Loading...
HomeMy WebLinkAboutPermit M17-0185 - CINNABON - BUILD-OUTCINNABON 985 SOUTHCENTER MALL M17-0185 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 9202470010 985 SOUTHCENTER MALL Project Name: CINNABON MECHANICAL PERMIT Permit Number: M17-0185 Issue Date: 1/26/2018 Permit Expires On: 7/25/2018 Owner: Name: Address: Contact Person: Name: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, MN, 92013 TROY HUFFER Address: 800 WASHINGTON AVE N - SUITE 208 , MINNEAPOLIS, MN, 55401 Contractor: Name: TRISQUARE CONSTRUCTION LLC Address: PO BOX 626 , LAKE STEVENS, WA, 98258 License No: Lender: Name: Address: TRISQCL894B0 Phone: (612) 547-1336 Phone: (425) 610-7424 Expiration Date: 1/31/2019 DESCRIPTION OF WORK: NEW TENANT BUILD -OUT AT EXISTING SOUTHCENTER MALL Valuation of Work: $40,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $730.51 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Permit Center Authorized Signature:gtitti I ` 11 k" I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: /—,,v----(60 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 5: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 7: ***MECHANICAL PERMIT CONDITIONS*** 8: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. 10: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: I 1 -30 -►1 (Eor•ofce use only)' f MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax N .:-. nen Site Address; ‘.AAlrt,^ts Tenant Name: CA NJ NA P-)0tJ Suite'Nurnibcr: New Tenant: PROPERTY OWNER Name:si...,-� covc P Address: He , tUS cm) aicA4 potizo r cN ,t-- t= t City: State:. Zip: > -Q 1� 16 1 v (c: 007 :1:1 CONTACT PERSON — person receiving all project communication Name: 120 ` t 1 --it: i Ect." -q.. Address: City: m tt..i i.)cA.LL4S State:} Zip: 5-5,40 I Phone: Fax: Le l 51-1'-) f 3 3 Zo Le 1-2 5 L-11 13 b i Email: rr, ^. 0 Floor: 1 Yes ❑..No MECHANICAL CONTRACTOR INFORMATION Company Name: o L'.r t?i li-> Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ , 40l O_©O Describe the scope of work in detail: fire A) API- El:4-1 U r t: K (S rt Use: Residential: New ❑ Replacement Commercial:- New ❑ Replacement Fuel Type: Electric Gas.......... Other H:\Applicatioos\Forms-Applicntions Du Line \2016 ApplIca tions\Mcchanicnl Permit Application Revised 1.4- 16. docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu 5 Floor furnace 1 Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfm 1 Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm 5 Evaporator cooler 1 Ventilation fan connected to single duct - 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) Incinerator— domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser 5 Thermostat 1 Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 1 3-15 hp/500,000 btu 15-30 hp/1,000,000 bru 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 *Daytim District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PE1U Y.BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING•OWIVER.URAUTH Signature:. Print'hlatne: Mailing Address: 1 2C,u),71 }1`,,,&j\. reK- Day Telephone:. St�kT/t-� Date: W7-1/ '1- % City H:\Applications\Forms-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16,docx Revised: January 2016 hh State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT I QUANTITY PAID $3,088.03 017-0320 Address: 985 SOUTHCENTER MALL Apn: 9202470010 $1,851.01 DEVELOPMENT $1,763.08 PERMIT FEE R000.322.100.00.00 0.00 $1,758.58 WASHINGTON STATE SURCHARGE 8640.237.114 0.00 $4.50 TECHNOLOGY FEE $87.93 TECHNOLOGY FEE R000.322.900.04.00 0.00 $87.93 EL17-0968 Address: 985 SOUTHCENTER MALL Apn: 9202470010 $430.65 ELECTRICAL $407.76 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 I 0.00 $407.76 TECHNOLOGY FEE $22.89 TECHNOLOGY FEE R000.322.900.04.00 0.00 $22.89 M17-0185 Address: 985 SOUTHCENTER MALL Apn: 9202470010 $556.41 MECHANICAL $528.31 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $495.16 TECHNOLOGY FEE $28.10 TECHNOLOGY FEE 1 R000.322.900.04.00 0.00 $28.10 PG17-0156 Address: 985 SOUTHCENTER MALL Apn: 9202470010 $249.96 PLUMBING $235.67 PERMIT FEE R000.322.100.00.00 0.00 $202.52 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 TECHNOLOGY FEE $14.29 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R13563 R000.322.900.04.00 0.00 $14.29 $3,088.03 Date Paid: Friday, January 26, 2018 Paid By: TRISQUARE CONSTRUCTION LLC Pay Method: CHECK 1870 Printed: Friday, January 26, 2018 8:03 AM 1 of 1 Cf'SYSTEMS Cash Register Receipt City of Tukwila Receipt Number R12910 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $174.10 M17-0185 Address: 985 SOUTHCENTER MALL Apn: 9202470010 $174.10 MECHANICAL $174.10 PERMIT FEE PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R12910 R000.322.100.00.00 R000.322.102.00.00 0.00 0.00 $33.62 $140.48 $174.10 Date Paid: Thursday, November 30, 2017 Paid By: CM ARCHITECTECTURE Pay Method: CHECK 132923 Printed: Thursday, November 30, 2017 2:03 PM 1 of 1 CiriPWSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit 141 0- 035 CITY OF TUKWILA BUILDING D 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 PERMIT NO. IVISION (206) 431-3670 Project:T l�rd)Yt a-a606a pe of Inspection: Cdr, k cal Fi to PtL Address: 9/55 SOa., nk MO1/41.j.s. . Special Instructions: ,------7; Date Wanted: -//- Zoe, The Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: >A- ri\s60')a n't crAL FDIJAL Inspector: r20C.. - Date: /I_/ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 1117- 018:5 Project:,1 ` t Type of Inspection: Address: 9 R5 SO ‘&441 661 Ati M_ Date Called: Special Instructions: Date Wanted: a.m. y-/ 3 - 2-0Ir p.m. Requester: PhoneNom' Approved per applicable codes. COMMENTS: Corrections required prior to approval. I 'VCR" F £)er# 4Z-. z)L? J,/ ,4/c ; i- n f ov F :rderiAa itiourtak --Sce;k". Inspector,N2 644, Date: j3 278 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION M17- 0/86- 6300 Southcenter Blvd., #100, Tukwila: WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: CA/JAM-bp/0 Type of Inspection: r. Mi Oak- k. f / .L Address Kit Date Called: Special Instructions: Date Wanted: 5 2:7 lk- izo p.m. Requester: Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: r� Ke-C...havl Lc [ /✓«-L 1)1deed ic--6/7 Jetz-k 0A goo -c 14-3Azic Caide-ti ceLie /frtz-S pe/'eiv-die . Inspector: Date:3//z7120,,r REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit /11)7-o)'5 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Pro tct: OI - ito l+ IR is C H+ I CSL Type of Inspection: ,/ifirOS -i --/fir: Add ess: 78 5ou/ /c rn res' %- G - PIE FRt.G -T76w Mir- Date Called: Special Instructions: NW./lycSll 6N R.Cf-n' "-RV,— Ram/ ' figey '- { LL ?> /lid Date Wanted: 3 �t -q-/ CJ j p.m. Requester: SOk) Phone No: 2.6 18.2_ 205' Approved per applicable codes. DCorrections required prior to approval. COMMENTS: Inspector: OI - ito l+ IR is C H+ I CSL CFAN/hl G- oN 3-7 91 ,/ifirOS -i --/fir: ofd — mectivvhot 1:00P, icrec, res' %- G - PIE FRt.G -T76w Mir- Inspector: Dater / g REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. PERMIT CSORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0185 DATE: 11/30/17 PROJECT NAME: CINNABON SITE ADDRESS: 985 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Pry ok, Building Division Public Works A -M Al/A-. Fire Prevention 1111 Structural Planning Division ❑ Permit Coordinator • PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 12/05/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/02/18 Approved Corrections Required 7` ❑ Approved with Conditions ❑ ❑ Denied (corrections entered in Reviews) ;: (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 TRISQUARE CONSTRUCTION LLC Home Fsparfol Contact Safety & Health Claims & Insurance Washington State Department of kI Labor & Industries Page 1 of 2 Workplace Rights Trades,& Licensing TRISQUARE CONSTRUCTION LLC Owner or tradesperson Principals WOLFF, DANIEL JOHN, PARTNER/MEMBER Doing business as TRISQUARE CONSTRUCTION LLC WA UBI No. 603 074 598 PO BOX 626 LAKE STEVENS, WA 98258 425-610-7424 SNOHOMISH County Business type Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. TRISQCL894B0 Effective — expiration 01/20/2011— 01/31/2019 Bond ................ Developers Surety & Indem Co Bond account no. 256039C Active. Meets current requirements. $12,000.00 Received by L&I Effective date 03/30/2012 04/01/2012 Expiration date Until Canceled Bond history Insurance ....................._.... Ohio Security Ins Co $1,000,000.00 Policy no. BKS57065230 Received by L&I Effective date 12/18/2017 01/18/2016 Expiration date 01/18/2019 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No al tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603074598&LIC=TRISQCL.894BO&SAW= 1/26/2018 TRISQUARE CONSTRUCTION LLC License Violations No license violaticns during the previous 6 _r period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 206,263-00 Doing business as TRISQUARE CONSTRUCTION LLC Estimated workers reported Quarter 4 of Year 2017 "0" Workers L&l account contact TO / JULIE SUR (360)902-4715 - Email: SURJ235@lni.