Loading...
HomeMy WebLinkAboutPermit M17-0171 - JOEY RESTAURANT - SPLIT HEAT PUMP SYSTEMJOEY RESTAURANT 758 SOUTHCENTER MALL M17-0171 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov MECHANICAL PERMIT 9202470010 Permit Number: 758 SOUTHCENTER MALL Project Name: JOEY RESTAURANT Issue Date: Permit Expires On: M 17-0171 3/5/2018 9/1/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, WA, 92013 SUSAN VAN ROOYEN 1516 MELROSE AVE - SUITE 200 , SEATTLE, WA, 98122 HOLADAY PARKS INC 4600 S 134 PL , SEATTLE, WA, 98168 HOLADP1379NO Phone: (206) 850-5003 Phone: (206) 248-9700 Expiration Date: 9/3/2019 DESCRIPTION OF WORK: INSTALL ONE (1) NEW SPLIT HEAT PUMP SYSTEM WITH DUCTWORK & CONTROL THERMOSTAT PER PLAN. NODIFY EXISTING VENTING SYSTEM FOR NEW FIREPLACE Valuation of Work: $154,000.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $2,110.81 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or I cal -laws reg' 11 ting co struction or the performance of work. I am authorized to sign and o•tain this develop n . o and a ree o the conditions attached to this permit. Signature: Print Name: ()_ CS -e a Dat This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0705 0701 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION REFRIGERATION EQUIP ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWI Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit Nb. ( 017 1. Project No. Date Application Accepted: 11' (7 - Date Application Expires: C 14 "- (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: —1VS -€44 Southcenter Parkway, Tukwila, WA King Co Assessor's Tax No.: 537920-0240 Suite Number: Floor: 1 Tenant Name: Joey Restaurant PROPERTY OWNER Company Name: Holaday-Parks, Inc. Name: Renee Young City: Seattle State: WA Zip: 981 68 Address: 505 Burrard Street, Suite 950 Contr Reg No.: CC HOLADPI3716 Exp Date: 09/03/2019 City: Vancouver State: BC Zip: CONTACT PERSON — person receiving all project communication Company Name: Holaday-Parks, Inc. Name: Susan van Rooyen City: Seattle State: WA Zip: 981 68 Address: 1 516 Melrose Ave Suite 200 Contr Reg No.: CC HOLADPI3716 Exp Date: 09/03/2019 City: Seattle State: WA Zip: 981 22 Phone: (206) 850-5003 Fax: Email: susanvr@gmail.com New Tenant: L Yes .. No MECHANICAL CONTRACTOR INFORMATION, Company Name: Holaday-Parks, Inc. Address: 4600 S. 1 34th Place City: Seattle State: WA Zip: 981 68 Phone: (206) 248-9700 Fax: (206) 248-8701 Contr Reg No.: CC HOLADPI3716 Exp Date: 09/03/2019 Tukwila Business License No.: BUS -01 00857 Valuation of project (contractor's bid price): $ Describe the scope of work in detail: 1. Install one (1) new split heat pump system with ductwork & control thermostat per plan. 2. Modify existing venting system for new fire place. 154,000 Use: Residential: New Replacement LI Commercial: New Replacement 1:1 Fuel Type: Electric 0 Gas El Other: H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: [nit Type ty� Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent 1 Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfin 1 Air handling unit >10,000 cfm Qty Evaporator cooler Ventilation fan connected to single duct Ventilation system 1 Hood and duct Incinerator — domestic Incinerator — comm/industrial Fire damper Diffuser 4 Thermostat 1 Wood/gas stove Emergency generator Other mechanical equipment 1 er/Compres'sor 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-lOpm); • Testing of backup generators during the day. Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERK ` BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN D AGENT: Signature: Print Name: Susa 11 /10/2017 Mailing Address: 1 51 6 Melrose Ave Suite 200 H:\Applications\Foams-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Day Telephone: l�wl ow-wv� Seattle City WA State 98122 Zip Page 2 of 2 r7r4ITC:f qs� � �-4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $69.87 M17-0171 Address: 758 SOUTHCENTER MALL Apn: 9202470010 $69.87 Credit Card Fee $2.04 Credit Card Fee R000.369.908.00.00 0.00 $2.04 MECHANICAL $67.83 ADDITIONAL PLAN REVIEW TOTAL FEES PAID BY RECEIPT: R14227 R000.345.830.00.00 1.00 ;; $67.83 $C9,87 Date Paid: Thursday, April 12, 2018 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 08019G Printed: Thursday, April 12, 2018 9:59 AM 1 of 1 ���SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK$1,704:89 ACCOUNT QUANTITY PAID M17-0171 Address: 758 SOUTHCENTER MALL . Apn:9202470010a $1,704.89 Credit Card Fee $49.66 Credit Card Fee R000.369.908.00.00 0.00 $49.66 MECHANICAL $1,576.41 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $1,543.26 TECHNOLOGY FEE $78.82 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R13923 R000.322.900.04.00 0.00 $78.82 $1,704.89 Date Paid: Monday, March 05, 2018 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 04753G Printed: Monday, March 05, 2018 11:24 AM 1 of 1 ?SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $1,844.49 D17-0308 Address: 758 SOUTHCENTER MALL Apn:9202470010 $1,438.57 Credit Card Fee $41.90 Credit Card Fee R000.369.908.00.00 0.00 $41.90 DEVELOPMENT $1,396.67 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,396.67 M17-0171 Address: 758 SOUTHCENTER MALL Apn: 9202470010 $405.92 Credit Card Fee $11.82 Credit Card Fee R000.369.908.00.00 0.00 $11.82 MECHANICAL $394.10 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R12796 R000.322.102.00.00 0.00 $394.10 $1,844.49 Date Paid: Tuesday, November 14, 2017 Paid By: SUSAN LUU VAN ROOYEN Pay Method: CREDIT CARD 07489D Printed: Tuesday, November 14, 2017 1:14 PM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit INS ON NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Projec .o e-'1 RS -f 4- Type of Inspection: McCnciX11 cel' ENTAL Address: 75'V +1 -Ir M6-1-1- A.LSpecial Date Called: 'SpecialInstructions: Date Wanted:a.m & —1,14 _ 201 t p.m. Requester: Phone No: Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: 4744 ',4'e -(_t A/ra.69 Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 1"!r7-0/7! (206) 431-3670 Project`: �/ �,,�,(. �J Ofil eRp 1 /�rarG " ' T e of Inspection: � vG�I ��� .. J L°C Inrw'u4 Address: 758 SAAte MAL Date Call Special Instructions: Date Wanted:/- a.m, Requester: Phone No: pproved per applicable codes. E Corrections required prior to approval. CO 14-ppievcd, cA/ --5/5-1,%T Inspector: Date: .1V—ter REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 MI7-cr71 Projec' -3 0 ei .ReS Type,off Inspection: ti h Eau.) p+c }+ Address: 35 V Scm, ee,n+tr M4\. Date Called: -� Special Instructions: Date Wanted: �' . a.m p.m. Requester: Phone No: Corrections required prior to approval. Inspector: Date: -/ Ze6 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit Mfl-x1`11 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:T To 0 r� r pe of Inspection: tripe..,% bt4c,-�- X741tae,..i> r, Address: c t 75S oto 4 ecAr M1 LL t%t Ca;l�[1: c$ iiero�-�Co>a �� � Special Instructions: Date Wanted: a. 5- /Y-2.0 f S p.m. Requester: Phone No: h/l Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: - P 71410ki lel, l 1 %!H'I, DtD 4,/ 1 % -.1, .Re),81, sA2- Inspector: Date: 5 / 2t REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 M 1-at7I ePrro ect: a of Inspectiion: Address: `1S$ ,ji-t.don4-r MIL Date Calldd: 3- t$ Special Instructions: �, t~Requester:s-7� Date Wanted: 24'4rS a.m. p. N.vorTC P, t- `ptc-� Phone No: ❑ Approved per applicable codes. ['Corrections required prior to approval. COMMENTS: • t t PC LIAt=k ltAalL&±tov1 kct' * in4o 'ent. (ems-/e"e- <S Inspector col, Dates- H - 2De REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit MIS / 71 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro•ec T e of Inspection: Address: 758 Soaiii&eiriee t i Date C ed: �--_ Special Instructions: Date Wanted:1 / fin.' L/ -3-22W p.m. Requester: Phone No: LJApproved per applicable codes. Corrections required prior to approval. COMMENTS: inspector -7)c ;, /� Date: y s_742,e, REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. NSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 (n/7-0/7/ Mil -0/P?/ Project: Qi!Es-Itta.ton J o�/ Tyyp�e�,offlInspection: avG..T Keck \ NI • 7=ns 14 Levi Address: / -1Sou+I1eeri 'SLvoi Date Called: �--' Special Instructions:Date y, pm' S Wanted: ap nn. Z3 20/8 / o 4 Requester: ' Phone No: 857- 337-5'0 375'0 Approved per applicable codes. Ei Corrections required prior to approval. COMMENTS: ftft.. ♦'Va „ At,'--C9 (Q t. M intigGS th. , 4.4, J . - .-' it - 41, ij fit r )4 ''Sopii.:6_=. PSI odt REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit Mil PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:Type o e�` esiAusranl�` of Inspection: Pi pe /DLtd' ZNsULadio„ Address: 758 Sott-4hcer\ ° - MArlt Date Called: Sp ecial Instructions: Date Wanted: 3�2 f /18 a. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 4).°' il-Cc-sc /tie g),t%J CoauirAd- ,A Ao � onsi-te , Inspector: ;o Cly Date: _ _ 24(r. REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Air System Sizing Summary for DXHP-02 Project Name: Joey Southcenter Remodel Prepared by: Holaday-Parks 11/10/2017 08:59AM Air System Information Air System Name. DXHP-02 Air System Type• Single Zone CAV Sizing Calculation Information Calculation Months. Jan to Dec Central Cooling Coil Sizing Data Total coil load. 4.0 Tons Total coil load. 47.7 MBH Sensible coil load. 39.6 MBH Coil airflow. 1947 CFM Sensible heat ratio. 0.831 Area per unit load. 269.8 sqft/Ton Load per unit area. 44.5 BTU/(hr-sqft) Central Heating Coil Sizing Data Max coil load• 26.6 MBH Coil airflow. 1947 CFM Load per unit area• 24.8 BTU/(hr-sqft) Supply Fan Sizing Data Actual max airflow. 1947 CFM Standard airflow. 1946 CFM Actual max airflow per unit area. 1.82 CFM/sqft Outdoor Ventilation Air Data Design airflow. 524 CFM Airflow per unit floor area• 0.49 CFM/sqft Space Sizing Data Number of zones. 1 Floor Area• 1072.0 sqft Location. Seattle IAP, Washington Calculation method. Radiant Time Series Load occurs at Jul 1500 OA DB / WB. 84.0/65.0 F 77.1/65.2 F 58.2/57.1 F 56.1 F Entering DB / WB:. Leaving DB / WB• Coil ADP. Bypass Factor 0.100 Resulting.RH• 61 % Design supply temp• 58.0 F Load occurs at Des Htg Ent DB / Lvg DB• 57.9170.6 F Fan motor BHP' 0.28 BHP Fan motor kW. 0.21 kW Fan static. 0.50 in wg Airflow per person Space1Name v � � r Maximum Cooling Sensiiiiik MBH Design Airflow CFM Time-ofxPeak � Lod ' ` Maximum Heating * LoadwMBH i Spacet €Floor Area soft.". Space CFMfsgft# .mr Bar Area33.6 1947 Jun 1500 1.5 1072.0 1.82 M(1Ol1 1 17.10 CFM/person REVIEWED FOP CODE COMPLIANC APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISIOP RECEIVED CITY OF TUKWILA NOV 14 2017 PERMIT CENTER Block Load 4.15 Page 1 of 2 System Design Load Summary for DXHP-02 Project Name: Joey Southcenter Remodel Prepared by: Holaday-Parks 11/10/2017 08:59AM Block Load 4.15 Page 2 of 2 DESIGN COOLING DESIGN HEATING - Jul 1500 OA DB/ WB 84F/ 65F Design Heating Day OA DB /- WB 25 F /"21 F" Zone Loads based on RTS Details " Sensible BTIJ/hr Latent BTt1Ihr : ' Details Sensible BTUIhr Latent BTU/hr Window and Skylight Solar Loads 0 sqft 0 - 0 sqft - - Wall Transmission 0 sqft 0 - 0 sqft 0 - Roof Transmission 1072 sqft 2250 - 1072 sqft 1495 - Window Transmission 0 sqft 0 - 0 sqft 0 - Skylight Transmission 0 sqft 0 - 0 sqft 0 - Door Loads 0 sqft 0 - 0 sqft 0 - Floor Transmission 0 sqft 0 - 0 sqft 0 - Partitions/Ceilings 0 sqft 0 - 0 sqft 0 - Overhead Lighting 1072 W 3658 - 0 W 0 - Electric Equipment 2680 W 9144 - 0 W 0 - People 31 9035 13936 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 9500 0 - 0 0 Safety Factor 0% / 0% 0 0 0% 0 0 »T,otal<Zone Loads 33587 13936 '' 1495 e Thermostat and Pulldown Adjustment - -66 0 - 335 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load 0% 0 - 0 0 - Ventilation Load 524 CFM 5366 -5870 524 CFM 25456 0 Supply Fan Load 1947 CFM 722 - 1947 CFM -722 - as Total System Loads 39610 " 8066 , 26565 0 Central Cooling Coil - 39610 8072 - 0 0 Central Heating Coil - 0 - - 26565 - Total Coll Loads " 39610 ' 8072 26565 0 Key: Positive values are clg.loads Negative values are htg loads Positive values are htg loads Negative values are c g loads Block Load 4.15 Page 2 of 2 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Information Project Title: Joey Southcenter Remodel Date 11/10/2017 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept Use Company Name: Holaday-Parks., Inc. REVIEWED FOF ODE Cp���IANt APPROVED Company Address: 4600 S 134th PL, Seattle, WA 98168 Applicant Name: Richard Lee Applicant Phone: 206-248-9700 Project Description Briefly describe mechanical systems in the text box provided trofit tilbVo System Glanggs l L� I 1 ostat. City of Tukwila BUILDING DIVISIC • New Building • Building Addition EI Tenant Improvement • System R Scope of the project include the following: 1. Install one (1) new split heat pump system with ductwork, grds & control the J • Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and 0407 Energy Analysis forms required. Design Load Calculations building heating, cooling or that includes all applicable el Load calculation summary MI MECH-LOAD-CALC Form Provide design load calculations for all mechanical systems and equipment serving the ventilating needs. if a load calculation summary is provided with the permit documents compliance information then the MECH-LOAD-CALC form is not required. Mechanical Schedules forms are not required, tables. El Mechanical Plans • MECH-EQ Forms (TBD) Indicate location of equipment compliance information. If provided on plans then MECH-EQ however, include on plans all applicable compliance information listed in MECH-EQ Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate and fire station occupancies) air in a manner that does no heating or cooling is required. Exception 1) in lieu of DOAS (C403.6, Exception library or fire station) per C402.4.1.4 with 100% of form. • DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation not require space conditioning fan operation. Space conditioning fans cycled off when • Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, . Ventilation and space conditioning provided by a HEVAV system per C403.7 • DOAS included in project, although not required (occupancy not