HomeMy WebLinkAboutTIS 2022-06-06 Item 2E - Resolution - 2023-2028 Six-Year Transportation Improvement ProgramTO: FROM: BY: CC: DATE: SUBJECT: City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATION MEMORANDUM Transportation and Infrastructure Services Committee Hari Ponnekanti, Public Works Director / City Engineer Cyndy Knighton, Senior Program Manager Mayor Ekberg June 3, 2022 Resolution for Six -Year Transportation Improvement Program (2023 - 2028) ISSUE Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for 2023 - 2028. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW) and must be adopted by June 30th of each year. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer, and local funds. Projects "roll" as funds or stages occur (design report, final design, and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related projects. The TIP generally lists only those transportation -related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The TIP is scheduled for adoption on June 27, 2022. ANALYSIS The attached spreadsheet is the "Draft" 2023 - 2028 TIP and was created by modifying the 2022 - 2027 TIP to add or remove projects and adjust project costs. No prioritization was assigned, and the list of projects is presented in alphabetical order. Only one project was removed because it is expected to be completed before the end of this year. Deleted: West Valley Highway/Longacres Way FINANCIAL IMPACT None. RECOMMENDATION Council is being asked to approve the Resolution for the 2023 - 2028 Six -Year Transportation Improvement Program and consider this item at a Public Hearing at the June 13, 2022 Committee of the Whole and subsequent June 27, 2022 Special Meeting. ATTACHMENTS: Draft Resolution Draft 2023-2028 TIP Summary 2023-2028 "Draft" Transportation Improvement Program Current Adopted 2022-2027 TIP 43 DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2023- 2028), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2023-2028); and WHEREAS, on June 13, 2022, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2023 to 2028, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. CC:\Legislative Development\TIP 2023-2028 5-31-22 CK:bjs Review and analysis by Barbara Saxton Page 1 of 2 44 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this day of , 2022. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Thomas McLeod, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Office of the City Attorney Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2023 to 2028 CC:\Legislative Development\TIP 2023-2028 5-31-22 CK:bjs Review and analysis by Barbara Saxton Page 2 of 2 45 DRAFT 2023 - 2028 TIP SUMMARY June 1, 2022 2021-2026 Project Costs in Thousands of Dollars FUNDING SOURCES CIP Sheet PROJECT TITLE 2023 2024 2025 2026 2027 2028 TOTAL Federal State/TIB City 9 42nd Avenue S Bridge Replacement 2,200 9,450 9,450 0 0 0 4 46th Avenue Safe Routes to School 0 515 2,065 0 0 0 Allentown Truck Reroute Project 700 200 0 0 0 0 14 ADA Improvements 50 50 50 50 50 50 20 APE/Minkler Blvd Intersection 144 1,570 0 0 0 0 13 Annual Bridge Inspections and Repairs 200 200 200 200 200 200 12 Annual Overlay and Repair Program 1,400 1,400 1,500 1,500 1,650 1,650 11 Green River Trail 1,297 0 0 0 0 0 Keeping South King County Moving with TDM 105 210 210 210 105 0 5 Macadam Road S Complete Streets Project 0 0 0 0 0 3,600 18 S 119th St Pedestrian Bridge Painting 0 0 200 0 0 0 S 140th St Intersection Improvements 0 0 0 200 1,200 21 S 144th St Bridge Sidewalks 0 550 2,690 0 0 0 3 S 152nd Street Safe Routes to School 0 2,600 0 0 0 0 South King County Regional TDM 263 263 0 0 0 0 19 Southcenter Blvd/65th Avenue S Signal 100 900 0 0 0 0 Transportation Demand Management Impleme 37 37 37 37 37 38 21,100 2,580 900 300 1,714 1,200 9,100 1,297 840 3,600 200 1,400 3,240 2,600 526 1,000 223 13,500 17,000 2,275 305 900 300 1,714 1,200 9,100 989 308 672 168 3,250 350 200 1,400 2,778 462 2,340 260 450 61 15 550 450 223 TOTAL PROJECTS REVISED FROM 2021-2027 TIP New none 6,496 17,945 16,402 1,997 2,242 6,738 Deleted/Completed: West Valley Highway/Longacres Way Unsecured 2,275 1,570 3,250 2,778 2,340 550 148 51,820 16,728 27,360 17,132 12,911 46 i Wiashingt State Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 STP TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement will require preliminary engineer design, right-of-way, and construction phases. The new structure will meet current road and bridge design standards. The replacement structure configuration will be two through -lanes, possibly a turn pocket, and include sidewalks. 