED AT THE END OF THE VISIT PROVIDED THERE ARE NO UNRESOLVED HVAC PUNCHLIST ITEMS. g. THE TRANE TECHNICIAN WILL WRITE THE HVAC CONTROL NUMBER ON THE STICKER INSIDE THE WR CONTROLS PANEL (IFS PANEL) AND ON THE FINAL VISIT CHECK LIST. h. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 3RD PARTY COMISSIONING/REVIEW REQUIRED BY CODE. • ECTION 230900: INSTRUMENTATION AND CONTROL FOR HVAC WORK RESPONSIBIUTY 1. LSD&C HVAC SUPPLIER WILL FURNISH NECESSARY CONTROL DEVICES TO THE FIELD. FOR ALL DEVICES NOT FACTORY INSTALLED, IT WILL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO INSTALL. • ECTION 232100: HYDRONIC PIPING AND PUMPS HYDRONIC PIPING 1. FURNISH AND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM IS REQUIRED. UNLESS OTHERWISE NOTED THE WORKING PRESSURE FOR SYSTEM PIPING AND COMPONENTS SHALL BE AT MINIMUM 150 PSIG. 2. PIPING a. HYDRONIC PIPING FOR CHILLED WATER, CONDENSER WATER AND/OR HEATING WATER SHALL BE ASTM A 53, SCHEDULE 40, ERW, BLACK STEEL PIPE WITH PLAIN ENDS. INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE IS 2-1/2 INCH AND LARGER. INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS. INSTALL TYPE "K" COPPER PIPE FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE IN STRICT CONFORMANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMENTS; WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. b. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMUM PRESSURE OF 125 PSI. c. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. FILL TENANT'S SYSTEM WITH DOMESTIC WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT FILL TENANT'S SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM THE LANDLORD'S FIELD REPRESENTATIVE. ANY RUNS THRU A CHASE OR SHAFT WILL BE DONE WITH FEWEST JOINTS POSSIBLE USING THE LONGEST LENGTH OF HARD COPPER PIPE AVAILABLE. SHOULD A JOINT BE REQUIRED, CONTRACTOR SHALL MAKE ALL EFFORTS TO KEEP THE JOINTS IN ACCESSIBLE AREAS. d. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. 3. PIPING SPECIALTIES a. PRESSURE/TEMPERATURE TEST PLUGS (PETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE, 1/8 INCH 0.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 PSIG, 0 TO 200 DEGREES F. b. STRAINERS - "Y" PATTERN STRAINERS, 125 PSIG, CAST IRON BODY WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2-1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BLOWDOWN VALVE WITH HOSE END FITTING. c. FLEXIBLE HOSE: PIPE SIZE 1/2 INCH TO 1-1/4 INCH - PROVIDE PLENUM RATED STAINLESS STEEL BRAIDED HOSE WITH EPDM CORE. END CONNECTIONS SHALL BE COMPATIBLE WITH PIPES TO BE JOINED. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. PIPE SIZE 1 1/2 INCH AND LARGER - PROVIDE STAINLESS STEEL BRAIDED HOSE OVER A CORRUGATED STAINLESS STEEL TUBE WITH CARBON STEEL END FITTINGS. END FITTINGS SHALL BE COMPATIBLE WITH PIPES TO BE JOINED. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. d. DIELECTRIC UNIONS: WHERE JOINING TWO SEPARATE METALS PROVIDE A CONNECTOR ASSEMBLY OF COPPER ALLOY AND FERROUS MATERIALS WITH SEPARATING NONCONDUCTIVE INSULATING MATERIAL INCLUDE END CONNECTIONS COMPATIBLE WITH PIPES TO BE JOINED. 4. GENERAL INSTALLATION a. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. ., : 1 • 1 $1 1`+ 1. 