Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit PL14-0012 - TAMI DREW / CASCADIA PM - VERIZON TYPE I WIRELESS TELECOMMUNICATIONS FACILITIES PERMIT
SEA EAST ANDOVER 596 INDUSTRY DRIVE PL14-0012 L14-0020 TYPE 1 WIRELESS City of Tukwila Jim Haggerton, Mayor Department of Community Development April 15, 2014 NOTICE OF DECISION TO: Tami Drew Cascadia PM 733 Seventh Ave., #209 Kirkland, WA 98033 Jack Pace, Director This letter serves as a notice of decision and is issued pursuant to TMC 18.104.170 on the following project and permit approval. Project File Number: Applicant: Type of Permit Applied for: Project Description: Location: Associated Files: Comprehensive Plan Designation/Zoning District: I. PROJECT INFORMATION L14-0020, PL 14-0012 Tami Drew, Cascadia PM Type 1 Wireless Telecommunications Facilities Permit Approval of a Type I Wireless Telecommunication Facilities Permit to upgrade existing antennas, cabinets and associated cabling on an existing wireless facilities tower. No ground disturbance or expansion of the existing compound is proposed. Tax Lot NO: 0223400010. This tower is located at 574 Industry Dr. N/A Tukwila Urban Center (TUC) II. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that this application does not require a SEPA threshold determination because it is categorically exempt. Decision on Substantive Permit: The City Community Development Department has determined that the application for a Type 1 Wireless Communications Facility does comply with applicable City and state code requirements and has approved that application without conditions. MB Page 1 of 3 04/15/2014 W:\Users\Max\L14-0017\L14-0020 NOD.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax: 206-431-3665 III. YOUR APPEAL RIGHTS The Decision on this Permit Application is a Type 1 decision pursuant to Tukwila Municipal Code § 18.104.010. Other land use applications related to this project may still be pending. No administrative appeal of a DNS or an EIS is permitted. One administrative appeal to the City Hearing Examiner of the Decision on the Permit itself is permitted. If an MDNS was issued, any person wishing to challenge either the conditions which were imposed by the MDNS decision or the failure of the Department to impose additional conditions in the MDNS must raise such issues as part of the appeal to the Hearing Examiner. A party who is not satisfied with the outcome of the Hearing Examiner appeal process may file an appeal in King County Superior Court from the Hearing Examiner's decision. IV. PROCEDURES AND TIME FOR APPEALING In order to appeal the Community Development Director decision on the Permit Application, a written notice of appeal must be filed with the Department of Community Development within 14 days of the issuance of this decision, that is by April 29, 2014. The requirements for such appeals are set forth in Tukwila Municipal Code ch. 18.116. All appeal materials shall be submitted to the Department of Community Development. Appeal materials MUST include: 1. The name of the appealing party. 2. The address and phone number of the appealing party; and if the appealing party is a corporation, association or other group, the address and phone number of a contact person authorized to receive notices on the appealing party's behalf. 3. A statement identifying the decision being appealed and the alleged errors in the decision, including any specific challenge to an MDNS. 4. The Notice of Appeal shall identify (a) the specific errors of fact or errors in application of the law in the decision being appealed; (b) the harm suffered or anticipated by the appellant, and (c) the relief sought. The scope of an appeal shall be limited to matters or issues raised in the Notice of Appeal. 5. Appeal fee of $541 plus retainer. V. APPEAL HEARINGS PROCESS Any administrative appeal regarding the Permit shall be conducted as a closed record hearing before the Hearing Examiner based on the information presented to the Community Development Director, who made the original decision. No new evidence or testimony will be permitted during the appeal hearing. Parties will be allowed to present oral argument based on the information presented to the Community Development Director before their decision was issued. The Hearing Examiner's decision on the appeal is the City's final decision. MB Page 2 of 3 04/15/2014 Any party wishing to challenge the Hearing Examiner's decision on this application must file an appeal pursuant to the procedures and time limitations set forth in RCW ch. 36.70C. An appeal challenging a DNS, an MDNS or an EIS may be included in such an appeal. If no appeal of the Hearing Examiner's decision is properly filed in Superior Court within such time limit, the Decision on this permit will be final. The City's decision to issue a DNS, an MDNS or an EIS is final for this permit and any other pending permit applications for the development of the subject property. VI. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Max Baker, who may be contacted at 206-431-3662 or via email at max.baker@tukwilawa.gov for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. Department of Community Development City of Tukwila MB Page 3 of 3 04/15/2014 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director STAFF REPORT TO THE DIRECTOR PREPARED April 15, 2014 NOTIFICATION: Notification is not required for a Type I land use application. FILE NUMBER: L14-0020, PL 14-0012 APPLICANT: Tami Drew, Cascadia PM PROPERTY OWNER: REIT Management & Research LLC Andover Executive Park and West Valley Distribution Center REQUEST: Approval of a Type I Wireless Telecommunication Facilities Permit to upgrade existing antennas, cabinets and associated cabling on an existing wireless facilities tower. LOCATION: Tax Lot NO: 0223400010. This tower is located at 574 Industry Dr. ASSOCIATED PERMITS: Electrical permits issued through the City of Tukwila will be required for service alteration for any other electrical service work this is anticipated but not noted on the plans, per article 85.13 (B), Washington electrical code. Building permit is not required for scope of work stated on the submitted plans. SEPA DETERMINATION: Exempt COMPREHENSIVE PLAN DESIGNATION: Tukwila Urban Center (TUC) ZONE DESIGNATION: Tukwila Urban Center (TUC) STAN"N: Max Baker, Planning Intern ATTACHMENTS: Project Plans for Permit L14-0020 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax: 