Loading...
HomeMy WebLinkAbout12-022 - Ponderosa Pacific - 2012 Annual Sewer Repair Program / East Marginal Way Manhole12 -022 Council Approval N/A CITY OF TUKWILA Short Form Contract Contractor/ Ponderosa Pacific, Inc. Vendor Name: Tim Albers Address: 31419 124 Street SE Sultan, WA 98294 Telephone: 425-471-3344 Project No Budget Item: Project Name q/Z yaZOI 4162. 51q, 3S 'le, as Manhole Repair at Boeing Bldg 9 -101 at 9725 E Marginal Way S Please initial all attachments, then sign and return copies one and two to: City of Tukwila, Public Works Department, 6300 Southcenter Boulevard, Suite 100, Tukwila, Washington 98188. Retain copy three for your records until a fully executed copy is returned to you. AGREEMENT This Agreement, made and entered into this A day of �l,-ua- t- 20/9 by and between the City of Tukwila, hereinafter called the City, and P)nderosa Pacific, Inc., hereinafter called the Contractor. The City and the Contractor hereby agree as follows: 1. SCOPE OF WORK The manhole repair at 9725 East Marginal Way South per the attached drawing and details. 2. TIME OF COMPLETION The work shall be commenced and be completed no later than (A 3® k k 3. CONTRACT SUM The City shall pay the Contractor for the performance of the work the sum of $7,900.00 plus applicable Washington State sales tax. 4. PAYMENTS The City shall make payments on account of the contract at completion of project. 5. ACCEPTANCE AND FINAL PAYMENT Final payment shall be due 10 days after completion of the work, provided the contract is fully performed and accepted. 6. GENERAL CONDITIONS The City and the Contractor agree upon the following general conditions which shall govern: A. Contract Documents The contract includes this Agreement, Scope of Work and Payment Exhibit. The intent of these documents is to include all labor, materials, appliances and services of every kind necessary for the proper execution of work, and the terms and conditions of payment therefore. The documents are to be considered as one, and whatever is called for by any one of the documents shall be as binding as if called for by all. The Contractor agrees to verify all measurements set forth in the above documents and to report all differences in measurements before commencing to perform any work hereunder. B. Materials, Appliances and Employees Except as otherwise noted, the Contractor shall provide and pay for all materials, labor, tools, water, power and other items necessary to complete the work. Unless otherwise specified, all material shall be new, and both workmanship and materials shall be of good quality. Contractor warrants that all workmen and subcontractors shall be skilled in their trades. C. Surveys, Permits and Regulations The City shall furnish all surveys unless otherwise specified. Permits and licenses necessary for the prosecution of the work shall be secured and paid for by the Contractor. Easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the City unless otherwise specified. The Contractor shall comply with all laws and regulations bearing on the conduct of the work and shall notify the City in writing if the drawings and specifications are at variance