office, retail, education, • DOAS related allowances included in project: • Prescriptive vertical fenestration maximum area allowance increased to 40% conditioned floor area in building served by DOAS. • Exception to air economizer per C403.3 Exception 1, include MECH-ECONO Fan Power exceeds 5hp. the 5 horsepower threshold. III Project includes HVAC air distribution systems that provide heating and/or cooling If yes, provide a MECH-FANSYS -SUM form. • Ni For one or more systems, the total fan motor nameplate hp of all fans in HVAC system If yes, provide a separate MECH-FANSYS form for each HVAC system exceeding Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. HVAC Hydronic Systems • No hydronic systems • Hydronic chilled water • Water -loop heat pump • Hydronic heating water • Geothermal 0406 Additional Efficiency Options - Mechanical or air -to -water heat be 15% more efficient than must have FEQ a 71 and must be delivers required ventilation air in a of annual hot water energy use • C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must minimum requirements. All stand alone supply, retum, and exhaust fans over 1hp selected within 10% of maximum total or static pressure. ■ C406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DOAS per 0403.6 that manner that does not require space conditioning fan operation. • C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C406.7.1 and that 60% be provided by heat pump, waste heat recovery or solar water -heating systems. Isq twv o CITILA NOV 14 2011 PERMIT CENTER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all RI Mechanical Summary, pg. 2 Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 MECH-SUM 2015 Washington State Energy Code Compliance Revised January 2017 Service Water Heating Systems Equipment Type (s) 0 No service water systems from space heat boiler or • Hot water heating tank(s) • Instantaneous 1 Dedicated boiler • Heat exchange central hot water/steam Distribution Type (s) • Circulation System 1 On -demand Commissioning Commissioning is required for: per C408.2 shall be performed requirements: of all mechanical heating. Mechanical water heating not required. water heating systems per C408.4 applicable systems regardless of individual equipment capacity. systems in the building do not exceed 240,000 Btu/h commissioning not required. does not exceed 200,000 Btu/h. Service water heating 1 Mechanical systems • Service If required, commissioning Exceptions to commissioning for all space conditioning systems system in building • Total output capacity cooling or 300,000 Btu/h NI Capacity of largest service systems commissioning Low Energy and Semi -Heated Spaces (Note 6 and 7) Space Type ' :.. Location in Plan(s) ;Space(s) Served Area Served, square feet ;:.. Heating Capacity, Btu/h (Note 4) .: Cooling Capacity,' Btu/h (Note 5) Peak Space. Conditioning Capacity,: Btu/h-sf ... `.Compliance • Check' Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C402.1.1 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h`sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btu/1)W Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 Mechanical Permit Plans Checklist MECH-CHK orms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Joey Southcenter Remodel Date 11/10/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableCode (yes,no,na) Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; identify provisions applicable to this equipment per C403.1 exception Yes C403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; inctude load adjustments to account for energy recovery See load calculations Yes C403.2.2 Equipment and system sizing Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions taken See load calculations Yes C403.2.3 C403.2.3.2 0403.2.13.1 HVAC equipment performance requirements (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) See equipment schedule M7.01 YesElectric C405.8 motor efficiency List all motors 2 1/12 hp (that are not Integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated efficiency, or exception applied See equip schedule M7.01 C403.2.14 For fractional hp motors (1/12 -1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exception taken For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form No C403.2.11.1 Fan power limitation For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations in Table C403.2.11.1(1), provide MECH- FANSYS form for each system No 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken No C403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is 2 67, or exception taken; indicate these fans are sized so total efficiency is within 15% of the fan maximum total efficiency No 0403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans < 400 cfm in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE -57) No C403.2.13 Variable flow capacity - fans For fan motors 2 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements No 0403.2.3 Maximum air cooled chiller capacity For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chiller capacity is s 100 tons, or exception taken No C403.4 Large capacity cooling systems For buildings with 2 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) No C403.2.3.1 Non-standard water-cooled centrifugal chillers For water-cooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements No 0403.2.13.1 C403.4.3.2 Centrifugal fan open -circuit cooling towers For open -circuit centrifugal fan cooling towers with 21,100 gpm capacity, indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating bumer No C403.4.2 C403.4.2.5 Large capacity boiler systems For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers. or combination) No C403.2.13 Variable flow capacity - pumps For pump motors 2 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements No C403.2.3 Gas and oil -fired forced air fumace and unit heaters For forced air fumaces with capacity 2 225,000 Btu/h and all unit heaters, indicate in equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss No 0403.2.4.8 Combustion heating equipment For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating or staged combustion control No C403.2.3.3 Packaged electric heating / cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules No C403.2.12 Heating outside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements No C403.2.7.1 Kitchen exhaust hoods Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC System Controls for additional requirements No C403.2.4.3 Outdoor supply air, exhaust and relief dampers Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/sf); refer to HVAC System Controls for additional requirements for OSA dampers Existing building dampers Yes C403.2.4.3 Indicate Retum air dampers locations of retum air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) M2.02 No 0403.2.4.3 Stairway and shaft vent Indicate dampers location of stairway and shaft vent dampers on plans; verify dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Joey Southcenter Remodel Date 11/10/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,n_ Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes No C403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additional requirements No C403.2.3.4 Humidification For cooling systems with humidification equipment that are also required to have air economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken r Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible NA 0406.2.1 0403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply NA C406.2.2 C403.2.3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NA C406.2.3 C403.2.11.3 Minimum fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans is a 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency HVAC System Controls Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, induding perimeter system zones M2.02 Yes C403.2.4.1 Thermostatic controls (thermostats and humidistats) Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones NA If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating NA NA C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less Yes C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling M7.01 No C403.2.4.1.3 Setpoint overlap restriction If separate heating and cooling systems with separate thermostatic control devices are used to serve a zone, indicate locations of both thermostatic control devices and the zone they serve on plans (thermostats) Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling Yes C403.2.4.2 C403.2.4.2.1 C403.2.4.2.2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual ovemde functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken M7.01 Yes C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy M7.01 Yes C403.2.4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA / exhaust M7.01 No C403.2.4.3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) No C403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken No C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied No C403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitallon is falling, and when outdoor air temperature exceeds 40°F No C403.2.4.6 Freeze protection system controls Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing No C403.2.4.9 Group R1 hotel / motel guest rooms least For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at 5°F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 3 of 7 Mechanical Permit Plans Checklist MECH-CHK E • Revised January 2017 Lv ID vvasninglvll oLaw De'yy ,.we ,..m npnm,eo , v,..w ,.., .... ..........................,.....-.__...y . --'" -- - - -- Project Title: Joey Southcenter Remodel Date 11/10/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes No C403.2.4.10 C403.2.4.11 Group R2 / R3 dwelling units, Group R2 sleeping units For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10°F deadband; or exception taken Yes C403.2.6 C403.2.11.4 Ventilation Indicate method of ventilation air delivery (natural or mechanical) for each zone M7.01 If mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken M7.01 If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces No C403.2.6.2 Demand controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA > 3,000 cfm, and / or the system has airside economizer or automatic modulating OSA damper; indicate OSA controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception M2.01 No C403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or attemate means provided to automatically reduce OSA when space is partially occupied No C403.2.6.4 C403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) No C403.2.6.4 C403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation / exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken No C403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood exhaust For kitchens with total hood exhaust exceeding 2,000 dm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) No C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements No C403.2.13 Variable flow capacity - HVAC system fans For HVAC fan motors a 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 1/3 static design pressure); note exception taken No C403.3.1 DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity a 65,000 Btu/h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors); indicate minimum displacement (capacity reduction) as % of full load Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) No C403.2.11.5 Fan airflow control For DX air handling units with cooling capacity a 65,000 Btu/h and evaporative and chilled water air handling units with fan a 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow. or both) For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is 5 66% of full speed drawing 5 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is 5 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken No C403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 Identify all DDC system input / output control points; indicate capability for trending and graphical display Ducting Systems Yes C403.2.8.1 C403.2.8.3 Duct construction Indicate on plans that all ductwork is constructed and seated per IMC M0.01 For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC M0.01 Yes C403.2.8.3 Dud pressure dassifications Identify location of low, medium and high pressure ductwork on plans No c403.2.8.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 Mechanical Permit Plans Checklist MECH-CHK C liance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 cillo vvdarnmywn oloio �llo�yy .,wo omp Project Title: Joey Southcenter Remodel Date 11/10/2017 The following information Is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. ApplicableLocation (yes,no,na) Code Section Code Provision Information Required - Must be in pemlit documents in Documents Building Department Notes Yes C403.2.8.1 C403.2.8.2 Duct insulation For supply and retum ductwork located in unconditioned space or outdoors, indicate R -value of insulation on ductwork on plans; identify climate zone; note exceptions taken For supply ductwork located in conditioned space, identify if design supply temperature is < 55°F or> 105°F and indicate R -value of insulation on this ductwork on plans; note exception taken M0.01 For OSA ductwork, shafts and plenums, indicate R -value of insulation on these elements on plans per Table C402.1.3 for steel -framed walls; note exception taken M0.01 Piping Systems No C403.2.9 Piping insulation Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken No C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Economizers Yes C403.3 Air economizer required Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls M7.01 Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) No C403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load No C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation Yes C403.3.3.1 Air economizer capacity Indicate modulating OSA and retum air dampers are configured to provide up to 100% OSA for cooling M7.01 Yes 0403.3.1 C403.3.3.2 Integrated air economizer Verify mechanical cooling controls are interlocked with air economizer controls so the outside air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is < 45°F M7.01 For systems with cooling capacity a 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken Yes C403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 M7.01 No C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may be provided in lieu of air economizer, indicate system is capable of 100% design cooling capacity at 50°F db / 45°F wb OSA temperatures No C403.3.4.