Loading...
HomeMy WebLinkAboutPlanning 2012-03-22 COMPLETE AGENDA PACKETCity of Tukwila Jiln Hui erton, H(11 Department Of Commllnil v Development .1(1CkT'(1Ce Director CHAIR, BROOKE ALFORD, VICE CHAIR, THOMAS MCLEOD, COMMISSIONERS, LOUISE STRANDER, DAVID SHUMATE, MIKE HANSEN, AARON HUNDTOFTE, AND JERI FRANGELLO- ANDERSON Planning Commission Public Hearing March 22, 2012 6:30 PM Tukwila City Hall Council Chambers L CALL TO ORDER II. ATTENDANCE III. ADOPTION OF 02/23/12 MINUTES IV. CASE NUMBER: L 12 -005 (Design Review —Major Modification), L08 -079 (Preliminary Subdivision Amendment) APPLICANT: Mike Overbeck REQUEST: Request to change conditions of approval of the original preliminary- approved subdivision and the approved design review to allow phased development of a 31 unit townhome development, including associated infrastructure and site improvements. The proposed phasing includes a temporary recreation space as part of Phase I that was not reviewed as part of the original design review. LOCATION: Six tax parcels located at 14420 14426 34 Ave S, and 3421 -3429 S 144 Street (parcels 0040000087, 6391100000, 6391110000, 0040000083 ,0040000088,0040000094). V. DIRECTOR'S REPORT VL ADJOURN 0300 SotithcenterBotilcvurcl. Stiitc 100 Tulorilo�. ff'ush Phone 00- 431_;0�'0 Fa in�ton 911,1,1 Fax 2II0-431 -3005 x City of Tukwila Planning Commission Planning Commission (PC) Minutes Date: Febnuai 23, 2012 Time: 6:')0 PM Location: City Hall Council Chambers Present: Brooke Alford, Chair, Commissioners, Louise Strander, Mike Hansen, David Shumate, Aaron Hundtofte, and Jeri Frangello- Anderson Absent: Vice Chair, Thomas McLeod Staff: Nora Gierloff, Deputy DCD Director, Minnie Dhaliival, Planning Supervisor, and Wv_ netta Bivens, Planning Commission Secretaiy Chair Alford opened the public hearing at 6: PM. Minutes: Commissioner Strander made a motion to adopt the Januaiy 26, 2012 Planning Commission minutes. Commissioner Hansen seconded the motion. The motion was unanimously approved. SPECIAL PRESENTATION: Antony Ritch, Regional Senior Vice President, Development, Westfield Shopping Mall, gave a presentation regarding the mall's vision at the request of the Planning Commission. Mr. Ritch expressed their pride in being a true partner and investing in the community. He said that it is through the shared visions and partnerships that they are able to achieve the best results for the community, customers, retailers, and investors. Recently, Southcenter kvon a "gold" award for the mall expansion. Mr. Ritch said the award is a veil prestigious award in the industry, and -,vas a real compliment to the City, and the team, for the remodel accomplislmient, which was achieved under the City's current planning codes. Westfield became in involved ed with the TUC Plan in 20 )2, and is interested in continuing to kvork with staff on the revised draft TUC Plan. They have some concerns with the original TUC Draft, which they discussed with staff. They feel that the proposed development regulations are not economically viable for developers. Concern ivas expressed with the ivav the code was ANritten in the previous draft. And also with the following language, `the shopping industry shift is away from internal focused malls to more open air malls', Westfield felt the previous draft Plan ,vas far too prescriptive,, and could be an issue for redeveloping the assets with a veil specific form of development. A Canadian pension fiord investor has purchased the largest ever real estate investment with Westfield for 1� percent stake of Southcenter and a number of other development assets. Mr. Ritch said they look foi ward to continuing to invest in Southcenter and being part of the next evolution of TukNvila. Mr. Ritch said they do not want to discourage investors. He stated that they share the vision for the Southcenter region to become more diversified with residential and office uses. They want to work with the City, but they need assurance that the infrastructure is in place. Public transportation, the roads, and connectivity are extremely important. However, they can't continue to invest if there is a risk that retailers and investors are going to go elsewhere due to better planning environments in which they can work, and this is a major concern. Mr. Ritch said that Westfield looks foiNvard to receiving the next draft of the Plan and participating in conversations. He said the results of the Southcenter remodel have been fantastic, and they are veil proud to say that Southcenter is extremely strong and has come through the recession in a vein solid fashion, and they think that the product is truly world class. Commissioner Hansen, said that he concurs with many of the things Mr. Ritch said, and he believes it's the right direction for the TUC Plan. Mr. Hansen said Westfield is the engineer for Southcenter, moving foiNvard. He said Page 1 of 5 PC I fearing Minutes February 23, 2011 transportation will be critical to hovy people continue to move through the TUC and have the good planning development that everyone wants to have. He also thanked Westfield for being part of the community and commended them on doing a great job. Commissioner Hundtofte asked what in particular is still outstanding for Westfield Nvith the second draft. Mr. Ritch answered that they provided a vei detailed list of concerns in the original draft and they have not received any ne-,y information on -yluch to comment. Once they receive ne-,y information, they vdll put together detailed comments. He also said that they iyould be happy to come back and discuss their comments. Additional comments from the PC The Commissioners thanked Mr. Ritch for the presentation, congratulated Westfield on iyinning the gold aiyard, and expressed their appreciation for having Westfield in the City. Commissioner Alford asked if Westfield had a 1(_), 2(_), or 50 year plan for a vision for this property in their organization for the future. Commissioner Alford also asked if Westfield could potentially see having residential housing above the mall one day. Mr. Ritch said they face a challenge having plans that are as far out as 10 -50 years. He said that five years out is even difficult to predict -,with all of the changes that happen and they are constantly adjusting their plans. He said they want to continue to diversifi the assets, keep open communication with the community and retailers, and evolve plans from there. He said the most important thing to do is to keep investing. Regarding housing above the mall, Mr. Ritch said Nyhat drives the ability to do nixed use is a lot of the infrastructure. He said it's veiy site specific and it depends on the timing and the demand. Commission Shumate expressed concern regarding the price of gas continuing to rise in the next few years and the impact it's going to have on people v ho normally drive to the mall. He said he hopes there iyill be a contingency plan on getting people from the train station, light rail, or the bus, to the mall. Mr. Ritch stated they are very adept at working with cities to integrate public transportation, and would be more than iyilling to iyork iyith the City on this issue. PLANNING COMMISSION PUBLIC HEARING 1/26/12 CONTINUANCE: Chair Alford sNyore in those «fishing to provide public testimony. CASE NUMBER: L12 -00 APPLICANT: City of Tuhc-yila REQUEST: A series of proposed housekeeping code amendments ranging from code clarification to policy decisions about alloiyed uses and development standards. LOCATION: Cih vdde Minnie Dhaliwal, Planning Supeii isor, Department of Community Development, explained that at the 1/26/12 public hearing it was proposed to add sub headings to the manufacturing uses that are allowed in the various zones including those alloiyed in the Commercial and Light Industrial (C /LI) zone. The discussion focused on one of the permitted uses listed as manufacturing of tools, vehicles, and machinery, and Nyhether it should continue to be listed as a permitted use or changed to a conditional use. Since the 1/26/12 public hearing, staff has notified all of the property owners of the C /LI zone that the Planning Commission is reviewing this particular use. Staff received three comment letters on this issue, N duch were provided to the Commissioners. Staff noted that the C/Ll zone is spread out throughout the city and only a small portion of the overall area is adjacent to residential areas. Commissioner Strander disclosed that she informed Nora Gierloff that she owns property in the C /LI. Ms. 2 Page 2 of 5 PC I fearing Minutes February 23, 2011 Gierloff thanked Ms. Strander for disclosing the information and stated that it is fine for her to participate in the public hearing for the Citywide zoning change. TESTIMONY: Paul Sheehan said he has owned a family business in Tukwila for 35 rears. He expressed concern yvith a comment made pertaining to whether manufacturing uses yvere zoned appropriately. He said he is hoping the City is not taking the approach that they do not want any manufacturing uses in the area. Mr. Sheehan said that they like it in Tukyvila and want to stay. Rick Bellin, Vice President, CFO for Hatnis Group, and subsidiary companies, NC Machineiy and NC PoNver System, said that he is very- alarmed there is consideration for a Conditional Use. He said thee yvork yvith light and heavy- machinery- including total rebuilds of tractors, and the proposed zoning change yvould affect them tremendously He said it yvould harm a long term resident that's been in Tulcyy "ila for over 40 years, yvho generates high sales taxes for the City-. He said they have never created any type of environmental issue. And he strongly urges that the zoning is not revised. In response to a question from Commissioner Alford, he said a Conditional Use yvould put a limitation on the use of their property. Robin Sweiger, business owner, said that she doesn't see yyhere this environmental impact issue has come from. She said that she is incredibly yy-om*ed about the zone being changed. She said all of the businesses in the area yvork together and that the area has been cleaned up. Gary Singh, Developer, discussed the issues addressed in the comment letter he submitted. He said that there is a language interpretation issue for one of the TMC codes. Mr. Singh is proposing a different method of calculation for the Maximum Building Footprint (TMC 18.10.)57). Mr. Singh spore in support of a proposal to alloy-, the Director of Community Development to approve a 10% allowable variance. (staff clarified that the building footprint issue was not discussed at the 1/26/12 public hearing but vyas discussed at the Community Affairs and Parks Committee meeting in October, 2011) Mr. Singh urged the planning Commission to consider his requests. Bruce MacVeigh, Civil Engineer, said he has yvorked on several projects yvith Mr. Singh. He spoke in support of Mr. Singh's proposed method of calculation for Maximum Building Footprint and spoke favorably of the homes Mr. Singh builds. Mike Overbeck, Tuklyila property owner of a proposed 31 unit tov,-nhomes development, said that he is very passionate about being proactive and helping the city. He spoke in support of developers like Gary- being able to invest in the City- He said he hopes there is a y-,-ay to resolve Mr. Singh's issues and move fon He commented that other municipalities yy ould, find a y-,-ay to make this yvork. Mr. Overbeck said that he wants to continue to participate in bringing businesses, people, and developers into Tulcyvila. Louie Sanft, Tukwila property ovyner, said he has several properties that are zoned C /LI. He said that he has a nevv project he is developing along Interurban Ave that could possibly be affected by changing the zoning, as yvell as some other existing properties. He said this change seems random and that he has not heard of any reasons yvhy- the changes need to occur. Environmentally, he said that the Department of Ecology is really good at Watching businesses, as yvell as Bing County Industrial Waste Water Division, and the City of Tulcyvila Fire Department. He said that he doesn't think changing the uses of businesses that are lay-, abiding, folloyving the rules, and doing everything appropriately, yvould be fair to landlords. He also said a Conditional Use could limit businesses from opening nevv businesses and some businesses may- move to a different city. Mr. Sanft requested the manufacturing use is not changed to a Conditional Use because it yvould be discouraging to ftiture businesses that may want to move here. There yvere no additional comments. The public hearing yvas closed. The Planning Commission deliberated. Page 3 of 5 3 PC I fearing Minutes February 23, 2011 Commissioner Shumate asked what the Conditional Use entails and how it would involve property owners. Ms. Dhaliwal explained that Conditional Uses require an additional review process for a use to be approved. It involves a hearing, notifi all property ov,ners within 5(_)(_) ft. of the property, staff making a recommendation to the Hearing Examiner, the Hearing Examiner preparing the finding and facts, and making a decision on the proposal. There is criteria in the code for a Conditional Use for which the applicant will need to submit reports and justifi that it is not an impact to the area. Nekv construction structures over 1,5(_)(_) sq. ft. must go through Design Review, which is approved administratively for up to 10,0a 0 sq. ft. For structures, over 10,0a 0 sq. ft. there is a hearing process. In addition, structures larger than 12,000 sq. ft. must go through the State Environmental Policy Act (SEPA). Design Review and SEPA are already in the code and may be triggered for new development. Permitted uses do not require land use approval, they a business license, and they need a building permit for construction inside the building. Commissioner Hundtofte asked what was driving the proposed Conditional Use amendment. He also asked for some clarification regarding mixed uses in the NCC, and said if the amendment is approved Conditional Use should apply to the NCC also, because it is lighter than C/LI. Commissioner Alford stated that she raised the proposed Conditional Use amendment for manufacturing, based on language in the basic housekeeping standards. She said there one classification that would have significant impacts in the C /LI, and she inquired whether it was appropriately zoned. She commented that she doesn't think that businesses should be penalized but that the community should have input regarding Nyhat is going on in their environment. Commissioner Stander said there are long term existing businesses that have been a part of the community, and that she personally would be reluctant to put any sort of Conditional Use on their previously zoned activity. Commissioner Hansen concurred with Commissioner Strander. He said that he votes in favor of leaving things the iyay they are. Commissioner Hundtofte asked if the proximity to the water could be governed by the Shoreline Master Plan and if other overlays, rather than just zoning, could cover it: Ms. Dhaliwal said that the properties that abut the river would apply for new construction or the uses section of the SMP. In addition to the local agencies, there are regional bodies such as the Department of Ecology that would regulate clean air emissions. Under the Conditional Use criteria, in addition to the hearing, there would be documentation on Nyhat other overlays cover for regulations. Commissioner Alford asked if all of the other agencies and the current codes would protect AllenToN n residents from redevelopment in the area from heavy Industiy and impacts from noise, vibration, dust, etc. Ms. Dhaliwal said that for any new development that triggers SEPA, there would be a review done for impacts to the environment. Also, an Environmental Impact Statement will need to be prepared to address the impacts for projects that have a significant impact. COMMISSIONER HANSEN MADE A MOTION TO RETAIN THE LANGUAGE IN ATTACHMENT `I' FOR MANUFACTURING USES IN THE C /LI WITH NO CHANGE. COMMISSIONER STRANDER SECONDED THE MOTION. COMMISSIONER ALFORD CALLED FOR A ROLL CALL VOTE. COMMISSION SHUMATE OPPOSED. THE MOTION PASSED 5-1. Commissioner Alford expressed a concern with having permitted uses causing impacts; she said she hopes this issue can be addressed by a more comprehensive look in the ftiture. Page 4 of 5 4 PC 1 fearing Minutes February 23, 2011 There was discussion on Mr. Singh's proposal to change the building footprint calculations. Staff noted that this change could only be implemented if the policy is changed for the way single family houses are regulated. It was the consensus of the Commissioner to retain the current building footprint calculations. Ouasi Judicial Rezone Staff returned with clarifi-ing information as requested by the PC at the 1/26/12 on their role pertaining to the quasi-judicial rezone process. The decision was to keep this item as a Type 5 decision unless Council delegates the authority to the PC for them to hear as a Tape 4 decision. COMMISSIONER HANSEN MADE A MOTION FOR TWO OPTIONS FOR THE PUBLIC HEARING PROCESS FOR SITE SPECIFIC REZONES: OPTION 1: STAFF HOLD ONE INFORMATIONAL PUBLIC MEETING PRIOR TO TYPE FIVE DECISIONS GOING TO CITY COUNCIL (PLANNING COMMISSION ATTENDANCE OPTIONAL); THEN CITY COUNCIL HOLD A PUBLIC HEARING AND MAKE A FINAL DECISION. OPTION 2: IF COUNCIL PREFERS, THE PLANNING COMMISSION HOLD THE PUBLIC HEARING AND FORWARD THEIR RECOMMENDATION TO THE CITY COUNCIL; THEN CITY COUNCIL HOLD A CLOSED RECORD PUBLIC HEARING AND MAKE A FINAL DECISION. COMMISSIONER STRANDER SECONDED THE MOTION. The decision was to keep this item as a Type 5 decision (Option 1) unless Council delegates the authority to the PC for them to hear as a Type 4 decision (Option 2). ALL WERE IN FAVOR. Other Reauested Housekeebinu Chances The remaining list of proposed housekeeping amendments, including the changes requested by the Planning Commission at the Januaiv meeting are listed in the draft Ordinance. COMMISSIONER SHUMATE MADE A MOTION TO APPROVE THE DRAFT ORDINANCE WITH AMENDED RECOMMENDATIONS. THE ORDINANCE WILL BE FORWARDED TO THE CITY COUNCIL FOR THEIR FINAL RECOMMENDATION. COMMISSIONER HANSEN SECONDED THE MOTION. ALL WERE IN FAVOR. DIRECTOR'S REPORT: Sign Code housekeeping items: Nora, stated that there were not provisions in the Sign Code for signs to appear on gas station canopies staff is proposing to add some modest signage allowance for gas station canopies; Staff 'is proposing changes to the Sign Code that will streamline the permit process and alloy businesses to amend their existing sign permit without being charged a fee. Staff will present changes to the CAP on 3/12/12, since they are very minor non policy oriented changes they are going to request for approve without returning to PC with the proposed changes. Staff contacted Nate Robinson in Tukwila Parks and Recreation regarding a youth outreach group attending a PC meeting and the PC using this as an opportunity to do some community outreach with the youth. Nate works with the Tukwila high school group of teens on college prep and community seiti ice. If there is an interest for Nora to pursue this, please let her know. Submitted By: Wynetta Bivens Planning Commission Secretaiy Adjourned: 8:40 PM Page 5 of 5 5 x r I i Jiln Hui crton, llluvor .Iack Pace, Director STAFF REPORT TO THE BOARD OF ARCHITECTURAL REVIEW DEPARTMENT OF COMMUNITY DEVELOPMENT Prepared March 12, 2012 HEARING DATE STAFF CONTACT NOTIFICATION FILE NUMBERS ASSOCIATED FILES APPLICANT March 22, 2012 Jaimie Reavis, Assistant Planner Notice of Application posted on site and mailed to surrounding properties and agencies with jurisdiction on February 14, 2012. Notice of Public Hearing published in the Seattle Times, posted on site, and mailed to surrounding properties and agencies with jurisdiction March 8, 2012. L08 -079 Preliminary Subdivision L 12 -005 Design Review Major Modification E08 -022 SEPA /Environmental Review C09 -014 Traffic Concurrency Certificate L08 -076 Design Review L08 -077 Comprehensive Plan Amendment L09 -002 Rezone PRE08 -011 Pre Application Meeting Mike Overbeck REQUEST: Request to amend the condition of approval of the original preliminary approved subdivision and design review to allow phased development of a 31 -unit townhome development. The original decision was issued in November 2009. At this time the applicant is proposing 8 units as part of Phase I, the remaining 23 units would be Phase IL The new phased approach includes a temporary recreation space proposed as part of Phase I that was not reviewed as part of the original design review. LOCATION: 14420 34 Ave S (parcel 40040000087) 14422 34 Ave S (parcel 46391100000) 14424 1 'Ave S (parcel 46391110000) 14426 34 Ave S (parcel 40040000083 3421 S 144 St (parcel 40040000088) 3429 S 144 St (parcel 40040000094) JR Page 1 of IS 03 Is 2012 H: Desi!