Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M17-0143 - BOEING #9-53 - LAB A1 RELOCATION CRAC UNIT
BOEING #9-53 -LAB Al RELOCATION 9725 E MARGINAL WAY S BLDG 9-053 M17-0143 att, Parcel No: Address: City of Tukwila •l Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 5624200990 Permit Number: 9725 E MARGINAL WAY S BLDG 9-053 Project Name: BOEING #9-53 - LAB Al RELOCATION Issue Date: Permit Expires On: M 17-0143 10/9/2017 4/7/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: DESIMONE TRUST BOEING 1201 THIRD AVE STE #5010 C/O BNY MELLON NA, SEATTLE, WA, 98101 CONNIE HARDIN 4600 S 134 PL, SEATTLE, WA, 98168 HOLADAY PARKS INC 4600 S 134 PL, SEATTLE, WA, 98168 HOLADP1379N0 1!/ Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2019 DESCRIPTION OF WORK: INSTALL (1) CRAC UNIT (PROVIDED BY OWNER). ALSO, SOME MINOR DUCTWORK & DIFFUSER MODIFICATIONS Valuation of Work: $10,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $340.68 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: .1?....cAit 2014 2014 2014 2015 Date: v I�� 7 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws re:.ulating construction or the performance of work. I am authorized to sign an _obtain this developme tpe mit ; nd agree to the ponditions attached to this permit. Signature: {�' Print Name c^ (1r'1c e ``irt f' This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL issued by the City of Tukwila time of inspection. l SIs Leo (Z_C CITY OF}TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 httn://www.TukwilaWA.gov Mechanical Permit No. M. l 7- 31. L 3 Project No. Date Application Accepted: (0 1: 1-1—( 7 Date Application Expires: ) i. t "'( (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION .�1Cint Site Address: �''/ 'j Zs L 1 o j iM (ALJ Tenant Name t LA- Al PROPERTY OWNER Name: awn; e kNlara Name • f s e City: s%.a Stalk ZKA I t.��y Address: pd 1 .g.70ylit71-- ct pwcr City: a yyppt/�yytIt State: Zip: i( I CONTACT PERSON — person receiving all project communication Name: awn; e kNlara Address: LUccoS `s( P. City: s%.a Stalk ZKA I t.��y Phone: 7�j� zsv,4530 Fax iv 2,4 c, 70 4 Email:ll�..ti• oriveh0Ito[ettiehvtl.�corks ` i71 Assessor's Tax No.:Sre2. 'I«✓'4O Suite Number: Floor: New Tenant: 0 Yes Trel< MECHANICAL CONTRACTOR INFORMATION Company Name: / ♦ % .%'I I/iJLiCS ?MACS Address: � LoDb IS EI 444' PJ City:_� State:, .)s. Zig y 40t, Phoneloi. v Liss Fax v.te 4 %D Contr Reg No.: 1a AOI 374 Date: q -/Le Tukwila Business License No.: Valuation of project (contractor's bid price): i3/4 0 IDOL) ' C CO Describe the scope of work in detail: SAZLIA (11.k Ar (.141, `� d bti (jc4-)6.1erS C Oi 545 _ 11ti w 6 e- . -t, + t. CLpct Ser m.O Ci c el C" ail 6K 1 - Use: Lise: Residential: New ❑ Replacement ❑ Cot�uu New ❑ Replacement Fuel Tyne: Electric ❑ Gas ❑ Other: H:SApplicationsWoms-Applications On Line12011 Applications 1Mtmhanical Permit Application Revised 18.94 3 .docs Revised: August 2011 bh Pap 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <IOOk btu Furnace>100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10.000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation Pan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat 3 Wood/gas stove Emergency generator Other mechanical equipment 0.704 Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750.000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan. review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON. AND I. AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: Mailing Address: qLO 0 Date: . t 0 Day Telephone: Me Z.,. '-!s- 3 EklApplicaliorslFor s•Appticatiam On Line\2011 Applications \Mechanical Per i8 Apptirnlion Revised 8-9-11.docs Revised: August 2011 bh City State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT 1 QUANTITY I1 PAID $340.68 M17-0143 Address: 9725 E MARGINAL WAY S BLDG 9-053 Apn: 5624200990 $340.68 Credit Card Fee $9.92 Credit Card Fee R000.369.908.00.00 0.00 $9.92 MECHANICAL $318.04 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $221.