HomeMy WebLinkAboutPlanning 2012-03-22 Item 4 - Osterly Park Townhomes - Attachment B - Water District #125 LetterWIANE YOUNG
Office Manager
Telephone: (206) 242-9547
FAX: (206) 248-1744
TUKWILA, WASHR 98 u68
March 2, 2012
Jaimie Reavis
City of 'Tukwila
6300 Southcenter Blvd, Ste. 100
Tukwila WA 98188
The District has approved Mike Overbeck's Phase 1 of four buildings with eight living
units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate
fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h
Ave. S.
However, the next pha quire the line to be looped. Please feel free to contact
me at the District office if you have any questions.
92sm
ry
Mark Parsons
Superintendent
Attachment B 27
MARK PARSONS
u. n
Superintendent
P.O. Box
68147, Ht.
r. Office 3460 S, 148th St, Ste.
TUKWILA, WASHR 98 u68
March 2, 2012
Jaimie Reavis
City of 'Tukwila
6300 Southcenter Blvd, Ste. 100
Tukwila WA 98188
The District has approved Mike Overbeck's Phase 1 of four buildings with eight living
units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate
fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h
Ave. S.
However, the next pha quire the line to be looped. Please feel free to contact
me at the District office if you have any questions.
92sm
ry
Mark Parsons
Superintendent
Attachment B 27