- Review Osterlv Townhomes nIajor Modification 1_12 -00S P1_12 -00 1_12 -00S LOS-079 P1_12 -00 Osterlv Major Modification SRdoc 0300 :Soilthcentcr Boulevard, :Suite —100 Tillorrlo, ffashiiIatoi1 98188 P19one 06 --{31 -36'0 Fox: 206- 431-3005 7 COMPREHENSIVE PLAN DESIGNATION/ ZONING DISTRICTS: High Density Residential (HDR) SEPA COMPLIANCE: The City of Tukwila, as the lead agency for this project, issued a Determination of Non Significance for this project on October 28, 2009. PUBLIC COMMENTS No comments were received during the Notice of Application for the Design Review Major Modification application. RECOMMENDATIONS: L08 -079 Preliminary Subdivision Staff recommends approval with conditions of the Preliminary Subdivision application. L12 -005 Design Review Major Modification Staff recommends approval with conditions of the design review major modification. ATTACHMENTS: A. Applicant's request B. Letter from Water District 125 C. Staff Report to the Board of Architectural Review dated November 2 2009 along with the original approved plan sheets: Site Plan Sheet A 1), Building "B" Elevations /Floorplans Sheet A 3 1), Landscaping Plans (Sheets L -1 and L -2), Survey (Sheet 3 of 4) D. New Plan Sheets a. Site Plan Sheet Al) b. Landscaping Plans (Sheets L -1 and L -2), c. Survey (Sheets 1 -3, Existing Conditions Survey) JR Page 2 of 18 03 1x'21.112 8 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 LIIS- 1179_PL12 -1111 osterh- Major Modification SRdoc Phase 11 JR Page 3 of 1S 03 1s 2012 H: Design Review Uaterh ToWnhomes 1\1aior Modification 1-12 -00j PL12- 004 1-12 -005 LOS -079 PL12 -004 Uaterh Major Modification SR.doc (i 00 SOW17CCliter Bouilevarcl..S'tlitC 100 f11100141, MCIShin(It011 98188 P17017C 431 0 0 Fax: 431 005 9 FINDINGS PROJECT DESCRIPTION Mr. Mike Overbeck received design review and preliminary subdivision approval in November 2009 for the Osterly Park Townhomes, a project to develop an approximately 1.7 -acre site with 31 townhouse units along with the required landscaping, guest parking, utilities, access, recreation areas, and frontage improvements. The Osterly Park Townhomes project was the first townhouse project to receive approval following the March 2008 adoption of Ordinance- 199 by the Tukwila City Council. Ordinance 2199 allows development of zero lot line and fee simple townhouses. Since obtaining the original Board of Architectural Review (BAR) approval for the Osterly Park Townhomes project, Mr. Overbeck has applied for Public Works permit for installation of project infrastructure, a demolition permit to remove the single family home located at 14426 34 Ave S, and a building permit for constriction of the first townhome unit (which has since expired). Criteria for design review and preliminary subdivision approval have not changed since the original approval for this project was granted by the BAR in November 2009. Please refer to Attachment C for staff review and recommendations of the original design review and preliminary subdivision applications. One of the conditions of approval of the preliminary subdivision application was the following: "All utilities for the project, private access road and sidewalks, and the recreation area located on the west and north sides of the private access road (including children's play equipment), shall be completed as part of the Public Works constriction permit." Due to the cost of constriction of project infrastructure and the applicant's needs for financing the project, Mr. Overbeck is requesting approval to allow phased constriction of the access road, utilities, and recreation space along with the first 8 dwelling units in the project. This portion of the project would be constricted first as Phase I starting in 2012, followed by constriction of the remainder of the development as part of Phase 11. One of the phasing criteria is that each phase of the project must be able to stand on its own, one phase cannot rely on a future phase to meet code requirements. The new proposed phasing involving constriction of a portion of the infrastructure and a temporary recreation space represents a major modification to the approved design review if Phase I were to stand on its own. Therefore, Mr. Overbeck's request involves a major modification to the design of the project for Phase I, an amendment to the preliminary subdivision approval, and review of the project according to phasing criteria. VICINITY /SITE DESCRIPTION Site Descriation The project site is located on the south side of S 144 Street between Tukwila International Blvd and Military Rd South. Six existing tax parcels make up the project site (see the Existing Conditions Survey in Attachment D). Access to the site will be from driveways located off S 144 Street and 34 Ave. S. A JR Page 4 of 18 03 1x'21.112 1 0 H: Design Review Osterly Townhomes Major Modification_L12 -005 PL12- 004 1-12 -005 LIIS- 1179_PL12 -11114 Osterly Major Modification SRdoc private road constricted off S. 144 St. will serve the eight units proposed as part of Phase I, this private road will continue and turn to the west to serve the remaining 23 units proposed as Phase IL The site is within close proximity to many neighborhood destinations, including grocery stores, schools, and parks. Existing Develoament Two of the existing parcels included in the project (parcels 004000 -0088 and 004000 -0094) have a combined frontage on S 144 Street of approximately 133 feet. These parcels were formerly developed with single family homes constricted in the 1940s which have been demolished in the past five years. One of these homes, located on parcel number 0040 000088, was an ongoing City of Tukwila code enforcement problem, and was demolished in 2009 to resolve King County Health violations. Two other parcels included in the project site have a combined frontage of approximately 158 feet along 34 t1i Ave S (parcels 0040 000087 and 0040-00008 Of these two parcels, the parcel located on the south (parcel 0040 000083) has two single family dwelling units that are proposed to be demolished as part of this project, one of the units was constricted in the 1940s and the other one is a mobile home. The northernmost parcel along 34 Ave S (parcel 0040 000087), and two parcels to the east (parcels 6391- 100005 and 6391- 110005) are developed with three two -story condominium buildings containing four dwelling units each which will be demolished as part of the project. Surroundiniz Land Uses The Osterly Park Townhouse development site is located within the High Density Residential (HDR) zoning district, which allows for up to 22 dwelling units per net acre. The HDR zone is intended to provide a high density, multiple family district which is also compatible with commercial and office areas. The project site is adjacent to multifamily development on parcels located directly to the east and to the south, which are also zoned HDR. The parcel directly to the east is developed as a large apartment complex (the La Roche apartments). Farther to the east, approaching Tukwila International Blvd, there is an area of neighborhood retail development including grocery and drug stores, and a variety of other small shops. To the south of the site is another large apartment complex (the Park Avenue Apartments). The three other parcels which border the project site on its south side are developed with smaller apartment complexes, including one duplex and two 4 -unit complexes. The three parcels to the west of the entrance to the site off S 144 Street are zoned Medium Density Residential (MDR), and are developed with one single family home on each parcel. Farther west, across 34 t1i Ave S the area south of S 144 Street is zoned Neighborhood Commercial Center (NCC and is developed with single family homes and small -scale commercial development. Businesses located in these homes and commercial developments include a salon, a dentist office, a restaurant, and a small grocery store. On the north side of S 144 Street, the area is zoned HDR and is developed with a large apartment complex (the Samara 1), with a single family home to the west of Samara 1, and the Cascade View community Park on the east side of the Samara 1. West of 34 Ave S, the north side of S 144 Street is zoned MDR and contains multi family development. JR Page 5 of 18 03 1x'21.112 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 LOS-079_1`1_12-004 Osterh- Major Modification SRdoc ToaoizraQhy Topography at the site is currently relatively flat. The topography is proposed to remain relatively flat after proposed development, the northern portion of the site will be all at one grade, and there will be a gradual slope down from the western side of the site to the eastern area of the site. Vegetation Vegetation on the project site currently consists of shrubs, blackberries, and several mature trees. Existing trees on the site include Hemlock, Cedar, and Fir trees on the north portion of the site, and Cherry, Maple, Fir, Ash, and Locust trees on the southern portion of the site. Most of the existing trees are located in areas where the access drive, townhouse buildings, or utility lines are proposed. There is an opportunity to retain one Cedar and one Hemlock located at the northwestern corner of the site, and an Ash clump located in the southeastern corner of the site. These trees shall be retained unless there is a conflict with the location of proposed utilities or fences. Access There will be two access points to the development from public streets. These include 34 Ave S and S 144 Street. Proposed access to Phase I is from the driveway off S 144 Street, the driveway off 34 Ave S will be added as part of Phase 11 to complete an L- shaped through- street within the development REVIEW PROCESS The Osterly Park Townhomes project will subdivide six existing parcels into 31 unit lots, with an access and utility tract and recreation tracts. Any land being divided into ten or more unit lots shall receive preliminary plat approval by the Tukwila Planning Commission as a Type 4 decision according to the provisions of 18.108.040. Townhouse development in Tukwila is restricted to the Medium Density Residential (MDR) and High Density Residential (HDR) zoning districts. According to 18.14.060, design review by the Board of Architectural Review is required for all multi- family structures over 1,500 square feet in size. Design review criteria for townhouse development are contained in the Townhouse Design Manual, which is available online at htti):// www. ci. tukwila.wa.us /dcd /dcdi)lan.html. Once a townhouse project receives preliminary subdivision and design review approval by the Planning Commission/Board of Architectural Review, the applicant must apply for a Public Works permit for construction of project infrastructure. Prior to receiving final approval, the developer of townhouse units may also apply for building permits to construct dwelling foundations. The project must receive final approval from the Tukwila City Council prior to construction of the dwelling units beyond the foundations. REPORT ORGANIZATION This staff report has been divided into two sections. The first section covers the Design Review Major Modification, the second covers the amendment to the Subdivision Preliminary Plat including a review of the phasing criteria of 17.14.040. Staff s conclusions and recommendations follow each section. JR Page 6 of 18 03 1x'21.112 12 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 LOS-079_1`1_12-004 Osterh- Major Modification SRdoc SECTION ONE DESIGN REVIEW MAJOR MODIFICATION DECISION CRITERIA DESIGN REVIEW The Osterly Park Townhomes project is subject to design review under 18.14.060 requiring all multi- family strictures to receive design review approval. Per TMC 18.60.050 (C), townhouse development is subject to the design criteria contained in the Townhouse Design Manual. The project is proposed to be constricted as originally approved, with development broken up into two separate phases. Phasing criteria of TMC 17.14.040 require that a project be reviewed to ensure that each phase meets all pertinent development standards on its own in case subsequent phases are not able to be constricted. The following is a discussion of the changes to the design of the project proposed during Phase I, in relation to applicable architectural review criteria. The applicable architectural review criteria for townhouse development are contained in Tukwila's Townhouse Design Manual, available online at htti):// www. tukwilawa /dcd /dcdi)lan.html. L SITE PLANNING C'ircukition (Petlestrian and Vehicular) Both phases include a comprehensive system of sidewalks which link the recreation areas and the entrances to all buildings within the project to the 5 -foot wide sidewalks on both sides of the private access road. Sidewalks along the private access road connect to the 6 -foot wide sidewalks along S 144 Street. A 5 -foot wide sidewalk segment has been added to the southern part of the site for Phase I, to connect sidewalks on the east and west sides of the private access road to the Phase I recreation space located at the southwestern corner of Phase L If Phase II does not occur, 10 feet of Type I rear yard perimeter landscaping is required along the south property line. Staff recommends as a condition of approval of this application that plans be revised as part of the Public Works permit to add rear yard landscaping on the south side of the new Phase I sidewalk shown along the south property line per landscaping requirements in the HDR zoning district. There are two access points to the site for vehicles for the completed project, one from S 144 Street and another from 34 Ave S. These two driveways allow through- movement from 34 Ave S to S 144 Street. If Phase 11 does not occur, the only vehicle access to the project site will be from S. 144 Street. The shared garage access areas provide room for vehicle maneuvering into and out of the private road. The resulting cul -de -sac, if Phase I were to stand on its own without constriction of Phase II, would be low volume to allow multiple use for street oriented social /recreation areas, consistent with circulation guidelines in the Townhouse Design Manual. Parking Tukwila parking requirements contained in TMC 18.56.065 require two off street parking spaces for each dwelling unit which contains up to three bedrooms. Parking for residents of the Osterly Park Townhomes project will be within the attached two -car garage for each unit. These garages are accessed from shared garage access areas located off the private access road to minimize conflicts between autos and pedestrians and to better screen garage areas from view. JR Page 7 of IS 03 1x'2012 H: Design Review Osterly Townhomes Major Modification_L12 -005 PL12 -1111 1_12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 13 The continuation of the private access drive as part of Phase II includes twelve on- street guest parking spaces on the south side of the site. The design of Phase I does not currently include guest parking. Shared garage access areas provide enough space for maneuvering into and out of the garages for each townhome unit, but there is no additional space in these areas for guest parking and the Codes, Covenants, and Restrictions for the development prohibit any parking in these areas to maintain garage access for residents. The width of the private access drive for Phase I is ?0 feet, which is not wide enough to allow on- street parking while at the same time maintaining enough width for emergency vehicle access. Additionally, on- street parking is not permitted on S. 144 Street in the vicinity of the Osterly Park Townhomes project. Staff recommends a condition of approval be added to require the addition of a minimum of two guest parking spaces, to be located at the south end of Phase 1. Staff recommends the design of these spaces be reviewed as part of the Public Works constriction permit for Phase 1. These spaces will then be removed and the private access drive extended to provide the guest parking spaces originally designed for the project at such time as Phase 11 is constricted. C'Ninte PNevention The design of this project incorporates several elements to reduce opportunities for crime. If Phase II were not to be constricted, the decorative fence along both S 144 Street would still be constricted as originally proposed, located approximately 5 feet back from the public sidewalk along S 144 Street. This fence provides both a symbolic and a physical barrier between the project site and the public street from which access is provided to the development. The fence is open, allowing surveillance of the street from street facing units. Additionally, a low wooden fence will be used to separate the public realm from the private front yard areas of the units facing S 144 St. A 6 -foot high perimeter wood fence is proposed along the side property lines of the entire development. If Phase II is not constricted, staff recommends a condition of approval to require a wood fence be constricted around the sides and rear perimeter of property included as part of Phase I to separate the site from adjacent properties. Similar to a fence around the back yard area of a single family home, this will help residents maintain surveillance of and limit access to private common areas of the site, including the recreation space and guest parking area. The recreation area proposed for Phase I is designed to be temporary until Phase II proceeds and the recreation spaces originally approved can be constricted. However, there will be a need for lighting for safety and surveillance of the recreation area, guest parking area, and mailbox cluster of Phase I until such time as Phase 11 is constricted. Staff recommends a condition of approval to require that lighting be added to the Phase I recreation space, guest parking area, and cluster mailbox location to support enhanced safety and surveillance of these areas. Staff recommends this change to the lighting design be made as part of the Public Works constriction permit for Phase I, and reviewed administratively according to lighting level requirements contained in TMC section 18.52.065, the Tukwila Infrastructure Design and Constriction Standards, and recommendations from the Tukwila Police Department. IL BUILDING DESIGN There are no changes proposed to the building design. However, if Phase II does not occur, the only building type included with this project will be building type B (see elevations in Attachment JR Page 8 of 18 03 1x'21.112 14 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 Lob- 1179_PL12 -1111 Osterh- Major Modification SRdoc C). The use of different color schemes for each of the four buildings as originally proposed will help provide visual variety to Phase I. III. LANDSCAPE /SITE TREATMENT Landscape Design and Design for Screening and Separation The current design for Phase I does not include perimeter landscaping at the rear property line where the private access road will continue to the south and west as part of Phase 11. Rear yard landscaping must be added to Phase I to meet one of the phasing criteria of TMC 17.14.040, which requires that any one phase cannot rely on future phases for meeting any City codes. Staff recommends, as a condition of approval, that the applicant be allowed to submit a revised landscape plan as part of the Public Works constriction permit in conformance with this requirement. This may require an adjustment to the subdivision survey for Phase I, the review of which can be done as part of the application for Final Subdivision Approval. Outdoor Space Design The temporary outdoor recreation space proposed for Phase I is 1,622 square feet, which exceeds the minimum