Loading...
HomeMy WebLinkAboutRes 1261 - 1994-1999 Transportation Improvement Program s I ✓fo Zsl a r J 1908 �s f C ity o Washington Resolution No. 1261 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS: Section 1. Prom Ado pted• The Six -Year Transportation Improvement Program for the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1994 -1999, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Pro gram. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular meeting thereof this —5?1 5 e day of 1993. Steve 'Lawrence, Council President ATTEST /AUTHENTICATED: ne' E. Cantu, City Clerk APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY Filed with the City Clerk: 6 17 Passed by the City Council: lv —I ­�;I3 Resolution Number Six Year Transoortation Program 06/16/93 1994 to 2000 Paoe 1 Agency City of Tukwila :ity 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) 01 Pri Identification Type Lenqth Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th 10 01 REST VALLEY HWY AT S 180 14 0.42 6 PE 0 0 0 0 0 0 0 0 STREET RW 0 0 0 0 0 0 0 0 West Valley Hwy, S 180 CN 01194 510 FAUS 1,115 T 475 2,100 2,100 0 0 0 Street TOTAL 510 1,115 475 2,100 1000' north /south 6 500' east /west Short -term widening_ all four legs of intersection, bridge widening, signal modification, channelization. 11 02 SOUTHCENTER BLVD 02 0.28 6 PE 0 0 0 0 0 0 0 0 Southcenter Blvd RW 0 0 0 0 0 0 0 0 68 Avenue to Grady Way Cif 07,93 4 STP 1,088 T 3,200 8,944 5,444 500 0 0 Widen to 5 lanes on new TOTAL 4,656 1,088 3,200 6,944 alignment with new bridoe over Green River, structure undercrossing realigned I405 ramps, new bridge for ramps over Green River, sionalization, channelization, signing_, drainage, landscapinq, on -ramp HOV lane with SCU I 10 03 EAST MARGINAL WAY 02 1.00 P PE 0 0 0 0 0 0 c; 0 RW 0 0 0 0 0 0 0 0 Boeino Access Rd to CN 01/94 500 STP, NHS 5.180 T 2,120 8,400 2,000 6000 0 cu midpoint TOTAL 500 5,180 2,720 8,400 Design and construct widening_, curb and -Utter, drainage, traf *ic signals, utility pole relocation, lighting, sidewalks, including_ Boeinq Access Rd intersection. ia 04 E A S IT MARGINAL stn( 02 0.93 P PE 0 1! 0 (i RW 0 0 fi j t1 0 0 Midpoint to North City CN 011 5011 STP,NHS LJ. T 3,000 6060 0 0 b,ri;n Licht TOTAL 501 000 Design and construct Widening, curb and gutter, sidewalk, drainage, traffic signals, utility pole relc_ +icr;. Six Year Transportation Program 06/14/93 1994 to 200 Page Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) C1 Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th 11 05 SOUTHCENTER 14 0.60 W PE 0 0 0 0 0 U 0 0 PARKWAY /STRANDER BLVD RW 0 0 0 0 0 c} 11) CN 09/93 154 STP,STP(H) 356 0 540 540 0 0 0 1000' north, 1400' south, TOTAL 154 3S6 U 540 500' east Construct pavement overlay /rehabilitation and safety and capacity improvements including signal and channelization modifications for additional left turn lane on Strander, sidewalk, lighting. 