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have bean issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. Page 2 of 2 © Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni, Na.gov/verify/Detail.aspx?UBI=603074598&LIC=TRISQCL894BO&SAW= 1/26/2018 GENERAL NOTES 1. Work to be accomplished on these Drawings and the accompanying specifications includes the furnishing of all labor, materials, equipment, and services necessary for the proper completion of all mechanical work. 2. Before submitting a proposal on the work contemplated on these drawings and accompanying specifications, each bidder shall examine the site, check as to the means of making connections to services, and shall become familiar with all the existing conditions and limitations. Mechanical equipment and systems shown as existing on the plans have been based on existing drawings. No extras will be allowed because of the contractor's misunderstanding as to the amount of work involved or his lack of knowledge of any site conditions which may affect his work. Any apparent variance of the plan or specification from existing conditions at the site shall be called to the attention of the Engineer during the bid period so clarification can be made by addendum. 3. Existence of any wires, conduits, pipes, ducts, or other facilities are shown in a general way only. It will be the duty of the contractor to visit the site and make exact determination of the existence of any such facilities prior to the submission of his bid. It is understood that he will be responsible for making the exact determination of the location and condition of such facilities. 4. All required fees, permits, and inspections shall be obtained and/or arranged for by the contractor under the section of the Specifications for which they are required. 5. Regular inspections shall be arranged by the contractor as required by any and all regulations. All charges from regulating agencies for inspections of installations or review of plans and Specifications shall be paid by the contractor. 6. Certificate of Final Inspection. Under each applicable section of the Specifications, contractor shall, upon completion of the work under that section, furnish a Certificate of Final Inspection to the Engineer from the inspection department having jurisdiction. 7. All materials and workmanship shall comply with all current and applicable codes, specifications, ordinances, laws, regulations, industry standards, and utility company regulations. 8. In case of difference among building codes, specifications, state laws, local ordinances, industry standards, and utility company regulations and the Contract Documents, the most stringent shall govern. Contractor shall promptly notify the Engineer in writing of any such difference. 9. All applicable federal, state, and local laws and ordinances shall be adhered to throughout the construction project. 10. Non -Compliance. Should the contractor perform any work that does not comply with the requirements of the applicable building codes, state laws, local ordinances, industry standards, and utility company regulations, he shall bear all costs arising to correct the deficiencies. 11. Contractor shall initiate, maintain, and supervise all safety pre -cautions required for his work, including regulations of the Occupational Safety and Health Administration (OSHA). 12. Drawings are to scale as noted, but the contractor shall refer to Architectural and Structural Drawings for exact location of partitions, walls, beams, shafts, equipment, etc. 13. Each trade shall obtain drawings and specifications of all other trades and coordinate his work with all other trades. 14. Drawings show the general arrangement of ductwork, piping, equipment, and appurtenances and shall be followed as closely as actual building construction and work of other trades will permit. Mechanical work shall conform to the requirements shown on all of the drawings. Architectural and Structural Drawings shall take precedence over Mechanical Drawings. Because of the small scale of the Mechanical Drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. 15. Discrepancies discovered before or after work has started shall be brought to the attention of the Engineer immediately, and the Engineer reserves the right to require minor changes in the work of any contractor to eliminate such discrepancies with no change in contract cost. 16. Plans and specifications are complementary, and what is called for in either one shall be as binding as if called for in both. 17. Where a disagreement exists between the plans and specifications, the item or arrangement of better quality, greater quality, or higher cost shall be included in the bid. 18. Access panels shall be furnished by the trade requiring them and delivered to the general contractor for installation. 19. All materials and equipment shall be stored in such a place and in such a manner that a minimum of congestion will result. the placing of such materials and equipment shall be subject to the approval of the owner. 20. Contractor shall thoroughly examine the existing building with regard to what temporary measures he must take in order to permit the owner to occupy specific areas of the building during the various construction phases. refer to architectural specification section for construction sequencing schedule. in general, systems must remain in use in those designated areas to permit the ownerto function in a pre -construction manner. 21. Each contractor shall coordinate work with other trades in the installation of equipment, piping, conduit, and ductwork. 22. HVAC/sheet-metal contractor shall initiate the coordination process by providing reproducible plan drawings showing ductwork and equipment. 23. Drawings will be forwarded to the piping contractor and electrical contractor for inclusion of their systems work. 24. Contractors shall solve all coordination conflicts among themselves when possible. engineer will arbitrate when necessary, and his judgment will stand, with no additional cost to the owner. 25. Normal use of the facility shall not be disturbed, except within the immediate construction area. all walks, driveways, and entrances shall be kept clear and free of all contractor's equipment, material, and debris at all times. 26. Access panels shall be as manufactured by milcor, or approved equal, and of type the is compatible with construction and finish of the wall and/or ceiling 27. Each trade shall perform all cutting and patching necessary in order to perform the work, unless such work has been delegated to the general contractor/another trade. however, special permission shall be obtained from the engineer before cutting structural members or finished materials. all patching shall be performed in such manner as to leave no visible trace and to return the part affected to the condition of undisturbed work. patching work shall be performed by persons experienced, skilled, and licensed for the particular type of work involved. inferior work will not be accepted. all holes in masonry shall be drilled with rotary drills. impact tools shall not be used. 28. Each trade shall bear the expense of all cutting, patching, repairing, or replacing of the work of other trades required because of his fault, error, or tardiness of because of any damage done by him. 29. Eachtrade shall provide all holes and openings required for his work, unless such holes and openings are shown to be provided on the architectural or structural drawings. 30. Each trade shall remove existing work that is shown, specified, or obviously necessary for completion of his work. owner shall have the option of retaining any item or material removed under this contract. items or materials not retained by owner shall become the property of the trade and shall be removed from the premises. 31. Each trade shall periodically clear away all debris, surplus materials, etc., resulting from his work or operations, leaving the job and the equipment furnished under any or all contracts in a clean condition. 32. Each trade shall test the equipment provided and/or installed under the specification and shall demonstrate its proper operation to the owner's operating engineer. 33. Each trade shall furnish, without additional expense to the owner, the services of competent instructors, who will give full instruction in the care, adjustment, and operation and maintenance of all parts of the equipment to the owner's permanent employees who are to have charge of the equipment. 34. Each subcontractor shall be responsible for tested & rated fire stop systems for all thru-penetration of walls, floors Sc roof assemblies resulting from piping & other work under his contract. refer to specification section for fire stopping for requirements. 35. All wood nailers and other lumber which is installed in contact with metal, concrete, or masonry shall be pressure treated against decay (unless otherwise noted). 36. Provide only products from manufacturers with local representation that can provide complete coverage, service, parts and labor of their products in a timely manner. 37. Material exposed within return air plenum ceilings shall comply with IMC section 602.2.1. 38..HVAC contractor shall line the inside of all return/relief/exhaust plenum boxes per specifications. If no lining is required, hvac contractor shall paint the inside flat black. 39. All duct sizes are internal dimensions. Contractor shall increase sheet metal size if duct receives internal liner. See specifications for insulation requirements. 40. Duct roof penetration sizes to rooftop units are same as duct main, unless noted otherwise. Transition to unit connection sizes within roof curbs. 41. Locations of orifices/L-vents for fabric ducts are oriented when facing the direction of airflow. 42. HVAC equipment shall be no closer to roof edge than 10'-6" at all times. 43. Maintain a minimum of 15'-0" horizontal distance from any intake to exhaust outlet. 44. Coordinate underground piping with general contractor to ensure proper footing depth clearance. 