HomeMy WebLinkAboutTIS 2022-06-21 Item 2C - Change Order #15 - Public Safety Plan: Public Works Fleet and Facilities Roof Enhancement with Lincoln ConstructionTO: FROM: By: CC: DATE: SUBJECT: City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Hari Ponnekanti, Public Works Director/ City Engineer Justine Kim, Senior Project Manager, Shiels Obletz Johnsen, Inc. Mayor Allan Ekberg June 17, 2022 Public Works Fleet and Facilities Tenant Improvement Project Project No. 91630601 Contract No. 21-046, Change Order No. 15 Issue Approve Change Order No. 15 to Contract No. 21-046 with Lincoln Construction, Inc. for the Public Works Building Tenant Improvements Project for ordering of roofing materials due to a long lead time. Background The City Council adopted a Combined Public Works Shop Capital Project as part of the City's Public Safety Plan. This project was most recently updated in the 2021-2022 Adopted Budget. The City chose a site in 2017, purchased properties in 2018 and began Phase 1 design and construction in 2019. Additional funding is needed for the Public Works Fleet and Facilities Tenant Improvement Project (Phase 1 of the Public Works Shop) of $1 million to complete exterior work (roofing work, exterior envelope, and covered storage), as was discussed at Transportation and Infrastructure Services Committee on April 4, 2022. At the April 11, 2022 Committee of the Whole meeting, Council provided their consensus to proceed with this funding plan as outlined. This Change Order is one of the steps in proceeding with the funding plan, specifically related to the roofing work. The Public Works Fleet and Facilities Tenant Improvement Project scope includes seismic upgrades, plumbing and electrical, fire protection, HVAC upgrades, and interior offices, locker rooms, and showers. The project is complete, and the Fleets and Facilities division will begin the move -in process in the coming weeks. The project team is in the process of negotiating the Change Order for the roofing enhancement scope of work, among other exterior work, which was approved to proceed by the Council in April of 2022. The project team was informed that the roofing material to be installed are impacted by Covid-19 pandemic related supply chain disruption and it will take between 12 to 16 weeks for delivery from the order date. We also learned that the same material cost is estimated to increase between 8% to 15% in the next two months. Thus, we recommend moving forward with this Change Order now to avoid the anticipated cost increase. Analysis The project architect is in the process of completing the documents for exterior scope of work, and it will take a few more weeks to perform due diligence to arrive at a fair, negotiated Change Order amount with Lincoln Construction. While waiting for the final negotiated number, it will be most advantageous for the City to approve ordering of the roofing materials that have a long lead requirement due to the Fleet & Facility Services - 14000 Interurban Avenue, Tukwila, WA 98168 - 206-431-0166 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 15 INFORMATIONAL MEMO Page 2 current market conditions. The attached draft Change Order has details of the material components that are required to perform the roofing enhancement work. The table below describes the current construction contract with Lincoln Construction, Incorporated from the original contract to the current contract sum to date as of May (including sales tax). As a reminder, at the time of bid award, Lincoln Construction was the third lowest responsive bidder after two other contractors rescinded their bids due to error. One of the conditions requested by Lincoln Construction of accepting the award was to exclude the Bid Alternate for the roof enhancement scope. This was due to Lincoln's Bid error associated with the Alternate. Fiscal Impact The expenditures associated with these tasks are anticipated and are included in the Council approved project budget. Lincoln Construction has provided a proposed amount of $339,441.00 for the purchase of roofing materials. The table below shows the initial contract amount, previous Change Orders, the new proposed Change Order amount, and the new contract total of $6,204,595.72. Lincoln Construction Contract Original Contract $ 4,427,221.00 Total Change Orders to Date (Including May) $ 899,895.00 Total Contract Sum to Date $ 5,327,116.00 Sales Tax $ 538,038.72 Subtotal (through Change Order#14) $ 5,865,154.72 Change Order #15 for Roofing Enhancement (Materials Only) $ 339,441.00 New Contract Amount $ 6,204,595.72 Council Approved Maximum Construction Budget (Tenant Improvement + Roof/Exterior Scope) $ 7,982,180.86 Remaining Amount of Council Approved Construction Budget after Change Order #15 $ 1,777,585.14 Next Steps Order the roofing material and complete the documents for the 20 -year roofing system upgrade, and other exterior scope of work and bring the negotiated Change Orders to Council for approval. Recommendation Council is being asked to approve Change Order No. 15 to Contract No. 21-046 with Lincoln Construction in the amount of $339,441.00 for roofing materials and to consider this item on the Consent Agenda of the June 27, 2022, Special Council Meeting. Attachment: Lincoln Construction Change Order Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov 16 TO: CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 15 DATE: 6/13/2022 PROJECT NO.: 91630601 PROJECT NAME: PW Fleet & Facilities BUDGET NO.: 306.98 CONTRACT NO.: 21-046 (o ) Sheet 1 of 1 You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Crhead_ Rate for approval in advance of all change orders. CHANGE: See Attached Exhibit "A" We the undersigned Contractor, have given careful cdillkion ch. "oe propose and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work abode specified will epfull payment therefore the prices shown above and below. ACCEPTED: Date By Original Contract (without tax), $ 4,427,221.00 Previous Change Order $ 899,895.00 This Change Order (without tax) $ 339,441.00 REV. CONTRACT AMOUNT $ 5,666,557.00 Original Contract Time: 242 days (December 3, 2021) Additional Contract Time from previous Change Orders: 129 days Additional Contract Time for this Change Order: 0 days Updated Contract Time: 371 days (April 11, 2022) APPROVED BY THE CITY OF TUKWILA Date By Mayor Public Works Director SOJ Program Director ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) cc: Finance Department (w/encumbrance) Project Management File PW Project Finance File *The original contract value is construction only and does NOT include preconstruction or amendments to preconstruction. 17 Exhibit "A" ORDER TUKWILA - SUMMARY OF CHANGE - Public Works (PW) Fleet & Facilities PW Fleet & Facilities CO # 015 ,,,..,04.11a-4,.., Gi -2.904_... CHANGE CITY OF Project Name Project # TO CONTRACTOR: 91630601 Contract # 21-046 (o) Date 6/13/22 Lincoln Construction, Inc 11803 101st Ave Ct E, Suite 201 Puyallup, WA 98373 COP/CCD # Description Reason Code Amount COP 118 Roofing Materials for West and East Roofs. The cost for roofing materials only, for complete re -roof per discussions and meetings for both East and West roof. Offloading by City of Tukwila, storage by City of Tukwila. Assumed storage in East shop. Please note there will be an assumed increase in material costs in the next 2 months anticipated between 8% and 15%. OC $339,441.00 Change 015 $339,441.00 IN\ IIS 18 CHANGE PROPOSAL REQUEST Lincoln Construction Public Works Fleet and Facilities To: City of Tukwila Attn.: Tukwila Public Works Fleet & Facilities Buildin A. TOTAL MATERIAL/EQ BASE COST B. TOTAL LABOR COST SUBTOTAL C. OVERHEAD AND PROFIT (13%) SUBTOTAL D. SUBCONTRACT COST E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (6%) SUBTOTAL H. BOND (GC COP NO: CCD/PR No.: Date: 6/13/2022 Project: LCI Project No.: $ 118 1239 $ SUBTOTAL 9,886.62 329,554.00 9,886.62 TOTAL CHANGE PROPOSAL COST $ 339,441 CONTRACT TIME ADJUSTMENT (DAYS) TBD Lincoln Construction, Inc. CONTRACTOR 6/13/2022 DATE 74.90144 .om U Tom Romberg 01114.00 g)3 (2) Lincoln Construction Change Order Request To: City of Tukwila Owner COP/CCD/PR #: Re: Public Works Fleet and Facilities Date: 6/13/2022 COP #: 118 Please provide a change order for the following work: Roofing materials only for complete re -roof per discussions and meetings for both East and West roof. Offloading by City of Tukwila, storage by City of Tukwila. Assume storage in East shop. Please note there will be an assumed increase materia ssts in tnext 2 months anticipated between 8% and 15%. Total price per attached breakdown: State and local sales tax: Extension of time: 339,441 include X TBD not included This price is good for We have proceeded with the work Work will not proceed without formal authorization 5 days from the above date, after which this request is subject to revision. Sincerely, 76,44a4 Ro " a9 - Pzalect 7Z en 20 Lincoln Construction CHANGE ORDER REQUEST SUMMARY Public Works Fleet and Facilities DESCRIPTION: LABOR COP: 118 Owner COP/CCD/PR #: REV: 000 DATE: 6/13/2022 PROJECT MANAGER SUPERINTENDENT ASSISTANT SUPERINTENDENT CARPENTER -Concrete Form and Pourback LABORER HOURS SUBTOTAL SMALL TOOL ALLOWANCE @ SUBTOTAL MARK-UP @ TOTAL LABOR 0.0% RATE 95.00 88.95 77.15 75.85 67.72 TOTAL 13. 0 MATERIALS/EQUIPMENT PHASE CODE UNITS - RATE 0.00 = $ 0.00 = $ 0.00 = 0.00 $ SUBTOTAL $ USE TAX ON MATERIALS AND EQUIPMENT MARK-UP @ TOTAL MATERIAL/EQUIPMENT'` $ SUBCONTRACTS Wayne's Roofing SUBTOTAL RATE X = $ - X = $ - X 310,900.00 = $ 310,900.00 X = $ - X = $ - X = $ - X = $ - X = $ MARK-UP @ Sub Direct Cost TOTAL SUBCONTRACTS PROPOSAL SUBTOTAL BONDS/Liability/Builders Risk/B&O Tax PROPOSAL TOTAL Updated: 9/30/2011 0 6.0% Less Sub Fee 3.000% $ 310,900.00 $ 18,654.00 $ 329,554.00 $ 329,554.00 $ 9,886.62 $ 339,440.62 Page 4 of 6 21 BREAKDOWN OF COST WAYNE'S ROOFING,INC. PO Box 228741.4 Sumner, WA 98390 6'� StLJUF(gt 52 JOB NAME Tukwila Public Works Fleet & Facilities Building DATE 6/13/2022 CR DESCRIPTION: PVC Roof Materials JOB NO PVC Roofing Materials QTY UNIT DESCRIPTION ITEM COST TOTAL SUB EQUIP LABOR MATERIALS 4,950.00 PC EPS Flute Filler Insulation $5.85 $28,957.50 421.00 SQ 1/2" HD Coverboard $94.50 $39,784.50 23.00 PAIL 4" Fasteners $254.00 $5,842.00 8.00 PAIL 9" Fasteners 44.00 BX 3" Insulation Plates $150.00 $6,600.00 50.00 SQ 3.3" Polyiso insulation 29.00 SQ Q -Panel Tapered Panel Insulation 55.00 SQ 2" Polyiso Insulation $101.40 $5,577.00 5.00 PAIL SA-Prmer 8.00 RL SA Vapor Barrier 50.00 RL Duro-Fleece 60m1 light gray 10'x100' $1,360.00 $68,000.00 9.00 RL Duro-Last 60m1 Light gray -2'8"x100' 91.00 PAIL WB 11 Adhesive $192.20 $17,490.20 30.00 RL 12" Duro-Last Stripping 100.00 EA Term Bar $7.00 $700.00 1.00 PAIL Term Bar Fasteners $179.00 $179.00 3.00 PAIL Membrane Plates $400.00 $1,200.00 7.00 EA Inside Corner 129.00 EA Outside Corner .60 20.00 EA Stack Flashing $11.25 $225.00 10.00 BAG T -Joints $8.99 32.00 SHEET Vinyl Coated Metal 4'X10' $186.005 5.00 CASE Caulking 30/Case $253.50 $ 67.50 38.00 EA Walkpads 30"x60" $24.35 $ 25 30 19,800.00 LF Vinyl Ribs - 24"oc $2.99 $59 ' 02.00 1.00 LS Freight $3,600.00 600.00 .130.00 HR PROJECT MANAGER HR ROOFER STANDARD ' =OR RATE • HR ROOFER OVERT , LABOR RATE , r AI DAY CREW CAB CREW TRUCK (PER DAY) $299.00 D 2 TON FLATBED/DUMP TRUCK (PER DAY) $696.00 AY 23 TON BO RUCK (PER SAY) $961.00 AY 6K -8K REAC RKLIFT (PER DAY $667.00 OTHER RENT E PARKING FEES CONSUMABLES TN DISPOSAL $200.00 LS COUNTY TOTAL MATERIALS $269,737.74 KING TOTAL LABOR TOTAL EQUIPMENT WRI PM SUBTOTAL $269,737.74 AARON LEONARD 13.00 % OH / PROFIT $35,065.91 TOTAL MATERIAL LABOR & EQUIP. $304,804 GC COP # TOTAL SUBCONTRACTOR N/A 10.00 % OH / PROFIT TOTAL SUBCONTRACTOR WRI CR # 2.00 % INSURANCE $6,096.07 001 % BONDING TOTAL PRICE $310,900 Tukwila - CR 6/13/2022, 9:50 AM Today's Date: 6/10/2022 Project Number: 194976 Customer: WILL WILLIAMS Job Name: TUKWILA FLEET FACILITIES Customer #: 525 Morely Drive Saginaw, MI 48601 (989) 753-6486 (800) 248-0280 FAX (989) 753-4472 FAX (800)432-9331 99U300 Address: TBD City: TUKWILA State: WA Zip: 00030 Ship to: TBD TUKWILA, WA Contact: WILL WILLIAMS Phone: c Email: 0 Taken By: NINA WENDLAND *4x4 Paliet uses one spot - 4x8 Pallet uses two spots Misc Notes: If you have any further questions, please call NINA WENDLAND at (800) 248-0280 - Ext: 2234 p awn* Insulation Products�� .. 23 rvinl INSIiLF[3AIyl Description -.. _.::.. 1# EPS BEVEL CUT . 4950 - _ - !Alit PC P` kcj nit $5-85 Fane ndo_d . _ $28,957.50 1.5"X1279.5' X96" r DRY VAN PICING VALID 3ODAYSfiOM DATE ON QUO T'E PRICING VALID ONLY IF SHIPPED BEFORE EXPIRATION DATE 1 MUST VERIFY PIECE COUNTS BEFORE ORDERING Fuel Surcharge INLUDFD Taxes Not Included Terms 2% 10 Net 30 *4x4 Paliet uses one spot - 4x8 Pallet uses two spots Misc Notes: If you have any further questions, please call NINA WENDLAND at (800) 248-0280 - Ext: 2234 p awn* Insulation Products�� .. 23 OLROkLAST Today's Date: '710/2022 Project Number: 19497o Customer: WILLIAMS Job Name: UKWILA FLEET FACILITIES 525 Morely Drive Saginaw, MI 48601 (989) 753-6486 (800) 248-0280 FAX (989) 753-4472 FAX (800) 432-9331 Expiration Date: 7/10/2022 Customer #: 990300 Address: 'BD City: TUKWILA State: Ship to: TBD TUKWILA, WA Contact: WILL WILLIAMS Zip: 00000 Phone: 0 Email: '" Taken By: NINA WENDLAND Part # 37399 MFR HO PL C83 001 - Description 0.5 -inch DG HD 150 100 P514x8 _ 403.2 Squares Price/Unit. 594`5{} Extended $38,102.40 - *ESTIMATED LEAD TIME: 9-12 MONTHS" PRICING VALID ONLY IF SHIPPED BEFORE EXPIRATION DATE FUEL SURCHAGE SUBJECT TO CHANGE ' I ASED AT TIME OF ORDER Full Truck Freight 0 Trucks 50-00 Partial Truck Freight -(30 Spots) 1 Truck 5380.00 5380.00 Taxes Not Includes Terms 2% 20 Net 30 PRICED SOSD - TOTAL: 538.482:40. *4x4 Pallet uses ane spot - 4x8 Pallet uses two spots Misc Notes: If you have any further questions, please call NINA WENDLAND at (800)248-0280 - E 2234 "'runs Insulation Products 24 DURO-LAST® STANDARD MEMBRANE Please referencepace 2 for temporary product lead time updates. Description Mil White Tan/Gray/Dark Gray/ Terra Cotta Roll Goods" 40 0.98/sq ft 1.00/ sq ft 60" Tabs/120" Tabs 40 1.03/sq ft 1.04/sq ft 28" Tab/Parapets 40 1.10/sq ft 1.12f sq ft Roll Goods" 50 1.11/sq ft 1.12/sq ft 60" Tabs/120" Tabs 50 1.15/sq ft 1.17/sq ft 28" Tabs/Parapets 50 1.22/sq ft 1.24/sq ft Roll Goods"" 60 1.23/sq ft 1.25/sq ft 60" Tabs/120" Tabs 60 1,28/sq ft 1,30/sq ft 28" Tabs/Parapets 60 1.351sq ft 1.38/sq ft 6" Round Patch (50 ct.) 10.00/bag 10,00/bag Terra Cotta availabia in 50 -Mil only. Roll Goods: Material that is 5'4" or less in width without custom fabrication. TERRA COTTA AVAILABLE IN THE FOLLOWING ACCESSORIES: Description Price Each Two -Way Roof Vent 26.99 Plenum Vent 85.99 6" x 6" Inside Corner 6.25 6" x 6" Outside Comer 7.45 6" x 18" Inside Comer 8.60 6" x 18" Outside Corner 10.80 18" x 12" Outside Corner 12.45 6" x 6" Outside Butterfly 9.25 j 1" Stack 11,95 J 1'/2" - 8" Stack 13. 9" - 11" Stack 7.65 12" - 15" Stack 20. 2"-8"Drain 18. SPECIAL DECK SHT CHARD - A $.07/sq. ft. upcharge will be ap , ted in the follow' 1. Tab spacing is not 28", 60" or 20" tabs • 10"-27" (28" pricing + $.07) • 29"-59" tabs (60" pricing + $. t" ) • 61"-119" tabs (120" pricing + $. 2. More than two reverses or last laps, ere are less than 60". 3. The fastening tab length is greater than 3". 