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $63.61 TECHNOLOGY FEE $12.72 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12483 R000.322.900.04.00 0.00 $12.72 $340.68 Date Paid: Wednesday, October 04, 2017 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 07989G Printed: Wednesday, October 04, 2017 11:36 AM 1 of 1 CANWSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit /07-6193 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:,,.....:Type i33EiNG- qM of Inspection: ///Wl - fit Address: Date Called: Special Instructions: 4A-8 4-1 A,La, 04776)) cow vAl�r /fbalv.'tY PrPR�S Date Wanted: P-2-9./7 a m p.m. Request EfV Phone,N,,o::361 �f} p► v �//� Approved per applicable codes. L Corrections required prior to approval: COMMENTS: Inspector: Date: —17 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT COORD COPY. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17 0143 DATE: 10/04/17 PROJECT NAME: BOEING #9-53 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter #_ Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ❑ Fire Prevention Structural io\ir Planning Division ❑ Permit Coordinator 1 PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 10/05/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11/02/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied ❑ n (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: ,Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping 0 PW 0 Staff Initials: 12/1S12ol3 HOLADAY PARKS INC Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of iLabor & Industries Search L&I Page 1 of 3 A -'L Index Help My L&1 Workplace Rights Trades & Licensing HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County Business type Corporation License Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/9/2017 HOLADAY PARKS INC Verify the contractor's active registration / licen Construction Contractor License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23000452 ertification (depending on trade) and any past violation. Active. Meets current requirements. $12,000.00 Received by L&I Effective date 08/23/2002 0910112002 Expiration date Until Canceled Insurance Charter Oak Fire Ins Co Policy no. DTCO1F465357C0F16 $1,000,000.00 Received by L&I Effective date 1013112016 1110112016 Expiration date 1110112017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 177,231-00 Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 2 of Year 2017 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/22/2016 Inspection no. No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/9/2017 BO 9 /25 SORT D v BJ AS v UKWA,\ 0\S OF S -"TIO\ WILLAVFTTI- VFH DARCFL OP D \v ARG AS �V A R FILE COPY Permit No. MI/VOK)) Plan review approval is subject to errors and omission, Approval of construction documents does not authorize the bY, �' • n of any adopted code or ordinance. Receipt of approved F= r rand• s is acknowledged: (1144 BY: ..1.►,m►.c Date: 4 TOW D A\ g A G 5J City of Tukwila BUILDING DIVISION 1111A" SCL 0\ 98O8 \S D 23 \OHT CO\1v, WAS -R 56740-0990 VB R A \ G� CTO\ FAST, REVISIONS No changes shall bo made to the scope of work without prior approval of Tukwila Building Division. 'OTS: Revisions will require a submittal and may include add tionai plan revew fees. SERVATE r: ooT 0 M cP, nical EirElec:ricaI D U rn5:ng 81 Gas Piping City of Tukviaa BUILDING DI1fI:ION V C T P A\ ARFA VA ID CO3 S v V ARY 7-127 KING COUNTY AIRPORT OFFICE 'CENTER (FM) PROJECT SITE FROM DOWNTOWN SEATTLE ❑ n 14-01 3UILD1\G ADNESS: 9725 EAST VAGI\AL WAY SOUTH TU<WILA, WASHI\GTO\ 9-53 SUMMARY LAND USE CODE BUILDING CODES 900 AIR MUSEUM PROJECT SITE BOEING FIELD rn rn OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRINT BUILDING GROSS FIRST FLOOR SECOND FLOOR THIRD FLOOR PENTHOUSE BUILDING HEIGHT 71. STORIES 99 EXIT 158 TUKWILA MUNICIPAL CODE CHAPTER 18, MIC/H ZONE MAXIMUM HEIGHT 125 F. 2015 IEBC, R0151 FC, 2015 IBC AS AMENDED, 2015 WASHINGTON STATE ENERGY CODE AND CITY OF TUKWILLA TITLE 16; WAC 51-11 BARRIER FREE CODE AS ADOPTED OR AMENDED, AND COMPLIANCE WITH THE CITY OF TUKWILLA ZONING CODES GROUP B TYPE II—B (ORIGINAL PERMIT AS TYPE II, UBC) SEE ALLOWABLE AREA ANALYSIS, SHEET Al B 54,821 (EXISTING) 97,901 (EXISTING) 54,821 (EXISTING) 43,080 (EXISTING) 880 (PROPOSED) 44 ft (EXISTING); 71'-9"± (PROPOSED — PER IBC 1510.2, HEIGHT GREATER THAN 18 FEET ABOVE ROOF DECK CONSIDERED AN ADDITIONAL