42nd Ave S Bridge
Replacement
February 2022
Presented with TranTech Engineering,
LLC
1
TRANTECH
Engineering LLC
42nd Ave Bridge History
• Prior crossing at 124th (Riverton Draw Bridge)
• Bridge replaced at 42nd Ave (1949)
• These two locations considered for replacement
• Local Bridge Program (FHWA) funds procured for
replacement
• Grant funds require the bridge to be replaced
within same corridor
Riverton Draw Bridge at S 124th St
2 City of Tukwila 142nd Ave Bridge Replacement
42nd ';57ve S &
Allentown Bridge._
• '16›.
Tukwila C
Center
TRANTECH
id 'Engineering LLC
Timeline
1949 —Existing Bridge built
2017 —Applied for state bridge grant (BRAC) — not received
2019 —Applied for state bridge grant (BRAC) — not received
2020 —Council approves 30% Plans and Estimate (P&E) - $1.1 M City Funds
2021— Received PSRC and Local Bridge Program funding - $1.5M + $12M
2022 — 42nd Ave Bridge included in pending State Transportation Package - $17M
2022 —Complete TS&L and 30% P&E
2023 — 3rd quarter complete 100% Plans, Specifications, and Estimate (PS&E)
bid -ready
2024 — Start construction
2025 —Construction complete by 4th quarter
3 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
III1Engineering LLC
2022 Timeline
January 18th — TIC — Project Update
February 14th — COW — TS&L update
February 22nd — Allentown Community Meeting and continued outreach
March — Additional outreach through South Seattle Chamber of Commerce
March — TS&L submission to Local Programs (WSDOT) for review
March 22nd - Monthly Allentown Community Meeting
March - Council direction for bridge location
• Design needed to progress the project
Reminder for 2022
• Continue to look for additional construction funding
• Advance design to 30% and 60%
4 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
Id 'Engineering LLC
Current Funding Summary
Funding Source
Amount
Matching
Requirements
Project Phase
Local Tukwila Funds
$1.1 M
Puget Sound Regional Council Contingency $1.5 M
Funds
N/A
Not Required
Local Bridge Program Federal Funds through $12 M
WSDOT
13.5% required for
construction if not
obligated by 2024
Washington State Legislature Transportation $17M
Package (pending)
N/A
5 City of Tukwila 142nd Ave Bridge Replacement
Design
Design
Construction/right-
of-way
Construction
TRANTECH
id 'Engineering LLC
Key Decisions for the TS&L Report
• Type —
• Two configurations used at both locations
• Steel plate girders
• Pre -stressed concrete girders
• Size—
• Width- two 12 ft travel lanes with an ADA -approved pedestrian path on the
upstream side
• Span length dependent on bridge location
• Location —
• Current location at 42nd Ave South
• S. 124th alignment
6 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
III 'Engineering LLC
Alternatives Analysis- 42nd Ave S Alignment
Estimated TS&L Cost: $24.4M Total Cost (includes construction, design, construction management,
inflation, and contingency)
7 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
Id 'Engineering LLC
Bridge Plan and Elevation — 42nd Ave S Concept
• Steel Plate Girder
Superstructure
• 255' main -span
with 30' approach
spans
• Min 3 -foot
clearance with
respect to 100 -year
flood
.more MP
MireLIWIffrelfi
mac``- �.��![fl1111I11,04
:.ASlHG SYCflIHO
8 City of Tukwila 142nd Ave Bridge Replacement
--- .ST PER
1P90RLE12 SW,
213.113GEEARE13
4214D. VES
81E�N
BRIDGE PLAN
HCH VAT. El 15.10
ROAD.
£1A
CAM
-22
----- Tukwila
3141. 1'61A
EF-Nanu
II I
• !1r-R40NI:i SLAB
BRIDGE ELEVATION
Iff9912Ril1E S -44T
Community Center
TRANTECH
IN /Engineering LLC
Bridge Typical Section — 42nd Ave S Concept
• 42.5' wide
cross section of
bridge
• 10' wide
sidewalk on the
west side
• (2) 12' Travel
lanes and 2'
shoulders
• Aesthetically
pleasing bridge
rail selected by
community
ROADWAY
12'-0"
12'-0"
1'-6'
1Y-0"
1'-6'
r:1
.
