Loading...
HomeMy WebLinkAboutRes 2058 - 2023-2024 Consolidated Permit Fee Schedule (Repealed by Res 2105) Cover page to Resolution 2058 The full text of the resolution follows this cover page. Resolution 2058 was amended or repealed by the following resolutions. AMENDED REPEALED Section(s) Amended Amended by Res # Section(s) Repealed Repealed by Res # 4 “Land Use Fee Schedule” 2103 2105 Res tioi 70.5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REPEALING RESOLUTION NOS. 2012, 2021, AND 2046, AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE. WHEREAS, the City Council adopted Resolution No. 2012 in 2020, establishing the City's current consolidated permit fee schedule; and WHEREAS, Resolution No. 2012 was amended by Resolution Nos. 2021 and 2046, which amended the fees for wireless permits, tree/landscape permits, and zoning verification letters; and WHEREAS, the Public Works permit structure for infrastructure and right-of-way permits has changed due to an update to Tukwila Municipal Code Chapter 11.08; and WHEREAS, the permit structure for small wireless facilities has changed due to an update of TMC Chapter 18.58; and WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City Council wishes to recover a portion of the City's costs for review and processing of permit applications; and WHEREAS, the City has adopted a biennial budget process; and WHEREAS, the City's primary cost for permit processing is employee salaries and benefits; and WHEREAS, the Seattle Consumer Price Index (CPI -W) was 9.5% for the June 2022 period; and WHEREAS, the cost for employee benefits has also risen; and WHEREAS, increasing flat fee permits by 8.5% in 2023 and 7% in 2024 will enable revenues to track with increasing City labor costs; and WHEREAS, the permit fees for short plats, subdivisions, development agreements, rezones, and lot consolidations have been increased by larger amounts based on the amount of staff time required and comparison with other jurisdictions; CC \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 1 of 12 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Repealer. Resolution Nos. 2012, 2021, and 2046 are hereby repealed, effective January 1, 2023. Section 2. For 2023 and 2024, the Technology Fee shall be set at 5% of the applicable permit fee. Section 3. Right -of -Way Use and Franchise Permit fees shall be charged according to the following schedule: RIGHT-OF-WAY USE PERMITS FEE SCHEDULE Permit Description Right -of -Way Use Permit (ROWUP). Required for (Franchise and Non - Franchise Holders). 2023 Fee $276.00 application base fee, Technology Fee and, as applicable, four additional fees based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See Public Works Bulletin Al for fee schedule. 2024 Fee $295.00 application base fee, Technology Fee and, as applicable, four additional fees based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See Public Works Bulletin Al for fee schedule. Annual Activities Blanket Permit (AABP). Issued to Existing Franchise Holders. $276.00 application base fee, Technology Fee and, as applicable, two additional fees based on construction value: 1) Plan Review 2) Construction Inspection See Public Works Bulletin Al for fee schedule. $295.00 application base fee, Technology Fee and, as applicable, two additional fees based on construction value: 1) Plan Review 2) Construction Inspection See Public Works Bulletin Al for fee schedule. Franchise application deposit for all franchise applications except cable franchises.' $5,506.00 deposit $5,891.00 deposit ' Requires a deposit with franchise application. The deposit is intended to cover all administrative expenses incurred by the City (including staff/consultant related time) associated with the review of each franchise application and associated franchise negotiations. Additional fees may apply if additional staff/consultant related time is necessary. Any application fee deposit monies not used for administrative expenses associated with the review of each franchise application and franchise negotiation shall be returned to the applicant following the approval or denial of the franchise by the City Council. This administrative fee excludes normal permit fees required for work within the City rights-of-way. CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 2 of 12 Permit Description 2023 Fee Franchise Application Fee– Cable Street Vacation Latecomer's Agreements Flood Zone Control Permit Infrastructure Inspector Safety, Investigation