Loading...
HomeMy WebLinkAboutPermit M17-0170 - WOODRIDGE PARTNERS - A/C UNITSWOODRIDGE PARTNERS LLC 11521 E MARGINAL WAY S 100 MIT0170 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 1023049076 11521 E MARGINAL WAY S 100 Project Name: WOODRIDGE PARTNERS LLC Permit Number: M17-0170 Issue Date: 1/24/2018 Permit Expires On: 7/23/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WOODRIDGE PARTNERS LLC 11521 E MARGINAL WAY #100 , SEATTLE, WA, 98168 DARLA DOLL 7717 DETROIT AVE SW , SEATTLE, WA, 98106 Phone: (206) 768-4278 MACDONALD/MILLER FAC SOL INC Phone: (206) 768-4180 PO BOX 47983 , SEATTLE, WA, 98146- 7983 MACDOFS980RU Expiration Date: 1/4/2019 //1 DESCRIPTION OF WORK: DEMO AND DISPOSE OF (5) ROOFTOP GAS/ELECTRIC A/C UNITS PER EPA REGULATIONS . PROVIDE AND INSTALL (5) NEW GAS/ELECTRIC A/C UNITS OF SAME SIZE AND CAPACITY OF EXISTING CURBS. CURB ADAPTORS REQUIRED. RECONNECT TO EXISTING NATURAL GAS AND CONTROL WIRING. PROVIDE AND INSTALL (5) NEW ELECTRICAL DISCONNECTS AND WHIP CONNECTS TO NEW UNITS. REPLACE EXISTING THERMOSTATS WITH NEW PROGRAMMABLE UNITS. Valuation of Work: $49,787.00 Type of Work: REPLACEMENT Fuel type: GAS Fees Collected: $863.76 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Permit Center Authorized Signature: Date: I:2 -11%1e I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: h6kALQAA. Print Name: L -1 f sex\ ' 12-e L 1 - Date: 1I 1 b This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 2: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 4: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 5: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 6: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 7: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 8: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 9: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 10: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 11: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 12: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 13: Readily accessible access to roof mounted equipment is required. 14: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 15: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 16: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 17: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 18: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 19: ***MECHANICAL PERMIT CONDITIONS*** 20: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 21: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 0703 1800 0705 0701 0702 FIRE FINAL MECH EQUIP EFF MECHANICAL FINAL REFRIGERATION EQUIP ROUGH -IN MECHANICAL SMOKE DETECTOR TEST a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWW Community Development Department Prr?, it Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No.11‘ t 017 6 Project No. Date Application Accepted: (' 1 H y 17 Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 1023049076 11521 E MARGINAL WAY S,Tukwila, WA WOODRIDGE PARTNERS LLC PROPERTY OWNER Name: WOODRIDGE PARTNERS LLC Address: 11521 E MARGINAL WAY S, City: TUKWILA State: WA Zip: 98198 CONTACT PERSON — person receiving all project communication Name: Joyce Copley Address: 7717 Detroit Ave SW City: Seattle State: WA Zip: 98106 Phone: (206) 406-2614 Fax: (206) 905-3749 Email: joyce.copley@MACMILLER.COM Suite Number: Floor: 100, Roof New Tenant: ❑ Yes ®..No MECHANICAL CONTRACTOR INFORMATION Company Name: MacDonald Miller Address: 7717 Detroit Ave SW Cit': Seattle State: WA Zip: 98106 Phone: (206) 905-3748 Fax: (206) 905-3749 Contr Reg No.: MACDOFS980RU Exp Date: 04/01/2019 Tukwila Business License No.: BUS -0994318 Valuation of project (contractor's bid price): $ 49,787 Describe the scope of work in detail: Demo and dispose of (5) rooftop gas/electric AC units per EPA regulations. Provide and install (5) new gas/electric AC units of same size and capacity of existing curbs. Curb adapters required. Reconnect to existing natural gas and control wiring. Provide and install (5) new electrical disconnects and whip connections to new units. Replace existing thermostats with new prograJnmabl Use: Residential: New ❑ Replacement ❑ Commercial: New Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications\Forms-Applications On Line12016 Applications\Mechanical Permit Application Revised I-4-16.docz Revised: January 2016 bh Page 1 of 2 Indicate type of mehanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 1 Air handling unit 65 dB(A) <10,000 cfin 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 1 Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 1 60 dB(A) 65 dB(A) f Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-1 OPM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (lam-lOpm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature:_ Date: 10/09/2017 Print Name: Joyce Copley Day Telephone: (206) 407-2614 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 CityState Zip H:\Applications\Forms-Applications On Line12016 Applications\Mechanical Permit Application Revised I-4-16.docx Revised: January 2016 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $863.76 M17-0170 Address: 11521 E MARGINAL WAY S 100 Apn: 1023049076 $863.76 MECHANICAL $830.54 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $631.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $166.11 TECHNOLOGY FEE $33.22 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12793 R000.322.900.04.00 0.00 $33.22 $863.76 Date Paid: Tuesday, November 14, 2017 Paid By: MACDONALD-MILLER FACILITY SOLU Pay Method: CHECK 4747 Printed: Tuesday, November 14, 2017 9:44 AM 1 of 1 C�SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit inspection Request Line (206) 438-9350 Proj ct: I�r��v- pi9r Type of Inspection: � (1e .„..1, t ioAL Address: 11.5-V.. n'1/ . % t../Date Special Instructions: Wanted: L0•'ZZ —ZOIg- rri. p.m. Requester: Phone No: Approved per applicable codes. Li Corrections required prior to approval. COMMENTS: 4--40avs Inspector's ca REINSPECTION FEE REQUIRED. Prior to next inspection, fele must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 vn�7-0I10 Project: M oDR)D6e PMZWefis Type of Inspection: m gcmul rill_ riM4q-c Address: 1/52/ Art /0/94.6700 -t_5 Date Called: - Special Special Instructions: /OD fir Pii3 C 5 R,T7 // Date Wanted: 10 --57---57-/j am ,�, p -.m. Requester: Phone No: 0 Approved per applicable codes. £9orrections required prior to approval. COMMENTS: /V5 t' J TT //OS. Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: /.1Rj)6 7�,es G6C Type of Inspection: / /C F/N*.. Address::Date 4452/ 4•; /i%/, 14/4Y Called: Special Instructions: /� Date Wanted: 2,f 1� Z Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ,fZ cess e /*Law� Inspector: Date: /8 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (206) 431-3670 11471/70 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 Prot -. -... r ,..k.) Typ . of 1 spectio _ / Address: ,1521 t ate Called: pecial instructions: € o 5 Row -Pp. Date Wante�J F% ! -- a.m. p. . I I Requester: C4441 5 r ne_` �� � TOP Phone No: Approved per applicable codes. COMMENTS: Corrections required prior to approval. .r.`D % /7-1 att/ 6-7 Inspector: Dater`/ i3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 /1/1-c)170 Project: d RJfrzj7Y " CL( Type of Inspection: pigCe 'C' L MSL Address: //5N 4 M > IVAY5 Date Called: Special Instructions: �� / FkW A 0P, Acyl- /41 AM -L /op z, 8125-7-- Date Wanted:—'' r 7,6p.m. Requester: Phone No: MaYA QO/Pa .riA Approved per applicable codes. E Corrections required prior to approval. COMMENTS: O4L--F Iw tNC 0k— Rbi 6]f - r46.c lj ic/7 3 k- 5446Aerf sklV%ar am x- /033 ie/ Inspector: Date: /6-i 8 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit Mr) 0 / 7Q /- -071 PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: jj ,,ah / /NOOD / -t 1,147-71m r s Type of Inspection: 1 -1/9 - Address: d Suite #: //cZ ! b-44 (ALS Contact Person: Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: 's -- //vchkficefr z New 'Ick kA Monitor: /6e G ,-- Pfrr ' f Permits: 21' Stl.44162 (bAcA Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: /5-3 Date: 9// 71/ j Hrs.: / . 0 / $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit .f/7- OHO PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: We C)Nc-e Type of Inspection: Address: / V Suite #: //S / b Cu C Contact Person: Special Instructions: Phone No.: Approved per applicable codes. ra—1 %C Corrections required prior to approval. COMMENTS: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: -- _F-K/__S -bdt_c-c-- r- o r- is - ..- ,o►°..Se a V w•-� l f�l 4r..e._ k ca r N �' V---71^- .\"--o 'q �1 r,�- IAC ( eNtg-"^ t /aC .ti Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: ? , 77// � Date: 2�/6/ E Hrs.: / p / $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 7/2/2018 City of Tukwila Department of Community Development DARLA DOLL 7717 DETROIT AVE SW SEATTLE, WA 98106 RE: Permit No. M17-0170 WOODRIDGE PARTNERS LLC 11521 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/15/2018. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/15/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M17-0170 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development November 29, 2017 JOYCE COPLEY 7717 DETROIT AVE SW SEATTLE, WA 98106 RE: Correction Letter # 1 MECHANICAL Permit Application Number M17-0170 WOODBRIDGE PARTNERS LLC - 11521 E MARGINAL WAY S Dear JOYCE COPLEY, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations)_ to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Provide engineer's calculations on regular size sheets. Reduced size sheets shall not be accepted. Drawings shall be drawn to an architectural scale. 2. Top sheet of engineer's calculations and each plan sheets shall have the registered design professional's Stamp, Signature and "Date" of that signature. See General Information Note above. 3. Provide manufacturer's specification sheets for the new units. Note: Contingent on response to these corrections, further plan review may request for additional corrections. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Sincerely, Bill Rambo Permit Technician File No. M17-0170 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 July 17, 2018 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Subject: Mechanical Permit M17-0170 - Extension Request q MacDonald -Miller FACILITY SOLUTIONS0 We make buildings work better. Our mechanical permit M17-0170 for work at 11521 E Marginal Way Suite 100 will expire Monday July 23, 2018. We failed our first fire inspection due to a requirement for a revised connection to the fire alarm system. The wiring revisions are being performed by a fire alarm contractor and they are having trouble allocating manpower to get the work completed. We believe the fire alarm work may have been completed today, however we are not certain that inspections can be scheduled before the mechanical permit expires. Please issue a 30 -day extension for our mechanical permit to allow time for scheduling the final inspections. • Thank you, Erryn Edrington Account Manager MacDonald -Miller Facility Solutions 206-331-1362 y 4k' YVRO OVA tIte/ 1/q (lc macmiller.com 1-800-962-5979 WASHINGTON & OREGON TOOT Job Name: MAC MILLER Prepared By: Unit Tag: YSC060G4RHA20 Quantity:1 #j? Trane Precedent Gas/Electric Packaged Rooftop Add- cos` Overview YSC060G4RHA**K000000001 A0B00000000000000 [Applicatio j[Unii Ski _j Supply Fan [ External Dimensions (in.) j[ Weight I EER -1 IEER/SEER r l External r____ DX cooling, !� 5 Ton(060)I Airflow J� Static Pressure Height Width Length Minimum Maximum 12.0 EER 14.00 gas heat `^2000 cfm 0.500 in H20[i 3.41 ft jr 3.69 ft jL5.82 ft , 522.0 Ib.j[ 362 kg I Low Leak Econ -dry bulb 0 - Fresh Air Selection1`100%/bar rel 3p E pp y Typ Su I Fan/Drive/ MotorT a Standard drive motor — Panels/Filters Standard condenser coil I L Voltage/phase/hertz 460/60/3 L MCA1r12.90 A MOP, 20.00 A 1 [ Unit Controls Microprocessor controls 3ph Communications Option,Without communications _ _System Monitoring Controls 1 Without system monitoring controls System Monitoring Controls 2 FDD (Fault Detection & Diagnostics) 3 ph Entering Dry.Bulb:80.00 F Entering Wet Bulb 67.00 F ][ Ci — Leaving Coil Dry Bulb' 57.55 F ][ Capacity L__ Ambient Temp 95.00 F_ E--_ Leaving Coil Wet Bulb 57.55 F T Leaving Unit Dry Bulb, 59.50 F _ [ Leaving Unit Wet Bulb 58.30 F Gross Total 59.98 MBh Gross Sensible 49.30 MBh Net Total 57.39 MBh l [ 1 _ I [ Net Sensible 46.71 MBh _] Fan Motor Heat 2.58 MBh 1 ]�—Refrig Charge -circuit 11 4.4 Ib Refrigeration System Options Leaving Dew Point 57.56 F Heat Type. Gas Heat [ HeatingStages_�i� [�_� _ `��_ _ _Output Heating Capacity,�106.60 MBh r _ __ _� _ ihh Fan Output HeatingCapacity wt,109.07 MBh _ - Heating EATjt70.00 F _i __ Heating LATL119.60 F 2017-09-25 18:32:44Z REVIEWED FOR -T CODE COMPLIANCE APPROVED JAN 2 2 2018 City of Tukwila BUILDING DIVISION p Rise 49.60 F RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER Mid -o110 Page 1 of 11 Tl LL } Job Name: MAC MILLER Prepared By: Unit Tag: YS0000G4RHA20 Ouaniily: 1 ;Fan Section, Indoor Fan Data Typ j I C Centrifugal Dri�'-ve�Typ `Direct Xi. Viii45 Type',(Propeller i[ Fan.QuantitY[i 1 Drive T1 e�jDirect. Indoor Fan Performance- [ Airflowf [2000 cfm . • Design ESP:D.500 in H2O- Indoor Motor Operating Power,r0.81 bhp j Type FC Centrifugal ii - Drlve Type Direct Indoor Fan FLA 10.70 A . J Indoor Motor Power 0.60 kW �[ .,, , t ;; ,,;. •;.outdoor Fan Pertormance 6iiJ.,a.«,4 ac,z; s • i[ -Condenser Fan FLA b:70 A 1 '- Exhaust Fan Data ;x • iCompressor Section . Powe -r1{0.00 kW' • Circuit 1 RLA1[7.10 A _Circuit 2 RLA [0.00 A ;' Exhaust fan Performance mrAlteor **me Exhaust Fan FLA 2.50 A 2017.09.25 18:32:44Z Page 2 of 11 Job Name: MAC MILLER Prepared By: Unit Tag:YSC060G4RHA20 Quantity: 1 EVAPORATOR SECTION ACCESS PANEL TOP PANEL CONDENSER FAN CONDENSATE DRAIII (ALT) 3/4"-14 NPT CIA. HOLE 41/4° THROUGH THE BASE CONDENSATE 42 1/4 PLAN VIEW UNIT I RETURN 24" 18" ■ 9114` - 14' - 3 E/8" DILA EII SION DRAWING CONDENSER COIL UNIT CONTROL WIRE 7113" DIA. HOLE SERVICE GAUGE PORT ACCESS 13/8"DIA. HOLE ND- POWER WIRE CONTROL AND COMPRESSOR ACCESS PANEL 112" NPT GAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT, CONNECTI ON, AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION'S CONDENSATE 2017-09-25 18:32:44Z 3116' L SUPPLY IRETURN 143/4" 7-1 CONDENSER COIL UNIT CONTROL WIRE 7113" DIA. HOLE SERVICE GAUGE PORT ACCESS 13/8"DIA. HOLE ND- POWER WIRE CONTROL AND COMPRESSOR ACCESS PANEL 112" NPT GAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT, CONNECTI ON, AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION'S CONDENSATE 2017-09-25 18:32:44Z 3116' PACKAGED GAS / ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 L 718" 20 I /4" 4I O 95/8' 55/8' 0 I u u I 41/4"-- 5 9116"--- -.-- 7 5/8" 44'1/4" PACKAGED GAS / ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 2017-09-25 18:32:44Z Jc>h Name: MAC MILLER Prepared By: Unit Tag: YSC080G4RHA20 Quantity: 1 314"-14 !NPT DRAIN CONNECTION 23 9116" 1114" ISOMETRIC -PACKAGED COOLING Page 4 of 11 Joh Name: MAC MILLER Prepared By: Unit Tag: YSC060G4RI1A20 Quantity: 1 ELECTRICAL / GENERAL DATA 'GENERAL t{21t4») Model: Unit Operating Voltage' Unit Primary Voltage: Unit Secon dory Voltage Unit 0 ertz: Unit Phase: EE RISE ER Standard 14 otor MCA MIFS: MC B. YSCO60G 414-506 460 _CB. . 60 ,, 120/14.0 12.0 15.0 15.0 Oversized M oto r MCA: N/A MFS: NIA NIA Field Installed Oversized Mot or MCA N/A MFS: N/A MC El: NJA HEATING PERFORMANCE HEATING -GENERAL DATA Heating Model: High H eating Input (BTU}: 130,000 H eating Output (BTU): 106,600 Ito. Burners: 3 N o. Stages 1 Gas Inlet Pressure Natu rat Gas (MinIMbc): 4.5/14.0 LP (14in/Max) 11.0/14.0 Gas Pipe Connection Size: 1/2" INDOOR MOTOR Standard LI otor Number Horsepower Motor Speed (RPM):. Phase Full Load'. Amps:. Locked Rotor Amps 1 1.9 — 1 2.5 _ Oversized Motor Number. N/A Horsepower. N/A Motor Speed (RPM ):. N/A Phase N A Full Load Amps: NA Locked Rotor Amps: N A .field Installed Oversized M et or ttumber: WA Horsepower: N/A Motor Speed (RPM X NIA Phase NIA Fui)Load Amps 14!A LodtedRotorAmps WA COMPRESSOR Number: Horsepower. Phase: Rated Load Amps: Locked Rotor Amps: Circuit 12 1 4.3 3 7.1 52.0 OUTDOOR MOTOR Number: 1 H orse,pover. 0.40 Motor Speed (RPM): 1100 Phase: 1 Fut Load Amps: 0.7 Locked Rotor Amps 2.6 POWER EXHAUST ACCESSORY ('") (Field Installed Power E xhaust) Phase: NIA Horsepower: 0/A Motor Speed (RPM }: N/A Full Load Amps: 0/A Lo died Rotor Amps: NIA FILTERS Type: Throvsway Furnished: Yes Number 2 Recommended 20"x35'72" REFRIGERANT ( ) Type R-410 Factory Charge Crcuit#1 4.61b Comit 42 N/A NOTES: 1. M aximum (HACR)Circuit Breaker sizing is for installations in the United States only. 2. R efrigerant charge is an approximate value. For a more precise value, see unit nameplate and service instructions 3. Value does not in elude Power E xh Oust Accessory. 4. Value includes oversized motor. 5. Value does not in clude Power Exhaust Accessory. 6. E ER is rated at AH RI co•.nditio no and in accordance with DOE test procedures. 2017-09-25 18:32:442 Page 5 0111 Job Name: MAC MILLER Prepared By: - Unit Tag: YSC000G4RHA20 Quantity: 1 PACKAGED GAS 1 ELECTRICAL CORNER WEIGHT INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS ECONOMIZER 66.0 Ib M OTO R/ZE D OUTSIDE AIR DAMPER M ANU AL OUTSIDE AIR DAM PE R BAROMETRIC RELIEF OVERSIZED MOTOR BELT DRIVE MOTOR POWER EXHAUST THROUGH T THE BASE E LE CTRICAUGAS (FIOPS) UNIT MOUNTED CIRCUIT BREAKER (FIOPS) UNIT MOUNTEO DISCONNECT(FIOPS) POWERED CONVENIENCE OUTLET (FIOPS) HINGED DOORS (FIOPS) HAIL GUARD SMOKE DETECTOR, SUPPLY/ RETURN 7.01b NOVAR CONTROL STAINLESS STEEL HEAT EXCHANGER REHEAT ROOF CURB BASIC UNIT WEIGHTS CORNER WEIGHTS C ENTER OF GRAVITIY SHIPPING NET O 214.010 CO 52.0 5 (E) LENGHT (F) WIDTH 627.0 lb 522.015 BU 193.Olb ® 63.01b 33" lb' 1. AIIweights are approximate. 2- Weights for optionathat ere not list refer toInstallation guide. 3. The actual weight are fisted on the unit nameplate. 4. Refer to unit nameplate and installation guide for weights before scheduling transportation and installation of unit. 5. The weightshown represents the typical unit operating weight for the configuration selected. Estimated at +1- 10 % ofth a nameplate weight.. 6. Verify eight,.connection, end 81 dimension vathinstaller documents bet reinstallation. 7- Corner weights are given for inbimationonly. 8. N et/Shipping weight of optional accessories should be added to unit weight when ordering factory or field installed accessories PACKAGED GAS / ELECTRICAL RIGGING AND CENTER OF GRAVITY 2017-09-25 18:32:442 Page 6 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSC090G4R1-1A20 Ouant;ty: I CLEARANCE 36" CLEARANCE 4 8" DOWN FLOW CLEARANCE36" HORIZ ON TAL CLEARANCE 18" ROOF OPENING UNIT OUTLINE CLEARANCE 36" PACKAGED GAS / ELECTRIC CLEARANCE 40' 37' CLEARANCE FROM TOP OF UNIT 7? 44 1/2' 68 3/1F PACKAGED GAS / ELECTRIC DOWNFLOW TYPICAL ROOF OPEN ING 2017-09-25 18:32:44Z Page 7 0111 Jon Name: MAC MILLER Prepared By: Unit Tag: YSGCBOG4RHA20 Quantity: I CONOM IZE R HOOD BAROMETRIC RELIEF HOOD CONOMIZERHOOD LOW LEAK ECONOMIZER HOOD ACCESSORY 2017-09-25 18:32:44Z Page 8 o1 11 Job Name: MAC MILLER Prepared By: Unit Tag:YSCOBOG4RHA20 Quantity: General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B117. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers in the indoor air section shall be insulated with a cleanable foil - faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 1/8 inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back- up applications. Dual compressors are available on 71/2-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes Crankcase heaters are optional on YSC (036, 048, 060, 072, 090, 102, 120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120F,T/YHC074F, T/YHC092F,T/YHC102F, 120F). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3 to 5 ton units (high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3 to 5 ton units (standard and high efficiency 3-phase) have multispeed, direct drive motors. All 6 to 81/2 ton units (standard efficiency) shall have belt drive motors with an adjustable idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons, 6 ton (074), 71/2 to 81/2 (high efficiency) units have variable speed direct drive motors. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). 2017-09-25 18:32:44Z Page 9 of 11 Job Name: MAC MILLER Prepared By: Uri: Tag: YSCO60G4RHA20 Quantity: 1 Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. Evaporator coils are standard for all 3 to 10 ton standard efficiency models. Microchannel condenser coils are standard for all 3 to 10 ton standard efficiency models and 4, 5, 6, 7.5, 8.5 ton high efficiency models. The microchannel type condenser coil is not offered on the 4 and 5 ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. These all aluminum coils are recyclable. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A plastic, dual -sloped, removable and reversible condensate drain pan with through -the -base condensate drain is standard. Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti - short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall include control transformer and contactor High Pressure Control All units include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostat/zone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions 2017-09-25 18:32:44Z Page 10 of 11 Job Nam;: MAC MILLER Prepared Ry: lag' YSCO50G4RHA20 Quantity: (Gas/Electric Only). Supply and/or Return Air Smoke Detector Smoke detector shall be factory installed photoelectric smoke detector mounted in the return air section (with or without the economizer or motorized damper option), AND/OR in the supply air fan compartment. The detector will be wired for continuous power whenever the unit is energized. Upon detection of smoke, the detector will shut down all unit operations. Local codes may dictate the location of detectors. Note: Due to the shipping position of the economizer or motorized damper, the return air smoke detector will not be completely factory installed. The wiring harness for the detector will be routed and tied off in the fan compartment for shipping. The smoke detector and barometric damper hood will also be installed in a shipping position in the fan compartment. Frostat This option is to be utilized as a safety device. The Frostat opens when temperatures on the evaporator coil fall below 10°F. The temperature will need to rise to 50°F before closing. This option should be utilized in low airflow or high outside air applications. (Cooling with Electric Heat Only.) Frostat This option is to be utilized as a safety device.The Frostat opens when temperatures on the evaporator coil fall below 10°F.The temperature will need to rise to 50°F before closing.This feature should be utilized in low airflow or high outside air applications (cooling only). Supply, Return, and Plenum Air Smoke Detector With this option installed, if smoke is detected, all unit operation will be shut down. Reset will be manual at the unit. In order for the supply air smoke detector or return air smoke detector to properly sense smoke in the supply air stream or the return air stream, the air velocity entering the smoke detector unit must be between 500 - 4000 feet per minute. Equipment covered in this manual will develop an airflow velocity that falls within these limits over the entire airflow range specified in the evaporator fan performance table. Supply and/or Return Smoke Detectors may not be used with the Plenum Smoke Detector. 2017-09-25 18:32:44Z Page 11 of 11 Pay Building and Land Use Permit Fees - Seattle Department of Construction and Inspect... Page 1 of 1 seattlewgo • Departments I Services I Staff Directory SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS Help Pay Permit Fees Pay building and land use permit fees online Thank you for using the City of Seattle Department of Construction and Inspections's Online Permit Fee Payment system. This is a receipt confirming payment of fees for Permit #6617046. You may print this screen for your records. A copy of this information has also been emailed to permtis@macmiller.com. Transaction Date 12/22/2017 7:07 AM Payment # 936725 Transaction Project Info # 6617046 4800 SAND POINT WAY NE Repair (2) existing air handling units and replace existing chilled water coils, control valves, supply fans with fan arrays with VFDs. Install ductwork and motorized damper for cross -connection duct, per plans. Project Contact Joyce Copley (Primary) 7717 Detroit Ave SW Seattle, WA 98106 (206) 407-2614 Cardholder Name Joyce Copley Credit Card Visa ****--**-****-8680 exp 11/2019 Total Amount Paid $1,846.75 Fee Detail Amt Description $630.00 MECHANICAL PLAN REVIEW $1216.75 VALUE BASED - PERMIT (ISSUANCE) This is a receipt of payment. This is NOT a permit, nor is it proof of having a permit. • Please retain this receipt for your financial records. Seattle Department of Construction and Inspections (SDCI) 700 Fifth Ave., Suite 2000 P.O. Box 34019 Seattle, WA 98124-4019 (206) 684-8600 Find Another Permit- 0 ermit © Copyright 1995-2015 City of Seattle SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS Seattle DCI Home I About Us j Contact Us App v3.3.1 Privacy and Security Policy https://web7.seattle.gov/dpd/paypermitfees/PermitPayment.aspx?p=6617046 12/22/2017 ?LAND' Job Name. MAC MILLER Prepared By - Una Top. YSC048G4RMA21 Quantity1 1 Trane Precedent Gas/Electric Packaged Rooftop Overview YSC048G4RMA**K00000000100B00000000000000 `ApplicationtUnitSize () - Supply Fan 1 External Dimensions (ice (_ Weight L EER DEER/SEER External I DX cooling, r4 Ton 048 ,11 Airflow r Static , Height Width Length Minimum Maximum I� 12.0 EER 14.00 gas heat ___LPressure� y 1600 cfm , 0.200 in H2OF 3.41 ft � _3.69 ft -1L5.82 ft 492.0 Ib L348 kg ';J 011iNtama Fresh Air Selection`, Low Leak Econ -dry bulb 0-- 100%/bar rel 3p [ SupplyFan/Drive/MotorType; Standard drive motor Panels/Filters Standard condenser coil aiMED L T _ Voltage/phase/hertz 460/60/3 MCA 11.00 A• �- MOP '15.00 A [Unit - _ Unit Controls_ Microprocessor controls 3ph _ _ _ _ Communications Option,Without communications t ystem Monitoring Controls 1),Without system, monitoring controls System Monitoring Controls2 FDD (Fault Detection & Diagnostics) 3 ph _ _ L. _ Entering DryBuib 80.00 F [ Entering Wet Bulb 67.00 F _ _ E._ Ambient Temp 95.00 F Leaving Coil Dry Bulb 56.91 F L. Leaving Coil WetBuib 56.91 F Leaving Unit Dry Bulb 58.56 F r Leaving Unit Wet Bulb 57.55 F 1 L Refrigeration System Options 1 r Leaving Dew Point 56.91 F ^] Ji Capacity Gross Total '48.90 MBh Gross Sensible 38.79 MBh 1 [ Net Total '47.80 MBh Net Sensible 37.69 MBh Jr Fan Motor Heat 0 MBh Refrig Charge -circuit 1,3.1 Ib J Heat Type- Gas Heat Heating Stages 41 Output Heating Capacity, 65.60 MBh t Output Heating Capacity with Fan 67.18 MBh Heating LAT 108.20 F REVIE Heatin • Tem Rise 38.20 F FOR CODE COMPLIANCE APPROVED JAN 2 2 2018 City of Tukwila BUILDING DIVISION 2017-09-25 18:32:43Z CORRE 1'1,0N LTR# RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER M11/b110 Page 1 of 11 Fan Section Job Name: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 Ouantity: 1 Indoor Fan Data 4-, Type,FC Centrifugal -Drive TWebirect Indoor Fan Performance cfm DesignESP 0.200 in H20 1 Condenser Fan FLA' 0.70 [ IndoWMOTOr"OPeratirig POW -el' 0.50 bhp 4.7t Veg7fPstr-VKO:4,fg OutdoorFan ata Type:Propeller L - 7 fan,C)uaiititi[l Drive.Typerbirect__ IMSEVItaibM4- Outd5or Fan Performande r Indoor Motor Powei" 0.37 kW aust FaD Data TFCentria . : IT IndoorRPM 945 rpm DrivetWe,rbirici Indoor Fan FLA! 0.70 A ,Fan: Performance #17Ar27-6 1Compressor,Sectlon. — —- _ ..... Power 0.00 kW _, oliif ili_A' 6.0A__.- ---== Circuit 2 Rt:Ay0.00 A 2017-09-25 18:32:43Z Page 2 of 11 Job Nine: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 Quantity: 1 EVAPORATOR SECTION ACCESS PANEL TOP PANEL CONDENSER FAN COIL DENSATE DRAIN (ALT) 314"-14 NPT DIA. HOLE 4 114' THROUGH THE BASE CONDENSATE 421/4 PLAN VIEW UNIT DIMENSION DRAWING 00 0 23 1/4" 4 3/4• 171/4" / 87/8' k•-131/4" CONDENSATE - 2017 -09-25 18:32:43Z 697/8" 3 3/16' CONDENSER COIL NIT CONTROL WIRE 7/8' DIA. HOLE SERVICE GAUGE PORT ACCESS 1 318"DIA. HOLE UNIT POWER WIRE CONTROL AND COM PRESSORACCESS PANEL 12" NPT GAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT, CONNECTION, AND ALL 01909 S10N WITH INSTALLER DOCUMENTS BEFORE INSTALLATION'. 40 A SUPPLY 143/4" RETURN ri 00 0 23 1/4" 4 3/4• 171/4" / 87/8' k•-131/4" CONDENSATE - 2017 -09-25 18:32:43Z 697/8" 3 3/16' CONDENSER COIL NIT CONTROL WIRE 7/8' DIA. HOLE SERVICE GAUGE PORT ACCESS 1 318"DIA. HOLE UNIT POWER WIRE CONTROL AND COM PRESSORACCESS PANEL 12" NPT GAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT, CONNECTION, AND ALL 01909 S10N WITH INSTALLER DOCUMENTS BEFORE INSTALLATION'. 40 PACKAGED GAS ! ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 A 7/8' 20/4" 1 1 O 0 95/8" 5518" I U L -J 4 1/4"—.:- /4"—.:-59/16" 5 9/16" 7 5/8' -' • 44'114" PACKAGED GAS ! ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 2017-09-25 18:32:432 Job Name: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 Quantity: 1 314"_14 NPT DRAIN CONNECTION 23 9118" ISOMETRIC -PACKAGED COOLING Page 4 of 11 Job Name: MAO MILLER Prepared By: Unit Tag: YSC048G4RMA21 Quantity: ELECTRICAL / GENERAL DATA GENERAL ax4xe> 18 odel: YSCO48G Oversized M otor HEATING PERFORMANCE HEATING- GENERAL DATA Unit Operating Voltage: 414-506 MCA: N/A Unit Primary Voltage: 460 MFS: N/A H eating Model: Medium Unit Secondary Voltage _ MCB: NIA H eating Input (BTU): 80,000 H eating Output (BTU): 65,600 Unitphaaze: UnitPh 3 60 No. Bumers: 2 No. Stages 1 EE RISE ER 12.0/14.0 Stand ard6otor Field installed Oversized 6otor Gas Inlet Pressure IBCA 11.0 MCA N/A N aturel Gas (Mtn/M bq: 4.5/14.0 t/FS: 15.0 MFS: NIA LP (M in/Max) 11..0114.0 NCB: 15.0 MC B: N/A Gas Pipe Connection Sze: 112" INDOOR MOTOR Standard M otor Oversized Motor field Installed Oversized Motor Number 1 Number: NIA Number: NWA Horsepower 1.0 Horsepower. NIA Horsepower: N/A Motor Speed (RPM):. — Motor Speed (RPM) NWA Motor Speed (RPM k N/A Phase 1 Phase NIA Phase N/A Full Lo ad Amps: 2.5 Full Lo ad Amps: NIA Full Load Amps N/A Locked Rotor Amps _ Locked Rotor Amps NIA Lo dked RotorAmps . N/A COMPRESSOR Circuit 1)2 OUTDOOR MOTOR Number: 1 Number: 1 H orsepova r: 3.6 H orsepa wer:. 0.33 Phase: 3 6l otor Speed (RPM}: 1100 Rated Load Amps: 62 Phase: 1 Locked Rotor Amps: 41.0 Fut Load Amps: 0.7 Locked Rotor Amps 2.3 POWER EXHAUST ACCESSORY (3) ALTERS REFRIGERANT (2) (Field Installed Power Exhaust) Type R-410 Phase: N/A Type: Th (DM way H arse ;pover: NIA Furnished: Yes Fadory Charge Motor 'Speed (RPM ): NIA Number 2 Circuit#1 51/2" FuIlLoad Amps: NIA Recommended 20x3Sx73 Circuit a2 N/A Locked Rotor Amps:. N/A NOTES: 1. h1 axi mu m (HACK } Circuit Breaker sizing is for installations in the United States only. 2. Refrigerant charge is an approximate value. Fora more precise value, see unit nameplate and service instructions. 3. Value does not include Power Exhaust Accessory. 4. Value includes oversized motor. 5. Value does not in elude Power Exhaust Accessory. 6. E ER is rated at AH RI conditions and in a ccondan ce wth DOE test procedures. 2017-09-25 18:32:432 Page 5 0111 Job Name: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 QUentity: 1 PACKAGED GAS / ELECTRICAL CORNE R WEIGHT INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS ECONOMIZER 68.0 fb MOTORIZED OUTSIDE AIR DAMPR MANUALOUTSIDE AIR DAM PER BAROMETRIC RELIEF OVERSIZED MOTOR BELT DRIVE MOTOR POWE R EXHAUST TH RO UGH T THE BASE E LE CTRICAUGAS CHOPS) UNIT MOU NTED CIRCUIT BREAKER (FLOPS) UNIT MOU NTED DISCONNECT (FLOPS) POWERED CONVENIENCE O'UTLET(FIOPS) HINGED DOORS (FLOPS) HALL GUARD SMOKE DETECTOR, SUPPLY/ RETURN NOVARCONTROL STAINLESS STEEL HEAT EXCHANGER REHEAT ROOF CURB BASIC UNIT WEIGHTS CORNER WEIGHTS CENTER OF GRAVITWY SHIPPING :NET AO 205.OIb 0 48.0 lb (E) LEN GHT (F)WIDTH 598.O Ib 492.0lb 0 183.0 lb 0 S8.0 15 33" 9" 1. .A I weights a re approximate. 2. Weights for cptionsthat are not list refer to Installation guide. 3. The actual weight are listed on the unit nameplate. 4. Refer to unit nameplate and installation guide br weights before scheduling tran sp citation and installation of unit. 5. The weight shown represents the typical unit operating weight tar the configuration se led ed. Estimated at +/-10 % of the nam eplate weight. . 6. Verify ...might, connection, and all dimension with installer documents before installation. 7. Corner weights are given for information only. 8. fl et/Shipping weight of optional accessories should be added to and weight when ordering factory or Said installed accessories. PACKAGED GAS / ELECTRICAL RIGGING AND CENTER OF GRAVITY 2017-09-25 18:32:43Z - Page 6 of 11 Joh Name: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 Quantity: 1 CLEARANCE 36" CLEARANCE 48" 0OWN FLOW CLEARANCE 36" HORIZONTAL CLEARANCE 18" ROOF OPENING UNIT OUTLINE CLEARANCE 36" PACKAGED GAS 1 ELECTRIC CLEARANCE 40- 37" CLEARANCE FROM TOP OF UNIT 7? 441/2" 68 3/16' PACKAGED GAS / ELECTRIC DOWhIFLOW TYPICAL ROOF OPENING 2017-09-25 1832:43Z Page 7 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSC048G4RMA21 Quantity: 1 CONOMIZER HOOD BAROMETRIC RELIEF HOOD ECONOMIZER H000 29" LOW LEAK ECONOMIZER HOOD ACCESSORY 2017-09-25 18:32:43Z Page 8 of 11 TR/iNE' Job Name: MAC MILLER Prepared By: IJn: Tay: YSC048G4RMA21 Quantity: General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B117. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers in the indoor air section shall be insulated with a cleanable foil - faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 1/8 inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back- up applications. Dual compressors are available on 71/2-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes: Crankcase heaters are optional on YSC (036, 048, 060, 072, 090, 102, 120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120F,T/YHC074F, T/YHC092F,T/YHC102F, 120F). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3 to 5 ton units (high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3 to 5 ton units (standard and high efficiency 3-phase) have multispeed, direct drive motors. All 6 to 81/2 ton units (standard efficiency) shall have belt drive motors with an adjustable idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons, 6 ton (074), 7'/2 to 8'/2 (high efficiency) units have variable speed direct drive motors. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). 2017-09-25 18:32:43Z Page 9 of 11 Job Name: MAC MILLER Prepared By: Unil Tag: YSC04AG4RMA21 Quantity: Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. Evaporator coils are standard for all 3 to 10 ton standard efficiency models. Microchannel condenser coils are standard for all 3 to 10 ton standard efficiency models and 4, 5, 6, 7.5, 8.5 ton high efficiency models. The microchannel type condenser coil is not offered on the 4 and 5 ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. These all aluminum coils are recyclable. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A plastic, dual -sloped, removable and reversible condensate drain pan with through -the -base condensate drain is standard. Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti - short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall include control transformer and contactor High Pressure Control All units include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostat/zone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions 2017-09-25 18:32:43Z Page 10 of 11 (Gas/Electric Only). Job Name: MAC MILLER Prepared By: UNI Tay: Y C048G4RMA21 Quantity: Frostat This option is to be utilized as a safety device. The Frostat opens when temperatures on the evaporator coil fall below 10°F. The temperature will need to rise to 50°F before closing. This option should be utilized in low airflow or high outside air applications. (Cooling with Electric Heat Only.) Frostat This option is to be utilized as a safety device.The Frostat opens when temperatures on the evaporator coil fall below 10°F.The temperature will need to rise to 50°F before closing.This feature should be utilized in low airflow or high outside air applications (cooling only). 2017-09-25 18:32:43Z Page 11 of 11 �v - _ _f- Job Namy:MMILLER Ul L�IGLi,I�UMV Prepared By: Unit Tag: YHC092F4RHA2L Ouanlily: 1 1 Trane Precedent Gas/Electric Packaged Rooftop AC- OS 3 Overview YHC092F4RHA**P700000000A0B00000000000000 ,Apph_cation;i Unit Size 1 Supply Fan External Dimensions (in.) Weight 11 EER 1 IEER/SEER ExternaF l -"II �n DX cooling, 7.5 Ton Dual Airflow Static i Height Width ` Length Minimum Maximum 12 6 EER 15.00 gas heat compressor ! _� Pressure f� � ��L �' �� t 3000 cfm_ _0.500in H2O 3.91 ft_ 4.44 7.39 7.39 ft _E1026.0Ib _ 586 kg,,� L Fresh Air Selection CSupplyFan/_Drive/ MotorType I - Panels%Filters Low Leak Econ -comp enthalpy J 0-100%/BR 3p. , J Multi speed fan Standard condenser coil Voltage/phase/hertz 460/60/3 MCA 19.90 A 7r - f -----MOP 25.00 A [ Unit Controls Microprocessor controls 3ph [__ - _Communications Option,Without communications System Monitoring Controls 1 Without system monitoring, controls System r System Monitoring Controls 2 FDD (Fault Detection & Diagnostics) 3 ph • • Olin Section C Entering Dry Bulb 80.00 F_ _ C _ Entering Wet Bulb 67.00 F r W AmbientTemp 95.00 F _ Leaving Coil Dry Bulb 58.82 F L_ µ Leaving Coil Wet Buib 57.10 F Leaving Unit Dry Bulb 60.04 F Leaving Unit Wet Buib 57.57 F Refrigeration [ - Leaving Dew_Point 55.99 F I Capacity -1--Gross Total 92.00 MBh J - _ 1[ Gross Sensible 68.63 MBh 1�I_��_ Net Total 89.07 MBh Net Sensib ile -' ''65.70MBh T Fan Motor Heat 2.93 MBh Jr iI- Refrig Charge -circuit 1 5.5 Ib 21 System Options -Ref rig Charge -circuit 2 '4.2 Ib 1 • Heat Type Gas Heat - - - - heating Stages 2 __ _-__ _ _ Output Heating Capacity 1160.00 MBh L L r -- Output Heating Capacity with Fan X62.93 MBh 1 2017-09-25 18:32:42Z Heating EAT170.00 F 1 Heating LA[19.60 F En.reinaleatt,tngg Temp Rise 49.60 F CODE COMPLIANCE APPROVED JAN 2 2 2018 City of Tukwila BUILDING DIVISION CORRECTION LTR# RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER MV1' 0110 Page 1 of 12 �E• Job Name: MAC MILLER Prepared By: Unil Tag: YHC092F4RHA2L Ouantily: 1 Section Indoor Fan Data ' Outdoor Fan Data _ Drive Type;,Variable Direct I Ty—RPropeller J Indoor Fan Performance [ Fan Quantity] 1 _ I [ Airflo41,3000 cfm Drive Type[Direct Design ESP [0.500 in H2O , Outdoor Fan -Performance [ Indoor Motor Operating Powe) 07 bhp _l Outdoor Motor Power; 0.71 kW Indoor Motor Power 0.80 kW .: Condenser FanFLA112.80 A __,_-___1 L Indoor RPMIft155 rpm Exhaust Fan Data j ['s---- Indoor Fan FLA 2.80 A. 1 Typej FC Centrifugal I Drive Type Direct _ _ _____J Exhaust Fan Performance. [ Exhaust Fan FL1(4.30 A Compressor Section _- __ Powerj[6.06 kW T Circuit 1 RLA! 7.10 A r Circuit 2 Rar4.70 A 2017-09-25 18:32:422 Page 2 of 12 job Name: MAC MILLER P'epared By: ling' Tag: YHH0092F4R1-IA21_ Quantity: 1 EVAPORATOR SECTION ACCESS PANEL CONDENSATE DRAIN (ALT) 3/4"-14 I4PT DIA. HOLE 12'NPTGAS CONNECTION (80M BH 8.120M H) 344' NPT GAS CONNECTION (158MBH, 200(1BH &.2506194) THROUGH THE BASE CONDENSATE CONDENSER FAN ONDENSER COIL 4747 UNIT CONTROL WIRE 7/8"DIA HOLE 7!8 SERVICE GAUGE PO RT ACC ESS 13/8'DIA HOLE U NIT POWER W7 RE O;NTROLAND COMPRESSOR ACCESS PANEL PACKAGED GAS/ ELECTRICAL ISOMETRIC VIEW PLAN VIEW UNIT DIMENSION DRAWING 00 —19 1/4' CONDENSATE 08 518' 2017-09-25 18:32:42Z 16 3/4' 32 1/4' 7/8' 46 PACKAGED GAS / ELECTRI NOTES: 1. THRU -THE -BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY ALL DIMENSIONS WITH INSTALLER DOCUMENTS BEFORE INSTALLATION. .,- IRETURN 237/0 SUPPLY 24 /2' 0 b0 0 / 9 5/8 5 5/8' 00 —19 1/4' CONDENSATE 08 518' 2017-09-25 18:32:42Z 16 3/4' 32 1/4' 7/8' 46 PACKAGED GAS / ELECTRI NOTES: 1. THRU -THE -BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY ALL DIMENSIONS WITH INSTALLER DOCUMENTS BEFORE INSTALLATION. DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 12 .,- 718" 24 /2' 0 b0 0 9 5/8 5 5/8' r i L___I 4 1!4' — 5 5/8"—.