ITEM INFORMATION
STAFF SPONSOR: BOB GIBERSON
VDA SYNOPSIS
ITEM NO.
Council review
5.C.
ORIGINAL_ AG ENDA DATE: 03/12/12
AG ENDA ITEM TrrI-E Tukwila Urban Center Access (Klickitat) Project
CH2M Hill Construction Management Supplement No. 2
CATEGORY Discussion Motion Resolution Ordinance Bid Award ❑Public Hearing ❑Other
tl2tg Date 03112112 Mt g Date 03/19/12 Mtg Date Mtg Date AItg Date Mtg Date Mtg Date
SPONSOR Council Mayor HR DCD Finance Fire IT P &R Police P6YI
SPONSOR'S CH2M Hill is currently the construction management consultant for the Tukwila Urban
SUMMARY Center (Klickitat) Project. Supplement No. 2 with CH2M Hill will extend the construction
management services needed as there have been delays due to the holiday traffic
moratorium and the heavy snow in January 2012. Construction management services are
needed through June 30, 2012. Council is being asked to approve Supplement No. 2 with
CH2M Hill in the amount of $81,047.80.
REVIr�wED BY ❑COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 03/05/12 COMMITTEE CHAIR: ALLAN EKBERG
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works Department
COMMITTEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$81,047.80 $2,611,243.00
Fund Source: 104 ARTERIAL STREETS (PG 13, 2012 CIP)
Comments:
MTG. DATE
03/12/12
03/19/12
MTG. DATE
03/12/12
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 03/02/12 (revised after 3/5 TC)
Contract No. 10 -120, Supplement No. 2
Minutes from the Transportation Committee meeting of 03/05/12
03/19/12
27
W
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO
FROM
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director
DATE: March 2, 2012
SUBJECT: Tukwila Urban Center Access (Klickitat) Proiect
Project No. 98410419, Contract 10 -120
Supplement No. 2 for Construction Management with CH2M Hill
ISSUE
Approve Supplement No. 2 for construction management (CM) services with CH2M Hill in the
amount of $81,047.80 for the Tukwila Urban Center (TUC) Access (Klickitat) Project.
BACKGROUND
CM contract No. 10 -120 with CH2M Hill for the TUC Access project was executed on December 14,
2010. While in -house City staff has been leading the CM effort on the road project, CH2M Hill has
been providing full -time field engineering, inspection, documentation compliance support, and on -call
specialty support.
DISCUSSION
Per project specifications, the contractor could not perform any construction work which impacted
traffic in Tukwila's Central Business District between November 16, 2011 and January 2, 2012. The
project completion date was extended to March 2, 2012 to account for working days that were
improperly charged to the contractor during that time period. Due to multiple days of heavy snow in
January 2012, the project completion date was then extended to March 9, 2012.
Additional construction work items are also being generated as part of the punch list and project
safety field review. Contract Supplement No. 2 will allow CH2M Hill to continue providing
construction management services through June 30, 2012.
Not to Exceed
CH2M Hill CM Original Contract
CH2M Hill Sup No. 1 (time extension only)
CH2M Hill Sup No. 2
HNTB Sup Nos. 12 13 Design Eng
Estimated City CM Staff, WSDOT, Misc.
Klickitat CM Budget (2012 CIP page 13)
Total Contract and Budget
RECOMMENDATION
CM Expenses Budget
$2,024,137.02
0.00
81,047.80
203,283.00
302,775.20
0.00 $2,611,243.00
$2.611.243.00 $2.6
Approve Supplement No. 2 with CH2M Hill in the amount of $81,047.80, and consider this item at
the March 12, 2012 Committee of the Whole meeting and subsequent March 19, 2012 Regular
Council meeting.
Attachments: Supplemental Agreement No 2
W:1PW EngWROJECTSW- RW RS Projects19 8 41 041 9 TUC Access (Klickitat)11nfo Memo for CH2M Hill Supplement #2 2- 28- 12.doc
29
30
r6
WrAIF Deparbmat of Trmsportation
Supplemental Agreement Organization and Address
pp J City of Tukwila
Number 002 6300 Southcenter Blvd Ste 100
Tukwila, WA 98188
Original Agreement Number
84 -RW19 /0"la0 (h) Phone: 206 433 -0179
Project Number Execution Date Completion Date
STP 1037(003) HPP999(474) HPP999(475)
Project Title
Tukwila Urban Center Access (Klickitat) Project
2/29/2012 6/30/2012
New Maximum Amount Payable
2,105,184.82
Description of Work
Provide Construction Management services related to the Tukwila Urban Center Access (Klickitat) Project, 84-
RW 19
The Local Agency of City of Tukwila
desires to supplement the agreement entered into with CH2M HILL, Inc.
and executed on 12/14/2010 and identified as Agreement No. 84 -RW19
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached Exhibit A
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: No C'hnnoe
Section V, PAYMENT, shall be amended as follows:
Tntal amount this amendment %81 80
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By:
s
c s'ult ignatuK V
Tung Le, Vice President
DOT Form 140 -063 EF
Revised 9/2005
By:
Approving Authority Signature
Date
31
Supplement 2
Exhibit A -2
Tukwila Urban Center Access (Klickitat) Project
Agreement 84 -RW19
Scope of Work
A time extension has been granted to the Contractor resulting in a revised construction
completion .date of March 9, 2012. Additional work items are also being generated as part of
the punch list generation. As a result the CH2M HILL construction management contract will be
extended to June 30, 2012, under Supplement #2, to allow for continued construction
management services.
