HomeMy WebLinkAboutTIS 2022-06-06 Item 2C - Bid Award - Titan Earthwork for 2022 Annual Small Drainage ProgramCity of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
BY: Joshua Hopkins, Surface Water Project Manager
CC: Mayor Allan Ekberg
DATE: June 3, 2022
SUBJECT:Surface Water Fund - 2022 Annual Small Drainage Program
Project No. 80041201
Construction Bid Award
ISSUE
Award a contract to Titan Earthwork, LLC for construction of the 2022 Annual Small Drainage Program.
BACKGROUND
The Small Drainage Program constructs drainage projects throughout the City that are too large for
City staff to complete but are smaller than a typical capital improvement project. The projects originate
from citizen complaints and maintenance staff recommendations and are compiled on the Small
Drainage Project List. Each year the projects are prioritized based on need, expense, permitting
requirements, and length of time on the list. The highest priority projects are then designed and
constructed. The 2022 Annual Small Drainage Program was advertised to provide drainage
improvements at two locations as noted in the attached vicinity map.
DISCUSSION
The 2022 Annual Small Drainage Program was advertised for bids on May 10 and May 17, 2022.
Seven bids were received and opened on May 24, 2022. The bids were checked, tabulated, and no
errors were found. Titan Earthwork, LLC is the apparent low bidder with an overall bid of $547,980.00.
The engineer's estimate was $556,440.00. Titan Earthwork, LLC has contracted with the City on
previous projects and done satisfactory work.
BUDGET AND BID SUMMARY (All amounts include sales tax)
The project construction budget of $700,000 is sufficient to cover the costs for the contract with
contingency. The project is funded through the Surface Water Enterprise Fund.
Bid Results Engineer's Estimate
Contract $ 547,980.00 $ 566,440.00
Contingency (10%) 54,798.00
Total $ 602,778.00
2022 Budget
$ 700,000.00
RECOMMENDATION
Council is being asked to award the construction contract for the 2022 Annual Small Drainage Program
to Titan Earthwork, LLC in the amount of $602,778.00 and consider this item on the Consent Agenda at
the June 13, 2022, Special Council Meeting.
ATTACHMENTS: 2021 CIP, page 78
Vicinity Map
Bid Tabulation Certification
Recommendation of Award Letter
23
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Annual Small Drainage Program Project No. 9x241201
81241207
DESCRIPTION: Select, design, and construct small drainage projects throughout the City.
JUSTIFICATION: Provide drainage corrections for existing/ongoing drainage problems throughout the City, including culvert
replacements, drain extensions, and pavement upgrades.
STATUS: Projects for this annual program are taken from Small Drainage Project List.
MAINT. IMPACT: Reduces maintenance.
COMMENT: Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar
years.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022 2023 2024 2025 2026 BEYOND TOTAL
EXPENSES
Design
74
92
100
100
100
100
110
110
80
866
Const. Mgmt.
40
68
100
100
100
100
110
110
80
808
Construction
108
515
700
700
700
700
750
750
513
5,436
TOTAL EXPENSES
222
675
900
900
900
900
970
970
673
7,110
FUND SOURCES
Awarded Grant
0
Proposed Grant
65
65
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
157
675
900
900
900
900
970
970
673
7,045
TOTAL SOURCES
222
675
900
900
900
900
970
970
673
7,110
Project Location:
Entire System
2021 - 2026 Capital Improvement Program
78
24
Small Drainage Program DESIGN Drawings \ Contract 22003C0v.dwg 5/5/2022 2:05 PM
K:\PROJECTS\TUKWILA\22003-2022
2022 SMALL DRAINAGE
PROGRAM
PROJECT NO. 80041201
MAYOR
ALLAN EKBERG
DIRECTOR OF PUBLIC WORKS/ CITY ENGINEER
HARI PONNEKANTI, P.E.
SCHEDULE OF DRAWINGS
SHEET NO.