1i 06 PACIFIC HWYiS 130 ST /S 0.00 P PE 0 0 0 0 0 s1 132 CT RW s! 0 0 0 0 0 0 0 CN 01/94 140 STP(H) 295 0 425 425 0 1 0 S 130 St to S 132 St TOTAL 1411 295 0 425 Design and construct signals and channelization at S 130 and S 132 intersections, reconstruct east approach of S 130, and modify driveway access. i1 07 ANDOVER PARK WEST 04 0.40 P PE 01;94 0 100 0 100 60 40 0 0 Tukwila Pkwy to Strander CN 01195 150 STP 63 U 1,010 1,223 0 1 0 0 Blvd. TOTAL 150 163 1,010 1,323 Design and construct widenino to 5 lanes including pavement overlay /rehabilitation, curb and gutter, drainage, sidewalks, channelization, iightinq, signing, signal modification. 1<< 08 PACIFIC HIGHWAY 03 2.71 P PE 09/93 0 900 0 900 300 600 0 0 RW 09:a4 0 300 0 300 0 300 0 0 5 116 Way to S 152 St CN 01/96 750 NHS, STP 4,250 T 5,1.;00 10,000 0 0 2,300 7,7`10 Design and construct TOTAL 7ro 5,450 5 11,200 paving, curb and gutter, drainage, sidewalks, Iighting, utility undergrounding. 10 09 MULTI -MODAL TRANSFER 0.00 P PE 07/94 120 STP,CMAQ 3v 0 150 150 0 0 c} STATION RW 01197 1,600 STP,CMAQ 400 0 2,000 0 0 0 2,000 interurban,6rady Way,I405 CN i1 11 c} c} 0 0 0 TOTAL 1, 7 2t1 4 i1 2.150 PrPnarp de=ien reeert. financing alternatives for site in City. Six Year Transportation Program 06/14/93 1994 to 2000 Paae 3 Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Utii Start Federal: Fund (Local Agency) Cl Pei Identification Type Length Code Date Cost Fund Code Local Src Cost Total ist 2nd 3rd 4th -6th 11 i) TRAFFIC SIGNAL SYSTEM 12 0.00 P PE 01/94 75 STP 250 0 325 80 50 50 145 RW 0 0 0 0 0 is 0 0 Streets in CBD. CM 06195 250 STP 1,615 i! 1,865 450 450 965 Design report, design, TOTAL 725 1,865 0 2,190 and install traffic signal interconnect system with master controller in CBD. 11 11 SOUTHCENTER PARKWAY 12 1.00 P PE 06/94 0 75 0 75 75 0 0 0 RW 0 0 0 0 0 i+ 0 0 168 St to S 180 St CN 111 0 450 0 450 75 175 200 0 Design and construct TOTAL G 525 525 traffic signals, pedestrian crossings and combine driveways. 10 12 PACIFIC HIGHWAY BRIDGE 09 0.10 PE 03/94 0 250 0 250 250 0 0 0 RW 0 0 0 0 0 0 0 0 Duwamish River crossino_ CN 03/95 2,800 BR 1,400 0 4,200 0 1,500 2 0 Recostruct to 6 lanes TOTAL 2 1,650 0 4,450 including curb and gutter, sidewalk, drainage, channelization, lighting, signs, trail. 10 13 16 AVENUE SOUTH BRIDGE 10 0.01 S PE 0 0 0 0 0 0 0 0 RW 0 0 0 0 0 0 0 0 Duwamish River Crossing CN 06/94 0 700 0 700 700 0 0 0 TOTAL 0 700 0 700 12 14 MINKLER BOULEVARD 01 0.38 T PE 07/93 0 100 0 100 0 0 0 0 RW 0 0 0 0 0 0 0 0 Southcenter Pkwy CN 02/94 0 700 0 700 700 0 0 1 Andover Park W. TOTAL 0 600 i+ 800 New 4 -lane street including paving, curb and qutter, drainage, sidewalks, lighting, signing, channelization, and signal at SC Pkwy. 10 15 WEST VALLEY HIGHWAY 12 0.45 T PE 10/94 72 STP 118 0 190 90 100 0 0 RW 0 0 0 0 0 0 0 0 1405 TO Strander Blvd. CN 011 400 STP 00 0 1,030 0 0 480 550 Design and construct TOTAL 472 748 0 1,220 widening from 6 to 7 lanes including paving, drainage, curb and gutter, lighting, channelization. Add HOV lanes NB and SB at S 156 +ropt rnnnor} with WSDOT project for HOV lane on I405 NB an-ramp. Six Year Transportation Program 06/14/93 1994 to fjii Page 4 Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (local Agency) C1 Pri identification Type Length Code Date Cost Fund Code Local Src Cost Total ist 2nd 3rd 4th -6 13 116 S 159 Street 03 0.10 P PE 06/94 0 50 0 50 50 0 0 0 RW 0 0 n 0 0 j 0 0 West Valley Hwy to Nelsen CN 0519 0 2 35 0 235 ±i 0 235 0 Place TOTAL ?8 c 295 0 285 Design and construct overlay, curb and Gutter, drainage on existing_ 4 lane street. 