Loading...
HomeMy WebLinkAboutTIS 2022-03-07 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Services Committee .•. •:• Kate Kruller, Chair Mohamed Abdi ❖ Tosh Sharp AGENDA Distribution: K. Kruller M. Abdi C. Hougardy T. Sharp H. Ponnekanti S. Kim (email) G. Lerner (email) City Attorney (email) Clerk File Copy Place pkt pdf on SharePoint: Z Trans & Infra Agendas email cover to: F. Ayala, A. Le, C. O'Flaherty, A. Youn, B. Saxton, S. Norris, L. Humphrey MONDAY, MARCH 7, 2022 — 5:30 PM HYBRID MEETING — ONSITE AND VIRTUAL DUWAMISH CONFERENCE ROOM, 6300 BUILDING, 2ND FLR MS Teams: Click here to join the meeting Virtual Meeting - Members of the public may listen by dialing 1-253-292-9750 and entering conference ID 799017451# Next Scheduled Meeting: March 21, 2022 S. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. Item Recommended Action Page 1. PRESENTATIONS 2. BUSINESS AGENDA a) Macadam Rd S Water Upgrade & Sidewalk a) Forward to 3/21/22 Regular Consent Pg. 1 Improvements Project, Amendment #3 — (A. Altallal) Agenda b) 42nd Ave South Bridge Replacement Project b) Committee approval Pg. 7 RAISE Grant Application — (B. Robinson) c) Solid Waste Contract Status Update — (G. Lerner) c) Discussion only Pg. 11 3. MISCELLANEOUS Allentown Community Update — (Hari Ponnekanti) Discussion only Pg. 21 Future Agenda: Next Scheduled Meeting: March 21, 2022 S. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Adib Altallal, Utilities Engineer CC: Mayor Allan Ekberg DATE: March 4, 2022 SUBJECT: Macadam Rd S. Water Upgrade Project- Design and Construction Mqmt Project No. 90440105 Contract No. 21-022, Amendment No. 3 ISSUE Approve Amendment No. 3 for Contract No. 21-022 with PACE Engineers Inc. (PACE) for the Macadam Rd S. Water Upgrade. Amendment No. 3 includes a fulltime inspector for the duration of the project. BACKGROUND In 2015, the City contracted with PACE as the design consultant for the Macadam Rd S. Water Upgrade Project, along with the Andover Park E Water & Sewer Improvements under Contract No. 15-116. In 2017, the design was put on hold due to construction cost estimates coming in higher than proposed in the 2019-2024 Capital Improvement Program. Due to limited fire flow issues, the project design contract was renewed and the project budget allocated was increased. This project addresses the need for additional capacity and the decision was made to change to a 12 -inch pipe after two fires had erupted during Summer 2021 along the Macadam Road S waterline. The 12 -inch pipe size wit create plenty of redundant capacity and fire storage to minimize liability. In February 2021, Council approved a new project design contract with PACE Engineers. Previous amendments increased design costs, added construction management costs, and included public outreach. DISCUSSION The project has been repeatedly prioritized as a critical Capital Improvement Program project by the Water Department. Due to staff shortage, construction management will need to be contracted out instead of completed in-house. Amendment No. 3 includes a fulltime inspector for the duration of the project. FINANCIAL IMPACT The contract amendment is for $150,062.40, which will bring the contract total to $292,001.56 for the design and construction management services portion of the Macadam Rd S Water Upgrade. The project costs are within budget and are 100% funded by the water enterprise fund. PACE Contract 2021-2023 Design/CM Budget Original Contract $77,339.16 $800,000.00 Amendment No. 1 27,600.00 Amendment No. 2 37,000.00 Amendment No. 3 150,062.40 Total $292,001.56 RECOMMENDATION Council is being asked to approve a supplemental agreement for design and construction management services with PACE in the amount of $150,062.40 for the Macadam Rd S Water Upgrade Project and consider this item on the Consent Agenda at the March 21, 2022 Regular Council Meeting. Attachments: 2021 CIP, Page 61 PACE Supplemental Agreement No. 3 1 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Macadam Rd S Water Upgrade Project No. 90440105 DESCRIPTION: Design and construct 4,300 LF of 10" waterline in Macadam Rd S from S 144th St to Southcenter Blvd. JUSTIFICATION: Improve fire flow water quality to the north side of Tukwila Hill. STATUS: Project now scheduled for 2021/2022. MAINT. IMPACT: The new waterline will eliminate maintenance time for flushing the dead end line while increasing service reliability. COMMENT: Pedestrian/Bicycle Program grant for sidewalks unsuccessful in 2018, with water funds used as a match. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location =`IN121kitr- 1Itostho ,10 MAikI, ` W /4'N. Design 68 100 50 50 V Ill 268 Land (R/W) 1 •'' 4 .' 4 . 5 748 0 Const. Mgmt. t m ' 250 50 300 Inirilli 600 Construction 300 300 950 'MMffigigyi '3156 St �� 1,550 TOTAL EXPENSES 68 0 650 400 1,300 0 0 0 0 2,418 FUND SOURCES st . 1,1111Nagi" .16o Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 68 0 650 400 1,300 0 0 0 0 2,418 TOTAL SOURCES 68 0 650 400 1,300 0 0 0 0 2,418 2021 - 2026 Capital Improvement Program 61 2 Project Location =`IN121kitr- 1Itostho ,10 MAikI, ` W /4'N. 110 k V Ill Mil 111 1 •'' 4 .' 4 . 5 748 m S 144 6t, 5 St t m ' , k.v Inirilli 150 S[ ' 'MMffigigyi '3156 St �� i 6t ery :: � S158St �i �` `♦ af��ii�\����i `�\ ��GI51 st . 1,1111Nagi" .16o 2021 - 2026 Capital Improvement Program 61 2 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 21-022 (c) CONTRACT FOR SERVICES Amendment #3 Between the City of Tukwila and PACE Engineers That portion of Contract No. 21-022 between the City of Tukwila and PACE Engineers is hereby amended as follows: Section 04a: 4a. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, will increase the contract amount by $150,000.00, provided that the total amount of payment to the Consultant not exceed $291,939.16 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of , 2022. CITY OF TUKWILA PACE ENGINEERS Allan Ekberg, Mayor Printed Name: xe.tsiA1C T M b /VicS 4J ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk Office of the City Attorney CA Reviewed May 2020 Page 1 of 1 3 (ACE M Engineering Services Company January 25, 2022 Mr. Adib Altallal Public Works City of Tukwila 6300 Southcenter Blvd Tukwila, Washington 98188 Engineers 1 Planners 1 Surveyors Subject: Macadam Road and Sidewalk Improvements- Professional Services Contract Amendment for Construction Inspection Dear Adib: Based on our prior discussions, PACE Engineers Inc. (PACE) is submitting the following contract amendment for City review and approval, to provide full time construction inspection for the Macadam Road Watermain and Sidewalk Improvement Project. This amendment covers costs necessary to provide full time inspection services including necessary support staff as described below. Construction Inspection PACE will provide a full-time inspector for this project as requested by the City. Duties include but are not limited to: • Onsite Inspection • Coordination with Contractor • Coordination with City • Tracking of Quantities • Pay Requests • Project Closeout • Other Tasks as needed. Previously approved scope and budget included responding to RFI's, review of Material Submittals and attendance at the preconstruction meeting. This contract does not include any required special inspections such as compaction testing which will be provided by the City under a separate contract. PACE proposes to provide the services listed above on a time -and -expense basis not to exceed $150,0000. The breakdown for the above fee is shown on the attached budget worksheet. This amount shall not to be exceeded without prior authorization from the City. Again, we are pleased to submit this updated scope of work and budget to support the Macadam Road Watermain and Sidewalk Improvement project through construction bidding. Please do not hesitate to contact me at 425.827.2014 or kenn@paceengrs.com if you have any comments or questions. Sincerely, PACE Engineers, Inc. Kenneth H. Nilsen, P.E. Executive Vice President PACE Engineers, Inc. 11255 Kirkland Way 1 Suite 300 Kirkland, Washington 98033-6715 p 425.827.2014 1 f 425.827.5043 4 www.paceengrs.com PACE Engineers Project Name Project #: Staff Type # (See Labor Rates Table) Staff Type Hourly Rate Drawing/Task Title Task 1- Inspection Support Full time inspection assume 90 days (10 hr days) Project