Resolution No. 1261 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a Comprehensive
Street Program and thereafter periodically modified said Comprehensive Street Program by
resolution, and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar
years, and
WHEREAS, a public hearing has been held on the said Six -Year Transportation
Improvement Program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS:
Section 1. Prom Ado pted• The Six -Year Transportation Improvement Program for
the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1994 -1999,
inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this
reference as if fully set forth, which program sets forth the project location, type of improvement
and the estimated cost thereof, is hereby adopted and approved.
Section 2. Filing of Pro gram. The City Clerk is hereby authorized and directed to file
a copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular meeting thereof this —5?1 5 e day of 1993.
Steve 'Lawrence, Council President
ATTEST /AUTHENTICATED:
ne' E. Cantu, City Clerk
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
Filed with the City Clerk: 6 17
Passed by the City Council: lv —I �;I3
Resolution Number
Six Year Transoortation Program 06/16/93
1994 to 2000 Paoe 1
Agency City of Tukwila
:ity 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
01 Pri Identification Type Lenqth Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th
10 01 REST VALLEY HWY AT S 180 14 0.42 6 PE 0 0 0 0 0 0 0 0
STREET RW 0 0 0 0 0 0 0 0
West Valley Hwy, S 180 CN 01194 510 FAUS 1,115 T 475 2,100 2,100 0 0 0
Street TOTAL 510 1,115 475 2,100
1000' north /south 6 500'
east /west
Short -term widening_ all
four legs of
intersection, bridge
widening, signal
modification,
channelization.
11 02 SOUTHCENTER BLVD 02 0.28 6 PE 0 0 0 0 0 0 0 0
Southcenter Blvd RW 0 0 0 0 0 0 0 0
68 Avenue to Grady Way Cif 07,93 4 STP 1,088 T 3,200 8,944 5,444 500 0 0
Widen to 5 lanes on new TOTAL 4,656 1,088 3,200 6,944
alignment with new bridoe
over Green River,
structure undercrossing
realigned I405 ramps, new
bridge for ramps over
Green River,
sionalization,
channelization, signing_,
drainage, landscapinq,
on -ramp HOV lane with
SCU I
10 03 EAST MARGINAL WAY 02 1.00 P PE 0 0 0 0 0 0 c; 0
RW 0 0 0 0 0 0 0 0
Boeino Access Rd to CN 01/94 500 STP, NHS 5.180 T 2,120 8,400 2,000 6000 0 cu
midpoint TOTAL 500 5,180 2,720 8,400
Design and construct
widening_, curb and
-Utter,
drainage, traf *ic
signals, utility pole
relocation, lighting,
sidewalks, including_
Boeinq Access Rd
intersection.
ia 04 E A S IT MARGINAL stn( 02 0.93 P PE 0 1! 0 (i
RW 0 0 fi j t1 0 0
Midpoint to North City CN 011 5011 STP,NHS LJ. T 3,000 6060 0 0 b,ri;n
Licht TOTAL 501 000
Design and construct
Widening, curb and
gutter, sidewalk,
drainage, traffic
signals, utility pole
relc_ +icr;.
Six Year Transportation Program 06/14/93
1994 to 200 Page
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
C1 Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th
11 05 SOUTHCENTER 14 0.60 W PE 0 0 0 0 0 U 0 0
PARKWAY /STRANDER BLVD RW 0 0 0 0 0 c} 11)
CN 09/93 154 STP,STP(H) 356 0 540 540 0 0 0
1000' north, 1400' south, TOTAL 154 3S6 U 540
500' east
Construct pavement
overlay /rehabilitation
and safety and capacity
improvements including
signal and channelization
modifications for
additional left turn lane
on Strander, sidewalk,
lighting.
1i 06 PACIFIC HWYiS 130 ST /S 0.00 P PE 0 0 0 0 0 s1
132 CT RW s! 0 0 0 0 0 0 0
CN 01/94 140 STP(H) 295 0 425 425 0 1 0
S 130 St to S 132 St TOTAL 1411 295 0 425
Design and construct
signals and
channelization at S 130
and S 132 intersections,
reconstruct east approach
of S 130, and modify
driveway access.
i1 07 ANDOVER PARK WEST 04 0.40 P PE 01;94 0 100 0 100 60 40 0 0
Tukwila Pkwy to Strander CN 01195 150 STP 63 U 1,010 1,223 0 1 0 0
Blvd. TOTAL 150 163 1,010 1,323
Design and construct
widenino to 5 lanes
including pavement
overlay /rehabilitation,
curb and gutter,
drainage, sidewalks,
channelization, iightinq,
signing, signal
modification.