- 7 5/8' ;AL 531/4 DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 12 2017-09-25 18:32:422 Jab Name: MAC fv11LLER Prepared By: Unit Taa: YI1C092F4RHA21. Quantify: 1 3/4"-14DIA HOLE CONDE NSATE DRAIN 27 5/8" 4 314" ISOMETRIC -PACKAGED COOLING Page 4 of 12 Job Name: MAC MILLER Prepared By: Unit Tag: YHHG092F4RHA2L Quantity: 1 ELECTRICAL / GENERAL DATA GENERAL 1 t4>(" HEATING PERFORMANCE Model: YHC092F 0vensizedMotor HEATING -GENERAL DATA Unit Operating Voltage: 414-508 M CA: U/A Heating Model: High Unit Primary Voltage Unit Secondary Voltage ge 466 _ fd FS: NIA MCB: NIA H eating Input (BTU): 200,000/140,000 Unit Hertz: 60 - Heating Output (BTU): 160,000/112,000 Unit Phase: 3 No. Burners: 4 N o. Stages 2 EE R Standard 14 otor Field �Installed Oversized I1otor Gas Inlet Pressure MCA 20.7 MCA N/A Natural Gas (Min/M ax): 4.5114 1475: '25.0 MFS; NIA LP (Min/Max) 11.0114.0 IAO B: 25.6 MC 5: NIA Gas P ipe Connection Size: 314" INDOOR MOTOR Standard M otar Oversized 'Motor Field Installed Oversized Motor Number 1 Number: NIA Num'ber: NIA Horsepower. 3.6 Horsepover NIA Horsepower: NIA Motor Speed (RPM):: — Motor Speed (RPM T N/A !Antal- Speed (RPM 0 NIA Phase 3 Phase N A Phase N/A Full Load Amps: 4,3 Full Load Amps: NA Full Load Amps NIA Locked RotorAmps _ LackedRotorAmps: NIA LodedRotorAmps: N/A COMPRESSOR Circuit 12 OUTDOOR MOTOR Number. 2 Number: 1 H orse pave r: 4.1/2.4 Horsepower 0.75 Phase: 3 Motor Speed (RPM): 1100 Rated LoadAmps: 7.114.7 Phase: 1 Locked Rotor Amps: 52.0138.0 Fut Load Amps: 2.8 Locked RotorAmps: 6.2 POWER EXHAUST ACCESSORY t") FILTERS REFRIGERANT (2) (Field Installed Power Exhaust) Type R-410 Phase: N/A Type: Throva.wtay ,H arse pove.r: NIA Furnished: Yes Factory Charge Motor Speed (RPM): N/A Number 4 Circuit#1 5.51b Full load Amps: 17/ARecommended 20`x255,2" Circuit ill 4.219 Locked Rotor Amps: NIA NOTES: 1. Maximum (H AC'R) Circuit Breaker sizing is for installations !in the U Oted States only. 2. R efrigerant charge is an approximate value. For a more pre dse value, see unit nameplate and service instructions, 3. Value does not include Power E >diaust Accessory. 4. Value i nctudes'oversized motor. 8. Value does not include Power Exhaust Accessory. 6. E ER is rated at AN RI conditions and in accordance with DOE test procedures. 2017-09-25 18:32:422 Page 5of12 Job Name: MAC MILLER Prepared By: Unit Tay: YIiC092P4RHA2L Quantity: 1 . 0MU PACKAGED GAS / ELECTRICAL CORNER WEIGHT INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS E CO NOM IZE R 93.0 lb MOTORIZED OUTSIDE AIR DAMPER MANUAL OUTSIDE AIR DAM PER BAROMETRIC RELIEF OVERSIZED MOTOR BELT DRIVE MOTOR POWER EXHAUST THROUGH T THE BASE E LE CTRICALIGAS (HOPS) UNIT MOUNTED CIRCUIT BREAKER (FIOPS) UNIT MOU NTED DISCONNECT(FIOPS) POWERED CONVENIENGE OUTLET (FIOPS) HINGED DOORS (FIOPS) HAIL GUARD SMOKE DETECTOR, SUPPLY/ RETURN 7.0 fb NOVAR CONTROL STAINLESS STEEL HEAT EXCHANGER REHEAT ROOF CURB BASIC UIIIT WEIGHTS CORNER WEIGHTS CENTER OF GRAVITIY SHIPPING NET O 340.0 lb O 249.0 lb (E)LENGHT (F)WIDTH 1124.O lb 1026.0 Ib 0 233.01b DO 264.019 4 r 23" NOTE. 1. Allweights are appro,ima e. 2. Weights to options that are not list refer to installation guide. 3. The actual might are listed on the unit nameplate.. 4. Refer to unit nameplate and installation guide for weights before scheduling transportation and installation of unit. 5. The weight shown represents th e typical unit operating weight for the configuration seleded. Estimated et +Y-10 % ofth a nameplate weight.. 6. Verify weight,connection. and all dimension vAth installer documents before installation. 7. Comer weights are given for information only. 8. NetShipping weight of optional accessories should be added to unit weight elven ordering factory or field installed accessories PACKAGED GAS! ELECTRICAL RIGGING AND CENTER OF GRAVITY 2017-09-25 18:32:422 Page 6 of 12 Job Name: MAC MILLER Prepared By: Unit Teg: YI1C092F4RHA2L Quantity: 1 CLEARANCE 36" CLEARANCE 48" DOWNFLOW CLEARANCE 36" HORIZONTAL CLEARANCE 18" ROOF OPENING UNIT OUTLINE CLEARANCE 36" PACKAGED GAS/ELECTRIC CLEARANCE 46" 46- CLEARANCE FROM TOP OF UNIT 72" 53 1/4' 88 5/8' PACKAGED GAS / ELECTRIC DOWN FLOW TYPIC ALROOFOPENING 2017-09-25 18:32:42Z Page 7 of 12 Job Name: MAC MILLER Prepared By: Unit Tag: YHC092F4RHA2L Quantity: 1 ECONOMIZER H 00D AROMETRIC RELIEF HOOD CON OMIZER HOOD 361/2' LOW LEAK ECONOMIZER HOOD ACCESSORY 2017-09-25 18:32:42Z 11 1R' 28' Page 8 of 12 Job Name: MAC MILLER Prepared By: Unit Tag: YI-IC092r4RHA2L Quantity: 1 ECONOMIZER HOOD COMMA IZER HOOD ACCESSORY - ECONOMIZER HOOD 2017-09-25 18:32:422 Page 9 of 12 Job Name: MAC MILLER Prepa ac By: Unit Tag: YHC092F4RHA21. Quantity: General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM 8117. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers in the indoor air section shall be insulated with a cleanable foil - faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 1/8 inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back- up applications. Dual compressors are available on 71-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes: Crankcase heaters are optional on YSC (036, 048, 060, 072, 090, 102, 120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120F,T/YHC074F, T/YHC092F,T/YHC102F, 120F). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3 to 5 ton units (high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3 to 5 ton units (standard and high efficiency 3-phase) have multispeed, direct drive motors. All 6 to 81/2 ton units (standard efficiency) shall have belt drive motors with an adjustable idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons, 6 ton (074), 71/2 to 81/2 (high efficiency) units have variable speed direct drive motors. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). 2017-09-25 18:32:42Z Page 10 of 12 Job Name: MAC MILLER Prepared By: Uri[ YEIC092F4RI1A2t.. Quan"ty: Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Multi -Speed Indoor Fan System Multi -speed indoor fan system is designed for use in applications for meeting the minimum requirement of CA Title 24. This system incorporates a multi -speed fan control to change the speed of the fan to 67% of full airflow based off of compressor stages. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. Evaporator coils are standard for all 3 to 10 ton standard efficiency models. Microchannel condenser coils are standard for all 3 to 10 ton standard efficiency models and 4, 5, 6, 7.5, 8.5 ton high efficiency models. The microchannel type condenser coil is not offered on the 4 and 5 ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. These all aluminum coils are recyclable. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A plastic, dual -sloped, removable and reversible condensate drain pan with through -the -base condensate drain is standard. Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti - short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall include control transformer and contactor High Pressure Control All units include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners 2017-09-25 18:32:42Z Page 11 of 12 Job Name: MAC MILLER Prepared By: Unit Tag YHC092P4Rt-HA2l. Quantity: and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostat/zone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions (Gas/Electric Only). Plenum Fan The following unit shall be equipped with a direct drive plenum fan design (all 10 tons and 7.5-8.5 ton high efficiency units). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. Supply and/or Return Air Smoke Detector Smoke detector shall be factory installed photoelectric smoke detector mounted in the return air section (with or without the economizer or motorized damper option), AND/OR in the supply air fan compartment. The detector will be wired for continuous power whenever the unit is energized. Upon detection of smoke, the detector will shut down all unit operations. Local codes may dictate the location of detectors. Note: Due to the shipping position of the economizer or motorized damper, the return air smoke detector will not be completely factory installed. The wiring harness for the detector will be routed and tied off in the fan compartment for shipping. The smoke detector and barometric damper hood will also be installed in a shipping position in the fan compartment. Supply, Return, and Plenum Air Smoke Detector With this option installed, if smoke is detected, all unit operation will be shut down. Reset will be manual at the unit. In order for the supply air smoke detector or return air smoke detector to properly sense smoke in the supply air stream or the return air stream, the air velocity entering the smoke detector unit must be between 500 - 4000 feet per minute. Equipment covered in this manual will develop an airflow velocity that falls within these limits over the entire airflow range specified in the evaporator fan performance table. Supply and/or Return Smoke Detectors may not be used with the Plenum Smoke Detector. 2017-09-25 18:32:42Z Page 12 of 12 ?LTLJLT Job Name. MAC MILLER Prepared By, Unit Tag: YSC038G4RMA21 Ouar hty: 1 L.. � IN-4 Trane Precedent Gas/Electric Packaged Rooftop /9C � 0 2 -- Overview YSC036G4RMA**K00000000100B00000000000000 [Application's _Unit Size_ 1 - - -Supply Fan DX cooling, Airflow • gas heat �3 Ton (036) I External Dimensions in. External, - 1 Static I Height i Pressure • 1200 cfm_10.200 in H2O 3.41 ft„ j[- 3.69 ft5.82 ft__IL,,,472.0 lb_JL.339 kg J Width Length Weight Minimum IL_EER— IEER/SEER 12.0 EER 14.00 Maximum Low Leak Econ -dry bulb 0- Fresh Air Selection 100%/bar rel 3p [.Supply-Fan/Drive/ MotorType Standard drive motor, L - Panels/Filters Standard condenser coil Voltage/phase/hertz 460/60/3 I -�_ — _ MCA' 9.50A MOP JI5.00 A UnitContro(s Microprocessor controls 3ph _ _ - Communications Option'; Without communications System Monitoring Controls]Without system monitoring controls _ J System Monitoring Controls 2 FDD (Fault Detection & Diagnostics) 3 ph r__ _ -_ Entering Dry Bulb ; 80.00 F [Entering Wet Bulb 67.00 F Ambient Temp 95.00 F - Leaving Cali Bulli' 57.21 F L Leaving Coil Wet B b 57.21 F C__ Leaving Unit Dry Bulb 58.85 F Leaving Unit Wet Bulb57.84 F Refrigeration System Options [ Leaving Dew Point 57.21 F 1r Capacity Gross Total 37.01 MBh Gross Gross Sensible 29.82 MBh iE - =r 71 i1 Refrig Charge -circuit 1] 2.9 Ib Net Total 36.15 MBh .1 Net Sensible 28.96 MBh 1 Fan Motor Heat 0.85 MBh 1 Heat Type Gas Heat j - Heating Stages71 r E_ 1 Output Heating Capacity, 65.60 MBh Output Heating _Capacity with Fan 66.47 MBh _ Heating EAT 70.00 F Heating LAT 120.80 F L_ Heating em • Rise; 50.80.F —REVIEWED FOR CODE COMPLIANCE APPROVED JAN 2 2 2018 City of Tukwila BUILDING DIVISION 2017-09-25 18:32:412 CORRE T1Od LTR# RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER W1O\10 Page 1 of 11 Job Name: MAC MILLER Preparod By: Unit Tag: YSC036G4RMA21 Quantity: 1 Indoor Fan Data 1 Outdoor Fan Data I Typ4[FC Centrifugal _ Typj`j[Propeller I Drive Type [Direct jr • FanF Quant y,[1 IndoorFan Performance Drive Type Lirect F-7---- Airflow1t200 cfm ] - , . • a a T f "Ot tdQor Fan Performance. Condenser.Fan•FLA[0.55A _] I. Design.ESPX200inH2O. Indoor Motor Operating Power t�26 bhp Exhaust Fan Data. r Indoor Motor PoweJ50.19 kW— 7 • • Type FC Centrifugal ____77 Drive TypellDirect_ __ —] C Indoor RPM fr69 rpm. . j • Indoor Fan FLA ;0.55 A ' R -Exhaust Fan Performance • Exhaust Fan FLA 1.70 A .. Power 10.00 kW Circuit 1 RLA76.40 A . Circuit 2 RLA 10:00 A 2017-09-25 18:32:412 Page 2 of 11 Job Name: MAC MILLER Prepared By: Unit Tag:YSC036G4RMA21 Quantity: 1 EVAPORATOR SECTION ACCESS PANEL TOP PANEL CONDENSER FAN CONDENSATE GRAIN (ALT) 314"-14 NPT DIA. HOLE 4 114 THROUGH THE BASE CONDENSATE 42 1/4 15112 - 9114" - 14" - k.-3 PLAN MEW UNIT DIMENSION DRAWING 0 I 00 23114" 4 314' 17 114"f' 8 718' 4+-13 114" CONDENSATE 2017-09-25 18:32:41Z 69 7/8" 3116" ONDENSERCOIL U NIT CONTROL WIRE 718" DIA. HOLE SERVICE GAUGE PORT ACCESS 1318"Om. HOLE NIT POWER WIRE CONTROL AND COMPRESSOR ACCESS PANEL 1/2'NPTGAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT,CONNECTION, MD ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION 40 SUPPLY 7 14314' RETURN Fl 0 I 00 23114" 4 314' 17 114"f' 8 718' 4+-13 114" CONDENSATE 2017-09-25 18:32:41Z 69 7/8" 3116" ONDENSERCOIL U NIT CONTROL WIRE 718" DIA. HOLE SERVICE GAUGE PORT ACCESS 1318"Om. HOLE NIT POWER WIRE CONTROL AND COMPRESSOR ACCESS PANEL 1/2'NPTGAS CONNECTION NOTES: 1. TH RU -THE -BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY WEIGHT,CONNECTION, MD ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION 40 PACKAGED GAS / ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 718" 1 20 14" - ¢ I 0 9 518" 5 518" 0 I u L____1 1 41/4"—.:- 5 9116" ----- b- - 7 518" + 44'114" PACKAGED GAS / ELECTRICAL DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 2017-09-25 18:32:412 Job Name: MAC MILLER Prepared By: Unit Tag: YSC036G4RMA21 Quantity: 1 3/4"-14 :N P T DRAIN CONNECTION 23 9116' 4 1114" ISOMETRIC -PACKAGED COOLING Page 4 of 11 Job Name: MAC MILLER Prepared By; Unit Tag; YSC036G4RMA21 Ouantity: 1 ELECTRICAL / GENERAL DATA GENERAL) HEATING PERFORMANCE Model: YSC03€G oversizedl4etor HEATING -GENERAL DATA Unit Operating Voltage: 414-506 MCA: N/A U nit Primary Voltage: 460 MFS: N/A H eating :Model: Medium U nit Secondary Voltage _ MCB: N/A Heating Input (BTU): 80600 U nit H ertz: 6 0 H eating Output (BTU): 65,600 Unit Phase: 3 No. Bumers: 2 No. Stages 1 EER/SEER 12:0/14.0 Standard 14 otor Field installed Oversized P4otor Gas Inlet Pressure MCA 9.5 MCA N/A NatmalGas (Min/Mix): 4.5/14.0 MFS: 15.0 MFS: NIA LP (Min/Max) 11.0/14.0 MC B: 15.0 MCB: NIA Gas Pipe Connection Size: 1/2" INDOOR MOTOR Standard Motor Oversized Motor Field Installed Oversizedtnotor Number 1 Number. N/A Number: N/A Horsepower 0.75 Horsepower N/A Horsepower. N/A Motor Speed (RPM): _ Motor Speed (RPM) N/A Motor Speed (RPM) N/A Phase 1 Phase N A Phase NIA Full Lo ad Amps: 1,7 Full to ad Amps: N/A Fuli Load Amps N/A Locked Rotor Amps. _- Locked Rotor Amps: N/A LockedRatorAmps; N/A COMPRESSOR Circuit 1/2 OUTDOOR MOTOR Number: 1 Number: Horsepov.e-r: 2.8 H arse pa war: Phase: 3 Motor Speed (RPM): Rated LoadAmps: 6.4 Phase: Locked Rotor Amps: 45.0 Fun Load Amps: Locked Rotor Amps: POWER EXHAUST ACCESSORY (3) FILTERS REFRIGERANT (2) (Field Installed Power E. xhaust) Type R-410 Phase: Horsepower: i1 /A N/A Type; Thravafway Furnished: Yes Factory Charge Motor Speed (RPM): N/A Number 2 Cscud #1 3.2lb Full Load Amps: N/A Recommended 20"x35"x2" Circuit#2 N/A Locked Rotor Amps:. N/A NOTES: 1. M aximu m (H AC R }Circuit Breaker sizing is for installations in the United States only. 2. R efrigerant charge is an approximate value. For a more predse value, see unit nameplate and service instructions 3. Value does not in elude Power Exhaust Accessory. 4. Value incudes oversized motor. 5. Value do es not in clude Power Exhaust Accessory. 6. E E R is rated at AH RI conditions and in accordance wth DOE test procedures. 2017-09-25 18:32:412 Page 5 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSC036G4RMA21 Quantity: 1 PACKAGED GAS / ELECTRICAL CORNER WEIGHT 2017-09-25 18:32:412 INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS ECONOMIZER 68.0 9 MOTOR1ZEDOUTSIDE AIR DAMPER MANU AL OUTSIDE Al DAfd PER BAROMETRIC RELIEF OVERSIZED MOTOR BELT DRIVE MOTOR POWER EXHAUST THROUGHT THE BASE ELECTRICAUGAS (FLOPS) UNIT MOUNTED CIRCUIT BREAKER (FIOPS) UNIT MOU NTEO DISCONNECT (FLOPS) POWERED CONVE UIENGE OUTLET (FIOPS) HINGED DOORS (FIOPS) HAIL GUARD SMOKE DETECTOR, SUPPLY/ RETURN NOVARCONTROL STAINLESS STEEL HEAT EXCHANGER REHEAT ROOF CURB BASIC UNIT WEIGHTS CORNER WEIGHTS CENTER OFGRAV1TW SHIPPING NET 193.018 O 45.09 (E)LEN GHT (F)WIDTH 577.015 472.015 0 178.0 Ib 0 55.015 1. All weightsa re approximate. 2. Weights for options that are not list referto:Installation guide. 3. The actual v.eight are listed an the unit nameplate.. 4. Referto unit nameplate and installation guide for weights before scheduling transportation and installation. ofunit. 5. The weightshowi represents the typical unit operating weight for the configuration :selected. Estimated at +1- 10 % ofthe nameplate weight.. 6. Venfyweight, connection, and 89 dime nsionwith installer documents before installation. 7. Corner weights are given for info rnation ,only. N et/Shipping weight of optional accessories should be added to unit weight when ordering factory or tell installed accessories. PACKAGED GAS / ELECTRICAL R IG GING AND CENTER OF GRAVITY Page 6 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSCO36G4RMA21 Quantity: 1 CLEARANCE 36" CLEARANCE 48" DOWNFLOW CLEARANCE 36" HORIZONTALCLEARANCE 18" ROOF OPENING UNIT OUTLINE CLEARANCE 36" PACKAGE D GAS / ELECTRIC CLEARANCE 40" 37" CLEARANCE FROM TOP Of UNIT72" 44 112" 68 3116" PACKAGED GAS/ELECTRIC DOWN FLOW TYPICAL ROOF OPENING 2017-09-25 18:32:41Z Page 7 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSC036G4RMA21 Quantity: 1 CONOMIZER H OOD AROMETRIC RELIEF HOOD CONOMIZER HOOD LOW LEAK ECONOMIZER HOOD ACCESSORY 2017-09-25 18:32:41Z 83/4" 1 Page 8 of 11 NUM" Jab Name: MAC MILLER Prepared By: Unit Tag: YSC035G4RMA21 OuanNy: 1 General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B117. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers in the indoor air section shall be insulated with a cleanable foil - faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 1/8 inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back- up applications. Dual compressors are available on 71/2-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes: Crankcase heaters are optional on YSC (036, 048, 060, 072, 090, 102, 120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120F,T/YHC074F, T/YHC092F,T/YHC102F, 120F). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3 to 5 ton units (high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3 to 5 ton units (standard and high efficiency 3-phase) have multispeed, direct drive motors. All 6 to 81/2 ton units (standard efficiency) shall have belt drive motors with an adjustable idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons, 6 ton (074), 7'/2 to 8'/2 (high efficiency) units have variable speed direct drive motors. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). 2017-09-25 18:32:41Z Page 9 of 11 VIKUIT Jeb Name: MAC MILLER Prepared By: Unit Tag: YSC036G4RMA21 Quantify: Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. Evaporator coils are standard for all 3 to 10 ton standard efficiency models. Microchannel condenser coils are standard for all 3 to 10 ton standard efficiency models and 4, 5, 6, 7.5, 8.5 ton high efficiency models. The microchannel type condenser coil is not offered on the 4 and 5 ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. These all aluminum coils are recyclable. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A plastic, dual -sloped, removable and reversible condensate drain pan with through -the -base condensate drain is standard. Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti - short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall include control transformer and contactor High Pressure Control All units include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostat/zone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions 2017-09-25 18:32:412 Page 10 of 11 (Gas/Electric Only). Job Name: MAC MILLER Prepared By: Unit Tag: Y ;C036(abRMA21 Quantb, Frostat This option is to be utilized as a safety device. The Frostat opens when temperatures on the evaporator coil fall below 10°F. The temperature will need to rise to 50°F before closing. This option should be utilized in low airflow or high outside air applications. (Cooling with Electric Heat Only.) Frostat - This option is to be utilized as a safety device.The Frostat opens when temperatures on the evaporator coil fall below 10°F.The temperature will need to rise to 50°F before closing.This feature should be utilized in low airflow or high outside air applications (cooling only). 2017-09-25 18:32:41Z Page 11 of 11 TW7 Job Name: MAC MILLER Prepared By: UNI Tag: YSC120F4RLA2L Quantity: 1 Trane Precedent Gas/Electric Packaged Rooftop Overview YSC120F4RLA**P700000000A0B00000000000000 Appiicatio'n]Lnft DX cooling, i+ 10 gas heat .4 gas �L 3ize� on 1 .j_4000.cfm.0.500in Supply Fan External Dimensions (in.) Weight l EER LEER/SEER External Airflow Prestic Height Width Length Minimum Maximum 11.2 EER 13.50 , H2O;L3.91 ft_J4.44ft_1['7.39 C1124.0Ib',,L621 kg Fresh Air Selection [—SupplyFan/Drive/ MotorType Panels/Filters, Low Leak Econ -comp enthalpy 0-100%/BR 3p Multi speed fan Standard condenser coil RAM L Voltage/phase/hertz r460/60/3 L Mff22.70A MOP, 30.00 A e _ ._ ____ Unit Contro s Microprocessor controls 3ph Communications Option Without communications _ System Monitoring Controls 1 Without system monitoring controls r System Monitoring Controls 2 FDD (Fault Detection & Diagnostics) 3 ph t Entering Dry Bulb 80.00 F Capacity Entering Wet Bulb 67.00 F jl Gross Total r1 l 09 0 MBh Ambient Temp 95.00 F in ----Gross Sensible' 92.65 MBh L Leaving Coil Dry Bulb 58.55 F 11 Leaving Coil Wet b 57.42 F Net Total x112.80 MBh -�� Net Sensible 86.45 MBh [-Leaving Unit Dry,Bulb 60.31.F. l! Fan Motor Heat 6.20 MBh ice—Refrig Charge -circuit 1 5.5 Ib i Refrigeration System Opt ons l Refrig Charge -circuit -2'472 Ib I (---- Leaving Dew Point 56.70 F 1 7—Leaving Unit Wet Bulb 58.09 F Heat Type Gas Heat Heating Stages 2 [' Output Heating_Capacity;`120.00MBh Output Heating Cal—Mil-FAIT—nilFan26.20 MBh Heating LATj 98.10 F Heating EATjf70.00 F 2017-09-25 18:32:412 Heating Temp Rise 28.10 F REVIEWED FOR CODE COMPLIANCE APPROVED JAN 2 2 2018 City of Tukwila BUILDIKaDIVISION RECEIVED CITY OF TUKWILA CORRECTION JAN 08 2018 LTR#� PERMIT CENTER Mn -ono Page 1 of 11 Job Name: MAC MILLER Prepared By: Unit Tap: YSC120F4RLA2L Quantity: 1 Fan Section Indoor Fan Data :Outdoor Fan Data .a • Drive Type [Variable Direct. ' 3 Type'; Propeller ;Compressor Section Powe"[8.38 kW • Circuit 1 RLA [8.20 A: _ Circuit 2 RLAr6.10 A • 1 2017-09-25 18:32:41Z Page 2 0111 Indoor Fan Performance i;', 'Al fan Quantityl IL - Drive Typel[Direct _ J _____._.- Airflow 4000 cfm .. t Design E Q500 in H2O i Outdoor Fan Performance r-h,if-WriVitt Indoor Motor Operating Powei 2.22 bhp 1 Outdoor Motor Power 0.69 kW , Indoor Motor Powr11.65 kW j Condenser Fan FLA Fu -A- vrt"r.ri 1 Indoor RPM1[1474 rpm i IMINAMSWANNak17 '` Exhaust Fan Data;- r Indoor Fan FLAI[2.00 A • _ _I Type][FC Centrifugal Drive Type Direct __ it, -.t.4.14,3,- Exhaust Fan Performance _n;A %it ° J,,, ;Y 6 Exhaust Fan FL 1 4.30 A ;Compressor Section Powe"[8.38 kW • Circuit 1 RLA [8.20 A: _ Circuit 2 RLAr6.10 A • 1 2017-09-25 18:32:41Z Page 2 0111 Job Name: MAC MILLER Prepared By: Unit Tag: YSC120F4RLA2L Quantity: 1 EVAPORATOR SECTION ACCESS PANEL CONDENSATE DRAIN (ALT) 3/4"-14 NPT DIA. HOLE TOP PANEL CONDENSER FAN 4 114° 1/7 NPT GAS CONNECTION (80M BH 8. 12011 BH) 3/4' NPT GAS CONNECTION (150M B H, 2001.1 BH 5 259 1.11311 ) THROUGH THE BASE CONDENSATE 47 7/8" CONDENSER COIL UNIT CONTROL WIRE 718"DIA HOLE SERVICE GAUGE PORT ACCESS 13/8'DIA HOLE NIT POWER WIRE O,NTROL AND COMPRESSOR ACCESS PANEL PACKAGED GAS i ELECTRICAL ISOMETRIC VIEW 27 5/8'—x{ PLAN VIEW UNIT DIMENSION DRAWING • 00 —19 1/4 CONDENSATE 68 S18' 2017-09-25 18:32:412 / I 00_1 9 3/8" 16 314' 32 114" PACKAGED GAS/ELECTRI NOTES: 1. THRU -THE -BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY ALL DIMENSIONS WITH INSTALLER DOCUMENTS BEFORE INSTALLATION. -° ,F RETURN 237/8" SUPPLY 24 /2 0 10 0 L 9 5/8 5 518' P 1 • 00 —19 1/4 CONDENSATE 68 S18' 2017-09-25 18:32:412 / I 00_1 9 3/8" 16 314' 32 114" PACKAGED GAS/ELECTRI NOTES: 1. THRU -THE -BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS. 2. VERIFY ALL DIMENSIONS WITH INSTALLER DOCUMENTS BEFORE INSTALLATION. DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 -° 718" 1 24 /2 0 10 0 9 5/8 5 518' 1 LJ L-1 I 4114" ... 55/8"-4- 7 5/8"— AL +*- -•.- •.-75/8"— • 53 1/4 DIMENSION DRAWING HORIZONTAL AIR FLOW Page 3 of 11 2017-09-25 18:32:41Z Job Name: MAC MILLER Prepared By: Unit Tag: YSC120F4RLA2L Quantity! 'I • �ll�llli111 314^_14 DIA HOLE CONDE NSATE DRAIN 27 518" 4 314" ISO IA ETR IC -PACKAG ED COOLING Page 4 of 11 Joh Name: MAC MILLER Prepared By: Unit Tag:YSC120F4RLA2L Quantity: 1 ELECTRICAL / GENERAL DATA 'GENERAL mow.) HEATING PERFORMANCE Model. YSC124F 0eersized14 oto r HEATING -GENERAL DATA Unit Operating Voltage' 414-508 MCA: N/k Heating Model: Lovr arVltag UnitSecondryVlto Unit Hecondary Vottege Unit H ertz: 460 — 30 MFS: N/A I.iCB: N/A HeatingInput(BTU): Heating Output {BTU}: 150,000!105,000 120,000!64,000 Unit Phase: 3 N o. Burners: 3 No. Stages 2 EER 11.3 Standard M. otor F mkt Installed Oversized M of or G as Inlet Pressure MCA 23.5 MCA NIA 0aturaIGas(Min/Mx): 4.5/14 HITS: 30.0 MFS: NIA LP (Min/Max) 11.0/14.0 IMC B. 30:0 MC 8: NJA Gas Pipe Connection Size: 3/4` INDOOR MOTOR Standard Motor Oversized Motor Field Installed Oversized 14 otor Number. 1 Number: N/A Number N/A Horsepower 3.6 Horsepower. N/A Horsepower. N/A Motor Speed(RPM):. — Motor Speed (RPM ):. N/A Motor Speed (RPM }; N/A Phase 3 Phase N A Phase NIA FullLaadAmps: 4.3 Full La ad Amps: N A Full Lo ad Amps N/A LodcedRoto rAmps: _ Lodred Roto r Amps N/A LockedRotorAmps N/A COMPRESSOR Circuit 1/2 OUTDOOR MOTOR Number: 2 Number. 1 Horsepove r: 4.8/3.7 H orsepower: 0.75 Phase: 3 14 otor Speed (RPM ): 1100 Rated Load Amps: 62/6.1 Plhase: 1 Locked Rotor Amps: 66.0141 .0 Fun Load Amps: 2.8 Locked Rotor Amps: 6.2 POWER D(HAUST ACCESSORY 13) FILTERS REFRIGERANT (2) (Field Installed Power Exhaust) Type R-410 Phase: Horsepower: N/A N/A Type: Throwaway Furnished: Yes Factory Charge Motor Speed i(RPM): N/A Number 4 Circuit#1 5.5 lb Full Load Amps: N/A Recommended 20525(2' Circuit r2 4.2 ib Locked Rotor Amps:. N/A NOTES 1.14 aximum (HACR } Circuit Breaker slain g is Sr installations in the United States only. 2. Refrigerant charge is an approximate value. For a more precise value, see unitnameplate and service instructions. 3. Value does not include Power Exhaust Accessory. 4. Value includes oversized motor. 5. Value does not in elude Power Exhaust Accessory. 6. E E R is rated at AN RI conditions and in accordance wth O OE test procedures. 2017-09-25 18:32:412 Page 5 of 11 c)\ T Job Name: MAC MILLER Prepared By: Unit Tag: YSC120F4RLA2L Quantity: PACKAGED GAS / ELECTRICAL CORNER WEIGHT INSTALLED ACCESSORIES NET WEIGHT DATA ACCESSORY WEIGHTS ECONOMIZER MOTORIZED OUTSIDE AIR DAMPER MANUAL OUTSIDE AIR DAMPER BAROMETRIC RELIEF OVERSIZED MOTOR BELT DRIVE MOTOR POWEREXHAUST THROUGHTTHE BASE Ell CTR ICAIJGAS(F1OPS) UNIT MOU NTED CIRCUIT BREAKER (FIDPS) UNIT MOU NTED DISCONNECT (F10 PS) POWERED CONVENIENCE OUTLET (FIOPS) HINGED DOORS (FIOPS) HAIL GUARD SMOKE DETECTOR, SUPPLYI RETURN 7,910 NOVAR CONTROL STAINLESS STEEL HEAT EXCMANGIER REHEAT ROOF CURB BASIC UNIT WEIGHTS CORNER WEIGHTS CENTER OF GRAVITIY SHIPPING NET O 345.0 lb CO 258.0 Lh (E) LENGHT (F) WIDTH 1156.9 ib 1056.018 0 242.01b 0 213.9 lb 4r 23" 1. All vreightsareapproximate. 2. Weights far options that are not list refer toInstallation guide. 3. The actual weight are Bated on the unit nameplate.. 4. Refer to unit nameplate and installation guide for weights before scheduling transportation and installation of unit. 5. The weight shows represents the typical unit operatmg weight for the configuration seleded. Estimated at +4- 10 % ofthe nameplate weight.. 6. Verify weight, connection, and all dimension with installer documents before installation. 7. Corner weights are given for info:motlan any. 8. N et/Shipping weight of optional accessories should be added to unit weight when ordering factory or field installed accessories PACKAGED GAS t ELECTRICAL R IG G I NG AND CENTER OF GRAVITY 2017-09-25 18:32:412 Page 6 of 11 Joh Narne: MAC MILLER Prepared By: Unit Tag:YSC120F4RLA2L. Quantity: 1 CLEARANCE 36" CLEARANCE 48" DOWN FLOW CLEARANCE 36" HORIZONTAL CLEARANCE 18" CLEARANCE 36" PACKAGED GAS/ELECTRIC CLEARANCE UNIT OUTLINE 46" 46 885'8' CLEARANCE FROM TOP OF UNIT 72" 53 !4' PACKAGED GAS / ELECTRIC DOWN FLOW TYPICAL ROOF OPENING 2017-09-25 18:32:412 Page 7 of 11 Job Name: MAC MILLER Prepared By: Unit Tag: YSC120F4RLA2L Quant iv: 1 CONOM IZE R HOOD AROMETRIC RELIEF HOOD CONOM1ZER H 000 36 72° LOW LEAK ECONOMIZER HOOD ACCESSORY 2017-09-25 18:32:41Z Page 8 of 11 SlLsCPST Job Name: MAC MILLER Prepared By: Uri! Tag: YSC120P4RLA2I... Quantity: t General The units shall be convertible airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for units with microprocessor controls. Operating range for units with electromechanical controls shall be between 115°F and 40°F. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation, and control sequence before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance for Central Cooling Air Conditioners. Casing Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B117. Cabinet construction shall allow for all maintenance on one side of the unit. Service panels shall have lifting handles and be removed and reinstalled by removing two fasteners while providing a water and air tight seal. All exposed vertical panels and top covers in the indoor air section shall be insulated with a cleanable foil - faced, fire -retardant permanent, odorless glass fiber material. The base of the unit shall be insulated with 1/8 inch, foil -faced, closed -cell insulation. All insulation edges shall be either captured or sealed. The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8 inch high downflow supply/return openings to provide an added water integrity precaution, if the condensate drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift capabilities on three sides of the unit. Unit Top The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top. Filters Throwaway filters shall be standard on all units. Optional 2 -inch MERV 8 and MERV 13 filters shall also be available. Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors. Dual compressors are outstanding for humidity control, light load cooling conditions and system back- up applications. Dual compressors are available on 71/2-10 ton models and allow for efficient cooling utilizing 3 -stages of compressor operation for all high efficiency models. Notes: Crankcase heaters are optional on YSC (036, 048, 060, 072, 090, 102, 120); standard on YHC (036, 048, 060, 072, 092, 102, 120). Indoor Fan The following units shall be equipped with a direct drive plenum fan design (T/YSC120F,T/YHC074F, T/YHC092F,T/YHC102F, 120F). Plenum fan design shall include a backward -curved fan wheel along with an external rotor direct drive variable speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer located in the control box. 3 to 5 ton units (high efficiency 3-phase with optional motor) are belt driven, FC centrifugal fans with adjustable motor sheaves. 3 to 5 ton units (standard and high efficiency 3-phase) have multispeed, direct drive motors. All 6 to 81/2 ton units (standard efficiency) shall have belt drive motors with an adjustable idler -arm assembly for quick -adjustment to fan belts and motor sheaves. All motors shall be thermally protected. All 10 tons, 6 ton (074), 71/2 to 81/2 (high efficiency) units have variable speed direct drive motors. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). 2017-09-25 18:32:41Z Page 9 0111 Job Name,: MAC MILLER Prepared By: Unit Tay: YSC120P4RI..A21.. Quantity: 1 Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal overload protection. Multi -Speed Indoor Fan System Multi -speed indoor fan system is designed for use in applications for meeting the minimum requirement of CA Title 24. This system incorporates a multi -speed fan control to change the speed of the fan to 67% of full airflow based off of compressor stages. Evaporator and Condenser Coils Internally finned, 5/16" copper tubes mechanically bonded to a configured aluminum plate fin shall be standard. Evaporator coils are standard for all 3 to 10 ton standard efficiency models. Microchannel condenser coils are standard for all 3 to 10 ton standard efficiency models and 4, 5, 6, 7.5, 8.5 ton high efficiency models. The microchannel type condenser coil is not offered on the 4 and 5 ton dehumidification model. Due to flat streamlined tubes with small ports, and metallurgical tube -to -fin bond, microchannel coil has better heat transfer performance. Microchannel condenser coil can reduce system refrigerant charge by up to 50% because of smaller internal volume, which leads to better compressor reliability. Compact all -aluminum microchannel coils also help to reduce the unit weight. These all aluminum coils are recyclable. Galvanic corrosion is also minimized due to all aluminum construction. Strong aluminum brazed structure provides better fin protection. In addition, flat streamlined tubes also make microchannel coils more dust resistant and easier to clean. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil and condenser coil shall be leak tested to 600 psig. The assembled unit shall be leak tested to 465 psig. The condenser coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A plastic, dual -sloped, removable and reversible condensate drain pan with through -the -base condensate drain is standard. Controls Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls provide for all 24V control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized microprocessor shall provide anti - short cycle timing and time delay between compressors to provide a higher level of machine protection. 24 -volt electromechanical control circuit shall include control transformer and contactor High Pressure Control All units include High Pressure Cutout as standard. Phase monitor Phase monitor shall provide 100% protection for motors and compressors against problems caused by phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that provides an ON or FAULT indicator. There are no field adjustments. The module will automatically reset from a fault condition. Refrigerant Circuits Each refrigerant circuit offer thermal expansion valve as standard. Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall be provided for replacement suction line driers. Gas Heating Section The heating section shall have a progressive tubular heat exchanger design using stainless steel burners 2017-09-25 18:32:41Z Page 10 of 11 L tr Job Name: MAC MILLER Prepared By: Uri! Tag: seSC120F4R1.. A21. Quantity: and corrosion resistant steel throughout. An induced draft combustion blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark ignition (DSI) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds before ignition After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually reset at the thermostat/zone sensor. Units shall be suitable for use with natural gas or propane (field -installed kit) and also comply with the California requirement for low NOx emissions (Gas/Electric Only). Supply and/or Return Air Smoke Detector Smoke detector shall be factory installed photoelectric smoke detector mounted in the return air section (with or without the economizer or motorized damper option), AND/OR in the supply air fan compartment. The detector will be wired for continuous power whenever the unit is energized. Upon detection of smoke, the detector will shut down all unit operations. Local codes may dictate the location of detectors. Note: Due to the shipping position of the economizer or motorized damper, the return air smoke detector will not be completely factory installed. The wiring harness for the detector will be routed and tied off in the fan compartment for shipping. The smoke detector and barometric damper hood will also be installed in a shipping position in the fan compartment. Supply, Return, and Plenum Air Smoke Detector With this option installed, if smoke is detected, all unit operation will be shut down. Reset will be manual at the unit. In order for the supply air smoke detector or return air smoke detector to properly sense smoke in the supply air stream or the return air stream, the air velocity entering the smoke detector unit must be between 500 - 4000 feet per minute. Equipment covered in this manual will develop an airflow velocity that falls within these limits over the entire airflow range specified in the evaporator fan performance table. Supply and/or Return Smoke Detectors may not be used with the Plenum Smoke Detector. 2017-09-25 18:32:41Z Page 11 of 11 2 0 0 CD O (D N 0 N (f] (o co N a a c 3 3 01 CD CD o' a a (p o O O, co co a `G `G v -• c a- ,• 3 O m 3 ( CD Y. O (0 X O 0 a a � m < m N 0 7 CU C) O 0 CD aegwnu ssawealo Je U!M ccc 3 3 3 co co co o N o_ a o 2. " 3 a (jco cj cn g o a 3 zT co- 6 O J01984 i(dleq u3 amssaad oulawoae8 N 3 oto o . o N co co_ E co O N O coaO 7 0 0 O CD uoisaan OOL ®3OVZ11 DL A O O O O N co co A A -i O O W co O A y PmD) OO NA N WV VO N V WO O V OCC N- A O NJ1 W 0 0 d0 al co NA W --i cr. iy, Cr) W D '0 D co 0 CD 3 co o 0 -n 0 -a n 3 I:I31N33 1I1A1d3d u no.aq/ulw.gI no•4/u!w•me x CL O.to to 0 rn -a m IND 0 Z 0 awq uogelnole3 LLOZ/LZ/ZL uo Wd £Z:170 O W o o 27 0c13. a 6 3 3 coo -• n co CD 3 O 7 `G 0 3 m 0 CD -1 m r c O j c. 7 °) =. 