12 17 BRIDGE RAILS L GUARDRAILS 11 0.00 PE 07/93 4 STP(H) 1 0 5 5 0 0 0 Various city streets and RU 0 0 0 0 0 0 0 0 locations. CN 01194 42 STP(H) 11 53 53 0 tj TOTAL 46 12 0 58 Repair and replace bridge rails and approach guardrails. 11 18 ANDOVER PARE: EAST 15 0.110 PE 07/93 9 STP(H) 1 0 10 10 0 0 0 RAILROAD XING RW 0 0 0 0 0 0 0 0 CN 03/94 126 STP(H) 14 ti 140 140 0 0 Strander Blvd to Treck TOTAL 1135 15 0 1 1 50 Drive Design and construct railroad crossing signal. 10 19 MARTIN LUTHER KING WAY 04 0.10 PE 01/94 0 3 O 12 15 15 0 0 0 Old SR900 RW 0 0 0 0 0 0 0 0 Boeing Access Rd to North CN 07'194 0 35 O 139 173 173 0 G' 0 City Limit TOTAL 0 38 150 189 Design and construct pavement rehabilitation, drainage, curb and gutter, sidewalks. 11 20 BRIDGE PROGRAM 11 0.00 PE 01/94 0 350 0 360 95 11 112 142 Existing bridges in City RW 0 0 0 0 0 0 0 0 Various locations in City Cid 01/95 0 695 0 695 0 129 133 433 Inspect, evaluate, TOTAL 0 1,055 0 1,055 design, and construct repairs and replacements. ii 21 OVERLAY AND ARTERIAL 04 0.00 PE 07/94 0 '60 0 360 6111 60 60 190 PRESERVATION RW 0 0 0 0 0 0 0 0 CN 03194 600 STP 3,540 0 4,140 690 690 690 2,070 Various City Streets TOTAL 600 3,900 if 4,500 11 22 CBD SIDEWALKS AND TREES 05 0.00 PE 01/94 0 200 0 200 70 65 65 01 Various CBD streets RW 0 0 0 0 0 0 0 it CN 07/94 1,182 STP,CMAQ 1,1'18 0 2,200 73U 731 735 Design, construct, and ToIAIL 1.191 1,218 0' 2.400 acquire easements for Six Year Transportation Program o6/14/93 1994 5 2000 Page Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Furic Project imp Total Util Start Federal Fund (Local Agency) Cl Fri Identification Type Length Code Date Cost Fund Code Local Src Cost Total L t 2nd 3rd 4th -6th sidewalks on Southcenter Parkway, Andover Park West, Andover Park East, Strander Blvd, Ninkler Blvd, South 180 St, West Valley Hwy. 11 23 PEDESTRIAN PATHS 05 0.00 PE 01/94 0 72 0 72 12 12 12 36 Various City streets RW 0 0 0 0 0 0 0 0 CN 05194 0 829 0 828 138 139 1 1 38 414 Design and construct ped TOTAL 0 900 0 900 paths in various locations. 12 24 40 AVE /42 AVE 03 1.93 P PE 01/94 0 320 0 320 805 120 120 0 RW 0 0 0 0 f{ 0 0 0 S 131 to S 160 St. CN 03/94 0 3 0 3,680 920 1,3801 1,380 0 Design and construct TOTAL 0 4,000 0 4 paving, drainage, curb and gutter, sidewalks, lighting, utility undergrounding. Coordinate with City SeaTac. it 25 TRAFFIC CONTROL UPGRADES 14 0.00 PE 011 0 60 0 60 10 10 10 30 Various City streets RW 0 0 0 0 0 0 0 0 Various intersections in CH 06/94 0 630 0 630 105 105 105 315 City TOTAL 0 690 0 690 Design and construct left turn signals. 11 26 SOUTH 178 STREET 01 0.46 W PE 01/94 0 90 0 90 90 0 0 0 RW 0 0 0 0 0 0 0 0 Southcenter Pkwy to 15 CN 03195 0 470 0 470 0 470 0 0 Widen to 5 lanes on new TOTAL 0 560 0 560 alignment including pairing, curb and gutter, sidewalks, drainage, and lighting. 