•
a
1
SHY
LANE
PROFILE GRADE
&PIVOT POINT
2.0%
1 LANE
1
2.0%
SHY
BARRIER
SOW(
C
C
C
M0o
-
,
r
co
'
o;
u
o>oo
,
`ak
11"1111 .
i
2'-1 X"
GIRDERB
I
I 3 SPA @ 11'-9" = 35'-3"
,JIGIRDERA
GIRDERC W
GIRDER
II
STEEL PLATE GIRDER SPACING MEASURED NORMAL TO ROADWAY
42-6'
9 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
III 'Engineering LLC
Road Plan gt Profile 42nd Ave S Alignment
• Match existing prior to
Interurban intersection
• Match existing elevation
before Tukwila
Community Center main
driveway
• Rebuild maintenance
driveway
• Existing 5' planter and 5'
sidewalk connect well to
10' sidewalk on bridge
30. 1P 41 3ff 617
10 City of Tukwila 142nd Ave Bridge Replacement
72
T
-----------=
72
—
6
16
V.;
11
C.
30
t ds
.
.,
_
.,
16
03
S= l' - oa
1- 33
.•
VY
31
SE
S
III
ag
le AD
19 !x
42nd AVE S Profile
aikwila.
ommunity
Center
rru..ms bei0Vi
' TRANTECH
IIIIEngineering LLC
Temporary Detour for 42nd Ave S Alignment
Maintain existing
facilities (if feasible)
Maintain slip lane
Temporary bridge
structure
Wide NB lane to
accommodate
truck turning
Maintain traffic signal
11 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
'Engineering LLC
Trail Connection — 42nd Ave S Alignment
• 14' wide path
• 10' clearance under
bridge (bicycles, horse
riders, and pedestrians)
• Less than 5% grade, or
less than 8.3% with a
landing every 2.5'
vertical
• Natural concept
preferred based on
community input at
September 15, 2021
Gallery Day and online
survey
Landscape Concept 2. Natural
12 City of Tukwila 142nd Ave Bridge Replacement
- Emphasis on enhancing the
ecology through plantings
of native vegetation
- Opportunities for pathways
- Best for stormwater and
habitat
- Reinforces Green River Trail
character
- Pedestrian -friendly lighting
recommended
TRANTECH
In Engineering LLC
Alternatives Analysis- S 124th St Alignment
connects to Interurban Avenue South
*example of a steel superstructure bridge similar to the proposed configuration of the S 124th St
Bridge
Estimated Cost Range: $21.5M Total Cost (includes construction, design, construction management,
inflation, and contingency)
13 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
Engineering LLC
Bridge Plan and Elevation — S 124t" St Alignment
• Precast pre-
stressed steel
Superstructure
• 220' main -span
with 60' approach
span west and 20'
approach span east
• Min 3 -foot
clearance with
respect to 100 -year
flood
APtittSemrittilt
1,_T ST
Weal& 11.4424
rrrr ;Da 114 -tut
.1
— L
Cihtolt311‘ bud
14 City of Tukwila 142nd Ave Bridge Replacement
iliTRANTECH
Engineering LLC
Bridge Typical Section S 124th St Alignment
• 42.5' wide
cross section of
bridge
• 10' wide
sidewalk on
the west side
• (2) 12' Travel
lanes and 2'
shoulders
• Aesthetically
pleasing bridge
rail selected by
community
F.OADINAY
...i.
. .1•:-..
,
. 0
I
i
PRO.ILE GRACE
A PIVOTPOIN—
" I
..
,, ..
LONE
2.3%
.
E 4;
BARRIER
fl.
;
1
1
1
l'
'
1 .1-
-
___
i- -
F --
1 7-- --,-- 1
P— --1——I
I ., I
.__
.
., .4'1.
. .
. •..
-
L.
... ,
• . . 1--
.,. .•:.:,,, ...,
..,"
,
....
- .-
.
.
_
i
,-
_ _
1
,
G1LRA t
GDER E.
5 -PA .p 114 - 3E,3"
GeRDER C
117EL PLATE G ER GPA CI h13 MEA.3 JR:EI NORVAL TO R{D AD WAY
47—E'
15 City of Tukwila I 42nd Ave Bridge Replacement
TYPICAL SECTION - SPAN 2
TRANTECH
III1Engineering LLC
Road Plan & Profile 124th
• Truck Aprons at
Signal Interurban
Ave for WB -67
Turning Movements
(RAB option too)
• One Way Superette
Parking Lot
• NE corner
properties
coordination for
driveway
30 15 0 30
SCALE 15 FEET
584-00
57.05
,TS
------
----
VP1 STA -52.13,02
VR EL -4186. .-5-40-74
-
_
_ VPF STA-
----
1
1
.. J....___
_
8
&
Iy __
Si_-____
__
100
TS
______-____________
__
VPI EL -19.52
VCL2.9P
. Y
j$ a,
C Yf
®®
LP STA -55.8795
2
—
a
0
.1 _2
F
—
1
1 1
--
I
n
--
_
,
-
--
-
-
-
a
I. 1
7sc0
aeR11
I
I--
It
SER"
I
I.
