HomeMy WebLinkAboutTIS 2022-10-03 Item 2G - Discussion - Public Works Water, Sewer & Surface Water RatesCity of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
To: Transportation and Infrastructure Services Committee
From: Hari Ponnekanti, Public Works Director/ City Engineer
By: Griffin Lerner, Public Works Analyst
CC: Mayor Ekberg
Date: September 30, 2022
Subject: Public Works Water, Sewer, and Surface Water Rates Discussion
ISSUE
Review proposed utility rates in advance of eventual adoption of Public Works Fee Schedule
Resolution for 2023 and 2024.
BACKGROUND
The City's Public Works Department manages three utility funds — Water, Sewer, and Surface Water.
The Water and Sewer Utilities serve approximately 60% of the property owners in the City, while the
Surface Water Utility serves all properties within City limits. Utility rates provide the bulk of the revenue
that supports the operations of the water, sewer, and surface water operations in the City of Tukwila.
These rates are reviewed biennially as a part of the City's budget and Capital Improvement process.
The City's Budget, Capital Improvement Program and Comprehensive Plan all reference or include the
policies that govern rate development. Here are a few examples of the City's policies, as taken from the
Capital Facilities Element (Chapter 14) of the Comprehensive Plan:
• Utility rates and charges shall be structured to ensure adequate infrastructure development, in
addition to compliance with operation, maintenance, and federal and State requirements
• Rate increases shall be small, applied frequently, and staggered to avoid an overly burdensome
increase and undue impact in any given year
• Each enterprise fund shall be reviewed at least biennially, and shall have a rate structure
adequate to meet its operations and maintenance and long-term capital requirements
• Rate increases of external agencies (i.e., King County secondary wastewater treatment fees)
shall be passed through to the users of the utility
Annual rate increases allow the City to keep pace with inflation and fixed cost increases, and to
implement the City's long-term strategic goals for maintenance, improvement, and replacement of
capital infrastructure. Without regularly occurring and sufficient rate increases, the City's ability to
address infrastructure needs would be compromised. In addition, the policies reinforce the importance
of maintaining adequate fund reserve levels.
The City has adopted Comprehensive Plans for Water, Sewer and Surface Water that analyze each
fund for revenue requirements and prioritize capital improvement projects. The City is currently
finalizing the Water and Sewer Comprehensive Plans and Surface Water is scheduled to conclude in
2023. Council adopts the comprehensive plans approximately every ten years and those adopted plans
inform rate studies. Rate recommendations are informed not only through identifying needed capital
projects but by examining trends in charges from suppliers, consumption patterns, and regulatory and
operating needs. Recommended rates are the product of a complex set of intertwined inputs, some of
which are fixed and outside of the City's control. Setting a rate higher or lower than what is suggested
through the fund modeling, could mean that the assumptions or inputs may also need to change.
141
INFORMATIONAL MEMO
Water, Sewer, and SWM Rates
Page 2
The Capital Improvement Program, which is one factor in establishing rate recommendations, is also
used to advantageously position the City for grants. A thorough list of capital projects is needed, as
granting agencies require that all projects must be listed in the City's adopted Capital Improvement
Program in order to be eligible for grants. Grant funding for Water and Sewer are normally rare and
difficult to obtain, but the City has been very successful in obtaining grants for Surface Water projects.
The City's current and proposed utility fees compare well in the region. With the proposed increases,
the City still ranks in the mid-range if not lower, even without taking into account the corresponding
increases that will occur in the other cities. The magnitudes of the proposed rate increases are also
reasonable; as smaller rate increases more frequently helps the City avoid the need to implement more
significant, catch-up increases in the future.
Exhibit A shows Cascade Water Alliance's proposed increases in 2023 and 2024.
Exhibit B is a rate matrix of all proposed utility rate increases for residential customers.
Exhibit C is King County Ordinance No 19447, providing sewage treatment costs for 2023.
Exhibit D-1 to D-3 shows a comparison of adjoining cities and their water rates along with the Water
Model from the Proposed 2023-2028 CIP.
The overall estimated additional monthly cost of the proposed City rate increases across all three
utilities (Water, Sewer and Surface Water) is $4.73, with an additional $2.84 due to a King County
passthrough. Further, the proposed rate increases are all below the recent inflation threshold of 9.5%.
WATER
Public Works analyzed the operational and capital needs of the Water Enterprise Fund in determining
the proposed fees. In addition, the City needs to account for Cascade Water Alliance's (CWA)
wholesale water rates that are set to increase by 2.2% in 2023 and 2.2% in 2024 (Exhibit A). A small
increase is being proposed to the base rates on residential, multi -family and commercial/ industrial
customers as well as increases to water consumption fees in winter only. Fire Protection service
charges are flat fees every month and will be increased in in 2023 & 2024.
Tukwila's residential water rates currently rank between 26 and 30 out of 30 (depending on pipe size) in
regional jurisdictions, and as rates will increase across the board, the estimate is that Tukwila will
continue to be lower as our neighboring cities. Even with the proposed water rate increases over the
next six years as shown in the Water model, the water fund shows a drawdown nearly in 2023 through
2025 and is at risk of not meeting the 20% reserve policy in the future. More competitive water rates will
allow the City to complete more capital projects annually, purchase a new reservoir, and combat
depreciating infrastructure.
TABLE 1 - WATER RATES PROPOSED FOR 2023 and 2024
CATEGORY
Current 2022
Charges
Proposed 2023
Charges
Proposed 2024
Charges
Single Family
$20.00
21.00
$22.00
Multi -Family (each condo, apt, or
dwelling unit)
$20.00
21.00
$21.50
Commercial/Industrial Base
Charges
$52.00 &
$708.00
$56.00 &
$740.00
$60.00 &
$770.00
Single Family Consumption
Charges per 1 CCF
$3.00 & $4.18
$3.39 & $4.18
$3.83 & $4.18
Multi -Family Consumption Charges
per 1 CCF
$3.62 & $5.02
$4.08 & $5.02
$4.56 & $5.02
Commercial/Industrial
Consumption per 1 CCF
$5.44 & $7.38
$6.15 & $7.38
$6.95 & $7.38
Fire Protection Service Charges
$10.50 to
$300.00
$11.00 to
$315.00
$11.25 to
$325.00
142
INFORMATIONAL MEMO
Water, Sewer, and SWM Rates
Page 3
Even with the proposed rate increases, Water provided by the City is still the cheapest source of water
within city limits. For instance, a gallon of water costs less than half a penny and filling the average
bathtub will cost a Tukwila consumer roughly 14 cents. Further, Highline Water District and Water
District 125, the two other main water providers to Tukwila residents, project to cost an average of
almost $6.00 more monthly per residential household in 2023.
$70
$60
$50
$40
$30
$20
$10
$-
Projected Average Monthly Cost for 10 CCF of Water
2023
Tukwila
2023
Highline
$63.26
2023
WD 125
The proposed rate increases would cost the average residential an additional $2.82 monthly, or another
26 cents per 748 gallons of water.
SEWER
King County Ordinance No. 19447 adopted a 5.75% rate increase in the King County sewage disposal
fees for 2023. The King County sewer rate will increase from $49.27 to $52.11 per residential customer
equivalent per month in 2023. There will likely be another rate increase by King County of 5.75% in
2024. Exhibit C is King County Ordinance No. 19447 for the 2023 rates.
Tukwila's sewer base rate will increase at a smaller rate of 3.3% annually in 2023 and 2024 in
accordance with the rate model that analyzes the City's operational and capital needs. The City's sewer
rate will increase to $31.00 per residential connection and $57.02 for up to 750 cubic feet or fraction
thereof for commercial/industrial customers in 2023. This results in a net increase of 4.54%. Exhibit D-2
shows a comparison of adjoining cities and their residential sewer rates, along with the Sewer Model
from the Proposed 2023-2028 CIP.
The proposed rate increases would cost the average resident $3.84 monthly, with $2.84 of that due to
King County's rate increase.
143
INFORMATIONAL MEMO
Water, Sewer, and SWM Rates
Page 4
TABLE 2 — SEWER RATES PROPOSED FOR 2023 and 2024
Cost Driver
Current 2022
Sewer Rate
Proposed 2023
Sewer Rate
Proposed 2024
Sewer Rate
King County Sewage
$49.27
$52.11
$54.72
City of Tukwila
$30.00
$31.00
$32.00
Total
$79.27
$83.11
$86.72
SURFACE WATER
Tukwila's surface water base rate is scheduled for an increase in 2023 and 2024. The City's surface
water rate will increase from $204.00 to $215.00 in 2023 and from $215.00 to $226.00 in 2024 per
residential parcel, per year. Commercial rates will range from $257.38 to $2,157.44 per 4,356 square
foot for all other parcels in 2023 and $270.25 to $2,265.31 in 2024.
Exhibit D-3 shows a comparison of surface water fees with other cities in the region along with the
Surface Water Model from the Proposed 2023-2028 CIP. The City's proposed residential rates for 2023
and 2024 are well below the 2022 average rate of $262.86.
If Council were not to adopt the proposed rate increases, the City would either have to eliminate
surface water capital projects, reduce staff allocation, or reduce reserves. Doing so would mean that
the City would fall behind on its infrastructure needs or would need to increase the rate more
substantially in subsequent years.
Surface water fees are processed by King County and collected with property taxes. The proposed
increases would cost the average resident an extra $0.91 monthly.
