HomeMy WebLinkAboutPlanning 2022-08-25 ITEM 5 - PUBLIC HEARING - PROSE SOUTHCENTER: 130 ANDOVER PARK EAST MIXED USE DESIGN REVIEW - STAFF REPORT STAFF REPORT TO THE BOARD OF ARCHITECTURAL REVIEW Design Review for Prose Southcenter Prepared for the August 25, 2022 Meeting FILE NUMBER: L22-0032 (Major Design Review) APPLICANT: Rob Anderson, Alliance Residential Company REQUESTS: Design review and variances from the required parking and open space standards to construct a seven-story mixed-use apartment building, to include 285 dwelling units and 313 parking spaces. LOCATION: 130 Andover Park E, APN: 0223100040 COMPREHENSIVE PLAN/ ZONING DESIGNATION: Tukwila Urban Center – Transit Oriented Development SEPA DETERMINATION: The project is covered under the Southcenter Subarea Plan FEIS and a SEPA Urban Center Project checklist has been included with this Staff Report as an attachment. Project-specific development proposals within the Southcenter Subarea are not subject to individual SEPA review provided they are consistent with the subarea plan, development regulations, and the SEIS. STAFF: Breyden Jager, Associate Planner ATTACHMENTS: A. Plan Set 1. Title Sheet (Sheet ADR 0.01) 2. Site Plan (Sheet ADR 1.00) 3. Floor Plans (Sheets ADR 1.01 – ADR 1.04) 4. Exterior Lighting Plan (Sheet ADR 1.10) 5. Open Space Diagrams (Sheet ADR 1.31) 6. Building Elevations (Sheets ADR 3.00 – 3.03) 7. Perspective Renderings (Sheets 4.01 – 4.04) 8. Landscape Plans (Sheets L1.01 – L2.00) 9. Frontage Improvement Plan (Sheet ADR C03) B. Applicant’s Response to the Design Review Criteria, including Open Space Variance Request C. Applicant’s Response to Parking Variance Criteria 11 L22-0032 Staff Report 8/25/2022 2 REPORT ORGANIZATION TMC 18.104.030 allows all permit applications related to a single project to be consolidated in a single hearing and approval procedure, using the highest numbered land use decision type applicable to the project application. Public hearing design review is a Type 4 decision made by the Board of Architectural Review (BAR). A request for a parking reduction for residential development within 1,320 feet of either the Sounder or Tukwila Bus Transit Station is a Type 2 Special Permission Decision made by the director. A request for an open space reduction for commercial or residential uses is also a Type 2 Special Permission Decision made by the director. The parking reduction and open space reduction are being combined with the design review for decision by the Board of Architectural Review. This staff report has been organized to include background information pertaining to these applications first, followed by three sections covering the parking reduction, open space reduction, and design review criteria. Staff conclusions and recommendations follow each section. BACKGROUND Project Description The project proposes to redevelop a 1.85-acre lot located at 130 Andover Park East. The proposal includes a seven-story, 373,045-square-foot, mixed-use apartment building, to include 285 dwelling units and 313 parking spaces. Associated site improvements include indoor and outdoor open space, landscaping, and frontage improvements along Baker Boulevard, Andover Park East, and Christensen Road. The existing three-story building will be demolished. The project is located within the Tukwila Urban Center-Transit Oriented Development (TUC-TOD) zoning district. TMC 18.28.040 describes the TUC-TOD district as the area extending from the bus transit center on Andover Park West eastward towards the Sounder commuter rail/Amtrak station is intended to provide a more compact and vibrant mix of housing, office, lodging and supportive retail and service uses. Parking will be accommodated by a combination of off- and on-street parking spaces/lots. The overall structure of the TOD Neighborhood will be characterized by moderate development intensities and building heights. A fine-grained network of streets with pedestrian amenities will increase the walkability of the area. The project location is outlined in blue in Figure 1 below. Figure 1: Project Location N 12 L22-0032 Staff Report 8/25/2022 3 Existing Development The subject property is located at the northeast corner of Baker Blvd. and Andover Park E. The site is currently occupied by a three-story office building, which was constructed in 1970; the existing structure is proposed to be demolished. The subject site is zoned Tukwila Urban Center – Transit Oriented Development (TUC-TOD). Andover Park E and Christensen Rd., which run along the site’s western and eastern frontages respectively, are both classified as Neighborhood Corridors. Baker Blvd., which runs along the southern site frontage, is classified as a Walkable Corridor. Figure 2: TUC Corridor Map Surrounding Land Uses All adjacent properties are zoned TUC-TOD. To the north, west and south are commercial and office uses, with a residential use across the intersection of Andover Park E and Baker Blvd to the southwest. To the east are office uses bounded by the Green River. Topography & Vegetation The parcels are generally flat. Much of the existing development consists of impervious surfaces (building, parking lots) with landscaped areas which include a variety of trees near the base of the building and the site perimeter. No sensitive areas have been identified onsite. 13 L22-0032 Staff Report 8/25/2022 4 PARKING VARIANCE PROJECT DESCRIPTION The applicant is requesting a reduction in the required number of residential parking stalls for a new, seven- story apartment building with 285 dwelling units. The proposed reduction to the required number of parking stalls is 2 percent (5 stalls); a total of 318 residential parking stalls are required per code and 313 are proposed. BACKGROUND Parking requirements within the TUC-TOD are depicted in Table 18-5 of the Tukwila Municipal Code. For regular residential development, one parking space per unit is required for studios and one-bedroom units. For units with two bedrooms, 1.5 spaces are required. The following table includes a breakdown of the number of studios, one bedroom, and two-bedroom units proposed in Prose Southcenter. Per 18.26.260(5)(b), parking requirements for residential development within 1,320 feet of walking distance of the Sounder transit station or the Tukwila Bus Transit Center may be reduced or modified. The distance from the project site to the Tukwila Bus Transit Center is approximately 1,100 feet. The applicant has requested that the City consider the Fire Code requirement to locate both a dedicated fire sprinkler room and a fire command room located at the