1<< 08 PACIFIC HIGHWAY 03 2.71 P PE 09/93 0 900 0 900 300 600 0 0
RW 09:a4 0 300 0 300 0 300 0 0
5 116 Way to S 152 St CN 01/96 750 NHS, STP 4,250 T 5,1.;00 10,000 0 0 2,300 7,7`10
Design and construct TOTAL 7ro 5,450 5 11,200
paving, curb and gutter,
drainage, sidewalks,
Iighting, utility
undergrounding.
10 09 MULTI -MODAL TRANSFER 0.00 P PE 07/94 120 STP,CMAQ 3v 0 150 150 0 0 c}
STATION RW 01197 1,600 STP,CMAQ 400 0 2,000 0 0 0 2,000
interurban,6rady Way,I405 CN i1 11 c} c} 0 0 0
TOTAL 1, 7 2t1 4 i1 2.150
PrPnarp de=ien reeert.
financing alternatives
for site in City.
Six Year Transportation Program 06/14/93
1994 to 2000 Paae 3
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Utii Start Federal: Fund (Local Agency)
Cl Pei Identification Type Length Code Date Cost Fund Code Local Src Cost Total ist 2nd 3rd 4th -6th
11 i) TRAFFIC SIGNAL SYSTEM 12 0.00 P PE 01/94 75 STP 250 0 325 80 50 50 145
RW 0 0 0 0 0 is 0 0
Streets in CBD. CM 06195 250 STP 1,615 i! 1,865 450 450 965
Design report, design, TOTAL 725 1,865 0 2,190
and install traffic
signal interconnect
system with master
controller in CBD.
11 11 SOUTHCENTER PARKWAY 12 1.00 P PE 06/94 0 75 0 75 75 0 0 0
RW 0 0 0 0 0 i+ 0 0
168 St to S 180 St CN 111 0 450 0 450 75 175 200 0
Design and construct TOTAL G 525 525
traffic signals,
pedestrian crossings and
combine driveways.
10 12 PACIFIC HIGHWAY BRIDGE 09 0.10 PE 03/94 0 250 0 250 250 0 0 0
RW 0 0 0 0 0 0 0 0
Duwamish River crossino_ CN 03/95 2,800 BR 1,400 0 4,200 0 1,500 2 0
Recostruct to 6 lanes TOTAL 2 1,650 0 4,450
including curb and
gutter, sidewalk,
drainage, channelization,
lighting, signs, trail.
10 13 16 AVENUE SOUTH BRIDGE 10 0.01 S PE 0 0 0 0 0 0 0 0
RW 0 0 0 0 0 0 0 0
Duwamish River Crossing CN 06/94 0 700 0 700 700 0 0 0
TOTAL 0 700 0 700
12 14 MINKLER BOULEVARD 01 0.38 T PE 07/93 0 100 0 100 0 0 0 0
RW 0 0 0 0 0 0 0 0
Southcenter Pkwy CN 02/94 0 700 0 700 700 0 0 1
Andover Park W. TOTAL 0 600 i+ 800
New 4 -lane street
including paving, curb
and qutter, drainage,
sidewalks, lighting,
signing, channelization,
and signal at SC Pkwy.
10 15 WEST VALLEY HIGHWAY 12 0.45 T PE 10/94 72 STP 118 0 190 90 100 0 0
RW 0 0 0 0 0 0 0 0
1405 TO Strander Blvd. CN 011 400 STP 00 0 1,030 0 0 480 550
Design and construct TOTAL 472 748 0 1,220
widening from 6 to 7
lanes including paving,
drainage, curb and
gutter, lighting,
channelization. Add HOV
lanes NB and SB at S 156
+ropt rnnnor} with
WSDOT project for HOV
lane on I405 NB an-ramp.
Six Year Transportation Program 06/14/93
1994 to fjii Page 4
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (local Agency)
C1 Pri identification Type Length Code Date Cost Fund Code Local Src Cost Total ist 2nd 3rd 4th -6
13 116 S 159 Street 03 0.10 P PE 06/94 0 50 0 50 50 0 0 0
RW 0 0 n 0 0 j 0 0
West Valley Hwy to Nelsen CN 0519 0 2 35 0 235 ±i 0 235 0
Place TOTAL ?8 c 295 0 285
Design and construct
overlay, curb and Gutter,
drainage on existing_ 4
lane street.
12 17 BRIDGE RAILS L GUARDRAILS 11 0.00 PE 07/93 4 STP(H) 1 0 5 5 0 0 0
Various city streets and RU 0 0 0 0 0 0 0 0
locations. CN 01194 42 STP(H) 11 53 53 0 tj
TOTAL 46 12 0 58
Repair and replace bridge
rails and approach
guardrails.