45. Plans do not include all offsets for coordination with duct, lighting, and structural systems. Provide allowances for required offsets: 46. Provide all materials and equipment and perform all labor required to install complete and operable plumbing system as indicated on the drawings, as specified, and as required by code. 47. Run 3" and larger sanitary waste, storm drain, and all vent piping at 1/8" per foot slope unless noted otherwise; and less than 3" was piping at 1/4" per foot slope. Horizontal vent piping shall be graded to drain back to the waste pipe by gravity. 48. Elevations shown are to the invert of all piping based on architectural finished floor elevation (FFE) of 100'-0", unless noted otherwise. 49. Adjust sewer inverts to keep bottom of pipes in line where pipe sizes change. 50. Provide shutoff valves in all water piping system branches in which branch piping serves two or more fixtures (not shown for clarity) and where shown on plan and risers. 51. Install piping so that all valves, strainers, unions, traps, flanges, and other accessories requiring access are accessible. 52. Unions and/or flanges shall be installed at each piece of equipment, in bypasses, and in long runs (over 100') to permit disassembly for alteration and repairs. 53. All valves shall be adjusted for smooth and easy operation. 54. All valves (except control valves) and strainers shall be full size of pipe before reducing size to make connections to equipment and controls. 55. Provide cleanouts in sanitary and storm drainage systems at the ends of runs, at changes in direction, near the base of stacks, every 100' in 4" and larger horizontal runs, every 50' in 3" and smaller horizontal runs, where noted on plans, and where required by code. 56. All valves shall be installed so that the valve remains in service when equipment or piping on equipment side of valve is removed. 57. All piping work shall be coordinated with all trades involved. Offsets in piping around obstructions shall be provided at no additional cost to the owner. 58. See plumbing risers for sizing not shown on plan sheets (for clarity) and see plumbing fixture schedule for fixture connections and runout sizes. 59. Contractor to ensure that cleanouts (FCO, WCO, CO) locations do not rest below or behind casework. Maintain accessibility for servicing. 60. Plumbing contractor is responsible for all removing, cutting, patching, and replacement of all building structure, surfaces, and finishes required to complete work stated in the contract documents. 61. Plumbing contractor to coordinate counter openings for new sinks/lays with general contractor prior to ordering materials. 62. Pipes shown spread apart on plans for clarity. Contractor to install pipes tight together. 63. All underground domestic water piping shall be seamless Type 'K' copper piping with no joints. See specifications. 64. Gas piping supports to be every 5 feet. 65. See architectural roof plar for roof slope and scupper sizes/locations. 66. Roof drains are sized bawd on 4" 100 year rainfall data in International Plumbing Code. 67. Reduced pressure zone backflow preventer (RPZ) shall be installed at an elevation between 3'-0" AFF and 6'-0" AFF and labeled indicating equipment served. RPZ's shall be inspected and tested annually or at a rate per local codes. 68. Piping material for sanitary waste, plumbing vents, and storm sewer shall be cast iron where piping runs through a return -air plenum. Reference 2012 International Mechanical Cade, Section 602. 69. Fire caulk all floor penetrations and where piping penetrates rated walls. ECHANICAL ABREVIATIONS AFF ABOVE FINISHED FLOOR AP ACCESS PANEL BFP BACK FLOW PREVENTER BHP BRAKE HORSEPOWER BLW BELOW BWV BACK WATER VALVE CD CONDENSATE DRAIN CHW CIRCULATING HOT WATER CLG CEILING CO CLEANOUT CONN CONNECTION CONSTR CONSTRUCTION CONT CONTINUOUS OR CONTINUED CU CONDENSING UNIT CW COLD WATER DF DRINKING FOUNTAIN DIFF DIFFUSER DMPR DAMPER DN DOWN EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EF EXHAUST FAN EHC ELECTRIC HEATING COIL EL ELEVATION ESP EXTERNAL STATIC PRESSURE EUH ELECTRIC UNIT HEATER EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EXH EXHAUST FCO FLOOR CLEANOUT FCU FAN COIL UNIT FD FLOOR DRAIN FDC FIRE DEPARTMENT CONNECTION FHC FIRE HOSE CABINET FI LT FILTER FIXT FIXTURE FP FIRE PROTECTION FPM FEET PER MINUTE FSV FIRE SERVICE VALVE FSW FLOW SWITCH G GAS GPH GALLONS PER HOUR GW GREASE WASTE HB HOSE BIBB HDCP HANDICAPPED HSTAT HUMIDISTAT HTG HEATING HW HOT WATER ID INDIRECT DRAIN INSUL INSULATION INV EL INVERT ELEVATION IRR IRRIGATION WATER ISO LAT LF LVR LWT MAU MEZZ MXA N NC NO OA OPNG OPR PD PG PLBG PRV RA RADN RD RECIRC RF RHC. RPZ-BFP RWL SA SAN SCW SD SF SL SLV SP SP SPKLR STM STR SU SW T TRANS TSP UG UH V VD VTR WG WH WPD ISOLATOR (ISOLATION) LEAVING AIR TEMPERATURE LINEAR FEET LOUVER LEAVING WATER TEMPERATURE MAKE-UP AIR UNIT MEZZANINE MIXED AIR NECK NORMALLY CLOSED NORMALLY OPEN OUTSIDE AIR OPENING OPERATING PRESSURE DROP PRESSURE GAUGE PLUMBING POWER ROOF VENTILATOR RETURN AIR RADIATION ROOF DRAIN RECIRCULATE RETURN FAN REHEAT COIL REDUCED PRESS. ZONE RAINWATER LEADER SUPPLY AIR SANITARY SOFTENED COLD WATER STORM DRAIN SUPPLY FAN STORM LEADER SLEEVE STATIC PRESSURE SUMP PUMP SPRINKLER STEAM STORM SUPPLY UNIT SANITARY WASTE THERMOSTAT TRANSFER TOTAL STATIC PRESSURE UNDERGROUND UNIT HEATER VENT VOLUME DAMPER VENT THRU ROOF WATER GAUGE WALL HYDRANT WATER PRESSURE DROP REVISION No cha iges shall no m: of v ork without prio 'ukwila Building NOTE: Re tions will require and ma include additiona B.F. PREVENTER FILE C')PY Permit No. M(1- OI`i Plan review approval is subjeC to errors and on Approval of construction doctr-nents does not a the violation of any adopted cote or ordinance. of approved Field Copy and editions is acknot By: 1204,. LUC Date: 1 City of T ikwila BUILDING DIVISION SEE NOTES ON PLANS AND VERIFY ALL MATERIALS AND WORK REQUIRED BY THE LANDLORD PRIOR TO BID. THE LANDLORD'S OPERATIONS MANAGER SHALL HAVE THE AUTHORITY TO MAKE ON-SITE DECISIONS AND FIELD CHANGES IN ACCORDANCE WITH THE LANDLORD'S TENANT DESIGN CRITERIA, AND ANY SPECIFIC MALLOPERATIONS NEEDS/REQUIREMENTS NOT NOTED ON PLANS. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LANDLORD'S "TENANT STORE DESIGN AND CONSTRUCTION MANUAL". ALL CONTRACTORS SHALL OBTAIN A COPY FROM THE LANDLORD'S TENANT COORDINATOR OR MALL OPERATIONS MANAGER AND BECOME FAMILIAR WITH THE REQUIREMENTS CONTAINED WITHIN PRIOR TO BIDDING THE JOB. WHERE LANDLORD'S REQUIREMENTS CONFLICT WITH CODES OR ORDINANCES, THE STRICTEST INTERPRETATION SHALL APPLY. MECHANICAL SYMBOL LEGEND COLD WATER SHEET 9 OR Q WATER HAMMER ARRESTER WITH )I DRAIN VALVE MECHANICAL TITLE SHEET M1.0 u LINEAR DIFFUSER - DOMESTIC (CW) CONNECT TO EXISTING .------------- FLEX DUCT - HARD COLD WATER (CW) P1.0 - H DOMESTIC SIAMESE FIRE DEPT. CONNECTION) ELBOW UP (PIPE) DOMESTIC HOT WATER (120' F ROOF (PRV) EXHAUST FAN _ ) ` 0 : ELBOW DOWN PLUMBING -- TEMPERED �-- SUPPLY, RETURN AND EXHAUST AIR (PIPE)��� -. HOT WATER F) -140 DOMES'tic., (140 M MOTORIZED DAMPER -p -_ TEE UP WATER RECIRCULATION HOT (CHW).. CABINET UNIT HEATER t T TEE -OFF THE BOTTOM / DOWN DAMPER FIRE/SMOKEO SANITARY WASTE UNDERGROUND -KO CLEANOUT FLOOR / CEILING CLEANOUT SW (rj VAV BOX WITH COIL FCO -GW- GREASE WASTE UNDERGROUND 0 SMOKE DAMPER PIPE CAP ] SANITARY WASTE ABOVE GROUND CHECK VALVE Q FIRE DAMPER SW SUPPLY DUCT ELBOW WITH TURNING VANES V- - VENT IA STOP & WASTE VALVE 1 �` DAMPER �, OR VOLUME (MANUAL) 111 VTR VENT THRU ROOF 1 GPM CIRCUIT BALANCING VALVE (GRA) EXHAUST REGISTER 14x10 STANDARD OR LINED DUCT (SUPPLY, RETURN, EXHAUST). DUCT IS LABELED TO INDICATE INTERNAL A PRESSURE REDUCING VALVE DUCT DIMENSION. SEE SPECIFICATION FOR INSULATION. G NATURAL GAS ).( CEILING SUPPLY DIFFUSER V PRESSURE RELIEF VALVE CD DRAIN PIPING STANDARD ROUND TAKEOFF (CONICAL BELL MOUTH) CONDENSATE BALL VALVE I L� WITH VOLUME DAMPER RETURN AIR GRILLE/REGISTER pi �� UT THERMOSTAT GAS PRESSURE REGULATOR p� CONTROL VALVE (TWO-WAY) s SPACE TEMPERATURE SENSOR Hi- WH WALL HYDRANT . FLOW DIRECTION_ I \ ,� - RETURN AIR GRILLE REGISTER WITH SOUND BOOT. / 0 HUMIDISTAT I -I- HB HOSE BIBB 11 PIPE UNION CO CARBON DIOXIDE SENSOR ' 4 THERMOMETER pj, OR ® IN-LINE PUMP -" SIDEWALL SUPPLY REGISTER - TEMPERATURE GAUGE FLOW SWITCH - `'- SIDWALL RETURN OR EXHAUST GRILLE o FLOOR DRAIN4FS N.O. NORMALLY OPEN II FLOOR SINK 14x10 DOUBLE WALL (SUPPLY, RETURN, EXHAUST). DUCT IS N.C. NORMALLY CLOSED S BREAK IN MATERIAL FOR VISUAL PURPOSES FLOOR REGISTER im LABELED TO INDICATE INTERNAL DUCT DIMENSION. VFD VARIABLE FREQUENCY DRIVES SEPARATE REQUIRED CR: 0 Mechanical ell/Electrical .,,/Plumbing IN Gas Piping City of Tukwila BLIILD!Nn DIVISION v -CH DAW\C SHEET \EX M0.0 MECHANICAL TITLE SHEET M1.0 MECHANICAL PLAN M2.0 MECHANICAL SCHEDULES AND DETAILS M3.0 MECHANICAL SPECIFICATIONS P1.0 PLUMBING PLAN - DWV PIPING P1.1 PLUv131NG PLAN - WATER PIPING P2.0 PLUMBING SCHEDULES AND DETAILS P3:0 PLUMBING -- -.- --` �, '-`11 r' , IJC lrV'II/IP-"LIH APPROVED DEC 0 8 2017 tA-J City of Tukwila BUILDING DIVISION I�tCkIV�LP CITY OF TUKWILA NOV 30 2011 PERMIT CENTER M oiss BRUCE M. CARLSON architecture • planning ' interior design BRUCE M. CARLSON ARCHITECT, PLLC 800 WASHINGTON AVE. N., SUITE 208 MINNEAPOLIS, MN 55401-1148 PHONE: (612) 547-1300 FAX: (612) 547-1301 CONTACT: TROY HUFFER thuffer@cmarch.com CONSULTANTS: EMANUELSON-PODAS, INC. 7705 E. BUSH LAKE RD. EDINA, MN 55439 PHONE: (952) 930-0050 le to theSronc- ':prirovel of ivision nev,v p!an subm7t! an review fc SEAL: sions. horixe eceipt deed: MICHAEL A. WEBERT SIGNATURE 11-15-2016 DATE ISSUED 45575 REG. NO. WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL TUKWILA, WA 98188 SPACE #985 - IN LINE .985 IN-LINE STORE DESIGN SHEET TITLE: MECHANICAL TITLESHEET REVISIONS: NO: DATE: BY: PERMIT SET 0 11.15.2017 PROJECT NO: 3588.0097 DRAWN BY: JMH M0.0 COPYRIGHT BRUCE M. CARLSON ARCHITECT, PLLC 2017 CCI 0 0 0 O i C) O a GENERAL NOTES A. CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS FOR BIDDING PURPOSES. FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THEIR WORK. B. NOT ALL EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. IS SHOWN ON THE PLANS. ALL EXISTING EQUIPMENT AND PIPING SHOWN DOES NOT REFLECT ALL OFFSETS, LENGTHS AND LOCATIONS. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AND PIPING TO BE REMOVED AND/OR CONNECTED TO PRIOR TO BID. C. FIELD VERIFY LOCATIONS AND QUANTITY OF ALL EXISTING EQUIPMENT, FIXTURES, DUCTWORK AND PIPING NECESSARY TO COMPLETE SCOPE OF WORK. D. CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE ROUTING OF DUCTWORK WITH WATER, WASTE, VENT, STORM PIPING, STRUCTURE, CEILING ELEVATION, ELEC SWITCHGEAR, PANEL BOARDS, LIGHTS, SPRINKLER PIPING, & ALL OTHER TRADES. E. REFER TO ELEC LIGHTING PLANS & ARCH REFLECTED CEILING PLANS FOR UGHT FIXTURE LOCATIONS. F. CONTRACTOR TO PROVIDE ALL NECESSARY OFFSETS REQUIRED TO COORDINATE WITH STRUCTURE & OTHER TRADES AT NO ADDMONAL COST TO THE OWNER. PLANS MAY NOT INDICATE ALL OFFSETS. G. ALL INSTALLATIONS, EQUIPMENT & MATERIALS SHALL COMPLY WITH ALL APPLICABLE LANDLORD REQUIREMENTS. H. ALL ROOF CUTTING, PATCHING & FLASHING REQUIRED TO INSTALL THE HVAC SYSTEMS SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR. COORDINATE ROOF PENETRATION REQUIREMENTS WITH LANDLORD & THE GENERAL CONTRACTOR. VERIFY SCOPE OF WORK WITH THE GENERAL CONTRACTOR PRIOR TO BID & INCLUDE ALL COSTS IN BID AS DIRECTED BY THE GENERAL CONTRACTOR. I. CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING & DUCTWORK NOT BEING USED IS FULLY REMOVED. & NOT ABANDONED. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR & LANDLORD. REFER TO SPECS FOR ADDMONAL INFORMATION. VERIFY SCOPE OF WORK WITH GENERAL CONTRACTOR PRIOR TO BID & INCLUDE ALL COSTS IN BID AS DIRECTED BY THE GENERAL CONTRACTOR. J. MATERIAL EXPOSED WITHIN RETURN AIR PLENUM CEILINGS SHALL COMPLY WITH CMC, SECTION 602.2. K. HVAC SUBCONTRACTOR SHALL BE RESPONSIBLE FOR TESTING & RATED FIRE STOP SYSTEMS FOR ALL THRU-PENETRATION OF WALLS, FLOORS, & ROOF ASSEMBLIES RESULTING FROM PIPING & OTHER WORK UNDER HIS CONTRACT. REFER TO FIRESTOPPING SPEC FOR REQUIREMENTS. SEAL DUCTS WITH DUCT SEALER PER SMACNA REQUIREMENTS AS INDICATED IN SPECS. M. CONCRETE CUTS SHALL BE STRAIGHT AND CLEAN. REPLACE SLAB WITH CONCRETE FLUSH AND SMOOTH WITH ADJACENT. N. COORDINATE KITCHEN ROUGH -IN REQUIREMENTS WITH FOOD SERVICE DRAWINGS AND SCHEDULES. 0. ALL INSTALLATIONS, EQUIPMENT AND MATERIAL SHALL COMPLY WITH ALL APPLICABLE LANDLORD REQUIREMENTS. P. INSULATE ALL SUPPLY DUCTWORK WITH 1.5" (R-5) INSULATION WRAP WITH FOIL VAPOR BARRIER. Q. DO NOT ROUTE PIPING OR DUCTWORK OVER ELEC. SWITCHGEAR, FIELD VERIFY. R. CONTRACTOR SHALL FIELD VERIFY / LOCATE EASING LANDLORD CONNECTIONS & CONNECT NEW TO EXISTING PER ALL APPLICABLE CODES. KEYNOTES (SHOWN OFF PLAN FOR CLARITY) 0 FURNISH AND INSTALL NEW 24"x24" LAY -IN SUPPLY DIFFUSER. COORDINATE LOCATION WITH LIGHTS, CEILING GRID & DECOR. O2 FURNISH AND INSTALL NEW RETURN AIR REGISTER. VERIFY EXACT LOCATION. O3 CONNECT INTO DUCTWORK WITH CONICAL BELLMOUTH SPIN -IN TAKE -OFF WITH VOLUME DAMPER. TYPICAL FLEXIBLE DUCT, MAXIMUM LENGTH 4'-0" (TYPICAL). PROVIDE SMOOTH TRANSITION AND PROPER SUPPORTS PER SMACNA. USE FLEXIBLE DUCT FOR FINAL RUN -OUT TO DIFFUSER ONLY. SEE DETAIL 2/M2.0 (TYPICAL). PROVIDE 7 -DAY PROGRAMMABLE CONTROL FOR HVAC UNIT. COORDINATE CONTROL SYSTEM WITH LANDLORD. COORDINATE ALL REQUIREMENTS AND SETTINGS WITH TENANTS PROJECT MANAGER AND LANDLORD REQUIREMENTS PRIOR TO BID. O REMOVE EXISTING CONDENSING UNIT. INSTALL NEW REMOTE CONDENSING UNIT ON CURB BEHIND TENANT SPACE. CONTRACTOR TO PROVIDE AND INSTALL NEW UNIT CURB AS REQUIRED. COORDINATE EXACT LOCATION WITH LANDLORD. COORDINATE ALL ROOF PENETRATIONS WITH LANDLORD APPROVED ROOFING CONTRACTOR. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. SEE DETAIL 5/M3 AND 6/M3. COORDINATE EXACT LOCATION AND INSTALLATION REQUIREMENTS WITH SHOPPING CENTER MANAGEMENT TEAM. 7O REMOVE EXISTING REFRIGERANT PIPING AND INSTALL NEW REFRIGERANT PIPING WITH MANIFOLDS, VALVES, TRAPS, AND DRYERS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. SIZE REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS WITH 1/2' ARMAFLEX INSULATION AND ALUMINUM JACKET ON ALL PIPING LOCATED OUTDOORS. COORDINATE EXACT ROUTING FROM CU ON ROOF TO AHU IN SPACE WITH LANDLORD ON-SITE PRIOR TO BID. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. SEE DETAIL 6/M2.0. 0 REMOVE EXISTING AIR HANDLER. INSTALL NEW AIR HANDLING UNIT. FIELD VERIFY EXACT SIZE AND DIMENSIONS WITH FIELD CONDITIONS PRIOR TO BID. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. CONNECT AIR HANDLER ECONOMIZER TO OUTDOOR DUCT WITH 16" ROUND OR SIMILAR. VERIFY CONDITIONS IN FIELD. SEE DETAIL 1/M3 AND 6/M3. EXTEND CONDENSATE DRAINS FROM AHU AND DRAIN PAN SEPARATELY TO MOP SINK OR APPROVED RECEPTOR. FIELD VERIFY EXACT ROUTING AND LOCATION ONSITE PRIOR TO BID. TERMINATE WITH AIR GAP PER LOCAL CODE. INSULATE CONDENSATE PIPING AND SLOPE AT 1/8" PER FOOT MINIMUM. PROVIDE CONDENSATE PUMP AS NECESSARY FOR FIELD CONDITIONS. FIELD VERIFY PRIOR TO CONSTRUCTION. INTERLOCK SAFETY OVERFLOW SWITCH WITH UNIT - TO SHUTDOWN UNIT UPON ALARM. 10 EXTEND 16" OUTDOOR AIR DUCT THRU ROOF AND TERMINATE WITH GOOSENECK AS SHOWN IN DETAIL. COORDINATE ROUTING AND LOCATION WITH LANDLORD, ARCHITECTURAL AND STRUCTURAL 11 TENANT CONTRACTOR TO EXTERNALLY INSULATE ALL NEW DUCTWORK WITH 1-1/2" R-5 MINIMUM INSULATION WRAP WITH FOIL VAPOR BARRIER. P REPAIR OR REPLACE INSULATION ON EXISTING DUCTWORK AS NEEDED TO MAINTAIN R-5 VALUE. BRUCE M. CARLSON arcnitocturo planning ' interior doaign BRUCE M. CARLSON ARCHITECT, PLLC 800 WASHINGTON AVE. N., SUITE 208 MINNEAPOLIS, MN 55401-1148 PHONE: (612) 547-1300 FAX: (612) 547-1301 CONTACT: TROY HUFFER thuffer@cmarch.com CONSULTANTS: EMANUELSON—PODAS, INC. 7705 E. BUSH LAKE RD. EDINA, MN 55439 PHONE: (952) 930-0050 SEAL: REVIEWED FOR CODE COMPLIANCE CH, APPROVED DEC 0 8 2017 GRILLE, REGISTER AND DIFFUSER KEY 24x6/8DIA.'1'-SIZE (INCHES) OR DIFFUSER NECK SIZE 450 CFM 12TYP 0 --QUANTITY, NO INDICATION = 1 UNIT DEVICE STYLE, SEE SCHEDULE City of Tukwila WILDING DIVISION RECEIVED NOTE: CITY OF TUKWILA BRANCH DUCT RUNOUTS TO DIFFUSERS/GRILLES SHALL BE SAME SIZE DIFFUSER/GRILLE NECK UNLESS OTHERWISE NOTED (LION). NOV 30 2017 PERMIT CENTER MICHAEL A. WEBERT SIGNATURE 11-15-2016 DATE ISSUED 45575 REG. NO. WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL TUKWILA, WA 98188 SPACE # cl85' IN—LINE STORE DESIGN SHEET TITLE: MECHANICAL PLAN REVISIONS: NO: DATE: BY: PERMIT SET 0 11.15.2017 PROJECT NO: 3588.0097 DRAWN BY: M 1 . 0 JMH YRIGHT BRUCE M. CARLSON ARCHITECT, PLLC 2017 C n n n r n II „� J L• • FE F - I []� II � 1 I II TYP. \ \ 1 TYP II / 18"x12" SA \ I 12"x12" 4kAiL, L ► ❑ -- W - , I o L litimmi.'leir / JP/ - • TYP. "'�' `� ' 0 TYP. © � °- ,- , TYP *101,.--- - - I I _ -__1.- '1 \ -I - �- - LHP" - II I �. 1 1 J \ -., �O 80 O � / � I � 80 O 240 __-!- -- - = I •' O 240 ,_ ,, \ , It I I AHU \� / I r , I / rr II 0 - \ � n r- — — - -=-- 0 � ii / r ---14. -1.1= I 80 I / \ il ® L. Am / n z 0 SP 240 V. \ l b \ GI \ i \ II 80 1 I-I== m I. e O 240 o J_ - -1 �\k 1O0 I ___*n , II J rF2)---'Ihi 11 - ° ° '�9 -==) ` / I r 1 -- 24x24 L I <=_---___ O RA 720 _ �: �, -_ Y Cl*= ''�- s`��L� 1Jf[lTIiBFR } .1 - 'I ��., :__,2 / 240 »KNNN J ii 01. _ill /////-ss) I— 4111It 1—. -\-- --\ ll GENERAL NOTES A. CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS FOR BIDDING PURPOSES. FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THEIR WORK. B. NOT ALL EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. IS SHOWN ON THE PLANS. ALL EXISTING EQUIPMENT AND PIPING SHOWN DOES NOT REFLECT ALL OFFSETS, LENGTHS AND LOCATIONS. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AND PIPING TO BE REMOVED AND/OR CONNECTED TO PRIOR TO BID. C. FIELD VERIFY LOCATIONS AND QUANTITY OF ALL EXISTING EQUIPMENT, FIXTURES, DUCTWORK AND PIPING NECESSARY TO COMPLETE SCOPE OF WORK. D. CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE ROUTING OF DUCTWORK WITH WATER, WASTE, VENT, STORM PIPING, STRUCTURE, CEILING ELEVATION, ELEC SWITCHGEAR, PANEL BOARDS, LIGHTS, SPRINKLER PIPING, & ALL OTHER TRADES. E. REFER TO ELEC LIGHTING PLANS & ARCH REFLECTED CEILING PLANS FOR UGHT FIXTURE LOCATIONS. F. CONTRACTOR TO PROVIDE ALL NECESSARY OFFSETS REQUIRED TO COORDINATE WITH STRUCTURE & OTHER TRADES AT NO ADDMONAL COST TO THE OWNER. PLANS MAY NOT INDICATE ALL OFFSETS. G. ALL INSTALLATIONS, EQUIPMENT & MATERIALS SHALL COMPLY WITH ALL APPLICABLE LANDLORD REQUIREMENTS. H. ALL ROOF CUTTING, PATCHING & FLASHING REQUIRED TO INSTALL THE HVAC SYSTEMS SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR. COORDINATE ROOF PENETRATION REQUIREMENTS WITH LANDLORD & THE GENERAL CONTRACTOR. VERIFY SCOPE OF WORK WITH THE GENERAL CONTRACTOR PRIOR TO BID & INCLUDE ALL COSTS IN BID AS DIRECTED BY THE GENERAL CONTRACTOR. I. CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING & DUCTWORK NOT BEING USED IS FULLY REMOVED. & NOT ABANDONED. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR & LANDLORD. REFER TO SPECS FOR ADDMONAL INFORMATION. VERIFY SCOPE OF WORK WITH GENERAL CONTRACTOR PRIOR TO BID & INCLUDE ALL COSTS IN BID AS DIRECTED BY THE GENERAL CONTRACTOR. J. MATERIAL EXPOSED WITHIN RETURN AIR PLENUM CEILINGS SHALL COMPLY WITH CMC, SECTION 602.2. K. HVAC SUBCONTRACTOR SHALL BE RESPONSIBLE FOR TESTING & RATED FIRE STOP SYSTEMS FOR ALL THRU-PENETRATION OF WALLS, FLOORS, & ROOF ASSEMBLIES RESULTING FROM PIPING & OTHER WORK UNDER HIS CONTRACT. REFER TO FIRESTOPPING SPEC FOR REQUIREMENTS. SEAL DUCTS WITH DUCT SEALER PER SMACNA REQUIREMENTS AS INDICATED IN SPECS. M. CONCRETE CUTS SHALL BE STRAIGHT AND CLEAN. REPLACE SLAB WITH CONCRETE FLUSH AND SMOOTH WITH ADJACENT. N. COORDINATE KITCHEN ROUGH -IN REQUIREMENTS WITH FOOD SERVICE DRAWINGS AND SCHEDULES. 0. ALL INSTALLATIONS, EQUIPMENT AND MATERIAL SHALL COMPLY WITH ALL APPLICABLE LANDLORD REQUIREMENTS. P. INSULATE ALL SUPPLY DUCTWORK WITH 1.5" (R-5) INSULATION WRAP WITH FOIL VAPOR BARRIER. Q. DO NOT ROUTE PIPING OR DUCTWORK OVER ELEC. SWITCHGEAR, FIELD VERIFY. R. CONTRACTOR SHALL FIELD VERIFY / LOCATE EASING LANDLORD CONNECTIONS & CONNECT NEW TO EXISTING PER ALL APPLICABLE CODES. KEYNOTES (SHOWN OFF PLAN FOR CLARITY) 0 FURNISH AND INSTALL NEW 24"x24" LAY -IN SUPPLY DIFFUSER. COORDINATE LOCATION WITH LIGHTS, CEILING GRID & DECOR. O2 FURNISH AND INSTALL NEW RETURN AIR REGISTER. VERIFY EXACT LOCATION. O3 CONNECT INTO DUCTWORK WITH CONICAL BELLMOUTH SPIN -IN TAKE -OFF WITH VOLUME DAMPER. TYPICAL FLEXIBLE DUCT, MAXIMUM LENGTH 4'-0" (TYPICAL). PROVIDE SMOOTH TRANSITION AND PROPER SUPPORTS PER SMACNA. USE FLEXIBLE DUCT FOR FINAL RUN -OUT TO DIFFUSER ONLY. SEE DETAIL 2/M2.0 (TYPICAL). PROVIDE 7 -DAY PROGRAMMABLE CONTROL FOR HVAC UNIT. COORDINATE CONTROL SYSTEM WITH LANDLORD. COORDINATE ALL REQUIREMENTS AND SETTINGS WITH TENANTS PROJECT MANAGER AND LANDLORD REQUIREMENTS PRIOR TO BID. O REMOVE EXISTING CONDENSING UNIT. INSTALL NEW REMOTE CONDENSING UNIT ON CURB BEHIND TENANT SPACE. CONTRACTOR TO PROVIDE AND INSTALL NEW UNIT CURB AS REQUIRED. COORDINATE EXACT LOCATION WITH LANDLORD. COORDINATE ALL ROOF PENETRATIONS WITH LANDLORD APPROVED ROOFING CONTRACTOR. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. SEE DETAIL 5/M3 AND 6/M3. COORDINATE EXACT LOCATION AND INSTALLATION REQUIREMENTS WITH SHOPPING CENTER MANAGEMENT TEAM. 7O REMOVE EXISTING REFRIGERANT PIPING AND INSTALL NEW REFRIGERANT PIPING WITH MANIFOLDS, VALVES, TRAPS, AND DRYERS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. SIZE REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS WITH 1/2' ARMAFLEX INSULATION AND ALUMINUM JACKET ON ALL PIPING LOCATED OUTDOORS. COORDINATE EXACT ROUTING FROM CU ON ROOF TO AHU IN SPACE WITH LANDLORD ON-SITE PRIOR TO BID. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. SEE DETAIL 6/M2.0. 0 REMOVE EXISTING AIR HANDLER. INSTALL NEW AIR HANDLING UNIT. FIELD VERIFY EXACT SIZE AND DIMENSIONS WITH FIELD CONDITIONS PRIOR TO BID. PROVIDE SCOPE OF WORK NECESSARY TO COMPLETE IN ORIGINAL BID. NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. CONNECT AIR HANDLER ECONOMIZER TO OUTDOOR DUCT WITH 16" ROUND OR SIMILAR. VERIFY CONDITIONS IN FIELD. SEE DETAIL 1/M3 AND 6/M3. EXTEND CONDENSATE DRAINS FROM AHU AND DRAIN PAN SEPARATELY TO MOP SINK OR APPROVED RECEPTOR. FIELD VERIFY EXACT ROUTING AND LOCATION ONSITE PRIOR TO BID. TERMINATE WITH AIR GAP PER LOCAL CODE. INSULATE CONDENSATE PIPING AND SLOPE AT 1/8" PER FOOT MINIMUM. PROVIDE CONDENSATE PUMP AS NECESSARY FOR FIELD CONDITIONS. FIELD VERIFY PRIOR TO CONSTRUCTION. INTERLOCK SAFETY OVERFLOW SWITCH WITH UNIT - TO SHUTDOWN UNIT UPON ALARM. 10 EXTEND 16" OUTDOOR AIR DUCT THRU ROOF AND TERMINATE WITH GOOSENECK AS SHOWN IN DETAIL. COORDINATE ROUTING AND LOCATION WITH LANDLORD, ARCHITECTURAL AND STRUCTURAL 11 TENANT CONTRACTOR TO EXTERNALLY INSULATE ALL NEW DUCTWORK WITH 1-1/2" R-5 MINIMUM INSULATION WRAP WITH FOIL VAPOR BARRIER. P REPAIR OR REPLACE INSULATION ON EXISTING DUCTWORK AS NEEDED TO MAINTAIN R-5 VALUE. BRUCE M. CARLSON arcnitocturo planning ' interior doaign BRUCE M. CARLSON ARCHITECT, PLLC 800 WASHINGTON AVE. N., SUITE 208 MINNEAPOLIS, MN 55401-1148 PHONE: (612) 547-1300 FAX: (612) 547-1301 CONTACT: TROY HUFFER thuffer@cmarch.com CONSULTANTS: EMANUELSON—PODAS, INC. 7705 E. BUSH LAKE RD. EDINA, MN 55439 PHONE: (952) 930-0050 SEAL: REVIEWED FOR CODE COMPLIANCE CH, APPROVED DEC 0 8 2017 GRILLE, REGISTER AND DIFFUSER KEY 24x6/8DIA.'1'-SIZE (INCHES) OR DIFFUSER NECK SIZE 450 CFM 12TYP 0 --QUANTITY, NO INDICATION = 1 UNIT DEVICE STYLE, SEE SCHEDULE City of Tukwila WILDING DIVISION RECEIVED NOTE: CITY OF TUKWILA BRANCH DUCT RUNOUTS TO DIFFUSERS/GRILLES SHALL BE SAME SIZE DIFFUSER/GRILLE NECK UNLESS OTHERWISE NOTED (LION). NOV 30 2017 PERMIT CENTER MICHAEL A. WEBERT SIGNATURE 11-15-2016 DATE ISSUED 45575 REG. NO. WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL TUKWILA, WA 98188 SPACE # cl85' IN—LINE STORE DESIGN SHEET TITLE: MECHANICAL PLAN REVISIONS: NO: DATE: BY: PERMIT SET 0 11.15.2017 PROJECT NO: 3588.0097 DRAWN BY: M 1 . 0 JMH YRIGHT BRUCE M. CARLSON ARCHITECT, PLLC 2017 rn N SPLIT SYSTEM FAN COIL AIR CONDITIONING UNIT SCHEDULE INDOOR FAN COIL OUTDOOR HEAT PUMP UNIT NOTES MARK MANUFACTURER MODEL NOMINAL TONS SUPPLY CFM ESP IN FRESH AIR CFM COOLING CAPACITY (MBH) HEAT CAPACITY HIGH (MBH) HEAT CAPACITY LOW (MBH) ELECTRICAL MARK MANUFACTURER MODEL NOMINAL TONS SEER HSPF ELECTRICAL VOLTS / PHASE MCA MOCP VOLTS / PHASE MCA MOCP AHU-1 LENNOX CBX32MV-036-230-6 3.0 1200 0.8 132 36.4 34.6 23.2 208/1 5 15 HP -1 LENNOX SPB036H4S43Y 3.0 16.5 9.0 208/3 16.2 25 ALL MECHANICAL NOTES 1. CONTRACTOR TO INSTALL NEW AIR HANDLER IN CEILING SPACE. CONTRACTOR TO MAINTAIN SERVICE CLEARANCES. 2. CONTRACTOR TO INSTALL AIR HANDLER WITH LENNOX ECONOMIZER. 3. CONTRACTOR TO INSTALL NEW HEAT PUMP ON ROOF. RUN NEW CONDENSING PIPING TO AIR HANDLER. COORDINATE WITH LANDLORD. MAINTAIN SERVICE CLEARANCES. 4. TENANTS CONTRACTOR MUST VISIT THE SITE PRIOR TO BID - ALL LABOR AND MATERIALS. NECESSARY TO PROVIDE THE TENANT WITH THE INTENDED DESIGN SHALL BE INCLUDED IN THE ORIGINAL BASE BID. NO EXCEPTIONS. 5. PROVIDE STARTER MOTOR AND ELECTRICAL DISCONNECT SWITCH. 6. HORIZONTAL INDOOR AIR HANDLER WITH MIXING BOX SECTION, STD 2" TA FILTERS. 7. FREEZESTAT AT INLET OF UNIT, AT TEMPERATURE OF 35 F, 2 -WAY CONTROL VALVE SHALL OPEN. 8. PROVIDE CONDENSATE OVERFLOW DRAIN PAN SENSOR OPTION, WATER LEVEL DETECTION TO SHUT DOWN UNIT ON ACTIVATION. 9. SUPPORT FROM STRUCTURE WITH VIBRATION ISOLATORS - COORDINATE INSTALLATION WITH LANDLORD'S ONSITE TENANT COORDINATOR. 10. PROVIDE TEMPERATURE CONTROLS (SENSORS, VALVES, ACTUATORS, AND PROGRAMMABLE THERMOSTAT). COORDINATE ALL REQUIREMENTS WITH LANDLORD. HEAT LOSS AND HEAT GAIN CALCULATIONS CINNABON - SEATTLE, WA HEATING: COOLING: IA: 68°F IA: 70°F/50%RH OA: 24°F OA: 86/66(DB/WB)°F AHU-1 SALES/STOCK ITEM HEAT LOSS HEAT GAIN SENSIBLE (BTUH) SENSIBLE (BTUH) LATENT (BTUH) TOTAL (BTUH) LIGHTING --- 2437 --- 2437 PEOPLE --- 2000 1600 3600 VENTILATION 6687 1576 -220 1356 ROOF 1371 2069 --- 2069 WALL 0 0 --- 0 GLASS 0 0 --- 0 INFILTRATION 2533 302 -37 265 MISC --- 25598 --- 25598 rkAi✓^::.:i 3at+k.. k{sSr: Cu ax?TFe4 k&Jk`1=�hbNG'tliSkD,.A tui .9 9m r.+m@, .?47-, a toi<a; AHU-1 10591 33982 1343 35325 GRILLE, REGISTER, DIFFUSER SCHEDULE MARK MANUFACTURER LOCATION AIR TYPE MODEL SIZE FINISH NOTES A PRICE CEILING SUPPLY DIFFUSER ASCDA 24 X 24 WHITE ALL B PRICE DUCT SUPPLY DIFFUSER RCD ON DRAWING WHITE 1,3 C PRICE CEILING RETURN REGISTER 530 24 X 24 WHITE ALL NOTES 1. NECK SIZE INDICATED ON FLOOR PLANS. 2. VERIFY WITH ARCHITECTURAL PLANS THE FRAME TYPE PLASTER OR LAY -IN FRAME. 3. COORDINATE FINISH/COLOR WITH ARCHITECT AND LANDLORD AS NOTED ON PLANS. BRUCE M. CARLSON architecture ' planning • interior design BRUCE M. CARLSON ARCHITECT, PLLC 800 WASHINGTON AVE. N., SUITE 208 MINNEAPOLIS, MN 55401-1148 PHONE: (612) 547-1300 FAX: (612) 547-1301 CONTACT: TROY HUFFER thuffer@cmarch.com CONSULTANTS: EMANUELSON-PODAS, INC. 7705 E. BUSH LAKE RD. EDINA, MN 55439 PHONE: (952) 930-0050 SEAL: VENTILATIONSCHEDULE UNIT SOC FT FT O MAX CFM MIN CFM PEOPLE MIN OA SUPPLY CFM EXHAUST CFM CFM AHU-1 595 1200 _ 6 120 0 ASHRAE 62.1-2007 VENTILATION REQUIREMENT: (Rp x Pz) + (Ra x Az) = Vbz RETAIL SALES - (7.5cfm x 6 people)+(.12 x 306 sq ft) = 82 cfm OA STORAGE - (.12 x 289 sq ft) = 35 cfm OA NOTES: 1. VERIFY ROUTING OF REFRIGERANT LINESETS ON SITE AND WITH THE LANDLORD REPRESENTATIVE. INSTALL 26 GA. GALVANIZED SHEET METAL LINE COVER AT ALL EXPOSED LINES OUTSIDE OF TENANT SPACE. LINE COVER SHALL BE MINIMUM SIZE TO ALLOW FOR ALL NECESSARY LINES FROM UNIT TO UNIT. COORDINATE LOCATION WITH LANDLORD SITE REPRESENTATIVE PRIOR TO . CONSTRUCTION SERVICE VALVE CONDENSING UNIT. NOTES: 1. REFRIGERANT LIQUID & SUCTION LINES SIZE & INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 2. G.C. TO COORDINATE FINAL PLACEMENT WITH LANDLORD AND TO COORDINATE ALL ROOF PENETRATIONS WITH LANDLORD REQUIRED ROOFING CONTRACTOR. LIQUID LINE OUTDOOR CONDENSING UNIT. SEE SCHEDULE FOR MAKE AND MODEL. AIR HANDLING UNIT. SUCTION UNE INSTALL REFRIGERANT LINESETS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. VERIFY ACTUAL LENGTHS IN FILED PRIOR TO INSTALLATION. REFRIGERANT LIQUID AND SUCTION LINES. PROVIDE ALL EXPOSED PIPE INSULATION WITH ALUMINUM JACKET. ELECTRICAL CONDUITS FOR POWER AND CONTROL WIRING. MEMBRANE PAD TO PREVENT DAMAGE TO ROOF MATERIAL. LOIL TRAP ROOF STRUCTURE COORDINATE ALL ROOF PENETRATIONS WITH LL REQUIRED ROOFING CONTRACTOR. COORDINATE ALL ROOF PENETRATIONS WITH LANDLORD APPROVED ROOFING CONTRACTOR. SECURE BIRDSCREEN TO ANGLE IRON FRAME WITH REMOVABLE BOLTS/NUTS/WASHERS. 