ground level of the building. In discussion with Fire Marshall Andy Nevens, the location of the proposed FCC and Sprinkler Room were relocated to a more preferred location along Andover Park E. In order to accommodate these spaces, five parking stalls were lost from the original design. DECISION CRITERIA TMC 18.56.140(B) contains the criteria used to evaluate all requests for reductions in parking. The criteria are listed below, followed by a discussion of the project as it relates to each. A. All shared parking strategies are explored. Applicant’s Response: This property has benefitted from a permit with the City of Seattle related to an SPU waterline to the adjacent north since at least 1992 providing for parking and vehicle access purposes. The applicant intends to renew this permit upon closing on the real estate, which is anticipated to provide up to 30 shared, surface parking stalls that would serve this site. Additionally, this project is providing dedicated, secure bike parking to encourage residents reduce dependency on resident driven automobiles. Staff Response: Staff concurs with the response provided by the applicant. The project meets the criteria. B. On-site parking and ride opportunities are fully explored. 14 L22-0032 Staff Report 8/25/2022 5 Applicant’s Response: As this project is located the in the TOD, public transportation is plentiful and conveniently located. Andover Park E is a frequent, all-day route for buses with 9 bus stops located within a two-block radius from the site, and the Tukwila Light Link Station is located .7 miles from the project site. Additionally, a transit center serving Rapid Ride and other bus lines is located at the intersection of Andover Park E and Baker Blvd, directly to the southwest of the proposed project. Staff Response: Staff concurs with the applicant. Neighborhood retail as well as more general shopping, dining, and recreation opportunities are within walking distance of the project site. The Tukwila Transit Center is located within walking distance of Prose Southcenter, which connects the Southcenter area to the region via bus routes. The project meets the criteria. C. The site is in compliance with the City’s commute trip reduction ordinance or, if not an affected employer as defined by the City’s ordinance, agrees to become affected. Applicant’s Response: The City of Tukwila’s goals for reductions in the proportions of drive-alone commute trips and vehicle miles traveled align well with the applicant’s desire to add significant housing density to a highly commercialized area. While maximizing the site area of the property to supply high- quality, attainable housing, the project intends to support the housing needs of the strong employment base already in Southcenter. Staff Response: Approval of this administrative parking variance will require that the site participate in the City's CTR program. However, the CTR program only addresses trip reduction for employees commuting to and from work. Staff recommends as a condition of approval that both employees and residents of Prose Southcenter become part of the City’s CTR Program to manage transportation demand at the project site. In order to participate in the CTR program, Prose Southcenter will be required to develop a Transportation Management Program (TMP) for the site, which will outline the specific activities and elements that will be implemented to reduce drive-alone trips and vehicle miles traveled. The TMP for Prose Southcenter shall be required to be submitted and finalized prior to final inspection of the Development Permit. The site will be required to submit an annual program report on TMP activities and progress toward meeting TMP goals to the City of Tukwila. D. The site is at least 300 feet away from a single-family residential zone. Applicant’s Response: This project is located over 300 feet from any single-family residential zone. Staff Response: Staff concurs with the response provided by the applicant. The project meets the criteria. E. A report is submitted providing the basis for less parking and mitigation necessary to offset any negative effects. Staff Response: The applicant has submitted a narrative (attachment D), which provides the basis for the parking reduction, as well as responses to the specific project approval criteria, as noted above. CONCLUSION The proposal for a parking variance is consistent with TMC 18.28.260(5)(b) to allow reduction to the amount of parking for residential developments within 1,320 feet walking distance of the Tukwila Bus Transit Center. RECOMMENDATION Staff recommends approval with the following condition: 15 L22-0032 Staff Report 8/25/2022 6 1. The applicant shall ensure that decreased parking will not have a negative impact on surrounding properties by implementing an effective parking management plan and participation in the City’s Commute Trip Reduction (CTR) program. The site’s required participation in the CTR program shall include both the employees and the residents of Prose Southcenter. The Transportation Management Plan (TMP) for Prose Southcenter shall be required to be submitted and finalized prior to final inspection of the Development Permit. Additionally, the applicant shall be required to submit an annual report showing compliance with the CTR program. OPEN SPACE VARIANCE PROJECT DESCRIPTION The applicant is requesting a reduction in the amount of required residential open space. The proposed reduction to the required amount of open space is 18 percent or 3,958 square feet; a total of 22,264 square feet of open space is required per code and a total of 18,306 square feet is proposed. BACKGROUND Open space requirements vary by use and zoning district. Open space requirements for residential uses within the TUC-TOD are depicted in Table 18-4 of the Tukwila Municipal Code. For residential development, a minimum of 10 percent of the residential unit floor area must be provided as open space and may be any combination of common or private open space. The following table includes a breakdown of the total proposed floor area of the structure, separated by use and function. The project proposes to provide 18,306 square feet of open space across four locations throughout the development. These locations include 1,812 square feet of open space in the southwest corner of the first floor, near the entrance, 1,666 square feet of open space in the southwest corner of the second floor, above the entrance, 12,288 square feet of open space in a central open-air courtyard on the third floor and 2,540 square feet of open space along a northern balcony, also on the third floor. The following open space diagrams depict these areas. 