Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 654 - Fiberchem Building
fiberchem BUILDING new warehouse and office building 1120 andover park east mccann construction company pacific western demolition company Cr li TUKWILA BUILDING Pb%,vAIT PERMIT No IIBDINC PERMIT TUILWMA, WASHINGTON 654 I LOT AR ]tA •LOCK REAR YARD NEAREST BUILDING CLASS OF WORK MAIN WIDTH DEPTH AREA BUILDING TYPE OF CONSTRUCTION FT. 8q, FT. ..SIZE FT. •��•�...�/���'�yy-/y-yy_ OF ACCESSORY WIDTH DEPTH AREA aZ N BUILDING BUILDING X FT. FT. Sq. FT. SQ. FT, EXISTING BUILDING AREA----------- Sq. FT. LOT COVERAGE EXTERIOR FINISH TOTAL AREA ✓t OCCUPIED Y G� 7 LOT AREA 5k GJ I so• FT. e r.9 sq. OCCUPANCY TO BE USED HOW AS �I G q- HEATED ROOMS I TOTAL I O F BATHS I LIVING COMBO DEN KITCHEN INOOK VALUATION OF HOUSES GARAGE S HOUSE ATT. GARAGE S ALLIMPROVEMENTS FOUNDATION OK I FRAMING OK I FINAL INSPECTION LOT AREA OCCUPIED O ER ADDRESS P ONE Jul L SIZE so. ADDRESS GARAGE ATT. I C� r DLT. ARCHITECT ADDRESS OTHER �Q O JOB STREET ff v NUMBER ADDRESS �G /T f^ ZONE LEGAL LOT SIZE w' LOT YARDS MAIN SETBACK SIDE YARD REAR YARD NEAREST ACCESSORY SET BACK SIDE YARD DISTANC BUILDING PROPERTY LINES 1 r y s BUILDING BUILDING is -7D I LOT AR ]tA •LOCK REAR YARD NEAREST BUILDING CLASS OF WORK MAIN WIDTH DEPTH AREA BUILDING TYPE OF CONSTRUCTION FT. 8q, FT. ..SIZE FT. •��•�...�/���'�yy-/y-yy_ OF ACCESSORY WIDTH DEPTH AREA aZ N BUILDING BUILDING X FT. FT. Sq. FT. SQ. FT, EXISTING BUILDING AREA----------- Sq. FT. LOT COVERAGE EXTERIOR FINISH TOTAL AREA ✓t OCCUPIED Y G� 7 LOT AREA 5k GJ I so• FT. e r.9 sq. OCCUPANCY TO BE USED HOW AS �I G q- HEATED ROOMS I TOTAL I O F BATHS I LIVING COMBO DEN KITCHEN INOOK VALUATION OF HOUSES GARAGE S HOUSE ATT. GARAGE S ALLIMPROVEMENTS FOUNDATION OK I FRAMING OK I FINAL INSPECTION LOT AREA OCCUPIED py 9ASLMENT SIZE so. FT. K•D GARAGE ATT. I C� NOOK DLT. LLJI f7 Q OTHER �Q O REMARKS DESCRIPTION OF ANY WORK NOT COVERED ABOVE WARNING Notify Building Department by Street Address and Permit Number when ready for inspection. Work must not be covered before inspection and OK for covering has been given by Inspector in writing on Permit Placard. I hereby acknowledge that I have read this application and state that the above is correct and I further agree to comply with all City Ordinances, State Laws, and lawful orders of the Building Inspector governing building con i struction. 1 I further grant to the building official or his authorized rep- resentative permission to enter upon said building, structure or premises to perform any duty imposed upon him by the Building Code. OWNER I PERMIT FEES, (THIS SPACE FO BUILDING DEPARTMENT USE ONLY) Z� r �V 6!' d HOUSE OTHER HOUSES GARAGE i 4 ^ARAGE S BUILD FEES S BOND NO TOTAL FEES ��Z" Y DATF NOTICE: THIS PERMIT DOES NOT COVER PLUMBING, SEWER, OR WIRING INSTALLATION. PERMIT PLACARD MUST BE POSTED ON THE WORK fiberchem legal description ""'"APPLICATION FOR BUILDING PE1tI1IT CITY OF TUIMIA 2"75 59th Ave. South Tukwila, Washington 98067 APPLICATION IS IEMY 1'L J- TO DO THE FOLL011ING WORK eve VALUla OF CONSTRUCTION Cd Oie'� S :ST ADDRI �S AHaat/ SM &Arg &St LOT BI,OCK DIVISION Olt IEGAL M.SCHIPTION S" At 72AAC AMD 0. 5606r NAM; X ME.,, PAC l FI C WFS row Dave dpmeo' Cd-PHO ri, ;?0 Z Z Vri ADDRESS f0/ A PIN MIt OAP %W r &AV# j Rita Qrwrft f, Wilf#, 5 4'j, 1, Street City State �f TMAE OP CONTRACTOR PHOidE ADDRESS 1 R oo SdurH Ba Fl" 04vi Street City State CQN`1'1?1lC'I'n12`i 'f,7:C]'�l E, NO, BUSIM S LICENSE NO. FIRM ZME PLAT PLAN: Sketch lot plan with property line dimensions and properly area, Include existing structures and /or additions, and measurements for right side yard, left side yard, front yard,. rear yard, height of structure, building size, distance from accessory buildings to main building and their location. The above