therewith. D. Protection of Work, Property and Persons The Contractor shall adequately protect the work, adjacent property and the public and shall be responsible for any damage or injury due to his act or neglect. E. Access to Work The Contractor shall permit and facilitate observation of the work by the City and its agents and public authorities at all times. F. Changes in the Work The City may order changes in the work, the contract sum being adjusted accordingly. All such orders and adjustments shall be in writing. Claims by the Contractor for extra cost must be made in writing before executing the work involved. -2- G. Correction of Work The Contractor shall re- execute any work that fails to conform to the requirements of the contract and that appears during the progress of the work, and shall remedy any defects due to faulty materials or workmanship which appear within a period of one year from date of completion of the contract and final acceptance of the work by the City unless the manufacturer of the equipment or materials has a warranty for a longer period of time, which warranties shall be assigned by Contractor to City. The provisions of this article apply to work done by subcontractors as well as to work done by direct employees of the Contractor. H. Owner's Right to Terminate Contract Should the Contractor neglect to prosecute the work properly, or fail to perform any provision of the contract, the City, after seven days' written notice to the contractor, and his surety, if any, may without prejudice to any other remedy the City may have, make good the deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contract or, at the City's option, may terminate the contract and take possession of all materials, tools, appliances and finish work by such means as the City sees fit, and if the unpaid balance of the contract price exceeds the expense of finishing the work, such excess shall be paid to the Contractor, but if such expense exceeds such unpaid balance, the Contractor shall pay the difference to the City. I. Payments Payments shall be made as provided in the Agreements. Payments otherwise due may be withheld on account of defective work not remedied, liens filed, damage by the Contractor to others not adjusted, or failure to make payments properly to the subcontractors. J. Contractor's Liability Insurance Contractor will carry public liability and property damage insurance with carriers satisfactory to the City, in the following amounts: $50,000 property damage 500,000 public liability (each person) $1,000,000 public liability (each occurrence) with endorsements naming the City as an additional insured and will provide the City with certificates of insurance prior to start of construction and with 30 days notice prior to cancellation. K. Performance Bond The Contractor shall furnish to the City prior to start of construction a performance bond in an amount of 100% of the contract in a form acceptable to the City. In lieu of bond for contracts less than $25,000, the City may, at the Contractor's option, hold 5% of the contract amount as retainage for a period of 30 days after final acceptance or until