16 L22-0032 Staff Report 8/25/2022 7 Figure 3: Open Space Diagrams DECISION CRITERIA TMC 18.28.250(D)(4)(d) contains the criteria to evaluate requests for reductions to open space. The criteria require allow the applicant to propose an alternate solution that meets the intent of the regulations if it is demonstrated that compliance with the open space regulations would create substantial practical difficulties for a site. 1. The applicant shall submit evidence to the Director that addresses the difficulties of meeting the regulations, the proposed alternative solution, and how the proposed solution meets the intent of the applicable open space regulations. The applicant has stated that “the design focus of the project is to provide as much well-designed housing as possible, while offering inviting open spaces and amenities for residents. Given the density of the proposed residential building, it is difficult to allocate the required 22,662 square feet of open space while still providing high quality, sufficiently sized housing units.” Additionally, the applicant has stated that they believe the proposed landscaping and benches provided along each street frontage, approximately 750 linear feet along the building exterior, would be sufficient in meeting the intent of the code to provide functional and desirable amenity spaces for the residents. Approval of an open space reduction must also demonstrate that none of the following approaches would provide relief: A. The square footage of all streets built per TMC Section 18.28.140, “New Streets,” may be counted toward meeting the provision of open space requirements for pedestrian space. They may not be used to satisfy common and/or private open space for residential uses. This criteria does not apply, as no new streets are proposed and the requested deviation is to satisfy residential open space requirements. 17 L22-0032 Staff Report 8/25/2022 8 B. The Director shall give credit for existing on-site open space amenities that meet the requirements of this section toward the open space square footage triggered by the new construction or change of use. This criteria does not apply, as no existing on-site open space amenities will be preserved after the project is complete. C. At the discretion of the Director, required pedestrian space for commercial uses or residential common open space may be constructed off-premises and/or as part of a larger open space being provided by the City or other private developments within that District or within 1,000 feet of the project premises. The applicant’s narrative does not address whether there is a feasible location for open space to be provided off-premises or as part of another private development within the TUC-TOD district or within 1,000 feet of the project premises. However, the TUC-TOD district and site vicinity are currently heavily developed with commercial and residential uses and the City does not currently have any proposal for new open space within the TUC-TOD district or within 1,000 feet of the premises. 2. Applicants may request that up to 75 percent of their required pedestrian open space be provided indoors. The project meets this criterion. The project proposes to provide 16 percent (3,478 square feet) of the required open space indoors on the first and second floors, and 66 percent (14,828 square feet) of the required open space outdoors in the courtyard and balcony areas. CONCLUSIONS • The TUC-TOD district requires that 10% of a residential development be allocated as open space. o The proposed project will create 222,635 square feet of residential space, requiring 22,264 sf of open space to be located either on site, or as a part of an off-site open space. • The applicant is requesting a deviation from the open space requirement of 18%, proposing 18,306 square feet of open space instead of the require 22,264 sf. • The applicant’s reasoning for the deviation states, “Given the density of the proposed residential building, it is difficult to allocate the required 22,662 square feet of open space while still providing high quality, sufficiently sized housing units.” RECOMMENDATIONS After review of the project, the applicant’s criteria responses, and the options provided in Tukwila Municipal Code Chapter 18.28 and the Southcenter Design Manual, City staff do not believe the applicant has exhausted all opportunities to provide the required 10% of open space onsite. Other recent residential projects in the Tukwila Urban Center have managed to provide the required 10% of onsite open space; two examples include Sterling Southcenter (L17-0041), 415 Baker Blvd, which allocated 14,144 sf open space for 140,000 sf residential space, and Holden at Southcenter (L18-0087), 112 Andover Park E, which allocated 8,900 sf of open space for 83,800 sf of residential space. Staff recommends that the Board of Architectural Review encourage the applicant to explore additional options for providing the remaining 3,958 sf of required open space on site. Options set forth within TMC 18.28 include 18 L22-0032 Staff Report 8/25/2022 9 but are not limited to personal balconies, rooftop decks, or ground level gathering spaces near entrances. Staff is recommending, as a condition of approval, that any design and/or modification related to the required residential open space be reviewed and approved by City Staff prior to issuance of the Development Permit associated with this project. DESIGN REVIEW This project is subject to Board of Architectural Review approval under TMC 18.28.030.D. New residential buildings with more than 50 dwelling units are considered large-scale projects. As a large-scale project, the project is subject to the applicable district-based standards, corridor-based standards, supplemental standards in TMC Chapter 18.28 and the guidelines set forth in the Southcenter Design Manual. This discussion below is grouped into four sub-sections: District Based Standards; Corridor Based Standards; Supplemental Standards; and Southcenter Design Manual. The standards can be found online at: http://www.tukwilawa.gov/wp-content/uploads/DCD-Planning-TMC-18.28-Tukwila-Urban-Center.pdf The Southcenter Design Manual can be found at: http://www.tukwilawa.gov/wp-content/uploads/DCD-Planning-Southcenter-Design-Manual.pdf I. District-Based Standards Structure Height (TMC 18.28.070): The proposed building reaches a maximum height of 68-feet, 6-inches, which is in conformance with the building height restriction of 115-feet for multi-family developments which include frontage improvements in the TUC-TOD. Maximum Block Face Length (TMC 18.28.080): The project is in compliance as it does not exceed the 700’ maximum block face length for TUC-TOD. Side and Rear Setbacks and Landscaping Requirements (TMC 18.28.100-110): The proposed building does not meet the required 5-foot rear setback from the alleyway running along the north side of the site. However, TMC Table 18-3 states that side and rear setback and landscaping requirements may be waived as part of design review if Building and Fire Code requirements are met. The Building Division and Fire Department have reviewed and approved the project design per applicable Building and Fire Code requirements. II. Corridor-Based Standards Baker Blvd. is designated as a Walkable Corridor and Andover Park E and Christensen Rd. are designated as Neighborhood Corridors. See Attachments D and E for Commercial and Neighborhood Corridor standards summary sheets. 