11 18 ANDOVER PARE: EAST 15 0.110 PE 07/93 9 STP(H) 1 0 10 10 0 0 0
RAILROAD XING RW 0 0 0 0 0 0 0 0
CN 03/94 126 STP(H) 14 ti 140 140 0 0
Strander Blvd to Treck TOTAL 1135 15 0 1 1 50
Drive
Design and construct
railroad crossing signal.
10 19 MARTIN LUTHER KING WAY 04 0.10 PE 01/94 0 3 O 12 15 15 0 0 0
Old SR900 RW 0 0 0 0 0 0 0 0
Boeing Access Rd to North CN 07'194 0 35 O 139 173 173 0 G' 0
City Limit TOTAL 0 38 150 189
Design and construct
pavement rehabilitation,
drainage, curb and
gutter, sidewalks.
11 20 BRIDGE PROGRAM 11 0.00 PE 01/94 0 350 0 360 95 11 112 142
Existing bridges in City RW 0 0 0 0 0 0 0 0
Various locations in City Cid 01/95 0 695 0 695 0 129 133 433
Inspect, evaluate, TOTAL 0 1,055 0 1,055
design, and construct
repairs and replacements.
ii 21 OVERLAY AND ARTERIAL 04 0.00 PE 07/94 0 '60 0 360 6111 60 60 190
PRESERVATION RW 0 0 0 0 0 0 0 0
CN 03194 600 STP 3,540 0 4,140 690 690 690 2,070
Various City Streets TOTAL 600 3,900 if 4,500
11 22 CBD SIDEWALKS AND TREES 05 0.00 PE 01/94 0 200 0 200 70 65 65 01
Various CBD streets RW 0 0 0 0 0 0 0 it
CN 07/94 1,182 STP,CMAQ 1,1'18 0 2,200 73U 731 735
Design, construct, and ToIAIL 1.191 1,218 0' 2.400
acquire easements for
Six Year Transportation Program o6/14/93
1994 5 2000 Page
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Furic Project imp Total Util Start Federal Fund (Local Agency)
Cl Fri Identification Type Length Code Date Cost Fund Code Local Src Cost Total L t 2nd 3rd 4th -6th
sidewalks on Southcenter
Parkway, Andover Park
West, Andover Park East,
Strander Blvd, Ninkler
Blvd, South 180 St, West
Valley Hwy.
11 23 PEDESTRIAN PATHS 05 0.00 PE 01/94 0 72 0 72 12 12 12 36
Various City streets RW 0 0 0 0 0 0 0 0
CN 05194 0 829 0 828 138 139 1 1 38 414
Design and construct ped TOTAL 0 900 0 900
paths in various
locations.
12 24 40 AVE /42 AVE 03 1.93 P PE 01/94 0 320 0 320 805 120 120 0
RW 0 0 0 0 f{ 0 0 0
S 131 to S 160 St. CN 03/94 0 3 0 3,680 920 1,3801 1,380 0
Design and construct TOTAL 0 4,000 0 4
paving, drainage, curb
and gutter, sidewalks,
lighting, utility
undergrounding.
Coordinate with City
SeaTac.
it 25 TRAFFIC CONTROL UPGRADES 14 0.00 PE 011 0 60 0 60 10 10 10 30
Various City streets RW 0 0 0 0 0 0 0 0
Various intersections in CH 06/94 0 630 0 630 105 105 105 315
City TOTAL 0 690 0 690
Design and construct left
turn signals.
11 26 SOUTH 178 STREET 01 0.46 W PE 01/94 0 90 0 90 90 0 0 0
RW 0 0 0 0 0 0 0 0
Southcenter Pkwy to 15 CN 03195 0 470 0 470 0 470 0 0
Widen to 5 lanes on new TOTAL 0 560 0 560
alignment including
pairing, curb and gutter,
sidewalks, drainage, and
lighting.
10 27 INTERURBAN AVENUE SOUTH 12 0.30 W PE 01/94 160 STP 40 0 200 200 0 0 0
Southcenter Blvd to Grady CN 01/95 800 STP 200 0 1,000 0 1,000 0 0
Way TOTAL 960 240 0 1,200
Design and construct
widening including
bridge, paving, curb and
gutty, sidewalk for
safety and capacity
improvements.
Six Year Transportation Proaras 06/14/93
1 'M t 2000 sage v
Agency v'ity of }.Vila
City 132.