206-431-3665 FINDINGS Vicinity/Site Information Project Description The applicant is requesting approval of a Type I Wireless Telecommunication Facilities [WCF] Permit to remove and replace equipment on an existing tower at 574 Industry Dr. The project includes: • Removal of (6) panel antennas • Installation of (8) Panel antennas (6) RRU's (3) TMA's (2) Surge protectors (1) Hybrid cable The existing cellular tower is 74' feet high with the existing Verizon antennas to be removed and the proposed antennas mounted at 74'. Existing Development The wireless tower is located within an industrial park. It is situated adjacent to an industrial/warehouse structure within the site, and utilizes part of the building to house equipment. Surrounding Land Uses Parcels surrounding the property are all zoned TUC. Directly north and east are railroad tracks. To the west is Andover Park E, and to the south is Industry Dr. BACKGROUND In 2006, the City adopted a Wireless Facilities Chapter (TMC 18.71) to the Zoning Code. The chapter provides specific location and design requirements for the placement of WCF within the City of Tukwila. In 2012 the WCF was approved for modifications (L12-030) through a Type 1 Wireless Facilities permit. Location Selection Tukwila Municipal Code (TMC) provides a hierarchy of appropriate locations within the City. Generally, co -locations and utilizing existing structures are favored over the development of new standalone WCF within the City. TABLE A Type of Permit Required, Based on Type of Wireless Communication Facility ZONING (1) TYPE OF FACILITY RESIDENTIAL COMMERCIAL INDUSTRIAL Transmission Tower co -location Type 1 Type 1 Type 1 Adding antennas to an existing tower Type 1(2) Type 1(2) Type 1(2) Utility pole co -location Type 2 Type 2 Type 2 Concealed building attached Type 2(3) Type 2(3) Type 2(3) Non -concealed building attached Type 2 Type 2 Type 1 New tower or waiver request Type 4 Type 4 Type 4 (1) SM Zoning for any private/public property or right-of-way Residential — LDR, MDR, or HDR Page 2 of 5 04/15/2014 Commercial — O, MUO, RCC, NCC, RC, RCM, TUC, C/LI or TVS Industrial - LI, HI, MIC/L, or MIC/H (2) Provided the height of the tower does not increase and the square footage of the enclosure area does not increase. (3) An applicant may request to install a non -concealed building attached facility, under TMC Section 18.58.150. The applicant is adding additional antennas to an existing tower. This decision does not require the use of any new facilities for placement of the new antennas. Design Standards The City provides specific design standards for the placement of WCF within the City of Tukwila. The table below indicates if the applicant's proposal complies with required standards. Table 1 (See TMC 18.58.070 for further details General Requirements Project does comply Project does not comply Not Applicab le Notes 1. Generators or other devices which will create noise must comply with TMC 8.22 regarding noise. X The applicant has not proposed a new generator. 2.Business License Requirement X Verizon has applied for a business license (00004523) 3. Only safety signage must be placed on the WCF. X The applicant does not propose any signage. 4. Accommodations for parking for maintenance personal must be provided. X Parking is not affected by this modification. 5. Towers shall either maintain a galvanized steel finish or be painted a neutral color so as to reduce its visual obtrusiveness. X No change to the existing tower is proposed. 6. The design of all buildings and ancillary structures shall use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and built environment. X No new buildings or structures are proposed. 7. Antennas shall have the same color scheme as the structure they are located on. X The existing pole is galvanized steel. New antennas will be painted to match. 8. WCF poles and towers shall only have safety lights if required by a government agency. X No lighting is proposed. 9. No advertising is permitted on WCF X No advertising is proposed. SM Page 3 of 5 04/15/2014 10. Each service provider Project does comply Project does not comply X No change to the existing equipment enclosure is shall be limited to an X proposed. equipment enclosure of 360 X Antennas and ancillary equipment will be painted to match the existing tower color. square feet. X Table 2 (See TMC 18.58.090 for additional information) Adding Antennas to Existing WCF Tower- Specific Development Standards Project does comply Project does not comply Not Applicab le Notes 1. When adding antennas to existing WCF towers, height must not exceed what was approved under the original application to construct the tower. X No change to the previously approved tower height of 74' is proposed. 2. Antennas shall be painted to match the color scheme of tower. X Antennas and ancillary equipment will be painted to match the existing tower color. 3. There is no limit on the number of antennas that may be located on an existing tower. X 4. Feed lines and coaxial cables shall be located within the tower. Those exposed shall be painted to match tower. X Cables shall be routed within the tower. 5. A new cabinet shall be located within the equipment enclosure that was approved as part of the original application, or it will require a Type 2 decision. X No new cabinets are to be installed. 6. Setbacks shall not apply when an applicant installs new antennas on an existing tower and uses an existing equipment enclosure. If the equipment enclosure is increased, it must meet setbacks. X There is no change to the existing equipment enclosure. SM CONCLUSIONS 1. The proposed modifications to the existing antenna will not significantly alter the conditions that currently exist and will not be materially detrimental to the public welfare or injurious to property or improvements in the vicinity. Page 4 of 5 04/15/2014 2. As demonstrated in Tables 1 and 2, the project meets all applicable development standards for a Type 1 WCF. 3. The proposed modifications will not alter the surrounding land uses in terms of traffic and pedestrian circulation, building or site design. 