amount of common open space required per 18.52.060 for 8 dwelling units. This temporary Phase I recreation space is slightly larger than the approximately 1,400 square foot recreation space on the south side of the private access drive that is part of Phase II, and the design is similar with its inclusion of lawn area and picnic tables. Townhome developments with 10 or more units must provide an on -site recreation space for children with at least one area designed for children aged 5 -12, per TMC 18.52.060. Therefore, the requirement to constrict a play area designed for children is not applicable until Phase II of the project. IV. MISCELLANEOUS STRUCTURES /STREETFURNITURE Lighting Mr. Overbeck submitted a lighting plan reviewed as part of the original design review application which showed lighting levels that would be very bright, and submitted a revised lighting plan as part of a Public Works permit. The lighting levels shown on the revised lighting plan were more appropriate for a residential development than the original lighting levels proposed. As a condition of approval of the current Major Modification application, the lighting plan submitted with the Public Works permit shall be revised to provide lighting, using the same fixtures approved in the original design review, to the Phase I recreation space, guest parking area, and cluster mailbox location to support enhanced safety and surveillance of these areas. Staff recommends this change to the lighting design be made as part of the Public Works constriction permit for Phase I, and reviewed administratively according to lighting level requirements contained in TMC section 18.52.065, the Tukwila Infrastructure Desi and Constriction Standards, and recommendations from the Tukwila Police Department. Seri Areas The location and type of mailboxes to serve the units in this project has been reviewed by the postmaster. The location of the cluster mailbox stricture for the development approved by the postmaster and the original design review will be located on the south side of the private access JR Page 9 of 18 03 1x'21.112 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -1111 1_12 -005 LIIS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 15 drive, adjacent to 34 Ave S. A new location for a mailbox cluster for Phase I will need to be identified by the postmaster. Staff recommends a condition of approval to allow the location of the mailbox cluster to be determined by the postmaster, and coordinated with the site design as part of the Public Works infrastructure permit. Additionally, the mailbox stricture for Phase I shall be the same as the design approved in the original design review. ,Street Furniture The Phase I recreation space includes two picnic tables. The original design review required that the picnic table in the recreation area located on the south side of the private access drive be consistent with the architectural design of the project. Similarly, as a condition of approval of this Major Modification application, staff recommends that the picnic tables proposed for the Phase I recreation area be consistent in design, materials and colors as the architectural design of the Osterly Park Townhouse development. CONCLUSIONS DESIGN REVIEW 1. Site Planning Pedestrian and vehicle circulation are accommodated in the design of Phase I of the Osterly Park Townhomes project. The location of the new sidewalk segment along the south property line does not leave enough room for required 10 -foot wide, Type 1 rear yard landscaping. Staff recommends as a condition of approval of this Major Modification application that plans be revised as part of the Public Works permit to add rear yard landscaping on the south side of the new Phase I sidewalk per landscaping requirements in the HDR zoning district. The existing Phase I design does not include guest parking spaces, guest parking for the project is included in Phase IL There is no room for parking outside of the garages for each unit, the narrow width of the private access drive for Phase I of the Osterly Park Townhomes must remain clear of parked cars to maintain emergency access, and there is no on- street parking allowed on S. 144 Street. Staff recommends a condition of approval be added to require the addition of a minimum of two guest parking spaces, to be located at the south end of Phase L Staff recommends the design of these spaces be reviewed as part of the Public Works constriction permit for Phase I. These spaces will then be removed and the private access drive extended to provide the guest parking spaces originally designed for the project at such time as Phase II is constricted. The project will include a hierarchy of different types of barriers, including landscaping and fences, to separate public areas from private areas. A 6 -foot high perimeter wood fence is proposed along the side property lines of the development for the entire project. If Phase II is not constricted, staff recommends a condition of approval to require that a wood perimeter fence be constricted around the sides and rear of Phase I. The recreation space, recommended guest parking area, and mailbox cluster location for Phase I were not included in the original design review approval. Until such time as Phase II is constricted, these areas will require lighting for safety and surveillance. Staff recommends a condition of approval of the current Major Modification application to require that lighting be added to the Phase I recreation space, guest parking area, and cluster mailbox location to support enhanced safety and surveillance of these areas. Staff recommends this change to the lighting JR Page 10 of IS 03 1x'2012 16 H: Design Review Osterly Townhomes Major Modification_L12 -005 PL12 -1111 1_12 -005 LOS- 1179_PL12 -1111 Osterly Major Modification SRdoc design be made as part of the Public Works constriction permit for Phase I, and reviewed administratively according to lighting level requirements contained in TMC section 18.52.065, the Tukwila Infrastructure Design and Constriction Standards, and recommendations from the Tukwila Police Department. 2. Building Design There are no changes proposed to the building design. However, if Phase II does not occur, the only building type included with this project will be building type B. The use of different color schemes for each of the four buildings as originally proposed will help provide visual variety to Phase I. 3. Landscape and Site Treatment The landscape design for Phase I is the same as originally approved in the design review application. However, rear yard landscaping must be added to Phase I to meet one of the phasing criteria of TMC 17.14.040, which requires that any one phase cannot rely on future phases for meeting any City codes. Staff recommends, as a condition of approval, that the applicant be allowed to submit a revised landscape plan as part of the Public Works constriction permit in conformance with this requirement. This may require an adjustment to the subdivision survey for Phase I which can be made as part of the application for Final Subdivision Approval. 4. Miscellaneous Structures and Street Furniture Lighting for Phase I will be the same as originally approved, with the exception of Phase I recreation area, guest parking area, and mailbox cluster location, areas which were not reviewed as part of the original application and for which lighting has not been included in the current application. Staff recommends as a condition of approval light fixtures used shall be consistent with those approved as part of the original design review. The mailbox cluster location for the Osterly Park Townhomes project was approved by the postmaster. Because the approved location is within Phase 11, the postmaster must identify a location for Phase I which can be used until such time as Phase 11 is constricted. Staff recommends a condition of approval to allow the location of the mailbox be coordinated with the postmaster and the site design as part of the Public Works infrastructure permit. Additionally, staff recommends the mailbox stricture for Phase I shall be the same as the design approved in the original design review. The Phase I recreation space includes two picnic tables. The original design review required that the picnic table in the recreation area located on the south side of the private access drive be consistent with the architectural design of the project. Similarly, as a condition of approval of this Major Modification application, staff recommends that the picnic tables proposed for the Phase I recreation area be consistent in design, materials and colors as the architectural design of the Osterly Park Townhouse development. RECOMMENDATIONS DESIGN REVIEW Staff recommends approval of the major modification to the design of the Osterly Park Townhome project, subject to the following conditions which apply to Phase L The original conditions of the design review approval are listed in the section following the new conditions, with the project phase to which each condition applies indicated in parentheses. JR Page 11 of IS 03 1x'2012 H: Design Review Osterly Townhomes Major Modification_L12 -005 PL12 -1111 1-12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 17 NEW APPROVAL CONDITIONS 1. Plans shall be revised as part of the Public Works permit to add rear yard landscaping on the south side of the new Phase I sidewalk shown along the south property line per landscaping requirements in the HDR zoning district and in conformance with the phasing criteria of 17.14.040. 2. A minimum of two guest parking spaces shall be added to Phase I, to be located at the south side of the site, to be removed at such time as the private access drive is extended as part of Phase IL Staff recommends the design of these spaces be reviewed as part of the Public Works constriction permit for Phase I. 3. If Phase II is not constructed, a perimeter fence constructed of wood shall be constructed around the sides and rear of Phase I property. 4. Lighting shall be added t o the Phase I recreation space, guest parking area, and cluster mailbox location to support enhanced safety and surveillance of these areas. This change to the lighting design be made as part of the Public Works constriction permit for Phase I, and reviewed administratively according to lighting level requirements contained in TMC section 18.52.065, the Tukwila Infrastructure Design and Constriction Standards, and recommendations from the Tukwila Police Department. The light fixtures shall be consistent with those approved as part of the original design review. 5. A mailbox cluster location shall be determined by the postmaster, and shall be coordinated with the site design as part of the Public Works infrastructure permit. The mailbox stricture for Phase I shall be the same as the design approved in the original design review. 6. The picnic tables proposed for the Phase I recreation area shall be consistent in design, materials and colors as the architectural design of the Osterly Park Townhouse development. ORIGINAL APPROVAL CONDITIONS 1. Existing trees, including an 8" diameter Cedar and a 7" diameter Hemlock located on the north portion of the site (on tax lot 004000 0088), and an Ash clump located in the southeastern corner of the site (on tax lot 004000 -0094) shall be retained unless there is conflict with location of proposed utilities. (Phase I) 2. A revised lighting plan shall be submitted as part of the Public Works constriction permit showing lighting levels to meet City requirements. (Phase I, Phase 11) 3. The material used in areas shown as having patterned pavement shall be submitted as part of the Public Works construction permit, and reviewed administratively by the Community Development Director. (Phase II) 4. A sign permit shall be obtained for any signs at the entrance to the project, and shall be reviewed for compliance with the Tukwila Sign Code and for consistency with the architectural style of the development. (Phase I, Phase II) 5. Screen individual meters, electrical boxes and similar equipment necessary for project infrastructure. This screening shall be reviewed and approved administratively as part of the review of the Public Works constriction permit. (Phase I, Phase II) JR Page 12 of 18 03 1x'21.112 18 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PI-12-004 1-12 -005 LIIS- 1179_PL12 -1111 Osterh- Major Modification SRdoc SECTION TWO SUBDIVISION PRELIMINARY PLAT APPLICATION REVIEW PROCESS SUBDIVISION PRELIMINARY PLAT AND FINAL PLAT APPROVAL There are three basic steps in the subdivision approval process: 1. Preliminary Approval Any land being divided into ten or more unit lots shall receive preliminary plat approval by the Tukwila Planning Commission as a Type 4 decision according to the provisions of 18.108.040. Criteria for Preliminary Plat Approval are contained in section 17.14.020(D). The application was reviewed by the Tukwila Short Subdivision Committee, and staff's response to each of the criteria for preliminary plat approval and recommended conditions of approval are included below. Once a townhouse project receives preliminary subdivision and design review approval by the Planning Commission /Board of Architectural Review, the applicant must apply for a Public Works permit for construction of project infrastructure. Prior to receiving final approval, the developer of townhouse units may also apply for building permits to constrict dwelling foundations. The project must receive final approval from the Tukwila City Council prior to construction beyond dwelling foundations. 2. Final Approval After constriction of project infrastructure and compliance with conditions of preliminary approval, the applicant must apply to receive final approval for the subdivision plat. The final approval decision on a subdivision plat is made by the Tukwila City Council. Before the final plat is submitted to the City Council, it shall be signed by the Tukwila Finance Director, Director of Public Works, and the Director of the Department of Community Development. If the applicant plans to build homes on Phase I, the eight lot plat shall require final plat approval by Tukwila City Council before the lots can be sold. If Phase 11 is constructed within five years of preliminary approval then a separate final plat approval by Tukwila City Council shall be required after the infrastructure for Phase 11 is constricted. However if Phase 11 is not constricted before the expiration of preliminary approval, a new preliminary approval by the Planning Commission shall be required. 3. Recording Upon approval by the City Council, the subdivision plat shall be sided by the Mayor and attested by the City Clerk. It is the applicant's responsibility to record the City approved final subdivision plat documents with the King County Department of Records. The applicant will need to pay the recording fees and submit the approved original final subdivision plat to King County. The final subdivision plat is not complete until the recording occurs and copies of the recorded documents are provided to the Department of Community Development. The approved final subdivision plat must be filed with the King County Department of Records five years from the date of this preliminary approval or the application will expire. The Planning Commission may grant a single one year extension. DECISION CRITERIA SUBDIVISION PRELIMINARY PLAT APPROVAL- PHASING The discussion of project consistency with criteria for preliminary plat approval is contained in the staff report for the original Preliminary Subdivision application (see Attachment C). No changes are proposed to the original subdivision. Phased development of the Osterly Park Townhomes project is proposed, JR Page 13 of IS 03 1x'2012 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 19 which must meet the Phasing criteria contained in TMC section 17.14.040. The criteria are listed below in italics, followed by staff discussion of the criteria as they relate to the Osterly Park Townhomes project. Original conditions of approval of the Subdivision Preliminary Plat will be combined with any additional conditions of approval added by the Board of Architectural Review in a new Notice of Decision issued for this project. 17.14.040 Phasing The subdivider may develop and record the subdivision in phases. Any phasing proposal shall be submitted for City Council review at the time at which a final plat for the first phase is submitted. Approval of the phasing plan shall be based upon making the following findings: 1. The phasing plait hichides all Imi d col ?talliecd irithiii the al)l)i ol 1' plat, hichicling areas 11'J?e1'e Offslte inipr'ol are being Inacle. Proposed project phasing consists of two phases which include all land contained within the preliminary plat, as well as frontage improvements along 34 Ave S. Sheet 3 of 3 of the Phase I subdivision survey shows how the entire tax parcel 004000 -0088 and a portion of tax parcel 004000 -0094 will be subdivided into 8 unit lots, Tract A (for ingress, egress and utilities), and Tract D (recreation space for Phase I). Sheet 2 of 3 of the Phase I subdivision survey shows how the remaining area of tax parcel 004000 -0094 shown as Lot 100 on Survey Sheet 2 of 3 in Attachment D), will become a new lot until such time as it is subdivided as part of Phase II. Phase II includes the remaining area of tax parcel 004000 -0094 along with tax parcels 004000- 0083, 639111 -0000, 639110 -0000, and 004000 -0087. In case Phase II does not occur, staff recommends a condition of approval to require legal access to the remaining area of tax parcel 004000 -0094 be provided through an easement, or alternatively, by combining the remaining area of tax parcel 004000 -0094 with tax parcel 004000 -0083. Staff recommends review of legal access to the remaining area of tax parcel 004000 -0094 be included in the review of the Public Works permit for Phase I. 2. The sequence aml timing c?f cleivlopnerlt is iclerltifiecl oii a naap. The sequence of project development is shown on the phasing plan see Site Plan Sheet A 1 in Attachment D). Phase I is planned to be constricted following BAR approval and approval of the Public Works infrastructure permit. Phase II is planned for constriction following final subdivision approval of Phase I and once constriction of the townhomes in Phase I has started. The final plat for both phases shall be recorded within 5 years of the date of preliminary subdivision approval, per RCW 58.17.140, unless an extension is requested by the applicant and granted by the City of Tukwila. 