Loading...
HomeMy WebLinkAboutPermit PG17-0061 - INSPIRUS CREDIT UNION - BACKFLOW PREVENTOR WITH WATER SERVICEINSPIRUS CREDIT UNION 5200 SOUTHCENTER BLVD PGI 7-0061 Parcel No: Address: Project Name: City of Tukwila Deportment of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT 1157200013. 5200 SOUTHCENTER BLVD INSPIRUS CREDIT UNION Permit Number: PG17-0061 Issue Date: 5/5/2017 Permit Expires On: 11/1/2017 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: INSPIRUS CREDIT UNION PO BOX 4184 C/0 WALLACE PROPERTIES, BELLEVUE, WA, 98009 FRED LAPLANTE 14111 NE 24 ST, BELLEVUE, WA, 98007 BELLEVUE PLUMBING INC Address: 14111 NE 124 ST, BELLEVUE, WA, 98007 License No: BELLEP18730F Lender: Name: Address: Phone: (425) 641-4222 Phone: (425) 641-4222 Expiration Date: 9/6/2017 DESCRIPTION OF WORK: REPLACE BACKFLOW PREVENTOR WITH LEAD FREE CURRENTLY APPROVED MODEL WATER SERVICE PROVIDED BY WD #125. Valuation of Work: $1,639.00 Water District: 125 Sewer District: TUKWILA Fees Collected: $171.22 Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Date: 6—'—cH I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: FKEc I L-APLA n('7 -L Date: S /-s %/'7 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 8: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 9: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments 10: Applicant shall call Public Works at 206 433-0179 to schedule an inspection for the Reduced Pressure Principle Assembly (RPPA) installation. The RPPA shall be installed per manufacturer's specifications and tested by a certified backflow tester. Backflow test report shall be forwarded by the Public Works to Water District #125. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Plumbila as, nut Project No.._.. Date Application Accepted:'. . rte.. PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** King Co Assessor's Tax No.:1157200013 Site Address: 5200 Southcenter BLVD Suite Number: N/A Floor: N/A Tenant Name: Inspirus Credit Union 'Op RTX OWNER Name: Address: City: State: Zip: CONTACTr c9,Pn,J cati4sn ceiv` ng all Name: Fred LaPlante Address: 14111 NE 24th St City: Bellevue State: WA Zip: 98007 Phone: (425) 641-4222 Fax: (425) 644-9903 Email: fred@bellevueplumbing.net New Tenant: ❑ Yes ..No 'LI5MBING CI O``R�iv1 Company Name: Bellevue Plumbing, Inc. Address: 14111 NE 24th St City: Bellevue State: WA Zip: 98007 Phone: (425) 641-4222 Fax: (425) 644-9903 Contr Reg No.: BELLEPI8730F Exp Date: 09/06/2017 Tukwila Business License No.: A c OtO! 3 /K TJo` Py D (7, Valuation of Project (contractor's bid price): $ q6,039 -- Scope 6,039— Scope of Work (please provide detailed information): Replace backflow preventor with lead free currently approved model. 6,6gq Building Use (per Int'l Building Code): Office Building Occupancy (per Int'! Building Code): Utility Purveyor: Water: Sewer: H:\Applications\Forms-Applications On Line \2011 Applications\Plumbing Pcrmit Application Revised 8-9-1 I .docx Revised: August 2011 bh Page 1 of 2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type ,,Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 1 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) " Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller 1 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type- Qty ' Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter 1 Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PER11 API Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNpR uRIZED AGENT: Signature: t Date: 04/26/2017 Print Name: Roger Iida Day Telephone: (425) 641-4222 Mailing Address: 14111 NE 24th St Bellevue WA 98007 City State Zip