01 ca o CO 3 o O 0.0 0 i n O - -4 r m(t) 0� „cp 3 3 m3 m m 'O 2131111N-a1vN000VW NOI.VIAMOI,NI 133f 02Jd System Description System Type SYSTEM SUMMARY DESIGN AIRFLOW QUANTITIES By MACDONALD-MILLER MAIN SYSTEM Outside Airflow cfm Cooling Airflow cfm Heating Airflow cfm Return Airflow cfm Exhaust Airflow cfm Auxiliary System Supply Airflow cfm Room Exhaust Airflow cfm Alternative 1 101-10 TON 102- 3 TON 103 - 7 and one half TONS 104 - 4 TON 105 - 5 TON 106 - EXISTING 4 TON Variable Temperature Constant Volume Variable Temperature Constant Volume Variable Temperature Constant Volume Variable Temperature Constant Volume Variable Temperature Constant Volume Variable Temperature Constant Volume 3,103 636 2,236 872 873 2,232 3,913 1,292 3,949 1,582 1,450 2,683 3,913 1,292 3,949 1,582 1,450 2,683 4,269 1,381 4,138 1,707 1,538 2,725 3,459 725 2,425 996 961 2,274 0 0 0 0 0 0 0 0 0 0 Totals 9,952 14,869 14,869 15,758 10,841 Note: Airflows on this report are not additive because they are each taken at the time of their respective peaks. To view the balanced system design airflows, see the appropriate Checksums report (Airflows section). Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc 0 0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Design Airflow Quantities Report Page 1 of 1 Room Checksums By MACDONALD-MILLER 01- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 2,157 346 21 0 0 0 723 3,247 1,758 450 1,611 0 0 0 0 0 29 0 29 440 0 0 Net Percent Total Of Total Btu/h (%) 0 0 0 2,157 346 50 0 0 0 723 3,276 2,198 450 1,611 0 15 2 0 0 0 0 5 23: 16 3 12! CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 2,931 254 25 0 0 0 242 3,451 1,758 250 1,611 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 37 Glass Solar 3 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 ' Adjacent Floor 3 . Infiltration 44 Sub Total ==> Internal Loads 22 Lights 3 People 20 ; Misc 3,819 440 4,259 30 : 3,619 46 ' Sub Total =_> -224 224 0 0 -223 -3 Ceiling Load O 0 4,882 35 0 0 Ventilation Load O 0 0 i 0 0 Adj Air Trans Heat 0 0 : Ov/Undr Sizing 1,033 1,033 7 ' 1,033 13 Exhaust Heat 551 551 4 OA Preheat Diff. 0 0 RA Preheat Diff. O 0 0 ! ' Additional Reheat -876 0 0 System Plenum Heat 0 0 Underfir Sup Ht Pkup O 0 0 I Supply Air Leakage 7,875 367 14,000 100.00 7,880 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -2,693 -2,693 8.09 -92 -204 0.61 O 0 0.00 O 0 0.00 O 0 0.00 -2,982 -2,982 8.96 -5,767 -5,879 17.67 0 0 0 0 -36 0 0 -7,331 -13,134 0 0 0 0.00 0.00 0.00 0 0.00 0 -20,138 0 -7,331 88 0 0 0 -11 0 0 0.00 60.53 0 22.03 -0.26 0.00 0.00 0.00 0.03 0.00 0.00 -33,272 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.2 14.0 0.0 0.0 0.0 0.0 1.2 14.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 11.2 391 81.0 65.2 67.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.4 58.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass f (%) Floor Part Int Door ExFlr Roof Wall Ext Door 644 0 0 0 0 0 0 128 60 47 21 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 73.9 Return 73.9 Ret/OA 81.0 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.8 69.8 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 391 391 391 0 391 391 58 0 449 449 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 391 391 391 0 391 391 58 0 449 449 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.61 0.61 cfm/ton 335.49 f/ton 552.01 Btu/hrff 21.74 -51.66 No. People 1.0 1.6/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -33.3 0.0 -13.6 0.0 0.0 -33.3 Lvg °F 391 24.0 100.0 0 0.0 0.0 391 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 1 of 49 Room Checksums By MACDONALD-MILLER 02- OFFICE INTERIOR COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 68 Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 40 40 40 0 40 188 450 630 1,268 47 0 0 47 236 450 630 1,315 Percent Of Total (%). 0 0 0 0 0 0 0 0 0 2 12 22 311, 65 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) Envelope Loads 0 0 Skylite Solar 0 0 Skylite Cond O 0 Roof Cond 0 0 Glass Solar O 0 Glass/Door Cond O Wall Cond O Partition/Door O Floor O Adjacent Floor 28 Infiltration 28 Sub Total ==> 0 0 0 0 3 3, 188 18 250 23 630 59 1,068 100 Internal Loads Lights People Misc Sub Total =_> -24 24 0 0 -24 -2 Ceiling Load O 0 594 30 0 0 Ventilation Load O 0 01 0 0 Adj Air Trans Heat 0 0' Ov/Undr Sizing O 0 0' 0 0 Exhaust Heat 62 62 3 ' OA Preheat Diff. 0 0 RA Preheat Diff. O 0 0 Additional Reheat -113 0 0' System Plenum Heat 0 0 Underflr Sup Ht Pkup O 0 0 ; Supply Air Leakage 1,283 21 2,011 100.00 1,072 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 -160 -160 0 0 0 0 -4 0 0 -1,528 -1,692 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -160 3.92 -160 3.92 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -2,387 58.51 O 0 -1,528 37.46 10 -0.24 0 0.00 O 0.00 O 0.00 -14 0.35 O 0.00 O 0.00 -4,080 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.0 0.0 0.0 0.0 0.0 0.2 2.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.6 50 81.7 65.4 0.0 0 0.0 0.0 67.5 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 55.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 69 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.9 Return 73.9 Ret/OA 81.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.8 69.8 27.7 0.0 0.0 0.0 AIRFLOWS Cooling 50 50 50 0 46 46 3 0 54 50 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 50 50 50 0 46 46 3 0 54 50 0 0 0 0 ENGINEERING CKS Cooling Heating 92.0 92.0 0.73 0.73 300.87 411.71 29.15 % OA cfm/ft2 cfm/ton ft'/ton Btu/hrft2 -59.13 No. People 1.0 14.5/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F -4.1 50 27.7 100.0 0.0 0 0.0 0.0 -1.5 50 27.7 54.0 0.0 0.0 -4.1 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 2 of 49 Room Checksums By MACDONALD-MILLER 03- EXIST MENS RM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> CLG SPACE PEAK Mo/Hr: 8 / 20 OADB: 75 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0. o 0 0 0 0 0 O 0 0 0: 0 O 0 0 0 O 0 0 0 O 0 0 0 0 O 0 0 0 O 0 0 0, 0 Internal Loads Lights 292 People 450 Misc 0 Sub Total ==> 742 Ceiling Load -38 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 888 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 1,592 Percent Of Total (%) Envelope Loads O Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 Partition/Door O Floor O Adjacent Floor 0 Infiltration n . Sub Total =_> j Internal Loads 73 365 14 292 21 Lights O 450 17 250 18 I People O 0 0 0 0 i Misc 73 815 30 542 39 Sub Total ==> 38 0 87 0 -155 0 0 905 0 0 888 87 0 0 0 0 0 0 34 0 0 33 3 0 0 0 0 43 2,695 100.00 -37 -3 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 888 64 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,393 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (°/ ) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -6 0 0 -2,316 -2,322 0 -3,560 0 -2,316 14 0 0 0 -19 0 0 0.00 60.53 0 39.37 -0.23 0.00 0.00 0.00 0.33 0.00 0.00 -5,882 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.2 69 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.9 56.3 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 107 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 0 ft' (%) 0 0 0 0 Ext Door 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 73.9 Return 73.9 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.8 69.8 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 69 69 69 0 69 69 0 0 69 69 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 69 69 69 0 69 69 0 0 69 69 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.65 0.65 308.18 476.52 25.18 % OA cfm/ft' cfm/ton Who n Btu/hr•ft' -54.98 No. People 1.0 9.3/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -5.9 69 0.0 0 -2.4 69 0.0 0.0 -5.9 24.0 0.0 24.0 Lvg °F 100.0 0.0 55.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 3 of 49 Room Checksums By MACDONALD-MILLER 04- RECEPTION COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h O 0 o 0 O 0 o 0 O 0 O 0 0 0 O 0 0 O 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 677 169 846 13 1,350 0 1,350 21 935 0 935 15 2,962 169 3,132 49 -88 88 0 0 O 0 2,017 32 O 0 0 0 0 1,021 1,021 16 205 205 3 0 0 O 0 0 -366 0 0 0 0 O 0 0 3,895 96 6,375 100.00 CLG SPACE PEAK Mo/Hr: 8 / 20 OADB: 75 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 677 750 935 2,362 -85 0 0 1,021 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond 0 ; Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 I Partition/Door O Floor O Adjacent Floor O Infiltration n Sub Total ==> 21 23 28 72 -3 0 0 31 Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 3,298 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -14 0 0.00 O -8,428 60.53 O 0 0 -5,483 -5,483 39.37 32 -0.23 0 0.00 0 0.00 O 0.00 -46 0.33 O 0.00 0 0.00 -5,496 -13,924 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.4 0.0 0.0 0.0 0.0 0.5 6.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.1 164 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.9 56.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 248 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating SADB 57.0 100.0 Ra Plenum 73.9 69.8 Return 73.9 69.8 Ret/OA 82.4 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling 164 164 164 0 164 164 0 0 164 164 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 164 164 164 0 164 164 0 0 164 164 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.66 0.66 cfm/ton 308.34 ft'/ton 466.84 Btu/hr•ft' 25.70 -56.15 No. People 3.0 12.1/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -13.9 164 24.0 100.0 0.0 0 0.0 0.0 -5.7 164 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -13.9 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 4 of 49 Room Checksums By MACDONALD-MILLER 05- FL1 PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 4,682 52 15 0 0 0 174 4,923 0 0 0 0 0 22 0 22 Net Percent Total Of Total Btu/h 0 0 0 4,682 52 37 0 0 0 174 4,946 0.. 0 0 58 1' 0 O 0 2! 62 410 102 512 6 450 0 450 6 768 0 768 10 1,627 102 1,730 22 i CLG SPACE PEAK Mo/Hr: 9 / 11 OADB: 71 Space Sensible Btu/h 0 0 0 5,447 -150 1 0 0 0 -62 5,236 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 82 Glass Solar -2 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor O Adjacent Floor -1 Infiltration 79 . Sub Total =_> Internal Loads 410 6 Lights 250 4 People 768 12 Misc 1,427 22 Sub Total ==> -54 54 0 0 -56 -1 ! Ceiling Load O 0 1,223 151 0 0 i Ventilation Load O 0 01 0 0 1 Adj Air Trans Heat 0 01 Ov/Undr Sizing O 0 0; 0 0 i Exhaust Heat 138 13821 10A Preheat Diff. 0 0 i 1RA Preheat Diff. O 0 01 ;Additional Reheat -696 0 0 i !System Plenum Heat 0 01 1 Underflr Sup Ht Pkup O 0 0 ; i Supply Air Leakage 6,497 -379 8,036 100.00 6,608 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,267 -72 0 0 0 -695 -2,034 0 0 0 0 -8 0 0 -8,392 -10,434 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 O 0.00 0 0.00 -1,267 8.25 -163 1.06 O 0.00 0 0.00 O 0.00 -695 4.52 -2,125 13.83 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -4,888 31.81 0 0 -8,392 54.62 21 -0.14 0 0.00 O 0.00 0 0.00 20 -0.13 0 0.00 0 0.00 -15,364 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib 0.7 8.0 6.9 311 75.3 61.5 59.4 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.7 8.0 Leave DB/WBIHR °F °F gr/Ib 54.0 52.5 56.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 150 0 0 0 0 0 0 122 68 56 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.9 Return 73.9 Ret/OA 75.3 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.8 69.8 55.8 0.0 0.0 0.0 AIRFLOWS Cooling 311 311 311 0 95 95 14 0 324 109 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 311 311 311 0 95 95 14 0 324 109 0 0 0 0 ENGINEERING CKS Cooling Heating 30.6 30.6 2.07 2.07 464.34 224.00 53.57 OA cfm/ft' cfm/ton W/ton Btu/hr•ft' -102.43 No. People 1.0 6.7/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -15.4 0.0 Lvg °F 311 55.8 100.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -15.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 5 of 49 Room Checksums By MACDONALD-MILLER 06- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 8 / 11 OADB: 76 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 0 0 0 0 Skylite Solar O 0 0 0 0 0 Skylite Cond O 0 0 0, 0 0 Roof Cond 5,772 0 5,772 48 ' 6,257 63 Glass Solar 59 0 59 0 -65 -1 Glass/Door Cond 21 31 52 0 15 0 Wall Cond O 0 0 0 0 Partition/Door O 0 0 0 0 Floor O 0 0 0 0 0 Adjacent Floor 162 162 1 14 0 Infiltration 6,014 31 6,044 50 6,221 63 Sub Total ==> 399 1,800 2,297 4,496 -53 0 0 0 10,457 100 0 0 100 53 0 153 0 -1,038 0 -702 498 1,800 2,297 4,595 0 1,323 0 0 0 153 0 0 0 0 0 12,116 4 15 19 38 0' 11 0I 0' 1 0: 0 0; 0' 0 100.00 Internal Loads 399 4 Lights 1,000 10 People 2,297 23 I Misc 3,696 37 Sub Total =_> i -53 -1 1 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. ' Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,863 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -2,347 -2,347 11.08 -138 -309 1.46 0 0 0.00 O 0 0.00 O 0 0.00 -676 -676 3.19 -3,161 -3,332 15.73 0 0 0 0 -8 0 0 -12,405 -15,573 0 0 0 0.00 0.00 0.00 0 0.00 0 -5,536 0 -12,405 24 0 0 0 70 0 0 0.00 26.14 0 58.57 -0.11 0.00 0.00 0.00 -0.33 0.00 0.00 -21,179 100.00 Total Capacity ton MBh Main Clg 1.0 12.1 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.0 12.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 10.3 464 75.0 61.3 59.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 55.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 146 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 227 Ext Door 0 0 0 125 55 0 0 TEMPERATURES SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict Cooling 56.0 73.9 73.9 75.0 0.0 0.0 0.0 Heating 100.0 69.8 69.8 59.2 0.0 0.0 0.0 AIRFLOWS Cooling 464 464 464 0 108 108 13 0 477 121 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Own Leakage Ups Heating 464 464 464 0 108 108 13 0 477 121 0 0 0 0 ENGINEERING CKS Cooling Heating 23.2 23.2 3.18 3.18 459.66 144.60 82.99 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' -145.06 No. People 4.0 27.4/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Ent Lvg °F °F -21.2 464 59.2 100.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -21.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 6 of 49 Room Checksums By MACDONALD-MILLER 07- FL1 CORNER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 12 OADB: 78 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 6,851 0 6,851 66 6,851 -71 0 -71 -1 -71 18 32 51 0 18 O 0 0 0 O 0 0 0 O 0 0 0 0 118 118 1 , 33 6,916 32 6,948 67 6,831 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 ' Roof Cond 81 Glass Solar -1 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration g0 Sub Total =_> Internal Loads 273 68 341 3 273 3 Lights 1,350 0 1,350 13 750 9 People 683 0 683 7 683 8 Misc 2,306 68 2,374 23, 1,706 20 Sub Total =_> -37 37 0 0 -37 O 0 984 9 ' 0 0 0 0 0 0 0 O 0 0 0 109 109 11 0 0, O 0 0I -895 0 0 ' 0 01 O 0 01 9,185 -648 10,415 100.00 ' 0 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,500 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -2,782 -2,782 15.97 -130 -322 1.85 0 0 0.00 O 0 0.00 O 0 0.00 -463 -463 2.66 -3,375 -3,566 20.48 0 0 0 0 -12 0 0 -10,035 -13,421 0 0 0 0.00 0.00 0.00 O 0.00 0 0.00 -3,859 22.16 O 0 -10,035 57.62 35 -0.20 O 0.00 O 0.00 O 0.00 10 -0.06 O 0.00 0 0.00 -17,415 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.4 0.0 0.0 0.0 0.0 0.9 10.4 COOLING COIL SELECTION Enter DB/WB/HR MBh cfm °F °F gr/Ib Sens Cap. Coil Airflow 9.0 400 74.7 61.1 58.6 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.0 54.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor Part Int Door ExFlr Roof Wall Ext Door fe (%) 100 0 0 0 O 0 255 148 0 58 O 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.8 Return 73.8 ReUOA 74.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 61.1 0.0 0.0 0.0 AIRFLOWS Cooling 400 400 400 0 75 75 9 0 409 84 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 400 400 400 0 75 75 9 0 409 84 0 0 0 0 ENGINEERING CKS Cooling Heating 18.8 18.8 4.00 4.00 460.83 115.22 104.15 % OA cfm/ft' cfm/ton fr/ton Btu/hr•ft' -174.15 No. People 3.0 30.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -17.4 0.0 Lvg °F 400 61.1 100.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -17.4 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 7 of 49 Room Checksums By MACDONALD-MILLER 08- PERIMETER OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total Btu/h (%) o o 0 0 0 0 0 0 0 0 0 0 3,988 0 3,988 16 699 0 699 3 74 102 175 1 0 0 0 0 0 0 0 0 0 0 1,471 1,471 6 6,232 102 6,334 25 2,760 2,250 2,560 7,570 690 0 0 690 3,451 13 2,250 9 2,560 10 8,260 32 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h 0 0 0 15,776 -1,117 -4 0 0 0 -923 13,731 2,760 1,250 2,560 6,570 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 79 Glass Solar -6 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 ; Floor 0 . Adjacent Floor -5 Infiltration Sub Total ==> 69 14 6 13 33 Internal Loads Lights People Misc Sub Total ==> -362 362 0 0 -389 -2 1 Ceiling Load O 0 10,209 40 0 0 Ventilation Load O 0 0 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing O 0 0 0 0, Exhaust Heat 913 913 4 OA Preheat Diff. O 0 1 RA Preheat Diff. 0 0 0 ' Additional Reheat -2,096 0 0 System Plenum Heat O 0 Underflr Sup Ht Pkup 0 0 0r Supply Air Leakage 13,440 -30 25,715 100.00 19,913 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -5,351 -315 0 0 0 -4,682 -10,347 0 0 0 0 -119 0 0 -20,974 -31,441 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 O 0.00 O 0.00 -5,351 8.35 -705 1.10 0 0.00 O 0.00 O 0.00 -4,682 7.31 -10,737 16.76 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -32,497 50.73 O 0 -20,974 32.74 300 -0.47 0 0.00 0 0.00 O 0.00 -156 0.24 O 0.00 0 0.00 -64,065 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 2.1 25.7 0.0 0.0 0.0 0.0 2.1 25.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 19.0 937 79.6 64.1 64.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 54.0 62.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 1,011 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 518 Ext Door 0 fF (%) O 0 285 55 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.9 Return 73.9 Ret/OA 79.6 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 38.9 0.0 0.0 0.0 AIRFLOWS Cooling 937 937 937 0 632 632 91 0 1,028 723 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 937 937 937 0 632 632 91 0 1,028 723 0 0 0 0 ENGINEERING CKS Cooling Heating OA 67.4 67.4 cfm/ft' 0.93 0.93 cfm/ton 437.24 ft'/ton 471.78 Btu/hr•ft' 25.44 -63.37 No. People 5.0 4.9/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F -64.1 0.0 -15.9 937 38.9 100.0 0 0.0 0.0 937 38.9 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -64.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 8 of 49 Room Checksums By MACDONALD-MILLER 09- WEST HALF PERIMETER FL1 HALLWAY COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 4,574 -251 41 0 0 0 265 4,629 751 0 0 751 -109 0 0 0 0 0 0 0 0 34 0 34 188 0 0 188 109 0 266 0 -547 0 Net Total Btu/h 0 0 0 4,574 -251 75 0 0 0 265 4,663 939 0 0 939 0 1,765 0 0 0 266 0 0 0 0 0 Percent Of Total (%) 0 0' 0 601 -3! 1'. 0`. o 0 3. 61 12! 0' 0 12 0 23 0 0 0 3 0 0 0 0 0, 5,270 50 7,633 100.00 CLG SPACE PEAK Mo/Hr: 6 / 10 OADB: 68 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar O 0 Skylite Cond O 0 Roof Cond 5,390 104 Glass Solar -652 -13 Glass/Door Cond 9 0 Wall Cond O 0 Partition/Door O 0 Floor O 0 Adjacent Floor -188 -4 Infiltration 4,559 88 , Sub Total ==> Internal Loads 751 14 Lights O 0 People O 0 ; Misc 751 14 ' Sub Total ==> -112 -2 j Ceiling Load O 0 Ventilation Load O 0 I Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat • System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,198 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3,726 -3,726 22.27 -468 -759 4.53 0 0 0.00 O 0 0.00 O 0 0.00 -1,273 -1,273 7.61 -5,467 -5,758 34.41 0 0 0 0 -35 0 0 -2,706 -8,207 O 0.00 O 0.00 O 0.00 0 0.00 O 0.00 -8,490 50.74 O 0 -2,706 16.17 85 -0.51 O 0.00 O 0.00 O 0.00 135 -0.81 0 0.00 O 0.00 -16,733 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.6 0.0 0.0 0.0 0.0 0.6 7.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.6 245 74.6 62.6 65.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 51.8 53.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 275 0 0 0 0 0 0 366 115 31 21 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 74.6 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 38.8 0.0 0.0 0.0 AIRFLOWS Cooling 245 245 245 0 165 165 25 0 269 190 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 245 245 245 0 165 165 25 0 269 190 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 67.5 67.5 cfm/ft' 0.89 0.89 cfm/ton 384.54 ft'/ton 432.35 Btu/hi-ft' 27.76 -60.85 No. People 0.0 0.0/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -16.7 Lvg °F 245 38.8 100.0 0.0 0 0.0 0.0 -4.2 245 38.8 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 9 of 49 Room Checksums By MACDONALD-MILLER 09 -EAST HALF PERIMETER FL1 HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 10 OADB: 68 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0, 0 O 0 0 0 0 4,574 0 4,574 60 5,390 -251 0 -251 -3 -652 41 33 74 1 9 O 0 0 0 O 0 0 0 O 0 0 0 0 265 265 3 -188 4,629 33 4,662 61 4,559 751 188 939 12 751 O 0 0 0 0 O 0 0 0 0 751 188 939 12 751 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond O Roof Cond 104 Glass Solar -13 Glass/Door Cond O Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -4 , Infiltration 88 Sub Total =_> Internal Loads 14 Lights O People O Misc 14 Sub Total ==> -103 103 0 0 -105 -2 O 0 1,766 23 0 0 O 0 0 0 0 O 0 O 0 0 0 0 250 250 3 O 0 0 0 0 -548 0 0 O 0 0 0 0 Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,277 25 7,616 100.00 5,205 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3,726 -3,726 22.26 -468 -759 4.53 O 0 0.00 O 0 0.00 O 0 0.00 -1,273 -1,273 7.61 -5,467 -5,758 34.40 0 0 0 0 -32 0 0 -2,719 -8,218 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -8,490 50.71 0 0 -2,719 16.24 79 -0.47 0 0.00 0 0.00 O 0.00 147 -0.88 0 0.00 O 0.00 -16,741 100.00 Main CIg Aux CIg Opt Vent Total. Total Capacity ton MBh 0.6 7.6 0.0 0.0 0.0 0.0 0.6 7.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.6 245 74.7 62.6 65.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 51.9 54.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 275 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 366 Ext Door 21 ft' (%) O 0 115 31 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.8 Return 73.8 ReUOA 74.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 38.9 0.0 0.0 0.0 AIRFLOWS Cooling 245 245 245 0 165 165 25 0 270 190 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 245 245 245 0 165 165 25 0 270 190 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 67.4 67.4 cfm/ft' 0.89 0.89 cfm/ton 385.88 ft'/ton 433.30 Btu/hrft' 27.69 -60.88 No. People 0.0 0.0/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -16.7 0.0 Lvg °F 245 38.9 100.0 0 0.0 0.0 -4.1 245 38.9 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 10 of 49 Room Checksums By MACDONALD-MILLER 10- INTERIOR OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 6 / 8 OADB: 64 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%); Btu/h 1 O 0 0 01 0 O 0 0 01 0 O 0 0 0' 0 900 0 900 2 • 3,871 176 0 176 0 -288 18 24 42 0 1 -2 0 0 01 0 O 0 01 0 O 0 0 01 0 O 0 0i 0 1,094 24 1,118 21 3,581 1 5,758 1,440 7,198 13 1 5,758 10,350 0 10,350 18 11 5,750 17,422 0 17,422 31 1 17,422 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 12 Glass Solar -1 Glass/Door Cond 0 Wall Cond 0 Partition/Door O Floor O Adjacent Floor O Infiltration 11 Sub Total =_> 18 18 55 33,530 1,440 34,970 6128,930 91 -596 596 0 0'1 -603 0 0 19,593 341 0 O 0 0i 0 0 01 O 0 0i 0 1,377 1,377 2 0 0i O 0 0'' -3,359 0 01 0 0 O 0 0i 34,028 77 57,057 100.001 31,908 100.00 Grand Total ==> Internal Loads Lights People Misc Sub Total ==> -2 . Ceiling Load 0 : Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing O Exhaust Heat OA Preheat Diff. ' RA Preheat Diff. ' Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,220 -74 0 0 0 0 -1,295 0 0 0 0 -68 0 0 -49,019 -50,382 Coil Peak Tot Sens Btu/h 0 0 0 0 -1,220 -164 0 0 0 0 -1,385 0 0 0 Percent Of Total (%) 0.00 0.00 0.00 0.00 1.01 0.14 0.00 0.00 0.00 0.00 1.14 0.00 0.00 0.00 0 0.00 0 0.00 58.49 -71,024 0 -49,019 157 0 0 0 -149 0 0 0 40.37 -0.13 0.00 0.00 0.00 0.12 0.00 0.00 -121,420 100.00 Total Capacity ton MBh Main Clg 4.8 Aux Clg 0.0 Opt Vent 0.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 57.1 44.3 1,501 81.7 65.4 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 Total 4.8 57.1 67.4 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.8 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 2,109 0 0 0 0 119 0 0 0 65 55 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.1 Return 74.1 Ret/OA 81.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 27.7 0.0 0.0 0.0 AIRFLOWS Cooling 1,501 1,501 1,501 0 1,380 1,380 0 0 1,501 1,380 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,501 1,501 1,501 0 1,380 1,380 0 0 1,501 1,380 0 0 0 0 ENGINEERING CKS Cooling Heating 91.9 91.9 0.71 0.71 315.77 443.56 27.05 % OA cfm/ft2 cfm/ton ft'/ton Btu/hr•ft' -57.57 No. People 23.0 10.9/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -121.4 0.0 -44.2 0.0 0.0 -121.4 Lvg °F 1,501 27.7 100.0 0 0.0 0.0 1,501 27.7 54.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 11 of 49 Room Checksums By MACDONALD-MILLER 11- PERIMETER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Net Percent Space Total Of Total Sensible Btu/h (%) : Btu/h o o 0 0 0 O 0 0 0 0 o o 0 0 0 5,486 0 5,486 41 5,812 -316 0 -316 -2 -412 3 8 11 0 -2 O 0 0 0 O 0 0 0 o 0 0 0' 0 54 54 0 -283 5,227 8 5,235 39 5,116 846 212 1,058 8 846 2,700 0 2,700 20 1,500 3,601 0 3,601 27 3,601 7,147 212 7,359 55 t 5,947 -125 125 0 0 -127 O 0 415 3 0 O 0 0 0 O 0 O 0 0 0 12,249 347 0 -1,151 0 -459 347 3 O 0 O 0 O 0 0 0 O 0 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond 53 Glass Solar -4 0 0 0' 0, -3 47 Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 81 Lights 14 + People 33 Misc 54 Sub Total ==> -1 ; Ceiling Load 0 !Ventilation Load 0 , Adj Air Trans Heat Ov/Undr Sizing 0 , Exhaust Heat 'OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 13,356 100.00 10,936 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 O 0 O 0 0 0 -1,971 -1,971 -111 -254 O 0 0 0 0 0 -1,436 -1,436 -3,518 -3,660 0 0 0 0 -39 0 0 -13,710 -17,268 0 0 0 0.00 0.00 0.00 0.00 6.91 0.89 0.00 0.00 0.00 5.03 12.84 0.00 0.00 0.00 0 0.00 0 -11,114 0 -13,710 109 0 0 0 -141 0 0 0.00 38.97 0 48.08 -0.38 0.00 0.00 0.00 0.49 0.00 0.00 -28,516 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 13.4 0.0 0.0 0.0 0.0 1.1 13.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 9.9 515 71.6 61.1 63.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.0 54.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 310 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 189 Ext Door 0 0 0 105 56 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 71.6 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 50.5 0.0 0.0 0.0 AIRFLOWS Cooling 515 515 515 0 216 216 28 0 543 244 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 515 515 515 0 216 216 28 0 543 244 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 42.0 42.0 cfmIft' 1.66 1.66 cfm/ton 462.37 fV/tan 278.53 Btu/hrft' 43.08 -91.99 No. People 6.0 19.4/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -28.5 515 50.5 100.0 0.0 0 0.0 0.0 -2.0 515 50.5 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -28.5 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 12 of 49 Room Checksums By MACDONALD-MILLER 12- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) O 0 0 0 O 0 0 0 O 0 0 0 2,612 0 2,612 59 -150 0 -150 -3 2 4 5 0 O 0 0 O 0 0 O 0 0 0 34 34 1 2,498 4 2,502 56 325 81 406 9 450 0 450 10 715 0 715 16 1,490 81 1,571 35 -48 48 0 0 O 0 246 6 O 0 0 0 0 O 0 0 124 124 3 0 0 0 0 0 -390 0 0 0 0 0 0 0 3,940 -133 4,443 100.00 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h 0 0 0 2,768 -196 -1 0 0 0 -109 2,462 Percent Of Total (%) Envelope Loads O Skylite Solar 0 Skylite Cond O Roof Cond 75 Glass Solar -5 Glass/Door Cond 0 Wall Cond O Partition/Door 0 Floor O Adjacent Floor -3 Infiltration 66 Sub Total ==> Internal Loads 325 9 Lights 250 7 People 715 19 Misc 1,290 35 Sub Total =_> -49 -1 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 ; Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 3,704 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -939 -53 0 0 0 -551 -1,543 0 0 0 0 -15 0 0 -4,290 -5,848 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 O 0.00 0 0.00 -939 9.56 -121 1.23 0 0.00 O 0.00 O 0.00 -551 5.61 -1,611 16.40 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -3,931 40.02 0 0 -4,290 43.67 39 -0.40 O 0.00 O 0.00 O 0.00 -30 0.31 O 0.00 O 0.00 -9,823 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.4 0.0 0.0 0.0 0.0 0.4 4.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 3.3 174 71.5 60.8 62.6 54.0 51.9 54.1 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 119 0 0 0 O 0 0 90 50 56 O 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 71.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 49.6 0.0 0.0 0.0 AIRFLOWS Cooling 174 174 174 0 76 76 11 0 185 87 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 174 174 174 0 76 76 11 0 185 87 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 43.8 43.8 cfm/ftp 1.46 1.46 cfm/ton 470.73 fV/ton 321.43 Btu/hr-ft' 37.33 -82.54 No. People 1.0 8.4/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -9.8 174 0.0 0 49.6 0.0 Lvg °F 100.0 0.0 -0.9 174 49.6 54.0 0.0 0.0 -9.8 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 13 of 49 Room Checksums By MACDONALD-MILLER 13- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) Envelope Loads O 0 0 0 0 0 Skylite Solar O o 0 0 0 0 Skylite Gond O 0 0 0 0 0 L Roof Cond 2,874 0 2,874 58 3,044 75 Glass Solar -165 0 -165 -3 -216 -5 Glass/Door Cond 2 4 7 0 i -1 0 Wall Cond O 0 0 0 0 '. Partition/Door O 0 0 0 0 Floor O 0 0 0 0 0 Adjacent Floor 42 42 1 i -135 -3 Infiltration 2,753 4 2,757 56 2,693 66 Sub Total ==> i Internal Loads. 404 101 505 10 404 10 i Lights 450 0 450 9 I 250 6 j People 765 0 765 16 I 765 19 ; Misc 1,619 101 1,720 35 j1,419 35 j Sub Total =_> -60 60 0 0 -60 -1 ' Ceiling Load O 0 297 6' 0 0 , Ventilation Load 0 0 0, 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 152 1523 1 ' OA Preheat Diff. 0 01RA Preheat Diff. O 0 0Additional Reheat -426 0 0I System Plenum Heat 0 0 ! Underflr Sup Ht Pkup O 0 0i: Supply Air Leakage 4,311 -109 4,926 100.00 4,051 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -1,033 -1,033 9.17 -71 -149 1.32 O 0 0.00 O 0 0.00 O 0 0.00 -685 -685 6.08 -1,789 -1,867 16.57 0 0 0 0 -19 0 0 -4,589 -6,396 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -4,826 42.84 O 0 -4,589 40.73 48 -0.43 O 0.00 O 0.00 O 0.00 -32 0.28 O 0.00 O 0.00 -11,266 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.9 0.0 0.0 0.0 0.0 0.4 4.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 3.6 191 71.2 60.9 63.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 51.9 54.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 148 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 104 Ext Door 0 ft2 (%) O 0 55 53 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 71.2 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 47.2 0.0 0.0 0.0 AIRFLOWS Cooling 191 191 191 0 94 94 13 0 204 107 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 191 191 191 0 94 94 13 0 204 107 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 49.2 49.2 cfm/ft2 1.29 1.29 cfm/ton 464.31 ft2/ton 360.51 Btu/hr•ft= 33.29 -76.12 No. People 1.0 6.8/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -11.3 0.0 -1.5 Lvg °F 191 47.2 100.0 0 0.0 0.0 191 47.2 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -11.3 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 14 of 49 Room Checksums By MACDONALD-MILLER 14- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 11 OADB: 71 Net Percent Space Total Of Total Sensible Btu/h (%) ` Btu/h o o 0 0 0 0 0 0 0 0 0 0 0 0 0 2,132 0 2,132 41 2,497 -29 0 -29 -1 -171 21 16 37 1 9 0 0 0 0 0 0 0 0 O 0 0 0 0 158 158 3 -57 2,282 16 2,298 44 2,278 363 91 454 9 363 450 0 450 9. 250 739 0 739 14 739 1,552 91 1,643 32 . 1,352 -52 52 0 0 -53 0 0 1,122 22 0 O 0 0, 0 O 0, O 0 0 0 134 134 3,, O 0i 0 0 0' -377 0 0; O 0 0 0 0, 3,782 -84 5,197 100.00 3,577 100.00 Grand Total =_> Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 70 -5 0 0 0 0 -2 64 Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 10 Lights 7 People 21 Misc 38 Sub Total ==> -1 Ceiling Load O Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing O Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 -1,127 -1,127 11.21 -320 -485 4.83 O 0 0.00 O 0 0.00 O 0 0.00 -616 -616 6.13 -2,062 -2,228 22.17 0 0 0 0 -17 0 0 -3,569 -5,648 0 0 0 0.00 0.00 0.00 0 0.00 0 -4,363 0 -3,569 43 0 0 0 68 0 0 0.00 43.42 0 35.52 -0.43 0.00 0.00 0.00 -0.68 0.00 0.00 -10,049 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.4 5.2 0.0 0.0 0.0 0.0 0.4 5.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm , °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 4.1 168 76.1 62.5 62.7 54.0 51.9 53.9 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFlr Roof Wall Ext Door 133 0 0 0 0 0 0 221 60 27 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 73.8 Return 73.8 Ret/OA 76.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.6 69.6 46.6 0.0 0.0 0.0 AIRFLOWS Cooling 168 168 168 0 85 85 12 0 180 97 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 168 168 168 0 85 85 12 0 180 97 0 0 0 0 ENGINEERING CKS Cooling Heating 50.4 50.4 1.27 1.27 388.63 307.09 39.08 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' -75.55 No. People 1.0 7.5/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -10.1 0.0 Lvg °F 168 46.6 100.0 0 0.0 0.0 -1.4 168 46.6 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -10.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Altemative - 1 System Checksums Report Page 15 of 49 Room Checksums By MACDONALD-MILLER 15- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O o 0 0 0 O 0 0 0 0 O 0 0 0 0 3,575 0 3,575 493,915 269 0 269 4� 162 31 44 75 1 35 0 0 0 0 0 0 0 0 O 0 0 0 0 188 188 3 18 4,064 44 4,107 56 I 4,129 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 70 Glass Solar 3 Glass/Door Cond 1 Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration 74 Sub Total ==> Internal Loads 448 112 560 8 448 8 450 0 450 6 250 4 792 0 792 11 792 14, 1,690 112 1,802 25 1,490 27 -46 46 0 0 -46 O 0 1,320 181 0 O 0 0 0 0 0 O 0 0 0 117 117 2 0 0 O 0 0 -587 0 0 0 0 O 0 0 5,707 -268 7,346 100.00 Lights People Misc Sub Total ==> -1 ' Ceiling Load 0 ; Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,573 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -2,469 -2,469 17.46 -135 -313 2.22 O 0 0.00 O 0 0.00 O 0 0.00 -759 -759 5.37 -3,364 -3,542 25.05 0 0 0 0 -5 0 0 -5,431 -8,800 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 -5,320 37.63 O 0 -5,431 38.41 13 -0.10 O 0.00 O 0.00 O 0.00 141 -1.00 0 0.00 0 0.00 -14,138 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.6 7.4 0.0 0.0 0.0 0.0 0.6 7.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 6.1 262 75.9 62.0 0.0 0 0.0 0.0 60.7 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.3 55.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 164 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 235 Ext Door 0 ft' (%) 0 0 132 56 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.1 Return 74.1 Ret/OA 75.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 51.8 0.0 0.0 0.0 AIRFLOWS Cooling 262 262 262 0 103 103 15 0 277 118 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 262 262 262 0 103 103 15 0 277 118 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 39.4 39.4 cfm/ft' 1.60 1.60 cfm/ton 428.42 ft'/ton 267.91 Btu/hr-ft' 44.79 -86.21 No. People 1.0 6.1/1000 ft' HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -14.1 262 51.8 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.6 262 51.8 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total ' -14.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 16 of 49 Room Checksums By MACDONALD-MILLER 16- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 2,931 115 10 0 0 0 164 3,219 0 0 0 0 0 15 0 15 Net Total Btu/h 0 0 0 2,931 115 25 0 0 0 164 3,234 Percent Of Total (%) 0 0 0 48 2 0 0' 0 0;, 3 531 CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Space Sensible Btu/h 0 0 0 3,354 -56 10 0 0 0 -47 3,262 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Percent Space Peak Coil Peak Percent Of Total Space Sens Tot Sens Of Total (%) Btu/h Btu/h (%) Envelope Loads O Skylite Solar 0 0 0.00 O Skylite Cond 0 0 0.00 0 ' Roof Cond 0 0 0.00 73 ' Glass Solar 0 0 0.00 -1 Glass/Door Cond -1,127 -1,127 9.71 O Wall Cond -64 -145 1.25 O Partition/Door 0 0 0.00 O Floor 0 0 0.00 O Adjacent Floor 0 0 0.00 -1 Infiltration -616 -616 5.31 71 Sub Total ==> -1,806 -1,888 16.27 ' Internal Loads 363 91 454 7 363 8 Lights 450 0 450 7 ' 250 5 ' People 739 0 739 12! 739 16 Misc 1,552 91 1,643 27 1,352 30 ' Sub Total ==> -37 37 0 0' -37 -1 ' Ceiling Load O 0 1,158 19' 0 0 Ventilation Load O 0 0 0 0 Adj Air Trans Heat 0 0 i Ov/Undr Sizing O 0 0 0 0 1 Exhaust Heat 95 95 2 1 OA Preheat Diff. O 0 , l RA Preheat Diff. O 0 0 , Additional Reheat -482 0 0 ! System Plenum Heat O 0 I Underflr Sup Ht Pkup O 0 0 1 Supply Air Leakage 4,734 -243 6,131 100.00 ' 4,577 100.00 ' Grand Total =_> 0 0 0 0 0 0 0 0.00 0.00 0.00 O 0.00 -4 0 0.00 O -4,363 37.60 O 0 0 -5,416 46.67 11 -0.09 O 0.00 O 0.00 O 0.00 52 -0.44 O 0.00 O 0.00 -5,416 -7,227 -11,605 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.1 0.0 0.0 0.0 0.0 0.5 6.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 5.0 215 75.9 61.9 59.9 54.0 52.0 54.3 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 133 Part 0 Int Door 0 ExFlr 0 Roof 0 0 0 Wall 108 60 56 Ext Door 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.1 Return 74.1 Ret/OA 75.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 51.8 0.0 0.0 0.0 AIRFLOWS Cooling 215 215 215 0 85 85 12 0 227 97 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 215 215 215 0 85 85 12 0 227 97 0 0 0 0 ENGINEERING CKS Cooling Heating 39.4 39.4 1.62 1.62 421.53 260.32 46.10 -87.25 % OA cfm/ft' cfm/ton ft'lton Btu/hr•ft' No. People 1.0 7.5/1000 ft2 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -11.6 215 51.8 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.5 215 51.8 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -11.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 17 of 49 Room Checksums By MACDONALD-MILLER 17- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 19 Outside Air: OADB/WB/HR: 76 / 64 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0' 0 O 0 0 0 0 O 0 0 0 0 1,437 0 1,437 64 1,564 37 0 37 2 -23 6 9 16 1, 5 0 0 01 0 O 0 0 0 O 0 0 0 0 66 66 3 -22 1,546 9 1,555 69 i 1,523 175 44 218 101 175 O 0 0 0, 0 O 0 0 01 0 175 44 218 10 175 -18 18 0 0 -18 O 0 440 19 0 O 0 0 0 0 0; O 0 0 0 43 43 2' 0 0' 0 0 0: -177 0 0 0 0, 0 0 0 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 93 Glass Solar -1 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -1 Infiltration 91 Sub Total ==> Internal Loads 10 Lights 0. People O Misc 10 Sub Total =_> -1 Ceiling Load O Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,703 -63 2,256 100.00 1,680 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -563 -563 12.16 -32 -73 1.57 O 0 0.00 O 0 0.00 O 0 0.00 -296 -296 6.40 -891 -932 20.12 0 0 0 0 O 0.00 O 0.00 O 0.00 O 0.00 -2 0 0.00 O -1,976 42.65 O 0 0 -1,759 -1,759 37.97 5 -0.11 O 0.00 O 0.00 O 0.00 29 -0.63 O 0.00 O 0.00 -2,653 -4,633 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.3 0.0 0.0 0.0 0.0 0.2 2.