4. The proposed project is in keeping with the goals and policies of the Comprehensive Land Use Policy Plan. RECOMMENDATIONS The recommendation to the Director of Community Development is to approve this application for a Type I Wireless Telecommunication Facility permit as applied for by Crown Castle for Sprint without conditions. INFORMATIONAL ITEMS A City of Tukwila electrical permit is required for service alteration. Please note that the installation of an emergency power disconnect switch is required for fire department use. Contact Don Tomaso at 206-971-8723 to get more information about permit requirements for the power disconnect switch. SM Page 5 of 5 04/15/2014 0400 City of Tukwila Department of Community Development File Number L14-0020 LAND USE PERMIT ROUTING FORM TO: Building Planning Public Works Fire Dept. 101 Police Dept. Parks/Rec Project: SEA East Andover Address: 596 Industry Drive, Tukwila, WA 98188 Date transmitted: 3/25/2014 Response requested by: 4/8/2014 Staff coordinator: Max Baker Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60 -day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) Plan check date:3 G p�,/� Comments Update date: prepared by: ,,, 0400 TO: City of Tukwila RECEIVED Department of Community Development MAR 26 2014. TUKW,LA PUBLIC WORKS File Number L14-0020 LAND USE PERMIT ROUTING FORM Building 0 PlanningJPublic Works Fire Dept. Police Dept. Parks/Rec Project: SEA East Andover Address: 596 Industry Drive, Tukwila, WA 98188 Date transmitted: 3/25/2014 Response requested by: 4/8/2014 Staff coordinator: Max Baker Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60 -day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) ?a /Akio, mio Plan check date:Comments ��I 241 l'� prepared by: \ ''5 Update date: CASCADIA\ PM Project: SEA East Andover Applicant: Verizon Applicant Representative: Tami Drew, Cascadia PM Address: 733 Seventh Ave, Suite 209, Kirkland, WA 98033 Phone: 206.331.7072 E-mail: tami.drew@cascadiapm.com Project Location: 596 Industry Drive, Tukwila, WA 98168 Parcel Number: 022340-010 Property Zoning: TUC Project Description: Precision Proaram Manaaement 18 March 2014 Verizon is removing 6 existing antennas and adding 8 new antennas. Total antenna count is going from 10 to 12 antennas located at the same height as existing antennas. Verizon will also add 6 RRHs (radios), 3 TMAs (tower mounted amplifiers), 2 surge protectors, and 1 hybrid fiber/power cable. Designs are attached. Applicable Applications: Type 1 Land Use Permit Project Summary: This is a proposal to make changes to equipment on an existing Verizon Wireless Communications Facility, on a tower located at 596 Industry Drive, Tukwila, WA 98168. The height of the tower and the square footage of the enclosure area will not increase. Attachments: 1. Application Checklist — 1 copy 2. Completed Application Form and Drawings (5 copies) 3. 4 sets of plans — 11 x 17 4. Application Fee (check) Cascadia PM, LLC Corporate Headquarters 3322 South Bay Road NE Olympia, WA 98506 360 438 8002 www.cascadiapm.com 130 N. Nimitz Hwy Suite A-200 Honolulu, HI 96817 808 536 7400 5501 NE 109th Ct Suite A-2 Vancouver, WA 98662 360 885 9200 733 Seventh Ave Suite 209 Kirkland, WA 98033 425 828 1008 i\ CASCADIA PM Precision Proaram Manaaement 5. Copy of signed lease in lieu of Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter Property to show allowed access to lease area. 6. SEPA Environmental Checklist — not required per 6 ii 7. Letter from applicant describing proposed project and describing compliance with City's Code requirements 8. Sensitive Area studies and proposed mitigation — not required 9. Noise Report — not applicable 18.58.090 Adding Antennas to Existing WCF Tower -Specific Development Standards 1. Height The equipment and antennas changes will not change the height of the tower. 2. Antenna aesthetics Antennas will be painted to match the color scheme of the tower. 3. Antenna intensity Since there is no limit for antennas on an existing tower, changing from 9 to 12 antennas meets code requirements. 4. Feed lines 1 hybrid fiber/power cable will be added according to code, similar to existing coax cables. 5. Cabinet equipment No new cabinets are being added to this facility. 6. Setbacks Setbacks do not apply since the installation and changes are on an existing tower and will not be outside of the existing equipment enclosure. Cascadia PM, LLC Corporate Headquarters 3322 South Bay Road NE Olympia, WA 98506 360 438 8002 www.cascadiapm.com 130 N. Nimitz Hwy Suite A-200 Honolulu, HI 96817 808 536 7400 5501 NE 109th Ct Suite A-2 Vancouver, WA 98662 360 885 9200 733 Seventh Ave Suite 209 Kirkland, WA 98033 425 828 1008 ORIGINAL SEAEANDOVER5 LEASE AGREEMENT Building: Six (6), Suite 566B Landlord: Equitec Real Estate Investors Fund XVI Tenant: Seattle SMSA Limited Partnership U S WEST NewVector Group, Inc., General Partner (op� of Lead Atir (mita& of A -C -41\1'c of- Do-Yvvti 4-avmle55 Perm.is�,:c51k. OFFICE/WAREHOUSE LEASE AGREEMENT THIS LEASE, Dated for reference purposes June 1, 1991, is made by and between Equitec Real Estate Investors Fund XVI, as Landlord, and Seattle SMSA Limited Partnership, U S WEST NewVector Group, Inc., General Partner, as Tenant. 1. CERTAIN LEASE PROVISIONS The descriptions and amounts set forth below are qualified by their usage elsewhere in this Lease, including those Articles referred to in parentheses: 1.1 Premises (Article 2.1): Unit #566B Building: Six (6) Street Address: 566B Industry Drive City: Tukwila County: King State: Washington Zip: 98188 1.2 Rentable Area of Premises (Article 2.1): 800 square feet (the "Area") Total Rentable Area of Building (Article 2.2): 13,379 square feet approximately approximately 1.3 Use Clause (Article 2.3): Construction, operation and maintenance of a Mobile Communications Facility which shall include Tenant's radio transmission and computer equipment, and emergency battery and generator equipment, and all uses incidental thereto, the construction and maintenance of an antenna structure. 1.4 Lease Term (Article 3.1): Ten (10) Years, Zero (0) Months. 