H:\Applications\Forms-Applications On Line\201 I Applications\Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY PermitTRAK I PAID $171.22. PG17-0061 Address: 5200 SOUTHCENTER BLVD BLDG 1 Apn: 1157200013 $171.22 PLUMBING $164.63 PERMIT FEE R000.322.100.00.00 0.00 $98.55 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PLAN CHECK FEE R000.322.103.00.00 0.00 $32.93 TECHNOLOGY FEE $6.59 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R11396 R000.322.900.04.00 0.00 $6.59 $171.22 Date Paid: Tuesday, May 02, 2017 Paid By: BELLEVUE PLUMBING INC Pay Method: CHECK 16225 Printed: Tuesday, May 02, 2017 11:03 AM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit 6300 Southcenter Blvd., #100, Tukwila: WA 98188 Permit Inspection Request Line (206) 438-9350 PERMIT NO. (206) 431-3670 CITY OF TUKWILA BUILDING DIVISION Project: / Pl IC OS , t 'r ails Time of Inspection: nom 11).4..j- /4L- Address: Date Called: Special Instructions: • ()ALL Date Wanted . /1/17 a.m._ p.m. Requester 1541 Phone No: Ii2r 2 -I owl Approved per applicable codes. L Corrections required prior to approval. COMMENTS: Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. rREVISIONS No chances shall be made to the scope of work without prior approval of Tukwila Building Division. iNOTE: Revisions will require a new plan submittal 1 and may include additional plan review fees. i FILE COPY Permit No. ?..GOP Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By: Date:qs--/ City of Tukwila BUILDING DIVISION �'G i1- ooh I SEPARATE PERMIT REQUIRED FOR: ['Mechanical electrical 0 umbing r.Vbas Piping Cal of Tukwila E1lADING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED MAY 0 4 2017 wf& City of Tukwila BUILDING DIVISION 47.4654473, -122.2685996 to 5200 Southcenter Blvd, Tukwila, WA 98188- Google Maps 47.4654473, -122.2685996 to 5200 Southcenter Blvd, Tukwila, WA 98188 2 4) 0 0 0 n S 52na Avc S 0 CV .444 Atit c 0 2 CC 4 m U W v 1.11I co mi. O 0 co O n I..0. M N O c. TO �( O ,-- PCJ 1- 2 i E Co E ~Y E go Cr en 3 co D g N 0 N� 1 g rim (D NrW co+ Q ai Y + 0 c 52nd Ave S n 0 %Awe Credit Union 92nd,-vo 5 via Southcenter Blvd aic <40 ,)? + N� N 4 co2 E 0 U C) ES-LF009 For Health Hazard Applications Job Name 1 d k -i ' m ist S C t--t�t;1 — 1,4 IVD c~'4 - Contractor i /e ✓ vt e Phi i r - 6 i 7 Job Location 00 0 1S O LA - - e,e4-81 / vei Approval Engineer Contractor's P.O. No Approval RE&VED RECEIVED CITY OF TUKWILA LEAD FREE* MAY 0 3 2017 Series LF009 TUKWILA Reduced Pressure Zone AssembliesuBl_Ic WORKS Sizes: 1/4" - 3" (8 - 80mm) Series LF009 Reduced Pressure Zone Assemblies are designed to protect potable water supplies in accordance with national plumbing codes and water authority requirements. This series can be used in a variety of installations, including the prevention of health hazard cross - connections in piping systems or for containment at the service line entrance.The LF009 features Lead Free* construction to comply with Lead Free* installation requirements. This series features two in-line, independent check valves, captured springs and replaceable check seats with an intermediate relief valve. Its compact modular design facilitates easy maintenance and assem- bly access. Sizes 1/4" - 1" (8 - 25mm) shutoffs have tee handles. Features Tell Type Test Cocks • Single access cover and modular check construction for ease of maintenance • Top entry - all internals immediately accessible • Captured springs for safe maintenance • Internal relief valve for reduced installation clearances • Replaceable seats for economical repair • Lead Free* cast copper silicon alloy body construction for durability 1/4" - 2" (8 - 50mm) • Fused epoxy