TABLE 3 — SURFACE WATER RATES PROPOSED FOR 2023 and 2024
CATEGORY
Current 2022
SWM Rate
Proposed 2023
SWM Rate
Proposed 2024
SWM Rate
Residential
Flat rate of $204.00
Flat rate of $215.00
Flat rate of $226.00
RECOMMENDATION
Council is being asked to provide guidance on the City's 2023 and 2024 Water, Sewer, and Surface Water
proposed rate increases in anticipation of the Public Works Fee Schedule Resolution and consider this
item at the October 10, 2022 Committee of the Whole meeting.
Attachments: Exhibit A Cascade Water Alliance Summary of Forecasted Member Payments
Exhibit B Rate Matrix
Exhibit C King County Ordinance No. 19447 for 2023
Exhibit 0-1 through D-3 Comparison of Utility Rates with Adjoining Cities with 2023 CIP Models
144
CASCADE Proposed 2023-2024 Member
Charge Revenue Increase
WATER Al1 IAN VV A T T R A 1 1 ;1 �. i f
Breakdown of Proposed Revenue Increase
2023
Dollars
2023
Percent
2024
Dollars
2024
Percent
Total Revenue Increase
$959,038
2.20%
$980,138
2.20%
Seattle Water
$988,400
2.27%
$909,263
2.04%
Increase
$512,349
1.18%
$909,263
2.04%
True -up
$476,051
1.09%
-
Operating Expenses*
$682,937
1.57%
$273,587
0.61%
Administration*
$34,835
0.08%
($69,620)
-0.16%
Miscellaneous (Conservation, R&R)
$108,973
0.25%
$73,928
0.17%
Increased Debt Service from Rates
($576,347)
-1.32%
$1,595,528
3.58%
Contribution to WSDF
-
0.00%
$445,517
1.00%
Change in Miscellaneous Revenues
($32,129)
-0.07%
($28,620)
-0.06%
Rate Smoothing
($247,631)
-0.57%
($2,219,445)
-4.98%
*Expenses are adjusted to exclude irregular expenses funded through reserve accumulation and related used of reserves.
• Annual 2.2% average increases are as projected last budget cycle and below inflation
• Seattle costs a major rate driver
• Rate smoothing mitigates impacts
• Starting in 2024, rates support funding for Water Supply Development Fund (WSDF)
145
City of Tukwila Proposed Utility Rate Increases
Monthly Fees for Residential Customers
Exhibit B
WATER RATES PER CCF
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
+5%
+0%
+5%
+5%
+5%
+0%
+1%
+5%
+7%
+7%
+5%
+5%
+4%
+4%
City of Tukwila Water average cost
$ 3.17
$ 3.17
$ 3.17
$ 3.17
$ 3.17
$ 3.17
$ 3.23
$ 3.39
$ 3.65
$ 3.95
$ 4.15
$ 4.35
$ 4.52
$ 4.70
monthly increase per household
$ -
$ -
$ -
$ -
$ -
$ -
$ 0.42
$1.12
$1.82
$ 2.05
$ 1.41
$ 1.40
$ 1.22
$ 1.27
Commercial average cost
$ 4.92
$ 5.17
$ 5.41
$ 5.70
$ 5.70
$ 5.70
$ 5.81
$ 6.09
$ 6.56
$ 7.09
$ 7.45
$ 7.82
$ 8.13
$ 8.46
Multifamily average cost
$ 3.64
$ 3.64
$ 3.73
$ 3.83
$ 3.83
$ 3.83
$ 3.90
$ 4.09
$ 4.39
$ 4.71
$ 4.95
$ 5.20
$ 5.40
$ 5.62
City of Tukwila Minimum Monthly
15.00 to 16.00
16
16.00 to 17.00
17.00 to 18.00
18.00 to 19.00
19
19
19.00 to 20.00
20.00 to 21.00
21.00 to 21.50
21.50 to 22.00
22
22 to 22.50
22.50 to 23
charge per meter/each dwelling unit
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
$0.50
$0.50
$0.50
$0.50
Monthly Residential Increase
$ 1.00
$ -
$ 1.00
$ 1.00
$ 1.00
$ -
$ 1.42
$ 2.12
$ 2.82
$ 2.55
$ 1.91
$ 1.40
$ 1.72
$ 1.77
RESIDENTIAL SEWER RATES
2015
2016
2017
2018
2019
2020
2021
2022
King County Sewer Treatment
(Monthly Flat Rate) increase
+5.6%
39.79 to 42.03
$2.24
0%
$42.03
+5.21%
42.03 to 44.22
$2.19
0%
$44.22
+2.51%
44.22 to 45.33
$1.11
0%
$45.33
+4.50%
45.33 to 47.37
$2.04
City of Tukwila Sewer
(Monthly Flat Rate)
+10%
$26.50 to $29
$2.50
0%
$29.00
0%
$29.00
+3.5%
$29 to $30
$1.00
0%
$30.00
0%
$30.00
0%
$30.00
4%
47.37 to 49.27
$1.90
0%
$30.00
2023
2024
2025
2026
2027
2028
+5.75%
49.27 to 52.11
$2.84
3%
$31.00
$1.00
5.75%
52.11 to 55.11
$3.00
5.75%
55.11 to 58.28
$3.17
5.75%
58.28 to 61.64
$3.36
5.75%
61.64 to 65.19
$3.55
3%
$32.00
$1.00
3%
$33.00
$1.00
3%
$34.00
$1.00
3%
$35.00
$1.00
+9%
65.19 to 71.06
$5.87
3%
$36.00
$1.00
Monthly Sewer Bill (Residential)
Monthly Residential Increase
$71.03
$4.74
$71.03
$0.00
$73.22
$2.19
$74.22
$1.00
$75.33
$75.33
$0.00
$77.37
$2.04
$79.27
$1.90
$83.11
$3.84
$86.97
$4.00
$88.44
$4.17
$92.22
$4.36
$96.72
$4.55
$101.43
$6.87
Commercial Sewer Rate Increases
+15.6%
+5%
+5.21%
+3.5%
0%
+0.0%
0%
+0.0%
+5.75%
+5.5%
+5.5%
+5.5%
+5.5%
+5.5%
RESIDENTIAL SURFACE WATER
2015
2016
2017
2018
2019
City of Tukwila Surface Water
Annual Charge (billed Jan & July)
Annual Charge divided monthly
Monthly Increase
+20%
$118 to $142
$9.83 to $11.83
$2.00
+15%
$142 to $163
11.83 to 13.58
$1.75
+5%
$163 to $171
13.58 to 14.25
$0.67
+3%
$171 to $176
14.25 to 14.67
$0.42
+5%
$176 to $185
14.67 to 15.42
$0.75
2020 I
+3%
$185 to $190
15.42 to 15.83
$0.41
2021
2022
+2%
$190 to $194
15.83 to 16.17
$0.34
+5%
$194 to $204
16.17 to 17.00
$0.66
2023
2024
2025
2026
2027
2028
+5%
$204 to $215
17.00 to 17.92
$0.92
+5%
$215 to $226
17.33 to 18.17
$0.84
+5%
$218 to $224
18.17 to 18.67
$0.50
+5%
$224 to $235
18.67 to 19.58
$0.91
3% 5%
$235 to $246 $246 to $258
19.58 to 20.50 20.50 to 21.50
$0.92 $1.00
Commercial Surface Water - Same IncrE
+20%
+15%
+5%
+3%
+5%
+3%
+2%
+4%
+5%
+5%
+5%
+5%
3%
5%
Total Monthly
Residential Increase
$7.74
$1.75
$3.86
$2.42
$2.86
$0.41
$3.80
$4.68
$7.58
$7.39
$6.58
$6.67
$7.19
$9.64
q:gail\cip\rate matrix
9142022
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
King County
KING COUNTY
Signature Report
Ordinance 19447
1200 King County Courthouse
516 Third Avenue
Seattle, WA 98104
Proposed No. 2022-0172.1 Sponsors McDermott
1 AN ORDINANCE relating to rates and charges for sewage
2 treatment and disposal; and amending Ordinance 12353,
3 Section 2, as amended, and K.C.C. 4A.670.100, Ordinance
4 18745, Section 2, and Ordinance 11398, Section 1, as
5 amended, and K.C.C. 28.84.055.
6 BE IT ORDAINED BY THE COUNCIL OF KING COUNTY:
7 SECTION 1. Ordinance 12353, Section 2, as amended, and K.C.C. 4A.670.100
8 are hereby amended to read as follows:
9 A. Having determined the monetary requirements for the disposal of sewage, the
10 council hereby adopts a ((2022)) 2023 sewer rate of ((forty nine)) fifty-two dollars and
11 ((twenty seven)) eleven cents per residential customer equivalent per month. Once a sewer
12 rate ordinance becomes effective, the clerk of the council is directed to deliver a copy of
13 that ordinance to each agency having an agreement for sewage disposal with King County.
14 B. The King County council approves the application of Statement No. 62 of the
15 Governmental Accounting Standards Board (GASB -62) as it pertains to regulatory assets
16 and liabilities to treat pollution remediation obligations and RainWise Program
17 expenditures and strategic planning costs as regulatory assets, recovered ratably over the
18 life of the underlying financing,. and to establish a rate stabilization reserve for the
19 purpose of leveling rates between years.