4. Non -rectangular sheets • 10"-28" tabs (28" pricing + 5.07) • 29"-120" tabs (60" pricing + $.07) DURO-LAST STANDARD ROLL GOOD SIZES COLOR MIL S1.ZE SQ FT WEIGHT ROLL PRICE White 40 5'4" x 150' 800 200 784.00 White 40 5'4" x 100' 534 115 523.32 White 40 5'4" x 50' 267 68 261.66 White 40 2'8" x 100' 267 68 261.66 White 40 8" x 100' 67 17 65.66 White 40 12" x 100' 100 25 98.00 Tan 40 5'4" x 100' 534 115 534.00 Tan 40 2'8" x 100' 267 68 267.00 Tan 40 12" x 100' 100 25 100.00 Gray 40 5'4" x 100' 534 115 534.00 Gray 40 2'8" x 100' 267 68 267.00 Gray 40 12" x 100' 100 25 100.00 Dark Gray 40 54" x 100' 534 115 534.00 Dark Gray 40 2'8" x 100' 267 68 267.00 Dark Gray 40 12" x 100' 100 25 100.00 *Only Maximum Sheet Sizes for 5' Tabs 40 -mil 2,500 sq. ft. 50 -mil 2,000 sq. ft. 60 -mit 1,500 sq. ft. Maximum Sheet Sizes for 10' Tabs 40 -mil 3,000 sq. ft. 50 -mil 2,500 sq. ft. 60 -mil 2,000 sq. ft. COLOR MIL SIZE SQ FoT,GHT WEIGHT ROLL PRICE White 50 5'4" x 100' 534 172 592.74 White 50 5'4" x 50' 267 85 296.37 White 50 2'8" x 100' 267 85 296.37 White 50 8" x 100' 67 22 74.37 White 50 12" x100" 100 33 111.00 Tan 60 5'4" x 100' 534 172 598.08 Tan 50 2'8" x 100' 267 85 299.04 n 60 12" x 100' 100 33 112.00 Gray 60 5'4" x 100' 534 172 598.08 Gray 60 2'8" x 100' 267 85 299.04 y 50 12" x100' 100 33 112.00 Gra 50 5'4" x 100' 534 172 598.08 Dark Gray 50 2'8" x 100' 267 85 299,04 ©ark Gray _; 50 12" x 100' 100 33 112.00 /terra Cotta 50 5'4" x 100' 534 172 598.08 Terra Cotta 50 2'8" x 100' 267 85 299.04 Terra Cotta 50 12" x 100' 100 33 112.00 COLOR MIL SIZE 80 FT WEIGHT ROLL PRICE White 60 54" x 100' 534 208 656.82 White 60 5'4" x 50' 267 104 328.41 White 60 2'8" x 100' 267 104 328.41 White 60 8" x 100' 67 26 82.41 White 60 ' 12" x 100' 100 40 123.00 Tan 60 54" x 100' 534 208 667.50 Tan 60 2'8" x 100' 267 104 333.75 Tan 60 12" x 100' 100 40 125.00 Gray 60 5'4" x 100' 534 208 667.50 Gray 60 218" x 100' 267 104 333.75 Gray 60 12" x 100' 100 40 125.00 Dark Gray 60 54" x 100' 534 208 667.50 Dark Gray 60 2'8" x 100' 267 104 333.75 Dark Gray 60 12" x 100' 100 40 125.00 NOTE: Not stocked -Call for lead time. 02/07/2022 6 All prices subject to change without notice. AJI prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX • Ludlow, MA 25 DURO-FLEECE® COLOR 60 -MIL Please reference Rage 2 for temporary product lead time updates. Color Roll Size Item # Sq. Ft. Price Price/Roll Light Gray 5' x 100' 662050 1.36 680.00 10' x 100' 662051 1.36 1,360.00 Charcoal 5' x 100' 662052 1.36 680.00 10" x 100' 662053 1.36 1,360.00 Patina 5' x 100' 662054 1.36 680.00 10' x 100' 662055 1.36 1,360.00 Light Tan • 5' x 100' 662056 1.36 680.00 10' x 100' 662057 1.36 1,360.00 Blue 5' x 100' 662062 1.36 680.00 10' x 100' 662063 1.36 1,360.00 Green 5' x 100' 662058 1.45 725.00 10' x 100' 662059 1.45 1,450.00 Copper 5' x 100' 662060 1.45 725,00 10' x 100' 662061 1.45 1,450.00 NOTES: • Mn'mum order quant ty is 10,000 sq. ft. • All shipments ship from Michigan facility. DURO-FLEECE® COLOR 80 -MIL Please reference page 2 for temporary product lead time updates. Color Roll Size Item # Sq. Ft. Price Price/Roll Light Gray 5' x 65' 662070 1.50 487.50 10' x 65' 662071 1.50 975.00 Charcoal 5' x 65' 662072 1.50 487,50 10' x 65' 662073 1.50 Patina Light Tan Blue Green Copper 5'x65'_ 662074 1.50 975.00 487.50 10' x 65' 5' x 65' 10'x65' 5' x 65' 10'x65' 5' 10' x 65' 5' x 65' 662075 662076 662077 662068 662069 662078_ 662079. 662066 1.50 1.50 1.50 1.50 1.50 1.60 1.60 1.60 975.00 DURO-LAST® EV ROLL GOODS WHITE Please reference pa 2 for tem ora oroduct lead time updates. Roll Size Mil Item # Sq. Ft. Price Price 1 Roll 10" x 100' Stripping 50 661471 1.13 94.92 2' 6" x 100' 50 661470 1,13 282.50 5' x 140' 50 661460 1.13 565.00 10' x 100' 50 661461 1.13 1,130.00 10" x 100' Stripping 60 661481 1.25 105.00 2' 6" x 100' 60 661480 1.25 312.50 5' x 100' 60 661462 1.25 625.00 10' x 100' 60 661463 1.25 1,250.00 T -Patch 4"-6" Bag (50 ct.) 8067EV 5.99 NOTES: • Accessories are produced with Duro-Last EV 50 -Mil White Membrane. • Pricing is equal to Duro-Last standard membrane accessory pricing. 8 0.0 0.00 520.00 10' x 65' 662067 1.60 1.044.00 NOTES: • Minimum order quantity is 10,000 sq. ft. • All shipments ship from Michigan facility. DURO-TUFF AND DURO-FLEECE COLOR MEMBRANE ACCESSORIES Product Description Price Two -Way Vent (customer chooses vent color) _ 20.99 Plenum Vent (customer chooses vent color) 86.49 6" x 6" Inside Corner 4.45 6" x 6" Outside Corner 5.60 6" x 18" Inside Corner 6.15 6" x 18" Outside Corner _ 6.95 18" x 12" Outside Corner 10.65 6" x 6" Outside Butterfly Comer 7.35 1" Stack 10.05 1'A"-8" Stack 11.95 9"-11" Stack 15.05 12"-15" Stack 18.25 2"-8" Drain 15.99 T -Patch 4"-6" Bag (50 ct.) 8.99 NOTE: Item numbers vary based on color selection of the membrane. 02107/2022 All prices subject to change without DURO-LAST ACCESSORIES STACK FLASHINGS Ad for arae, tan or dark aravl NOTES: • Over 24", call Sales Department for pricing. • Manufactured using outside diameter measurements.. PANDUIT BANDS Description Sogl Price Each os d IOn pe Price Each 1" 1222 37.99 1315 nla 8.80 1'/z" 1315H 2315H 10.75 2" 1316 2316 10.75 1317 2317 10.75 1318 2318 10.75 1319 2319 10.75 1320 2320 10.75 1321 2321 _ 10.75 1322 2322 10.75 1323 2323 13.20 _8;'," 10" 1324 2324 13.20 11" 1325 2325 13.20 12" 1326 2326 16.40 13" 1327 2327 16.40 14" 1328 _ 2328 16.40 15" 1329 2329 16.40 16" n/a Open Only 1 39.65 18" n/a Open Only 40.26 20" nla Open Only 40.87 22" nla Open Only 41.47 24" - nla Open Only 42.08 NOTES: • Over 24", call Sales Department for pricing. • Manufactured using outside diameter measurements.. PANDUIT BANDS Description Item # Price Each Panduit Tool 1221 221.49 %" x 14" S.S. Bands (50/baq) - 1222 37.99 %" x 20" S.S. Bands (50/baq) 1222P 56.49 10 notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, 0 R • Sigourney, IA • Carrollton, TX • Ludlow, MA 26 Ni''''''''':"...