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Fur,c Project Imp Total Util Start Federal Fund (Local Agency)
Ci Fri identification Type Length Code Date Cost Fund Code Local arc Cost Total Lt 21nd 3rd 4th -6th
10 28 PACIFIC HIGHWAY 12 0 clif PE 01'94 125 STP r'S i 3;3 'S 0 0 0
L((J iL_ a7�`- v
RW 51 i} V t} 0 f_} 0 0
id f 0 i9, s J J =Li
Pacific Hwy Br 0 x.00 1 1501 0
Luge to C Itl 1. LL `J f:' L�iE .r iy
SF599 TOTAL 750 i 'i 0 2,5!itj
Design and construct
widening on Pacific Hwy
and SR599 on -rUp for HOV
improvements.
1 O rr 1 i P P "94 03 �t35 i'. 5i }5 5 0 500
1 L, €SANDER BOULEVARD 01 i,.LB E 0
EXTENSIIIN Rid 0 U 0 0 0 0 0 0
CN 01107 f} 1 0011 1 3,5 b 500 r} 6
Hest Valley Hwy to TOTAL 0 3,50 7 ,500 7,005
Datesdale
Design and construct new
5 lane arterial with
separated grade crossing
railroad tracts. Joint
project with Fenton.
10 30 VALLEY SIGNAL 12 0.00 PE 0i/94 48 STP 12 0• 60_i 20 2u 1 10 0
COORDINATION RW 03 0 0 0 0 0
W Valley Hwy, S 180 St. C•N 08/94 312 STP 78 0 390.1 130 130 130 0
1405 to SR516 TOTAL 350 90:} 0? 450
Desion report and
equipment installation
for interagency signal
coordination on Nest
Valley Hwy and S 1501
Street. Joint project
with WSDDT, Fenton, Kent,
King County.
12 31 42 AVENUE BRIDGE PAINTING 11 0.00 PE 07193 14 BR 14 0 28 0 0 0 0
42 Ave Bridge over EN 01:94 100 BR 100 0 200 200 0 0 0
Duwarish River TOTAL 114 il4 0 228
Repaint existing bridge
10 32 BOEING ACCESS READ BRIDGE 11 0.00 PE 07/93 10 BR 9
PAINTING RW 0 0 0 0 0 0 0 0
CN 01i 94 72 BR 7l 0 143 143 0 03 03
Boeino Access Rd over TOTAL 82 80 0 162
BNRR
Repaint existing bridge.
1 33 INTERURBAN TRAIL 05 1.00 P PE 04093 0 54 0 50 0 0 0
RN 0 0 0 0 0 D r} 0
Strander Blvd to Fort C 01194 627 STP(E; 7 0 "n 0 7AA 0 0 0
0 t TOTAL 62- 12' 0 750
Design, acquire right of
way, and construct trail
Six Year Transportation Frovar, ')6/14/;3
1994 to 2000 Fage 7
Agency City of Tukwila
City 1320
r. County it Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
CI Pri Identification Type Length Code Date Cost Fund Code Local Sri Cost Total 1st 2nd 3rd 4th -6th
including bridge
crossinq.
0 34 MULTI JURISDICTIONAL 06 0.00 PE 01/94 80 STP 20 0 ifin 100 0 0 0
DEPOSITORY RN 011 400 STP i00 0 500 0 500 0 0
C14 0 t? 0 0 0 0 0 t
TOTAL 480 120 0 6
Develop
muItijurisdictiona1
site(s) for deposit of
street sweepings and
catch basin cleanings
prior to ultimate
disposal.
0 35 COMMUTE TRIP REDACTION 1B 0.00 PE 07/93 20 STP 5 0 25 .1 0 6 0
RV 0 0 0 0 0 0 0 ti
CN 0 0 0 0 0 0 0 0
Review parking policies. TOTAL 20 5 0 25
0 36 I405 MULTIMODAL CORRIDOR tj.il(? FE 05/93 0 5 0 5 5 0 0 i1
STUDY RN ft 0 0 0 0 0 0 0
CN it 0 0 0 0 0 0 0
Tukwila to Swamp Creek TOTAL 0 5 0 5
0 37 NON MOTORIZED 05 0.00 PE 01/94 0 5 0 5 5 0 0 0
TRANSPORTATION PLAN RV 0 6 0 C 0 0 0 it
CMd 0 0 0 0 0 0 0 0
TOTAL 0 5 0
1 38 TRANSPORTATION 06 0.00 PE 01/94 0 5 0 5 5 0 0 0
ENHANCEMENT PROGRAM, RN 0 0 0 0 0 0 0 0
CN 0 0 0 0 0 0 0 it
TOTAL 0 5 0 5
12 39 51 AVENUE BRIDGE 09 0.1 01 PE 01195 64 BR 16 0 80 t> 80 0 0
51 Ave over S 154 St and CN 01/96 736 BR 184 0 920 0 0 920 0
Gilliam Creek TOTAL 800 200 0 1,000
Design and construct
bridge replacement with
sidewalks
13 40 SOUTH 130 PLACE 17 0.50 PE 01195 0 15 0.5 0 15 0 0
RN 0 0 0 0 0 0 0 111
56 Ave. to 56 Place cc. CN 06195 0 135 0 135 0 135 t1 t`.•
Design and construct TOTAL 0 i5it 0 l5t)
safety improvements.