06/13/22 06/27/22 0 2,600,000 11 CN 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 STP 1,500,000 OTHER 1,100,000 0 2,600,000 S CN 2024 STP(BR) 12,000,000 OTHER 15,900,000 0 27,900,000 Totals 13,500,000 CN 17,000,000 0 30,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 2,200,000 0 0 0 0 CN 0 9,450,000 9,450,000 0 0 Totals 2,200,000 9,450,000 9,450,000 0 0 Report Date: June 01, 2022 Page 1 47 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -1111:06/13/22 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. SRTS 06/27/22 85,000 265,000 05 RW 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 SRTS 180,000 85,000 265,000 P RW 2024 0 SRTS 230,000 20,000 250,000 P CN 2025 0 SRTS 1,865,000 200,000 2,065,000 Totals 0 0 2,275,000 305,000 2,580,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 265,000 0 0 0 RW 0 250,000 0 0 0 CN 0 0 2,065,000 0 0 Totals 0 515,000 2,065,000 0 0 Report Date: June 01, 2022 Page 2 48 i Wanshingth, state War Department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA05409 Allentown Truck Reroute Project to Study alternatives for truck access to reroute outside of residential neighborhood. 06/13/22 06/27/22 1,000,000 1,000,000 18 0 700,000 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2023 0 0 1,000,000 1,000,000 Totals 0 700,000 0 1,000,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 700,000 200,000 0 0 0 Totals 700,000 200,000 0 0 0 Report Date: June 01, 2022 Page 3 49 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/13/22 06/27/22 300,000 300,000 06 0 50,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 4th 0 5th & 6th 0 300,000 300,000 Totals 0 50,000 0 300,000 300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 50,000 50,000 50,000 50,000 100,000 Totals 50,000 50,000 50,000 50,000 100,000 Report Date: June 01, 2022 Page 4 50 ■ Was.l,irton State C7:pasrtrgtr3 t of Tr3rastsort.°ation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 RW WA -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/13/22 06/27/22 134,000 134,000 03 C G O P S TW 2023 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 RW 0 0 0 134,000 134,000 S RW 2023 0 0 0 0 10,000 10,000 P CN 2024 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 1,570,000 0 0 0 Totals 144,000 1,570,000 0 0 0 Report Date: June 01, 2022 Page 5 51 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/13/22 06/27/22 1,200,000 1,200,000 06 0 200,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 4th 0 5th & 6th 0 1,200,000 1,200,000 Totals 0 200,000 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 Report Date: June 01, 2022 Page 6 52 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/13/22 06/27/22 9,100,000 9,100, 000 06 C G O P S TW 1,400,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 4th 0 5th & 6th 0 9,100,000 9,100, 000 Totals 0 1,400,000 0 9,100,000 9,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400,000 1,400,000 1,500,000 1,500,000 3,300,000 Totals 1,400,000 1,400,000 1,500,000 1,500,000 3,300,000 Report Date: June 01, 2022 Page 7 53 i wanshingtnn State IWATF department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TAP(UL) TUK-50A Green River Trail Improvements Green River Trail Christensen Road to TUC Pedestrian Bridge The Green River Trail Connector Project will replace approximately 700 feet of existing trail with a widened 12 -foot paved pathway, 2 -foot gravel shoulders, illumination and security cameras. A new pedestrian plaza will also be constructed where the Green River Trail intersects with Christensen Road, including way -finding signs to major destinations. The TUK-50A programming is only for the construction phase of these improvements. The PE phase is included in TUK-50. 06/13/22 06/27/02 308,000 1,297,000 28 989,000 0.130 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 TAP(UL) 989,000 0 308,000 1,297,000 Totals 989,000 1,297,000 0 308,000 1,297,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,297,000 0 0 0 0 Totals 1,297,000 0 0 0 0 Report Date: June 01, 2022 Page 8 54 i Washington State IWATF department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th TUK-63 Keeping South King County Moving with TDM South King County Various to Various This project will help people access sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM programming and services will be provided to residents, workers, visitors, employers, property managers, and