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.8 79 75.1 61.8 60.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 53.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 64 0 O ' 0 O 0 0 54 30 56 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.1 Return 74.1 Ret/OA 75.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 47.6 0.0 0.0 0.0 AIRFLOWS Cooling 79 79 79 0 38 38 6 0 85 44 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 79 79 79 0 38 38 6 0 85 44 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 48.6 48.6 cfm/ft2 1.24 1.24 cfm/ton 420.40 W/ton 340.36 Btu/hrft2 35.26 -72.39 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -4.6 79 0.0 0 47.6 0.0 Lvg °F 100.0 0.0 -0.6 79 47.6 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 18 of 49 Room Checksums By MACDONALD-MILLER 18- HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 83 / 66 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Net Percent Space Total Of Total Sensible Btu/h (%) I Btu/h O 0 0 0 0 o 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 216 0 216 9 216 17 2 3 4 0 2 0 O 0 0 0 0 o 0 0 0 0 o 0 0 0 0 0 139 139 6 84 7 357 3 359 15 302 24 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> 287 72 358 15 287 O 0 0 0 0 O 0 0 0 0 287 72 358 15 287 Internal Loads 23 Lights 0 People 0 Misc 23 Sub Total ==> -30 30 0 0 -30 -2 j Ceiling Load O 0 926 38 0 0 i Ventilation Load O 0 0 0 0' Adj Air Trans Heat 0 0 ; Ov/Undr Sizing 709 709 29 709 56 Exhaust Heat 72 72 3 I OA Preheat Diff. 0 0 , RA Preheat Diff. O 0 0 ; Additional Reheat -141 0 0 i System Plenum Heat 0 0 ! Underflr Sup Ht Pkup O 0 0 1J Supply Air Leakage 1,323 35 2,425 100.00 1,268 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,566 -28 0 0 0 -486 -2,081 0 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 0 0.00 0 0.00 0 0.00 -1,566 29.25 -59 1.10 0 0.00 0 0.00 0 0.00 -486 9.08 -2,112 39.43 O 0.00 O 0.00 O 0.00 O 0.00 -3 0 0.00 O -3,241 60.53 O 0 0 -29 -29 0.55 8 -0.15 0 0.00 O 0.00 O 0.00 19 -0.35 O 0.00 0 0.00 -2,114 -5,355 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.0 63 83.0 65.7 66.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.0 56.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 105 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 20 Ext Door 21 ft2 (%) O 0 O 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 83.0 Fn MtrTD 0.0 Fn BIdTD 0:0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 63 63 63 0 63 63 9 0 72 72 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 63 63 63 0 63 63 9 0 72 72 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft2 0.60 0.60 cfm/ton 311.74 ft2/ton 519.56 Btu/hrft2 23.10 -51.00 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -5.4 63 24.0 0.0 0 0.0 -2.2 63 24.0 0.0 0.0 -5.4 Lvg °F 100.0 0.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 19 of 49 Room Checksums By MACDONALD-MILLER 19- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Plenum Net Percent , Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o 0 0 0 0 o 0 0 0 0 o o 0 0. 0 o o 0 0 0 o o 0 0 0 o 0 0 0 0 o 0 0 0 o 0 0 0 o 0 0 0 0 O 0 0 0 O 0 0 0 0 34 171 13i 137 19 O 450 34 250 35 O 0 0 0 0 34 621 47' 387 55 Internal Loads Lights 137 People 450 Misc 0 Sub Total =_> 587 Ceiling Load -14 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 332 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 904 Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 ! Partition/Door 0 Floor O Adjacent Floor 0 Infiltration 0 Sub Total ==> 14 0 0 -14 O 346 26 0 0 0 0 0 0 332 25 332 35 35 3 0 0 O 0 0 -78 0 0 0 0 0 0 0 5 1,334 100.00 Internal Loads Lights People Misc Sub Total ==> -2 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 47 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 705 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -2 0 0.00 O -1,801 60.53 O 0 0 -1,173 -1,173 39.42 4 -0.13 0 0.00 0 0.00 O 0.00 -6 0.19 0 0.00 O 0.00 -1,174 -2,975 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 _ 1.3 0.0 0.0 0.0 0.0 0.1 1.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.1 35 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 50 0 0 0 0 0 0 O 0 0 O 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 35 35 35 0 35 35 0 0 35 35 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 35 35 35 0 35 35 0 0 35 35 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.70 0.70 cfm/ton 314.89 ft'/ton 449.85 Btu/hr•ft' 26.68 -59.51 No. People 1.0 20.0/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -3.0 35 24.0 100.0 0.0 0 0.0 0.0 -1.2 35 24.0 55.0 0.0 0.0 -3.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 20 of 49 Room Checksums By MACDONALD-MILLER 20- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 137 People 450 Misc 0 Sub Total =_> 587 Ceiling Load -14 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 332 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 904 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 O 0 0 0 O 0 0 0 O 0 0 0 O 0 0• 0 O 0 0 0 0 0 0 0 0 0 O 0 0i 0 0 01 0 0 0 0; 0 34 171 13 137 O 450 34: 250 O 0 01 0 34 621 47 387 14 0 0 -14 0 346 26; 0 0 01 0 O 0 332 25 332 35 35 3i O 0, O 00j -78 0 0 O 0 0 0 01 5 1,334 100.001 705 Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 ' Partition/Door O Floor 0 Adjacent Floor O Infiltration 0 Sub Total =_> 19 35 0. 55 -2 ' Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 47 I Exhaust Heat OA Preheat Diff. RA Preheat Diff. ', Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> Internal Loads Lights People Misc Sub Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 -1,173 -1,174 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -1,801 60.53 0 0 -1,173 39.42 4 -0.13 0 0.00 O 0.00 O 0.00 -6 0.19 O 0.00 O 0.00 -2,975 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.3 0.0 0.0 0.0 0.0 0.1 1.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.1 35 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 50 0 0 0 O 0 0 O 0 0 O 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 35 35 35 0 35 35 0 0 35 35 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 35 35 35 0 35 35 0 0 35 35 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.70 0.70 314.89 449.85 26.68 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' -59.51 No. People 1.0 20.0/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -3.0 35 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -1.2 35 24.0 55.0 0.0 0.0 -3.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 21 of 49 Room Checksums By MACDONALD-MILLER 21- TOILET COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 218 People 0 Misc 0 Sub Total =_> 218 Ceiling Load -23 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 770 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 966 0 0 0 0 0 0 0 0 Net Total Btu/h Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h Percent Of Total (%) Envelope Loads 0 0 0 0 Skylite Solar O 0 0 0 Skylite Cond 0 0 0 0 Roof Cond O 0 0 0 Glass Solar O 0 0 0 Glass/Door Cond 0 0 0 0 Wall Cond 0 0 0 0 Partition/Door O 0 0 0 Floor O 0 0 0 I Adjacent Floor O 0 0 0 ; Infiltration O 0 0 0 Sub Total ==> i 55 273 O 0 O 0 55 273 23 0 O 745 0 0 770 48 48 0 O 0 -107 0 0 0 0 i 15 218 23 0: 0 O 0 151 218 23 I O -22 -2 !Ceiling Load 41 ! 0 0 Ventilation Load 0 , 0 0 1 Adj Air Trans Heat 0 , ' Ov/Undr Sizing 42 : 770 80 j Exhaust Heat 3 , OA Preheat Diff. 0 . IRA Preheat Diff. 0 ; : Additional Reheat 0 i System Plenum Heat 0 , Underflr Sup Ht Pkup 01 : Supply Air Leakage Internal Loads Lights 0 People 0 ' Misc Sub Total ==> 18 1,836 100.001 966 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0 0 O 0 0.00 0.00 0.00 0 0 0.00 -3 0 0 -1,608 -1,611 0 -2,470 0 -1,608 5 0 0 0 -8 0 0 0.00 60.53 0 39.41 -0.13 0.00 0.00 0.00 0.20 0.00 0.00 -4,080 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 1.8 0.0 0.0 0.0 0.0 0.2 1.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 1.5 48 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 80 0 0 0 O 0 0 0 0 0 O 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 48 48 48 0 48 48 0 0 48 48 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 48 48 48 0 48 48 0 0 48 48 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.60 0.60 cfm/ton 313.80 fP/ton 523.01 Btu/hr•ft' 22.94 -51.00 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -4.1 0.0 -1.7 Lvg °F 48 24.0 100.0 0 0.0 0.0 48 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 22 of 49 Room Checksums By MACDONALD-MILLER 22- TOILET COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 177 People 0 Misc 0 Sub Total ==> 177 Ceiling Load -18 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 626 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 785 0 0 0 0 0 0 0 0 44 0 0 44 18 0 39 0 -87 0 Net Total Btu/h 0 0 0 0 0 0 0 0 0 0 0 222 0 0 222 0 605 0 0 626 39 0 0 0 0 0 Percent Of Total (%) 0' 0 0 0 0. 0 0. 0, 0 0 0! 15 0' 0.. 15 41'', 01 01 421 3j 0!. 0! 0 14 1,491 100.00 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 177 0 0 177 -18 0 0 626 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 Partition/Door O Floor O Adjacent Floor 0 Infiltration O Sub Total ==> Internal Loads 23 Lights 0 People 0 Misc 23 Sub Total ==> -2 Ceiling Load 0 'Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing 80 1 Exhaust Heat OA Preheat Diff. RA Preheat Diff. I Additional Reheat System Plenum Heat 1 Underflr Sup Ht Pkup Supply Air Leakage 785 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -2 0 0.00 O -2,007 60.53 O 0 0 -1,307 -1,307 39.41 4 -0.13 O 0.00 O 0.00 O 0.00 -7 0.20 O 0.00 0 0.00 -1,309 -3,315 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.5 0.0 0.0 0.0 0.0 0.1 1.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.2 39 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 65 0 0 0 0 0 0 0 0 0 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 39 39 39 0 39 39 0 0 39 39 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 39 39 39 0 39 39 0 0 39 39 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrf Cooling 100.0 0.60 313.80 523.00 22.94 Heating 100.0 0.60 -51.00 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -3.3 0.0 Lvg °F 39 24.0 100.0 0 0.0 0.0 -1.4 39 24.0 0.0 0.0 -3.3 55.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 23 of 49 Room Checksums By MACDONALD-MILLER 23- LUNCH ROOM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 568 1,800 0 2,368 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 O 0 O 0 O 0 O 0 O 0 0 0 O 0 0 O 0 142 710 O 1,800 O 0 142 2,510 -59 59 0 O 0 1,460 O 0 0 1,405 1,405 144 144 0 O 0 -324 0 0 O 0 O 0 O 0 0, 0 O 0 O 0 01 0 0' 0 O 0 O 0 O 0 0, 0 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond 0 : Roof Cond O Glass Solar O Glass/Door Cond 0 Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration O Sub Total ==> Internal Loads 13 ' 568 19 Lights 33 1,000 34I People O 0 0 Misc 451 1,568 54 I Sub Total =_> 01 -57 -2 Ceiling Load 26 i 0 0 Ventilation Load 0 i 0 0 1 Adj Air Trans Heat 0 i Ov/Undr Sizing 25: 1,405 48 Exhaust Heat 3 i OA Preheat Diff. 0 , i RA Preheat Diff. 0 j , Additional Reheat 0 'System Plenum Heat 0 Underflr Sup Ht Pkup 0 Supply Air Leakage 3,714 21 5,519 100.00 2,915 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -7 0 0.00 O -7,450 60.53 O 0 0 -4,852 -4,852 39.42 16 -0.13 O 0.00 O 0.00 O 0.00 -23 0.19 0 0.00 O 0.00 -4,859 -12,309 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 5.5 0.0 0.0 0.0 0.0 0.5 5.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 4.5 145 82.4 65.8 0.0 0 0.0 0.0 68.1 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.5 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 208 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 ft2 (%) 0 0 0 0 Ext Door 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 145 145 145 0 145 145 0 0 145 145 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 145 145 145 0 145 145 0 0 145 145 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.70 0.70 cfm/ton 314.86 ft'/ton 452.28 Btu/heft' 26.53 -59.18 No. People 4.0 19.2/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -12.3 0.0 -5.0 0.0 0.0 -12.3 Lvg °F 145 24.0 100.0 O 0.0 0.0 145 24.0 55.0 0 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 24 of 49 Room Checksums By MACDONALD-MILLER 24- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 333 450 720 1,503 0 0 0 0 0 0 0 0 Net Percent Total Of Total'. Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 83 416 O 450 O 720 83 1,587 -34 34 0 O 0 1,016 O 0 0 305 305 78 78 0 O 0 -175 0 0 O 0 0 0 0 0, 0 0, 0 0 0' 0 14 15i 241 53; 0` 34 0 0 10; 3i 0' 0 0 01 1,774 21 2,986 100.00 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%), ; Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond O Glass Solar O Glass/Door Cond 0 Wall Cond 0. Partition/Door 0 ! Floor 0 Adjacent Floor 0 ' Infiltration 0 Sub Total ==> Internal Loads 333 21 Lights 250 16 People 720 46 Misc 1,303 83 Sub Total ==> -34 -2 'Ceiling Load O 0 i Ventilation Load O 0 ! Adj Air Trans Heat Ov/Undr Sizing 305 19 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,574 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 O 0 O 0 0.00 0.00 0.00 0 0 0.00 -4 0 O -4,024 0 0 -2,620 -2,620 9 0 0 0 -13 0 0 0.00 60.53 0 39.41 -0.13 0.00 0.00 0.00 0.19 0.00 0.00 -2,624 -6,648 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh MBh cfm 0.3 3.0 2.4 78 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.3 3.0 Enter DB/WB/HR °F °F gr/Ib 82.4 65.8 68.1 0.0 0.0 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 0.0 0.0 0.0 0.0 57.4 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 122 0 0 0 O 0 0 O 0 0 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 78 78 78 0 78 78 0 0 78 78 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 78 78 78 0 78 78 0 0 78 78 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.64 0.64 cfm/ton 314.29 ft'/ton 490.33 Btu/hr•ft2 24.47 -54.49 No. People 1.0 8.2/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -6.7 0.0 -2.7 0.0 0.0 -6.7 Lvg °F 78 24.0 100.0 O 0.0 0.0 78 24.0 55.0 0 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 25 of 49 Room Checksums By MACDONALD-MILLER 25- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air:. OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h 0 0 0 0 0 0 o 0 0 O 0 0 o 0 0 O 0 0 0 0 O 0 o o 0 O 0 O o 0 519 450 836 1,805 -54 0 0 843 130 0 0 130 54 0 119 0 -266 0 648 450 836 1,935 0 1,649 0 0 843 119 0 0 0 0 0 Percent Of Total (%) 0; 0': 0'. 0. 0 0 0 0 0 0 0 14 10 18 43 0 36 0 0 19 3 0 0 0 0 0 2,594 36 4,546 100.00 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 519 250 836 1,605 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar O Glass/Door Cond O Wall Cond 0 Partition/Door O Floor O Adjacent Floor 0 . Infiltration O Sub Total ==> 22 10 35 67 Internal Loads Lights People Misc Sub Total ==> -52 -2 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing 843 35 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,396 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (°/ ) 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -6 0 0.00 O -6,123 60.53 O 0 0 -3,987 -3,987 39.41 14 -0.13 0 0.00 0 0.00 O 0.00 -20 0.19 0 0.00 O 0.00 -3,993 -10,116 100.00 Main Cig Aux CIg Opt Vent Total Total Capacity ton MBh 0.4 4.6 0.0 0.0 0.0 0.0 0.4 4.6 COOLING COIL SELECTION Enter DB/WB/HR MBh cfm °F °F gr/Ib Sens Cap. Coil Airflow 3.7 119 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 190 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 119 119 119 0 119 119 0 0 119 119 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Inf'il MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 119 119 119 0 119 119 0 0 119 119 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.63 0.63 314.12 501.54 23.93 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' -53.24 No. People 1.0 5.3/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -10.1 119 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -4.1 119 24.0 55.0 0.0 0.0 -10.1 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 26 of 49 Room Checksums By MACDONALD-MILLER 26- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h Percent Of Total (%) O 0 0 O 0 0 O 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 O 0 0 265 66 331 14 450 0 450 19 677 0 677 28 1,392 66 1,459 60 -27 27 0 0 O 0 784 32 O 0 0 0 0 107 107 4 63 63 3 0 0 O 0 0 -141 0 0 0 0 O 0 0 1,472 15 2,412 100.00 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent • Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond O Glass Solar O Glass/Door Cond O Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration O Sub Total ==> Internal Loads 265 21 Lights 250 20 People 677 53. Misc 1,192 94 Sub Total ==> -27 -2 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 107 8 , Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,272 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3 0 0.00 O -3,252 60.53 0 0 0 -2,118 -2,118 39.41 7 -0.13 0 0.00 O 0.00 0 0.00 -10 0.19 O 0.00 0 0.00 -2,121 -5,372 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.0 63 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 53.2 57.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 97 0 0 0 0 0 0 O 0 0 O 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 63 63 63 0 63 63 0 0 63 63 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 63 63 63 0 63 63 0 0 63 63 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.65 0.65 314.41 482.55 24.87 % OA cfm/ft' cfm/ton W/ton Btu/hr•ft' -55.39 No. People 1.0 10.3/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -5.4 63 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -2.2 63 24.0 55.0 0.0 0.0 -5.4 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 27 of 49 Room Checksums By MACDONALD-MILLER 27- FL2 OPEN PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 6,069 68 14 0 0 0 421 6,573 0 0 537 0 0 33 0 570 Net Total Btu/h 0 0 537 6,069 68 47 0 0 0 421 7,143 Percent Of Total (%) 0' 0, 4 42 0 0'. 0' Oj 0' 3 49 CLG SPACE PEAK Mo/Hr: 9 / 11 OADB: 71 Space Sensible Btu/h 0 0 0 7,061 -195 1 0 0 0 -156 6,711 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 67 Glass Solar -2 Glass/Door Cond 0 Wall Cond 0 ' Partition/Door O Floor O Adjacent Floor -1 Infiltration 63 Sub Total ==> Internal Loads 1,038 259 1,297 9 1,038 10 Lights 450 0 450 31 250 2 People 2,696 0 2,696 19 I 2,696 25 Misc 4,184 259 4,443 30 : 3,984 38 . Sub Total ==> -46 46 0 0 -111 -1 . Ceiling Load O 0 2,869 20: 0 0 Ventilation Load 0 0 0 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing O 0 0, 0 0 Exhaust Heat 113 113 1 : OA Preheat Diff. 0 0 I ! RA Preheat Diff. O 0 0 I [Additional Reheat -1,114 0 0 System Plenum Heat 0 0 ' Underflr Sup Ht Pkup O 0 0 ; Supply Air Leakage 10,711 -126 i 14,569 100.00 10,584 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -805 2.76 O 0 0.00 -1,643 -1,643 5.64 -67 -210 0.72 O 0 0.00 O 0 0.00 O 0 0.00 -1,760 -1,760 6.04 -3,470 -4,418 15.16 0 0 0 0 -181 0 0 -13,061 -16,712 0 0 0 0.00 0.00 0.00 0 0.00 0 -11,988 0 -13,061 450 0 0 0 -130 0 0 0.00 41.13 0 44.81 -1.54 0.00 0.00 0.00 0.45 0.00 0.00 -29,146 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.2 14.6 0.0 0.0 0.0 0.0 1.2 14.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/lb 12.2 498 76.5 62.5 61.9 54.0 52.4 56.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass n2 (%) Floor 380 Part 0 Int Door 0 ExFIr 0 Roof 380 Wall 158 88 55 Ext Door 0 O 0 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.6 Return 74.6 Ret/OA 76.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 47.7 0.0 0.0 0.0 AIRFLOWS Cooling 498 498 498 0 233 233 34 0 532 267 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Inf'il MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 498 498 498 0 233 233 34 0 532 267 0 0 0 0 ENGINEERING CKS Cooling Heating 46.8 46.8 1.31 1.31 410.21 313.00 38.34 % OA cfm/n' cfm/ton fV/ton Btu/Iv-ft' -76.70 No. People 1.0 2.6/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -29.2 0.0 -3.5 Lvg °F 498 47.7 100.0 0 0.0 0.0 498 47.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -29.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 28 of 49 Room Checksums By MACDONALD-MILLER 28- FL2 OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 9 / 11 .OADB: 71 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 O 0 0 0 0 O 177 177 3. 0 3,468 0 3,468 53 4,035 39 0 39 1 -111 8 19 27 0 0 0 0 0 0 O 0 0 0 O 0 0 0: 0 141 141 2 -51 3,656 196 3,851 59 3,873 i 341 85 427 7 341 450 0 450 7; 250 725 0 725 11 725 1,517 85 1,602 25 I 1,317 -15 15 0 0 -37 0 01,002 15 0 O 0 0 0 0 0 O 0 0+ 0 39 39 1 0 0 O 0 0. -542 0 0 0 0: O 0 01 5,157 -208 6,494 100.00' 5,153 Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 78 -2 0 0 0 0 -1 75 Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 7 Lights 5 People 14 Misc 26 Sub Total =_> -1 Ceiling Load 0 ; Ventilation Load 0 ' Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -265 2.11 O 0 0.00 -939 -939 7.49 -37 -119 0.95 O 0 0.00 O 0 0.00 O 0 0.00 -579 -579 4.62 -1,555 -1,901 15.18 0 0 0 0 -60 0 0 -6,522 -8,136 0 0 0 0.00 0.00 0.00 0 0.00 0 -4,116 0 -6,522 154 0 0 0 -141 0 0 0.00 32.86 0 52.06 -1.23 0.00 0.00 0.00 1.13 0.00 0.00 -12,526 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 6.5 0.0 0.0 0.0 0.0 0.5 6.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/lb 5.5 242 75.9 61.9 60.0 54.0 52.6 56.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFir Roof Wall Ext Door 125 0 0 0 125 0 0 90 50 56 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 74.6 68.5 74.6 68.5 75.9 53.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 242 242 242 0 80 80 11 0 254 91 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 242 242 242 0 80 80 11 0 254 91 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 33.0 33.0 cfmIfF 1.94 1.94 cfm/ton 448.05 ft'/ton 230.99 Btu/hr-ft' 51.95 -100.21 No. People 1.0 8.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -12.5 0.0 -0.1 0.0 0.0 -12.5 Lvg °F 242 53.8 100.0 0 0.0 0.0 242 53.8 54.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 29 of 49 Room Checksums By MACDONALD-MILLER 29- FL2 CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 72 Net Percent . Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 188 188 1 0 7,719 0 7,719 58 8,138 -173 0 -173 -1 -361 9 30 39 0' 6 O 0 0 0 O 0 0 0 O 0 0 0 0 182 182 1 -69 7,737 218 7,955 60 7,714 Percent Of Total (%) Envelope Loads 0 : Skylite Solar O Skylite Cond O Roof Cond 75 Glass Solar -3 Glass/Door Cond 0 Wall Cond O Partition/Door 0 , Floor 0 Adjacent Floor -1 Infiltration 71 Sub Total ==> 549 137 686 5 549 5 1,350 0 1,350 10 750 7 1,879 0 1,879 14 1,879 17 3,778 137 3,915 29 3,178 29. -37 37 0 0 -49 O 0 1,364 10 j 0 O 0 0 0 0 0, O 0 0 0 101 101 1i 0 0' 0 0 0' -1,141 0 0' 0 0 0 0 0: Internal Loads Lights People Misc Sub Total ==> O Ceiling Load O Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing O Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 11,477 -648 13,335 100.00 , 10,843 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -426 1.72 O 0 0.00 -3,028 -3,028 12.25 -89 -338 1.37 O 0 0.00 O 0 0.00 O 0 0.00 -931 -931 3.76 -4,048 -4,723 19.10 0 0 0 0 -96 0 0 -12,976 -17,121 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 -6,977 28.21 0 -12,976 259 0 0 0 -312 0 0 0 52.48 -1.05 0.00 0.00 0.00 1.26 0.00 0.00 -24,729 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 1.1 13.3 0.0 0.0 0.0 0.0 1.1 13.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 11.2 510 74.6 61.3 59.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 0.0 0.0 0.0 0.0 55.3 0.0. 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 201 Part 0 Int Door 0 ExFIr 0 Roof 201 Wall 275 Ext Door 0 O 0 161 59 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.4 Return 74.4 Ret/OA 74.6 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 56.7 0.0 0.0 0.0 AIRFLOWS Cooling 510 510 510 0 136 136 18 0 528 154 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 510 510 510 0 136 136 18 0 528 154 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 26.6 26.6 cfm/ft' 2.54 2.54 cfm/ton 459.14 ft'/ton 180.88 Btu/hr•ft' 66.34 -123.03 No. People 3.0 14.9/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -24.7 510 56.7 100.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -24.7 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 30 of 49 Room Checksums By MACDONALD-MILLER 30- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total' Btu/h (%) CLG SPACE PEAK Mo/Hr: 7 / 9 OADB: 69 Space Sensible Btu/h O 0 0 0 0 O 0 0 0' 0 O 595 595 6, 0 532 0 532 5 1,985 93 0 93 11 -114 7 15 22 0 1 O 0 0 0 O 0 0 0 O 0 0 0 0 420 420 4 -228 1,052 611 1,662 16 1,644 1 961 240 1,201 12 . 961 1,800 0 1,800 17 1,000 2,648 0 2,648 251 2,648 5,410 240 5,650 54 ; 4,610 -19 19 0 0, -114 O 0 0 0 6,442 3,066 0 0 0 50 29! 0 O 0 0! O 0 50 0 0 0j O 0 01 -646 0 01 0 0' O 0 0! 274 10,428 100.00 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 32 Glass Solar -2 Glass/Door Cond O Wall Cond 0 Partition/Door O Floor O Adjacent Floor -4 Infiltration 27 . Sub Total ==> 16! 16 43 75 Internal Loads Lights People Misc Sub Total ==> -2 Ceiling Load O Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing O Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,140 100.00 i Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -713 -28 0 0 0 -1,630 -2,372 0 0 0 0 -168 0 0 -7,155 -9,695 Coil Peak Tot Sens Btu/h 0 0 -746 0 -713 -90 0 0 0 -1,630 -3,179 0 0 0 Percent Of Total (%) 0.00 0.00 3.44 0.00 3.29 0.42 0.00 0.00 0.00 7.52 14.66 0.00 0.00 0.00 0 0.00 0 0.00 54.85 -11,896 0 -7,155 443 0 0 0 99 0 0 0 32.99 -2.04 0.00 0.00 0.00 -0.46 0.00 0.00 -21,688 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.4 0.0 0.0 0.0 0.0 0.9 10.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 8.3 289 80.9 65.0 66.6 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 53.0 58.1 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' VA) Floor Part Int Door ExFlr Roof Wall Ext Door 352 0 0 0 352 0 0 68 38 56 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.8 Return 74.8 Ret/OA 80.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 32.9 0.0 0.0 0.0 AIRFLOWS Cooling 289 289 289 0 231 231 32 0 321 263 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 289 289 289 0 231 231 32 0 321 263 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 80.0 80.0 cfm/ft' 0.82 0.82 cfm/ton 332.47 fVlton 405.07 Btu/hrft2 29.62 -61.61 No. People 4.0 11.4/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -21.7 0.0 -6.8 Lvg °F 289 32.9 100.0 0 0.0 0.0 289 32.9 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -21.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 31 of 49 Room Checksums By MACDONALD-MILLER 31 FL2 CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 8 / 11 OADB: 76 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o o 0 0 0 0 O 0 0 0 0 0 0 208 208 2 0 0 6,216 0 6,216 62 6,738 83 64 0 64 1 -70 -1 12 36 48 0 9 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 198 198 2 16 0 6,490 244 6,734 68 6,692 82 440 110 549 6 440 450 0 450 5 250 787 0 787 8 787 1,676 110 1,786 18 1,476 -19 19 0 0 -29 0 0 1,391 14 0 O 0 0 0 0 0 O 0 0 0 49 49 0 O 0, O 0 0 -857 0 0 O 0 O 0 0 8,147 -435 9,961 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 5 Lights 3 People 10 , Misc 18 . Sub Total ==> 0 ! Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 . Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,139 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -2,528 -78 0 0 0 -746 -3,352 0 0 0 0 -77 0 0 -9,423 -12,852 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 O 0.00 -341 1.84 O 0.00 -2,528 13.62 -287 1.55 O 0.00 0 0.00 O 0.00 -746 4.02 -3,902 21.03 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -5,228 28.18 0 0 -9,423 50.79 196 -1.05 O 0.00 O 0.00 O 0.00 -196 1.06 0 0.00 O 0.00 -18,553 100.00 Total Capacity ton MBh Main Cig 0.8 10.0 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.8 10.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 8.6 383 75.7 61.3 58.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.3 55.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 161 Part 0 Int Door 0 ExFIr 0 Roof 161 Wall 232 Ext Door 0 O 0 135 58 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.6 Return 74.6 Ret/OA 75.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 56.7 0.0 0.0 0.0 AIRFLOWS Cooling 383 383 383 0 102 102 14 0 397 116 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 383 383 383 0 102 102 14 0 397 116 0 0 0 0 ENGINEERING CKS Cooling Heating OA 26.5 26.5 cfm/ft' 2.38 2.38 cfm/ton 461.41 fV/ton 193.96 Btu/hrfe 61.87 -115.24 No. People 1.0 6.2/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -18.6 383 56.7 100.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -18.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 32 of 49 Room Checksums By MACDONALD-MILLER 32- PERIMETER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 10 Outside Air: OADB/WB/HR: 72 / 63 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 14,034 -682 12 0 0 0 354 13,718 1,690 1,800 2,080 5,570 0 0 378 0 0 36 0 414 423 0 0 423 Net Total Btu/h 0 0 378 14,034 -682 48 0 0 0 354 14,132 2,113 1,800 2,080 5,993 Percent Of Total (%) 0 0 2 61 -3 0 0' 0 0 2 61 9, 8 9, 26 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h Percent Of Total f%) Envelope Loads O 0 Skylite Solar O 0 Skylite Cond 0 0 Roof Cond 85 Glass Solar -7 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -3 Infiltration Sub Total =_> 15,730 -1,234 -3 0 0 0 -565 13,929 1,690 1,000 2,080 4,770 75 Internal Loads 9I Lights 5 People 11 Misc 26 Sub Total ==> -151 151 0 0 i -210 -1 Ceiling Load O 0 2,489 111 0 0 i Ventilation Load O 0 01 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing O 0 0 0 0, Exhaust Heat 385 3852 OA Preheat Diff. 0 0 I : RA Preheat Diff. O 0 0 , Additional Reheat -1,946 0 0 System Plenum Heat 0 01 i Underflr Sup Ht Pkup O 0 0 i ; Supply Air Leakage I I 19,138 -574 22,999 100.00 18,489 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h O 0 O 0 O -1,311 O 0 -5,727 -5,727 -228 -723 0 0 O 0 0 0 -2,866 -2,866 -8,821 -10,627 0 0 0 0 -295 0 0 -20,077 -29,193 Percent Of Total (%) 0.00 0.00 2.62 0.00 11.42 1.44 0.00 0.00 0.00 5.72 21.20 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -20,138 40.17 0 0 -20,077 40.04 753 -1.50 0 0.00 0 0.00 O 0.00 -48 0.10 O 0.00 O 0.00 -50,138 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.9 23.0 0.0 0.0 0.0 0.0 1.9 23.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 17.7 870 73.1 61.3 62.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.1 55.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFlr Roof Wall Ext Door 619 0 0 0 619 549 0 0 305 56 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.2 Return 74.2 Ret/OA 73.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 48.5 0.0 0.0 0.0 AIRFLOWS Cooling 870 870 870 0 391 391 56 0 926 447 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 870 870 870 0 391 391 56 0 926 447 0 0 0 0 ENGINEERING CKS Cooling % OA 45.0 cfm/ft2 1.41 cfm/ton 453.93 ff/ton 322.97 Btu/hr•ft' 37.15 -81.00 Heating 45.0 1.41 No. People 4.0 6.5/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -50.1 870 48.5 100.0 0.0 0 0.0 0.0 -5.4 870 48.5 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -50.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 33 of 49 Room Checksums By MACDONALD-MILLER 33- EAST HALF FL2 PERIMETER HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 11 OADB: 71 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 242 242 3 0 3,553 0 3,553 46 4,162 -48 0 -48 -1 -284 60 43 103 1 27 O 0 0 0 O 0 0 0 O 0 0 0 0 336 336 4, -113 3,900 285 4,185 54 3,791 724 181 904 12 724 O 0 0 0 0 452 0 452 6 452 1,176 181 1,357 17 1,176 -3 3 0 0 -18 O 0 2,239 29 0 O 0 0, 0 O 0 O 0 0; 0 6 6 0 O 0' O 0 0 -521 0 0 O 0 O 0 0' 5,073 -46 7,787 100.00 Percent - Of Total (%) Envelope Loads 0 Skylite Solar 0 ! Skylite Cond 0 Roof Cond 84 Glass Solar -6 Glass/Door Cond 1 Wall Cond O Partition/Door O Floor 0 I Adjacent Floor -2 Infiltration 77 Sub Total =_> Internal Loads 15i 0 9' 24 0 j Ceiling Load O Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing O Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Lights People Misc Sub Total ==> 4,949 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -557 3.45 O 0 0.00 -1,878 -1,878 11.63 -490 -829 5.13 O 0 0.00 O 0 0.00 O 0 0.00 -1,227 -1,227 7.60 -3,595 -4,491 27.81 0 0 0 0 -155 0 0 -4,064 -7,814 0 0 0 0.00 0.00 0.00 0 0.00 0 -8,181 0 -4,064 377 0 0 0 211 0 0 0.00 50.67 0 25.17 -2.34 0.00 0.00 0.00 -1.31 0.00 0.00 -16,147 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.7 7.8 0.0 0.0 0.0 0.0 0.7 7.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.9 233 77.3 63.4 64.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 51.9 54.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 265 0 0 0 265 378 0 0 100 26 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.0 Return 75.0 Ret/OA 77.3 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 38.0 0.0 0.0 0.0 AIRFLOWS Cooling 233 233 233 0 159 159 24 0 257 183 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 233 233 233 0 159 159 24 0 257 183 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' Cooling 68.3 0.88 358.82 408.36 29.39 Heating 68.3 0.88 -60.93 No. People 0.0 0.0/1000 ft' HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -16.2 233 38.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -4.2 233 38.0 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -16.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 34 of 49 Room Checksums By MACDONALD-MILLER 33- WEST HALF FL2 PERIMETER HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 11 OADB: 71 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 247 247 3 0 3,553 0 3,553 45 4,162 -48 0 -48 -1 -284 60 47 107 1 27 O 0 0' 0 O 0 0. 0 O 0 0 0 0 336 336 4 -113 3,900 294 4,194 53 3,791 724 181 904 11 724 O 0 0 0 0 452 0 452 6. 452 1,176 181 1,357 17'' 1,176 -39 39 0 0 -51 0 0 2,237 28 0 O 0 0. 0 0 0 O 0 0 0 94 94 1 0 0 O 0 0, -517 0 0 0 0! O 0 0' 5,037 90 7,882 100.00 4,915 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 85 Glass Solar -6 Glass/Door Cond 1 Wall Cond O Partition/Door 0 ` Floor 0 ' Adjacent Floor -2 Infiltration 77 Sub Total ==> Internal Loads 15 0 9 Lights People Misc 24 Sub Total ==> -1 Ceiling Load 0 : Ventilation Load 0 I Adj Air Trans Heat Ov/Undr Sizing 0 I Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup 1 Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,878 -490 0 0 0 -1,227 -3,595 0 0 0 0 -126 0 0 -4,040 -7,761 Coil Peak Tot Sens Btu/h Percent Of Total (i°) 0 0.00 0 0.00 -561 3.49 0 0.00 -1,878 11.69 -832 5.18 0 0.00 0 0.00 O 0.00 -1,227 7.64 -4,498 28.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -8,181 50.93 O 0 -4,040 25.15 308 -1.92 O 0.00 O 0.00 O 0.00 346 -2.16 O 0.00 O 0.00 -16,064 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 7.9 0.0 0.0 0.0 0.0 0.7 7.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 6.0 231 77.1 63.3 64.8 54.0 51.7 53.2 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 265 Part 0 Int Door 0 ExFlr 0 Roof 265 Wall 378 Ext Door 0 O 0 100 26 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.5 Return 74.5 Ret/OA 77.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 37.9 0.0 0.0 0.0 AIRFLOWS Cooling 231 231 231 0 159 159 24 0 255 183 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 231 231 231 0 159 159 24 0 255 183 0 0 0 0 ENGINEERING CKS Cooling Heating OA 68.7 68.7 cfm/ft' 0.87 0.87 cfm/ton 352.15 ft'/ton 403.47 Btu/hr-ft2 29.74 -60.62 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -16.1 Lvg °F 231 37.9 100.0 0.0 0 0.0 0.0 231 37.9 54.0 -4.2 0.0 0.0 -16.1 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 35 of 49 Room Checksums By MACDONALD-MILLER 34- OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 1,574 276 75 0 0 0 2,077 4,002 5,144 5,929 9,960 21,033 0 0 3,143 0 0 67 0 3,210 1,286 0 0 1,286 Net Total Btu/h 0 0 3,143 1,574 276 142 0 0 0 2,077 7,212 6,430 5,929 9,960 22,319 Percent Of Total (%) 0 0 7 3' 1' 0 0 0 0 5 16 14' 13' 22! 491 188 -188 0 0 0 0 14,652 321 0 0 01 0 01 1,806 1,806 4 -481 -481 -1 ! 0 01 O 0 0 -2,676 0 0 0 0 O 0 0 I 27,029 1,151 45,507 100.001 CLG SPACE PEAK Mo/Hr: 7 / 9 OADB: 69 Space Percent Sensible Of Total Btu/h 0 0 0 5,878 -338 9 0 0 0 -1,219 4,329 5,144 3,294 9,960 18,398 (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 24 , Glass Solar -1 Glass/Door Cond O Wali Cond 0 Partition/Door O Floor 0 Adjacent Floor -5 Infiltration 18 Sub Total ==> 21 14 41 76 Internal Loads Lights People Misc Sub Total ==> -448 -2 Ceiling Load 0 0 Ventilation Load 0 0 i Adj Air Trans Heat Ov/Undr Sizing 1,806 7 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 24,085 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -2,112 -320 0 0 0 -8,724 -11,157 0 0 0 0 -27,884 -40,142 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -3,961 3.89 O 0.00 -2,112 2.08 -602 0.59 O 0.00 O 0.00 0 0.00 -8,724 8.58 -15,400 15.14 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -61,551 60.53 O 0 -27,884 27.42 2,818 -2.77 O 0.00 O 0.00 O 0.00 323 -0.32 O 0.00 0 0.00 -101,692 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 3.8 45.5 0.0 0.0 0.0 0.0 3.8 45.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 37.4 1,196 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.3 57.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof WaII Ext Door 1,884 0 0 0 1,884 315 0 0 113 36 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 75.3 Return 75.3 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 1,196 1,196 1,196 0 1,196 1,196 170 0 1,366 1,366 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,196 1,196 1,196 0 1,196 1,196 170 0 1,366 1,366 0 0 0 0 ENGINEERING CKS Cooling Heating OA 100.0 100.0 cfm/ft' 0.63 0.63 cfm/ton 315.45 ft'/ton 496.80 Btu/hr•ft' 24.15 -53.98 No. People 13.2 7.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F -101.7 0.0 -41.5 0.0 0.0 -101.7 1,196 24.0 100.0 O 0.0 0.0 1,196 24.0 55.0 O 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 36 of 49 Room Checksums By MACDONALD-MILLER 35- FL2 CONF RM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 3,603 475 37 0 0 0 309 4,424 0 0 557 0 0 69 0 627 Net Total Btu/h 0 0 557 3,603 475 106 0 0 0 309 5,051 Percent. Of Total (%) 0 0; 4 23 3 0! 0; 2i 33'. CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 72 Space Sensible Btu/h 0 0 0 5,550 -407 9 0 0 0 -122 5,029 Percent Of Total (%) Envelope Loads O Skylite Solar 0 Skylite Cond 0 Roof Cond 55 Glass Solar -4 Glass/Door Cond O Wall Cond 0 Partition/Door O Floor O Adjacent Floor -1 Infiltration 50 Sub Total ==> Internal Loads 977 244 1,222 8 ! 