coated cast iron body 21" and 3" (65 and 80mm) • Ball valve test cocks — screwdriver slotted 1/4" - 2" (8 - 50mm) • Large body passages provides low pressure drop • Compact, space saving design • No special tools required for servicing 42 2017 PERMIT CENTER Test Cock No 3 Specifications A Reduced Pressure Zone Assembly shall be installed at each potential health hazard location to prevent backflow due to backsiphonage and/ or backpressure. The assembly shall consist of an internal pressure differential relief valve located in a zone between two positive seating check modules with captured springs and silicone seat discs. Seats and seat discs shall be replaceable in both check modules and the relief valve. There shall be no threads or screws in the waterway exposed to line fluids. Service of all internal components shall be through a single access cover secured with stainless steel bolts. Body and shutoffs shall be constructed using Lead Free` cast copper silicon alloy materials. Lead Free" reduced pressure zone assembly shall comply with state codes and standards, where applicable, requiring reduced lead content. The assembly shall also include two resilient seated isolation valves, four resilient seated test cocks and an air gap drain fitting. The assem- bly shall meet the requirements of: USC; ASSE Std. 1013; AWWA Std. C511; CSA B64.4. Shall be a Watts Series LF009. Test Cock No. 2 First Check Module Assembly R.P. Zone LF REVIEWED FOR LODE COMPLIANCE APPROVED MAY 0 4 2017 Relief Valve Assembly econd Check Module Assembly Water Outset Now Available WattsBox Insulated Enclosures. For more information;: send for literature ES -WB. NOTICE Inquire with governing authorities for local installation requirements NOTICE The information contained herein is not intended to replace the full product installation and safety information available or the experience of a trained product installer. You are required to thoroughly read all installation instructions and product safety information before begin- ning the installation of this product. *The wetted surface of this product contacted by consumable water contains less than 0.25% of lead by weight. Watts leas pronuct spates Tec ns in U.S. cusice. try ueser and mnigh are eior te many are provided for,cronstruction, only. For se measurements, materials WAS® please contact Watts Technical Service. Watts reserves the right to change or modify product design, consbvction, specifications, or materials with- out prior notice and without incurring any obli ation to make such changes and modifications on4rodu produI previously or subsequently sold. illi) c7 `. Available Models: 1/4" - 2" (8 -50mm) ,1 Suffix: QT - quarter -turn ball valves S - strainer LF - without shutoff valves PC - internal polymer coating Prefix: U - union connections Available Models: 21/2" - 3" (65-80mm) Suffix: NRS - non -rising stem resilient seated gate valves OSY - UUFM outside stem and yoke resilient seated gate valves S -FDA - FDA epoxy coated strainer QT -FDA - FDA epoxy coated quarter -turn ball valves LF - without shutoff valves Note: The installation of a drain line is recommended. When install- ing a drain line, an air gap is necessary (see ES -AG). Materials: 1/4" - 2" (8 - 50mm) Lead Free* cast copper silicon alloy body construction, silicone rubber disc material in the first and second check plus the relief valve. Replaceable polymer check seats for first and second checks. Removable stainless steel relief valve seat. Stainless steel cover bolts. Standardly furnished with NPT body connections. Model LF009QT furnished with quarter -turn, full port, resilient