STORY); ALLOWABLE = 75 FT. TABLE 504.3 2 (EXISTING); 3 (PROPOSED — PER IBC 1510.2, HEIGHT GREATER THAN 18 FEET ABOVE ROOF DECK CONSIDERED AN ADDITIONAL STORY) Q OCCUPANT LOAD: HANDICAPPED REQUIREMENTS FIRE PROTECTION SEISMIC DESIGN CATEGORY NO CHANGES NON APPLICABLE: IBC1104.4, EXCEPTION 1 FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS THROUGHOUT D SCOPE OF WORK: EXIT 157 RECONFIGURE EXISTING BUILDING AREA TO ACCOMMODATE NEW LAB FUNCTIONS. WORK INCLUDES INSTALLING WORKSTATIONS TABLES, WHITE BOARDS, SHELVING, FURNITURE, (1) INTERIOR WALL AND DOOR, ALONG WITH ASSOCIATED MECHANICAL AND ELECTRICAL. EXIT 157 599 TUKWILA EAST MARGINAL WAY 99 CORPORATE PARK FROM KENT & AUBURN 900 FROM SEATTLE—TACOMA AIRPORT RECEIVED CITY OF TUKWILA OCT 04 2017 COM APPROVED OCT 0 6 217 -�J 21t3Y'filoglitTrS& HILL ERS, INC. Lf 3 DEVELOP v E\TAL CE\TE NO SCALE 3UILDI\G 9-53 LOCATIO\ NO SCALE PERMIT CENTER 90% DESIGN REVIEW SEPTEMBER 27, 2017 CIVIL • STRUCTURAL • SURVEYING 4815 CENTER STREET 1 TACOMA, WA. 98409 PHONE: (253) 474-9449 1 FAX: (253) 474.9449 http://www.sifts-hill-engineers.com/ Project No.: 18003 Proj. Engineer: DCB Project Mgr.: BKL Proj. Drafter: SLM SYM REVISION BY DATE SYM REVISION BY APPROVED Al OR Z1A AND Z1C 34355 SITTS 09.28.17 Q� BOE/NG` ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DRAWN S. McCarthy CHECKED B. Leslie DATE 09.08.17 09.08.17 SUBTITLE COVER SHEET CURRENT REVISION SYMBOL 34355 DATE 09.28.17 ENGINEER D. Boileau CHECKED B. Leslie SHEET TITLE Al OR Z1A AND Z1C BUILDING 09-53 AO JOB NO. 34355 COMP Ni ARCHITECTURAL DEV. CENTER, WA \FX 0F DRAW \GS INCLUDED IN SET SHEET N0. DRAWING TITLE REV DATE DRAWING N0. ACHITECTUAL • 09-053—A0 AO COVER SHEET — 09.28.17 • 09-053—AI Al GENERAL ARCHITECTURAL NOTES — 09.28.17 • 09--053—IA3 IA3 COMPOSITE FIRST FLOOR PLAN — 09.28.17 • 09-053—IA450 IA450 ENLARGED FIRST FLOOR PLAN — 09.28.17 • 09-053—IA450R IA450R ENLARGED FIRST FLOOR PLAN —REMOVAL — 09,28,17 • 09-053—A500 A500 MISC SECTIONS AND DETAILS — 09,28,17 vEC—A\ICAC • 09-053—IMI IR IMI IR FIRST FLOOR HVAC PLAN A 09.12.17 • 09-053—IMII IMII FIRST FLOOR HVAC PLAN A 09.12.17 • 09-053—IM61 IM61 CHILLED AND HOT WATER PIPING C 09.12,17 • 09-053—IMIII IMIII PLUMBING FIRST FLOOR PLAN E 09.12.17 • 09-053—IM261 IM261 FIRE PROTECTION A 09.12.17 • 09-053—M361 M361 SCHEDULES D 09.12.17 • 09-053—IM516 IM516 DETAILS AND SECTIONS — 09,12.17 ELECTRICAL • 09-053—IEIIR IEIIR LIGHTING PLAN L 09.29,17 • 09-053—IEII IEII LIGHTING PLAN L 09.29.17 • 09-053-1E61 1E61 120/208V POWER PLAN L 09.29.17 • 09-053—IE4XX IE4XX NETWORK PLAN L 09,29.17 599 TUKWILA EAST MARGINAL WAY 99 CORPORATE PARK FROM KENT & AUBURN 900 FROM SEATTLE—TACOMA AIRPORT RECEIVED CITY OF TUKWILA OCT 04 2017 COM APPROVED OCT 0 6 217 -�J 21t3Y'filoglitTrS& HILL ERS, INC. Lf 3 DEVELOP v E\TAL CE\TE NO SCALE 3UILDI\G 9-53 LOCATIO\ NO SCALE PERMIT CENTER 90% DESIGN REVIEW SEPTEMBER 27, 2017 CIVIL • STRUCTURAL • SURVEYING 4815 CENTER STREET 1 TACOMA, WA. 98409 PHONE: (253) 474-9449 1 FAX: (253) 474.9449 http://www.sifts-hill-engineers.com/ Project No.: 18003 Proj. Engineer: DCB Project Mgr.: BKL Proj. Drafter: SLM SYM REVISION BY DATE SYM REVISION BY APPROVED Al OR Z1A AND Z1C 34355 SITTS 09.28.17 Q� BOE/NG` ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DRAWN S. McCarthy CHECKED B. Leslie DATE 09.08.17 09.08.17 SUBTITLE COVER SHEET CURRENT REVISION SYMBOL 34355 DATE 09.28.17 ENGINEER D. Boileau CHECKED B. Leslie SHEET TITLE Al OR Z1A AND Z1C BUILDING 09-53 AO JOB NO. 34355 COMP Ni ARCHITECTURAL DEV. CENTER, WA TRANSITION FROM 22x18 TO 18x22 =.5 18x6 VD (H) 18x14 gaia IMO 56x32 56x32 1080 23 20x16 18x 14-1-1 SEE DETAIL 1M1111M518 56x32 2400 ■•. •r RAR -1 RAR -1 170 CFM 170 CFM NEW 18x14 18x16 ( H MATCHLINE-FOR CONTINUATION SEE SHT. 1M10 RAR -1 ° 630 CFM V1 500 CFM ■rte -ti-•- 18x14 22x18 011 Mib.:41111.11 NM I 18x10 20x10 10"0 FLEX VD 980 LAB Z1A EXG 18x14 DUCTS REMAIN IN PLACE 12x10 MAKE NEW 18x14 CONNECTIO 2420 20 RAR -1 170 CF 24x18 473 CFM RAR -1 930 CFM RAR -1 580 CFM RELOC RAR -1 18x6 500 10 10"0 FLEX 12x8 20x16 18x14 20x14 co N tN LO 18x14 18x12 15x8�� 20x12 10x14 16x10 VD 980 12 RAR -1 1210 C=M VD 0 18x11 (H) 0 22x14 19 16x12 MANBAR ASSEMBLY SHALL BE FURNISHED AT EVERY DUCT PENETRATION OVER 90 SQ. IN. THROUGH WALLS SURROUNDINe SECURE AREAS (INDICAT SHADING) SEE DETAIL 1 11 1M5'7 20x14 LAB Z „4-18x11 9x11 20x14 18x10 605 12x8 RAR -1 170 CFM 44x20 30'-0" DIA. DOME SIMULATOR (F-2) SEE DRAWING 1M512 INSPECTION DOOR MAN -BARS 22x14 RAR -1 875 CFM 18x12 (H) 16x10 10x14 22x14 16x10 RAR -1 580 CFM 12x32 RAR -FROM DOME I SUPPLY DIFF. TO DOME 15x8�� 1680 CFM 1680 CFM 600 CFM F2A SEE DETAIL 1M11 FOR DUCTWORK IN THIS AREA. 516 28x15 1/4 17x12 16x14 VD 980 H 12 20x16 24x14 UP 22x14 26x20 50x20 18x12 RAR -1 170 CFM 16x12 R''-1 310 CFM !hI!!iI� .j 18x121' DN�(�....