16 GA. MIN GALV. DUCT. ANGLE IRON REINFORCING TO SECURE BIRDSCREEN. ROOF JOIST HANGER WIRE NO SCALE NO SCALE SHEET METAL DUCT HANGER SPIRAL DUCT XTERNAL INSULATION SHALL BE RUN CONTINUOUS THRU HANGERS -o d DUCT SOLDERED WATERTIGHT DN TO DRIP PAN 4.0 a) 00 0 W SHEET METAL COUNTER FLASHING SOLDERED TO GOOSENECK WATERTIGHT BY MECH. CONTRACTOR. BIRD SCREEN CURB & FLASHING BY GENERAL CONTRACTOR. RECTANGULAR OR ROUND SPIN -IN, CONICAL OR SUPPLY AIR DUCT BELL MOUTH TAKE -OFF SIZE EACH SPRING ISOLATOR PER MANUFACTURER'S CORNER WEIGHT DATA. WELD UNISTRUT TO TOP OF JOIST BOTTOM CORD (TYP. OF EACH JOIST). SPAN MINIMUM OF 1 JOIST PAST UNIT IN EACH DIRECTION. SPRING VIBRATION ISOLATOR (TYP. OF EACH HANGER) REVIEWED FOR CODE COMPLIANCE APPROVED ROUND RIGID DUCT DEC 0 8 2017 ELBOW RADIUS 1-1/2 TIMES DUCT DIAMETER RUBBER - GROMMET ROOF STRUCTURE MECH EQUIP / City of Tukwila BUILDING DIVISION MOUNTING BRACKET INTEGRAL TO UNIT INSULATION, SEE SPECIFICATION FOR DETAILS. MOTORIZED DAMPER ACCESS DOOR WITH CAM LOCKS. 2" DEEP DRIP PAN SOLDERED WATERTIGHT SHEET METAL DUCT HANGER DRAW BAND (2 TYP) RUNOUT DUCT SIZE SHALL BE SAME AS DIFFUSER NECK DIAMETER UNLESS NOTED OTHERWISE ON DRAWINGS. -RECTANGULAR DUCT XTERNAL INSULATION SHALL BE RUN CONTINUOUS THRU HANGERS AIR DIFFUSER FLEXIBLE AIR DUCT (4'-0" MAX.) /-CEILING HANGER ROD. TYP OF EACH SUPPORT. REFERENCE - MANUFACTURER'S DATA FOR QUANTITY. OUTDOOR AIR GOOSENECK DETAIL NO SCALE DUCT HANGING DETAILS DUCT TO SUPPLY DIFFUSER NO SCALE NO SCALE PERMIT 3 SCALE: NONE 45575 0 0• Eb MICHAEL A. WEBERT SIGNATURE 11-15-2016 DATE ISSUED 45575 REG. NO. WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL TU KWI LA, WA 98188 SPACE # 98G - IN -LINE STORE DESIGN SHEET TITLE: MECHANICAL SCHEDULES REVISIONS: NO: DATE: BY: PERMIT SET 0 11.15.2017 PROJECT NO: 3588.0097 UNIT HANGING DETAIL DRAWN BY: M2.0 JMH OPYRIGHT BRUCE M. CARLSON ARCHITECT, PLLC 2017 N N 0 N 0 0 0 L a) .0 0 PROJECTS\3588.0097 w z z DIVISION 15000 - MECHANICAL SECTION 15001 - BASIC MECHANICAL REQUIREMENTS A. GENERAL CONDITIONS 1. THE DRAWINGS AND GENERAL CONDITIONS, INCLUDING SUPPLEMENTARY GENERAL CONDITIONS SHALL APPLY TO ALL WORK IN DIVISION 15000. 2. THE CONTRACTOR FOR THIS DIVISION SHALL REVIEW THE DRAWINGS AND ACCOMPANYING SPECIFICATIONS, EXAMINE THE SITE, CHECK AS TO THE MEANS OF MAKING CONNECTIONS TO SERVICES, AND SHALL BECOME FAMILIAR WITH ALL THE EXISTING CONDITIONS AND LIMITATIONS BEFORE SUBMITTING A PROPOSAL. ANY APPARENT VARIANCES OF THE PLAN OR SPECIFICATION FROM THE EXISTING CONDITIONS AT THE SITE SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER DURING THE BID PERIOD SO THAT CLARIFICATION CAN BE MADE BY ADDENDUM. ITEMS KNOWN TO BE INCONSISTENT WrrH THE BID DOCUMENTS INTENT MUST BE LISTED AND QUALIFIED ON THE CONTRACTORS BID FORM. NO EXTRAS WILL BE ALLOWED BECAUSE OF THE CONTRACTORS MISUNDERSTANDING AS TO THE AMOUNT OF WORK INVOLVED OR HIS LACK OF KNOWLEDGE OF ANY SITE CONDITIONS WHICH MAY AFFECT HIS WORK. 3. COORDINATION OF SCHEDULING FOR COMPLETION AND ALL INSPECTIONS OF THEIR WORK AND WORK OF SUBCONTRACTORS IS THE RESPONSIBILITY OF THIS CONTRACTOR. 4. BEFORE SUBMITTING A PROPOSAL ON THE WORK CONTEMPLATED ON THESE DRAWINGS AND ACCOMPANYING SPECIFICATIONS, EACH BIDDER SHALL EXAMINE THE SITE, CHECK AS TO THE MEANS OF MAKING CONNECTIONS TO SERVICES, AND SHALL BECOME FAMILIAR WITH ALL THE EXISTING CONDITIONS AND LIMITATIONS. MECHANICAL EQUIPMENT AND SYSTEMS SHOWN AS EXISTING ON THE PLANS HAVE BEEN BASED ON EXISTING DRAWINGS. NO EXTRAS WILL BE ALLOWED BECAUSE OF THE CONTRACTOR'S MISUNDERSTANDING AS TO THE AMOUNT OF WORK INVOLVED OR HIS LACK OF KNOWLEDGE OF ANY SITE CONDITIONS WHICH MAY AFFECT HIS WORK. ANY APPARENT VARIANCE OF THE PLAN OR SPECIFICATION FROM EXISTING CONDITIONS AT THE SITE SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER DURING THE BID PERIOD SO CLARIFICATION CAN BE MADE BY ADDENDUM. 5. INFORMATION FOR ITEMS WHICH MAY AFFECT THE BID ARE LISTED ON THE RESPONSIBILITY SCHEDULE WHICH IS ON THE PLANS. SECTION 15002 - GENERAL REQUIREMENTS 1. WORK TO BE ACCOMPLISHED ON THESE DRAWINGS AND SPECIFICATIONS INCLUDES FURNISHING ALL LABOR, MATERIAL, EQUIPMENT AND SERVICES FOR THE COMPLETION OF ALL MECHANICAL WORK. ALL MECHANICAL WORK UNLESS NOTED TO BE SPECIFICALLY BY THE OWNER IS THE RESPONSIBILITY OF THIS CONTRACTOR. 2. THIS CONTRACTOR AND THEIR SUB CONTRACTORS SHALL WORK CLOSELY WITH THE PROJECT MANAGER/SUPERINTENDENT FOR COORDINATION OF TRADES AND COMPLETION OF THE PROJECT. 3. PLANS AND SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS CALLED FOR IN EITHER ONE SHALL BE AS BINDING AS IF CALLED FOR IN BOTH. ANY ITEM OR LABOR THAT IS NECESSARY TO COMPLETE THE WORK AND IS TYPICALLY INCLUDED IN SIMILAR WORK SCOPE SHALL BE FURNISHED AND INSTALLED AS PART OF THE CONTRACT WHETHER OR NOT IT IS SHOWN ON THE PLANS OR IN THE SPECIFICATIONS. 4. WHEN THE INCLUDED DRAWINGS AND/OR SPECIFICATIONS CALL OF ITEMS WHICH EXCEED CODE, IT'S THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL THE MORE STRINGENT REQUIREMENTS NOTED ON THE PLANS AND/OR SPECIFICATIONS. IF THE PLANS AND SPECIFICATIONS HAVE DISCREPANCIES BETWEEN THEM, THE CONTRACTOR SHALL ASSUME IN THEIR BID THAT THE MORE STRINGENT ITEM IS REQUIRED AT NO ADDITIONAL COST. 5. ALL PIPING, DUCTWORK AND EQIJIPMENT SHALL BE FURNISHED AND INSTALLED TO PRESENT A NEAT AND CLEAN APPEARANCE USING GOOD CONSTRUCTION PRACTICES. EQUIPMENT SHALL BE INSTALLED FOR PROPER ACCESS TO OPERATE, SERVICE AND MAINTAIN THE EQUIPMENT WITHOUT HAVING TO MOVE OTHER EQUIPMENT FOR ACCESS. ANY MECHANICAL EQUIPMENT (OR EXISTING EQUIPMENT TO REMAIN) THAT REQUIRES ACCESS PANELS SHALL HAVE THOSE PANELS FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR. 6. UNLESS SPECIFICALLY NOTED ON THE PLANS/SPECIFICATIONS ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND BEST QUALITY TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE CODES GOVERNING THE WORK INVOLVED AND BE MADE BY NATIONALLY RECOGNIZED MANUFACTURES WITH UL LISTINGS AND LABELS. SECTION 15003 - CODES 1. ALL WORK SHALL BE INSTALLED IN CONFORMITY OF THE OWNERS CRITERIA, AND APPLICABLE LOCAL CODES AND ORDINANCES AND STATE STATUTES. ALL REQUIREMENTS OF THE CURRENT PLUMBING CODES, HEATING AND VENTILATION CODES, HEALTH AND SAFETY CODES, NFPA CODES AND ENERGY CODES MUST BE MET. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INQUIRE INTO AND COMPLY WITH ALL LOCAL ORDINANCES AND INCLUDE ANY ADDITIONAL ITEMS NOT NOTED IN THE PLANS/SPECIFICATIONS IN THEIR BID. ANY CHANGES TO THE MECHANICAL SYSTEM AS REQUIRED BY LOCAL OR STATE CRITERIA THAT ARE NOT QUALIFIED ON THE CONTRACTORS BID FORM ARE ASSUMED TO BE INCLUDED IN THE ORIGINAL 13ID AND ADDITIONAL COSTS WILL NOT BE DUE TO COMPLETE THOSE ITEMS AFTER THE CONTRACT IS ISSUED. SECTION 15004 - LICENSES, PERMITS, INSPECTIONS & FEES 1. THIS CONTRACTOR IS RESPONSIBLE FOR ALL FEES, CHARGES AND OBLIGATIONS FOR OBTAINING PERMITS AND INSPECTIONS FOR PLUMBING, HEATING AND VENTILATION AND FIRE EXTINGUISHING WORK. 2. ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTIONS SHALL BE TURNED OVER TO THE PROJECT MANAGER AT THE COMPLETION OF THE PROJECT. SECTION 15005 - TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. IN ANY CASE WHERE A SPECIFIC NAME OF EQUIPMENT OR MATERIAL IS MENTIONED ON THE DRAWINGS OR SPECIFICATIONS THE EXACT EQUIPMENT SHALL BE USED FOR THE BASE BID. EQUIPMENT OF EQUAL GRADE AND QUALITY WILL BE SUBJECT TO PRIOR APPROVAL BY THE PROJECT MANAGER AND THE ENGINEER IN WRITING THRU THE SHOP DRAWING SUBMITTAL PROCESS. ANY EQUIPMENT INSTALLED WITHOUT WRITTEN APPROVAL WILL BE CHANGED OUT TO THE SPECIFIED EQUIPMENT AT THE CONTRACTORS EXPENSE. 2. MECHANICAL CONTRACTOR SHALL SUBMIT 3 COPIES OF SHOP DRAWINGS TO THE PROJECT MANAGER FOR APPROVAL. IF APPROVED, COPIES WILL BE STAMPED "NO EXCEPTIONS" OR "APPROVED AS NOTED" AND WILL BE RETURNED TO THE CONTRACTOR. IF NOTATIONS AND MARKS INDICATE THAT REVISED INFORMATION IS REQUIRED, THEN CORRECTED INFORMATION SHALL BE SUBMITTED. SECTION 15006 - GUARANTEE 1. THIS CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR AND DEFECTS WHICH MAY DEVELOP IN ANY PART OF THE SYSTEMS CAUSED BY FAULTY WORKMANSHIP, MATERIAL OR EQUIPMENT, AND AGREES TO REPLACE ANY SUCH FAULTY WORKMANSHIP, MATERIAL OR EQUIPMENT DURING A PERIOD OF 12 MONTHS FROM THE DATE OF FINAL ACCEPTANCE WITHOUT ANY COST TO THE OWNER. 2. EACH PIECE OF EQUIPMENT FURNISHED BY THE CONTRACTOR SHALL HAVE A 12 MONTH WARRANTY FOR MATERIAL AND LABOR AT STARTS UPON THE DATE OF FINAL ACCEPTANCE AS DESIGNATED BY THE PROJECT MANAGER. ALL COSTS FOR THE WARRANTY (MATERIAL AND LABOR) SHALL BE INCLUDED IN THE ORIGINAL BID. SECTION 15007 - RECORD DRAWINGS 1. THIS CONTRACTOR SHALL MAINTAIN AT THE JOB SITE A SET OF DRAWINGS TO BE USED SPECIFICALLY FOR RECORDING CHANGES FROM THE CONTRACT DOCUMENTS. THE INFORMATION SUCH AS VALVES, DUCT AND PIPE DEVIATIONS SHOULD BE DIMENSIONED FROM EASILY RECOGNIZABLE REFERENCE POINTS INDICATING BOTH HORIZONTAL AND VERTICAL DISTANCES. 2. THE CONTRACTOR SHALL SUBMIT A FINAL SIGNED SET OF AS -BUILT DRAWINGS TO THE PROJECT MANAGER AT THE COMPLETION OF THE PROJECT. 3. THE CONTRACTOR SHALL SUBMIT TO THE PROJECT MANAGER AT THE END OF THE PROJECT (2) COMPLETE HARD BOUND SET OF CATALOG DATA, MANUFACTURES LITERATURE, DETAIL MANUALS COVERING THE OPERATION AND MAINTENANCE OF ALL EQUIPMENT SPECIFIED. SECTION 15008 DISCREPANCIES IN DOCUMENTS 1. THE DRAWINGS OF PIPING AND DUCTWORK SYSTEMS SHALL BE INSTALLED SUBSTANTIALLY AS SHOWN ON THE PLANS. THE EXACT POSITION OF EACH AND EVERY PIPE, DUCT, OFFSET AND TRANSITION CANNOT BE GIVEN BY SCALING THE DRAWINGS BUT SHALL IN EVERY CASE BE PLACED SO AS TO AVOID INTERFERENCE WITH OTHER WORK. ALL NECESSARY CHANGES IN THE LOCATION OF PIPE OR DUCTWORK FOR ITS PROPER INSTALLATION AND TO AVOID CONFLICT WITH OTHER TRADES SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL CHARGE. SECTION 15009 DEMOLITION 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 2. EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH THE GENERAL CONTRACTOR FOR THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. 