or Re -inspection Fee Infrastructure Inspection Outside of Normal Business Hours (four-hour minimum charge) $5,506.00 plus 5% of total revenue $1,322.00 $549.00 processing fee, plus 17% administrative fee, plus $549.00 segregation fee $55.00 + Technology Fee $77.00 per hour 2024 Fee $5,891.00 plus 5% of total revenue $1,415.00 $587.00 processing fee, plus 17% administrative fee, plus $587.00 segregation fee $59.00 + Technology Fee I $83.00 per hour $116.00 per hour $124.00 per hour Section 4. Land use permit and processing fees will be charged according to the following schedule: LAND USE FEE SCHEDULE All peer review fees will be passed through to the applicant per TMC Section 18.50.200. Decision Type APPEALS Appeal of Type 1, 2 and 4 Decisions SEPA MDNS Appeal Appeal of Sign Code Decision Appeal of Fire Impact Fees 2023 Fee 2024 Fee Plus Hearing Examiner Fee $743 $795 Plus Technology Fee (TF) $743 $795 $743 $795 Appeal of Parks Impact Fees $743 $743 Appeal of Transportation Impact Fees SIGNS (TMC Chapter 19) Permanent Temporary $743 $307 $795 $795 $795 Pole/Banner Initial Application Special Event Pole/Banner Annual Renewal New Billboard $50 $328 $54 $307 $328 + TF + TF + TF $133 $67 $142 $72 Master Sign Program—Admin Master Sign Program—BAR $743 $2,744 $795 $2,936 $4,393 $4,701 + TF + TF + TF + TF + TF CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 3 of 12 Decision Type 2023 Fee 2024 Fee Plus Hearing Examine r Fee Plus Technolog y Fee (TF) TUC MODIFICATIONS Modification to TUC Corridor Standards (TMC Section 18.28.130.C) Modification to TUC Open Space Regulations (TMC Section 18.28.250. D. 4. d) Transit Reduction to Parking Requirements (TMC Section 18.28.260.8.5. b) DESIGN REVIEW (TMC Section 18.60.030) Administrative Public Hearing Major Modification Minor Modification $743 $743 $743 $2,822 $5,058 $1,733 $795 $795 $795 $3,020 $5,412 $1,854 $788 PARKING VARIANCES AND SPECIAL PERMISSIONS Administrative Parking Variance (Type 2—TMC Section 18.56.140) Parking Variance (Type 3—TMC Section 18.56.140) $843 $743 $795 + TF .......... + TF + TF + TF + TF $1,310 + TF Parking Standard for use not specified (TMC Section 18.28.250. D. 4. d.1 and TMC Section 18.56.100) Residential Parking Reduction (TMC Section 18.56.065) Shared, covenant, Complementary Parking Reduction (TMC Section 18.56.070) Parking Lot Restriping (TMC Section 18.56.120) $732 $743 $795 VARIANCES, SPECIAL PERMISSIONS AND SITE PLAN REVIEW Variances (TMC Chapter 18.72) Environmentally Sensitive Areas Deviation, Buffer Reduction (TMC Chapter 18.45) Reduced fee for LDR home- owners, no associated short plat $3,571 $1,889 $743 $3,821 $2,021 $795 CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 4 of 12 Decision Type Reasonable Use Exception (TMC Section 18„45..180) Exception from Single Family Design Standard (TMC Section 18.50.055) 2023 Fee 2024 Fee Plus Hearing Examiner Fee Plus Technology Fee (TF) $3,778 $4,042 + HE $743 $795 Special Permission Cargo Container (TMC Section 98.50.060) Tree Permit for single family residential properties (TMC Chapters 18.44, 18.45 and 18.54, including shoreline and critical areas tree permits) Tree Permit and Landscape Modification Permit and Exceptions for non -single family residential properties (TMC Section 18.53.120, and Chapters 18.44, 18.45 and 18.54, including shoreline and critical areas tree permits) ................................ $743 $795 $135 $743 LOT CREATION AND CONSOLIDATION Boundary Line Adjustment (TMC Chapter 17.08) Lot Consolidation (TMC Chapter 17.08) Short Plat (2-4 lots) (TMC Chapter 17.12) Short Plat (5-9 lots) (TMC Chapter 17.12) Subdivision Preliminary Plat (10+ lots) (TMC Section 17.14.020) Subdivision Final Plat (10+ lots) (TMC Section 97.12.030) ,.......... Binding Site Improvement Plan (TMC Chapter 17.16) $144 $795 $2,100 $2,247 $1,000 $1,070 $6,000 $6,420 $8,000 $8,560 $8,500 $9,095 $5,000 $5,350 $4,823 $5,160 + TF + TF + TF + TF + TF + TF + TF + HE + TF + TF CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton + TF Page 5 of 12 Decision Type Planned Residential Administrative (TMC Section 18.46. Planned Residential Public Hearing (TMC Section 18.46. Planned Residential Minor Modification (TMC Section 18.46. Planned Residential Major Modification (TMC Section 18.46. 