■ — L• ®■r__iw _ . �111110.1i1111IWi■ ;'�l; ii. 1 410 8 16x12 12x 14x16 24x20 20X20 15x 16x12 20x16 1670 16x10 6 400 8 32x18 14x8 310 8 14x8 6X12 RAR -1 310 CFM 16x12 18x12 18x12 310 8 18x12 14x9 VD 400 8 17x10 32x18 --SVD 360 16x12 RAR -1 170 CFM 16x10 24x18, 800 MOUNT 10 FT 20x10 41x18 41x18 32x22 16x12 RAR -1 22x16 36x16— 16x11 835 CFM RAR -1 630 CFM 32x18 RAR -1 320 CFM RAR -1 600 CFM FUSELAGE CEILING COOLING DETAIL 1M11 1 M504 REMOVAL PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED FSI consulting engineers Seattle, Washington Solutions 8c Service 6 7 A LEGE\J GE\HAL \OTES 1. ALL DUCT SIZES SHOWN ARE INTERNAL CLEAR DIMENSIONS WITH ONE INCH SOUND LINING IN THE INSIDE OF ALL SUPPLY, RETURN AND EXHAUST DUCTWORK. 2. FIELD INSPECTION INDICATES DUCT DIMENSIONS SHOWN ARE EXTERNAL EFE 4./ INDICATES MANBARS IN DUCT HALON DAMPERS INDICATEDS LOCATION OF CAPACITANCE GRID AND LOCKABLE ACCESS WITH INSET VIEWING PANEL X DUCT CLEANING ACCESS �E\ CE DAWI \GS Ev OVAL \OTES REMOVE DIFFUSER, DUCT, AND ASSOCIATED COMPONENTS BACK TO TEE AND CAP. ISSUED FOR CONSTRUCTION SEPTEMBER 12, 2017 CITY OF TUKWILA OCT 04 2017 PERMIT CENTER OCT 0 6 1M12 City of SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD COSI 12.10.00 A BDS LAB PACKAGES 1-5 34355 FSi AWL 09.12.17 M2.17 MW ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN Y.L. CHAN DATE 9.20.85 APPROVED BY DEPT. DATE CHECKED D.P.N. ENGINEER 10.10.85 SUBTITLE CHECKED D.P.N. 8.26.90 APPROVED APP R/ )VED TITLE FIRST FLOOR HVAC PLAN BDS LAB PACKAGES 1-5 BUILDING 9-53 MECHANICAL MASTER COL. A -G/4-8 CURRENT REVISION 34355 SYMBOL A DATE 09.12.17 D.0 SHEET 1M11R JOB NO. COMP NO. DWG NO. 9-53-1M11R TRANSITION FROM 18x6 22x18 TO 18x22 VD LEGE\D 18x14 NEW 18x14 18x16 (H) 56x32 56x32 18x14 56x32 Im GPS11 Tit 111•1•0-7-1. MATCHLINE—FOR CONTINUATION SEE SHT. 1M10 RAR -1 ° 630 CFM 22x18 VDS (H)I 18x6 18x11 18x14 DETAIL H 2100 21 RAR -1 700 CFM 1M518 12x1 "NNE . t all! 18x1 -IL IP IrOIN I Itile:11 4Wwito!.;_. .5%' •14IILI All l&„. , '3 ligiMILMEK4=1111111111110 , „....„ 24x18 18x10 LAB Z1A 22x14 EXG 18x14 DUCTS REMAIN IN PLACE HAL \OTES 22x14 MAKE NEW 18x14 CONNECTIO 6x12 R7 26x16 360 UP 8 14x14 I VA 1,1 DS! 473 CFM RAR -1 930 CFM RELOC RAR -1 1. ALL DUCT SIZES SHOWN ARE INTERNAL CLEAR DIMENSIONS WITH ONE INCH SOUND LINING IN THE INSIDE OF ALL SUPPLY, RETURN AND EXHAUST DUCTWORK. 2. FIELD INSPECTION INDICATES DUCT DIMENSIONS SHOWN ARE EXTERNAL INDICATES MANBARS IN DUCT HALON DAMPERS 10"0 FLEX 12x8 20x16 18x14 (H) 18x12 4,,,;-,-4zartwitxtx=rans 20x12 20x14 ION 20x14 ------------ 10x14 16x10 22x14 20x14 —BARS RAR -1 70 CM VD 980 12 MEP 19 16x12 MANBAR ASSEMBLY SHALL BE FURNISHED AT EVERY DUCT PENETRATION OVER 90 SQ. IN. THROUGH WALLS SURROUNDIN SECURE AREAS (INDICAT SHADING) SEE DETAIL 20x14 20x14 18x10 605 12 12x8 RAR -1 170 CFM 30'-0" DIA. DOME SIMULATOR (F-2) SEE DRAWING 1M512 INDICATEDS LOCATION OF CAPACITANCE GRID AND LOCKABLE ACCESS WITH INSET VIEWING PANEL 1750 rvr 22x14 87 13 (H) ripmiqu'l MIMI MI IN 28x15 1/4 16x10 10x14 22x14 16x10 RAR -1 580 CFM RAR—FROM DOME] 15x8 1680 CFM 600 CFM SUPPLY DIFF. TO DOME 1680 CFM F2A X DUCT CLEANING -ACCESS SEE DETAIL FOR DUCTWORK IN THIS AREA. 1M11 1 516 VD 980 12 20x16 14x16 SUPPLY 18x12 22x14 26x20 24x14 UP 50x20 E\CE DAWI\GS .