19 L22-0032 Staff Report 8/25/2022 10 Figure 4: Walkable and Neighborhood Corridor Frontage Example Public Frontage Standards (TMC 18.28.150): The proposed project meets the requirements for public frontage standards along all frontages, including streetscape width and landscaping. Andover Park E and Baker Blvd. are currently improved with existing sidewalks, which will be replaced with sidewalks which meet the public frontage standards. Christensen Rd. is currently unimproved, without sidewalks on the project side of the street. New 15-foot-wide pedestrian rights-of-way will be provided along all street frontages, with sidewalks and street trees provided at the back of the curb face, spaced approximately 20 feet on center, as is the Public Frontage standard for Neighborhood and Walkable Corridors. Figure 5: Neighborhood Corridor Public Frontage Figure 6: Walkable Corridor Public Frontage 20 L22-0032 Staff Report 8/25/2022 11 Building Orientation/Placement & Landscaping (TMC 18.28.160-.190): The proposed project meets building orientation standards. The building will be oriented toward all street frontages, with parking provided in a parking garage occupying the first and second stories. Architectural Design Standards (TMC 18.28.200): Neighborhood Corridor Architectural Design Standards Design Response Acceptable Partial Unresponsive N/A Façade articulation Increment Commercial/mixed-use maximum – 50 ft X Residential maximum – 30 ft X Major vertical modulation maximum – 120 ft X Ground level Transparency Commercial-use minimum – 50% X Table 1. Architectural Design Standards for the Neighborhood Corridor Walkable Corridor Architectural Design Standards Design Response Acceptable Partial Unresponsive N/A Façade articulation Increment Commercial/mixed-use maximum – 30 ft X Residential maximum – 30 ft X Major vertical modulation maximum – 120 ft X Ground level Transparency Commercial-use minimum – 75% X Table 2. Architectural Design Standards for the Walkable Corridor III. Supplemental Standards Special Corner Feature (TMC 18.28.220): The building is located on the northeastern corner of Andover Park E and Baker Blvd, and the northwestern corner of Christensen Rd. and Baker Blvd. The building is rectangular in shape and the corners have been chamfered to face both adjacent street intersections. Additionally, the corners are articulated through use of color, and an upper eyebrow at the top of the seventh-floor windows. The parapet along the corners is higher, in order to help differentiate the mass from the rest of the structure. Figure 7: Special Corner Feature 21 L22-0032 Staff Report 8/25/2022 12 Landscaping Types and General Landscaping Requirements (TMC 18.28.230-.240): Front yard landscaping requirements along Baker Blvd., Andover Park E, and Christensen Rd. include 15 feet of streetscape. Public frontage improvements are proposed to be constructed along all street frontages, consisting of a combination of street trees, landscaping, and sidewalk areas. The project meets the landscaping criteria and the landscape plan satisfies all requirements for proposed species, spacing and dimensional specifications. The City’s Urban Environmentalist has reviewed and approved the proposed landscape plans, with the following items to be addressed as part of the building permit approval: 1. Applicant shall ensure that all trees are 5' from utilities, over or above ground, see redlined landscape plan for one example called out. 2. Per TMC18.52.030, large and medium stature trees are required, except when there is insufficient planting area due to underground utilities. The applicant shall work with Puget Sound Energy to determine how planting large canopy street trees can be accommodated by discussing depth, size, and precise location of gas lines. Open Space Regulations (TMC 18.28.250): The project does not provide the required amount of open space to satisfy the TUC-TOD requirements. Retail uses in the TUC-TOD are required to allocate open space for new developments at an amount of 30 SF per 1,000 SF of building footprint, or a minimum of 100 SF. The project proposes to locate 250 SF of commercial open space in the form of a plaza at the northwest corner of the site, across the north side of the proposed access aisle. The applicant has explained that there are existing utilities in this location that cannot be relocated, which this open space must be designed around. However, TMC 18.28.250 requires that commercial open space contain seating areas and open on to pedestrian generators, such as entrances to stores or restaurants. As shown in the figure below, the applicant’s proposed commercial open space does not appear to contain any pedestrian amenities and is disconnected from the entrance to the retail space by an access aisle. As a condition of approval, staff recommends that the applicant be required to revise the project’s commercial open space design to meet the criteria of TMC 18.28.250, with regard to seating and site orientation. Figure 8 Proposed Commercial Plaza 22 L22-0032 Staff Report 8/25/2022 13 Residential uses within the TUC-TOD require that a minimum of 10 percent of the residential unit floor area must be provided as open space. As discussed earlier in this report, the applicant is requesting a reduction in the amount of required residential open space. The proposed reduction to the required amount of open space is 18 percent or 3,958 square feet; a total of 22,264 square feet of open space is required per code and a total of 18,306 square feet is proposed. Please see the previous section on page 6 for a discussion of the variance criteria. General Parking Requirements