1
2
3-4
5
6
7
8
9
CITY COUNCIL
THOMAS McLEOD, PRESIDENT
KATHY HOUGARDY
DE'SEAN QUINN
KATE KRULLER
CYNTHIA DELOSTRINOS JOHNSON
TOSH SHARP
MOHAMED ABDI
TITLE
COVER
LEGEND & ABBREVIATIONS
DETAILS
48TH AVE S STA 20+00 — STA 24+00 — STORMWATER PLAN AND PROFILES
48TH AVE S STA 24+00 — STA 27+15 — STORMWATER PLAN AND PROFILES
49TH AVE S STA 30+00 — STA 34+00 — STORMWATER PLAN AND PROFILES
49TH AVE S STA 34+00 — STA 37+15 — STORMWATER PLAN AND PROFILES
37TH AVE S STA 10+00 — STA 14+50 — STORMWATER PLAN AND PROFILES
PROJECT
LOCATIONS
SIM
SI
GOLF B
COUNTRY
SIMA
37TH AVE S (S 126TH ST - S 128TH ST)
jSST
48TH AVE S &
49TH AVE S
DERT
8*
5151ST
53
ST
CALL 2 DAYS
BEFORE YOU DIG
811
PUBLIC' WORKS DEPT_
* ENGINEERING *STREETS *WATER* SEWER *BUILDING *
designed
drawn
checked
by
JF
JF
KDA
date
05/22
05/22
05/22
prof eng
prof dir
field bk no
KPG
P S OMA S
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
Tacoma I Wenatchee I KPG.com
BID
DOCUMENTS
2022 SMALL DRAINAGE PROGRAM
COVER
C9J
file no 22003COV.DWG
scale
no date
revisions
Q5 05/05/2022
2022 Annual Small Drainage Project 99830105
Certified Bid Tab
No.
Item
Unit
Qty
Roadway
1
Minor Changes
EST
2
Record Drawings (Minimum Bid $1,500)
LS
3
Mobilization
LS
4
Project Temporary Traffic Control
LS
5
Clearing and Grubing
LS
6
Removal of Structure and Obstruction
LS
7
Pavement Removal Incl. Haul
CY
8
Unsuitable Foundation Excavation Incl. Haul
CY
9
Shoring or Extra Excavation Cl. B
SF
10
Crushed Surfacing Top Course
TN
11
HMA Cl. 3/8" PG 58H-22
TN
12
HMA Berm
LF
13
Adjust Hydrant Assembly
EA
14
Adjust Water Service
EA
15
Erosion Control and Water Pollution Prevention
LS
1
1
1
1
1
1
150
18
450
830
160
290
2
25
1
Roadside Development
16
Topsoil Type A
CY
17
Seeded Lawn Installation
SY
18
Property Restoration
EST
48
260
1
Storm Drainage
19
Remove/Abandon Existing Storm Sewer Pipe
LF
20
Storm Sewer Pipe 8 In. Diam
LF
21
Storm Sewer Pipe 12 In. Diam
LF
22
Ductile Iron Storm Sewer Pipe 8 In. Diam.
LF
23
Ductile Iron Storm Sewer Pipe 12 In. Diam.
LF
24
Concrete Inlet
EA
280
47
1106
224
325
11
25
Catch Basin Type 1
EA
26
New Pipe Connection to Existing Storm Drain Structure
EA
27
Protect Utility Pole
LS
28
Utility Potholing
EA
29
Resolution of Utility Conflicts
EST
15
3
1
36
1
Total:
Engineer's Estimate
Titan Earthwork, LLC
B&B Utilities
Rodarte Construction,
Inc.
HCON Incorporated
Northwest Cascade, Inc.
R.W. Scott Construction
Co.