1.5 Lease Commencement Date (Article 3.1): July 1, 1991 1.6 Lease Expiration Date (Article 3.1): June 1.7 Security Deposit (Article 4.): None 1.8 (A) Tenant's Addresses (Articles 5.1, 27.10): Notice Address: Seattle SMSA Limited Partnership c/o U S WEST NewVector Group, Inc., Attn: Real Estate Department P.O. Box 91211 Bellevue, WA 98009-2211 (B) Billing Address: Same. 1 30, 2001 pRdurst s LEASE AGREEMENT EXHIBIT. A SITE PLAN 1.111111 )IUVd .111140pAyy 1 Tenant : Seattle SMSA Limited Partnership U S WEST NewVector Group, Inc. General Partner The Premises and the Building as shown above are approximations. Demised Premises: approximately 800 square feet Frontage: approximately 20 lineal feet Maximum Depth: approximately 40 lineal feel .A. LEASE AGREEMENT EXHIBIT B LEGAL DESCRIPTION PARCEL A-3 A PORTION OF THE WEST 1/2 OF SECTION 25 AND THE EAST 1/2 OF SECTION 26, ALL IN TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M, DESCRIBED AS FOLLOWS: BEGINNING AT THE EAST 1/4 CORNER OF SAID SECTION 28; THENCE NORTH 88.06'42' WEST ALONG THE EAST -WEST CENTERLINE OF SAID SECTION 26 A DISTANCE OF 105.84 FEET TO THE TRUE POINT OF BEGINNING; THENCE NORTH 01.47'28' EAST 2.45 FEET TO A POINT OF CURVATURE; THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 410.28 FEET, THROUGH A CENTRAL ANGLE OF 46°46'10', AN ARC DISTANCE OF 334.90 FEET; THENCE NORTH 48°33'38' EAST 188.36 FEET, THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 410.28. FEET THROUGH A CENTRAL ANGLE OF 72°18'35', AN ARC DISTANCE OF 517.55 FEET TO AN INTERSECTION WITH A LINE BEARING SOUTH 56°38'20' EAST; THENCE SOUTH 56°38'20' EAST ALONG SAID LINE A DISTANCE OF 69.93 FEET; THENCE SOUTH 43°44'23' EAST 71.30 FEET; THENCE SOUTH 45°09'27' EAST 9.91 FEET TO THE WESTERLY MARGIN OF JAMES CHRISTENSEN ROAD NO. 1479; THENCE SOUTH 37.'54'41' WEST 488.23 FEET; THENCE SOUTH 32.39'25' WEST 132.67 FEET; THENCE NORTH 8892'32' WEST 524.50 FEET; THENCE NORTH 01°47'28' EAST 90.66 FEET TO THE TRUE POINT OF BEGINNING. TOGETHER WITH AND SUBJECT TO ALL PROTECTIVE COVENANTS, RESTRICTIONS, RESERVATIONS AND EASEMENTS OF RECORD; SITUATE IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WASHINGTON. (LEGAL DESCRIPTION PER TRANSAMERICA TITLE INSURANCE CO, TITLE REPORT DATED FEBRUARY 27, 1988.) .g. 3-64 B LEASE AGREEMENT EXHIBIT D SPACE PLAN 5 564 566 568 -D• IN WITNESS WHEREOF, the parties have subscribed their respective signatures in execution hereof, on the day and year written. TENANT: Seattle SMSA Limit -d Partnership By: U S WEST NewV=ctor Group, Inc. Ge + a Pc rtner By: Name: W. 1 Dix•n Title: Vic- President for Network and Services Date: LANDLORD: Equ'tec Rea By: Name: P Irak( eYk [ /` 5, Title: es64i4-•1 Cie (I r� Hallwood Management Company, as Agent for: Equitec Real Estate Investors Fund XVI Investors Fund XVI Date: 3e/ /'5'49' 1 25 CASCADTAPM Project: SEA East Andover Applicant: Verizon Applicant Representative: Tami Drew, Cascadia PM Address: 733 Seventh Ave, Suite 209, Kirkland, WA 98033 Phone: 206.331.7072 E-mail: tami.drew@cascadiapm.com Project Location: 596 Industry Drive, Tukwila, WA 98168 Parcel Number: 022340-010 Property Zoning: TUC Project Description: Precision Proaram Manaaement 7 March 2014 Verizon is removing 5 existing antennas and adding 8 new antennas. Total antenna count is going from 9 to 12 antennas located at the same height as existing antennas. Verizon will also add 6 RRHs (radios), 3 TMAs (tower mounted amplifiers), 2 surge protectors, and 1 hybrid fiber/power cable. Designs are attached. Applicable Applications: Type 1 Land Use Permit Project Summary: This is a proposal to make changes to equipment on an existing Verizon Wireless Communications Facility, on a tower located at 596 Industry Drive, Tukwila, WA 98168. The height of the tower and the square footage of the enclosure area will not increase. Attachments: 1. Application Checklist — 1 copy 2. Completed Application Form and 3. 4 sets of plans — 11 x 17 4. Application Fee (check) Cascadia PM, LLC Corporate Headquarters 3322 South Bay Road NE Olympia, WA 98506 360 438 8002 www.cascadiapm.com Drawings (5 copies) 130 N. Nimitz Hwy Suite A-200 Honolulu, HI 96817 808 536 7400 RECEIVED MAR 18 2014 (;(/MMt./i�Ji,�i r�5�-r �1 fi`l `{'CTSuif A-2 Vancouver, WA 98662 360 885 9200 733 Seventh Ave Suite 209 Kirkland, WA 98033 425 428 1008 4• 1. CASCADIAPM Precision Proaram Manaaement 5. Copy of signed lease in lieu of Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter Property to show allowed access to lease area. 6. SEPA Environmental Checklist — not required per 6 ii 7. Letter from applicant describing proposed project and describing compliance with City's Code requirements 8. Sensitive Area studies and proposed mitigation — not required 9. Noise Report — not applicable 18.58.090 Adding Antennas to Existing WCF Tower -Specific Development Standards 1. Height The equipment and antennas changes will not change the height of the tower. 2. Antenna aesthetics Antennas will be painted to match the color scheme of the tower. 3. Antenna intensity Since there is no limit for antennas on an existing tower, changing from 9 to 12 antennas meets code requirements. 4. Feed lines 1 hybrid fiber/power cable will be added according to code, similar to existing coax cables. 5. Cabinet equipment No new cabinets are being added to this facility. 6. Setbacks Setbacks do not apply since the installation and changes are on an existing tower and will not be outside of the existing equipment enclosure. Cascadia PM, LLC Corporate Headquarters 3322 South Bay Road NE Olympia, WA 98506 360 438 8002 www.cascadiapm.com 130 N. Nimitz Hwy Suite A-200 Honolulu, HI 96817 808 536 7400 5501 NE 109th Ct Suite A-2 Vancouver, WA 98662 360 885 9200 733 Seventh Ave Suite 209 Kirkland, WA 98033 425 828 1008 COMPLETE APPLICATION CHECKLIST The materials listed below must be submitted with your application unless specifically waived in writing the Department of Community Development. Please contact each Department if you feel that certain items are not applicable to your project and should be waived. Application review will not begin until it is determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED. The initial application materials allow project review to begin and vest the applicant's rights. However, the City may require additional information as needed to establish consistency with development standards. City staff are available to answer questions about application materials at 206-431-3670 (Department of Community Development) and 206-433-0179 (Department of Public Works). Check items submitted with application Information Required. May be waived in unusual cases, upon approval of both Public Works and Planning APPLICATION MATERIALS: Items 1-9 are required for ALL Wireless Telecommunication Facilities. ✓ 1. Application Checklist (1 copy) indicating items submitted with application. ✓ 2. Completed Application Form and drawings (5 copies). ✓ 3. Four sets of plans prepared by a design professional. The plans shall include a vicinity map, site map, architectural elevations, method of attachment, proposed screening, location of proposed antennas, and all other information which accurately depicts the proposed project. Minimum size is 8 1/2" x 11". Plans shall be no greater than 24" x 36". ✓ 4. Application Fee: See Land Use Fee Schedule. ✓ 5. Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter Property (1 copy attached). I v /A 6. SEPA Environmental Checklist. SEPA is not required when the facility: i) Is a microcell and is to be attached to an exiting structure that is not a residence or school and does not contain a residence or a school; ii) Includes personal wireless antennas, other than a microcell, and is to be attached to an existing structure (that may be an existing tower) that is not a residence or school and does not contain a residence or school, and the existing structure to which it is to be attached is located in a commercial, industrial, manufacturing, forest or agriculture zone; or iii) Involves constructing a personal wireless tower less than sixty feet in height that is located in a commercial, industrial, manufacturing, forest, or agricultural zone. ✓ 7. A letter from the applicant describing the proposed project and describing compliance with the City's Code requirements. N/A 8. Sensitive Area studies and proposed mitigation (if required). N / h 9. If an outdoor generator is proposed, a report prepared by an acoustical engineer demonstrating compliance with TMC Chapter 8.22, "Noise". If the application requires a Type 2 review these additional items are needed: 10. Four sets of photo simulations that depict the existing and proposed view of the proposed facility; 11. Materials board for the screening material; 12. Landscaping plan; 13. Letter from a radio frequency engineer that demonstrates that the facility meets Federal requirements for allowed emissions; 14. If the facility is located within a residential zone, a report from a radio frequency engineer explaining the need for the proposed wireless communication facility at that location. Additionally, the applicant shall provide detailed discussion on why the wireless communication facility cannot be located within a commercial or industrial zone. H;\Land Use Applications in PDF\Wireless Communication Facility-Jan2011.doc CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 FAX: (206) 431-3665 E-mail.: planninzivTukwilaWA.gov WIRELESS TELE- COMMUNICATION FACILITIES APPLICATION FOR STAFF USE ONLY Permits Plus Type: P -WIRE Planner: File Number: Z_ lel_ i-() Application Complete Date: Project File Number: 'p (_ f L/_CJ 6 ( a Application Incomplete Date: Other File Numbers: NAME OF PROJECT/DEVELOPMENT: SEA East Andover LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. 596 Industry Drive, Tukwila, WA 98188 LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). 022340-010 DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City, to whom all notices and reports will be sent. Name: Tami Drew Address: Phone: E-mail: 733 Seventh Ave #209, Kirkland, WA 98033 (206) 331-7072 targi.drew@cascadiapm.com FAX: (425) 671-6201 Signature: Date: '7FCEIVED MAR 18 2014 H:\L.and Use Applications in PDF\Wireless Communication Facility-Jan201 DE-VE_LUPMLNT 03/07/2014 EAST ANDOVER - AWS veflZflwireIess CONSTRUCTION DRAWINGS ver►nnwireless PROJECT DATA PROJECT CONTACTS DRAWING INDEX CASCADIA PM 3322 SOUTH BAY ROAD NE OLYMPIA, WA 98506 PH: 360.438.8002 SITE ADDRESS: 574 INDUSTRY DRIVE GOVERNING CODES APPLICANT SHEET I DESCRIPTION TUKWILA, WA 98188 IBC-2012, INTERNATIONAL BUILDING CODE W/ LOCAL AMENDMENTS LATITUDE: 47°27'15.36" N LONGITUDE: 122°14'55.44" W NEC-2008, NATIONAL ELECTRICAL CODE VERIZON WIRELESS 3245 158TH AVE MS 231 BELLEVUE, WA 98008 PROPERTY OWNER T1.0 TITLE SHEET T2.0 GENERAL NOTES A1.0 OVERALL SITE PLAN SOURCE: VZW SMR ADA COMPLIANCE REIT MANAGEMENT & RESEARCH LLC ANDOVER EXECUTIVE DATUM: NAD 83 INSTALLATION IS UNMANNED AND NOT FOR HUMAN HABITATION. HANDICAP ACCESS IS NOT REQUIRED PER A.D.A. JURISDICTION: CITY OF TUKWILA TAX ID NO.: 0223400010 PARK AND WEST VALLEY DISTRIBUION CENTER 617 INDUSTRY DRIVE TUKWILA, WA 98188 TOWER OWNER A1.1 ENLARGED SITE PLAN A2.0 ELEVATION A3.0 ENLARGED ANTENNA PLANS — M9 ZONING CLASSIFICATION: TUC (TUKWILA URBAN CENTER) ELEVATION: 25 AMSL TOP MONOPOLE: 74'-0" AGL VEGROUND 3245 1558TH AVE MS 231 BELLEVUE, WA 98008 DRAWING LEGEND ,! MC SQUARED I N C O R P O R AT S D OF (E) S. l. SI9 `Z`P OF WAS/4.j ,9 G ��8 4T, 0 20:•• '9,L ` %OVAL 03/18/14 OCCUPANCY GROUP: U PRINCIPAL ENGINEER, NETWORK CONSTRUCTION — — — SUBJECT PROPERTY LINE CONSTRUCTION TYPE: II-B VERIZON WIRELESS 3245 158TH AVE MS 231 — — ADJACENT PROPERTY LINE LEASE AREA COAX ROUTE BELLEVUE, WA 98008 COAX (E) HYBRID CABLE ROUTE HYBRID (N) TELCO ROUTE ZONING AND PERMITTING CONSULTANT T CASCADIA PM 733 SEVENTH STE 209 T / P TELCO/POWER ROUTE, P ROUTE PROJECT SUMMARY DRIVING DIRECTIONS KIR80,33 POWER F SARAH ROGERS FIBER ROUTE PH: 425.671.6201 F / P FIBER/POWER ROUTE EXISTING FENCE THIS PROJECT INCLUDES THE FOLLOWING SCOPE OF WORK: FROM SEA-TAC INTERNATIONAL AIRPORT: SITE ACQUISITION CONSULTANT x------x 1. PROPOSED MODIFICATION OF AN EXISTING TELECOMMUNICATIONS FACILITY. 1. HEAD SOUTH ON DEPARTURES DR 0.4 MI 2. CONTINUE ONTO AIRPORT EXPRESSWAY 1.3 MI CASCADIA PM 5501 NE 109TH CT, STE A-2 VANCOUVER, WA 98662 X CPM PROJECT NO.: 7141 PRELIMINARY NO. DATE D/C DESCRIPTION 2. PROPOSED REMOVAL OF SIX (6) PANEL ANTENNAS WITH INSTALLATION OF EIGHT (8) PANEL ANTENNAS, SIX (6) RRU'S,THREE (3) TMA'S, AND TWO (2) SURGE PROTECTORS (ONE (1) MOUNTED NEAR GROUND EQUIP. AND ONE (1) MOUNTED NEAR ANTENNAS) WITH ASSOCIATED HYBRID CABLE/COAXIAL CABLE. 3. KEEP RIGHT AT THE FORK AND MERGE ONTO WA-518 E 1.9 MI 4. CONTINUE ONTO 1-405 N 0.5 MI PAMELA TURNER PH: 360.567.3790 STRUCTURAL ENGINEER XX.X ELEVATION MARKER 0 02-14-14 CL/EG 90% CD REVIEW 1 03-04-14 EG/DM CLIENT COMMENT 5. TAKE EXIT 1 FOR WA-181 S TOWARD TUKWILA/W VALLEY HWY 0.3 MI MC SQUARED INC. © MARKER 6. TURN RIGHT ONTO WA-181 S/W VALLEY HWY 0.4 MI 7. TURN RIGHT ONTO STRANDER BLVD 0.3 MI 1235E 4TH AVE, SUITE 101 OLYMPIA, WA 98506 MICHAEL SZRAMEK SECTION NW SUBMITTAL NO. DATE D/C DESCRIPTION 8. TURN LEFT ONTO ANDOVER PARK E 0.1 MI 9. TAKE THE 1ST LEFT ONTO INDUSTRY DR ESTIMATED TIME: 9 MINUTES ESTIMATED DISTANCE: 5.3 MILES PH: 360.754.9339 CDs 42. = _ 0 03-17-14 EG/EG BP SUBMITTAL SITE NAME 2 EAST ANDOVER PROJECT VICINITY MAP W co - 574 INDUSTRE Y DRIVE TUKIMLA, WA 98188 �, ark rQ �d t (I ..:..:`:. BBkBIIvd i-: a�, = b Boekig Longacres i in Q„,, ns =' L. , I 03 Southc rder Mall i £ WlIdu8Nie1Pork m APPROVAL LIST SHEET TITLE a St AStrantler-Bivtl • — PROJECT LOCATION $W...27th-St- - TITLE SIGNATURE DATE TITLE SHEET Tukwila § i - PROPERTY OWNER W a ) � ' lti I Renton VZW REPRESENTATIVE °k is1 r 1 16.1° PROJECT MANAGER s 170th St s �I ro N SITE ACQUISITION SHEET NO. P, 1 SeaTac i g X TN MN E i� m ZONING T e -Minl1er m SW” 34th SS p� W E T W NIP 245 / CONST. MANAGER BRI— )i 3 gg ( 00 RF ENGINEER Upland.:.EQr'r I v t S AAV MANAGER GENERAL NOTES 1. THE FACILITY IS AN UNOCCUPIED SPECIALIZED MOBILE RADIO FACILITY. 