HomeMy WebLinkAboutTIS 2022-06-21 Item 2A - Contract Amendment #5 - Public Safety Plan: Public Works Fleet and Facilities Design with SHKS ArchitectsCity of Tukwila
Alton Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director / City Engineer
BY: Justine Kim, Senior Project Manager, Shiels Obletz Johnsen, Inc.
CC: Mayor Allan Ekberg
DATE: June 17, 2022
SUBJECT: Public Works Fleet and Facilities Tenant Improvement Project
Project Number 91630601,
Contract 18-197, Amendment No. 5
ISSUE
Approve Amendment No. 5 to Contract No. 18-197 with SH KS Architects for the Public Works Fleet
and Facilities Tenant Improvement Project.
BACKGROUND
The City Council adopted a Combined Public Works Shop Capital Project as part of the City's Public Safety
Plan. This project was most recently updated in the 2021-2022 Adopted Budget. The City chose a site in
2017, purchased properties in 2018 and began Phase 1 design and construction in 2019. Additional funding
is needed for the Public Works Fleet and Facilities Tenant Improvement Project (Phase 1 of the Public Works
Shop) of $1 million to complete exterior work (roofing work, exterior envelope, and covered storage), as was
discussed at Transportation and Infrastructure Services Committee on April 4, 2022. At the April 11, 2022
Committee of the Whole meeting, Council provided their consensus to proceed with this funding plan as
outlined. This amendment is one of the steps in proceeding with the funding plan, specifically related to
architectural services.
The City of Tukwila hired SHKS Architects to perform architectural design and planning services for the
Public Works Project as part of the Tukwila Public Safety Plan, in the amount of $299,997.00. Amendment
No. 1 was for additional services and fees for preparing permit and bid documents, obtaining demolition
permits, and construction contract administration for the demolition of two existing buildings on the City of
Tukwila Public Works future site, in the amount of $16,500.00. Amendment No. 2 provided Schematic
Design, Design Development, Construction Documents, Bidding, Construction Administration, and Project
Closeout services related to Public Works project in the amount of $570,768.00. Amendment No. 3 provided
continued construction administration time beyond basic services, in the amount of $39,125.00. Amendment
No. 4 was a no cost, time extension amendment to extend the contract end date to December 31, 2022.
ANALYSIS
Amendment No. 5 is for services which includes design and construction oversight for the roofing
enhancement, envelope painting/repair, and addition of detached storage buildings at the Public
Works Fleet and Facilities property. These services will include preparing design, permit (as
applicable) and Request for Change Order Proposal documents for the Tukwila Public Works
Shops roofing enhancement, envelope painting/repair and detached storage buildings project.
FISCAL IMPACT
The expenditures associated with these tasks are anticipated and are included in the Council
approved project budget. SHKS Architects has provided an hourly cost, not to exceed
$130,000.00, to perform the additional services in Amendment No. 5. The total contract amount
will now be $1,056,390.00.
1
INFORMATIONAL MEMO
Page 2
A. Original Contract — Master Planning & Programming
$299,997.00
B. Amendment No. 1 — Bid documents, demolition permits &
construction contract administration
$16,500.00
C. Amendment No. 2 — Schematic Design, Design Development,
Construction Documents, Bidding, Construction Administration,
and Project Close -Out
$570,768.00
D. Amendment No. 3 —Additional Construction Administration,
Tukwila Public Works Scope additions/revisions
$39,125.00
E. Amendment No. 4 — No Cost, Time Extension Only
$0.00
F. Amendment No. 5 — Design/Construction oversight for
Roofing Enhancement, Envelope Repair, Addition of
Detached Storage Buildings
$130,000.00
New Contract Amount
$1,056,390.00
RECOMMENDATION
Council is being asked to approve Amendment No. 5 to Contract No. 18-197 with SHKS Architects in
the amount of $130,000.00 and to consider this item on the Consent Agenda of the June 27, 2022,
Special Council Meeting.
Attachments: SHKS Architects Amendment No. 5
SHKS Architects Scope of Work and Fee — EXHIBIT A
Phone: 206-4334800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
2
J
Ir
19oa
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number: 18-197(e)
CONTRACT FOR SERVICES
Amendment No. 5
Between the City of Tukwila and SHKS Architects
That portion of Contract No. 18-197 between the City of Tukwila and SHKS Architects is
hereby amended as follows:
Section 1 Project Designation: The Consultant is retained by the City to perform
Architectural Design, Planning and Close -Out services in connection with the project titled
Tukwila Public Works Facility project ("Project").
Section 2 Scope of Services: The Consultant agrees to perform the services, identified
on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment
and supplies.
Section 4 Payment. The Consultant shall be paid by the City for completed work and for
services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be made as provided on Exhibit "A"
attached hereto, provided that the total amount of payment to the Consultant shall not
exceed $1,056,390 (including estimated expenses) without express written modification of
the Agreement signed by the City. The total fee for additional services related to
Amendment No. 5 are $130,000.
All other provisions of the contract shall remain in full force and effect.
