Loading...
HomeMy WebLinkAboutPermit PG17-0036 - ABU-BAKR ISLAMIC CENTER - ROUGH-IN GAS LINE FOR WATER HEATERABU-BAKR ISLAMIC CENTER 14101 TUKWILA INTERNATIONAL BLVD PGI 7-0036 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.sov PLUMBING/GAS PIPING PERMIT 1610000125 Permit Number: PG17-0036 14101 TUKWILA INTERNATIONAL Issue Date: 3/31/2017 BLVD Permit Expires On: 9/27/2017 ABU-BAKR ISLAMIC CENTER Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: ABU-BAKR ISLAMIC CTR OF WA POBOX 68069 , TUKWILA, WA, 98169 RIZ SAMAD 4719 UNIVERSITY WAY NE - SUITE 206 , SEATTLE, WA, 98105 NEW WAVE CONSTRUCTION INC 4723 UNIVERSITY WAY NE , SEATTLE, WA, 98105 NEWWAVWC864CC Phone: (206) 437-8911 Phone: (206) 527-8911 Expiration Date: 2/3/2018 DESCRIPTION OF WORK: ROUGH -IN 3/4" GAS LINE FOR 80 000 BTU WATER HEATER. GAS LINE WILL BE TESTED WITH 30 LB GAUGE AT 15 PSI. TOTALDEVELOPED LENGTH IS 76 FT Valuation of Work: $2,000.00 Water District: 125 Sewer District: VALLEY VIEW Fees Collected: $256.16 Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Permit Center Authorized Signature: 2014 2014 2014 2015 Date: ' ' I I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: /8ri atm./ dp-0 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: 3-3/----2(5/7 PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stories, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2000 GAS PIPING FINAL 1900 PLUMBING FINAL 9002 ROUGH -IN GAS PIPING 8005 ROUGH -IN PLUMBING CITY OF TUKW-- 4 Community Developm.... Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 littp://www.TukwilaWA. c40 V Pluinbing/Gk.., 2 erlmit No. Project No. Date Application Accepted: 01 7 Date Application Expires: -)0-f (For:ofce use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: / LI / / n 1 L( v il>n rg�i) Suite Number: Floor: Tenant Name: t� lA f'j �%C 1 �L/s�7� (L C4:74-)MIL—New Tenant: ❑ Yes ❑.. No PROPERTY OWNER Name: 'z 0 2. A t4. Address: I L} (!7 i <Tu 1 ( - • l t__ lbt-lJ, b City: Ili ,4-W t( Stat- Zip: c g 4 Name: ffZ iie!--`1S`.t Email: r6 t l%e4-t3\/ Gib lib 4,&-(1 sta ,, i L )k7. - 6.4 Address: N/0 / ,--1-L e_jLt_ilk.l W 7 ,_ > City; t1( -wl_Lp., State: tAJp Zip:ig j CONTACT :PERSON - person receiving all project communication Name: 'z 0 2. A t4. Address: I L} (!7 i <Tu 1 ( - • l t__ lbt-lJ, b City: Ili ,4-W t( Stat- Zip: c g 4 Phone: `_i_c , ,Fa.7: ` Email: r6 t l%e4-t3\/ Gib lib 4,&-(1 sta ,, i L )k7. - PLUMBING CONTRACTOR INFORMATION Company Name: Y je W 1 J Q J� �� i - Address: 2 `7)' (J /J t t/„p�J f ki vV',.i ,JC..a., City: /-L, State: tLf,_ Zip: Qfj e,) / Phone:2E3t 1 ,3 7'q 11 Fax: !o S2 3�( ``II '7 Cu rr� �� Cut Reg .64 n lit) Wei toe_ (p�LG 21 r 31 `t g Tukwila Business License No.:6 IA S -6-1571/ 2n6 Valuation of Project (contractor's bid price): $ 2 (4.