Loading...
HomeMy WebLinkAboutSpecial 2022-06-13 Item Spec 2A - Bid Award / Contract - 2022 Small Drainage Program with Titan Earthwork for $547,980 (Plus Contingency)COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 06/13/22 JR ITEM INFORMATION ITEM NO. Spec 2.A. 97 STAFF SPONSOR: JOSHUA HOPKINS ORIGINAL AGENDA DATE: 06/13/22 AGENDA ITEM TITLE Surface Construction Water Fund - 2022 Annual Small Drainage Program Bid Award CATEGORY ❑ Discussion Altg Date Motion Date 06/13/22 ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date 11 Mtg SPONSOR ❑Council Mayor HR ❑DCD Finance Fire IS P&R Police PW' ❑Court SPONSOR'S The 2022 Annual Small Drainage Program was advertised for bids on May 10 and May 17, SUMMARY 2022. Seven bids were received on May 24, 2022, with the apparent low bid of $547,980.00 from Titan Earthwork, LLC. This project will provide drainage improvements at two locations. Council is being asked to award the construction contract for the 2022 Annual Small Drainage Program to Titan Earthwork, LLC in the amount of $547,980.00 (plus contingency). REVIEWED BY Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev. ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: KATE KRULLER ❑ LTAC DATE: 06/06/22 RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Public Works Department Unanimous Approval; Forward to Special Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $547,980.00 $700,000.00 $0.00 Fund Source: Comments: 2021-2026 CIP, Page 78 MTG. DATE RECORD OF COUNCIL ACTION 06/13/22 MTG. DATE ATTACHMENTS 06/13/22 Informational Memorandum dated 06/03/22 (updated) 2021-2026 CIP, Page 78 Vicinity Map Bid Tabulation Certification Recommendation of Award Letter Minutes from Transportation and Infrastructure Committee meeting of 06/06/22 97 98 City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/ City Engineer BY: Joshua Hopkins, Surface Water Project Manager CC: Mayor Allan Ekberg DATE: June 3, 2022, (revised after 6/6/22 T&I Committee) SUBJECT:Surface Water Fund - 2022 Annual Small Drainage Program Project No. 80041201 Construction Bid Award ISSUE Award a contract to Titan Earthwork, LLC for construction of the 2022 Annual Small Drainage Program. BACKGROUND The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete but are smaller than a typical capital improvement project. The projects originate from citizen complaints and maintenance staff recommendations and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, expense, permitting requirements, and length of time on the list. The highest priority projects are then designed and constructed. The 2022 Annual Small Drainage Program was advertised to provide drainage improvements at two locations as noted in the attached vicinity map. DISCUSSION The 2022 Annual Small Drainage Program was advertised for bids on May 10 and May 17, 2022. Seven bids were received and opened on May 24, 2022. The bids were checked, tabulated, and no errors were found. Titan Earthwork, LLC is the apparent low bidder with an overall bid of $547,980.00. The engineer's estimate was $556,440.00. Titan Earthwork, LLC has contracted with the City on previous projects and done satisfactory work. BUDGET AND BID SUMMARY (All amounts include sales tax) The project construction budget of $700,000 is sufficient to cover the costs for the contract with contingency. The project is funded through the Surface Water Enterprise Fund. Bid Results Engineer's Estimate Contract $ 547,980.00 $ 566,440.00 Contingency (10%) 54,798.00 Total $ 602,778.00 2022 Budget $ 700,000.00 RECOMMENDATION Council is being asked to award the construction contract for the 2022 Annual Small Drainage