Loading...
HomeMy WebLinkAboutPermit PG17-0109 - INSPIRUS CREDIT UNION - WATER, WASTE AND VENTINSPIRUS CREDIT UNION 5200 SOUTHCENTER BLVD 230 PGI 7-0109 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov. PLUMBING/GAS PIPING PERMIT 1157200013 Permit Number: 5200 SOUTHCENTER BLVD 230 Project Name: INSPIRUS CREDIT UNION Issue Date: Permit Expires On: PG 17-0109 9/11/2017 3/10/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: INSPIRUS CREDIT UNION PO BOX 4184 C/0 WALLACE PROPERTIES, BELLEVUE, WA, 98009 JASON WHITNEY 650 S LUCILE ST, SEATTLE, WA, 98108 PINCHIFF MECHANICAL LLC 650 S LUCILE ST, SEATTLE, WA, 98108 PINCHML876PG Phone: (206) 379-2435 Phone: (206) 643-2046 Expiration Date: 10/7/2017 DESCRIPTION OF WORK: PROVIDE WASTE AND VENT FOR PARKING GARAGE ADDITION AS WELL AS WATER, WASTE AND VENT FOR TENANT IMPROVEMENT Valuation of Work: $119,000.00 Water District: 125 Sewer District: TUKWILA Fees Collected: $691.27 Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree t. he c.n. ions attached to this permit. Signature: Print Name: Date: // (1 /r This permit shall become null and void if the work I not co menced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 1 8 ..ys from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for. inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 gauge. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 8004 GROUNDWORK 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING a CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Plumbing/Gas Permit No. f411-- Project No. Date Application Accepted: Date Application Expires: (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION 115720-0021-00 Site Address: Tenant Name: King Co Assessor's Tax No.: 115720-0013-00 5200 Southcenter Blvd., Tukwila, WA, 98188 Inspirus Credit Union Suite Number: PROPERTY OWNER Name: Jason Whitney Name: Inspirus Credit Union City: Seattle State: WA Zip: 98108 Address: 5200 Southcenter Blvd. Email: jasonw@pinchiffinechanical.com City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Jason Whitney Address: 650 S. Lucile St. City: Seattle State: WA Zip: 98108 Phone: (206) 379-2435 Fax: (206) 767-1680 Email: jasonw@pinchiffinechanical.com Floor: 181' 2 New Tenant: ❑ Yes m..No PLUMBING CONTRACTOR INFORMATION Company Name: Pinchiff Mechanical Address: 650 S. Lucile St City: Seattle State: WA Zip: 98108 Phone: (206) 379-2435 Fax: (206) 767-1680 Contr Reg No.: CC PINCHML87wiExp Date: 10/07/2017 Tukwila Business License No.: BUS -0995331 Valuation of Project (contractor's bid price): $ 119,000 Scope of Work (please provide detailed information): Provide waste and vent for parking garage addition as well as water, waste, and vent for tenant improvement. Building Use (per Int'I Building Code): Occupancy (per Int'I Building Code): Office B(Office) / S-2(Parking) Utility Purveyor: Water: Sewer H: Applications'Forns-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain 1 Shower, single head trap 4 Sinks 2 Rain water system — per drain (inside building) 1 Grease interceptor for commercial kitchen (>750 gallon capacity) 5 Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) 2. Fixture Type Qty Bidet Drinking fountain or water cooler (per head) 1 Lavatory 4 Urinal 2 Water heater and/or vent 1 Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 2. Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial 6 Wash fountain 1 Water closet 10 Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets 2. Fixture Type Qty Dental unit, cuspidor Floor drain 6 Receptor, indirect waste 1 Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices apoS, OIL. S-PQM1A. f)MP .5•114T141r1 2. PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 Signature: ER OR AUTHRI ED GENT: Print Name: on Whitney Mailing Addres 650 S. Lucile St. H:\ Applications\Forms-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Date: 09/01/2017 Day Telephone: (206) 379-2435 Seattle WA 98108 City State Zip Page 2 of 2 (44 IL.41 L906 4 Cash Register Receipt City of Tukwila Receipt. Number R12288 DESCRIPTIONS 1 PermitTRAK ACCOUNT QUANTITY PAID $561.48 PG17-0109 Address: 5200 SOUTHCENTER BLVD 230 Apn: 1157200013 $561.48 Credit Card Fee $16.35 Credit Card Fee R000.369.908.00.00 0.00 $16.35 PLUMBING $519.17 PERMIT FEE R000.322.100.00.00 0.00 $486.02 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 TECHNOLOGY FEE. $25.96 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R12288 R000.322.900.04.00 0.00 $25.96 $561.48 Date Paid: Monday, September 11, 2017 Paid By: JASON WHITNEY Pay Method: CREDIT CARD 23303B Printed: Monday, September 11, 2017 12:49 PM 1 of 1 CSYSTEMS Cash Register Receipt. City of Tukwila DESCRIPTIONS I PermitTRAK ACCOUNT QUANTITY PAID $4,494.96 M16-0176 Address: 5200 SOUTHCENTER BLVD Apn: 1157200013 $4,365.17 MECHANICAL $4,157.30 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $4,124.80 TECHNOLOGY FEE $207.87 TECHNOLOGY FEE I R000.322.900.04.00 I 0.00 $207.87 PG17-0109 Address: 5200 SOUTHCENTER BLVD 230 Apn: 1157200013 $129.79 PLUMBING $129.79 PLAN CHECK FEE R000.322.103.00.00 0.00 $129.79 Date Paid: Friday, September 01, 2017 Paid By: PINCHIFF MECHANICAL Pay Method: CHECK 3987 Printed: Friday, September 01, 2017 1:59 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 //7--®/09 Project: 4 J / , �A /Typ PInspection: . ANfI Address: 5200 Sv ITIVe-AgY 7Z 6 WP Date Called: Special Instructions: 62 30 ti Date Wanted: -a,� a.ms P.M. Requester: 7254)P Phone No: _ `fzs-4gS 622 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: r> — 4 VD — Pd..v 4&$ — p( -t— Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 FAY -o Icq Project: /,,spI,'W3 Cues/ - UAbox) Type of Inspection: f �..U0,113I G- A L - Address: 5200nier/)7riR &VO Date Called: Special Instructions: ,2 Date Wanted: 6,-(90-45 p.m. Requester: 71) DD Phone No: iiz - 4'.S- 022-7 aApproved per applicable codes. Corrections required prior to approval. COMMENTS: , G' 2 / i C4 — ! r f` _ i's/ / x•/l tivnii1 ft -R.6 -7m cid- d iaiwe G CyrA mc f314 AM St Si-' DD RiK Dg- Ai a --Pt Inspector: Date: —0268 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit RGA! V 6iO`1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ��J- �\ 1A,AAS•' (,.bI i Ir to T of�I�nsspeection: ¶LI-Af ' V ] f Y MJ / to (� Address 5200 aio,c,-rRod Date Called: Special Instructions: Date Wanted: g—/3. -Zf-ZS a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMM /0 X1(2) 11 e_s Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, "fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD �y Retain a copy with permit I11'-1`91 0? INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Proje 6 I CAzig- Typ(pYspection: wo V1.1' 1 ! ®N . Date Called: Special Instructions: 5 _ talI.CP�'{, c200 so BLvd, e;,(.3 a Date Wanted: 7_11_ . � ap.mm. Requester: 46Ex Phoni o: 4/19— 79 45k7 0 Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: tt IVIA.droc Ceps of ILL j r>✓v< riP'etAW<-- NPeci-(cK )47/Ck ee" cesi 5 S71;11 Ra Inspector: 70909 Date 7 -it- 206/ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 INSPECTION RECORD Retain a copy with permit Project: - /� is plea( rverittt Tyree, of Inspection: PL, ,,,, 61 Fj 1 L Address: 5200 mcbgAceefiee BL vd Date Called: ''— Special Instructions: sty1 it_ 2 liCO �2v- SD227 Date Wanted: ed: n-�`V• G.;-:, ! pm Requester: iNoO:k ) Ceoo Phone ZC (P "ar 2105 ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: it imis5/ cs,fri (Pyn4 I�S�tr'alo��i2S 2+' cIw+e/ 2t moi+ 3, r AW._ 67� I4)4/ k * (( rwiei f1YfM er ek AcKpri REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit P6/7-0 09 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'ect: •/����� s l.. ray- %/ nkr„ T e of Ins ect/ p (ater4,• ' tr /f Ora' Address:.s�! c J 31.3id eP/I D `�"' V Special Instructions: 230 Date Wanted: 1/i 740/2?)p. : Requester: /` _ _ f Phone" —639-M33 Approved per applicable codes. DLCorrections required prior to approval. COMMENTS: i a,,,,, Li 12)C4 1 4 7yts le f_i _ l0 Ftzt,cSink ♦ /y—SA*--'©/ 0 4.Ati-- i 5 NtY /71.444, la<j)164.5 skel,C.... -- Co yr Inspector:B0 Date: %3/zD1e, REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila: WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 p6t1-oto 9 Prot:� t .1-NS.��rU5 Cregd.� tinter Tyke of Inspection: � �b f {'l�I Address: 52.00 SottiiIcer,Ate ELvd Date Cafred: J Special Instructions: e+\i't.. 42.30. Date Wanted: 3-2,1-2.0181 p.m. Requester: �AP 7 Phone No:20_ Co _ 6 39 —/G13 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: --� KA miViks /1/M T � aai s��—� �)G S GexlC6v Inspector: Date: 3'21 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Prt: ''S area 4 SA,SPirliLAddres Typ1040 eection: .Date Sys - F (je kr OtiO��-*--� Called: Special Instructions:Date Sta ;.,1._t. %��. Wanted: 3-5 ZD) p.m. Requester: Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: 7/i,Ift. A sc ' 2 1 LCVV 1 Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director February 16, 2018 Jason Whitney Pinchiff Mechanical LLC 605 S Lucile St Seattle, WA 98108 RE: Request for Extension #1 Permit Number PG17-0109 Dear Mr. Whitney, This letter is in response to your written request for an extension to Permit PG17-0109. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through September 10, 2018. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, Rachelle Riple Permit Technician File: Permit No. PG17-0109 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov Pi nchi ffa MEC HAN1CAL Design • Installation • Service Reference: Permit No. PG17-0109 To whom it may concern, Due to the phasing and size of the job associated with Permit No. PG17-0109 the schedule is going to exceed the 180 -day window the permit was initially scheduled for. Please extend the permit by another 180 days. Respectfully, Jason Whitney Project Manager Pinchiff Mechanical 206-379-2435 Jasonw@pinchiffinechanical.com Request for Extension # I ��yy Current Expiration Date:47 Extension Request: Approved for Denied (provide explanation) 0 days Signature/Initials .7$7.-- RECEIVED CITY OF TUKWILA, FEB 15 2018 PERMIT CENTER 2/1/2018 City of Tukwila Department of Community Development JASON WHITNEY 650 S LUCILE ST SEATTLE, WA 98108 RE: Permit No. PG 17-0109 INSPIRUS CREDIT UNION 5200 SOUTHCENTER BLVD Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 3/10/2018. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 3/10/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, MarRachelle Ripley Permit Technician File No: PGI7-0109 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY,. PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG17-0109 DATE: 09/01/17 PROJECT NAME: INSPIRUS CREDIT UNION SITE ADDRESS: 5200 SOUTHCENTER BLVD X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # k after Permit Issued DEPARTMENTS: A -w, q-(0-(7 Building Division N� Public Works Fire Prevention Structural Planning Division ❑ ❑ Permit Coordinator if PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/05/17 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/03/17 Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 PINCHIFF MECHANICAL LLC Home Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1. of 2 A -Z Index help My L&1 Workplace Rights Trades & Licensing PINCHIFF MECHANICAL LLC Owner or tradesperson Principals PINCHIFF, KENNETH ANDREW, PARTNER/MEMBER EQUINOX BUSNSS LAW GROUP PLLC, AGENT Doing business as PINCHIFF MECHANICAL LLC WA UBI No. 603 322 609 650 S Lucile St. SEATTLE, WA 98108 206-643-2046 KING County Business type Limited Liability Company Governing persons KENNETH PINCHIFF KENNETH PINCHIFF; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. PINCHML876PG Effective — expiration 1010712013-10/07/2017 Bond Great American Ins Co Bond account no. 2208838 Active. Meets current requirements. $6,000.00 Received by L&I Effective date 10/07/2013 11/01/2013 Expiration date Until Canceled Insurance Liberty Northwest Ins Corp $1,000,000.00 Policy no. BKS55785886 Received by L&I Effective date 08/29/2016 10/04/2013 Expiration date 10/04/2017 Savings No savings accounts during the previous 6 year period. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603322609&LIC=PINCHML876PG&SAW= 9/11/2017 PINCHIFF MECHANICAL LLC Lawsuits against the bond or savings No lawsuits against the bond or savings accoL. a during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 272,700-00 Doing business as PINCHIFF MECHANICAL Estimated workers reported Quarter 2 of Year 2017 "21 to 30 Workers" L&I account contact T3 / KENT ANDERSON (360)902-6963 - Email: ANDN235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against tis contractor. Contractors not allowed to bid No debarments have been issued against this contractor. [rkpIace safety and health No inspections during the previous 6 year period. Page 2 of 2 n Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603322609&LIC=PINCHML876PG&SAW= 9/11/2017 6 zt c 0 H N c0 E 0 U O 0 �C 3 U 5 mco 8/24/2016 1:09:09 PM ABBREVIATIONS: 0 DIAMETER, PHASE A AAV ABV AC AD ADA AFF AHJ AHU ALT ALUM AMB APD APPROX ARCH ASHRAE ATM B BDD BF BFF BHP BLDG BLW BOD BOP BOT BTU BTUH C CAP CBV CC CD CFH CFM CH CHWP CHWR CHWS AIR AUTOMATIC AIR VENT ABOVE AIR CONDITIONING UNIT AREA DRAIN, ACCESS DOOR AMERICANS WITH DISABILITIES ACT ABOVE FINISHED FLOOR AUTHORITY HAVING JURISDICTION AIR HANDLING UNIT ALTERNATE ALUMINUM AMBIENT AIR PRESSURE DROP APPROXIMATE ARCHITECT AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS, INC. ATMOSPHERE BOILER BACKDRAFT DAMPER BELOW FLOOR BELOW FINISHED FLOOR BRAKE HORSEPOWER BUILDING BELOW BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM BRITISH THERMAL UNIT BRITISH THERMAL UNIT PER HOUR CONDENSATE PIPING CAPACITY CIRCUIT BALANCING VALVE COOLING COIL CEILING DIFFUSER CUBIC FEET PER HOUR CUBIC FEET PER MINUTE CHILLER, CABINET HEATER CHILLED WATER PUMP CHILLED WATER RETURN CHILLED WATER SUPPLY CHWS/R CHILLED WATER SUPPLY AND RETURN CI CL CLG CMU CO COMB COND CONN CONT CONTR COP CP CT CU CV CW CWP CWR CWS CWS/R DB DC DDCV DEPT DEG DF DFU DH DI DIA DIAG DIFF DIM DN DX DWG DWP (E) EA EAT ECG EDH EER EF EFF EG EJ ELEC ELEV EMCS ENT EQUIP ESP ET ETC EUH EVAP EWC EWH EWT EX EXT FILE COPY Permit No. ql,MOG Plan revlavy approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fieid Copy and > dit g;t is ack t, ; s::, ed: By: _ ANL,4 Date: City of Tukwila BUILDING DIVISION RP ViSiONS No chane he made to the scope of work vvithout prior approval Of Tu;:w:Ia Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. CAST IRON CENTER LINE CEILING CONCRETE MASONRY UNIT CLEANOUT COMBUSTION, COMBINATION CONDENSATE CONNECTION CONTINUE, CONTROL CONTRACTOR COEFFICIENT OF PERFORMANCE CONDENSATE PUMP COOLING TOWER CONDENSING UNIT, CUBIC CHECK VALVE, CONSTANT VOLUME DOMESTIC COLD WATER CONDENSER WATER PUMP CONDENSER WATER RETURN CONDENSER WATER SUPPLY CONDENSER WATER SUPPLY AND RETURN DRY BULB DUCT COIL DOUBLE DETECTOR CHECK VALVE DEPARTMENT DEGREE DRINKING FOUNTAIN DRAINAGE FIXTURE UNIT DUCT HEATER DUCTILE IRON DIAMETER DIAGRAM DIFFERENTIAL DIMENSION DOWN DIRECT EXPANSION DRAWING DOMESTIC WATER PUMP EXISTING EACH, EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE ELECTRIC DUCT HEATER ENERGY EFFICIENCY RATIO EXHAUST FAN EFFICIENCY EXHAUST GRILLE EXPANSION JOINT ELECTRIC ELEVATION ENERGY MANAGEMENT CONTROL SYSTEM ENTERING EQUIPMENT EXTERNAL STATIC PRESSURE EXPANSION TANK AND SO FORTH ELECTRIC UNIT HEATER EVAPORATOR, EVAPORATIVE ELECTRIC WATER COOLER ELECTRIC WATER HEATER ENTERING WATER TEMPERATURE EXHAUST EXTERIOR, EXTERNAL 1 S:.: PARATE PERMIT f EQUIR :D FOR: i ec!1anical ' Ele; tricai ,Dumbing lei Cas Piping Ci'; j of E ukwi!a "F FC FCO FCU FD F/D FFD FLA FLR FLEX FP FPM FPS FS F/S FT FTU FTR GAL GALV GC GPD GPH GPM GR GRD GWB HC HD HOR HP HR HRU HT HTR HX HVAC HW HWC HWS HWR HZ IAQ I.E. IN INCL INT INV ISP L LAT LAV LB LBS/HR LD LF LL LRA LVG LVR LWT MAT MAV MAX MBH MCA MECH MED MERV MFR MIN MISC MOCP MS MTD MU MUA (N) NA NC NEG NO NO. NOM NTS OA OAT OBD OC OCC OSA OT OV DEGREES FAHRENHEIT FLEXIBLE CONNECTION FLOOR CLEANOUT FAN COIL UNIT FLOOR DRAIN FIRE DAMPER FUNNEL FLOOR DRAIN FULL LOAD AMPS FLOOR FLEXIBLE FIRE PROTECTION, FIRE PUMP FEET PER MINUTE FEET PER SECOND FLOOR SINK COMBINATION FIRE SMOKE DAMPER FEET FAN POWERED TERMINAL UNIT FINNED TUBE RADIATION GALLON GALVANIZED GENERAL CONTRACTOR GALLONS PER DAY GALLONS PER HOUR GALLONS PER MINUTE GRILLE GRILLES, REGISTERS, AND DIFFUSERS GYPSUM WALLBOARD HEATING COIL HEAD HORIZONTAL HEAT PUMP, HORSEPOWER HOUR HEAT RECOVERY UNIT HEIGHT HEATER HEAT EXCHANGER HEATING, VENTILATION & AIR CONDITIONING DOMESTIC HOT WATER DOMESTIC HOT WATER CIRCULATING HEATING WATER SUPPLY HEATING WATER RETURN HERTZ INDOOR AIR QUALITY INVERT ELEVATION INCH INCLUDING INTERNAL INVERT INTERNAL STATIC PRESSURE LENGTH LEAVING AIR TEMPERATURE LAVATORY POUND POUNDS PER HOUR LINEAR DIFFUSER LINEAR FEET REFRIGERANT LIQUID LINE LOCKED ROTOR AMPS LEAVING LOUVER LEAVING WATER TEMPERATURE MIXED AIR TEMPERATURE MANUAL AIR VENT MAXIMUM THOUSANDS OF BTUH MINIMUM CIRCUIT AMPACITY MECHANICAL MEDIUM MINIMUM EFFICIENCY REPORTING VALUE MANUFACTURER MINIMUM MISCELLANEOUS MAXIMUM OVERCURRENT PROTECTION MOP SINK MOUNTED MAKEUP WATER MAKE-UP AIR UNIT NEW NOT APPLICABLE NOISE CRITERIA, NORMALLY CLOSED NEGATIVE NORMALLY OPEN NUMBER NOMINAL NOT TO SCALE OUTSIDE AIR OUTSIDE AIR TEMPERATURE OPPOSED BLADE DAMPER ON CENTER OCCUPIED OUTSIDE AIR OFF TOP OUTLET VELOCITY P PD PERF PH POC PRESS PRV PSI PSIG PSIA PTRV PU PVC RA RAF RAG RCP RD REF REG REL REQD RET RF RG RH RHC RI&C RLA RM ROD RPBA RPBP RPM RTU RV SA SAD SAT SCFM SCH SCHEM S/D SF SG SL SMACNA SP SPEC SQ SRV SS ST STD STR SUCT TAB TDH TEMP TG TOD TOF TOP TP TPRV TSP TSTAT TU TYP PRESSURE, PUMP PRESSURE DROP PERFORATED PHASE POINT OF CONNECTION PRESSURE PRESSURE REDUCING VALVE POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH GAUGE POUNDS PER SQUARE INCH ABSOLUTE PRESSURE/TEMPERATURE RELIEF VALVE PUMP POLYVINYL CHLORIDE REFRIGERANT PIPING RETURN AIR RETURN/RELIEF AIR FAN RETURN AIR GRILLE REFLECTED CEILING PLAN ROOF DRAIN REFERENCE, RETURN/EXHAUST FAN REGISTER RELIEF REQUIRED RETURN RETURN FAN RETURN GRILLE RELATIVE HUMIDITY, ROOF HOOD REHEAT COIL ROUGH IN AND CONNECT RATED LOAD AMPS ROOM ROOF OVERFLOW DRAIN REDUCED PRESSURE BACKFLOW ASSEMBLY REDUCED PRESSURE BACKFLOW PREVENTER REVOLUTIONS PER MINUTE ROOFTOP UNIT RELIEF VALVE SUPPLY AIR SUPPLY AIR DIFFUSER SUPPLY AIR TEMPERATURE STANDARD CUBIC FEET PER MINUTE SCHEDULE SCHEMATIC SMOKE DAMPER SUPPLY FAN, SQUARE FOOT SUPPLY GRILLE REFRIGERANT SUCTION LINE, SOUND LINING SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, INC. STATIC PRESSURE SPECIFICATION SQUARE SAFETY RELIEF VALVE STAINLESS STEEL STORAGE TANK, SOUND TRAP STANDARD STARTER, STRUCTURAL SUCTION TESTING, ADJUSTING AND BALANCING TOTAL DYNAMIC HEAD TEMPERATURE TRANSFER GRILLE TOP OF DUCT TOP OF FOOTING TOP OF PIPE TOTAL PRESSURE TEMPERATURE/PRESSURE RELIEF VALVE TOTAL STATIC PRESSURE THERMOSTAT TERMINAL UNIT TYPICAL UH UNIT HEATER UNOCC UNOCCUPIED URN URINAL V VAC VAV VB VD VEL VENT VFD VTR W W/ WB WC WCO WH WM W/O WPD WSFU WT WTD VENT, VOLTS VACUUM VARIABLE AIR VOLUME UNIT VACUUM BREAKER VOLUME DAMPER VELOCITY VENTILATION, VENTILATOR VARIABLE FREQUENCY DRIVE VENT THRU ROOF WASTE, WATT, WIDTH WITH WET BULB WATER CLOSET WALL CLEANOUT WATER HEATER WATER METER WITHOUT WATER PRESSURE DROP WATER SUPPLY FIXTURE UNIT WEIGHT WATER TEMPERATURE DROP REFERENCE SYMBOLS ///////// OEM 1 MX.X AHU-XXX NEW MECHANICAL WORK EXISTING MECHANICAL WORK EXISTING MECHANICAL WORK TO BE DEMOLISHED ENLARGED PLAN BORDER MATCHLINE SECTION IDENTIFIER DETAIL OR DRAWING IDENTIFIER REVISION CLOUD INDICATES WHERE SECTION APPEARS INDICATES REVISION & NUMBER FLAG NOTE EQUIPMENT IDENTIFIER POINT OF CONNECTION NORTH ARROW MECHANICAL ACCESS J PLUMBING LINE DESIGNATION SYMBOLS 411111111111111111111111 DOMESTIC COLD WATER (POTABLE) DOMESTIC HOT WATER (POTABLE ) DOMESTIC HOT WATER CIRCULATING (POTABLE) SANITARY SEWER ABOVEGROUND SANITARY SEWER UNDERGROUND VENT PIPING PIPING ELEMENTSNALVING to FCO CO 3 OVTR VALVE CLEAN-OUT (FLOOR) CLEAN-OUT (WALL) CLEAN-OUT PIPE CONTINUES PIPE CAP PIPE RISING UP PIPE DROPPING DOWN PIPE CONNECTION PIPE CONNECTION DOWN FLOOR DRAIN FLOOR SINK VENT THRU ROOF TRENCH DRAIN 2 -PIPE REFRIGERANT PIPING FROM VRF HEAT RECOVERY BRANCH CIRCUIT CONTROLLER (BS) TO VRF FAN COIL UNIT (FCU) 3 -PIPE REFRIGERANT PIPING FROM VRF HEAT RECOVERY BRANCH CIRCUIT CONTROLLER (BS) TO SUB VRF HEAT RECOVER BRANCH CIRCUIT CONTROLLER DUCTWORK SYMBOLS BDD VA • UC NEW DUCTWORK RISE OR DROP DIRECTION OF AIR FLOW INTERNALLY LINED DUCT MANUAL VOLUME DAMPER BACKDRAFT DAMPER MOTOR OPERATED DAMPER DUCT SMOKE DETECTOR FIRE DAMPER SMOKE DAMPER COMBINATION FIRE/SMOKE DAMPER HORIZONTAL FIRE DAMPER HORIZONTAL SMOKE DAMPER HORIZONTAL COMBINATION FIRE/SMOKE DAMPER FLEXIBLE CONNECTION UNDERCUT DOOR SUPPLY AIR DUCT SECTION RETURN OR OUTSIDE AIR DUCT SECTION EXHAUST AIR DUCT SECTION RECTANGULAR DUCT UP RECTANGULAR DUCT DOWN ROUND DUCT UP ROUND DUCT DOWN FLEXIBLE DUCTWORK DIFFUSER, REGISTER, AND GRILLE SYMBOLS OXxX CFM CONTROLS 8 0 CO mak AIR DEVICE TAG SUPPLY DIFFUSER RETURN OR RELIEF GRILLE EXHAUST GRILLE SIDEWALL GRILLE (SUPPLY), LOUVER (EXHAUST OR RETURN) SIDEWALL GRILLE (RETURN OR EXHAUST), LOUVER (OUTSIDE) LINEAR GRILLE ROUND DIFFUSER ROOM THERMOSTAT ROOM SENSOR ROOM PRESSURE SENSOR ROOM HUMIDITY SENSOR ROOM CARBON MONOXIDE SENSOR ROOM CARBON DIOXIDE SENSOR OCCUPANCY SENSOR VARIABLE FREQUENCY DRIVE STARTER OR STARTER/DISCONNECT DIRECT DIGITAL CONTROL PANEL DIFFERENTIAL PRESSURE TRANSMITTER CONTROL WIRING SWITCH GENERAL NOTES: COMMISSIONING: COMMISSIONING SHALL BE PROVIDED PER C408 AND IS REQUIRED FOR ALL MECHANICAL SYSTEMS REGARDLESS OF CAPACITIES; PROVIDE FUNCTION PERFORMANCE TESTING RESULTS, COMMISSIONING PROGRESS REPORT (PRELIMINARY) AND FINAL REPORT, AND ALL PROJECT CLOSE OUT DOCUMENTATION REQUIRED PER C103.6. A COMMISSIONING COMPLIANCE CHECKLIST SHALL BE PROVIDED TO THE JURISDICTION UPON COMPLETION OF COMMISSIONING PROGRESS REPORT. PROJECT CLOSEOUT DOCUMENTATION: PROJECT CLOSE OUT DOCUMENTATION AND TRAINING OF BUILDING OPERATIONS PERSONNEL IS REQUIRED FOR ALL MECHANICAL COMPONENTS, EQUIPMENT AND SYSTEMS GOVERNED BY THIS CODE. CLOSE OUT DOCUMENTATION SHALL INCLUDE: RECORD DOCUMENTS, O&M MANUALS, APPLICABLE WSEC COMPLIANCE FORMS AND CALCULATIONS. GENERAL NOTES: GENERAL: 1. COORDINATE MECHANICAL WORK WITH ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION WHERE REQUIRED. 