1
147
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
Ordinance 19447
20 C. As required for GASB -62 application, amounts are to be placed in the rate
21 stabilization reserve from operating revenues and removed from the calculation of debt
22 service coverage. The reserve balance shall be an amount at least sufficient to maintain a
23 level sewer rate between ((2024)) 2023 and ((2022)) 2024, and shall be used solely for
24 the purposes of: maintaining the level sewer rate in ((2 22)) 2024; and if additional
25 reserve balance is available, moderating future rate increases beyond ((2022)) 2024. The
26 estimated amount of the reserve, as shown in the financial forecast, Attachment A to
27 ((Ordinance 1929'1)) this ordinance, shall be revised in accordance with the ((2021
28 2022)) 2023-2024 Biennial Budget Ordinance and financial plan. If the reserve needs to
29 be reduced to meet debt service coverage requirements for ((202-1-)) 2022, the county
30 executive shall notify the council of the change by providing an updated financial plan.
31 SECTION 2. Ordinance 18745, Section 2, as amended, is hereby amended to
32 read as follows:
33 Monetary requirements for the disposal of sewage as defined by contract with the
34 component sewer agencies for the fiscal year beginning January 1, ((2022)) 2023, and
35 ending December 31, ((282-2)) 2023. The council hereby determines the monetary
36 requirements for the disposal of sewage as follows:
37 Administration, operating, maintenance repair and replacement (net of other
38 income): (($61,625,987)) $73,541,834.
39 Establishment and maintenance of necessary working capital reserves:
40 (($73,961,091)) $112,291,106.
41 Requirements of revenue bond resolutions (not included in above items and net of
42 interest income): (($295,026,970)) $289,269,486.
2
148
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
Ordinance 19447
43 TOTAL: (($133,617,051)) $475,102,427.
44 SECTION 3. Ordinance 11398, Section 1, as amended, and K.C.C. 28.84.055 are
45 hereby amended as follows:
46 A. The amount of the metropolitan sewage facility capacity charge adopted by
47 K.C.C. 28.84.050.0. that is charged monthly for fifteen years per residential customer or
48 residential customer equivalent shall be:
49 1. Seven dollars for sewer connections occurring between and including January
50 1, 1994, and December 31, 1997;
51 2. Ten dollars and fifty cents for sewer connections occurring between and
52 including January 1, 1998, and December 31, 2001;
53 3. Seventeen dollars and twenty cents for sewer connections occurring between
54 and including January 1, 2002, and December 31, 2002;
55 4. Seventeen dollars and sixty cents for sewer connections occurring between
56 and including January 1, 2003, and December 31, 2003;
57 5. Eighteen dollars for sewer connections occurring between and including
58 January 1, 2004, and December 31, 2004;
59 6. Thirty-four dollars and five cents for sewer connections occurring between
60 and including January 1, 2005, and December 31, 2006;
61 7. Forty-two dollars for sewer connections occurring between and including
62 January 1, 2007, and December 31, 2007;
63 8. Forty-six dollars and twenty-five cents for sewer connections occurring
64 between and including January 1, 2008, and December 31, 2008;
3
149
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
Ordinance 19447
65 9. Forty-seven dollars and sixty-four cents for sewer connections occurring
66 between and including January 1, 2009, and December 31, 2009;
67 10. Forty-nine dollars and seven cents for sewer connections occurring between
68 and including January 1, 2010, and December 31, 2010;
69 11. Fifty dollars and forty-five cents for sewer connections occurring between
70 and including January 1, 2011, and December 31, 2011;
71 12. Fifty-one dollars and ninety-five cents for sewer connections occurring
72 between and including January 1, 2012, and December 31, 2012;
73 13. Fifty-three dollars and fifty cents for sewer connections occurring between
74 and including January 1, 2013, and December 31, 2013;
75 14. Fifty-five dollars and thirty-five cents for sewer connections occurring
76 between and including January 1, 2014, and December 31, 2014;
77 15. Fifty-seven dollars for sewer connections occurring between and including
78 January 1, 2015, and December 31, 2015;
79 16. Fifty-eight dollars and seventy cents for sewer connections occurring
80 between and including January 1, 2016, and December 31, 2016;
81 17. Sixty dollars and eighty cents for sewer connections occurring between and
82 including January 1, 2017, and December 31, 2017;
83 18. Sixty-two dollars and sixty cents for sewer connections occurring between
84 and including January 1, 2018, and December 31, 2018;
85 19. Sixty-four dollars and fifty cents for sewer connections occurring between
86 and including January 1, 2019, and December 31, 2019;
4
150
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
Ordinance 19447
87 20. Sixty-six dollars and thirty-five cents for sewer connections occurring
88 between and including January 1, 2020, and December 31, 2020
89 21. Sixty-eight dollars and thirty-four cents for sewer connections occurring
90 between and including January 1, 2021, and December 31, 2021; ((and))
91 22. Seventy dollars and thirty-nine cents for sewer connections occurring
92 between and including January 1, 2022, and December 31, 2022; and
93 23. Seventy-two dollars and fifty cents for sewer connections occurring between
94 and including January 1, 2023, and December 31, 2023.
95 B.1. In accordance with adopted policy FP -15.3.d. in the Regional Wastewater
96 Services Plan, K.C.C. 28.86.160.C., it is the council's intent to base the capacity charge
97 upon the costs, customer growth and related financial assumptions used in the Regional
98 Wastewater Services Plan.
99 2. In accordance with adopted policy FP- 6 in the Regional Wastewater Services
100 Plan, K.C.C. 28.86.160.C., the council hereby approves the cash balance and reserves as
101 contained in the attached financial plan for ((2-02-2)) 2023, which is Attachment A to
102 ((Ordinance 192911)) this ordinance.
103 3. In accordance with adopted policy FP -15.3.c., King County shall pursue
104 changes in state legislation to enable the county to require payment of the capacity charge
5
151
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31E01
Ordinance 19447
105 in a single payment, while preserving the option for new ratepayers to finance the
106 capacity charge.
Ordinance 19447 was introduced on 5/3/2022 and passed by the Metropolitan King
County Council on 6/7/2022, by the following vote:
Yes: 7 - Balducci, Dembowski, Kohl -Welles, Perry, McDermott,
Upthegrove and Zahilay
No: 2 - Dunn and von Reichbauer
ATTEST:
DocuSigned by:
8DE1 BB375AD3422...
Melani Pedroza, Clerk of the Council
APPROVED this day of 6/21/2022
KING COUNTY COUNCIL
KING COUNTY, WASHINGTON
DocuSigned by: L
Laut),ia 6466,,1
7E1 C273CE9994B6...
Claudia Balducci, Chair
DocuSigned by:
4FBCAB8196AE4C6...
Dow Constantine, County Executive
Attachments: A. Wastewater Treatment Division Financial Plan
6
152
DocuSign Envelope ID: 205A6A8E-D64E-40CA-A8B8-8DBA48A31 E01
Wastewater Treatment Division Financial Plan
Ordinance 19447
Attachment A
King County Wastewater Treatment Division
Financial Plan
Adopted
2022
Rate Proposal
2023
Projected
2024
Projected
2025
Projected
2026
Projected
2027
Projected
2028
Projected
2029
Projected
2030
Projected
2031
Projected m
2032
Operating Financial Plan - 4611 ($ '000)
Monthly Sewer Rate
Rate Increase
Residential Customer Equivalents (RCEs)
Revenue
Sewer Rate
Capacity Charge
Industrial Waste
Resource Recovery
Other Income
Investment Income
Use (Transfer to) Rate Stabilization Reserve
Total - Revenue
Expenditures & Transfers
O&M Expenses
Existing Debt Service
New Debt Service
Debt Retirement/ Defeasance Use of Cash
Minimum Operating Reserve Contribution
Total - Expenditures & Transfers
Net Cash Flow
Beginning Balance
Net Cash Flow
Policy Cash -Funded Capital (Transfer to Capital Fund)'
Ending Balance
Ending Reserve Balances
Water Quality Operating Liquidity Reserve
Rate Stabilization Reserve Account
Debt Service Coverage - Parity Bonds (Senior Lien)
Debt Service Coverage - All -In Debt Service
$49.27 $52.11 $55.11 $58.28 $61.64 $65.19 $71.06 $77.46 $84.44 $92.04 $100.33
4.00% 5.75% 5.75% 5.75% 5.75% 5.75% 9.00% 9.00% 9.00% 9.00% 9.00%
747,046 759,775 776,344 785,391 790,314 795,245 800,185 805,134 810,091 815,057 820,033
$ 441,683 $ 475,102 $ 513,412 $ 549,271 $ 584,579 $ 622,104 $ 682,334 $ 748,388 $ 820,849 $ 900,215 $ 987,286