--, H Scope of Work (please provide detailed information): / c5,hr / vt 7/u CCS' 1-L!i k 6 ri t,J A C %CP : . A it L t +�,� t (( 44,iA- —) a L- 1 3 0 « L frL -F l �s r -Lc � ��� Le,„s /c rt F -1 -- Building Use (per Int'l Building Code): Occupancy (per Int'I Building Code): Utility Purveyor: Water: Sewer: H:Wpplications\Forms-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 2.4 Indicate type of plumbing fixtures and/ as piping outlets being installed and the guar )elow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap i Sinks Rain water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory i Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Receptor, indirect waste i Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets 1 Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT A.PPLLCATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGEN Signature: Print Name: Mailing Address: 4 7 [ 3 GI ,"J I. (Lea IN D" Date:(2-4(17 Day Telephone: r�22a�, -e-6,01, 104z, ?e(61 --- City State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS f ACCOUNT I QUANTITY ; PAID PermitTRAK $342.10 EL17-0211 Address: 14101 TUKWILA INTERNATIONAL BLVD Apn: 1610000125 $85.94 Credit Card Fee $2.50 Credit Card Fee I R000.369.908.00.00 0.00 I $2.50 ELECTRICAL $79.47 PERMIT FEE MULTI-FAM/COMM 1 R000.322.101.00.00 0.00 I $79.47 TECHNOLOGY FEE $3.97 TECHNOLOGY FEE 1 R000.322.900.04.00 0.00 $3.97 PG17-0036 Address: 14101 TUKWILA INTERNATIONAL BLVD Apn: 1610000125 $256.16 Credit Card Fee $7.46 Credit Card Fee 1 R000.369.908.00.00 0.00 $7.46 GAS $124.31 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $66.30 PLAN CHECK FEE R000.322.103.00.00 0.00 $24.86 PLUMBING $113.73 PERMIT FEE R000.322.100.00.00 0.00 $80.58 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 TECHNOLOGY FEE $10.66 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11108 R000.322.900.04.00 0.00 $10.66 $342.10 Date Paid: Monday, March 20, 2017 Paid By: RIZWAN SAMAD Pay Method: CREDIT CARD 07214G Printed: Monday, March 20, 2017 2:21 PM 1 of 1 CRISYSTEM$ INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 17 - 0036 Project: Aa - e)A0 >sfmi/c ere ection: Ty e of In4pi,c- S frji -> L Address: JL//O/ . 1,QT& atAit Date Called: Special Instructions: Date Wanpt 1 30 /7 Requester: Phone No: Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 W1 -06S6 Pry ject: /�• ,/� &)BAY T of Inspection: tiry e - WI' S PIP/A16- Address: j /]� IL O/ 'vZ / 447, Date Called: Special Instructions: Date Wante ii J9/ 7 m. Requester Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: 77/ /7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 1131N33111A1b3d 0 Z •,: 0 -,- O ? `" i:::?.._ Z N m ei 0 Z ' -0mfAtIcaa7 7 N c n -0 3r, �1 sem- 5 a g. -n iii =1 to 0 0- o < m, mw cp a. 5 , . m O O; igi��7 c Ch 1; P q V ix � o =aca. cs —I L w Q7 0 O c : ca 0'7 G?