2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION WORK PRIOR TO INSTALLATION. DUCTWORK AND EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING FOR AVAILABLE MECHANICAL SHEET LIST M0.01 MECHANICAL LEGEND AND GENERAL NOTES M0.02 MECHANICAL SCHEDULES M0.03 MECHANICAL SCHEDULES M0.04 SPECIFICATIONS MD.01 FIRST FLOOR DEMOLITION PLAN MD.02 SECOND FLOOR DEMOLITION PLAN MD.03 ROOF DEMOLITION PLAN M2.00 GARAGE PLUMBING PLAN M2.01 FIRST FLOOR PLUMBING PLAN M2.02 SECOND FLOOR PLUMBING PLAN M3.00 GARAGE HVAC PLAN M3.01 FIRST FLOOR HVAC PLAN M3.02 SECOND FLOOR HVAC PLAN M3.03 MECHANICAL ROOF PLAN M4.01 FIRST FLOOR REFRIGERANT PIPING PLAN M4.02 SECOND FLOOR REFRIGERANT PIPING PLAN M4.03 REFRIGERANT PIPING SCHEMATIC M7.00 GARAGE FIRE SPRINKLER PLAN M7.01 FIRST FLOOR FIRE SPRINKLER PLAN M7.02 SECOND FLOOR FIRE SPRINKLER PLAN SPACE. 3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL". 4. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF DUCTS, PIPES, CONDUITS, SUSPENDED EQUIPMENT, ETC., IN MECHANICAL ROOM ACCESS SPACES. 5. COORDINATE EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND PIPING DIMENSIONS BEFORE FABRICATION. 6. PROVIDE 4" MINIMUM CONCRETE BASES (HOUSEKEEPING PADS) UNDER FLOOR MOUNTED MECHANICAL EQUIPMENT. THIS INCLUDES, BUT IS NOT LIMITED TO BOILERS, CHILLERS, FLUID COOLERS, COOLING TOWERS, PUMPS, EXPANSION TANKS, WATER HEATERS, AND STORAGE TANKS. COMPLY WITH REQUIREMENTS FOR EQUIPMENT BASES AND FOUNDATIONS SPECIFIED IN DIVISION 03. 7. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION OF MECHANICAL SYSTEMS. 8. LOCATE VALVES, WATER HAMMER ARRESTERS, CLEANOUTS, DAMPERS, CONTROLS AND SIMILAR COMPONENTS SO THAT THEY ARE ACCESSIBLE. PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS AND BELOW FLOORS. COORDINATE ACCESS DOOR LOCATIONS WITH ARCHITECT/ENGINEER. INSTALL TAG ON CEILING GRID FRAME TO INDICATE LOCATION AND TYPE OF EQUIPMENT THAT REQUIRES MAINTENANCE. PROVIDE 16 GA, STEEL, FLUSH TYPE ACCESS DOOR WITH CONCEALED HINGE AND SLOT SCREWDRIVER TYPE CAM LATCH. PROVIDE FACTORY PRIMED IN PAINTED SURFACE AREAS FOR FIELD PAINTING. PROVIDE STAINLESS STEEL FOR ALL OTHER AREAS. PROVIDE UL LISTED AND LABELED DOOR WHERE FIRE -RESISTANCE RATING IS INDICATED ON DRAWINGS. ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR, MILCOR, OR APPROVED. 9. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED. 10. MAINTAIN INDICATED FIRE AND SMOKE RATING OF WALLS, PARTITIONS, CEILINGS, AND FLOORS AT MECHANICAL PENETRATIONS. SEAL PENETRATIONS WITH FIRESTOP MATERIAL. PROVIDE MATERIAL IN ACCORDANCE WITH ASTM E 814 AND UL 1479 3M OR APPROVED. COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION 07. 11. REFER TO TYPICAL DETAILS PROVIDED IN THIS DWG SET FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE WITH DETAILS. 12. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER TRADES INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK, CUTTING, CORING, PATCHING AND PAINTING OF EXISTING WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON ARCHITECTURAL DRAWINGS. 13. PROVIDE ELASTOMERIC FOAM MATERIAL ON MECHANICAL EQUIPMENT THAT PRESENT A SAFETY HAZARD. PAINT FOAM MATERIAL WHITE. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS. 15. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS CAUSE BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT. BEFORE SUBSTANTIAL COMPLETION, CLEAN EQUIPMENT, FIXTURES, EXPOSED DUCTS, PIPING AND SIMILAR ITEMS. 16. PROVIDE EQUIPMENT THAT FITS INTO THE SPACE ALLOTTED AND ALLOWS ADEQUATE ACCEPTABLE CLEARANCE FOR INSTALLATION, REPLACEMENT, ENTRY, SERVICING AND MAINTENANCE. COORDINATE WITH OTHER TRADES TO ENSURE NO CONFLICT WITH REQUIRED CLEARANCES. 17. PROVIDE OFFSETS IN PIPING WHERE PLUMBING/PIPING WALL IS LOCATED DIRECTLY ABOVE STRUCTURE. OFFSET PIPING INTO CASEWORK OR SHAFT TIGHT TO WALL AND BACK INTO WALL ONCE BELOW STRUCTURE. REFER TO STRUCTURAL DRAWINGS. 18. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP DRAWING SO ROUTING IS COORDINATED WITH OTHER DISCIPLINES. 19. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723. 20. MECHANICAL EQUIPMENT, PACKAGED UNITS, CONTROL PANELS, MOTOR STARTER, MOTOR CONTROLLERS, VARIABLE FREQUENCY DRIVES AND SIMILAR EQUIPMENT SHALL CARRY A SHORT CIRCUIT CURRENT RATING (SCCR) EQUAL TO OR GREATER THAN AVAILABLE FAULT CURRENT DELIVERED FROM ELECTRICAL SYSTEM. INCLUDE VISIBLE FACTORY NAMEPLATE FOR SUCH EQUIPMENT INDICATING SCCR OF EQUIPMENT IN ACCORDANCE WITH UL 1995 AND UL 508A. PLUMBING: 1. DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING FIXTURES, PLUMBING FITTINGS AND ALL OTHER APPURTENANCES IN CONTACT WITH DRINKING WATER SHALL BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN SECTION 3874 OF THE SAFE WATER DRINKING ACT. LEAD-FREE SHALL MEAN (A) NOT CONTAINING MORE THAN 0.2 PERCENT LEAD WHEN USED WITH RESPECT TO SOLDER AND FLUX; AND (B) NOT MORE THAN A WEIGHTED AVERAGE OF 0.25 PERCENT LEAD WHEN USED WITH RESPECT TO WETTED SURFACES OF DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PLUMBING FITTINGS. 2. PROVIDE WATER HAMMER ARRESTORS IN DOMESTIC WATER PIPING IN ACCORDANCE WITH PDI -WH 201. 3. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH BACKFLOW PREVENTER, WATER PRESSURE REDUCING VALVE, CONTROL VALVE, SOLENOID VALVE AND PUMP. PROVIDE SHUTOFF VALVE ON EACH SIDE OF STRAINER. 4. VALVES, EXPANSION FITTINGS/LOOPS, AND PIPING SPECIALTIES SHALL BE FULL SIZE OF PIPE UNLESS NOTED OTHERWISE. PIPING: 1. PROVIDE AN AUTOMATIC AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED WATER, AND OTHER CLOSED WATER PIPING SYSTEMS. PIPE VENT TO NEAREST DRAIN. PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE BOTTO ERS AND LOW POINTS. 2. VALVES SHALL BE INSTALLED SO THAT VALVE REM SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPME VALVE IS REMOVED. 3. VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS. 4. PROVIDE UNIONS AND/OR FLANGES AT EACH PIECE OF EQUIPMENT, AT EACH CONTROL VALVE, IN BYPASSES, AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS. 5. PROVIDE FLEXIBLE CONNECTORS IN PIPING SYSTEMS CONNECTED TO AIR HANDLING EQUIPMENT, PUMPS, CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. 6. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH BACKFLOW PREVENTER, WATER PRESSURE REDUCING VALVE, AUTOMATIC FLOW CONTROL VALVE, CONTROL VALVE, SOLENOID VALVE, GAS PRESSURE REGULATOR, AND PUMP. PROVIDE SHUTOFF VALVE ON EACH SIDE OF STRAINER. 7. VALVES, EXPANSION FITTINGS/LOOPS, AND PIPING SPECIALTIES SHALL BE FULL SIZE OF PIPE UNLESS NOTED OTHERWISE. HVAC/SHEET METAL: 1. DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS. 2. PROVIDE TEMPORARY COVERS OVER OPEN ENDS OF EQUIPMENT AND DUCTWORK DURING CONSTRUCTION. 3. PROVIDE MANUAL VOLUME DAMPER FOR EACH DIFFUSER, REGISTER, AND GRILLE. 4. PROVIDE DUCT ACCESS DOORS AT DUCT SMOKE DETECTORS, BACKDRAFT DAMPERS, MOTORIZED CONTROL DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS, DUCT MOUNTED COILS, DUCT AIRFLOW STATIONS AND LOUVER PLENUMS. 5. PROVIDE THE FOLLOWING MINIMUM BRANCH DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES, UNLESS NOTED TO USE LARGER SIZE ON DRAWINGS: 5.1.. 6"0: 100 CFM 5.2. 8"0": 200 CFM 5.3. 10"0: 300 CFM 5.4. 12"0: 450 CFM 5.5. 14"0: 600 CFM 5.6. 16"0: 750 CFM ENERGY CODE: (WASHINGTON STATE ENERGY CODE) 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD EFFICIENCIES LISTED IN THE WASHINGTON STATE ENERGY CODE. 2. PIPING AND DUCT INSULATION: COMPLY WITH THICKNESS AND TYPES LISTED IN THE WASHINGTON STATE ENERGY CODE. 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND LONGITUDINAL SEAMS PER THE WASHINGTON STATE ENERGY CODE. 4. RECORD DRAWINGS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 5. OPERATION AND MAINTENANCE MANUALS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 6. SYSTEM BALANCING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 7. MECHANICAL SYSTEMS COMMISSIONING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED TO COMPLY WITH THE WASHINGTON STATE ENERGY CODE. CONTRACTOR IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. 9. BUILDING PRESSURE TESTING: COORDINATE PHASING OF BUILDING ENVELOPE LEAKAGE TESTING WITH MECHANICAL SYSTEM SCOPES OF WORK. TEMPORARILY CAP SYSTEMS AS REQUIRED TO FACILITATE LEAKAGE TESTING SCOPE OF WORK. NON-STRUCTURAL MECHANICAL COMPONENTS: 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2012 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. 2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING CHAPTER 14 AND APPENDIX 1IA. 3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS. 4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE IMPACTED. EXISTING MECHANICAL: 1. WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE CONSTRU AREA. 2. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT B REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED BEING RELOCATED. 3. WHERE INDICATED, DUCTWORK AND PIPING OR PORTIO DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 4. PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANI SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERA, OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL REC NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER CITY OF OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. SEP DEMOLITION: 1. TAKE CAUTION IN DEMOLITION OF MECHANICAL EQUIPMENT. JACKSON f MAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 W W W.JACKSONMAIN.COM ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 EVIEWED CODE COMPL APPROV D d tc m c0 cr W a, O`° _ Q Z W: VU _ OY �I- 0 LO z O z z a0 W .r.