`. RAR -1 (H) RAR -1 , N, 875 CFM 730 CFM 18x12 44x26 1.. Ellinainurion ulloar—ii miiiimminiiirAlia II. mommomivI -‚- U5d2AirAr'llE ik 1114 14x16 24x20 20X20 1 • liEd 671.1.1 ,I1, R —1 310 CFM 1560 i 1411:1:2111 r,b1% OMNI NI MI KO -ab 1ollommi =EN am pm wo Fk. MOB ismemmellimor Min ei a a 111111111M111111111IIIMEME OP Cig 1111 111111111111111r, - 9�j '18x12 310 11•11 CFM 16x12 20x16 1670 16x10 6 400 8 32x18 14x8 310 8 14x8 6X12 RAR -1 310 CFM 410 8 16x12 CO\S-RUCTI3\ \OTES 18x12 310 8 18x12 PROVIDE RETURN GRILLE AND CONNECT 6"0 DUCT TO EXISTING RETURN DUCT. REBALANCE SUPPLY AIRFLOW TO VALUE SHOWN ON PLAN. 32x18 H) 18x14 16x10 16x12 RAR -1 170 CFM 16x10 RELOCATE EXISTING MIXING BOX THERMOSTAT TO WALL. RAR -1 CFM1-1 RAR —1 32x18 630 CFM RAR -1 320 CFM RAR -1 600 CFM FUSELAGE CEILING COOLING DETAIL 1M11 1M504 FRST FLOO HVAC PLA\ SCALE: 1/8"=1 —0" RECEIVED CITY OF TUKWIL OCT 04 2017 PERMIT CENTE J PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED REVISION APPROVED REVISION APPROVED CONVERSION FROM MYLAR TO CAD BDS LAB PACKAGES 1-5 12.10.00 34355 09.12.17 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 0 FSi consulting engineers Seattle, Washington Solutions 8c Service DRAWN Y.L. CHAN CHECKED D.P.N. DATE 9.20.85 10.10.85 ISSUED FOR CONSTRUCTION SEPTEMBER 12 2017 SCALE: NONE SUBTITLE FIRST FLOOR HVAC PLAN CURRENT REVISION 34335 SYMBOL 09.12.17 TITLE BDS LAB PACKAGES 1-5 09.12.17 QRS CHECKED D.P.N. 8.26.90 APPROVED APPROVED BUILDING 9-53 JOB NO. COMP NO. MECHANICAL MASTER COL. A—G/4-8 D.0 MGM 9-53-1M11 STRAINER 60 59 6" 5" ) } 62 61 �? SEISMIC BRAbING, LATERAL LONGITUDINAL --mss SEISMIC LATERAL -+ r+- RETURN + COIL 1+-� 1 /2" BALANCE VALVE SUPPLY a HOSE CONN (TYP) TAP EXISTING FLANGE (3/4" PIPE THREAD) AND ROUTE 3/4" PIPE AS SHOWN. COMPLETE CONNECTION WITH HOSE ASSY TO UNIT 3" 0 FUTURE VALVED TEE WITH BLIND FLANGE IN VERTICAL. TYP FOR WEST CORRIDOR 64 63 I(Po (1)"t 3--- -- I O 1 3 6" 1 1/2" _ 11 66 68 CM -4 SEE USER SUPPLIED HEAT EXCHANGER 70,000 BTUH 10 GPM FLOOR MTD COMP RM A/C EDPAC MDL:CD-8033 20 TON COOLING CAP 9700 CFM DETAIL 1 M61 1M62 71 72 -J -73 -74 -70 69 SEISMIC BRACING, LATERAL LONGITUDINAL E LAB Z1A 118N AAV 121, 122, 123 SEISMIC BRACING, LATERAL HWR- CM -6 • CHWR 3"0 VALVED TEE WITH BLIND FLANGE 1 8" 5" 116 117 L___ E.5 MATCHLINE-FOR CONTINUATION SEE SHT. 1M60 3"CHWS &R ABOVE CIILING CONNECT TO EX WITH 3"x2" REDU r USER SUP�/P�I�E�D HEAT EXC�A�L;ER " HWR- y HWR- 2" 81 108 82 80 110 +0- 75 CHWR OPP. HAND 1 DETAIL 9A61 M-2 91 92 89 90 CAPPED LINES 79 r 84 CM -6 K) 1 1/2" 109 2" -CHWR- CHWR +3- 15 TON LIEBERT CW060DC1A2 DOWNFLOW W/0 HUMIDIFIER 5 -HP FANS, 480V, 30, 15A 105 118 187 186 185 PUMP COND BELOW FLOOR 10 TON LIEBERT CW041 DC 1 A2 DOWNFLOW W/0 HUMIDIFIER 5 -HP FAN, 480V, 30, 15A 9 1 I+ CR1E4 SEISMIC BRACING, LATERAL UTO ROOM F2B RAISED OR. FOR CONT SEE " -CHWR '104 A ) 88 87 181 182 182 SEISMIC BRACING LATERAL LONGITUDINAL LIEBERT U11529C 26 TON 2" 5 :I�_ _ 11 - 2 1 2" CHWS & I DROP TO IN RAISED FLOOR TO AC UNIT W/DRAIN COCKS UP TO ROOM F2B FOR CONT SEE 2M61 TYP FOR CM-19,CM-20 CLG MTD UNIT, SEE1 M61 1 M5 ~AAV 10 11 h 80 Liz 9 g)I-i�) (t? -2 )1 —h- I I 177 178 CHWS CHWR— SEISMIC LATERAL 7(-3" RUN IN SUNKEN FLOOR CHWS CHWR 1" 3R4CING MATCHLINE-FOR PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED CONTINUATION SEE SHT. 1M62 16 9 GPM TO AIR CONDITIONER LIEBRT MODEL FH147C-Ao0 FSi consulting engineers Seattle, Washington Solutions & Service gt 6 7 7�5 LEGE\J GE\HAL \OTES CO\S-RUCTIO\ \OTES INSTALL 5 -TON LIEBERT UNIT. UNIT TO BE PROVIDED BY OWNER. ROUTE 1 1/2" CHW SUPPLY AND 1 1/2" CHW RETURN BENEATH RAISED FLOOR. RECEIVED CITY OF TUKWILA ISSUED FOR CONSTRUCTION SEPTEMBER 12, 2017 OCT 04 2017 PERMIT CENTER 1M12 City of Tukwila go n!!'Y N'.'I SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE P AIR HANDLER UNIT #775361-05 SLB/RWS EC 3.13.98 CONVERSION FROM CAD TO MYLAR COSI 12.10.00 A CHWS/R TO RUSSELLS CHAMBER 55750700 HARR 06/15/06 B ITDL CHILLER REPLACEMENT 13148013 M.WONG RWS. 07.11.12 c BDS LAB PACKAGES 1-5 34355 FSi AWL 09.12.17 Q�BOE/NG° 05.17 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN AR CHECKED DPN ENGINEER DATE 7.23.85 10.10.85 SUBTITLE CHILLED & HOT WATER PIPING CURRENT REVISION 34335 SYMBOL C DATE 09.12.17 CHECKED DPN 3.26.90 APPROVED APPROVED TITLE MECHANICAL MASTER BDS LAB PACKAGES 1-5 BUILDING 9-53 COL. A -G/4-8 D.C. SHEET 1M61 JOB NO. COMP NO. DWG NO. 9-53-1M61 r iv 1 1/2"V L -5 rt V 1 1/2"V UP FS -S 10 0 00 LAB Z1A 3 4x2x2 TEE J FLOOR MTD i/C UNIT 3/8"CD TO FLOOR SINK Y" HIGH PRESS. AIR (BELOW RAISED FLOOR)4 LAB 