seated, Lead Free* cast copper silicon alloy body ball valve shutoffs. Materials: 21/2" and 3" (65 -80mm) • (FDA approved) Epoxy coated cast iron unibody with plastic seats • Relief valve with stainless steel seat and trim. • Lead Free cast copper silicon alloy body ball valve test cocks Air Gaps and Elbows Pressure / Temperature Sizes 1/4" - 2" (8 - 50mm) Suitable for supply pressure up to 1 75psi (12 bar). Water temperature: 33°F -180°F (0.5° - 75°C). Sizes 21/2" and 3" (65 and 80mm) are suitable for supply pressures up to 1 75psi (12.1 bar) and water temperature at 110°F (43°C) continuous, 140°F (60°C) intermittent. Standards usC ASSE No. 1013 AWWA C511 CSA B64.4 IAPMO File No. 1563. SP NSF. Approvals ASSE, AWWA, CSA, IAPMO Approved by the Foundation for Cross -Connection Control and Hydraulic Research at the University of Southern California. Approval models QT, PC, NRS, OSY. UL Classified 21/2" and 3" (65 and 80mm) with OSY gate valves. 3/4" - 2" (20-50mm) without shutoff valves (-LF) (except LF009M3LF) MODEL for 909, 009 and 993 sizes DRAIN OUTLET in. mm in. DIMENSIONS A mm in. R mm WEIGHT lbs. kgs. 909AGA /4"-'/" 009, 1/2 13 2% 60 3%e 79 0.625 0.28 3/" 009M2/M3 909AGC %"-1" 009/909, 1 25 3% 83 4' 124 1.5 0.68 1"-1%" 009M2 909AGF 11/4"-2" 009M1, 2 51 4% 111 63/ 171 3.25 1.47 11/4"-3" 009/909, , 2" 009M2, 4"-6" 993 909AGK 4"-6" 909, 3 76 63/8 162 9% 244 6.25 2.83 8"-10" 909M1 909AGM 8"-10" 909 4 102 73/8 187 111/4 286 15.5 7.03 909ELA /"-W 009, 3/4" 009M2/M3 - - - - - - - - 909ELC %"-1" 009/909 - - 2% 60 2% 60 , 0.38 0.17 * 909ELF 11/4'-2" 009M1, - - 3% 92 3% 92 2 0.91 11/4"-2" 009/909, 2" 009M2, 4"-6" 993 * 909ELH 2'W'-3" 009/909 - - - - - - - - Vertical A Dimensions and Weight: 1/4" - 2" (8 - 50mm) LF009 LF0091/4" - 2" SIZE (DN) in. mm in. A mm in. 8 mm in. C mm DIMENSIONS (APPROXI D in. mm in. L mm in M mm in N mm WEIGHT lbs. kgs. '/ 8 10 250 4%s 117 33 86 11/2 32 51/2 140 2% 60 21 64 5 2 % 10 10 250 4% 117 33/ 86 11/2 32 • 5/ 140 2% 60 21/2 64 5 2 / 15 10 250 45 117 33/6 86 11/2 32 51/2 140 2% 70 21/2 57 5 2 3/4 20 10% 273 5 127 31/2 89 11 38 6% 171 33/6 81 2% 70 6 3 1 25 141/2 368 51/2 140 3 76 21/2 64 91/2 241 3% 95 3 76 12 5 11/2 32 17'/s 441 6 150 3/ 89 21/2 64 113 289 47/5 113 314 89 15 6 11/2 40 17',4 454 6 150 31/2 89 21/2 64 11% 283 4' 124 4 102 16 7 2 50 213 543 7% 197 41/ 114 31/2 83 131 343 55/6 151 5 127 30 13 Dimensions and Weight: 21/2" and 3" (65 and 80mm) LF009 STRAINER SIZE SIZE DN DIMENSIONS (APPROX.) WEIGHT DIMENSIONS (APPROX.) M N WEIGHT Nit mm in. in. mm in. in. mm in. in. mm in. min lbs. kgs. 21/2 65 10 21/2 254 61/2 — 165 9% 248 28 12.7 3 80 101/2 — 257 7 270 178 10 254 34 15.4 tClearance for servicing Watts G-4000 Series QT – Ball Valves MODEL SIZE DN A DIMENSIONS (APPROX.) WEIGHT in. mm in. mm in. C mm in. D mm E in. mm in. L mm in. R mm in. U mm lbs. kgs. LF009LF 21/2 65 — — r — — 41/2 114 — — 18'/ 460 — — 10% 270 76 34.5 LF0090SY 21/2 65 331/2 845 15%6 403 41 114 16% 416 18'/ 460 73/4 197 10% 270 166 75.3 LF009NRS 21/2 65 331/2 845 11% 289 41/2 114 . 18% 460 7%4 197 10% 270 161 73.0 LF0090TFDA 21/2 65 3314 845 6 152 41/2 114 163% 416 18',4 460 7% 197 105 270 150 68.0 LF009LF 3 80 — — — — 4/ 114 — — 18'/ 460 — — 10% 270 76 34.5 LF0090SY 3 80 34/ 870 1812 470 41/2 114 165 422 18' 460 8% 222 105% 270 198 89.8 LF009NRS 3 80 341/2 870 12% 324 41/2 114 16% 422 18'% 460 8% 222 105 270 191 86.6 LF0090TFDA 3' 80 341/2 870 7 178 41/2 114 16% 422 18% 460 . 