I h
traps,__
1
,I
1 --
1
I'.
S
-_
—
-
1
49-15
u
50
AIN
CO
�ffi
Nm
M
51
m
00
u
m
°-S
52
00
5
8
S3
53-00
5
�w
VI
-,
.8
a,
54
tl..
-00
..
.;
a
55
-90
55
®
,(
56 50
S 124TH ST - PROFILE
16 City of Tukwila 142nd Ave Bridge Replacement
5
C
EngiTRANTEneering CLLHC
Trail Connection — 124t" Option
• 14' wide path
• 10' clearance under
bridge (bicycles, horse
riders, and
pedestrians)
• Less than 5% grade,
or less than 8.3% with
a landing every 2.5'
vertical
• Connection can be
one straight
connection or a
switchback
a
Iterurban Ave & S 124th St Bridge - Option 1
I T i 11 1 I di 1 1 1- .1 u
1 it 1 111 141° 1-
�. rqa-......+aa,l...r Imr.fLEAr•c•..rrialA mCL T-0nn MINI IL.L 1x 1.yy.a., F. _-1 a1
17 City of Tukwila 142nd Ave Bridge Replacement
11 I I i i i- 11 ii - 1 1 1 Ir•
a— l l i l .el -IT1
R 5S
November 1, 2021 FIGURE
Ira reFo
_.,..
TRANTECH
IIIIEngineering LLC
Alternative Cost Table
Bridge
Alignment
Total Approximate Costs
42nd Ave S Concrete Girder
42nd Ave S Steel Plate Girder
S 124th Ave S Concrete Girder
S 124th Ave S Steel Plate Girder
1A
$24,372,157.00
2A $25,957,499.00
1B
2B
18 City of Tukwila 142nd Ave Bridge Replacement
$21,503,620.00
$22,962,950.00
TRANTECH
Engineering LLC
Alternative Comparison Matrix
Environmental:
Ill
Natural River Flow Conditions
Permittability
Importance
Factors
(out of 100)
AlignmentA
42nd Ave S
Alignment B
S 124th Street
Alt. 1A
concrete girders
3 spans
Alt. 2A
steel plate girdersl
3 spans
Alt. 1B
concrete girders
w 3 spans
Alt. 2B
steel plate girde'
3 spans
15
15
2
1
2
1
1
2
1
2
Social:
Temporary MOT Impacts
Aesthetics
15
15
2
2
2
2
1
2
1
2
Costs:
Construction Costs (Bridge and
Approaches)
Right of Way Requirements
25
15
4
2
3
2
2
3
1
3
Total Score: Sum (Importance Factor x State)
100
235
210
185
160
*The alternative with the combined lowest score is the most optimized alternative with respect to the chosen desired criteria
19 City of Tukwila 142nd Ave Bridge Replacement
TRANTECH
101 Engineering
TS&L Report
• Advance S 124th Street Steel
Superstructure Alternative to
Construction Documents
• Advantages to the S 124th Street Steel
Bridge
• Best hydrological placement
• Preferred permitting
• Traffic control during construction
• Least expensive option
• Adequate soil condition
• No turning movements at the 42nd Ave S and S 124th
St intersection.
• Total Construction Cost at $21.5M —
Escalated to 2024 Construction
• Construction Duration at 12 months
20 City of Tukwila 142nd Ave Bridge Replacement
*example of a steel superstructure bridge similar to the proposed configuration
of the S 124th St Bridge
'Li TRANTECH
Engineering LLC
Engineering LLC
Next Steps
• February 22nd Allentown community
meeting
• March 22nd Allentown community
meeting
• Direction from Council by end of March
2022
• Design need to determine option to move
forward
• TS&L submission to Local Programs
(WSDOT)
• City to apply for additional federal grants
• Advance design with council approval
• Design complete 2023
• Construction begins 2024
21 City of Tukwila 142nd Ave Bridge Replacement