Harkness Construction,
LLC
Unit Cost
Total Cost
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$12,000.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$7,500.00
$7,500.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$10,000.00
$10,000.00
$1,500.00
$1,500.00
$65,000.00
$65,000.00
$54,000.00
$54,000.00
$52,500.00
$52,500.00
$52,000.00
$52,000.00
$53,000.00
$53,000.00
$63,330.50
$63,330.50
$70,000.00
$70,000.00
$72,000.00
$72,000.00
$65,000.00
$65,000.00
$32,600.00
$32,600.00
$25,000.00
$25,000.00
$40,000.00
$40,000.00
$52,500.00
$52,500.00
$64,500.00
$64,500.00
$60,000.00
$60,000.00
$10,000.00
$10,000.00
$15,000.00
$15,000.00
$9,500.00
$9,500.00
$24,500.00
$24,500.00
$4,000.00
$4,000.00
$10,700.00
$10,700.00
$22,779.00
$22,779.00
$5,000.00
$5,000.00
$15,000.00
$15,000.00
$5,000.00
$5,000.00
$2,500.00
$2,500.00
$25,000.00
$25,000.00
$5,000.00
$5,000.00
$35,500.00
$35,500.00
$26,050.00
$26,050.00
$4,200.00
$4,200.00
$11,500.00
$11,500.00
$50.00
$7,500.00
$165.00
$24,750.00
$25.00
$3,750.00
$90.00
$13,500.00
$150.00
$22,500.00
$97.00
$14,550.00
$65.00
$9,750.00
$90.00
$13,500.00
$75.00
$1,350.00
$50.00
$900.00
$50.00
$900.00
$100.00
$1,800.00
$100.00
$1,800.00
$54.00
$972.00
$80.00
$1,440.00
$120.00
$2,160.00
$8.00
$3,600.00
$1.00
$450.00
$1.00
$450.00
$2.50
$1,125.00
$1.00
$450.00
$4.00
$1,800.00
$4.00
$1,800.00
$25.00
$11,250.00
$40.00
$33,200.00
$60.00
$49,800.00
$18.00
$14,940.00
$60.00
$49,800.00
$25.00
$20,750.00
$65.00
$53,950.00
$60.00
$49,800.00
$90.00
$74,700.00
$160.00
$25,600.00
$330.00
$52,800.00
$200.00
$32,000.00
$300.00
$48,000.00
$250.00
$40,000.00
$352.00
$56,320.00
$300.00
$48,000.00
$200.00
$32,000.00
$25.00
$7,250.00
$3.50
$1,015.00
$34.00
$9,860.00
$12.00
$3,480.00
$25.00
$7,250.00
$12.25
$3,552.50
$12.00
$3,480.00
$20.00
$5,800.00
$1,200.00
$2,400.00
$3,000.00
$6,000.00
$4,000.00
$8,000.00
$1,600.00
$3,200.00
$3,500.00
$7,000.00
$2,530.00
$5,060.00
$4,200.00
$8,400.00
$1,000.00
$2,000.00
$700.00
$17,500.00
$500.00
$12,500.00
$1,000.00
$25,000.00
$700.00
$17,500.00
$1,200.00
$30,000.00
$385.00
$9,625.00
$2,000.00
$50,000.00
$400.00
$10,000.00
$7,000.00
$7,000.00
$10,000.00
$10,000.00
$5,000.00
$5,000.00
$6,000.00
$6,000.00
$10,000.00
$10,000.00
$11,500.00
$11,500.00
$20,000.00
$20,000.00
$10,000.00
$10,000.00
$65.00
$3,120.00
$80.00
$3,840.00
$50.00
$2,400.00
$70.00
$3,360.00
$100.00
$4,800.00
$96.00
$4,608.00
$85.00
$4,080.00
$60.00
$2,880.00
$10.00
$2,600.00
$5.00
$1,300.00
$7.00
$1,820.00
$5.00
$1,300.00
$20.00
$5,200.00
$7.00
$1,820.00
$7.00
$1,820.00
$25.00
$6,500.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$4,000.00
$25.00
$7,000.00
$10.00
$2,800.00
$20.00
$5,600.00
$10.00
$2,800.00
$41.00
$11,480.00
$12.50
$3,500.00
$10.00
$2,800.00
$100.00
$28,000.00
$80.00
$3,760.00
$75.00
$3,525.00
$60.00