Program to Titan Earthwork, LLC in the amount of $602,778.00 $547,980.00 (plus contingency) and consider this item on the Consent Agenda at the June 13, 2022, Special Council Meeting. ATTACHMENTS: 2021 CIP, page 78 Vicinity Map Bid Tabulation Certification Recommendation of Award Letter 99 100 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Annual Small Drainage Program Project No. 9x241201 81241207 DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing/ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Projects for this annual program are taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. COMMENT: Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar years. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Design 74 92 100 100 100 100 110 110 80 866 Const. Mgmt. 40 68 100 100 100 100 110 110 80 808 Construction 108 515 700 700 700 700 750 750 513 5,436 TOTAL EXPENSES 222 675 900 900 900 900 970 970 673 7,110 FUND SOURCES Awarded Grant 0 Proposed Grant 65 65 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 157 675 900 900 900 900 970 970 673 7,045 TOTAL SOURCES 222 675 900 900 900 900 970 970 673 7,110 Project Location: Entire System 2021 - 2026 Capital Improvement Program 78 101 102 2022 SMALL DRAINAGE PROGRAM PROJECT NO. 80041201 MAYOR ALLAN EKBERG DIRECTOR OF PUBLIC WORKS/ CITY ENGINEER HARI PONNEKANTI, P.E. SCHEDULE OF DRAWINGS SHEET NO. 1 2 3-4 5 6 7 8 9 CITY COUNCIL THOMAS McLEOD, PRESIDENT KATHY HOUGARDY DE'SEAN QUINN KATE KRULLER CYNTHIA DELOSTRINOS JOHNSON TOSH SHARP MOHAMED ABDI TITLE COVER LEGEND & ABBREVIATIONS DETAILS 48TH AVE S STA 20+00 — STA 24+00 — STORMWATER PLAN AND PROFILES 48TH AVE S STA 24+00 — STA 27+15 — STORMWATER PLAN AND PROFILES 49TH AVE S STA 30+00 — STA 34+00 — STORMWATER PLAN AND PROFILES 49TH AVE S STA 34+00 — STA 37+15 — STORMWATER PLAN AND PROFILES 37TH AVE S STA 10+00 — STA 14+50 — STORMWATER PLAN AND PROFILES PROJECT LOCATIONS or 1 SINAIa: ur JIM 37TH AVE S (S 126TH ST - S 128TH ST) 48TH AVE S & 49TH AVE S CALL 2 DAYS BEFORE YOU DIG 811 PUBLIC' WORKS 1I1'1T_ * ENGINEERING *STREETS *WATER* SEWER *BUILDING * by designed drawn checked proj eng JF JF KDA date 05/22 05/22 05/22 proj dir field bk no KPG PS OMA S Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 Tacoma I Wenatchee I KPG.com BID DOCUMENTS 2022 SMALL DRAINAGE PROGRAM COVER 3 F IL 0 o- F v 1 9 i file no 22003C0V.DWG scale no date revisions date 05/05/2022 o 2022 Annual Small Drainage Project 99830105 Certified Bid Tab No. Item Unit Qty 1 2 Roadway Minor Changes Record Drawings (Minimum Bid $1,500) 3 4 5 6 Mobilization Project Temporary Traffic Control Clearing and Grubing Removal of Structure and Obstruction EST 1 LS 1 LS 1 LS 1 LS 1 LS 1 7 8 9 10 11 12 13 14 15 Pavement Removal Incl. Haul CY 150 Unsuitable Foundation Excavation Incl. Haul CY 18 Shoring or Extra Excavation Cl. B SF 450 Crushed Surfacing Top Course TN 830 HMA Cl. 3/8" PG 58H-22 TN 160 HMA Berm LF 290 Adjust Hydrant Assembly EA 2 Adjust Water Service EA 25 Erosion Control and Water Pollution Prevention LS 1 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Roadside Development Topsoil Type A CY 48 Seeded Lawn Installation SY 260 Property Restoration EST 1 Storm Drainage Remove/Abandon Existing Storm Sewer Pipe LF 280 Storm Sewer Pipe 8 In. Diam LF 47 Storm Sewer Pipe 12 In. Diam LF 1106 Ductile Iron Storm Sewer Pipe 8 In. Diam. LF 224 Ductile Iron Storm Sewer Pipe 12 In. Diam. LF 325 Concrete Inlet EA 11 Catch Basin Type 1 EA 15 New Pipe Connection to Existing Storm Drain Structure EA 3 Protect Utility Pole LS 1 Utility Potholing EA 36 Resolution of Utility Conflicts EST 1 Errors in Contractor Bid Proposals: No