$ Spade Point Item # DURO-LAST Quantity/Pail MEMBRANE 1C 1? CUSTOM 1- MADE 15 SCUPPERS 18 2{l ESTIMATING 24 CHART ,, 33 32 1456 50.15 51.23 52.31 53.39 54.47 55.55 56.63 57.71 58.19 59.87 60.95 62.03 63.11 64.19 65.27 6 1,000/pail 52.31 53.39 54.47 55.55 56.63 57.71 58.79 59.87 60.95 62.03 63.11 64.14 65.27 6535 8 3 b 54.47 65.55 56.63 57.11 58.79 5981 64.95 62.03 63.11 64.15 65.21 6636 67.43 10 238.00 55.63 57.71 58.19 59.87 54,95 62,43 63.11 64,19 66.27 1 66.35 67.43 68.52 12 500/pail 58.79 59.87 60.95 62.93 63.11 64.19 65.27 66.35 61.43 68.52 69.64 14 60.95 62.03 63.11 64.19 65.27 66.35 67.43 68.52 69.60 70.68 16 ...- . , 63.11 64.19 65.27 66.35 61.43 68.52 69.60 70.68 71.76 15 ..,.. ,, i r 65.27 66.35 67.43 58.52 69.60 74,68 _, 71.76 72.84 20 67,43 68.5269.6.7 70.68 71.76 72.84 73.92 22 69.60 74.6E 71.16 72.84 73.92 75.04 24 71.76 72.84 73.92 T5.00 75.08 26 73.92 75.00 76.08 77.16 28 76.08 77.16 78.24 30 78.24 79.32 32 80.40 The above prices are good for scuppers with distance through the wall "C" equal to 18 inches or le FASTENERS #14 SCREWS P-3 Head Description Spade Point Item # Drill Point Item # Quantity/Pail Price Each 1W' 1442-2 _ 1361-2 2,000/pail 178.00 2" 1445-2 1362-2 2,000/pail 208.00 21/2" 1456 1363 1,000/pail 135.00 3" 1447 1364 1 /pail 149 00 3W 1457 1365 1,000/pail . 65.00 4" 1448 136 1,000/pail 250/pail 4'/" 1458 67 1, 000/pail 254. 0 5" 1449 1368 1, 000/pail 269.00 5'/" 14591369 347.00 1,000/pail 3 b 6" 1450_1370 16" _ 1,000/pail 344.00 7" 1451 1371. 500/pail 216.00 8" 1452 1372 5001. 238.00 9" _ 1253 1373 /pail 329.00 10" 1254 1374 500/pail 381.00 11" 1255 1375 500/pail 425.00 12" 1256 1376 500/pail 463.00 NOTES: • Spade Point. • Drill Point P-3 Head: Steel Decks (18 to 24 Gauge). 02/07/2022 #15 SCREWS Wood or Steel Decks Des ' n Item # Quantity/Pail Price Each 2" 1378 1 AOOGpail 179.00 eige• 1379 1,000/pail 224.00 4011c_ 4" 1380 1,001/pail 254.00 VersaFast Plates 1381 000/pail 329.00 6" 1382 500/pa0 210.00 7"' 3 500/pail 291.00 8" 1384 500/pail 322.00 9 1385 250/pail 254.00 10" 1386 250/pail 272.00 11" 1387 250/pail 280.00 ' 12" 1388 250/pail 347.00 14" 1257 250/pail 381.00 16" _ 1258 250/pail 422.00 18" 1259 250/pail 542.00 20" 1260 250/pail 657.00 FASTENERS FOR EDGE DETAILS Description Item # Quantity/Pail Price Each 1'1 " Hexhead #14 1444-2 2,000/pail 208.00 1/4" x 1'/z' ZAMAC Meta! Anchor 12411 1,000/pail 224.00 VERSA -FASTENERS or addWan al sizes call for ar�ailabilitV. Description Item # Quantity/Pail Price Each 2''%" 20001 1,0 0/pail 149.00 314 20002 1,000/pail 196.00 41/44" 20003 1,000/pail 238.00 VersaFast Plates 20040 1,000/pail 177.00 13 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX • Ludlow, MA 27 DRILL BITS Description Item # Price Each 7/32" x 6" Straight 1631 5.25 7/32" x 11" SDS 1644 18.05 7/32" x 16" SDS 1645 26.45 ' 3/16' x 3" Straight 1632 3.35 3/16" x 6" Straight 1633 1629 4.55 6.95 3/16" x 6'/z' SDS 3/16" x 8%" SDS 1635 10.00 3/16' x 10" SDS 1630 13.95 3/16" x 12" Straight 1804 19.15 3/16" x 12" SDS 1640 17.40 'f" x 4" Straight 1266 _ 3.70 14" x 4" SDS 1268 6.65 i<"x6"SDS 1643 6,95 DRILL BIT INFORMATION 1. All drill bits are listed by size and total length. 2. Deduct approx. 2" for insertion of bit into tool. 3. 3116"- For concrete decks. 4. ''/."- for anchors going into concrete. 5. 7/32"- bigger easier to use when concrete is dense. 6. Straight bit vs. SDS (spline drive shaft) - based on drill. 7. Straight- More likely to spin. 8. SDS- Only for specific drills. 9. Usable length is 2" shorter than drill bit size, 10. Drill bit is'/7"-1" ranger than fastener. 11. Order drill bit 3" longer than fastener. Description 14" 2,,,4" 3;/4" 4%" 5'/" 63/4" PURLIN FASTENERS Drop -Ship Onl item # 1488 1489 1490 1491 1492 1493 Y SNOW DIVERTERS Add .50 for ctrav. tan or dark ora Description Item # Price Each White w/ White Skirt 1240 44.60 Tan w/ Tan Skirt 1240B 45.55 Tan w/ Terra Cotta Skirt 1240TC 49.15 Gray w/ Gray Skirt 1240E 45.55 Dark Gray w/ Dark Gray Skirt 1240GDX 45.55 CONDUIT/ESCUTCHEON WASHERS hite, tan and gra Description Item # Price Each 1/2" 2" 1338 3.00 3/4" 1337 3.00 1" 1336 3.00 ROOF TRAK° III WALKWAY PADS Description Item # Price Each 30" X 60" White 1080 24.35 60" X 60" White 1082 43.95 30" X 60' Tan 1081 24.35 60" X 60' Tan 1083 43.95 30" X 60" Gray 11107 24.35 60" X 60" Gray 11108 43.95 30" X 60fety 1086 24.90 60" X 60" Safety 1087 45.70 NOTE: The above walkway pads come w h a 4" white skirt on two sides with the 60" dimension. Description Item # Price Each 30" X 60" Safety Skirt 4 Sides 1355 33.85 30" X 60' White Skirt 4 Side 1356 33.85 Quantity/Pail ,500/pail ,000/pai litODOip 00 rice E 3 22 344.00 1,000)pa , 1,000Jpail 35' 68.00 7'/" 94 500/pail 308.00 83/4" 494-001 500/pail 366.00 PLATES Description - " Item # Quantity/Box Price Each 2" Round Poly Plates 1305P '1,000/box 250.00 3" Square Steel Plates 13005 500/box 150.00 3" Plastic Insulation Plates 13051 1,000/box 200.00 Metal Cleat Plates 1304 1,000/box 400.00 RhinoBond Induction Plate 1302 500/box 450.00 DL 3" Induction Insulation Disc 18654 100/bag 10.50 ' RhinoBond Insulation Disk 1339 250/box 47.00 TruFast induction Plate 1865 500/box 400.00 11/4 x 23/4 Oval Metal Plate 1310 5001bax 175.00 AccuSeam® Plates 2-3/8" 1867 1,000/box 400.00 AccuTrac® Plates 3' 1866 1,000/box 400.00 02/07/2022 15 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR s Sigourney, IA s Carrollton, TX r Ludlow, MA 28 TERMINATION DETAILS VINYL