Initiation Project Closeout Coordination Hours Total Labor Total Labor Code Job Title Project Budget Worksheet - 2022 Washington EOR Rates Macadam Road Inspection Support Location: Tukwila Prepared By: Date: KN Billing Group #: Task #: 1/24/2022 Labor Hours by Classification 1 15 81 91 $2,942.40 Total 1 $2,942.40 $250 $165 $150 $115 Sr. Principal Engineer Sr. Engineer Sr. Inspector Project Administrator Hour Total Dollar Total 900 900.0 $135,000 8 8.0 $1,200 8 8.0 $1,200 12 24 24 60.0 $9,720 12.0 24.0 916.0 24.0 $3,000 $3,960 $137,400 $2,760 976.0 $147,120.00 Expenses Reimbursable rate/unit Quantity Cost Postage/Courier Printing Costs Photo/Video Mileage/Travel/Per Diem Miscellaneous $2,942.40 Total 1 $2,942.40 File: Macadam Exhibit B1, Fee Worksheet Subconsultants Utility Locate Mechanical Engineer Electrical Engineer Geotechnical Engineer 1 & C Engineer Subconsultant Subtotal Markup 15% Total' Page 1 of 1 PACE Billed Labor Total Reimbursable Expenses Subconsultants Total Project Budget $147,120.00 $2,942.40 $150,062.40 Printed: 21212022, 4:39 PM 5 6 City f Tukwila Allan Ekberg, Mayor Public Works Department - Hari Porrrrekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation & Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Brittany Robinson, Public Works Grant Analyst CC: Mayor Allan Ekberg DATE: March 4, 2022 SUBJECT: 42nd Ave South Bridge Replacement Project Project No. 91810404 RAISE Grant Application ISSUE Approval to submit an application to the Rebuilding American Infrastructure with Sustainability & Equity (RAISE) grant program for the 42nd Ave S Bridge Replacement Project in the amount of $8,429,000. BACKGROUND The 42nd Ave S Bridge is a critical link to the Allentown neighborhood and is the primary access route in and out of the BNSF intermodal yard. The replacement of this structure is a high priority for the City; however, grant funding is needed to complete this project. The City applied for state funding to replace the bridge in 2017 and 2019 through federally supported grants programs, but was unsuccessful in these requests. In 2020, the City approved $1.078 million in funding to begin the 30% design for the 42nd Ave S Bridge Replacement. The City has an additional $2.942 million in Solid Waste Utility Tax budgeted for this project. In 2021, the City received $1.5 million in federal funding from the Puget Sound Regional Council (PSRC) to complete the design phase and $12 million from the Washington State Department of Transportation (WSDOT) Local Bridge Program, which can support all phases of the 42nd Ave S Bridge replacement. The 42nd Ave S Bridge Replacement Project is estimated to be approximately $4-9 million short of being fully funded, depending on which bridge replacement option is selected. The City continues to apply for local, state, and federal funding opportunities to fill this funding gap. DISCUSSION On February 1, 2022, the United State Department of Transportation (USDOT) opened their call for project for RAISE grant funding. The RAISE program is a federal funding source that supports road, rail, transit, and port infrastructure projects that have local and regional impacts. The deadline to apply for funding is April 14, 2022. Tukwila City Hall • 6200 Southcentor Boulovard • Tukwila, WA 98158 • 206.43.3-1800 • Whhsite_ TukwilaWA.giw 7 Info Memo, Page 2 FINANCIAL IMPACT The City is requesting $8,429,000 from the RASIE grant to fund the remaining anticipated expenses of the 42nd Ave S Bridge project. This grant requires a 20% local City match of $2,107,250. The match would be covered by the Solid Waste Utility Tax budgeted for this project. Fund Source Revenue RAISE Grant $ 8,429,000 City Revenue 1,087,000 Solid Waste Tax 2,942,000 PSRC Grant 1,500,000 WSDOT Grant 12,000,000 Project Total* $ 25,958,000 Project Phase Cost Estimate Design $3,700,000 Right of Way 200,000 Construction Mgmt. 3,058,000 Construction 19,000,000 Project Total* $ 25,958,000 *Total project costs are based on the most expensive bridge replacement option. This is reflected on the revised CIP page. RECOMMENDATION The Transportation and Infrastructure Services Committee is being asked to approve a