Loading...
HomeMy WebLinkAboutPermit M17-0139 - DCHS WORKSOURCE - CEILING FAN, VAV BOX, DIFFUSERSDCHS WORKSOURCE 645 ANDOVER PARK W M17-0139 Parcel No: Address:, Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 2623049143 645 ANDOVER PARK W DCHS WORKSOURCE MECHANICAL PERMIT Permit Number: Issue Date: Permit Expires On: M17-0139 10/9/2017 4/7/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SOUTHCENTER CORPORATE SQUAR 635 ANDOVER PARK W #107 , TUKWILA, WA, 98188 CONNIE HARDIN 4600 5 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS INC 4600 S 134 PL , SEATTLE, WA, 98168 HOLADP1379NO Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2019 DESCRIPTION OF WORK: INSTALL (1) CEILING FAN, (1) VAV BOX AND (15) DIFFUSERS. RELOCATING (5) DIFFUSERS AND ASSOCIATED DUCTWORK. Valuation of Work: $20,000.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $477.93 Electrical Service Provided by: PUGEST SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Date: [U I ( 7 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or ocal laws r-_ulating construction or the performance of work. I am authorized to sign and obtain this develo •i- i a"? agr-e to the con Won attached to this permit. ( r1 Signature Date: Print Name: ri `--Nk('r. i 1 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0701 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. aar6a)rcc CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. N't (7 013 7 Project No. Date Application Accepted: L0-)„.( Date Application Expires: /� ��_ -.- (For office use only) MECIIANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION put) ik King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: ❑ Yes Site Address.LI4 J Tenant Name:ItlQ Jrc PROPERTY OWNER bc crab_LR r �Sl'' Name: y� _,en Ln�G1�- Address:6zs`Y��✓n /)m.e. 'Y A State: 604 Zip:e‘trri w CONTACT PERSON — person receiving all project communication Name: � DnY) .e i" Addressq Leo s `gt }{�� D t ✓`Zip:0v City„✓ State: Phone:2O` 2LI�'\ Fax: b `� , i,7 w aileiAs .�6.� Email: A_ n n i 0��C MECHANICAL CONTRACTOR INFORMATION Company Name:666‘1124 \ S Address: 4 (W j q1,,, pi `Statatp: CityF4 _ _ Zie siLik Phon z cvii solo Fax. AN1/ 2 qt. g 7,62)Contr layilDate: �.� +,^ eg Ni tpisr (ll Tukwila Business License No.: Q1 �� Valuation of project (contractor's bid price): $ pescribe the sco . e of work in detail: Use: Residential: New Commercial: New Fuel Type: Electric ❑ Replacement Replacement Gas 0 Other: H:\Applications\Fors-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.dacx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfin 60 dB(A) Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfin Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment fes,. , BoX Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam -1 Opm); Testing of backup generators during the day. PERM T APPLICATION NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: Z42440 H t RIZED AG C‘_on na�e Mailing Address: Date: Day Telephone: Ci H:\ApplicationsWorms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh State Zip Page 2 of 2 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $477.93 M17-0139 Address: 645 ANDOVER PARK W Apn: 2623049143 $477.93 Credit Card Fee $13.92 Credit Card Fee R000.369.908.00.00 0.00 $13.92 MECHANICAL ; $446.16 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $323.78 PLAN CHECK FEE R000.322.102.00.00 0.00 $89.23 TECHNOLOGY FEE $17.85 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12459 R000.322.900.04.00 0.00 $17.85 $477.93 Date Paid: Monday, October 02, 2017 Paid By: CINNIE HARDIN Pay Method: CREDIT CARD 08665G Printed: Monday, October 02, 2017 2:11 PM 1 of 1 SYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit /14 t7 - o, 3 d1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: K,C, ,x/Ws tvoRKS'4 Type of Inspection: /51 C/ -//1,N C%-1-- FINAL_ Address: 6`5 ANN) if,‹R PARR kJ Date Called: Special Instructions: Date Wanted: (m.' Requester: Phone No: Approved per applicable codes. E Corrections required prior to approval. COMMENTS: mak, �Ci- (c 6 0—t - Inspector: 7?.5 Date: f2-/—/7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit fI O 037 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: we, ,wes Type of Inspection: , v -Bv idiEn-wincilL. Address: 61/4-- Dc V,'R PARK N/ Date Called: Special Instructions: Date Wanted: 19-30 '17 a.m. p.m. Requester: Phone No: Approved per applicable codes. E Corrections required prior to approval. COMMENTS: paw. Inspector: Date: /6-3047 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. EMT