93,600 96,408 99,300 104,265 109,479 114,953 120,700 126,735 133,072 139,726 146,712
10,285 10,339 10,393 10,447 10,502 10,558 10,613 10,669 10,726 10,782 10,839
8,784 8,837 8,892 2,979 3,068 3,160 3,255 3,353 3,454 3,557 3,664
4,356 4,371 4,387 4,404 4,421 4,439 4,457 4,475 4,495 4,514 4,535
5,109 5,830 7,467 8,323 8,662 10,222 12,581 15,202 17,975 19,349 21,054
$ 563,817 $ 600,888 $
$ (175,490)
(248,233)
(2,078)
$ (193,327)
(248,467)
(8,221)
(1,977) (1,784)
$ (427,778) $ (451,799)
$ 136,039 $ 149,089
$ 73,154 $
136,039
(209,193)
149,089
(149,089)
$
$
$ 17,549 $
$ 46,250 $
$
643,851 $
(198,878) $
(258,573)
(13,890)
(555)
$ (471,896) $
$ 171,955 $
$ - $
171,955
(171,955)
$ - $
19,333 $ 19,888 $
46,250 $ 46,250 $
679,690 $ 720,712 $ 765,436 $ 833,940 $ 908,823 $
(210,585) $ (220,869) $ (231,399) $ (242,439) $ (254,016) $
(256,809) (255,770) (253,050) (253,742) (250,545)
(29,866) (46,287) (66,885) (95,293) (129,780)
(1,171) (1,028) (1,053) (1,104) (1,158)
(498,431) $ (523,955) $ (552,387) $ (592,579) $ (635,499) $
181,259 $ 196,756 $ 213,048 $ 241,362 $ 273,324 $
- $ $ $ - $ $
181,259 196,756 213,048 241,362 273,324
(181,259) (196,756) (213,048) (241,362) (273,324)
$ _ $ 0 $ _ $ _ $
21,059 $ 22,087 $ 23,140 $ 24,244 $ 25,402 $
46,250 $ 46,250 $ 46,250 $ 46,250 $ 46,250 $
2.68x 2.62x 2.73x 2.82x 2.74x 2.67x 2.56x 2.76x
1.55x 1.59x 1.63x 1.64x 1.65x 1.67x 1.69x 1.72x
'Includes target 40% capital funding from rates, plus excess transfer from the operating reserve in 2022
990,570 $
(266,155) $
(258,896)
(168,389)
(1,214)
(694,654) $
295,916 $
295,916
(295,916)
1,078,143 $
(278,885)
(258,035)
(210,746)
(1,273)
(748,939)
329,204
329,204
(329,204)
$
$
$
$
1,174,090
(292,234)
(266,209)
(249,850)
(1,335)
(809,628)
364,461
364,461
(364,461)
26,616 $
46,250 $
2.51x
1.70x
$
27,889 $ 29,223
46,250 $ 46,250
2.38x
1.70x
2.33x
1.71x
Capital Funding Plan - 3611 & 3612 ($ '000)
Beginning Balance
WIFIA Proceeds
State Loan Proceeds
Variable Rate Debt Proceeds
Commercial Paper / Interim Financing
Retirement of Interim Financing
Net Bond Proceeds
Debt Reserve Contribution/(Requirement)
Grants, Settlements, and Other
Capital Expenditures
Ending Balance Before Transfers
Year-end Transfers from Operating Fund
Ending Balance
Ending Reserve Balances
Capital Liquidity Reserve
Emergency Capital Reserve
Revenue Bonds Reserve Account
State Revolving Fund Reserve Account
$ 233,909 $
34,974
48,650
(34,304)
2,612
(282,999)
$ 2,842 $
209,193
$ 212,035 $
5,000
15,000
124,076
981
212,035 $
134,500
58,848
49,446
(82,556)
5,147
(307,113)
70,307
149,089
219,396
5,000
15,000
129,209
981
219,396 $
15,848
8,841
23,627
(15,848)
73,838
(325,702)
$ - $
171,955
$ 171,955 $
5,000
15,000
134,398
219
171,955 $ 181,259 $ 196,756 $ 213,048 $
96,845 -
241,362 $
19,233 27,034 33,070 45,277 61,283
9,202
(77,418) - -
180,122 200,783 272,839 374,982 449,299
(380,513) (428,502) (502,666) (633,308)
- $ _ $ _ $ _ $
181,259 196,756 213,048 241,362
181,259 $ 196,756 $ 213,048 $ 241,362 $
5,000 5,000 5,000 5,000
15,000 15,000 15,000 15,000
146,525 164,665 183,782 209,675
219 176 133 133
(751,943)
273,324
273,324 $
5,000
15,000
240,899
133
273,324 $
74,802
501,237
(849,363)
295,916
295,916 $
5,000
15,000
275,886
68
295,916 $
82,822
548,775
(927,513)
329,204
329,204 $
5,000
15,000
314,240
329,204
91,412
487,154
(907,770)
364,461
364,461
5,000
15,000
348,766
153
DocuSign
Certificate Of Completion
Envelope Id: 205A6A8ED64E40CAA8B88DBA48A31E01
Subject: Please DocuSign: Ordinance 19447.docx, Ordinance 19447 Attachment A.xlsx
Source Envelope:
Document Pages: 6 Signatures: 3
Supplemental Document Pages: 1 Initials: 0
Certificate Pages: 5
AutoNav: Enabled
Envelopeld Stamping: Enabled
Time Zone: (UTC -08:00) Pacific Time (US & Canada)
Status: Completed
Envelope Originator:
Cherie Camp
401 5th Ave
Suite 100
Seattle, WA 98104
Cherie.Camp@kingcounty.gov
IP Address: 198.49.222.20
Record Tracking
Status: Original
6/9/2022 2:51:06 PM
Security Appliance Status: Connected
Storage Appliance Status: Connected
Holder: Cherie Camp
Cherie.Camp@kingcounty.gov
Pool: FedRamp
Pool: King County General (ITD)
Location: DocuSign
Location: DocuSign
Signer Events
Signature
Timestamp
Claudia Balducci
claudia.balducci@kingcounty.gov
King County General (ITD)
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Supplemental Documents:
Melani Pedroza
melani.pedroza@kingcounty.gov
Clerk of the Council
King County Council
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Supplemental Documents:
,-DocuSigned by.
CLaua,ia 154,uuu
'-7E1C273CE9994B8...
Signature Adoption: Pre -selected Style
Signed by link sent to
claudia.balducci@kingcounty.gov
Using IP Address: 73.181.163.252
Ordinance 19447 Attachment A.xlsx
,-DocuSigned by:
'-8DE1BB375AD3422...
Signature Adoption: Uploaded Signature Image
Signed by link sent to
melani.pedroza@kingcounty.gov
Using IP Address: 50.35.122.133
Ordinance 19447 Attachment A.xlsx
Sent: 6/9/2022 2:58:45 PM
Viewed: 6/13/2022 2:34:56 PM
Signed: 6/13/2022 2:35:07 PM
Viewed: 6/13/2022 2:35:02 PM
Read: Not Required
Accepted: Not Required
Sent: 6/13/2022 2:35:08 PM
Viewed: 6/14/2022 5:59:40 AM
Signed: 6/14/2022 5:59:51 AM
Viewed: 6/14/2022 5:59:44 AM
Read: Not Required
Accepted: Not Required
154
Signer Events
Signature
Timestamp
Dow Constantine
Dow.Constantine@kingcounty.gov
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Accepted: 6/21/2022 11:21:51 AM
ID: 3a2c42d0-4d50-484c-b908-0d2d7da14b3e
Supplemental Documents:
c—DocuSigned by:
�ow C�nnw.Ga..�
L-4FBCAB8196AE4C6...
Signature Adoption: Uploaded Signature Image
Signed by link sent to
Dow.Constantine@kingcounty.gov
Using IP Address: 198.49.222.20
Ordinance 19447 Attachment A.xlsx
Sent: 6/14/2022 5:59:52 AM
Viewed: 6/21/2022 11:21:51 AM
Signed: 6/21/2022 11:22:04 AM
Viewed: 6/21/2022 11:22:02 AM
Read: Not Required
Accepted: Not Required
In Person Signer Events
Signature
Timestamp
Editor Delivery Events
Status
Timestamp
Agent Delivery Events
Status
Timestamp
Intermediary Delivery Events
Status
Timestamp
Certified Delivery Events
Status
Timestamp
Carbon Copy Events
Status
Timestamp
Kaitlyn Wiggins
kwiggins@kingcounty.gov
Executive Legislative Coordinator
King County Executive Office
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
COPIED
Sent: 6/14/2022 5:59:53 AM
Viewed: 6/14/2022 8:06:22 AM
Witness Events
Signature
Timestamp
Notary Events
Signature
Timestamp
Envelope Summary Events
Status
Timestamps
Envelope Sent
Certified Delivered
Signing Complete
Completed
Hashed/Encrypted
Security Checked
Security Checked
Security Checked
6/9/2022 2:58:45 PM
6/21/2022 11:21:51 AM
6/21/2022 11:22:04 AM
6/21/2022 11:22:04 AM
Payment Events Status
Electronic Record and Signature Disclosure
Timestamps
155
Electronic Record and Signature Disclosure created on: 2/1/2018 6:03:55 AM
Parties agreed to: Dow Constantine
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Carahsoft OBO King County ITD (we, us or Company) may be required by
law to provide to you certain written notices or disclosures. Described below are the terms and
conditions for providing to you such notices and disclosures electronically through the
DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below
carefully and thoroughly, and if you can access this information electronically to your
satisfaction and agree to these terms and conditions, please confirm your agreement by clicking
the `I agree' button at the bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per -page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign `Withdraw Consent' form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
156
How to contact Carahsoft OBO King County ITD:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: bob.johnson@kingcounty.gov
To advise Carahsoft OBO King County ITD of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at bob.johnson@kingcounty.gov and
in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from Carahsoft OBO King County ITD
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to bob.johnson@kingcounty.gov and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with Carahsoft OBO King County ITD
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check -box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to bob.johnson@kingcounty.gov and in the body of such request you
must state your e-mail, full name, US Postal Address, and telephone number. We do not
need any other information from you to withdraw consent.. The consequences of your
withdrawing consent for online documents will be that transactions may take a longer
time to process..