710 3/4"A (BELOW RAISED FLOOR) 4"RL UP & DN r7c) /CONNECT 1 1/2"V 3W UP TO 6" ABOVE SUNKEN 2NF FLR FLR LEVEL FS -1 (TYP) S.4 ----2"V UP & DN FLOOR MTD A/C UNIT A.C. UNIT AT CEILING–rte IN UTI LI TRENC PC 3/4" 3/4" ON SUNKEN FLR A.C. UNIT AT CEILING 1 /2"CD FROM PUMP IN AC UNIT { 1 1/2"V P F FLOOR MTD A/C UNIT TRAP PRIMER VALVE 3/4" CU-� 3/4" CU AIR 1/2" SS CO2 1" A IcpHI r M111 1M520 1 1M111 1M520 • 1/2" CU AIR 1/2" CU HP AIR 1/2" SS CO2 1/2" SS GN2 1/2" SS GN2 PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED 1/2" COND. DRAIN PUMP IN A/C UNIT FSi consulting engineers Seattle, Washington Solutions & Service FROM LEGEND: A PC CD CW V W D —0O2- -GN2— COMPRESSED 02GN2 COMPRESSED AIR PUMPED CONDENSATE CONDENSATE DRAIN DOMESTIC COLD WATER VENT WASTE DRAIN CABON DIOXIDE GASEOUS NITROGEN GENERAL NOTES: 1. COMP AIR & HIGH PR COMP AIR: TYPE L COPPER PIPE, RIDGID PRESSFIT FITTINGS. 2. CARBON DIOXIDE AND NITROGEN PIPING: .049" WALL STAINLESS STEEL, SWAGELOK 3000 PSI FITTINGS, WHITEY SHUTOFF BALL VALVES. AIR AMPLIFIER: HASKELL MD -2 W/ RECEIVER. CONSTRUCTION NOTES: ROUTE CONDENSATE LINE FROM LIBERT UNIT AND CONNECT TO EXISTING CONDENSATE LINE UNDER RAISED FLOOR. RECEIVED CITY OF TUKWILA OCT 04 2017 PERMIT CENTER ISSUED FOR CONSTRUCTION SEPTEMBER 12, 2017 RE pOD /rie,)domw(fex % '41 1 CCT 06 pmli72 moi► cf Tukwila r BUILDING DIVISION I KEY PLAN SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE REDRAWN KB SB 2.23.98 E BDS LAB PACKAGES 1-5 34355 FSi AWL 09.12.17 A AIR HANDLER UNIT 775361-05 SLB/RWS EJC 3.13.98 B CW: RELOCATE GNC LAB 523254-00 HARRAH 10.10.02 C RUSSELLS CHMBR; PIPES TO TENSION TESTER 55750700/01 HARR 06/15/06 D DESIGN CRITERIA CAFETERIA OFFLOAD 1265763 M.WONG RWS 01.30.12 SWAM ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K.BUN DATE CHECKED S.BEROSIK ENGINEER SUBTITLE PLUMBING FIRST FLOOR PLAN CURRENT REVISION 34355 SYMBOL r DATE 09.12.17 CHECKED APPROVED APPiOVED TITLE MECHANICAL MASTER BDS LAB PACKAGES 1-5 BUILDING 9-53.1 COL. A–G/4-8 D.0 SHEET 1 M 1 11 JOB NO. 523254-00 COMP NO. DWG NO. 9-53-1M111 AIR DIFFUSER/REGISTER/GRILLE SCHEDULE MARK NUMBER TYPE MATERIAL FINISH FACE SIZE INCHES INLET/ NECK SIZE INCHES MAXIMUM NOISE COEFFICIENT MAXIMUM TP INCH WG MAXIMUM SET CFM REMARKS CD -1 SQUARE CEILING DIFFUSER STEEL WHITE 12x12 60 20 .060 140 CARNES SJTA CD -2 SQUARE CEILING DIFFUSER STEEL WHITE 24x24 80 21 .110 275 CARNES SJTA CD -3 SQUARE CEILING DIFFUSER STEEL WHITE 24x24 100 24 .130 425 CARNES SJTA CD -4 SQUARE CEILING DIFFUSER STEEL WHITE 24x24 120 23 .127 550 CARNES SJTA CD -5 SQUARE CEILING DIFFUSER STEEL WHITE 24x24 140 29 .240 950 CARNES SJTA CD -6 ROUND CEILING DIFFUSER STEEL WHITE 240 80 26 .08 260 CARNES SSAA CD -7 ROUND CEILING DIFFUSER STEEL WHITE 300 100 26 .07 315 CARNES SSAA CD -8 ROUND CEILING DIFFUSER STEEL WHITE 400 140 24 .03 750 CARNES SSAA RG -1 PERFORATED CEILING RETURN GRILLE STEEL WHITE 24x24 80* 21 .04 550 CARNES SPRB222 RG -2 PERFORATED CEILING RETURN GRILLE STEEL WHITE 24x24 120* 20 .03 800 CARNES SPRB222 - PERFORATED CEILING _ RG -4 PERFORATED CEILING RETURN GRILLE STEEL WHITE 24x24 6"0 20 .013 125 TITLS 50R G= EXHAUST GRILLE , , _ --- 4 • .1 , , - - , , - . , * INLET DUCT SIZE TO PLENUM PLUMBING FIXTURE CO\NECTION SCHEDULE MARK NUMBER DESCRIPTION CONNECTION (INCHES) REMARKS SAN VENT HW CW P-1 WATER CLOSET 4 2 – 1 WALL–HUNG FLUSH VALVE P -1A WATER CLOSET 4 2 – 1 WALL–HUNG FLUSH VALVE (HANDICAP) P-2 URINAL 2 1 1/2 – 3/4 WALL–HUNG FLUSH VALVE P-3 LAVATORY 1 1/4 1 1/4 1/2 1/2 OVAL COUNTER RECESSED P -3A LAVATORY 1 1/4 1 1/4 1/2 1/2 OVAL COUNTER RECESSED (HANDICAP) P-4 SERVICE SINK 3 2 1/2 1/2 FLOOR TYPE P-5 ELECTRIC WATER COOLER 1 1/4 1 1/4 – 1/2 WALL MOUNTED (HANDICAP) P-6 SINK 2 1 1/2 1/2 1/2 – P-7 EMERG EYE WASH 1 1/4 1 1/4 – 1/2 – FD -1 FLOOR DRAIN 2 2 – – – FD -2 FLOOR DRAIN 2 – – – W/ FUNNEL FS -1 FLOOR SINK 6 3 – – FLOOR SINK EXHAUST FAN (EF) SCHEDULE MARK NUMBERARRNGMT. LOCATION AREA SERVED (ROOM NO.) EXHAUST FAN SECTION REMARKS FAN SIZE MFG. SIZE NO. NUMBER CFM (* MAX) TOTAL STATIC PRESS. INCHES WG MAX. OUTLET VELOCITY FPM APPROX. RPM DRIVE SIDE INLET GUIDE VANES MOTOR HP EFRCC10 ROOF TOILET ROOM(S) 18" CRE -18F – 2650 3/4 1400 510 – – 1 GREENHECK LB -18-10 W/ BIRD SCREEN AND