Dated this
CITY OF TUKWILA
day of , 2022
Allan Ekberg, Mayor
ATTEST/AUTHENTICATED
Christy O'Flaherty, MMC, City Clerk
CA Revised December 2016
CONSULTANT
Jonathan Hartung, Principal
APPROVED AS TO FORM
Office of the City Attorney
Page 1 of 1
3
SHKSARCHITECTS
June 09, 2022
Justine Kim
Shiels 1 Obletz 1 Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
Re: CITY OF TUKWILA PUBLIC WORKS
Dear Justine,
The following proposal for services includes design and construction administration for the roofing
enhancement, envelope repair, and addition of detached storage buildings at the Tukwila Public Works Fleet and
Facilities property. These services include preparing design, permit (as applicable) and Job Order Contract bid
documents, for the Tukwila Public Works Shops Envelope repair/replacement and detached storage buildings
project.
Please do not hesitate to contact us with any questions you may have.
Sincerely,
mH
Principal
cc: file
Seattle, WA 1 Burlington, VT
www.shksarchitects.com
4
ADDITIONAL SERVICES FEE PROPOSAL
Project Name
Date Submitted
CITY OF TUKWILA PUBLIC WORKS
June 09, 2022
SHKSARCHITECTS
Revision Number:
4
PROJECT UNDERSTANDING
Basic services include design, permit, construction documents, bidding, and limited construction phase services
for the Tukwila Public Works Shops Envelope repair/replacement and design review/coordination of the detached
storage buildings. Our scope of work includes renovations to the existing building and design review of stand-
alone storage structures. Renovations include: roof retrofitting (membrane roofing installed over existing root),
exterior envelope repair and replacement (replacement of existing metal cladding to +/- 8 feet, repair of existing
metal panel above, and painting of building), and manufactured steel platform at generator. Storage structure
design review consists of review of supplier/manufacturer provided drawings and coordination/review of the
design to meet operational requirements of the City. It is our understanding that The City of Tukwila has elected to
perform this work utilizing a Job -Order -Contractor.
Basic services include architectural, structural, and envelope consulting services. Basic service meetings are
limited to three (3) meetings during Design, four (4) meetings during Construction Documents, and monthly
meetings during Construction. Each meeting is budgeted for two hour including travel time. All meetings are
scheduled to occur at TPW offices. Meetings during design and construction documents beyond (7) identified
above, are an additional service. Meetings during construction beyond (3-SHKS, 12 — Envelope Consultant), are
an additional service.
SCOPE OF SERVICES & DELIVERABLES — ENVELOPE REPAIR
1. Design
• 100% Design Drawings and outline specifications
• 100% Design Cost Plan
• Permit submittal including drawings, calculations and revisions (as necessary)
2. Construction Documents
• 100% Bid Documents (drawings and specifications)
• 100% Bid Documents Cost Plan
3. Bidding (Job -order Contractor)
• Coordinate issuance of bid documents
• Respond to bidder questions
• Clarify bid documents
4. Construction Phase Services
• Envelope Consultant to perform weekly (assumes 12) job walks/issue field reports to confirm
construction in accordance with design intent
• Attend monthly meetings with JOC and owner to review progress
• Perform punch walk and issue punch list
5
SHKSARCHITECTS
SCOPE OF SERVICES & DELIVERABLES — STORAGE STRUCTURE DESIGN REVIEW
1. Design
• Review manufacturer/supplier provided documents
• Confirm/coordinate with City of Tukwila that the design meets operational requirements
• Attendance at (2) meetings with owner
• Civil Engineering for grading, site drainage.
2. Construction Documents
• Review construction documents for design intent conformance
MAXIMUM ALLOWABLE CONSTRUCTION COST (MACC)
The anticipated maximum allowable construction cost (MACC) for the Envelope Repair project is $1,100,000.
BASIC SERVICE FEE
We have based our fee proposal on the State of Washington A/E Fee Schedule for Public Works Building
Projects. Based on the scope and deliverables we have prorated the fee and percentage, the fixed fee for basic
services is $130,000. Should the cost of construction exceed the anticipated MACC we will request additional
compensation as necessary.
REIMBURSABLES:
Expenses in addition to compensation for Basic Services include expenses incurred by the Architect directly
related to the Project. Expense costs to be reimbursed by the Client may include but are not limited to the
following: printing, courier fees, mileage, permit fees, other fees, presentation materials, models, visualizations,
and photography. The Architect shall seek prior authorization from the Owner for these expense costs.
For Reimbursable Expenses the compensation shall be the expenses incurred by the Architect plus « Ten »
percent («10 » %) of the expenses incurred.
The estimated reimbursable expenses for this project are $500.
EXCLUSIONS
Construction administration phase services and project closeout are excluded.
SUMMARY OF FEES
Envelope Repair/Replacement: $85,000
Civil Engineering: $10,000 ALLOWANCE
Envelope Consultant: $25,000 ALLOWANCE
Storage Structure Design Review: $9,500
Reimbursables: $500
Total: $130,000
RATES
Rates are hourly, in accordance with the rates stated in City Project No. 91630601, Contract 18-197.
SCHEDULE
Design 04/01/22 through 05/13/22
Construction Documents 05/16/22 through 06/17/22
Bidding 06/20/22 through 07/13/22
6
Construction TBD
SHKSARCHITECTS
7