receipt of all necessary releases from the Department of Revenue and the Department of Labor and Industries and settlement of any liens, whichever is later. L. Liens The final payment shall not be due until the Contractor has delivered to the City a complete release of all liens arising out of this contract or receipts in full covering all labor and materials for which a lien could be filed, or a bond satisfactory to the City indemnifying the City against any lien. -3- M. Separate Contracts The City has the right to let other contracts in connection with the work and the Contractor shall properly cooperate with any such other contracts. N. Attorneys Fees and Costs In the event of legal action hereunder, the prevailing party shall be entitled to recover its reasonable attorney fees and costs. O. Cleaning Up The Contractor shall keep the premises free from accumulation of waste material and rubbish and at the completion of the work he shall remove from the premises all rubbish, implements and surplus materials and leave the building broom clean. P. Indemnification The Contractor shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, including attorney's fees, arising from injury or death to persons or damage to property occasioned by an act, omission or failure of the Contractor, its officers, agents and employees, in performing the work required by this Agreement. With respect to the performance of this Agreement and as to claims against the City, its officers, agents and employees, the Contractor expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the contractor. This waiver is mutually negotiated by the parties. This paragraph shall not apply to any damage resulting from the sole negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted from the concurrent negligence of the City, its agents or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Contractor, its officers, agents, and employees. Q. Prevailing Wages The Contractor shall pay all laborers, workmen and mechanics the prevailing wage and shall file the required "Statement of Intent to Pay Prevailing Wages" in conformance with RCW 39.12.040. R. Discrimination Prohibited The Contractor shall comply with all Equal Employment Opportunity regulations and shall not discriminate against any employee, applicant for employment, or any person seeking the services of the Contractor on the basis of race, color, religion, creed, sex, age, national origin, marital status or the presence of any sensory, mental or physical handicap. -4- IN WITNESS WHEREOF, the parties hereto executed this Agreement the day and year first above written. CITY OF TUKWILA By:�_ Si�atu Printed Name: Ji fK gc"h J0 Title: W4 ,fy L Date: 1 /I:? By: Sa alt Name: ,-Pf Title: Date: Z 6 Z- ATTEST /AUTHENTICATED: City Clerk J APPROVED AS TO FORM: Office of the City Attorney -5- f O 15� 12" 18" THE CONTRACTOR SHALL ASSUME THAT THE SLAB REPLACEMENT AREA IS TO BE 50 S.F. G 4 12 10 1 CONCRETE x x `1111, x x x EXISTING CONDUI..x x Y x x 6 x xCDFxxx xxx. Xx7 xxX x x x x x x x x x x x x x x x x x x x x x x i x x x x x x x'EXISTINGx (SL A"fbPE� x x x x x x a EXISTING 36" CONCRETE 3„) DIA MANHOLE j U 2 J E SECTI "E �3.