errors nobserved. Certified by Joshua Hopkins Surface Water Project Manager Total: Engineer's Estimate Titan Earthwork, LLC B&B Utilities Rodarte Construction, Inc. HCON Incorporated Northwest Cascade, Inc. R.W. Scott Construction Co. Harkness Construction, LLC Unit Cost Total Cost Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $7,500.00 $7,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $10,000.00 $10,000.00 $1,500.00 $1,500.00 $65,000.00 $65,000.00 $54,000.00 $54,000.00 $52,500.00 $52,500.00 $52,000.00 $52,000.00 $53,000.00 $53,000.00 $63,330.50 $63,330.50 $70,000.00 $70,000.00 $72,000.00 $72,000.00 $65,000.00 $65,000.00 $32,600.00 $32,600.00 $25,000.00 $25,000.00 $40,000.00 $40,000.00 $52,500.00 $52,500.00 $64,500.00 $64,500.00 $60,000.00 $60,000.00 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $9,500.00 $9,500.00 $24,500.00 $24,500.00 $4,000.00 $4,000.00 $10,700.00 $10,700.00 $22,779.00 $22,779.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $25,000.00 $25,000.00 $5,000.00 $5,000.00 $35,500.00 $35,500.00 $26,050.00 $26,050.00 $4,200.00 $4,200.00 $11,500.00 $11,500.00 $50.00 $7,500.00 $165.00 $24,750.00 $25.00 $3,750.00 $90.00 $13,500.00 $150.00 $22,500.00 $97.00 $14,550.00 $65.00 $9,750.00 $90.00 $13,500.00 $75.00 $1,350.00 $50.00 $900.00 $50.00 $900.00 $100.00 $1,800.00 $100.00 $1,800.00 $54.00 $972.00 $80.00 $1,440.00 $120.00 $2,160.00 $8.00 $3,600.00 $1.00 $450.00 $1.00 $450.00 $2.50 $1,125.00 $1.00 $450.00 $4.00 $1,800.00 $4.00 $1,800.00 $25.00 $11,250.00 $40.00 $33,200.00 $60.00 $49,800.00 $18.00 $14,940.00 $60.00 $49,800.00 $25.00 $20,750.00 $65.00 $53,950.00 $60.00 $49,800.00 $90.00 $74,700.00 $160.00 $25,600.00 $330.00 $52,800.00 $200.00 $32,000.00 $300.00 $48,000.00 $250.00 $40,000.00 $352.00 $56,320.00 $300.00 $48,000.00 $200.00 $32,000.00 $25.00 $7,250.00 $3.50 $1,015.00 $34.00 $9,860.00 $12.00 $3,480.00 $25.00 $7,250.00 $12.25 $3,552.50 $12.00 $3,480.00 $20.00 $5,800.00 $1,200.00 $2,400.00 $3,000.00 $6,000.00 $4,000.00 $8,000.00 $1,600.00 $3,200.00 $3,500.00 $7,000.00 $2,530.00 $5,060.00 $4,200.00 $8,400.00 $1,000.00 $2,000.00 $700.00 $17,500.00 $500.00 $12,500.00 $1,000.00 $25,000.00 $700.00 $17,500.00 $1,200.00 $30,000.00 $385.00 $9,625.00 $2,000.00 $50,000.00 $400.00 $10,000.00 $7,000.00 $7,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 $11,500.00 $11,500.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $65.00 $3,120.00 $80.00 $3,840.00 $50.00 $2,400.00 $70.00 $3,360.00 $100.00 $4,800.00 $96.00 $4,608.00 $85.00 $4,080.00 $60.00 $2,880.00 $10.00 $2,600.00 $5.00 $1,300.00 $7.00 $1,820.00 $5.00 $1,300.00 $20.00 $5,200.00 $7.00 $1,820.00 $7.00 $1,820.00 $25.00 $6,500.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 $25.00 $7,000.00 $10.00 $2,800.00 $20.00 $5,600.00 $10.00 $2,800.00 $41.00 $11,480.00 $12.50 $3,500.00 $10.00 $2,800.00 $100.00 $28,000.00 $80.00 $3,760.00 $75.00 $3,525.00 $60.00 $2,820.00 $85.00 $3,995.00 $146.00 $6,862.00 $80.00 $3,760.00 $120.00 $5,640.00 $160.00 $7,520.00 $95.00 $105,070.00 $75.00 $82,950.00 $60.00 $66,360.00 $125.00 $138,250.00 $92.00 $101,752.00 $86.00 $95,116.00 $89.00 $98,434.00 $160.00 $176,960.00 $110.00 $24,640.00 $100.00 $22,400.00 $75.00 $16,800.00 $125.00 $28,000.00 $90.00 $20,160.00 $122.00 $27,328.00 $134.00 $30,016.00 $200.00 $44,800.00 $130.00 $42,250.00 $130.00 $42,250.00 $100.00 $32,500.00 $137.00 $44,525.00 $110.00 $35,750.00 $137.00 $44,525.00 $140.00 $45,500.00 $220.00 $71,500.00 $2,500.00 $27,500.00 $2,000.00 $22,000.00 $4,500.00 $49,500.00 $2,000.00 $22,000.00 $2,000.00 $22,000.00 $2,000.00 $22,000.00 $1,900.00 $20,900.00 $1,000.00 $11,000.00 $2,750.00 $41,250.00 $3,000.00 $45,000.00 $6,500.00 $97,500.00 $2,000.00 $30,000.00 $2,300.00 $34,500.00 $2,000.00 $30,000.00 $2,010.00 $30,150.00 $3,000.00 $45,000.00 $750.00 $2,250.00 $2,000.00 $6,000.00 $1,500.00 $4,500.00 $1,200.00 $3,600.00 $3,500.00 $10,500.00 $800.00 $2,400.00 $800.00 $2,400.00 $1,000.00 $3,000.00 $2,500.00 $2,500.00 $10,000.00 $10,000.