COORD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0139 DATE: 10/02/17 PROJECT NAME: DCHS WORKSOURCE SITE ADDRESS: 645 ANDOVER PARK W X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # k after Permit Issued DEPARTMENTS: Atik, Building Division Public Works ❑ Nrt Io1 1 Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 10/03/17 Not Applicable n Structural Review Required (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/31/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: (Permit Center Use Only e. . CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 HOLADAY PARKS INC Home Espafol Contact Search L&I Page 1 of 3 .A -Z Index Help My L$d Safety & Health Claims & Insurance Workplace Rights Trades & Licensing 0 Washington State Department of Labor & Industries HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County Business type Corporation License Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/9/2017 HOLADAY PARKS INC Verify the contractor's active registration / liL Construction Contractor License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23000452 / certification (depending on trade) and any past violet. Active. Meets current requirements. $12,000.00 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance Charter Oak Fire Ins Co Policy no. DTCO1F465357C0F16 $1,000,000.00 Received by L&I Effective date 10/31/2016 11/01/2016 Expiration date 11/01/2017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 177,231-00 Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 2 of Year 2017 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/22/2016 Inspection no. No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/9/2017 C:IUsers\Shane Smith\Documents\DCHS Renton Worksource - 2017 Central_ssmith@wja-dc.com.rvt 9/1512017 4:07:38 PM Sheet Size: 22"x34" (24"x36") DCHS WORKSOURCE - TI FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 645 ANDOVER PARK WEST, BLDG. 6 TUKWILA, WA CONTRACT #: E00380E1 5 SITE STREET VIEW: WORK ORDER #: CA -0414 CLIENT : KING COUNTY DEPARTMENT OF COMMUNITY AND HEALTH SERVICES PROJECT DESCRIPTION INTERIOR TENANT IMPROVEMENT OF A TWO STORY 20,000SF OFFICE BUILDING FOR THE USE OF THE DCHS WORKSOURCE OFFICE, TO INCLUDE PROGRAM SPACE FOR THE KING COUNTY VETERANS, EMPLOYMENT, AND EDUCATION RESOURCES PROGRAMS. PROGRAM AREA WILL INCLUDE, OFFICE AND ADMINISTRATIVE SPACE FOR EACH PROGRAM, SECURE FILE STORAGE, IN ADDITION TO SHARED CONFERENCE AND MEETING SPACES, CLASSROOM AND COMPUTER RESOURCE AREAS AND TRAINING SPACES. SHEET INDEX SHEET NUMBER SHEET NAME 0001 - GENERAL G-001 COVER SHEET G-002 FIRST FLOOR CODE PLAN G-003 SECOND FLOOR CODE PLAN 0002 - ARCHITECTURAL A-001 ARCHITECTURAL GENERAL NOTES AND LEGENDS A-002 ACCESSIBILITY DETAILS AD101 FIRST FLOOR DEMOLITION PLAN - WEST AD102 FIRST FLOOR DEMOLITION PLAN - EAST AD103 SECOND FLOOR DEMOLITION PLAN - WEST AD104 SECOND FLOOR DEMOLITION PLAN - EAST AD111 FIRST FLOOR DEMOLITION RCP - WEST AD112 FIRST FLOOR DEMOLITION RCP - EAST AD113 SECOND FLOOR DEMOLITION RCP - WEST AD114 SECOND FLOOR DEMOLITION RCP - EAST A-101 FIRST FLOOR PLAN - WEST A-102 FIRST FLOOR PLAN - EAST A-103 SECOND FLOOR PLAN - WEST A-104 SECOND FLOOR PLAN - EAST A-111 FIRST FLOOR RCP - WEST A-112 FIRST FLOOR RCP - EAST A-113 SECOND FLOOR RCP - WEST A-114 SECOND FLOOR RCP - EAST A-401 INTERIOR ELEVATIONS A-501 DETAILS A-502 TYPICAL ACT DETAILS A-503 CASEWORK DETAILS A-601 DOOR SCHEDULES & LEGENDS A-602 FLOOR, WALL & CEILING ASSEMBLIES 0003 - INTERIORS 1-101 LEVEL 1 FINISH PLAN - WEST 1-102 LEVEL 1 FINISH PLAN - EAST 1-103 LEVEL 2 FINISH PLAN - WEST 1-104 LEVEL 2 FINISH PLAN - EAST 0004 - MECHANICAL M-000 LEGEND, ABBREVIATIONS & NOTES M-001 HVAC SCHEDULES MD -101 FIRST FLOOR PLAN - WEST - HVAC DEMO SHEET INDEX SHEET NUMBER SHEET NAME MD -102 FIRST FLOOR PLAN - EAST - HVAC DEMO MD -103 SECOND FLOOR PLAN - WEST - HVAC DEMO MD -104 SECOND FLOOR PLAN - EAST - HVAC DEMO M-101 FIRST FLOOR PLAN - WEST - HVAC M-102 FIRST FLOOR PLAN - EAST - HVAC M-103 SECOND FLOOR PLAN - WEST - HVAC M-104 SECOND FLOOR PLAN - EAST - HVAC M-105 ROOF PLAN - HVAC M-400 SEQUENCE OF OPERATIONS AND POINTS LIST M-500 HVAC DETAILS 0005 - PLUMBING P-000 LEGEND, ABBREVIATIONS & NOTES P-001 PLUMBING SCHEDULES PD -101 FIRST FLOOR PLAN - WEST - PLUMBING DEMO PD -102 FIRST FLOOR PLAN - EAST - PLUMBING DEMO PD 103 SECOND FLOOR PLAN - WEST - PLUMBING DEMO P-101 FIRST FLOOR PLAN - WEST - PLUMBING P-103 FIRST FLOOR PLAN - EAST - PLUMBING 0006 - FIRE PROTECTION FP -000 LEGEND, ABBREVIATIONS & NOTES FP -101 FIRST FLOOR PLAN - WEST - FIRE PROTECTION