° 730 co a c' 02 ,c 0m I 0 o • ▪ Mr O) cr) z 8 - 7° n g_ m 1 6i pi ID P 2 0 1:13.L1433 ,CI& 3d -v 0 (Al NOLLION00 311S jpipg .3ppfRrpy>58 s pmppg>r@f! nspppoprAaI5FteUeUssFWIFIW 1411°171911409911,0119911111,99Wir 111 130i130qip siPRPFM5NUE'FPVI1; 19F144,01,4t1V4 SNOLLVIA32189V imp hillp odd woll hlo 11,1 NOLLVWH0dNI30O0 efp Win fiII ; 1 1: i 9 ,1 l"§�; 1;441 i p8 �C§5� =Q g;a,Bj i4 s 1' erw8 F,i �L mil II z gid" p@g f g4. l 1„,i. 11 f1 ➢ � � n S310N '1d30 321Id (S)1V111W9ns O3HH3d30 NHOM JO 3d00S 1 WO Mid zi AHO1038I0103rOHd V1VO 103rOdd SS3H03/X30NI133HS W (w�� �!d 08 3 -94 CD 3 CD L./ \ AVALON PROJECT 1 g ABU—BAKR ISLAMIC CENTER OF WASHINGTON 14101 TUKWLA INTERNATIONAL BLVD e 6 �y TITLE SHEET AND PROJECT INDEX 1:131N33 11Wa3d i� , \ i�€�€ffig € € mil �� Y'# € mil R fig€ # g; s mini € ���� ; s�igg€a €$gi$lifi!ll i liii 11 iga;iR$ a$ajj E6 l i7pq a sp(' Q 1CC5 iglilg @�g{ �$�E"S�"� �_� piS$� � � � ;$$ ��-�tS�R����€�,Y �� F� � ��A s$ij �. pi !�$$��� # 3 ��6 gg3fiq1y$ €b byig'¢fh y�6Fin 94 7 @ 6!- ii 9q€l8 riggpt!#111 g " °3A ,}$. 4e 11 ag Iy S cdYib� ;ijij Jj� R �HA � 3q AE R �E � �E '^# 10044011g" lop01004.1itf � l €€ §I g baR€s[ IYr ii,iipial€11Q� i$$ x€g 0= 4 $ "R ?€e2e2 i i €� Ii _ $ € ill pill2$ _�67" # 1 1a `€E11:1111 4YRi$p$ i$ 3 1 g lil -1 !i!:1 Y $i i° 1ill ) l!Gip 3i Ili i b 1 i.A l " Q .101 {R 10 $_ l• g8€ i� I g # 'I 1 F 11 1p6l iz rg i 11;,110„1111 7 7 66 L# 9 bill! q4€E"IE iii � �"7i =� 9 :Y>; i >'i (e, �G� � Z 8 sap• �( 001 ��� �� ��.o.i��R��R �pp����EEQ SY�� F��>°F FC� i ��� 1111'. � A� by3�C�� ��€$Ti,1� € a lye F ! f 4 '€x# 11! ? ¢1111 1 ''. illibb li -; til 'ill 11111$i il�€Ii ib ^� i I I/ Ji € " I g P° € 1 €& a i$ 1° s i al € € € F 1a a€q € J€ € 3 $ $ iY lE i ¢ Rb E$q Ra$ $c^I;gQ;2$a 11 PO $ it i €1{�{. 3Q 4�,b F $ g, a� 9t;A°r�A Epg Iy@� 41 Fj ig p 'G E$iR f 7i 1 /C `$g E®A = ;4 i1y$ g€ii$ lir Sill r i "a 1101'.01 q y1gt ;� ` igi "gj $ gA'R $B� a $ F7 C = �' �9Ylf Q # SMSA # ,� bf; $ $ $ 5 liEEFI'g¢^ R ii:a[s pp I N 1 "yi!€� EyifI _i i ii €_ i#1t gi if aSi r €kaQ7 F: Y � ipiIA ��61$gf R 1111A4i$i A fil1 F�$ gEE l Y miiii €€R R egi poi 5 . 3 1iS#�CS� RS � �� 9 �2 b A3€ �YF �B$ Ai �R s i "� $a Y {! D$� g # B Y �Q Ag$¢€��ea g gA �¢ 3a ° Aa y# I i j � $ Siyi @1 R qE a ya Ei5 ! E • it 1 gi igg G IT ¢FS $g g dgl it lit �yI R I s q lq " I+ t$ ?" b vi $ $ R ! €. 1 ilii" ill $� �`h i $ iY lilt $e !$ g $ €g 1 #€ . e F ;b I �E ga E ' iiic 5 if € " pp ill i€E go € AL 1 yy $o, Rgg" g ^1""iF,11 ig, i_.