3. Each phase shall consist of a ('olltigllolls gl•olg) c?f lots that meets all per•tirlerlt cleivlopmerlt stamlar•cly on its oirii. The phase caitrlot rely on filtur•e phases fol• ineeting al11 0t1' codes. Phase I meets all pertinent development standards on its own, with the exception of meeting the required rear yard landscaping requirements. Ten feet of Type 1 landscaping is required along the southern property line of Phase I until such time as Phase 11 is constricted. Staff recommends a new condition of approval of the preliminary subdivision to require that plans for Phase I be revised as part of the Public Works permit to provide space for 10 feet of Type I rear yard landscaping on the south side of the new Phase I sidewalk located along the south property line. JR Page 14 of IS 03 1x'21.112 2 0 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12- 004 1-12 -005 LIIS- 1179_PL12 -11114 Osterh- Major Modification SRdoc 4. Each phase proVideN aclequate circitlatioii aml utilities. PiibliC Works haN cleter inhiecl that all street aml other public ini1)ro1 hichicling but riot linzitecl to drainage aml erosion colitrot nnpro1 are assilrecl Dc ferinew of i1npro1 final' be alloired prn'suai ?t to El1C Chapter 17.24. The design of Phase I will provide adequate circulation for both automobiles and pedestrians. Each townhouse unit contains an attached 2 -car garage. There is no space designed as part of Phase I to include guest parking; all guest parking is included as part of Phase IL There is no parking allowed in the shared garage access area to maintain garage access for residents, and there is no on- street parking allowed on the 20 -foot wide private street serving Phase I of Osterly Park Townhomes or the public right -of -way of S. 144 Street. In order to maintain adequate vehicle circulation and emergency vehicle access, staff recommends a condition of approval to require a minimum of two guest parking spaces be added to Phase L These spaces can be added to the south side of the site, and shall be removed at such time as the private access drive is extended as part of Phase IL The addition of the guest parking spaces and the rear yard landscaping may require revisions to the lot or tract layout as shown in the preliminary subdivision survey. Staff recommends the design of these spaces and any necessary changes to the survey be reviewed as part of the Public Works constriction permit for Phase I. Plans have been reviewed by the Public Works, Fire, Building, and Planning departments to ensure adequate utilities are included to serve the development proposed as part of Phase I. Sewer, water, and storm drainage infrastructure is adequate to serve Phase I, and is designed so that it can be extended into Phase II of the project. An original condition of approval of the preliminary subdivision was: `Buildings will be required to meet fire flow requirements per the International Fire Code." The previous subdivision approval required that the water line be looped from the main located off 34 Ave S. Per the applicant, installation of the looped water line as part of Phase I will be prohibitively expensive. The Fire and Public Works Departments requested the applicant obtain a written statement from Water District 125 to ensure that the design of the water line proposed for Phase I will meet adequate fire flow requirements for the sprinklered townhome units. Attachment B is a letter from Mark Parsons of Water District 125, which states there is adequate fire flow for the first 8 units without a looped water line; Phase II of the project will require the water line to be looped, consistent with the originally approved utility design. 5. All phases shall be recorded irithiii the fire -near life of the preliinhiar plat, wiles all exterisiori iN granted. Constriction of Phase I is expected to commence in Spring /Summer of 2012. All phases shall be recorded within five years unless the applicant applies and receives approval for an extension. CONCLUSIONS PHASING PLAN 1. The phasing plan includes all land for the entire development project to constrict 31 townhomes, with associated recreation space, access, utilities, landscaping, and frontage improvements along 34 Ave S. In case Phase II does not occur, staff recommends a condition of approval to require legal access to the remaining area of tax parcel 004000 -0094 be provided through an easement, or alternatively, by combining the remaining area of tax parcel 004000 -0094 with tax parcel 004000- JR Page 1s of IS 03 1x'2012 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -1111 1_12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 21 0083. Staff recommends review of legal access to the remaining area of tax parcel 004000 -0094 be included in the review of the Public Works permit for Phase I. The sequence of the development project is included on the Site Plan, Sheet Al (Attachment D). Constriction of Phase I is expected to start in Spring /Summer of 2012. All phases shall receive final subdivision approval within 5 years unless an extension is granted. Constriction of the individual townhouse units shall meet the time requirements of each stricture's building permit. 3. Both Phase I and Phase II meet pertinent development standards on their own, with the exception of rear yard landscaping requirements along the southern boundary of Phase L Staff recommends a new condition of approval of the preliminary subdivision to require that plans for Phase I be revised as part of the Public Works permit to provide space for 10 feet of Type I rear yard landscaping on the south side of the new Phase I sidewalk located along the south property line. 4. Each phase of the project will include adequate utilities. Phase I does not include any guest parking spaces. There is no parking allowed in the shared garage access areas to maintain garage access for residents, there is no on- street parking allowed on the 20 -foot wide private street serving Phase I of Osterly Park Townhomes, and there is no on- street parking on S. 144 Street. In order to maintain adequate vehicle circulation and emergency vehicle access, staff recommends a condition of approval to require a minimum of two guest parking spaces be added to Phase I. These spaces can be added to the south side of the site, and shall be removed at such time as the private access drive is extended as part of Phase 11. The addition of the guest parking spaces and the rear yard landscaping may require revisions to the lot or tract layout as shown in the preliminary subdivision survey. Staff recommends the design of the design of these spaces and any necessary changes to the survey be reviewed as part of the Public Works constriction permit for Phase I. RECOMMENDATION SUBDIVISION PRELIMINARY PLAT APPROVAL Staff recommends approval of an amendment to the Subdivision Preliminary Approval to include the following new conditions of preliminary subdivision approval. The new list of conditions is immediately below, followed by the original list of conditions of the preliminary subdivision approval. A note in parentheses after each condition indicates whether the condition applies to Phase I, Phase 11, or both phases of the project. NEW PRELIMINARY APPROVAL CONDITIONS 1. Legal access to the remaining area of tax parcel 004000 -0094 shall be provided through an easement, or alternatively, by combining the remaining area of tax parcel 004000 -0094 with tax parcel 004000 -0083. This shall be included as part of the review of the Public Works permit for Phase I. 2. Plans for Phase I shall be revised as part of the Public Works permit to provide space for 10 feet of Type I rear yard landscaping on the south side of the new Phase I sidewalk located along the south property line. (Phase I) 3. A minimum of two guest parking spaces shall be added to Phase L These spaces can be added to the south side of the site, and shall be removed at such time as the private access drive is extended as part of Phase 11. The addition of the guest parking spaces and the rear yard landscaping may require revisions to the lot or tract layout as shown in the preliminary subdivision survey. Staff recommends the design of these spaces and any necessary changes to the survey be reviewed as part of the Public Works constriction permit for Phase L (Phase I) JR Page 16 of IS 03 1x'2012 2 2 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc ORIGINAL PRELIMINARY APPROVAL CONDITIONS The following shall be atItI °essed as part of the Public Works Conshwetion Permit: 1. The applicant shall submit a revised lighting plan to meet recommendations of the Tukwila Police Department, the lighting requirements in TMC section 18.52.065 and the Tukwila Infrastructure Design and Constriction Standards. (Phase I, Phase II) 2. All utilities for the project, private access road and sidewalks, and the recreation area located on the west and north sides of the private access road (including children's play equipment), shall be completed as part of the Public Works construction permit. (Phase I utilities, private access road and sidewalks, and recreation area shall be constricted for the first 8 units per plans submitted with the Major Modification application, which shall be revised as part of the Public Works permit for Phase I to accommodate the new conditions of approval added with this Design Review Major Modification and Preliminary Subdivision amendment. Phase II shall include utilities, private access road and sidewalks, and recreation areas as originally approved in November 2009). 3. The applicant shall obtain an NPDES constriction permit for this project. (Phase I) 4. A street light mast arm shall be added to the existing wooden pole. (Phase II) 5. Overhead utilities along 34 Ave S shall be moved underground, unless the applicant applies for and obtains a waiver from this requirement from the Public Works Director. The applicant shall submit an estimate for work to underground these utilities with the waiver request. (Phase II) 6. Storm drainage for roof drains, foundation drains, and paved areas shall be infiltrated and /or dispersed on -site, or detention provided. Civil site plans shall be reviewed as part of the PW infrastructure permit. Contact the Tukwila Public Works Department for submittal and design requirements. (Phase I, Phase II) 7. Access road, utilities, undergrounding of power, and extension of sewer and water lines to the unit lots shall be approved by the appropriate departments and /or utility and conform to the Civil Plans dated August 4, 2009. As -built plans shall be provided to the Public Works Department prior to final approval. (Phase 11, new civil plans dated February 6, 2012 and revised to accommodate new conditions of approval shall be used for Phase I) 8. Install all required site improvements, including those proposed in the application and those identified above as conditions of approval. You will need to obtain all required permits prior to beginning any constriction. For water and sewer permits, contact the individual provider District. For City of Tukwila utilities, contact Tukwila Public Works at (206) 433 -0179 for a Public Works (PW) type `C' permit for approval. A Street Use will be part of this permit and require bonding, insurance, and a Hold Harmless Agreement for work within the Public Right -of -Way. (Phase I, Phase II) 9. Minimum clear access road width is 20 feet. Fire lane marking /stenciling will be required as necessary to ensure width is maintained. (Phase I Phase II) 10. Submit a current water availability letter from Water District 125. (Phase I, Phase II) The following shall be atItI °essed as part of the Demolition Perniit(s): 1. Existing strictures shall be demolished prior to final approval, unless a bond for demolition of the strictures is submitted to and approved by the Director of the Department of Community Development. (Phase II) 2. The applicant shall apply to the Puget Sound Clean Air Agency for PSAPCA permits for demolition of existing strictures. (Phase II) JR Page 17 of 18 03 1x'21.112 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12- 004 1_12 -005 LIIS- 079_1`1_12 -004 Osterly Major Modification SRdoc 23 3. Per Dana Dick of Valley View Sewer District, capping permits will be required with demolition of any of the existing buildings, and a developer extension will likely be required as part of the process to provide sewers to the development. (Phase 11) The following shall be addressed prior to final approval of the subdivision plat: 1. Survey and "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes" shall be modified to reference BAR approval, and to include joint maintenance agreements for access road, utilities, and landscaping areas. Also, the legal descriptions under Exhibit A of the codes, covenants, and restrictions shall be added to the document, and reviewed administratively. Easements and the codes, covenants, and restrictions shall be recorded prior to final subdivision approval. (Phase I, Phase 11) 2. Separate easement documents and maintenance agreements for any common infrastructure (utility lines, access roads /driveways) shall be submitted for review and approval by the Public Works Director. (Phase I, Phase II) 3. Submit a set of recording documents in either legal or record of survey format that meet the King County Recorder's requirements and contain the following items: a) A survey map as described in the application checklist that is consistent with all of the conditions of approval. The surveyor's oritzinal signature must be on the face of the plat. b) Separate easement document with legal descriptions for any common access /utility infrastructure. c) Separate joint Maintenance Agreements for the access road, drainage system, and landscaping areas. d) Add Tukwila land use file number L08 -079 for the subdivision application to all sheets of the survey. e) Include Existing Conditions Survey as Sheet 5 of 5 of the survey sheets. f) Add a vicinity map to the survey. g) Add "After" legal description to the survey sheets for the boundaries of the new subdivision. Also add legal descriptions for each of the tracts. h) The fact that the unit lot is not a separate buildable lot, and that additional development of the individual unit lots may be limited as a result of the application of development standards to the parent lot, shall be noted on the plat. (Phase I, Phase 11) The following shall be addressed as part of the Building Permits: 1. Transportation, Parks, and Fire impact fees will apply to the future Building Permit(s). (Phase I, Phase II) 2. Buildings will be required to meet fire flow requirements per the International Fire Code. (Phase I, Phase II) 3. Adequate ground ladder access area of 15 feet minimum depth to be provided for 2nd and 3rd story bedroom rescue windows. (Phase I, Phase II) JR Page 18 of 18 03 1x'21.112 2 4 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PI-12-004 1-12 -005 LIIS- 1179_PL12 -1111 Osterh- Major Modification SRdoc c! FEB 4 3 202 To: City of Tukwila cpMMUNiTY )11112- DEVELOPMEN Osterly Park Townhomes permit 1-08 -076; L08 -079 was approved as 31 Units. Due to economics I am requesting to build the first 8 units as phasel in the spring of 2012 and then go back and build the rest of the approved subdivision, with the construction on phase 2 to start as soon as 80% of the units in phase 1 are sold. Originally we had submitted to build 10 units with the complete infrastructure and then finish the rest of the buildings in phases. Due to the cost of the Sewer and water mains as well as the loss of rental income until the first phase is sold, that is no longer a viable option. I intend on this being 1 motion with no breaks in the project. As we all are aware of, the economy has presented great changes to many devoplers and I am no exception. Both of the local banks that had approved this project when I started have permanatly closed their construction departments. We turned to private investment to continue and they are limiting the risk. Specifically the first 8 units /lots are exactly the same as in the approved subdivision. A recreation space was added to meet the city phasing requirements in what will eventually be the C building in phase 2. If there were no phase 2 for an unforeseen reason then this would be a permanent recreation space as it meets all city requirements. Water, Sewer, and Storm drain will end at the southern boundary line of the Phasing lots and will be extended at the start of phase 2 to exactly what is approved on the subdivision approval. The common utility trench, including power, gas, cable, and phone will be in underground conduit. The conduit will go in at the start of phase 1, units as added will be hooking up to the stubs already in the ground. Thank You for your consideration Mike Overbeck Osterly Park Townhomes Attachment A 25 26 WIANE YOUNG Office Manager Telephone: (206) 242-9547 FAX: (206) 248-1744 TUKWILA, WASHR 98 u68 March 2, 2012 Jaimie Reavis City of 'Tukwila 6300 Southcenter Blvd, Ste. 100 Tukwila WA 98188 The District has approved Mike Overbeck's Phase 1 of four buildings with eight living units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h Ave. S. However, the next pha quire the line to be looped. Please feel free to contact me at the District office if you have any questions. 92sm ry Mark Parsons Superintendent Attachment B 27 MARK PARSONS u. n Superintendent P.O. Box 68147, Ht. r. Office 3460 S, 148th St, Ste. TUKWILA, WASHR 98 u68 March 2, 2012 Jaimie Reavis City of 'Tukwila 6300 Southcenter Blvd, Ste. 100 Tukwila WA 98188 The District has approved Mike Overbeck's Phase 1 of four buildings with eight living units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h Ave. S. However, the next pha quire the line to be looped. Please feel free to contact me at the District office if you have any questions. 92sm ry Mark Parsons Superintendent Attachment B 27 W.* ANUMEM .liar Hcr,,1 1 ,yerton, Mcn•or Jack Pace, Director STAFF REPORT TO THE HOARD OF ARCHITECTURAL REVIEW DEPARTMENT OF COMMUNITY DEVELOPMENT Prepared November 2, 2009 HEARING DATE STAFF CONTACT November 12, 2009 Jaimie Reavis, Assistant Planner NOTIFICATION: Notice of Application posted on site and mailed to surrounding properties and agencies with jurisdiction on March 27, 2009. Notice of Public Hearing posted on site, mailed to surrounding properties, agencies with jurisdiction, and parties of record October 27, 2009. It was also published in the Seattle Times on October 29, 2009. FILE NUMBERS: L08 -076 Preliminary Subdivision L08 -079 Design Review ASSOCIATED FILES: E08 -022 SEPA /Environmental Review C09 -014 Traffic Concurrency Certificate L08 -077 Comprehensive Plan Amendment L09 -002 Rezone PRE08 -011 Pre Application Meeting APPLICANT: Mike Overbeek REQUEST: Preliminary Subdivision and Design Review approval by the Board of Architectural Review to subdivide six existing parcels into 31 unit lots, an access and utilities tract and recreation tracts, for development of 31 townhomes. LOCATION: 14420 34"' Ave S (parcel #0040000087) 14422 34 Ave S (parcel #6391100000) 14424 34 Ave S (parcel #6391110000) 14426 34"' Ave S (parcel #0040000083) 3421 S 144 St (parcel #0040000088) 3429S 144 St (parcel #0040000094) COMPREHENSIVE PLAN DESIGNATION/ ZONING DISTRICTS: High Density Residential (HDR) SEPA COMPLIANCE: The City of Tukwila, as the lead agency for this project, issued a Determination of Non Significance for this project on October 28, 2009 JR Pa Lc 1 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1_08 -076 L08-079 Ostcrly Park Sub livision &DcsiLnRcvicw SR. loc 6;00 Soullicenrer Bolrlci!ard, Srrire #100 Tirkiilla, Washin,,,Ion 9SI 'R Phone 200-4-11-1070 Fax: 200- 4-11--1665 Attachment C 29 PUBLIC COMMENTS One written response, from Dana Dick of Valley View Sewer District, was received in response to the notice of application. Comments from Dana Dick were to inform the City of Tukwila and the applicant that capping permits will be required prior to demolition of any of the existing buildings, and a developer extension will be required to provide sewers to the proposed townhome project. This information was forwarded to the applicant and will be added as a condition of approval of the preliminary subdivision application. RECOMMENDATIONS: L08 -076 Preliminary Subdivision Staff recommends approval of the Preliminary Subdivision application, with conditions. L08 -081 Design Review Staff recommends approval of the development project with conditions. ATTACHMENTS: A. Applicant's response to Design Review and Preliminary Subdivision Criteria B. Site Plan (Sheet A1) /Building Elevations /Flooiplans /Details (Sheets A2- A5) /Landscaping Plans Sheets L -1 and L-2) C. Colored Elevations and Isometric Color Rendering D. Plat Survey /Existing Conditions Survey /Civil Plans E. Printed copies of colors and materials and site furniture F. Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes JR Pa Lc 2 of 26 11/05/2009 3 0 HADcsip RcvicwvOtitcrly TownhomcsvL08 -076 L08 -079 Ostcrly Park Sub livision &DcsiLnRcvicw SR. loc JR Paflc i of 26 H: \Dcsien Rcv ic\y \Ostcrly To\ynhomcs \LOS -076 LOS -079 Ostcrly Park Sub lip ision &DcsienRc\ ic\y 100 Soullicc lacr Borth ard, Suilc #100 Tukuvila, tt aslini:;lnn MISS 11/05/2009 SR. loc Phnnc 206-4-11-1670 Fax: 206- -1,1 -;665 31 FINDINGS PROJECT DESCRIPTION Mike Overbeck has applied for design review and preliminary subdivision approval to develop an approximately 1.7 -acre site with 31 townhouse units and required landscaping, guest parking, utilities, access, recreation areas, and frontage improvements. The project will involve demolition of 14 dwelling units including two single- family homes and three condominium buildings (each building containing four dwelling units). The project is proposed to be constructed in three phases. Prior to construction of residential units and final approval of the plat, construction of the access road, utilities, and the larger recreation with children's play equipment will be required to ensure that all required emergency access and infrastructure is in place to serve the first phase of development. Phase I is planned to include units 16 -25. Phase II will include units 5 -15 and the southern recreation area. Phase III will include units 1 -4 and 26 -31. This project, if approved, will be the first townhouse project to receive approval since the ordinance (Ordinance 2199, adopted March 2008) allowing development of zero lot line and fee simple townhouses was adopted by the Tukwila City Council. VICINITY /SITE DESCRIPTION Site Description The project site is located on the south side of S 144' Street between Tukwila International Blvd and Military Rd South. Six existing tax parcels make up the project site (see the Existing Conditions Survey in Attachment D). Access to the site will be from driveways located off S 144 Street and 34 Ave. S. The site is within close proximity to many neighborhood destinations, including grocery stores, schools, and parks. Existing DevelODment Two of the existing parcels included in the project (parcels 0040- 000088 and 0040- 000094) have a combined frontage on S 144' Street of approximately 133 feet. These parcels were formerly developed with single family homes constructed in the 1940s which have been demolished in the past five years. One of these homes, located on parcel number 0040- 000088, was an ongoing City of Tukwila code enforcement problem, and was demolished in 2009 to resolve King County Health violations. Two other parcels included in the project site have a combined frontage of approximately 158 feet along 34"' Ave S (parcels 0040- 000087 and 0040-000083). Of these two parcels, the parcel located on the south (parcel 0040 000083) has two single family dwelling units that are proposed to be demolished as part of this project; one of the units was constructed in the 1940s and the other one is a mobile home. The northernmost parcel along 34"' Ave S (parcel 0040- 000087), and two parcels to the east (parcels 6391- 100005 and 6391- 110005) are developed with three two -story condominium buildings containing four dwelling units each which will be demolished as part of the project. Surrounding Land Uses The Osterly Park Townhouse development site is located within the High Density Residential (HDR) zoning district, which allows for up to 22 dwelling units per net acre. The HDR zone is intended to JR Pa Lc d of 26 11/05/2009 3 2 HADcsip RcvicwvOtitcrly TownhomcsvL08 -076 L08 -079 Ostcrly Park Sub livision &DcsiLnRcvicw SR. loc provide a high density, multiple family district which is also compatible with commercial and office areas. The project site is adjacent to multifamily development on parcels located directly to the east and to the south, which are also zoned HDR. The parcel directly to the east is developed as a large apartment complex (the La Roche apartments). Farther to the east, approaching Tukwila International Blvd, there is an area of neighborhood retail development including grocery and drug stores, and a variety of other small shops. To the south of the site is another large apartment complex (the Park Avenue Apartments). The three other parcels which border the project site on its south side are developed with smaller apartment complexes, including one duplex and two 4 -unit complexes. The three parcels to the west of the entrance to the site off S 144 Street are zoned Medium Density Residential (MDR), and are developed with one single family home on each parcel. Farther west, across 34"' Ave S the area south of S 144' Street is zoned Neighborhood Commercial Center (NCC), and is developed with single family homes and small -scale commercial development. Businesses located in these homes and commercial developments include a salon, a dentist office, a restaurant, and a small grocery store. On the north side of S 144' Street, the area is zoned HDR and is developed with a large apartment complex (the Samara 1), with a single family home to the west of Samara 1, and the Cascade View community Park on the east side of the Samara 1. West of 34 Ave S, the north side of S 144 Street is zoned MDR and contains multi family development. TO DOQraahy Topography at the site is currently relatively flat. The topography is proposed to remain relatively flat after proposed development; the northern portion of the site will be all at one grade, and there will be a gradual slope down from the western side of the site to the eastern area of the site. Vegetation Vegetation on the project site currently consists of shrubs, blackberries, and several mature trees. Existing trees on the site include Hemlock, Cedar, and Fir trees on the north portion of the site, and Cherry, Maple, Fir, Ash, and Locust trees on the southern portion of the site. Most of the existing trees are located in areas where the access drive, townhouse buildings, or utility lines are proposed. There is an opportunity to retain one Cedar and one Hemlock located at the northwestern corner of the site, and an Ash clump located in the southeastern corner of the site. These trees shall be retained unless there is a conflict with location of proposed utilities or fences. Access There will be two access points to the development from public streets. These include 34"' Ave S and S 144' Street. REVIEW PROCESS The applicant is proposing to subdivide six existing parcels into 31 unit lots, with an access and utility tract and recreation tracts. Any land being divided into ten or more unit lots shall receive preliminary plat JR Pa Lc 5 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \L08-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 33 approval by the Tukwila Planning Commission as a Type 4 decision according to the provisions of 18.108.040. Townhouse development in Tukwila is restricted to the Medium Density Residential (MDR) and High Density Residential (HDR) zoning districts. According to 18.14.060, design review by the Board of Architectural Review is required for all multi- family structures over 1,500 square feet in size. Design review criteria for townhouse development are contained in the Townhouse Design Manual, which is available online at htti): /www ci. tukwila .wa.us /elect /ciccli)lan11tm1. Once a townhouse project receives preliminary subdivision and design review approval by the Planning Commission /Board of Architectural Review, the applicant must apply for a Public Works permit for construction of project infrastructure. Prior to receiving final approval, the developer of townhouse units may also apply for building permits to construct dwelling foundations. The project must receive final approval from the Tukwila City Council prior to construction beyond dwelling foundations. REPORT ORGANIZATION This staff report has been divided into two sections. The first section covers the Design Review decision; the second covers the Subdivision Preliminary Plat decision. Staff's conclusions and recommendations follow each section. SECTION ONE DESIGN REVIEW DECISION CRITERIA DESIGN REVIEW The Osterly Park Townhomes project is subject to design review under 18.14.060 requiring all multi family structures to receive design review approval. Per TMC 18.60.050 (C), townhouse development is subject to the design criteria contained in the Townhouse Design Manual. In the following discussion, the main topic areas of the architectural review criteria for townhouse development contained in Tukwila's Townhouse Design Manual is shown followed by Staff's comments. The Townhouse Design Manual is available online at htti): /www ci. tLikw'ila.wa.Lis /dcd /dcdi)lan.html. L SITE PLANNING Streetscape The Osterly Park Townhomes project includes street frontage on S 144' Street and 34"' Ave S. The original site configuration included townhouse buildings which had the side of the buildings facing the public street. The applicant revised the original site plan so that units adjacent to S 144 Street and 34 Ave S will face the street. This helps improve the street presence of the development project, allowing windows and front porches to face the street. A combination of landscaping, trellises, and fences provide physical separation of street- facing units from the public realm of the street, providing for privacy while at the same time allowing residents to casually observe activities along the street. A decorative fence is proposed to separate the front yard of street facing units from the sidewalk along both S 144 Street and 34 Ave S. The decorative fence is approximately 4 feet in height and made of black metal with stone veneer fence posts to match the stone veneer on the units facing S 144 Street and 34 Ave S. This fence JR Pa Lc 6 of 26 11/05/2009 3 4 HADcsip RcvicwvOtitcrly Townhomcsv1.08 -076 L08 -079 Ostcrly Park Sub livision &DcsiLnRcvicw SR. loc is meant to signify the entrance to the development, and is proposed to include a sign with the name of the development at each entrance. Design of the sign will be reviewed as part of a sign permit application to ensure consistency with the architectural style of the development. Within the development site, a combination of trellises and /or landscaping separates the sidewalk on either side of the access road from the pathways leading to the front entrances to each of the units. Natural Environment Due to the site configuration, there is little existing vegetation that can be retained. However, mature trees, including an 8" Cedar and a 7" Hemlock located on the north portion of the site (on tax lot 0040- 000088), and an Ash clump located in the southeastern comer of the site (on tax lot 0040 000094) shall be retained as a condition of approval of this application, unless there is a conflict with location of proposed utilities or fences. The proposed location of buildings, recreation areas, and landscaping on the site has been designed to screen adjacent development from view within the project and from view points along S 144' Street and 34" Ave S. The location of westernmost unit of the tri -plex and the recreation area at the southeastern corner of the site was chosen in order to create a focal point from S 144' Street. The combination of this portion of the tri -plex and trees located in the south portion of the recreation space help to screen the existing apartment building to the south from view. The location of trees within the front yard areas of units B 12 and B 13, as well as trees within the adjacent perimeter landscaping area to the south of these units help to screen the adjacent apartment building to the east from view within the development, and from the public right -of- way of 34 Ave S. Buildings along S 144 and 34 Ave S face the street. Buildings that do not face public streets, with the exception of units C24 and C25, have the side of the building facing the street. In order to create more of a relationship between the side elevation of units and the private access road, a few different design elements were added: A window was added to the side elevation of the first floor. 2. A small area with landscaping was added in between the building and the sidewalk. Tall growing plantings are included in the landscape design to screen blank walls areas along the first floor elevation. A trellis was added to the side building adjacent to the private access road to add architectural interest and provide more greenery to the streetscape. Circulation (Pedestrian and Vehicular) A comprehensive system of sidewalks links the recreation areas and the entrances to all buildings within the project to the 5 -foot wide sidewalks on either side of the private access road. Sidewalks along the private access road connect to the 6 -foot wide sidewalks along S 144'' Street, and to new 6 -foot wide sidewalks that will be constructed in front of project site along 34 Ave S. In the middle of the project site, raised pedestrian crossings will be installed across the private access road to provide greater visibility to pedestrians. These crossings will be concrete to distinguish them from the asphalt used for the roadway. One of these walkways is located to provide an east west connection between units on the east side of the development and the recreation space with JR Pa Lc 7 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1-08 -076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 35 play equipment; the other walkway provides a north -south connection between the two recreation areas. The pavement area in between these two walkways, as well as within the shared garage access areas, will be made of a patterned and /or colored material to distinguish it from the asphalt roadway. The material submitted by the applicant for this area is sample of a concrete aggregate. In initial discussions with the applicant, the material was proposed to be colored concrete pavers. The material submitted does not provide the design quality envisioned, and as a major element of the site design, staff would like to recommend that the applicant change the material to concrete pavers, brick, or other material of a higher design quality. Staff recommends that the appropriate material be determined by the Community Development Director as part of the review of the Public Works construction permit. There are two access points to the site for vehicles; one from S 144' Street and another from 34"' Ave S. These two driveways allow through movement from 34"' Ave S to S 144' Street. A combination of the narrow roadway width, and raised pedestrian walkways which act as a speed table, will help to preserve this through connection as a local access road for residents of the development rather than as a cut through for non -local traffic. Parking Parking for residents of the Osterly Park Townhomes project will be within the attached two -car garage for each unit. With the exception of units C24 and C25, these garages are accessed within shared garage access areas located off the private access road in order to minimize conflicts between autos and pedestrians and to better screen garage areas from view. Landscaping, including a row of trees and shrubs, is proposed to be clustered at the end of the shared garage access area to help provide greenery to this paved area. Additionally, trellises will be located in between the garage doors of each building having a shared garage access area in order to provide some additional greenery see Rear Elevation, Sheet A3 of Attachment B for typical elevation for all unit types which have a shared garage access area). Units C24 and C25 have garages located directly off the private access road. There is extra space in front of the garages for these units to provide residents visibility to watch out for traffic (both along the sidewalk and within the roadway) as they are backing out of the garages. The extra space in front of garages also provides room for on- street parking for residents of these units. Twelve on- street guest parking spaces are proposed on the south side of the site. Groupings of on- street parking stalls are separated by landscape islands with street trees, which minimize the pavement area of the access road and add greenery to the streetscape. .Solar Orientation The large number of windows on the second- and third stories of the buildings in the project will allow sunlight into the living spaces within each unit. Units on the site which are likely to receive the most exposure to the sun are units 31, 28, and 26. Street trees will help provide partial shade to windows of units 31 and 26 during summer months while at the same time allowing scattered sunlight into windows on the south side of these buildings. JR Pa Lc R of 26 11/05/2009 3 6 HADcsip RcvicwvOstcrly Townhomcsv1.08 -076 L08 -079 Ostcrly Park Sub livision &DcsiLnRcvicw SR. loc Crime Prevention The design of this project incorporates several elements to reduce opportunities for crime. A decorative fence is proposed along both S 144' Street and 34"' Ave S, to be located approximately 5 feet back from the public sidewalk along S 144' Street and 34"' Ave S. This fence is intended to provide a symbolic and, to a lesser extent, a physical barrier between the project site and the public streets from which access is provided to the development. The fence is open, allowing surveillance of the street from street- facing units. A 6 -foot high perimeter fence will be located along all other property lines to separate the site from adjacent properties. Within the development, a combination of landscaping and trellises separate individual front yard entrance areas from the private access road serving the development. These design elements help to create symbolic areas of influence, giving residents and visitors alike an indication of which areas of the site are more private. Clustering of perimeter landscaping at the end of the garage access areas where the landscaping can clearly be seen helps to keep other areas along the perimeter clear for better surveillance. The location of the recreation areas in the middle of the development make them easy to be watched over by adjacent townhouse units, as well as from the private access road. The mailboxes are proposed to be located near the entrance to the development off 34"' Ave S, and activity at the mailbox will be easily seen from adjacent townhouse units, as well as from the private access road and the right -of -way of 34"' Ave S. Lighting levels within the project site have been reviewed by the Tukwila Police Department, and are also regulated by section 18.52.065 of the TMC and the Tukwila Infrastructure Design and Construction Standards administered by the Public Works Department. The Tukwila Police Department recommends a lighting level of 5 footcandles in the areas where the pedestrian crossings of the private access road are located. The lighting levels within the recreation areas are recommended to be 2 -3 footcandlcs. Within the shared garage access areas, guest parking areas, and along sidewalks within the project, the Police Department recommends lighting levels of at least 1 footcandle. Section 18.52.065 of the TMC requires that porches, alcoves, and pedestrian circulation walkways within HDR zones be provided with low -level safety lighting. The Public Works Department establishes appropriate lighting levels along roadways. The applicant has submitted a lighting plan that staff recommends be revised and resubmitted with the Public Works construction permit to meet the requirements above, as well as to examine potential glare impacts to the residential units from the proposed lighting. A copy of the light fixtures the applicant is proposing to use is included in Attachment E. IL BUILDING DESIGN Neighborhood Compatibility The existing single family homes in the area located in the MDR and NCC zoning districts were constructed in the period from 1930 to 1965, with most being built in the 1940s. All other commercial and multifamily development surrounding the project on all sides was constructed in the 1960s. The area of Tukwila in which this project is located was annexed to Tukwila in the 1990s. Much of the development in this area would not meet the design criteria and zoning requirements that are currently in place, including the Multi- Family Design Manual. Rather than taking design cues from the modern -style multi family structures building in the 1960s, which have little building modulation (if any), and flat roofs, the design of the structures in the Osterly JR Pa Lc 9 of 26 11/05/2009 H:ADcsiLn Rcvicw \Ostcrly Townhomcs \1_08 -076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 37 Park Townhomes is more similar in design to single family development in the area, incorporating elements of Northwest regional architecture including peaked roofs, large eaves, brackets for roof elements, building modulation for window areas, and use of wood siding and shingles for the building facade. The buildings proposed as part of the Osterly Park Townhomes project are in scale with the existing neighborhood multifamily residential units, as well as the underlying and surrounding zoning. The height and mass of the buildings is in between the scale of the large apartment complexes and the existing single family homes that are in the vicinity of the project site. Nearby single- family homes are in the Medium Density Residential (MDR) and Neighborhood Commercial Center (NCC) zoning districts; zones which allow development of much greater intensity than the existing single family development. The proposed townhome buildings are three stories in height, with a maximum height of approximately 36 feet. The underlying HDR zoning district allows a maximum height of 45 feet. The La Roche apartment complex to the east of the project site has four, 2 -story rectangular buildings which are arranged in a rectangle with a central open space area. The Park Avenue apartments located to the south of the project site are also 2- stories in height. The Samara 1 apartment complex across the street to the north of the project site has multiple 3 -story buildings, each in the shape of a long, narrow rectangle. The overall building mass of these apartments is much greater than the proposed townhome buildings will be. While the townhouse units in the proposed project will be taller than some of the adjacent apartment buildings, the length of the buildings will be much shorter so that the overall mass of the buildings in the proposal is not as large as adjacent multifamily development. Building Elevations Each building within the project, whether duplex or triplex, will read as a unified mass through consistent use and placement of colors, materials, and modulation. Colors and arrangement of the different types and siding are varied from building to building within the site to create visual and architectural interest. There are four different building types used in this project (A, B, C, and D). These are shown on Sheets A2 -A5 of Attachment B, as well as on the Colored Elevations in Attachment C. The Site Plan (Sheet Al of Attachment B) shows the location of each of these different building types within the project. The units in Building A, at 22 feet wide, are slightly wider than those in Building B, which are 20 feet wide. Both of these buildings have three bedrooms. The design of these buildings varies slightly; the main distinction is the width of the front and rear modulations, which creates a difference in the size of the balconies and the design and location of windows in the vicinity of the balconies. There is only one C building type included in the project. The units in this building have two bedrooms (there is no bedroom on the first floor). The garage door and the front door for these units are located on the front elevation. The balconies on this building are smaller than those on other units, due to the large width of the building modulations on the front and rear elevations. The D building uses the same floorplan as the A units, with one more unit added to the building to make a triplex. Unlike the A units, the balconies on the D building are located on the rear elevation. This was done because of the close proximity of the D building to the Park Avenue JR Pa Lc 10 of 26 11/05/2009 38 HADcsip RcvicwvOstcrly Townhomcsv1.08 -076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc Apartments to the south. Balconies on the rear elevation of the D building provide more privacy than they would if located on the front elevation, and provide a view of landscaping and recreation spaces within the Osterly Park Townhomes development. Windows Multi -pane windows are proposed for all sides of each building. However, during staff review of the project, there was concern that the side elevation along the first story of the buildings did not have enough windows to create visual interest along the private access road. Because the first floor of the units along the private access road will contain the garage and a bedroom, the applicant did not want to provide additional windows to the first story due to noise and security concerns. Instead, two elements were added, including a trellis incorporated into the architecture of the building on the side facing the street, and a landscaping strip between the building and the sidewalk to provide space in which tall shrubs could be placed to screen the blank wall areas. These elements address staff concerns by working to screen blank wall areas, and to add greenery and visual interest to the streetscape while at the same time meeting the applicant's desire to maintain privacy and security for first floor uses. Sheets A2 -A5 (Attachment B) show the shape of modulations and configuration of windows on the second and third floors of side elevations. These elements are varied among buildings to make the sides of the buildings slightly different from one another. This was also done to help address staff concerns about how the side elevation would be repeated and would be the dominant elevation seen as you look down the street through the development. Roofline All of the buildings within the project have pitched roofs. Some of the buildings within the project will have roof forms that slope down on the side elevations; others will have gables. This helps to vary the look of the roofs from building to building, and also helps to add variety to the look of the side elevation of the building. Modulation is used on all sides of each different building type. The size of the modulations and the location of windows on the front and rear elevations differs for each building type. The size of the balconies on the front elevations also varies by building type. The range of design options for the side elevations for all building types is demonstrated on Sheets A2 -A5. These sheets illustrate how the height, width, and roof design of the modulations for the windows and the gas fireplaces on the sides of the building differs and will be varied throughout the site. Building Massing Adjacent developments, including the La Roche apartment complex to the east and the Samara 1 apartment complex to the north, are long, narrow rectangular buildings. Building lengths for these apartment buildings are between 125 and 200 feet, and widths are between 30 and 50 feet. The scale of the Osterly Park Townhomes buildings are more similar to the smaller multi family buildings located to the south of the project site (including two 4 -unit apartment buildings), which are more in the range of 50 feet long by 30 feet wide. Including side elevation modulations, the maximum dimension of the buildings in the Osterly Park Townhomes project is approximately 48 feet (side -to -side) by 38 feet (front -to- back). In contrast to all of the surrounding multi family development, whether large scale or small, building and roof modulation incorporated into the JR Pa Lc 1 1 of 26 11/05/2009 H:ADcsiLn Rcvicw \Ostcrly Townhomcs \LU8-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 39 design of the townhome units helps to differentiate the units within the same building from one another, and also helps to reduce the appearance of the building mass. Materials and Colors Materials used for the building exteriors will primarily be wood, with the addition of stone veneer to the base of the front elevation of units facing the street along 34"' Ave S and S 144' Street. A combination of horizontal and vertical wood siding and cedar shingles will be used on building exteriors. Cedar shingles will be used primarily on the side elevation modulations. They will also be used as the siding material on the first floor on some of the units (See Building C in Attachment B, Sheet A4) and as the material used for the upper portion of the roof on other units (see Front Elevation of Building B in Attachment B, Sheet A3). A neutral color palette that includes seven different color schemes, all of which are in the same color family, has been submitted. Additionally, some of the wood shingles on the buildings will be painted, and others will be a natural wood color. Front doors on the units will be painted with either the trim color or red (see color sample in Attachment E). All colors to be used for the project, including the seven different color schemes, a picture sample of the wood finish for the shingle, and red door color are included in Attachment E. For each building, at least three colors will be used, to include a color for the body of the unit, an accent color, and a trim color. The isometric color rendering showing the entire development (Attachment C) provides an example of how the different color schemes will be distributed throughout the site. Please note that the colors on the isometric drawing are not an exact match to the actual colors that will be used according to the paint sample colors contained in Attachment E. Garage Design The original design for the Osterly Park Townhomes included a long row of townhouses, with garages accessed directly off the private access drive. A change to this design was suggested in order that units adjacent to S 144' Street and 34"' Ave S would have the front elevation, including the front door, facing the street. Additionally, there was concern about having the garage doors accessed directly from the private access road, so the design of the townhome buildings was changed so that there would be duplex units on either side of the access road, with each grouping of units sharing a common garage access area separated from the private access road. The location of the garages off the private access road also helps to screen the garage doors from view. An exception to this pattern is the C Building, which has garages accessed from the private access road. On these units, the building modulation over the garages helps recess the garages doors, minimizing their appearance. The front doors and balconies on the building help to create a relationship between the building and the private access road. The garages for all the building types include a window on the side elevation so that the garages appear to contain habitable space and to create visual interest along the first floor elevation. As shown in the colored elevations, the garage doors incorporate windows, and will be painted to match the color scheme of the buildings. JR Pa Lc 12 of 26 11/05/2009 4 0 HADcsip RcvicwvOtitcrly Townhomcsv1 -08 -076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc III. LANDSCAPE I SITE TREATMENT Landscape Design and Design for Screening and Separation In the landscape design for the Osterly Park Townhomes, the plantings are arranged to focus attention to high- visibility locations of the site, to reduce the appearance of paved areas by adding greenery, and to provide for screening and separation. Two of the areas of the site in which there is a notable concentration and variety of plantings include the front yard areas at the back side of the public sidewalk along S 144 Street and 34 Ave S. The concentration of tress and shrubs at these entry points to the site help to signal the entrance to the development while at the same time helping to separate the public realm of the sidewalk from the private development. Other areas on the site with a high concentration of plantings include the two recreation spaces, including the kids' play space and the more passive recreation area that includes a picnic table and open lawn area. The large number and variety of plantings helps to make the recreation areas focal points within the development. Shrubs placed at the back of curb and along the perimeter help to direct pedestrian traffic along the sidewalks into the recreation areas, and to provide a sense of enclosure that still allows passersby and residents in surrounding buildings to casually observe activity. The location of shrubs and trellises adjacent to the sidewalks along the access drive similarly direct pedestrian traffic moving to the front entrance of townhouse units, while acting as a symbolic barrier to separate the more public space of the private access drive from the front yard /private recreation areas of the townhouse units. Landscaping within the southeastern corner of the site, where the front entrances to triplex units are located along the south property line, includes several trees which help to screen from view the adjacent apartment building located to the south. The location of trees on the south side of units B 12 and B 13 also works to help screen from view the La Roche apartment building located to the east. In order to reduce the appearance of paved area on the site, changes that were made to the original landscape plan include the following: Street trees were added to the southern portion of the private access road in between areas of on- street parking. In contrast to the northern area of the project site, the parcel configuration within the southern area of the site provided more width to allow room for on- street parking and landscape islands to accommodate street trees. A two -foot landscape strip in between the townhome buildings and the sidewalk along the private access road was added. While relatively narrow, these two -foot spaces provide enough room for plantings including bamboo and tall growing grasses, which help add greenery on either side of the private access road, while at the same time helping to screen blank wall areas along the sides of first story of the townhome buildings. Trellises attached to the side elevation of the townhome building also help to add greenery to the streetseape while adding visual interest to the side of the townhome buildings. A trellis attached to the wall area in between the garage doors on the rear elevation of each building was added (with the exception of the "C" units, which have the front door of the units on the same side of the building as the garage doors). JR Pa Lc 13 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \L08-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 41 In order to further reduce the appearance of paved area on the site and to accomplish screening within the shared garage access areas, the applicant is requesting approval to cluster trees and shrubs within the perimeter landscape area rather than spacing them evenly. Type 1 perimeter landscaping requires one tree for each 30 lineal feet of required perimeter, and one shrub for each 7 lineal feet of required perimeter. Curb cuts are excluded from the calculation. The following are the criteria from TMC section 18.52.020 (B) for approval of landscape perimeter averaging: 1. Plant material can be clustered to more of fectivel_v screen parking areas and blank building walls. 2. Perimeter averaging enables significant trees or existing milt features to be retained. 3. Perimeter averaging is used to reduce the number of drivewa_vs and curb cuts and allow joint use of parking facilities between neighboring businesses. 4. Width of the perimeter landscaping is not reduced to the point that activities on the site become a nuisance to neighbors. 5. Averaging does not diminish the duality of the site landscape as a whole. The perimeter areas of the site adjacent to S 144 Street and 34 Ave S meet the perimeter landscaping requirements, where at least one tree per 30 lineal feet and one shrub per 7 lineal feet are provided. Within the site, however, trees and shrubs are clustered so they can be seen at the ends of the shared garage access areas from the private access road. The total number of trees and shrubs in these clustered areas is the same as would be required if they were spaced evenly throughout the perimeter. Staff believes that approval of the request for landscape perimeter averaging is consistent with the criteria above for the following reasons: The resulting landscape pattern will add greenery at the end of the garage access areas, helping to minimize the extent of paved area by providing green focal points; The resulting landscape pattern will allow the spaces in between the buildings and the perimeter fence to remain clear of potential hiding spaces and will allow for private use of these areas as pea patches or other small -scale recreation that will be screened from view by the building; The resulting landscape pattern will not diminish the quality of the landscaping on the site as a whole. Protection of Existing Trees Existing trees on the site include Hemlock, Cedar, and Fir trees on the north portion of the site, and Cherry, Maple, Fir, Ash, and Locust trees on the southern portion of the site. Most of the existing trees are located in areas where the access drive, townhouse buildings, or utility lines are proposed. There is an opportunity to retain one 8" diameter Cedar located at the northwestern corner of the site, one 7" diameter Hemlock, and an Ash clump located in the southeastern comer of the site. As a condition of approval of the design review application, these trees shall be retained unless there are conflicts with the location of utility lines and fences. Outdoor .Space Design There are two outdoor recreation spaces proposed within this project. For the design and function of these spaces, the applicant consulted with the Tukwila Parks and Recreation Department staff. JR Pa Lc 14 of 26 11/05/2009 4 2 HADcsip RcvicwvOstcrly TownhomcsvLU8-076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc One of the spaces is intended to provide on -site recreation space for children aged 5 -12; the other is intended for all ages, including adult residents, for picnics and passive recreation. The kids' play space is approximately 3100 square feet and is located on the north and west sides of the private access drive in the middle of the site. Its location in the center of the development allows for casual surveillance of activity by surrounding townhome units. The raised pedestrian walkways and patterned pavement within the private access road help to signify that this area of the site is different from other areas, so that motor vehicle operators will be more watchful as they move through this area of the site. The play space will be surrounded by a low metal fence, with gates on the east and south sides of the recreation space, made of the same black metal used for the fence used at the street front (see detail in Attachment B, Sheet A5). Play equipment proposed has been selected to meet the needs of the 5 -12 year old age group, including facilitating group interaction and skill testing. Large rocks will provide additional climbing /play opportunities for children, as well as potential seating for adults supervising their children. Benches will also be located within the recreation area to provide seating see Attachment E for pictures of proposed play equipment and metal benches). The other recreation area is approximately 1400 square feet, and is located on the south side of the private access drive to the south of the children's play space. This recreation area contains a picnic table and an open lawn area with benches. The recreation activities in this area are intended to be less intense, including activities such as reading, dog walking, picnicking, etc. IV. MISCELLANEOUS STRUCTURES .STREET FURNITURE Lighting Samples of the proposed light fixtures have been submitted with a draft lighting plan (see Attachment E). Lighting fixtures proposed include decorative street lamps, and square lights that will be recessed within the townhouse buildings. The draft lighting plan submitted by the applicant showed lighting levels that would be very bright. Therefore, staff recommends as a condition of approval that the lighting plan be resubmitted with the Public Works construction permit, and reviewed administratively according to lighting level requirements contained in TMC section 18.52.065, the Tukwila Infrastructure Design and Construction Standards, and recommendations from the Tukwila Police Department. Fencing, Walls, and Screening Three different types of fences are used in the Osterly Park Townhomes Project. Details for these fences are shown on Sheet A5 of Attachment B. 1. Decorative fences to include a sign with the name of the development project will be placed along the front property line along S 144 Street and 34 Ave S. These fences will be a maximum height of 4 feet, and are proposed to be made of black metal with fence posts faced with the same stone veneer material that will used on the base of townhome units facing the public streets along S 144 Street and 34 Ave S. The black metal used for the street front fence is the same fence that will be used to separate the recreation spaces from the private access drive. This type of black metal fence will completely enclose the recreation space designed as a children's play area. 2. A low wooden fence will be used to provide a sense of separation