10 27 INTERURBAN AVENUE SOUTH 12 0.30 W PE 01/94 160 STP 40 0 200 200 0 0 0 Southcenter Blvd to Grady CN 01/95 800 STP 200 0 1,000 0 1,000 0 0 Way TOTAL 960 240 0 1,200 Design and construct widening including bridge, paving, curb and gutty, sidewalk for safety and capacity improvements. Six Year Transportation Proaras 06/14/93 1 'M t 2000 sage v Agency v'ity of }.Vila City 132. County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Fur,c Project Imp Total Util Start Federal Fund (Local Agency) Ci Fri identification Type Length Code Date Cost Fund Code Local arc Cost Total Lt 21nd 3rd 4th -6th 10 28 PACIFIC HIGHWAY 12 0 clif PE 01'94 125 STP r'S i 3;3 'S 0 0 0 L((J iL_ a7�`- v RW 51 i} V t} 0 f_} 0 0 id f 0 i9, s J J =Li Pacific Hwy Br 0 x.00 1 1501 0 Luge to C Itl 1. LL `J f:' L�iE .r iy SF599 TOTAL 750 i 'i 0 2,5!itj Design and construct widening on Pacific Hwy and SR599 on -rUp for HOV improvements. 1 O rr 1 i P P "94 03 �t35 i'. 5i }5 5 0 500 1 L, €SANDER BOULEVARD 01 i,.LB E 0 EXTENSIIIN Rid 0 U 0 0 0 0 0 0 CN 01107 f} 1 0011 1 3,5 b 500 r} 6 Hest Valley Hwy to TOTAL 0 3,50 7 ,500 7,005 Datesdale Design and construct new 5 lane arterial with separated grade crossing railroad tracts. Joint project with Fenton. 10 30 VALLEY SIGNAL 12 0.00 PE 0i/94 48 STP 12 0• 60_i 20 2u 1 10 0 COORDINATION RW 03 0 0 0 0 0 W Valley Hwy, S 180 St. C•N 08/94 312 STP 78 0 390.1 130 130 130 0 1405 to SR516 TOTAL 350 90:} 0? 450 Desion report and equipment installation for interagency signal coordination on Nest Valley Hwy and S 1501 Street. Joint project with WSDDT, Fenton, Kent, King County. 12 31 42 AVENUE BRIDGE PAINTING 11 0.00 PE 07193 14 BR 14 0 28 0 0 0 0 42 Ave Bridge over EN 01:94 100 BR 100 0 200 200 0 0 0 Duwarish River TOTAL 114 il4 0 228 Repaint existing bridge 10 32 BOEING ACCESS READ BRIDGE 11 0.00 PE 07/93 10 BR 9 PAINTING RW 0 0 0 0 0 0 0 0 CN 01i 94 72 BR 7l 0 143 143 0 03 03 Boeino Access Rd over TOTAL 82 80 0 162 BNRR Repaint existing bridge. 1 33 INTERURBAN TRAIL 05 1.00 P PE 04093 0 54 0 50 0 0 0 RN 0 0 0 0 0 D r} 0 Strander Blvd to Fort C 01194 627 STP(E; 7 0 "n 0 7AA 0 0 0 0 t TOTAL 62- 12' 0 750 Design, acquire right of way, and construct trail Six Year Transportation Frovar, ')6/14/;3 1994 to 2000 Fage 7 Agency City of Tukwila City 1320 r. County it Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) CI Pri Identification Type Length Code Date Cost Fund Code Local Sri Cost Total 1st 2nd 3rd 4th -6th including bridge crossinq. 0 34 MULTI JURISDICTIONAL 06 0.00 PE 01/94 80 STP 20 0 ifin 100 0 0 0 DEPOSITORY RN 011 400 STP i00 0 500 0 500 0 0 C14 0 t? 0 0 0 0 0 t TOTAL 480 120 0 6 Develop muItijurisdictiona1 site(s) for deposit of street sweepings and catch basin cleanings prior to ultimate disposal. 0 35 COMMUTE TRIP REDACTION 1B 0.00 PE 07/93 20 STP 5 0 25 .1 0 6 0 RV 0 0 0 0 0 0 0 ti CN 0 0 0 0 0 0 0 0 Review parking policies. TOTAL 20 5 0 25 0 36 I405 MULTIMODAL CORRIDOR tj.il(? FE 05/93 0 5 0 5 5 0 0 i1 STUDY RN ft 0 0 0 0 0 0 0 CN it 0 0 0 0 0 0 0 Tukwila to Swamp Creek TOTAL 0 5 0 5 0 37 NON MOTORIZED 05 0.00 PE 01/94 0 5 0 5 5 0 0 0 TRANSPORTATION PLAN RV 0 6 0 C 0 0 0 it CMd 0 0 0 0 0 0 0 0 TOTAL 0 5 0 1 38 TRANSPORTATION 06 0.00 PE 01/94 0 5 0 5 5 0 0 0 ENHANCEMENT PROGRAM, RN 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 it TOTAL 0 5 0 5 12 39 51 AVENUE BRIDGE 09 0.1 01 PE 01195 64 BR 16 0 80 t> 80 0 0 51 Ave over S 154 St and CN 01/96 736 BR 184 0 920 0 0 920 0 Gilliam Creek TOTAL 800 200 0 1,000 Design and construct bridge replacement with sidewalks 13 40 SOUTH 130 PLACE 17 0.50 PE 01195 0 15 0.5 0 15 0 0 RN 0 0 0 0 0 0 0 111 56 Ave. to 56 Place cc. CN 06195 0 135 0 135 0 135 t1 t`.