Six Year Transportation Program OU14 13
1994 to 200 Page
Agency city of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
Cl Pri Identification Type Length Code Date Coat Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th
STREET �3 P 5 is 3
13 41 SOUTH 1.,4 0.�.� r E 0119�� .;.F 0 30 0 30 0 0
R,W 0 0 0 0 0 0 0 0
s 133 St. to 48 Ave. CN 01/96 0 200 0 200 0 0 200 0
Design and construct TOTAL 0 230 0 230
widening to 4 lanes
including paving,
drainage, curb and
gutter, sidewalks,
channelization, lighting,
signing.
13 42 NELSEN PLACE 03 0.11 P PE 01195 0 25 0 25 0 25 0 0
RW 0 0 0 0 0 0 0
S 156 St to S 158 St. CN 01196 0 280 0 250 0 0 280 0
Design and construct TOTAL 0 305 0 305
widening_ including_
paving, drainage, curb
and gutter, sidewalks,
lighting.
ii 43 TUKWILA PARKWAY EXTENSION 01 9.25 PE 01/95 0 50 !i 50 0 50 0 0
RW 0 0 0 0 0 0 4 0
Andover Park E. to N. CN 0 0 0 ,v 0 0 0 0
Valley Hwy TOTAL 0 50 0 50
Design report for new 5
lane arterial with bridge
across Green River.
0 44 RIVERTON CREEK RUNOFF 06 U.O.} PE 01;95 29 STP(E) 7 0 36 0 36 tj 0
ENHANCEMENT RW, 0 0 0 0 0 0 0 0
CN 06,95 331 STP(E) 83 0 414 0 414 0 0
Duwamish River to Pacific TOTAL 360 90 0 450
Hwy
Water quality and
fisheries enhanuments.
12 45 MACADAM ROAD BRIDGE 09 010 P PE 01!96 48 BR 12 0 60 0 0 60 0
RW 0 0 0 0 0 0 0 it
Bridge ever S 133 St and CN 06!96 552 BR 138 0 690 0 0 690 0
Southgate Creek; TOTAL 600 150 0 750
Design and constrict
bridge replacement
including sidewalks.
0 46 SOUTHGATE CREEK RUNOFF 06 0.00 PE 01/96 22 STP(E) 6 si 28 0 0 28 0
ENHANCEMENTS RW 0 0 0 0 0 0 0 0
CN 06;96 258 STP11 64 it 322 0 0 322 0
Duwamish River to S 133 TOTAL 280 70 0 350
St
Water quality and fishery
enhancement.
Six '[ear Transportation Program 06 14/93
1994 to 200if' Page e
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
C1 Fri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th
11 47 STRANDER BRIDGE TRAIL 05 0.10 PE 01/96 16 STP(E) 4 20 0 0 20 0
RW 0 ij 0 0 0 0
Strander bridge over CN 06/96 184 STP(E) 46 i+ 230 0 0 2 0
Green River TOTAL 200 5ti t; 250
Design and construct
bicycle /pedestrian trail
on existing or new
structure over !Green
River.
0 48 EAST MARGINAL NAY 02 '.''.40 W PE 01196 0 100 0 NO 0 0 60 40
RW 01197 0 i00 0 ioo 0 0 0 100
Boeino_ Access Rd to S 112 CN 00 1 /97 t] 1,72 0 1,720 t; 0 0 1,720
St. TOTAL 0 1,920 0 1,920
Design and construct
widening to 5 lanes
including paving, curb
and gutter, drainage,
sidewalks, lighting,
channelization.
it 49 SOUTH 180 STREET 17 0.60 PE 01196 0 10 0 10 0 0 10 0
RW 0 0 0 0 0 U 0 0
Southcenter Pkwy to CN 01/97 0 120 0 120 0 0 0 120
Andover Park N TOTAL 0 130 0 130
Design and construct left
and right turn
modifications, access
improvements that may
include signalization.
11 50 ANDOVER PARK WEST 02 1.00 S PE 01/96 0 24 U 96 120 0 0 120 0
Strander Bivd to S 180 CN 06196 0 276 U 1.104 1,380 0 0 1,330 0
Street TOTAL 0 300 1,200 1,50
Design and construct
widening to 5 lanes
including paving, curb
and gutter, drainage,
sidewalks,
channelization, signals,
lighting, signing.