#E1 a iIii s $sE $� $ 'i I� $ Y 4!TF(Q11 �E $p leo, ¢�E$ " Ff 4 i 11 € :#13.R 1 :€ A� l '. 2 g1 Oil i 61 �' R C1 :$ • I 1 11 19 $€ €1 $ I gE $i £ a i E § $ '�i 1 $8 € t b i��i pbf" v E 4 EFs4=3Fe@gs#$ 9 yTaybR !II ieRAE. 11 , ,. , .1ji : ,, hi1i5€6 I 0 ig, ii!4[A $ A gi lL ?� pil p■g1 3 8i8iaai gi ! VrF 1! 1 1 as �° RR1g 3366-gE 5 pBA !i g$ "�i 3 9" 3 g FeER7R$f 53�$' G6 C F xb E" C€ "ia6Ei 'E Y IL 3$' ',II $ i E E E 6 E .1 E F a C ' �� E� E li .$Fq� �� � � � Y�� �'��€� �����as �pp�i�p �_ � g°C5 `p�IF ��' 2 $$ �'- E�° � ii[Q�{ Qj R �� � �I@@F� ��R4�C���F�RA�$Ad'd ����1 € 6��1S ��� . �°� � 6�g � 8Cg �� k� i �$'11101'01111 �� �eC" �_1111 = F A@��R$�aa��111 ¢�� '� � S��� �g #�E � 1 � � � - �� ��� i�� � $ � � ill 111111 E A $�Eb���p�aux���� 912 s e$ $2#Rill 'E5 E 8g� a E114a q R�ppa� FpFppF.€ $ 4S^�$$R g3aa�g as 1111 .1 �£¢ &€Q€$ ^$ E1g3!itC $g 11p 11{ A6 '0 i1ll 1F i Ili iii € S5 ii ii 4O bl €F IN€E 14 �1 Al $111: 111 1 1 ie� ! E€ ii€ i_" 1R 1111 i€i E 1 €1 @€ i 0 € i€ € _ € 111,11111 1'11 q ; Rl 111E is 0101;041111}e 4�;Ia t g"111 g $=kq� 1s gl i€[^ 2€ 111!! ' R i R4G$h i_ t 11Y11 i Abd 4 99 _ �1 RPfq $" i 1i p 31#1.1 1 I q 11 15 5 i$$ li f 11 14$ 1 t1 91 q1q �E i 1 T§g1 : iFl_ i E i�[R a . IP 11611 16? 1 €€1 � p� p a�€ ° a Pi p3pII € €3 € r1911111111€' € s ii5 €p € Pi 'Ia 69€ € iiiiii E v 16b11 1i$ Y €€ Lp$5p !RRP p IY agq,na1 II€IItii""R11=gR;� �R�Ogifix€ 5 € g:aY5€ get^�{gY= $$ li 1 111 jjj1iEP E1€4_i1 l$ IIII 1 e C R li " 01$ga i ilG l" ilii 11 11/1111111110 1&1 illi 8� Xe A°E$ cg " FEE�J $ E@sa$Y A thb -pt$ ia$ "$�.t 6aa; ! yt$ ILia € "" € "! $ aidi € €€ 111 1$Q11 /1a R;ia 111 $ i 1111 Y@ iii Cahi a$ •� �� € ;;� �ii € 8 5€ 8'" 1110111 # 6�i11 1- ° RGi°E 9 F -$REE $ ° $p E €E $ i€' €$Rf�s�g= f! @$� tgEE9$ r°s €€5g i�iai! 4 ]1 a 1# 110 a €yig Y4l: g eeE 1111 i �g4141,I 4f� @€ s 8 R$$ a#€a5 j7 z�$a s€pg q€yg' A E eke "�°q$ g 1 P E ]$$ a I. 7 9$ E ( agpeees 8 $�A =°I! � $�R ��` � �F $ � g� � � $ I$ IN � � is i71� ��� ��R i ��l� �ii � C€ l' IX ii6 7 � � P $E 1111 ��G�4"Bay$€e�'g-P$$R R! liill g�a iA 1 11 `115 i111011 . %g1 p i"i♦ F{Fg 668 ¢6 �i{ s 3'I # e 3E b" pi=$ $# $ L1 •W IiiE b$ LAb 1 4$ h 1 1 a1$ Al P E$ "A4$ �f $ �5 Y $ $$ 1. ii $ e ESpe i k p; g § i8 .i2 4 $ 1 �I g ilill#,ARI $Fa=$pRa $�$g $ Q$ &eR b a$# 3i"s. T @p ��l>€fgs y# iYpa S�*g €Q3plyyy t¢ €a ��€ € €qp € - °� 'i _ $R8 € ¢ejjs�E [y5I € $a19`e{� Fi£,J�{9�I�- AF a 5ilf5 +�9 4 Sii8R11 a 3 EB•1y li$ !I i$1 hi6i t� Ri. €71 ,iB � F ° Q R^ i 1 P.6$A 4J! 3 �s iq P$k SSS 11.P$ li .€$$ -521RiE m h ¢1g0¢# $ r!€a$�ggb $is a€ Ili >¢€ $p1E 3R 6S -��s� a �g•���� Pilliit =1R p�• �Y� : � �,��i ii. � C � �� �$ F a F A ��_ � =�Iq$i a i.