2. PLANS ARE NOT TO BE SCALED AND ARE INTENDED TO BE A GRAPHIC REPRESENTATION OF THE FINAL INSTALLATION. THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES AND LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE DRAWINGS. 3. PRIOR TO THE SUBMISSION OF BIDS, THE CONTRACTOR SHALL VISIT THE JOB SITE AND BE RESPONSIBLE FOR ALL CONTRACT DOCUMENTS, FIELD CONDITIONS, AND DIMENSIONS AND CONFIRMING THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER. 4. THE CONTRACTOR SHALL RECEIVE, IN WRITING, AUTHORIZATION TO PROCEED BEFORE STARTING WORK. 5. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS UNLESS SPECIFICALLY OTHERWISE INDICATED OR WHERE LOCAL CODES OR REGULATIONS TAKE PRECEDENCE. 6. ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE OF THE WORK. MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND LOCAL AND STATE JURISDICTIONAL CODES, ORDINANCES, AND APPLICABLE REGULATIONS. 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING BEST SKILLS AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT INCLUDING CONTACT AND COORDINATION WITH THE PROJECT MANAGER AND WITH LANDLORD'S AUTHORIZED REPRESENTATIVE. 8. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A1OBC WITHIN 5 FEET OF TRAVEL DISTANCE TO ALL PORTIONS OF THE PROJECT AREA DURING CONSTRUCTION. 9. THE CONTRACTOR SHALL PROVIDE SITE FOREMAN WITH A CELLULAR PHONE, AND KEEP SAME ON SITE WHENEVER ANY PERSONNEL ARE ON SITE. 10. DETAILS ARE INTENDED TO SHOW END RESULT OF DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. 11. THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, PAVING, CURBS, GALVANIZED SURFACES, ETC., AND UPON COMPLETION OF WORK, REPAIR ANY DAMAGE THAT OCCURRED DURING CONSTRUCTION TO THE SATISFACTION OF THE PROJECT MANAGER AND/OR LANDLORD. 12. ON A DAILY BASIS: KEEP GENERAL AREA CLEAN, HAZARD FREE, AND DISPOSE OF ALL DIRT, DEBRIS, RUBBISH, AND REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY. LEAVE PREMISES IN CLEAN CONDITION AND FREE FROM PAINT SPOTS, DUST OR SMUDGES OF ANY NATURE. 13. CONTRACTOR TO PROVIDE COMPLETE SET OF AS -BUILT DRAWINGS WITHIN 10 WORKING DAYS OF PROJECT COMPLETION. 14 WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. 15. ASTM SPECIFICATIONS NOTED ON THE DRAWINGS SHALL BE OF THE LATEST REVISION. 16 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTI9LITIES WHETHER SHOWN HERON OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT IN CONJUNCTION WITH THE PROSECUTION OF THIS WORK. 17. ALL ITEMS REMOVED OR DAMAGED DURING CONSTRUCTION WORK WILL BE REPLACED OR REPAIRED TO MATCH EXISTING. SPECIAL INSPECTION 1. THE REQUIRED SPECIAL INSPECTIONS SHALL BE PERFORMED BY AN INDEPENDENT SPECIAL INSPECTOR. 2. THE SPECIAL INSPECTOR SHALL PROVIDE A COPY OF THEIR REPORT TO THE OWNER, ARCHITECT, STRUCTURAL ENGINEER, CONTRACTOR, AND BUILDING OFFICIAL AS EACH TEST IS COMPLETED. 3. ANY MATERIAL WHICH FAILS TO MEET THE PROJECT SPECIFICATIONS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER. SPECIAL INSPECTOR TESTING REQUIREMENTS APPLY EQUALLY TO ALL BIDDER DESIGNED COMPONENTS. 4. INSPECTION FOR PREFABRICATED CONSTRUCTION SHALL BE THE SAME AS FOR THE MATERIAL USED IF THE CONSTRUCTION TOOK PLACE ON SITE. CONTINUOUS INSPECTION WILL NOT BE REQUIRED DURING PREFABRICATION IF THE APPROVED AGENCY CERTIFIES THE CONSTRUCTION AND FURNISHES EVIDENCE OF COMPLIANCE. 5. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT CERTIFYING THAT ALL WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE SPECIAL INSPECTOR'S KNOWLEDGE IN CONFORMANCE WITH THE APPROVED PERMIT PLANS AND SPECIFICATIONS AND THE APPLICABLE WORKMANSHIP PROVISIONS. l /y-0�2o STRUCTURAL NOTES GENERAL STRUCTURAL NOTES: 1. WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. 2. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES. 3. NO PIPES, DUCTS, SLEEVES, CHASES, ETC., SHALL BE PLACED IN SLABS, BEAMS, OR WALLS UNLESS SPECIFICALLY SHOWN OR NOTED, NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR PIPES, DUCTS, ETC., UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FOR INSTALLATION OF ANY ADDITIONAL PIPES, DUCTS, ETC. 4. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD VERSION WIRELESS AND THE ARCHITECT/ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF VERIZON WIRELESS WIRELESS OR THE ARCHITECT/ENGINEER. 5. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE, WORKERS, AND PEDESTRIANS DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, TEMPORARY STRUCTURES, AND PARTIALLY COMPLETED WORK, ETC. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT/ENGINEER SHALL NOT INCLUDE INSPECTION OF SUCH ITEMS. 6. ASTM SPECIFICATIONS NOTED ON THE DRAWINGS SHALL BE OF THE LATEST REVISION. 7. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOOR OR ROOF. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING/BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. 8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT IN CONJUNCTION WITH THE PROSECUTION OF THIS WORK. 9. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS. 10. THESE NOTES SHALL BE CONSIDERED A PART OF THE WRITTEN SPECIFICATIONS. 11. ALL ITEMS REMOVED DURING CONSTRUCTION WORK (I.E., DRYWALL, PLYWOOD, CEILING PANELS, ETC.) SHALL BE REPLACED TO MATCH EXISTING. THE FOLLOWING REQUIREMENTS SHALL BE MET FOR SPECIAL INSPECTION: A. THE SPECIAL INSPECTOR SHALL BE UNDER THE SUPERVISION OF A REGISTERED PROFESSIONAL ENGINEER. B. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE ARCHITECT/ENGINEER, AND OTHER DESIGNATED PERSONS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION; THEN, IF UNCORRECTED, TO THE PROPER DESIGN AUTHORITY AND THE BUILDING OFFICIAL. C. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT SIGNED BY BOTH HE AND HIS SUPERVISOR STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE. D. COMPLY WITH ALL CITY SPECIAL INSPECTION REQUIREMENTS. STANDARD STRUCTURAL STEEL NOTES: 1. ALL METAL WORK SHALL BE IN ACCORDANCE WITH THE SPECIFICATION GALVANIZED ASTM A123-A123M-02 UNLESS NOTED OTHERWISE. 2. STRUCTURAL TUBING MEMBERS SHALL CONFORM TO ASTM A500, GRADE A OR A501. 3. ALL WELDING SHALL BE DONE USING E70XX ELECTRODES AND WELDING SHALL CONFORM TO AISC AND AWS D1.1 WHERE FILLET WELD SIZES ARE NOT SHOWN, PROVIDE THE MINIMUM SIZE PER TABLE J2.4 IN THE AISC "MANUAL OF STEEL CONSTRUCTION", 9TH EDITION. 4. BOLTED CONNECTIONS SHALL USE BEARING TYPE GALV. ASTM A307 BOLTS (5/8" DIA. UNO) AND SHALL HAVE A MINIMUM OF TWO BOLTS U.N.O AND SHALL INCLUDE HEAVY -HEX NUTS AND STANDARD CUT WASHERS. 5. NON-STRUCTURAL CONNECTIONS FOR HANDRAIL, LADDERS AND STEEL GRATING MAY USE 5/8" DIA GALVANIZED ASTM A307 BOLTS U.N.O. 6. ALL STRUCTURAL PIPE ASTM A53, TYPE E OR S, GRADE B. SPECIAL INSPECTION: 1. THE REQUIRED SPECIAL INSPECTIONS SHALL BE PERFORMED BY AN INDEPENDENT SPECIAL INSPECTOR PER CODE FOR THE FOLLOWING ITEMS. A. CONTINUOUS DURING THE INSTALLATION OF EXPANSION AND/OR ADHESIVE ANCHORS: INSPECT HOLE SIZE, DEPTH, CLEANLINESS, AND INSTALLATION PER ICBG REPORT. DRAWING ABBREVIATIONS AFF ABOVE FINISH FLOOR LF LINEAR FEET AGL ABOVE GRADE LEVEL MAX MAXIMUM AWG AMERICAN WIRE GAUGE MECH MECHANICAL AC AIR CONDITIONING MFR MANUFACTURER ADJ ADJUSTABLE MGR MANAGER APPROX APPROXIMATELY MIN MINIMUM AZ AZIMUTH MISC MISCELLANEOUS BLDG BUILDING MTL METAL CM CONSTRUCTION MANAGER MTZL METALIZE(D) CAB CABINET MW MICROWAVE CL CENTERLINE NEC NATIONAL ELECTRICAL CODE CLG CEILING NIC NOT IN CONTRACT CLR CLEAR NTS NOT TO SCALE CO COPPER N/A NOT APPLICABLE CONC CONCRETE OC ON CENTER COND CONDUIT OD OUTSIDE DIAMETER CONST CONSTRUCTION OP OVERHEAD POWER CONT CONTINUOUS OT OVERHEAD FIBER CPM CASCADIA PM OPP OPPOSITE D/C DRAFTER/CHECKER PL PROPERTY LINE DEMO DEMOLISH PLYWD PLYWOOD DIA DIAMETER PM PROJECT MANAGER DIM DIMENSION PROJ PROJECT DN DOWN PROP PROPERTY DTL DETAIL PT PRESSURE TREATED DWG DRAWING RO ROUGH OPENING EA EACH ROW RIGHT OF WAY ELECT ELECTRICAL RRU REMOTE RADIO UNIT ELEV ELEVATION REQ REQUIRED EQ EQUAL SBTC SOLID BARE TINNED COPPER EQUIP EQUIPMENT SF SQUARE FEET EXT EXTERIOR SHT SHEET FIN FINISH SPEC SPECIFICATION FLR FLOOR SQ SQUARE FT FOOT, FEET SS STAINLESS STEEL GA GAUGE STL STEEL GALV GALVANIZED STRUCT STRUCTURE, STRUCTURAL GC GENERAL CONTRACTOR TOC TOP OF CONCRETE GWB GYPSUM WALL BOARD TOM TOP OF MASONRY GR GRADE THRU THROUGH GRND GROUND TNND TINNED HVAC HEATING, VENTING & AIR CONDITIONING UBC UNIFORM BUILDING CODE HORIZ HORIZONTAL UG UNDERGROUND HT HEIGHT UNO UNLESS NOTED OTHERWISE IBC INTERNATIONAL BUILDING CODE UP UNDERGROUND POWER ID INSIDE DIAMETER UF UNDERGROUND FIBER IN INCH VIF VERIFY IN FIELD INSUL INSULATION VERT VERTICAL INT INTERIOR WP WATERPROOF JBOX JUNCTION BOX W/ WITH LB(S) POUND(S) W/O WITHOUT V@I7nawireless CASCADIA\ PM 3322 SOUTH BAY ROAD NE OLYMPIA, WA 98506 PH: 360.438.8002 I IMS 111. MI NM MN MC SQUARED I N C O A P O R A T S o CPM PROJECT NO.: 7141 PRELIMINARY NO. DATE D/C DESCRIPTION 0 02-14-14 CUEG 90% CD REVIEW 1 03-04-14 EG/DM CLIENT COMMENT SUBMITTAL NO. DATE D/C DESCRIPTION 0 03-17-14 EG/EG BP SUBMITTAL SITE NAME EAST ANDOVER LIJ ITE AD- D• RESS INDURY DRIVE 1KWILA NA 98188 U Ce IH SHEET TITLE GENERAL NOTES SHEET NO. T2.0 ADJACENT ZONING TUC — — TRECK DR Vii//////////////.i (E) BUILDINGS (TYP) ADJACENT ZONING TUC NOTE: SITE PLAN DERIVED FROM; EXISTING DRAWINGS, GIS, AERIAL IMAGES, DEED AND SITE PHOTOS. (E) RAIL ROAD TRACKS (TYP) PE) SUBJECT ROPERTY LINE (TYP) ± 405 - ANDOVER PARK E (E) INGRESS / EGRESS FROM ANDOVER PARK ± 302' - INDUSTRY DR (E) EDGE OF ASPHALT SURFACE /iiiiiii/./22iii7/7/////wiii/iiii7ii7.4ii,/,///1 i i i / S I TAX ID NO.: 0223400010 AREA: 4.08 ACRES ZONING: TUC (E) INGRESS / EGRESS FROM INDUSTRY DR. VER ZON WIRELESS PROJECT AREA ADJACENT ZONING TUC /EASPHALT SURFACE \ \\ N (E) INGRESS / EGRESS FROM INDUSTRY DR. ADJACENT ZONING TUC LfIMO2L? 6.1^ W cc S 1 OVERALL SITE PLAN SCALE: 1" = 80'-0" (11X17) SCALE: 1" = 40'-0" (22X34) 0' 40' 80' 160' i i V@Y%nawireless CASCADIA PM 3322 SOUTH BAY ROAD NE OLYMPIA, WA 98506 PH: 360.438.6002 MC SQUARED :Ncoxroxwran PEt. s29 G`z• as of l+ss,:l fr. Ak,A 88/CNAL ° 03/18/14 CPM PROJECT NO.: 7141 PRELIMINARY NO. DATE D/C DESCRIPTION 0 02-14-14 CL/EG 90%CDREVIEW 1 03-04-14 EG/DM CLIENT COMMENT SUBMITTAL NO. DATE D/C DESCRIPTION 0 03-17-14 EG/EG BP SUBMITTAL SITE NAME EAST ANDOVER SITE ADDRESS o -6B INDUSTRY DRIVE N_ UKWILA, WA 98188 00 4 N--1 = J SHEET TITLE OVERALL SITE PLAN SHEET NO. A1.0 (E) BUILDING J 22'3" /E) ver,� wireless ....\____....\____X (E) 36" SITE ACCESS GATE'S -x---x-_ (E) MONOPOLE CONCRETE BASE —x._� (ASPHALT SURFACE •-_,,,k 8'-0" (E) 74-0" VERIZON WIRELESS MONOPOLE PM 3322 SOUTH BAY ROAD NE OLYMPIA, 98506 LPY PIA,360.WA8002 (E) VERIZON WIRELESS ICE BRIDGE (N) SURGE SUPPRESSOR MOUNTED TO (E) ICE BRIDGE LEG NEAREST SHELTER (E) GRAVELED COMPOUND SURFACE 4........1CASCADIA �♦� -•_.-.2 (E) VERIZON WIRELESS FENCED COMPOUND MA IM / x •••� co 60 x — (E) VERIZON WIRELESS GPS ANTENNA PIPE MOUNTED TO (E) -- — .--...r..---- A D 1 MC SQUARED INCORPORATED �♦�•�♦ BUILDING x :♦:♦:. :.:♦:. MOUNTED ROOF ACCESS LADDER (E) WALL MOUNTED EXHAUST (E) BUILDING O _ 20L •a, FSS/ONAL a 03/18/14 (E) OUTDOOR HVAC CONCRETE UNITS ON PAD (E) VERIZON (E) VERIZON WIRELESS WIRELESS ICE COAX PORT BRIDGE I CPM PROJECT NO.: 7141 PRELIMINARY NO. DATE D/C DESCRIPTION 0 02-14-14 CUEG 90% CD REVIEW 1 03-04-14 EG/DM CLIENT COMMENT SUBMITTAL (E) EXHAUST ( COVERS NO. DATE D/C DESCRIPTION 0 03-17-14 EG/EG BP SUBMITTAL SITE NAME EAST ANDOVER SITE ADDRESS I (/ � Z 574 INDUSTRY DRIVE TUKWIUA, WA 98188 �� `� S ((E) VERIZON V IRELESS 14J 00 ti { INDOOR EQUIPMENT (TYP) C' y - ,1, SHEET TITLE ENLARGED SITE PLAN v Z, / ti .0020 ,s,o N TN MN SHEET NO. W E / / / / S Al .1 SCALE: 1/4"= 1'-0" (11)(17) 0' 2' 4' 8' 1 ENLARGED SITE PLAN• SCALE:1/2"=1'-0"(22X34) - 1.1 1111� r----)332OLYYMP ANTENNA MOUNT WITH /fed= wireless NOTES: NEW ANTENNAS AND ALL MOUNTING HARDWARE TO BE PAINTED TO MATCH EXISTING STRUCTURE IF REQUIRED. VERIFY PAINT MANUFACTURER AND FINISH WITH OWNER. (E) VERIZON WIRELESS ANTENNA TIP HEIGHT 76.00' — (E) TOP OF MONOPOLE pik CASCADIA PM 2 SOUTH BAY ROAD NE A, WA 98506— PH: 360.438.8002 ,.J - (E) 74'-0" MONOPOLE ' :;, l�• (N) MECHANICAL DOWN TILT (N) VERIZON VNRELESS ANTENNA rrIZIEI MC SQUARED xxacoxroxwrs ) (N) RRU W/ MOUNTING BRACKET TOP AND BOTTOM (N) SURGE PROTECTION UNIT W/ MOUNTING P -t' S29 G• a1usg,_ 9 •-. y't°� r o 20L •�� �� SS/QUAL L—.,, BRACKET TOP AND BOTTOM jr f I OR 2-3/8" O.D. MIN. i 1 (E) (N) ANTENNA PIPE MOUNT(TYP) 03/18/14 1 I NOTES: - VERIFY ANTENNA MOUNTING WITH TOWER STRUCTURAL - (N) JUMPER W/ 10" MIN. RADIUS ON DRIP LOOP; ALL JUMPERS TO BE SECURED AS REQ'D W/ (N) CABLE SUPPORTS, TYP. (E) ANTENNA PLATFORM (E) COLLAR MOUNT CPM PROJECT NO.: 7141 PRELIMINARY NO. DATE D/C DESCRIPTION 0 02-14-14 CUEG 90% CD REVIEW 1 03-04-14 EG/DM CLIENT COMMENT SUBMITTAL NO. DATE D/C DESCRIPTION 0 03-17-14 EG/EG BP SUBMITTAL f- 1 (E) MONOPOLE (N) HYBRID CABLE; SUPPORT HYBRID CABLE W/ IN 12" OF SURGE PROTECTOR W/ HOIST SITE NAME EAST AN DOVER 0 f a- SITE ADDRESS (E) VERIZON WIRELESS SHELTER V GRIPS PER MFR'S REQUIREMENTS (E) COAX PORT L. ,... 