Required hardware and software
Operating
Systems:
Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X
Browsers:
Final release versions of Internet Explorer® 6.0 or above (Windows only);
Mozilla Firefox 2.0 or above (Windows and Mac); SafariTM 3.0 or above
(Mac only)
PDF Reader:
Acrobat® or similar software may be required to view and print PDF files
Screen
Resolution:
800 x 600 minimum
157
Enabled Security
Settings:
Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re -accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the `I agree' button below.
By checking the `I agree' box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify Carahsoft OBO King County ITD as described above, I consent to
receive from exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by Carahsoft OBO King County ITD during the course of my
relationship with you.
158
Residential Water Rate Comparison as of September 2022
2022 Ranking
City Base Rate
CITY (3/4")
lir
City Base Rate
(1")
Summer
Rates Winter Rates
Per CCF per CCF
Winter
Consumption
Assume 10
CCF
Summer
Consumption
Assume 10
CCF2
Average
Cost per 10
ccf
Averge total
cost 2022
with 1 inch
meter
Averge total
cost 2022
with 3/4
inch meter
1
WATER DISTRICT 119 (Duvall)
$ 45.00
$ 48.00
4.34/8.70
2.90/5.81
36.73
55.04 $ 42.83
$ 90.83
$ 87.83
2
MERCER ISLAND
20.43
51.07
4.85/13.25
4.85/13.25
65.25
65.25 $ 65.25
$ 116.32
$ 85.68
3
SKYWAY (CWA)
22.06
51.90
4.90/9.97
4.90/9.97
63.30
63.30 $ 63.30
$ 115.20
$ 85.36
4
DUVALL
29.59
29.59
4.41/9.47
4.41/9.47
50.40
50.40 $ 50.40
$ 79.99
$ 79.99
5
ISSAQUAH
17.62
38.27
2.28/23.56
2.28/23.56
61.82
61.82 $ 61.82
$ 100.09
$ 79.44
6
BELLEVUE
27.06
47.88
4.24/10.10
4.24/10.10
49.26
49.26 $ 49.26
$ 97.14
$ 76.32
7
SEATTLE
19.00
19.60
5.71/11.80
5.56
55.60
$ 57.10 $ 56.10
$ 75.70
$ 75.10
8
WOODINVILLE
29.85
150.10
0/9.21
0/7.92
41.76
52.08 $ 45.20
$ 195.30
$ 75.05
9
COVINGTON WATER DISTRICT
28.33
38.58
2.80/8.50
2.80/5.90
38.35
43.15 $ 39.95
$ 78.53
$ 68.28
10
COAL CREEK UTILITY
21.96
37.48
3.62/8.62
3.62/8.62
44.88
44.88 $ 44.88 $ 82.36 $ 66.83
11
KIRKLAND
21.79
21.79
5.22
5.22
41.76
41.76 $ 41.76
$ 63.55
$ 63.55
12
LYNNWOOD
28.25
28.25
3.24/4.88
3.24/4.88
32.40
32.40 32.40
60.65
60.65
13
TACOMA
37.45
60.08
2.207/2.75C.
2.21
22.07
24.83 $ 22.99
$ 83.07
$ 60.44
14
CEDAR RIVER WATER DIST
19.17
24.38
2.92/8.90
2.92/8.90
40.00
40.00 $ 40.00
$ 64.38
$ 59.17
15
REDMOND (CWA)
15.15
19.23
1.86/3.71/7
1.86/3.71/7
42.70
42.70 $ 42.70
$ 61.93
$ 57.85
16
SAMMAMISH PLATEAU
34.23
73.48
2.16/8.56
2.16/8.56
23.48
23.48 $ 23.48
$ 96.96
$ 57.71
17
KENT
25.34
39.99
2.65/5.21
2.65/5.21
31.62
31.62 $ 31.62
$ 71.61
$ 56.96
18
KING COUNTY WD #20
25.25
37.88
2.78/3.56
2.78/3.56
31.70
31.70 $ 31.70
$ 69.58
$ 56.95
19
HIGHLINE WATER DISTRICT
16.07
28.60
3.96/4.69
3.96
39.60
43.25 $ 40.82
$ 69.42
$ 56.89
20
AUBURN
18.24
18.24
3.62/5.02
3.62/5.02
38.60
38.60 $ 38.60
$ 56.84
$ 56.84
21
BOTHELL
16.57
34.26
3.24/8.97
3.24/8.97
40.10
40.10 $ 40.10
$ 74.36
$ 56.67
22
KING COUNTY WD #125
15.51
41.17
4.08
4.08/4.82
40.80
40.80 $ 40.80
$ 81.97
$ 56.31
23
NE SAMMAMISH
22.30
38.26
3.10
3.10
32.84
32.84 $ 32.84
$ 71.10
$ 55.14
24
ALGONA
34.79
34.79
3.32
3.32
19.92
19.92 $ 19.92
$ 54.71
$ 54.71
25
NORTHSHORE
15.10
15.10
3.45/5.45
3.45/5.45
39.50
39.50 $ 39.50
$ 54.60
$ 54.60
26
TUKWILA 2022
•
20.00
20.00
4.18
3.00
30.00
41,80 33.93
53.93
53.93
27
ALDERWOOD WATER DIST
23.82
37.81
2.66/3.89
2.66/3.89
26.60
26.60 26.60
64.41
50.42
28
RENTON
18.68
37.03
2.69/4.57
2.69/4.57
31.55
31.55 $ 31.55
$ 68.58
$ 50.23
29
SOOS CREEK
16.35
22.00
2.17/6.99
2.17/5.83
32.10
36.35
$ 33.52
$ 55.52
$ 49.87
30
LAKEHAVEN (FEDERAL WAY)
19.85
30.59
1.75/4.90
1.75/4.90
20.64
20.64
$ 20.64
$ 51.23
$ 40.49
Average
$ 62.97
159
https://tukwilawamy.sharepo nt.com/personal/gr'Rfn_lemer_tukwilawa_gov/Documents/Documents/0tility Rate Surveys Water, Sewer 8 SSW M 2022
ATTACHMENT D
City of Tukwila
WATER ENTERPRISE FUND
2023 - 2028 Analysis in 000's
REVENUES
zots
Actual
zoza
Actual
zort
Actual
zozz
Budget
zozz
Estimate
2023
2024
2025
2026
2027
2028
Total
Monthly Water Charges ltl
+5%
Commercial
+5%
commercial
+2%
+5%
+7.5%
+7.5%
+5%
+5%
+4%
+4%
Cascade Water Alliance (CWA)
2,707
2,753
2,688
3,356
2,805
2,763
2,769
3,012
3,071
3,141
3,211
17,967
Regular City Water
4,030
3,397
4,067
3,488
4,288
4,862
5,428
5,594
5,966
6,145
6,329
34,323
Subtotal Water
6,737
6,150
6,755
6,844
7,093
7,625
8,197
8,606
9,037
9,000
9,000
51,464
Other Miscellaneous Revenue
352
105
50
83
92
130
135
140
145
150
150
850
Interlocal Ags\PWTF\Grants/Bonds
0
0
0
1,900
0
0
1,437
1,563
3,000
6,600
1,225
13,825
Water Connection Fees (2)
37
78
68
20
45
20
20
20
20
20
20
120
Total Revenues
7,126
6,333
6,873
8,847
7,230
7,775
9,789
10,329
12,202
15,770
10,395
66,259
EXPENDITURES
CWA Purchased Water (3)
2,707
2,753
2,688
3,356
2,805
2,763
2,769
3,012
3,071
3,141
3,211
17,967
Water Operations & Maintenance
2,345
2,263
2,440
2,520
2,150
2,425
2,528
2,579
2,630
2,683
2,736
15,581
Debt Service (4)
146
145
144
129
129
128
128
147
147
200
200
950
Debt Service/Costs for PW Shops
340
197
182
358
358
1,038
698
1,058
1,057
1,058
1,058
5,967
Interfund Utility Tax (5) 10%
677
617
677
693
709
775
833
875
918
915
915
5,231
Engineering Labor (7)
63
39
75
119
77
80
82
84
86
88
90
510
Subtotal
6,278
6,014
6,206
7,175
6,228
7,209
7,038
7,754
7,909
8,085
8,210
46,206
Water Capital - CIP Program
265
138
332
2,455
3,300
1,997
2,825
3,275
3,600
5,455
2,600
19,752
Total Expenditures
6,543
6,152
6,538
9,630
9,528
9,206
9,863
11,029
11,509
13,540
10,810 65,958
FUND BALANCE
Change in Fund Balance (a)
583
181
335
(783)
(2,299)
(1,431)
(75)
(700)
692
2,230
(415)
(415)
Beginning Balance
6,058
5,787
6,639
6,987
6,987
4,690
3,259
3,184
2,484
3,177
5,407
5,407
Ending Balance
6,641
6,639
6,987
6,204
4,690
3,259
3,184
2,484
3,177
5,407
4,991
4,991
Fund Balance:
Reserved 1b120% of revenue
1,435
1,302
1,267
1,375
1,375 1,389
1,555
1,670
1,753
1,840
1,834
1,834
Unreserved
5,206
5,337
5,720
4,830
3,315 1,869
1,629
814
1,423
3,566
3,157
3,157
Ending Balance
6,641
6,639
6,987
6,204
4,690 3,259
3,184
2,484
3,177
5,407
4,991
4,991
(a) Revenues in excess of (less than) expenditures
(b) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2023 - 2028 Financial Planning Model XXXI I 9/ 5022
ATTACHMENT D-1
NOTES TO WATER ENTERPRISE FUND
1) Rates reflect increases of 7.5% in 2023, 7.5% in 2024, and 5%14% in 2025 through 2028.