• Design and construct TOTAL 0 i5it 0 l5t) safety improvements. Six Year Transportation Program OU14 13 1994 to 200 Page Agency city of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) Cl Pri Identification Type Length Code Date Coat Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th STREET �3 P 5 is 3 13 41 SOUTH 1.,4 0.�.� r E 0119�� .;.F 0 30 0 30 0 0 R,W 0 0 0 0 0 0 0 0 s 133 St. to 48 Ave. CN 01/96 0 200 0 200 0 0 200 0 Design and construct TOTAL 0 230 0 230 widening to 4 lanes including paving, drainage, curb and gutter, sidewalks, channelization, lighting, signing. 13 42 NELSEN PLACE 03 0.11 P PE 01195 0 25 0 25 0 25 0 0 RW 0 0 0 0 0 0 0 S 156 St to S 158 St. CN 01196 0 280 0 250 0 0 280 0 Design and construct TOTAL 0 305 0 305 widening_ including_ paving, drainage, curb and gutter, sidewalks, lighting. ii 43 TUKWILA PARKWAY EXTENSION 01 9.25 PE 01/95 0 50 !i 50 0 50 0 0 RW 0 0 0 0 0 0 4 0 Andover Park E. to N. CN 0 0 0 ,v 0 0 0 0 Valley Hwy TOTAL 0 50 0 50 Design report for new 5 lane arterial with bridge across Green River. 0 44 RIVERTON CREEK RUNOFF 06 U.O.} PE 01;95 29 STP(E) 7 0 36 0 36 tj 0 ENHANCEMENT RW, 0 0 0 0 0 0 0 0 CN 06,95 331 STP(E) 83 0 414 0 414 0 0 Duwamish River to Pacific TOTAL 360 90 0 450 Hwy Water quality and fisheries enhanuments. 12 45 MACADAM ROAD BRIDGE 09 010 P PE 01!96 48 BR 12 0 60 0 0 60 0 RW 0 0 0 0 0 0 0 it Bridge ever S 133 St and CN 06!96 552 BR 138 0 690 0 0 690 0 Southgate Creek; TOTAL 600 150 0 750 Design and constrict bridge replacement including sidewalks. 0 46 SOUTHGATE CREEK RUNOFF 06 0.00 PE 01/96 22 STP(E) 6 si 28 0 0 28 0 ENHANCEMENTS RW 0 0 0 0 0 0 0 0 CN 06;96 258 STP11 64 it 322 0 0 322 0 Duwamish River to S 133 TOTAL 280 70 0 350 St Water quality and fishery enhancement. Six '[ear Transportation Program 06 14/93 1994 to 200if' Page e Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) C1 Fri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th 11 47 STRANDER BRIDGE TRAIL 05 0.10 PE 01/96 16 STP(E) 4 20 0 0 20 0 RW 0 ij 0 0 0 0 Strander bridge over CN 06/96 184 STP(E) 46 i+ 230 0 0 2 0 Green River TOTAL 200 5ti t; 250 Design and construct bicycle /pedestrian trail on existing or new structure over !Green River. 0 48 EAST MARGINAL NAY 02 '.''.40 W PE 01196 0 100 0 NO 0 0 60 40 RW 01197 0 i00 0 ioo 0 0 0 100 Boeino_ Access Rd to S 112 CN 00 1 /97 t] 1,72 0 1,720 t; 0 0 1,720 St. TOTAL 0 1,920 0 1,920 Design and construct widening to 5 lanes including paving, curb and gutter, drainage, sidewalks, lighting, channelization. it 49 SOUTH 180 STREET 17 0.60 PE 01196 0 10 0 10 0 0 10 0 RW 0 0 0 0 0 U 0 0 Southcenter Pkwy to CN 01/97 0 120 0 120 0 0 0 120 Andover Park N TOTAL 0 130 0 130 Design and construct left and right turn modifications, access improvements that may include signalization. 11 50 ANDOVER PARK WEST 02 1.00 S PE 01/96 0 24 U 96 120 0 0 120 0 Strander Bivd to S 180 CN 06196 0 276 U 1.104 1,380 0 0 1,330 0 Street TOTAL 0 300 1,200 1,50 Design and construct widening to 5 lanes including paving, curb and gutter, drainage, sidewalks, channelization, signals, lighting, signing. 