students in Tukwila and the partnering jurisdictions of Burien, Des Moines, Kent, Renton, and SeaTac. The program will target those willing and able to try sustainable modes of transportation at activity centers (community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions). Examples of activity centers include the Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport. The TDM Program will work in partnership with transit agencies, nonprofits, employers, and community organizations to reach priority populations through trusted channels. The project aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled. 06/13/22 06/27/22 168,000 840,000 44 0 0.000 672,000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 4th 0 OTHER 672,000 168,000 840,000 Totals 0 210,000 672,000 168,000 840,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 105,000 210,000 210,000 210,000 105,000 Totals 105,000 210,000 210,000 210,000 105,000 Report Date: June 01, 2022 Page 9 55 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -1111( Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/13/22 06/27/22 40,000 400,000 04 RW 0.350 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 4th 0 Ped/Bike Program 360,000 40,000 400,000 P RW 2028 0 Ped/Bike Program 90,000 10,000 100,000 P CN 2028 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 3,250,000 350,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 3,600,000 Totals 0 0 0 0 3,600,000 Report Date: June 01, 2022 Page 10 56 i Wiashingt State Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13494 S 119th St Pedestrian Bridge Painting S 119th Street West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. 06/13/22 06/27/22 200,000 200,000 06 0 0.040 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2024 0 0 200,000 200,000 Totals 0 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 200,000 0 0 Totals 0 0 200,000 0 0 Report Date: June 01, 2022 Page 11 57 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -09873 S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection 06/13/22 06/27/22 150,000 150,000 04 C G P S T W 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 4th 0 5th & 6th 0 150,000 150,000 P RW 2027 0 0 50,000 50,000 P CN 2028 0 0 1,200,000 1,200,000 Totals 0 0 1,400,000 1,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 150,000 RW 0 0 0 0 50,000 CN 0 0 0 0 1,200,000 Totals 0 0 0 0 1,400,000 Report Date: June 01, 2022 Page 12 58 i Wanshinwth, state Department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 SRTS WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S 06/13/22 06/27/22 74,250 550,000 28 CN 0.250 SRTS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 SRTS 475,750 0 74,250 550,000 P CN 2025 SRTS 2,302,000 0 388,000 2,690,000 Totals 2,777,750 CN 0 462,250 3,240,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 550,000 0 0 0 CN 0 0 2,690,000 0 0 Totals 0 550,000 2,690,000 0 0 Report Date: June 01, 2022 Page 13 59 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -111106/13/22 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. SRTS 06/27/22 260,000 2,600,000 05 0 0.300 2,340,000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2024 0 SRTS 2,340,000 260,000 2,600,000 Totals 0 0 2,340,000 260,000 2,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 2,600,000 0 0 0 Totals 0 2,600,000 0 0 0 Report Date: June 01, 2022 Page 14 60 i wanshingtnn State IWATF department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 CMAQ TUK-64 South King County TDM South King County N/A to N/A This project will provide TDM programming and services at selected activity centers in Tukwila and partnering South King County jurisdictions. Activity centers include community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions. For example, places such as Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport. By providing transportation resources and incentives, the project will encourage people to choose sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM services will be provided to residents, commuters, and visitors, targeting those willing and able to try sustainable modes of transportation. The program will work in partnership with partner agencies, nonprofits, employers, and community organizations. 06/13/22 06/27/22 15,000 525,750 24 450,000 0.