Loading...
HomeMy WebLinkAboutPlanning 2012-03-22 Item 4 - Osterly Park Townhomes - Attachment B - Water District #125 LetterWIANE YOUNG Office Manager Telephone: (206) 242-9547 FAX: (206) 248-1744 TUKWILA, WASHR 98 u68 March 2, 2012 Jaimie Reavis City of 'Tukwila 6300 Southcenter Blvd, Ste. 100 Tukwila WA 98188 The District has approved Mike Overbeck's Phase 1 of four buildings with eight living units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h Ave. S. However, the next pha quire the line to be looped. Please feel free to contact me at the District office if you have any questions. 92sm ry Mark Parsons Superintendent Attachment B 27 MARK PARSONS u. n Superintendent P.O. Box 68147, Ht. r. Office 3460 S, 148th St, Ste. TUKWILA, WASHR 98 u68 March 2, 2012 Jaimie Reavis City of 'Tukwila 6300 Southcenter Blvd, Ste. 100 Tukwila WA 98188 The District has approved Mike Overbeck's Phase 1 of four buildings with eight living units. There is 1200 GPM at this time. PACE Engineers assures that there is adequate fire flow to sprinkler the buildings without looping the water line from S 144 th St. to 34 1h Ave. S. However, the next pha quire the line to be looped. Please feel free to contact me at the District office if you have any questions. 92sm ry Mark Parsons Superintendent Attachment B 27