Loading...
HomeMy WebLinkAboutReg 2022-03-21 Item 5C - Contract Amendment #3 - Macadam Road South Water Upgrade with PACE Engineers for $150,062.40lit AO COUNCIL AGENDA SYNOPSIS Initials Aleeting Date Prepared by Mayor's review Council review 03/21/22 JR ITEM INFORMATION ITEM No. 5.C. 29 STAFF SPONSOR: ADIB ALTALLAL ORIGINAL AGENDA DATE: 03/21/22 AGENDA ITEM TITLE Macadam Rd S. Water Upgrade Project Design and Construction Mgmt Supplemental Agreement No. 3 CATEGORY ❑ Discussion Mtg Date 0 Motion Date 03/21/22 ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date Mtg SPONSOR ❑Council ❑Mayor HR DCD ❑Finance ❑Fire TS ❑P&R ❑Police BPIF ❑Court SPONSOR'S PACE has been working on the design and construciton management services for the SUNLVARY Macadam Rd S. Water Upgrade Project. Due to internal staffing capacity, there is a need for a full time inspector for the duration of the project. Supplemental Agreement No. 3 supports the costs of a full time inspector and remains within budget. Council is being asked to approve PACE's Supplemental Agreement No. 3 to Contract No. 21-022 for $150,062.40, for a total contract amount of $292,001.56. REVIEWED BY 0 Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev. ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: KATE KRIJLLER ❑ LTAC DATE: 03/07/22 RECOMMENDATIONS: SPONSOR/ADMIN. COMMII Public Works Department Approval; Forward to Regular Consent Agenda IEE Unanimous COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $150,062.40 $800,000.00 $0.00 Fund Source: WATER ENTERPRISE Comments: page 61, 2021-2026 CIP MTG. DATE RECORD OF COUNCIL ACTION 03/21/22 MTG. DATE ATTACHMENTS 03/21/22 Informational Memorandum dated 03/04/22 2021-206 CIP, page 6 PACE Supplemental Agreement No 3 Minutes from Transportation and Infrastructure Committee meeting of 03/07/22 29 30 City of Tukwila Public Works Department - Hari Ponnekanti, Director/City Engineer Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Adib Altallal, Utilities Engineer CC: Mayor Allan Ekberg DATE: March 4, 2022 SUBJECT: Macadam Rd S. Water Upqrade Project- Design and Construction Mcimt Project No. 90440105 Contract No. 21-022, Amendment No. 3 ISSUE Approve Amendment No. 3 for Contract No. 21-022 with PACE Engineers Inc. (PACE) for the Macadam Rd S. Water Upgrade. Amendment No. 3 includes a fulltime inspector for the duration of the project. BACKGROUND In 2015, the City contracted with PACE as the design consultant for the Macadam Rd S. Water Upgrade Project, along with the Andover Park E Water & Sewer Improvements under Contract No. 15-116. In 2017, the design was put on hold due to construction cost estimates coming in higher than proposed in the 2019-2024 Capital Improvement Program. Due to limited fire flow issues, the project design contract was renewed and the project budget allocated was increased. This project addresses the need for additional capacity and the decision was made to change to a 12 -inch pipe after two fires had erupted during Summer 2021 along the Macadam Road S waterline. The 12 -inch pipe size will create plenty of redundant capacity and fire storage to minimize liability. In February 2021, Council approved a new project design contract with PACE Engineers. Previous amendments increased design costs, added construction management costs, and included public outreach. DISCUSSION The project has been repeatedly prioritized as a critical Capital Improvement Program project by the Water Department. Due to staff shortage, construction management will need to be contracted out instead of completed in-house. Amendment No. 3 includes a fulltime inspector for the duration of the project. FINANCIAL IMPACT The contract amendment is for $150,062.40, which will bring the contract total to $292,001.56 for the design and construction management services portion of the Macadam Rd S Water Upgrade. The project costs are within budget and are 100% funded by the water enterprise fund. PACE Contract 2021-2023 Design/CM Budget Original Contract $77,339.16 $800,000.00 Amendment No. 1 27,600.00 Amendment No. 2 37,000.00 Amendment No. 3 150,062.40 Total $292,001.56 RECOMMENDATION Council is being asked to approve a supplemental agreement for design and construction management services with PACE in the amount of $150,062.40 for the Macadam Rd S Water Upgrade Project and consider this item on the Consent Agenda at the March 21, 2022 Regular Council Meeting. Attachments: 2021 CIP, Page 61 PACE Supplemental Agreement No. 3 31 32 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Macadam Rd S Water Upgrade DESCRIPTION: JUSTIFICATION: STATUS: MAI N T. IMPACT: COMMENT: Project No. 90440105 Design and construct 4,300 LF of 10" waterline in Macadam Rd S from S 144th St to Southcenter Blvd. Improve fire flow water quality to the north side of Tukwila Hill. Project now scheduled for 2021/2022. The new waterline will eliminate maintenance time for flushing the dead end line while increasing service reliability. Pedestrian/Bicycle Program grant for sidewalks unsuccessful in 2018, with water funds used as a match. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Design 68 100 50 50 268 Land (R/W) 0 Const. Mgmt. 250 50 300 600 Construction 300 300 950 1,550 TOTAL EXPENSES 68 0 650 400 1,300 0 0 0 0 2,418 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 68 0 650 400 1,300 0 0 0 0 2,418 TOTAL SOURCES 68 0 650 400 1,300 0 0 0 0 2,418 2021 - 2026 Capital Improvement Program 61 W a 74,:."