13 51 SOLlTl? 168 STREET 01 0.39 P PE 09196 0 No 0 100 0 0 25 75 Southcenter Pkwy to 58 CN 06;'98 t? 700 r! 7tji; t? 0 0 700 Ave S. TOTAL 0 800 0 9106 Design and construct new 4 lane street including Tight of way, paving, rtiro And nuffPr_ drainage, lighting, sidewalk, and signal. Six Year Transportation Program V6/1413 1994 to 2VV0 Page 10 Agency City of Tukwila City \J20 Cou ty 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schdule Rmc Project imp Total Uti} Start Federal Fund (Local Agency) C\ Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th-6th 11 52 SOUTHCENTER BOULEVARD 12 0.20 N PE 01/96 96 STP 24 V 120 0 V 120 V RW O 0 V 0 V V V 0 61 Avenue to Macadam Rd. CM 07/96 1 STP 276 0 1,380 V O 480 900 Design and construct TOTAL 1 300 V 1 widening to 7 lanes. 11 53 STRAN0ER BOULEVARD 02 0.50 W P[ 03/96 0 8 U 31 39 V V 39 0 RN V V V O V O V 0 Andover Park N to N CN 01/97 V 92 U 367 461 O V V 461 Valley Hwy TOTAL V NV 400 500 Design and construct widening to 5 lanes including paving` curb and gutter drainage sidewalks, lighting and chaooelization. 11 54 ANDOVER PARK WEST 14 0.10 P[ 01/96 V 8 V 8 V V 8 V RN V 0 V V V 0 O 0 At S 180 Street CN 06/96 O 77, V 73 V V 73 V Design and construct TOTAL V 81 V 81 widening at intersection to accomodate turn lanes and signal modifications. 13 55 SOUTH 143 PLACE 03 0.19 P PE 06/96 V 32 O 32 0 0 32 V RN V V V V V V V V Interurban to 0uwamish CN 01/97 V 217 V 217 O V V 217 River TOTAL V 249 V 249 Design and construct widening including Paving` curb and gutter, drainage, sidewalks and lighting. 13 56 SOUTH 143 STREET 03 0.20 P PE 06/96 V 60 V 60 V V 60 V RN O V V V V V V V Interurban to Uuwami5h CN 01/97 0 420 0 420 V V V 420 River TOTAL 0 480 V 480 Design and construct widening including paving, curb and gutter, drainage, sidewalks, lighting. 12 57 GATEWAY UH{V[ BRIDGE 01 0.40 PE 01/96 184 STP 46 O 230 V V 230 V RN O V 0 V V V V V Gateway Drive to S 129 CN 0816 2085 STP 521 V 2 V V 6t 1 Street TOTAL 2,269 567 V 2 Design and construct new 4 lane arterial with bridge crossing Duwami»h River, Six Year Transportation Pngmm 06/14/ 19Y4 to 2VVO PaOe Ageocy City of Tukwila City O2V Umoty D Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Fuoc Project lmp Total Uti} Start Federal Fund (Local Agency) Cl Pri Identification Type Lpogth Code Uate Cust Fund Code Luca} Src Cost Total Ist 2od 3rd 4th-6th �2 58 MACADAM ROAD V5 \.VV P ME V7/93 V 5 V 5 V 0 V V KW O V V O O V V V S 144 St to 'interurban CN 01/Y7 V 5V 0 5O 5V V V V Ave TOTAL V 55 V 55 Design and construct pedestrian path in phases 11 59 STRANUER BOULEVARD 14 0.50 PE 06/96 V 2V V 2V V V 2V 0 RN V O 0 V V V V V At Andover Park Nest CN 01 V 205 V 205 O V V 2O5 Design and construct TOTAL 0 225 V 225 intersection improvement providing north/south left turns lanes and sidewaQs on Andover Park West. 1 60 S0UTH 133 STREET 03 0.56 P PE 01197 V 115 V 115 0 V O U5 8N 0 V V O V 0 V V S 134 St �n S 13V S� CN V1/9O V 1 350 V 1 35V V 0 V 1,350 Design and construct TOT AL el 1,465 O 1 widening including paving` drainage curb and Outter, sidpwalks, chanoelizotion lighting` utility underOrouodiog. 