FP -103 SECOND FLOOR PLAN - FIRE PROTECTION FP -104 SECOND FLOOR PLAN - EAST - FIRE PROTECTION 0007 - ELECTRICAL E-001 SYMBOL LEGEND, ABBREVIATIONS, SHEET LIST E-002 FIXTURE SCHEDULE, NREC FORMS ED101 FIRST FLOOR POWER AND SIGNAL DEMO PLAN ED102 FIRST FLOOR LIGHTING DEMO PLAN ED103 SECOND FLOOR POWER DEMO PLAN ED104 SECOND FLOOR LIGHTING DEMO PLAN E-201 FIRST FLOOR POWER AND SIGNAL PLAN E-202 SECOND FLOOR POWER AND SIGNAL PLAN E-301 FIRST FLOOR LIGHTING PLAN E-302 SECOND FLOOR LIGHTING PLAN E-501 PARTIAL RISER DIAGRAM E-601 PANEL SCHEDULES E-602 PANEL SCHEDULES (2) E-603 PANEL SCHEDULES (3) SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical ElElectricai L9' Plumbing CS/Gas Piping City of Tukwila Bltl! Dl`uG DIVISION. SITE MAP PROJECT SITE VICINITY MAP PROJECT SITE FILE COPY Permit No. WA \l'.(n°1 Plan review approval is subject to errors end omissions. Approval of construction documents does not authorize of any adopted code or ordnance. R is acknowledged: City of Tukwila BUILDING DMSION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a nsw plan submittal and may ireude ,additional plan review fees PERMIT CENTER FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 King County Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 i design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 6431 KING COUNTY REGISTERED ARC HITEC T E ORY J. NESPOR STATE OF WASHINGTON ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 6 2017 . k3 City of Tukwila BUILDING DIVISION Project No.:15032-17ZA Site No.: Drawn By: WJA Checked By: WJA Sheet Title COVER SHEET G-001 GENERAL LEGEND : /////// NORTH ARROW DETAIL, DRAWING REFERENCE SECTION REFERENCE CONSTRUCTION NOTE BOLD LINE WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT INDICATES EXISTING SLASHED LINE INDICATES EXISTING WORK TO BE DEMOLISHED OR ABANDONED AS INDICATED ON PLANS VENTILATION LEGEND SINGLE LINE DUCTWORK INDICATES VIEW DIMENSION LESS THAN 12 J FVD a---FD—�a 111111110324 :D® 4. I (11) SD 4. 4, C3ill1:n 0 VAV-1 100 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36") 4. SUPPLY OR EXHAUST TAKEOFF SUPPLY DUCT TURNING TOWARD SUPPLY DUCT TURNING AWAY EXHAUST DUCT TURNING TOWARD EXHAUST DUCT TURNING AWAY ROUND DUCT TURNING TOWARD ROUND DUCT TURNING AWAY TRANSITION SMOKE DAMPER MOTORIZED DAMPER VOLUME DAMPER FIRE DAMPER ACCESS DOOR, ACCESS PANEL FLEXIBLE CONNECTION TURNING VANES FLEXIBLE DUCT 2'x2' SUPPLY DIFFUSER 2' DIAMETER SUPPLY DIFFUSER 1'x2' EXHAUST GRILLE 2'x2' EXHAUST GRILLE 2'x4' EXHAUST GRILLE SENSORS EQUIPMENT TAG INCHES ABV AD ADDN AFF ALT AP APPROX ARCH AUX BAL BLDG BTU BTUH CAP CL CLG COND COL CONN CONST CONT CONTR COORD DEG DIA DIAG DIFF DIM DISCH DIV DN DP DR DWG EA EFF ELEC ELEV EMCS ENT EQ EQUIP EX, (E) EXP F FIN FLEX FLR FP FT GA GAL GC GEN GPM GWB H HOR HP HR HZ IBC ID IMC IN INFO INSUL KW KWH L LAV LB GENERAL ABBREVIATIONS ABOVE ACCESS DOOR ADDITION, ADDITIONAL ABOVE FINISHED FLOOR ALTERNATE ACCESS PANEL APPROXIMATELY ARCHITECT; ARCHITECTURAL AUXILIARY BALANCING BUILDING BRITISH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR CAPACITY CENTERLINE CEILING CONDENSATE COLUMN CONNECT; CONNECTION CONSTRUCTION CONTINUOUS; CONTINUATION CONTRACTOR COORDINATE DEGREE DIAMETER DIAGRAM DIFFERENTIAL DIMENSION DISCHARGE DIVISION DOWN DIFFERENTIAL PRESSURE DRAIN DRAWING EACH EFFICIENCY ELECTRICAL ELEVATION ENERGY MANAGEMENT CONTROL SYSTEM ENTERING EQUAL EQUIPMENT EXISTING EXPOSED FAHRENHEIT FINISHED FLEXIBLE FLOOR FIRE PROTECTION; FREEZE PROTECTION FEET; FOOT; FEET OF WATER(PRESS) GAGE; GAUGE GALLON GENERAL CONTRACTOR GENERAL GALLONS PER MINUTE GYPSUM WALLBOARD HEIGHT; HIGH HORIZONTAL HORSE POWER HOUR HERTZ INTERNATIONAL BUILDING CODE INSIDE DIAMETER INTERNATIONAL MECHANICAL CODE INCH INFORMATION INSULATE; INSULATION KILOWATT KILOWATT HOUR LENGTH; LONG (DIM) LAVATORY POUND LBS/HR LF LO LTG LVG MAT MAX MBH MCC MECH MED MFG MFR MIN MISC MTD MTG MTL N NA NC NIC NO NOM NTS OC OD OPP PERF PERP PH POC PRELIM PRESS PROP PSI QTY R REF REQD RET RM RPM S SCHED SECT SF SHT SIM SPEC SPECD SQ STD STRUCT TBD TD TEMP TH THRU TYP UBC UL UTI L V VAR VEL VERT VOL W W/0 WT YD YR POUNDS PER HOUR LINEAL FEET LOW LIGHTING LEAVING MATERIAL MAXIMUM THOUSAND BRITISH THERMAL UNITS PER HOUR MOTOR CONTROL CENTER MECHANICAL; MECHANICAL CONTRACTOR MEDIUM MANUFACTURING MANUFACTURER MINIMUM; MINUTE MISCELLANEOUS MOUNTED MOUNTING METAL NORTH NOT APPLICABLE NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN; NUMBER NOMINAL NOT TO SCALE ON CENTER OUTSIDE DIAMETER; OVERALL DIMENSION OPPOSITE PERFORATED PERPENDICULAR PHASE POINT