INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee Meeting
FROM: Hari Ponnekanti, Public Works Director/City Engineer
BY: Mike Perfetti, Senior Surface Water Project Manager
CC: Mayor Ekberg
DATE: April 1, 2022
SUBJECT: Riverton Creek Flapgate Removal Project
Project No. 99830103, Contract No. 20-075
Change Order No.1
ISSUE
Approve Change Order No. 1 to Contract 20-075 with AtWork! Commercial Enterprises, LLC of Bellevue, WA.
BACKGROUND
At Work! Commercial Enterprises is nearing completion of the initial clearing, planting and 1 -year maintenance period
associated with the Riverton Creek Flapgate Removal Project, Phase 2. This phase restored 1.48 acres of native riparian
vegetation along Riverton Creek and 0.45 acres along the Duwamish River.
DISCUSSION
To protect this investment, enable success, and meet grant commitments, the City will maintain the restoration work for a 10 -
year period. Generally, the first 3 or so years are the most critical periods of plant establishment, where plants need
supplemental water and weed control to survive and outcompete invasive, non-native plants such as Himalayan Blackberry
and Reed Canary grass. Change Order No. 1 will increase the contract amount and provide a two-year contract extension
ending on April 30, 2024, which will allow AtWork! to provide restoration during this critical establishment period.
FISCAL IMPACT (All amounts include sales tax)
The Riverton Creek Flap Gate Removal Project construction, including both phases, was initially budgeted at $918,000. The
low bid for the first phase, which was recently awarded, exceeded the budget and is utilizing all CIP funds dedicated for this
project. The initial AtWork! contract was funded through Surface Water Utility Funds transferred from the 205 Levee
Certification CIP and WRIA 9/CWM grant funds.
Change order No. 1 includes additional compensation of $57,031.80, raising the tax -inclusive contract total to $163,122.40.
This compensation will utilize project contingency allocated in the initial contract and the remainder from the 2022 CIP of the
Green the Green Program CIP. The City has a pending no -match grant application for $40,000 to assist with funding this work.
Contract Amount Fund Source Budget
Initial Contract $106,090.60 205 Levee CIP $66,669.66
Change Order No. 1 $57,031.80 Green the Green CIP 46,452.74
WRIA 9/CWM Grant 50 000.00
Total
$163,122.40 $163,122.40
RECOMMENDATION
Council is being asked to approve Contract 20-075 Change Order No. 1 for the Riverton Creek Flap Gate Removal Project
Restoration Phase II to AtWork Commercial Enterprises, LLC in the amount of $57,031.80 and consider this item on the
Consent Agenda at the April 18, 2022 Regular Meeting.
Attachments: 2021 CIP Pages 82,86,96
Change Order No. 1
https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2022 Agenda Items/TIC 04-04-22/3. Riverton Creek Ch Order No1/Info Memo for CO#1.docx
21
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Green the Green Program Project No. 91641202
DESCRIPTION: Interdepartmental effort to provide trees along the Green River and its tributaries in order to provide shade
and cooler water temperatures to threatened salmon and steelhead.
JUSTIFICATION: WRIA 9 has identified warm water temperatures as an impediment to salmon recovery, and has also started
a funding program called, "ReGreen the Green" which aims to support revegetation projects along the river.
STATUS: CIP utilized for restoration at NC Machinery & Southcenter Plaza. Planting completed and maintenance began
in 2020. Other opportunities are being identified in a collaborative effort between Public Works and DCD.
MAINT. IMPACT: Expected to increase maintenance.
COMMENT: Grant funding ongoing. Funding to date has come from WRIA9, King Co., and the Rose Foundation.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
.
j t Location
il.
i. I 15.
zill.s' �li
.. ' r 'I
.i%
5
7
� e
\
� a
� S ,'7 \
R
Design
30
5
20
5
20
5
20
5
30
140
Land (R/W)
5
5
3
5
18
Monitoring
10
20
20
30
30
20
45
45
220
Const. Mgmt.
2
7
20
20
20
20
89
Construction
45
136
100
100
100
100
581
TOTAL EXPENSES
77
158
45
145
55
155
40
173
200
1,048
FUND SOURCES
Awarded Grants KC
19
113
132
Proposed Grants
50
50
50
50
200
Rose Foundation
13
12
25
Mitigation Expected
0
City Oper. Revenue
45
33
45
95
55
105
40
123
150
691
TOTAL SOURCES
77
158
45
145
55
155
40
173
200
1,048
2021 - 2026 Capital Improvement Program
82
22
.
j t Location
il.
i. I 15.
zill.s' �li
.. ' r 'I
.i%
5
7
� e
\
� a
� S ,'7 \
R
�
• • I �,.,��
.