0 _� r- / q ... 00 2.6, too v a N574, 1DUSTRY DRIVE ,:T LA, WA 98188 " ;3 (E) GRADE :.� ;- SHEET TITLE ELEVATION SHEET NO. AMSL) (25 SL) � A2 • 0 scALE:1"=10'-o"(11X17) 0' 5' 10' 20' SCALE: NTS (11X17) 1 SOUTH ELEVATION - PROPOSED SCALE: 1" = 5-0" (22X34) • • M 2 ANTENNA MOUNT DETAIL SCALE: NTS (22X34) O0 * Ji mw� = ii Z �a WQZ vii Q r+ V `-' Q co a Nn_Z��i+ Q., 2. �QQ• Z. ` 01 (E) (850 g , BET ) (E) 74'-0" MONOPOLE; OTHER ���• • AZIMUTNCTOR CARRIER ANTENNAS NOT < ' �,t106° SHOWN FOR CLARITY ••• �,� ' ,, :'• ,1 ,50 t ° 4P,..27 Q, 5 ` ±- _ ^ t� V@I7�wireless TOWER -MOUNTED EQUIPMENT SCHEDULE SECTOR QUANTITY (N) / (E) SERVICE TYPE ANTENNA MODEL # OR EQUIPMENT SPECIFICATION TIP HEIGHT AZIMUTH MECH. DOWNTILT DIMENSIONS WEIGHT !OuTHyRoAoNE OLYMPIA, WA 98506 PH: 360.438.8002 ALPHA 1 (N) AWS WWX063X19X00.704-2100 76.03' 10° 0° 12.1"W 7.0"D 75.0"L 32 LBS 1 (E) 850 B BXA-80063/4CF 75.98' 10° 4° 11.2'W 4.5"D 47.4"L 9.9 LBS 1 (N) 700 UPPER BXA-70063/8CF 74.00' 10° 4° 11.2'W 5.1"D 94.6"L 24 LBS 4>4..�'2' -'='.�, (E) (UN ��CrJ ^a ze . 4• 5 /1 _ ��� BETA sEc,- N) of q 3 A2/MUT / M H, OU S�.A ° �.°' t 7jp, NT 'T U O h C9 Q o (E) (PCS) �0 4 li°� �1' ,z / t AE) SE) c p AZ/ T SECTOR gQ/Z•'r MU H = * 706° U `1 t '1 ♦ I +I - � BETA SEC TQ R ' A2/MUTH ':1.-/06 y��U�oy ° 16 j° U `\' N / ', t Q� TN MN ,..„,-- ." J O W -;-, E 1 (N) PCSA WWX063X19X00.T04-1900 76.03' 10° 0° 12.11N 7.0"D 75.0"L 32 LBS "D X Lti 1 (N) TOWER MOUNTED AMPLIFIER 9.9'W X 6.4"D X 11.0"L 10.5 LBS 2 (N) DIPLEXER 1 (N) SURGE PROTECTOR 10.3'W X 15.7"D X 19.2"L 27 LBS BETA 1 (N) AWS WWX063X19X00.T02-2100 76.00' 106° 0° 12.1'W 7.0' D 75.0'L 32 LBS ITIFZEI 1_ 1 - (E) 850 B BXA-80090/4CF 75.98' 106° 0° 8.0'W 5.9"0 47.5"L 12 LBS 1 (N) 700 UPPER BXA-70063/8CF 73.98' 106° 0° 11.2'1N5.1 "D 94.6"L 24 LBS _ . ' 1 PCS A WX063X19X00•T04-1900 76.00' 106° 0° MCS SQUARED Q INCORPORA'f8D (N) RW RU 1815' W X 7.4"D X 20A"L 58 LBS 1 (N) TOWER MOUNTED AMPLIFIER 9.9"W X 6.4"D X 11.0"L 10.5 LBS 2 (N) DIPLEXER 1�t L 9 Sz ÷r-OF WASBAZI C) �0, T ` 0 I f - * ' q"'� 20. • ?� . r�•� /OVAL 03/18/14 GAMMA 1 (N) AWS WWX063X19X00.T04-2100 76.02' 205° 0° 12.1'W 7.0"D 75.0"L 32 LBS 1 (E) 850 B BXA-80063-8CF-EDIN-6 75.97' 205° 1° 11.2'W 4.5"D 94.7"L 24 LBS 1 (E) 700 UPPER BXA-70063-8CF•6-750MHZ 76.05' 205° 1° 11.2'W 5.1"D 94.6"L 24 LBS 1 (N) PCS A WWX063X19X00-T04-1900 76.02' 205° 0° 12.1"W 7.0"D 75.0"L 32 LBS S 2 (N) RRU 18.5'W X 7.4"D X 20.4"L 58 LBS 1 (N) TOWER MOUNTED AMPLIFIER 9.9"W X 6.4"D X 11.0"L 10.5 LBS 2 (N) DIPLEXER SCALE: 3/16" = 1'-0" (11X17) 0' 5' 10' 2 ANTENNA PLAN - EXISTING SCALE: 3/8"=1'-0"(22X34) mu m NEAR EQP. 1 (N) SURGE PROTECTOR 10.3W X 15.7"D X 19.2"L 27 LBS o: o _ 0. o o✓ .1 m w o = I -o o 0 cr 0 y 0 h ti o C j U /- ^ G Q 2 m = w �� --.1 m •ga - a co h Q ti h vi 3 ,, Z Z --¢ CO2 aQj ttY Q •W.. Q Q Zp ,� W. ¢ ° + /�NTENN uy UTH,t MOUNT 7jp° ^ Viii, 'f (N) VERIZON WIRELESS 0�_ .�/�.■" t ,` J r�°��', BETq S B) MOUNTED SURGE PROTECTORBEHINDANTENNA•,S• f (N)(pCs�IMUTHCT,O6. (1 REQ'D NEAR ANTENNAS) J� • oi, - BET �; AzIMUTH�T OR C3 CPM PROJECT NO.: 7141 COAX/FIBER SCHEDULE PRELIMINARY NO. DATE D/C DESCRIPTION SECTOR QUANTITY NEW OR EXIST. TYPE DIPLEXED/ TRIPLEXED SERVICE TYPE 0 02-14-14 CUEG 90% CD REVIEW A,B,G 1 NEW 1.09"FIBER/PWR N/A AWS 1 03-04-14 EG/DM CLIENT COMMENT ALPHA 2 EXIST. 1 5/8" COAX DIPLEXED 850/PCS SUBMITTAL 2 EXIST. 1 5/8"COAX N/A 700 NO. DATE D/C DESCRIPTION BETA 2 EXIST. 1 5/8" COAX DIPLEXED 850/PCS 0 03-17-14 EG/EG BP SUBMITTAL 2 EXIST. 1 5/8" COAX N/A 700 GAMMA 2 EXIST. 1 5/8" COAX DIPLEXED 850/PCS 2 EXIST. 1 5/8" COAX N/A 700 SITE NAME NOTES: �, EAST ANDOVER ` co e, ITE ADDRESS ,. NEW ANTENNAS AND ALL MOUNTING HARDWARE TO BE PAINTED TO MATCH EXISTING STRUCTURE IF REQUIRED. VERIFY PAINT MANUFACTURER AND FINISH WITH OWNER. 2. TOWER STRUCTURAL ANALYSIS TO BE PERFORMED BY OTHERS. VERIZON WIRELESS INSTALLATION SHALL NOT START UNTIL ENGINEER RECEIVES COPY OF APPROVED STRUCTURAL ANALYSIS OR ASSESSMENT. 3. CONTRACTOR RESPONSIBLE FOR PROVIDING TOWER RIGGING PLANS, SUBJECT TO OWNER APPROVAL. 4. REFER TO STRUCTURAL ANALYSIS FOR APPROVED HYBRID COAX(N) CABLE PLACEMENT. 5. RAYCAP DC SURGE PROTECTOR RCMDC-3315-PF-48 TO BE MOUNTED NEAR ANTENNAS, SECTOR TBD. ?P�O� �� .,`Z ` L °- �� \* o�* . I `oh0�o L/1' � (N (E) 74'-0" MONOPOLE; OTHER t , O a BETgAwS) CARRIER ANTENNAS NOT co SECT �e J A, �IMUTI / , �6° SHOWN FOR CLARITY 0 to iii' Q a Q h ry rr: 5 C7 2 V n Ls (N) (00)2 'r ,.,,,,;,;;;.;;` BETq �e-.4co �IMUTlEjCTOR 4U,�0 o „ .f.I' �/ l ps° (T eo VERIZON WIRELESS RRU ='tu0 t� %' MOUNTED BEHIND ANTENNA 0 , • (TYP OF 6) Z -4: ` O h Oen `U ry 11r TN `j. �� J W Lu "'r 16.1. N MN / E U INnDLUAS WA DRIVE O SHEET TITLE ENLARGED ANTENNA PLANS SHEET NO. tip q ....04 zd 4 / (N) VERIZON WIRELESS TOWER MOUNTED AMPLIFIER MOUNTED BEHIND ANTENNA (TYP OF 3) S A3 ■ 1 ANTENNA AND COAX/FIBER SCHEDULES SCALE: 3/16"=,'-0"(11X17) 0'm 5' 10' 3 ANTENNA PLAN - PROPOSED SCALE: 3/8" = 1'-0" (22X34) mi Application • Original application materials • Subsequent materials submitted by the applicant Include only one copy of all studies (and one to library if wetland report or soils report) Notice • Affidavit of mailings and mailing addresses (returned notices can be discarded after appeal period) Correspondence • Routing to other departments • All public correspondence including letters to the applicant, public & agency comments Decision (for long range projects this section would include staff report to PC, agenda packets to CC etc in chronological order) • Notice of Decision • Staff report with attachments (include a color photograph of any boards or materials) • Approved plans • Minutes of the meeting if PC or City Council.