OF CONNECTION PRELIMINARY PRESSURE PROPERTY; PROPOSAL POUNDS PER SQUARE INCH QUANTITY RADIUS; RETURN; RISER REFERENCE REQUIRED RETURN ROOM REVOLUTIONS PER MINUTE SOUTH SCHEDULE SECTION SQUARE FEET SHEET SIMILAR SPECIFICATION SPECIFIED SQUARE STANDARD STRUCTURAL TO BE DETERMINED TEMPERATURE DIFFERENTIAL TEMPERATURE TOTAL HEAD THROUGH TYPICAL UNIFORM BUILDING CODE UNDERWRITER'S LABORATORY UTILITY VOLT VARIABLE VELOCITY VERTICAL VOLUME WATER; WIDE(DIM); WATT WITH WITHOUT WEIGHT YARD YEAR HVAC ABBREVIATIONS AL AC AHU BDD BHP BOD C CC CFM CG CLG COND DDC DMPR DB EA EAT EF EG EXH ACOUSTIC LINED; ALUMINUM AIR CONDITIONING AIR HANDLING UNIT BACKDRAFT DAMPER BRAKE HORSEPOWER BOTTOM OF DUCT CONDENSATE; COMMON COOLING COIL CUBIC FEET PER MINUTE CEILING GRILLE COOLING CONDENSATE DIRECT DIGITAL CONTROLS DAMPER DRY BULB TEMPERATURE(°F) EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN EXHAUST GRILLE EXHAUST FA FACE AREA FD FIRE DAMPER FPM FEET PER MINUTE GALV GALVANIZED GR GRILLE HTG LAT MA OA OAT OSA RA RETURN AIR RG RETURN GRILLE S SFD SP SD SA SF SG SR T, TSTAT THERMOSTAT TG TRANSFER GRILLE VAV VENT VD HEATING LEAVING AIR TEMPERATURE MIXED AIR OUTSIDE AIR OUTSIDE AIR TEMPERATURE OUTSIDE AIR SUPPLY SMOKE/FIRE DAMPER STATIC PRESSURE SMOKE DAMPER; SUPPLY DIFFUSER SUPPLY AIR; SOUND ATTENUATOR SUPPLY FAN SUPPLY GRILLE SUPPLY REGISTER WG WB VARIABLE AIR VOLUME VENTILATE; VENTILATION VOLUME DAMPER WALL GRILLE WET BULB TEMPERATURE(°F) MECHANICAL DRAWING INDEX M-000 M-001 MD -101 MD -102 MD -103 MD -104 M-101 M-102 M-103 M-104 M-105 M-400 M-500 LEGEND, ABBREVIATIONS AND NOTES HVAC SCHEDULES FIRST FLOOR PLAN — WEST — HVAC DEMO FIRST FLOOR PLAN — EAST — HVAC DEMO SECOND FLOOR PLAN — WEST — HVAC DEMO SECOND FLOOR PLAN — EAST — HVAC DEMO FIRST FLOOR PLAN — WEST — HVAC FIRST FLOOR PLAN — EAST — HVAC SECOND FLOOR PLAN — WEST — HVAC SECOND FLOOR PLAN — EAST — HVAC ROOF PLAN — HVAC SEQUENCE OF OPERATIONS AND POINTS LIST HVAC DETAILS MECHANICAL GENERAL NOTES 1. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND REPORT ANY CONDITION THAT PREVENTS THE PROPER INSTALLATION OF THE NEW MECHANICAL/ELECTICAL SCOPE OF WORK PRIOR TO WORK. 2. UNLESS OTHERWISE NOTED, REMOVE ALL ABANDONED PIPING, CONTROLS, WIRING, ETC., WHERE ACCESSIBLE IN RENOVATED AREAS. NO ABANDONED IN PLACE MATERIALS ARE ALLOWED IN RENOVATED AREAS. 3. WHERE CONTROLS ARE DEMOLISHED, REMOVE WIRING BACK TO NEAREST CONTROL PANEL OR JUNCTION BOX. REMOVE ACCESSIBLE CONDUIT, JUNCTION BOXES, ETC. 4. CONTRACTOR TO CLEAN AND PROTECT WORK FROM DAMAGE, RESTORE DAMAGED FINISHES AND COVER ENDS OF PIPING NOT ACTIVELY BEING WORKED ON. 5. CONTRACTOR SHALL NOT CUT ANY STRUCTURAL ELEMENTS WITHOUT PRIOR WRITTEN APPROVAL. 6. CONTRACTOR TO DELIVER, HANDLE AND STORE MATERIALS PER MANUFACTURER'S RECOMMENDATION. 7. MAINTAIN AND RESTORE (IF INTERRUPTED ALL CONDUITS AND CONDUCTORS, PIPING, AND DUCTWORK PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS. 8. COORDINATE ALL MECHANICAL WORK WITH OTHER TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR WORK WITH THE WORK OF MECHANICAL CONTRACTOR. PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR TO FABRICATION AND INSTALLATION. 9. SEISMIC PROVISIONS SHALL BE PROVIDED WHERE REQUIRED IN ACCORDANCE WITH LOCAL CODES. 10. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND CONSTRUCTION FEES. FURNISH FINAL CERTIFICATE TO OWNER SHOWING COMPLIANCE WITH CODE REQUIREMENTS. 11. REPLACE ANY CEILING TILES AND SECTIONS OF CEILING GRID DAMAGED DURING CONSTRUCTION. MATCH EXISTING. CUT MAINS OF SUSPENDED CEILING SYSTEM TO BE REPLACED BY CONTRACTOR. 12. NOTIFY AND COORDINATE CONSTRUCTION WORK WITH OWNER AND KC DCHS. 13. COORDINATE WORK WITH BUILDING OWNER TO AVOID FALSE TRIPPING OF SMOKE DETECTORS DURING CONSTRUCTION. PROTECT DETECTORS FROM DAMAGE/DEBRIS BY USING VACUUM TO COLLECT DEBRIS AND DUST CREATED DURING DRILLING, CUTTING, SANDING, ETC. 14. DUCT SIZING IS ESTIMATED. ALL DUCT SIZES TO BE VERIFIED BY CONTRACTOR. 