J
. Ii 1
I
j k
I
4,1
J.
e _
M1
' 'Y_72 I.
zei
X Al
--
__ •I
:3 :AIM
111 1,
aR 'S:..
2021 - 2026 Capital Improvement Program
82
22
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Tukwila 205 Levee Certification Project No. 91341203
DESCRIPTION: Reconstruct the Tukwila 205 Levee to provide 500 -year level of flood protection and obtain levee certification.
The US Army Corps of Engineers no longer provides levee certification services to federally authorized
levees. The existing certification expired in August 2013. Certification is required for the Federal Emergency
JUSTIFICATION: Management Agency to accreditate the levee system as providing a 100 -year level of flood protection. A
study of the Tukwila 205 Levee found approximately 80% of the levee could not be certified in its current
condition and will require repair or reconstruction.
STATUS: A levee assessment has been completed.
MAINT. IMPACT:
Certification process is expected to lead to additional levee repair projects that are required to meet the
certification criteria. Certification is valid for a 10 -year period.
The City has petitioned the King County Flood Control District to make levee improvements to upgrade the 205
Levee to provide a minimum of 100 -year level of protection, and where construction is needed, construct to a
COMMENT: 500 -year level of protection. KCFCD has agreed to begin design of several projects in 2020, which will take
approximately 15 years to complete and will require extensive work with the City of Tukwila and property
owners. A full time employee to monitor this project will be required and listed in 2021 through 2026.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022 2023 2024 2025 2026 BEYOND TOTAL
EXPENSES
Certification Phase 1
350
350
Certification Phase II
229
500
500
500
500
500
500
3,229
Design
0
Const. Mgmt.
150
150
150
150
600
Construction
0
TOTAL EXPENSES
579
0
500
500
650
650
650
650
0
4,179
FUND SOURCES
KC Flood Control
236
150
150
150
150
836
Proposed Grants
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
343
0
500
500
500
500
500
500
0
3,343
TOTAL SOURCES
579
0
500
500
650
650
650
650
0
4,179
Project Location:
Enters, Sm
2021 - 2026 Capital Improvement Program
86
23
rage
PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2021 - 2026
SURFACE WATER
412 Fund
--utner Atter Six
2021 2022 2023 2024 2025 2026 TOTAL Sources Years
78 Annual Small Drainage Program 900 900 900 900 970 970 5,540 0 673
79 Storm Water Quality Retrofit Program 115 3,314 105 105 110 105 3,854 2,160 115
80 NPDES Program 100 50 55 55 60 60 380 110 65
81 WRIA 9 Watershed Planning 20 21 21 21 22 23 128 87 23
82 Green the Green Program 45 145 55 155 40 173 613 150 200
83 Surface Water Monitoring 35 37 37 38 38 39 224 0 39
84 East Marginal Wy S Stormwater Outfalls 1,276 0 0 0 0 0 1,276 842 0
85 Gilliam Creek Fish Barrier Removal 936 536 405 5,952 2,400 0 10,229 7,076 0
86 Tukwila 205 Levee Certification 500 500 650 650 650 650 3,600 600 0
87 Nelsen Side Channel 225 240 1,825 0 0 0 2,290 1,550 0
88 Surface Water Comprehensive Plan 200 0 0 0 0 0 200 0 250
89 S 131st PI Drainage Improvements 150 1,000 0 0 0 0 1,150 250 0
90 Riverton Creek Flap Gate Removal 55 0 0 0 0 0 55 50 0
91 Chinook Wind Public Access 59 357 0 0 0 0 416 137 0
92 Surface Water GIS Inventory 0 100 0 150 0 0 250 0 0
93 Northwest Gilliam Storm Drainage System 0 100 840 0 0 0 940 0 0
94 Tukwila Pkwy/Gilliam Creek Outfalls 0 0 60 415 0 0 475 0 0
S 146th St Pipe & 35th Ave S Drainage 0 0 0 0 0 0 0 0 1,066
Soils Reclamation Facility 0 0 0 0 0 0 0 0 1,375
S 143rd Street Storm Drainage System 0 0 0 0 0 0 0 0 1,096
Nelsen PI/Longacres Surface Water Phase II 0 0 0 0 0 0 0 0 345
Duwamish Rvrbk Stabilization at S 104th St 0 0 0 0 0 0 0 0 595
TUC Surface Water Conveyance 0 0 0 0 0 0 0 0 541
Grand Total 4,616 7,300 4,953 8,441 4,290 2,020 31,620 13,012 6,383
Changes from 2019 to 2021 CIP:
Additions
83 Surface Water Monitoring
25
"* Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2026
can be found in the City's website under
Public Works Capital Improvement Program.