11 6� 57 AYENUE S0UTH V2 V.5V P PE 01/97 D7 STP 33 V 12V V V V \2V (Southcenter Pkwy) RN 06197 O 300 V JVV V O V 360 CN O1/97 85V STP 85V O 1 V V V 1 S 18V St to South City TOTAL 11 37 1,183 V 2,120 Limit Design and construct widening to 4 and 5 lanes including pavio0` curb and gutter, draioa0e sidewalks, lighting, utility uodprgmunding. 11 62 SOUTH 156 STREET 01 0.30 P PE 06/ V JVV T 300 600 0 V V 6VV KN V 0 V V V V V V West Valley Hwy to SW 16 CN 01/9Y 0 J,275 7 3,275 6 V A 0 6 St TOTAL V 3 3,575 7 Design and construct new 5 lane arterial with separated 0rade crossing of railroads including paving, curb and gutter, drainage, sidewalks lightiog. Sir, Year Transportation Program 06/14l53 1 °94 to 2000 Pace 12 Agency City of Tukwila City 131. County i? Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project imp Total Util Start Federal Fund (Local Agency) Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 1. nd 3rd 4th -6 13 63 TRECK DRIVE EXTENSION 01 0.11 P PE 06x'97 Q 3: 0 A 0 0 32 Andover Park E to Andover CNI 011 0 389 v 359 0 0 359 Parr. W TOTAL 0 421 0 4L1 Design and construct new 3 lane street includin paving, curb and gutter, drainage, sidewalks, lighting. 13 64 T }3 STREET SOUTH 14 40 °E 0.11 C' 24 4 V r ''4 J J EE 1I P PE 0. '9 F 0 A t L RW Li 0 0 j 0 v; yE Interurban Ave to C 01i9 0 i55 155 is 0 0 155 Duwamish River TOTAL U 179 179 Design and construct widening_ includinQ paving, curb and gutter, drainage, sidewalk:.., lighting. 13 65 SOUTH 151 STREET 03 0.1:} P PE 01f97 t} 15 15 D 0 0 15 Ply D D A i; G 4 51 Ave to 52 Ave. CN syt 197 u 1;,5 0 155 0 0 0 155 Design and construct TOTAL 0 17.E 0 1 70 widening_ including paving, curb and gutter, drainage, sidewalks, lighting, utility undergrounding. 13 66 SOUTH 144 STREET }3 0.11 P PE 06'97 0 5 0 0 0 0 RW 0 G 0 i} U 0 0 0 Interurban Ave to IN 01195 g 160 0 160 0 r, n 160 Duwamish River TOTAL 0 i5< 15 Design and construct widening_ including paving, curb and gutter, drainage, sidewalks, lighting, utility undervoundino. ii? 67 INTERURBAN AVENUE E 1.36 P PE 01;97 S 400 h r i? 00 t� 06 1'Q7 4 Olt U 20 i 4o tj Et 1 00 S 139 5t to Southcenter CIN 0i /98 0 4.000 U 1 }ir0 5 000 3J A 0 gi }r} Blvd TOTAL it 4,400 i 5 Design, acquire r iobt- of way, and reconstruct 5 lane improvements including paving, cure and gutter, drainage, sidewalks, landscaping, lighting. Six Year Transportation Program V6/14/93 1994 to 2000 Page D Agency City of Tukwila City 1320 County D Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RmU (Local Agency) C1 Pri Identification Type Length Code Date Cost Fund Code Local Src Cost lubl 1st 2nd Rd 046th 1! 68 ANDOVER PARK EAST 02 1.39 P P[ 011 V 32 U 128 160 V V O \6V KW V V V O V V V O Tukwila Pkwy to S 00 St CN 01/98 V 380 U 1 1,900 V V 1 Design and construct TOTAL V 412 1 2 widening to 5 lanes including paving, curb and gutter, drainage, sidewalks, lighting, chaooe}ization signals, signing. 11 69 SOUTH 154 STREET 03 0.60 P P[ 01/97 0 150 V 150 0 V 0 150 RN V V V V O V O V 52 Ave to Pacific Hwy CN 06/97 V 1,650 V 1 V 0 V 1,650 Design and construct TOTAL 0 1 V 1,800 widening including paving, curb and gutter drainage, sidewalk, 1igRing. 12 70 42 AVENUE BRIDGE TRAIL 05 0.010 PE 01/ 16 STP([) 4 V 20 V V 0 20 RN V V V V O V V V Bridge crossing Duwamish CN 06/97 184 STP([) 46 V 230 V V V 230 River TOTAL 200 50 V 250 Uosign and construct pedestrian/bicycle facility oo existing or new structure over Duwamish River. 