SS:OAD:
ARI ONNEKANTI
TAFF PONSOR RIGINAL GENDA ATE
Public Works Fleet and Facilities Tenant Improvement Project
AIT
GENDA TEM ITLE
Contract 18-197, Amendment No. 5
C Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
ATEGORY
Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
Ɏ
S Council Mayor HR DCD Finance Fire TS P&R Police PW Court
PONSOR
S
SHKS Architects is performing architectural design and planning services for the Public
PONSORS
S
Works Project as part of the Tukwila Public Safety Plan. Amendment No. 5 is for services
UMMARY
which includes design and construction oversight for the roofing enhancement, envelope
painting/repair, and addition of detached storage buildings at the Public Works Fleet and
Facilities property. Council is being asked to approve Amendment No. 5 with SHKS
Architects in the amount of $130,000.00 with a total contract amount of $1,056,390.00.
R
EVIEWED BY
Trans&Infrastructure CommunitySvs/Safety Finance Comm. Planning/Economic Dev.
LTAC Arts Comm. Parks Comm. Planning Comm.
06/21/22KK
DATE: COMMITTEE CHAIR:
ATE RULLER
RECOMMENDATIONS:
Public Works Department
S/A.
PONSORDMIN
C
Unanimous Approval; Forward to Special Consent Agenda
OMMITTEE
COST IMPACT / FUND SOURCE
AB AR
ER
XPENDITURE EQUIRED MOUNT UDGETEDPPROPRIATION EQUIRED
$
130,000.00 $$
10,750,008 0.00
Fund Source:
#®¬¬¤³²Ȁ
MTG. DATE
RECORD OF COUNCIL ACTION
06/27/22
MTG. DATE
ATTACHMENTS
06/27/22 Informational Memorandum dated 06/17/22
SHKS Architects Amendment No. 5
SHKS Architects Scope of Work and Fee EXHIBIT A
Minutes from T Committee meeting of 06/21/22
239
240
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Services Committee
TO:
Hari Ponnekanti, Public Works Director / City Engineer
FROM:
Justine Kim, Senior Project Manager, Shiels Obletz Johnsen, Inc.
BY:
Mayor Allan Ekberg
CC:
June17, 2022
DATE:
Public Works Fleet and Facilities Tenant Improvement Project
SUBJECT:
Project Number91630601,
Contract 18-197,Amendment No. 5
ISSUE
Approve Amendment No. 5toContract No. 18-197 with SHKSArchitectsfor the Public Works Fleet
and Facilities Tenant Improvement Project.
BACKGROUND
Plan. This project was most recently updated in the 2021-2022 Adopted Budget. The City chose a site in
2017, purchased properties in 2018 and began Phase 1 design and construction in 2019. Additional funding
is needed for the Public Works Fleet and Facilities Tenant Improvement Project (Phase 1 of the Public Works
Shop) of $1 million to complete exterior work (roofing work, exterior envelope,and covered storage), as was
discussed at Transportation and Infrastructure Services Committeeon April 4, 2022. At the April 11, 2022
Committee of the Whole meeting, Council provided their consensus to proceed with this funding plan as
outlined.This amendment is one of the steps in proceeding with the funding plan, specifically related to
architectural services.
TheCity of Tukwila hired SHKS Architectsto perform architectural design and planningservices forthe
Public WorksProjectas part ofthe Tukwila Public Safety Plan, in the amount of $299,997.00.Amendment
No. 1 was for additional services and fees for preparing permit and bid documents, obtaining demolition
permits, and construction contract administration for the demolition of two existing buildings on the City of
Tukwila Public Works future site, in the amount of $16,500.00.Amendment No. 2 provided Schematic
Design, Design Development, Construction Documents, Bidding, Construction Administration, and Project
Closeout services related to Public Works project in the amount of $570,768.00. Amendment No. 3 provided
continued construction administration time beyond basic services,in the amount of $39,125.00.Amendment
No.4 was a no cost, time extension amendment to extend the contract end date to December 31, 2022.
ANALYSIS
Amendment No. 5is for services which includes design and construction oversight for the roofing
enhancement, envelope painting/repair,and addition of detached storage buildings at the Public
Works Fleet and Facilities property.These services will include preparing design, permit (as
applicable) andRequest for Change Order Proposaldocuments for the Tukwila Public Works
Shops roofing enhancement, envelope painting/repair and detached storage buildings project.
FISCAL IMPACT
The expenditures associated with these tasks are anticipated and are included in the Council
approved project budget. SHKS Architectshas provided an hourlycost, not to exceed
$130,000.00,to perform the additional servicesin Amendment No. 5.Thetotal contract amount
will now be $1,056,390.00.
241
INFORMATIONAL MEMO
Page 2
A.Original Contract Master Planning & Programming$299,997.00
B.Amendment No. 1 Bid documents, demolition permits & $16,500.00
construction contract administration
C.Amendment No. 2 Schematic Design, Design Development, $570,768.00
Construction Documents, Bidding, Construction Administration,
and Project Close-Out
D.Amendment No. 3 Additional Construction Administration, $39,125.00
Tukwila Public Works Scope additions/revisions
E.Amendment No. 4 No Cost, Time Extension Only$0.00
F.Amendment No. 5 $130,000.00
Design/Construction oversight for
Roofing Enhancement, Envelope Repair, Addition of
Detached Storage Buildings
New Contract Amount$1,056,390.00
RECOMMENDATION
Council is being asked to approve Amendment No. 5 to Contract No. 18-197 with SHKS Architects in
the amount of $130,000.00and to consider this item on the Consent Agenda of the June 27, 2022,
Special Council Meeting.
Attachments:
SHKS ArchitectsAmendment No. 5
SHKS Architects Scope of Work and Fee EXHIBIT A
242
Agreement Number: 18-197(e)
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
CONTRACT FOR SERVICES
Amendment No. 5
Between the City of Tukwila and SHKS Architects
That portion of Contract No. 18-197 between the City of Tukwila and SHKS Architects is
hereby amended as follows:
Section 1 Project Designation: The Consultant is retained by the City to perform
Architectural Design, Planning and Close-Out services in connection with the project titled
Tukwila Public Works Facility project (“Project”)
.
Section 2 Scope of Services: The Consultant agrees to perform the services, identified
on Exhibit “A” attached hereto, including the provision of all labor, materials, equipment
and supplies.
Section 4 Payment. The Consultant shall be paid by the City for completed work and for
services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be made as provided on Exhibit "A"
attached hereto, provided that the total amount of payment to the Consultant shall not
exceed $1,056,390 (including estimated expenses) without express written modification of
the Agreement signed by the City. The total fee for additional services related to
Amendment No. 5 are $130,000.
All other provisions of the contract shall remain in full force and effect.
Dated this ________ day of ___________________________, 2022
CITY OF TUKWILA CONSULTANT
_
Allan Ekberg, Mayor Jonathan Hartung, Principal
ATTEST/AUTHENTICATEDAPPROVED AS TO FORM
Christy O’Flaherty, MMC, City ClerkOffice of the City Attorney
Page 1 of 1