grant submittal for the Rebuilding American Infrastructure with Sustainability & Equity (RAISE) grant application for the 42nd Ave S Bridge Replacement Project. ATTACHMENT: 2021 CIP Page 9 (Revised) 2021 CIP Page 9 Phone; 106-433-1800 • Email: Mayor TukwilaWA.gcv • Website: TukwilMMMA.gov 8 REVISED CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: 42nd Ave S Bridge Replacement Project No. 91810404 DESCRIPTION: Design and construct a replacement structure for the existing 42nd Ave S Bridge near the Tukwila Community Center. Council approved 30% design with City funding of $1 M in 2020, remaining scheduled in 2022. JUSTIFICATION: The current bridge has a sufficiency rating of 7.6 (out of 100), is load restricted for AASHTO Type 3 trucks and is structurally deficient. Truck speed was reduced to 15 mph in 2018. In 2017 and 2019, Bridge Replacement Advisory Committee (BRAC) funding was submitted, but not awarded. STATUS: Staff will apply for future BRAC funding during the next call. Applying for STP funding in 2020 for $1.5m for design. MAINT. IMPACT: New bridge. STP funding has 13.5% match requirement. BRAC funding would be at 80% match for up to $12 million. Project COMMENT: partners may include FMSIB & BNSF Railroad as they have over 1,800 trips a day on the 42nd Ave S Bridge and it is the only ingress/egress available for their intermodal yard. Also State TIB for $3M. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location 't,... ` yN b Design 19 200 878 248 2,355 3,700 Land (R/W) WA 1 200 +� hm 200 Const. Mgmt. It ■ Rw- N 288 1,380 1,390 v 3,058 Construction 9,500 9,500 S,z_ St. 19,000 TOTAL EXPENSES 19 200 878 248 2,843 10,880 10,890 0 0 25,958 FUND SOURCES Awarded PSRC Grant 248 1,252 1,500 Awarded WSDOT Grant 302 5,698 6,000 12,000 Proposed Grants I 5,000 3,429 8,429 Solid Waste Utility Tax 650 700 700 710 720 549 4,029 City Oper. Revenue 19 200 228 (700) 589 (528) 741 (549) 0 0 TOTAL SOURCES 19 200 878 0 1,289 10,880 10,890 0 0 25,958 2021 - 2026 Capital Improvement Program 9 9 Project Location 't,... ` yN b T jIL y 1 4 WA 1 +� hm It ■ Rw- N P v r S,z_ St. IN 30 StlatilhiNZ °O, 2021 - 2026 Capital Improvement Program 9 9 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: 42nd Ave S Bridge Replacement Project No. 91810404 DESCRIPTION: Design and construct a replacement structure for the existing 42nd Ave S Bridge near the Tukwila Community Center. Council approved 30% design with City funding of $1M in 2020, remaining scheduled in 2022. JUSTIFICATION: The current bridge has a sufficiency rating of 7.6 (out of 100), is load restricted for AASHTO Type 3 trucks and is structurally deficient. Truck speed was reduced to 15 mph in 2018. In 2017 and 2019, Bridge Replacement Advisory Committee (BRAC) funding was submitted, but not awarded STATUS: Staff will apply for future BRAC funding during the next call. Applying for STP funding in 2020 for $1.5m for design. MAINT. IMPACT: New bridge. STP funding has 13.5% match requirement. BRAC funding would be at 80% match for up to $12 million. Project COMMENT: partners may include FMSIB & BNSF Railroad as they have over 1,800 trips a day on the 42nd Ave S Bridge and it is the only ingress/egress available for their intermodal yard. Also State TIB for $3M. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Project Location \ j 7 St a Design 19 200 878 i I 4: 1,252 4* 41,1, 2,349 Land (R/W) r Iiii. 30 t .1- . . n, . 0 '9 - 30 Const. Mgmt. Ski N ',,r,....,, —t. y a 250 1,650 1,650 3,550 Construction 7,800 7,800 15,600 TOTAL EXPENSES 19 200 878 0 1,532 9,450 9,450 0 0 21,529 FUND SOURCES Awarded Grant 0 Proposed BRAC Grant 6,000 6,000 12,000 Proposed STP Gran 1,000 1,000 2,000 Proposed TIB 1,500 1,500 3,000 Proposed FMSIB 500 500 Solid Waste Utility Tax 650 700 700 710 720 549 4,029 City Oper. Revenue 19 200 228 (700) 832 240 (270) (549) 0 0 TOTAL SOURCES 19 200 878 0 1,532 9,450 9,450 0 0 21,529 2021 - 2026 Capital Improvement Program 9 10 Project Location \ j 7 St a i I 4: _, w 4* 41,1, ....‹ r Iiii. ,___si, , _____— '., t t .1- . . n, . 0 '9 - Ski N ',,r,....,, —t. y a ;,.S 30 St --- ....1 I i�. 2021 - 2026 Capital Improvement Program 9 10 City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer By: Griffin Lerner, Public Works Budget Analyst CC: Mayor Allan Ekberg DATE: March 4, 2022 SUBJECT: Solid Waste Contract Status Update Contract No. 12-027 ISSUE The City's contract with Waste Management (WM) expires on October 31, 2023. The City is now undergoing a request for proposals (RFP) process to ensure a smooth transition. DISCUSSION: Since the last update on January 18th, staff have incorporated industry review comments and resident feedback, and released the RFP, with final proposals due April 18. Based on resident feedback from the survey, staff included the following (and more) in the RFP: • enhanced language around operational reliability • a cost estimate for weekly recycling • performance measures for customer service PROCESS SCHEDULE (All times Pacific Time) Event Staff/Legal Review of Industry Review RFP and Contract Release Industry Review draft of document set Release Resident Survey Industry Review comments due Resident Survey due Time Frame November 2021 December 10, 2021 December 27, 2021 January 4, 2022 January 14, 2022 Release Final RFP to Known Interested Parties First Round Proposer Questions Due Second Round Proposer Questions Due Proposals Due February 7, 2022 March 7, 2022 3:00 PM PST March 28, 2022 3:00 PM PDT April 18, 2022 5:00 PM PDT Proposal Evaluation, Interviews, Clarifications, Selection Finalization of Contract Recommendation to City Council, Council Process City Executes Contract Contractor Delivers Transition/Implementation Plan Container Delivery Start of Collection Services April/May, 2022 May/June, 2022 June, 2022 July, 2022 September, 2022 October, 2023 November 1, 2023 FINANCIAL IMPACT There is no financial impact since the selected vendor will reimburse the procurement costs at the end of this process. While there will be no financial impact to the city, staff expects that future rates (monthly user fees) will increase substantially. RECOMMEDATION Discussion only. Attachment: Solid Waste Survey Analysis 11 SOLID WASTE RFP SURVEY ANALYSIS ri in erner, Public Works Analyst 12 1 OVERVIEW s a part of the RFP process, city staff created and administered an online urvey to assess resident priorities in the next solid waste contract. Open for three weeks, from December 27 — January 14 eceived 112 responses from nearly every neighborhood in Tukwila l Survey measured priorities for next contract; it is not a reflection of current service 13 RELIABILITY IS A KEY PRIORITY FOR RESIDENTS Weighted Importance of Priorities in Solid Waste Provider Reliability Customer Service 14 RESIDENTS PREFER THE STATUS QUO IN GARBAGE COLLECTION How Frequently Would You Like Garbage to be Collected? 91% 5% 4% Every week - keep it the same Every other week Other (specify) RESIDENTS EXPRESSED INTEREST IN MORE FREQUENT RECYCLING How Frequently Would You Like Recycling to be Collected? 46% Every other week - keep it the same 50% 5% Every week Other (specify) [RESIDENTS FEEL COMPOSTING SHOULD REMAIN AN OPT -IN SERVICE How Should Composting Incorporated into the Solid Waste Contract? 32% It should be mandatory, and everyone should receive a composting bill even if that means a higher cost 59% It should be an opt -in service 10% People should address their own compost outside of the solid waste provider 17 OTHER INSIGHTS Need for bulky item pick-up/drop off nterest in options for difficult to recycle items 18 RESIDENT PRIORITIES WILL BE REFLECTED IN THE NEXT CONTRACT WhatWe Hear Lwtiu1 Reliability is important i Interest in more frequent recycling Customer servic should be responsive t needs [1> IP Incorporated enhanced language around monitoring operational performance Requested a cost estimate for weekly recycling Added performance measures for customer service 19 20 21 Allentown Questions & Answers Working Document Date of Question Question/Comment Answer to Question/Comment Action/Action Date 1. 1/18 TISC Meeting Provide information on traffic enforcement in Allentown, including emphasis patrols, warnings, tickets, and congestion mitigation. Police Chief Dreyer provided a written response that was shared with the City Council and community. Emailed to Council 1/21 and to residents 2/10 2. 1/18 TISC Meeting Provide BNSF vendor brochure regarding emergency routes. Emailed to Council Emailed to Council 1/21 3. 1/18 TISC Meeting Engage with community prior to painting barriers at S. 124th intersection. This discussion is planned for a future Allentown Community meeting. 4. 1/18 TISC Meeting Make December bridge closure traffic (crash/speed) data available to the public. There were four reported vehicle accidents between 12/15 — 1/18, although the relationship to the bridge closure is unknown. No speeding tickets were issued during that period. 5. 1/18 TISC Meeting Provide history of the placement of the jersey barriers in the Foster Point neighborhood. Information about this was located in City Council minutes from 1998 and emailed to Council. Emailed to Council 1/21 6. 1/24 Committee of the Whole Are laws in place regarding hazmat materials driven through a residential area? Hazmat materials can be transported through residential areas. Please see the https://www.fmcsa.dot.gov/regulations/hazardous- materials/how-comply-federal-hazardous- materials-regulations. 7. 1/24 Committee of the Whole How can the City effectively regulate restrictions on bridge? Enforcement is through the local police department. 21 8. 1/24 Committee of the Whole Can short term traffic calming solutions be put into place? (Signs, speed cushions, etc). Include partners when possible. Public Works is in the process of doing an evaluation of traffic on all Allentown streets to determine what types of traffic calming measures will be most effective. This item will be brought to the 3/21 Transportation & Infrastructure Services Committee meeting. 9. 1/24 Committee of the Whole I How much has the city spent on past EIS studies? No EIS studies have been completed regarding the truck reroute in the past. 10. 1/24 Committee of the Whole Are we actively engaged with partners/stakeholder? How can we go further to partner toward solutions? The City is actively engaging with residents, local businesses (including BNSF), state representatives, and other stakeholders regarding the truck traffic through Allentown. Our goal is to find a solution that will be beneficial for all parties. 11. 2/7 Regular Meeting Provide update on outcomes of recent increased truck traffic enforcement in Allentown Chief Dreyer will be present at 3/7 TIS meeting to address this question. 12. 2/7 Regular Meeting Provide update on outcomes of recent meeting with Sheriff's Office, WSDOT, etc. Chief Dreyer will be present at 3/7 TIS meeting to address this question. 13. 2/14 Committee of the Whole TS&L 42nd Ave S Bridge Replacement Options- Develop a chart with cost, timeframe to build, lifespan, which design is easiest to maintain, which design is most function for traffic patterns, and a mock-up illustrating what each option will look like. Staff is working on this and will bring a response to the TISC meeting on 3/7. 14. 2/14 Committee of the Whole Does the city need to purchase property for the 124th option? Staff is working on this and will bring more a response to the TISC meeting on 3/7. 22 15. 2/14 Committee of the Whole Gather feedback from large group of residents on bridge replacement options. Staff is working on this and will bring more information to the TISC meeting on 3/7. At the 2/22/22 Allentown community meeting residents were very vocal in support of the 42nd Ave. alignment and strongly against the 124th Ave. alignment. 16. 2/14 Committee of the Whole Would a new bridge on 124th have good traffic flow? Is there a good way to slow trucks on 124th? Staff is working on this and will bring a response to the TISC meeting on 3/7. 17. 2/14 Committee of the Whole What are the social impacts of the new bridge on either 42nd Ave S or 124th Street on the community? Staff is working on this and will bring a response to the TISC meeting on 3/7. 18. 2/14 Committee of the Whole Can the city legally do anything to limit truck traffic on the new bridge? Is there a way to create an ordinance to reroute trucks outside of Allentown? Staff is working on this and will bring a response to the TISC meeting on 3/7. 23