13 51 SOLlTl? 168 STREET 01 0.39 P PE 09196 0 No 0 100 0 0 25 75
Southcenter Pkwy to 58 CN 06;'98 t? 700 r! 7tji; t? 0 0 700
Ave S. TOTAL 0 800 0 9106
Design and construct new
4 lane street including
Tight of way, paving,
rtiro And nuffPr_
drainage, lighting,
sidewalk, and signal.
Six Year Transportation Program V6/1413
1994 to 2VV0 Page 10
Agency City of Tukwila
City \J20
Cou ty 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schdule
Rmc Project imp Total Uti} Start Federal Fund (Local Agency)
C\ Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th-6th
11 52 SOUTHCENTER BOULEVARD 12 0.20 N PE 01/96 96 STP 24 V 120 0 V 120 V
RW O 0 V 0 V V V 0
61 Avenue to Macadam Rd. CM 07/96 1 STP 276 0 1,380 V O 480 900
Design and construct TOTAL 1 300 V 1
widening to 7 lanes.
11 53 STRAN0ER BOULEVARD 02 0.50 W P[ 03/96 0 8 U 31 39 V V 39 0
RN V V V O V O V 0
Andover Park N to N CN 01/97 V 92 U 367 461 O V V 461
Valley Hwy TOTAL V NV 400 500
Design and construct
widening to 5 lanes
including paving` curb
and gutter drainage
sidewalks, lighting and
chaooelization.
11 54 ANDOVER PARK WEST 14 0.10 P[ 01/96 V 8 V 8 V V 8 V
RN V 0 V V V 0 O 0
At S 180 Street CN 06/96 O 77, V 73 V V 73 V
Design and construct TOTAL V 81 V 81
widening at intersection
to accomodate turn lanes
and signal modifications.
13 55 SOUTH 143 PLACE 03 0.19 P PE 06/96 V 32 O 32 0 0 32 V
RN V V V V V V V V
Interurban to 0uwamish CN 01/97 V 217 V 217 O V V 217
River TOTAL V 249 V 249
Design and construct
widening including
Paving` curb and gutter,
drainage, sidewalks and
lighting.
13 56 SOUTH 143 STREET 03 0.20 P PE 06/96 V 60 V 60 V V 60 V
RN O V V V V V V V
Interurban to Uuwami5h CN 01/97 0 420 0 420 V V V 420
River TOTAL 0 480 V 480
Design and construct
widening including
paving, curb and gutter,
drainage, sidewalks,
lighting.
12 57 GATEWAY UH{V[ BRIDGE 01 0.40 PE 01/96 184 STP 46 O 230 V V 230 V
RN O V 0 V V V V V
Gateway Drive to S 129 CN 0816 2085 STP 521 V 2 V V 6t 1
Street TOTAL 2,269 567 V 2
Design and construct new
4 lane arterial with
bridge crossing Duwami»h
River,
Six Year Transportation Pngmm 06/14/
19Y4 to 2VVO PaOe
Ageocy City of Tukwila
City O2V
Umoty D Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Fuoc Project lmp Total Uti} Start Federal Fund (Local Agency)
Cl Pri Identification Type Lpogth Code Uate Cust Fund Code Luca} Src Cost Total Ist 2od 3rd 4th-6th
�2 58 MACADAM ROAD V5 \.VV P ME V7/93 V 5 V 5 V 0 V V
KW O V V O O V V V
S 144 St to 'interurban CN 01/Y7 V 5V 0 5O 5V V V V
Ave TOTAL V 55 V 55
Design and construct
pedestrian path in phases
11 59 STRANUER BOULEVARD 14 0.50 PE 06/96 V 2V V 2V V V 2V 0
RN V O 0 V V V V V
At Andover Park Nest CN 01 V 205 V 205 O V V 2O5
Design and construct TOTAL 0 225 V 225
intersection improvement
providing north/south
left turns lanes and
sidewaQs on Andover Park
West.
1 60 S0UTH 133 STREET 03 0.56 P PE 01197 V 115 V 115 0 V O U5
8N 0 V V O V 0 V V
S 134 St �n S 13V S� CN V1/9O V 1 350 V 1 35V V 0 V 1,350
Design and construct TOT AL el 1,465 O 1
widening including
paving` drainage curb
and Outter, sidpwalks,
chanoelizotion lighting`
utility underOrouodiog.