83/4 222 10%6 270 158 71.7 ' Capacity >� Performance as established by an independent testing laboratory. kPa psi 138 20 117 17 96 14 76 11 55 8 35 5 ''/a" (8mm) LF009QT i �P 0 .25 .60 .75 1 1.17 gpm 0 .95 1.9 2.9 3.8 4.5 Ipm kPa psi 138 20 117 17 96 14 76 11 55 8 35 5 '/a" (10mm) LF009QT 0 .25 .50 .75 1.25 1.50 2.5 3. gpm AP 0 .95 1.9 2.9 3 8 4.8 5.7 9.4 11.8 Ipm kPa psi 172 25 %" (15mm) LF009QT * 138 20 103 15 69 10 35 5 AP kPa psi 207 30 165 24 124 18 83 12 41 6 0 0 2.5 5 7 5 10 12.5 15 gpm 3 8 9.5 19 28.5 38 47.5 57 Ipm 5 7.5 15 fps 1.5 2.3 4.6 mps 3/4" (20mm) LF009M3QT * 0 2 6 10 14 18 22 26 30 34 38 42 46 gpm AP 07.6 23 38 53 68 84 99 114 129 144 160 175 Ipm 7.5 15 fps 2.3 4.6 mps 1" (25mm) LF009M2QT * kPa psi 207 30 172 25 138 20 103 15 69 10 35 5 0 0 AP 0 5 10 20 30 40 50 60 70 80 gpm 19 38 76 114 152 190 228 266 304 Ipm 7.5 15 fps 2.3 4.6 mps 1wATrS• *Typical maximum system flow rate (7.5 feet/sec., 2.3 meters/sec.) 1'/a" (32mm) LF009M2QT kPa psi 172 25 138 20 103 15 69 10 35 5 0 0 AP O kPa psi 207 30 172 25 138 20 103 15 69 10 35 5 0 0 AP kPa psi 207 30 172 25 138 20 103 15 69 10 35 5 0 0 . AP g 10 20 30 40 50 60 70 80 gpm 38 76 114 152 190 228 266 304 Ipm 5 7.5 10 15 fps 1.5 2.3 3.0 4.6 mps 11/2" (40mm) LF009M2QT * 10 20 30 40 50 60 70 80 90 100 110 120 gpm 38 76 1 4 152 190 228 266 304 342 380 418 456 Ipm 5 7.5 10 15 fps 1.5 2.3 3.0 4.6 mps 2" (50mm) LF009M2QT * kPa 172 138 103 69 35 0 psi 20 40 76 152 228 5 1.5 60 80 100 120 140 160 180 200 gpm 304 380 456 532 608 684 760 Ipm 7.5 10 15 fps 2.3 3.0 4.6 mps 21" (65mm) LF009 LD 20 15 10 5 n AP O kPa psi 172 25 138 20 103 15 69 10 35 5 0 0 25 50 75 05 10- 295 5 1.5 100 125 150 175 200 225 250 gpm 380 475 570 665 760 885 950 Ipm 7.5 10 15 fps 2.3 3.0 4.6 mps 3" (80mm) LF009 * �P 0 25 50 75 100 125 150 175 200 225 250 275 300 325 gpm 0 95 190 285 380 475 570 665 760 855 950 104511401235 Ipm 5 7.5 10 fps 1.5 2.3 3.0 mps ES-LF009 1711 USA: T: (978) 689-6066 • F: (978) 975-8350 • Watts.com Canada: T: (905) 332-4090 • F: (905) 332-7068 • Watts.ca Latin America: T: (52) 81-1001-8600 • F: (52) 81-8000-7091 • Watts.com © 2017 Watts PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER:. PG17-0061. DATE: 05/02/17 PROJECT NAME: INSPIRUS CREDIT UNION SITE ADDRESS: 5200 SOUTHCENTER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: \-L Awt Building Division Public Works Fire Prevention Planning Division Structural ❑ Permit CoordinatorINT PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 05/04/17 Structural Review Required APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions ❑ Denied •(corrections entered in Reviews) (ie: Zoning Issues) Notation: DATE: DUE DATE: 06/01/17 REVIEWER'S INITIALS: DATE: fCPernut Center Use Only L.�T_ CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 BELLEVUE PLUMBING INC Home Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1 of 2 A -Z Index Help My L&I Workplace Rights Trades & Licensing BELLEVUE PLUMBING INC Owner or tradesperson Principals IIDA, ROGER, PRESIDENT STEPHEN, KARIE LYNNE, VICE PRESIDENT ELSASSER, JOHN EDWARD, SECRETARY Doing business as BELLEVUE PLUMBING INC WA UBI No. 603 323 314 14111 NE 24TH STREET BELLEVUE, WA 98007 425-641-4222 KING County Business type Corporation Governing persons JOHN E ELSASSER ROGER IIDA; KARIE LYNNE STEPHEN; JARED S STEPHEN; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. BELLEPI873OF Effective — expiration 09/06/2013— 09/06/2017 Bond Federated Mutual Ins Co Bond account no. 9328865 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 09/06/2013 09/01/2013 Expiration date Until Canceled Insurance Federated Mutual Ins Co $1,000,000.00 Policy no. 9345674 Received by L&I Effective date 08/31/2016 08/28/2016 Expiration date 08/28/2017 Insurance history Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603323314&LIC=BELLEPI873OF&SAW= 5/5/2017