1. PRESENTATION(S)
2. BUSINESS AGENDA
AGENDA
Distribution:
A. Ekberg
G. Labanara
K. Hougardy
C. Knighton
D. Quinn
S. Kerslake
D. Robertson
Clerk File Copy
V. Seal
2 Extra
Mayor Haggerton
D. Cline
e -mail pkt pdf to A. Le
K. Matej
e -mail cover to: C.
B. Giberson
O'Flaherty, D. Almberg-
F. Iriarte
Dideon, B. Saxton, S.
R. Tischmak
Norris, M. Hart, S. Kirby
MONDAY, MARCH 19, 2012
Time: 5:00 PM Place: Conference Room #1
a) Interurban Ave S (S 143 St Fort Dent Wy)
PSRC Grant Application
3. SCATBd
4. MISCELLANEOUS
5. ANNOUNCEMENTS
Recommended Action Page
a) Committee Approval
Future Agendas:
Transportation Benefit District
Next Scheduled Meeting Monday, April 2, 2012
i& The City of Tukwila strives to accommodate individuals with disabilities
Please contact the Public Works Department at 206- 433-0179 for assistance.
Pg. 1
x
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO:
FROM:
DATE:
SUBJECT
ISSUE
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director I
March 16, 2012
Interurban Ave S (S 143r St Fort Dent Wv)
Project No. 90310402
Puget Sound Regional Council Federal Funds 2012 Call for Projects
The Puget Sound Regional Council (PSRC) has announced its Call for Projects for the 2012
Federal Funding Programs. Full applications for candidate projects in the Regional Competition
must be submitted by March 21, 2012.
BACKGROUND
The grant funding programs which have called for project applications include:
Program PSRC Fundinq Requested Amount
Surface Transportation Program (STP) $35.95 million $5 million
DISCUSSION
Per CIP policy, appropriate committees must approve grant application submittals. The following
project is recommended for a 2012 PSRC Federal Funding grant application:
Interurban Ave S S 143 St to Fort Dent Way (2012 CIP pg. 28)
The design of Interurban Ave S is 90% complete and construction is estimated to cost $11
million. The City is requesting $5 million for the construction phase of the project that requires a
minimum local match of 13.5% (or $675,000) for federal funds. The current CIP shows City
Operating Revenues of $6.1 million.
The Interurban Ave S project has been scored by the SCATBd Technical Advisory Committee
(TAC) and was rated #2 in its recommendation to SCATBd. The SCATBd TAC received seven
project applications and has recommended five be forwarded to compete in the Regional
Competition.
RECOMMENDATION
The Committee is being asked to approve the submittal of a grant application for the Surface
Transportation Program (STP) for the Interurban Ave S project.
Attachment: TAC Recommendation to SCATBd for PSRC's Regional Project Competition
CIP Page 28
WAPW EngIPROJECTSW RW RS Projects19 0 31 0 4 02Interurban Ave S12012 Grant AppUfo Memo 2012 Grant Apps TC 03- 19- 12.docx
TAC Recommendation to SCATBd for PSRC's Regional Project Competition
Rank
Order
Based on
Avg.
Score
Sponsor
Project Title
Program
Amount
Requested
Phase
Average
Score
Des Moines
SeaTac
Connecting 28th /24th Avenue South
(South 200th Street to South 216th Street)
.STP
$4,000,000
Construction
/Design
87.0
2
Tukwila2
Interurban Ave South
(S 143rd St to Fort Dent Way) •
STP
$5,000,000
Construction
77.9
3
Federal Way
SR 99 HOV Lanes Phase V
/S 340th St to 359th St
STP
$4,000,000
Design /ROW
76.9
4
Auburn
S. 272nd/277th Street Corridor Capacity &
Non- Motorized Trail Improvements
STP
$4,900,000
Construction
76.0
5
Kent
SE 256th Street Improvements
(SR 516 to 116th Ave SE)
STP
$3,000,000
Construction
74.7
6
Renton
South 7th Street
(Rainier Avenue South to Grady Way)
STP
$850,000
Design
67.0
7
Tukwilal
Strander Blvd /SW 27th Street Extension - Phase 3
STP
$5,000,000
Design
63.3
W:\PW,Eng \ OTHER \Grant Applications\Final TAC Regional Comp List.vnl
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2012 to 2017
PROJECT: Interurban Ave S (S 143 St Fort Dent Way) Project No. 90310402
DESCRIPTION: Design and construct sidewalks, pavement restoration, drainage and lighting
Project Location
2012 2017 Capital Improvement Program 28
3
Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and
JUSTIFICATION:
pavement failure is accelerating.
Completed 90% of design in 2010. State TIB grant submitted in 2011.
Federal STP construction grant
STATUS:
submitted in 2009 was unsuccessful.
MAINT. IMPACT:
Reduce annual pavement repairs and increase pedestrian safety.
COMMENT:
Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB.
FINANCIAL
Through Estimated
(in $000's)
2010 2011 2012 2013 2014 2015
2016 2017 BEYOND
TOTAL
EXPENSES
Design
464
250
714
Land (R/W)
150
150
Const. Mgmt.
1,300
1,300
Construction
9,400
9,400
TOTAL EXPENSES
464 0 0 0 0 0
0 0 11,100
11,564
FUND SOURCES
Awarded Grant
389
389
Proposed Grant
5,000
5,000
Mitigation Actual
0
Impact Fees
0
City Oper. Revenue
75 0 0 0 0 0
0 0 6,100
6,175
TOTAL SOURCES
464 0 0 0 0 0
0 0 11,100
11,564
Project Location
2012 2017 Capital Improvement Program 28
3