1 1 : 1 '1Y :1 iv 1 Y, 1 1 1 • 18,7 ,•1 1"•'1 11 BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1" TO 10 FEET. c. SEE MECHANICAL DETAIL DRAWINGS FOR APPLICABLE DETAILS. d. PROVIDE UL/ULC LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS THROUGH RATED WALLS. PENETRATIONS SHALL MEET THE REQUIREMENTS OF UL/ULC DETAILS WL1001 (UNINSULATED WALL) AND WL5039 (INSULATED WALL). ECTION 232300: REFRIGERANT PIPING REFRIGERANT PIPING: 1. THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR CONDENSING UNITS. REFER TO PLANS TO DETERMINE IF A REFRIGERANT SYSTEM IS REQUIRED. NEW PIPING IS REQUIRED. REUSE OF EXISTING PIPING IS NOT ALLOWED. 2. PIPING a. REFRIGERANT PIPING SHALL BE TYPE ACR COPPER TUBING. TUBING SHALL BE CLEAN AND CLEAR OF DEBRIS, AND EVACUATED WITH A DEEP VACUUM PRIOR TO REFRIGERANT CHARGE. THE CONTRACTOR SHALL CONFIRM THE DIAMETER OF THE REFRIGERANT PIPING RUNS IN EXCESS OF 50 EQUIVALENT FEET WITH THE ARCHITECT, ENGINEER, AND MANUFACTURER FOR ALL SPLIT SYSTEMS. NO REFRIGERANT PIPING RUNS EXCEEDING 100 EQUIVALENT FEET ARE TO BE INSTALLED WITHOUT LSD&C PM'S PERMISSION. THE MANUFACTURER SHALL PROVIDE ALL FINAL PIPE SIZING AND COIL SELECTIONS FOR ALL REFRIGERANT PIPING SYSTEMS. b. ALL FITTINGS AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE (ANSI B 16.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH A COPPER -PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE BRAZED WITH SILFOS-5 ALLOY. c. ALL ELBOWS ARE TO BE LONG RADIUS TYPE. 3. INSTALLATION a. REFRIGERANT PIPE SIZING SHALL BE THE RESPONSIBILITY OF THE HVAC SUPPLIER. CONTRACTOR WILL PROVIDE A SCHEMATIC PROPOSED LAYOUT OF THE SYSTEM INCLUDING ALL ELBOWS, RISES, RUNS, ETC., WITH DIMENSIONS. THE HVAC SUPPLIER WILL THEN PROVIDE WRITTEN DOCUMENTATION OF PIPE SIZES AND ADDITIONAL REQUIRED SYSTEM COMPONENTS TO THE FIELD. b. SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND/OR DOUBLE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. c. BRAZE ALL JOINTS WITH SILFOS-5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT. THE SEALS ON THE OUTDOOR UNIT SHALL BE BROKEN LAST. A NITROGEN BLEED SHALL BE USED DURING ALL BRAZING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL BE CAPPED AND SEALED' BEFORE LEAVING THE SITE DURING CONSTRUCTION. PRESSURE TEST FOR LEAKS WITH AN INERT GAS UP TO 245 PSIG. REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. EVACUATE ENTIRE SYSTEM TO 200 MICRONS OF MERCURY. CHARGE SYSTEM WITH 5 PSI OF R -410A AND AN INERT GAS TO 245 PSI AND RETEST SYSTEM. ENERGIZE CRANK CASE HEATERS 24 HOURS PRIOR TO STARTING COMPRESSOR TO ENSURE THAT ALL REFRIGERANT LIQUID IS OUT OF THE COMPRESSOR. d. UPON COMPLETION OF TESTING, BUT BEFORE THE REFRIGERANT PIPING INSULATION IS APPLIED, THE PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. e. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES AS SPECIFIED HEREIN. f. PROVIDE UL/ULC LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS THROUGH RATED WALLS. PENETRATIONS SHALL MEET THE REQUIREMENTS OF UL/ULC DETAILS WL1001 (UNINSULATED WALL) AND WL5039 (INSULATED WALL). 4. INSPECTION a. CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO THE LOCAL MANUFACTURER REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, THIS CONTRACTOR MUST CALL THE LOCAL REPRESENTATIVE FOR FIELD INSPECTION OF WORK PERFORMED. ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY MANUFACTURER REPRESENTATIVE MUST BE CORRECTED. THIS INSPECTION IS PERFORMED AT LSD&C EXPENSE. ECTION 233100: HVAC DUCTS AND CASINGS METAL DUCTWORK 1. NO FIBERGLASS DUCT ALLOWED (RETURN AIR GRILLE BOOTS MAY BE DUCT BOARD WHERE ALLOWED BY LANDLORD). 2. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SHOP DRAWING MUST BE SUBMITTED INDICATING CONSTRUCTION METHODS FROM DESIGN AND MUST BE APPROVED BY LSD&C'S PROJECT MANAGER PRIOR TO FABRICATION OR INSTALLATION. 3. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (1 E. UMC, BOCA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 4. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: a. SUPPLY DUCTS: 2" W.G., POSITIVE b. RETURN AND EXHAUST DUCTS: 2" W.G., NEGATIVE EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: c. SUPPLY DUCTS: CLASS B - 3" W.G. d. RETURN AND EXHAUST DUCTS: CLASS C - 2" W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. 4. ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCKSEAM CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND DUCTWORK SIZES 13" DIAMETER AND SMALLER MAY BE SNAP -LOCK CONSTRUCTION. ALL SNAP -LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. 5. ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK IN HORIZONTAL APPLICATION WHEN ABOVE CEILING CLEARANCES PERMITS AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; ALL SUPPLY AND RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED. ONCE A TRANSITION IN THE DIRECTION OF THE AIRFLOW TO SPIRAL HAS BEEN DONE, DUCT WILL NOT BE ALLOWED TO REVERT TO RECTANGULAR. WHERE ROUND DUCT SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK TO LSD&C PROJECT MANAGER'S FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. 6. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN RIGHT ANGLE ELBOWS IN MAIN DUCT PER LATEST EDITION OF SMACNA. 7. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE/PROVINCE AND LOCAL CODES OR BY LANDLORD. 8. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1 -1/2"X1 -1/2"X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 9. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS -FIBER -FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. 10. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 11. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 12. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY LSD&C'S PROJECT MANAGER PRIOR TO INSTALLATION. IN HARD CEILINGS, LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-0" OF DEVICE. 13. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. SEE MECHANICAL DRAWINGS FOR DETAIL. MEDIUM PRESSURE DUCT 1. WHERE DUCTWORK 'IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RATING OF 4 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH THE LANDLORD'S CRITERIA. 3. CONNECTIONS TO THE LANDLORD'S MEDIUM PRESSURE DUCTWORK SHALL BE MADE WITH "LO -LOSS" SADDLE TEE TAPS OR AS OTHERWISE REQUIRED BY THE LANDLORD. 4. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTION THAT ALL MEDIUM PRESSURE DUCTWORK MUST BE WRAPPED WITH INSULATION, NOT LINED. ECTION 233300: AIR DUCT ACCESSORIES FLEXIBLE CONNECTIONS 1. FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE -COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. FLEXIBLE AIR DUCT 1. FLEXIBLE AIR DUCT SHALL BE 1" INSULATED CLASS 1, UL/ULC LISTED AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. 2. FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON THE DRAWINGS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 8'-0" IN LENGTH AT ANY ONE LOCATION. WHERE LANDLORD HAS SHORTER LENGTH RESTRICTIONS, COMPLY WITH LANDLORD REQUIREMENTS. SUPPLY AIR TAKE -OFF FITTINGS 1. FURNISH AND INSTALL CONICAL, TAPERED OR 45 DEGREE SADDLE TAKEOFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALLATION SHALL BE PER SMACNA LATEST EDITION. DAMPERS 1. WHERE DESIGNATED, FURNISH AND INSTALL ROUND BALANCING DAMPERS. PROVIDE MINIMUM 20 GAUGE GALVANIZED STEEL FRAME AND BLADES WITH MINIMUM 3/8" SQUARE STEEL AXLE, AND MOLDED SYNTHETIC BEARINGS (EQUIVALENT TO RUSKIN MODEL MDRS25) WITH MANUAL LOCKING POSITION REGULATOR WITH STANDOFF (EQUIVALENT TO DURO DYNE MODEL KR). 