These rate increases are essential to sustain our reserve balance and cover any possible
increases from Cascade Water Alliance (CWA). We will continue to review the annual rate
model to confirm that the proposed increases are necessary.
Future water purchased at additional costs will be passed on to ratepayers. We have identified
Cascade Water Alliance's revenues and expenditures to better reflect the actual water charges
and the respective increases. CWA has proposed rate increases of 2.2% in 2023 and 2.2% in
2024.
2) Connection fees are estimated for the Allentown/Foster Point and Duwamish projects.
3) Cascade Water Alliance is split out to identify the actual costs of purchased water. CWA has
scheduled increases in their six-year planning model that will affect our water rates.
4) Debt schedule includes Public Works Trust Fund (PWTF) loans and Bonds.
Water Debt Service includes: Expires 2023 2024
2004 PWTF Allentown (26%) 7/1/24 $ 81,431.74 $ 81,028.63
2006 Bond Allentown (26%) 12/31/26 46,388.75 46,648.51
Subtotal $127,820.49 $127,677.14
2018 Public Works Shops (17%) 12/31/38 260,559.00 260,856.50
2019 Public Works Shops (17%) 12/31/39 63,245.27 63,189.17
Total $323,804.27 $324,045.67
5) An Interfund Utility Tax was approved in October 2009 for the water, sewer, and surface
water utilities. Gross revenues are currently taxed 10% through December 31, 2027.
6) The Working Capital Reserve Fund's policy was updated in 2012 per Resolution No. 1774 to
maintain an adequate fund balance in each of the enterprise funds. For the Enterprise Funds,
the unrestricted fund balance shall equal or exceed 20% of the previous year's revenue,
exclusive of significant non-operating, non-recurring revenues.
7) The Senior Water/Sewer Engineer's salary and benefits are split evenly between the water
department and the sewer department. For 2023 and 2024, Technology staff will continue to
charge at 22% for the GIS Coordinator and 10% for the Information Systems Project Analyst.
Water Enterprise Fund
The City's Enterprise Funds account for utility operations that are self -
supported through user charges. The utilities are financed and operated
like a private business enterprise which requires periodic determination of
revenues earned; expenses incurred, and net income for capital
maintenance, public policy, management control and accountability. The
Water Fund accounts for operations and capital improvements to provide
water to a portion of City residents. King County Water District 125 and
Highline Water District also supply water to City residents.
2023 — 2028 Financial Planning Model
XXXIII 161
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2023 - 2028
WATER ENTERPRISE FUND
401
CIP **Other After Six
Page # PROJECT TITLE 2023 2024 2025 2026 2027 2028 TOTAL Sources Years
57 S 152nd Street Waterline Extension & Replacer 1,880 0 0 0 0 0 1,880 0 0
58 Water Reservoir and Pump Station 0 750 1,000 3,000 4,600 0 9,350 9,350 7,000
59 Update GIS Water System Inventory 67 0 0 50 105 0 222 0 0
61 Smart Water Meters Upgrade 0 1,250 1,000 0 0 0 2,250 1250 0
62 S 149th St & S 150th St Watermain Replaceme 0 575 925 0 0 0 1,500 0 0
63 Annual Water Repair 0 100 200 400 500 0 1,200 0 1,500
64 Large Water Meters Replacement 50 150 150 150 100 100 700 0 200
65 Baker Blvd Water Main Replacement 0 0 0 0 150 2,500 2,650 1,225 0
Strander Blvd Waterline Upgrade 0 0 0 0 0 0 0 0 3,450
Allentown Phase III - Water Revitalization 0 0 0 0 0 0 0 0 1,650
57th Ave S Waterline Replacement 0 0 0 0 0 0 0 0 975
Southcenter Blvd Water Main Replacement 0 0 0 0 0 0 0 0 2,500
S 140th St Waterline Replacement 0 0 0 0 0 0 0 0 1,225
S 180th & W Valley Loop/Renton Turnover 0 0 0 0 0 0 0 0 2,550
Foster Area Water Upgrade 0 0 0 0 0 0 0 0 2,750
West Valley Hwy East Side Water Looping 0 0 0 0 0 0 0 0 2,200
58th Ave S Water Main Replacement 0 0 0 0 0 0 0 0 1,450
West Valley Deep Water Main Replacement 0 0 0 0 0 0 0 0 1,350
65th Ave S Water Main Replacement 0 0 0 0 0 0 0 0 3,150
49th Ave S Water Main Replacement 0 0 0 0 0 0 0 0 2,000
S 180th St Water Main Replacement 0 0 0 0 0 0 0 0 1,232
Evans Black Dr Water Main Replacement 0 0 0 0 0 0 0 0 780
S 112 St Water Looping 0 0 0 0 0 0 0 0 1,140
S 153rd St Water Main Replacement 0 0 0 0 0 0 0 0 350
Corporate Dr S Water Main Replacement 0 0 0 0 0 0 0 0 560
Ryan Hill Watermain Improvements 0 0 0 0 0 0 0 0 4,650
Crystal Springs Intertie with Highline WD - 500 i 0 0 0 0 0 0 0 0 325
Grand Total 1,997 2,825 3,275 3,600 5,455 2,600 19,752 11,825 39,692
** Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2028
Changes from 2021 to 2023 CIP: can be found in the City's website under
Additions Public Works Capital Improvement Program.
S 149th St & S 150th St Watermain Replacement
Large Water Meters Replacement
Smart Water Meters Upgrade
Annual Water Repair
Deleted:
Water Comp Plan Completed
Macadam Road completed
2023 - 2028 Capital Improvement Program 9/?2022
Residential Sewer Rate Comparison as of September 2022
2022
Ranking
CITY
2023 King
2022 City County
Charge Sewer
2022 total
1
MERCER ISLAND
$ 78.66
$ 52.11
$ 130.77
2
DUVALL
$ 77.86
$ 52.11
$ 129.97
3
SEATTLE (Typical)
$ 73.14
$ 52.11
$ 125.25
4
SKYWAY
$ 58.64
$ 52.11
$ 110.75
5
TACOMA
$ 52.26
$ 52.11
$ 104.37
6
MIDWAY SEWER DISTRICT
$ 48.35
$ 52.11
$ 100.46
7
LYNNWOOD
$ 47.93
$ 52.11
$ 100.04
8
LAKEHAVEN
$ 46.39
$ 52.11
$ 98.50
9
SAMMAMISH PLATEAU
$ 39.29
$ 52.11
$ 91.40
10
SOUTHWEST Suburban Sewer
$ 38.75
$ 52.11
$ 90.86
11
NE SAMMAMISH
$ 30.86
$ 52.11
$ 82.97
12
RENTON
$ 30.51
$ 52.11
$ 82.62
13
TUKWILA 2022
$ 30.00
$ 52.11
$ 82.11
14
WOODINVILLE
$ 28.80
$ 52.11
$ 80.91
15
BELLEVUE
$ 23.80
$ 52.11
$ 80.90
16
CEDAR RIVER W & S
$ 27.02
$ 52.11
$ 79.13
17
KENT
$ 26.31
$ 52.11
$ 78.42
18
AUBURN
$ 25.99
$ 52.11
$ 78.10
19
COAL CREEK
$ 22.24
$ 52.11
$ 74.35
20
BLACK DIAMOND
$ 21.78
$ 52.11
$ 73.89
21
SOOS CREEK
$ 21.22
$ 52.11
$ 73.33
22
ALDERWOOD
$ 20.64
$ 52.11
$ 72.75
23
ISSAQUAH
$ 19.89
$ 52.11
$ 72.00
24
REDMOND
$ 19.86
$ 52.11
$ 71.97
25
LAKE FOREST PARK
$ 19.02
$ 52.11
$ 71.13
26
ALGONA
$ 17.67
$ 52.11
$ 69.78
27
KIRKLAND
$ 16.47
$ 52.11
$ 68.58
28
VALLEY VIEW SEWER
$ 16.07
$ 52.11
$ 68.18
29
NORTHSHORE
$ 13.97
$ 52.11
$ 63.97
Average $ 86.46
haps://tukwilawa-my.sharepoint.com/personal/griffin_ lerner_tukwilawagov/Documents/Documents/Utility Rate Surveys Water, Sewer & SSWM 2022
163
ATTACHMENT E
City of Tukwila
SEWER ENTERPRISE FUND
2023 - 2028 Analysis in 000's
REVENUES
Actual
2020
Actual
zozz
Actual
zozz
Budget
zozz
Estimate
2023
2024
2025
2026
2027
2028
Total
Monthly Sewer Charges
KC
0%
KC
+4.5%
0%
1,917
�
+5.75%; city
KC +5% 'City
3%
KC +5% 'City
h1
3%
+5% City
KC +5% 'CityKC +