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit No C403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity z 65,000 MLA, refer to HVAC System Controls for requirements No C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity 5 54,000 Btu/h, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Systems Requiring Energy Recovery No 0403.5.1 Energy recovery (ER) - ventilation / exhaust systems For systems with design OSA > 5,000 dm, or design supply air dm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For rooms served by multiple systems with aggregate design OSA > 5,000 cfm, or aggregate design supply air cfm and % OSA exceeding the values in Tables 0403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and retum air enthalpies at design conditions No 0403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air; ER effectiveness (min 25°F); or alternative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) No C404.10.4 (under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature at design conditions by a 36°F No 0403.5.2 For buildings with on-site steam heating systems, indicate condensate water ER Energy recovery - steam condensate systems For buildings that use off-site generated steam where condensate is not retumed to the source, indicate on-site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project. Title: Joey Southcenter Remodel Date 11/10/2017 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Energy recovery - For buildings with food service, meat or deli departments that have a 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) No C403.5.3 cooler / freezer condensers For buildings with a 40.000 sf conditioned floor area and with a 1,000,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating No C403.5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Blu/h of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Hydronic System Controls No C403.2.13 Variable flow control - For hydronlc system pump motors s 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires t 30% design wattage at 50% design fluid flow); note exception taken C403.4.2.7 hydronic system pumps Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature No C403.2.5 Hydronic system setback For heating and chilled water systems a 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. If system pump motor hp a 3 hp, also indicate controls automatically reduce flow by 5 50%. C403.4.2.4 and part load controls For chilled water systems (z 300,000 Btu/h, pump motor hp z 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken No C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers No C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 No C403.4.2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) No C403.4.2.6 Chiller / boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use No C403.2.13.1.1 C403.4.3.1.1 Heat rejection equipment - For cooling towers with fan motors a 7.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) C403.4.3.1.2 variable flow control For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans in unison No C403.4.3.3 Heat rejection equipment - cooling tower flow tumdown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run in parallel No C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken No 0403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed No C403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop No C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power > 10 hp, indicate 2 -way isolation valves on each heat pump and variable flow system control Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 No C403.6 C403.6.3 Dedicated outdoor air systems For buildings with office, retail, education, library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 may not utilize exceptions) No C403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and return air enthalpies at design conditions. No C403.6.2 Heating / cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to tum down, when there is no call for heating or cooling in the zone they serve If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule 2015 Washington State Energy Code Compliance Forams for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 MECH-CHK Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Project Title: Joey Southcenter Remodel The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable ves,no,naj No Code Section Code Provision C402.4.1.4 0403.6 Increased prescriptive maximum vertical fenestration area with DOAS Information Required - Must be in permit documents Indicate that all occupied, conditioned spaces are served by a DOAS per C403.8 Revised January 2017 Date 11/10/2017 Location in Documents Building Department Notes Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) option, indicate that 90% or more of all occupied, Building provided with To comply with additional efficiency package 0406.8 DOAS conditioned spaces are served by a DOAS per C403.6 Multiple Zone Air Systems No 0403.4.4 No No C403.4.4 C403.4.4.1 No No C403.4.4.2 C403.4.1.1 0403.4.1.2 Air systems serving multiple zones VAV systems serving multiple zones Single duct VAV terminal units Dual duct systems - terminal units VAV system static pressure sensors - sensors and DDC set points Identify supply air systems serving multiple zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types For each air terminal include: maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling For systems with separate warn air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verify controller setpoint pressure at each sensor is 51.2 inch w.g. For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; indede control logic that automatically detects and generates an alarm if any zone excessively drives reset logic, and allows building operators to exclude zones from reset logic For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken air reset Indicate controls automatically reset supply air temperature in response to building loads or No C403.4.4.4 VAV system supply outdoor air temperature; or exception taken Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Exception 2, must comply with all 16 provisions C403.7, Indicate system is configured for 100% air economizer operation and complies with all related No Air economizer economizer requirements per C403.3 (without economizer exceptions) Item 1 0403.7,Provide DDC controls for all components of system; identify all DDC system input / output Item 2 Direct digital controls (DDC) control points; indicate capability for trending and graphical display For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that C403.7, Outdoor airflow measures OSA intake under all load conditions; indicate control sequence that increases or No Item 3 measurement and reduction reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) C403.7,For systems with minimum OSA > 2,500 cfm, indicate supply airflow monitoring station capable No Item 4 Supply airflow measurement of measuring supply air delivered to VAV terminals under all load conditions Verify maximum area served by a single HEVAV system is 5 50,000 sf, or one entire floor, Nowhichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are C403.7, Zone isolation and Item 5 maximum area served expected to be occupied non -simultaneously, indicate zone isolation controls per C403.2.4.4 Verify that VAV terminals serving interior cooling driven loads are sized per design supply air temperature that is 5°F higher than VAV terminals serving exterior zones Identify air terminals with minimum primary airflow setpoints > 50% of maximum setpoint in C403.7, Maximum air terminal inletcity equipment schedule or MECH-EQ form; indicate air terminal inlet velocity does not exceed 900 No Item 7 velocity fp fn Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC No 0403.4.4.3 Multiple -zone VAV system ventilation optimization controls No C403.7, Item 6 No 0403.7Item 8, Sequence of operation 36 0403.7, Maximum allowable system Verify fan system bhp is 5 90% of the bhp limit per Option 2 equation in Table 0403.2.11.1 No Item 9 brake horsepower provide MECI+FANSYS form for each system Indicate all series and parallel terminal fans have electronically commutated motors; indicake C403.7,10 motor and control unit inDC dica a fansystem is configured to vary air terminal fan speed as a speed during periods of low heating, low cooling, or ventilation oonly is 5 load;n of the 6 % of Item 10 motor and control supporting peak design air flow or provide supp g documentation for applied exception Interior / exterior zone design supply air temperature No 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 MECH-CHK Mechanical Permit Plans Checklist January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 ReviseddJaIDate itdJanary 7 Project Title: Joey Southcenter Remodel The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the 'n ton State Energy Code, Commercial Provisions. asig ApplicableCode Section (yes,no,na) Code Provision Information R No C403.7, Item 11 Application of single duct and fan -powered terminal units Indicate VAV terminal types on pla zones with envelope loads; verify e No C403.7, Item 12 Fan -powered terminal unit primary air reset Indicate DDC controls are configur of all fan -powered terminal units to occupied heating or deadband, ba No C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant dedicated terminal unit with DCV c indicate occupancy sensor control sets back room heating and coolin No C403.7,indicate Item 14 Dedicated HVAC systems For server, electronic equipment, 1 spaces are served by inch systems serving rest of building; it controls or energy recovery per C Indicate whether systems are sen efficiency chilled water plant C403.7,efficiency If complying via high efficiency he heating coils served by heating wi a 90%, air -to -water heal No Item 15 Central plant efficiency If complying via high efficiency ch coils served by chillers with rated 25% per Table C403.2.3(7) (note smallest chiller or compressor in I storage sized for 5 20% of total pl No C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a f monitor operation and provide far. and VAV air terminal units in the 1 HVAC Equipment Energy Use Metering No C409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf am all equipment used to provide spa be provided per C409; indicate ea Specific Requirement To Support Commissioning Documentation and System Indicate that all mechanical syste control functions and / or configi commissioned; Yes C408.2 Scope of mechanical systems commissioning For buildings with z 240,000 Btu/ heating capacity, indicate that all required to be commissioned; or demonstrating eligibility for excel Indicate in plans and specificatio Yes C403.2.10 0408.1.1 C408.1.2 C408.1.4.2 Commissioning requirements in construction documents systems; Include general summary with at including: narrative description o activities required); of tivest plan (f including C103.6 Include in general summary that C408.1.4.2) shall be completed I prior to the final mechanical insp Yes C408.2.2 Air system and hydronic system balancing Indicate in plans that air and fluia defined in the specifications; ind throttling losses, then adjusted t Yes C408.2.2.1 Air system balancing devices Indicate devices that provide the air handling equipment requiring No 0408.2.2.2 Hydropic system balancing devices Indicate devices that provide the hydronic equipment requiring sy Yes C408.2.3 Functional performance testing criteria Identify in plans and specificatio all modes of operation, includint Project Close Out Documentation Yes C103.6 Documentation and project close out submittal requirements Indicate in plans that project clo personnel is required for all mw code; indicate close out docum applicable WSEC compliance fc equired - Must be in permit documents ts; verify fan -powered terminal units only serve perimeter II other zones are served by single duct terminal units ed to automatically reset the primary supply air cfm setpoint the minimum required to maintain ventilation during sed upon the VAV air handling unit OSA ventilation fraction density 5 25 people / 1000 sf, indicate space is served by a ontrol that resets terminal unit ventilation setpoint; also that automatically reduces minimum ventilation to zero and g setpoints by 2 5°F elecom or similar spaces with cooling loads > 5 W/sf, pendent HVAC systems that are separate from HPVAV dicate dedicated HVAC systems have air economizer 103.3 Exception 9 ed by a high efficiency heating water plant, or a high sting water plant: Indicate all VAV terminals have hydronic iter system with either gas-fired boiler(s) with thermal pumps, or heat recovery chillers filled water plant: Indicate all VAV air handlers have cooling IPLV efficiency that exceeds WSEC listed IPLV by at least water-cooled IPLV is max. all others are min); indicate dant is 5 20% of total plant capacity, or provide thermal ant capacity cult detection and diagnostics (FDD) system configured to itt reporting of required parameters for all VAV air handlers 1PVAV system Location in Building Department Documents Notes building additions > 25,000 sf, verify energy use metering of ce heating and cooling, dehumidification and ventilation will uipment eligible for exception ms, equipment, and controls for which the WSEC requires ration to perform specific functions are required to be h total output cooling capacity or 5 300,000 Btu/h total output mechanical systems regardless of individual capacity are provide building heating / cooling capacity calculation rtion ns that Cx per C408 is required for all applicable mechanical M0.01 M0.01 