HomeMy WebLinkAboutReg 2022-03-21 Item 7 - Purchase - 2 Lifts for New Fleet and Facilities Shop / Transfer Existing Equipment for $64,698.87COUNCIL AGENDA SYNOPSIS
Initials
ITEM NO.
'"
Meeting Date
Prepared by
Mayor's review
Council review
3/21/22
BR
ITEM INFORMATION
STAFF SPONSOR: CODY LEE GRAY
ORIGINAL AGENDA DATE: 3/21/22
AGENDA ITEM TITLE Fleet & Facilities Public Works Shop - Equipment Purchase & Transfer
CATEGORY ❑ Discussion
Mtg Date
0 Motion
Mtg Date 3/21/22
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ Admin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Police
A
PIr
SPONSOR'S The new Fleet & Facilities Heiser building has three lift bays for repair of fleet vehicles. To
SUMLMARY fullfill lift capacity, Fleet & facilities will need to relocate an existing lift and purchase two
new lifts for the Heiser building, including one 20,000 Ib. capacity 2 -post lift and one
16,000 Ib. 2 -post lift with 3 -stage front and rear arms. Council is being asked to approve
the purchase of two lifts, including shipping and installation, from Shop Equipment Co.,
Inc. and the transfer of existing shop equipment in the amount of $64,698.87.
REVIEWED BY 0 Trans&Infrastructure Svcs ❑ Community Svcs/Safety ❑ Finance & Governance ❑ Planning & Community Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 3/21/22 COMMITTEE CHAIR: KATE KRULLER
RECOMMENDATIONS:
SPONsoR/AD\HN. Department of Public Works
COM 1I IEE Unanimous Approval; Forward to Regular Council Meeting
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$64,698.87 $572,000 $
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
3/21/22
MTG. DATE
ATTACHMENTS
3/21/22
Informational Memorandum dated 3/18/22
2021 CIP, pg 56
Shop Equipment Co., Inc. Purchase Estimate
Shop Equipment Co., Inc. Transfer Estimate
67
68
City of Tukwila
Public Works Department - Hari Ponnekanti,
City Engineer
Engineer
INFORMATIONAL MEMORANDUM
Allan Ekberg, Mayor
TO: Transportation & Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
By: Cody Gray, Operations Manager — Fleet, Facilities & Street Maintenance
Garron Herdt, Fleet Superintendent
DATE: March 18, 2022
SUBJECT: Fleet & Facilities Public Works Shop - Equipment
Issue
Approve the purchase of two lifts for the new Fleet & Facilities Shop and the cost of moving one existing lift and one crane
from the George Long Shop to the new facility.
Background
The new Fleet & Facilities Heiser building has three lift bays for repair of fleet vehicles. The original plan accounted for the
purchase of one lift and the relocation of two lifts from the George Long building. However, one of the existing lifts is obsolete
and has subsequently suffered mechanical issues rendering it unusable. As a result, the City will need to purchase a second
new lift to meet capacity needs of the Heiser building. The existing rotary 2 -post hoist lift and a heavy-duty crane will move to
the new shop as well.
Discussion
Fleet Services reached out to four potential vendors to relocate the existing lift and purchase two lifts - one 20,000 Ib. capacity
2 -post lift and one 16,000 Ib. 2 -post lift with 3 -stage front and rear arms. The attached quote from Shop Equipment Co., Inc.
was the lowest responsive bid.
Financial Impact
Costs for purchasing and moving the vehicle lifts will be 100% funded from the Fleet Replacement budget in the 501 Fund.
The Fleet Replacement budget is more than sufficient to cover these costs.
Cost Estimate Fleet Replacement Budget
Two new lifts $58,291.05 $572,000
Transfer existing lift & crane 6,407.82
Total $64,698.87
Recommendation
Council is being asked to approve the purchase of two (2) lifts, including shipping and installation, from Shop Equipment Co.,
Inc. and the transfer of existing shop equipment in the amount of $64,698.87 and consider this item same day at the March 21,
2022 Regular Council Meeting.
Attachment: 2021 CIP, page 56
Shop Equipment Co., Inc. Purchase Estimate
Shop Equipment Co., Inc. Transfer Estimate
Fleet &Facility Services-14000interurbanAvenue, Tukwila, WA 98168 -206-431-0166
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwiIQWAgov
69
70
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Public Works Shops Project No. 91630601
DESCRIPTION: Construct a new City Public Works maintenance and operations center, combining all operational functions
at one location. Facility may also include a City Clerk & Police Records Center and Police evidence storage.
Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current
JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler
Shops,
and George Long Shops to acquire the real estate to build an equipment operations center that meets current
STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility.
MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations.
COMMENT:
Based on usage and benefits, it is estimated that the Water, Sewer, and Surface water enterprise funds will
fund 50% of the Public Works Shops with the other 50% funded by Streets, Facilities, & Equipment Rental.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
Design/PM
722
300
500
1,522
Land (R/W)
25,462
25,462
Const. Mgmt.
11
1,050
1,061
Construction
14
624
7,517
20,000
20,000
48,155
TOTAL EXPENSES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
FUND SOURCES
Enterprise Funds
8,572
462
4,284
250
20,000
33,568
Councilmatic Bond
5,572
20,000
25,572
REET/ Funds
3,000
3,000
6,000
General Fund
462
1,283
250
1,995
306 Fund Balance
9,065
0
0
0
0
(20,000)
20,000
0
0
9,065
TOTAL SOURCES
26,209
924
8,567
0
500
20,000
20,000
0
0
76,200
2021 - 2026 Capital Improvement Program
56
71
72
Shop Equipment Co., Inc.
ooww11111111
wuuuu
„„„, 11111111111111111111111
Aurora, OR 97002 QUOTE
Estimate #
Phone # 503.620.2794 Fax # 503.620.1763
18749
Ship To
City of Tukwilla
14000 Inner Urban Ave S
Tukwila, WA 98068
Date
Terms
Rep
11/16/2021
Net 10 days
PJ
Qty
Item
Description
Cost
Total
Move Rotary two post hoist.
UNIT 9601
1
1
1
2
Move
Move
SC
Material - Install
1,500.00
3,500.00
450.00
185.00
1,500.00T
3,500.00T
450.00T
370.00T
Move CraneI
Service Call
I Q0
EPDXY ANCHOR PACKAGE
Sales Tax (10.1%) $587.82
Total $6,407.82
Signature
73
Shop Equipment Co., Inc.
Aurora, OR 97002 QUOTE
Estimate #
Phone # 503.620.2794 Fax # 503.620.1763
18858
Ship To
City of Tukwila
14000 Inner Urban Ave S
Tukwila, WA 98068
Date
Terms
Rep
2/1/2022
Net 10 days
PJ
Qty
Item
Description
Cost
Total
16,000 LB CAPACITY 2 POST
UNIT 9616
1
1
1
1
1
1
1
1
1
1
2
CH-CL16-3S
S&H
S&H
Install 2p
Hyd. oil
CH-CL20
S&H
S&H
Install 2p
Hyd. oil
Material - Install
21,598.58
1,195.00
1,263.00
1,500.00
35.00
22,849.15
1,263.00
1,335.00
1,500.00
35.00
185.00
21,598.58T
1,195.00T
1,263.00T
1,500.00T
35.00T
22,849.15T
1,263.00T
1,335.00T
1,500.00T
35.00T
370.00T
Symmetric cargo vehicle 2 -post lift, 3 -stage front and 3 -stage rear arms (174 in.
height) - Designed specifically for cargo van style carrying vehicles.
Shipping & Handling
Freight Surcharge
Install 2 post, less electrical (208/230 VAC, single phase on a 30 amp service).
Hydraulic oil for lift power unit
20,000 LB CAPACITY 2 POST
UNIT 9617
Challenger 20,000 lb capacity Symmetric 2 -post lift, 2 -stage front and 2 -stage
rear arms, single point air actuated lock release (174 in. height)
Shipping & Handling
Freight Surcharge
Install 2 post, less electrical (208/230 VAC, single phase on a 30 amp service).
Hydraulic oil for lift power unit
Hilti Anchor Package
Sales Tax (10.1%) $5,347.32
Total $58,291.05
Signature
74