2. WHERE DESIGNATED, FURNISH AND INSTALL RECTANGULAR VOLUME DAMPERS. PROVIDE MINIMUM 16 GAUGE GALVANIZED STEEL CHANNEL FRAME, 16 GAUGE GALVANIZED STEEL BLADES, MINIMUM 1/2" HEXAGONAL AXLE, MOLDED SYNTHETIC BEARINGS, WITH 3/8" SQUARE PLATED STEEL CONTROL SHAFT (EQUIVALENT TO RUSKIN MODEL CD35). MAXIMUM BLADE WIDTH SHALL NOT EXCEED 6". LINKAGES SHALL BE CONCEALED IN THE FRAME. CONTROL SHAFT SHALL EXTEND BEYOND FRAME AND DUCT COVERING TO A LOCKING QUADRANT WITH ADJUSTABLE LEVER (EQUIVALENT TO DURO DYNE MODEL K-4) WITH STANDOFF. 3.OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18" LONG ORANGE MARKER TAPE AND SHALL BE INSTALLED FAR ENOUGH AWAY FROM DUCT TO ENSURE IT FULLY AND COMFORTABLY CLEARS THE INSULATION WHEN TURNED. 4. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, A REMOTE DEVICE, MANUALLY OPERATED SHALL BE USED. UNITS SHALL BE ORDERED THREE WEEKS BEFORE INSTALLATION TO ALLOW FOR DELIVERY LEAD TIME. FIRE/SMOKE DAMPERS 1. FURNISH AND INSTALL PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL/ULC LABELED AND MEET ALL CODE REQUIREMENTS. 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 165 DEGREE F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH AND INSTALL ACCESS DOORS AS NECESSARY. 3. FURNISH AND INSTALL ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL/ULC AND CODE REQUIREMENTS. 4. FIRE/SMOKE DAMPERS SHALL BE FURNISHED AND INSTALLED WITH ELECTRIC POWERED MECHANISM. COORDINATE WITH ELECTRICAL CONTRACTOR FOR POWER'REQUIREMENTS MIS alzz M -Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 phone: 614.839.4639 fax: 614.839.2222 www. mengineering. us. com ,kms OF ` S '1'7► C.) 44� < X000 �p0 ,p,,3_G240�� O'��s AUG 2 5 2017 z 0 U J z 0 U 06 ttznn V w 0 w 0 M d' M N. O O r -O v) .Q � ELL O O O 0 >+ 0 V r N � _ c J O O � O O -C O !-1- J a aZ x � � W C � 4 NW = 0 0 = 0 a = 0 ��os� N w !) W U = U O v W W 4 V S W W Z NON � - < = 0 0 Z W z U 1.1 - [N7 < = - W E C 0 oyayw0 °3 C W W E C=.7 0 W N 0 In 0 d H H N W W W_ W 0 = O 3 ,„ � a _ ,N„ W 0 O W = Z 4 1= Z 0 ass°m `� 3 4 O W W < yJj 4 W 0 2 O p Z W Z 0 O 0 O 0, V O W Z O a D = O Q w d 1-- U a C 0 3 0 W O U 4 z 4 aa,�,Ozp >-Z =mom<< p W W N N V W1.� O= U W K a Z 0 ,Z, 1= Z W O d W 13 3 ,�, N C {0.1 S W K m W (.'J = d 0 .- 0 0 ___ _ � r o r W W J Z O O H >' N N < W= W Z 0 <- O W Vl y�j = W K U C..> O O C W 1-- W O N ti U (/� .� W N O W' 0< N 3 CC1 c 40 m>"yDO n. < 0aZ< W W O C 0 d U• < 2 - W V O d L i O = d = O 0 w O W V U 0 V O~ U = w w < O N O W moa=o Y��o Q x'00 Q 03'.' V O N W 4 O N JON N Z 20 1= N HHO U < C 0 < V l_ < d 4 W iW- Q = W yowl=La N =a1<_-� v=i In,y,m t 0 < ~ ~ 0 0 .. < O F- !- K O '` W W 3 N= W .� 00 O N� Hfy.7 0 <2H N = 3 � 3 3 o,. o _� W Z N V I < U• 0 N Y WO = 4 O 2 cn W Q z Z Z = Z O 3 • 0 ¢ 0 4 o Z= N Q N V W O O a L 0 N p. 2 U W W >t y 1- W = 1=- 4 C Q N 0 = 0 0 W /L = H 0 0 s e a J J M Ill0000 I-LOwtO ��ZO LLI � w V •SS' 1-zog =wu,- U PROJECT INFORMATION: 1- Z U W cam IC W QW� a c� a 'F •)W J LIA P REVSIV�U REQUIR BY: SEP 0 7 2017 ATE City of Tukwila I'RIl�If ` in! / Q� PERMIT CENTER DATE ISSUED: DESIGNED. BY: DRAWN BY: CHECKED BY: 08/25/17 GMT GMT BMM MECHANICAL SPECIFICATIONS DRAWING NUMBER: