HomeMy WebLinkAboutTIS 2022-03-21 Item 2B - Purchase - 2 Lifts for New Fleet and Facilities Shop / Cost of Moving Existing Lift and Crane to New FacilityCity of Tukwila
Allan Ekberg, Mayor
Public Works Deportment - Had Ponnekrznti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation & Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
By: Cody Gray, Operations Manager — Fleet, Facilities & Street Maintenance
Garron Herdt, Fleet Superintendent
DATE: March 18, 2022
SUBJECT: Fleet & Facilities Public Works Shop - Equipment
Issue
Approve the purchase of two lifts for the new Fleet & Facilities Shop and the cost of moving one existing lift and one crane
from the George Long Shop to the new facility.
Background
The new Fleet & Facilities Heiser building has three lift bays for repair of fleet vehicles. The original plan accounted for the
purchase of one lift and the relocation of two lifts from the George Long building. However, one of the existing lifts is obsolete
and has subsequently suffered mechanical issues rendering it unusable. As a result, the City will need to purchase a second
new lift to meet capacity needs of the Heiser building. The existing rotary 2 -post hoist lift and a heavy-duty crane will move to
the new shop as well.
Discussion
Fleet Services reached out to four potential vendors to relocate the existing lift and purchase two lifts - one 20,000 lb. capacity
2 -post lift and one 16,000 lb. 2 -post lift with 3 -stage front and rear arms. The attached quote from Shop Equipment Co., Inc.
was the lowest responsive bid.
Financial Impact
Costs for purchasing and moving the vehicle lifts will be 100% funded from the Fleet Replacement budget in the 501 Fund.
The Fleet Replacement budget is more than sufficient to cover these costs.
Cost Estimate Fleet Replacement Budget
Two new lifts $58,291.05 $572,000
Transfer existing lift & crane 6.407.82
Total $64,698.87
Recommendation
Council is being asked to approve the purchase of two (2) lifts, including shipping and installation, from Shop Equipment Co.,
Inc. and the transfer of existing shop equipment in the amount of $64,698.87 and consider this item same day at the March 21,
2022 Regular New Business Meeting.
Attachment: 2021 CIP, page 56
Shop Equipment Co., Inc. Purchase Estimate
Shop Equipment Co., Inc. Transfer Estimate
Fleet & Facility Services -14000 Interurban Avenue, Tukwila, WA 98168 - 206-431-0166
Tukwila City 'atf i 6200 Satothcenter&auikvard ■ Tukwila, WA 98188 2015-4.33-1800 * Website: Tukwi aWA.gtw
27
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Public Works Shops Project No. 91630601
DESCRIPTION: Construct a new City Public Works maintenance and operations center, combining all operational functions
at one location. Facility may also include a City Clerk & Police Records Center and Police evidence storage.
Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current
JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler
Shops,
and George Lona Shops to acquire the real estate to build an equipment operations center that meets current
STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility.
MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations.
COMMENT:
Based on usage and benefits, it is estimated that the Water, Sewer, and Surface water enterprise funds will
fund 50% of the Public Works Shops with the other 50% funded by Streets, Facilities, & Equipment Rental.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
Project Location`
4 :0 +
411
I
j� t�JicCBhi A. 1 r�R'
O _
,\,,, , i
1
Design/PM
722
300
500
mil
1,522
Land (R/W)
25,462
11.
25,462
Const. Mgmt.
11
1,050
p 1
'
-11
1,061
Construction
14
624
7,517
,W�3ostow
20,000
20,000
48,155
TOTAL EXPENSES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
FUND SOURCES
Enterprise Funds
8,572
462
4,284
250
20,000
33,568
Councilmatic Bond
5,572
20,000
25,572
REET/ Funds
3,000
3,000
6,000
General Fund
462
1,283
250
1,995
306 Fund Balance
9,065
0
0
0
0
(20,000)
20,000
0
0
9,065
TOTAL SOURCES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
2021 - 2026 Capital Improvement Program
56
28
Project Location`
4 :0 +
411
I
j� t�JicCBhi A. 1 r�R'
O _
,\,,, , i
1
v
mil
.
;
11.
4
P
k
INIII
p 1
'
-11
12 5L. inFili ,ry�„ 1�' GIS
'
,W�3ostow
2021 - 2026 Capital Improvement Program
56
28
Shop Equipment Co., Inc.
rt uia,`stotetse Svrace Elwsre ce
Aurora, OR 97002 QUOTE
Estimate #
Phone # 503.620.2794 Fax # 503.620.1763
18749
Ship To
City of Tukwilla
14000 Inner Urban Ave S
Tukwila, WA 98068
Date
Terms
Rep
11/16/2021
Net 10 days
PJ
Qty
Item
Description
Cost
Total
1
1
1
2
Move
Move
SC
Material - Install
Move Rotary two post hoist.
1,500.00
3,500.00
450.00
185.00
1,500.00T
3,500.00T
450.00T
370.00T
Move Crane
Service Call
EPDXY ANCHOR PACKAGE
Sales Tax (10.1%) $587.82
Total $6,407.82
Signature
29
Shop Equipment Co., Inc.
Ateeto totetse Se/race E waote#c
Aurora, OR 97002 QUOTE
Estimate #
Phone # 503.620.2794 Fax # 503.620.1763
18858
Ship To
City of Tukwila
14000 Inner Urban Ave S
Tukwila, WA 98068
Date
Terms
Rep
2/1/2022
Net 10 days
PJ
Qty
Item
Description
Cost
Total
1
1
I
1
1
1
I
1
1
1
2
16,000 LB CAPACITY 2 POST
Symmetric cargo vehicle 2 -post lift, 3 -stage front and 3 -stage rear arms (174 in.
height) - Designed specifically for cargo van style carrying vehicles.
Shipping & Handling
Freight Surcharge
Install 2 post, less electrical (208/230 VAC, single phase on a 30 amp service).
Hydraulic oil for lift power unit
CH-CL16-3S
21,598.58
21,598.58T
S&H
S&H
Install 2p
Hyd. oil
1,195.00
1,263.00
1,500.00
35.00
1,195.00T
1,263.00T
1,500.00T
35.00T
20,000 LB CAPACITY 2 POST
CH-CL20
Challenger 20,000 lb capacity Symmetric 2 -post lift, 2 -stage front and 2 -stage
rear arms, single point air actuated lock release (174 in. height)
22,849.15
22,849.15T
S&H
S&H
Install 2p
Hyd. oil
Material - Install
Shipping & Handling
Freight Surcharge
Install 2 post, less electrical (208/230 VAC, single phase on a 30 amp service).
Hydraulic oil for lift power unit
1,263.00
1,335.00
1,500.00
35.00
185.00
1,263.00T
1,335.00T
1,500.00T
35.00T
370.00T
Hilti Anchor Package
Sales Tax (10.1%) $5,347.32
Total $58,291.05
Signature