� 0 0 vJ W Ua. u__ z m Et co w co Z co W O) U< 1- <- 0C/) O t.() I - SOF SEP 0 7 2 City of Tu WILDING DI L DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET BID SET %IC ill ~Q 0 1 10/24/2016(71 ti N 0 M 11 2. CONTRACTOR SHALL REMOVE ALL PIPING, DUCTWORK, AND EQUIPMENT INDICATED ON DRAWINGS INCLUDING ALL ASSOCIATED INSULATION, HANGERS, VALVES, PLENUM WALLS, DAMPERS, WIREMOLD, WIRING, CONTROLS, AND APPURTENANCES ASSOCIATED WITH EACH PIECE OF EQUIPMENT. 3. EXISTING CONTROL PATHWAYS MAY BE RE -USED. COORDINATE CONTROLS DEMO WORK PRIOR TO DEMOLITION. REMOVE ALL EXISTING THERMOSTATS SHOWN ON THE DRAWINGS ALONG WITH ASSOCIATED WIRING AND RACEWAYS. 4. WHERE EXISTING ITEMS PENETRATE A WALL OR ROOF, CONTRACTOR SHALL PROVIDE INFILL AT (E) PENETRATIONS THROUGH WALL/ROOF WITH LIKE MATERIALS. PATCH & REPAIR TO MATCH SURROUNDING SURFACES INCLUDING PAINT. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT OF EXISTIN ICAL EQUIP r T DE LIT + • ' TERAT1O DU G CONS ! N. C S IN RITY, - AND P ME ANICAL YSTEMS. IDE PERM! la ISION IVED UKWILA 1 2017 CENTER PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM LEGEND AND NOTES - MECHANICAL M 0.0 1 { JACKSON 1 MAIN ARCHITECTURE P.S. ® 2016 0 cfl C:\Users\nick.watkins\Documents\ 8/24/2016 1:09:09 PM SUMP PUMP SCHEDULE TAG SYSTEM SERVED LOCATION MANUFACTURER / MODEL TOTAL FLOW (GPM) # PUMPS (#) PUMP FLOW (GPM) HEAD (FT) DISCHARGE SIZE (IN) MOTOR BASIN NOTES HP (HP) SPEED (RPM) VOLTAGE/PHASE V/0 TYPE DIMENSIONS (DIA INxIN) SP -1 SANITARY GARAGE WEIL / 2526-2" 110 2 30 17 2 3/4 1750 208 / 3 FIBERGLASS 36x84 1 2" 2" 1/2" 1/2" 1,2 P-4 SHOWER KOHLER K-TS395-4S - 2" 2" 1/2" 1/2" - P-5 NOTES: 1) PROVIDE WITH NEMA 4 CONTROL PANEL, MAGNETIC CONTACTORS, MAIN DISCONNECT, OVERLOAD PROTECTION, TOA SWITCHES, TRANSFORMER, PILOT LIGHTS, HWA BELL AND HWA DOME LIGHT. PLUMBING FIXTURE SCHEDULE TAG FIXTURE MAKE/MODEL FAUCET RECOVERY AT 60°F (GPH) NOTES W V CW HW P-1 WATER CLOSET KOHLER K-3493 - 4" 2" 1-1/2" - 3 P-2 DRINKING FOUNTAIN ELKAY EDFPB114C - 2" 2" 1/2" - - P-3 LAVATORY KOHLER K-2209 SLOAN / EBF 85 2" 2" 1/2" 1/2" 1,2 P-4 SHOWER KOHLER K-TS395-4S - 2" 2" 1/2" 1/2" - P-5 KITCHEN SINK JUST / SL -ADA -2122 -A -GR AMERICAN STANDARD / 4101.350 2" 2" 1/2" 1/2" 2 TP TRAP PRIMER PPP INC / P-2 - - - 1/2" - - FD FLOOR DRAIN JAY R. SMITH / 2010 - 2" 2" - - - FS FLOOR SINK JAY R SMITH / 3100 - 4" 2" - - - NOTES: 1) NOTES: 1) PROVIDE WITH INDIVIDUAL FIXTURE WATER TEMPERING VALVES. 2) PROVIDE WITH LEAD FREE QUARTER TURN STOPS, FLEXIBLE SUPPLY RISERS AND P -TRAP. 3) PROVIDE TRIP LEVER ON WIDE SIDE OF WALL. ELECTRIC WATER HEATER SCHEDULE TAG LOCATION MANUFACTURER / MODEL CAPACITY (GAL) RECOVERY AT 60°F (GPH) TEMP SETTING (F) CAPACITY (KW) ! CW INLET (IN) HW OUTLET (IN) ELECTRICAL DIMENSIONS (DIAxHT) (INxIN) OPERATING WEIGHT (LBS) NOTES FLA (AMPS) VOLTAGE/PHASE (V/0) EWH-1 KITCHEN BRADFORD WHITE / E32 -50S-3 50 42 120 6 1-1/4" 1-1/4" 50 208/3 22x47 650 1,2 ST NOTE 5 - NOTE 1 NOTE 3 NOTE 4 ADJ NONE - - S TITUS 300RS SUPPLY GRILLE ST NOTES: 1) PROVIDE WITH HEAT TRAPS ON SUPPLY AND DISCHARGE LINES. PUMP SCHEDULE TAG SYSTEM SERVED LOCATION MANUFACTURER / MODEL ELECTRICAL NOTES HP (HP) RPM (RPM) FLA (AMPS) VOLTAGE/PHASE V/0 CP -1 DOMESTIC HOT WATER KITCHEN BELL & GOSSETT / SERIES 100 1/12 1725 1.75 120/1 1 NOTE 1 NOTE 3 NOTE 4 ADJ NONE NOTES: 1) PROVIDE WITH 18" RISER TO ACCOMMODATE INVERT ELEVATION OF GARAGE DRAIN INLET (36" BFF). - E TITUS 50F NOTES: 1) PROVIDE WITH PROGRAMMABLE TIMER CONTROLS FOR PROGRAMMED SHUTDOWN. OIL WATER SEPARATOR SCHEDULE TAG AREA SERVED LOCATION MANUFACTURER / MODEL CAPACITY (GALLONS) DIMENSIONS (LxWxH) WEIGHT (LB) NOTES OWS-1 GARAGE GARAGE OLDCASTLE / 660 -SA 450 6'-0" x 4'-0" x 6'-0" 11,000 1 ST NOTE 5 - NOTE 1 NOTE 3 NOTE 4 ADJ NONE NOTES: 1) PROVIDE WITH 18" RISER TO ACCOMMODATE INVERT ELEVATION OF GARAGE DRAIN INLET (36" BFF). EXPANSION TANK SCHEDULE TAG SYSTEM SERVED LOCATION MANUFACTURER / MODEL VOLUME (GAL) SYSTEM CONN (IN) NOTES ET -1 DOMESTIC HOT WATER KITCHEN AMTROL / THERM-X-TROL ST -25V 10.3 3/4 A TITUS MCD MODULAR CORE SUPPLY DIFFUSER ST NOTE 5 - NOTE 1 NOTE 3 NOTE 4 DIFFUSER, REGISTER, AND GRILLE SCHEDULE TAG MANUFACTURER / MODEL TYPE MATERIAL FINISH FACE STYLE FACE SIZE DUCT INLET MOUNTING PATTERN DAMPERS ACCESSORIES NOTES A TITUS MCD MODULAR CORE SUPPLY DIFFUSER ST NOTE 5 - NOTE 1 NOTE 3 NOTE 4 ADJ NONE - - E TITUS 50F EGGCRATE GRILLE ST NOTE 5 - NOTE 1 NOTE 3 NOTE 4 ADJ NONE - - S TITUS 300RS SUPPLY GRILLE ST NOTE 7 - NOTE 2 NOTE 3 NOTE 4 FA NOTE 8 - - R TITUS 350RL RETURN GRILLE ST NOTE 5 - NOTE 2 NOTE 3 NOTE 4 - NONE - - 24x24x18 115 1 GF -4 GARAGE GARAGE GREENHECK / SEI -18-436-83 2600 0.25 1/3 120/1 24x24x18 115 NOTES: 1) SEE DRAWINGS FOR FACE SIZE (24x24 OR 12x12). PROVIDE 24x24 FOR LAY IN CEILINGS. 2) FACE SIZE DETERMINED FROM DUCT INLET SIZE. 3) SEE AIR DEVICE TAG FOR DUCT INLET SIZE. 4) COORDINATE BORDER TYPE (SURFACE MOUNT, SNAP IN, LAY -IN, SPLINE, DROPPED FACE, AND BEVELED DROP FACE) WITH ARCHITECTURAL CEILING PLANS. 5) PROVIDE COLOR PER ARCHITECT. 6) SLOTTED DIFFUSER SHALL BE 5' LONG x 2 SLOTS. 7) WHEN INSTALLED WITH DUCTWORK PAINT GRILLE GRAY TO MATCH DUCTWORK. 8) PROVIDE WITH OPPOSED BLADE DAMPERS. ABBREVIATIONS: ST = STEEL, AL = ALUMINUM, BE = BAKED ENAMEL, M = ANODIZED ALUMINUM, FA = FULLY ADJUSTABLE, TP = TWO POSITION, OPD = OPPOSED BLADE DAMPERS, ADJ = ADJUSTABLE, BA=BAKED ACRYLIC, BO = BLANK OFF, DB = DIRECTIONAL BLADES, AND P = PLENUM. EXHAUST FAN SCHEDULE TAG AREA SERVED LOCATION MANUFACTURER / MODEL FAN MOTOR DIMENSIONS (DIAxHT) (INxIN) WEIGHT (LBS) NOTES FLOW (CFM) ESP (IN WC) POWER (HP) VOLTAGE/PHASE (V/0) EF -2 LOCKER ROOMS / GYM ROOF GREENHECK / G-065-VG/6/A 210 0.225 1/6 120/1 19x13 15 - ti 0 N 0 e- ci GF -1 GARAGE GARAGE GREENHECK / SBE -2L36-10 13875 0.125 1 120/1 44x44x21 115 - GF -2 GARAGE GARAGE GREENHECK / SEI -12-426 925 0.125 1/10 120/1 18x18x11 20 - GF -3 GARAGE GARAGE GREENHECK / SEI -18-436-B3 2600 0.25 1/3 120/1 24x24x18 115 1 GF -4 GARAGE GARAGE GREENHECK / SEI -18-436-83 2600 0.25 1/3 120/1 24x24x18 115 1 NOTES: 1) CONTROLLED BY CO2 SENSORS. E RD/CODE B JACKSON IMAIN ARCHITETURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 W W W.JACKSONMAIN.COM ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 d co C13 co 017) < W� c 0 O� CO 0 O I— O N L() z O z J ca 0 0 tL co W 1— F- 0 co 0 w toQ =`� �W Q C3 O tit- Lu)L O � �u_N� z O Ln DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET BID SET I S I DATE 10/24/2016 11/16/2016 ti 0 N 0 e- ci IEWED FC R COMPLIANCE 'PROVED SEP 0 7 2017 City Of Tukwil BUILDING D!VI: ON RECEIVED CITY OF TUKWILA SEP 012017. PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM MECHANICAL SCHEDULES PERMIT CENTER _srs d.°A 14°. 0(0 1 MO.03 JACKSON I MAIN ARCHITECTURE P.S. 0 2016 C:\Users\nick.watkins\Documents\16040 Inspirus Credit Union Addition_Nick.Watkins.rvt 8/24/2016 1:09:09 PM HVAC SPECIFICATION 23 05 01.00 — Common Requirements for HVAC General General Provisions of the Contract including General and Supplementary Conditions and General Requirements apply to work of this section. Scope The base bid includes furnishing alt materials, Iabor, tools, s, and equipment and the performance of all work required to install a complete heating and air conditioning system as outlined herein. Guarantee The contractor shall provide a guarantee in written form stating that all work under this section shall be free of defective work, materials, or parts for a period of one year from the date of owner's final acceptance and shall repair, revise or replace at no cost to the owner any such defects occurring within the guarantee period. Contractor shall also state in written form that any items or occurrences arising during the guarantee period will be attended to in a timely manner and wilt in no case exceed four (4) working days from date of notification by owner. Quality Assurance Provide a complete installation in conformance with the following standards. ASHRAE: American Society of Heating, Refrigerating and Air Conditioning Engineers NFPA: National Fire Protection Association SMACNA: Sheet Metal and Air Conditioning Contractors National Association. Statewide Building Code IMC: International Mechanical Code Permits, Fees, Inspections, Laws and Regulations Permits and fees of every nature required in connection with this work shall be obtained and paid for by this contractor who shall also pay for all the installation fees and similar charges. Laws and regulations, which bear upon or affect the various branches of this work shall be complied with by this contractor and are hereby made a part of this contract. All work, which such laws require to be inspected, shall be submitted to the proper public official for inspection and a certificate of final approval must be furnished. Work in Existing Spaces General: Care shall be taken when working in existing spaces so as not to damage existing walls and ceilings where work is being performed. Ceilings: Where work is being performed above ceilings, and the architectural drawings do not indicate ceiling modifications by the general contractor, it shall be the responsibility of this contractor to remove and replace existing ceilings where work is being performed. In those instances, all repair and installation of new grid, ceiling panels, etc shall be the responsibility of this contractor. Match existing finishes. Walls & Floors: It shall be the responsibility of this contractor to patch existing walls and floors and match existing finishes where work is being removed or installed and patching is being performed, unless noted otherwise on the architectural drawings. Tests and Adjustments No ducts, piping, fixtures or equipment shall be concealed or covered until they have been inspected and approved by the Architect and the inspector who shall be notified by the contractor when the work is ready for inspection. Work shall be completely installed, tested and leak tight before inspection is required. All tests shall be repeated to the satisfaction of those making the inspection. 