3% 3%
KC+S%'City
5%
2,594
King County Metro Sewer ltl
4,840
4,658
4,173
5,225
4,690
5,526
5,830
6,151
6,489
6,846
7,188
38,029
Regular City Sewer (2)
4,927
3,477
4,937
4,730
4,800
5,085
5,238
5,395
5,557
5,723
6,010
33,007
Subtotal Sewer Revenue
9,767
8,135
9,110
9,955
9,490
10,611
11,068
11,545
12,045
12,569
13,197
71,036
Other Misc. Revenue
976
467
312
305
504
300
300
1,300
300
300
300
3,321
Grant/Bonds/PWTF
0
0
0
0
0
0
0
0
0
0
0
0
Sewer Connection Fees (3)
150
143
163
25
106
0
100
100
100
100
100
594
Total Revenues
10,893
8,745
9,585
10,285
10,100
10,911
11,468
12,945
12,445
12,969
13,597
74,951
EXPENDITURES
Sewer Operations & Maintenance
King County Metro Sewer (4)
4,840
4,658
4,173
5,225
4,690
5,526
5,830
6,151
6,489
6,846
7,188
38,083
Regular City Sewer (5)
1,330
1,435
1,382
1,660
1,611
1,769
1,828
1,883
1,939
1,998
2,057
12,072
Debt Service (6)
356
355
352
352
352
348
347
154
154
42
42
2,059
Debt Service/Costs for PW Shops
80
95
103
200
1,200
606
200
671
671
671
671
3,651
Interfund Utility Tax (7) 10%
1,006
844
942
1,021
999
1,091
1,137
1,285
1,235
1,287
1,350
7,709
Engineering Labor (9)
93
91
436
478
664
701
754
777
800
824
845
4,610
Subtotal
7,705
7,478
7,388
8,936
9,516
10,041
10,096
10,920
11,288
11,667
12,153
68,184
Sewer Capital - CIP Program
416
418
2,011
2,865
2,000
2,592
3,325
2,725
2,725
3,075
1,975
18,243
Total Expenditures
8,121
7,896
9,399
11,801
11,516
12,633
13,421
13,645
14,013
14,742
14,128
86,427
FUND BALANCE
Change in Fund Balancelal
2,772
849
186
(1,516)
(1,416)
(1,722)
(1,953)
(699)
(1,567)
(1,773)
(530)
(8,688)
Beginning Balance
8,651
12,269
12,646
12,832
13,158
11,742
10,020
8,067
7,368
5,801
4,028
12,646
Ending Balance
11,423
13,118
12,832
11,316
11,742
10,020
8,067
7,368
5,801
4,028
3,497
3,958
Fund Balance:
Reserved 1b120% of revenue
2,076
2,179
1,982
1,917
1,917
2,057
2,182
2,294
2,589
2,489
2,594
2,589
Unreserved
9,347
10,939
10,850
9,399
9,825
7,963
5,885
5,074
3,211
1,538
904
3,211
Ending Balance
11,423
12,646
13,158
11,316
11,742
10,020
8,067
7,368
5,801
4,028
3,497
5,801
lai Revenues in excess of (less than) expenditures
(b) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2023 - 2028 Financial Planning Model XXXVI11 9/M022
ATTACHMENT E-1
NOTES TO SEWER ENTERPRISE FUND
1) King County Metro sewer and Tukwila's sewer have been split out to present the revenues
separately. Metro increases will be passed through to the sewer ratepayers. King County Metro
sewer fees will increase 5.75% in 2023 per KC Ordinance No. 19447 and we have factored in
potential King County increases for 2024 through 2028.
2) 3 percent increases are proposed for Tukwila sewer in 2023 and 2024. We will continue with
the annual rate model review to confirm that the proposed increases are necessary.
3) Sewer connection fees for Allentown Phase I and Allentown/Foster Point Phase II.
4) King County Metro Sewer treatment fees are passed through to ratepayers.
5) City's basic operation and maintenance costs.
6) Includes the Public Works Trust Fund (PWTF) Loan and the 2006 Bond for the Allentown/Foster
Point Phase II Sewer Improvement Project.
Sewer Debt Service includes: Expires 2023 2024
2004 PWTF Allentown (62%) 7/1/24 $194,183.39 $193,222.08
2006 Bond Allentown (62%) 12/31/26 110,619.33 111,238.76
2013 PWTF CBD Sewer Rehab 12/31/33 43,233.72 43,027.85
Subtotal $351,672.31 $351,543.63
2018 Public Works Shops (10%) 12/31/38 145,606.50 145,772.75
2019 Public Works Shops (10%) 12/31/39 35,342.95 35,311.60
Total $528,985.89 $528 573.04
7) An Interfund Utility Tax was approved in October 2009 for the water, sewer, and surface water
utilities. Gross revenues are currently taxed 10% through December 31, 2027.
8) The Working Capital Reserve Fund's policy was updated in 2012 per Resolution No. 1774 to
maintain an adequate fund balance in each of the enterprise funds. For the Enterprise Funds,
the unrestricted fund balance shall equal or exceed 20% of the previous year's revenue,
exclusive of significant non-operating, non-recurring revenues.
9) The Senior Water/Sewer Engineer's salary and benefits are split evenly between the water
department and the sewer department. For 2023 and 2024, Technology staff will continue to
charge at 22% for the GIS Coordinator and 10% for the Information Systems Project Analyst to
assist with the GIS Inventory of the sewer fund. The Sewer fund is also splitting a GIS
Technician position with the Surface Water fund.
Sewer Enterprise Fund
The City's Enterprise Funds account for utility operations that are self -
supported through user charges. The utilities are financed and operated like
a private business enterprise which requires periodic determination of
revenues earned; expenses incurred, and net income for capital
maintenance, public policy, management control and accountability. The
Sewer Fund accounts for operations and capital improvements to provide
sanitary sewer to a portion of City residents. Valley View Sewer District also
provides sewer in the City.
2023 — 2028 Financial Planning Model
XXXV 165
Page
# PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2023 - 2028
SEWER ENTERPRISE FUND
402
*Other After Six
2023 2024 2025 2026 2027 2028 TOTAL Sources Years
68 Annual Sewer Repair Program
69 GIS Sewer System Inventory
70 Sewer Lift Station No. 5 Rebuild
71 Sewer Lift Station No. 3 Upgrade
72 Abandon Sewer Lift Station No. 9
73 Southcenter Blvd Sewer Upgrade
74 Lift Stations Generators Load Bank Testing
75 Sewer Repair at 14438 59th Ave S
76 Future Sewer Lift Station No. 7
Ryan Hill - Sewer Revitalization
Sewer Lift Station No. 12
APW Sewer connection to KC Metro
Allentown Phase III - Sewer Revitalization
MLK Way Sewer Improvements
Valley View West Hill Sewer Transfer Area
1,050 1,100 1,050 1,100 800 850 5,950 0 6,450
67 0 0 0 0 0 67 0 0
1,300 1,250 0 0 0 0 2,550 0 0
0 600 300 0 0 0 900 0 910
150 350 300 0 0 0 800 0 0
0 0 300 900 900 0 2,100 0 0
25 25 25 25 25 25 150 0 0
0 0 750 0 0 0 750 0 0
0 0 0 700 1,350 1,100 3,150 0 0
0 0 0 0 0 0 0 0 1,900
0 0 0 0 0 0 0 0 3,650
0 0 0 0 0 0 0 0 650
0 0 0 0 0 0 0 0 1,900
0 0 0 0 0 0 0 0 1,000
0 0 0 0 0 0 0 0 0
Grand Total
2,592 3,325
2,725 2,725 3,075 1,975 16,417
0 15,460
Changes from 2021 to 2023 CIP:
Combined Annual Sewer Repair and CBD Rehab
Added Lift Station No. 5 Rebuild
Added Lift Station No. 3 Upgrade
Added MLK Way & 47th Ave S Sewer Improvements
Deleted:
CBD Sanitary Sewer Rehabilitation
Sewer Lift Station No. 2 Upgrades
Sewer Comprehensive Plan
Sewer Replacement at 14025 Interurban Ave S
** Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2028
can be found in the City's website under
Public Works Capital Improvement Program.