The extension of the contract will require additional funds, as shown below, to continue field
observation of the contractor's operations, resident engineering services including Change
Order preparation and negotiation and pay estimate processing, office support and overall
project management. In addition the Consultant will prepare an APWA Public Works Project
of the Year Award application for the project. The specific tasks and assumptions from the
original scope of services (under the Local Agency Agreement dated December 14, 2010) will
apply to this supplement.
Professional Services: Hourly OH@ Fee@ f Rate
Name Job Title Hours Rate 131.14% 32% Per Hour Bill Amount
Johnson,
Matthew G. Senior Engineer 40.0 $72.00 $94.42 $23.04 $189.46 7,578.43
Jackson, Resident Engineer 120.0 $58.00 $76.06 $18.56 $152.62 18,314.54
Craig
Inspector
Chang, /Documentation 200.0 $39.00
George
$51.14 $12.48
$102.62
20, 524.92
Inspector
Szili, Christie /Documentation 200.0 $39.00
$51.14 $12.48
$102.62($
20,524.92
Inspector/
Leigh, Sherri Documentation 40.0 $39.00
$51.14 $12.48
$102.62
4,104.98
600.0 I
Total Direct Labor:
r
71,047.80
Expenses: Copies, cell phones, computers vehicles 10, 000.00
Total Expenses:1 10, 000.00
Supplement #2 Total: 81,047.80
Original Contract Maximum: $2,024,137.02
New Contract Maximum: $2,105,184.82
32
TRANSPORTATION COMMITTEE Meeting Minutes
it ouch 5. 2012 5:15 /�.m. ConAr•ence Room =1
PRESENT
Citv of Tukwila
Transportation Committee
Councilmembers: Allan Ekberg, Chair: Kathv Hougardv and De'Sean Quinn
Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischnmak, Peter Lau, Cndy Knighton and
Gail Labanara
Guest: Sharon Mann
CALL TO ORDER: The meeting was called to order at 5:19 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Tukwila Urban Center Access (Klickitat) Proiect Sut)tnlement No. 2 with CH2M Hill
Staff is seeking Council approval for Construction Management Supplement No. 2 witlm CH2M Hill in the
amount of $81,047.80 for the TUC Access (Klickitat) Project. With the holidav traffic moratorium and the
heave snow in Jamrar 2012- construction management sen ices need to be extended to June 30. 2012. The
budget for Construction uction management remains the same but the City Construction mmanagement staffirng estimate
Of $302.775.20 was reduced to compensate for the additional CH2M Hill supplement. UNANIMOUS
APPROVAL. FORWARD TO MARCH 12 COW FOR DISCUSSION.
B. Ordinance: 201.2 WSDOT Standard SDeClfiCatiolls
Staff is seeking Council approval for an ordinance adopting the 2012 WSDOT Standard Specifications. The
ordinance is needed to adopt the Standard Specifications for any Federal Aid Pro iects so that the contract format
is the same across all jurisdictions. The mandated contract specifications are only in Division 1 of the WSDOT
Standard Specifications, whereas Divisions 2 through 9 can be modified to meet our specific City's
requirements. There are only minor technical changes to the Division 1 contract boilerplates. The Committee
was concerned that there Nyere not "substantial" changes and requested a synopsis of the 2012 updates if
available. The draft ordinance will repeal Ordinance No. 2284. After further discussion, staff will make an
inquire to the Cite AttorneN's office to see if the draft ordinance could be changed to reflect acceptance of all
fixture /subsequent editions to make this process more efficient. Again the Committee and /or Council Nvould be
informed of any significant changes made in these editions (i.e. such as changes made in 2014).
UNANIMOUS APPROVAL. FORWARD TO MARCH 12 COW FOR DISCUSSION.
C. Strander Blvd /SW 27 St Extension Phase III Grant A )[Aieation
Staff is seeking Committee approval to apple for the Federal Highway Administration's TIGER IV grant for
Phase 11] of the Sunder Blvd Extension Project. Phase 111 is completely in the City of Tukwila and will connect
Strander Boulevard from the Trd<wlla Longaeres Station tinder the railroad tracks to West Vallev Highway.
At Committee, .Bob announced that the Freight Mobilitv Strategic Investment Board (FMSIB) has pledged $5
million for Phase 111. With the $5 million. only $22 million will be requested from the TIGER IV grant as the
total project cost is estimated to be $27 million. Matching funds are available from Phases I and 11 and
Tukwila's contribution should be $0.00. This grant is very competitive, but the City of Renton and FMSIB are
requesting the City's participation. An updated informational memo was requested to be attached to time
Committee minutes with the neiy information. UNANIMOUS APPROVAL FROM UTILTIES
COMMITTEE TO APPLY FOR TIGER IV GRANT.
D. TUC Transit Center and Andover Park W Street Imurovements Desiin Update
C-ndy informed Committee on the Transit Center and Andover Park West street improvement design before the
stakebolders meeting scheduled for Wednesday, Mach 7, 2012 at 1:00 pm at the Chamber of Conntnerce (oil
Interurban across from Galliano's).