%�;iz m I'�ll, GIS, fr am 33 34 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 21-022 (c) CONTRACT FOR SERVICES Amendment #3 Between the City of Tukwila and PACE Engineers That portion of Contract No. 21-022 between the City of Tukwila and PACE Engineers is hereby amended as follows: Section 04a: 4a. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, will increase the contract amount by $150,000.00, provided that the total amount of payment to the Consultant not exceed $291,939.16 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this CITY OF TUKWILA day of , 2022. Allan Ekberg, Mayor PACE ENGINEERS Printed Name: ez;),/ t1,7- /1)1,6,54/1. ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk Office of the City Attorney CA Reviewed May 2020 Page 1 of 1 35 36 PACE An Engineering Services Company January 25, 2022 Mr. Adib Altallal Public Works City of Tukwila 6300 Southcenter Blvd Tukwila, Washington 98188 Planners yors Subject: Macadam Road and Sidewalk Improvements- Professional Services Contract Amendment for Construction Inspection Dear Adib: Based on our prior discussions, PACE Engineers Inc. (PACE) is submitting the following contract amendment for City review and approval, to provide full time construction inspection for the Macadam Road Watermain and Sidewalk Improvement Project. This amendment covers costs necessary to provide full time inspection services including necessary support staff as described below. Construction Inspection PACE will provide a full-time inspector for this project as requested by the City. Duties include but are not limited to: • Onsite Inspection • Coordination with Contractor • Coordination with City • Tracking of Quantities • Pay Requests • Project Closeout • Other Tasks as needed. Previously approved scope and budget included responding to RFI's, review of Material Submittals and attendance at the preconstruction meeting. This contract does not include any required special inspections such as compaction testing which will be provided by the City under a separate contract. PACE proposes to provide the services listed above on a time -and -expense basis not to exceed $150,0000. The breakdown for the above fee is shown on the attached budget worksheet. This amount shall not to be exceeded without prior authorization from the City. Again, we are pleased to submit this updated scope of work and budget to support the Macadam Road Watermain and Sidewalk Improvement project through construction bidding. Please do not hesitate to contact me at 425.827.2014 or kenn@paceengrs.com if you have any comments or questions. Sincerely, PACE Engineers, Inc. Kenneth H. Nilsen, P.E. Executive Vice President :,ACI.. f....r giineers Inc. 11255 Kirkland Way Suite 300 Kirkland, Waslhiingtoin 98033-5715 p 425.827.2014 f 425.827.5043 www. paceeing rs. c or3 7 Engineers Project Name Project#: Macadam Road Inspection Support Billing Group #:I Project Budget Worksheet - 2022 Washington EOR Location:1 Tukwila Task #: Prepared By: Date: KN 1/24/2022 De # (See Labor Rates Table) De Hourly Rate /Task Title Labor Hours by Classification Labor Code Job Title 1 15 = 81 = 91 $250 $165 $150 $115 Sr. Principal Engineer Sr. Engineer Sr. Inspector Project Administrator Hour Total Dollar Inspection Support me inspection assume 90 days (10 hr days) 900 _ _ _ 900.0 $1 ct Initiation 8 8.0 ct Closeout 8 8.0 Jination 12 24 24 _ _ _ 60.0 otal12.0i )tal 24.0= 916.0= $3,000 $3,960 = $137,400 = 24.0: $2,760: _ _ _ _ 976.0 $147 PACE Billed Labor Total Reimbursable Expenses Subconsultants Total Project Budget[I as Reimbursable Quantity i Cost Subconsultants rate/unit Utility Locate Mechanical Engineer Electrical Engineer Geotechnical Engineer I & C Engineer Subconsultant Subtotal ' /Courier Costs 'ideo /Travel/Per Diem neons = $2,942.40 $147,120.00 $2,942.40 $150,062.40 Markup Total) 15% Total I $2,942.40 City of Tukwila City Council Transportation & Infrastructure Services Committee Meeting Minutes March 7, 2022 5:30 p.m. - Electronic Meeting due to COVID-19 Emergency Councilmembers Present: Kate Kruller, Chair; Mohamed Abdi, Tosh Sharp Staff Present: David Cline, Hari Ponnekanti, Seong Kim, Adib Altallal, Griffin Lerner, Adam Cox, Eric Dreyer Chair Kruller called the meeting to order at 5:30 p.m. I. BUSINESS AGENDA A. Amendment: Macadam Road South Water Upgrade and Sidewalk Improvements Project Staff is seeking Council approval of Amendment No. 3 to Contract No. 21-22 with PACE Engineers, Inc. in the amount of $150,062.40 for the Macadam Road South Water Upgrade Project. The amendment includes a fulltime inspector. Committee Recommendation Unanimous approval. Forward to March 21, 2022 Regular Consent Agenda. B. Grant Application: 42nd Avenue South Bridge Replacement Project Staff is seeking Committee approval to apply for $8,429,000 in Rebuilding American Infrastructure with Sustainability & Equity (RAISE) grant funding for the 42nd Avenue South Bridge Replacement Project. Mr. Cline indicated that staff will be recommending replacement of the bridge at its current location and further discussion will occur at the next meeting. Item(s) for follow-up: • Provide survey link to Councilmembers for assistance with constituent outreach. • Send BNSF, WDOT, and Representative Hackney letters to the Allentown listserv. • Add link to traffic calming priority projects on Neighborhood Traffic Calming website. Committee Recommendation Unanimous approval. C. Solid Waste Contract Status Update Staff briefed the Committee on the status of the RFP process. Councilmembers and staff discussed overall community outreach efforts in the city. Committee Recommendation Return to Committee. 39