a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 activities, responsibilities of the Cx team, schedule of project close out documentation per C103.6. and conflict of a Cx project report or Compliance Checklist (Figure y the Certified Cx Professional and provided to the owner ection. f flow rates shall be tested and balanced within the tolerances nate systems shall be balanced in a manner to first minimize meet design flow conditions capability to balance all supply air outlets, zone terminals and system balancing capability to isolate, balance and measure flow across all stem balancing including heating and cooling coils and pumps s the intended operation of all equipment and controls during interfacing between new and existing -to -remain systems se out documentation and training of building operations chanical components, equipment and systems govemed by this entation shall include: record documents, O&M manuals, rris and calculations M0.01 M0.01 M0.01 mercial, R2 and R3 over 3 stories and all R1 Design LoadCalculationSummary MECH-LOAD-CALC R2 & R3 over 3 stories and all Rflevised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including Project Title: Joey Southcenter Remodel Date 11/10/2017 The following information shall be included in the load calculation program summary submitted with the permit documents. If a load calculation summary is not available, provide the required information below. For Building Dept. Use Equip. ID Area(s) Served Heating Design Load in Btu/h (Note 1) Cooling Design Load in Btu/h (Note 1) Calculation Method (Note. 2) Notes DXFC-02 Bar 26,600 47,700 Block Load E-20 Note 1 - Design load shall account for the building envelope, lighting, ventilation and occupancy loads of the spaces) served by t e mechanical system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer load calculation program, worksheet (identify source), or equivalent computation procedure in accordance with ASHRAE Standard 183. P5I PLAN RENEW/ROUTING SLIP PERMIT NUMBER: M17-0171 DATE: 04/03/18 PROJECT NAME: JOEY RESTAURANT SITE ADDRESS: 758 SOUTHCENTER MALL Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # X Revision # 1 after Permit Issued DEPARTMENTS: AIA Building Division Public Works ❑ /01-M A -f b‘ -S-19 Fire Prevention Structural Planning Division ❑ Permit Coordinator n PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 04/05/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05/03/18 Approved Corrections Required Approved with Conditions 111 Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: .Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 'ERM T COORD COPY.. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0171 DATE: 11/14/17 PROJECT NAME: JOEY RESTAURANT SITE ADDRESS: 758 SOUTHCENTER MALL , X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: ki 'mu 1141 Building Division Public Works ❑ N� 1411 Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 11/16/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12/14/17 Approved Corrections Required ❑ Approved with Conditions ❑ ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire ❑ Ping ❑ PW 0 Staff Initials: 12/18/2013 PROJECT NAME:T.4sts-fatAranj-- SITE ADDRESS: i J LoOtk. te44., V( PERMIT NO: M17—c17J ORIGINAL ISSUE DATE: `-,S--( REVISION LOG REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 ii_&_(0 ff ,r Summary of Revision` N, pc� -o )1 ((Oar' COy`d o�iv1r `bre VV f/l frr. Gl�d-el 1 �' poli r� r��oluc� wi i.�-- - Received by: Received by: Received byt ) ,/ 7 REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www:TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. \____Date: Plan Check/Permit Number: VI' — 0 t 1 ❑ Response to Incomplete Letter # 0 Response to Correction Letter # ❑ Revision # 1 after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: Project Address: '7 t e a - 1 ' r• u� Contact Person: ��44 i.e..' rA ti- Phone Number: ZO t. 2 SD u C 5 Summary of Revision: t. Move oc DacR Co.ti)rrptiscR re #V a L� »,v . 2 . PA01111)* Digit L co►°'S vt= tools 6( r'LA c� / fL -ce- 4sivT, RECEIVED CITY OF TUKW I APR 0 3 2018 PERMIT CENTER Sheet Numbers :Y1001 ti 1141349 12 Z 3 "Cloud" or highlig t all area's of revision including date of revision Received at the City of Tukwila Permit Center by: ❑ Entered in TRAKiT on W:\Fcrmit Center\Templates \Forms\Revision Submittal Form.doc Revised: August 2015 HOLADAY PARKS INC Home Espai'iol Contact. Search L&I A -Z Index Help Safety & Health Claims & Insurance Workplace Rights Washington State Department of Lab©r & Industries HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County Business type Corporation License Page 1 of 3 L&l Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 11/21/2017 HOLADAY PARKS INC Verify the contractor's active registration / licen: Construction Contractor License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23000452 3rtification (depending on trade) and any past violation: Active. Meets current requirements. $12,000.00 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance Charter Oak Fire Ins Co Policy no. DTCO1F465357C0F17 $1,000,000.00 Received by L&I Effective date 10/31/2017 11/01/2017 Expiration date 11/01/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 177,231-00 Account is current. Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 3 of Year 2017 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/22/2016 Inspection no. No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 11/21/2017 HOLADAY PARKS INC 317940948 Location 1007 Stewart St Seattle, WA 98101 Inspection results date 08/09/2016 Inspection no. 317940177 Location 1011 Western Ave, Suite 1000 Seattle, WA 98104 No violations Inspection results date 05/05/2016 Inspection no. 317940156 Location 4600 S 134th PI Tukwila, WA 98168 No violations Inspection results date 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 No violations Inspection results date 05/08/2014 Inspection no. 317278497 Location 2nd and 110th Ave Bellevue, WA 98004 Inspection results date 09/04/2012 Inspection no. 316256841 Location 3003 W Casino Rd Everett, WA 98204 No violations Violations Page 3 of 3 Washington State Dept. of Labor 8 Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 11/21/2017 38x240 or 38x248 d GENERAL NOTES 1. THESE DOCUMENTS ARE BASED ON HOLADAY PARKS ENGINEERING AND SHOP FABRICATION STANDARDS, SMACNA DUCT CONSTRUCTION STANDARDS, AND APPLICABLE LOCAL AND STATE CODES WHICH ARE NOT SHOWN IN DETAIL ON THESE DRAWINGS. VARIATION FROM THESE PLANS REQUIRES NOTIFICATION OF HOLADAY-PARKS ENGINEERING DEPARTMENT 2. ALL TRADES SHALL LEAVE A MINIMUM OF 36" CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR SERVICING. ACCESS PANELS THAT CONTAIN UNE VOLTAGE POWER (120 VOLT AND GREATER) SHALL HAVE A MINIMUM OF 42" CLEARANCE IN FRONT OF THE ACCESS PANEL AND A MINIMUM OF THE ACCESS PANEL WIDTH CLEAR FROM OBSTRUCTIONS AS REQUIRED BY STATE AND LOCAL ELECTRICAL CODES. 3. CUTTING, FRAMING, PATCHING AND PAINTING OF WALL, CEIUNG AND FLOOR OPENINGS, AS REQUIRED BY THESE MECHANICAL PLANS, SHALL BE BY THE GENERAL CONTRACTOR. 4. ROOF CURBS, FLASHINGS, SLEEPERS, PITCH POCKETS, CUTTING AND PATCHING OF ROOF OPENINGS, ROOFING, AND ROOF INSULATION SHALL BE BY THE GENERAL CONTRACTOR. 5. PAINTING OF GRILLES, REGISTERS, AND DIFFUSERS, AS MAY BE REQUIRED BY ARCHITECT OR OWNER, SHALL BE DONE BY THE GENERAL CONTRACTOR. 6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR TEMPORARY HEAT REQUIRED DURING CONSTRUCTION UNLESS NOTED OTHERWISE. 7. EQUIPMENT, DUCTS, AND PIPING WEIGHTS AND LOCATIONS HAVE BEEN COORDINATED WITH ARCHITECT, STRUCTURAL ENGINEER, AND GENERAL CONTRACTOR IN ORDER TO DETERMINE BUILDING STRUCTURAL ADEQUACY. IF IT IS NECESSARY TO RELOCATE EQUIPMENT, DUCTS, OR PIPING, NOTIFY HOLADAY-PARKS' ENGINEERING DEPARTMENT FOR ASSISTANCE IN RE -COORDINATION. 8. IN NO INSTANCE SHALL OTHER CONTRACTORS HANG OR SUPPORT EQUIPMENT, CEIUNG WIRES, LIGHT FIXTURE HANGERS, ETC..., FROM HVAC EQUIPMENT, OR DUCTS, OR PIPING. 9. THE PLUMBING CONTRACTOR SHALL ROUTE PLUMBING VENTS SO AS TO MAINTAIN MINIMUM 15 FEET OF CLEARANCE FROM OUTSIDE AIR INTAKES. SHEET METAL NOTES 1. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 2015 INTERNATIONAL MECHANICAL CODE (SMC), OTHER STATE AND LOCAL CODES AND STANDARDS. ALL DUCTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA DUCT CONSTRUCTION STANDARDS. ALL DUCTS SHALL BE SEISMICALLY BRACED IN ACCORDANCE WITH SMACNA SEISMIC RESTRAINT MANUAL (SEE SEISMIC RESTRAINT NOTES ON THIS SHEET). 2. DUCT SIZES INDICATED ON PLANS ARE NET INSIDE DIMENSIONS. A CALL -OUT SUCH AS 12* X 12"/SL MEANS A 14" X 14" SHEET METAL DUCT WITH 1" SOUNDUNER, GIVING A NET INSIDE DIMENSION OF 12" X 12". 3. DUCTWORK SHALL BE CONSTRUCTED TO DIMENSIONS INDICATED ON PLANS. THE TOLERANCE OF THESE DIMENSIONS SHALL BE AS SPECIFIED IN HOLADAY-PARKS, INC. SHOP STANDARDS MANUAL LENGTHS, AND CRITICAL DIMENSIONS BETWEEN DUCTWORK AND OTHER BUILDING/SYSTEM ELEMENTS ARE INDICATED WHERE A LOCATION OR DIMENSION SCALED FROM THE DRAWING WILL NOT BE ADEQUATE. THE TOLERANCE OF CRITICAL DIMENSIONS, IF NOT INDICATED, SHALL DEFAULT TO THAT OF THE INSTAWNG MECHANIC'S MEASURING DEVICES. SCALED LOCATIONS OR DIMENSIONS ARE NOT SUBJECT TO TOLERANCE GUIDEUNES. 4. THESE PLANS HAVE BEEN COORDINATED WITH THE ARCHITECTURAL, STRUCTURAL, SPRINKLER, AND ELECTRICAL DRAWINGS. ANY CHANGES IN THIS LAY -OUT MUST BE REVIEWED BY HOLADAY-PARKS' ENGINEERING DEPARTMENT. 5. DUCT ELBOWS SHALL BE RADIUS TYPE WITH FULL WIDTH THROAT RADIUS, UNLESS SHOWN OTHERWISE. TURNING VANE ELBOWS SHALL HAVE DOUBLE THICKNESS TURNING VANES INSTALLED IN EVERY RAIL TAB. 6. DUCTWORK SHALL BE SEALED PER 2015 WASHINGTON STATE ENERGY CODE REQUIREMENTS (SEE DUCT SEALING AND LEAKAGE TEST NOTES ON THIS SHEET). DUCT SYSTEMS SHALL BE LEAK TESTED IN ACCORDANCE WITH THE 2015 WASHINGTON STATE ENERGY CODE REQUIREMENTS (SEE DUCT SEALING AND LEAKAGE TEST NOTES ON THIS SHEET). DUCT LEAKAGE NOTES 1. ALL DUCTS AND PLENUMS SHALL BE SEALED IN ACCORDANCE WITH SECTION C403.2.8.3 OF THE 2015 WASHINGTON STATE ENERGY CODE (WSEC). DUCTS SHALL BE SEALED USING WELDS, GASKETS, MASTIC, OR MASTIC -PLUS -EMBEDDED -FABRIC TAPE. DUCT TAPE IS NOT PERMITTED EXCEPT FOR FLEXIBLE DUCT SYSTEMS MAY USE TAPES LISTED FOR THESE SYSTEMS. PROVIDE SOLVENT OR WATER BASED MCGILL AIRSEAL CORPORATION UNITED DUCT SEALER OR APPROVED EQUIVALENT. FOR DUCT SEALING, THE FOLLOWING DEFINITIONS APPLY: LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION OF AIRFLOW. TRANSVERSE JOINTS ARE CONNECTIONS OF TWO DUCT SECTIONS ORIENTED PERPENDICULAR TO AIRFLOW. DUCT WALL PENETRATIONS ARE OPENINGS MADE BY ANY SCREW FASTENER, PIPE, ROD, OR WIRE. ALL OTHER CONNECTIONS ARE CONSIDERED TRANSVERSE JOINTS, INCLUDING BUT NOT LIMITED TO SPIN -INS, TAPS, ACCESS DOOR FRAMES AND JAMBS, AND DUCT CONNECTIONS TO EQUIPMENT. DUCTS SHALL BE SEALED AS FOLLOWS: PRESSURE CLASS SEALING REQUIREMENTS LESS THAN 1/2' W.C. NO SEALING REQUIRED 1/2" W.C. TO LESS THAN 3" W.C. TRANSVERSE JOINTS AND LONGITUDINAL SEAMS, SPIRAL LOCK SEAMS IN ROUND OR FLAT OVAL DUCT DO NOT REQUIRE SEALING, ALL OTHER SEAMS SHALL BE SEALED GREATER THAN 3" W.C. TRANSVERS JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS LOW PRESSURE SUPPLY AND RETURN DUCTS (3" W.C. OR LESS PRESSURE CLASS) LOCATED OUTSIDE THE CONDITIONED SPACE (ABOVE AN INSULATED CEILING OR BELOW AN INSULATED FLOOR) SHALL BE SECURELY FASTENED AND SEALED. REFRIGERANT PIPING NOTES 1. INSTALLATION OF REFRIGERANT PIPING SHALL BE IN ACCORDANCE WITH THE 2015 INTERNATIONAL MECHANICAL CODE (IMC) AND ALL OTHER STATE AND LOCAL CODES AND STANDARDS. 2. INSTALLATION OF LISTED AND LABELED FACTORY BUILT EQUIPMENT AND APPLIANCES SHALL BE PER THE MANUFACTURER'S INSTALLATION REQUIREMENTS. INSTALLATION OF REFRIGERANT PIPING SERVING LISTED AND LABELED FACTORY BUILT EQUIPMENT SHALL BE PER THE MANUFACTURER'S INSTALLATION REQUIREMENTS. REFRIGERANT PIPE SIZE SHALL BE NO LESS THAN THAT REQUIRED BY THE MANUFACTURER'S INSTALLATION REQUIREMENTS AND AS REQUIRED FOR THE INSTALLED LENGTH OF PIPE AND THE LOCATION OF THE EQUIPMENT. 3. REFRIGERANT PIPING SHALL BE EITHER SEAMLESS TYPE "L" DRAWN COPPER TUBING IN ACCORDANCE WITH ASTM 688 OR SEAMLESS COPPER ACR TUBING IN ACCORDANCE WITH ASTM B280. REFRIGERANT PIPE FITTINGS SHALL BE WROUGHT COPPER WITH SILVER -SOLDERED OR BRAZED JOINTS. 4. PENETRATIONS THROUGH FIRE AND/OR SMOKE RATED WALLS, FLOORS, CEILINGS AND ROOFS SHALL BE PROTECTED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC) AND THE 2015 IMC. PROTECTION, AS REQUIRED, SHALL BE PROVIDED AND INSTALLED BY THE PIPING CONTRACTOR THROUGH APPROVED FIRE/SMOKE STOP ASSEMBLIES. 