B.D. EFRCC3 ROOF STORAGE 9" CRE -9F – 875 3/4 1550 1029 – – 1/2 GREENHECK LB -10-5 W/ BIRD SCREEN AND B.D. EF2CC2 FAN ROOM FIRST FLOOR 44" 44 1 20,000* 1.5 1620 771 – – 10 TRANE MODEL Q, AXIAL FLOW EF2BB2 FAN ROOM SECOND FLOOR 40" 40 1 16,200* 1.5 1480 852 – – 7.5 TRANE MODEL Q, AXIAL FLOW R410A 480/3/60 LIEBERT DSE PUMPED REFRIGERANT ECONOMIZER DOMESTIC HOT WATER HEATER (HWH) SCHEDULE MARK NUMBER KW INPUT TANK STORAGE GALLONS CODE STAMP RECOVERY ELECTRICAL REMARKS GPM B VOLTS/PH/HZ HW -1 9 65 ASME 37 100 480/3/60 A.O.SMITH MOD. DSE-65 HW -2 1.5 6 100 6 100 120/1/60 A.O.SMITH MOD. DEL -6 — 0.30 35 6 300 4 150 10x8 5 TITUS EDV -3100 VV -3 200-600 0.30 35 8 600 6 VARIABLE AIR VOLUME TERMINAL UNIT (VAV) SCHEDULE MARK NUMBER AIR QUANT. RANGE CFM PRIMARY AIR PRESSURE DROP AT MAXIMUM INCH WG MAX. NC LEVEL © 1.5" WG INLET COOLING HEATING DISCHARGE DUCT REMARKS SIZE (INCH) CFM INLET SIZE CFM SIZE SOUND LINE LENGTH FEET VV -1 0-150 0.30 35 4 150 4 100 8x6 4 TITUS EDV -3100 VV -2 100-300 0.30 35 6 300 4 150 10x8 5 TITUS EDV -3100 VV -3 200-600 0.30 35 8 600 6 300 12x10 6 TITUS EDV -3100 VV -4 300-900 0.30 35 10 900 8 450 14x12 7 TITUS EDV -3100 VV -5 400-1500 0.30 35 12 1400 10 750 20x12 10 TITUS EDV -3100 R410A 480/3/60 LIEBERT DSE PUMPED REFRIGERANT ECONOMIZER AIR COOLED COMPUTER ROOM COOLING UNITS (ES) (Sc (CU) SCHEDULE MARK NUMBER LOCATION (ROOM NUMBER) TYPE CAPACITY TONSDB, C001 INC CAPACITY FAN REFRIG ELECTRICAL EER MAKE/MODEL REMARKS RETURN AIR ( F)TYPE RETURN AIR (DP, F) OUTDOOR AIR (CFM) TOTAL (KW) SENSIBLE (KW) CAPACITY (CFM) VOLTS/PH/HZ ES -1 ACAL/ASIC LAB INDOOR EVAPORATOR 34 80 52.3 95 119.9 34 18,000 R410A 480/3/60 12.77 LIEBERT DSE DA125DP1ATS INDOOR SECTION CU -1 ROOF OUTDOOR CONDENSER 63.1 68.2 75 61 5.0 . 45 50 R410A 480/3/60 4.8 LIEBERT DSE MCM120EIADS MICROCHANNEL CONDENSER CU -2 ROOF OUTDOOR CONDENSER R410A 480/3/60 LIEBERT DSE MCM120EIADS MICROCHANNEL CONDENSER PS -1 ROOF OUTDOOR REFRIG PUMPS R410A 480/3/60 LIEBERT DSE PUMPED REFRIGERANT ECONOMIZER COMPUTER ROOM COOLING UNITS (CRU) SCHEDULE MARK NUMBER LOCATION (ROOM NUMBER) TYPE NOMINAL CAPACITY TONS FAN COIL COOLING CAPACITY CHILLED WATER HUMIDIFIER ELECTRICAL REHEAT COIL #/HR FILTER REMARKS HP* CAPACITY CFM ESP IN WG CAPACITY MBH RM TEMP °F FLOW GPM EWT °F LWT °F MAX PD @ MAX FLOW FT H2O CAP #/HR KW* TYPE & DEPTH EFFICIENCY PER ASHRAE 52-76 MAX FINAL SP WG SENSIBLE TOTAL DB WB CRU -1 Z1C SELF CONTAINED 5 1.5 2800 0.3 63.1 68.2 75 61 5.0 . 45 50 10.6 11.0 4.8 56,200 4-28.5 X 29.5 30 0.6 LIEBERT BV102C PROFESSIONAL STAMP & SIGNATURE APPLIES TO WORK WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED • FSi consulting engineers Seattle, Washington Solutions & Service LEGE\ D GE\ PAL \OTE PROVIDE ALL EQUIPMENT IN THIS SCHEDULE AS A SYSTEM OF MATCHED COMPONENTS FROM A SINGLE MANUFACTURER. EFEH\CE liRAWI\GS CO\S-RUCTIO\ \OTES CONTRACTOR TO COORDINATE WITH OWNER TO VERIFY VALUES SHOWN ON SCHEDULE MATCH SALVAGED UNIT PROVIDED BY OWNER. ISSUED FOR CONSTRUCTIO SEPTEMBER 12, 2017 REVIEWED FOR C9)101/ COMPLIANCE,, FTU WIERVED .04OC.2017 06 2017 Tthikwila BUILDING DIVISION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A RECORD DRAWING MJC KMR/RB 08.30.91 B DROPPED CLGS RMS 12BB3 & 11M4 HARR 09.07.11 C ACAL/ASIC LAB RELOCATION 12787 SAZAN/SS 07.12.12 RECORD DRAWING 12787 SAZAN/SS 08.13.13 BDS LAB PACKAGES 1-5 34555 FSi AWL 09.12.17 Q� BOE/NG' • ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. SE NR&D DATE DRAWN DATE CHECKED SUBTITLE SCHEDULES CURRENT REVISION 34555 SYMBOL DATE 09.12.17 ENGINEER CHECKED APP{).OVED TITLE MECHANICAL MASTER BDS LAB PACKAGES 1-5 BUILDING 09-53 DEV. CENTER, WA SHEET M361 JOB NO. 12787 COMP NO. DWG NO. 09-53–M361 PETE'S PLUG Uh AIR FLOW PETE'S PLUG COIL DRAIN PAN MAIN DRAIN \e-- 1 -> HOSE BIBB `L COOLI\G vODUI_E 7,0M-FLO U\IT AUX. DRAIN RAISED FLOOR IPI\ ETAIL SCALE: NONE DIAGRAMMATIC ---� TO FS HOSE BIB G DIAGAN 1M61 1M516 PLENUM AIR FLOW HOSE BIBB FLOOR COIL DRAIN PAN AUX. DRAIN CONDENSATE PUMP MAI N DRAIN AIR FLOW COOL\C NODULE HP\C DACA UP -FLS UGIT DETAIL SCALE: NONE DIAGRAMMATIC v (2 1M6) 1M516 ////// ///// //////'// ///// ////%/ ///// ///// // /// //' // DUCTWORK AS REQ'D CEIL'G OR SLAB CONDENSATE PUMP FLOOR AIR FLOW DUCTWORK AS REQ'D COOLI\G VODULE PIPI\G DIAGAV HOIZO\TAL-FLO U\IT DETAIL SCALE: NONE DIAGRAMMATIC 1q.1 1y516 LOUVER (BY OTHERS) 9"0 BEAM PENETRATION (TYPICAL OF 3) 560 CFM F2 1 C40 DOME 560 f CFM 560 CFM 9"0 RIGID DUCT WITH 1" —� INSUL., 3 TYP. VDI— ' -1 VD 2x10 INSUL JU CM -19 1680 CFM PLENUM F2A 1C30 RAR -1 1680 CFM RETURN AIR PLENUM 20x12 CM -20 CO X CO N 14x14 DUCT UP, INSTALL FD.