and Guidelines (TMC 18.28.260-.270): The proposed project provides 313 residential parking spaces, which is 2 percent less than the required 318 spaces to fulfill the parking requirements for residential uses in the TUC-TOD (1 space/unit for 1-bedroom units, and 1.5 spaces/unit for 2- bedroom units). As discussed earlier in this report, the applicant has requested a parking reduction based on the project’s proximity to the Tukwila Bus Transit Center. Please see the previous section on page 4 for a discussion of the variance criteria. The project provides 4 parking spaces for the retail use, which is 2 less than the 6 spaces required to fulfill the parking requirements for business service uses in the TUC-TOD. However, TMC 18.28.260 allows for a range of parking reduction opportunities. As a condition of approval, staff recommends that the applicant explore parking reduction opportunities based on the criteria in the “Parking Reductions” section in order to meet the intent of the Code. The project provides the required amount of residential bicycle parking, per TMC Table 18-7. A total of 1 space per 10 residential parking spaces is required, for a required total of 31 spaces. The project proposes 45 residential bicycle parking spaces. The project does indicate that the minimum required bicycle parking for bank uses is provided. A minimum of 2 spaces is required. As a condition of approval, staff recommends that the applicant shall provide a minimum of 2 parking spaces for the bank use. Site Requirements (TMC 18.28.280): Pedestrian circulation and access is accomplished through compliance with the TUC Corridor public frontage standards, which will require new sidewalks along all street frontages. The building entrances are oriented toward pedestrian connections in order to facilitate safe and efficient movement of pedestrians in and out of the structure. Pedestrian ramps are provided along the sides of each curb cut for accessibility. The project provides new streetlights along all proposed frontage improvements and building mounted lighting is provided to illuminate the façade and associated façade landscape areas. The refuse and recycling area is located within the building, and not visible from the streetscape. IV. Southcenter Design Manual The Southcenter Design Manual guidelines support and complement the community vision described in the Southcenter Subarea Plan, supplement and expand upon the design requirements in Chapter 18.28, and provide a flexible tool for quality and innovation. The Design Manual is organized into two main sections: Site Design Elements and Building Design. Site Design Elements covers a number of design topic areas, including Site Design, Service Areas and Mechanical Equipment, Lighting, Walls and Fences, and Open Spaces. The section on Building Design covers Architectural Concept, Entrances and Doors, Building Façade – Base and Top, Corner Treatments, Building Massing, Building 23 L22-0032 Staff Report 8/25/2022 14 Details and Elements, Building Materials and Colors, Windows, Weather Protection, Blank Walls, and Parking Structures. For each topic area, there are one or more Design Criteria, which can be general in nature. The Design Criteria explain the requirements for development proposals. They are the decision criteria by which the Department of Community Development decides whether to approve, condition or deny a project. The examples and explanations which augment each Design Criteria, provide guidance to the project applicant, to City Staff in reviewing a project proposal, and to the decision maker in determining whether the project meets the Design Criteria. A. Site Design/Elements 1. Site Design The intent of the site design/elements criteria is to encourage site design which is easily understood, appropriate to the area, takes advantage of unique opportunities, and is a positive element in the architectural character of the District within which it is located. The design criteria address various elements including: facilitation of traffic circulation by connecting through-streets; provision of safe, convenient, and connected pedestrian access; encouragement of harmonious visual character (where desirable); arrangement of buildings to enhance street frontages and the pedestrian environment; incorporation of open space and landscaping as a unifying feature; incorporation of screening, environmental mitigation, utilities and drainage as positive design elements; incorporation of opportunities for joint development of sites; and the use of site design to take advantage of and/or enhance views of and access to natural amenities such as the Green River. The project meets the design criteria. The building is brought up to the street, enhancing the street frontages and the pedestrian environment. Public frontage improvements will be constructed along all street frontages providing pedestrian circulation along the building perimeter. Building access is provided at the corner of Andover Park E and Baker Blvd, activating the streetscape, and facilitating circulation along the improved Neighborhood and Walkable Corridors. Proposed curb cuts providing vehicular access to the residential parking garage, as well as the bank use are proposed off Christensen, located as far from the intersection as possible. Parking spaces are located within a parking garage, occupying the first and second stories of the structure. Landscaping helps to soften the built environment and to screen the parking area and service station from adjacent rights-of-way, with additional landscaping located along the perimeter of pedestrian open spaces to provide screening from the parking area. 2. Service Areas and Mechanical Equipment The intent of the service areas and mechanical equipment design criteria is to minimize the potential negative impacts of service elements through thoughtful siting and screening while meeting functional needs. Design criteria include: service element location and design; minimizing public visibility of loading docks and service bays, location and/or design of utility meters; electrical conduit and other service utility apparatus; rooftop equipment screening; and concealment and design incorporation of downspouts. The project meets the design criteria. The refuse and recycling area is located within the building along the northern elevation, and not visible from the streetscape. Utility areas and loading zones are consolidated on the north end of the building, away from heavy traffic areas and away from public view. Rooftop mechanical equipment will be screened by parapets. A generator along the north elevation will be placed in an enclosure, and effectively screened from view of pedestrians and vehicular traffic. 