Sewer Lift Station Locations
Lift Station No. 1 - Master Telemetry Panel
Lift Station No. 2 - Backup Dialer
Lift Station No. 3
Lift Station No. 4
Lift Station No. 5
Lift Station No. 6
Lift Station No. 7 - Abandoned in 2011
Lift Station No. 8
Lift Station No. 9
Lift Station No. 10
Lift Station No. 11
Lift Station No. 12
Lift Station No. 13
600 Minkler Blvd. - Shops
1105 Andover Pk W (at Minkler Blvd)
550 Minkler Blvd
6790 Todd Blvd - Southcenter South
6830 Fort Dent Way (entrance to Park)
6820 Fort Dent Way (only serves Park)
was at 14601 Interurban - replaced by gravity sewer
13359 56th Ave S - Foster Point (new in 2007)
12638 Interurban - Suburban Propane
12218 51st PI S - Allentown (new in 2007)
18799 Southcenter Pkwy (new in 2012)
255 Andover Park W - Key Bank parking lot at mall
Future - Tukwila Pkwy & Andover Park W
2023- 2028 Capital Improvement Program
9//Vi�022
SINGLE FAMILY SURFACE WATER
RATES
as of September 2022
City ranking CITY
2022
Yearly Rate
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Seattle (Mid 6,000 SF)
$ 632.67
Bellevue (1/3 acre)
$ 448.65
Sammamish
$ 396.00
Tacoma (typical)
$ 337.80
Newcastle
$ 330.09
Shoreline
$ 313.24
King County
$ 289.00
Duvall
$ 265.80
Mercer Island
$ 238.86
lssaquah
$ 214.74
Tukwila 2022
$ 204.00
Redmond
$ 198.72
Auburn
$ 190.56
Renton
$ 189.12
Algona
$ 186.00
Burien
$ 184.94
Lynnwood
$ 172.08
Kent
$ 161.76
Federal Way
$ 153.18
SeaTac
$ 149.91
Average $262.86
haps://tukwilawa-my.sharepoint.com/personal/griffin_lerner_tukwilawa_gov/Documents/Documents/Utility Rate Surveys Water, Sewer & SSWM 2022
Exhibit D-3
167
ATTACHMENT F
City of Tukwila
SURFACE WATER ENTERPRISE FUND
2023 - 2028 Analysis in 000's
REVENUES
2019
Actual
2020
Actual
2021
Actual
2022
Budget
2022
Estimate
2023
2024
2025
2026
2027
2028
Total
Reserved (b)20% of revenue
+5%
+3%
+2%
+5%
+5%
+5%
+5%
+5%
+5%
+3%
+5%
1,958
Annual Billings (Current) (1)
6,739
6,971
7,021
7,350
7,390
7,760
8,147
8,555
8,983
9,252
9,715
52,411
Other Revenues
71
2
8
50
18
60
65
70
70
75
75
490
Grants/Bond Proceeds ill
310
1,069
1,540
3,109
625
3,944
3,164
8,746
3,495
215
4,666
24,230
Total Revenues
7,120
8,042
8,569
10,509
8,033
11,764
11,376
17,371
12,548
9,542
14,456
77,056
EXPENDITURES
Operations & Maintenance
2,823
2,299
2,434
2,262
2,587
2,376
2,485
2,560
2,636
2,715
2,797
15,569
Debt Service (3)
301
300
288
285
285
283
282
22
22
-
-
891
Debt Service/Costs for PW Shops
189
235
255
495
495
1,441
971
1,463
1,463
1,463
1,463
8,264
Interfund Utility Tax (4) 10%
676
692
702
740
738
776
815
855
898
925
971
5,241
Engineering Labor(6)
148
673
724
708
836
855
896
997
1,026
1,057
1,089
5,920
Subtotal
4,137
4,199
4,403
4,490
4,941
5,731
5,449
5,897
6,046
6,161
6,320
35,603
SSWM Capital - CIP Program
917
3,433
3,507
7,300
3,051
7,316
6,305
12,995
7,340
1,965
6,673
42,594
Total Expenditures
5,054
7,632
7,910
11,790
7,992
13,047
11,754
18,892
13,386
8,126
12,993
78,197
FUND BALANCE
Change in Fund Balance (e)
2,066
410
659
(1,281)
41
(1,283)
(377)
(1,521)
(838)
1,416
1,462
(1,141)
Beginning Balance
2,709
4,775
5,185
5,903
5,903
5,944
4,661
4,283
2,762
1,924
3,341
5,944
Ending Balance
4,775
5,185
5,903
4,622
5,944
4,661
4,283
2,762
1,924
3,341
4,803
4,803
Fund Balance:
Reserved (b)20% of revenue
1,362
1,395
1,406
1,410
1,482
1,564
1,642
1,725
1,811
1,865
1,958
1,958
Unreserved
3,413
3,790
4,497
3,212
4,462
3,097
2,641
1,037
114
1,475
2,845
2,845
Ending Balance
4,775
5,185
5,903
4,622
5,944
4,661
4,283
2,762
1,924
3,341
4,803
4,803
ial Revenues in excess of (less than) expenditures
(b) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2023 - 2028 Financial Planning Model XXXVI11 9/182022
ATTACHMENT F-1
NOTES TO SURFACE WATER ENTERPRISE FUND
1) Reflects proposed rate increases of 5% in 2023 through 2028, excluding a 3% increase in
2027. We will continue with the annual rate model review to confirm that the proposed Surface
Water rate increases are necessary.
The National Pollution Discharge Elimination System (NPDES) permit required by the State
Department of Ecology is having a significant impact on the Surface Water fund.
2) Potential grants and/or bond revenue. Included is the estimated Department of Ecology grant
for NPDES and King County Flood Control District Opportunity grants as well as significant
grant funding for the Nelsen Side Channel, the Storm Quality Retrofit Project, S 131st PI
Drainage Improvements, the Gilliam Creek Fish Barrier Removal Project and the Chinook
Wind Project.
3) Debt schedule includes PWTF loans and the 2006 Allentown Bond.
Debt Service includes: Expires 2023 2024
2004 PWTF Cascade View Const. 7/01/24 $ 224,365.58 $ 223,254.86
2004 PWTF Allentown (12%) 7/01/24 37,956.00 37,398.00
2006 Bond Allentown (12%) 12/31/26 21,410.19 21,530.08
Subtotal $283,359.65 $282,182.76
2018 Public Works Shops (23%) 360,185.00 360,596.00
2019 Public Works Shops (23%) 12/31/38 134,427.00 134,350.00
Total $ 777,971.00 $ 777,130.00
4) An Interfund Utility Tax was approved in October 2009 for the water, sewer, and surface water
utilities. Gross revenues are currently taxed 10% through December 31, 2027.
5) The Working Capital Reserve Fund's policy was updated in 2012 per Resolution No. 1774 to
maintain an adequate fund balance in each of the enterprise funds. For the Enterprise Funds,
the unrestricted fund balance shall equal or exceed 20% of the previous year's revenue,
exclusive of significant non-operating, non-recurring revenues.
6) Cost of engineering to support capital projects, NPDES, and operation efforts in-house. For
2023 and 2024, Technology staff will continue to charge 22% for the GIS Coordinator and
10% for the Information Systems Project Analyst to assist with the GIS Inventory of the
Surface Water fund. The Surface Water Fund is also hiring a GIS Field Technician (split with
Sewer) and another NPDES Inspector.
Surface Water Enterprise Fund
The City's Enterprise Funds account for utility operations that are self -
supported through user charges. The utilities are financed and operated like
a private business enterprise which requires periodic determination of
revenues earned; expenses incurred, and net income for capital
maintenance, public policy, management control and accountability. The
Surface Water Enterprise Fund accounts for operations and capital
improvements for the City's storm drainage and surface water management
function. Surface Water projects are required to meet Federal, State and local
mandates. The largest contributor to the surface water enterprise fund is the
City of Tukwila.
2023 - 2028 Financial Planning Model
XXXV I I 169
CIP
Page
PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2023 - 2028
SURFACE WATER
412 Fund
**Other After Six
2023 2024 2025 2026 2027 2028 TOTAL Sources Years
79 Annual Small Drainage Program
80 Storm Water Quality Retrofit Program
81 NPDES Program
82 Regional Surface Water Partnerships
83 Green the Green Program
84 Gilliam Creek Fish Barrier Removal
85 Tukwila 205 Levee Certification
86 Nelsen Side Channel
87 Surface Water Comprehensive Plan
88 S 131st PI Drainage Improvements
89 Chinook Wind Public Access
90 Chinook Wind Extension
91 Surface Water GIS Inventory
92 Northwest Gilliam Storm Drainage System
93 Duwamish Rvrbk Stabilization at S 104th St
94 Duwamish Hill Preserve
95 Soils Reclamation/Decant Facility
96 Tukwila Pkwy/Gilliam Creek Outfalls
97 S 146th St Pipe & 35th Ave S Drainage
S 143rd Street Storm Drainage System
TUC Surface Water Conveyance
900
1,620
60
75
185
600
650
600
165
671
422
150
47
100
150
370
551
0
0
0
0
900
100
60
75
180
650
650
300
0
2,400
0
150
0
840
0
0
0
0
0
0
0
970
100
60
75
105
8,500
650
1,825
0
0
0
50
0
0
0
600
0
60
0
0
0
970
2,200
60
75
160
0
650
0
0
0
0
1,060
0
0
200
0
1,550
415
0
0
0
970
100
65
100
80
0
650
0
0
0
0
0
0
0
0
0
0
0
0
0
0
970
100
65
100
188
0
650
0
0
0
0
0
0
0
0
4,600
0
0
0
0
0
5,680
4,220
370
500
898
9,750
3,900
2,725
165
3,071
422
1,410
47
940
350
5,570
2,101
475
0
0
0
0 673
3,095 115
150 65
87 100
319 200
8,050 0
900 0
1,932 0
0 400
1,960 0
126 0
650 0
0 0
0 1,100
0 6,700
5,000
1,468 1,375
0 0
0 1,066
0 1,096
0 541
Grand Total
7,316 6,305 12,995 7,340 1,965 6,673 42,594 23,737 13,431
Changes from 2021 to 2023 CIP:
Additions
Duwamish Hill Preserve Phase III
Duwamish Rvrbk Stabilization at S 104th St
Chinook Wind Extension
Consolidated multiple items into Regional Partnerships
Deletions
Riverton Creek Flap Gate Removal
East Marginal Wy S Stormwater Outfalls
** Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2028
can be found in the City's website under
Public Works Capital Improvement Program.
Surface Water Lift Station Locations
Storm Lift Station No. 15
Storm Lift Station No. 16
Storm Lift Station No. 17
Storm Lift Station No. 18
Storm Lift Station No. 19
5910 S 180th St - Mizuki Grill
7420 S 180th St (underpass)
530 Strander Blvd - Bicentennial Park
4225 S 122nd St - Allentown
Fort Dent Park (Parks Dept.)
2023 - 2028 Capital Improvement Program