977 10 Lights 5,400 0 5,400 35 i 3,000 30 People 1,200 0 1,200 81i 1,200 12 Misc 7,577 244 7,822 51 5,177 51 Sub Total =_> 25 -25 0 0! -48 0 Ceiling Load 0 0 2,638 171 0 0 Ventilation Load O 0 0 I 0 0 Adj Air Trans Heat 0 0'i Ov/Undr Sizing O 0 0 0 0 Exhaust Heat -77 -77 01 OA Preheat Diff. 0 0 RA Preheat Diff. 0 0 0 , Additional Reheat -1,069 0 0 1 System Plenum Heat 0 0 I Underflr Sup Ht Pkup 0 0 0 I Supply Air Leakage 12,027 -300 15,435 100.00 10,159 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -753 2.46 O 0 0.00 -3,417 -3,417 11.17 -166 -472 1.54 0 0 0.00 O 0 0.00 O 0 0.00 -1,658 -1,658 5.42 -5,241 -6,300 20.59 0 0 0 0 -209 0 0 -10,590 -16,040 0 0 0 0.00 0.00 0.00 0 0.00 0 -14,139 0 -10,590 634 0 0 0 -203 0 0 0.00 46.21 0 34.61 -2.07 0.00 0.00 0.00 0.66 0.00 0.00 -30,599 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 1.3 15.4 0.0 0.0 0.0 0.0 1.3 15.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 12.1 478 78.5 64.0 65.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 53.2 58.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 358 Part 0 Int Door 0 ExFIr 0 Roof 358 0 0 Wall 342 182 53 Ext Door 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.2 Return 75.2 Ret/OA 78.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 42.8 0.0 0.0 0.0 AIRFLOWS Cooling 478 478 478 0 275 275 32 0 510 307 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 478 478 478 0 275 275 32 0 510 307 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 57.5 57.5 cfm/ft2 1.34 1.34 cfm/ton 371.65 ft2/ton 278.34 Btu/heft' 43.11 -85.47 No. People 12.0 33.5/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent. Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -30.6 0.0 -6.0 Lvg °F 478 42.8 100.0 0 0.0 0.0 478 42.8 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -30.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 37 of 49 Room Checksums By MACDONALD-MILLER 36- LOUNGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 420 74 6 0 0 0 463 963 1,043 450 652 2,145 0 0 637 0 0 12 0 649 261 0 0 261 Net Total Btu/h 0 0 637 420 74 18 0 0 0 463 1,612 1,304 450 652 2,406 Percent Of Total (%) 0 0 7 5 1 0 0 0 0 5 19. 15 5 7 28 38 -38 0 0 O 0 3,153 36 O 0 0''. 0 0 1,630 1,630 19 -95 -95 -11 O 0i 0 0 0 -524 0 0j O 0 0 0 0i 4,776 253 8,706 100.00 i CLG SPACE PEAK Mo/Hr: 7 / 9 OADB: 69 Space Sensible Btu/h 0 0 0 1,567 -90 1 0 0 0 -247 1,231 1,043 250 652 1,945 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond O Roof Cond 33 Glass Solar -2 Glass/Door Cond O Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -5 Infiltration 26 Sub Total ==> 22 5. 14 41 i Internal Loads Lights People Misc Sub Total ==> -91 -2 . Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing 1,630 35 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,715 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -803 4.03 O 0 0.00 -563 -563 2.83 -27 -78 0.39 O 0 0.00 O 0 0.00 O 0 0.00 -1,769 -1,769 8.89 -2,359 -3,213 16.14 0 0 0 0 -223 0 0 -5,276 -7,859 0 0 0 0.00 0.00 0.00 0 0.00 0 -12,050 0 -5,276 554 0 0 0 76 0 0 0.00 60.53 0 26.50 -2.78 0.00 0.00 0.00 -0.38 0.00 0.00 -19,909 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.7 0.0 0.0 0.0 0.0 0.7 8.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 7.1 234 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 53.6 58.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 382 Part 0 Int Door 0 ExFIr 0 Roof 382 Wall 56 30 53 Ext Door 0 0 0 ft' (%) 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 75.3 Return 75.3 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 234 234 234 0 234 234 34 0 269 269 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 234 234 234 0 234 234 34 0 269 269 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' Cooling 100.0 0.61 322.82. 526.54 22.79 Heating 100.0 0.61 -52.12 No. People 1.0 2.6/1000 ftz Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -19.9 0.0 Lvg °F 234 24.0 100.0 O 0.0 0.0 -8.1 234 24.0 55.0 0.0 0.0 -19.9 O 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Altemative - 1 System Checksums Report Page 38 of 49 Room Checksums By MACDONALD-MILLER 37- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 O 0 0 O 299 299 4,464 0 4,464 343 0 343 29 65 94 O 0 O 0 O 0 0 264 264 5,100 365 5,465 628 157 785 450 0 450 904 0 904 1,982 157 2,139 1 -1 0 0 0 1,822 O 0 0 O 0 -2 -2 0 O 0 -726 0 0 O 0 7,084 -207 Percent Of Total (%), 0' 0' 3 47 4'., 0; 0'. 0 3 58 8 5 10j 23; CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar O 0 O 0 4,869 71 206 3 33 0 O 0 O 0 O 0 25 0. 5,133 628 250 904 1,782 Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration 74 Sub Tota! ==> 9 4 13 26 Internal Loads Lights People Misc Sub Total ==> 0 , -20 0 Ceiling Load 191 0 0 Ventilation Load O 0 0 , Adj Air Trans Heat 0 Ov/Undr Sizing 0 ' 0 0 Exhaust Heat O ! OA Preheat Diff. O RA Preheat Diff. O Additional Reheat 0 0, 9,424 100.00 System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,895 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -484 2.60 O 0 0.00 -3,154 -3,154 16.94 -125 -396 2.13 O 0 0.00 O 0 0.00 O 0 0.00 -1,065 -1,065 5.72 -4,345 -5,099 27.39 0 0 0 0 -134 0 0 -6,408 -10,887 0 0 0 0.00 0.00 0.00 0 0.00 0 -7,358 0 -6,408 338 0 0 0 -92 0 0 0.00 39.52 0 34.42 -1.81 0.00 0.00 0.00 0.50 0.00 0.00 -18,619 100.00 Main Clg Aux Clg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm F. °F gr/Ib 0.8 9.4 7.8 324 76.7 62.4 61.3 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.8 9.4 Leave DB/WB/HR °F °F gr/lb 54.0 52.4 56.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 230 0 0 0 230 0 0 302 168 56 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.0 Return 75.0 Ret/OA 76.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 48.7 0.0 0.0 0.0 AIRFLOWS Cooling 324 324 324 0 143 143 21 0 345 164 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 324 324 324 0 143 143 21 0 345 164 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' Cooling 44.1 1.41 413.14 292.87 40.97 Heating 44.1 1.41 -80.95 No. People 1.0 4.3/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -18.6 0.0 -1.9 Lvg °F 324 48.7 100.0 0 0.0 0.0 324 48.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -18.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 39 of 49 Room Checksums By MACDONALD-MILLER 38- PERIMETER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 7,815 Glass/Door Cond 305 Wall Cond 19 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration 751 Sub Total ==> 8,892 Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 O 0 0 0 953 953 4 0 O 7,815 29 8,265 O 305 1 161 44 63 0 26 0 0 0 0 0 0 0 0 0 0 751 3 84 996 9,888 37 8,537 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond 0 Roof Cond 46 Glass Solar 1 Glass/Door Cond O Wall Cond 0 Partition/Door O Floor 0 Adjacent Floor 0 Infiltration 47 Sub Total ==> 2,097 524 2,621 10 2,097 12 3,600 0 3,600 13 2,000 11 5,406 0 5,406 20 5,406 30 11,103 524 11,627 43 9,503 53 3 -3 0 0 -68 0 0 5,444 20 0 O 0 0 0 0 0 O 0 0 0 -8 -8 0 0 0 O 0 0 -1,892 0 0 0 0 O 0 0 Internal Loads Lights People Misc Sub Total ==> O Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. • RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup 11 Supply Air Leakage 19,998 -382 26,952 100.00 17,972 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -1,615 2.94 O 0 0.00 -3,004 -3,004 5.48 -119 -377 0.69 0 0 0.00 0 0 0.00 0 0 0.00 -3,556 -3,556 6.48 -6,680 -8,552 15.59 0 0 0 0 -449 0 0 -21,248 -28,377 0 0 0 0.00 0.00 0.00 0 0.00 0 -25,767 0 -21,248 1,176 0 0 0 -464 0 0 0.00 46.97 0 38.73 -2.14 0.00 0.00 0.00 0.85 0.00 0.00 -54,856 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.3 27.0 0.0 0.0 0.0 0.0 2.3 27.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 21.5 846 77.2 63.2 64.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 52.4 55.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 768 Part 0 Int Door 0 ExFlr 0 Roof 768 Wall 288 Ext Door 0 ft2 (%) 0 0 160 56 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.0 Return 75.0 Ret/OA 77.2 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 42.0 0.0 0.0 0.0 AIRFLOWS Cooling 846 846 846 0 501 501 69 0 915 570 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 846 846 846 0 501 501 69 0 915 570 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 59.2 59.2 cfm/ft' 1.10 1.10 cfm/ton 376.52 ft'/ton 341.94 Btu/hrft2 35.09 -71.43 No. People 8.0 10.4/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -54.9 0.0 -11.3 Lvg °F 846 42.0 100.0 0 0.0 0.0 846 42.0 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -54.9 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 40 of 49 Room Checksums By MACDONALD-MILLER 39- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 O 0 0 0 120 120 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 80 80 80 120 200 188 450 630 1,268 7 0 0 0 47 236 O 450 O 630 47 1,315 -7 0 O 596 0 0 0 -19 -19 0 O 0 -119 0 0 O 0 Percent Of Total (%) 0 0 6 0 0 0 0: 0 0 4 101 221 30 63 0' 28I 0 0 0' -1 0 0 0 0 01 1,355 23 2,093 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 56 56 188 250 630 Percent Of Total (%) 0 0 0 0 0 0 0 0 0, 5 171 22 56 1,068 94 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> 8 1 ; Ceiling Load 0 0 Ventilation Load 0 0 ' Adj Air Trans Heat Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,132 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -145 3.46 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -320 -320 7.63 -320 -465 11.09 0 0 O 0 O 0 0.00 0.00 0.00 0 0 0.00 -40 0 0 -1,427 -1,787 0 0.00 57.00 - 2,387 0 -1,427 109 0 0 0 -18 0 0 0 34.07 -2.59 0.00 0.00 0.00 0.43 0.00 0.00 - 4,188 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 2.1 0.0 0.0 0.0 0.0 0.2 2.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 1.7 53 81.5 65.3 0.0 0 0.0 0.0 0.0 0 0.0 0.0 67.2 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 55.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor Part Int Door ExFIr Roof Wall Ext Door ft2 (%) 69 0 0 0 69 0 0 0 0 0 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.3 Return 75.3 Ret/OA 81.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 29.7 0.0 0.0 0.0 AIRFLOWS Cooling 53 53 53 0 46 46 6 0 59 53 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 53 53 53 0 46 46 6 0 59 53 0 0 0 0 ENGINEERING CKS Cooling Heating OA 87.1 87.1 cfm/ft' 0.77 0.77 cfm/ton 305.32 ft'/ton 395.61 Btu/hr•ft' 30.33 -60.70 No. People 1.0 14.5/1000 112 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -4.2 53 29.7 100.0 0.0 0 0.0 0.0 -1.5 53 29.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 41 of 49 Room Checksums By MACDONALD-MILLER 40- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 O 0 0 O 1,305 1,305 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 0 1,305. 1,305 2,042 3,150 4,860 10,052 511 2,553 O 3,150 O 4,860 511 10,563 75 -75 0 O 0 6,263 O 0 0 1,000 1,000 -170 -170 0 O 0 -1,082 0 0 O 0 11,127 488 Percent Of Total, (%). 0 0 7; 0' 0' 0, 0, 0 7`. CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Gond O Roof Cond 0 Glass Solar O Glass/Door Cond 0 Wall Cond O Partition/Door 0 Floor 0 • Adjacent Floor 0 ! Infiltration n Sub Total ==> 1 Internal Loads 13 ; 2,042 21 Lights 17 1,750 18 People 26 I 4,860 50 Misc 8,652 89 I Sub Total =_> I j 0 88 1 I Ceiling Load 331 0 0 ; Ventilation Load 01 0 0 I Adj Air Trans Heat 0 i Ov/Undr Sizing 5 ` 1,000 10 , Exhaust Heat -1 i 10A Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat 0 Underflr Sup Ht Pkup " Supply Air Leakage 56 0 01 0 0' 18,960 100.00 9,741 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -437 0 0 -15,797 -16,234 Coil Peak Tot Sens Btu/h 0 0 -1,573 0 0 0 0 0 0 0 -1,573 0 0 0 Percent Of Total (%) 0.00 0.00 3.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.82 0.00 0.00 0.00 0 0.00 O 0.00 -24,892 60.53 0 0 -15,797 38.41 998 -2.43 O 0.00 O 0.00 O 0.00 137 -0.33 O 0.00 0 0.00 -41,127 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.6 19.0 0.0 0.0 0.0 0.0 1.6 19.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 15.3 484 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.8 56.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 748 Part 0 Int Door 0 ExFIr 0 Roof 748 Wall 0 Ext Door 0 ft' (%) O 0 O 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 75.3 Return 75.3 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 484 484 484 0 484 484 0 0 484 484 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 484 484 484 0 484 484 0 0 484 484 0 0 0 0 ENGINEERING CKS °A OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' Cooling 100.0 0.65 306.20 473.41 25.35 Heating 100.0 0.65 -54.98 No. People 7.0 9.4/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -41.1 0.0 -16.8 Lvg °F 484 24.0 100.0 0 0.0 0.0 484 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -41.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 42 of 49 Room Checksums By MACDONALD-MILLER 41- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 295 People 0 Misc 0 Sub Total ==> 295 Ceiling Load 11 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 997 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 1,303 Net Total Btu/h O 0 O 0 188 188 O 0 O 0 O 0 0 0 O 0. 0 188 188 74 369 O 0 O 0 74 369 -11 0 O 1,023 0 0 997 -23 -23 0 O 0 -145 0 0 O 0 Percent Of Total (%) 0 0 7 0 0. 0 0 0' 0 0; 7 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 14 j 295 23 : Lights 0 ; 0 0 ' People 0 0 0 , Misc 14 295 23 Sub Total ==> 13 1 . Ceiling Load 40' 0 0 Ventilation Load 0 0 0 I Adj Air Trans Heat 0 Ov/Undr Sizing 39 997 76 Exhaust Heat 0. -1 0 o, 0 0' 0' 84 2,554 100.00' OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,305 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -63 0 0 -2,111 -2,174 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 0 0.00 -227 4.12 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 -227 4.12 O 0.00 O 0.00 O 0.00 0 0.00 O 0.00 -3,334 60.53 0 0 -2,111 38.33 134 -2.43 O 0.00 0 0.00 O 0.00 30 -0.55 O 0.00 O 0.00 -5,508 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.6 0.0 0.0 0.0 0.0 0.2 2.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.1 65 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.8 55.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (v.) Floor 108 Part 0 Int Door 0 ExFIr 0 Roof 108 0 Wall 0 Ext Door 0 O 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 75.3 Return 75.3 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 65 65 65 0 65 65 0 0 65 65 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 65 65 65 0 65 65 0 0 65 65 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/fP 0.60 0.60 cfm/ton 304.41 ftlton 507.35 Btu/hr•ft' 23.65 -51.00 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -5.5 65 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -2.3 65 24.0 55.0 0.0 0.0 -5.5 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 43 of 49 Room Checksums By MACDONALD-MILLER 42- OPEN OFFICE INTERIOR COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load ' Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 O 1,137 O 0 O 0 O 0 0 0 O 0 0 O 1,137 Net Percent Total Of Total Btu/h (%) 0 0 1,137 0 0 0 0 0 0 0 1,137 0 0 6 0 0 0: 0 0 0 0 6 1,756 439 2,195 12 3,600 0 3,600 20 5,193 0 5,193 29 10,549 439 10,987 62 -35 35 0 O 0 5,488 O 0 0 O 0 81 81 0 0 0 -953 0 0 0 0 10,514 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar O 0 Skylite Cond O 0 Roof Cond O 0 Glass Solar O 0 ' Glass/Door Cond O 0 Wall Cond O 0 • Partition/Door O 0: Floor O 0 . Adjacent Floor 0 0 ' Infiltration O 0 Sub Total ==> 1,756 20 2,000 22 5,193 58 8,949 100 i Internal Loads Lights People Misc Sub Total ==> 0 -25 0 Ceiling Load 31 0 0 Ventilation Load O 0 0 Adj Air Trans Heat 0 Ov/Undr Sizing O 0 0 Exhaust Heat 0 OA Preheat Diff. 0 0 01 0 0 739 17,693 100.00 RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,923 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 -1,362 3.76 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O -1,362 3.76 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -307 0 0 -13,981 -14,288 0 -21,908 0 -13,981 717 0 0 0 338 0 0 0.00 60.53 0 38.63 -1.98 0.00 0.00 0.00 -0.93 0.00 0.00 -36,196 100.00 Main Cig Aux Clg Opt Vent Total Total Capacity ton MBh 1.5 17.7 0.0 0.0 0.0 0.0 1.5 17.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 14.1 426 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.3 52.0 53.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 643 0 0 0 643 0 0 O 0 0 O 0 0 TEMPERATURES Cooling SADB 56.3 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 426 426 426 0 426 426 0 0 426 426 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 426 426 426 0 426 426 0 0 426 426 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.66 0.66 cfm/ton 288.80 fP/ton 436.11 Btu/hi-ft' 27.52 -56.29 No. People 8.0 12.4/1000 fF Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -36.2 0.0 -14.4 Lvg °F 426 24.0 100.0 0 0.0 0.0 426 24.0 54.3 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -36.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 44 of 49 Room Checksums By MACDONALD-MILLER 43- BREAK COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 461 1,800 0 2,261 -g 0 0 989 3,242 0 0 299 0 0 0 0 299 115 0 0 115 9 0 23 0 -272 0 175 Net Total Btu/h 0 0 299 0 0 0 0 0 0 0 299 Percent Of Total (%) 0 0 6 0 0 0' 0 0 0' Oi 6� 577 12 1 1,800 37 0 0 1 2,377 0 1,130 0 0 989 23 0 0 0 0 0 491 0� 231 01 0 211 0 0'. 0; 0' 0 0; 4,818 100.00' CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 O 0 0 0 O 0 O 0 O 0 O 0 Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond O Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 461 19 ; Lights 1,000 41 People 0 0 ; Misc 1,461 60 11 Sub Total ==> r -7 0 ' Ceiling Load 0 0 ; Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 989 40 ; Exhaust Heat OA Preheat Diff. RA Preheat Diff. ' Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,444 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -81 0 0 -3,993 -4,074 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -358 3.47 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -358 3.47 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 -6,246 60.53 0 0 -3,993 38.69 205 -1.98 O 0.00 0 0.00 O 0.00 73 -0.71 0 0.00 0 0.00 -10,320 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.4 4.8 0.0 0.0 0.0 0.0 0.4 4.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 3.9 121 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.7 55.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 169 Part 0 Int Door 0 ExFIr 0 Roof 169 0 Wall 0 Ext Door 0 0 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 121 121 121 0 121 121 0 0 121 121 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 121 121 121 0 121 121 0 0 121 121 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrf Cooling 100.0 0.72 302.34 420.89 28.51 Heating 100.0 0.72 -61.06 No. People 4.0 23.7/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -10.3 0.0 -4.2 0.0 0.0 -10.3 Lvg °F 121 24.0 100.0 0 0.0 0.0 121 24.0 55.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 45 of 49 Room Checksums By MACDONALD-MILLER 44- HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADBANB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 194 People 0 Misc 0 Sub Total ==> 194 Ceiling Load -4 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 667 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 857 Net Percent Total Of Total Btu/h (%) O 0 O 0 O 0 O o O 0 O 0 0 0 O 0 0 O 0 48 242 O 0 O 0 48 242 4 0 O 673 0 0 667 8 8 0 O 0 -95 0 0 O 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h Percent Of Total (%) Envelope Loads 0 0 0 Skylite Solar O 0 0 Skylite Cond 0 0 0 . Roof Cond O 0 0 Glass Solar 0 0 0 Glass/Door Cond O 0 0 Wall Cond O 0 0. Partition/Door O 0 0 1 Floor O 0 0 ; Adjacent Floor O 0 0 Infiltration O 0 0 Sub Total ==> 15, 0 0 15 0 42 0; 0' 42 1 0 0 0 0 0 -35 1,590 100.00 Internal Loads 194 23 Lights 0 0 People 0 0 Misc 194 23 ' Sub Total ==> -3 0 Ceiling Load 0 0 !Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 667 78 Exhaust Heat OA Preheat Diff. I RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 858 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -34 0 0.00 O -2,192 60.53 0 0' 0 -1,396 -1,396 38.54 72 -1.98 O 0.00 0 0.00 O 0.00 -106 2.92 0 0.00 O 0.00 -1,429 -3,621 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 0.1 1.6 0.0 0.0 0.0 0.0 0.1 1.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.3 43 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.5 58.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 71 0 0 0 0 0 0 O 0 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 43 43 43 0 43 43 0 0 43 43 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 43 43 43 0 43 43 0 0 43 43 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm/ton ft2/ton Btu/hr•ft2 Cooling 100.0 0.60 321.57 535.95 22.39 Heating 100.0 0.60 -51.00 No. People 0.0 0.0/1000 ft2 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -3.6 43 24.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -1.5 43 24.0 55.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -3.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 46 of 49 Room Checksums By MACDONALD-MILLER 45- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 117 People 0 Misc 0 Sub Total =_> 117 Ceiling Load -2 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 404 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> 519 Net Total Btu/h O 0 O 0 76 76 O 0 O 0 O 0 0 0 O 0 0 76 76 29 147 O 0 O 0 29 147 2 0 O 407 0 0 404 5 5 0 O 0 -58 0 0 0 0 55 1,039 Percent Of Total (%) 0 0 7 0 0 0 0 0 0 0 7' 14 0 01 141 0i 39 01 0 39 o: 0, 0, 0' 0' 0i 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0' 0 0 0 0I 0I Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 117 23 Lights O 0 People O 0 Misc 117 23 Sub Total =_> -2 0 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing 404 78 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 519 100.00 Grand Total __> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -91 4.15 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O -91 4.15 0 0 0 0 -21 0 0 -845 -866 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -1,327 60.53 O 0 -845 38.54 43 -1.98 O 0.00 O 0.00 O 0.00 27 -1.24 O 0.00 0 0.00 -2,193 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.0 0.0 0.0 0.0 0.0 0.1 1.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 0.8 26 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.4 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 43 0 0 0 43 0 0 0 0 0 0 0 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 26 26 26 0 26 26 0 0 26 26 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 26 26 26 0 26 26 0 0 26 26 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.60 0.60 298.04 496.74 24.16 % OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft' -51.00 No. People 0.0 0.0/1000 ft2 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -2.2 26 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -0.9 26 24.0 55.0 0.0 0.0 -2.2 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 47 of 49 Room Checksums By MACDONALD-MILLER 46- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights - 117 People 0 Misc 0 Sub Total =_> 117 Ceiling Load -2 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 404 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> 519 Net Total Btu/h O 0 O 0 76 76 O 0 O 0 O 0 0 0 O 0 0 76 76 Percent Of Total (%) 0- 0 7 0 0 0 0 0 0 0 7 29 147 14 O 0 0 O 0 0 29 147 14 2 0 0 O 407 39 0 0 0 0 404 39 5 5 0 0 0 O 0 0 -58 0 0 0 0 0 0 0 55 1,039 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h Percent Of Total (%). Envelope Loads O 0 Skylite Solar O 0 Skylite Cond 0 0 Roof Cond O 0 Glass Solar O 0 Glass/Door Cond 0 0 Wall Cond 0 0 Partition/Door 0 0 Floor O 0 Adjacent Floor O 0 Infiltration O 0 Sub Total =_> Internal Loads 117 23 Lights O 01 People O 0 Misc 117 23 Sub Total ==> -2 0 Ceiling Load O 0 Ventilation Load O 0 II Adj Air Trans Heat Ov/Undr Sizing 404 78 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 519 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -21 0 0 -845 -866 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -91 4.15 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -91 4.15 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -1,327 60.53 0 0 -845 38.54 43 -1.98 0 0.00 0 0.00 0 0.00 27 -1.24 0 0.00 O 0.00 -2,193 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.0 0.0 0.0 0.0 0.0 0.1 1.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 0.8 26 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.4 54.5 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 43 Part 0 Int Door 0 ExFlr 0 Roof 43 Wall 0 Ext Door 0 0 0 O 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 26 26 26 0 26 26 0 0 26 26 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 26 26 26 0 26 26 0 0 26 26 0 0 0 0 ENGINEERING CKS Cooling % OA 100.0 cfm/ft' 0.60 cfm/ton 298.04 ft'/ton 496.74 Btu/heft' 24.16 -51.00 Heating 100.0 0.60 No. People 0.0 0.0/100011' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F -2.2 26 24.0 100.0 0.0 0 0.0 0.0 -0.9 26 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -2.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 48 of 49 Room Checksums By MACDONALD-MILLER 47- CONFERENCE ROOM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: . OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 833 7,200 1,200 9,233 Net Percent Total Of Total Btu/h (%) O 0 0 0 539 539 0 0 O 0 0 0 0 0 O 0 0 539 539 208 1,041 O 7,200 O 1,200 208 9,441 -16 16 0 O 0 1,504 O 0 0 O 0 50 50 0 O 0 -634 0 0 O 0 0 0 5 0 0 0 0 0 0 0 5 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) Envelope Loads 0 : Skylite Solar 0 Skylite Cond O Roof Cond O Glass Solar 0 0 0 0 0 0 0, 9 833 14 62 4,000 66 10 1,200 20 82 6,033 100 Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> O -12 0 Ceiling Load 13 0 0 Ventilation Load O 0 0 Adj Air Trans Heat O Ov/Undr Sizing O 0 0 Exhaust Heat 0 OA Preheat Diff. 0 . RA Preheat Diff. 0 : Additional Reheat O System Plenum Heat O Underflr Sup Ht Pkup 0 Supply Air Leakage 9,216 180 11,534 100.00 6,021 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -146 0 0 -9,361 -9,506 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 0 0.00 -646 2.80 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -646 2.80 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -13,532 58.65 O 0 -9,361 40.57 443 -1.92 O 0.00 O 0.00 0 0.00 23 -0.10 O 0.00 0 0.00 -23,073 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 1.0 11.5 0.0 0.0 0.0 0.0 1.0 11.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 9.0 283 81.9 65.6 68.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.1 54.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 305 0 0 0 305 0 0 0 0 0 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.8 Return 74.8 ReUOA 81.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 27.2 0.0 0.0 0.0 AIRFLOWS Cooling 283 283 283 0 263 263 0 0 283 263 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 283 283 283 0 263 263 0 0 283 263 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 92.8 92.8 cfm/ft' 0.93 0.93 cfm/ton 294.75 fVlton 317.33 Btu/heft' 37.82 -75.65 No. People 16.0 52.5/1000 ft' Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -23.1 0.0 -8.5 0.0 0.0 -23.1 Lvg °F 283 27.2 100.0 0 0.0 0.0 283 27.2 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 49 of 49 System Checksums By MACDONALD-MILLER 101- 10 TON Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 21,429 1,425 227 0 0 0 4,280 27,361 0 0 7,445 0 0 300 0 7,746 Net Total Btu/h 0 0 7,445 21,429 1,425 527 0 0 0 4,280 35,107 Percent Of Total (%) 0 0 5 16 1' 0 0. 0 0 3 26 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 30,291 37 Glass Solar -753 -1 Glass/Door Cond 105 0 Wall Cond 0 0 Partition/Door O 0: Floor O 0 Adjacent Floor -1,537 -2 Infiltration 28,106 35 Sub Total =_> 13,139 3,285 16,423 12 ; 13,139 19,429 0 19,429 14 10,794 24,064 0 24,064 18: 24,064 56,632 3,285 59,916 44 i 47,997 345 -345 0 -584 -1 Ceiling Load O 0 28 0 0 , Ventilation Load O 0 ! 0 0 , Adj Air Trans Heat 0 i Ov/Undr Sizing 5,434 4 5,434 7 f Exhaust Heat -868 -11 I OA Preheat Diff. 01 ; RA Preheat Diff. Additional Reheat Internal Loads 16 Lights 13 People 30 Misc 59 Sub Total ==> 0 37,830 0 0 5,434 -868 0 0 0 0 0 O 0, -8,754 0' 0 O 01 89,771 1,063 137,419 100.00 Underflr Sup Ht Pkup Supply Air Leakage 80,952 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -14,129 -1,249 0 0 0 -18,319 -33,696 0 0 0 0 -2,813 0 0 -94,805 -131,314 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -10,116 3.46 O 0.00 -14,129 4.83 -2,755 0.94 0 0.00 0 0.00 0 0 -18,319 6.26 -45,319 15.49 O 0.00 0 0.00 O 0.00 0 0.00 O 0.00 -159,659 54.56 O 0 -94,805 32.40 7,138 -2.44 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -292,645 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 11.5 137.4 110.9 3,913 80.0 64.6 66.2 54.5 52.9 56.8 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 11.5 137.4 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 4,812 Part 0 Int Door 0 ExFIr 0 Roof 4,812 Wall 1,682 Ext Door 0 fe (%) 0 0 753 45 0 0 TEMPERATURES Cooling Heating 56.5 100.0 75.2 68.2 75.2 68.2 80.9 33.1 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 3,913 3,913 3,913 0 3,103 3,103 356 0 4,269 3,459 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 3,913 3,913 3,913 0 3,103 3,103 356 0 4,269 3,459 0 0 0 0 ENGINEERING CKS Cooling Heating 79.3 79.3 0.81 0.81 341.73 420.20 28.56 -60.82 43 % OA cfm/fe cfm/ton ft'/ton Btu/hrfe No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -292.7 0.0 -93.5 0.0 0.0 -292.7 Lvg °F 3,913 33.1 100.0 O 0.0 0.0 3,913 33.1 54.5 0 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 1 of 6 System Checksums By MACDONALD-MILLER 102- 3 TON Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 17,678 -912 69 0 0 0 553 17,389 2,689 4,050 5,819 12,559 -394 0 0 0 29,553 0 0 0 0 0 66 0 66 672 0 0 672 394 0 1,024 0 -2,891 0 -735 Net Total Btu/h 0 0 0 17,678 -912 135 0 0 0 553 17,455 3,362 4,050 5,819 13,231 0 3,845 0 0 0 1,024 0 0 0 0 0 Percent Of Total (%) O 0 0 50 -3 Oi 0 0' 0 2' 49 9. 11 16 37; 11 0; 0; 0 3I 0 0 01 0: 0 35,555 100.00 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 19,512 71 Glass Solar -1,646 -6 , Glass/Door Cond 14 0 Wall Cond O 0 Partition/Door O 0 Floor O 0 Adjacent Floor -772 -3 Infiltration 17,108 62 Sub Total =_> 2,689 2,250 5,819 10,759 Internal Loads 10 ' Lights 8 People 21 Misc 39 Sub Total ==> -401 -1 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 27,466 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -8,795 -1,023 0 0 0 -4,561 -14,379 0 0 0 0 -125 0 0 -28,864 -43,368 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 O 0.00 O 0.00 -8,795 11.51 -1,767 2.31 O 0.00 O 0.00 O 0 -4,561 5.97 -15,124 19.80 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -32,723 42.84 0 0 -28,864 37.79 325 -0.43 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 -76,386 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 3.0 35.6 26.6 1,292 72.7 61.5 63.5 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 3.0 35.6 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 54.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 985 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 970 Ext Door 21 O 0 385 40 O 0 TEMPERATURES Cooling Heating 56.0 100.0 73.7 69.6 73.7 69.6 74.4 47.2 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,292 1,292 1,292 0 636 636 89 0 1,381 725 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,292 1,292 1,292 0 636 636 89 0 1,381 725 0 0 0 0 ENGINEERING CKS Cooling Heating 49.2 49.2 1.31 1.31 436.20 332.44 36.10 -77.55 9 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -76.4 0.0 -9.9 0.0 0.0 -76.4 Lvg °F 1,292 47.2 100.0 O 0.0 0.0 1,292 47.2 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 2 of 6 System Checksums By MACDONALD-MILLER 103 - 7 and one half TONS Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 13 Outside Air: OADB/WB/HR: 81 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 4,457 4,457 4 . 0 41,591 0 41,591 34 47,850 -640 0 -640 -1 ' -2,369 123 215 338 0 41 O 0 0 0 O 0 Oi 0 O 0 0 0 0 2,052 2,052 2 i -1,166 43,126 4,672 47,798 39 44,355 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 57 Glass Solar -3 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -1 Infiltration Sub Total ==> 53 Internal Loads 9,221 2,305 11,526 9 j 9,221 Lights 18,900 0 18,900 151 10,500 People 17,661 0 17,661 14 I 17,661 Misc 45,781 2,305 48,087 39 " 37,381 45 Sub Total ==> 11 13 21 -395 395 0 0 -652 -1 O 0 24,028 19 0 0 O 0 0 0 0 O 0 2,463 2,463 2 2,463 3 1,003 1,003 1 O 0 0 0 0 -8,833 0 0 O 0 0 0 0 Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 90,976 -458 123,379 100.00 83,548 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 - 16,455 -1,018 0 0 0 -9,738 - 27,212 0 0 0 0 -1,612 0 0 -103,674 -132,498 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -7,003 2.80 O 0.00 -16,455 6.57 -2,599 1.04 O 0.00 O 0.00 O 0 -9,738 3.89 -35,796 14.29 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -115,057 45.94 O 0 -103,674 41.40 4,087 -1.63 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -250,440 100.00 Total Capacity ton MBh Main Clg 10.3 123.4 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 10.3 123.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 99.5 3,949 77.1 63.0 63.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.1 52.3 0.0 0.0 0.0 0.0 55.3 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 3,377 Part 0 Int Door 0 ExFIr 0 Roof 3,306 Wall 1,751 Ext Door 0 O 0 876 50 O 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 56.1 74.6 74.6 78.1 0.0 0.0 0.0 100.0 68.5 68.5 43.3 0.0 0.0 0.0 AIRFLOWS Cooling 3,949 3,949 3,949 0 2,236 2,236 189 0 4,138 2,425 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 3,949 3,949 3,949 0 2,236 2,236 189 0 4,138 2,425 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft' No. People Cooling 56.6 1.17 384.05 328.45 36.54 42 Heating 56.6 1.17 -74.16 HEATING COIL SELECTION Ent Lvg °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Capacity Coil Airflow MBh cfm -250.4 0.0 -47.6 3,949 43.3 100.0 0 0.0 0.0 3,949 43.3 54.1 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -250.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 3 of 6 System Checksums By MACDONALD-MILLER 104 - 4 TON Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 13 Outside Air: OADB/WB/HR: 81 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 O 0 0 15,413 0 15,413 377 0 377 133 167 301 O 0 O 0 O 0 0 1,854 1,854 17,777 167 17,944 3,784 946 4,730 3,600 0 3,600 3,242 0 3,242 10,627 946 11,573 -501 501 0 0 0 12,958 0 0 0 O 0 1,271 1,271 0 O 0 -3,539 0 0 O 0 0 0 0 35 1 1 0 0 0 4 41 11 8 7; 26 0' 30 0 0. 0 31 0! 0 0; 0 01 27,902 -653 43,746 100.00 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Sensible Btu/h 0 0 0 28,017 -1,840 23 0 0 0 -1,078 25,121 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 83 Glass Solar -5 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -3 Infiltration 75 Sub Total ==> Internal Loads 3,784 11 Lights 2,000 6 People 3,242 10 Misc 9,027 27 . Sub Total ==> -531 -2 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. 'Additional Reheat ; Underflr Sup Ht Pkup I Supply Air Leakage 33,617 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -11,858 -11,858 12.07 -913 -1,785 1.82 O 0 0.00 O 0 0.00 O 0 0 -6,418 -6,418 6.53 -19,189 -20,062 20.43 0 0 0 0 -163 0 0 -33,728 -53,080 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 -44,846 45.66 O 0 -33,728 34.34 414 -0.42 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -98,221 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 3.7 43.8 0.0 0.0 0.0 0.0 3.7 43.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 33.6 1,582 77.6 63.1 63.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 53.8 61.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 1,386 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 1,139 Ext Door 21 ft' (%) O 0 548 48 O 0 TEMPERATURES Cooling Heating 56.0 100.0 73.9 69.6 73.9 69.6 77.7 44.5 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,582 1,582 1,582 0 872 872 125 0 1,707 996 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,582 1,582 1,582 0 872 872 125 0 1,707 996 0 0 0 0 ENGINEERING CKS Cooling Heating 55.1 55.1 1.14 1.14 433.91 380.19 31.56 -70.87 8 OA cfm/ft' cfm/ton fr/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -98.2 0.0 Lvg °F 1,582 44.5 100.0 0 0.0 0.0 -16.8 1,582 44.5 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -98.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 4 of 6 , System Checksums By MACDONALD-MILLER 105 - 5 TON Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 13 Outside Air: OADBANB/HR: 81 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h o o 0 0 0 0 0 0 0 0 0 0 0 0 0 12,611 0 12,611 28 . 14,635 457 0 457 1 39 58 81 139 0 40 0 0 0 0 O 0 0 0 0 0 0 0 0 1,098 1,098 2' 222 14,223 81 14,30532 14,936 3,724 931 4,655 10 3,724 4,950 0 4,950 11 2,750 6,241 0 6,241 141 6,241 14,915 931 15,846 35 ; 12,715 -480 480 0 0' -478 O 010,944 24' 0 O 0 0 0 0 Oi 2,941 2,941 7 2,941 1,196 1,196 3 0 0, O 0 0' -3,243 0 0 0 0' O 0 0 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond 49 Glass Solar O Glass/Door Cond 0 . Wall Cond O Partition/Door O Floor O Adjacent Floor 1 Infiltration 50 Sub Total ==> Internal Loads 12 Lights 9 People 21 ; Misc 42 Sub Total ==> -2 Ceiling Load 0 Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing 10 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup 1 Supply Air Leakage 31,599 -555 45,232 100.00 30,114 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -6,307 -6,307 6.73 -302 -677 0.72 0 0 0.00 O 0 0.00 O 0 0 -4,513 -4,513 4.82 -11,122 -11,497 12.27 0 0 0 0 O 0.00 O 0.00 O 0.00 O 0.00 -75 0 0.00 O -44,938 47.96 0 0 0 -37,454 -37,454 39.97 188 -0.20 0 0.00 0 0.00 O 0.00 -48,651 O 0.00 0 0.00 -93,702 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 3.8 45.2 0.0 0.0 0.0 0.0 3.8 45.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 37.3 1,450 78.1 63.3 63.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.4 52.7 56.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 1,364 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 476 Ext Door 21 ft' (%) 0 0 253 53 0 0 TEMPERATURES Cooling Heating SADB 56.4 100.0 Ra Plenum 73.9 69.8 Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 73.9 77.9 0.0 0.0 0.0 69.8 42.2 0.0 0.0 0.0 AIRFLOWS Cooling 1,450 1,450 1,450 0 873 873 88 0 1,538 961 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,450 1,450 1,450 0 873 873 88 0 1,538 961 0 0 0 0 ENGINEERING CKS Cooling Heating 60.2 60.2 1.06 1.06 384.65 361.87 33.16 -68.70 11 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•f0 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -93.7 0.0 -19.8 0.0 0.0 -93.7 Lvg °F 1,450 42.2 100.0 O 0.0 0.0 1,450 42.2 54.4. 