� a;i€ vl , $E illa i11111$€iii5l :it $ i l €a s�i Il$ Y# 1X81 I hR iY��. Qd$ E 6i � Aa v$ RI�$�� li i hh >���b#f•.aA€€€' #€�. /1411111 R 6$ {�' RiE$ EP 3;IE111 41 € 11101111011111 1'€i big@€'r = gig€ l€ g € €�; l&�$ €" •1� 11E€1 $il . 1 1 1 1 $a€ F = 3S I -. R € g °$g.qg$�;F" a e =$g 9010 .3�"� $X F�� 1 . ��$�6a I€FiES'k 111$111140 SR AS1 q�!`R J11 hJ CP E 11. i'b R $5 iiiig1 #: A $$�ig'�$;14 �'9g a a$€$Qqq$r" 3sAGea�! iO1a; @q�gg $[(i $ €$ Yig$ ly aEEE€ 111 €€b ; 1A g#�€ � ; �_ @gal a � 1 f p € € ` 0 1 e ° CO 1�' iI G M 0 ABU—BAKR i CENTER OF WASHINGTON 14101 TUKWILA INTERNATIONAL BLVD GENERAL NOTES AND SPECIFICATIONS— a � 1 441. zer7-1 o /1ISLAMIC I I m 1:131N3O 11W%3d F I.O., ML... EINEM ■..■■ MIMS 111.CM .:I.r.r MEM v 0 0 m m 0 m m r L 7.0 a a =.6/L :TWOS NOIlIGNO0 ONI1SIX3 E 01 5 tri.i■ mom IIELEmm aal il■. ieee- dram 1,1.■.Naos' 1■..l loom imme i j i. d1 �1 MIDAS 0 m v m z 0 z o®®®®©®®ooEOEEo©E R 000®oa0000000 TOpET 155UE/SEAT COVER DISPENSER YENS TORE TOYLT TISSUE SEAT COVER DISPENSER APKIN DSP. LLT S DISPENSER AR. DI SP. SURFACECOUNTED NAT NAi AND COAT NOp( P g z s 11 J..` S 8 �xx o• O O OO RFC O 0 0 0 . 0 r- 0 C) m 0) 0 m 0) —04 ABU-BPRR ISLAMIC CENTER OF WASHINGTON 14101 TUKWILA INTERNATIONAL BLVD FLOOR PLAN AND DETAILS 1:131N30 111111183d E © ® E f\ j, 11 ��l� _�.. 44.44 ,_fil 3 ill pq.... — s IN) i-> 0 li ! . . 1 A II! Ill c. 1111 Z 4 o II iJ i iiI''i tiif fliiI;oci ` ,1 !Ei r y ' iiEg 0i ! si o ; �� ii 1 �ai1 i,!ia �i� 6 1 I 1 a,!11!'1 a � ° i i1 E , 1i Iifi iii IT' 1(I I IIli ilii I iii s �' ' �. I. ii lid 0 if � � . A � "°a 6 � i : gilk ii i il iiP L 73 17 i i P-L--:3 ii cn e �..w' 4 iii i f�E 1 HJII s li Jiiijfl 4 11111 JTOLUZE ALL Al inu 4ui�i L1" 4* 5 K i1 %5 a II 1 i I 1 ) i i1 i!II +Lal 1 11111 II g iv i—Y TYPOCAL AC i 11 ; IIN III 4 ' 1°16; li thil o iri � N: Vie- � � � ����l 1 iE �a TT 1 4© f{% Cil � /spm �, � � R3� V. ell taL. 11'—' 1 'A' sIV" 11 i, i1 ES 1, I7 1110 a 11 ?; a Hiliii i�l PP lit MI II , i1 i, ii 111 �I 1 1 7-,- 1' iklit i i �t � `_. 07 t s 11 Q a ABU—BAKR ISLAMIC CENTER OF WASHINGTON ' 1 b r;.4. , q $ 14101 TUKIMLA INTERNATIONAL BLVD •a 0 / c Q f~ ce �, C —itri TYPICAL ACCESSIBILITY NOTES in= —v Cy • Z n 77 m Lift_ d a 0 Eli Jo Ert C=tCit"'-1 cg 0 �! OO a9` • • PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG17-0036 DATE: 03/20/17 PROJECT NAME: ABU-BAKR ISLAMIC CENTER SITE ADDRESS: 14101 TUKWILA INTERNATIONAL BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: mo h Building Division Building Division Public Works Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 03/21/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 04/18/17 Approved Corrections Required ❑ Approved with Conditions ❑ ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW ❑ Staff Initials: 12/18/2013