23 05 03.00 — submittals for HVAC General Where submittals are required by the Contract Documents, they shall be prepared and supplied in accordance with the Contract Documents. In addition to Division 01, the Contractor is advised to review and comply with the requirements articulated within each Division and within each section of that Division. Some Divisions may include a division—specific "Submittal Requirements for ...."section. Where this section exists, it articulates additional requirements for submittals that apply to the work of that Division. The following requirements help to identify, track and keep the project organized for all parties involved. They are necessary to ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the administrative requirements are rejected and returned, without technical review. Requirements Supply submittals for each section: Submittals shall be supplied on a section—by—section and type—by—type basis. For example, independent product data submittals shall be furnished for each section that requires product data submittals. Independent shop drawing submittals shall be furnished for each section that requires shop drawings. Refer to the specifications for identification of which submittals are required for the project. Separate PDF file packages shall be supplied for each section, for each submittal type, where electronic submittals are required. Each PDF shall represent a single standalone submittal. Separately bound and identified submittals shall be provided where hardcopies are required. Include a transmittal: Transmittals shall enumerate each submittal for each section of each type and iteration. Include cover sheet / title page: The cover sheet shall include the information identified in the contract documents. It shall be included as the first page of each electronic and/or hardcopy document—based submittal. An editable and printable PDF form created with editable fields and specification compliant appearance is available from KLH upon request. It is also downloadable from the KLH website at www.klhengrs.com. Include an index: The index shall enumerate the contents of the submittal. Include checklists: Where checklists are included with the specifications, complete and include them within the appropriate submittal. Supply complete submittals: Complete submittals of each type are required. Partial submittals will be rejected.Where a section requires a product data submittal, all product data for that section shall be supplied together, at one time, as one complete submittal. Do not send half the product data as one submittal and the other half as a separate one. When resubmittal is required (e.g. Revise and Resubmit) the revised submittal shall be more complete, more accurate and more contract—compliant than its rejected predecessor. The submittal number (for each section and type) shall increment for each subsequent submittal (00 — Original submission, 01 — First Resubmission, 02 — Second Resubmission, etc...). Resubmittals shall include a copy of the reviewers comments supplied with the prior submittal rejection and shall be amended with a description of the specific action taken to comply with the reviewer's comments. The absence of this on resubmittal is cause for rejection. Name electronic files to match the -submittal ID and cover sheet: The electronic file name of submittals shall match the submittal ID included on the submittals cover page. For example: The original/first product data submittal for Section 234116 would be labeled as "234116.00—PD-00"; the first resubmittal of same shall be labeled "234116.00—PD-01". The original/first shop drawings submittal file for the same section would be labeled '234116.00—SD-00"; the first resubmittal of same shall be labeled '234116.00—SD-01". Use of Electronic Drawings from the Owner's Design Team Plan drawings for the Project were created with AutoCAD. If expressly permitted by the Owner and the terms of the Contract, editable electronic versions of standard—scale, AutoCAD—based plan drawings may be made available for the creation of shop and as—built drawings. Due to the proprietary nature of internal design systems, editable native—software versions of some drawings, including but not limited to system diagrams and details will not be made available in an editable form. In these cases, electronic versions of the drawings may be made available only in PDF, JPG or similar non—editable electronic form, at the sole discretion of the Design Professional. The Request Drawings form can be accessed, filled out and submitted at the following Internet address (scroll down to bottom of home page): http: //www.klhengrs.com. 23 05 29.00 — Hangers and Supports for HVAC Piping and Equipment General Support all piping, ductwork and equipment by hangers or brackets. Furnish structural steel members where required to support piping and equipment. No portion of piping or valves shall be supported by equipment. Ductwork — Support by means of hangers as follows: Duct Width Hanger Size and Type Max. Spacing 30 or less (#16 gage) 8 A pair of hangers shall be located at every transverse joint and elsewhere according to the table. 23 05 93.00 — Testing, Adjusting and Balancing for HVAC General Test, adjust, and balance the following mechanical systems: Supply air systems Return air systems. Exhaust air systems. Verify temperature control system operation. Test systems for proper sound and vibration levels. Quality Assurance Codes and Standards: AABC: "National Standards for Total System Balance". ASHRAE: ASHRAE Handbook, 2011 Applications, Chapter 38, Testing, Adjusting, and Balancing. Submittals Certified Reports: Submit testing, adjusting, and balancing reports bearing the seal and signature of the Test and Balance Engineer. The reports shall be certified proof that the systems have been tested, adjusted, and balanced in accordance with the referenced standards; are an accurate representation of how the systems have been installed; are a true representation of how the systems are operating at the completion of the testing, adjusting, and balancing procedures; and are an accurate record of all final quantities measured, to establish normal operating values of the systems. Follow the procedures and format specified below: Final Report: Upon verification and approval prepare final reports, type written, and organized and formatted as specified below. Submit 2 complete sets of final report to the owner. Report Format: Report forms shall be those standard forms prepared by the referenced standard for each respective item and system to be tested, adjusted, and balanced. Qualifications The contractor shall procure the services of an independent Balance and Testing Agency, approved by the Engineer, and a member of Associated Air Balance Council (AABC) or NEBB, which specializes in the balancing and testing of heating, ventilating and air conditioning systems, to balance, adjust and test all air and water systems and equipment as herein specified. All work by this agency shall be done under direct supervision of a qualified heating and ventilating Engineer employed by this agency. All instruments used by this agency shall be accurately calibrated and maintained in good working order. Sequencing and Scheduling Test, adjust, and balance the air systems before hydropic, steam, and refrigerant systems. Test, adjust and balance air conditioning systems during summer season and heating systems during winter season, including at least a period of operation at outside conditions within 5 deg F wet bulb temperature of maximum summer design condition, and within 10 deg F dry bulb temperature of minimum winter design condition. Take final temperature readings during seasonal operation. Check alt filters for cleanliness, provide new as required. Check dampers (volume and fire) for correct and locked position, and temperature control for completeness of installation before starting fans. Place outlet dampers in full open position. Lubricate alt motors and bearings. Check fan belt tension. Check fan rotation. Air balance and testing shall not begin until the system has been completed and is in full working order. The Contractor shall put all heating, ventilating and air conditioning systems and equipment into full operation and shall continue the operation of same during each working day of testing and balancing. The contractor shall submit within 30 days after receipt of contract, 8 copies of submittal data for the testing and balancing of the air conditioning, heating, and ventilating systems. The Air Balance and Testing Agency shall provide proof of having successfully completed at least five projects of similar size and scope. The air balancing contractor shall include the additional cost to change every fan factory installed sheave, pulley and/or belt of in order to obtain the design air flows. Performing Testing, Adjusting and Balancing Perform testing and balancing procedures on each system identified, in accordance with the detailed procedures outlined in the referenced standards. Cut insulation, ductwork, and piping for installation of test probes to the minimum extent necessary to allow adequate performance of procedures. Patch insulation, ductwork, and housings, using materials identical to those removed. Seal ducts and piping, and test for and repair leaks. Seal insulation to re—establish integrity of the vapor barrier. Mark equipment settings, including damper control positions; valve indicators, fan speed control levers, and similar controls and devices, to show finat settings. Mark with paint or other suitable, permanent identification materials. Retest, adjust, and balance systems subsequent to significant system modifications, and resubmit test results. 23 07 13.00 — Duct Insulation Provide insulation on all concealed supply, return and outside air ductwork. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Rigid Fiberglass Ductwork Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type IB, without facing and with vapor barrier all—service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. Insulation shall have a minimum R value as required by Code. Flexible Fiberglass Ductwork Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 553, Type 11, without facing and with vapor barrier all—service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. Insulation shall have a minimum R value as required by Code. Vapor Barrier Material for Ductwork: Paper—backed aluminum—foil, except as otherwise indicated; strength and permeability rating equivalent to factory—applied vapor barriers on adjoining ductwork insulation, where available; with following additional construction characteristics: High Puncture Resistance: Low vapor transmission (for ducts in exposed areas: Mech. Rooms, etc.) Moderate Puncture Resistance: Medium vapor transmission (for ducts in concealed areas). Controls Electrical contractor will provide power wiring. HVAC contractor shall provide all the low voltage wiring of rooftop heat pumps, indoor fan coil units and and controls, thermostats and controllers. Controllers shall be by the manufacturer of the HVAC unit (heat/cool/auto/off) with night setback. General Control Wiring Requirements and Installation Methods Except where specifically indicated otherwise above, the HVAC/Temperature Control Contractor shall provide all electrical work as required for all temperature control related wiring (i.e. conduit, raceway, outlet boxes, junction boxes, wiring, etc.) in accordance with Electrical Specifications requirements. All conduit shall be 3/4"minimum. Coordinate all thermostat/sensor locations in field (case by case) with Architect, Owner and Electrical Contractor to ensure that they are placed in locations that will not interfere with fumiture, equipment, artwork, wall—hung specialties, room finishes, etc. All thermostat/sensor wall locations indicated on HVAC drawings are schematic only and must be verified case—by—case prior to rough—in. All electrical work as described in this specification shall be per the latest edition of the National Electrical Code (NEC) and per applicable state and local codes. Where "free—air" installation methods (either exposed above the ceilings, in bridle rings or in cable trays) are permitted under Electrical Specifications above ceilings, provide plenum—rated cables wherever plenum ceilings (if any) exist and install as defined under Electrical Specifications. Install low voltage circuits, located in concrete slabs and masonry walls, in inaccessible locations, or exposed in occupied areas, in electrical conduit regardless of what wiring methods are permitted under Electrical Specifications. Where cable trays or bridle rings are provided by the electrical contractor for low voltage cables, these raceways may be utilized for control wiring by this contractor (provide special color coded jackets, label cable jackets per Electrical Specifications and group control wiring cables together). Provide conduit drops from cable tray/bridle ring paths to wall outlet boxes and equipment unless directed otherwise under Electrical Specifications. Regardless of permitted methods in Electrical Specifications, all cables/wiring installed concealed by gypsum board, masonry or other inaccessible materials in walls or above ceilings shall be installed in conduit, 3/4"minimum. All conduit, bridle rings, raceway, outlet boxes, etc. necessary for complete operational installation of control wiring shall be provided (furnished and installed) by the temperature control contractor in strict compliance with Electrical Specifications documents. Coordinate all work with all other applicable trades including the electrical contractor. Provide all required conduit work to and between equipment in a manner compliant with that described above (i.e. between VAV boxes, to boilers, starters, condensing units, etc. as applicable). Install control wiring without splices between terminal points, color—coded. Install in neat workmanlike manner, securely fastened. Install in accordance with National Electrical Code and per Electrical Specifications. Install circuits over 25 volt with color—coded No. 12 wire in electrical metallic tubing, per Electrical Specifications. Install circuits under 25 volt with color—coded No. 18 wire with 0.031" high temperature (105 degs. F [41 degs C]) plastic insulation on each conductor and plastic sheath over all. Install electronic circuits with color—coded No. 22 wire with 0.023" polyethylene insulation on each conductor with plastic—jacketed copper shield over all. 23 31 13.00 — Metal Ducts Ductwork Materials Exposed Ductwork Materials: Where ductwork is indicated to be exposed to view in occupied spaces, provide materials which are free from visual imperfections including pitting, seam marks, roller marks, stains and discolorations, and other imperfections, including those which would impair painting. Exposed ductwork which is to be painted shall have paint grip applied. Sheet Metal: Except as otherwise indicated, fabricate ductwork from galvanized sheet steel, lock forming quality; with G 90 zinc coating and mill phosphatized for exposed locations. Minimum gauge shall be 24. Miscellaneous Ductwork Materials Volume Dampers: Provide volume dampers in all branch ducts or as required for balancing to required air flows. Fittings: Provide radius type fittings fabricated of multiple sections with maximum 15 deg. change of direction per section. Unless specifically detailed otherwise, use 45 deg. laterals and 45 deg. elbows for branch takeoff connections. Where 90 deg. branches are indicated, provide conical type tees. Duct Sealant: Non—hardening, non—migrating mastic or liquid elastic sealant, type applicable for fabrication/installation detail, as compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork. Duct Cement: Non—hardening migrating mastic or liquid neoprene based cement, type applicable for fabrication/installation detail, as compounded and recommended by manufacturer specifically for cementing fitting components, or longitudinal seams in ductwork. Ductwork Support Materials: Except as otherwise indicated, provide hot—dipped galvanized steel fasteners, anchors, rods, straps, trim and angles for support of ductwork. Flexible Ducts Either spiral—wound spring steel with flameproof vinyl sheathing, or corrugated aluminum. Unless specifically mentioned, the maximum length of flex duct on the supply equals 5 feet. Flex is not allowed for return, relief or exhaust applications. The flexible ducts indicated for use in the H.V.A.C. system shall conform to the requirements of UL 181 for Class 0 or Class 1 flexible air ducts and shall be so identified. Where installed in unconditioned spaces other than return air plenums, provide 1" thick 1-1/2 Ib. continuous flexible fiberglass sheath with vinyl vapor barrier jacket. Installation is not permitted above drywall ceilings and inaccessible ceilings. Fabrication Shop fabricate ductwork in 4, 8, 10 or 12—ft lengths, unless otherwise indicated or required to complete runs. All ductwork shall be Pittsburgh Construction with a minimum of thickness of 24 gauge. in addition, ductwork used in systems over 3" W.G. shall have cold sealant applied. Shop fabricate ductwork of gauges and reinforcement complying with SMACNA "HVAC Duct Construction Standards". Lined Duct Fabricate ductwork with duct liner in each section of duct where indicated. Laminate liner to internal surfaces of duct in accordance with instructions by manufacturers of lining and adhesive, and fasten with mechanical fasteners. Duct liner to be 3—Ib density for acoustic requirements 1" thick or as noted. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Duct Liner: Fibrous glass of thickness indicated. 3—Ib density. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Duct Liner Adhesive Duct Liner Fasteners: Comply with SMACNA HVAC Duct Construction Standards. Installation of Metal Ductwork General: Assemble and install ductwork in accordance with recognized industry practices which will achieve air—tight (5% leakage for systems rated 3" and under; 1% for systems rated over 3") and noiseless (no objectionable noise) systems, capable of performing each indicated service. Install each run with minimum number of joints. Align ductwork accurately at connections, within 1/8" misalignment tolerance and with internal surfaces smooth. Support ducts rigidly with suitable ties, braces, hangers and anchors of type which will hold ducts true—to—shape and to prevent buckling. Support vertical ducts at every floor. Sealing: Seal all longitudinal seams, S's and drives and all joints with mastic or cement. Install according to SMACNA standards. Balancing Dampers: The sheet metal contractor shall be fully responsible for installing balancing dampers in the ductwork, (whether shown on the drawing or not) in order to arrive at the intended air flow. The balancing sub—contractor shall provide direction and assistance in determining locations where dampers are required. Additional dampers, if required shall be installed at no additional cost to the owner. Wall Penetrations: Seal and pack around all ducts and piping sleeves which pass through walls that extend to bottom side of structure and rated walls. Field Fabrication: Complete fabrication of work at project as necessary to match shop—fabricated work and accommodate installation requirements. Routing: Locate ductwork runs, except as otherwise indicated, vertically and horizontally and avoid diagonal runs wherever possible. Run ductwork in shortest route which does not obstruct useable space or block access for servicing building and its equipment. Hold ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building. Limit clearance to 1/2" where furring is shown for enclosure or concealment of ducts, but allow for insulation thickness, if any. Where possible, locate insulated ductwork for 1" clearance outside of insulation. Wherever possible in finished and occupied spaces, conceal ductwork from view, by locating in mechanical shafts, hollow wall construction or above suspended ceilings. Do not encase horizontal runs in solid partitions, except as specifically shown. Coordinate layout with suspended ceiling and lighting layouts and similar finished work. Electrical Equipment Spaces: Do not route ductwork through transformer vaults and their electrical equipment spaces and enclosures. Penetrations: Where ducts pass through interior partitions and exterior walls, and are exposed to view, conceal space between construction opening and duct or duct insulation with sheet metal flanges of same gage as duct. Overlap opening on 4 sides by at least 1-1/2". Fasten to duct and substrate. Where ducts pass through fire—rated floors, walls, or partitions, provide fire dampers and firestopping between duct and substrate, in accordance with requirements of Division -7 Section "Firestopping". Coordination: Coordinate duct installations with installation of accessories, dampers, coil frames, equipment, controls and other associated work of ductwork system. Installation of Duct Liner General: Install duct liner in accordance with SMACNA HVAC Duct Construction Standards. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Store internally lined ductwork up off of the floor. Protect internally lined ductwork from water and dust. "Butter the leading edge of all internal duct lining with the manufacturer's recommended adhesive. Inspect and repair all damaged lining prior to installation of ductwork. Installation of Flexible Ducts MaximumLength: For any duct run using flexible ductwork, do not exceed 5' — 0" extended length. Installation shall hove smooth full radius turns down to diffuser. Installation not permitted above inaccessible ceilings. Roof Curbs: Furnish roof curbs to roofing Installer for installation. Install according to roofing manufacturer's recommendation and specifications. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be factory—mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of Division -16 sections. Ensure that rotation is in direction indicated and intended for proper performance. Do not proceed with centrifugal fan start—up until wiring installation is acceptable to fan Installer. Field Quality Control Testing: After installation of ventilators has been completed, test each ventilator to demonstrate proper operation of units at performance requirements specified. When possible, field correct malfunctioning units, then retest to demonstrate compliance. Replace units, which cannot be satisfactorily corrected. Adjusting and Cleaning Cleaning: Clean factory -finished surfaces. Repair any marred or scratched surfaces with manufacturer's touch—up paint. Spare Parts General: Furnish to Owner, with receipt, one spare set of belts for each belt drive power ventilator. 23 37 13.00 — Diffusers, Registers and Louvers Ceiling Air Diffusers Lay—In: Diffuser housing sized to fit between ceiling exposed suspension tee bars and rest on top surface of tee bar. Diffuser Dampers: Opposed Blade Dampers: Multiple opposed blade dampers connected to linkage adjustable from face of diffuser with key. Integral: Combination volume control and pattern adjustment for linear diffusers. Diffuser Acoustic Performance: NC less than or equal to 30 Diffuser Accessories: Plaster Ring: Perimeter ring designed to act as plaster stop and diffuser anchor. Titus TRM frame kit Diffuser Finishes:. White Enamel: Semi—gloss white enamel prime finish. Manufacturer: Subject to compliance with requirements, provide diffusers of one of the following: Anemostat Products Div., Dynamics Corp. of America. Metal—Aire Titus Products Div., Philips Industries, Inc. Tuttle and Bailey. Price Ceiling and Wall Registers & Grilles Steel Construction: Manufacturer's standard stamped sheet steel frame and adjustable blades. Register Dampers: Opposed Blade: Adjustable opposed—blade damper assembly, key operated from face of register. Register and Grille Finishes: White Enamel: Semi—gloss white enamel prime finish. Register and Grille Acoustic Performance: NC less than or equal to 30 Manufacturer: Subject to compliance with requirements, provide diffusers of one of the following: Anemostat Products Div., Dynamics Corp. of America. Metal—Aire Titus Products Div., Philips Industries, Inc. Tuttle and Bailey. Price PLUMBING SPECIFICATIONS GENERAL THE GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND INSTRUCTIONS TO BIDDERS SHALL APPLY TO AND BE PART OF THIS SPECIFICATION. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES, RULES AND REGULATIONS. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, CERTIFICATES OF INSPECTION AND APPROVALS REQUIRED. SCOPE OF WORK WATER PiPING SYSTEMS SOiL, WASTE, AND VENT PIPING SYSTEMS PLUMBING FIXTURES PLUMBING EQUIPMENT PIPE JOINTS AND CONNECTION PLUMBING INSULATION INTERRUPTION OF SERVICES WARRANTY GENERAL STANDARDS THE APPLICABLE PROVISIONS OF THE FOLLOWING STANDARDS SHALL GOVERN: AMERICAN SOCIETY FOR TEST MATERIALS (ASTM); AMERICAN STANDARDS ASSOCIATION (ASA); UNDERWRITERS LABORATORIES (UL); NATIONAL FIRE PROTECTION ASSOCIATION (NFPA); 2015 INTERNATIONAL BUILDING CODE; 2015 UNIFORM PLUMBING CODE. THE INSTALLATION OF ALL PLUMBING WORK SHALL CONFORM TO THE APPLICABLE LOCAL PLUMBING CODES AND STATUTES. EXCAVATION AND BACKFILL DO ALL EXCAVATION AND BACKFILLING. LAY SEWER AND UNDERGROUND PIPING LINES ON 6" COMPACTED SAND. BACKFILL UNDER BUILDING AND ALL DRIVES, ROADS AND WALKS WITH BANK -RUN GRAVEL. WATER PIPING SYSTEMS INTERIOR BACKFLOW PREVENTERS WITH FUNNELS AND DRAINS DOMESTIC COLD -WATER PIPING DOMESTIC HOT-WATER PIPING TRAP PRIMERS FOR FLOOR DRAINS (PROVIDE SHUT-OFF VALVE BEFORE EACH TRAP PRIMER) INSTALL WATER PRESSURE REGULATORS WHERE NECESSARY TO LIMIT THE INCOMING WATER PRESSURE TO 80 PSI INSIDE THE BUILDING. INTERIOR WATER PIPING: TUBE SIZE 2" AND SMALLER: COPPER TUBE. WALL THICKNESS: TYPE L, HARD -DRAWN TEMPER. FITTINGS: WROUGHT -COPPER, SOLDER -JOINTS. TUBE SIZE 2-1/2" AND LARGER: COPPER TUBE. WALL THICKNESS: TYPE L, HARD -DRAWN TEMPER. FITTINGS: WROUGHT -COPPER, SOLDER -JOINTS. SOIL, WASTE AND VENT PIPING SYSTEM FURNISH AND INSTALL A COMPLETE SOIL, WASTE AND VENT SYSTEM IN THE BUILDING AND ON THE SITE AS INDICATED ON THE DRAWINGS AND AS SPECIFIED HEREIN. ABOVE GROUND SOIL, WASTE AND VENT PIPING WITHIN BUILDINGS INCLUDING SOIL STACKS, VENT STACKS, HORIZONTAL BRANCHES, TRAPS, AND CONNECTIONS TO FIXTURES AND DRAINS. UNDERGROUND BUILDING DRAIN PIPING INCLUDING MAINS, BRANCHES, TRAPS, CONNECTIONS TO FIXTURES AND DRAINS, AND CONNECTIONS TO STACKS, TERMINATING AT CONNECTION TO EXISTING SANITARY SEWER. INTERIOR PIPING: CAST IRON SOIL PIPING AND FITTINGS SERVICE WEIGHT ASTM A-74 WITH ASTM C-564 GASKETED JOINTS. SCHEDULE 40 PVC PIPE AND FITTINGS SHALL BE USED UNDER SLAB. CONTRACTOR SHALL MAINTAIN INTEGRITY OF FIRE RATINGS. PIPING SHALL NOT BE RUN IN PLENUM SPACES AND CONTRACTOR SHALL PROVIDE AND INSTALL INTUMESCENT COLLARS WHEN PENETRATING A RATED WALL, FLOOR, OR OTHER ASSEMBLY. WASTE AND VENT PIPING 2-1/2" AND UNDER - TYPE "M" COPPER ASTM B88.62. SOIL, WASTE AND VENT PIPING 3" AND OVER IN SIZE AND ALL UNDERGROUND CAST IRON SOIL PIPING AND FITTINGS, ASTM A-74, SERVICE WEIGHT. NO -HUB CAST IRON PIPE AND FITTINGS MAY BE USED ABOVE FLOOR FOR SOIL, WASTE, AND VENT PIPING. PIPING ALIGNMENT SHALL BE AS INDICATED ON THE DRAWINGS USING APPROVED Y BRANCHES OR EIGHT BANDS FOR DIRECTION CHANGES AND SHALL BE SURELY SUPPORTED OR SECURED TO MAINTAIN SUCH ALIGNMENT. PITCH OF PIPING SHALL BE UNIFORM AT A MINIMUM OF 1/4" PER FOOT FOR BUILDING DRAINS AND AS INDICATED ON THE DRAWINGS FOR SEWERS. PROTECTION SHALL BE GIVEN ALL FOOTINGS, OTHER STRUCTURAL ELEMENTS DURING UNDERGROUND WORK ADJACENT TO SUCH ITEMS. REFER TO STRUCTURAL DRAWINGS. VENT ALL FIXTURES, CONNECT BRANCH VENTS TO MAIN VENT RISERS AT LEAST THREE FEET AND SiX INCHES ABOVE VENTED FIXTURES. PITCH VENT LINES BACK TO SOIL OR WASTE PIPE, FREE OF DROPS AND SAGS. CLEANOUTS SHALL BE FULL SIZE OF PIPE UP TO 4", AND 4" FOR LARGER SIZES. FOR UNDERGROUND AND CONCEALED LINES, PROVIDE CLEANOUTS IN ACCESSIBLE POSITIONS AT EACH RIGHT ANGLE TURN AND AT INTERVALS NOT TO EXCEED FIFTY FEET. iN FLOORS, INSTALL FLUSH WITH FINISH FLOOR WITH EXTENSION PIPE FROM CLEANOUT "Y". CLEANOUTS REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR PROJECT SPECIFIC CLEANOUT MANUFACTURERS AND MODELS. FLOOR DRAINS JOSAM, SMITH, WADE, ZURN, WATTS, MIFAB, SIOUX CHIEF, OR OATEY FLOOR DRAIN TO BE ZURN Z415 WITH DOUBLE DRAINAGE FLANGE, WEEP HOLES, CAULKED OUTLET, 6" NICKLE BRONZE STRAINER AND PRIMER CONNECTION. NOTE: ALL FLOOR DRAINS LOCATED IN ROOMS WHICH HAVE TiLE FLOORS SHALL HAVE SQUARE STRAINERS. THE PLUMBING CONTRACTOR SHALL PROVIDE TRAP PRIMERS FOR FLOOR DRAINS, AS INDICATED ON THE DRAWINGS (TPI). TRAP PRIMER SHALL BE EQUAL TO MIFAB MR -500 TRAP PRIMER VALVE. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR PROJECT SPECIFIC FLOOR DRAiN MANUFACTURERS AND MODELS. PLUMBING FIXTURES REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE. MANUFACTURER: SUBJECT TO COMPLIANCE WITH REQUIREMENTS PLUMBING EQUIPMENT REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE. WATER HEATER - REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE. CATHODIC PROTECTION PROVIDE DIELECTRIC INSULATION AT POINTS WHERE COPPER OR BRASS PIPE COMES IN CONTACT WITH FERROUS PIPING, REINFORCING STEEL OR OTHER DISSIMILAR METAL IN STRUCTURE. SHOCK ABSORBERS REMOVE SHOCK CONDITIONS FROM ALL PIPING. PROVIDE AND INSTALL SHOCK ABSORBERS ON ALL PIPING SERVING FLUSH VALVE FIXTURES. VALVES PROVIDE STOPS ON DOMESTIC WATER SUPPLIES TO ISOLATE HOT AND COLD WATER TO EACH FIXTURE, INCLUDING ALL EQUIPMENT AND EQUIPMENT PROVIDED BY OTHERS. FIXTURES, ITEM OR UNITS FURNISHED BY THE MANUFACTURER WITH INTEGRAL STOPS OR STOPS SPECIFIED WITH THE FIXTURE ARE CONSIDERED TO BE PROPERLY VALVED OFF AT THE FIXTURES. ACCESS SHALL BE PROVIDED TO ALL VALVES. VALVES ON DOMESTIC WATER PIPING SHALL BE BALL VALVES OR BUTTERFLY VALVES DEPENDING ON SIZE. ALL VALVES INSTALLED ON DOMESTIC WATER PiPING 3" AND SMALLER SHALL BE BALL VALVES. BALL VALVES -1 INCH AND SMALLER: 2 -PIECE BODY, 600 PSI CWP, 150 PSI SWP, CAST BRONZE BODY, FULL PORT, TEFLON SEATS, BLOWOUT -PROOF STEM, ADJUSTABLE PACKING GLAND, CHROME PLATED BRONZE BALL, WITH SCREWED ENDS, AND VINYL -COVERED STEEL HANDLE. PROVIDE SOLDER ENDS. PROVIDE EXTENDED VALVE STEMS FOR VALVES USED ON INSULATED LINES. PROVIDE EQUAL TO NIBCO SERIES 585 -70 -NS. BALL VALVES -1-1/4 INCH TO 3 INCH: 3 -PIECE BODY, 600 PSI CWP, 150 PSI SWP, CAST BRONZE BODY, CONVENTIONAL PORT, TEFLON SEATS, BLOWOUT -PROOF STEM, ADJUSTABLE PACKING GLAND, CHROME PLATED BRONZE BALL, SCREWED ENDS, AND VINYL -COVERED STEEL HANDLE. PROVIDE SOLDER ENDS. PROVIDE EXTENDED VALVE STEMS FOR VALVES USED ON INSULATED LINES. PROVIDE EQUAL TO NIBCO SERIES 590-Y. BUTTERFLY CHECK VALVES SWING CHECK VALVES - CLASS 125, CAST BRONZE BODY AND CAP, HORIZONTAL SWING, Y -PATTERN, WITH A BRONZE DISC, AND HAVING THREADED OR SOLDER ENDS. PROVIDE SOLDER ENDS FOR DOMESTIC HOT AND COLD WATER SERVICE. PROVIDE EQUAL TO NIBCO S-413. PIPE JOINTS AND CONNECTION ALL CUTTING AND PATCHING OF FINISHED CONSTRUCTION OF BUILDING SHALL BE PERFORMED BY THIS CONTRACTOR UNDER THE SECTION OF SPECIFICATIONS COVERING THESE MATERIALS. ANY MINOR ADJUSTMENT iN LOCATION OF ALIGNMENT OF NEW WORK OR TO CONNECT TO EXISTING UTILITIES SHALL BE PERFORMED AS DIRECTED BY THE ARCHITECT WITHOUT ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO THE GROUNDS, WALKS, ROAD, BUILDING, PIPING SYSTEMS, ELECTRICAL SYSTEMS, AND THEIR EQUIPMENT AND CONTENTS, CAUSED BY LEAKS iN THE PIPING SYSTEMS BEING INSTALLED OR HAVING BEEN INSTALLED BY HIM. HE SHALL REPAIR AT HIS EXPENSE ALL DAMAGED SO CAUSED. ALL REPAIR WORK SHALL BE DONE AS DIRECTED BY AND IN SUCH MANNER AS SATISFACTORY TO THE ARCHITECT. OWNER