24 L22-0032 Staff Report 8/25/2022 15 3. Lighting Site lighting should be designed to promote safety as well as enhance the nighttime appearance of buildings and landscaping. The project meets the design criteria. New street lighting will be provided along all street frontages and building- mounted lighting will illuminate the base of the building and associated landscape areas, providing pedestrian safety. Proposed building lighting includes downlit wall-mounted LED sconces and recessed can lighting in the metal weather protection canopies. Upward ground lighting is proposed only near the entrances, in order to accentuate pedestrian areas and assist in wayfinding. 4. Walls and Fences Walls and fences shall be designed to be compatible with the building, improve the appearance of the site, and improve safety. The main entrance to the building from Baker Blvd. features a half-height wall which conceals the accessible ramp up to the entry. The wall is to be constructed of concrete, which is a primary building material in the base of the structure. 5. Open Space Provide safe, attractive, and usable open spaces that promote pedestrian activity and enhance the setting and character of the development. As stated previously, the proposed project provides an insufficient amount of open space to satisfy the TUC-TOD requirements. Retail uses in the TUC-TOD are required to allocate open space for new developments at an amount of 30 SF per 1,000 SF of building footprint, or a minimum of 100 SF. Residential uses within the TUC-TOD require that a minimum of 10 percent of the residential unit floor area must be provided as open space. As discussed earlier in this report, the applicant is requesting a reduction in the amount of required residential open space. The proposed reduction to the required amount of open space is 18 percent or 3,958 square feet; a total of 22,264 square feet of open space is required per code and a total of 18,306 square feet is proposed. Please see the previous section for a discussion of the variance criteria on page 6. B. Building Design 1. Architectural Concept The architectural design criteria encourages building design with easily understood organization, an appropriate relationship to the site, and with a positive impact on the architectural character of the District within which it is located. Architectural design should unify the massing and components of a structure or structures on a site into a cohesive and consistent thematic or stylistic architectural character or style that is responsive to the functional requirements of the development. The design of the building is responsive to the functional requirements of the development. The common areas, bank use, and parking garage which occupy the first two floors of the building are clearly distinct from the residential use area on floors three through seven. The building incorporates a large amount of transparency on the first two floors, with a grid pattern of fenestration. The third through seventh stories utilize articulation and modulation to create a pattern that is distinguishable from the building’s base. The materials and façade are contemporary and classic, and the base and top form two separate expressions based on their respective 25 L22-0032 Staff Report 8/25/2022 16 proposed uses. The building is pushed to the street frontage along all sides, enhancing and activating the streetscape. 2. Entrances and Doors The primary entrance should be located and designed to represent the overall style and architectural character of the building and ensure a welcoming public face to the building. The project meets the design criteria. The primary entrance to Prose Southcenter is on the southwest corner of the building, facing the intersection of Baker Blvd. and Andover Park E. The entrance is accented by decorative patterned breezeblocks, situated just to the right of the front door. The design includes an overhead canopy and is recessed and cantilevered under the top residential stories of the structure. Just outside the entrance, steps and a ramp are provided with railings and a partial height concrete wall. Landscaping at the base of the building helps to soften the transition to the streetscape. All building entries are consistent with the overall character of the building. 3. Building Façade – Base & Top Create a building base where the horizontal articulation of the lower part of a building façade’s design establishes a human scale for pedestrian users and passers-by, and aesthetically “ties” a building to the ground. Create a “top” on buildings through a substantial horizontal articulation of the façade at the uppermost floor of the building to provide an attractive façade skyline and complete the upper façade composition. Rooflines should reflect the architectural style of the building and be a distinctive design element. Roof surfaces should be punctuated with varying roof forms to break up large massing of roof surfaces and/or to provide opportunities to daylight interior spaces. Roof overhangs for both flat and sloping roofs are encouraged to add depth, shadow and visual interest. Base Building design meets design criteria to provide a “base” for the structure. The design of the first two stories provides a base that anchors the building. The base treatment that is commercial in nature, with a large amount of glazing separated into a grid by concrete and metal columns and larger concrete wall areas. The design along the parking garage continues this grid pattern by utilizing concrete and decorative breezeblock walls. The upper residential stories cantilever over the base, creating a clear separation between the base and upper residential floors. Top While the roofline of the structure is reinforced by differing parapet heights and a variation in roofline, which break down the façade of the upper mass into sections, the “top” of the structure is not clearly defined enough to meet the intent of the design criteria in the Southcenter Design Manual. The criteria require that the uppermost floor “provide an attractive façade skyline and complete the upper façade composition.” Potential strategies to accomplish this design include providing an architecturally profiled cornice and/or expressed parapet cap to terminate the top of the parapet wall, as well as potentially providing roof overhangs to add depth, shadow and visual interest. Staff is recommending, as a condition of approval, that the applicant