TERMINATION BAR 10' lenpths Description Item # Price/Ft White 1225 0.60 Tan 12258 0.70 Gray 12253 0.70 ALUMINUM TERMINATION BAR 10` lenpths Description Item # Price/Ft Aluminum Term Bar TB -50 1962 0.70 Aluminum Term Bar TB -75 1963 0.85 VINYL FASCIA BAR & VINYL COVERS 10' lenpths Description Item # Price/Ft 1%" Fascia Bar 1 1568 1.49 1%', White Vinyl Cover 1569 0.99 1%Tan Vinyl Cover 15698 0.99 1%' Gray Vinyl Cover 1574 _ 0.99 1%" Additional White Joint Clips 1570 _ 0.99 1'/+" Additional Tan Joint Clips 1570B 0.99 1%' Additional Gray Joint Clips i 1575 pe 4" Fascia Bar 1571 2.49 4" White Vinyl Cover 1572 2,49 I 4" Tan Vinyl Cover 1572 2.99 4" Gray Vinyl Cover 1 8 99 4" Additional White Joint Clips 1573 49 4" Additional Tan Joint Clips 15736 1114 4" Additional Gray Joint s 1579 2.49 NOTES: • Fascia Bar price list. • One clip per 10 o et covers are located in the Exceptional' M over is included with cover. VINYL DRIP EDGE ,--#/#"' 10' fengths with 6 skirt VINYL DRIP EDGE OUTSIDE CORNERS Description Item # PricelFt 2"' Face White wt White Skirt 1558 10.25 2" Face Tan wl Tan Skirt 15586 12.60 2" Face Gray wt Gray Skirt 15583 12.60 4" Face White wl White Skirt 1585 12.60 4" Face Tan WI Tan Skirt 16856 15.00 4' Face Gray Wi Gray Skirt 1585G 15.00 NOTES: • Edging and skirt colors are interchangeable, but are not a stook item. VINYL GRAVEL STOP 10' lenpths with 6" skirt Description Item # Price/Ft 2"Face WhitefWhite Skirt 1226 3.70 2" Face Tanrtan Skirt 12266 4.35 2" Face GraylGray Skirt 12263 4.35 2" Additional Clip White 1613 1.25 2" Additional Clip Tan 1613B 1.80 2" Additional Clip Gray -N,133 1.80 4" Face White/White Skirt 1587 4.35 A" Face Tan/Tan Skirt 158 B 4.95 4" Face GraylGra Skirt 17G 4.95 ,,,,it" Additional Cii: ite 1584 1.80 ,,,1588 4" Additional Clip 1588B 1.80 4" Additional Clip Gray 1588G 1.80 Frininn shirr rnEnrs pro inrorrhannanhlo hi t mro rw.f n stnrir item Description Item # Price/Ft 2" Face White/White Skirt 1220 3.60 2" Face TanfTan Skirt 1220E 4.25 2" Face Gray/Gray Skirt 1220G 4.25 2" Additional Clip White 1228 1.80 2" Additional Clip Tan 1228B 1.80 2" Additional Clip Gray 12283 1.80 4" Face White/White Skirt 1583 4.25 4" Face Tan/Tan Skirt 1583E 4.80 4" Face Gray/Gray Skirt 15833 4.80 4" Additional Clip White 1584 1.80 4" Additional Clip Tan 1584B 1.80 4" Additional Clip Gray 1584G 1.80 NOTES: • One clip per 10' of drip edge is included. • Edging and skirt colors are interchangeable, but are not a stock item. 02107/2022 e clip per 10' of gravel stop is included. Metal gravel stop covers are located in the Exceptional Metals price list. VINYL GRAVEL STOP OUTSIDE CORNERS Description Item # Price/Ft 2" Face White wi White Skirt 1614 10.50 2" Face Tan wt Tan Skirt 16143 12.95 2' Face Gray wt Gray Skirt 1614E 12.95 4" Face White wl White Skirt 1589 12.40 4" Face Tan Wt Tan Skirt 15896 14.80 4" Face Gray VW Gray Skirt 1589G 14.80 NOTES: • Edging and skirt colors are interchangeable, but are not a stock item. Metal gravel stop covers are located in the Exceptional Metals price list. 16 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX • Ludlow, MA 29 CAULK AND ADHESIVES CAULK Description _ Item # QuantitylCase Price/Each Duro-Caulk® Plus White 1136 30/case or single 8.45 Duro-Caulk® Plus Tan 1137 3fllcase or single 8.45 Duro-Caulk® Pius Gray 1134 30/case or single 8.45 Duro-Caulk® Plus Bronze 1135 30lcase or single 8.45 Duro-Caulk Advanced White 11480 30lcase or single 8.45 NOTE: Duro-Caulk Plus is a silicone -based sealant, while Du o -Caulk Advanced is a polyether-based sealant a lowing it to be painted. SEALANTS Description Item # Quantity Price/Each Pitch Pan Filler 1122 30/case or single 8.80 Sure Bond 240 Mastic 1123 5G Pail _ 225.80 Duro-Mastic® Strip Mastic 1129 350' mastic 123.90 Tab Sealer 4725 (5G Pail) , 1119T 5G Pail 167.40 NON -FLEECE MEMBRANE ADHESIVES Description Item # Quantity Price/Each Water Base Adhesive 1111 5G 192.20 Duro-Last Solvent -Grip Spray Adhesive 11020 40 Ib Canister (400 sq. ft.2) 275.65 Duro-Last Solvent -Grip Cleaner 11021 15 Ib. Canister 128.' Duro-Last Solvent -Grip Gun and Wand (Re -Usable) 11023 Each 208.49 Duro-Last Solvent -Grip 12' Hose 11025 Ea • 51.9 Duro-Last Solvent -Grip 18' Hose 11024 Each _ 5.99 Duro-Last Solvent -Grip Replacement Spray Tip 7 4/case 320.55 Solvent Base IV Adhesive �' 1112-010 5G am, 22235 NOTE: Coverage rates for last.com. I adhesives are available on www:duro- LOIN RISE INSULATION ONLY ADHESIVES Drop -Ship On ; Description Item # Quantity Price/Each Duro-Grip CR -20 HFO 11055Set 5G 953.55 Duro-Grip" CR -20 HFO 17G Refillable Tank f 11057 Set, Plus Deposit 2,489.90 Duro-Grip' CR -20 HFO 17G Refillable Tank Kit 11058 Set, Plus Deposit 2,537.05 TRUFAST Roof Adhesive Cartridge 11036 4icase 143.20 OMG OlyBond 500' Insulation Adhesive Bag -in -Box 1108 100 Set 743.35 OmG OlyBond 500' insulation Adhesive 150 Drums (includes 25' hose, 3 extension tubes, 6 tips and gun assembly) 1108-056 150 Drums 1,358.40 OMG OlyBond 500' SpotShot Insulation Adhesive 1104 4/case 320.55 OMG OlyBond 500' SpotShot Insulation Adhesive Winter 1104W 4/case 320.55 Millennium One Step 1105 4/case 223.20 Millennium PG -1 Pump Set 1130 TRUFAST Roofing Adhesive Hose and Gun 707.40 Millennium PG -1 Pump Grade 1130-15 15G 1,626.60 I nstaStik 1117-001 10,453.49 345.95 InstaStik Wand Kit 1117-002 OMG Stand -Up Applicator 52.70 02/07/2022 DURO-FLEECE MEMBRANE ADHESIVES Drnra-Shits Onl Description Item # Quantity Price/Each Water Base Adhesive' 1111 5G 192.20 Adhesives Below Approved for Both Membrane and Insulation Attachment Duro-Grip-CR-20 HFO 11055 Set 953.55 Duro-Grip"' CR -20 HFO 17G Refillable Tank 11057 Set Plus Deposit Below 2,489.90 Duro-Grip' CR -20 HFO 170 Refillable Tank Kit ' 11058 Set Plus Deposit Below 2,537.05 Duro-Grip"CR-20 HFO 17G Refillable Tank Deposit 11048 Deposit per each set 300.00 TRUFAST Roofing Adhesive Tanks (Part A & Part 8) Hose & Gun Included 11049 Set 805.35 TRUFAST Roofing Adhesive 15G Tanks (Part A & Part B) Cart Dispensed 4 Set 1,079.40 OMG OlyBond 500" Fleece Adhesive Cartridge 1106 4icase 306.25 OMG OlyBond 500" eece Adhesive Ba_ ox Set p 1107 100 Set 745.25 NOTES: a drop -ship item. HESIVE ACCESSORIES Drop -Ship Orr 1W° ill-DeAktion Item # Price/Each Duro-Grip Hose Kit 1109-001 170.50 Duro-Grip Nozzles (10/ha) 1109-002 49.60 juro-Grip CR -20 Colorwise Fan Tip Nozzle 8/bag 11050 28.50 Duro-Grip CR -20 Colorwise Fan Tip Nozzle 25/baggy" 11051 57.65 1 uro-Grip CR -20 170 Refillable Tank Gun /&" 100' Hose Applicator 11039 225.65 Duro-Grip CR -20 170 Refillable Tank Regulator Assembly wl Hoses 11040 788.65 Duro-Grip CR -20 17G Refillable Tank Calibration Nozzles 6/Pack 11044 27.25 Duro-Grip CR -20 17G Refillable Tank Calibration Nozzles 25/Pack 11045 67.50 Duro-Grip CR -20 17G Refillable Tank Colorwise Mixing Nozzles 10/Pack 11041 49.60 Duro-Grip CR -20 170 Refillable Tank Colorwise Mixing Nozzles 25/Pack 11042 104.75 Duro-Grip CR -20 170 Refillable Tank Small Gram Scale 11047 125.85 Duro-Grip CR -20 170 Refillable Tank PSI "PolySoly" Aerosol Cleaner 11046 345.95 Duro-Grip CR -20 170 Refillable Tank Cart Transporter 11048-001 2,694.99 TRUFAST Roofing Adhesive Hose and Gun 11052 170.50 TRUFAST Roofing Adhesive Mixing Tip Pack 11053 29.75 OMG Pace Cart 3 1099-003 10,453.49 OMG Hand Applicator 1096 208.49 OMG Stand -Up Applicator 1097 433.99 OMG Power Applicator 1098 1,180.99 Powerblanket Bucket Heaters 5 GL 12033 345.50 Powerblanket 17G Foam Cylinder Warmer 12034 560.50 Powerblanket Hot Box 48" x 48" x 48" 12035 2,703.00 Powerblanket Tote Heaters 48"x48"x48" 12036 1,594.50 Powerblanket Tote Heaters 48"x40"x53" 12037_ 1,789.00 Powerblanket 40 lb Cylinder Warmer 12038 613.60 7 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI . Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX_. Ludlow, MA 30 UNDERLAYMENTS AND VAPOR BARRIERS UNDERLAYMENT Description item # Roll Size Price/Each Duro-Weave Slip -Sheet CLR 1292-155 10' x 360' 222.10 Duro-Blue" Slip -Sheet 1292-050 20' x 100' 104.40 Duro-Blue Slip -Sheet 1292-100 20' x 360' 349.45 Atlas FR -10 Slip -Sheet 1290 48" x 250' 236.80 GAF Solo Fire -Retardant Slip - Sheet 1290002 6' x 166.67' 436.85 Geotextile 1298 15' x 360' 519.75 Ballast Mat 1293 12' x 100' 223.35 Drainage Mat 1533 4' x 100' 508:99 DURD-GUARD° XPS & EPS Description Item # Sheet Size Price/Each Duro-Guard XPS Crush Fold 1295 4e x 50' x Sia' 52.49 Duro-Guard EPS Fan Fold 38142 i 4e' x 50 x112" 70.49 DURO-LAST VAPOR BARRIER PRODUCTS Description Item # Size Price/Each Duro-Last Vapor Barrier 1344 45" x 133' 299.60 Sopramastic 1346 10.5 oz cartridge 20/case10.80 call for price Duro-Last VB Primer 1345 5G Pail 216 Duro-Last Torch -Down Vapor Barrier 1347 39.4" x 49,2' 9 Duro-Last TDVB Primer 1348 / 5G Pallid.,137.30 DURO-LIGHT'" SKYLIGHT SERIE Delivered direct to you from the manufacturer. Manufacturing lead times and ship dates are subject to the skylight manufacturer. Manufacturing lead times and ship dates are subject to the skylight manufacturer. For pricing and availability email iestimating'duro-last.com or contact the Insulation Team at 1-800-248-0280. HATCHES Drop -Ship Only; Contact the Insulation Team for pricing. Description Item # Size Price/Each Bileo Hatch S-20 (Steel) 9 Series 701600 3' x 2'6" call for price Bilco Hatch 8-50 (Aluminum) 9 Series 701801 3' x 2'6" call for price Bilco Hatch S-50TB 701803 3' x 2'6" call for price 02107/2022 DURO-GUARD INSULATION ISO Duro-Guard 13011 --limited stock in Duro-Last plants Duro-Guard ISO III CG Duro-Guard ISO HD Duro-Guard ISO HD Composite Duro-Guard ISO Flat — HP Duro-Guard ISO NB Duro-Guard ISO Foil EPS Duro-Guard EPS Type 1 Duro-Guard EPS Type 11 Duro-Guard EPS Type VIII Duro-Guard EPS Type IX Duro-Guard EPS Fan Fold Duro-Guard EPS Fiberglassfcer Duro-Guard EPS Nal Base Duro-Guard HD ISO + EPS Duro-Guard EPS Type I, II, and VIII Flute Fi r Duro-Guard EPS Flute Fill Combo DensDeck® DensDeck2 Roof Board DensDeck® Prime Roof Board SECUROCK® Gypsum -Fiber Roof Board Glass Mat Roof Board DEXceil® DEXceIfLS Glass Mat DEXceIl® FA Glass Mat DEXcell® Cement Roof Board Everboard Everboard Paper -Face Everboard Fiberglass NOTES: • To Quote or Order Insulation, please contact the Insulation Team at 1.800.248.1280. • For complete technical information, product data sheets, code compliances and approvals visit www.duro-last.camlinsulation. • Delivered direct to you from the manufacturer. • All orders will be rounded up to a full pallet. 