2023 Fee 2024 Fee Development - 110) Development - 110) Development - 130) Development - 130) $2,744 $2,936 $6,298 $6,739 $743 $795 $3,063 $3,277 Plus Hearing Examiner Fee WIRELESS COMMUNICATION FACILITY (TMC Section 18.58.050) Eligible Facilities Modification Substantial Change New Macro Facility $743 $795 $2,118 $2,266 $4,237 $4,534 Plus Technology Fee (TF) +HE + TF + TF + TF SMALL WIRELESS COMMUNICATION FACILITY PERMITS (TMC Chapter 23.04) Non-recurring fee per application, which covers up to 5 small wireless communication facilities (SWF), plus added fee for each additional SWF beyond 5 Non-recurring fee per application for each new pole intended to support one or more SWF $543 for up to 5 $109 for each additional $1,085 $580 for up to 5 $116 for each additional $1,161 + TF + TF Recurring site fee (per year) for locating a SWF on City property SEPA AND ENVIRONMENTAL Checklist SEPA EIS SEPA Planned Action SEPA Addendum SEPA Exemption Letter Critical Area MasterPlaa.. Master n Overlay (TMC Section 18.45.160) $293 $313 $2,157 $2,308 $3,778 $4,042 $743 $795 $743 $795 $442 $473 $6,298 $6,739 CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton + TF + TF + TF + TF ................... + TF + TF + TF Page 6 of 12 Decision Type SHORELINE PERMITS Project value: $5,000 - $10,000 $10,001 - $50,000 $50,001 - $500,000 $1,492 $3,493 $5,566 $1,596 $3,737 $5,956 Plus Technology Fee (TF) + TF + TF + TF More than $500,000 Permit Exemption Letter, Shoreline Shoreline Permit Revision Conditional Use Permit, Shoreline (TMC Section 18.44.050) Shoreline Environment Redesignation $7,059 $7,553 $307 $329 $771 $825 $4,901 $5,244 + HE $4,042 + TF + TF + TF + TF + TF NOISE VARIANCES (TMC Section 8.22.120) Type I $609 I $651 Type II $827 $885 ...-Tpel11_mm.m,..�_..............................................................................................................................w.........................$1....,839..............................$1,968 Y USE PERMITS + TF Conditional Use Permit (TMC Section 18.64.020) Unclassified Use Permit (TMC Chapter 18.66) $4,901 $5,244 $6,739 + HE + TF + TF TSO Special Permission Use $1,224 $1,310 +HE +TF COMPREHENSIVE PLAN CHANGES (TMC Chapter 18.84) Rezone (Map Change - separate Comprehensive Plan amendment fees also apply) $8,000 $8,560 + TF Comprehensive Plan Amendment $5,035 $5,388 + TF Zoning Code Text Amendment $5,729 $6,130 + TF MISCELLANEOUS SERVICES AND CHARGES Development Agreement Code Interpretation (TMC Section 18.96.020) Zoning Verification Letter (Up to two contiguous parcels; $50 for each additional parcel.) Legal Lot Verification $5,000 $5,350 $442 $473 $442 $473 $704 $753 Preapplication Meeting $609 $651 In -lieu Tree Replacement Fee $458 $490 CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 7 of 12 Decision Type 2023 Fee 2024 Fee $575 $615 Mailing Fee to Generate Labels, er .ro.ect Public Notice Mailing Fee per address for each mailing $1 $1 Plus Hearing Examiner Fee Plus Technology Fee (TF) Section 5. Building permit fees will be charged according to the following schedule: Total Valuation $1 to $500 $501 to $2,000 BUILDING PERMIT FEE SCHEDULE $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 Building Permit Fees $73.01 + Technology Fee $73.01 for the first $500,add lus $4.83 for each additional itional $100, or fraction thereof, to and including $2,000, + Technology Fee $145.47 for the first $2,000, plus $22.01 for each additional $1,000, or fraction thereof, to and including $25,000, + Technology Fee $674.44 for the first $25,000, plus $17.19 for each additional $1,000, or fraction thereof, to and including $50,000, + Technology Fee $1,104.49 for the first $50,000, plus $11.90 for each additional $1,000, or fraction thereof, to and including $100,000, + Technology Fee $1,697.97 for the first $100,000, plus $9.55 for each additional $1,000, or fraction thereof, to and including $500,000, + Technology Fee $500,001 to $1,000,000 $1,000,001 to $5,000,000 $5,000,001 and up $5,511.25 for the first $500,000, plus $7.86 for each additional $1,000, or fraction thereof, to and including $1,000,000, + Technology Fee $9,484.31 for the first $1,000,000, plus $5.27 for each additional $1,000, or fraction thereof, to and including $5,000,000, + Technology Fee $30,602.36 for the first $5,000.000, plus $5.05 for each $1,000 or fraction thereof, + Technology Fee A. Non -Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural plan review fee. C. Total Value of All Construction Work. The latest Building Data Valuation that is updated twice a year by the International Code Council shall be used for the purposes of calculating value of the construction work. CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton Page 8 of 12 Section 6. M8Ch@Oic@l permit fees will be charged according to the following schedule: Valuation of Work (Total Contract Amount) $25Uorless $251 to $500 $1,001 to $5,000 $5.001to$50.000 $50,001 to $250,000 $250.001to$1.000.000 $1.000.001 and up MECHANICAL PERMIT FEE SCHEDULE Mechanical Permit Fee $36.50 for issuance of each permit (base fee) + Technology Fee $73.01 + Technology Fee $73.01 for first $250, plus $8.79 for each $1 00 or fraction thereof, to and incldin $500 + Technology Fee $95.02 for the first $5OO.plus $877for each $100orfraction thereof, tnand including $1.00O.