Loading...
HomeMy WebLinkAboutTIS 2021-12-13 Item 2B - Grant Application - Surface Water Fund: Nelsen Side Channel with King CountyCity of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Mike Perfetti, Surface Water Sr. Program Manager CC: Mayor Ekberg DATE: December 10, 2021 SUBJECT: Surface Water Fund - Nelsen Side Channel Project No. 91641203 Grant Application ISSUE Authorize the submittal of a grant application to King County's new Open Space -River Corridors (ORSC) grant program and other future grant opportunities to fund the Nelsen Side Channel project. BACKGROUND The Nelsen side channel is a remnant section of the Green River as it existed prior to the construction of 1-405 in the 1960s. The remnant channel is separated from the mainstem of the river by a constructed levee but offers potential as off -channel rearing habitat for threatened Puget Sound Chinook salmon and other aquatic species. This project will set the levee back to create a ±1.2 -acre side channel, restore an acre of riparian forest, provide additional flood storage and provide public access to the river. Currently, there is a concept design in place for this project and property transfer arrangements are underway between the City, WDNR and WSDOT. DISCUSSION King County is currently seeking applications for its new ORSC grant program. City policy requires approval by the appropriate committee before applying for grants with a match requirement. The OSRC program goal is to deliver projects that help restore the natural functions of rivers and the benefits they provide to our environment and communities, including providing or restoring public access to the water, improving the ecological function of a waterbody, or increasing public awareness of river corridors as valuable natural resources. Cities within King County are eligible to apply. FISCAL IMPACT The City is seeking $300,000 in grant funding for project design and permitting. The grant application indicates that a 20% local city match, or $75,000, is required. The city match can be allocated from the Nelson Side Channel Project budget, which has of $147,000 from the Surface Water utility fund dedicated in 2021-2022 and is more than adequate to cover the costs of the match. Funding Source ORSC Grant Utility Revenue Total Amount $300,000 75,000 $375,000 2021-2022 Utility Budget $147,000 RECOMMENDATION Committee approval is being asked for the submittal of the ORSC grant and other grant opportunities that may become available for the Nelsen Side Channel project. Attachment: 2021 CIP Pg. 87 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Nelsen Salmon Habitat Side Channel Project No. 91641203 DESCRIPTION: Create an off -channel salmon rearing habitat side channel by connecting a segment of historic river channel with the Green River. JUSTIFICATION: WRIA 9 has identified this project a proposed action in the Salmon Habitat Plan. The project area is primarily within State lands, but the intent is to transfer to City. The project may take place STATUS: under an aquatic lease (DNR), depending on timing. Grant application for design funding submitted to Floodplains in 2020 with a low probability of success. MAINT. IMPACT: Expected to increase maintenance COMMENT: Property acquisition to the north could create the opportunity for a side channel and additional flood storage, or potentially combine this with Gilliam Creek Fish Barrier project depending on funding source feedback. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES R-- ..r Project Location ;' )r ~� ' Design 50 220 240 IIS .�� ,: 510 Land (R/W) ! 5 5 ,, s 10 Monitoring 0 Const. Mgmt. 385 .„A ..� 385 Construction 1,440 NNW 1,440 TOTAL EXPENSES 0 55 225 240 1,825 0 0 0 0 2,345 FUND SOURCES 7 i YAM ylll• o- 1 Awarded Grant S1.5613;r4. ii.� •. r014 . _s 1 4 er44) � ' �Tula RNwy 1"'� ilk? 0 Proposed Grant 100 218 1,232 1,550 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 55 125 22 593 0 0 0 0 795 TOTAL SOURCES 0 55 225 240 1,825 0 0 0 0 2,345 20 2021 - 2026 Capital Improvement Program 87 18 R-- ..r Project Location ;' )r ~� ' Akiw4, IIS .�� ,: r r ! ,, s l .„A ..� 8,449[ NN @ * i NNW I/ A ,,lete4. 4 7 i YAM ylll• o- 1 rte-"— S1.5613;r4. ii.� •. r014 . _s 1 4 er44) � ' �Tula RNwy 1"'� ilk? Alkst . .. s, 20 2021 - 2026 Capital Improvement Program 87 18