3. CONTRACTOR MUST VERIFY WITH THE OWNER ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. 4. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. 5. IF REQUIRED BY OWNER OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION WITH THE GENERAL CONTRACTOR AND OWNER PRIOR TO BID AND INCLUDE IN BID PROPOSAL AS DIRECTED BY THE GENERAL CONTRACTOR AND OWNER. SECTION 15010 - CUTTING AND PATCHING 1. THIS CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF HIS EQUIPMENT IN THE BUILDING WALLS, PARTITIONS, FLOORS, CEILINGS, ETC., UNLESS OTHERWISE NOTED. ALL CUTTING AND PATCHING SHALL BE SUBJECT TO THE DIRECTION OF THE OWNER, ARCHITECT OR ENGINEER. 2. THIS CONTRACTOR SHALL NOT ENDANGER THE STABILITY OF THE STRUCTURE BY CUTTING, DIGGING OR OTHERWISE ALTERING THE STRUCTURE AND SHALL NOT AT ANY TIME CUT OR ALTER WORK OF ANY OTHER CONTRACTOR. 2. PATCHING OF WALLS, FLOORS AND ROOF SHALL BE OF SAME MATERIAL AND WORKMANSHIP OF THE SURROUNDING MATERIAL WITH FINISHED SURFACE APPEARING THE SAME AS THE SURROUNDING AREAS. ALL PATCHING SHALL BE PERFORMED BY WORKMEN SKILLED IN THAT PARTICULAR TRADE. 3. DAMAGE CAUSED BY THE CONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR IN A SUITABLE MANNER ACCEPTABLE TO THE OWNER AND PROJECT MANAGERS. SECTION 15011 - SLEEVES 1. THIS CONTRACTOR SHALL INSTALL SLEEVES IN CONNECTION WITH ALL PIPES PASSING THROUGH ALL WALLS, PARTITIONS AND FLOORS. SLEEVES SHALL EXTEND THROUGH FULL THICKNESS OF WALLS AND FLOORS AND SHALL BE CUT FLUSH WITH THE FINISHED SURFACES. SLEEVES IN SLABS SHALL BE CUT 2" ABOVE THE FLOOR SURFACE. 2. ALL SLEEVES SHALL BE 22 GAUGE GALVANIZED STEEL MINIMUM FINISHED WITH A SMOOTH EDGE AND PROPERLY SUPPORTED. 3. CORE DRILLING FLOORS AND WALLS MUST BE COORDINATED WITH THE OWNER AND THE PROJECT MANAGER. 4. THIS CONTRACTOR SHALL FURNISH AND INSTALL FIRE STOPPING AT ALL PENETRATIONS THRU RATED FLOORS TO MAINTAIN THE FIRE RATING. 3M FIRE BARRIER SYSTEMS, FLAME SAFE FIRE RETARDANT SYSTEMS, DOW CORNING, SPECSEAL OR EQUAL. THE CONTRACTOR MUST PRESENT UL LISTING DATA SHEETS TO THE PROJECT MANAGER/SUPERINTENDENT AND OWNER TO SHOW THAT THE PENETRATIONS MAINTAIN THE FIRE RATING. SECTION 15012 - HANGERS 1. FURNISH AND INSTALL BRACKETS, BRACES OR REINFORCING ANGLES AS REQUIRED FOR ALL PARTITIONS NOT SUFFICIENT IN THEMSELVES TO SUPPORT PLUMBING FIXTURES OR OTHER EQUIPMENT. 2. PIPING SHALL BE SUSPENDED FROM CONSTRUCTION ABOVE WITH ANGLE IRON, CLAMPS, UNISTRUT, OR HANGER RODS. NO PIPING SHALL BE HUNG FROM OTHER PIPING EXISTING OR NEW. CONTRACTOR SHALL COORDINATE WITH ALL CODES. 3. ALL PIPES WHICH ARE SPECIFIED TO BE INSULATED SHALL HAVE PREFABRICATED INSULATED METAL SADDLES SIZED FOR THE INSULATION THICKNESS AND CONTINUOUS INSULATION THROUGH THE HANGER. ALL DISSIMILAR METALS MUST BE SEPARATED WITH DIELECTRIC MATERIAL. DIVISION 15300 - FIRE PROTECTION SECTION 15302 - MATERIALS A. SPRINKLER HEADS: 1. ALL SPRINKLER HEADS SHALL BE NEW U.L., F.M. LISTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY GRINNELL, RELIABLE, STAR, OR VIKING. 2. ALL SPRINKLER HEADS SHALL BE QUICK RESPONSE RATED FOR 165'F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODES. 3. VERIFY HEAD TYPES AND COLORS WITH OWNER AND SUBMIT WITH SPRINKLER DRAWINGS FOR PERMIT. 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY OWNER AND THE LOCAL FIRE PROTECTION OFFICIAL BEFORE INSTALLATION. A. RETAIL SALES AREA ACT LAY -IN CEILING - SEMI -RECESSED WITH WHITE ESCUTCHEONS AND WHITE HEADS. GYP BOARD HARD LID CEILING - FULLY RECESSED CONCEALED HEADS PAINT COVERPLATES TO MATCH ADJACENT GYP BOARD. B. STOCKROOM OPEN CEILING - ROUGH BRONZE UPRIGHT HEAD. LAY -IN CEILING - SEMI -RECESSED. B. PIPING: 1. SCHEDULE 40, BLACK STEEL PIPE, ASTM A-53 FOR FERROUS PIPING, WELDED AND SEAMLESS, ANSI B-36-10-70 FOR WROUGHT STEEL PIPE. 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER. 4. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE. 5. HANGERS SHALL COMPLY WITH CODE REQUIREMENTS. C. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE WITH OTHER TRADES. D. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW REQUIREMENTS OF THIS DESIGN AND INCLUDE ALL COSTS TO RAISE OR RELOCATE EXISTING PIPING TO OBTAIN CEILING HEIGHTS SHOWN ON DRAWINGS. THE CONTRACTOR SHALL CONNECT AND EXTEND NEW PIPING AS REQUIRED. VERIFY ALL REQUIREMENTS PRIOR TO BID. E. PROVIDE AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY LOCAL INSPECTOR, OR OWNER'S INSURANCE CARRIER. F. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED BY THEM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. G. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES" SHALL BE FURNISHED TO THE OWNER, AUTHORITIES HAVING JURISDICTION AND ENGINEER FOR REVIEW. H. ONLY DRY TYPE SIDEWALL HEADS SHALL BE INSTALL IN DRYER PLENUM SPACE BEHIND DRYERS. NO WET SPRINKLER PIPING IS ALLOWED BEHIND DRYERS. GENERAL NOTES . Work to be accomplished on these Drawings and the accompanying specifications includes the furnishing of all labor, materials, equipment, and services necessary for the proper completion of all mechanical work. SECTION 15301 - SUMMARY OF WORK 1. THE CONTRACTOR IS REQUIRED TO FURNISH AND INSTALL ALL NECESSARY MATERIAL, EQUIPMENT AND LABOR FOR A WET SPRINKLER SYSTEM TO MEET THE OWNERS CRITERIA AND LOCAL CODES. THE CONTRACTOR SHALL BE REQUIRED TO HAVE DESIGN DRAWINGS COMPLETED BY A CERTIFIED FIRE SPRINKLER DESIGNER AND COPIES OF THE HYDRAULIC CALCULATIONS AND PLANS ALONG WITH SHOP DRAWINGS OF THE HEADS, SHALL BE SUBMITTED TO THE STATE FIRE MARSHALS OFFICE OR LOCAL AUTHORITY HAVING JURISDICTION FOR PLAN REVIEW AND APPROVAL. ON OR BEFORE THE TIME THE PLANS AND CALCULATIONS ARE SUBMITTED TO THE STATE FOR APPROVAL, THEY SHOULD BE SUBMITTED TO THE PROJECT MANAGER AND ENGINEER FOR REVIEW. 2. THE EXISTING WET SPRINKLER SYSTEM SHALL BE REVISED MEET NFPA-13 AND LOCAL AUTHORITY CRITERIA. 3. CONTRACTOR IS RESPONSIBLE FOR ALL FEES RELATED PERMITS AND TESTS AND INSPECTIONS. DIVISION 15500 - HEATING, VENTILATING, AIR CONDITIONING SECTION 15501 - SUMMARY OF WORK A. THIS CONTRACTOR SHALL FURNISH, INSTALL, TEST AND BALANCE ALL NECESSARY EQUIPMENT FOR A COMPLETE WORKING SYSTEM. SEE PLAN FOR DUCTWORK AND SCHEDULES. B. CONTROLS 1. COMMERCIAL THERMOSTAT WITH CONTROL FOR UP TO 2 -STAGES OF HEATING AND 2 -STAGES OF COOLING WITH FULL ECONOMIZER AND DEHUMIDIFICATION CONTROL SEQUENCES. PROVIDE REMOTE SENSORS AS INDICATED ON PLANS. VERIFY COMPATIBILITY WITH LANDLORDS REQUIREMENTS PRIOR TO INSTALLATION. 2. VERIFY COMPLETE OPERATION OF ALL MODES: HEAT, COOL, ECONOMIZER, OCCUPIED, UNOCCUPIED, DEHUMIDIFICATION, ETC. CONTRACTOR SHALL PROVIDE FULLY FUNCTIONAL SYSTEM AS APPROVED BY TENANT. ASSIST IN ANY NECESSARY TRAINING AND/OR PROGRAMMING PER TENANTS REQUIREMENTS. 3. COORDINATE CONTROL REQUIREMENTS AND SETTINGS WITH LANDLORD REQUIREMENTS PRIOR TO BID. IF REQUIRED PROVIDE ALL EQUIPMENT TO TIE INTO LANDLORD SYSTEMS. SECTION 15502 - MATERIALS A. SEE PLANS FOR SCHEDULES AND DETAILS OF EQUIPMENT. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE ALL REQUIREMENTS WITH LANDLORD. 1. THIS CONTRACTOR SHALL PROVIDE ALL NECESSARY PARTS AND LABOR INCLUDING BUT NOT LIMITED TO FANS, BELTS, PULLEYS, BEARINGS, DAMPERS, COILS AND MOTORS AS REQUIRED TO OBTAIN A FULLY OPERATIONAL UNIT THAT MEETS OR EXCEEDS THE DESIGN QUANTITIES SET FORTH IN THESE DOCUMENTS INCLUDING BUT NOT LIMITED TO CAPACITY, CFM AND EXTERNAL STATIC PRESSURE. B. DUCTWORK - FIBERGLASS DUCT BOARD IS NOT APPROVED 1. ALL SUPPLY, RETURN, EXHAUST AND RELIEF DUCTWORK SHALL BE GALVANIZED STEEL SHALL BE MANUFACTURED (GAUGES, REINFORCEMENT AND CONNECTIONS), AND INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA "HVAC DUCT CONSTRUCTION STANDARDS". 2. ALL ELBOWS SHALL HAVE A MINIMUM THROAT RADIUS OF ONE HALF THE DUCT WIDTH OR SHALL BE PROVIDED WITH TURNING VANES. 3. HANG DUCTWORK FROM STRUCTURE ACCORDING TO SMACNA STANDARDS. CONTRACTOR SHALL BE REQUIRED TO INSTALL SEISMIC BRACING AS REQUIRED BY LANDLORD CRITERIA AND/OR LOCAL CODES. 4. ALL DUCT JOINTS AND LONGITUDINAL SEAMS SHALL BE SEALED WITH A WATER BASED DUCT SEALER, DURO DYNE "DUROSEAL" OR APPROVED EQUAL. 5. PROVIDE FLEXIBLE DUCT CONNECTIONS CONSTRUCTED OF NEOPRENE -COATED FLAMEPROOF FABRIC AT EQUIPMENT INLET AND OUTLET TO ISOLATE VIBRATION. 6. THE FINAL 4' OF DUCTWORK TO THE AIR DEVISE MAY BE FLEXIBLE CLASS 1 DUCT WITH R-5 INSULATION AND FOIL VAPOR BARRIER. DUCTWORK MUST MEET LOCAL REQUIREMENTS AND LANDLORDS CRITERIA. 7. THE FIRST 15 FT OF DUCTWORK FROM THE ROOFTOP UNIT SHALL BE INTERNALLY LINED WITH 1 IN FIBROUS GLASS DUCT LINER WITH ANTI -MICROBIAL COATING FOR CONDENSATE AND NOISE. 8. ALL SUPPLY TAKE -OFFS SHALL HAVE AIR SCOOP AND MANUAL VOLUME DAMPER WITH QUADRANT LOCKING HANDLE FOR BALANCING. WHERE DUCTWORK IS LOCATED ABOVE A GYPSUM BOARD CEILING, A CABLE CONTROLLED DAMPER OPERATOR SHALL BE FURNISHED, YOUNG REGULATOR COMPANY OR EQUAL. Before submitting a proposal on the work contemplated on these drawings and accompanying specifications, each bidder shall examine the site, check as to the means of making connections to services, and shall become familiar with all the existing conditions and limitations. No extras will be allowed because of the contractor's misunderstanding as to the amount of work involved or his lack of knowledge of any site conditions which may affect his work. Any apparent variance of the plan or specification from existing conditions at the site shall be called to the attention of the Engineer during the bid period so clarification can be made by addendum. Existence of any wires, conduits, pipes, ducts, or other facilities are shown in a general way only. It will be the duty of the contractor to visit the site and make exact determination of the existence of any such facilities prior to the submission of his bid. It is understood that he will be responsible for making the exact determination of the location and condition of such facilities. 