11 6� 57 AYENUE S0UTH V2 V.5V P PE 01/97 D7 STP 33 V 12V V V V \2V
(Southcenter Pkwy) RN 06197 O 300 V JVV V O V 360
CN O1/97 85V STP 85V O 1 V V V 1
S 18V St to South City TOTAL 11 37 1,183 V 2,120
Limit
Design and construct
widening to 4 and 5 lanes
including pavio0` curb
and gutter, draioa0e
sidewalks, lighting,
utility uodprgmunding.
11 62 SOUTH 156 STREET 01 0.30 P PE 06/ V JVV T 300 600 0 V V 6VV
KN V 0 V V V V V V
West Valley Hwy to SW 16 CN 01/9Y 0 J,275 7 3,275 6 V A 0 6
St TOTAL V 3 3,575 7
Design and construct new
5 lane arterial with
separated 0rade crossing
of railroads including
paving, curb and gutter,
drainage, sidewalks
lightiog.
Sir, Year Transportation Program 06/14l53
1 °94 to 2000 Pace 12
Agency City of Tukwila
City 131.
County i? Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project imp Total Util Start Federal Fund (Local Agency)
Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 1. nd 3rd 4th -6
13 63 TRECK DRIVE EXTENSION 01 0.11 P PE 06x'97 Q 3: 0 A 0 0 32
Andover Park E to Andover CNI 011 0 389 v 359 0 0 359
Parr. W TOTAL 0 421 0 4L1
Design and construct new
3 lane street includin
paving, curb and gutter,
drainage, sidewalks,
lighting.
13 64 T }3 STREET SOUTH 14
40 °E 0.11 C' 24 4 V r ''4
J J EE 1I P PE 0. '9 F 0 A t L
RW Li 0 0 j 0 v; yE
Interurban Ave to C 01i9 0 i55 155 is 0 0 155
Duwamish River TOTAL U 179 179
Design and construct
widening_ includinQ
paving, curb and gutter,
drainage, sidewalk:..,
lighting.
13 65 SOUTH 151 STREET 03 0.1:} P PE 01f97 t} 15 15 D 0 0 15
Ply D D A i; G 4
51 Ave to 52 Ave. CN syt 197 u 1;,5 0 155 0 0 0 155
Design and construct TOTAL 0 17.E 0 1 70
widening_ including
paving, curb and gutter,
drainage, sidewalks,
lighting, utility
undergrounding.
13 66 SOUTH 144 STREET }3 0.11 P PE 06'97 0 5 0 0 0 0
RW 0 G 0 i} U 0 0 0
Interurban Ave to IN 01195 g 160 0 160 0 r, n 160
Duwamish River TOTAL
0 i5< 15
Design and construct
widening_ including
paving, curb and gutter,
drainage, sidewalks,
lighting, utility
undervoundino.
ii? 67 INTERURBAN AVENUE E 1.36 P PE 01;97 S 400 h r i? 00
t� 06 1'Q7 4 Olt U 20 i 4o tj Et 1 00
S 139 5t to Southcenter CIN 0i /98 0 4.000 U 1 }ir0 5 000 3J A 0 gi }r}
Blvd TOTAL it 4,400 i 5
Design, acquire r iobt- of
way, and reconstruct 5
lane improvements
including paving, cure
and gutter, drainage,
sidewalks, landscaping,
lighting.
Six Year Transportation Program V6/14/93
1994 to 2000 Page D
Agency City of Tukwila
City 1320
County D Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RmU (Local Agency)
C1 Pri Identification Type Length Code Date Cost Fund Code Local Src Cost lubl 1st 2nd Rd 046th
1! 68 ANDOVER PARK EAST 02 1.39 P P[ 011 V 32 U 128 160 V V O \6V
KW V V V O V V V O
Tukwila Pkwy to S 00 St CN 01/98 V 380 U 1 1,900 V V 1
Design and construct TOTAL V 412 1 2
widening to 5 lanes
including paving, curb
and gutter, drainage,
sidewalks, lighting,
chaooe}ization signals,
signing.
11 69 SOUTH 154 STREET 03 0.60 P P[ 01/97 0 150 V 150 0 V 0 150
RN V V V V O V O V
52 Ave to Pacific Hwy CN 06/97 V 1,650 V 1 V 0 V 1,650
Design and construct TOTAL 0 1 V 1,800
widening including
paving, curb and gutter
drainage, sidewalk,
1igRing.
12 70 42 AVENUE BRIDGE TRAIL 05 0.010 PE 01/ 16 STP([) 4 V 20 V V 0 20
RN V V V V O V V V
Bridge crossing Duwamish CN 06/97 184 STP([) 46 V 230 V V V 230
River TOTAL 200 50 V 250
Uosign and construct
pedestrian/bicycle
facility oo existing or
new structure over
Duwamish River.