is a oorrec't. atatemc�nt� and I agree omp]y with till, app lics.hlo codes wAd ordinancos as well as aeoing that my su c ictoro is oil by the City, D AI'S V /�MNrIN i��wvl�► �Nv1. �l ,�r. iI R II►/ fI'C OFICTAL USE ONLY: PD UT NO. BUILDING PERMIT F `'a$ PLAN CHECK FEE: (deposit)$ 9 BUILDING DETARTNENT VALUATION OF CONSTRUCTION: Ry j O itch MA Z a .rap, +,r f •w.' ,ji,: k !,i 1 4 S y l i `.t' i '.A#A e� �l/ia �L L,kR��� ,...5 0 41 f <.tS k� €i1 xd 2 r`fil'x x 7,tf4l Fa} t titt!rA.4� rx. McCann Construction Corl ny, Inc. 8013 Perimeter Road South 'boeing Field 4 SEATTLE, WASHINGTON 98108 01 DATE JOB NO. 11-20-70 P. 156 206 R02-2555 206 R02-8124 ATTENTION RE, TO Mr. Frank Z.n Fiberchem Bldg. Building Department Tukwila, Washington GENTLEMEN: WE ARE SENDING YOU N Attached Under separate cover via the following items: Shop drawings Prints Plans Samples Specifications Copy of letter Change order r COPIES I DATE NO. DESCRIPTION 111 -19- 701167831 Check for $98.25 to cover foundation permit fee THESE ARE TRANSMITTED as checked below: For approval Approved as submitted Resubmit 'copies for. approval For your use L Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment FOR BIDS DUE 19 PRINTS, RETURNED AFTER LOAN TO US REMARKQ COPY TO SIGNED: Antone J. Ritchie it enclosures are not me noted, kindly notify us at once. 1 A thomas szonzo manson burnett and associates 1411 fourth avenue hubert crawley fire marshal (DWRLAKE 61JILDING CONSULT S' 16071 N. E. 2nd ST. r BELLEVUE, ;WASH. 9,1004 AREA CODE 206 SH 6- 5223 ,i NO. 397'i DATE i SOLD 1 f D+> oa m t di na An t s H1PPED TC? t tf,•,��C Hall TA101 lam;_ WEsh I hatan P 0 4 :1 0, 6 7 YOUR ORDER NO, OUR ORDER NO. SALESMAN DATE SHIPPED SHIPPED VIA f.0.8.:. TERMS net C�UANTITY ORDERED QUANTITY SHIPPED STOCK NUMBER /DESCItIPT10N PRICE PER AMOUNT Plan Check No. 0 -383 'manufacturing- Fiberchom Valuations $67,475.46 Permit Fee $171.00 ,7 Plan check fee 85.5�� Tonal Fee 8256.5D. ltlravW lei 'nNAP A WAY® YORM 44.401 3 -W(T'J A 1069 p�p��CM�� d WILSON JONES COMPANY 01997 PRINTCD IN U.S.A. MANSON BENNETT ASSOCIATES THE 1.411 FOURTH AVENUE BUI LD1 NG SEATTLE 9 ©1 O 1 MA 2-1616 December 2, 1970 Mr. Frank Zepp, City Supervisor City of Tukwila 14475 59th Avenue South Tukwila, Washington 98067 Dear Frank; Re: Fiberchem Regarding Project 4156 Fiberchem) plan check, I called Mr. Mangar to clarify Item 2 which has a direct bearing on Items 3, 4, 5, 9. He agrees that if we add one Exit on grid line #1 between girds E and F we will conform with a Type III N, E -3 building. We also discussed item #5, and we agreed to change the separation between the warehouse and office to a one hour wall construction that is 5/8" plaster- board each side in lieu of 1/2 Item 6 is a part of the standard specification and meets the code require- ment. Item 7 is not applicable; there are no temperature partitions. Item 8 is a part of the standard specification and meets with code require- ment. Item #10 the partition as shown are the final layout and no changes are an -s.. ticipated. ..Item #11 light and air requirements are per code. Item #12 ventilating system is per code. Item #13) we are adding one more exit to meet code. (Refers to item 2). Item #14) it if It Item #15 door C -2 will be changed to meet code requirements Item #16). meet all code requirements and are specified in specifications. Item #17) 11 1' Item #18) it if It n Item #19 will be handled the same as all past projects, in accordance with code. Item 420 structural calculations will be mailed out as soon as possible for your review. Item #21 certificates will be issued from the Contractor. Item X122 is under consideration by our structural department. We will advise if necessary. Very truly yours, I TS :bb cc: Mr. Dave Lowry, McCann Const. Co. MAN BENNETT ASSOC ATES Thomas A. Sconzo imi