5. REFRIGERANT PIPING INSULATION THICKNESS SHALL BE BASED ON NOMINAL PIPE DIAMETER AND OPERATING TEMPERATURE RANGE IN ACCORDANCE WITH TABLE C403.2.9 IN THE 2015 WASHINGTON STATE ENERGY CODE (WSEC). THE PIPE INSULATION MATERIAL SHALL BE PREFORMED ELASTOMERIC INSULATION, "ARMAFLEX", "RUBATEK", OR APPROVED EQUAL WITH A CONDUCTIVITY VALUE EQUAL TO OR BETTER THAN THE VAULES LISTED IN TABLE C403.2.9 OF THE 2015 WSEC. ALL REFRIGERANT PIPE LOCATED OUTSIDE THE BUILDING SHALL BE INSULATED. ALL REFRIGERANT PIPE INSULATION EXPOSED TO WEATHER SHALL HAVE UV PROTECTION OR SHALL HAVE A PROTECTIVE JACKET TO PREVENT UV DAMAGE IN ACCORDANCE WITH SECTION C403.2.9.1 OF THE WSEC. 6. REFRIGERANT PIPING THAT IS ERECTED ON SITE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE 2015 IMC SECTION 1108. SYSTEMS ERECTED WITH COPPER PIPE NOT EXCEEDING 5/8" OD IN ACCORDANCE WITH ASHRAE STANDARD 15, CAN BE TESTED BY MEANS OF THE REFRIGERANT CHARGED INTO THE SYSTEM AT THE SATURATED VAPOR PRESSURE OF THE REFRIGERANT AT 70 DEGREES F OR HIGHER. GASES USED FOR PRESSURE TESTING SHALL BE INERT DRIED GAGES. PRESSURE TESTS SHALL COMPLY WITH MANUFACTURER'S RECOMMENDATIONS AND SHALL BE IN ACCORDANCE WITH SECTION 1108.1 OF THE 2015 IMC. ABBREVIATIONS (MECHANICAL) /W AAV ABV AC ACC AD AFF AHU AL AP AR B BAS BDD BEL BFV BHP BOD BOI BOP BOS BOU BP BTU BTUH BV C.C. WITH WRAP (DUCT INSULATION) AUTOMATIC AIR VENT ABOVE AIR CONDITIONER AIR COOLED CONDENSER ACCESS DOOR ABOVE FINISHED FLOOR AIR HANDLING UNIT ALUMINUM ACCESS PANEL ARGON BOILER BUILDING AUTOMATION SYSTEM BACK DRAFT DAMPER BELOW BUTTERFLY VALVE BRAKE HORSE POWER BOTTOM OF DUCT BOTTOM OF INSULATION BOTTOM OF PIPE BOTTOM OF STEEL BOTTOM OF UNIT BOOSTER PUMP BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BALANCE VALVE, BALL VALVE CONTROLS CONTRACTOR CA COMPRESSED AIR CB BDD COUNTER BALANCED BACK DRAFT DAMPER CC CFF CFM CHWR CHWS CI CO CO2 COND CONN CP CS CT CU CV CWR CWS D DB DBP DCVA DC DE DEMO DH DN DPT DWG DXFC E E.C. EA EAT ECH EF EFF ELEV EMR EPF EQZR ESP EUH EWT EXH EXHP FC FCU FD FE FFD FFL FLA FM FOB FOR FOS FOT FSD FUT FV G G.C. GPM GRV GV HC HE HHP HP HPG HPS HPWR HPWS HRC HRWR COOLING COIL CAPPED FOR FUTURE CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY CAST IRON CLEANOUT CARBON DIOXIDE CONDENSATE CONNECTION CIRCULATING PUMP CLEAN STEAM, CURRENT SWITCH COOLING TOWER CONDENSING UNIT CHECK VALVE CONDENSER WATER RETURN CONDENSER WATER SUPPLY DROP (DOWN IN ELEVATION) DRY BULB, DUCTBOARD DOUBLE BOOSTER PUMP DOUBLE CHECK VALVE ASSEMBLY DUST COLLECTION DRYER EXHAUST DEMOLITION DUCT HEATER DOWN (THROUGH FLOOR BELOW) DIFFERENTIAL PRESSURE TRANSMITTER DRAWING DIRECT EXPANSION FAN COIL EXISTING ELECTRICAL CONTRACTOR EACH ENTERING AIR TEMPERATURE ELECTRIC CABINET HEATER EXHAUST FAN EFFICIENCY ELEVATION ELEVATOR MACHINE ROOM ELEVATOR PRESSURIZATION FAN EQUALIZING ONES EXTERNAL STATIC PRESSURE ELECTRIC UNIT HEATER ENTERING WATER TEMPERATURE EXHAUST EXHAUST PIPING FLEXIBLE CONNECTION, FLUID COOLER FAN COIL UNIT FIRE DAMPER, FLOOR DRAIN FUME EXHAUST FUNNEL FLOOR DRAIN FINISHED FLOOR LEVEL FULL LOAD AMPS FLOW METER FLAT ON BOTTOM FUEL OIL RETURN FUEL OIL SUPPLY, FLAT ON SIDE FLAT ON TOP FIRE SMOKE DAMPER FUTURE FLOAT VALVE LOW PRESSURE GAS GENERAL CONTRACTOR GALLONS PER MINUTE GAS REGULATOR VENT GATE VALVE HEATING COIL HELIUM HYDRONIC HEAT PUMP HEAT PUMP, HORSE POWER HIGH PRESSURE GAS HIGH PRESSURE STEAM HEAT PUMP WATER RETURN HEAT PUMP WATER SUPPLY HEAT RECOVERY COIL HEAT RECOVERY WATER RETURN HEAT RECOVERY WATER SUPPLY HEATING VENTILATION AIR CONDITIONING HOT WATER COIL HOT WATER RETURN HOT WATER SUPPLY HEAT EXCHANGER INSIDE DIAMETER/DIMENSION INVERT ELEVATION INSULATION KITCHEN EXHAUST KITCHEN HOOD LEAVING AIR TEMPERATURE POUNDS UQUID NITROGEN LOW PRESSURE STEAM LEAVING WATER TEMPERATURE METER MECHANICAL CONTRACTOR MANUAL AIR VENT MAXIMUM THOUSANDS BTU/HR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MECHANICAL EQUIPMENT ROOM MINIMUM MEDIUM PRESSURE GAS MAKE UP AIR MOTORIZED VALVE MANUAL VOLUME DAMPER NITROGEN NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NITROUS OXIDE NOT TO SCALE OXYGEN OUTSIDE AIR OPPOSED BLADE DAMPER OPEN CONDENSER WATER RETURN OPEN CONDENSER WATER SUPPLY OUTSIDE DIAMETER/DIMENSION PUMP PLUMBING CONTRACTOR PUMPED CONDENSATE POLLUTION CONTROL UNIT PROCESS COOLING WATER RETURN PROCESS COOLING WATER SUPPLY PROCESS HEATING WATER RETURN PROCESS HEATING WATER SUPPLY PRESSURE INDICATOR POINT OF CONNECTION PRIMARY PRESSURE REDUCING VALVE PRESSURE SENSOR POUNDS PER SQUARE INCH PRESSURE TEMPERATURE TRAP (PETE'S PLUG) RELIEF VENT RISE (UP IN ELEVATION) RETURN AIR RELIEF AIR REUEF FAN REFRIGERANT LIQUID REVERSE OSMOSIS DEIONIZED WATER REDUCED PRESSURE BACK FLOW ASSEMBLY REFRIGERANT SUCTION ROOF TOP UNIT SENSOR SUPPLY AIR STEAM CONDENSATE LOW PRESSURE STEAM CONDENSATE STEAM CONDENSATE STEAM CONDENSATE PUMPED STEAM CONDENSATE VENT SMOKE DAMPER, SMOKE DETECTOR SMOKE EXHAUST FAN SUPPLY FAN SOUND LINING SHEETMETAL STATIC PRESSURE STAIR PRESSURIZATION FAN STAINLESS STEEL SOLVENT TRANSFER, SOUND TRAP THERMOSTAT TRANSFER AIR TO BE DETERMINED TOILET EXHAUST TEMPERATURE INDICATOR, TENANT IMPROVEMENT TOP OF DUCT TOP OF PIPE TOP OF STEEL TOP OF UNIT TEMPERATURE SENSOR TURNING VANES TYPICAL UP (THROUGH FLOOR ABOVE) VACUUM VARIABLE AIR VOLUME VOLUME DAMPER VARIABLE FREQUENCY DRIVE WITH WATER FILTER WATER FOR INJECTION WATT METER GRILLES, REGISTERS, DIFFUSERS LEGEND -�- 1' o: o: PI rzi 2%4 - fel tzi DI El NOTE: THE "/FD" CALLOUT INDICATES A GRILLE WITH U.L. CLASSIFIED RADIATION DAMPER TO BE INSTALLED IN RATED FLOOR/CEILING OR ROOF/CEILING ASSEMBUES. USE RUSKIN MODEL CFD. INCLUDE THERMAL INSULATION BLANKET FOR LAY -IN T -BAR CEILINGS. NOTE: ALL SUPPLY DIFFUSERS ARE TO BE INSTALLED WITH A DIFFUSER CAN W/ PERF DIVIDER, GENSCO REGISTER BOX W/ FLEX COLLAR & DIFF, MODEL COLDC21 OR EQUIV. NOTE: FOR EXPOSED DUCTWORK WITH SUPPLY EXHAUST GRILLES TAKEOFFS TO BE GRILLE SIZE PLUS 2" TO MATCH GRILLE FRAME. CEILING DIFFUSER (LAY -IN T -BAR CEILING) X"xX" CD 4 CORE ADJUSTABLE, WITH FILLER FOR 24" x 24" LAY -IN MODULE CFM TITUS MCD BORDER TYPE 3 - SHOEMAKER 700 MA -0 (USE X"0 RUNOUT) CEIUNG DIFFUSER WITH RADIATION DAMPER (LAY -IN T -BAR CEILING) X"xX" CD/FD SAME AS CD ABOVE WITH RADIATION DAMPER, HR RATING AS NOTED CFM ON PLANS, RADIATION DAMPER TO MATCH DIFFUSER MANUFACTURER (USE X"0 RUNOUT) CEILING DIFFUSER (GYPSUM BOARD CEILING) 4 CORE ADJUSTABLE, "V" FRAME TITUS MCD BORDER TYPE 6 - SHOEMAKER MODEL MA -DCF (USE X"0 RUNOUT) CEILING DIFFUSER (GYPSUM BOARD CEILING) WITH FIRE DAMPER SAME AS CD ABOVE WITH RADIATION DAMPER, HR RATING AS NOTED ON PLANS, RADIATION DAMPER TO MATCH DIFFUSER MANUFACTURER (USE X"0 RUNOUT) CEILING DIFFUSER WITH PERFORATED FACE (LAY -IN T -BAR CEILING) X"xX" CD/PF 4 CORE ADJUSTABLE, WITH FILLER FOR 24" x 24" LAY -IN MODULE CFM TITUS PMC BORDER TYPE 3 - SHOEMAKER 825 MA SQUARE COLLAR (USE X" RUNOUT) X"xX" CD/P CFM X"xX" CD/P/FD CFM X"xX" CLF CEILING LAMINAR FLOW DIFFUSER WITH PERFORATED FACE CFM TITUS TLF-SS - SHOEMAKER 5375, SEE SUBMITTAL FOR OPTIONS #SLOT-INLETO CFM SLOT DIFFUSER FOR LAY -IN T -BAR CEIUNG TITUS TBD 80 - SHOEMAKER LSD TYPE 1 FRAME SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS #SLOT-INLETO/FD SLOT DIFFUSER FOR RATED LAY -IN T -BAR CEILING WITH FIRE DAMPER CFM TITUS TBD FR, SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS #SLOT-INLETO/P SLOT DIFFUSER (GYPSUM BOARD CEILING) CFM SAME AS LAY -IN SLOT DIFFUSER ABOVE WITH GYPSUM BOARD CEIUNG FRAME OPTION, SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS #SLOT-IN.O/FD/P SLOT DIFFUSER WITH RADIATION DAMPER (GYPSUM BOARD CEILING) CFM SAME AS ABOVE FOR GYPSUM BOARD CEIUNG WITH RADIATION DAMPER SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS X"xX" SSR CFM X"xX" SSG CFM X"xX" LNWSG CFM X"xX" RAG X"xX" RAG/P X"xX" SRG X"xX" LNWRG X"xX" EG CFM X"xX" EG/P CFM X"xX" ER CFM X"xX" TG X"xX" TG/P X"xX" STG SIDEWALL SUPPLY REGISTER DOUBLE DEFLECTION, HORIZONTAL LONG FRONT BLADES, WITH O.B.D. TITUS MODEL 272RL OBD OPTION - SHOEMAKER 933 OBD OPTION SIDEWALL SUPPLY GRILLE DOUBLE DEFLECTION, HORIZONTAL FRONT BLADES, WITH O.B.D. TITUS MODEL 272RL - SHOEMAKER 933 ALUMINUM LINEAR WALL SUPPLY GRILLE FIXED ANGLED DEFLECTION BLADES, 1/2" SPACING, 1/8" BAR THICKNESS TITUS CT 581 - SHOEMAKER LSW RETURN AIR GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH '/2" x '/2" x 1/2" CORE TITUS 50F - SHOEMAKER 600T RETURN AIR GRILLE (GYPSUM BOARD CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 SIDEWALL RETURN GRILLE SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 ALUMINUM LINEAR WALL RETURN GRILLE FIXED ANGLED DEFLECTION BLADES, 1/2* SPACING, 1/8' BAR THICKNESS TITUS CT 581 - SHOEMAKER LSW EXHAUST GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH '/2" x '/2" x '/2" CORE TITUS 50F - SHOEMAKER 600T RETURN AIR GRILLE (PLASTER CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 EXHAUST REGISTER SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES, O.B.D. TITUS 350RL OBD OPTION - SHOEMAKER 935 OBD OPTION TRANSFER GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH '/2" x '/2" X '/2" CORE TITUS 50F - SHOEMAKER 600T TRANSFER GRILLE (GYPSUM BOARD CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES, 0.B.D. TITUS 350RL OBD OPTION - SHOEMAKER 935 OBD OPTION SIDEWALL TRANSFER GRILLE SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 SYMBOLS LEGEND (HVAC) XXXX El 12x12/SL 1 12x12 SM 12x12 f 12x12 SM/W IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DUCT UNDER POSITIVE PRESSURE DUCT UNDER NEGATIVE PRESSURE TURNING VANES ELEVATION FROM F.F.L (INSULATION AND DUCT FLANGES EXTEND 1 1/2" BELOW BOD CALLOUT) EQUIPMENT IDENTIFICATION THERMOSTAT SENSOR CEILING OR INUNE EXHAUST FAN 24" x 12" RETURN AIR GRILLE W/SOUNDUNED CAN SUPPLY AIR ARROW RETURN AIR ARROW SPEED SWITCH: FURNISHED BY HOLADAY-PARKS, INSTALLED BY ELECTR. CONTR. FLEXIBLE CONNECTION OUTSIDE AIR INTAKE LOUVER EXHAUST AIR LOUVER DUCT HEATER MANUAL VOLUME DAMPER MOTORIZED DAMPER BACK DRAFT DAMPER SMOKE DETECTOR VERTICAL FIRE DAMPER (1'/2 HOUR) IN AIRSTREAM RUSKIN MODEL DIB2 STYLE A HORIZONTAL FIRE DAMPER (1'/2 HOUR) IN AIRSTREAM RUSKIN MODEL DIB2 STYLE A VERTICAL FIRE DAMPER (3 HOUR) IN AIRSTREAM RUSKIN MODEL DIB23 STYLE A HORIZONTAL FIRE DAMPER (3 HOUR) IN AIRSTREAM RUSKIN MODEL DIB23 STYLE A BACK DRAFT DAMPER RUSKIN MODEL BD2/A1, LOCAL VELOCITY < 1500 FPM BACK DRAFT DAMPER RUSKIN MODEL BD2/A2, LOCAL VELOCITY < 2500 FPM BACK DRAFT DAMPER RUSKIN MODEL BD6, LOCAL VELOCITY < 3500 FPM SMOKE DAMPER HORIZONTAL COMBINATION SMOKE AND FIRE DAMPER VERTICAL COMBINATION SMOKE AND FIRE DAMPER SPIN -IN TAKE -OFF & VOLUME DAMPER INDICATES 14" x 14" O.D. SHEETMETAL WITH 1" SOUNDUNER (U.N.O.), 12" x 12' NET I.D. INDICATES UNLINED 12" x 12" S.M. DUCT INDICATES 12" x 12" I.D. DUCTBOARD INDICATES UNLINED 12" x 12" S.M. DUCT WITH INSULATED WRAP RISE OR DROP IN DIRECTION OF FLOW FLEXIBLE DUCT INDICATES FLAT OVAL DUCT SPIN -IN TAKE -OFF & VOLUME DAMPER WITH RIGID ROUND FIBERGLASS DUCT INDICATES AIRFLOW DIRECTION THROUGH THE PARKING GARAGE TO THE GARAGE EXHAUST FANS. SHEET INDEX REV # SHEET # SHEET TITLE 5 M0.01 LEGENDS AND NOTES 5 M2.01 LEVEL 1 HVAC PLAN 5 M2.02 LEVEL 2 HVAC PLAN 5 M2.03 LEVEL 3 HVAC PLAN 4 * MD2.01 LEVEL 1 HVAC DEMO PLAN 4 * M6.01 DETAILS 4 * M7.01 SCHEDULES * NOT INCLUDED IN THIS SET VICINITY MAP J.17 Turxila So-RE.center Mail� Sa�rFhcentBr Atoll - E=.vai15 BIa:Jc ,a Sour cRnter 6nk4rBtvd BDt..T I Itle 1y�y t i Suander Btv i .it 1! iLLir givd. . ,ra,fCer,E� 8 SITE PLAN E:. IIt r I I t vrz5iOA° e t i t -- i` IJ Dn t4 t I rte./'moi' I i l t , , T,- r <j\i r,>rFA. tt AREA OF WORK PROPERTY INFORMATION PARCEL NUMPER: 920247-0010 LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC #20101021000765) SCOPE OF WORK 1. INSTALL ONE (1) NEW SPUT HEAT PUMP SYSTEM WITH AIRSIDE ECONOMIZER, ASSOCIATED DUCTWORK AND CONTROL THERMOSTAT PER PLAN. 2. MODIFY EXISTING DUCTWORK AND DIFFUSERS FOR TENANT NEW FLOOR PLAN. 3. BALANCE EXISTING AND NEW AIR SYSTEM PER PLAN. PERMIT REVISION SCOPE OF CHANGES 1. MOVE OUTDOOR CONDENSER TO LOWER ROOF AS SHOWN. 2. PROVIDE DETAIL SCOPE OF WORK FOR FIREPLACE VENT PIPE REPLACEMENT. --7t FILE COPY Plan rc :: - ( is subject to errors and omissions. Approval a' I V,i1 (.'Lf iii ion documents does not authorize The viola::. 4,:. E.:lopted coda or ordnance. Receipt approv= : ' Cop' n d co ditions i owledged: E:: tot Data: City of Tukwila BUILDING DIVISION REVISION MIS RECEIVED CITY OF TUKWILA APR 0 3 2018 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED APR 11 2018 144c City of Tukwila BUILDING DIVISION HOLADAY-PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO mss_ .. 1 PROJECT I PERM iT ED FOR: M chanical [ '€Iectrical 8lumbing Lr Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No changas :to 11 he t ^t1e to the Scone of work ‘Otho *"-:or approval of l -up ih B4. rtinn Division. t NOTE: Rvis:ons hill r ii'uire a new plan subrivitat and may intrude adrItonal plan renew fees. (in w O Designed by: MC DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M001-54527.DWG I REGISTRATION 03/30/2018 APPROVED FOR CONSTRUCTION ISSUE NAME/DATE PERMIT REVISION 03/30/2018 REvisioNI No. Date By Description 1 9-29-17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT 4 03/05/18 RL ISSUE FOR CONSTRUCTION 5 3/30/18 RL PERMIT REVISION I CITY APPROVAL SHEET TITLE LEGENDS & NOTES I SHEET NUMBER M0.01 ALL RIGHTS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-PIKS, INC- NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRMNG FROM HOLADAY PARKS, INC. 1 1 1 1 8"0 B VENT UP (EXHAUST) 8"0 VENT UP (INTAKE) \ EXISTING FIREPLACE VENT AND COMBUSTION PIPES TO BE MODIFIED TO MEET NEW FIREPLACE'S MANUFACTURER INSTALLATION REQUIREMENTS 18x6 TG (TYP.2) 24x6 TG (TYP.2) 1 STAFF MEE6SEG STAFF WOMEN'S 1205 (TYP.2) 121 STAFF16xA, TC 119 I 21x1 - 21x6 TG i 17 TO RTU - AT ROOF 24 Imo - \\\sr`01 ,\Jr3 E _ , x L.6x6 EG 10\. 150 NEW 8'0 PRESSURE STACK, INSTALL PER -FIREPLAC KA tUFACTAIRERS.1NSTALLA ION ------ INSTRUCTION -- RE -ME -EMS 151010 VENT (pA-1) 1; • VENT TERMINATION PROVIDED BY FIREPLACE MANUFACTURER, INSTALLED BY G.C., INSTALLATION TO MEET MANUFACTURER'S INSTALLATION INSTRUCTION 1 �•• ' '\ '. `\ ..,.! x 12x12 CD/P 450 (TYP.2) . TOS -FI --OPEN-TO-CEIUNG-PLENUM-FOR- ;' FIREPLACE COMBUSTION INTAKE R ITEIF-figtaPEAM=NANUFArTURER''S 1INSTALLATION-INSTRUCTIO-' N 5'0 B NI FROMI TOP On FIREPLACE.. TOI POWER VENTER _INI Ef-.C:ONNECTIONS' PER L FIREPLACE MIA�NUFACTURER'S INSTALLATION_INSTRUCTION /. ,_._8I x10 CD/P 65 (TYP.2) _--njil : i - � - 370 LB$ = H-5 - 1200 CFM '6x6 EG 1 30 10x10 ii OPENING(TYP.2 � f ;. i I ; I� -1' jl k i 1 ° _` 10.x-01 1W -778k i, AD 1 .1 16"'1 , x L.6x6 EG 10\. 150 NEW 8'0 PRESSURE STACK, INSTALL PER -FIREPLAC KA tUFACTAIRERS.1NSTALLA ION ------ INSTRUCTION -- RE -ME -EMS 151010 VENT (pA-1) 1; • VENT TERMINATION PROVIDED BY FIREPLACE MANUFACTURER, INSTALLED BY G.C., INSTALLATION TO MEET MANUFACTURER'S INSTALLATION INSTRUCTION 1 �•• ' '\ '. `\ ..,.! x 12x12 CD/P 450 (TYP.2) . TOS -FI --OPEN-TO-CEIUNG-PLENUM-FOR- ;' FIREPLACE COMBUSTION INTAKE R ITEIF-figtaPEAM=NANUFArTURER''S 1INSTALLATION-INSTRUCTIO-' N 5'0 B NI FROMI TOP On FIREPLACE.. TOI POWER VENTER _INI Ef-.C:ONNECTIONS' PER L FIREPLACE MIA�NUFACTURER'S INSTALLATION_INSTRUCTION /. ,_._8I x10 CD/P 65 (TYP.2) _--njil : i - � - 370 LB$ = H-5 - 1200 CFM '6x6 EG 1 30 10x10 ii OPENING(TYP.2 t '8"0 / 8x8 EG i t„.11 -1-1l x1,11117 3 Cri H - ' I {{ OM' N' r- s,--1 1 �G�-,, -t 10'-101 I \oo>, EN 12x12 ATG %P (TyP.6) \\\\\\\.:� r� COV - = E FOBALCING IAMPE ter:L_-____.;`n • ,, H1t0 r11rr1111 - ------------ 30 -- - j A HWT-1 8x8 EG sY i_ EX - 8"0 li �� ��// J/ %/i %ii.�,.