& H.D. AT FLOOR LEVEL 680 26x16 UP CFM 1680 CFM PLA\ CHEW STATIO\ A/C DETAIL r'21- SCALE: 1/4"=1'-0" 9"0 RIGID DUCT 1M11, 1M12 I1M516 REMOVE APPROX 3'-4" FROM END OF SQUARE DUCTS (TYP. OF 9). VERIFY OPERATION OF FIRE DAMPER AFTER REMOVAL SUPPLY EGISTR 30X vIOU\TI\G DETAIL SCALE: NONE / 38x50 UP 0 N LL, O O TOP OF STEEL 26x12 F1 & F2 SHOWN C1 OPPOSITE HAND CONCRETE FLOOR METAL DECK CELL PS -200 LOCK NUTS ROD HANGER TYPICAL VOU\TI\ SCALE: NONE A\GE G DETAIL 2780 2780 F2B SEE MOUNTING DETAIL CM -19 RAR -1 12x10 1680 CFM 9„0 1M516 F2A 1C30 CEILING FLOOR VIEWING ROOM FLOOR DOME SEE DETAIL 1 6 1 1M516 F2 1C40 ELEVATION CHEW STATION A/C DETAIL SCALE: 1/4"=1'-0° 1M516 1390 CFM 1100 CFM 1 1680 CFM q_ 1390 CFM 2360 CFM 2360 CFM CM -20 F2 (TYP.) 2360 CFM ________;1680 1680 CFM i 120' -;(CEILING 2360 12 F2B (TYP.) ..--RAISED FLOOR CM -19 CFM 680 A CFM 116' 1680 2360 CM -20 1680 CFM 1680 CFM F2A (TYP.) 100' CHEW STATIO\ AIS FLOW IA0. DETAIL r -E-3 SCALE: NONE DIAGRAMMATIC M-204, M-207,LM516 M-205, M-208 18x38 22x34 32x38 30x38 30x38 26x38 TELEP o\ E EQUIP v E\T CEILING 15x8 22x34 30x38 CEILING COIDD DIFFUSER SECTIO\ A SCALE: 1/2"=1'-0” M-206 1y516 ti TOP OF STEEL CEILING El FOR REFERENCE ONLY VIEWED FOR E COMPLIANCE PROVED CT 062017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA OCT 04 2017 PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD COSI 12.10.00 BOE/N'G � i ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SRL DATE 9.20.85 CHECKED DPN 10.10.85 SUBTITLE DETAILS AND SECTIONS CURRENT REVISION SYMBOL DATE 12.10.00 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE BUILDING 9-53 MECHANICAL MASTER D.0 SHEET 1M516 JOB NO. COMP NO. DWG NO. 9-53-1M516 FILTER COOL'G COIL �a o (7 CONDENSATE PUMP FLOOR AIR FLOW DUCTWORK AS REQ'D COOLI\G VODULE PIPI\G DIAGAV HOIZO\TAL-FLO U\IT DETAIL SCALE: NONE DIAGRAMMATIC 1q.1 1y516 LOUVER (BY OTHERS) 9"0 BEAM PENETRATION (TYPICAL OF 3) 560 CFM F2 1 C40 DOME 560 f CFM 560 CFM 9"0 RIGID DUCT WITH 1" —� INSUL., 3 TYP. VDI— ' -1 VD 2x10 INSUL JU CM -19 1680 CFM PLENUM F2A 1C30 RAR -1 1680 CFM RETURN AIR PLENUM 20x12 CM -20 CO X CO N 14x14 DUCT UP, INSTALL FD.& H.D. AT FLOOR LEVEL 680 26x16 UP CFM 1680 CFM PLA\ CHEW STATIO\ A/C DETAIL r'21- SCALE: 1/4"=1'-0" 9"0 RIGID DUCT 1M11, 1M12 I1M516 REMOVE APPROX 3'-4" FROM END OF SQUARE DUCTS (TYP. OF 9). VERIFY OPERATION OF FIRE DAMPER AFTER REMOVAL SUPPLY EGISTR 30X vIOU\TI\G DETAIL SCALE: NONE / 38x50 UP 0 N LL, O O TOP OF STEEL 26x12 F1 & F2 SHOWN C1 OPPOSITE HAND CONCRETE FLOOR METAL DECK CELL PS -200 LOCK NUTS ROD HANGER TYPICAL VOU\TI\ SCALE: NONE A\GE G DETAIL 2780 2780 F2B SEE MOUNTING DETAIL CM -19 RAR -1 12x10 1680 CFM 9„0 1M516 F2A 1C30 CEILING FLOOR VIEWING ROOM FLOOR DOME SEE DETAIL 1 6 1 1M516 F2 1C40 ELEVATION CHEW STATION A/C DETAIL SCALE: 1/4"=1'-0° 1M516 1390 CFM 1100 CFM 1 1680 CFM q_ 1390 CFM 2360 CFM 2360 CFM CM -20 F2 (TYP.) 2360 CFM ________;1680 1680 CFM i 120' -;(CEILING 2360 12 F2B (TYP.) ..--RAISED FLOOR CM -19 CFM 680 A CFM 116' 1680 2360 CM -20 1680 CFM 1680 CFM F2A (TYP.) 100' CHEW STATIO\ AIS FLOW IA0. DETAIL r -E-3 SCALE: NONE DIAGRAMMATIC M-204, M-207,LM516 M-205, M-208 18x38 22x34 32x38 30x38 30x38 26x38 TELEP o\ E EQUIP v E\T CEILING 15x8 22x34 30x38 CEILING COIDD DIFFUSER SECTIO\ A SCALE: 1/2"=1'-0” M-206 1y516 ti TOP OF STEEL CEILING El FOR REFERENCE ONLY VIEWED FOR E COMPLIANCE PROVED CT 062017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA OCT 04 2017 PERMIT CENTER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD COSI 12.10.00 BOE/N'G � i ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SRL DATE 9.20.85 CHECKED DPN 10.10.85 SUBTITLE DETAILS AND SECTIONS CURRENT REVISION SYMBOL DATE 12.10.00 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE BUILDING 9-53 MECHANICAL MASTER D.0 SHEET 1M516 JOB NO. COMP NO. DWG NO. 9-53-1M516