� �..�r: ti 3.65 RIM TO INVERT PER SHEET 15 OF 59 PACE DRAWING 101 CALL 48 HOURS BEFORE YOU DIG 1- 800 424 -5555 NOT TO SCALE BOEING FLOW MONITORING MANHOLE �tD Cl ®f I BOEING BUILDING 9 -101 9725 EAST MARGINAL WAY 4 CL1 z SHEET: PLAN SHEET 'PS �Dy ll I REVISION #1: 1 09 2012 LAST REVISION: Igoe' r ��,OOO��� i I APPROVAL: M.CUSICK PE 1 r CONSTRUCTION NOTES 1. SAW CUT EXISTING SLAB AND DEMO CONCRETE SLAB FOR INSTALLATION OF PROPOSED 54" MANHOLE SECTION. THE CONTRACTOR SHALL PROTECT EXISTING CONDUIT INTO THE MANHOLE. 2. EXCAVATE AND DEMO EXISTING MANHOLE CONE SECTION. OVER EXCAVATE BY A MINIMUM OF OF 30" FOR INSTALLATION OF THE CONCRETE COLLAR. 3. PROVIDE 18" BY 18" CONCRETE COLLAR AROUND THE EXISTING MANHOLE SECTION. THE MIX SHALL BE FROM A APPROVED BATCH PLANT AND 6000 PSI STRENGTH AT 28 DAYS AND 3000 PSI AT 3 DAYS. 4. PROVIDE A 54" TYPE 3 MANHOLE WITH 24" FRAME WITH COVER PER TUKWILA STANDARD PLAN SS -11 AND LADDER STEPS PER STANDARD PLAN SS -13. ROTATE LID PER DIRECTION FROM THE ENGINEER. NOTCH THE BARREL IN PROPOSED 54" MANHOLE FOR THE EXISTING CLAY PIPE FROM THE WEST. 5. PROVIDE NON- GROUT BETWEEN THE MANHOLE SECTIONS. THE MANHOLE SECTIONS SHALL OVER LAP EACH OTHER BY A MINIMUM OF 12 6. CORE DRILL MANHOLE BARREL FOR EXISTING CONDUIT. MATCH EXISTING DEPTH AND LOCATION. PROVIDE COUPLING AND EXTEND CONDUIT INTO THE MANHOLE BY MATCH EXISTING SIZE. PROVIDE GROUT COLLAR AROUND THE CORE DRILL FOR THE CONDUIT. 7. BACK FILL TRENCH WITHIN 15" OF EXISTING GRADE OF THE DRIVEWAY WITH 200 PSI CDF. 8. RESTORE DRIVE WAY WITH 15" PORTLAND CEMENT CONCRETE. THE MIX SHALL FROM A APPROVED BATCH PLANT AND HAVE STRENGTH OF 6000 PSI IN 28 DAYS. 9. ASSUME THE EXISTING CONCRETE PAVEMENT IS BETWEEN 18" AND 24" IN DEPTH. 10. THE CONTRACTOR SHALL STEEL PLATE THE EXCAVATION DURING PERIODS OF NON CONSTRUCTION. 11. DIMENSION PROVIDED FOR THE MANHOLE SECTION ARE APPROXIMATE. THE CONTRACTOR SHOULD ASSUME THE MANHOLE BARREL SECTION IS 5 FEET IN LENGTH AND SHOULD ORDER THE MANHOLE SECTION AFTER THE EXCAVATION IS COMPLETE. V 12. THE CONTRACTOR Lq a o a z �s boy 1908 ".j "14 City of Tukwila ING GRADES WHEN PLACING THE CONCRETE SLAB. /v NOT TO SCALE BOEING FLOW MONITORING MANHOLE BOEING BUILDING 9 -101 9725 EAST MARGINAL WAY SHEET: CONSTRUCTION NOTES REVISION #1: 1 09 2012 I LAST REVISION: APPROVAL: M.CUSICK PE r ufy� KENYM �T S C� BOEING C �..t it s, Q S MqtfRQE_ YL 101l'AMISH.' kIELD may\ Rl 'ER PK �i� il. S ELI'16ROVE ST I r` Or,.O: II j SqtjHERN n 0 1 n ST 1 Eu j 80) S RME J T BOEING 17, 7 PLANT .n PLGq�D ;Fr; SL L &N LOVERDALE i 6 FS 500 s DO� _OVA� IT S ��JRE�%N T CONCORD 32 x ST S ST .4 500 'W! _DIRECTOR T DIRECTOR _ST- ls S !_BLRTQLST i t i L ST FOOTE- EB !S 920 ST WINERY ST_ s s S 95TH J '51 Z n s i S 411 R1 ___J_s_9&H_sT -R V Boo S MUSEUM t MIR 11 ss ST OF S 91TH PL FLIGHT ryl C TH ST S': -y h x FC ioisi. ST t�; V1.11"kv 1% s_­­NOR 5 S 02ND j SVI 0 F s 103RD T §j ?ND _j �2 4 iGarx S Qua_. 