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $11,050.00 $11,050.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $600.00 $21,600.00 $600.00 $21,600.00 $300.00 $10,800.00 $575.00 $20,700.00 $475.00 $17,100.00 $715.00 $25,740.00 $600.00 $21,600.00 $600.00 $21,600.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $566,440.00 $547,980.00 $552,500.00 $573,435.00 $591,554.00 $633,336.00 $636,210.00 $726,170.00 Contingency 10%: Total Construction: ?tataa. 7V,040,i4_ Date: 5/25/2022 $54,798.00 $602,778.00 106 KPG P OA May 25, 2022 City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 RE: 2022 Small Drainage program Dear Mayor & City Council, As requested, KPG Psomas has completed the verification for TITAN Earthwork, LLC for the 2022 Small Drainage Program for their bid in the amount of $547,980.00. We have checked the status of TITAN Earthwork, LLC on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records arose federally or statewide regarding TITAN Earthwork, LLC. There were no subs to be used. We phoned the references listed in TITAN Earthwork, LLC's bid and left messages for Lindsey McElwain from City of Edgewood, Patrick Donohue from City of Seattle & Myke Woodwell from City of Roslyn. We have not received a call back as of this writing. KPG Psomas recommends the Small Drainage program be awarded to TITAN Earthworks, LLC. We have enclosed the contractor verification package & reference checks for your review. Sincerely, KPG Psomas Inc. Bryce Corrigan, P.E. Cc: Enclosures: Titan Earthworks, LLC Verification Package 107 108 City of Tukwila City Council Transportation & Infrastructure Services Committee Meeting Minutes June 6, 2022 5:30 p.m. - Hybrid Meeting; Duwamish Conference Room & MS Teams Councilmembers Present: Kate Kruller, Chair; Mohamed Abdi, Tosh Sharp Staff Present: David Cline, Hari Ponnekanti, Griffin Lerner, Brittany Robinson, Seong Kim, Cyndy Knighton, Bryan Still, Joshua Hopkins, Mike Perfetti, Laurel Humphrey Chair Kruller called the meeting to order at 5:30 p.m. I. BUSINESS AGENDA A. Grant Award: Green River Trail Improvements Project Staff is seeking Council approval to accept a Transportation Alternative Program (TAP) Grant Award in the amount of $989,000 for the Green River Trail Improvements Project. Item(s) for follow-up: • Provide detailed breakdown of construction costs Committee Recommendation Unanimous approval. Forward to June 6, 2022 Regular Meeting. B. Contract Amendment: 2022 Overlay & Repair Program Staff is seeking Council approval of a contract amendment with KPG, Inc. in the amount of $265,988 for the 2022 Overlay and Repair Program. Committee Recommendation Unanimous approval. Forward to the June 13, 222 Special Consent Agenda. C. Contract: 2022 Annual Small Drainage Program Staff is seeking Council approval of a contract with Titan Earthwork, LLC in the amount of *$602,778 for construction of the 2022 Annual Small Drainage Program. Item(s) for follow-up: • Identify which agency paid for the utility work Committee Recommendation Unanimous approval. Forward to the June 13, 222 Special Consent Agenda. D. Contract Amendment: 2022 Annual Small Drainage Program Staff is seeking Council approval of an amendment to a contract with KPG Psomas, Inc. in the amount of $99,872.00 for construction management services on the 2022 Small Drainage Program. 109