13 71 SOUTH 168 STREET 01 0.17 P PE 01197 V 30 V 30 O V V 30
KN V V V V V V V V
Andover Park E to Andover CN 06197 V 30 V 343 V 0 V 343
Park N TOTAL 0 373 O 373
Design and construct new
4 lane street including
right of way/ paving,
curb and gutter
drainage, sidewalks,
lighting.
12 72 SOUTH 144 STREET 03 0.30 P PE 01/97 0 40 V 40 V V O 40
RV O V V V V 0 O O
Pacific Hwy to Military CN 06/Y7 V 460 O 460 V V O 460
Rd TOTAL V 500 V 50 10
Design and construct
widening including
paving, drainage curb
and gutter, sidewalks,
lighting` utility
undergrouoding.
Sit Year Transportation Program OV 14/43
14 ?4 to 2000 Page 14
Agency City of Tukwila
City 1320
County 17 Project Costs in Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal Fund (Local Agency)
Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Lost Total 1st 2nd 3rd 4th -6th
it 73 STRANDER BOULEVARD 14 0.14; PE 06/ 0 ,7 0 30 0 30 0 0 0 30
RW 0 0 0 r4 U 0 0 0
At 59 Ave CN ME E0 125 0 125 0 0 0 125
Design and construct new TOTAL 0 155 0 155
traffic signal and
channelization at new
intersection.
13 74 59 AVENUE SOUTH 01 0.26 P PE 01197 0 150 0 150 0 0 r; 150
RW t4 0 0 0 0 0 U 0
Strander Blvd to S 169 CN 06 97 1,375 0 1 E, 0 0 1,375
St. TOTAL 0 1 1 1 525 0 1.525
Design and construct new
4 lane street including
paving, curb and gutter,
drainage, sidewalk,
lighting,
10 75 PACIFIC HIGHWAY 02 0.90 P PE 0119 0 49 U 142 240 0 0 0 240
RW 0 0 0 0 0 0 0 0
Boeing Access Rd to S 116 CN 0713 0 552 U 2 2,760 0 0 0 2,760
Way TOTAL 0 600 2,400 3,000
Design and construct
paving, curb and gutter,
drainage, sidewalks,
lighting.
10 76 SOUTH 190 STREET RR XING 15 0.20 P PE 01/49 0 700 T 700 1,400 0 0 0 1
RW 0 0 0 0 114 0 0 0
S 180 at UPRR /BNRR Xing's CN 11/49 0 3,415 T 3, 05 1,930 0 0 0 1130
Design and construct new TOTAL 0 4 4,615 4
separated grade crossing
of exiting railroad
tracks. Joint project
with Renton.
11 77 ANDOVER PARK WEST RR 15 0.10 T PE 01/49 0 15 0 15 0 0 0 13
SIGNAL RW 0 0 0 0 0 0 0 0
CN 06114 0 145 0 145 0 0 0 145
At existing railroad TOTAL 0 160 0 160
grade crossing
Design and install
railroad crossing signal.
11 79 SOUTHCENTER PARKWAY 02 0.50 P PE 01/99 0 140 0 1 1 40 0 0 0 140
RW 0 0 0 0 0 0 0 0
I5 off -ramp to S 169 St CN 06f?9 0 915 0 915 0 0 0 915
Design and construct TOTAL 0 955 0 9"
safety and capacity
improvements including
widening Southcenter
Pkwy.
ix Year Transportation Prouram 76114193
1994 to 2600 page 15
Agency City of T ukwila
City 1320
County 17 Project Cost In Thousands of Dollars
Phase Data Expenditure Schedule
Func Project Imp Total Ltil Start Federal Fund (Local Agency}
Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th
10 79 BOEING ACCESS RD115 NB 01 0.50 PE 01179 0 10 0 1u 0 0 0 lit
ACCESS RW 0 '1 i! 0 u 0 0
C r0 0 0 u 0 0 0
Boeing Access Rd, ML king TOTAL 0 10 0 10
Nay, 15
Form LID or similar
process to design and
construct new I5
northbound acce
improvements in
coordination with City of
Seattle and NSDOT.
10 80 SOUTH 180 STREET 05 0.10 P PE 01/99 0 80 0 80 0 0 0 8
PEDESTRIAN CROSSING RN 0 0 0 0 0 0 0 0
"N 06179 0 920 0 f% 0 v f 920
S 180 St at UPRR TOTAL 0 1,0 0 1 1 000
Design and construct
separated grade
pedestrian crossing for
Interurban trail.
GRAND TOTAL 24,879 71,835 33,993 /30,707