‘,4::00,-.P,,,,71-140.;',,%,,i 1 t 1' ��\ 1 ! .o ?r1 '� I 1 \\ tt _ 1 1 1 \\ �—�. f 1� r� ! � I 65 �._ \\ ` 1 � '-y�=�=-1 l `1.0x1 � CD/P 1 biAR 1 II I y 102; 6x6 EGA= N • ,y 1 If '11\1, H1 \L.') 1 (� 12'°0 f 1 I 8x8 EG 200 _8x8 EG million o o \� '1 \. ;\ \ 1•••:-;•• \ \ ,1 -- \ �\ 240 i \ \ 300 TWO / /1 `` Ir r• RH-1 (45 MBH) '' \ \ \\ \\ j \ vA \ , EXHAUST AIR OUTLET 14"0 HOAV)AY-PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADP1379N0 w w U 2 O Ci) Ctic) w O PROJECT co w ®c) zO) w< U 1 D O- C 00 LO D \ i •\ \. ,,�� \1 \\ \ 26"X16"0 ),JP - NING 48 18 RA 24>J24 RAG/P PATIO 1002 LEVEL 1 HVAC PLAN 11 KEYED NOTES 0 RE -INSTALL DIFFUSER ON NEW CEILJNG. EXTEND FLEX DUCT AS NEEDED. 0 COORDINATE RETURN AIR GRILLE IN NEW CEIUNG STRUCTURE WITH ARCHITECT. TI SHEET NOTES 1. EXISTING CEILING DIFFUSERS AND GRILLES ARE TO BE REMOVED FOR PAINTING BY G.C., REINSTALLATION BY M.C. 2. DEMAND CONTROLLED VENTILATION IS NOT REQUIRED BASED ON 2015 WSEC C403.2.6.2 EXCEPTION 3. SYSTEM OUTDOOR IS LESS THAN 750 CM. REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 1 2018 City of Tukwila BUILDING DIVISION RECEIVEU CITY OF TUKWILA APR 03 2018 PERMIT CENTER SHELL + CORE KEYED NOTES 0 DUCT SHALL BE FIREWRAP. DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER AND GREASE EXHAUST DUCTS. 0 TYPE I DUCT SHALL BE WELDED STAINNISS STEEL GA. 18. Designed by: MC Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M201-54527.DWG 03/30/2018 APPROVED FOR CONSTRUCTION I ISSUE NAME/DATE - PERMIT REVISION 03/30/2018 No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT 4 03/05/18 RL ISSUE FOR CONSTRUCTION 5 3/30/18 RL PERMIT REVISION SHEET TITLE LEVEL 1 HVAC PLAN = EXISTING CONSTRUCTION = NEW CONSTRUCTION ALL RIGFITS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-P ENT MAY BE REPRODUCED IN ANY FORM OR BY ANY NIEANS WITHOUT PERMISSION W WRITING FROM HOLADAY PARKS, � f ;. i I ; I� -1' jl k a _` Qy i ®, •, • rtD JC” 1 A ` 1 4•F b I I •� _w 't7 ,I ,, - i 111 �� I I '� � �' I j c r �- 11 II I I 19 -a, 1 I 17111111.- I I I I I '�-F i • Ir Il i`� I , 800 LBS I t x.113. �-r-� 71( �Ti! } k I! I kY I I' !�' 0'.-� �• ----'; �a �a - i 8b0 -tom ' / t '8"0 / 8x8 EG i t„.11 -1-1l x1,11117 3 Cri H - ' I {{ OM' N' r- s,--1 1 �G�-,, -t 10'-101 I \oo>, EN 12x12 ATG %P (TyP.6) \\\\\\\.:� r� COV - = E FOBALCING IAMPE ter:L_-____.;`n • ,, H1t0 r11rr1111 - ------------ 30 -- - j A HWT-1 8x8 EG sY i_ EX - 8"0 li �� ��// J/ %/i %ii.�,.‘,4::00,-.P,,,,71-140.;',,%,,i 1 t 1' ��\ 1 ! .o ?r1 '� I 1 \\ tt _ 1 1 1 \\ �—�. f 1� r� ! � I 65 �._ \\ ` 1 � '-y�=�=-1 l `1.0x1 � CD/P 1 biAR 1 II I y 102; 6x6 EGA= N • ,y 1 If '11\1, H1 \L.') 1 (� 12'°0 f 1 I 8x8 EG 200 _8x8 EG million o o \� '1 \. ;\ \ 1•••:-;•• \ \ ,1 -- \ �\ 240 i \ \ 300 TWO / /1 `` Ir r• RH-1 (45 MBH) '' \ \ \\ \\ j \ vA \ , EXHAUST AIR OUTLET 14"0 HOAV)AY-PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADP1379N0 w w U 2 O Ci) Ctic) w O PROJECT co w ®c) zO) w< U 1 D O- C 00 LO D \ i •\ \. ,,�� \1 \\ \ 26"X16"0 ),JP - NING 48 18 RA 24>J24 RAG/P PATIO 1002 LEVEL 1 HVAC PLAN 11 KEYED NOTES 0 RE -INSTALL DIFFUSER ON NEW CEILJNG. EXTEND FLEX DUCT AS NEEDED. 0 COORDINATE RETURN AIR GRILLE IN NEW CEIUNG STRUCTURE WITH ARCHITECT. TI SHEET NOTES 1. EXISTING CEILING DIFFUSERS AND GRILLES ARE TO BE REMOVED FOR PAINTING BY G.C., REINSTALLATION BY M.C. 2. DEMAND CONTROLLED VENTILATION IS NOT REQUIRED BASED ON 2015 WSEC C403.2.6.2 EXCEPTION 3. SYSTEM OUTDOOR IS LESS THAN 750 CM. REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 1 2018 City of Tukwila BUILDING DIVISION RECEIVEU CITY OF TUKWILA APR 03 2018 PERMIT CENTER SHELL + CORE KEYED NOTES 0 DUCT SHALL BE FIREWRAP. DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER AND GREASE EXHAUST DUCTS. 0 TYPE I DUCT SHALL BE WELDED STAINNISS STEEL GA. 18. Designed by: MC Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M201-54527.DWG 03/30/2018 APPROVED FOR CONSTRUCTION I ISSUE NAME/DATE - PERMIT REVISION 03/30/2018 No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT 4 03/05/18 RL ISSUE FOR CONSTRUCTION 5 3/30/18 RL PERMIT REVISION SHEET TITLE LEVEL 1 HVAC PLAN = EXISTING CONSTRUCTION = NEW CONSTRUCTION ALL RIGFITS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-P ENT MAY BE REPRODUCED IN ANY FORM OR BY ANY NIEANS WITHOUT PERMISSION W WRITING FROM HOLADAY PARKS, 8" GALV STL PIPE DN & UP/ FW 6" GALV STL PIPE DN & UP/FW 8" GALV STL PIPE DN & UP/ FW 6" GALV STL PIPE DN & UP/FW 8"0 B VENT DN & UP 8"0 VENt41 & UP \ 11111MrM01111S4 t\„ \"‘J, A71/8' SL 8t 3/8" LL REFRIGERANT UNES DN SEE‘DETAIL 1/M6.01\s, FOR INSTALLATION sv, SLEEPERS \PROVIDED BY G.C. \V -r- / \--- ,•1 \ EBH-1 1 HEBH-3 CD (U) Cs, \J TO EBH-5 1 (5) 1 1/2" HG UP & DN 5/8" LL UP & DN LD2-2100 (2 TYP) 20"0/FW DN L ; 26)4'6/W UP 24"0/FW/DN 38x20 UP & ,/-24x22 120"O CD2 -245 N I '1-1, HOLi 'AY -PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO I1,1:,,,,,,,,.-,,-,-!--_---r--::::,..=-9.i. • if, -::--- --:,:••,......,‘ 5 : \‘'Ll 1 ps ti ',..$ • :. • ! , ;:. 11 i \ •,. .!,/ 1 ! A ' I".',, "....!-•-... ,...--",";......,..4 ' 1 .,:t.e...`7,,,,,,,,,,,,,,,.........,..•-( , 20x20 UP TO LAC -1J FSD'S NOT PROVIDED WHERE TYPE I EXHAUST PENETRATES SHAFT SINCE DUCT IS PROVIDED WITH FIRE WRAP EG2-165 /4- EG2- 165 1 DESIGN TEAM EBH-2 (3 TYP) EBH-3 (3 TYP) / \ I \ \// ' / \ 1- 241V/W SA DN & UP 42x18/W SA DN & UP <1S-0) BOD ss ,.. r, ....../"\\ / 30x2 -6W Designed by: MC Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M202-54527.DWG REGISTRATION 03/30/2018 APPROVED FOR CONSTRUCTION LEVEL 2 HVAC PLAN SCALE 1/4' - OUTLINE OF SHAFT BY 0.01 SHELL + CORE KEYED NOTES 0 DUCT SHALL BE FIREWRAP. 0 DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER EXHAUST. 0 TYPE I DUCT SHALL BE WELDED STAINLESS STEEL GA. 18. REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 1 2018 • City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA APR 03 2018 PERMIT CENTER CITY APPROVAL ISSUE NAME/DATE PERMIT REVISION 03/30/2018 REVISIONS No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT 4 03/05/18 RL ISSUE FOR CONSTRUCTION 5 3/30/18 RL PERMIT REVISION I SHEET TITLE LEVEL 2 HVAC PLAN SHE NUMBER = EXISTING CONSTRUCTION = NEW CONSTRUCTION M2.02 ALL NIGHTS RESERVED. THESE DRAWINGS BELONG IN ANy FORM TO HOLADAYPARKS, ING. NO PART OF THIS DOCUMENT I4AY BE REPRODUCED IN ANY FORM OR BYANY MEANS WITHOUT PERMISSION IN WRaING FROM HOLADAY PARKS, INC. C'D 1 is �i r 1— \\ `\ • \\ FUTURE FC7 TENANT\ ROOFTOP EQUIPMEF'J \. (BY OTHERS, TYP) FC7 j 1 1 • \1 cpj 1 /" 38x20/SL SA DN PO FC 30x24/SL 0 1/- LOCATE UNIT PER STRUCTURAL DWG • WT: 2000 32x64 ROOF OPE\ING CAP WATHTIGHT (TYP) HOLADAY-PAR1LS INC. SMART Mechanical Solutions° Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 WA LICENSE NUMBER: HOLADP1379NO fr LOCATE UNIT PER STRUCTURAL DWG WT: 3510 LBS MUA-1 FC RTU -2 WT: 2700 LB /-LOCATE UN T IPE STRUCTUR DW m LEVEL 3 HVAC PLAN 26x16/SL SA UP \ 36x12/SL RA DN I \ 24x24/SL SA DN 1 OA HWB-2 HWB-1 20"0 DN LOCATE UNIT PER STRUCTURAL DWG GDCO LOCATE UNIT PER WT: 510 LBS STRUCTURAL DWG EF -2 PIRIOJECT H co co Designed by: MC Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M203-54527.DWG AIR INTAKE 24"0 DN SLOPE 24"0 /-LOCIJE UNIT PER / STRUCTURAL DWG EF -1 SEE DETAIL 2/M6.02 WT: 980 LBS OUTLINE OF SHAFT BY G c. SHELL + CORE KEYED NOTES h 0 DUCT SHALL BE FlREWRAP. 0 DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER EXHAUST. 0 TYPE I DUCT SHALL BE WELDED STAINLESS STELL GAGE 18. (i) BY OTHER TENANT = EXISTING CONSTRUCTION = NEW CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 1 2010 • City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA APR 03 2018 PERMIT CENTER M11/011 03/30/2018 APPROVED FOR CONSTRUCTION ISSUE NAME/DATE PERMIT REVISION 03/30/2018 REVISION No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT 4 03/05/18 RL ISSUE FOR CONSTRUCTION 5 3/30/18 RL PERMIT REVISION SHEET TITLE I LEVEL 3 HVAC PLAN ALL RIGHTS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-PARKG INC- NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRMNG FROM HOLADAY PARRS. INC. GENERAL NOTES 1. THESE DOCUMENTS ARE BASED ON HOLADAY PARKS ENGINEERING AND SHOP FABRICATION STANDARDS, SMACNA DUCT CONSTRUCTION STANDARDS, AND APPLICABLE LOCAL AND STATE CODES WHICH ARE NOT SHOWN IN DETAIL ON THESE DRAWINGS. VARIATION FROM THESE PLANS REQUIRES NOTIFICATION OF HOLADAY-PARKS ENGINEERING DEPARTMENT 2. ALL TRADES SHALL LEAVE A MINIMUM OF 36' CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR SERVICING. ACCESS PANELS THAT CONTAIN UNE VOLTAGE POWER (120 VOLT AND GREATER) SHALL HAVE A MINIMUM OF 42' CLEARANCE IN FRONT OF THE ACCESS PANEL AND A MINIMUM OF THE ACCESS PANEL WIDTH CLEAR FROM OBSTRUCTIONS AS REQUIRED BY STATE AND LOCAL ELECTRICAL-- CODES. 3. CUTTING, FRAMING, PATCHING AND PAINTING OF WALL, CEILING AND FLOOR OPENINGS, AS REQUIRED BY THESE MECHANICAL PLAINS, SHALL BE BY THE GENERAL CONTRACTOR. 4. ROOF CURBS, FLASHINGS, SLEEPERS, PITCH POCKETS, CUTTING AND PATCHING OF ROOF OPENINGS, ROOFING, AND ROOF INSULATION SHALL BE BY THE GENERAL CONTRACTOR. 5. PAINTING OF GRILLES, REGISTERS, AND DIFFUSERS, AS MAY BE REQUIRED BY ARCHITECT OR OWNER, SHALL BE DONE BY THE GENERAL CONTRACTOR. 6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR TEMPORARY HEAT REQUIRED DURING CONSTRUCTION UNLESS NOTED OTHERWISE. 7. EQUIPMENT, DUCTS, AND PIPING WEIGHTS AND LOCATIONS N HAVE BEEN COORDINATED WITH ARCHITECT, STRUCTURAL ENGINEER, AND GENERAL CONTRACTOR IN ORDER TO DETERMINE BUILDING STRUCTURAL ADEQUACY. IF IT IS NECESSARY TO RELOCATE EQUIPMENT, DUCTS, OR PIPING, NOTIFY HOLADAY-PARKS' ENGINEERING DEPARTMENT FOR ASSISTANCE IN RE -COORDINATION. 8. IN NO INSTANCE SHALL OTHER CONTRACTORS HANG OR SUPPORT EQUIPMENT, CEILING WIRES, LIGHT FIXTURE HANGERS, ETC..., FROM HVAC EQUIPMENT, OR DUCTS, OR PIPING. 9. THE PLUMBING CONTRACTOR SHALL ROUTE PLUMBING VENTS SO AS TO MAINTAIN MINIMUM 15 FEET OF CLEARANCE FROM OUTSIDE AIR INTAKES. SHEET METAL NOTES 1. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 2015 INTERNATIONAL MECHANICAL CODE (SMC), OTHER STATE AND LOCAL CODES AND STANDARDS. ALL DUCTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA DUCT CONSTRUCTION STANDARDS. ALL DUCTS SHALL BE SEISMICALLY BRACED IN ACCORDANCE WITH SMACNA SEISMIC RESTRAINT MANUAL (SEE SEISMIC RESTRAINT NOTES ON THIS SHEET). 2. DUCT SIZES INDICATED ON PLANS ARE NET INSIDE DIMENSIONS. A CALL -OUT SUCH AS 12' X 12"/SL MEANS A 14" X 14" SHEET METAL DUCT WITH 1" SOUNDUNER, GIVING A NET INSIDE DIMENSION OF 12" X 12'. 3. DUCTWORK SHALL BE CONSTRUCTED TO DIMENSIONS INDICATED ON PLANS. THE TOLERANCE OF THESE DIMENSIONS SHALL BE AS SPECIFIED IN HOLADAY-PARKS, INC. SHOP STANDARDS MANUAL LENGTHS, AND CRITICAL DIMENSIONS BETWEEN DUCTWORK AND OTHER BUILDING/SYSTEM ELEMENTS ARE INDICATED WHERE A LOCATION OR DIMENSION SCALED FROM THE DRAWING WILL NOT BE ADEQUATE. THE TOLERANCE OF CRITICAL DIMENSIONS, IF NOT INDICATED, SHALL DEFAULT TO THAT OF THE INSTAWNG MECHANIC'S MEASURING DEVICES. SCALED LOCATIONS OR DIMENSIONS ARE NOT SUBJECT TO TOLERANCE GUIDELINES. THESE PLANS HAVE BEEN COORDINATED VATH THE ARCHITECTURAL, STRUCTURAL, SPRINKLER, AND ELECTRICAL DRAWINGS. ANY CHANGES IN THIS LAY -OUT MUST BE REVIEWED BY HOLADAY-PARKS' ENGINEERING DEPARTMENT. 5. DUCT ELBOWS SHALL BE RADIUS TYPE WITH FULL WIDTH THROAT RADIUS, UNLESS SHOWN OTHERWISE. TURNING VANE ELBOWS SHALL HAVE DOUBLE THICKNESS TURNING VANES INSTALLED IN EVERY RAIL TAB. 6. DUCTWORK SHALL BE SEALED PER 2015 WASHINGTON STATE ENERGY CODE REQUIREMENTS (SEE DUCT SEALING AND LEAKAGE TEST NOTES ON THIS SHEET). DUCT SYSTEMS SHALL BE LEAK TESTED IN ACCORDANCE WITH THE 2015 WASHINGTON STATE ENERGY CODE REQUIREMENTS (SEE DUCT SEALING AND LEAKAGE TEST NOTES ON THIS SHEET). DUCT LEAKAGE NOTES 1. ALL DUCTS AND PLENUMS SHALL BE SEALED IN ACCORDANCE WITH SECTION C403.2.8.3 OF THE 2015 WASHINGTON STATE ENERGY CODE (WSEC). DUCTS SHALL BE SEALED USING WELDS, GASKETS, MASTIC, OR MASTIC -PLUS -EMBEDDED -FABRIC TAPE. DUCT TAPE IS NOT PERMITTED EXCEPT FOR FLEXIBLE DUCT SYSTEMS MAY USE TAPES LISTED FOR THESE SYSTEMS. PROVIDE SOLVENT OR WATER BASED MCGILL AIRSEAL CORPORATION UNITED DUCT SEALER OR APPROVED EQUIVALENT. FOR DUCT SEAUNG, THE FOLLOWING DEFINITIONS APPLY: LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION OF AIRFLOW. TRANSVERSE JOINTS ARE CONNECTIONS OF TWO DUCT SECTIONS ORIENTED PERPENDICULAR TO AIRFLOW. DUCT WALL PENETRATIONS ARE OPENINGS MADE BY ANY SCREW FASTENER, PIPE, ROD, OR WIRE. ALL OTHER CONNECTIONS ARE CONSIDERED TRANSVERSE JOINTS, INCLUDING BUT NOT LIMITED TO SPIN -INS, TAPS, ACCESS DOOR FRAMES AND JAMBS, AND DUCT CONNECTIONS TO EQUIPMENT. DUCTS SHALL BE SEALED AS FOLLOWS: PRESSURE CLASS SEAUNG REQUIREMENTS LESS THAN 1/2" W.C. NO SEALING REQUIRED 1/2" W.C. TO LESS THAN 3" W.C. TRANSVERSE JOINTS AND LONGITUDINAL SEAMS, SPIRAL LOCK SEAMS IN ROUND OR FLAT OVAL DUCT DO NOT REQUIRE SEALING, ALL OTHER SEAMS SHALL BE SEALED GREATER THAN 3" W.C. TRANSVERS JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS LOW PRESSURE SUPPLY AND RETURN DUCTS (3" W.C. OR LESS PRESSURE CLASS) LOCATED OUTSIDE THE CONDITIONED SPACE (ABOVE AN INSULATED CEIUNG OR BELOW AN INSULATED FLOOR) SHALL BE SECURELY FASTENED AND SEALED. REFRIGERANT PIPING NOTES 1. INSTALLATION OF REFRIGERANT PIPING SHALL BE IN ACCORDANCE WITH THE 2015 INTERNATIONAL MECHANICAL CODE (IMC) AND ALL OTHER STATE AND LOCAL CODES AND STANDARDS. 2. INSTALLATION OF LISTED AND LABELED FACTORY BUILT EQUIPMENT AND APPUANCES SHALL BE PER THE MANUFACTURER'S INSTALLATION REQUIREMENTS. INSTALLATION OF REFRIGERANT PIPING SERVING LISTED AND LABELED FACTORY BUILT EQUIPMENT SHALL BE PER THE MANUFACTURER'S INSTALLATION REQUIREMENTS. REFRIGERANT PIPE SIZE SHALL BE NO LESS THAN THAT REQUIRED BY THE MANUFACTURER'S INSTALLATION REQUIREMENTS AND AS REQUIRED FOR THE INSTALLED LENGTH OF PIPE AND THE LOCATION OF THE EQUIPMENT. 3. REFRIGERANT PIPING SHALL BE EITHER SEAMLESS TYPE "L' DRAWN COPPER TUBING IN ACCORDANCE WITH ASTM B88 OR SEAMLESS COPPER ACR TUBING IN ACCORDANCE WITH ASTM B280. REFRIGERANT PIPE FITTINGS SHALL BE WROUGHT COPPER WITH SILVER -SOLDERED OR BRAZED JOINTS. 4. PENETRATIONS THROUGH FIRE AND/OR SMOKE RATED WALLS, FLOORS, CEILINGS AND ROOFS SHALL BE PROTECTED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC) AND THE 2015 IMC. PROTECTION, AS REQUIRED, SHALL BE PROVIDED AND INSTALLED BY THE PIPING CONTRACTOR THROUGH APPROVED FIRE/SMOKE STOP ASSEMBUES. 