$2,820.00
$85.00
$3,995.00
$146.00
$6,862.00
$80.00
$3,760.00
$120.00
$5,640.00
$160.00
$7,520.00
$95.00
$105,070.00
$75.00
$82,950.00
$60.00
$66,360.00
$125.00
$138,250.00
$92.00
$101,752.00
$86.00
$95,116.00
$89.00
$98,434.00
$160.00
$176,960.00
$110.00
$24,640.00
$100.00
$22,400.00
$75.00
$16,800.00
$125.00
$28,000.00
$90.00
$20,160.00
$122.00
$27,328.00
$134.00
$30,016.00
$200.00
$44,800.00
$130.00
$42,250.00
$130.00
$42,250.00
$100.00
$32,500.00
$137.00
$44,525.00
$110.00
$35,750.00
$137.00
$44,525.00
$140.00
$45,500.00
$220.00
$71,500.00
$2,500.00
$27,500.00
$2,000.00
$22,000.00
$4,500.00
$49,500.00
$2,000.00
$22,000.00
$2,000.00
$22,000.00
$2,000.00
$22,000.00
$1,900.00
$20,900.00
$1,000.00
$11,000.00
$2,750.00
$41,250.00
$3,000.00
$45,000.00
$6,500.00
$97,500.00
$2,000.00
$30,000.00
$2,300.00
$34,500.00
$2,000.00
$30,000.00
$2,010.00
$30,150.00
$3,000.00
$45,000.00
$750.00
$2,250.00
$2,000.00
$6,000.00
$1,500.00
$4,500.00
$1,200.00
$3,600.00
$3,500.00
$10,500.00
$800.00
$2,400.00
$800.00
$2,400.00
$1,000.00
$3,000.00
$2,500.00
$2,500.00
$10,000.00
$10,000.00
$1,500.00
$1,500.00
$2,000.00
$2,000.00
$2,500.00
$2,500.00
$11,050.00
$11,050.00
$5,000.00
$5,000.00
$10,000.00
$10,000.00
$600.00
$21,600.00
$600.00
$21,600.00
$300.00
$10,800.00
$575.00
$20,700.00
$475.00
$17,100.00
$715.00
$25,740.00
$600.00
$21,600.00
$600.00
$21,600.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$566,440.00
$547,980.00
$552,500.00
$573,435.00
$591,554.00
$633,336.00
$636,210.00
$726,170.00
Errors in Contractor Bid Proposals:
No errors nobserved.
Certified by
Joshua Hopkins Surface Water Project Manager
Contingency 10%:
Total Construction:
Date: 5/25/2022
$54,798.00
$602,778.00
26
KPG
PS 0 MAS
May 25, 2022
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
RE: 2022 Small Drainage program
Dear Mayor & City Council,
As requested, KPG Psomas has completed the verification for TITAN Earthwork, LLC for the 2022 Small Drainage
Program for their bid in the amount of $547,980.00.
We have checked the status of TITAN Earthwork, LLC on the Washington State Labor and Industries web page to
confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records arose federally
or statewide regarding TITAN Earthwork, LLC. There were no subs to be used.
We phoned the references listed in TITAN Earthwork, LLC's bid and left messages for Lindsey McElwain from City
of Edgewood, Patrick Donohue from City of Seattle & Myke Woodwell from City of Roslyn. We have not received
a call back as of this writing.
KPG Psomas recommends the Small Drainage program be awarded to TITAN Earthworks, LLC.
We have enclosed the contractor verification package & reference checks for your review.
Sincerely,
KPG Psomas Inc.
Bryce Corrigan, P.E.
Cc:
Enclosures: Titan Earthworks, LLC Verification Package
27