15. PROVIDE POST CONSTRUCTION COMMISSIONING AND COMPLETION REQUIREMENTS IN ACCORDANCE WITH THE 2015 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS SECTION C408 AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 16. BALANCE ALL HVAC SYSTEMS IN ACCORDANCE WITH THE 2015 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS; GENERALLY ACCEPTED ENGINEERING STANDARDS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 17. PROVIDE CONTROLS IN ACCORDANCE WITH THE 2015 WASHINGTON STATE ENERGY CODE, COMMERCIAL PROVISIONS; INCLUDING SECTION C405.2 FOR LIGHTING, C403.3, C403.4, AND C403.6 OR C403.7 AS APPLICABLE FOR HVAC CONTROLS, C403.2.6 FOR VENTILATION, C403.5 FOR ENERGY RECOVERY, AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. ENERGY CODE 2015 INTERNATIONAL BUILDING CODE (IBC)* 2015 INTERNATIONAL PROPERTY MAINTENANCE CODE 2015 INTERNATIONAL MECHANICAL CODE (IMC)* 2015 UNIFORM PLUMBING CODE (UPC)* 2015 WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS (WSEC) * INCLUDING AMENDMENTS BY THE STATE OF WASHINGTON Mr/ 013 't RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14,2017 King nty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED • FSi consulting engineers Seattle, Washington Solutions & Service ko -- Z 0 W W0— U 5 CO aC W D > co O O 00 rY Q 1--a. � aQ cc -, O 11--1 W 0 1-- 8 <- U Z 0 21 0 < Q a—a z -1--I-1U w d- D �� q:1I— ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR C ODE COMPLIANCE APPROVED OCT 062017 City of Tukwila BJILD1htG D VISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title LEGEND, ABBREV., AND NOTES M-000 EXHAUST FA\ SCHEDULE CALLOUT LOCATION FAN TYPE SERVICE FAN MAX SOUND LEVEL BASIS OF DESIGN NOTES TYPE MARK CFM DRIVE TYPE STATIC PRESSURE (IN WC) [1] RPM MOTOR MANUFACTURER MODEL RPM HP EF 1 RESTROOM CEILING CEILING RESTROOMS 100 DIRECT 0.50 1075 1075 44 W 25 COOK GC -148 [3] SCHEDULE NOTES: 1 STATIC PRESSURE EXTERNAL TO FAN. 2 AS RATED PER AMCA 205 3_ PROVIDE WITH ECM MOTOR. VAV BOX SCHEDULE MARK SERVICE CFM DUCT CONNECTIONS ECM FAN HP HEAT CFM REHEAT COIL (1) MAKE AND MANUFACTURER REMARKS INLET SIZE 0 OUTLET WIDTH OUTLET HEIGHT TOTAL KW # OF STEPS V/PH/HZ MAX MIN VAV-6-211 MEETING RM 206 &207 500 150 8" 12" 10" 1/3 150 3.0 1 277/1/60 ENVIRO—TEC CFR—EH 0811 [2] SCHEDULE NOTES: [1] PROVIDE WITH FACTORY MOUNTED 24V TRANSFORMER. L2J MAINTAIN ALL MANUFACTURER REQUIRED CLEARANCES 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36") M17 013 I RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 King My Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED FSi consulting engineers Seattle, Washington Solutions & Service In F- LU LU W 00 oC z F— U z Q Z \ LU 0 F 0 J CO OO CO Ce co OQ OJ z' Q� ko ISSUE / REVISIONS ID DATE DESCRIPTION C D FOR ODE COMPLIANCE APPROVED OCT 0 6 2017 City of T BUILDING ukwila DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title HVAC SCHEDULES M-001 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36") i r I RE-0U'C E CD VAV-6 —103 VAV-6-101 r_l C. ESOu CS — • L T c.zf � t T — n' 0" l_ V N :�I W Z N _J Q 0 QI� 2IN- I I I I I I (E)12x12 I I I I I VAV— 6 —104 rn LJ - i Y - (.E)14710- :: (E)18x12 VAV— 6-115 (E)24"0 VAV— 6 CT _ .....-.._1..._1.._4...... (E)10" 0 V i \ I± - r FIRST FLOOR PLAN - WEST - HVAC DEMO SCALE : 1/4" = 1'-0" i_L 1/ T. \ ii I I •1 i 1- I I i I I I I I J\�Y' _ (E)16x12 • F ,1 ....., GE\EAL \OTES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP.). 2. PRE—BALANCE EXISTING SYSTEM PRIOR TO DEMOLITION. PROVIDE PRE—BALANCE REPORT FOR REVIEW. DE VOLITIO\ \OTES: REMOVE RETURN GRILLE AND PRESERVE FOR RE—USE. PROVIDE TEMPORARY CAP OR GRILLE REMOVE SENSOR AND PRESERVE FOR RE—USE. REMOVE DUCTWORK AS SHOWN. PROVIDE TEMPORARY CAP. X117 0139 SCALE: 1/4" =1'-0" RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 King.rrrty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED • FSi consulting engineers Seattle, Washington Solutions & Service .. Z V LULU 0 U 2 CO S o0 O O °° (/) aCce co oC � � � O ll -4 w OI— U z 0 J 'n < z 1_, U Lu Ln ISSUE / REVISIONS ID DATE DESCRIPTION LREVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 6 2017 City of Tukwila BUILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title FIRST FLOOR PLAN -WEST - HVAC DEMO MD -101 6/14/2017 9:34:24 AM Sheet Size': 22"x34" (24"x36") < I• � I l , (E)18x12 `b, II II II II H p is i-' • Li. \ \ \1 IR Fp I \ . V L_ I (E)12x.1 i, VAV-6 —106 (E)12x12 (E)8"07 i...._I (0)16x12 VAV-6-113 „ t.L VAV— 6 1-112 / Tr - V VAV— 6-110 1\/AV-6- 1112A I 01201 rTh +I I (E)12x12 N A \ I' 1 D-10 X • ;i FIRST FLOOR PLAN - EAST - HVAC DEMO SCALE : 1/4” = 1'-0" CE\ERAL \OTES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP.). 