and privacy for the front entrance areas to the units facing S 144 Street and 34 Ave S. JR Pa Lc 15 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1_08 -076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 43 3. A 6 -foot tall perimeter fence will be placed along all other property lines to provide privacy and separation from surrounding development. Service Areas The applicant met with the waste removal company to determine that individual waste containers will be used for garbage and recycling service. The draft "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes" states that garbage and recycling containers must be kept in garages until the day designated for pickup. Further, the CC &Rs state that the Association may adopt rules as necessary to manage the disposal of garbage and recycling. The location and type of mailboxes to serve the units in this project has been reviewed by the postmaster. The cluster mailbox structure will be located on the south side of the private access drive; adjacent to 34"' Ave S. Sheet A4 of Attachment B shows the proposed design of the structure that will house the mailbox cluster. The mailbox structure will be made of wood, with a peaked roof for weather protection. It has not yet been determined where the individual meters for the units, or electrical boxes for the lighting, will be located. As a condition of approval of the design review application, staff suggests screening of individual meters be included as part of the building permit review for each townhouse building, and screening for electrical boxes and similar equipment necessary for project infrastructure be included as part of the review of the Public Works construction permit. .Street Farnitaare Attachment E includes pictures of the bench proposed within the recreation areas, which has a metal base and seating material made of recycled plastic with a natural wood color. The picnic table shall be consistent in color and material with other site furnishings such as the benches. Additionally, large rocks placed within the recreation areas will provide climbing opportunities for small children, and can potentially provide additional seating. Attachment E contains pictures of the proposed street lights which will be used throughout the site, including the recreation areas. CONCLUSIONS DESIGN REVIEW Site Planning A combination of landscaping, fences, and building orientation helps to accomplish transitions from public to private spaces. These elements help the development to present an aesthetically pleasing entrance, or "face to the neighborhood, while at the same time making use of landscaping and low fences as barriers to signal that the townhome project is a private residential community. The arrangement of buildings on the site works to screen from view some of the large walls of the buildings adjacent to the project. Shared garage access areas help to move vehicle maneuvering out of the private access road, while at the same time working to screen the garage access areas from view so that that the garage doors are not a dominant feature along the streetscape. On- street parking spaces provide parking for guests to the site. These parking spaces are broken into groupings by landscaping islands with street trees, which help to minimize the pavement area within the southern portion of the access road. JR Pa Lc 16 of 26 11/05/2009 4 4 HADcsip RcvicwvOtitcrly Townhomcsv1_08-076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc The patterned and colored material used within the shared garage access areas and in between the raised pedestrian walkways in the vicinity of the recreation spaces will add visual interest within paved areas of the project. The concrete aggregate material submitted by the applicant is not consistent with the level of design interest the patterned pavement is intended to create for the project, as shown on the site plan (Sheet Al of Attachment B). Staff recommends a different decorative pavement treatment be selected on as part review of the Public Works construction permit. The location of the recreation spaces in the middle of the site allows opportunities for surveillance by surrounding townhome units. Clustering of perimeter landscaping at the end of the shared garage access areas provides additional greenery within these paved areas, while allowing the spaces between the townhouse buildings and the 6 -foot perimeter fence to remain clear of vegetation for easier surveillance. A draft lighting plan showing very bright lighting levels was submitted for the project. Staff recommends the lighting plan be revised and resubmitted for review administratively as part of the Public Works construction permit. 2. Building Design The townhouse buildings proposed as part of the Osterly Park Townhomes project will add architectural interest to the neighborhood; the design of the structures in the Osterly Park Townhomes incorporates elements of Northwest regional architecture including peaked roofs, large eaves, brackets for roof elements, building modulation for window areas, and use of wood siding and shingles. The scale of the buildings is less severe than the long walls of the apartment complexes adjacent to the project site on the east, south, and north sides. The length of buildings included in this project is at least half that of the La Roche and Samara apartment complexes, and building and roofline modulation included in the design of the buildings helps to further reduce the scale of the proposed buildings. Colors and materials used will be consistent for each building, so that each duplex or triplex included in the project will read as one unified mass. Complimentary colors will be used and varied throughout the site. Additionally, colors, roof forms, and arrangement of materials on the different buildings throughout the project add variety in texture and colors. Variation in the design of modulation forms and arrangement of windows from building to building is also included in the design of the townhome buildings in this project. 3. Landscape and Site Treatment. Landscape design proposed for this project accentuates the entry points to the development, helps to create focal points within the project, including the recreation spaces in the center of the project; and the design works to help minimize the appearance of paved areas, blank wall areas, and adjacent development. The applicant's request to cluster landscaping at the ends of garage access areas, if approved, will allow clustering of landscaping where it can be seen on the site, and where it will help add greenery to areas of the site dominated by pavement. Existing trees, including a Cedar and Hemlock tree in the north portion of the project site, and an Ash clump in the southern part of the site, shall be saved as a condition of approval of the design review application unless there are conflicts with the location of utilities or fences. Recreation spaces on the site have been designed based on guidance provided by staff from the Tukwila Parks and Recreation Department. The two spaces include a recreation area for children ages 5 to 12 years old, and a more flexible space for reading, picnicking, etc. Both of JR Pa Lc 17 of 26 11/05/2009 H:ADcsiLn Rcvicw \Ostcrly Townhomcs \L08-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 45 these areas can be casually observed from adjacent townhouse units, and are separated from activity within the street by low shrubs and fences. 4. Miscellaneous Structures and Street Furniture Light fixtures proposed with the project include recessed lights within the side of the building, which will provide pathway lighting along the sidewalk, and street lamps which will provide lighting within the recreation areas and along the private access road. A draft lighting plan was submitted by the applicant that included lighting levels that are too bright for the project site. Staff recommends the revised plan be resubmitted and reviewed administratively as part of the Public Works construction permit, as a condition of approval of the design review application. The different types of fences for the project include a decorative fence at the entrances to the project along S 144 Street and 34 Ave S; a perimeter fence along all other property lines; 3 1 /2 foot tall wooden fences within front porch areas; and a short metal fence to separate the recreation areas from the private access road (similar in design to the decorative fence used at the project entrance). These fences are consistent with the other materials used for the buildings in the project, and are appropriate in design for the locations where they are proposed, and for their intended function. A sign permit shall be obtained for any signs at the entrance to the project, and shall be reviewed for compliance with the Tukwila Sign Code. Trash and recycling containers shall be kept inside the garages of the individual townhouse units, except of trash and recycling collection days, as specified in the codes, covenants, and restrictions for the project. Additionally, the meters and any other service equipment shall be screened by landscaping as a condition of approval of the design review. Benches and large decorative rocks are proposed within both recreation spaces. The benches proposed are made of metal and recycled plastic, and are a natural wood color consistent with the color palette used for the townhome buildings. The picnic table will also be made of materials and colors consistent with the architectural style of the development. RECOMMENDATIONS DESIGN REVIEW Staff recommends design review approval and special permission approval for landscape perimeter averaging for the Osterly Park Townhome project, subject to the following conditions: 1. Existing trees, including an 8" diameter Cedar and a 7" diameter Hemlock located on the north portion of the site (on tax lot 0040- 000088), and an Ash clump located in the southeastern comer of the site (on tax lot 0040- 000094) shall be retained unless there is conflict with location of proposed utilities. 2. A revised lighting plan shall be submitted as part of the Public Works construction permit showing lighting levels to meet City requirements. 3. The material used in areas shown as having patterned pavement shall be submitted as part of the Public Works construction permit, and reviewed administratively by the Community Development Director. 4. A sign permit shall be obtained for any signs at the entrance to the project, and shall be reviewed for compliance with the Tukwila Sign Code and for consistency with the architectural style of the development. 5. Screen individual meters, electrical boxes and similar equipment necessary for project infrastructure. This screening shall be reviewed and approved administratively as part of the review of the Public Works construction permit. JR Pa Lc 18 of 26 11/05/2009 4 6 HADcsip ReviewvOtiterly Townhome~vL08 -076 L08 -079 Osterly Park Sub livision &DcsipReview SR. loc SECTION TWO SUBDIVISION PRELIMINARY PLAT APPLICATION REVIEW PROCESS SUBDIVISION PRELIMINARY PLAT AND FINAL PLAT APPROVAL There are three basic steps in the subdivision approval process: 1. Preliminary Approval Any land being divided into ten or more unit lots shall receive preliminary plat approval by the Tukwila Planning Commission as a Type 4 decision according to the provisions of 18.108.040. Criteria for Preliminary Plat Approval are contained in section 17.14.020(D). The application was reviewed by the Tukwila Short Subdivision Committee, and staff's response to each of the criteria for preliminary plat approval and recommended conditions of approval are included below. Once a townhouse project receives preliminary subdivision and design review approval by the Planning Commission /Board of Architectural Review, the applicant must apply for a Public Works permit for construction of project infrastructure. Prior to receiving final approval, the developer of townhouse units may also apply for building permits to construct dwelling foundations. The project must receive final approval from the Tukwila City Council prior to construction beyond dwelling foundations. 2. Final Approval After construction of project infrastructure and compliance with conditions of preliminary approval, the applicant must apply to receive final approval for the subdivision plat. The final approval decision on a subdivision plat is made by the Tukwila City Council. Before the final plat is submitted to the City Council, it shall be signed by the Tukwila Finance Director, Director of Public Works, and the Director of the Department of Community Development. 3. Recording Upon approval by the City Council, the subdivision plat shall be signed by the Mayor and attested by the City Clerk. It is the applicant's responsibility to record the City approved final subdivision plat documents with the King County Department of Records. The applicant will need to pay the recording fees and submit the approved original final subdivision plat to King County. The final subdivision plat is not complete until the recording occurs and copies of the recorded documents are provided to the Department of Community Development. The approved final subdivision plat must be filed with the King County Department of Records five years from the date of this preliminary approval or the application will expire. The Planning Commission may grant a single one year extension. JR Pa Lc 19 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1_08-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 47 DECISION CRITERIA SUBDIVISION PRELIMINARY PLAT APPROVAL The criteria for preliminary plat approval are listed below in italics, followed by staff's response to each of the criteria. For the applicant's response to the criteria see Attachment A. 17.14.020 (D) Criteria for Preliminary Plat Approval The Planning Commission shall base its decision on an application for preliminary plat approval on the following criteria: 1. The proposed subdivision is in conformance with the Tukwila Comprehensive Plan and any other city adopted plans. Following are the relevant policies of the Tukwila Comprehensive Plan: Communitv Image Residential Areas Goal 1.6 "Residential neighborhood ph>>sical features that are "small town in character: Residential- scale streets, with on- street parking allowed (in addition to required off -'street parking). Lawns, trees, and low scale fences in front vards. Garages located toward the rear or side of the lot. Front porches and sidewalks that allow interaction between passing neighbors. Shallower front vards consistent with the adjacent pattern of development. This project includes a 20 -foot access road with sidewalks on both sides which provides a through- connection from 34"' Ave S to S 144' Street. The street width is wide enough to provide adequate access to the development, but narrow enough to deter drivers from using the access road as a cut through and /or moving through the project at high speeds. In the middle portion of the development, the pavement ramps up to a raised pedestrian walkway area, which acts as a speed table to slow drivers down in the area where the two recreation areas are located. The pavement in this area will be patterned and /or colored to add greater visibility. Along the southern portion of the private access road, the street includes on- street parking and street trees. All of these elements help to enhance the residential character of the development. With the exception of the "C" type units in the middle of the site, all of the garages are accessed from a shared garage access area, helping to screen garage areas and separate vehicle turning movements from the street. Front porches will be located on the units that have frontage on 34"' Ave S and S 144' Street. The porches are proposed to be enclosed by 4 -foot high fences. These areas will encourage interaction between neighbors while also incorporating low fences which will help delineate private from public space. Units that do not front along the public streets have private recreation space located at the front entrance to their units. These areas can be used as front porch areas, and will allow interaction between neighbors. StreetscaDe DeVelODment 7.4.1 Provide pedestrian and other nonmotorized travel facilities, giving priorit>> to sidewalk improvements that connect public places, such as parks, the river, open spaces, and neighborhood gathering slots. JR Pa Lc 20 of 26 11/05/2009 48 HADcsip RcvicwvOtitcrly Townhomcsv1.08-076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc Sidewalks are proposed on both sides of the private access road that will serve this project. These sidewalks connect residential units to recreation areas, the mailbox, and to sidewalks along S 144' Street and 34"' Ave S. 7.4.2 Emphasize a network of residential local access through- streets, nlininiizing cul -de- sacs. The private access road proposed for this project will provide a through connection from 34"' Ave S to S 144' Street. 7.4.4 Design residential local access streets to provide the niinininni capacitfi)r emergency access and for slow traffic. The width of roadway for this project, at 20 feet, is the minimum necessary to provide capacity for emergency access. Pedestrian amenities including raised pedestrian walkways and street trees will help establish the character of the street as a residential, local access street and help deter fast speeds and cut through traffic. Residential Neighborhoods 7.6. 10 Ensure that all multi family residential developnients contribute to a strong sense of cone nnnity through site planning focused on neighborhood design integration; building design architecturally linked with the surrounding neighborhood and style; streetscapes that encourage pedestrian use and safe transition to private spaces; with trees reducing the effects of large paved areas; with recreational spaces and facilities on site; creative project design that provides a diversity of housing types within adopted design criteria, standards, and guidelines; and operational and management policies that ensure safe, stable living environnients. The design of this project has evolved from the applicant's original submittal, which was a site plan that included a long row of townhouses, the garages of which fronted the access road. The site plan has been revised to include smaller townhouse buildings located on either side of the access road, with shared garage access areas to prevent vehicles from having to maneuver within the through street where there is more activity occurring. The recreation space was moved to the middle of the site, creating a focal point that can be seen from either entrance to the development. Raised pedestrian walkways are located within the private access road to provide greater visibility to pedestrians crossing the roadway to and from the recreation spaces. Several design elements help to reduce the effect of paved area, including street trees along the southern portion of the access road, trees placed as close as possible to the roadway in the front yard areas of some units, and landscaping and trellises located in between the buildings and the sidewalk. Additionally, patterned pavement located in the shared garage access areas and in the area of the access road in between the recreation areas will help to add visual interest to the paved areas on the site. 2. Appropriate provisions have been made for water, storm drainage, erosion control and sanitary sewage disposal for the subdivision that are consistent with current standards and plans. Plans for water, storm drainage, erosion control, and sanitary sewage disposal are contained in the Civil Plans for the project (see Attachment D), and have been reviewed by the Public Works Department for compliance with city standards. Basic Development Standards for the HDR zoning district (TMC Section 18.14.070) require townhouse JR Pa Lc 21 of 26 11/05/2009 H:ADcsiLn Rcvicw \Ostcrly Townhomcs \LU8-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 49 developments with development coverage of over 50% to incorporate low- impact development techniques, if feasible (including such features as pervious pavement, raingardens, etc.). The development area coverage for the Osterly Park Townhomes project is approximately 55 During meetings among the applicant, the applicant's civil engineer, and Tukwila's surface water engineer, it was determined that soil conditions on the project site do not allow stormwater infiltration. These site conditions preclude the applicant's ability to incorporate low- impact development techniques as part of this project. 