provide a revised design for the “top” of the structure, and that this design be reviewed and approved by staff prior to the approval of the Development Permit associated with this project. The below figures represent an example of designs for the top and base of the structure that satisfy the design criteria. These examples are from adjacent developments “Mariblu” at 411 Baker Blvd and “Holden” at 112 Andover Park E. 26 L22-0032 Staff Report 8/25/2022 17 Figures 9 and 10: Base and Top Examples within the TUC-TOD 4. Corner Treatments The design criteria serve to emphasize building corners at important intersections with a distinctive building element. The project meets the criteria. The building is located on the northeastern corner of Andover Park E and Baker Blvd, and the northwestern corner of Christensen Rd. and Baker Blvd. The building is rectangular in shape and the corners have been chamfered to face both adjacent street intersections. Additionally, the corners are articulated through use of color, and an upper eyebrow at the top of the seventh-floor windows. The parapet along the corners is higher, in order to help differentiate the mass from the rest of the structure. 5. Building Massing The use of horizontal and vertical modulation is required to maintain the desired human scale and character for the Southcenter area. The requirements encourage the design of building façades which incorporate interesting architectural details that add variety to the façade, animate the street presence, and are attractive at a pedestrian scale. The project meets the design criteria. The building design meets the façade articulation criteria by utilizing a mixture of window fenestration patterns, vertical building modulation, changes in roofline pattern that follow the modulation of the mass of the building, and changes in building materials, siding style, and color. The project is required to provide a major vertical modulation at a maximum interval of 120 feet. The project design accomplishes this by providing a 2-foot inset at most bedrooms which are emphasized by a change in material from gray fiber cement lap siding to white panel siding at the inset. The lighter colors are framed by a “sash green” tone around the entire inset, vertically and horizontally. 6. Building Details and Elements Detail elements are required to encourage the incorporation of design details and small-scale elements into building facades that are attractive at a pedestrian scale. The project meets the design criteria. The design incorporates a recessed entry with a decorative breezeblock pattern at the corner of Baker Blvd. and Andover Park E. Display windows divided into grids of multiple panes are provided along all elevations. Landscape trellises are provided along the east and south elevations. Metal weather protection canopies are provided along all street frontages at a minimum of 75 percent of the length of the façade. Building mounted light fixtures are provided in order to illuminate the building façade at night. 27 L22-0032 Staff Report 8/25/2022 18 Decorative, high-quality materials are provided in the form of natural tone fiber cement panels and metal coping. Decorative patterned breezeblocks are provided along the parking garage and building entrance. 7. Building Materials and Colors The use of natural materials that reflect our Northwest setting such as stone, local woods like cedar and fir, and functional materials like concrete, brick, and metal are encouraged. Wall cladding materials appropriate to the architectural style and building type shall be used. Authentic materials and methods of construction should be used to the degree possible. More than two colors and materials should be incorporated into each building’s design. Monochromatic schemes are discouraged. Color choices should include warm rich colors that reflect and complement the woodlands, water and open sky of the region; weathered wood and oxidized metal colors relate to industrial and agricultural influences. The project meets the design criteria. The proposal includes a range of contemporary neutral colors and earth tones. Along the base, natural cement breezeblocks and black fiber cement panels provide a simple and contemporary pattern of color serving the retail use and the residential entrances, which are accented by black metal trim. Along the residential floors, the recessed pane of the façade includes a white “snowbound” fiber cement panel, while the modulated areas include a grey “peppercorn” fiber cement lap siding. Fiber cement panels in “sash green” are used for accent along the base of windows and as a vertical element to provide visual interest along the façade. The same “sash green” siding is used on stair areas, which become vertical elements in the design. 8. Windows Ornamental framing and hardware should be used to provide a utilitarian opportunity for craftsmanship and decoration. Window frames and sills should be designed to be prominent and substantial in order to enhance openings and add additional relief. The project meets the design criteria for windows by utilizing window treatments that help articulate the function of different areas of the building. On the first two floors, street-facing facades include large windowpanes that are broken into grids using metal and concrete columns to maximize transparency at the pedestrian level. On residential floors 3-7, windows are modulated and recessed in areas to provide fenestration patterning. Residential floor windows utilize a repeating motif that is emphasized in a change of material from gray fiber cement lap siding to white panel siding at the inset. Lighter color insets are framed by a sash green tone color around the inset, vertically and horizontally. 9. Weather Protection Design buildings with non-residential ground floor uses to provide pedestrian weather protection along adjacent street front sidewalks and open spaces using awnings, canopies, or building overhangs such as porticos, covered porches and arcades. The project satisfies the criteria. The Walkable and Neighborhood Corridors require building orientation to the street and the proposed building design provides weather protection at least 6-feet in width along at least 75 percent of the street frontage. 10. Blank Walls Blank walls are not permitted facing streets, sidewalks, open spaces, or pedestrian pathways and instead shall be designed to provide visual interest and human scale. 