2. PRE—BALANCE EXISTING SYSTEM PRIOR TO DEMOLITION. PROVIDE PRE—BALANCE REPORT FOR REVIEW. DEV LITIO\ \OTES: REMOVE DUCTWORK AS SHOWN. PROVIDE TEMPORARY CAP. fri'7o'3q SCALE: 1/4" =1-0" RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 Kin ..rity Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED • O FSi consulting engineers Seattle, Washington Solutions & Service ko .. Z C6 w w a U E m Ce w O 0 CO V) %oo I— a. 0_ oC 5<ct , 0 I— o Q J U z 0 J ,_,Uw SOH of ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED OCT e 6 2017 City of I ukwila BUILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title FIRST FLOOR PLAN - EAST - HVAC DEMO MD -102 6/14/2017 9:34:24 AM // // i /// , / /// // / / t --\ F \ ' I `v ; � RESOURC r� ... ! i....i 1 II 11 1 I NI VAV-6-210 VAV-6-209 VAV-6-203 0 VAV- LIBRARY Your H I VJ L H u N & 11,1 : T Y V' R.1 0 I- N C 0Civ1 2 N i i i L. H J III L J' %,(///////i(evii/////////(/////////////////// 3 SECOND FLOOR PLAN - WEST - HVAC DEMO D-10 SCALE : 1/4" = 1'-O" 7Y UP TO RTU / • CE\HAL \OTES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. PRE -BALANCE EXISTING SYSTEM PRIOR TO DEMOLITION. PROVIDE PRE -BALANCE REPORT FOR REVIEW. DEvOLTO \OTES: REMOVE SUPPLY DIFFUSER AND PRESERVE FOR RE -USE. PROVIDE TEMPORARY CAP. REMOVE SENSOR AND PRESERVE FOR RE -USE. DEMO DUCTWORK BACK TO MAIN TRUNK AS SHOWN. CITY OF TUKWILA OCT 02 2017 PERMIT CENTER MI1 o X39 SCALE: 1/4" =1'-0" 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 11 King.a_trrty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED O FSi consulting engineers Seattle, Washington Solutions & Service 1 .. z 0 W W o U m W O O 00 �� QoO oC � O O.te U z 0J ri (I) Q Z ~ Z HUW CII— I- � ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 6 2017 City of Tukwila BUILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title SECOND FLOOR PLAN -WEST- HVAC DEMO MD -103 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36) Lu Z_ I Io r' ••", I I i OR ASiti1.I It_;' S ;\ ?' I I I I I I I I QJ L� 0 RTU I 11 I I I =_i>< I I I I I I I I 1N vi i + VAV-6-208 i VAV-6\205 `LJ i.; i /11 A I .L I L II; — L 1 i �\ \\„_O VAV—_6 —204 711 }\f 1 i /-L 0 t. A 1111- • SECOND FLOOR PLAN - EAST - HVAC DEMO D-10 SCALE : 1/4" = 1'-0" CE\EAL \OTES: DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. PRE—BALANCE EXISTING SYSTEM PRIOR TO DEMOLITION. PROVIDE PRE—BALANCE REPORT FOR REVIEW. DEMOLITIO\ \OTES: REMOVE RETURN GRILLE AND PRESERVE FOR RE—USE. PROVIDE TEMPORARY CAP. RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER l'`117 013 SCALE: 1/4" =1'-0" 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 King ay Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED 0 FSi consulting engineers Seattle, Washington Solutions & Service ko F-- . . --- Z ww CD U5 m u O O (1) 00 a. ZQ 0 11 w > OF. o Q U z 0(f) zI \ �Uw L� ko ISSUE / REVISIONS ID DATE DESCRIPTION REVILD FOR CODE C•MPLIAN APP " OVER OCT 16 2017 CE City of Tukwila BUILDINt DivisioN Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title SECOND FLOOR PLAN -EAST - HVAC DEMO MD-104 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36") \\ 150 CFM 150 CFM _ A GENDER NUET RESTROOP4 (E)12x12 CONFERENCE/ TRAINING 5 CFM 125 CFM " \ 400 CFM (E)18x12 125 CFM 100 CFM VAV— 6-115 VAV— 6 —114 0 CORR OR 100 CFM 91 4' 11 VAV— 6-101 T WAIT 125 CFM AIL -125 CFM STORAGE 125 CFM COMPU ASSESM LAB I[ 108 125 CFM 6 6"0 II IIIH+4I 100 CFMI 125 CFM ADMIN A ribjt RESOURCE 1e7 _ 375 CFM (TYP. 4) EETING ROOM fl 07c ;VAV-6 —104 MEETING ROOM 11 ROOM L (E)16x12 375 CFM (ThFIRST FLOOR PLAN - WEST - HVAC SCALE : 1/4" = 1'-0" • STORAGE 'IOSA 375 CFM 250 CFM STORAGE Ii 11 II GE\HAL \OTES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. BALANCE ALL ZONES TO AIRFLOW VALUES SHOWN. CO \S-RUCTIO\ OTES: INSTALL SALVAGED RETURN GRILLE IN LOCATION SHOWN. PROVIDE SENSOR IN LOCATION SHOWN. LOCATE APPROXIMATELY AT 48" AFF. RECONFIGURE SENSORS SERVING SAME ZONE TO BE SET TO THE SAME TEMPERATURE SETPOINT. PROVIDE EXHAUST FAN AND TIE TO EXISTING EXHAUST DUCTWORK MAIN LOCATED IN THE BATHROOM AREA. CONTRACTOR TO VERIFY EXACT LOCATION OF EXISTING DUCTWORK. PROVIDE RETURN AIR GRILLE AND CONNECT TO DUCTWORK AS SHOWN. BALANCE DIFFUSER TO CFM INDICATED. RECEIVED CITY OF TUKWILA OCT 02 2011 PERMIT CENTER P`117%- x139 SCALE: 1/4" = 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 King ' •nty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED FSi consulting engineers Seattle, Washington Solutions & Service ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 6 2011 City of Tukwila �>3UILDI�IG DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title FIRST FLOOR PLAN - WEST - HVAC M-1 0 1 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (2411x36") (E)18x121 150 CFM 3 125 CFM 160 CFM 150 CFM VAV-6-110 150 CFM (E)12x12 1125: 125 CFM 125 CFM 125 CFM 150 CFM 300 CFM 300 CFM 125 CFM 125 CFM '0 150 CFM 350 CFM 100 CFM �,. A 11\/1 1/�/I I.jr Imo_ 250 CFM 1 (E)12x12 250 CFM / —(E)12x12 i / 2501 CFM / (E)10"01 VH u 250 CFM VAV-6-113 , (E)16x12 I I I 100 CFM ir VAV-6 —106 VAV-6-111 —11 N -�I 375 CFM 375 CFM 3 350 CFM 350 CFM VAV-6 —107 (E)12x12 )16x12 114 350 CFM I! J FIRST FLOOR PLAN - EAST - HVAC oj� SCALE : 1/4" = r.o" 350 CFM \ GE \EAL \ OYES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. BALANCE ALL ZONES TO AIRFLOW VALUES SHOWN. CO \S-RUCTIO\ \OTES: PROVIDE SENSOR IN LOCATION SHOWN. LOCATE APPROXIMATELY AT 48" AFF. RECONFIGURE SENSORS SERVING SAME ZONE TO BE SET TO THE SAME TEMPERATURE SETPOINT. BALANCE DIFFUSER TO CFM INDICATED. PROVIDE SOUND LINED BOOT. RECEIVED CITY OF TUKWILA OCT 02 2011 PERMIT CENTER M17 013? SCALE: 1/4" = 1'-0" 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 King My Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED FSi consulting engineers Seattle, Washington Solutions & Service g zW U CO DC W )> co O O 00 tin C %ooa. p� � 0 I -4w 0I— o Q U Z p J w SOH oI- ISSUE / REVISIONS ID DATE DESCRIPTION REVIE D FOR CODE CO' PLIANCE APPR •Ela OCT 0 2017 City of I ukwila BUILDIN DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title FIRST FLOOR PLAN -EAST - HVAC M-102 6/14/2017 9:34:24 AM ,10") 9, ........................................................................................................... 00 CFM P. 2) SSROOM A 225.. f 150 CF (TYP. 2) KC1 COS -226; VAV-6-209 180 CFM V-6-210; 0 100 CFM RESOURCE AND COMPUTERS 400 CFM 100 CFM .l I RECEPTION/ -/ WAITING AREA 1203_! I UP TO RTU 1-1 400 CFM 300 CFM C 150 CFM CL.ASSRO OM 2081 VAV-6C-202 250 CFM (TYP. 6) MEETING ROOM RO 1206.1 150 CFM ME RO 350 CFM -- n MEETIN ROOM I I L.0 SECOND FLOOR PLAN - WEST - HVAC ySCALE : va•=iw" i C GE\ HAL \ OYES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. BALANCE ALL ZONES TO VALUES AIRFLOW VALUES SHOWN. CO\ S-RUCTIO\ \OTES: PROVIDE SENSOR IN LOCATION SHOWN. LOCATE APPROXIMATELY AT 48" AFF. RECONFIGURE SENSORS SERVING SAME ZONE TO BE SET TO THE SAME TEMPERATURE SETPOINT. PROVIDE RETURN GRILLE AND CONNECT WITH FLEX DUCT AS SHOWN. GRILLES TO MATCH EXISTING. RELOCATE SENSOR TO LOCATION SHOWN. CONNECT THERMOSTAT TO RELATED UNIT. BALANCE DIFFUSER TO CFM INDICATED. PROVIDE DIFFUSER AND CONNECT TO DUCTWORK AS SHOWN. BALANCE DIFFUSER TO CFM INDICATED. DIFFUSERS TO MATCH EXISTING. RELOCATE DIFFUSER TO LOCATION SHOWN. PROVIDE DUCTWORK TO MAKE COMPLETE CONNECTION. BALANCE TO CFM INDICATED. RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER MI7Oi3 q SCALE: 1/4" =1'-0" 2' 4' 8' 16' NORTH • FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 L41 King:nty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED O FSi consulting engineers Seattle, Washington Solutions & Service k H . .. z C9 L.1 W 0 U\ m W aC I— a. a_ Q01 aC 5<ce -- 0 IL-1 w F. o <t U z o J 1--1U L I 'n 0 �H ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED OCT 062017 City of Tukwila BUILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title SECOND FLOOR PLAN - WEST - HVAC M-103 6/14/2017 9:34:24 AM Sheet Sizer 22"x34" (24"x36") 250 CFM 180 CFM 180 CFM 1 180 CFM I I I \r VAV-6-205/ 0 2 100 CFM VAV— E REAK ROOM -204 2 50 CFM CLASSROOM C1 21 0.a 50 CFM CLASSROOM 2111 W " ZI 0 150 CFM r;' L VAV-6-201 OR 100 CFM SECOND FLOOR PLAN - EAST - HVAC 104 SCALE : 1/4" = 1'-0" 80 CFM 180 CFM SECURED FILE STORAGE 1217' MEETING ROOM 1215' 250 CFM 150 CFM 150 CFM 200 CFM SECURE OPEN _ 200 CFM 200 CFM MEETING ROOM 12161 200 CFM 200 CFM 200 CFM IIII 200 CFM CE\HAL NOTES: 1. DUCT SIZING TO BE VERIFIED BY CONTRACTOR (TYP). 2. BALANCE ALL ZONES TO VALUES AIRFLOW VALUES SHOWN. CO\STRUCTO \OTES: INSTALL SALVAGED RETURN GRILLE IN LOCATION SHOWN. PROVIDE SENSOR IN LOCATION SHOWN. LOCATE APPROXIMATELY AT 48" AFF. RECONFIGURE SENSORS SERVING SAME ZONE TO BE SET TO THE SAME TEMPERATURE SETPOINT. PROVIDE RETURN GRILLE AND CONNECT WITH FLEX DUCT AS SHOWN. GRILLES TO MATCH EXISTING. BALANCE DIFFUSER TO CFM INDICATED. "'" My 013? RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER NORTH FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SICKED 0 FSi consulting engineers Seattle, Washington Solutions & Service V rrnn' ■ . z W W 0 U C1� W o0 O O �C ° cn Q a. oC z 0 UJ O U Z of f- oo Q J cap (/) occz I Z W Ln I kO ISSUE / REVISIONS ID DATE DESCRIPTION C RFVIFWED FOR ODE COMPLIANCE ARPR©VI�D OCT 062017 City of T ikwila BUILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title SECOND FLOOR PLAN - EAST - HVAC M-104 6/14/2017 9:34:24 AM Sheet Size: 22"x34" (24"x36") TRANE 50—TON DX COOLING, NATURAL GAS HEATING. CARRIER 2—TON HEAT PUMP TRANE 10—TON DX COOLING, NATURAL GAS HEATING TRANE 5—TON DX COOLING, NATURAL GAS HEATING TRANE 4—TON DX COOLING, NATURAL GAS HEATING ROOF PLAN - HVAC SCALE : 1/8" = 1-0" FOR REFERENCE ONLY, NO WORK ON ROOF RECEIVED CITY OF TUKWILA OCT 02 2011 PERMIT CENTER M17�i39 SCALE: 1/8" = 4' 8' 16' 32' NORTH FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 L4,1 King ` __nty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED FSi consulting engineers Seattle, Washington Solutions & Service .. z C� W W 0 E W 0 Q T° (foCco Q oC z D01-1 UJ 0- oQ J u z pJ (� <z z Q 1_, U Lu L � �E ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED City of Tukwila BUILDI G DIV Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title ROOF PLAN - HVAC M-105 6/14/2017 9:34:24 AM SEQUE\CE OF OPEATO\ "REUSE EXISTING SEQUENCE" PO\TS LIST BUILDING CONTROL SYSTEM POINT SUMMARY ANALOG INPUTS ANALOG OUTPUTS DIGITAL INPUTS DIGITAL OUTPUTS ALARMS REMARKS SYSTEM NAME: GENERAL DESCRIPTION: BUILDING OCCUPIED/UNOCCUPIED SCHEDULE SCHEDULE FOR EACH OF THE AIR UNITS SYSTEM NAME: VAV BOX/SPACE CONTROL DESCRIPTION: SPACE TEMPERATURE X X LOW TEMP ALARM SPACE TEMPERATURE ADJUST X FAN START/STOP X FAN PROOF X X ANALOG DAMPER MODULATION X X UNIT DISCHARGE TEMPERATURE X X SETPOINT X SYSTEM NAME: EXHAUST DESCRIPTION: TYPICAL OF EACH FAN FAN START/STOP X FAN PROOF X ANALOG l `7 RECEIVED CITY OF TUKWILA OCT 02 2011 PERMIT CENTER 6139 FINAL ISSUED FOR CONSTRUCTION - SEPTEMBER 14, 2017 wF.nty Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SICKED FSi consulting engineers Seattle, Washington Solutions & Service ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWE FOR ODE COM LIANCE APPRO ED OCT U 6 2017 City of Tukwila BUILDING DIVIS10 Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title SEQUENCE OF OPERATIONS & POINTS LIST M-400 6/14/2017 9:34:24 AM FLEX DUCT, MAX 6' � TAP—IN LENGTH n 3" 1 4" n EQUAL--)f---EQUAL Q FLEX DUCT PERFORATED METAL DIAMOND #341 OR EQUAL, 5/32" DIA HOLES ©3/16" WITH 65% OPEN AREA. 22 OR 24 GAUGE COLD ROLLED / 24 GA SHEETMETAL DIFFUSER CAN _L SQUARE—NECK DIFFUSER Jr CAN SIZE TO SLIP OVER DIFFUSER NECK LAY—IN CEILING SHOWN, FRAME—MOUNT TO "HARD" CEILINGS SIZING CHART CFM RANGE DIFFUSER NOMINAL NECK SIZE TAP—IN BASIS OF DESIGN THROW AT 100 FPM (FT) [11 NC [2] 0-125 6" x 6" 8"0 TITUS MCD 7 <10 125-225 8" x 8" 8"0 TITUS MCD 9 12 225-350 10" x 10" 10" 0 TITUS MCD 12 17 350-475 12" x 12" 12"0 TITUS MCD 14 19 475-675 14" x 14" 14"0 TITUS MCD 16 23 675-850 16" x 16" 14"O TITUS MCD 19 25 850-1100 18" x 18" 16"� TITUS MCD 21 28 [1] AT ISOTHERMAL CONDITIONS. [2] MAX FOR EACH OCTAVE BAND WITH tOdB ROOM ABSORPTION. SQUARE -NECK SUPPLY DIFFUSER DETAIL � SCALE: NONE PRIMARY SUPPLY AIR DUCT SERVICE ACCESS AREAS MIN CLEARANCE 36" MIN (0 CONTROL PANEL TERMINAL UNIT INLET, CONNECTION SIZE SAME AS INLET COLLAR VAV DETAIL SCALE: NONE M500 INTEGRAL HEATING COIL TERMINAL UNIT OUTLET, CONNECTION SIZE SAME AS OUTLET COLLAR SUPPLY AIR DUCT 36" VAV TERMINAL UNIT MIN SOUND LINED FOR 36" MIN BEFORE 1ST TAKEOFF M500 24" LONG GALV STEEL CAN WITI 11 " LINING WIDTH r 1_ EGGCRATE/ GRILLE 1 FLEX DUCT, MAX 6' LENGTH, DIAMETER AS SCHEDULED EXCEPT AS NOTED OTHERWISE ON PLANS 6" LAY -IN CEILING SHOWN, FRAME -MOUNT TO "HARD" CEILINGS SIZING CHART CFM RANGE NOMINAL GRILLE SIZE, LENGTH x WIDTH D BASIS OF DESIGN 0-400 24" x 6" 10"0 TITUS 50F 401-799 24" x 12" 12"0 TITUS 50F 800-1199 24" x 18" 14"0 TITUS 50F DUCTED RETURN AIR GRILLE DETAIL SCALE: NONE M500 24" LONG GALV STEEL CAN WITI 11 " LINING WIDTH r LINED FLEX DUCT, MAX 6' LENGTH, DIAMETER AS SCHEDULED EXCEPT AS NOTED OTHERWISE ON\ PLANS EGGCRATE GRILLE 6" LAY -IN CEILING SHOWN, FRAME -MOUNT TO "HARD" CEILINGS SIZING CHART CFM RANGE NOMINAL GRILLE SIZE, LENGTH x WIDTH D BASIS OF DESIGN 0-400 24" x 6" 10"0 TITUS 50F 401-799 24" x 12" 12"0 TITUS 50F 800-1199 24" x 18" 14"0 TITUS 50F SOUND LINED RETURN AIR GRILLE DETAIL � SCALE: NONE J1-500 1 SCALE: 1/4" =1'-0" RECEIVED CITY OF TUKWILA OCT 02 2017 PERMIT CENTER 0' 2' 4' 8' 16' NORTH FINAL ISSUED FOR CONSTRUCTION -SEPTEMBER 14, 2017 King rity Department of Executive Services Facilities Management Division Capital Planning & Development King County Administration Bldg. 500 4th Avenue, Room 820 Seattle, WA 98104 Tel. 206.477.9367 design collaborative 119 South Main St, Suite 400 Seattle, WA 98104 Tel. 206.946.9746 www.wja-dc.com 09.14.17 SIGNED FSi consulting engineers Seattle, Washington Solutions & Service TENANT IMPROVEMENTS C.6 0 ca o0 00 LU 0< 0 D z� L ISSUE / REVISIONS ID DATE DESCRIPTION REVIEWED FOR ODE COMPLIANCE APPROVED OCT 0 6 2017 City of Tukwila UILDING DIVISION Project No.: 15032-17ZA Site No.: Drawn By: MJV/GMN Checked By: BSC Sheet Title HVAC DETAILS M-500