Surface Water Lift Station Locations
Storm Lift Station No. 15
Storm Lift Station No. 16
Storm Lift Station No. 17
Storm Lift Station No. 18
Storm Lift Station No. 19
5910 S 180th St - Mizuki Grill
7420 S 180th St (underpass)
530 Strander Blvd - Bicentennial Park
4225 S 122nd St - Allentown
Fort Dent Park (Parks Dept.)
2021 - 2026 Capital Improvement Program
77
30/2022
Sheet 1 of 1
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 1
DATE: February 24, 2022 BUDGET NO.: 412.98.594.382.65.00
PROJECT NO.: 99830103 CONTRACT NO.: 20-075
PROJECT NAME: Riverton Creek Flapgate Removal Project Phase 2
TO: At Work! Commercial Enterprises
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not
included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions:
A. The following change, and work affected thereby, are subject to all contract stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change
orders.
CHANGE: See Attached Exhibit "A"
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
ACCEPTED: Date Contractor
By Title
Original Contract (without tax) $ 96,446.00 APPROVED BY THE CITY OF TUKWILA
Previous Change Order $ NA Date
This Change Order (without tax) $ 51,800.00 By
Mayor
REV. CONTRACT AMOUNT $ 148,246.00
Original Contract Time: ended April 30, 2022
Additional Contract Time for this Change Order: 2 years
Updated Contract Time: April 30, 2024
City Engineer
ORIGINAL: City Clerk (1 of 2)
Contractor (2 of 2)
PW Project Finance File
cc: Finance Department (w/encumbrance)
Project Management File
25 (11/2014)
EXHIBIT "A"
CHANGE:
2 years of restoration maintenance
Provide weed control of blackberry, Reed Canary Grass, Knotweed, Ivy, Black Hawthorne, and
any other invasive weeds growing in the buffer. Perform weed control three times per year or as
needed, typically in spring, late summer and fall.
Weed control methods will include minimizing competing grasses and invasive vegetation
throughout the buffer especially 3 feet surrounding each plant by spraying an approved herbicide
and/or mechanical weeding.
Adaptive Management
At the direction of the Engineer, the Contractor will procure, install and maintain, within the
project area native plants to fill in gaps or respond to changing site conditions. This item will be
paid on a time and materials basis not to exceed $5,000, plus 10.1% sales tax.
COST AND TIME CONSIDERATIONS:
The scope of services are valued at $51,800.00 plus $5,231.80 in taxes for a total of $57,031.80.
Extend the contract by two years, ending on April 30, 2024.
26
Atwork! Commercial Enterprise LLC
Headquarters: 1935 152nd PI Ne Bellevue, WA 98007
Operations Center: 690 NW Juniper Street Issaquah WA 98027
(425) 274-4026, (206) 434-6623
Contract Extension Proposal City of Tukwila
Johnsl (a�atworkwa.orq
2/27/2022
RIVERTON CREEK FLAPGATE REMOVAL PROJECT
Contract Extension
Project No. 99830103
Scope of Work for Maintenance
Contract Extension
2 year extension of existing contract (May 2022 to April 2024)
Invasive Weeds Maintenance
Provide weed control of blackberry, Reed Canary Grass, Knotweed, Ivy, Black
Hawthorne, and any other invasive weeds growing in the buffer. Perform weed control
three times per year or as needed, typically in Spring, late Summer, Fall. Weed -control
methods will include minimizing competing grasses and invasive vegetation throughout
the buffer especially 3 feet surrounding each plant by spraying an approved herbicide
and/or mechanical weeding.
Watering
Provide watering for newly installed plantings as needed. Watering to include all costs
including labor, equipment, water meter and its costs, water use charges.
Litter Control
Remove litter and debris from the work areas two time per year, once in the
spring/summer and once in summer/fall. Haul off and dispose.
Pricing
$20,900.00 Per Year - plus appropriate taxes
27