19 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX • Ludlow, MA 31 ADDITIONAL ROOF COMPONENTS VINYL RIB SYSTEM Drop -Ship item with a 12 week lead time Minimum order quantity -2,000 Description Item # Price/Lineal Ft Price/Lineal Ft. Price/Lineal Ft 6.99 KnuckleHead Lite Pipe Support wi Cap 2,000-4,999 5,000-19,999 20,000 + Duro-Last White 1895 4.64 2.99 2.07 Duro-Last Gray 1896 4.64 2.99 2,07 Duro-Last Tan 1897 4.64 2.99 2.07 Duro-Last Dark Gray 1899 4.64 2.99 2.07 Duro-Last Terra Cotta 1894 4.64 2.99 2.07 DT Light Tan 1887 4.64 2.99 2.07 DT Patina 1889 4.64 2.99 2.07 DT Green 1890 4.64 2.99 2.07 DT Blue 1891 4.64 2,99 2,07 DT Light Gray 1892 4.64 2.99 2.07 DT Charcoal 1893 4.64 _2.99 2.07 KNUCKLEHEAD PIPE STANDS Description Item # PricelEach KnuckleHead Roof Protection Pad 21368 6.99 KnuckleHead Lite Pipe Support wi Cap 21369 12.99 KnuckleHead Heavy Pipe Support w/ Strap 21370 14.99 KnuckleHead Strut Support 21371 11.49 KnuckleHead Base 9" Extension Assembly 21372 6.49 KnuckleHead Base 18" Extension Assembly 21373 21.49 DURO-LAST PROTERMTM'.IAOPALL Stocked in.MNfichigan Onl Description Item #k IEP ProTenn rr" 7.2 Panel ction 124011 9.80 ProTermm Classic Rib Panel 3' Section 124022 19.80 ProTem'i PBR Panel 3' Section .124033 19.80 LADDERANCHORTr Description Item # Price/Each White w/ 4 Butterfly Corners 1219W 489.49 Tan wf 4 Butterfly Comers 1219E 489.49 Gray w/ 4 Butterfly Corners 1219G 489.49 Dark Gray w/ 4 Butterfly Comers 1219DG 489.49 White EV w/ 4 Butterfly Corners 1219EV 489.49 White w/ 4 Butterfly Corners & Gutter Ext 2219W 657.99 Tan w/ 4 Butterfly Corners & Gutter Ext 2219E 657.99 Gray w/ 4 Butterfly Corners & Gutter Ext 2219E 657.99 Dark Gray wi 4 Butterfly Corners & Gutter Ext 2219DG 657.99 White EV wf 4 Butterfly Comers & Gutter Ext 2219EV 657.99 02/07/2022 TOOLS SCREW GUNS AND DRILLS Description Item # Price/Each Hlti Screw Gun ST -1800 1273 340.99 Hilti TE -7C Rotary, Hammer Drill 1276-007 579 99 Milwaukee M18 FUEL T" 1/4" Hex Impact Driver Kit 12765 320.95 Rhino -frac Tool 1974 4,881.49 RhinoTrac Boot 1974-001 2,769.99 Acculrac® Tool 1972 2,664.99 AccuTrac® Plates 3" 1000/box 1866 300.00 Tool 1973 3,436.49 ,AccuSeam® AccuSeam® Boot 1973-001 1,504,99 AccuSeam® Plates 2-3/8" 1000/box 1867 300.00 DURO-LAST QUICK-PULLTM & GRIPULL PARTS Description Item # Price/Each Duro-Last Quick-PuIITh' 18011 467.49 Duro-Last Quick-PullReplacement Cable 18013 17.49 Duro-Last Cuick-PullTM Front Replacement Pad 1$015 6.99 Duro-Last Quick-PuIITM Re eplace ni Pad 18014 6.99 GriPull Replacement -Cable 1801 22.99 GriPull Ext ion Pulley 1802 7.49 GriP ear Pulley 1803 7.49 Pull Vise Kit 1786 42.99 GriP rip Pliers ' 1805 40.49 GriPul Vis Locking Nut 1805-001 3.49 GriPuil Handl 1806 41.99 GriPull Contact acket Set ' 1785 21.99 Push Link Ass: ly Kit 1787 46.49 1 -uull II Extensi• r' ube Assembly Kit 1788 64.49 ,GriPull'J" Clip (2 required) 1791 0.99 G ' ale" E Clip {2 required) 1792 1.49 riPull Handle Pivot Pin 1794 6.99 GriPult Handle Grip 1794-001 4.99 GriPull Rear Pulley Shaft 1795 8.49 GriPull Rear Pulley Spacer 1796 6.99 GriPullW x 1" Link Pivot Pin w+ 3/16" x'/." Cotter Pin 1797 3.49 GriPull Roller Shaft Rollers (2)8, A" E -Clips (4) 1798 9.49 GriPull '1," x 1' - " Extension Pulley Pin w/Caner Rinq'2- 1799 3,49 GriPull 15/16' Retaining Ring 1807 3.49 GriPull Cable Guide 1808 6.99 GriPull 3/16" x 1" Spring Pin 1809 0.99 GriPull 3116` x Vise Grip Pm with 3118 x 314" Cotter Pin 1809-001 2,99 20 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR s Sigourney, IA • Carrollton, TX • Ludlow, MA 32 T -EDGE ADVANCED T -EDGE ADVANCED "Face" once includes cleat and hook strip. Cleat is required for all sizes. Description Item # Price/Ft. 2" Face 7320206 12.25 2" Cleat 733020624 5.74 3" Face 7320306 13.04 3" Cleat 733030624 5.97 4" Face 7320606 13.83 4" Cleat 733060624 6.18 5" Face 7320706 14.60 5" Cleat 733070624 6.39 6" Face 7320806 15.39 6" Cleat 733080624 6.60 7" Face 7320906 16.18 7" Cleat 733090624 6.83 8" Face 7321006 16.94 8" Cleat 732100624 7.04 Hook Strip 7340006 6.90 MISCELLANEOUS EDGE DETAILS EDGE EXTENDER Description Item # Price/Ft. 3" Face 6400306 2.65 4" Face (Need Cleat) 6400606 2.95 5" Face (Need Cleat] 6400706 3.10 6" Face (Need Cleat) 6400806 3.40 7" Face (Need Cleat) 6400905/ 3.65 8" Face (Need Cleat) 6401006 3.90 31/2" Cleat 593040524 or 1.65 DURO-FLA (10' ienglhs REGLET 10' lengths! Description Item # Price/Ft. 5" One -Piece Reglet 6423606 3.55 5'/" Two -Piece Reqlet 6423706 7.90 COUNTER FLASHING 10' lengths Description Item # Price/Ft. 5'l:" Surface Mount Counter Flashing 6433806 3.40 VINYL COATED METAL Description Item # Price/Ft. White 4' x fi0' Sheet 1603 186.00 Tan 4' x 10' Sheet 1603E 186.00 Gray 4' x 10' Sheet 1603E 186.00 Dark Gray 4' x 10' Sheet 1603DG 186.00 Light Tan 4' x 10' Sheet 1603LT 186.00 Light Gray 4' x 10' Sheet 1603LG 186.00 Charcoal 4' x 10' Sheet 1603CH 186.00 Midnight Bronze 4' x 10' Sheet 1603MB 186.00 NOTES: • _023" thick (25 sheets per • = et). D RO-EDGE Description Item'# Price/Ft. Duro-Edge White 64408066601 9.30 Duro-Edge Tan 64408066602 10.15 Duro-Edge Gray 64408066603 10.15 Duro-Edge Dark Gray 64408066604 10.15 Duro-Edge Custom 64408 Call EM for pricing Description Item. calk 12" White Skirt 64103066601 7.10 12" Tan. Skirt 64103066502 7„9" 12" Gray skirt 64103066403' 7.95 12" Dark Gray Skirt 64103066304 7.95 Duro Flash Il Custom 3 *call EM for price 0210712022. 24 All prices subject to change without notice. All prices listed are FOB in USD. Saginaw, MI • Jackson, MS • Grants Pass, OR • Sigourney, IA • Carrollton, TX • Ludlow, MA 33