104TH Sr 7 6 R 104N L n- �T T H 106TH 5T S s I bim BOEIN 1H 6 LEN ;�RES �I l 9L'� F i 3 S,_19711­1 ST I'll ACCES j=T-T GOLF 1W 1 i l\ .4 7 -t 6\ RAiNI 7 R. GOLF COURSE 110TH CLUB 0 OUNTR CL s U) ST C' Lt8 Mv p� 112TH STJ s II? ST S 112TH S S4 6 -4 112TH ST s Nc DTH ST s h If _TH' 13 H: 4 J, _4< S 114 §E 1 DAY s 1 rp FOLI I 114TH P L, c' INN ST S I TH S' 11 6TH (n J\ s ST 5T* S� S 116TH PL S 117TH '117TH ST! Ile I IftTa -<j ST '�!S 117TH; PL_� ST EIt C, IST n .INTERURBAN' Ay S i H S ST 1120TH S 120TH 7 126TH ST :ST ST �SOUTHERN! 16001� 21 i! 'a i HEIGHTS; 1_1 w w. w i2 �r ARBOR LAKE F- Lc). PARK LIB ti S 1 ai PARK PL _22W JIL s,.jMj 2 ST 0 b ST 2 0 1#1 s CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555- NOT TO SCALE LA BOEING FLOW MONITORING MANHOLE Cit BOEING BUILDING 9-101 9725 EAST MARGINAL WAY O f SHEET: VICINITY MAP T ukwila REVISION #1: 1 09 2012 LAST REVISION: 1 908 APPROVAL: M.Cusick i manho e products 54" Type 3 Precast Manhole WS DOT B- 15.60 -00 Flat -top Slab Reinforcing #4 deformed rebar Round opening Manhole Wall Reinforcing Minimum 0.135 square inches linear foot Base Reinforcing 0.19 square inches linear foot in both directions 8 Separate base slab 0.19 square inches/ linear foot in both directions Hole or Knock Out Dimensions Maximum hole size is 42 inches 8 inches of minimum distance between holes 2 inch diameter lifting holes provided Cored holes available Conformity Standards ASTM C478 97 Manhole ASTM C443 rubber gasket joint ASTM D 4104 Polypropylene steps and ladders Washington State APWA WSDOT Standard Options Available Prechanneled base Specialized coatings Custom hatches Kor -N -Seal boots Top Slab Plan View 24" Note: drawings not to scale S�? Shope Enterprises, Inc. (253) 848 -1551 1- 800 422 -7560 [Toll Free WA only] ��j 1618 East Main Avenue Fax Line 1 (253) 845 -0292 www.shopeconcrete.com concrete products Puyallup, WA 98372 -3142 Fax Line 2 (253) 864 -6172 4" min 16 ax I T l 10 J� 8 24" j 12" 1' to 5' �r 2' to 5' 5Y�i 54" 5%" 'T Top Slab Plan View 24" Note: drawings not to scale S�? Shope Enterprises, Inc. (253) 848 -1551 1- 800 422 -7560 [Toll Free WA only] ��j 1618 East Main Avenue Fax Line 1 (253) 845 -0292 www.shopeconcrete.com concrete products Puyallup, WA 98372 -3142 Fax Line 2 (253) 864 -6172 4 WEBS, 3/4" THICK �J �r (1) 1" DIAMETER PICKHOLE COVER PLAN 3BOLTHOLES J L A B 3/4" LETTERING 1 -1/4" LETTERING :5�-' Z,/ r2" i 25" MACHINE GROUND SEAT, SECTION A-A GRAY IRON LOCKING COVER FRAME PLAN 26 -3/4" 25 -1/4" J 1" 24 MACHINE GROUND SEAT. 6" 3/4" 5 a 34 -1/8" SECTION 13-13 GRAY IRON FRAME NOTES: 1. FRAME TO BE GROUTED 2. COVER TO BE EJI''V CATALOG NUMBER 3t'1 �'C1i' r'N oF•',0DUC;T NUf�RBEI, ITH THE SEAL OF TUKWIL.A, AND LEGENDS 1903, 2903, AND `�Ek. -NER, hiC;R07 27T5D, `JV :3. FRA1lAE 1 BE EJIW CATALOG NUMBER 3705CPT', OR EQUAL, L. INSTALL SC7 I I {A!" €COI, l` I IOL.ES ALiGh� i /ail i I C,I:::;ft`i "I =L C3I L./�f�CvlER%. h`0 FO SC AL.E j z 7, t r r s s" ,v <<I i.t 4 r f 13 CC 1 -3116" ol W0000 i v 15 -1/4" 9 -3/8" 6" NOTES: i� °iaf� ♦f ♦°j ♦e �♦i e� i �'i a Q.oi a i iG i RE ZORCING BA AI A ♦I A ♦I �eil�!oiG AIA I Aj ♦I �j 1. LANE P -14938 OR APPROVED EQUAL. CUT OUT 0 NOT TO SCALE LA A MANHOLE a� Caty ®f POLYPROPYLENE SAFTEY STEPS O SHEET: SS-13 a x Oy Tukwila REVISION #1: 12 20201 1 I LAST REVISION: 1908 I APPROVAL: by date EAST MARGINAL WAY deslpned! '95 F�gin W AT E R M A I N REPLACEMENT i i 15 4 drnrn NAANAR '95 Planning s PUR checked lNrrINAR LIC WORKS DEPT_ I 5s z '95 Penha]]egon Associates Consulting Engineers. rs, Ioc. Inc. 6 Y ENGINEERING STREETS WATER SEWER prof engIZOZIMAR'95 760 SUCTH STRESr SOUTH SUITE zoo PLAN AND PROFILE I I Flee no N xMLAND WA 96033 J• A prof dIrI,pIMAR '95 (206) 827 -2016 t field 6k STA 61+50 TO STA 67 +50 no ntel re�lslons scn e date GRAPHIC SCALE o ER x� NENS0'I ID 1 fIMAT I I I I (D) EASEMENT I I l 7EQUrED f I I �{l I ''I i �h a 20 tr 0 L F 6''. DI I- TRENCtYCf70.IE r DI-- I 1 195 LF 18 iDI 24' ,p� -S D 2 4 SD 24 -.w 24 V 4' -_T— T Al .4 NOTE: SEE GPR REPORT tv6 REMOVE iRVA 1 �r R STALL PROVIDE 1` C' MIN 6 FOR DEPTH OF IMPROVEMENT SHORE,U`IS RE REINSTALL SI N VERT._ H STA 67 +00 TO 69 +00 TO P�107fCT SIGN PER SH 37 UTILITIES Ac -ec 67 FEWNg o�� m 7t 63r.� 64 v..> 66 n 7� 65 I J A GZ +J'S, 37.�� F 92 DEEP S�UGT 9r Opp sucr STA 64 +58, uz LT: u SiA 65 +20 36:x' LT STA 65 +55, 36.5' LT -u o _x I? TEE.(Q x F INSTALL INSTALL INSTALL c r -jj FL�7f`"R7j'.Ag TE t'z= b"98`ig€�i05 =18' 0' ifE =(RJ -X F LY- t$ -mac =I TEE= (#IJ= )�'Ft�_ 18" x 8" TEE x FL) uoa ro mc g VH U U B 6" 10' FL X RJ) ADAPTER RESTRAINED JOINT 3 LF 6" DI RJ g- fihTE ALafE 3 VAkVE 89 PH ASS ER DETAIL 4 ASSEMBLY 'P R DETAIL \Y -4, Cr JM. 41 23 LF 10!-DI­-(R �"-(FL X RJ) ADAPTER 12 SH. 41 t7 H• d 17 I tf 1 td'. 0 BEND t2" 12 26�� s �3T 2 sn t D 12' so 12 so SD Q. N S r<� A- 65 #25,- 3b.5' -LT- I- sD lZ SD fi t!) a" C DE TO r1JSTAl' r z fra�_4tNCtnaTEnI- 7a }If# SEFLYICE�E�PIAN._.A4�H37.__ I ucrca aru p r H3 B U ss RE FsT f BIfFTf PER PLA it 5 .37 :PER;DETAIL SH. 38 o �24' SUL• __•�}}j ,4 "Sig FL RJ- ADAPi y ua i i_ i E I t z_..,. •I 44 II I T I I •12" 5`E I I I I I I I I I_ "I: I (aF�I`:,, I\\��° I I I I I u I u I I I i I I I n I I I I n I I Y -O i BURIED UTtuTIES AREA ssteR t I 15w CALL BEFORE YOU DID I E. �S) 4, ss 1- 600724 ISpas, u n I n I n I I n I n I rt I to _..._.._.j� sir iii. I r I I r, I I n t I I I I n I s�DG -tot DISGONN�C��b z n�wc, thurr r nom FROM 11 F1 aIRPIANE -OW IIM�ONVORI G IN T TION LU 6" 1 1 1 SERVICE LINE 1 SEE SN. 4G m STA 61 +80, 37.4' L7 �,I INSTALL I I TTT i8" 45' B :ND (RJ) 1 1 __5_' x_30.' PERMANENZ�"�_ -seek- I I I I VERTICAp. -I BE iae ro C, EASEMENT PROVIDE 1' 0" MIN. 2t "w: v6r f 1 PER'SH 37 i w 203 LF 18" Dv' i BD 't ig, -'-D i SO 24' —5� 2 4. 24, r�r 24'- O �5 4- 24 I 21 7 Jan Lo i z u l:1'La Honoerosa i aaTic PROPOSAL Manhole Repair at Boeinq Buildinq 9 -101 at 9725 East Marginal Wav South THIS IS A PREVAILING WAGE JOB Installation of Side Sewer January 2092 Description: j unit j Cost Perform all work associated with this project including bonding and insurance. Lump Sum 7 1 SD b a Trench Safety System Lump Sum 7 So Tax (9.5 750 50 Total 8 (o SD S o Company Name: P10 VIAJColes s a 1�a �I' Contact Name: T A t 0 S Address: 31 ({4 e u-- C o �R Telephone: W'z'5 q 7/ 3 3 Please return to: Mike Cusick, P.E. City of Tukwila Public Works Department 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 (WTIAI Enp/Projects;A- SNV /Manho!c Rcpair9725 EMWS) P,ECEIVED 01-25-'12 07:10 FPOI''l- 3 3eu iy15- i P. 1 TO- publicworks /dcd P0011/001 OP ID: KTH CERTIFICATE OF LIABILITY INSURANCE DAT 02114 D,YYYY) 02/14!12 