3. Appropriate provisions have been made for road, utilities and other improvements that are consistent with current standards and plans. Provisions for access, utilities, and other improvements have been reviewed by multiple departments, including the Planning, Fire, Building, and Public Works departments. Because of challenges presented by the shape and width of the project site, the applicant met with representatives from the departments mentioned above on multiple occasions to discuss revisions to the site plan, including street width and configuration, and on- street parking. The resulting street, at 20 feet wide with 5 -foot sidewalks on both sides and on- street parking along the southern portion, represents an exception to the standard 28 -foot roadway width required for a local access street. However, a roadway width of 20 feet, with additional room provided for on- street guest parking, was determined by the Public Works and Fire departments to be acceptable for the amount of traffic and for emergency access requirements. Additionally, narrower roadways in residential areas are consistent with Comprehensive Plan policies (see discussion under number 2, Streetscape Development, above). The Planning Commission has the authority to approve the preliminary plat, and any exceptions to the requirements of the subdivision code shall be considered by the Planning Commission according to TMC section 17.28. The residential units are proposed to be constructed in three phases. Prior to construction of residential units and final approval of the plat, construction of the access road, utilities, and the larger recreation with children's play equipment will be required to ensure that all required emergency access and infrastructure is in place to serve the first phase of development. Phase I is planned to include units 16 -25. Phase II will include units 5 -15 and the southern recreation area. Phase III will include units 1 -4 and 26 -31. A draft lighting plan has been submitted by the applicant to provide lighting for the access road, on- street parking, and sidewalk and recreation areas. Since the draft submitted includes lighting levels that are much brighter than needed to meet City requirements, staff recommends that this plan be revised and resubmitted for review administratively as part of the Public Works construction permit (see previous discussion of lighting requirements contained in the Design Review portion of this staff report, under section I. Site Planning, Crime Prevention). 4. Appropriate provisions have been made for dedications, easements and reservations. The applicant has submitted a plat survey showing proposed easements (see Attachment D), and a draft copy of easement documents and codes, covenants, and restrictions (see JR Pa Lc 22 of 26 11/05/2009 5 0 HADcsip RcvicwvOstcrly Townhomcsv1.08-076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc Attachment F). These documents have been reviewed by the Public Works and Planning departments, as well as the City Attorney's Office. These documents shall be revised to reference BAR approval, and to include joint maintenance agreements for access road, utilities, and landscaping areas. Also, the legal descriptions under Exhibit A of the codes, covenants, and restrictions shall be added to the document, and reviewed administratively. Transportation, Parks, and Fire impact fees will apply to the future Building Permit(s). 5. The design, shape and orientation of the proposed lots are appropriate to the proposed use for which the lots are intended and are compatible with the area in which they are located. This is the first townhouse project to be reviewed and to undergo design review since townhouse development was allowed in Tukwila starting in March of 2008. The configuration of unit lots (the lot area corresponding to each townhouse unit) is appropriate for this development type. The lots are compatible with the area in which they are located; the addition of townhome development to the area will add to the diversity of housing types available. The scale of the development is most similar to the duplex and four -plex units located to the south of the project site; the buildings as proposed are in between the scale of the high density, large apartment complexes located to the east and the north of the project site and the single- family dwelling units located to the west. 6. The subdivision complies with the relevant requirements of the Tukwila Subdivision and Zoning Ordinances, and all other relevant local regulations. The project has been reviewed for compliance with the requirements of the Tukwila Subdivision and Zoning Ordinances. Issues that will need to be addressed prior to final subdivision approval are listed under the "Conclusions" section below. 7. Appropriate provisions for maintenance of privately owned conznzon facilities have been made. The applicant has submitted a draft of the Codes, Covenants, and Restrictions (CC &Rs) for the Osterly Park Townhomes subdivision. These rules outline common responsibilities of owners and residents of property within the development for maintenance of common areas, including recreation spaces, parking areas, and the access drive, as well as how owners who share a common wall will coordinate to make repairs to their homes (i.e. roof repairs, painting, etc.) so that the aesthetic appearance and function of each building remains intact. Prior to final approval, the "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes" shall be revised to reference BAR approval, and to include joint maintenance agreements for access road, utilities, and landscaping areas. Also, the legal descriptions under Exhibit A of the codes, covenants, and restrictions shall be added to the document, and reviewed administratively. 8. The subdivision complies with RCW 58.17.110. Review of this project by multiple departments at the City of Tukwila, including Building, Community Development, Public Works, and Fire, and written findings based on the project review found here meet the requirements of RCW 58.17.110. According to plans submitted by the applicant, appropriate provisions have been made for the public health, safety, and general welfare, for recreation areas, and for infrastructure including access and JR Pa Lc 23 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1.08-076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 51 utilities. The proposed subdivision is consistent with the Tukwila Comprehensive Plan and will serve the public interest. CONCLUSIONS SUBDIVISION PRELIMINARY PLAT APPROVAL The following conclusions are numbered according to the Subdivision Preliminary Plat criteria: 1. The project complies with applicable goals and policies of the Tukwila Comprehensive Plan. 2. The project has been reviewed by the Public Works department to ensure that appropriate provisions, consistent with city standards and plans, are included for water, storm drainage, erosion control, and sanitary sewage disposal. 3. Proposed infrastructure, including access road, utilities, and frontage improvements have been reviewed by the Public Works, Planning, Building, and Fire department for consistency with current standards and plans. A draft lighting plan has been submitted by the applicant to provide lighting for the access road, on- street parking, and sidewalk and recreation areas. The draft plan shows lighting levels that are much brighter than necessary. Staff recommends the lighting plan be revised and reviewed administratively as part of the Public Works construction permit to meet recommendations of the Tukwila Police Department, the lighting requirements in TMC section 18.52.065 and the Tukwila Infrastructure Design and Construction Standards. 4. Appropriate provisions have been made for easements and for codes, covenants, and restrictions. Prior to final subdivision approval, easements and the "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes" shall be revised to reference BAR approval, and to include joint maintenance agreements for access road, utilities, and landscaping areas. Also, the legal descriptions under Exhibit A of the codes, covenants, and restrictions shall be added to the document, and reviewed administratively. Transportation, Parks, and Fire impact fees will apply to the future Building Permit(s). 5. The design, shape and orientation of the proposed lots are appropriate for the proposed use of the site for townhouse development. The type of development and site design is compatible with the area in which it will be located. 6. The subdivision complies with the zoning requirements of the HDR zone, and has been reviewed for compliance with the subdivision code. 7. The "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements" includes provisions for use and maintenance of privately owned common facilities, including private access road, recreation areas, and landscaping. 8. The proposed subdivision is consistent with Tukwila's Comprehensive Plan, zoning and subdivision regulations, and other city plans. The subdivision as proposed will serve the public interest and will comply with RCW 58.17.110. RECOMMENDATION SUBDIVISION PRELIMINARY PLAT APPROVAL Staff recommends approval of the Subdivision Preliminary Plat application with the following conditions: PRELIMINARY APPROVAL CONDITIONS The following shall be addressed as part of the Public Works Construction Permit: 1. The applicant shall submit a revised lighting plan to meet recommendations of the Tukwila Police Department, the lighting requirements in TMC section 18.52.065 and the Tukwila Infrastructure Design and Construction Standards. JR Pa Lc 24 of 26 11/05/2009 5 2 WDcsip RcvicwvOtitcrly TownhomcsvL08 -076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 2. All utilities for the project, private access road and sidewalks, and the recreation area located on the west and north sides of the private access road (including children's play equipment), shall be completed as part of the Public Works construction permit. 3. The applicant shall obtain an NPDES construction permit for this project. 4. A street light mast arm shall be added to the existing wooden pole. 5. Overhead utilities along 34"' Ave S shall be moved underground, unless the applicant applies for and obtains a waiver from this requirement from the Public Works Director. The applicant shall submit an estimate for work to underground these utilities with the waiver request. 6. Stone drainage for roof drains, foundation drains, and paved areas shall be infiltrated and /or dispersed on -site, or detention provided. Civil site plans shall be reviewed as part of the PW infrastructure permit. Contact the Tukwila Public Works Department for submittal and design requirements. 7. Access road, utilities, under-rounding of power, and extension of sewer and water lines to the unit lots shall be approved by the appropriate departments and /or utility and conform to the Civil Plans dated August 4, 2009. As -built plans shall be provided to the Public Works Department prior to final approval. 8. Install all required site improvements, including those proposed in the application and those identified above as conditions of approval. You will need to obtain all required permits prior to beginning any construction. For water and sewer permits, contact the individual provider District. For City of Tukwila utilities, contact Tukwila Public Works at (206) 433 -0179 for a Public Works (PW) type `C' permit for approval. A Street Use will be part of this permit and require bonding, insurance, and a Hold Harmless Agreement for work within the Public Right -of -Way. 9. Minimum clear access road width is 20 feet. Fire lane marking /stenciling will be required as necessary to ensure width is maintained. 10. Submit a current water availability letter from Water District 125. The following shall be addressed as part of the Demolition Pernzit(s): 1. Existing structures shall be demolished prior to final approval, unless a bond for demolition of the structures is submitted to and approved by the Director of the Department of Community Development. 2. The applicant shall apply to the Puget Sound Clean Air Agency for PSAPCA permits for demolition of existing structures 3. Per Dana Dick of Valley View Sewer District, capping permits will be required with demolition of any of the existing buildings, and a developer extension will likely be required as part of the process to provide sewers to the development. The following shall be addressed prior to final approval of the subdivision plat: 1. Survey and "Declaration of Covenants, Conditions, Restrictions, Easements and Agreements for Osterly Park Townhomes" shall be modified to reference BAR approval, and to include joint maintenance agreements for access road, utilities, and landscaping areas. Also, the legal descriptions under Exhibit A of the codes, covenants, and restrictions shall be added to the document, and reviewed administratively. Easements and the codes, covenants, and restrictions shall be recorded prior to final subdivision approval. 2. Separate easement documents and maintenance agreements for any common infrastructure utility lines, access roads /driveways) shall be submitted for review and approval by the Public Works Director. 3. Submit a set of recording documents in either legal or record of survey format that meet the King County Recorder's requirements and contain the following items: JR Pa Lc 25 of 26 11/05/2009 H:ADcsiLn Rcvicw \Otitcrly Townhomcs \1_08 -076 L08-079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 53 a) A survey map as described in the application checklist that is consistent with all of the conditions of approval. The surveyor's original signature must be on the face of the plat. b) Separate easement document with legal descriptions for any common access /utility infrastructure. c) Separate joint Maintenance Agreements for the access road, drainage system, and landscaping areas. d) Add Tukwila land use file number L08 -079 for the subdivision application to all sheets of the survey. e) Include Existing Conditions Survey as Sheet 5 of 5 of the survey sheets. f) Add a vicinity map to the survey. g) Add "After" legal description to the survey sheets for the boundaries of the new subdivision. Also add legal descriptions for each of the tracts. h) The fact that the unit lot is not a separate buildable lot, and that additional development of the individual unit lots may be limited as a result of the application of development standards to the parent lot, shall be noted on the plat. The following shall be addressed as part of the Building Permits: 1. Transportation, Parks, and Fire impact fees will apply to the future Building Permit(s). 2. Buildings will be required to meet fire flow requirements per the International Fire Code. 3. Adequate ground ladder access area of 15 feet minimum depth to be provided for 2nd and 3rd story bedroom rescue windows. JR Pa Lc 26 of 26 11/05/2009 5 4 HADcsip RcvicwvOstcrly TownhomcsvL08 -076 L08 -079 Ostcrly Park Sub livision &DcsipRcvicw SR. loc 55 W -o. E5 So iE; gt- HE H LAI M 11A I lot At 1131 19 1 z ly, Ali I m Lit! ii Ell 17FIT." 1131 19 1 z ly, Ali I W IN 19 1 z ly, Ali I 56 W IN 56 7C I v y two 91 4 lot �lp 56 4. -1' it an 57 d Q) CZ rz cz 4D 0 3: IPM, j3 cz U) 4. -1' it an 57 E p 8 T., try E a CIS E 2 co FL CL 0 I E 11 E 0 0 1pnis zx� (L E p 8 T., try E a T R� Q 2 mewg 2a' ca .9 I o 2 I E T R� Q 2 mewg 2a' ca .9 I o W.* 11 p VV9i 9i WIN 5558 INIM 555555 22 22 119 SS o0 E E E E E E E E 0 0 0 0 W.* ylnoS anuaA y (6uNosg {o s1s09) 3.Zb,90. LON Tt�S o Z a Ln -H -H Y m� E c c o v o moo n o N� I� 00 0 1 Q `u o o +1 +i +I +I +i +i +i fl mM ww gq ww ww ww yy�� mM ww ww yy�� ww wW E y o� 1 C O T U W N -H 8888088 o pp pp 0 0 0 0 0 0 Y U O O u 0 U Y�! y Y U U U U U v W Z �������II 6 o o e o o t e e e Y Y Y Y e e w 8° Y Y Y Y Y €l) M aMMMa M €lf O aaMaM a i(1 M M�a y I lug a'� d ``oon000 °o,000000000000 000000000000go wm c w «cc M`48000000000000000000 00000000008 0 0 Q o o o o o o 0 0 o o o o o o o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 o c c j c to to w m v +1 +1 +1 +1 +1 +1 it +1 +1 +1 -H -H -H -H -H -H +1 +1 -H a` m A�pppp O w &a d c° o O N66 m m m w w m n n €lf I� W €DNNNaro ON �O Oi(INN�N N° vd M m_ww KKKK M OOOONtY I� M O M €D777� ttpp W O M O O W FFI�ONfm Ntm W .g NNM€DNNNtmO W+`I €p tm Ntm�ro�MMOy� c b 4 Y II z g N N- Cl Cl N c (O W N o E Q Q Q 6 00 II II 1 II II II II II II II 1 II II II II II II II 1 II II �I II II II II 1 II II I II 1 N O d d w NN I w O�NM <NtDneO W O �NN NNN N NNMM X ,w U c c NMONtD Ism Y€����������NN d vJ U d m °Eaa 00000000000000000000000000000o a J K J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J d ai ,OZ Q �v---- a d wz d >w d 4 uo rcw o N� d Lo o BF M.B LLJ `d0'0£� O ,O£ F,60.LOSI a7 T d MI 19'F o 000 ON I °w 1959 .00'9S ,00'LS 1 'Q 9OL D$ n o did N s N O O o oTiZ,DS.99S o L l0 ZZ,DS of w E 4 d w I„ '99, d 1 3 ti W: T OD 9b d Ni9 OD'LL M N M 3 m d M 3.9F,60.LON n .96 69 m .pp 3 8£,6QL s. OD'9'�" d 60. LOS 03 O iv n`�'• a0 d MiN F" ^>3£,60. LOS d ro rn 43,6.60. LON M io o�of I., 4 �N y�m„, N 4ON z o r�^ °v2,`- d d ,00'99 �.lu+.... 00'SS d N 4 £F'SF M4N (O tV ZPi�. Cq r m� d do .d M.ZS,60.LOS ,9ittZ l �...•L o'° (E N u n z ui e m 3.ZS,60.lON {H) luewas0m 3.ZS,60.lOND6 N IM.BF,60.lOS d w vi s c .4 YN Y� B >IloMmpls ,9_B7 MaN l� d o «o �vaM M 3.ZS,60.lOMl) 3uewaeoa „IOMepls 0�`3� y a` c' a o tq .9£'90Z ,9 By0A1Jd Mm 4o y AG'6S c: C a€'n `r� 4 d ,8Z'bL r M.8£.60. LOS X I W a d 3.Z9,60.LON w N 00'LS /�N ,00'LF ,0 'GZ (,Ol�'ZZ p� u T NO 10V2ll I {f N m N M N d d N�.= a i�o a f- s LLV321214 o �m L.^ 9G'bL m N n LLyoo oD 1DV2LL N vl 0 M 4 3.ZS,60.lON m l Z9.60. LON 0 F 4 �N a W N o c> rc c>�� w N N 3.ZZ,OS N. u) OQ94 V O N ri z I M N rn U� N 3.ZS,6d. ION o! N �i N a rc N a m N{ 3 ,Gi.Z01J Z€ W y l 19S9 cni MM ml w o 0 L...OLF Is OD'GZ o Y Ln i� pro N 8 o N d ,99'LSl I M.ZS,60. LOS o3 S,60.ION d 4 I l y �(€n Z z 0 O v N u F OO'bZ j,OO'£L _I/ u o 8 3 „9£,f bZON vk} m o ,00'bZ ,DO'ZF d 4 4 oY o o �Z d 3 F °m W 3.9£LZ ZON I o ;wx 0 4 N o o b� N u at w d ti r n Y J y r 0) m 0 0 z$ a s I N Lo ra o g I� Y o -c L wrc� 1 i N u v+°i Miuo °dm O 4 o t� 4 a O a a In ui i n X ID 8 m OG, z N d 3.9£,l bZON w QB ZON 4 m ct' z o .80'ZF !ZON Q z in 3.sF.[ rn a a J d 'ZF zw N an d a LQ d `a d 0 8 w 3 3 iv O W O G1 N O 00 3 d B ZE; d zw t N M�u°i N N W �f 8 o 8 w z ®_j i I o W —4 C a o d,90'ZF ,00'bZ U` a` s ,Own 00'Z£d P w d 3.9F,L Z.ZON N Z o 3 9 F,(?,ZON a oL 3 I'M X� d ww B O o v ,00'*Z 0 9b ,00'bZ N U' .00'Z£ a c 3 .L 1 ,69.ZON N M q�no,5 anuaA y o M 49/ Poo�1J� /.�iY B 59 M-1 1 Ro09-AL-LOG-Matw 'O SIL3311HOMV 293muvo F -1: F 7 11 'Z 3i JI' Attachment D(a) 61 'Z 3i JI' Attachment D(a) 61 3i JI' Attachment D(a) 61 M Cx Attachment D(b) 63 a E R Cx Attachment D(b) 63 2 e Cx Attachment D(b) 63 QE Iro, R." C'4 k -IM T i, f�IM' l �4 rat i .l f� l 1. tl kr LLJ ILI T. 4"t g ui A LU 2 s I 70 LU mo CL 21 8 t 'q P s Lli U) Al CL Lli Cf) j I I l X ,0 CL L Wi R Hi, WE 0 0 R Hi, Attachment D(c) 65 8 r uj iu 72 &5 iV 15 ,r -,5 0 3 s LL h Co z 0 7-1 js Co 41 1 P 9 6 F4 L1 fr IN WfJW 0 Il 51 L 1 R 1- 1 A g i P5 N 9 d u 9 lo Q& z-7 C c vI w 4C ju 5 p-, Z R 1 4 CL C4 4 a: PI 0 FYI 1 1A 6 Y R w _Rp t R- ko ry 6 717, 2 lwg, id w W 0 P Attachment D(c) 65 �5 11 41 11 LU r l 6 3 Ji LL [Ell U l co cz 02 v4 a Cj C3) lz 0 b OS tCl 0 00 0 0 6 -1111 LLZ9 2�j 1 VLII 4— OL I .71 I w I s s v, 01 4 0 ul— plk 11 M. L 0 LU Co 0 co rl cn 0 Z tu 5: Uj uj T,�, Z U) cr) 2j CD L CY C-1 Ln o F YL it �z ti .,2 x 67 ON 0 Q? •aj N PU. ,Co V j l—pp clan .a ^alt j!j env V V, 01TOZ M.n '8mm% zo t,6 F4 �2 Z; cz,�- —1 I I r El cn 0 Z tu 5: Uj uj T,�, Z U) cr) 2j CD L CY C-1 Ln o F YL it �z ti .,2 x 67 ON 0 Q? •aj j!j V V, 01TOZ M.n '8mm% zo F4 cn 0 Z tu 5: Uj uj T,�, Z U) cr) 2j CD L CY C-1 Ln o F YL it �z ti .,2 x 67 c Q) Cn 1 Cn CL 03 C) co E5 Q ry R 4 EE 6 15 9 n 16 1 a T 1--ti .08 S p.4 .13 0 ism M%eakos MU 2J bn a c pj 84 VT v I 6i -I-k�il MIPAN .,v Nkpn M Aga zF H K§ V) TIN 19 2" F 9 9!2 2 i M a bJpqd.. -Pe p..N Z 0 Z O S 0 W LMM