5. REFRIGERANT PIPING INSULATION THICKNESS SHALL BE BASED ON NOMINAL PIPE DIAMETER AND OPERATING TEMPERATURE RANGE IN ACCORDANCE WITH TABLE C403.2.9 IN THE 2015 WASHINGTON STATE ENERGY CODE (WSEC). THE PIPE INSULATION MATERIAL SHALL BE PREFORMED ELASTOMERIC INSULATION, "ARMAFLEX', "RUBATEK', OR APPROVED EQUAL WITH A CONDUCTIVITY VALUE EQUAL TO OR BETTER THAN THE VAULES USTED IN TABLE C403.2.9 OF THE 2015 WSEC. ALL REFRIGERANT PIPE LOCATED OUTSIDE THE BUILDING SHALL BE INSULATED. ALL REFRIGERANT PIPE INSULATION EXPOSED TO WEATHER SHALL HAVE UV PROTECTION OR SHALL HAVE A PROTECTIVE JACKET TO PREVENT UV DAMAGE IN ACCORDANCE WITH SECTION C403.2.9.1 OF THE WSEC. 6. REFRIGERANT PIPING THAT IS ERECTED ON SITE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE 2015 IMC SECTION 1108. SYSTEMS ERECTED WITH COPPER PIPE NOT EXCEEDING 5/8" OD IN ACCORDANCE WITH ASHRAE STANDARD 15, CAN BE TESTED BY MEANS OF THE REFRIGERANT CHARGED INTO THE SYSTEM AT THE SATURATED VAPOR PRESSURE OF THE REFRIGERANT AT 70 DEGREES F OR HIGHER. GASES USED FOR PRESSURE TESTING SHALL BE INERT DRIED GAGES. PRESSURE TESTS SHALL COMPLY WITH MANUFACTURER'S RECOMMENDATIONS AND SHALL BE IN ACCORDANCE WITH SECTION 1108.1 OF THE 2015 IMC. ABBREVIATIONS (MECHANICAL) /W AAV ABV AC ACC AD AFF AHU AL AP AR B BAS BDD BEL BFV BHP BOD BOI BOP BOS BOU BP BTU BTUH BV C.C. WITH WRAP (DUCT INSULATION) AUTOMATIC NR VENT ABOVE AIR CONDITIONER AIR COOLED CONDENSER ACCESS DOOR ABOVE FINISHED FLOOR AIR HANDUNG UNIT ALUMINUM ACCESS PANEL ARGON BOILER BUILDING AUTOMATION SYSTEM BACK DRAFT DAMPER BELOW BUTTERFLY VALVE BRAKE HORSE POWER BOTTOM OF DUCT BOTTOM OF INSULATION BOTTOM OF PIPE BOTTOM OF STEEL BOTTOM OF UNIT BOOSTER PUMP BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BALANCE VALVE, BALL VALVE CONTROLS CONTRACTOR CA COMPRESSED AR CB BDD COUNTER BALANCED BACK DRAFT DAMPER CC COOUNG COIL CFF CFM CHWR CHWS CI CO CO2 COND CONN CP CS CT CU CV CWR CWS D DB DBP DCVA DC DE DEMO DH DN DPT DWG DXFC E E.C. EA EAT ECH EF EFF ELEV EMR EPF EQZR ESP EUH EWT EXH EXHP FC FCU FD FE FFD FFL FLA FM FOB FOR FOS FOT FSD FUT FV G G.C. GPM GRV GV HC HE HHP HP HPG HPS HPVVR HPWS HRC CAPPED FOR FUTURE CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY CAST IRON CLEANOUT CARBON DIOXIDE CONDENSATE CONNECTION CIRCULATING PUMP CLEAN STEAM, CURRENT SWITCH COOLING TOWER CONDENSING UNIT CHECK VALVE CONDENSER WATER RETURN CONDENSER WATER SUPPLY DROP (DOWN IN ELEVATION) DRY BULB, DUCTBOARD DOUBLE BOOSTER PUMP DOUBLE CHECK VALVE ASSEMBLY DUST COLLECTION DRYER EXHAUST DEMOU11ON DUCT HEATER DOWN (THROUGH FLOOR BELOW) DIFFERENTIAL PRESSURE TRANSMITTER DRAWING DIRECT EXPANSION FAN COIL EXISTING ELECTRICAL CONTRACTOR EACH ENTERING AIR TEMPERATURE ELECTRIC CABINET HEATER EXHAUST FAN EFFICIENCY ELEVATION ELEVATOR MACHINE ROOM ELEVATOR PRESSURIZATION FAN EQUAUZING ONES EXTERNAL STATIC PRESSURE ELECTRIC UNIT HEATER ENTERING WATER TEMPERATURE EXHAUST EXHAUST PIPING FLEXIBLE CONNECTION, FLUID COOLER FAN COIL UNIT FIRE DAMPER, FLOOR DRAIN FUME EXHAUST FUNNEL FLOOR DRAIN FINISHED FLOOR LEVEL FULL LOAD AMPS FLOW METER FLAT ON BOTTOM FUEL OIL RETURN FUEL OIL SUPPLY, FLAT ON SIDE FLAT ON TOP FIRE SMOKE DAMPER FUTURE FLOAT VALVE LOW PRESSURE GAS GENERAL CONTRACTOR GALLONS PER MINUTE GAS REGULATOR VENT GATE VALVE HEATING COIL HELIUM HYDRONIC HEAT PUMP HEAT PUMP, HORSE POWER HIGH PRESSURE GAS HIGH PRESSURE STEAM HEAT PUMP WATER RETURN HEAT PUMP WATER SUPPLY HEAT RECOVERY COIL HRWR HEAT RECOVERY WATER RETURN HRWS HEAT RECOVERY WATER SUPPLY HVAC HEATING VENTILATION AIR CONDITIONING HWC HOT WATER COIL HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER ID INSIDE DIAMETER/DIMENSION IE INVERT ELEVATION INS INSULATION KE KITCHEN EXHAUST KH KITCHEN HOOD LAT LEAVING AIR TEMPERATURE LBS POUNDS IN UQUID NITROGEN LPS LOW PRESSURE STEAM LWT LEAVING WATER TEMPERATURE M METER M.C. MECHANICAL CONTRACTOR MAV MANUAL AIR VENT MAX MAXIMUM MBH THOUSANDS BTU/HR MCA MINIMUM CIRCUIT AMPACITY MD MOTORIZED DAMPER MER MECHANICAL EQUIPMENT ROOM MIN MINIMUM MPG MEDIUM PRESSURE GAS MUA MAKEUP AIR MV MOTORIZED VALVE MVD MANUAL VOWME DAMPER N2 NITROGEN NC NORMALLY CLOSED NIC NOT IN CONTRACT NO NORMALLY OPEN NOS NITROUS OXIDE NTS NOT TO SCALE 02 OXYGEN OA OUTSIDE AIR OBD OPPOSED BLADE DAMPER OCWR OPEN CONDENSER WATER RETURN OCWS OPEN CONDENSER WATER SUPPLY OD OUTSIDE DIAMETER/DIMENSION P PUMP P.C. PLUMBING CONTRACTOR PC PUMPED CONDENSATE PCU POLLUTION CONTROL UNIT PCWR PROCESS COOUNG WATER RETURN PCWS PROCESS COOUNG WATER SUPPLY PHWR PROCESS HEATING WATER RETURN PHWS PROCESS HEATING WATER SUPPLY PI PRESSURE INDICATOR POC POINT OF CONNECTION PRIM PRIMARY PRV PRESSURE REDUCING VALVE PS PRESSURE SENSOR PSI POUNDS PER SQUARE INCH PT PRESSURE TEMPERATURE TRAP (PETE'S PLUG) RV REUEF VENT R RISE (UP IN ELEVATION) RA RETURN AIR RELF RELIEF NR RF RELIEF FAN RL REFRIGERANT UQUID RODI REVERSE OSMOSIS DEIONIZED WATER RPBA REDUCED PRESSURE BACK FLOW ASSEMBLY RS REFRIGERANT SUCTION RTU ROOF TOP UNIT S SENSOR SA SUPPLY AIR SCLP STEAM CONDENSATE LOW PRESSURE SCHP STEAM CONDENSATE SCMP STEAM CONDENSATE SCPU STEAM CONDENSATE PUMPED SCVT STEAM CONDENSATE VENT SD SMOKE DAMPER, SMOKE DETECTOR SEF SMOKE EXHAUST FAN SF SUPPLY FAN SL SOUND UNING SM SHEETMETAL SP STATIC PRESSURE SPF STAIR PRESSURIZATION FAN SS STAINLESS STEEL ST SOLVENT TRANSFER, SOUND TRAP T THERMOSTAT TA TRANSFER AIR TBD TO BE DETERMINED TE TOILET EXHAUST 11 TEMPERATURE INDICATOR, TENANT IMPROVEMENT TOD TOP OF DUCT TOP TOP OF PIPE TOS TOP OF STEEL TOU TOP OF UNIT TS TEMPERATURE SENSOR TV'S TURNING VANES TYP TYPICAL UP UP (THROUGH FLOOR ABOVE) VAC VACUUM VAV VARIABLE AIR VOWME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE W/ WITH WF WATER FILTER WFI WATER FOR INJECTION WM WATT METER GRILLES, REGISTERS, DIFFUSERS LEGEND C] NOTE: NOTE: NOTE: X'xX' CD CFM X'xX' CD/FD CFM X'xX' CD/P CFM X'xX' CD/P/FD CFM - X'xX' CD/PF 1><I o: la CFM X'xX" CLF CFM #SLOT-INLETO CFM #SLOT-INLETO/FD CFM #SLOT-INLETO/P CFM #SLOT-IN.O/FD/P CFM X'xX' SSR CFM X'xX' SSG CFM X'xX' LNWSG CFM X'xX' RAG X'xX' RAG/P X'xX" SRG X'xX' LNWRG X"xX' EG CFM X'xX" EG/P CFM X'xX' ER CFM X'xX' TG X'xX' TG/P X'xX' STG THE '/FD' CALLOUT INDICATES A GRILLE WITH U.L CLASSIFIED RADIATION DAMPER TO BE INSTALLED IN RATED FLOOR/CEIUNG OR ROOF/CEIUNG ASSEMBUES. USE RUSKIN MODEL CFD. INCLUDE THERMAL INSULATION BLANKET FOR LAY -IN T -BAR CEIUNGS. ALL SUPPLY DIFFUSERS ARE TO BE INSTALLED WITH A DIFFUSER CAN W/ PERF DIVIDER, GENSCO REGISTER BOX W/ FLEX COLLAR & DIFF, MODEL COLDC21 OR EQUIV. FOR EXPOSED DUCTWORK WITH SUPPLY EXHAUST GRILLES TAKEOFFS TO BE GRILLE SIZE PLUS 2' TO MATCH GRILLE FRAME. CEILING DIFFUSER (LAY -IN T -BAR CEIUNG) 4 CORE ADJUSTABLE, WITH FIU.ER FOR 24" x 24' LAY -IN MODULE TITUS MCD BORDER TYPE 3 - SHOEMAKER 700 MA -0 (USE X"O RUNOUT) CEILING DIFFUSER WITH RADIATION DAMPER (LAY -IN T -BAR CEILING) SAME AS CD ABOVE WITH RADIATION DAMPER, HR RATING AS NOTED ON PLANS, RADIATION DAMPER TO MATCH DIFFUSER MANUFACTURER (USE X'0 RUNOUT) CEILING DIFFUSER (GYPSUM BOARD CEILING) 4 CORE ADJUSTABLE, "V' FRAME TITUS MCD BORDER TYPE 6 - SHOEMAKER MODEL MA -DCF (USE X"0 RUNOUT) CEIUNG DIFFUSER (GYPSUM BOARD CEILING) WITH FIRE DAMPER SAME AS CD ABOVE WITH RADIATION DAMPER, HR RATING AS NOTED ON PLANS, RADIATION DAMPER TO MATCH DIFFUSER MANUFACTURER (USE X"0 RUNOUT) CEIUNG DIFFUSER WITH PERFORATED FACE (LAY -IN T -BAR CEIUNG) 4 CORE ADJUSTABLE, WITH FILLER FOR 24' x 24' LAY -IN MODULE TITUS PMC BORDER TYPE 3 - SHOEMAKER 825 MA SQUARE COLLAR (USE X' RUNOUT) CEILING LAMINAR FLOW DIFFUSER WITH PERFORATED FACE TITUS TLF-SS - SHOEMAKER 5375, SEE SUBMITTAL FOR OPTIONS SLOT DIFFUSER FOR LAY -IN T -BAR CEILING TITUS TBD 80 - SHOEMAKER LSD TYPE 1 FRAME SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS SLOT DIFFUSER FOR RATED LAY -IN T -BAR CEILING WITH FIRE DAMPER TITUS TBD FR, SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS SLOT DIFFUSER (GYPSUM BOARD CEILING) SAME AS LAY -IN SLOT DIFFUSER ABOVE WITH GYPSUM BOARD CEILING FRAME OPTION, SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS SLOT DIFFUSER WITH RADIATION DAMPER (GYPSUM BOARD CEILING) SAME AS ABOVE FOR GYPSUM BOARD CEIUNG WITH RADIATION DAMPER SEE SUBMITTAL FOR SLOT DIMENSION AND OPTIONS SIDEWALL SUPPLY REGISTER DOUBLE DEFLECTION, HORIZONTAL LONG FRONT BLADES, WITH O.B.D. TITUS MODEL 272RL OBD OPTION - SHOEMAKER 933 OBD OPTION SIDEWALL SUPPLY GRILLE DOUBLE DEFLECTION, HORIZONTAL FRONT BLADES, WITH O.B.D. TITUS MODEL 272RL - SHOEMAKER 933 ALUMINUM UNEAR WALL SUPPLY GRILLE AXED ANGLED DEFLECTION BLADES, 1/2' SPACING, 1/8' BAR THICKNESS TITUS CT 581 - SHOEMAKER LSW RETURN AIR GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH 'A' x 1/2" x '/2" CORE TITUS 50F - SHOEMAKER 600T RETURN AIR GRILLE (GYPSUM BOARD CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 SIDEWALL RETURN GRILLE SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 ALUMINUM LINEAR WALL RETURN GRILLE FIXED ANGLED DEFLECTION BLADES, 1/2' SPACING, 1/8' BAR THICKNESS TITUS CT 581 - SHOEMAKER LSW EXHAUST GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH 1/2' x 1/2" x 1/2' CORE TITUS 50F - SHOEMAKER 600T RETURN AIR GRILLE (PLASTER CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 EXHAUST REGISTER SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES, 0.B.D. TITUS 350RL OBD OPTION - SHOEMAKER 935 OBD OPTION TRANSFER GRILLE (WITH FRAME) ALUMINUM EGGCRATE WITH '/2' x '/s x 'A" CORE TITUS 50F - SHOEMAKER 600T TRANSFER GRILLE (GYPSUM BOARD CEILING) SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES, O.B.D. TITUS 350RL OBD OPTION - SHOEMAKER 935 OBD OPTION SIDEWALL TRANSFER GRILLE SINGLE DEFLECTION, FIXED ANGLED BLADES, LONG FRONT BLADES TITUS 350RL - SHOEMAKER 935 SYMBOLS LEGEND (HVAC) Boo XXXX DUCT UNDER POSITIVE PRESSURE DUCT UNDER NEGATIVE PRESSURE TURNING VANES ELEVATION FROM F.F.L (INSULATION AND DUCT FLANGES EXTEND 11/2" BELOW BOD CALLOUT) EQUIPMENT IDENTIFICATION THERMOSTAT SENSOR CEIUNG OR INLINE EXHAUST FAN 24" x 12" RETURN AIR GRILLE W/SOUNDUNED CAN SUPPLY AIR ARROW RETURN AIR ARROW SPEED SWITCH: FURNISHED BY HOLADAY-PARKS, INSTALLED BY ELECTR. CONTR. FLEXIBLE CONNECTION OUTSIDE AIR INTAKE LOUVER EXHAUST AIR LOUVER 3 HR 3 HR DUCT HEATER MANUAL VOLUME DAMPER MOTORIZED DAMPER BACK DRAFT DAMPER SMOKE DETECTOR VERTICAL FIRE DAMPER (1'/2 HOUR) IN AIRSTREAM RUSKIN MODEL DIB2 STYLE A HORIZONTAL FIRE DAMPER (11/2 HOUR) IN AIRSTREAM RUSKIN MODEL DIB2 STYLE A VERTICAL FIRE DAMPER (3 HOUR) IN AIRSTREAM RUSKIN MODEL DIB23 STYLE A HORIZONTAL FIRE DAMPER (3 HOUR) IN AIRSTREAM RUSKIN MODEL DIB23 STYLE A BACK DRAFT DAMPER RUSKIN MODEL BD2/A1, LOCAL VELOCITY < 1500 FPM BACK DRAFT DAMPER RUSKIN MODEL BD2/A2, LOCAL VELOCITY < 2500 FPM BACK DRAFT DAMPER RUSKIN MODEL BD6, LOCAL VELOCITY < 3500 FPM SMOKE DAMPER HORIZONTAL COMBINATION SMOKE AND FIRE DAMPER VERTICAL COMBINATION SMOKE AND FIRE DAMPER SPIN -IN TAKE -OFF & VOLUME DAMPER INDICATES 14' x 14' O.D. SHEETMETAL WITH 1" SOUNDUNER (U.N.O.), 12" x 12" NET I.D. 12x12 SM f 12x12 12x12 SM/W INDICATES UNLINED 12' x 12" S.M. DUCT INDICATES 12" x 12" I.D. DUCTBOARD INDICATES UNUNED 12" x 12' S.M. DUCT WITH INSULATED WRAP f 1111111111111111111111111111111111111111111111111 p 38x240 or 38x24e d a RISE OR DROP IN DIRECTION OF FLOW FLEXIBLE DUCT INDICATES FLAT OVAL DUCT SPIN -IN TAKE -OFF & VOLUME DAMPER WITH RIGID ROUND FIBERGLASS DUCT INDICATES AIRFLOW DIRECTION THROUGH THE PARKING GARAGE TO THE GARAGE EXHAUST FANS. SHEET INDEX EIDLt SHEET 1 SHEET TITLE 2 M0.01 2 M2.01 2 M2.02 2 112.03 2 MD2.01 2 M6.01 2 M7.01 LEGENDS AND NOTES LEVEL 1 HVAC PLAN LEVEL 2 HVAC PLAN LEVEL 3 HVAC PLAN LEVEL 1 HVAC DEMO PLAN DETAILS SCHEDULES VICINITY MAP a 11 ky v II Sant amterkiir Tit- la la Satancentar 14tatl W e!d Southcenter' C Tukwsta FF _ Evans Black Baker Blvd Baker I Strander Blvd ry Strandar Blvd 0 Strander Blvd NORDSTROM IE SITE PLAN Tana ays dp I U 7 A O II O G❑❑ 0 E D S5 pp SSS L ❑ 0 0G 7-1 I I�' ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 LI -f- a E Is9S93Q@ a P fi� s�3�o ,El U enntay r-, AREA OF WORK PROPERTY INFORMATION PARCEL NUMBER: 920247-0010 LEGAL DESCRIPTION: WEA SOUTHCENTER LLC BSIP PER BSIP REC VOL 256 PGS 1-9 WHICH REPLACES BSIP REC VOL 249 PGS 77-84 (AKA PARCEL A TUKWILA BSIP #L10-032 REC 120101021000765) SCOPE OF WORK 1. INSTALL ONE (1) NEW SPOT HEAT PUMP SYSTEM WITH AIRSIDE ECONOMIZER, ASSOCIATED DUCTWORK AND CONTROL THERMOSTAT PER PLAN. 2. MODIFY EXISTING DUCTWORK AND DIFFUSERS FOR TENANT NEW FLOOR PLAN. 3. BALANCE EXISTING AND NEW AIR SYSTEM PER PLAN. 4. MODIFY EXISITING FIREPLACE VENT AND COMBUSTION PIPES TO MEET NEW FIREPLACE MANUFACTURER INSTALLATION REQUIREMENTS. COPY Permit No. tikl'I/ 011 I Plan review approval is subject to errors and omissions. Approval of construction documents doos not authorize the violation of.any adopted code or ordinance. Receipt of d Fief aliconditions ' cknow1adged: By . Date: SEPARATE PEi`,.IT REQUIRED FOR: Q Mechanical t Electncaf Plumbing Cg/Gas Piping City of Tukwila BUILDING DIVISION MIS City of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 PO 1?4" City of Tukwila BUILDING DIVISION 0117'-11 RECEIVED CITY OF TUKWILA NOV 14 2017 PERMIT CENTER �..VIONS No Changes shall be made to the scop) of work without prior approval of • Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 1 a��AY,PARKS®` SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO PRIECT 11 w z w U 2 O Cia) w O • co W o0 TW Z V/ w Q Z _ O so- u) Designed by: MC DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: Filename: 54527 M001-54527. D WG I REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION 1 ISSUE NAME/DATE r ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 11/10/17 REVISIONSIr No. Date By Description 1 9-29-17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT I APPROVAL SHEETTITLE LEGENDS & NOTES SHEET NUMBER M 0 . 0 1 ALL RIGHTS RESERVED. THESE DRAWNGS BELONG IN ANY FORM TO HOLADAY-PARKS. INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRITING FROM HOLIDAY PARKS, INC. 8"0 B VENT UP (EXHAUST) 8"0 VENT UP (INTAKE) 18x6 TG (TYP.2) 24x6 TG (TYP.2) STAFF tri E6x6SEG 12050 (TYP.2) I// \\ 21x6 TG- c = 24x ITG� '-10x1'07 CD ST C t 1 I Z/ II AD 1 "�I =MT e 0x'0 AD l 1 HOLADAY-PARKS INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO I - Z/ II AD 1 "�I ,ri) Fat 12x1.2gCtJ i} i \� )<11 ( it -77-1-11 !1 I 0 ` � „ „ 4 11 111 %{ !i- I 7 z=o r 2 i POil I i II t-. �I -`�! l i� 11 II 11 �i a1`-Il,�-"� li-. ...Z i i; -AD --;i-"` -" " � 4I �' I_iI �ll.