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750 Totals 450,000 262,875 60,750 15,000 525,750 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 262,875 262,875 0 0 0 Totals 262,875 262,875 0 0 0 Report Date: June 01, 2022 Page 15 61 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 WA -13495 Southcenter Blvd/65th Avenue S Signal Southcenter Boulevard 65th Avenue S to Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue S intersection to improve level of service and safety. 06/13/22 06/27/22 50,000 100,000 21 CN 2023 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 0 TIB 50,000 50,000 100,000 P CN 2023 0 TIB 500,000 400,000 900,000 Totals 0 CN 550,000 450,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 0 900,000 0 0 0 Totals 100,000 900,000 0 0 0 Report Date: June 01, 2022 Page 16 62 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2023 to 2028 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13491 Transportation Demand Management Implementation to Provision of TDM services to Commute Trip Reduction -affected employment sites. Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. 06/13/22 06/27/22 0 74,204 44 ALL 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 0 WSDOT 74,204 0 74,204 P ALL 2023 0 WSDOT 148,408 0 148,408 Totals 0 222,612 0 222,612 Expenditure Schedule Federal Funds State Funds Local Funds Total Funds Phase 17,716,750 1st 26,370,362 2nd 61,319,362 3rd 4th 5th & 6th ALL 37,102 37,102 37,102 37,102 74,204 Totals 37,102 37,102 37,102 37,102 74,204 Report Date: June 01, 2022 Page 17 63 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 17,716,750 26,370,362 17,232,250 61,319,362 Report Date: June 01, 2022 Page 17 63 i Wiashingt State War Elepartrirent od Transportation on Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 STP TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement will require preliminary engineer design, right-of-way, and construction phases. The new structure will meet current road and bridge design standards. The replacement structure configuration will be two through -lanes, possibly a turn pocket, and include sidewalks. 06/14/21 06/21/21 0 2024 11 CN 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2022 STP 1,500,000 0 0 1,500,000 P CN 2024 STP(BR) 12,000,000 TIB 3,000,000 0 15,000,000 P CN 2024 STP 2,000,000 FMSIB 500,000 3,029,000 5,529,000 Totals 15,500,000 9,450,000 3,500,000 3,029,000 22,029,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 750,000 1,250,000 0 0 0 CN 0 0 9,450,000 9,450,000 0 Totals 750,000 1,250,000 9,450,000 9,450,000 0 Report Date: June 15, 2021 Page 1 64 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/14/21 06/21/21 85,000 2024 05 RW 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 SRTS 180,000 85,000 265,000 P RW 2023 0 SRTS 230,000 20,000 250,000 P CN 2024 0 SRTS 1,865,000 200,000 2,065,000 Totals 0 0 2,275,000 305,000 2,580,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 265,000 0 0 0 0 RW 0 250,000 0 0 0 CN 0 0 2,065,000 0 0 Totals 265,000 250,000 2,065,000 0 0 Report Date: June 15, 2021 Page 2 65 i Wiashingt State Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/14/21 06/21/21 285,000 2024 06 0 50,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2022 4th 0 5th & 6th 0 285,000 285,000 Totals 0 50,000 0 285,000 285,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 35,000 50,000 50,000 50,000 100,000 Totals 35,000 50,000 50,000 50,000 100,000 Report Date: June 15, 2021 Page 3 66 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 RW WA -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/14/21 06/21/21 134,000 2024 03 C G O P S TW 2022 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 RW 0 0 0 134,000 134,000 P RW 2022 0 0 0 0 10,000 10,000 P CN 2023 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 1,570,000 0 0 0 Totals 144,000 1,570,000 0 0 0 Report Date: June 15, 2021 Page 4 67 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/14/21 06/21/21 1,075,000 2024 06 0 200,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2022 4th 0 5th & 6th 0 1,075,000 1,075,000 Totals 0 200,000 0 1,075,000 1,075,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 75,000 200,000 200,000 200,000 400,000 Totals 75,000 200,000 200,000 200,000 400,000 Report Date: June 15, 2021 Page 5 68 Wanshinwth, State Var Department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/14/21 06/21/21 8,850,000 2024 06 C G O P S TW 1,400,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2022 4th 0 5th & 6th 0 8,850,000 8,850,000 Totals 0 1,400,000 0 8,850,000 8,850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000 Totals 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000 Report Date: June 15, 2021 Page 6 69 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA05409 BNSF Regional Center Access Study to Study access to the BNSF Regional Distribution Center. 