RESERVES THE RIGHT TO MAKE EMERGENCY REPAIRS AS REQUIRED TO KEEP EQUIPMENT IN OPERATION WITHOUT VOIDING THE CONTRACTOR'S GUARANTEE BOND NOR RELIEVING THE CONTRACTOR OF HIS RESPONSIBILITIES DURING THE BONDING PERIOD. PLUMBING INSULATION INSULATE DOMESTIC COLD WATER PIPING, ASSOCIATED FITTINGS AND VALVES WITH 1/2" WALL THICKNESS INSULATION. INSULATE DOMESTIC HOT WATER PIPING, ASSOCIATED FITTINGS AND VALVES WITH 3/4" WALL THICKNESS INSULATION. INSULATE DOMESTIC HOT WATER RETURN PIPING, ASSOCIATED FITTINGS AND VALVES WITH 3/4" WALL THICKNESS INSULATION. INSULATE ABOVE FLOOR HORIZONTAL STORM DRAIN PIPING, ROOF DRAIN PANS, AND VERTICAL PIPING FROM ROOF DRAIN PAN TO THE FIRST HORIZONTAL BEND WITH 1/2" WALL THICKNESS INSULATION. INSULATE WASTE PIPING ABOVE CEILINGS THAT RECEIVE CONDENSATE WITH 1/2" WALL THICKNESS INSULATION. INSULATE WASTE PiPING, SUPPLY PIPING, STOPS, AND VALVES UNDER HANDICAP ACCESSIBLE PLUMBING FIXTURES. FLEXIBLE ELASTOMERIC INSULATION CLOSED -CELL, SPONGE- OR EXPANDED -RUBBER MATERIALS. COMPLY WITH ASTM C 534, TYPE I FOR TUBULAR MATERIALS AND TYPE II FOR SHEET MATERIALS. MANUFACTURERS: ARMSTRONG ARMAFLEX II RUBATEX R -180 -FS NOMACO K -FLEX INSULATION SHALL BE LISTED AND LABELED PER ASTM E 84 FOR PLENUM INSTALLATIONS EMPLOYING SLIP ON TECHNIQUES. JOINTS SHALL BE SEALED WITH ARMSTRONG #520 OR RUBATEX #373 ADHESIVE OR AS REQUIRED BY MANUFACTURER. PIPE INSULATION EXPOSED OUTSIDE SHALL BE COVERED WITH A VINYL WRAP. FIBERGLASS INSULATION FIBERGLASS PIPING INSULATION: ASTM C 547, CLASS 1 ENCASE PIPE FITTINGS INSULATION WITH ONE-PIECE PREMOLDED PVC FITTING COVERS. VAPOR BARRIER MATERIAL: PAPER -BACKED ALUMINUM FOIL, EXCEPT AS OTHERWISE INDICATED, STRENGTH AND PERMEABILITY RATING EQUIVALENT TO ADJOINING PIPE INSULATION JACKETING. STAPLES, BANDS, WIRES, AND CEMENT: AS RECOMMENDED BY INSULATION MANUFACTURER FOR APPLICATIONS INDICATED. ADHESIVES, SEALERS, AND PROTECTIVE FINISHES: AS RECOMMENDED BY INSULATION MANUFACTURER FOR APPLICATIONS INDICATED. MANUFACTURERS: ARMSTRONG WORLD INDUSTRIES, INC. OWENS-CORNING FIBERGLASS CORP. KEENE CORP. CERTAINTEED. JOHNS MANVILLE. INSULATION FOR HANDICAP ACCESSIBLE FIXTURES ALL HANDICAP LAVATORY P -TRAP AND ANGLE STOP ASSEMBLIES SHALL BE INSULATED WITH TRAP WRAP PROTECTIVE KIT MANUFACTURED BY PROFLO MODEL PF202WH OR EQUAL. ABRASION RESISTANT , ANTI -MICROBIAL VINYL EXTERIOR COVER SHALL BE SMOOTH. FOR TRAPS, THE INSULATION SHALL HAVE A CLEANOUT NUT CAP TO ALLOW SERVICE TO THE TRAP WITHOUT DISASSEMBLY. FOR STOPS, THE INSULATION SHALL HAVE A LOCK LID THAT PREVENTS TAMPERING BUT ALLOWS ACCESS WITHOUT REMOVAL OF THE INSULATION. FASTENERS SHALL REMAIN SUBSTANTIALLY OUT OF SIGHT. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS: PROFLO TRUEBRO PLUMBEREX WATER -HAMMER ARRESTERS MANUFACTURERS:SUBJECT TO COMPLIANCE WITH REQUIREMENTS, AVAILABLE MANUFACTURERS OFFERING PRODUCTS BEINCORPORATED INTO THE WORK S T HAT MAY INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: AMTROL, INC. JOSAM COMPANY. MIFAB, INC. PRECISION PLUMBING PRODUCTS, INC. SIOUX CHIEF MANUFACTURING COMPANY, INC. SMITH, JAY R. MFG. CO.; DIVISION OF SMITH INDUSTRIES, INC. TYLER PIPE; WADE DIV. WATTS DRAINAGE PRODUCTS. ZURN INDUSTRIES, LLC; PLUMBING PRODUCTS GROUP; SPECIFICATION DRAINAGE PRODUCTS. STANDARD: ASSE 1010 OR PDI -WH 201. TYPE: METAL BELLOWS OR COPPER TUBE WITH PISTON. SIZE: ASSE 1010, SIZES AA AND A THROUGH F, OR PDI -WH 201, SIZES A THROUGH F. INSTALL WATER -HAMMER ARRESTERS IN WATER PIPING ACCORDING TO PDI -WH 201. INTERRUPTION OF SERVICES WHEN IT IS REQUIRED TO INTERRUPT EXISTING SERVICES, THIS CONTRACTOR SHALL FIRST NOTIFY THE ARCHITECT THAT AN INTERRUPTION IS REQUIRED. IT SHOULD BE NOTED THAT FACILITIES MUST BY KEPT IN OPERATION AS MUCH AS POSSIBLE. THIS CONTRACTOR SHALL ADVISE THE ARCHITECT OF THE LENGTH OF TIME THE SERVICE WILL BE INTERRUPTED AND SHALL GET PERMISSION FROM THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. WARRANTY THIS CONTRACTOR SHALL WARRANT THAT ALL WORK UNDER THIS SECTION SHALL BE FREE OF DEFECTIVE WORK, MATERIALS AND PARTS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE WORK AND SHALL REPAIR, REVISE, AND REPLACE, AT NO COST TO THE OWNER, ANY SUCH DEFECTS OCCURRING WITHIN THE WARRANTY PERIOD. REVIEWED FOR CODE COMPLIANC APPROVED SEP 0 7 2017 JACKSONMAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM Dc ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 0 d J m_o L.L 00 ZQ U Q I— I D O Y c O O Z O z J Z 00 WE— Wcoo Ct � Zo 0 W t!) <C = < L1.Lo O! DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET d z City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 01 2017 PERMIT CENTER PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM MECHANICAL SPECIFICATIONS M0.04 JACKSON 1 MAIN ARCHITECTURE P.S. © 2016 C:1Users1nick.watkinslDocuments116040 Inspirus Credit Union Addition_Nick.Watkins.rvt 8/24/2016 1:09:09 PM DD CC BB (Al) CB 4.5 4.7 CONNECT 6" SD TO (E)6" SD BY1 / CIVIL CONTRACTOR 7 7 1 /y 1 6.3 (7 7.6 u NEIN BASEMENT PARKING 4" 010 GD -1 N-4" 17 GENERAL NOTES: 1. REFER TO CIVIL DRAWINGS FOR UTILITY CONNECTIONS. FLAG NOTES: SP -1 GD -1 • I - ti OWS-1 OIL/WATER SEPARATOR • O U MIL RVL 4" RWL UP 2 (E)4" W IN GARAGE CEILING SPACE CONNECT 4" W TO (E)4" W "I —8- 2"WUP O — r e • A _ . * • .Ss ♦ \-4" I 2"V'UP 2"WUP 2"VUP L �2"VUP 4"WUP 2" W UP� 2" V UP� UP TO FCO 2"WUP t 4" V` UP 2" 2"WUP VUP /j) 2"VUP 2"WUP 2"VUP 2"VUP i CP 2"VUP 2"WUP 4"IP' UP (E)4"WTO SANITARY SEWER 2"WUP EXISTING BASEMENT PARKING 011 13521 SF r • • LOBBY 014 109 SF • NOT USED. ROUTE 6" SD BELOW GRADE AT 1/8" PER FOOT SLOPE. COORDINATE CONNECTION OF 6" SD TO STORM DRAIN PIPE INDICATED ON CIVIL PLANS. ROUTE 4" GARAGE DRAIN PIPING BELOW GRADE AT 1/8" PER FOOT SLOPE. PROVIDE NEW TRENCH DRAIN AT BOTTOM OF DRIVEWAY. CONNECT TO STORM DRAIN PIPING BELOW GRADE. DUPLEX SUMP PUMP AND BASIN. ROUTE 2" PUMPED WASTE UP TIGHT TO COLUMN AND THROUGH GARAGE CEILING SPACE. TIE IN 2" PUMPED WASTE TO 4" WASTE PIPE AT TOP OF PIPE. OWS-1 - OIL/WATER SEPARATOR, OLDCASTLE MODEL 660 -SA, 450 GALLONS, 6' -0"x4' -0"x6'-0", 11,000 LBS, 37 GPM. c=::> Top Section No. 660,ST Base No. 660 -SS 660 -SA L ATER SEPARATOR 450 Gallon Capacity Inlet Pipe Ohara 6 Dr REVIEWED FOR CODE COMPLIANCE APPROVED SEP 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 0 1 2017 PERMIT CENTER JACKSON j MAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 cc) oo ce 01; co I- 1 Z LLI ce 0 8 a. 11„. 03 Ce 00 CO cp cs DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET BID SET z Ill 10/24/2016 11/16/2016 3/10/2017 Ca PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM GARAGE PLUMBING PLAN M2.00 JACKSON 1 MAIN ARCHITECTURE P.S. ©2016 C:\Users\nick.watkins\Documents116040 Inspirus Credit Union Addition_Nick.Watkins.rvt 8/24/2016 1:09:09 PM D© CC BB AA.9 A (J. 1 i MEDIUM CONF 124 163 SF MEDIUM CONF _123_r 161 SF --r MEDIUM CONF 122 165 SF 4.5 4.7 MEDIUI?5 CONF 121 164 SF 2"VUP COAT CLOSE 165 9 SF 0 J 6.3 OPEN OFFICE 120 1368 SF ,MET 'S 111 157 -SF HALL 1 107 586 SF EWH-1 CP -1 ET -1 FS 0 1"CW 0 1" HW 0 w LOBBY 001 627 SF UP let 0 EL EC T F:ICAL CLOSET 164 -1 9 SF GY to 114 1018 SF MEN'S TOILET RM 1I15A I 29 SF3/4" HW ' 3/4' CW ?'CmvlEs'S TOILET RM 7 I `314"1HW ---J 1"H(V I 116A 29 SI - WO MEN'S LOCI -SER RI's 116 CIE`=RI' 115 AFD 10SF P-3 .:(:y` -- P-3 ®FD 1,11-07-01 TP 3/4" HWC, 1" HW, 2" CW 2"WDN STORAGE 129 114 SF 1 OFFICE 157 128 SF OPEN OFFICE 1154 11 1981 SF 7.6 OFFICE 15P 144 SF 159 I.T. r 156 68 SF ROOM 155 1 154 SF ISA OFFICE 118 354 SF HALL 117 178 SF 3/4" HWC, 3/4" HW, 3/4" CW K ITCH. 1_153 I 223 SF }�I Lr OFFICE 160 1 �14ysi- OFFICE 161 158 SF TT CONF 162 340 SF 2"WUP, 3/4" CW UP, 3/4" HW UP Lia.� A A Pw .k U ROOMf 163 808 SF 4" RWL UP & DN 4 GENERAL NOTES 1. ROUTE CONDENSATE PIPING SERVING FAN COIL UNITS AND BC CONTROLERS TO NEAREST SINK TRAP. REFER TO M3-01 OR M4-01 FOR FAN COIL UNIT LOCATIONS. REFER TO SCHEDULES ON M0-02 FOR CONDENSATE CONNECTION INFORMATION. FLAG NOTES: CONNECT 2" CW TO (E) 2" CW IN EXISTING JANITOR'S CLOSET. PROVIDE HOT WATER CONNECTION TO DISHWASHER AND PROVIDE AIR GAP FITTING AT KITCHEN SINK. CONNECT 1-1/2" V TO (E) 2" V SERVING TOILET ROOM. PROVIDE SEISMIC SEISMIC RATED CONNECTION FOR PIPING PENETRATING SEISMIC JOINT. REVIEWED FOR CODE COMPLIANCE APPROVED 9 SEP 07 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 01 2017 PERMIT CENTER JACKSON I MAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 z 0 z Z 00 UJ �--- U0 0 LLJ rt0 Z0 0 J m Ce 00 z coW 0 < .c O� O2 LO DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET CO CO r O 1 N CO O N CCG PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM FIRST FLOOR PLUMBING PLAN M2.01 JACKSON 1 MAIN ARCHITECTURE P.S. 0 2016 C:\Users\nick.watkins\Documents116040 Inspirus Credit Union Addition Nick.Watkins.rvt 8/24/2016 1:09:09 PM DD CC BB (Al) EDI� 0 Ry O F HS_._-, 202 1 157 S/ 157 SF JAN. 203 52 SF e / 2ND FL LOBBY 201 809 SF 4.5 4.7 3" RWL UP 3" ORWL UP U SMALL GOOF 262 99 SF �rn CHAT III 261 1- 571SF CHAT RM 260 56 SF(/ z-� S FORAGE MEDIUM \ a 258 1 11CONF. 48 S o� 257 111 SF 6.3 • ,— -- --I i'vi EDIUI'v COIF. 256 1 113 SF 3 O 3"VDN 3" VTR TALL 205 665 SF SI? ALL CONF 251 98 Sfr--- 0 SMALL CONF 252 95SF- SMALL CONF. 0 253 97 SF—i / / / 4" ORWL UP 4" RWL UP EXEC VYING, 263 3159 SF 0 SMALL CONF j 254 100 SF EHEC LOBBY 1264 377 SF P-5 7.6 T 4" RWL UP 4" ORWL UP 2" VTR 1. 1/2"CW,1/2"HW SMALL 8, 2" V DN CONF 255 101 SF 0 4" RWL DN 3" RWL UP 31! ORWL-UP MEDIUM CONF 247 136 SF MEDIUM _ CONF O v GENERAL NOTES 1. ROUTE CONDENSATE PIPING SERVING FAN COIL UNITS AND BC CONTROLERS TO NEAREST SINK TRAP. REFER TO M3-02 OR M4-02 FOR FAN COIL UNIT LOCATIONS. REFER TO SCHEDULES ON M0-02 FOR CONDENSATE CONNECTION INFORMATION. FLAG NOTES: ROUTE ROOF DRAIN AND OVERFLOW ROOF DRAIN TO THIS LOCATION. TIE IN OVERFLOW DRAIN IN THE VERTICAL DRAIN RISER. PROVIDE HOT WATER CONNECTION TO DISHWASHER AND PROVIDE AIR GAP FITTING AT KITCHEN SINK. PROVIDE SEISMIC SEISMIC RATED CONNECTION FOR PIPING PENETRATING SEISMIC JOINT. REVIEWED FOR CODE COMPLIANCE APPROVED SEP 0 7 2017 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 01 2017 PERMIT CENTER 1 JACKSON MAIN ARCHITECTURE 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 W W W.JACKSONMAIN.COM ENGINEERS 725 Powell Ave SW, SUITE 100 RENTON, WA 98057 425-336-2822 0 z O z 1 Z o 0_ �E Cta 0 W Cu_U z DESCRIPTION CITY OF TUKWILA ADMINISTRATIVE APPLICATIONS PERMIT SUBMITTAL SET BID SET IzI DATE 10/24/2016 CD tI 3/10/2017 PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 16025 SM BD SM SECOND FLOOR PLUMBING PLAN M2.02 JACKSON I MAIN ARCHITECTURE P.S. © 2016