0 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 5 of 6 System Checksums By MACDONALD-MILLER 106 - EXISTING 4 TON Variable Temperature Constant Volume COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 8,843 Glass/Door Cond 812 Wall Cond 68 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration 557 Sub Total =_> 10,279 Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 9,384 15,300 21,186 45,871 -970 0 0 5,428 60,608 Net Percent • Total Of Total Btu/h (%) O 0 O 0 O 0 O 8,843 O 812 94 162 0 0 O 0 557 94 10,374 2,346 11,730 O 15,300 O 21,186 2,346 48,217 970 0 O 30,389 0 0 5,428 2,265 2,265 0 O 0 -6,003 0 0 0 0 0 0! 9, 1 0` 0; 0' 0 1 11' 12! 16''. 22! 50 0 311 0 6. 2! O 0'I 0 0' 0 -327 96,672 100.00 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Sensible Btu/h 0 0 0 12,704 12 49 0 0 0 33 12,798 9,384 8,500 21,186 39,071 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 23 . Glass Solar O Glass/Door Cond 0 Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration 23 Sub Total ==> 17 15 38 69 Internal Loads Lights People Misc Sub Total ==> -970 -2 i Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 5,428 10 ; Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 56,326 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -6,946 -334 0 0 0 -2,158 -9,437 0 0 0 0 -111 0 0 -80,491 -90,039 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 O 0.00 O 0.00 -6,946 3.39 -755 0.37 O 0.00 O 0.00 O 0 -2,158 1.05 -9,858 4.81 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -114,851 56.04 0 0 -80,491 39.28 259 -0.13 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -204,942 100.00 Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Main CIg 8.1 96.7 76.6 Aux CIg 0.0 0.0 0.0 2,683 80.7 0 0.0 Leave DB/WB/HR °F °F gr/Ib 64.8 66.1 54.2 52.8 56.9 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 8.1 96.7 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total • Glass ft' (%) Floor 3,437 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 536 Ext Door 21 0 0 287 53 0 0 TEMPERATURES Cooling Heating 56.2 100.0 74.1 69.9 74.1 69.9 81.0 31.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 2,683 2,683 2,683 0 2,232 2,232 42 0 2,725 2,274 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Own Leakage Ups Heating 2,683 2,683 2,683 0 2,232 2,232 42 0 2,725 2,274 0 0 0 0 ENGINEERING CKS Cooling Heating 83.2 83.2 0.78 0.78 333.08 426.64 28.13 -59.63 34 % OA cfm/ft' cfm/ton ft'/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -204.9 2,683 31.7 0.0 0 0.0 Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F 100.0 0.0 -67.6 2,683 31.7 54.2 0.0 0.0 -204.9 0 0.0 0.0 0 0.0 0.0 TRACE@ 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 6 of 6 Zone Checksums By MACDONALD-MILLER 01- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 2,157 346 21 0 0 0 723 3,247 1,758 450 1,611 3,819 -224 0 0 1,033 7,875 0 0 0 0 0 29 0 29 440 0 0 440 224 0 551 0 -876 0 367 Net Total Btu/h 0 0 0 2,157 346 50 0 0 0 723 3,276 2,198 450 1,611 4,259 0 4,882 0 0 1,033 551 0 0 0 0 0 Percent Of Total (%) 0 0 0 15 2 0 0' 0 0 5 23 16' 3. 12: 30! 0'. 35 0 0 7' 4 0i 0 0' 01 01 14,000 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 2,931 254 25 0 0 0 242 3,451 1,758 250 1,611 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 0 37 3 0 0 01 0'1 3 44 22 3 20 3,619 46 Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> -223 -3 Ceiling Load O 0 Ventilation Load O 0 1Adj Air Trans Heat Ov/Undr Sizing 1,033 13 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,880 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -2,693 -2,693 8.09 -92 -204 0.61 O 0 0.00 O 0 0.00 O 0 0.00 -2,982 -2,982 8.96 -5,767 -5,879 17.67 0 0 0 0 0 0 0 0.00 0.00 0.00 0 0.00 -36 0 0.00 O -20,138 60.53 0 0 0 -7,331 -13,134 -7,331 22.03 88 -0.26 0 0.00 0 0.00 0 0.00 -11 0.03 0 0.00 0 0.00 -33,272 100.00 Main Gig Aux Clg Opt Vent Total Total Capacity ton MBh 1.2 14.0 0.0 0.0 0.0 0.0 1.2 14.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 11.2 391 81.0 65.2 67.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 53.4 58.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 644 Part 0 Int Door 0 ExFlr 0 Roof 0 0 0 Wall 128 60 47 Ext Door 21 0 0 TEMPERATURES Cooling Heating 57.0 100.0 73.9 69.8 73.9 69.8 81.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 391 391 391 0 391 391 58 0 449 449 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 391 391 391 0 391 391 58 0 449 449 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 100.0 0.61 335.49 552.01 21.74 1 Heating 100.0 0.61 -51.66 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -33.3 0.0 -13.6 0.0 0.0 -33.3 Lvg °F 391 24.0 100.0 O 0.0 0.0 391 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 1 of 49 Zone Checksums By MACDONALD-MILLER 02- OFFICE INTERIOR COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h o o 0 0 0 o 0 0 0 0 o 0 0 0 0 o 0 0 0 0 o 0 0 0 0 o o 0 0 0 o 0 0 0 o 0 0 0 o o 0 0 0 40 40 21 28 40 0 40 2 28 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond O Glass Solar O Glass/Door Cond 0 Wall Cond 0 Partition/Door O Floor O Adjacent Floor 3 Infiltration 3 Sub Total ==> Internal Loads 188 47 236 12 188 18 Lights 450 0 450 22 250 23 People 630 0 630 31 : 630 59 Misc 1,268 47 1,315 65 1,068 100. Sub Total =_> -24 0 0 0 24 0 62 0 -113 0 0 594 0 0 0 62 0 0 0 0 0 01 30 0, 0 0 3 0 0: OI 1,283 21 2,011 100.00 -24 -2 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,072 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -160 -160 3.92 -160 -160 3.92 O 0 O 0 O 0 0.00 0.00 0.00 O 0 0.00 -4 0 O -2,387 O 0 -1,528 -1,528 10 0 0 0 -14 0 0 0.00 58.51 0 37.46 -0.24 0.00 0.00 0.00 0.35 0.00 0.00 -1,692 -4,080 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 2.0 0.0 0.0 0.0 0.0 0.2 2.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.6 50 81.7 65.4 67.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 55.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 69 Part 0 Int Door 0 ExFIr 0 Roof 0 0 Wall 0 Ext Door 0 O 0 O 0 TEMPERATURES Cooling Heating 56.0 100.0 73.9 69.8 73.9 69.8 81.7 27.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 50 50 50 0 46 46 3 0 54 50 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infd MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 50 50 50 0 46 46 3 0 54 50 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 92.0 0.73 300.87 411.71 29.15 1 Heating 92.0 0.73 -59.13 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -4.1 0.0 -1.5 Lvg °F 50 27.7 100.0 0 0.0 0.0 50 27.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 2 of 49 Zone Checksums By MACDONALD-MILLER 03- EXIST MENS RM COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 68 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 292 People 450 Misc 0 Sub Total ==> 742 Ceiling Load -38 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 888 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 1,592 0 0 0 0 0 0 0 0 Net Total Btu/h 0 0 0 0 0 0 0 0 0 0 0 73 365 O 450 O 0 73 815 38 0 O 905 0 0 888 87 87 0 O 0 -155 0 0 O 0 43 2,695 Percent Of Total (%) 0' 0 0 0' 0' 0' 0' 0 0 0; 0' 14'. 17 0 30: 0 34 0 0' 33 3i 0' 0' 0! 0 0� 100.00 CLG SPACE PEAK Mo/Hr: 8 / 20 OADB: 75 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 292 250 0 542 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar O Glass/Door Cond 0 Wall Cond O Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration n Sub Total =_> Internal Loads 21 Lights 18 People 0 i Misc 39 Sub Total ==> -37 -3 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 888 64 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,393 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -6 0 0.00 O -3,560 60.53 O 0 0 -2,316 -2,316 39.37 14 -0.23 0 0.00 0 0.00 0 0.00 -19 0.33 0 0.00 0 0.00 -2,322 -5,882 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.2 69 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.9 56.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 107 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 57.0 73.9 73.9 82.4 0.0 0.0 0.0 100.0 69.8 69.8 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 69 69 69 0 69 69 0 0 69 69 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 69 69 69 0 69 69 0 0 69 69 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'lton Btu/hr•ft' No. People Cooling 100.0 0.65 308.18 476.52 25.18 1 Heating 100.0 0.65 -54.98 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -5.9 69 24.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -2.4 69 24.0 55.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -5.9 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 3 of 49 Zone Checksums By MACDONALD-MILLER 04- RECEPTION COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 8 / 20 OADB: 75 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 677 1,350 935 2,962 169 0 0 169 846 1,350 935 3,132 13 21 15; 49 -88 88 0 0' 0 0 2,017 32 O 0 0 0 0: 1,021 1,021 16 205 205 3j 0 O 0 0i -366 0 01 0 0 O 0 0 1 3,895 96 6,375 100.001 677 750 935 2,362 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0' Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration n Sub Total =_> 21 23, 28 Internal Loads Lights People Misc 72 . Sub Total =_> -85 -3 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing 1,021 31 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 3,298 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O 0 0.00 o o 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -14 0 0.00 0 -8,428 60.53 0 0 0 -5,483 -5,483 39.37 32 -0.23 0 0.00 0 0.00 0 0.00 -46 0.33 0 0.00 0 0.00 -5,496 -13,924 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.4 0.0 0.0 0.0 0.0 0.5 6.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 5.1 164 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.9 56.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 248 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 57.0 100.0 73.9 69.8 73.9 69.8 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 164 164 164 0 164 164 0 0 164 164 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Until MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heati ng 164 164 164 0 164 164 0 0 164 164 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 100.0 0.66 308.34 466.84 25.70 3 Heating 100.0 0.66 -56.15 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -13.9 0.0 -5.7 0.0 0.0 -13.9 Lvg °F 164 24.0 100.0 O 0.0 0.0 164 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 4 of 49 Zone Checksums By MACDONALD-MILLER 05- FL1 PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 4,682 52 15 0 0 0 174 4,923 410 450 768 1,627 0 0 0 0 0 22 0 22 102 0 0 102 Net Percent Total Of Total Btu/h (%) 0 0 0 4,682 52 37 0 0 0 174 4,946 512 450 768 1,730 0 0 58 1 0 0! 0, 0 21 621 6 6 10 22 CLG SPACE PEAK Mo/Hr: 9 / 11 OADB: 71 Space Sensible Btu/h 0 0 0 5,447 -150 1 0 0 0 -62 5,236 410 250 768 1,427 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 82 Glass Solar -2 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -1 Infiltration Sub Total =_> 79 6 4 12 22 Internal Loads Lights People Misc Sub Total ==> -54 54 0 0 ! -56 -1 Ceiling Load O 0 1,223 15 , 0 0 Ventilation Load O 0 01 0 0' Adj Air Trans Heat 0 0 I Ov/Undr Sizing O 0 0 0 0 Exhaust Heat 138 138 2 i OA Preheat Diff. 0 0 I , RA Preheat Diff. 0 0 01 Additional Reheat -696 0 01 System Plenum Heat 0 0 I Underflr Sup Ht Pkup 0 0 0 Supply Air Leakage 6,497 -379 8,036 100.00 6,608 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 - 1,267 -72 0 0 0 -695 - 2,034 0 0 0 0 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 O 0.00 0 0.00 O 0.00 -1,267 8.25 -163 1.06 0 0.00 0 0.00 O 0.00 -695 4.52 -2,125 13.83 0 0.00 0 0.00 0 0.00 0 0.00 -8 0 0.00 O -4,888 31.81 O 0 0 -8,392 -10,434 -8,392 54.62 21 -0.14 0 0.00 0 0.00 0 0.00 20 -0.13 0 0.00 0 0.00 -15,364 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.0 0.0 0.0 0.0 0.0 0.7 8.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 6.9 311 75.3 61.5 59.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.5 0.0 0.0 0.0 0.0 56.5 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass 52 (%) Floor 150 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 122 68 56 Ext Door 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 73.9 69.8 73.9 69.8 75.3 55.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 311 311 311 0 95 95 14 0 324 109 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 0 Heating 311 311 311 0 95 95 14 0 324 109 0 0 0 ENGINEERING CKS Cooling Heating 30.6 30.6 2.07 2.07 464.34 224.00 53.57 -102.43 1 % OA cfm/fP cfm/ton fP/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -15.4 0.0 0.0 Lvg °F 311 55.8 100.0 O 0.0 0.0 O 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -15.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 5 of 49 Zone Checksums By MACDONALD-MILLER 06- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 8 / 11 OADB: 76 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h o o 0 0 0 O 0 0 0 0 O 0 0 0 - 0 5,772 0 5,772 48 6,257 59 0 59 0: -65 21 31 52 0 15 O 0 0 0 o 0 0• 0 o 0 0 0 0 162 162 1' 14 6,014 31 6,044 50 6,221 399 100 498 4 399 1,800 0 1,800 15 1,000 2,297 0 2,297 19 2,297 4,496 100 4,595 38 : 3,696 -53 53 0 0 -53 O 0 1,323 11 0 O 0 01 0 0 0, O 0 0 0 153 153 1 O 0, O 0 OF -1,038 0 0 O 0 O 0 0, 10,457 -702 12,116 100.00 ' 9,863 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond 63 Glass Solar -1 Glass/Door Cond 0 Wall Cond 0 Partition/Door O Floor O Adjacent Floor 0 Infiltration 63 Sub Total =_> Internal Loads 4 Lights 10 People 23 Misc 37 ; Sub Total =_> -1 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 , Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -2,347 -2,347 11.08 -138 -309 1.46 O 0 0.00 O 0 0.00 O 0 0.00 -676 -676 3.19 -3,161 -3,332 15.73 0 0 0 0 0 0 0 0.00 0.00 0.00 O 0.00 -8 0 0.00 O -5,536 26.14 O 0 0 -12,405 -12,405 58.57 24 -0.11 O 0.00 O 0.00 O 0.00 70 -0.33 0 0.00 O 0.00 -15,573 -21,179 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 12.1 0.0 0.0 0.0 0.0 1.0 12.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 10.3 464 75.0 61.3 59.1 54.0 52.2 55.3 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 146 0 0 0 0 0 0 227 125 55 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 56.0 73.9 73.9 75.0 0.0 0.0 0.0 100.0 69.8 69.8 59.2 0.0 0.0 0.0 AIRFLOWS Cooling 464 464 464 0 108 108 13 0 477 121 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 464 464 464 0 108 108 13 0 477 121 0 0 0 0 ENGINEERING CKS Cooling Heating -23.2 23.2 3.18 3.18 459.66 144.60 82.99 -145.06 4 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -21.2 0.0 Lvg °F 464 59.2 100.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -21.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 6 of 49 Zone Checksums By MACDONALD-MILLER 07- FL1 CORNER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 6,851 -71 18 0 0 0 118 6,916 0 0 0 0 0 32 0 32 Net Percent Total Of Total Btu/h (%) 0 0 0 6,851 -71 51 0 0 0 118 6,948 0 0 66 -1 0 0 0 0' 1: 67 CLG SPACE PEAK Mo/Hr: 7 / 12 OADB: 78 Space Sensible Btu/h 0 0 0 6,851 -71 18 0 0 0 33 6,831 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 81 Glass Solar -1 Glass/Door Cond O Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration 80 Sub Total ==> Internal Loads 273 68 341 3 i 273 3 Lights 1,350 0 1,350 13 750 9 People 683 0 683 7 ; 683 8 ' Misc 2,306 68 2,374 23 1,706 20 Sub Total ==> -37 37 0 0 984 I 0, O 9! O 0 0! 0 0 O 0 01 109 109 1 i O 01 0 0 01 -895 0 0I O 0, 0 0 0, 1 9,185 -648 10,415 100.00 -37 0 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,500 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -2,782 -2,782 15.97 -130 -322 1.85 O 0 0.00 O 0 0.00 O 0 0.00 -463 -463 2.66 -3,375 -3,566 20.48 0 0 0 0 O 0.00 O 0.00 O 0.00 O 0.00 -12 0 0.00 O -3,859 22.16 O 0 0 -10,035 57.62 35 -0.20 O 0.00 O 0.00 O 0.00 10 -0.06 O 0.00 O 0.00 -10,035 -13,421 -17,415 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.4 0.0 0.0 0.0 0.0 0.9 10.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 9.0 400 74.7 61.1 58.6 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 52.0 54.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 100 Part 0 Int Door 0 ExFlr 0 Roof 0 0 0 Wall 255 148 58 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return RetJOA Fn MtrTD Fn BIdTD Fn Frict 56.0 73.8 73.8 74.7 0.0 0.0 0.0 100.0 69.6 69.6 61.1 0.0 0.0 0.0 AIRFLOWS Cooling 400 400 400 0 75 75 9 0 409 84 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 400 400 400 0 75 75 9 0 409 84 0 0 0 0 ENGINEERING CKS Cooling Heating 18.8 18.8 4.00 4.00 460.83 115.22 104.15 -174.15 3 % OA cfm/ft' cfm/ton ft'/ton Btu/hr-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -17.4 0.0 Lvg °F 400 61.1 100.0 O 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -17.4 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 7 of 49 Zone Checksums By MACDONALD-MILLER 08- PERIMETER OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underf r Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total Btu/h (%) o 0 0 0 O 0 0 0 O 0 0 0 3,988 0 3,988 16 699 0 699 3 74 102 175 1 O 0 0 O 0 0 O 0 0 0 1,471 1,471 6 6,232 102 6,334 25. 2,760 690 3,451 2,250 0 2,250 2,560 0 2,560 7,570 690 8,260 -362 362 0 O 0 10,209 O 0 0 O 0 913 913 0 O 0 -2,096 0 0 O 0 13,440 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h 0 0 0 15,776 -1,117 -4 0 0 0 -923 13,731 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 79 Glass Solar -6 Glass/Door Cond O Wall Cond O , Partition/Door O Floor O Adjacent Floor -5 Infiltration 69 Sub Total =_> Internal Loads 13 2,760 14 Lights 9 1,250 6 People 10 , 2,560 13 Misc 32 6,570 33 Sub Total ==> O -389 -2 . Ceiling Load 40 0 0 Ventilation Load 0 ! 0 0 i Adj Air Trans Heat 0 Ov/Undr Sizing O 0 0 Exhaust Heat 4 , i OA Preheat Diff. O RA Preheat Diff. 0 i' Additional Reheat O System Plenum Heat O Underflr Sup Ht Pkup 0 ; Supply Air Leakage -30 25,715 100.001 19,913 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -5,351 -315 0 0 0 -4,682 -10,347 0 0 0 0 -119 0 0 -20,974 -31,441 Coil Peak Tot Sens Btu/h 0 0 0 0 -5,351 -705 0 0 0 -4,682 -10,737 Percent Of Total (%) 0.00 0.00 0.00 0.00 8.35 1.10 0.00 0.00 0.00 7.31 16.76 O 0.00 O 0.00 O 0.00 O 0.00 0 -32,497 0 -20,974 300 0 0 0 -156 0 0 0.00 50.73 0 32.74 -0.47 0.00 0.00 0.00 0.24 0.00 0.00 -64,065 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 2.1 25.7 0.0 0.0 0.0 0.0 2.1 25.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 19.0 0.0 937 79.6 0 0.0 Leave DB/WB/HR °F °F gr/lb 64.1 64.4 54.0 54.0 62.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 1,011 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 518 285 55 Ext Door 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 73.9 69.6 73.9 69.6 79.6 38.9 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 937 937 937 0 632 632 91 0 1,028 723 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 937 937 937 0 632 632 91 0 1,028 723 0 0 0 0 ENGINEERING CKS Cooling Heating 67.4 67.4 0.93 0.93 437.24 471.78 25.44 -63.37 5 % OA cfm/ft' cfm/ton ft'/ton Btu/hr-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -64.1 0.0 -15.9 0.0 0.0 -64.1 Lvg °F 937 38.9 100.0 O 0.0 0.0 937 38.9 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 8 of 49 Zone Checksums By MACDONALD-MILLER 09- WEST HALF PERIMETER FL1 HALLWAY COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h O 0 0 O 0 0 O 0 0 4,574 0 4,574 -251 0 -251 41 34 75 O 0 O 0 O 0 0 265 265 4,629 34 4,663 751 188 939 O 0 0 O 0 0 751 188 939 -109 109 0 O 0 1,765 O 0 0 O 0 266 266 0 O 0 -547 0 0 O 0 5,270 Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 6 / 10 OADB: 68 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 0 Skylite Solar O 0 0 Skylite Cond O 0 0 Roof Cond 60 5,390 104 Glass Solar -3 -652 -13 Glass/Door Cond 1 • 9 0 Wall Cond 0 0 0. Partition/Door 0 - 0 0 Floor O 0 0 • Adjacent Floor 3 -188 -4 Infiltration 61 : 4,559 88 Sub Total ==> Internal Loads 12 751 14 Lights O 0 0 People O 0 0 i Misc 12 i 751 14 Sub Total ==> 1 01 231 0! 0 0 3 0� 0; 0I 0 0 50 7,633 100.00 -112 -2 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup 1 Supply Air Leakage 5,198 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,726 -468 0 0 0 -1,273 -5,467 0 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 O 0.00 O 0.00 -3,726 22.27 -759 4.53 0 0.00 O 0.00 O 0.00 -1,273 7.61 -5,758 34.41 O 0.00 O 0.00 O 0.00 O 0.00 -35 0 0.00 O -8,490 50.74 O 0 0 -2,706 -8,207 -2,706 16.17 85 -0.51 0 0.00 0 0.00 O 0.00 135 -0.81 O 0.00 0 0.00 -16,733 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.6 0.0 0.0 0.0 0.0 0.6 7.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 5.6 245 74.6 62.6 65.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.8 53.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 275 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 366 115 31 Ext Door 21 0 0 TEMPERATURES Cooling Heating 56.0 100.0 73.7 69.6 73.7 69.6 74.6 38.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 245 245 245 0 165 165 25 0 269 190 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 245 245 245 0 165 165 25 0 269 190 0 0 0 0 ENGINEERING CKS Cooling Heating 67.5 67.5 0.89 0.89 384.54 432.35 27.76 -60.85 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -16.7 0.0 -4.2 Lvg °F 245 38.8 100.0 0 0.0 0.0 245 38.8 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 9 of 49 Zone Checksums By MACDONALD-MILLER 09 -EAST HALF PERIMETER FL1 HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 75 / 64 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) CLG SPACE PEAK Mo/Hr: 6 / 10 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 4,574 0 4,574 60 5,390 -251 0 -251 -3 -652 41 33 74 1 9 0 0 0 0 0 0 0 0 0 0 0 0 0 265 265 3 -188 4,629 33 4,662 61 4,559 751 188 939 12 751 O 0 0 0 0 O 0 0 0 0 751 188 939 12 751 -103 103 0 0 -105 O 0 1,766 23 0 O 0 0 0 0 0 O 0 0 0 250 250 3 O 0 0 0 0 -548 0 0 O 0 0 0 0 5,277 25 7,616 100.00 Envelope Loads 0 . Skylite Solar O Skylite Cond O Roof Cond 104 Glass Solar -13 Glass/Door Cond O Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor -4 Infiltration 88 Sub Total =_> Internal Loads 14 Lights 0 People 0 Misc 14 Sub Total ==> -2 ; Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. IRA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,205 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -3,726 -3,726 22.26 -468 -759 4.53 O 0 0.00 O 0 0.00 0 0 0.00 -1,273 -1,273 7.61 -5,467 -5,758 34.40 0 0 0 0 -32 0 0 -2,719 -8,218 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 -8,490 50.71 0 0 -2,719 16.24 79 -0.47 0 0.00 0 0.00 0 0.00 147 -0.88 0 0.00 0 0.00 -16,741 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.6 0.0 0.0 0.0 0.0 0.6 7.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.6 245 74.7 62.6 65.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 54.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 275 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 366 115 31 Ext Door 21 0 0 TEMPERATURES Cooling Heating 56.0 100.0 73.8 69.6 73.8 69.6 74.7 38.9 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 245 245 245 0 165 165 25 0 270 190 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 245 245 245 0 165 165 25 0 270 190 0 0 0 0 ENGINEERING CKS Cooling Heating 67.4 67.4 0.89 0.89 385.88 433.30 27.69 -60.88 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -16.7 0.0 Lvg °F 245 38.9 100.0 0 0.0 0.0 -4.1 245 38.9 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 10 of 49 Zone Checksums By MACDONALD-MILLER 10- INTERIOR OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 8 OADB: 64 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Net Percent Space Percent Space Peak Coil Peak Percent Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Envelope Loads O 0 0 0 0 0 Skylite Solar 0 0 0.00 O 0 0 0 0 0 Skylite Cond 0 0 0.00 O 0 0 0 0 0 Roof Cond 0 0 0.00 900 0 900 2 3,871 12 Glass Solar 0 0 0.00 176 0 176 0 -288 -1 Glass/Door Cond -1,220 -1,220 1.01 18 24 42 0' -2 0 Wall Cond -74 -164 0.14 O 0 0' 0 0 Partition/Door 0 0 0.00 O 0 0 0 0 Floor 0 0 0.00 O 0 0 0 0 0 Adjacent Floor 0 0 0.00 O 0 0 i 0 0 Infiltration 0 0 0.00 1,094 24 1,1182 3,581 11 Sub Total =_> -1,295 -1,385 1.14 5,758 10,350 17,422 33,530 -596 0 0 0 34,028 1,440 0 0 1,440 596 0 1,377 0 -3,359 0 7,198 10,350 17,422 34,970 0 19,593 0 0 0 1,377 0 0 0 0 0 13 18l 31! 61 0 34 0, 0 0 2' 0 0 0' 0 0' 77 57,057 100.00 5,758 5,750 17,422 28,930 Internal Loads 18 Lights 18 People 55 Misc 91 . Sub Total ==> -603 -2 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 ' Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 31,908 100.00 Grand Total =_> O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -68 0 0.00 O -71,024 58.49 O 0 0 -49,019 -49,019 40.37 157 -0.13 0 0.00 0 0.00 0 0.00 -149 0.12 0 0.00 0 0.00 -50,382 -121,420 100.00 Total Capacity ton MBh Main Clg 4.8 57.1 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 4.8 57.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 44.3 1,501 81.7 65.4 67.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 52.8 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 2,109 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 119 65 55 Ext Door 0 0 0 0 0 TEMPERATURES SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict Cooling Heating 56.0 74.1 74.1 81.7 0.0 0.0 0.0 100.0 69.9 69.9 27.7 0.0 0.0 0.0 AIRFLOWS Cooling 1,501 1,501 1,501 0 1,380 1,380 0 0 1,501 1,380 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,501 1,501 1,501 0 1,380 1,380 0 0 1,501 1,380 0 0 0 0 ENGINEERING CKS Cooling Heating 91.9 91.9 0.71 0.71 315.77 443.56 27.05 -57.57 23 % OA cfm/f cfm/to n ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -121.4 0.0 -44.2 Lvg °F 1,501 27.7 100.0 0 0.0 0.0 1,501 27.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -121.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 11 of 49 Zone Checksums By MACDONALD-MILLER 11- PERIMETER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 5,486 -316 3 0 0 0 54 5,227 846 2,700 3,601 7,147 0 0 0 0 0 8 0 8 212 0 0 212 Net Total Btu/h 0 0 0 5,486 -316 11 0 0 0 54 5,235 1,058 2,700 3,601 7,359 Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Percent Sensible Of Total Btu/h (%) Envelope Loads 0 0 0 Skylite Solar O 0 0 Skylite Cond O 0 0 Roof Cond 41 5,812 53 Glass Solar -2 -412 -4 Glass/Door Cond 0 -2 0 Wall Cond 0 0 0 Partition/Door 0 0 0 Floor 0 0 0 Adjacent Floor 0 -283 -3 Infiltration 39 5,116 47 Sub Total =_> 8 20, 27i 55. 846 1,500 3,601 5,947 Internal Loads 8 Lights 14 People 33 Misc 54 Sub Total =_> -125 125 0 0 -127 -1 Ceiling Load 0 0 415 3 : 0 0. Ventilation Load 0 0 0 0 0 Adj Air Trans Heat O 0 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 347 347 3 OA Preheat Diff. 0 0 ' RA Preheat Diff. O 0 0' Additional Reheat -1,151 0 0 . System Plenum Heat 0 0 , Underflr Sup Ht Pkup O 0 0 . • Supply Air Leakage 12,249 -459 13,356 100.00 ' 10,936 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -1,971 -1,971 6.91 -111 -254 0.89 O 0 0.00 O 0 0.00 O 0 0.00 -1,436 -1,436 5.03 -3,518 -3,660 12.84 0 0 0 0 -39 0 0 -13,710 -17,268 0 0 0 0.00 0.00 0.00 0 0.00 O 0.00 38.97 -11,114 O 0 -13,710 48.08 109 -0.38 O 0.00 0 0.00 O . 0.00 -141 0.49 O 0.00 O 0.00 -28,516 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 13.4 0.0 0.0 0.0 0.0 1.1 13.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 9.9 0.0 0.0 515 71.6 O 0.0 O 0.0 61.1 0.0 0.0 63.3 Leave DB/WB/HR °F °F gr/Ib 54.0 52.0 54.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 310 0 0 0 O 0 0 189 105 56 O 0 0 TEMPERATURES Cooling Heating 56.0 100.0 73.7 • 69.6 73.7 69.6 71.6 50.5 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 515 515 515 0 216 216 28 0 543 244 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 515 515 515 0 216 216 28 0 543 244 0 0 0 0 ENGINEERING CKS Cooling Heating 42.0 42.0 1.66 1.66 462.37 278.53 43.08 -91.99 6 % OA cfm/ft' cfmlton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -28.5 0.0 -2.0 Lvg °F 515 50.5 100.0 0 0.0 0.0 515 50.5 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -28.5 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 12 of 49 Zone Checksums By MACDONALD-MILLER 12- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 O 0 0 O 0 0 2,612 0 2,612 -150 0 -150 2 4 5 O 0 0 0 O 0 0 34 34 2,498 4 2,502 325 81 406 450 0 450 715 0 715 1,490 81 1,571 -48 48 0 0 0 246 O 0 0 O 0 124 124 0 0 0 -390 0 0 0 0 3,940 -133 Percent Of Total (%) 0 0 0 59 -3 0 0 0 0 1 56 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h 0 0 0 2,768 -196 -1 0 0 0 -109 2,462 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Percent Space Peak Coil Peak Percent Of Total Space Sens Tot Sens Of Total (%) Btu/h Btu/h (%) Envelope Loads 0 Skylite Solar 0 0 0.00 0 Skylite Cond 0 0 0.00 0 Roof Cond 0 0 0.00 75 Glass Solar 0 0 0.00 -5 Glass/Door Cond -939 -939 9.56 0 Wall Cond -53 -121 1.23 0 Partition/Door 0 0 0.00 O Floor 0 0 0.00 O Adjacent Floor 0 0 0.00 -3 Infiltration -551 -551 5.61 66 Sub Total =_> -1,543 -1,611 16.40 Internal Loads 9 325 9 Lights 10 250 7 People 16' 715 19 Misc 35' 1,290 35 ' Sub Total =_> 0, 6 0', 0 0 3 0 0; -49 -1 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat 0System Plenum Heat 0 , Underflr Sup Ht Pkup Supply Air Leakage 3,704 100.00 Grand Total =_> 4,443 100.00 0 0 0 0 -15 0 0 -4,290 -5,848 0 0 0 0.00 0.00 0.00 0 0.00 0 -3,931 0 -4,290 39 0 0 0 -30 0 0 0.00 40.02 0 43.67 -0.40 0.00 0.00 0.00 0.31 0.00 0.00 -9,823 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.4 0.0 0.0 0.0 0.0 0.4 4.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 3.3 174 71.5 60.8 62.6 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 54.1 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 119 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 90 50 56 Ext Door 0 O 0 O 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 71.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 69.6 69.6 49.6 0.0 0.0 0.0 AIRFLOWS Cooling 174 174 174 0 76 76 11 0 185 87 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 174 174 174 0 76 76 11 0 185 87 0 0 0 0 ENGINEERING CKS Cooling Heating 43.8 43.8 1.46 1.46 470.73 321.43 37.33 -82.54 % OA cfmlft' cfm/ton fV/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -9.8 0.0 -0.9 Lvg °F 174 49.6 100.0 0 0.0 0.0 174 49.6 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -9.8 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 13 of 49 Zone Checksums By MACDONALD-MILLER 13- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 9 Outside Air: OADB/WB/HR: 69 / 62 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%)' Btu/h o 0 0 0 0 o o 0 0 0 o 0 0 0 0 2,874 0 2,874 58 3,044 -165 0 -165 -3 ; -216 2 4 7 0' -1 O 0 0 0 O 0 0• 0 O 0 0 0' 0 42 42 11 -135 2,753 4 2,757 56: 2,693 404 101 505 10. 404 450 0 450 9 250 765 0 765 161 765 1,619 101 1,720 35 1,419 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 75 Glass Solar -5 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 ' Adjacent Floor -3 Infiltration 66 Sub Total ==> Internal Loads 10 Lights 6 People 19 , Misc 35 Sub Total ==> -60 60 0 0 -60 -1 O 0 297 6! 0 0 O 0 01 0 0 0 0; 0 0 0; 0 0 152 152 3; 0 0, O 0 0 -426 0 0 0 0! O 0 0 Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,311 -109 4,926 100.00 4,051 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,033 -71 0 0 0 -685 -1,789 0 0 0 0 -19 0 0 -4,589 -6,396 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 0 0.00 O 0.00 O 0.00 -1,033 9.17 -149 1.32 O 0.00 O 0.00 0 0.00 -685 6.08 -1,867 16.57 0 0.00 O 0.00 O 0.00 0 0.00 O 0.00 -4,826 42.84 O 0 -4,589 40.73 48 -0.43 0 0.00 O 0.00 O 0.00 -32 0.28 O 0.00 O 0.00 -11,266 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.9 0.0 0.0 0.0 0.0 0.4 4.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 3.6 0.0 Leave DB/WB/HR °F °F gr/Ib 191 71.2 60.9 63.4 54.0 51.9 54.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass fF (%) Floor 148 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 104 55 53 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 73.7 Return 73.7 Ret/OA 71.2 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 69.6 69.6 47.2 0.0 0.0 0.0 AIRFLOWS Cooling 191 191 191 0 94 94 13 0 204 107 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 191 191 191 0 94 94 13 0 204 107 0 0 0 0 ENGINEERING CKS Cooling Heating 49.2 49.2 1.29 1.29 464.31 360.51 33.29 -76.12 1 % OA cfm/ft' cfm/ton fV/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -11.3 0.0 -1.5 0.0 0.0 -11.3 Lvg °F 191 47.2 100.0 O 0.0 0.0 191 47.2 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 14 of 49 Zone Checksums By MACDONALD-MILLER 14- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 12 Outside Air: OADB/WB/HR: 78 / 65 / 69 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 2,132 -29 21 0 0 0 158 2,282 0 0 0 0 0 16 0 16 Net Total Btu/h 0 0 0 2,132 -29 37 0 0 0 158 2,298 Percent Of Total (%) 0 0 0 41 1 0 0 0 3 44 CLG SPACE PEAK Mo/Hr: 6 /11 OADB: 71 Space Sensible Btu/h 0 0 0 2,497 -171 9 0 0 0 -57 2,278 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Percent Space Peak Coil Peak Percent Of Total Space Sens Tot Sens Of Total (%) Btu/h Btu/h (%) Envelope Loads 0 Skylite Solar 0 0 0.00 O Skylite Cond 0 0 0.00 O Roof Cond 0 0 0.00 70 Glass Solar 0 0 0.00 -5 Glass/Door Cond -1,127 -1,127 11.21 0 Wall Cond -320 -485 4.83 0 Partition/Door 0 0 0.00 0 Floor 0 0 0.00 O Adjacent Floor 0 0 0.00 -2 Infiltration -616 -616 6.13 64 Sub Total =_> -2,062 -2,228 22.17 Internal Loads 363 91 454 9 363 10 Lights 450 0 450 9 250 7 People 739 0 739 14 739 21 Misc 1,552 91 1,643 32 1,352 38 Sub Total ==> -52 52 0 0 -53 -1 Ceiling Load O 0 1,122 22 0 0 Ventilation Load O 0 0 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing O 0 0 0 0 Exhaust Heat 134 134 3 OA Preheat Diff. 0 0 RA Preheat Diff. O 0 0 Additional Reheat -377 0 0 System Plenum Heat 0 0 Underflr Sup Ht Pkup O 0 0 , Supply Air Leakage 3,782 -84 5,197 100.00 3,577 100.00 Grand Total ==> 0 0 0 0 -17 0 0 -3,569 -5,648 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 43.42 -4,363 0 -3,569 43 0 0 0 68 0 0 0 35.52 -0.43 0.00 0.00 0.00 -0.68 0.00 0.00 -10,049 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 5.2 0.0 0.0 0.0 0.0 0.4 5.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 4.1 168 76.1 62.5 62.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 53.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor - 133 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 221 60 27 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 73.8 Return 73.8 Ret/OA 76.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 69.6 69.6 46.6 0.0 0.0 0.0 AIRFLOWS Cooling 168 168 168 0 85 85 12 0 180 97 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 168 168 168 0 85 85 12 0 180 97 0 0 0 0 ENGINEERING CKS Cooling Heating 50.4 50.4 1.27 1.27 388.63 307.09 39.08 -75.55 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hi-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -10.1 0.0 -1.4 Lvg °F 168 46.6 100.0 0 0.0 0.0 168 46.6 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -10.1 TRACE& 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 15 of 49 Zone Checksums By MACDONALD-MILLER 15- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Envelope Loads Envelope Loads Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 3,575 0 3,575 49 3,915 70 Glass Solar 0 0 0.00 Glass/Door Cond 269 0 269 4 162 3 Glass/Door Cond -2,469 -2,469 17.46 Wall Cond 31 44 75 1 35 1 Wall Cond -135 -313 2.22 Partition/Door 0 0 0' 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0 0 Floor 0 0 0.00 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Infiltration 188 188 3' 18 0 Infiltration -759 -759 5.37 Sub Total =_> 4,064 44 4,107 56 4,129 74 Sub Total ==> -3,364 -3,542 25.05 Internal Loads Internal Loads Lights 448 112 560 8 ' 448 8 Lights 0 0 0.00 People 450 0 450 6 250 4People 0 0 0.00 Misc 792 0 792 111 792 14 , Misc 0 0 0.00 Sub Total =_> 1,690 112 1,802 25' 1,490 27 Sub Total ==> 0 0 0.00 Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> -46 46 0 0 O 0 1,320 18 O 0 0' 0 0 O 0 0 117 117 2 0 0 0 0 0 -587 0 0: 0 0 0 0 0, 5,707 -268 7,346 100.00 -46 -1 Ceiling Load O 0 Ventilation Load O 0 ' Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,573 100.00 Grand Total =_> -5 0 0 -5,431 -8,800 0 0.00 -5,320 37.63 0 0 -5,431 38.41 13 -0.10 0 0.00 0 0.00 O 0.00 141 -1.00 O 0.00 O 0.00 -14,138 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh Main Clg 0.6 7.4 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.6 7.4 cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 6.1 262 75.9 62.0 60.7 54.0 52.3 55.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 164 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 235 132 56 Ext Door 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 74.1 69.9 74.1 69.9 75.9 51.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating 262 262 262 262 262 262 0 0 103 103 103 103 15 15 0 0 277 277 118 118 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ENGINEERING CKS Cooling Heating 39.4 39.4 1.60 1.60 428.42 267.91 44.79 -86.21 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -14.1 262 51.8 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -0.6 262 51.8 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -14.1 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 16 of 49 Zone Checksums By MACDONALD-MILLER 16- PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADBANB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (% ) o o 0 0 0 0 o o 0 0 0 0 O 0 0 0 0 0 2,931 0 2,931 48 3,354 73 115 0 115 2 -56 -1 10 15 25 0' 10 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 164 164 3 -47 -1 3,219 15 3,234 53 3,262 71 363 91 454 7 363 450 0 450 7: 250 739 0 739 12 • 739 1,552 91 1,643 27 1,352 -37 37 0 0 -37 0 0 1,158 19 0 O 0 0 0 0 0 O 0 0 0 95 95 2 0 0 0 0 0 -482 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 8 Lights 5 People 16 Misc 30 Sub Total ==> -1 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,734 -243 6,131 100.00 4,577 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,127 -64 0 0 0 -616 -1,806 0 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 O 0.00 O 0.00 -1,127 9.71 -145 1.25 O 0.00 O 0.00 O 0.00 -616 5.31 -1,888 16.27 O 0.00 O 0.00 O 0.00 O 0.00 -4 0 0.00 O -4,363 37.60 O 0 0 -5,416 -7,227 -5,416 46.67 11 -0.09 O 0.00 0 0.00 O 0.00 52 -0.44 O 0.00 O 0.00 -11,605 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 6.1 0.0 0.0 0.0 0.0 0.5 6.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 5.0 0.0 215 75.9 0 0.0 Leave DB/WB/HR °F °F gr/lb 61.9 59.9 54.0 52.0 5.4.3 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 133 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 108 60 56 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 56.0 74.1 74.1 75.9 0.0 0.0 0.0 100.0 69.9 69.9 51.8 0.0 0.0 0.0 AIRFLOWS Cooling 215 215 215 0 85 85 12 0 227 97 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 215 215 215 0 85 85 12 0 227 97 0 0 0 0 ENGINEERING CKS Cooling Heating 39.4 39.4 1.62 1.62 421.53 260.32 46.10 -87.25 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hr-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -11.6 0.0 -0.5 0.0 0.0 -11.6 Lvg °F 215 51.8 100.0 0 0.0 0.0 215 51.8 54.