06/14/21 06/21/21 100,000 2024 18 0 0 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 4th 0 5th & 6th 0 100,000 100,000 Totals 0 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 100,000 Totals 0 0 0 0 100,000 Report Date: June 15, 2021 Page 7 70 i Wiashingt State War department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -11115 Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and pedestrian plaza. 06/14/21 06/21/21 8,000 2024 28 CN 0.140 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 Ped/Bike Program 66,000 8,000 74,000 P CN 2023 0 Ped/Bike Program 900,000 300,000 1,200,000 Totals 0 CN 966,000 308,000 1,274,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 74,000 0 0 0 0 CN 0 1,200,000 0 0 0 Totals 74,000 1,200,000 0 0 0 Report Date: June 15, 2021 Page 8 71 i Washington State IWATF department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-63 Keeping South King County Moving with TDM South King County Various to Various This project will help people access sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM programming and services will be provided to residents, workers, visitors, employers, property managers, and students in Tukwila and the partnering jurisdictions of Burien, Des Moines, Kent, Renton, and SeaTac. The program will target those willing and able to try sustainable modes of transportation at activity centers (community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions). Examples of activity centers include the Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport. The TDM Program will work in partnership with transit agencies, nonprofits, employers, and community organizations to reach priority populations through trusted channels. The project aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled. 06/14/21 06/21/21 0 2024 44 ALL 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2022 0 OTHER 672,000 0 672,000 S ALL 2022 0 OTHER 168,000 0 168,000 Totals 0 840,000 0 840,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 210,000 210,000 210,000 210,000 0 Totals 210,000 210,000 210,000 210,000 0 Report Date: June 15, 2021 Page 9 72 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -11110 Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/14/21 06/21/21 40,000 2024 04 RW 0.350 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 Ped/Bike Program 360,000 40,000 400,000 P RW 2022 0 Ped/Bike Program 90,000 10,000 100,000 P CN 2023 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 0 3,250,000 350,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 400,000 0 0 0 RW 0 100,000 0 0 0 CN 0 0 3,100,000 0 0 Totals 0 500,000 3,100,000 0 0 Report Date: June 15, 2021 Page 10 73 i Wiashingt State War Elepartrirent od Transportation on Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13494 S 119th St Pedestrian Bridge Painting S 119th Street West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. 06/14/21 06/21/21 200,000 2024 06 0 0.040 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2024 0 0 200,000 200,000 Totals 0 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 200,000 0 0 Totals 0 0 200,000 0 0 Report Date: June 15, 2021 Page 11 74 i Wiashingtfln St War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -09873 S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection 06/14/21 06/21/21 150,000 2024 04 C G P S T W 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 150,000 150,000 P RW 2027 0 0 50,000 50,000 P CN 2027 0 0 0 1,200,000 1,200,000 Totals 0 0 0 1,400,000 1,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 150,000 0 0 0 RW 0 50,000 0 0 0 CN 0 0 1,200,000 0 0 Totals 0 200,000 1,200,000 0 0 Report Date: June 15, 2021 Page 12 75 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 SRTS WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over I-5 between 51st Ave S and 53rd Ave S 06/14/21 06/21/21 43,000 2024 28 400,000 0.250 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 SRTS 400,000 0 43,000 443,000 Totals 400,000 0 0 43,000 443,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 443,000 0 0 0 Totals 0 443,000 0 0 0 Report Date: June 15, 2021 Page 13 76 i Wiashingt State War Elepartrirent od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -11112 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. 