-�'EiOD I __P L-11 1E1 1 B VENT -UL LISTED, INSTALL PER FIREPLACE MANUFACTURER'S INSTRUCTIONS. MECHANICAL DRAFT SYSTEM TO COMPLY WITH IMC (2006) 804.3.8. t 1� H H\ )) 1 COVE 4P--LkTE FOR BALANCING DAMPER REGUILATOB`(TYP) 8x8 EG At' 0 o111110 111111"1i11 0111111111�1A1111 I 8x8 EG Ij IIIIIIIIII II 12"0 EF -4 \ (ROOF _2 12x12:, CD/17,- : ` - 26"X16"0 1P -- 24"0 480_ RA OPEN NG 4OPENING-8x18 RA --;ti 24x24 RAG/P (TYP.2) i LEVEL 1 HVAC DEMO PLAN SCALE 114' ® T -O" U 1Jt,! t) J I,t•1 EXHAUST AIR OUTLET 14"0 w z w U 2 O PROJECT w O Designed by: MC DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: MD201-54527.DWG REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION CITY OF'UKWILA NOV 14 2017 PERMIT CENTER o All RIGHTS RESERVED. THESE DRAM ISSUE NAME/DATE ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 1 1/1 0/1 7 No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT CITY APPROVAL SHEET TITLE LEVEL 1 HVAC DEMO PLAN SHEET NUMBER MD2.O1 S BELONG IN ANY FORM • HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRITING FROM HOLADAY PARKS. INC. I7 o111110 111111"1i11 0111111111�1A1111 I 8x8 EG Ij IIIIIIIIII II 12"0 EF -4 \ (ROOF _2 12x12:, CD/17,- : ` - 26"X16"0 1P -- 24"0 480_ RA OPEN NG 4OPENING-8x18 RA --;ti 24x24 RAG/P (TYP.2) i LEVEL 1 HVAC DEMO PLAN SCALE 114' ® T -O" U 1Jt,! t) J I,t•1 EXHAUST AIR OUTLET 14"0 w z w U 2 O PROJECT w O Designed by: MC DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: MD201-54527.DWG REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION CITY OF'UKWILA NOV 14 2017 PERMIT CENTER o All RIGHTS RESERVED. THESE DRAM ISSUE NAME/DATE ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 1 1/1 0/1 7 No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT CITY APPROVAL SHEET TITLE LEVEL 1 HVAC DEMO PLAN SHEET NUMBER MD2.O1 S BELONG IN ANY FORM • HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRITING FROM HOLADAY PARKS. INC. HOLADAYPARKS, INC. SMART Mechanical Solutions STAFF MEE'X6SEG STAFF WOMEN'S 1205© (TYP.2) 1 121 Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO PROJECT PROTEIN REEZ 114 21 x12 Te = 24k1-2—TG-- 7 EXISTING FIREPLACE VENT AND COMBUSTION PIPES TO BE MODIFIED TO MEET NEW FIREPLACE'SMANUFACTURER INSTALLATION I_- REQUIREMENTS — l I : i. ✓ .. ..TOE_ PANE li 111\1 liOD> of lij �860—L-BS 6 —6'\ H'— 1C — 14"0 \ 8x8 EG 250 HAW- I I I IZ 10-10 02 -DN 12x12 CD 400 WOMEN'S PA—1-1 -WERVENTE LOUNGE STORAGE r 1 !i l 12WIDN AO( 165(TYP.2) I___E- ( ,I \i!:\ ��' , \ 1 x0 ADI f I 2x12�CD[- I i 16"0, I 11 8x8 EG 250 HAW- I I I IZ 10-10 02 -DN 12x12 CD 400 WOMEN'S PA—1-1 -WERVENTE LOUNGE STORAGE r 1 !i l 12WIDN AO( 165(TYP.2) I___E- .,,..3 2x12�CD[- �®®� !I, ll ,¢ I �I i i I g n r 12 -0 i r�i '1r --1, 1 I ,h: _O IJ ( i i' II 7:7C3f ii ii ,�� i� «9 -t1 - -, . „I vBI- -.�— pp I-_ , .. I ! r=1 Is/li i -{I - I ' -u 20 2_'_�� 6x6 CDR B VENT—UL LISTED, INSTALL PER FIREPLACE MANUFACTURER'S INSTRUCTIONS. MECHANICAL DRAFT SYSTEM TO COMPLY WITH IMC (2006) 804.3.8. LINEN OVE =FOR BALANCING DAMPER REGULATOR/ TYP) LIQ OH STU ; I 104 8x8 EG A/'30 105 DXFC 01 FC fl r l IT1T II 11® 8x8 EG 30 w z w U 2 O (1) 10x10 SCD P I 2-8'0 -165 / ` % HOLADAY-PARKS INC. SMART Mechanical Solutions 8" GALV STL PIPE \ DN & UP/ FW 6" GALV STL PIPE \ DN & UP/FW 8" GALV STL PIPE t ` DN & UP/ FW _o • 6" GALV STL PIPE DN & UP/FW RB VENT DN & UP L8LVEIT,L0 & UP © EXISTING FIREPLACE VENT AID COMBUSTION, PIPES TO BE-MOD1FIED• TO7MEET1IEW — —` FIREPLACE'S MANUFACTURER INSTALLATION REQUIREMENTS L TO MAC -9 © © © 24x22 Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO 1 PROJECT 1'1/2"HGUP&DN %"LLUP&DN LD2-2100 (2 TYP) 20x20 SCOPE OF WORK LAC -1J CD2 -245 \ / EBH-1 38x20 UP & 20"0/FW DN FSD'S NOT PROVIDED WHERE TYPE I EXHAUST PENETRATES SHAFT SINCE DUCT IS PROVIDED WITH FIRE WRAP EG2-165 TO 24" 0/FW,DN 2 x16/W UP SLOPE 20"o/F EG2- 165 EBH-5 CD2 -245 (3 TYP) Designed by: Drawn by: Approved by: Job Number: Filename: DESIGN TEAM MC MLK, MV, PB 54527 M202-54527. D WG EBH-2 (3 TYP) REGISTRATION EBH-3 24"0/W SA DN & UP SLOPE1 16"0 P )6»�A& DIC.'\ \ \ \\ J 16"0 SLOPE 42x18/W SA DN & UP 24X20/W 50x21/SL FROM UNIT 30x24/W UP {, ; a .j .N Y �, � 'i \ 30x24/W — — I LEVEL 2 HVAC PLAN SCALE 1V4" • 1-0' OUTLINE OF SHAFT BY G.0 SHELL + CORE KEYED NOTES Q DUCT SHALL BE FIREWRAP. 0 DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER EXHAUST. 03 TYPE I DUCT SHALL BE WELDED STAINLESS STEEL GA. 18. LINETYPE LEGEND = EXISTING CONSTRUCTION = NEW CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION CITY OF TUKWILA NOV 14 2017 PERMIT CENTER ISSUE NAME/DATE ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 11/10/17 Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT CITY APPROVAL ( SHEET TITLE LEVEL 2 HVAC PLAN ii/D111 SHEET NUMBER M2.02 ALL RIGHTS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRRING FROM HOLADAY PARKS. INC. irTh 1 \\ © („1 © FC7 i FUTURE FC7 TENANT ROOFTOP EQUIPMENST\ (BY OTHERS, TYP)_\ \ \ WT Cgs 32x64 ROOF OPE\ING FOR FUTURE TENANT CAP WATERTIGHT (TYP) A Pi HOLA©AY-PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO CU -02 ADD 5 -TON HEAT PUMP CONDENSING UNIT SEE DETAIL 1/M6.01 FOR INSTALLATION CU -2Q1 EF -31 1 1/2" HG DN 5/a" LL DN 30x24/SL FC J 38x20/SL SA DN !/ 26x16/SL SA UP H36x12/SL RA DN 24x24/SL SA DN RAC k. OA — X LOCATE UNIT PER STRUCTURAL DWG RTU -3 \ WT: 20005 d RTU -2 WT: 2700 LBS i—LOCATE UN T STRUCTURAL FC 0 0 RTU -1 WT: 412'0 LBS PEP; DW' LOCATE UNIT PER STRUCTURAL DWG WT: 3510 LBS MUA-1 /—IHWB-2 • PROJECT w z w U 2 O (f) HWB-1 20"0 DN LOCATE UNIT PER STRUCTURAL DWG GDCO LOCATE UNIT PER WT: 510 LBS STRUCTURAL DWG EF -2 } w O DESIGN TEAM Designed by: MC Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M203-54527.DWG AIR INTAKE 24"0 DN —CDCO I -c • ss S OPE 24"5 —LOCATE UNIT PER / STRUCTURAL DWG E F-1 EF— SEE DETAIL /M6.02 WT: 980 LBS LEVEL 3 HVAC PLAN SCALE 114' • 1-0' OUTLINE OF SHAFT BY G C. SHELL + CORE KEYED NOTES 0 DUCT SHALL BE FIREWRAP. ® DUCT SHALL BE STAINLESS STEEL FOR DISHWASHER EXHAUST. Q3 TYPE I DUCT SHALL BE WELDED STAINLESS STELL GAGE 18. ® BY OTHER TENANT REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA NOV 14 2017 PERMIT CENTER = EXISTING CONSTRUCTION = NEW CONSTRUCTION CITY APPROVAL I REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION ISSUE NAME/DATE r ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 11/10/17 REV No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT SHEET TITLE LEVEL 3 HVAC PLAN I SHEET NUMBER M2.03 ALL RIGHTS RESERVED. THESE DRAW NGS BELONG IN ANY FORM TO HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRITING FROM HOLADAY PARKS. INC. EQUIPMENT SECURE EQUIPMENT TO SLEEPERS PER TABLE BELOW — SLEEPER CAP/ FLASHING BY M.C. SLEEPER BY OTHERS SEE SCHEDULE CANT STRIP ROOF DECK SLEEPERS© B TIE DOWN STRAP 10 SLEEPER & SLEEPER CONNECTION TRUCTURE BY OTHERS( EQUIPMENT TAG SLEEPER DIMENSIONS NOTE 8) MECH. PLAN SHEET SUPPORTED EQUIPMENT DIMENSIONS EQUIP WEIGHT LBS SEISMIC TIEDOWN CALCS BY SUPPORT FOR SLEEPER BY LAG SCREWS ONLY NO STRAPS TIE DOWN STRAPS DISTANCE LENGTH MIN. WIDTH QTY OF CONNECTS LAGS PER CONNECT LAG SIZE QTY REQ'D S ' I= L X W STRAP GA eis SCREWS —y 'AP ` - TYPE SCREW SIZE A (NOTE 9) B (NOTE 2) C (NOTE 1) L W H CU -02 32* 48' 8' M2.03 37.25' 34.25' 45' 289 MECH. ENG. STRUCT. ENG. 4 1 5/8'0x4' STANDARD SLEEPER SHALL BE 6' WIDE UNLESS OTHERWISE NOTED OR REQUIRED BY OTHERS. SLEEPER SHALL BE A MINIMUM OF 6' LONGER THAN SUPPORTED EQUIPMENT AT EACH END. STRUCTURAL ENGINEER OR OTHERS MAY SPECIFY LONGER LENGTHS IF REQUIRED TO SPAN STRUCTURAL SUPPORTS. O EQUIPMENT WEIGHT DISTRIBUTION AND CENTER OF GRAVITY INFORMATION IS SHOWN ON UNIT SUBMITTAL WHEN POINT LOADS AND CENTER OF GRAVITY ARE NOT AVAILABLE, STRUCTURAL ENGINEER SHALL MAKE STANDARD ASSUMPTIONS AND INCLUDE APPROPRIATE SAFETY FACTORS CANT STRIP, ROOFING, FLASHING, AND SEALING SHALL BE BY OTHERS 5O MECHANICAL CONTRACTOR TO PROVIDE SHEET METAL CAP OVER SLEEPER 0 SLEEPERS SHALL BE PROVIDED AND HARD CONNECTED TO STRUCTURE BY OTHERS. MATERIAL SHALL BE AS SPECIFIED BY OTHERS. 7 SLEEPER MINIMUM HEIGHT REQUIREMENT SHALL BE DETERMINED BY OTHERS WITH KNOWLEDGE OF ACTUAL ROOFING CONDITIONS, HEIGHT CONSTRAINTS, ETC. 8 SLEEPER QUANTITY AND ORIENTATION MAY BE MODIFIED BY OTHERS IF REQUIRED (E.G. TO IMPROVE DRAINAGE, BETTER STRUCTURAL SUPPORT, ETC.) 9O DISTANCE BETWEEN DUCT SUPPORT SLEEPERS SHALL BE A UNIFORM DISTANCE AS SHOWN UNLESS OTHERWISE NOTED IN THE REMARKS COLUMN 10 DEFAULT 11E DOWN STRAP PLACEMENT SHALL BE UNIFORMLY SPACED ALONG SLEEPER UNLESS OTHERWISE REQUIRED BY STRUCTURAL ENGINEER DETAIL - SLEEPER SCALE: NTS HOLADAY-PARKS, INC. SMART Mechanical Solutions 0 Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO REVIEWED FOR CODE COMPLIANCE APPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION CITY OF TUKWILA NOV 14 2017 PERMIT CENTER CITY APPROVAL Designed by: MC I DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M601-54527.DWG REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 11/10/17 No. Date By Description 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 3 11/10/17 RL ISSUE FOR HVAC PERMIT SHEET TITLE HVAC DETAILS SHEET NUMBER M6.01 ALL RIGHTS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRITING FROM HOLADAY PARKS, INC. D.X./H.P. FAN COIL SCHEDULE (SPLIT SYSTEM) CODE COMPLIANCE PPROVED TAG MAKE MODEL DX/HP FC SERVED ELECTRICAL DATA MINIMUM CODE EFFICIENCY (3) EQUIPMENT EFFICIENCY (3) TAG AREA SERVED LOCATION MAKE MODEL MATCHING COND. UNIT COOLING CAPACITY (MBH) HEATING CAPACITY (MBH) FAN PERFORMANCE DATA ELECTRIC HEAT DATA FAN COIL ELECTRICAL DATA 017F FILTERS WEIGHT HSPF COP 047FCOP 017F CU -02 REMARKS TWA7060A4000A DXFC-02 460/3 10 ENT. DB/WB TOTAL SENS. 047F 017F CFM OA CFM ESP RPM BHP KW VOLT/PH AMPS MHP VOLTS/PH AMPS QTY. SIZE DXFC-02 BAR ABOVE CEILING TRANE TAM9A0C60V51 CU -02 80/67 56 42 52.5 34.8 1875 600 1 - - 9.6 480/3 11.6 1 240/1 6.4 1 22x20x1 175 1, 2, 3, 4, 5,- 6, 7, 8, 9, 10, 11, 12, 14 1. WIRING AND DISCONNECT BY E.C. SINGLE POINT POWER CONNECTION. 2. INTERNAL FAN MOTOR MEET THE REQUIREMENTS OF 2015 WSEC SECTION C405.8 FOR FAN EFFICIENCY. 3. FAN MOTOR IS LESS THAN 1 HP AND GREATER THAN 1/12 HP AND MEETS 2015 WSEC SECTION 405.8 FOR EC MOTOR REQUIREMENT. 4. SEE CONDENSING UNIT SCHEDULE FOR EQUIPMENT AHRI RATED EFFICIENCY. 5. 115V/1 PHASE, 1/30 HP CONDENSATE PUMP RATED FOR USE IN RETURN AIR PLENUMS TO BE PROVIDED, LITTLE GIANT MODEL VCC-20-P. 6. INSTALL UL 508 LEVEL DETECTION MONITORING SWITCH IN CONDENSATE DRAIN PAN, KELE MODE SS3, AND WIRE TO PACKAGED CONTROLS TO SHUT DOWN FAN COIL UPON ACTIVATION. 2015 IMC 7. PC TO ROUTE CONDENSATE TO APPROVED PLUMBING RECEPTICAL SEE DETAIL x SHEET xxx FOR TRAP DIMENSIONS. 8. UNIT PROVIDED WITH PROGRAMMABLE THERMOSTAT MEETING THE REQUIREMENTS OF 2015 WSEC SECTION C403.2.4.1 AND C403.2.4.2. PROGRAMMABLE T -STAT INSTAUED AND WIRED TO INDOOR 9. UNE VOLTAGE (120V AND ABOVE) WIRING BETWEEN INDOOR FAN COIL AND OUTDOOR CONDENSING UNIT FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. 10. LOW VOLTAGE (LESS THAN 120V) WIRING BETWEEN INDOOR FAN COILS AND OUTDOOR CONDENSING UNIT FURNISHED AND INSTALLED BY THE CONTROLS CONTRACTOR. 11. UNIT IS PROVIDED WITH SUPPLEMENTARY ELECTRIC HEAT. PACKAGED CONTROLS SHALL USE ELECTRIC HEAT AS SECONDARY HEAT WHEN COMPRESSORIZED HEAT IS AVAILABLE PER 2015 SECTION 12. UNIT WILL OPERATE WITH 100% OUSTIDE ECONOMIZER AS THE FIRST STAGE OF COOLING PER 2015 WSEC SECTION C403.3. 13. NO SPRING OR NEOPRENE ISOLATION REQUIRED. 14. HANG WITH MASON TYPE "DNHS" SPRING ISOLATORS WITH SEISMIC SLACK CABLING. SEE SEISMIC RESTRAINT SUBMITTAL 15. HANG WITH MASON TYPE "HD" NEOPRENE HANGERS. 16. DUCT MOUNTED RETURN AIR SMOKE DETECTOR PROVIDED BY E.C., INSTALLED BY M.C. IN DUCT, WIRED TO SHUTDOWN FAN COILBY E.C., AND WIRED TO FIRE/LIFE/SAFETY SYSTEM BY E.C.. SECTION 307.2.3 ITEM 4. FAN COIL BY CONTROLS CONTRACTOR. C403.2.4.1.1. SPLIT SYSTEM OUTDOOR CONDENSING UNIT SCHEDULE CODE COMPLIANCE PPROVED TAG MAKE MODEL DX/HP FC SERVED ELECTRICAL DATA MINIMUM CODE EFFICIENCY (3) EQUIPMENT EFFICIENCY (3) WEIGHT (LBS) REMARKS VOLTS/PH MCA MFS EER SEER HSPF COP 047FCOP 017F EER SEER HSPF COP 047FCOP 017F CU -02 TRANE TWA7060A4000A DXFC-02 460/3 10 15 - 14.0 8.2 - - - 15.0 8.5 - - - 1, 2, 3, 4, 5, 6, 7 1. POWER WIRING AND DISCONNECT FURNISHED AND INSTALLED BY E. C., SINGLE POINT POWER CONNECTION. 2. LOW AMBIENT COOUNG CONTROLS PROVIDED WITH UNIT. SEE SUBMITTAL 3. MINIMUM CODE EFFICIENCY IS BASED ON TABLES C403.2.3(1)A OR C403.2.3(2) AS APPROPRIATE. 4. EQUIPMENT EFFICIENCY IS BASED ON MANUFACTURER'S AHRI RATED EFFICIENCY FOR THE EQUIPMENT TYPE AND RATING TEST PROCEDURE. 5. UNE VOLTAGE (120V AND ABOVE) WIRING BETWEEN INDOOR FAN COIL AND OUTDOOR CONDENSING UNIT FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. 6. LOW VOLTAGE (LESS THAN 120V) WIRING BETWEEN INDOOR FAN COILS AND OUTDOOR CONDENSING UNIT FURNISHED AND INSTALLED BY THE CONTROLS CONTRACTOR. 7. UNIT TO BE FASTENED TO SUPPORTS ON ROOF PER DETAIL SHOWN ON PLANS. ATTACHMENT OS SUPPORTS TO ROOF BY G.C., ATTACHMENT OF EQUIPMENT TO SUPPORT BY M.C.. CITY OF TUKWILA NOV 14 2017 PERMIT CENTER HOLADAY-PARKS, INC. SMART Mechanical Solutions Mechanical Solutions • Energy Services Building Controls • Service & Maintenance 4600 S. 134TH PLACE SEATTLE, WA 98168 • (206) 248-9700 HOLADAYPARKS.com WA LICENSE NUMBER: HOLADPI379NO PROJECT w z w U 2 O aU (1) w O 758 SOUTHCENTER MALL CO 00 CO rn J Designed by: MC I DESIGN TEAM Drawn by: MLK, MV, PB Approved by: Job Number: 54527 Filename: M701-54527. DWG REGISTRATION 11/10/17 APPROVED FOR CONSTRUCTION ISSUE NAMEJDATE ISSUE FOR HVAC PERMIT PENDING CITY APPROVAL 11/10/17 a REVIEWED FOR CODE COMPLIANCE PPROVED NOV 21 2017 City of Tukwila BUILDING DIVISION REVISIONS No. Date By Description 1 9/29/17 RL COORDINATION REVIEW SET 2 10/11/17 RL ISSUE FOR LANDLORD REVIEW 2 11/10/17 RL ISSUE FOR HVAC PERMIT P %4' 011 CITY APPROVAL SHEET TITLE HVAC SCHEDULES SHEET NUMBER M7.01 ALL RIGHTS RESERVED. THESE DRAWINGS BELONG IN ANY FORM TO HOLADAY-PARKS, INC.. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION IN WRBNG FROM HOLADAY PARKS, INC.