28 L22-0032 Staff Report 8/25/2022 19 The ground level façade provides articulation along walls in the form of masonry breezeblocks, which break up large expanses of wall mass and allow light and air into the parking garage. Through the project review process, the applicant has added vertical trellises along the east and south elevations to provide visual interest along blank walls. There are two locations along the east elevation and two locations along the north elevation that meet the Southcenter Design Manual definition of a blank wall. However, these are locations where the parking garage doors, utility and refuse areas, and exterior parking area proposed along the façade. Due to the necessity of the functional design of the building, it is not possible to mitigate the effect blank walls in these specific areas. 11. Parking Structures Design parking structures which are part of a new development to be architecturally consistent with exterior elements of the primary structure, including roof lines, façade design and finish materials. Design ground floors of parking structures that front on Tukwila Pond or public streets in the TOD and Pond Districts to accommodate future office, retail or residential uses. The visual impact of parking garage areas along street frontages has been minimized and designed to match the pattern of window bays. The street level parking garage is broken up by concrete breezeblocks to provide a tactile and visually interesting method of relief from the concrete base, while securing the parking structure. Through the project review process, the applicant has added vertical trellises along the east and south elevations to provide visual interest along blank walls. A ground level commercial bank use has been proposed and considered in the design along the west elevation of the ground floor. V. Public Comments No public comments have been received regarding the project at the time of this report. CONCLUSIONS 1. District-Based Standards Structure height, length, and setback requirements are in compliance with the Tukwila Urban Center-Transit Oriented Development standards. 2. Corridor-Based Standards Public frontage, building orientation and landscaping, façade articulation, blank wall, weather protection, and transparency requirements have been fulfilled in accordance with the applicable Walkable and Neighborhood Corridor standards. 3. Supplemental Standards With the exception of open space and parking requirements, for which conditions of approval have been recommended to address, the project meets the criteria. Landscaping is in compliance with all TUC-TOD requirements and pedestrian access and circulation standards are met through installation of the proposed public frontage improvements. 4. Southcenter Design Manual a. Site Design Elements 29 L22-0032 Staff Report 8/25/2022 20 The proposal includes a site design which is easily understood, constructing public street frontage and bringing the building up to the street to enhance the pedestrian environment. Service areas and vehicular circulation are located on the back side of the building to screen them from view. Landscaping is located along the base of the building to soften the façade and break up blank walls. Site lighting is proposed along all street frontages and entry and building mounted lighting will increase pedestrian safety and wayfinding at nighttime. The design of the open space areas are still conceptual at this stage of the project, and the project currently does not meet the required amount of commercial and residential open space. Staff is recommending, as a condition of approval, that design details of these spaces be reviewed by staff and approved by the Director prior to Development Permit approval. b. Building Design The renderings demonstrate a cohesive style and high-quality design with ample modulation, articulation, and attention to detail. The color palate features a sufficient spectrum of colors that complement one another and a variety of materials that add visual interest. The base of the building clearly anchors the structure and provides ample glazing with window treatment that meets the design criteria. The structure avoids blank walls by providing landscaped areas and trellises along the base, breaks up the visual impact of the façade with decorative breezeblocks. The design of the structure’s “top” does not meet the intent of the design criteria outlined in the Southcenter Design Manual, and thus, staff is recommending a condition of approval that the “top” be reviewed and approved by staff prior to issuance of the Development Permit associated with this project. RECOMMENDATIONS Staff recommends the approval of the Design Review application with the following conditions: 1. The applicant shall be required to revise the project’s commercial open space design to meet the criteria of TMC 18.28.250, with regard to seating and site orientation. 2. The design of the residential open space, as well as any requested modifications to such open space shall be reviewed by City Staff and approved by the Director prior to issuance of the Development Permit associated with this project. 3. Staff recommends that the minimum side and rear 5’ setbacks be waived, as the project has satisfied the necessary Building and Fire Code requirements. 4. The proposed commercial bank use requires a total of 6 parking spaces; four have been proposed on- site by the applicant. Per TMC 18.28.260, the applicant shall explore parking reduction opportunities based on the criteria in the “Parking Reductions” section. 5. A minimum of 2 bicycle parking spaces shall be provided for the bank use. 6. The applicant shall work with Planning Staff in order to provide a design for the “top” of the structure that satisfies the requirements of the Southcenter Design Manual. The design for the “top” of the structure shall be reviewed and approved by City Staff prior to issuance of the Development Permit associated with this project. 30 L22-0032 Staff Report 8/25/2022 21 Informational Items 7. Signage shall be reviewed as part of separate sign permit. 8. Project is subject to Transportation Concurrency Test application and Transportation Impact fee to be paid at the time of Development Permit issuance. 9. The following landscaping items shall be addressed as part of building permit: a. Applicant shall ensure that all trees are 5' from utilities, over or above ground. b. Per TMC18.52.030, large and medium stature trees are required, except when there is insufficient planting area due to underground utilities. The applicant shall work with Puget Sound Energy to determine how planting large canopy street trees can be accommodated by discussing depth, size, and precise location of gas lines. 31