06/14/21 06/21/21 260,000 2024 05 0 0.300 2,340,000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2023 0 SRTS 2,340,000 260,000 2,600,000 Totals 0 0 2,340,000 260,000 2,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 2,600,000 0 0 0 Totals 0 2,600,000 0 0 0 Report Date: June 15, 2021 Page 14 77 i Washington State V department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 CMAQ TUK-64 South King County TDM South King County N/A to N/A This project will provide TDM programming and services at selected activity centers in Tukwila and partnering South King County jurisdictions. Activity centers include community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions. For example, places such as Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport. By providing transportation resources and incentives, the project will encourage people to choose sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM services will be provided to residents, commuters, and visitors, targeting those willing and able to try sustainable modes of transportation. The program will work in partnership with partner agencies, nonprofits, employers, and community organizations. 06/14/21 06/21/21 15,000 2024 24 450,000 0.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2023 CMAQ 450,000 OTHER 60,750 15,000 525,750 Totals 450,000 100,000 60,750 15,000 525,750 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 100,000 175,000 175,000 75,750 0 Totals 100,000 175,000 175,000 75,750 0 Report Date: June 15, 2021 Page 15 78 i Wanshinwth, State Department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 CN WA -13495 Southcenter Blvd/65th Avenue S Signal Southcenter Boulevard 65th Avenue S to Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue S intersection to improve level of service and safety. 06/14/21 06/21/21 50,000 2024 21 CN 2023 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 CN 0 TIB 50,000 50,000 100,000 P CN 2023 0 0 TIB 500,000 400,000 900,000 Totals 0 550,000 450,000 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 0 900,000 0 0 0 Totals 100,000 900,000 0 0 0 Report Date: June 15, 2021 Page 16 79 i Wiashingt State War department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13491 Transportation Demand Management Implementation to Provision of TDM services to Commute Trip Reduction -affected employment sites. Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. 06/14/21 06/21/21 0 2024 44 ALL 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2022 0 WSDOT 74,204 0 74,204 P ALL 2022 0 WSDOT 148,408 0 148,408 Totals 0 222,612 0 222,612 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 37,102 37,102 37,102 37,102 74,204 Totals 37,102 37,102 37,102 37,102 74,204 Report Date: June 15, 2021 Page 17 80 i Washington State IWATF department od Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2022 to 2027 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 /0181(019) TUK-60 West Valley Highway/Longacres Way Shared Use Pathways SR 181 & Longacres Way West end of planned Green River Bridge to Longacres Way The West Valley Highway/Longacres Way project modifies northbound channelization between Strander Boulevard and S 156th Street. A 600ft section of general-purpose lane will be added, north of Strander. The existing dedicated NB turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru lanes on the north leg as the existing inside lane will be changed to a dedicated NB left turn lane. Sidewalks will be added to the east side of the roadway where there are currently none. A wider, shared -use path will replace the existing sidewalk on the west side of the road between Longacres Way and the new sidewalks installed for the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres Way from WVH to the Tukwila Station, including new street and pedestrian illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike bridge and a rapid flashing beacon on Longacres at the Interurban Trail crossing will be added. 06/14/21 06/21/21 40,000 2024 28 0 0.170 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2022 0 TIB 100,000 40,000 140,000 Totals 0 140,000 100,000 40,000 140,000 Expenditure Schedule Federal Funds State Funds Local Funds Total Funds Phase 16,350,000 1st 14,104,362 2nd 48,878,362 3rd 4th 5th & 6th CN 140,000 0 0 0 0 Totals 140,000 0 0 0 0 Report Date: June 15, 2021 Page 18 81 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 16,350,000 14,104,362 18,424,000 48,878,362 Report Date: June 15, 2021 Page 18 81