13 71 SOUTH 168 STREET 01 0.17 P PE 01197 V 30 V 30 O V V 30 KN V V V V V V V V Andover Park E to Andover CN 06197 V 30 V 343 V 0 V 343 Park N TOTAL 0 373 O 373 Design and construct new 4 lane street including right of way/ paving, curb and gutter drainage, sidewalks, lighting. 12 72 SOUTH 144 STREET 03 0.30 P PE 01/97 0 40 V 40 V V O 40 RV O V V V V 0 O O Pacific Hwy to Military CN 06/Y7 V 460 O 460 V V O 460 Rd TOTAL V 500 V 50 10 Design and construct widening including paving, drainage curb and gutter, sidewalks, lighting` utility undergrouoding. Sit Year Transportation Program OV 14/43 14 ?4 to 2000 Page 14 Agency City of Tukwila City 1320 County 17 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Lost Total 1st 2nd 3rd 4th -6th it 73 STRANDER BOULEVARD 14 0.14; PE 06/ 0 ,7 0 30 0 30 0 0 0 30 RW 0 0 0 r4 U 0 0 0 At 59 Ave CN ME E0 125 0 125 0 0 0 125 Design and construct new TOTAL 0 155 0 155 traffic signal and channelization at new intersection. 13 74 59 AVENUE SOUTH 01 0.26 P PE 01197 0 150 0 150 0 0 r; 150 RW t4 0 0 0 0 0 U 0 Strander Blvd to S 169 CN 06 97 1,375 0 1 E, 0 0 1,375 St. TOTAL 0 1 1 1 525 0 1.525 Design and construct new 4 lane street including paving, curb and gutter, drainage, sidewalk, lighting, 10 75 PACIFIC HIGHWAY 02 0.90 P PE 0119 0 49 U 142 240 0 0 0 240 RW 0 0 0 0 0 0 0 0 Boeing Access Rd to S 116 CN 0713 0 552 U 2 2,760 0 0 0 2,760 Way TOTAL 0 600 2,400 3,000 Design and construct paving, curb and gutter, drainage, sidewalks, lighting. 10 76 SOUTH 190 STREET RR XING 15 0.20 P PE 01/49 0 700 T 700 1,400 0 0 0 1 RW 0 0 0 0 114 0 0 0 S 180 at UPRR /BNRR Xing's CN 11/49 0 3,415 T 3, 05 1,930 0 0 0 1130 Design and construct new TOTAL 0 4 4,615 4 separated grade crossing of exiting railroad tracks. Joint project with Renton. 11 77 ANDOVER PARK WEST RR 15 0.10 T PE 01/49 0 15 0 15 0 0 0 13 SIGNAL RW 0 0 0 0 0 0 0 0 CN 06114 0 145 0 145 0 0 0 145 At existing railroad TOTAL 0 160 0 160 grade crossing Design and install railroad crossing signal. 11 79 SOUTHCENTER PARKWAY 02 0.50 P PE 01/99 0 140 0 1 1 40 0 0 0 140 RW 0 0 0 0 0 0 0 0 I5 off -ramp to S 169 St CN 06f?9 0 915 0 915 0 0 0 915 Design and construct TOTAL 0 955 0 9" safety and capacity improvements including widening Southcenter Pkwy. ix Year Transportation Prouram 76114193 1994 to 2600 page 15 Agency City of T ukwila City 1320 County 17 Project Cost In Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Ltil Start Federal Fund (Local Agency} Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th 10 79 BOEING ACCESS RD115 NB 01 0.50 PE 01179 0 10 0 1u 0 0 0 lit ACCESS RW 0 '1 i! 0 u 0 0 C r0 0 0 u 0 0 0 Boeing Access Rd, ML king TOTAL 0 10 0 10 Nay, 15 Form LID or similar process to design and construct new I5 northbound acce improvements in coordination with City of Seattle and NSDOT. 10 80 SOUTH 180 STREET 05 0.10 P PE 01/99 0 80 0 80 0 0 0 8 PEDESTRIAN CROSSING RN 0 0 0 0 0 0 0 0 "N 06179 0 920 0 f% 0 v f 920 S 180 St at UPRR TOTAL 0 1,0 0 1 1 000 Design and construct separated grade pedestrian crossing for Interurban trail. GRAND TOTAL 24,879 71,835 33,993 /30,707