4. All required fees, permits, and inspections shall be obtained and/or arranged for by the contractor under the section of the Specifications for which they are required. 5. Regular inspections shall be arranged by the contractor as required by any and all regulations. All charges from regulating agencies for inspections of installations or review of plans and Specifications shall be paid by the contractor. 6 Contractor to provide Certificate of Final Inspection. 7 All materials and workmanship shall comply with all current and applicable codes, specifications, ordinances, laws, regulations, industry standards, and utility company regulations. 8 In case of difference among building codes, specifications, state laws, local ordinances, industry standards, and utility company regulations and the Contract Documents, the most stringent shall govern. Contractor shall promptly notify the Engineer in writing of any such difference. 9 All applicable federal, state, and local laws and ordinances shall be adhered to throughout the construction project. 10. Non -Compliance. Should the contractor perform any work that does not comply with the requirements of the applicable building codes, state laws, local ordinances, industry standards, and utility company regulations, he shall bear all costs arising to correct the deficiencies. 11. Contractor shall initiate, maintain, and supervise all safety pre -cautions required for his work, including regulations of the Occupational Safety and Health Administration (OSHA). 12. Drawings are to scale as noted, but the contractor shall refer to Architectural and Structural Drawings for exact location of partitions, walls, beams, shafts, equipment, etc. 13. Each trade shall obtain drawings and specifications of all other trades and coordinate his work with all other trades. 14. Drawings show the general arrangement of ductwork, piping, equipment, and appurtenances and shall be followed as closely as actual building construction and work of other trades will permit. Mechanical work shall conform to the requirements shown on all of the drawings. Architectural and Structural Drawings shall take precedence over Mechanical Drawings. Because of the small scale of the Mechanical Drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. 15. Discrepancies discovered before or after work has started shall be brought to the attention of the Engineer immediately, and the Engineer reserves the right to require minor changes in the work of any contractor to eliminate such discrepancies with no change in contract cost. 16. Plans and specifications are complementary, and what is called for in either one shall be as binding as if called for in both. 17. Where a disagreement exists between the plans and specifications, the item or arrangement of better quality, greater quality, or higher cost shall be included in the bid. 18. Normal use of the facility shall not be disturbed, except within the immediate construction area. All walks, driveways, and entrances shall be kept clear and free of all contractor's equipment, material, and debris at all times. 19. All materials and equipment shall be stored in such a place and in such a manner that a minimum of congestion will result. the placing of such materials and equipment shall be subject to the approval of the owner. 20. Contractor shall thoroughly examine the existing building with regard to what temporary measures he must take in order to permit the owner to occupy specific areas of the building during the various construction phases. in general, systems must remain in use in those designated areas to permit the owner to function in a pre -construction manner. 21. Each contractor shall coordinate work with other trades in the installation of equipment, piping, conduit, and ductwork. 22. HVAC/sheet-metal contractor shall initiate the coordination process by providing reproducible plan drawings showing ductwork and equipment. 23. Drawings to be forwarded to the piping contractor and electrical contractor for inclusion of their systems work. 24. Contractors shall solve all coordination conflicts among themselves when possible. Engineer will arbitrate when necessary, and his judgment will stand, with no additional cost to the owner. 25. Access panels shall be furnished by the trade requiring them and delivered to the general contractor for installation. 26. Access panels shall be as manufactured by Milcor, or approved equal, and of type the is compatible with construction and finish of the wall and/or ceiling 27. Each trade shall perform all cutting and patching necessary in order to perform the work, unless such work has been delegated to the general contractor/another trade. However, special permission shall be obtained from the engineer before cutting structural members or finished materials. All patching shall be performed in such manner as to leave no visible trace and to return the part affected to the condition of undisturbed work. Patching work shall be performed by persons experienced, skilled, and licensed for the particular type of work involved. Inferior work will not be accepted. All holes in masonry shall be drilled with rotary drills. Impact tools shall not be used. 28. Each trade shall bear the expense of all cutting, patching, repairing, or replacing of the work of other trades required because of his fault, error, or tardiness of because of any damage done by him. 29. Each trade shall provide all holes and openings required for his work, unless such holes and openings are shown to be provided on the architectural or structural drawings. 30. Each trade shall remove existing work that is shown, specified, or obviously necessary for completion of his work. Owner shall have the option of retaining any item or material removed under this contract. Items or materials not retained by owner shall become the property of the trade and shall be removed from the premises. 31. Each trade shall periodically clear away all debris, surplus materials, etc., resulting from his work or operations, leaving the job and the equipment furnished under any or all contracts in a clean condition. 32. Each trade shall test the equipment provided and/or installed under the specification and shall demonstrate its proper operation to the owner's operating engineer. 33. Each trade shall furnish, without additional expense to the owner, the services of competent instructors, who will give full instruction in the care, adjustment, and operation and maintenance of all parts of the equipment to the owner's permanent employees - who are to have charge of the equipment. 34. HVAC subcontractor shall be responsible for tested & rated fire stop systems for all thru-penetration of walls, floors & roof assemblies resulting from piping & other work under his contract. refer to specification section for fire stopping for requirements. 35. All wood nailers and other lumber which is installed in contact with metal, concrete, or masonry shall be pressure treated against decay (unless otherwise noted). C. TESTING, ADJUSTING, AND BALANCING 1. THE ADJUSTING AND BALANCING OF THE AIR FLOW THROUGHOUT THE FACILITY SHALL BE PERFORMED BY AN NEBB OR AABC CERTIFIED AIR BALANCER AS HIRED BY THE MECHANICAL CONTRACTOR. THE BALANCING SHALL TAKE PLACE AFTER THE FINAL PUNCH LIST. THE BALANCING CONTRACTOR SHALL VERIFY THAT ITEMS ON THE PUNCH LIST EFFECTING THE AIR BALANCE REPORT ARE COMPLETED PRIOR TO STARTING THE AIR BALANCE. THE MECHANICAL CONTRACTOR SHALL PROVIDE ASSISTANCE TO THE TESTING AND BALANCING CONTRACTOR BY MAKING ADJUSTMENTS TO THE SYSTEM AND SYSTEM COMPONENTS REQUIRED FOR ACHIEVING DESIGN PERFORMANCE. THE BALANCING REPORT SHALL INCLUDE AT MINIMUM THE FOLLOWING: A. CERTIFICATION NUMBER OF THE AIR BALANCER. B. CALIBRATION DATES AND INFORMATION ON THE EQUIPMENT USED FOR BALANCING. C. ITEM BEING TESTED WITH MAKE, MODEL AND SERIAL NUMBERS D. AIR CFM AT INLET AND OUTLET OF SUPPLY UNIT (PRELIMINARY READING, FIRST ADJUSTMENT, SECOND ADJUSTMENT) D. AIR CFM AT DISTRIBUTION POINT (PRELIMINARY READING, FIRST ADJUSTMENT, SECOND ADJUSTMENT). EACH GRILLE, REGISTER, DIFFUSER SHALL BE LABELED ON A MASTER PLAN THAT SHOULD BE INCLUDED IN THE FINAL REPORT. E. MOTOR AMP READINGS AFTER EACH ADJUSTMENT. F. MOTOR AND FAN RPM READINGS AFTER EACH ADJUSTMENT. G. STATIC PRESSURE AT UNIT INCLUDING, INLET, OUTLET AND TOTAL. H. OUTSIDE AIR CFM. I. SUBMIT (4) COPIES OF THE AIR BALANCE REPORT TO THE TENANT'S PROJECT MANAGER. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 8 2017 City Of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA NOV 30 2017 PERMIT CENTER BRUCE M. CARLSON arcnitcctura • planning • interior assign BRUCE M. CARLSON ARCHITECT, PLLC 800 WASHINGTON AVE. N., SUITE 208 MINNEAPOLIS, MN 55401-1148 PHONE: (612) 547-1300 FAX: (612) 547-1301 CONTACT: TROY HUFFER thuffer@cmarch.com CONSULTANTS: EMANUELSON-PODAS, INC. 7705 E. BUSH LAKE RD. EDINA, MN 55439 PHONE: (952) 930-0050 SEAL: MICHAEL A. WEBERT SIGNATURE 11-15-2016 DATE ISSUED 45575 REG. NO. WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL TUKWILA, WA 98188 SPACE #:985 - IN -LINE STORE DESIGN SHEET TITLE: MECHANICAL SPECIFICATIONS REVISIONS: NO: DATE: 0 11.15.2017 BY: PERMIT SET PROJECT NO: 3588.0097 DRAWN BY: JMH M3.0 COPYRIGHT BRUCE M. CARLSON ARCHITECT, PLLC 2017