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 17 of 49 Zone Checksums By MACDONALD-MILLER 17- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 19 Outside Air: OADB/WB/HR: 76 / 64 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 1,437 0 1,437 64 1,564 37 0 37 2 -23 6 9 16 1 5 O 0 0 0 O 0 0 0 O 0 0 0 0 66 66 3 -22 1,546 9 1,555 69 1,523 175 44 218 10 175 O 0 0 0 0 O 0' 0 0 0 175 44 218 10 175 -18 18 0 0 -18 O 0 440 19 0 O 0 0 0 0 0 O 0 0 0 43 43 2, 0 0 0 0 0 -177 0 0 0 0 0 0 0 Percent Of Total (%), Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 . Roof Cond 93 Glass Solar -1 Glass/Door Cond 0' Wall Cond 0 Partition/Door 0 Floor 0 I Adjacent Floor -1 Infiltration 91 ! Sub Total ==> Internal Loads 10 ' Lights 0 People 0 Misc 10 Sub Total ==> -1 Ceiling Load 0 Ventilation Load 0 ; Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,703 -63 2,256 100.00 1,680 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -563 -32 0 0 0 -296 -891 0 0 0 0 -2 0 0 -1,759 -2,653 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 O 0.00 O 0.00 O 0.00 -563 12.16 -73 1.57 0 0.00 0 0.00 0 0.00 -296 6.40 -932 20.12 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 -1,976 42.65 0 0 -1,759 37.97 5 -0.11 O 0.00 O 0.00 O 0.00 29 -0.63 0 0.00 O 0.00 -4,633 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 2.3 0.0 0.0 0.0 0.0 0.2 2.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 1.8 79 75.1 61.8 60.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 51.9 53.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 64 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 54 Ext Door 0 O 0 30 56 O 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 56.0 74.1 74.1 75.1 0.0 0.0 0.0 100.0 69.9 69.9 47.6 0.0 0.0 0.0 AIRFLOWS Cooling 79 79 79 0 38 38 6 0 85 44 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 79 79 79 0 38 38 6 0 85 44 0 0 0 0 ENGINEERING CKS Cooling Heating 48.6 48.6 1.24 1.24 420.40 340.36 35.26 -72.39 0 OA cfm/ft' cfm/ton ft'/ton Btu/hr-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F. -4.6 79 47.6 100.0 0.0 0 0.0 0.0 -0.6 79 47.6 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 18 of 49 Zone Checksums By MACDONALD-MILLER 18- HALL COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 83 / 66 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 216 2 0 0 0 139 357 0 0 0 0 0 3 0 3 Net Total Btu/h 0 0 0 0 216 4 0 0 0 139 359 Percent Of Total (%) 0 0 0 0 9 0 0. 0 0, 6 15 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 216 2 0 0 0 84 302 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 0 17 0' 0 0 0 7 24 Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 287 72 358 15 287 23 Lights O 0 0 0, 0 0 People O 0 0 0 0 0' Misc 287 72 358 15 287 23 Sub Total =_> -30 30 0 0 -30 -2 Ceiling Load O 0 926 38 0 0 Ventilation Load 0 0 0 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing 709 709 29 709 56 Exhaust Heat 72 72 3 OA Preheat Diff. 0 0 RA Preheat Diff. 0 0 0' Additional Reheat -141 0 01 ! System Plenum Heat 0 0 Underflr Sup Ht Pkup 0 0 0 , Supply Air Leakage 1,323 35 2,425 100.00 I 1,268 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -1,566 -28 0 0 0 -486 -2,081 0 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 0 0.00 0 0.00 -1,566 29.25 -59 1.10 O 0.00 O 0.00 O 0.00 -486 9.08 -2,112 39.43 O 0.00 O 0.00 O 0.00 O 0.00 -3 0 0.00 O -3,241 60.53 O 0 0 -29 -2,114 -29 0.55 8 -0.15 O 0.00 0 0.00 O 0.00 19 -0.35 O 0.00 O 0.00 -5,355 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.0 63 83.0 65.7 66.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 53.0 56.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 105 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 20 Ext Door 21 O 0 O 0 O 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 57.0 74.1 74.1 83.0 0.0 0.0 0.0 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 63 63 63 0 63 63 9 0 72 72 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 63 63 63 0 63 63 9 0 72 72 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 100.0 0.60 311.74 519.56 23.10 0 Heating 100.0 0.60 -51.00 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.4 0.0 -2.2 Lvg °F 63 24.0 100.0 0 0.0 0.0 63 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -5.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 19 of 49 Zone Checksums By MACDONALD-MILLER 19- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 CLG SPACE PEAK HEATING COIL PEAK Mo/Hr: 7 / 23 OADB: 68 Mo/Hr: Heating Design OADB: 24 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h Btu/h Btu/h (%) ' Btu/h (%) Btu/h Btu/h (%) Envelope Loads Envelope Loads Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 Glass/Door Cond 0 0 0 0' 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0 0 Floor 0 0 0.00 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sub Total ==> 0 0 0 0' 0 0 Sub Total =_> 0 0 0.00 Internal Loads Internal Loads Lights 137 34 171 13 137 19 Lights 0 0 0.00 People 450 0 45034 250 35 People 0 0 0.00 Misc 0 0 0 0I 0 0 Misc 0 0 0.00 Sub Total =_> 587 34 621 47 387 55 Sub Total ==> 0 0 0.00 Ceiling Load -14 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 332 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 904 14 0 0 -14 -2 Ceiling Load O 346 26 0 0 Ventilation Load O 0 0 0 Adj Air Trans Heat O 0 Ov/Undr Sizing 332 25 332 47 Exhaust Heat 35 35 3 OA Preheat Diff. 0 0 RA Preheat Diff. O 0 0 Additional Reheat -78 0 0 ' System Plenum Heat 0 0 Underflr Sup Ht Pkup O 0 0 Supply Air Leakage 5 1,334 100.00 705 100.00 Grand Total =_> -2 0 0.00 O -1,801 60.53 O 0 0 -1,173 -1,173 39.42 4 -0.13 O 0.00 O 0.00 O 0.00 -6 0.19 O 0.00 O 0.00 -1,174 -2,975 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/lb 0.1 1.3 1.1 35 82.4 65.8 68.1 55.0 53.2 57.5 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.3 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 50 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 57.0 74.1 74.1 82.4 0.0 0.0 0.0 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling Heating 35 35 35 35 35 35 O 0 35 35 35 35 O 0 0 0 35 35 35 35 O 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.70 0.70 314.89 449.85 26.68 -59.51 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•W No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -3.0 35 24.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -1.2 35 24.0 55.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -3.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 20 of 49 Zone Checksums By MACDONALD-MILLER 20- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h Btu/h Btu/h (%) ' Btu/h (%) Btu/h Btu/h (%) Envelope Loads Envelope Loads Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0' 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0 0 Floor 0 0 0.00 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sub Total =_> 0 0 0 0 0 0 Sub Total ==> 0 0 0.00 Internal Loads Internal Loads Lights 137 34 171 13 137 19 Lights 0 0 0.00 People 450 0 450 34 250 35 People 0 0 0.00 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Sub Total ==> 587 34 621 47 ' 387 55 Sub Total ==> 0 0 0.00 Ceiling Load -14 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 332 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 904 14 0 0 -14 -2 Ceiling Load -2 0 0.00 0 346 26 0 0 Ventilation Load 0 -1,801 60.53 O 0 0 0 Adj Air Trans Heat 0 0 0 O 0 Ov/Undr Sizing 332 25 332 47 Exhaust Heat 35 35 3 OA Preheat Diff. O 0 . RA Preheat Diff. 0 0 0 ; Additional Reheat -78 0 0 System Plenum Heat O 0 Underflr Sup Ht Pkup 0 0 0. Supply Air Leakage 5 1,334 100.00 705 100.00 Grand Total =_> -1,173 -1,173 39.42 4 -0.13 O 0.00 O 0.00 O 0.00 -6 0.19 0 0.00 0 0.00 -1,174 -2,975 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb Main CIg 0.1 1.3 1.1 35 82.4 65.8 68.1 55.0 53.2 57.5 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.1 1.3 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 50 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BidTD Fn Frict 57.0 74.1 74.1 82.4 0.0 0.0 0.0 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling Heating 35 35 35 35 35 35 0 0 35 35 35 35 0 0 0 0 35 35 35 35 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ENGINEERING CKS Cooling Heating 100.0 100.0 0.70 0.70 314.89 449.85 26.68 -59.51 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -3.0 35 24.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -1.2 35 24.0 55.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -3.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 21 of 49 Zone Checksums By MACDONALD-MILLER 21- TOILET COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Internal Loads Lights 218 People 0 Misc 0 Sub Total ==> 218 Ceiling Load -23 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 770 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> 966 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 273 O 0 0 0 55 273 23 0 O 745 0 0 770 48 48 0 O 0 -107 0 0 0 0 Percent Of Total (%) Envelope Loads 0 : Skylite Solar 0 , Skylite Cond 0 . Roof Cond 0 Glass Solar 0 i Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration 0 Sub Total ==> ' Internal Loads 15 218 23 Lights O 0 0 People O 0 0 Misc 15 218 23 Sub Total ==> , O -22 -2 Ceiling Load 41 0 0 Ventilation Load O 0 0 Adj Air Trans Heat O , Ov/Undr Sizing 42 ' 770 80 Exhaust Heat 3 ; ' OA Preheat Diff. O , RA Preheat Diff. O Additional Reheat 0 , : System Plenum Heat O ; Underflr Sup Ht Pkup 0 Supply Air Leakage 18 1,836 100.00 966 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 ' Space Peak Space Sens Btu/h Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3 0 0.00 O -2,470 60.53 O 0 0 -1,608 -1,608 39.41 5 -0.13 O 0.00 O 0.00 0 0.00 -8 0.20 O 0.00 O 0.00 -1,611 -4,080 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.2 1.8 0.0 0.0 0.0 0.0 0.2 1.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.5 48 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.2 57.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 80 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 57.0 100.0 74.1 69.9 74.1 69.9 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 48 48 48 0 48 48 0 0 48 48 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 48 48 48 0 48 48 0 0 48 48 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.60 0.60 313.80 523.01 22.94 -51.00 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ftW No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -4.1 48 24.0 100.0 0.0 0 0.0 0.0 -1.7 48 24.0 55.0 0.0 0.0 -4.1 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 22 of 49 Zone Checksums By MACDONALD-MILLER 22- TOILET COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 CLG SPACE PEAK HEATING COIL PEAK Mo/Hr: 7 / 23 OADB: 68 Mo/Hr: Heating Design OADB: 24 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Envelope Loads Envelope Loads Skylite Solar 0 0 0 0• 0 0 Skylite Solar 0 0 0.00 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0 0 Floor 0 0 0.00 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sub Total =_> 0 0 0 0 0 0 Sub Total ==> 0 0 0.00 Internal Loads Lights 177 44 222 15. 177 23 Lights 0 0 0.00 People 0 0 0 0 0 0 People 0 0 0.00 Misc 0 0 0 0 i ' 0 0 Misc 0 0 0.00 Sub Total ==> 177 44 222 15: 177 23 Sub Total ==> 0 0 0.00 Internal Loads Ceiling Load -18 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 626 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> 785 18 0 0 -18 -2 Ceiling Load -2 0 0.00 0 605 41 ! 0 0 ; Ventilation Load 0 -2,007 60.53 0 0 0 0; Adj Air Trans Heat 0 0 0 0 0 Ov/Undr Sizing 626 42 626 80 Exhaust Heat 39 39 3 • OA Preheat Diff. 0 0 i RA Preheat Diff. 0 0 01 , Additional Reheat -87 0 0' System Plenum Heat 0 0' Underflr Sup Ht Pkup 0 0 0 ' Supply Air Leakage I 14 1,491 100.00 785 100.00 Grand Total =_> -1,307 -1,307 39.41 4 -0.13 O 0.00 O 0.00 0 0.00 -7 0.20 O 0.00 O 0.00 -1,309 -3,315 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb Main Clg 0.1 1.5 1.2 39 82.4 65.8 68.1 55.0 53.2 57.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.1 1.5 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 65 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 74.1 69.9 74.1 69.9 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating 39 39 39 39 39 39 0 0 39 39 39 39 0 0 0 0 39 39 39 39 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 0 0 ENGINEERING CKS Cooling Heating % OA 100.0 100.0 cfm/ft' 0.60 0.60 cfm/ton 313.80 W/ton 523.00 Btu/heft' 22.94 -51.00 No. People 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.3 39 24.0 100.0 0.0 0 0.0 0.0 -1.4 39 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.3 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 23 of 49 Zone Checksums By MACDONALD-MILLER 23- LUNCH ROOM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 O 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0' 0 0'. CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 568 142 710 13 568 19 Lights 1,800 0 1,800 33 1,000 34 People O 0 0 0 0 0 Misc 2,368 142 2,510 45 1,568 54 Sub Total ==> -59 59 0 0 -57 -2 Ceiling Load 0 0 1,460 26 0 0 Ventilation Load O 0 0 i 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing 1,405 1,405 25 1,405 48 Exhaust Heat 144 144 31 OA Preheat Diff. 0 01 RA Preheat Diff. 0 0 0' Additional Reheat -324 0 0 System Plenum Heat 0 0 Underflr Sup Ht Pkup 0 0 0 i Supply Air Leakage 3,714 21 5,519 100.00 2,915 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -7 0 0.00 O -7,450 60.53 O 0 0 -4,852 -4,852 39.42 16 -0.13 O 0.00 O 0.00 O 0.00 -23 0.19 O 0.00 0 0.00 -4,859 -12,309 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 5.5 0.0 0.0 0.0 0.0 0.5 5.5 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 4.5 145 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/lb 55.0 53.2 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 208 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 74.1 69.9 74.1 69.9 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 145 145 145 0 145 145 0 0 145 145 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 145 145 145 0 145 145 0 0 145 145 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr-ft' No. People Cooling 100.0 0.70 314.86 452.28 26.53 4 Heating 100.0 0.70 -59.18 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -12.3 0.0 -5.0 Lvg °F 145 24.0 100.0 0 0.0 0.0 145 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -12.3 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 24 of 49 Zone Checksums By MACDONALD-MILLER 24- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 O 0 O 0 0 Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Percent Space Peak Coil Peak Percent • Sensible Of Total Space Sens Tot Sens Of Total Btu/h (%) Btu/h Btu/h (%) Envelope Loads O 0 0 Skylite Solar 0 0 0.00 O 0 0 Skylite Cond 0 0 0.00 O 0 0 Roof Cond 0 0 0.00 O 0 0 Glass Solar 0 0 0.00 O 0 0 Glass/Door Cond 0 0 0.00 O 0 0 Wall Cond 0 0 0.00 O 0 0 Partition/Door 0 0 0.00 O 0 0 Floor 0 0 0.00 O 0 0 Adjacent Floor 0 0 0.00 O 0 0 Infiltration 0 0 0.00 O 0 0 Sub Total =_> 0 0 0.00 Internal Loads 333 83 416 14 333 21 Lights 450 0 450 15 250 16 People 720 0 720 24, 720 46 • Misc 1,503 83 1,587 53 1,303 83 Sub Total ==> -34 34 0 0 -34 -2 Ceiling Load O 0 1,016 34, 0 0 Ventilation Load O 0 0 0 0 Adj Air Trans Heat 0 0 Ov/Undr Sizing 305 305 10 305 19 Exhaust Heat 78 78 31 OA Preheat Diff. 0 0 ; RA Preheat Diff. O 0 0 i Additional Reheat -175 0 0 System Plenum Heat 0 0 , Underflr Sup Ht Pkup O 0 0 j Supply Air Leakage 1,774 21 2,986 100.00 1,574 100.00 Grand Total =_> O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -4 0 0.00 O -4,024 60.53 O 0 0 -2,620 -2,620 39.41 9 -0.13 O 0.00 O 0.00 O 0.00 -13 0.19 O 0.00 0 0.00 -2,624 -6,648 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.0 0.0 0.0 0.0 0.0 0.3 3.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 2.4 78 82.4 65.8 68.1 55.0 53.2 57.4 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 122 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 74.1 69.9 74.1 69.9 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 78 78 78 0 78 78 0 0 78 78 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 78 78 78 0 78 78 0 0 78 78 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.64 0.64 314.29 490.33 24.47 -54.49 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft2 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -6.7 0.0 -2.7 Lvg °F 78 24.0 100.0 0 0.0 0.0 78 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -6.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 25 of 49 Zone Checksums By MACDONALD-MILLER 25- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h 0 0 0 O 0 0 O 0 0 o 0 0 O 0 0 O 0 0 O 0 o 0 O 0 0 0 0 O 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%). Envelope Loads 0 Skylite Solar 0 . Skylite Cond 0 ! Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 ' Adjacent Floor 0 Infiltration 0 Sub Total =_> Internal Loads 519 130 648 14 519 22 Lights 450 0 450 10 250 10. People 836 0 836 18 836 35 Misc 1,805 130 1,935 43 1,605 67 Sub Total =_> -54 54 0 0 -52 -2 Ceiling Load O 0 1,649 36 0 0 Ventilation Load O 0 0, 0 0 1 Adj Air Trans Heat 0 0 1 Ov/Undr Sizing 843 843 19 843 35 ; Exhaust Heat 119 119 3 : OA Preheat Diff. 0 0 ; RA Preheat Diff. O 0 0 Additional Reheat -266 0 0 System Plenum Heat 0 0 Underflr Sup Ht Pkup O 0 0 Supply Air Leakage 2,594 36 4,546 100.00 2,396 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (% ) 0 0 0.00 O 0 0.00 O 0 0.00 O o 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -6 0 0.00 O -6,123 60.53 O 0 0 -3,987 -3,987 39.41 14 -0.13 O 0.00 O 0.00 O 0.00 -20 0.19 O 0.00 O 0.00 -3,993 -10,116 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.6 0.0 0.0 0.0 0.0 0.4 4.6 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh 3.7 0.0 Leave DB/WB/HR °F °F gr/Ib 119 82.4 65.8 68.1 55.0 53.2 57.4 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 190 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 0 Ext Door 0 ft' (%) 0 0 O 0 O 0 TEMPERATURES Cooling Heating SADB 57.0 Ra Plenum 74.1 Return 74.1 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 69.9 69.9 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 119 119 119 0 119 119 0 0 119 119 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 119 119 119 0 119 119 0 0 119 119 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.63 0.63 314.12 501.54 23.93 -53.24 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -10.1 0.0 -4.1 0.0 0.0 -10.1 Lvg °F 119 24.0 100.0 O 0.0 0.0 119 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 26 of 49 Zone Checksums By MACDONALD-MILLER 26- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> 0 0 0 0 0 0 O 0 0 O 0 0 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 265 450 677 1,392 -27 0 0 107 66 0 0 66 27 0 63 0 -141 0 331 450 677 1,459 0 784 0 0 107 63 0 0 0 0 0 Percent Of Total. (%) 0 0 0 0 0 0 0 0 0 0 0 14 19 281 60 0 32 0 0 4 3 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 23 OADB: 68 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 Skylite Solar O 0 Skylite Cond 0 0 Roof Cond 0 0 Glass Solar O 0 Glass/Door Cond O 0 Wall Cond 0 0 Partition/Door O 0 Floor O 0 Adjacent Floor O 0 Infiltration O 0 Sub Total =_> Internal Loads 265 21 Lights 250 20 People 677 53 Misc 1,192 94 Sub Total =_> -27 -2 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing 107 8 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,472 15 2,412 100.00 1,272 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -3 0 0.00 O -3,252 60.53 O 0 0 -2,118 -2,118 39.41 7 -0.13 O 0.00 O 0.00 O 0.00 -10 0.19 0 0.00 0 0.00 -2,121 -5,372 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 2.0 63 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 53.2 57.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 97 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 ft2 (%) O 0 O 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 74.1 69.9 74.1 69.9 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 63 63 63 0 63 63 0 0 63 63 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 63 63 63 0 63 63 0 0 63 63 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.65 0.65 314.41 482.55 24.87 -55.39 1 % OA cfm/ft' cfm/ton f/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -5.4 63 24.0 100.0 0.0 0 0.0 0.0 -2.2 63 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -5.4 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 27 of 49 Zone Checksums By MACDONALD-MILLER 27- FL2 OPEN PERIM OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 9 / 11 OADB: 71 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O o 0 0 0 0 0 0 0 0 0 0 0 537 537 4 0 0 6,069 0 6,069 42 7,061 67 68 0 68 0 -195 -2 14 33 47 0 1 0 O 0 01 0 0 O 0 0 0 0 O 0 0 0 0 0 421 421 3 i -156 -1 6,573 570 7,143 49 6,711 63 1,038 259 1,297 9 ; 1,038 450 0 450 3 250 2,696 0 2,696 19 2,696 4,184 259 4,443 30 3,984 -46 46 0 0 -111 O 0 2,869 20' 0 O 0 0 0 0 0. O 0 0 0 113 113 1 0 0, O 0 01 -1,114 0 0' 0 0' O 0 0' 10,711 -126 14,569 100.00' 10,584 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 10 Lights 2 People 25 Misc 38 Sub Total ==> -1 Ceiling Load 0 Ventilation Load 0 . Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -805 2.76 O 0 0.00 -1,643 -1,643 5.64 -67 -210 0.72 0 0 0.00 O 0 0.00 O 0 0.00 -1,760 -1,760 6.04 -3,470 -4,418 15.16 0 0 0 0 -181 0 0 -13,061 -16,712 0 0 0 0.00 0.00 0.00 0 0.00 0 -11,988 0 -13,061 450 0 0 0 -130 0 0 0.00 41.13 0 44.81 -1.54 0.00 0.00 0.00 0.45 0.00 0.00 -29,146 100.00 Main Clg Aux Clg Opt Vent ' Total Total Capacity ton MBh 1.2 14.6 0.0 0.0 0.0 0.0 1.2 14.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 12.2 498 76.5 62.5 61.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.4 56.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 380 Part 0 Int Door 0 ExFIr 0 Roof 380 0 0 Wall 158 88 55 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 74.6 Return 74.6 Ret/OA 76.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.5 68.5 47.7 0.0 0.0 0.0 AIRFLOWS Cooling 498 498 498 0 233 233 34 0 532 267 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 498 498 498 0 233 233 34 0 532 267 0 0 0 0 ENGINEERING CKS Cooling Heating 46.8 46.8 1.31 1.31 410.21 313.00 38.34 -76.70 1 % OA cfm/ft' cfm/ton f/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -29.2 0.0 -3.5 Lvg °F 498 47.7 100.0 0 0.0 0.0 498 47.7 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -29.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 28 of 49 Zone Checksums By MACDONALD-MILLER 28- FL2 OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 3,468 39 8 0 0 0 141 3,656 341 450 725 1,517 -15 0 0 0 5,157 0 0 177 0 0 19 0 196 85 0 0 85 15 0 39 0 -542 0 -208 Net Total Btu/h 0 0 177 3,468 39 27 0 0 0 141 3,851 427 450 725 1,602 0 1,002 0 0 0 39 0 0 0 0 0 Percent Of Total (%) 0 0 3 53 1' OI 0 0 0 2 59', 7 7 11 25 0 15 0 0. 1 0 0� 0 0 0 6,494 100.00 CLG SPACE PEAK Mo/Hr: 9 / 11 OADB: 71 Space Percent Sensible Of Total Btu/h 0 0 0 4,035 -111 0 0 0 0 -51 3,873 (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond 78 Glass Solar -2 Glass/Door Cond 0 Wall Cond O Partition/Door O Floor 0 Adjacent Floor -1 Infiltration 75 Sub Total =_> Internal Loads 341 7 Lights 250 5 , People 725 14 Misc 1,317 26 Sub Total =_> -37 -1 . Ceiling Load O 0 . Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,153 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -939 -37 0 0 0 -579 -1,555 0 0 0 0 -60 0 0 -6,522 -8,136 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -265 2.11 0 0.00 -939 7.49 -119 0.95 0 0.00 O 0.00 O 0.00 -579 4.62 -1,901 15.18 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -4,116 32.86 O 0 -6,522 52.06 154 -1.23 O 0.00 O 0.00 O 0.00 -141 1.13 O 0.00 O 0.00 -12,526 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh 0.5 6.5 5.5 0.0 0.0 0.0 0.0 0.0 0.0 0.5 6.5 cfm °F °F gr/Ib 242 75.9 61.9 60.0 O 0.0 0.0 0.0 O 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.0 52.6 56.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 125 Part 0 Int Door 0 ExFIr 0 Roof 125 Wall 90 50 56 Ext Door 0 ft' (%) O 0 O 0 TEMPERATURES Cooling Heating 56.0 100.0 74.6 68.5 74.6 68.5 75.9 53.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 242 242 242 0 80 80 11 0 254 91 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 242 242 242 0 80 80 11 0 254 91 0 0 0 0 ENGINEERING CKS Cooling Heating 33.0 33.0 1.94 1.94 448.05 230.99 51.95 -100.21 1 % OA cfm/ft' cfm/ton fOton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -12.5 0.0 Lvg °F 242 53.8 100.0 O 0.0 0.0 -0.1 242 53.8 54.0 0.0 0.0 -12.5 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 29 of 49 Zone Checksums By MACDONALD-MILLER 29- FL2 CORNER OFFICE COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 11 Mo/Hr: 7 / 10 OADB/WB/HR: 75 / 64 / 70 OADB: 72 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 188 188 1 0 7,719 0 7,719 58 8,138 -173 0 -173 -1 -361 9 30 39 0 6 0 0 0 0 O 0 0 0 O 0 0 0 0 182 182 1 -69 7,737 218 7,955 60 7,714 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 75 -3 0 0 0 0 -1 71 Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> • Internal Loads 549 137 686 5 549 5 Lights 1,350 0 1,350 10 750 7 People 1,879 0 1,879 14 1,879 17 1 Misc 3,778 137 3,915 29 3,178 29 . Sub Total ==> -37 37 0 0 -49 O 0 1,364 10 0 O 0 0 0 0 0 O 0 0 0 101 101 1: O 0 O 0 0 -1,141 0 0 O 01 O 0 0' 11,477 -648 13,335 100.00 0 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,843 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -426 1.72 O 0 0.00 -3,028 -3,028 12.25 -89 -338 1.37 0 0 0.00 0 0 0.00 0 0 0.00 -931 -931 3.76 -4,048 -4,723 19.10 0 0 0 0 0 0 0 0.00 0.00 0.00 0 0.00 -96 0 0.00 O -6,977 28.21 O 0 0 -12,976 -17,121 -12,976 259 0 0 0 -312 0 0 52.48 -1.05 0.00 0.00 0.00 1.26 0.00 0.00 -24,729 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 13.3 0.0 0.0 0.0 0.0 1.1 13.3 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 11.2 510 74.6 61.3 59.8 54.0 52.2 55.3 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor Part Int Door ExFIr Roof Wall Ext Door ft' (%) 201 0 0 0 201 0 0 275 161 59 0 0 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 74.4 Return 74.4 Ret/OA 74.6 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.5 68.5 56.7 0.0 0.0 0.0 AIRFLOWS Cooling 510 510 510 0 136 136 18 0 528 154 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 510 510 510 0 136 136 18 0 528 154 0 0 0 0 ENGINEERING CKS Cooling Heating 26.6 26.6 2.54 2.54 459.14 180.88 66.34 -123.03 3 % OA cfm/ft' cfm/ton W/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -24.7 0.0 0.0 Lvg °F 510 56.7 100.0 O 0.0 0.0 O 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -24.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 30 of 49 Zone Checksums By MACDONALD-MILLER 30- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 14 Mo/Hr: 7 / 9 OADB/WB/HR: 82 / 66 / 68 OADB: 69 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h o 0 0 0 0 o 0 0 0 0 O 595 595 6 0 532 0 532 5 1,985 93 0 93 1 -114 7 15 22 0 1 o 0 0 0 o 0 0 0 O 0 0 0 0 420 420 4 -228 1,052 611 1,662 16 1,644 961 240 1,201 12 961 1,800 0 1,800 17, 1,000 2,648 0 2,648 25 , 2,648 5,410 240 5,65054 4,610 -19 19 0 0 -114 O 0 3,066 29 0 O 0 0' 0 0 0 O 0 0 0 50 50 0 0 0 O 0 0 -646 0 0, 0 0, O 0 0 6,442 274 10,428 100.00 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond 0 Roof Cond 32 Glass Solar -2 Glass/Door Cond 0 Wall Cond O Partition/Door O Floor O Adjacent Floor -4 Infiltration 27 Sub Total =_> 16 16 43 75 Internal Loads Lights People Misc Sub Total ==> -2 Ceiling Load O Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 0 ; Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,140 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (°/a) O 0 0.00 O 0 0.00 O -746 3.44 0 0 0.00 -713 -713 3.29 -28 -90 0.42 0 0 0.00 O 0 0.00 0 0 0.00 -1,630 -1,630 7.52 -2,372 -3,179 14.66 0 0 0 0 -168 0 0 -7,155 -9,695 0 0 0 0.00 0.00 0.00 0 0.00 0 -11,896 0 -7,155 443 0 0 0 99 0 0 0.00 54.85 0 32.99 -2.04 0.00 0.00 0.00 -0.46 0.00 0.00 -21,688 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.4 0.0 0.0 0.0 0.0 0.9 10.4 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 8.3 289 80.9 65.0 66.6 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 54.0 53.0 58.1 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 352 Part 0 Int Door 0 ExFIr 0 Roof 352 Wall 68 38 56 Ext Door 0 fF (%) 0 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 74.8 68.5 74.8 68.5 80.9 32.9 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return RetJOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 289 289 289 0 231 231 32 0 321 263 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 289 289 289 0 231 231 32 0 321 263 0 0 0 0 ENGINEERING CKS Cooling Heating 80.0 80.0 0.82 0.82 332.47 405.07 29.62 -61.61 4 % OA cfm/ft' cfm/ton fV/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -21.7 289 32.9 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -6.8 289 32.9 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -21.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 31 of 49 Zone Checksums By MACDONALD-MILLER 31 FL2 CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) O 0 0 O 0 0 O 208 208 6,216 0 6,216 64 0 64 12 36 48 O 0 O 0 O 0 0 198 198 6,490 244 6,734 440 110 549 450 0 450 787 0 787 1,676 110 1,786 -19 19 0 O 0 1,391 O 0 0 O 0 49 49 0 O 0 -857 0 0 O 0 0 0 2• 62 1 0 0 0• 0 2 68 6 5 8 CLG SPACE PEAK Mo/Hr: 8 / 11 OADB: 76 Space Sensible Btu/h 0 0 0 6,738 -70 9 0 0 0 16 6,692 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 83 Glass Solar -1 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor Infiltration Sub Total ==> 0 82 Internal Loads 440 5 Lights 250 3 People 787 10 Misc 18 1,476 18 Sub Total ==> O -29 0 Ceiling Load 14 0 0 , Ventilation Load O 0 0 , Adj Air Trans Heat O Ov/Undr Sizing O 0 0 Exhaust Heat O I OA Preheat Diff. O I RA Preheat Diff. O Additional Reheat 0 ! System Plenum Heat 0 i Underflr Sup Ht Pkup 0 ; I Supply Air Leakage 8,147 -435 9,961 100.00 8,139 100.00 ' Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -2,528 -78 0 0 0 -746 -3,352 0 0 0 0 -77 0 0 -9,423 -12,852 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -341 1.84 O 0.00 -2,528 13.62 -287 1.55 O 0.00 O 0.00 O 0.00 -746 4.02 -3,902 21.03 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 28.18 -5,228 0 -9,423 196 0 0 0 -196 0 0 0 50.79 -1.05 0.00 0.00 0.00 1.06 0.00 0.00 -18,553 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.8 10.0 0.0 0.0 0.0 0.0 0.8 10.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh 8.6 0.0 383 75.7 0 0.0 Leave DB/WB/HR °F °F gr/lb 61.3 58.0 54.0 52.3 55.5 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass fF (%) Floor 161 Part 0 Int Door 0 ExFIr 0 Roof 161 0 0 Wall 232 135 58 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 74.6 Return 74.6 Ret/OA 75.7 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.5 68.5 56.7 0.0 0.0 0.0 AIRFLOWS Cooling 383 383 383 0 102 102 14 0 397 116 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 383 383 383 0 102 102 14 0 397 116 0 0 0 ENGINEERING CKS Cooling Heating 26.5 26.5 2.38 2.38 461.41 193.96 61.87 -115.24 1 OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -18.6 0.0 Lvg °F 383 56.7 100.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -18.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 32 of 49 Zone Checksums By MACDONALD-MILLER 32- PERIMETEROPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 10 Outside Air: OADB/WB/HR: 72 / 63 / 70 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h 0 0 0 O 0 0 O 378 378 14,034 0 14,034 -682 0 -682 12 36 48 O 0 O 0 O 0 0 354 354 13,718 414 14,132 Percent Of Total (%). 0 0 2 61 -3 0 0 0 0. 2 61 1,690 423 2,113 9 1,800 0 1,800 8 2,080 0 2,080 9 5,570 423 5,993 26 -151 151 0 0 0 0 2,489 11 0 0 0 O 0 0 0 0 385 385 2 O 0 O 0 0 -1,946 0 0 O 0 O 0 0 19,138 -574 22,999 100.00 CLG SPACE PEAK Mo/Hr: 6 / 9 OADB: 66 Space Sensible Btu/h 0 0 0 15,730 -1,234 -3 0 0 0 -565 13,929 1,690 1,000 2,080 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 85 Glass Solar -7 Glass/Door Cond 0 Wall Cond O Partition/Door O Floor 0 Adjacent Floor -3 Infiltration 75 Sub Total ==> , Internal Loads 91 5 11!, Lights People Misc 4,770 26 Sub Total =_> -210 -1 . Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 ; Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup i Supply Air Leakage 18,489 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -5,727 -228 0 0 0 -2,866 -8,821 0 0 0 0 -295 0 0 -20,077 -29,193 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -1,311 2.62 0 0.00 -5,727 11.42 -723 1.44 0 0.00 O 0.00 O 0.00 -2,866 5.72 -10,627 21.20 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 -20,138 40.17 O 0 -20,077 40.04 753 -1.50 O 0.00 O 0.00 O 0.00 -48 0.10 O 0.00 O 0.00 -50,138 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.9 23.0 0.0 0.0 0.0 0.0 1.9 23.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 17.7 870 73.1 61.3 62.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 54.0 52.1 55.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 619 Part 0 Int Door 0 ExFIr 0 Roof 619 Wall 549 Ext Door 0 0 0 305 56 0 0 TEMPERATURES Cooling Heating 56.0 100.0 74.2 68.5 74.2 68.5 73.1 48.5 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 870 870 870 0 391 391 56 0 926 447 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 870 870 870 0 391 391 56 0 926 447 0 0 0 0 ENGINEERING CKS Cooling Heating 45.0 45.0 1.41 1.41 453.93 322.97 37.15 -81.00 4 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -50.1 0.0 -5.4 0.0 0.0 -50.1 Lvg °F 870 48.5 100.0 0 0.0 0.0 870 48.5 54.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 33 of 49 Zone Checksums By MACDONALD-MILLER 33- EAST HALF FL2 PERIMETER HALL COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 12 OADB/WB/HR: 78 / 65 / 69 Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h O 0 0 O 0 0 O 242 242 3,553 0 3,553 -48 0 -48 60 43 103 O 0 0 0 O 0 0 336 336 3,900 285 4,185 724 181 904 O 0 0 452 0 452 1,176 181 1,357 -3 3 0 O 0 2,239 O 0 0 O 0 6 6 0 0 0 -521 0 0 0 0 Percent Of Total VA) 0 0 3 46 -1 1 0 0 0 4 54 CLG SPACE PEAK Mo/Hr: 6 / 11 OADB: 71 Space Percent Sensible Of Total Btu/h (%) 0 0 O 0 O 0 4,162 84 -284 -6 27 1 O 0 O 0 O 0 -113 -2 3,791 77 12 724 15 0 0 0 6 452 9 17 1,176 24 0 29, 0' 0; 0. 0 i 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> -18 0 Ceiling Load 0 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. 0 ! Additional Reheat 0 1 System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 0; Oi 5,073 -46 7,787 100.001 4,949 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (% ) O 0 0.00 O 0 0.00 O -557 3.45 O 0 0.00 -1,878 -1,878 11.63 -490 -829 5.13 O 0 0.00 O 0 0.00 O 0 0.00 -1,227 -1,227 7.60 -3,595 -4,491 27.81 0 0 0 0 -155 0 0 -4,064 -7,814 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 50.67 -8,181 0 0 -4,064 25.17 377 -2.34 O 0.00 0 0.00 0 0.00 211 ' -1.31 0 0.00 O 0.00 -16,147 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 0.7 7.8 5.9 233 77.3 63.4 64.7 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.7 7.8 Leave DB/WB/HR °F °F gr/lb 54.0 51.9 54.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' CA) Floor 265 Part 0 Int Door 0 ExFIr 0 Roof 265 0 0 Wall 378 100 26 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict 56.0 75.0 75.0 77.3 0.0 0.0 0.0 100.0 68.2 68.2 38.0 0.0 0.0 0.0 AIRFLOWS Cooling 233 233 233 0 159 159 24 0 257 183 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 233 233 233 0 159 159 24 0 257 183 0 0 0 0 ENGINEERING CKS Cooling Heating 68.3 68.3 0.88 0.88 358.82 408.36 29.39 -60.93 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People 0 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -16.2 233 38.0 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -4.2 233 38.0 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -16.2 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 34 of 49 Zone Checksums By MACDONALD-MILLER 33- WEST HALF FL2 PERIMETER HALL COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 12 OADB/WB/HR: 78 / 65 / 69 CLG SPACE PEAK Mo/Hr: 6 / 11 OADB: 71 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%)' Btu/h O 0 0 0 0 O 0 0 0• 0 O 247 247 3 0 3,553 0 3,553 45 4,162 -48 0 -48 -1 -284 60 47 107 1• 27 O 0 0' 0 O 0 0 0 0 • 0 0 0 0 336 336 4 -113 3,900 294 4,194 53 3,791 724 181 904 11 724 0 0 0 0 0 452 0 452 6 452 1,176 181 1,357 17 1,176 -39 39 0 0 -51 O 0 2,237 28 0 O 0 0 0 0 0 O 0 0 0 94 94 1 0 0 O 0 0 -517 0 0 0 0 O 0 0 5,037 90 7,882 100.00 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 85 Glass Solar -6 Glass/Door Cond 1 Wall Cond 0. Partition/Door O , Floor O Adjacent Floor -2 Infiltration 77 Sub Total =_> Internal Loads 15 Lights O People 9 Misc 24 Sub Total =_> -1 Ceiling Load 0 , Ventilation Load 0 j Adj Air Trans Heat Ov/Undr Sizing 0 : Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,915 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -561 3.49 O 0 0.00 -1,878 -1,878 11.69 -490 -832 5.18 0 0 0.00 O 0 0.00 O 0 0.00 -1,227 -1,227 7.64 -3,595 -4,498 28.00 0 0 0 0 -126 0 0 -4,040 -7,761 0 0 0 0.00 0.00 0.00 0 0.00 0 -8,181 0 -4,040 308 0 0 0 346 0 0 0.00 50.93 0 25.15 -1.92 0.00 0.00 0.00 -2.16 0.00 0.00 -16,064 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 7.9 0.0 0.0 0.0 0.0 0.7 7.9 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb Sens Cap. MBh 6.0 0.0 Leave DB/WB/HR °F °F gr/Ib 231 77.1 63.3 64.8 54.0 51.7 53.2 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass Floor 265 Part 0 Int Door 0 ExFIr 0 Roof 265 Wall 378 Ext Door 0 ft' (%) 0 0 100 26 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 74.5 Return 74.5 Ret/OA 77.