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 425 489 -4500 I CONTACT NAME: Hub International Northwest 425 -489 -4501 1 PHONE 1 (AIC, No): 1 (A/C. No. Extl: P. 0. Box 3018 E -MAIL ADDRESS: Bothell, WA 98041 -3018 PRODUCER Richard Malowney CUSTOMER ID #:PONDE -2 INSURER(S) AFFORDING COVERAGE NAIC INSURED Ponderosa Pacific, Inc. INSURERA: West American Ins. Company 31444 Rosewood Drive I INSURER B: 1 Sultan, WA 98294 INSURERC: INSURER D INSURER E INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 1 INSR ADDL SUBR� POLICY EFF POLICY EXP LIMITS LTR TYPE OFINSURANCE INSR WVD' POLICY NUMBER (MMIDDIYYYY) (MMIDDrr "f7 "f1 GENERAL LIABILITY EACH OCCURRENCE 1,000,0001 FIED AMAGL IU RLNILU A _X C OMMERCIAL GENERAL LIABILITY BKW1154291531 11/17!11 11/17/12 REMISES(Eaoccurrence) 100,000 1 CLAIMS -MADE I OCCUR EXP (Any one person) 10,0001 X STOP GAP G AGGREGATE LIMIT APPLIES PER: X POLICY 1 jRC LOC AUTOMOBILE LIABILITY A X ANY AUTO BAW1154291531 ALL OWNED AUTOS SCHEOULEDAUTOS HIREDAUTOS NON -OWNED AUTOS UMBRELLA LIAB X OCCUR X EXCESS LIAR CLAIMS -MADE A BA05429153 DEDUCTIBLE X RETENTION 10,000 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY A ANY PROPRIETOR /PARTNER /EXECUTIVE YIN BKW 1154291531 OFFICER /MEMBER EXCLUDED? N/A (Mandatory in NH) WA STOP GAP If yes, describe under DESCRIPTION OF OPERATIONS below PERSONAL& ADV INJURY 1,000,0001 GENERAL AGGREGATE I 2,000,0001 PRODUCTS COMP /OPAGG 1 2,000,000 Emp Ben. 1,000,000 COMBINED SINGLE LIMIT (Ea accident) 11/17/11 11/17/12 1 BODILY INJURY (Per person) 1,000,0001 1 BODILY INJURY (Per accident) 1,000,000 PROPERTY DAMAGE 1,000,000 (Per accident) I$ I EACH OCCURRENCE 5,000,0001 AGGREGATE 5,000,0001 11/17/11 11/17/12 1 CSTATU- H- TORY LIMITS 1 X 1 6R 11/17/11 11/17112 E.L. EACH ACCIDENT 1 1,000,0001 E.L. DISEASE -EA EMPLOYEE 1,000,0001 E.L. DISEASE POLICY LIMIT 1,000,0001 DESCRIPTION OF OPERATIONS I LOCATIONS VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) The City of Tukwila is included as additional insured as per written contract or agreement per form CG8416 12 03. CERTIFICATE HOLDER CANCELLATION CITUKWI SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN CITY OF TUKWILA ACCORDANCE WITH THE POLICY PROVISIONS. 6200 SOUTHCENTER BLVD, #100 TUKWILA, WA 98188 AUTHORIZED REPRESENTATIVE 1988 -2009 ACORD CORPORATION. All rights reserved. ACORD 25 (2009109) The ACORD name and logo are registered marks of ACORD BID TAB FOR 2012 ANNUAL REPAIR PROGRAM MIKE CUSICK JAN 27 2012 MANHOLE REPAIR AT 9725 EAST MARGINAL WAY ALL WORK TRENCH SAFETY TAX TOTAL SYSTEM CONTRACTOR PONDEROSA PACIFIC INC 7,150.00 750.00 750.50 8,650.50 UTILITY PIPELINE CONTRACTORS 7,900.00 150.00 764.75 8,814.75 BRIKE EXCAVATING 8,150.00 500.00 821.75 9,471.75 COMBINED CONSTRUCTION 9,046.00 189.00 877.33 10,112.33 B& B UTILITIES 11,800.00 275.00 1,147.13 13,222.13 HOFFMAN CONSTRUCTION, INC 14,375.00 150.00 1,379.88 15,904.88 MVG LLC 14,000.00 1,000.00 1,425.00 16,425.00 NORDIC CONSTRUCTION, INC 16,098.00 500.00 1,576.81 18,174.81 PACIFIC NW CONSTRUXION 17,215.00 600.00 1,692.43 19,507.43 NW CONSTRUCTION GENERAL CON. 26,757.00 1,500.00 2,684.42 30,941.42 ENGINEERS OPINION INCLUDING 25% CONTINGENCEY 18,359.25