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.5 68.5 37.9 0.0 0.0 0.0 AIRFLOWS Cooling 231 231 231 0 159 159 24 0 255 183 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 231 231 231 0 159 159 24 0 255 183 0 0 0 0 ENGINEERING CKS Cooling Heating 68.7 68.7 0.87 0.87 352.15 403.47 29.74 -60.62 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -16.1 0.0 -4.2 0.0 0.0 -16.1 Lvg °F 231 37.9 100.0 O 0.0 0.0 231 37.9 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 35 of 49 Zone Checksums By MACDONALD-MILLER 34- OPEN AREA COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 9 OADB: 69 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 3,143 3,143 7 0 1,574 0 1,574 3 5,878 276 0 276 1 -338 75 67 142 0 9 O 0 0 0 O 0 0 0 O 0 0 0 0 2,077 2,077 5 -1,219 4,002 3,210 7,212 16 4,329 5,144 1,286 6,430 14 5,144 5,929 0 5,929 13 3,294 9,960 0 9,960 22 9,960 21,033 1,286 22,319 49 18,398 188 -188 0 0 -448 O 0 14,652 32 0 O 0 0 0 0 0 1,806 1,806 4 1,806 -481 -481 -1 0 0. O 0 0 -2,676 0 0 0 0 O 0 0 Percent Of Total Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 24 Glass Solar -1 Glass/Door Cond 0 ' Wall Cond O Partition/Door 0 Floor O Adjacent Floor -5 Infiltration 18 Sub Total ==> i Internal Loads 21 ' Lights 14 People 41 Misc 76 Sub Total =_> -2 Ceiling Load p Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 7 i Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 27,029 1,151 45,507 100.00 24,085 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -2,112 -320 0 0 0 -8,724 -11,157 0 0 0 0 -1,101 0 0 -27,884 -40,142 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -3,961 3.89 O 0.00 -2,112 2.08 -602 0.59 0 0.00 O 0.00 O 0.00 -8,724 8.58 -15,400 15.14 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -61,551 60.53 O 0 -27,884 27.42 2,818 -2.77 0 0.00 0 0.00 O 0.00 323 -0.32 0 0.00 0 0.00 -101,692 100.00 Total Capacity ton MBh Main Clg 3.8 45.5 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 3.8 45.5 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh 37.4 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 1,196 82.4 65.8 68.1 55.0 53.3 57.6 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 1,884 Part 0 Int Door 0 ExFlr 0 Roof 1,884 0 0 Wall 315 113 36 Ext Door 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 75.3 68.2 75.3 68.2 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,196 1,196 1,196 0 1,196 1,196 170 0 1,366 1,366 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 0 Heating 1,196 1,196 1,196 0 1,196 1,196 170 0 1,366 1,366 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.63 0.63 315.45 496.80 24.15 -53.98 13 % OA cfm/ft' cfm/ton ft'/ton Btu/hi-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -101.7 0.0 -41.5 1,196 24.0 100.0 0 0.0 0.0 1,196 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -101.7 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 36 of 49 Zone Checksums By MACDONALD-MILLER 35- FL2 CONF RM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h Percent Of Total (%) CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 72 Space Percent Sensible Of Total Btu/h (%) Envelope Loads O 0 0 0 0 0 Skylite Solar O 0 0 0 0 0 Skylite Cond O 557 557 4 0 0 Roof Cond 3,603 0 3,603 23 5,550 55 Glass Solar 475 0 475 3 -407 -4 Glass/Door Cond 37 69 106 1 9 0 Wall Cond 0 0 0 0 0 Partition/Door O 0 0 0 0 Floor O 0 0 0 0 0 Adjacent Floor 309 309 2 -122 -1 Infiltration 4,424 627 5,051 33 5,029 50 Sub Total =_> 977 5,400 1,200 7,577 25 0 0 0 12,027 244 0 0 244 -25 0 -77 0 -1,069 0 -300 1,222 5,400 1,200 7,822 0 2,638 0 0 0 -77 0 0 0 0 0 8 35' 8 51 0 17; 0 0 0 0 0 0 0 0 0 15,435 100.00 977 3,000 1,200 5,177 Internal Loads 10 Lights 30 People 12 Misc 51 Sub Total =_> -48 0 , Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. j RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,159 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,417 -166 0 0 0 -1,658 -5,241 0 0 0 0 -209 0 0 -10,590 -16,040 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -753 2.46 O 0.00 -3,417 11.17 -472 1.54 0 0.00 O 0.00 O 0.00 -1,658 5.42 -6,300 20.59 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -14,139 46.21 O 0 -10,590 34.61 634 -2.07 0 0.00 O 0.00 0 0.00 -203 0.66 0 0.00 0 0.00 -30,599 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.3 15.4 0.0 0.0 0.0 0.0 1.3 15.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 12.1 0.0 0.0 478 78.5 O 0.0 Leave DB/WB/HR °F ' °F gr/lb 64.0 65.8 5.4.0 53.2 58.9 0.0 0.0 0.0 0.0 0.0 O 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 358 Part 0 Int Door 0 ExFIr 0 Roof 358 0 0 Wall 342 182 53 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 75.2 Return 75.2 Ret/OA 78.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.2 68.2 42.8 0.0 0.0 0.0 AIRFLOWS Cooling 478 478 478 0 275 275 32 0 510 307 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 478 478 478 0 275 275 32 0 510 307 0 0 0 0 ENGINEERING CKS Cooling Heating 57.5 57.5 1.34 1.34 371.65 278.34 43.11 -85.47 12 % OA cfm/f cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -30.6 0.0 -6.0 0.0 0.0 -30.6 Lvg °F 478 42.8 100.0 0 0.0 0.0 478 42.8 54.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 37 of 49 Zone Checksums By MACDONALD-MILLER 36- LOUNGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 9 OADB: 69 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 637 637 7 0 420 0 420 5 1,567 74 0 74 1 -90 6 12 18 0 1 O 0 0 0 O 0 0 0 O 0 0 0 0 463 463 5 -247 963 649 1,612 19 1,231 Internal Loads 1,043 261 1,304 15 1,043 Lights 450 0 450 5 250 People 652 0 652 7 652 Misc 2,145 261 2,406 28 1,945 41 ' Sub Total =_> 38 -38 0 0 -91 O 0 3,153 36 0 O 0 0 0 0 0 1,630 1,630 19 1,630 -95 -95 -1 O 0 O 0 0 -524 0 0 O 0 O 0 0 4,776 253 8,706 100.00 4,715 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 33 Glass Solar -2 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 , Floor 0 Adjacent Floor -5 : Infiltration 26 Sub Total =_> 22 5i 14 -2 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 35 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h Percent Of Total (%) 0 0 0.00 0 0 0.00 O -803 4.03 O 0 0.00 -563 -563 2.83 -27 -78 0.39 O 0 0.00 0 0 0.00 O 0 0.00 -1,769 -1,769 8.89 -2,359 -3,213 16.14 0 0 0 0 -223 0 0 -5,276 -7,859 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -12,050 60.53 0 0 -5,276 26.50 554 -2.78 0 0.00 0 0.00 0 0.00 76 -0.38 0 0.00 0 0.00 -19,909 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.7 0.0 0.0 0.0 0.0 0.7 8.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 7.1 234 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.6 58.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 382 Part 0 Int Door 0 ExFIr 0 Roof 382 0 0 Wall 56 30 53 Ext Door 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 75.3 68.2 75.3 68.2 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 234 234 234 0 234 234 34 0 269 269 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 234 234 234 0 234 234 34 0 269 269 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fVlton Btu/hr-ft' No. People Cooling 100.0 0.61 322.82 526.54 22.79 1 Heating 100.0 0.61 -52.12 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -19.9 0.0 Lvg °F 234 24.0 100.0 0 0.0 0.0 -8.1 234 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -19.9 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 38 of 49 Zone Checksums By MACDONALD-MILLER 37- CORNER OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0'' 0 O 0 0 0 0 O 299 299 3 0 4,464 0 4,464 47 4,869 343 0 343 4 206 29 65 94 1 33 O 0 0, 0 O 0 0 0 O 0 0 0' 0 264 264 3 25 5,100 365 5,465 58 5,133 628 157 785 8' 628 450 0 450 5; 250 904 0 904 10' 904 1,982 157 2,139 23; 1,782 1 -1 0 0 ; -20 O 0 1,822 19 , 0 O 0 0' 0 O 0j O 0 o; 0 -2 -2 0 O o O 0 0 -726 0 0 O 0; O 0 0; 7,084 -207 9,424 100.00 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond 71 Glass Solar 3 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 j Adjacent Floor 0 Infiltration Sub Total ==> 74 Internal Loads 9 Lights 4 People 13 Misc 26 Sub Total =_> 0 Ceiling Load 0 Ventilation Load O Adj Air Trans Heat Ov/Undr Sizing 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,895 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -484 2.60 O 0 0.00 -3,154 -3,154 16.94 -125 -396 2.13 O 0 0.00 O 0 0.00 O 0 0.00 -1,065 -1,065 5.72 -4,345 -5,099 27.39 0 0 0 0 -134 0 0 -6,408 -10,887 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 39.52 -7,358 0 0 -6,408 34.42 338 -1.81 0 0.00 0 0.00 0 0.00 -92 0.50 0 0.00 0 0.00 -18,619 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.4 0.0 0.0 0.0 0.0 0.8 9.4 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 7.8 324 76.7 62.4 61.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 54.0 52.4 56.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 230 Part 0 Int Door 0 ExFIr 0 Roof 230 Wall 302 Ext Door 0 O 0 168 56 O 0 TEMPERATURES Cooling Heating 56.0 100.0 75.0 68.2 75.0 68.2 76.7 48.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 324 324 324 324 324 324 0 143 143 21 0 345 164 0 0 0 0 0 143 143 21 0 345 164 0 0 0 0 ENGINEERING CKS Cooling Heating 44.1 44.1 1.41 1.41 413.14 292.87 40.97 -80.95 1 OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -18.6 324 48.7 100.0 Aux Htg 0.0 0 0.0 0.0 Preheat -1.9 324 48.7 54.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -18.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 39 of 49 Zone Checksums By MACDONALD-MILLER 38- PERIMETER OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/NB/HR: 79 / 65 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 O 0 0 953 7,815 0 305 0 19 44 0 0 O 0 751 8,892 996 CLG SPACE PEAK Mo/Hr: 7 / 19 OADB: 76 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0, 0 953 4 0 7,815 29 8,265 305 1 161 63 0 26 0 0 0 O 0 0 O 0 0 751 3 84 9,888 37 ; 8,537 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond O Roof Cond 46 Glass Solar 1 Glass/Door Cond O Wall Cond 0 Partition/Door O Floor O Adjacent Floor O Infiltration 47 Sub Total ==> Internal Loads 2,097 524 2,621 10 , 2,097 12 Lights 3,600 0 3,600 13 2,000 11 People 5,406 0 5,406 20 5,406 30 Misc 11,103 524 11,627 43 9,503 53 Sub Total ==> 3 -3 0 0 I -68 0 0 0 5,444 20I 0 0 O 0 0' 0 0 0 0' O 0 0 0 0 -8 -8 0 , 0 0' O 0 0 -1,892 0 0 0 0 O 0 0, Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 19,998 -382 26,952 100.00 17,972 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -1,615 2.94 O 0 0.00 -3,004 -3,004 5.48 -119 -377 0.69 0 0 0.00 0 0 0.00 O 0 0.00 -3,556 -3,556 6.48 -6,680 -8,552 15.59 0 0 0 0 -449 0 0 -21,248 -28,377 0 0 0 0.00 0.00 0.00 O 0.00 0 0.00 46.97 -25,767 O 0 38.73 -2.14 0 0.00 O 0.00 O 0.00 -464 0.85 0 0.00 O 0.00 -21,248 1,176 -54,856 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.3 27.0 0.0 0.0 0.0 0.0 2.3 27.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 21.5 846 77.2 63.2 64.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.4 0.0 0.0 0.0 0.0 55.8 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 768 Part 0 Int Door 0 ExFIr 0 Roof 768 0 0 Wall 288 160 56 Ext Door 0 0 0 TEMPERATURES Cooling Heating 56.0 100.0 75.0 68.2 75.0 68.2 77.2 42.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 846 846 846 0 501 501 69 0 915 570 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 846 846 846 0 501 501 69 0 915 570 0 0 0 0 ENGINEERING CKS Cooling Heating 59.2 59.2 1.10 1.10 376.52 341.94 35.09 -71.43 8 % OA cfm/ft' cfm/ton ft'/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -54.9 0.0 -11.3 Lvg °F 846 42.0 100.0 0 0.0 0.0 846 42.0 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -54.9 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 40 of 49 Zone Checksums By MACDONALD-MILLER 39- OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 0 120 0 0 0 0 0 0 0 0 O 0 80 80 120 188 450 630 1,268 7 0 0 0 Net Percent Total Of Total Btu/h (%) CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h Percent Of Total (%) Envelope Loads O 0 0 0 Skylite Solar O 0 0 0 Skylite Cond 120 6 0 0 Roof Cond O 0 0 0 Glass Solar 0 0 0 0 Glass/Door Cond 0 0 , 0 0 Wall Cond 0 0' 0 0 Partition/Door O 0 0 0 Floor O 0 0 0 Adjacent Floor 80 4 56 5 Infiltration 200 10 56 5 Sub Total ==> 47 236 0 450 0 630 47 1,315 -7 0 0 596 0 0 0 -19 -19 0 O 0 -119 0 0 O 0 Internal Loads 11 l 188 17 ; Lights 22 ; 250 22 : People 30 : 630 56 Misc 63 , 1,068 94 i ; Sub Total =_> 0 ; 8 1 1 Ceiling Load 28 ' 0 0 Ventilation Load 01 0 0 i Adj Air Trans Heat O Ov/Undr Sizing O 0 0 . Exhaust Heat -1 : OA Preheat Diff. RA Preheat Diff. j Additional Reheat O , System Plenum Heat 0 , ; Underflr Sup Ht Pkup 0 ' i Supply Air Leakage 0l 0 1,355 23 2,093 100.00 1,132 100.00 ' Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 -320 -320 0 0 0 0 -40 0 0 -1,427 -1,787 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 O 0.00 -145 3.46 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -320 7.63 -465 11.09 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 57.00 -2,387 0 0 -1,427 34.07 109 -2.59 O 0.00 0 0.00 O 0.00 -18 0.43 O 0.00 0 0.00 -4,188 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.1 0.0 0.0 0.0 0.0 0.2 2.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F 1.7 53 81.5 65.3 0.0 0 0.0 0.0 0.0 0 0.0 0.0 gr/lb 67.2 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 54.0 52.2 55.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft2 (%) Floor 69 Part 0 Int Door 0 ExFIr 0 Roof 69 Wall 0 Ext Door 0 O 0 0 0 O 0 TEMPERATURES Cooling SADB 56.0 Ra Plenum 75.3 Return 75.3 Ret/OA 81.5 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 29.7 0.0 0.0 0.0 AIRFLOWS Cooling 53 53 53 0 46 46 6 0 59 53 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 53 53 53 0 46 46 6 0 59 53 0 0 0 0 ENGINEERING CKS Cooling Heating 87.1 87.1 0.77 0.77 305.32 395.61 30.33 -60.70 1 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -4.2 0.0 -1.5 0.0 0.0 -4.2 Lvg °F 53 29.7 100.0 O 0.0 0.0 53 29.7 54.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 41 of 49 Zone Checksums By MACDONALD-MILLER 40- OPEN OFFICE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 2,042 3,150 4,860 10,052 0 0 1,305 0 0 0 0 1,305 511 0 0 511 Net Total Btu/h 0 0 1,305 0 0 0 0 0 0 0 1,305, 2,553 3,150 4,860 10,563 Percent Of Total (%) 0 0 7 0 0' 0 0 0 0 0 13 17 26 56 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 2,042 1,750 4,860 8,652 0 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 21 Lights 18 People 50 Misc 89 Sub Total =_> 75 -75 0 0 88 1 Ceiling Load 0 0 6,263 33. 0 0 , Ventilation Load 0 0 0 0 0 Adj Air Trans Heat O 0 Ov/Undr Sizing 1,000 1,000 5 1,000 10 Exhaust Heat -170 -170 -1 OA Preheat Diff. 0 0 ' RA Preheat Diff. O 0 0 Additional Reheat -1,082 0 0 System Plenum Heat O 0 Underflr Sup Ht Pkup O 0 0 Supply Air Leakage 11,127 488 18,960 100.00 9,741 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -437 0 0 -15,797 -16,234 Coil Peak Tot Sens Btu/h 0 0 -1,573 0 0 0 0 0 0 0 -1,573 0 0 0 Percent Of Total (%) 0.00 0.00 3.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.82 0.00 0.00 0.00 O 0.00 O 0.00 60.53 -24,892 0 -15,797 998 0 0 0 137 0 0 0 38.41 -2.43 0.00 0.00 0.00 -0.33 0.00 0.00 -41,127 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.6 19.0 0.0 0.0 0.0 0.0 1.6 19.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb Sens Cap. MBh 15.3 0.0 0.0 484 82.4 O 0.0 O 0.0 65.8 0.0 0.0 68.1 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.8 56.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 748 Part 0 Int Door 0 ExFlr 0 Roof 748 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 75.3 68.2 75.3 68.2 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 484 484 484 0 484 484 0 0 484 484 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 484 484 484 0 484 484 0 0 484 484 0 0 0 0 ENGINEERING CKS % OA cfm/fF cfm/ton ft'/ton Btu/hrft2 No. People Cooling 100.0 0.65 306.20 473.41 25.35 7 Heating 100.0 0.65 -54.98 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -41.1 0.0 -16.8 0.0 0.0 -41.1 Lvg °F 484 24.0 100.0 O 0.0 0.0 484 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 42 of 49 Zone Checksums By MACDONALD-MILLER 41- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 O 188 O 0 O 0 0 0 0 0 O 0 0 0 188 Internal Loads Lights 295 People 0 Misc 0 Sub Total ==> 295 Ceiling Load 11 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 997 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 1,303 Net Percent Total Of Total Btu/h (%) 0 0 188 0 0 0 0 0 0 0 188 74 369 0 0 0 0 74 369 -11 0 0 1,023 0 0 997 -23 -23 0 0 0 -145 0 0 0 0 0 0 7 0 0 0 0 0 0 0 7 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 0 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 14 295 23 Lights 0 i 0 0 People O 0 0 Misc 14 295 23 . Sub Total ==> O 13 > 1 Ceiling Load 40 0 0 Ventilation Load 0 • 0 0 Adj Air Trans Heat Ov/Undr Sizing 39 • 997 76 Exhaust Heat -1 . OA Preheat Diff. O RA Preheat Diff. O Additional Reheat O System Plenum Heat 0 , Underflr Sup Ht Pkup 0 , Supply Air Leakage 0' 84 2,554 100.00 1,305 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h Percent Of Total (%) O 0 0.00 O 0 0.00 O -227 4.12 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O -227 4.12 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -63 0 0.00 O -3,334 60.53 O 0 0 -2,111 -2,111 38.33 134 -2.43 O 0.00 O 0.00 O 0.00 30 -0.55 O 0.00 O 0.00 -2,174 -5,508 100.00 Main Clg Aux Cig Opt Vent Total Total Capacity ton MBh 0.2 2.6 0.0 0.0 0.0 0.0 0.2 2.6 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh 2.1 0.0 Leave DB/WB/HR °F °F gr/Ib 65 82.4 65.8 68.1 55.0 52.8 55.7 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass f (%) Floor 108 Part 0 Int Door 0 ExFIr 0 Roof 108 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling SADB 57.0 Ra Plenum 75.3 Return 75.3 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Heating 100.0 68.2 68.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 65 65 65 0 65 65 0 0 65 65 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 65 65 65 0 65 65 0 0 65 65 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft2 No. People Cooling 100.0 0.60 304.41 507.35 23.65 0 Heating 100.0 0.60 -51.00 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.5 65 0.0 0 24.0 0.0 Lvg °F 100.0 0.0 -2.3 65 24.0 55.0 0.0 0.0 -5.5 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 43 of 49 Zone Checksums By MACDONALD-MILLER 42- OPEN OFFICE INTERIOR COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 O 1,137 0 0 O 0 O 0 0 0 O 0 0 O 1,137 1,756 3,600 5,193 10,549 Net Percent Total Of Total Btu/h (%) 0 0 1,137 0 0 0 0 0 0 0 1,137 439 2,195 0 3,600 0 5,193 439 10,987 -35 35 0 0 0 0 10,514 O 5,488 0 0 0 81 81 0 O 0 -953 0 0 O 0 0 0 6 0 0 0 0 0 0 0, 6, 12 • 20 29 62 • 0 31; 0 0 0 0 0 0 0 0 0 739 17,693 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 1,756 2,000 5,193 8,949 0 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads 20 , Lights 22 People 58 Misc 100 Sub Total =_> -25 0 Ceiling Load O 0 Ventilation Load O 0 Adj Air Trans Heat Ov/Undr Sizing O 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. i Additional Reheat System Plenum Heat Underflr Sup Ht Pkup I Supply Air Leakage 8,923 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -307 0 0 -13,981 -14,288 Coil Peak Tot Sens Btu/h 0 0 -1,362 0 0 0 0 0 0 0 -1,362 Percent Of Total (%) 0.00 0.00 3.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.76 O 0.00 O 0.00 O 0.00, O 0.00 O 0.00 60.53 -21,908 0 0 -13,981 38.63 717 -1.98 O 0.00 O 0.00 O 0.00 338 -0.93 O 0.00 O 0.00 -36,196 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.5 17.7 0.0 0.0 0.0 0.0 1.5 17.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 14.1 426 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.3 52.0 53.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 643 Part 0 Int Door 0 ExFIr 0 Roof 643 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 56.3 100.0 74.8 68.5 74.8 68.5 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 426 426 426 0 426 426 0 0 426 426 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 426 426 426 0 426 426 0 0 426 426 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 100.0 0.66 0.66 288.80 436.11 27.52 -56.29 8 % OA cfm/ft' cfm/ton ft'/ton Btu/heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -36.2 0.0 -14.4 0.0 0.0 -36.2 Lvg °F 426 24.0 100.0 0 0.0 0.0 426 24.0 54.3 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 44 of 49 Zone Checksums By MACDONALD-MILLER 43- BREAK COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 68 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h O 0 0 0 O 0 0 0 299 299 6 0 o 0 0 0 o 0 0 0 o 0 0 0 o 0 0 0 0. 0 O 0 0 0 0 0. 0 299 299 6 0 461 115 577 12 461 1,800 0 1,800 37 1,000 O 0 0 0 0 2,261 115 2,377 49 1,461 -9 9 0 0 -7 O 0 1,130 23 0 O 0 0 0 0 0'. 989 989 21 989 23 23 0, 0 0 O 0 0 -272 0 0 0 0 O o 0, Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass/Door Cond 0 Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor 0 : Infiltration O . Sub Total ==> Internal Loads 19 Lights 41 People 0 • Misc 60 Sub Total =_> 0 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov/Undr Sizing 40 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underfir Sup Ht Pkup Supply Air Leakage 3,242 175 4,818 100.00 2,444 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -81 0 0 -3,993 -4,074 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -358 3.47 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -358 3.47 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -6,246 60.53 0 0 -3,993 38.69 205 -1.98 0 0.00 0 0.00 0 0.00 73 -0.71 O 0.00 O 0.00 -10,320 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.4 4.8 0.0 0.0 0.0 0.0 0.4 4.8 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb Sens Cap. MBh Leave DB/WB/HR °F °F gr/lb 3.9 121 82.4 65.8 68.1 55.0 52.7 55.3 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass fe (%) Floor 169 Part 0 Int Door 0 ExFIr 0 Roof 169 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating SADB 57.0 Ra Plenum 74.8 Return 74.8 Ret/OA 82.4 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 121 121 121 0 121 121 0 0 121 121 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 121 121 121 0 121 121 0 0 121 121 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/heft' No. People Cooling 100.0 0.72 302.34 420.89 28.51 4 Heating 100.0 0.72 -61.06 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -10.3 0.0 -4.2 Lvg °F 121 24.0 100.0 0 0.0 0.0 121 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -10.3 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 45 of 49 Zone Checksums By MACDONALD-MILLER 44- HALL COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights 194 48 242 15 194 23 Lights People 0 0 0 0 0 0• People Misc 0 0 0 0 • 0 0 Misc Sub Total =_> 194 48 242 15 194 23 Sub Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 68 CLG SPACE PEAK HEATING COIL PEAK Mo/Hr: 7 / 15 OADB: 83 Mo/Hr: Heating Design OADB: 24 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (*A) Envelope Loads O 0 0 0 0 0 Skylite Solar 0 0 0.00 O 0 0 0 0 0 Skylite Cond 0 0 0.00 O 0 0 0 0 0 Roof Cond 0 0 0.00 O 0 0 0 0 0 Glass Solar 0 0 0.00 O 0 0 0 0 0 Glass/Door Cond 0 0 0.00 O 0 0 0 0 0 Wall Cond 0 0 0.00 O 0 0; 0 0 Partition/Door 0 0 0.00 0 0 0 0 0 Floor 0 0 0.00 0 0 0 0' 0 0 Adjacent Floor 0 0 0.00 O 0 0 0 0 Infiltration 0 0 0.00 O 0 0 0 0 0 Sub Total ==> 0 0 0.00 Internal Loads Ceiling Load -4 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 667 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 857 4 0 0 O 673 42! 0 0 0 0 667 42 8 8- 1 0 0 O 0 0i -95 0 0 0 0: O 0 0i -35 1,590 100.00 0 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -3 0 Ceiling Load -34 0 0.00 O 0 Ventilation Load 0 -2,192 60.53 O 0 Adj Air Trans Heat 0 0 0 Ov/Undr Sizing 667 78 Exhaust Heat OA Preheat Diff. RA Preheat Diff. ' Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 858 100.00 Grand Total ==> -1,396 -1,396 38.54 72 -1.98 0 0.00 0 0.00 0 0.00 -106 2.92 0 0.00 0 0.00 -1,429 -3,621 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb Main CIg 0.1 1.6 1.3 43 82.4 65.8 68.1 55.0 53.5 58.6 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.1 1.6 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 71 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict 57.0 74.8 74.8 82.4 0.0 0.0 0.0 100.0 68.5 68.5 24.0 0.0 0.0 0.0 AIRFLOWS Cooling Heating 43 43 43 43 43 43 0 0 43 43 43 43 0 0 0 0 43 43 43 43 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ENGINEERING CKS Cooling Heating 100.0 100.0 0.60 0.60 321.57 535.95 22.39 -51.00 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.6 0.0 -1.5 43 24.0 100.0 0 0.0 0.0 43 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.6 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 46 of 49 Zone Checksums By MACDONALD-MILLER 45- STORAGE COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 66 / 68 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 O 76 O 0 O 0 O 0 0 0 O 0 0 O 76 Net Total Btu/h 0 0 76 0 0 0 0 0 0 0 76 Percent Of Total (%) 0 0 7 0 0 0 0 0 0 0 7 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond O Glass Solar O Glass/Door Cond O Wall Cond 0 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration n Sub Total =_> Internal Loads 117 29 147 14 117 23 Lights O 0 0 0 0 0 People O 0 0 01 0 0 Misc 117 29 147 14, 117 23 Sub Total =_> 1 -2 2 0 0 ' -2 0 Ceiling Load O 0 407 39 : 0 0 , Ventilation Load O 0 0! 0 0 1 Adj Air Trans Heat 0 0 : Ov/Undr Sizing 404 404 39 404 78 Exhaust Heat 5 5 0 OA Preheat Diff. 0 0 , RA Preheat Diff. O 0 0 Additional Reheat -58 0 0 System Plenum Heat 0 0 Underflr Sup Ht Pkup O 0 0 Supply Air Leakage 519 55 1,039 100.00 519 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -21 0 0 -845 -866 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 -91 4.15 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 O 0.00 O 0.00 -91 4.15 O 0.00 O 0.00 0 0.00 0 0.00 O 0.00 -1,327 60.53 0 0 -845 38.54 43 -1.98 0 0.00 O 0.00 0 0.00 27 -1.24 O 0.00 O 0.00 -2,193 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.0 0.0 0.0 0.0 0.0 0.1 1.0 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 0.8 26 82.4 65.8 68.1 55.0 52.4 54.5 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 43 Part 0 Int Door 0 ExFIr 0 Roof 43 Wall 0 Ext Door 0 0 0 0 TEMPERATURES Cooling Heating 57.0 100.0 74.8 68.5 74.8 68.5 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 26 26 26 0 26 26 0 0 26 26 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 26 26 26 0 26 26 0 0 26 26 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/heft' No. People Cooling 100.0 0.60 298.04 496.74 24.16 0 Heating 100.0 0.60 -51.00 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -2.2 0.0 -0.9 0.0 0.0 -2.2 Lvg °F 26 24.0 100.0 O 0.0 0.0 26 24.0 55.0 0 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 47 of 49 Zone Checksums By MACDONALD-MILLER 46- STORAGE COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h O 0 0 0 0 O 0 0 0 0 O 76 76 7 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 O 0 0 0 O 0 0 0 0 O 0 0 0 O 76 76 7 0 Internal Loads Lights 117 People 0 Misc 0 Sub Total ==> 117 Ceiling Load -2 Ventilation Load 0 Adj Air Trans Heat 0 Dehumid. Ov Sizing Ov/Undr Sizing 404 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 519 29 147 O 0 O 0 29 147 2 0 O 407 0 0 404 5 5 0 O 0 -58 0 0 O 0 14 0 14' 0 39, 01 0' 39 0 0 0 0 0 55 1,039 100.00 Percent Of Total (%) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond O Glass Solar O Glass/Door Cond 0 Wall Cond O Partition/Door O Floor O Adjacent Floor O Infiltration O Sub Total ==> Internal Loads 117 23 Lights O 0 People O 0 Misc 117 23 Sub Total =_> -2 0 Ceiling Load O 0 Ventilation Load O 0 AdjAirTrans Heat Ov/Undr Sizing 404 78 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 519 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -21 0 0 -845 -866 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -91 4.15 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -91 4.15 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 -1,327 60.53 O 0 -845 38.54 43 -1.98 O 0.00 O 0.00 O 0.00 27 -1.24 O 0.00 0 0.00 -2,193 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.0 0.0 0.0 0.0 0.0 0.1 1.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 0.8 26 82.4 65.8 68.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.4 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 43 Part 0 Int Door 0 ExFIr 0 Roof 43 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 57.0 100.0 74.8 68.5 74.8 68.5 82.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 26 26 26 0 26 26 0 0 26 26 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 26 26 26 0 26 26 0 0 26 26 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 100.0 0.60 298.04 496.74 24.16 0 Heating 100.0 0.60 -51.00 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -2.2 0.0 -0.9 0.0 0.0 -2.2 Lvg °F 26 24.0 100.0 0 0.0 0.0 26 24.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 48 of 49 Zone Checksums By MACDONALD-MILLER 47- CONFERENCE ROOM COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 66 / 68 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door ' Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 O 539 O 0 O 0 0 0 0 0 O 0 0 O 539 Net Percent Total Of Total Btu/h (%) 0 0 539 0 0 0 0 0 0 0 539 0 5 0 0 0 0 0 0 0' 833 208 1,041 9 7,200 0 7,200 62 1,200 0 1,200 10 9,233 208 9,441 82 -16 16 0 0 0 0 O 1,504 0 0 0 50 50 0 O 0 -634 0 0 O 0 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 83 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 833 4,000 1,200 Envelope Loads O Skylite Solar O Skylite Cond 0 . Roof Cond 0 Glass Solar O Glass/Door Cond O Wall Cond 0 Partition/Door O Floor O Adjacent Floor O Infiltration O Sub Total ==> Internal Loads 14 Lights 66 People 20 Misc 6,033 100 Sub Total ==> O -12 0 Ceiling Load 13 0 0 Ventilation Load 0 0 0 ;Adj Air Trans Heat O Ov/Undr Sizing 0 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,021 100.00 Grand Total ==> 0, 0, 0, 0 0' 0 9,216 180 11,534 100.00 HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -146 0 0 -9,361 -9,506 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 0 0.00 -646 2.80 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -646 2.80 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -13,532 58.65 O 0 -9,361 40.57 443 -1.92 O 0.00 O 0.00 O 0.00 23 -0.10 O 0.00 O 0.00 -23,073 100.00 Main Clg Aux Cig Opt Vent Total Total Capacity ton MBh 1.0 11.5 0.0 0.0 0.0 0.0 1.0 11.5 COOLING COIL SELECTION Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Sens Cap. MBh Leave DB/WB/HR °F °F gr/Ib 9.0 283 81.9 65.6 68.3 54.0 52.1 54.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: COMPLETE OFFICE LOADS.trc AREAS Gross Total Glass ft' (%) Floor 305 Part 0 Int Door 0 ExFIr 0 Roof 305 Wall 0 Ext Door 0 O 0 O 0 0 0 TEMPERATURES Cooling Heating SADB 56.0 Ra Plenum 74.8 Return 74.8 Ret/OA 81.9 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 100.0 68.5 68.5 27.2 0.0 0.0 0.0 AIRFLOWS Cooling 283 283 283 0 263 263 0 0 283 263 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 283 283 283 0 263 263 0 0 283 263 0 0 0 0 ENGINEERING CKS Cooling Heating 92.8 92.8 0.93 0.93 294.75 317.33 37.82 -75.65 16 % OA cfm/ft' cfm/ton ft'/ton Btu/hi-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -23.1 0.0 -8.5 Lvg °F 283 27.2 100.0 0 0.0 0.0 283 27.2 54.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -23.1 TRACER 700 v6.3.3 calculated at 04:23 PM on 12/21/2017 Alternative - 1 System Checksums Report Page 49 of 49 HERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0170 DATE: 01/08/18 PROJECT NAME: WOODBRIDGE PARTNERS LLC SITE ADDRESS: 11521 E MARGINAL WAY S 100 Original Plan Submittal X Response to Correction Letter # 1 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: F�J nOk\00‘Building Division CC Public Works Fire Prevention Structural Planning Division ❑ ❑ Permit Coordinator n PRELIM! NARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 01/09/18 Structural Review Required REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 02/06/18 ❑ Approved with Conditions ❑ ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER.S INITIALS: DATE: [Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY'. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M17-0170 DATE: 11/14/17 PROJECT NAME: WOODBRIDGE PARTNERS LLC SITE ADDRESS: 11521 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Do. Building Division Public Works ❑ A- M Auk IWO-t7 Fire Prevention Structural Planning Division nPermit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 11/16/17 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 12/14/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews)) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: ;Permit Center Use Only CORRECTION LETTER MAILED: 11 )-Cist Departments issued corrections: Bldg I Fire ❑ Ping 0 PW 0 Staff Initials: 144e-- 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc, 12-22-2017 Date: Plan CheckfPermit. Number: M17-0170 E Response to Incomplete Letter # RECEIVED ® p CITY OF TUKWILA Res once to Correction Letter # • Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner. Project Name: Woodbridge Partners LLC Project Address: 11521 E Marginal Way S Contact Person: Summary of Revision: JESSE MONTEZ JAN 0 8 2018 PERMIT CENTER 206-768-4178 Phone Number: 1- COOLING AND HEATING LOAD CALCULATIONS WITH ZONE MAP FOR FLOORS 1 8& 2 ATTACHED. 2- COOLING AND HEATING CALCULATION COVER SHEET STAMPED AND SIGNED BY P.E. 3- MANUFACTURER'S SPECIFICATION SHEETS FOR NEW UNITS ATTACHED. Sheet Number(s): "Cloud" or highlight all areas of revision including date of r vision' Received at the City of Tukwila Permit Center by: L/ h6(171(11) Ic��eCi Entered in TRAKiT on �1 \applications\forms-applications on Zine\revision submittal Created: 8-13-2004 Revised: MACDONALD/MILLER FAC SOL "TC IIIIIII) Washington State Department of Labor & Industries Page 1 of 3 Home Espafiol Contact Search L&I A -Z Index Help Safety & Health Claims & Insurance Workplace Rights MACDONALD/MILLER FAC SOL INC Owner or tradesperson Principals SIMONDS, DERRICK R, PRESIDENT WEBSTER, MARK E, VICE PRESIDENT GEBHARDT, STEPHANIE WETTACH, TREASURER HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01/04/2011) GOUGH, DAVID ANTHONY, DIRECTOR (End: 08/29/2014) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. 602 254 260 PO BOX 47983 SEATTLE, WA 98106 206-768-4180 KING County Business type Corporation Governing persons FREDRIC J SIGMUND STEVE C LOVELY; TYLER C KOPET; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration My L&1 Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 1/24/2018 MACDONALD/MILLER FAC SOL INC 12/31/2002— 01/04/2019 Bond ................. LIBERTY MUTUAL INS CO Bond account no. 023006951 $12,000.00 Received by L&I Effective date 12/31/2002 12/11/2002 Expiration date Until Canceled Insurance Phoenix Insurant!a Company, The $1,000,000.00 Policy no. DT -CO -3K790954 -P HX -1 Received by L&I sJ Effective date 01/02/2018 12/31/2017 Expiration date 12/31/2018 Liberty Mutual Ins Co $2,000,000.00 Policy no. T67-661-066178-033 Received by L&I Effective date 11/20/2017 12/31/2013 Expiration date 12/31/2018 Insurance history- Savings istory Savings .................. _..... No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ........................._....._....... No L&I tax debts <,:e recorded for this contractor license during the previous 6 year period, but some debts may be recorded `r ;/ other agencies. License Violation;:"' ......... _............................................ No license violatics during the previous 6 year period. Workers' Do you know if the t.usiness has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 252,457-05 Doing business as MACDONALD MILLER FACILITY Estimated workers reported Quarter 3 of Year 2017 "Greater than 100 Workers" L&I account contact T4 / STEPHEN TA$SONI (360)902-4819 - Email: TASS235@lni.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have b. -.en issued against this contractor. Contractors not alowed to bid ........................................................................................... No debarments h::ve been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 08/24/2015 Violations Inspection no. Page 2 of 3 Help us improve https://secure.lni,wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 1/24/2018 A7317\6765 Complete Office 1 (1) (—) - 7 1_ 5 11 EXISTING WAREHOUSE '3\ z Cf!) \' n 0 ° n -1- n FILE COPY I A N Permit No. M \/1' 01 VI (-) Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and cond"ons is acknowledged: By: CVNOidaLtk a Vat - Date: t . a q ' 1 1 City of Tukwila BUILDING DIVISION rREVISIONS No changes stl?li bo rnde to the scope of work witho, :. f".;7;Cr approval ot Tukwi!a, Bu;*•jrzci, niviSiOrl. NOTE: Revisiond will wquir( a nay,/ plan submittal 1 and my in:;!ucll additional pian re•Vi•VJ teas SEPARATEP7-411-r RQU1R7D CI Mechanical EfEiectricai el Numbing eCas Piping City of Tukvlif.a BUILDIV`;71 DIVISION 0 !!!!!! n ) ry I r 0 [110 CD 1 ; 4 4 1, (); ! • (BD '71 1// 6>, \,Y /S) ANOO NO 00\7 0 6)1 1 r ---, 11 ii11 M 0 I I 11 1 I . 1 i i 1 ONIkOld GO 1SV MOL Vh1 1 r 7 1/ AA 0 ed /\A ; 0 I II 11 . 1 1 Ito I 1 I _r_ i MO /\A ; 0 I , . 1 \c/ 01S orm 0 691sf-r 0 C ' - • - LJ ED) , , • \ z Ito I 1 I _r_ , /\A ; 0 -4. , . 1 I I i-• 1 r 1 II orm 0 691sf-r 0 C ' - • - LJ ED) , , • \ z I 1 < m n 36 0" Ito I 1 I _r_ -4. , . 1 I 1 < m n 36 0" 2,109 si 0 D U • t", , k.) rr i ; i ' . rTh ) -r- r-- , [ \ . 1 1 \ I , ; • 1 i 5 I\ • , i I I 1 \ / \ \ \ N ;---;\ \/ !--- __ \11„ ! (!\! PT; r (-‘,1 5 (10 h/''ID L,,;;;; ... SOUtfl 0 1_! REVIEWED FOR CODE COMPLIANCE APPROVED JAN 2 2 2018 Prtl City of Tukwila BUILDING DIV1SiON1 ..21, I RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER CORRECTION LTR# 1 a) 0 0 0 as 11111111 PERMIT SET REPLACE H W 1.1.1 0 C.) 177] LL f= - LL LL 0 0 LLI0" 1— LLI w _J b". < CL ooE ENGINEER: J MONTEZ CHECKED BY: B GEZON CAD: F MAMERTO DRAWING NUMBER: E izt) E • co a) (i) u_ 0 002 z .0 w 0 REVISIONS: LA 0 REVISIONS: z 0 (/) z 0 12 0 u_ 0 (f) LAST REVISED: 1 1 —06-1 7 DATE PLOTTED: 11-06-17 ISSUE DATE: D-3853-73176765-00 SHEET NUMBER: TM2.01 I 1 I _r_ ---,- i-• 1 2,109 si 0 D U • t", , k.) rr i ; i ' . rTh ) -r- r-- , [ \ . 1 1 \ I , ; • 1 i 5 I\ • , i I I 1 \ / \ \ \ N ;---;\ \/ !--- __ \11„ ! (!\! PT; r (-‘,1 5 (10 h/''ID L,,;;;; ... SOUtfl 0 1_! REVIEWED FOR CODE COMPLIANCE APPROVED JAN 2 2 2018 Prtl City of Tukwila BUILDING DIV1SiON1 ..21, I RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER CORRECTION LTR# 1 a) 0 0 0 as 11111111 PERMIT SET REPLACE H W 1.1.1 0 C.) 177] LL f= - LL LL 0 0 LLI0" 1— LLI w _J b". < CL ooE ENGINEER: J MONTEZ CHECKED BY: B GEZON CAD: F MAMERTO DRAWING NUMBER: E izt) E • co a) (i) u_ 0 002 z .0 w 0 REVISIONS: LA 0 REVISIONS: z 0 (/) z 0 12 0 u_ 0 (f) LAST REVISED: 1 1 —06-1 7 DATE PLOTTED: 11-06-17 ISSUE DATE: D-3853-73176765-00 SHEET NUMBER: TM2.01 J:\7317\6765 Complete Office — RTU Replacements EE\00\2 — Engineering\DWG\Shts\73176765TM2_02.dwg A.4 C 0 1 0 281-i 0 1 29 s: 2011 sf 16'-8" z 0 EXISTING WAREHOUSE 16'-11" -6'-5" 61 -8" -* N 1 A 45 C1) 46 , . 45 sf 43 sf 71 169 sf 43 42 36!-8" 32 'lit rik L/ 619 sf 61'-2" FAT 0 U 0 0_ �n ELECTRICAL 0 01 ' 1I ry0 c�L 0 0_1 n )- n Im n y f 31 w //1 M0 e I 1 J 11sf I -- I m 169 sf 43 42 36!-8" 32 'lit rik L/ 619 sf 61'-2" FAT 0 U 0 0_ �n ELECTRICAL 0 01 ' 1I ry0 c�L 0 0_1 n )- n Im n y O1401c MOL -e: -\ g //1 M0 r� � I 1 J "II I L O1401c MOL -e: -\ L MO �d�ois 31SlV y�n� -b 7r 1 M0 ! I 1 "II L MO �d�ois 31SlV y�n� I. XX IIS "II I / I ' I. XX IIS "II I. XX "II / • \"/ \./ '. V /\\-- / rn IBJ 0 33 EAST HALF tea 39'-4" 1 0 84'-8" I 33 E XITS2 ; �f 33 WEST HALF 85'-0" 3 I I 351-3" 1,884 sf 34 / i' 1 1 ._'` \i [ 22'-7" l \ , ( . I n 19'-4" 1 , 4. 7'-2" -* LO CO 41 108 sf j 382 s 69 sf 39 { NEW CONVERA LOUNGE ROTATING AREA '- 31-0" 3'-0" PARK AVE CONFERENCE 21'-3" 23'-2" now 131-^" ?,r?D TL{ 1- Z‘1/41 N CO CO 0 LC50 --) REVIEWED FOR CODE COMPLIANCE APPROVED JAN 222010 City of Tukwila BUILDING DIVICON RECEIVED CITY OF TUKWILA JAN 0 8 2018 PERMIT CENTER • - 0 as O M O N - ▪ ti co (s? co ti Q O a N V) coL � O 7 O N O > C`') Q O O O L Q p) N 0 .- C 0 N- L D_ .macmiller.com 11111111 WA Lic No: MACDOFS980RU w 0 REVISIONS: Nt– F— LiJ D_ II 1111 l< REPLACE W W o LLI LI_ Ll_ u- L vJ O O WW4co F— - WWz _I _l o a. a..:cE 22L7_1 o o O 0 12 REVISIONS: z 0 U z 0 0 0 LL 0 W ENGINEER: LAST REVISED: J MONTEZ 11-06-17 CHECKED BY: B GEZON CAD: F MAMERTO DATE PLOTTED: 11-06-17 ISSUE DATE: DRAWING NUMBER: D-3853-73176765-00 SHEET NUMBER: TM2.02