+Teohno|ngyFee %143.88for the first $1.O0O.plus S10.83for each $1.00Oorfraction thereof, to and including $5,000, + Technology Fee $187.25for the first $5.00O.plus $11.28for each $1.OUOnrfraction thereof, hoandinduding$50.000.+Teohno|ngyFeo $718.UOfor the first $5O.00U.plus $0.43for each $1.00Onrfraction thereof, to and including $250,000, + Technology Fee $2.G05.15for the first $25O.UUO.plus $8.31for each $1.00Oorfraction thonen�toandino|uding$1.0OO.0O0.+Teohno|ogyFee $8.838.4Gfor the first $1.O00.000.plus $7.52for each $1.0U0or fraction thereof, + Technology Fee Section 7. Plumbing permit fees will be charged according to the following schedule: PLUMBING PERMIT FEE SCHEDULE Permit Issuance -Issuance of each permit (base fee) Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) For each additional fixture For each buikdingsevvnrand each �ai�rpark oevver Rain wahersysham-perdrain (inside building) For each water heater and/or vent For each industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type ginterceptors For each grease interceptor for commercial kitchens For each repair or alteration of water piping and/or water treating equipment, each occurrence For each repair or alteration of drainage or vent piping, each nmmre______ For each medical gas piping system serving one to five inlets/outlets for a speoificgoe CC: \Legislative Development\Consolidated permit fee schedue 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton $36.50 + Technology Fee $73.01 + Technology Fee $16.51 + Technology Fee $27.53 Technology Fee $16.51 + Technology Fee $16.51 + Technology Fee $33.04 + Technology Fee $33.O4+Technology Fee $16.51 + Technology Fee $16.51 + Technology Fee $ 93.60 + Technology Fee Page 9 of 12 For each additional medicagas inlets/outlet Foroaoh|avvnnphnk|ereyob*monanyone(1)meterinc|uding backflow protection devices therefor. $18.68 + Technology Fee For atmospheric -type vacuum breakers not included in Iawn sprinkler backflow protection: 1 to 5 $16.51 +Teohno|ogy Fee Over 5 $16.51 for first 5 plus $3.57 for each additional + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inohdiameter and smaller $33.04 + Technology Fee Over 2 -inch diameter: $36.34 + Technology Fee $33.04 + Technology Fee Section 8. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appHance with both plumbing and gas connection.) Unit Fee Schedule For each gas piping system of one to five outlets For each additional gas piping system outlet, per outlet $36.50 + Technology Fee $73.01 + Technology Fee $16.51 + Technology Fee Section 9. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE 1. NEW SINGLE-FAMILY DWELLINGS New single-family dwellings (including a garage) Garages, pools, spas and outbuildings Low voltage systems 2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES Service change or alteration—no added/altered circuits Service change $1O0.O4with added/altered circuits, plus $11.01for each added circuit (maximum permit fee Circuits added/altered without service change (includes up to 5 circuits) Circuits $66.08 added!altered without service change (more than 5 circuits); $11.U1for each added circuit (maximum permit fee $100.U4 Technology F Meter/mast repair Low voltage systems Do: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton $196.06 + Technology Fee $132.15 + Technology Fee $66.08 + Technology Fee $132.15 + Technology Fee $109.04 + Technology Fee $66.08 + Technology Fee $66.08 + Technology Fee $88.10 + Technology Fee Page 10 of 12 3. MULTI -FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Contract Amount) $250 or less $251 - $1...000........ Permit Fee $73.01 + Technology Fee $73.01 for the first $250 plus $4.83 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 - $5,000 $5,001 - $50,000 $50,001 - $250,000 $250,001 - $1,000,000 $108.97 for the first $1,000 plus $24.26 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $205.90 for the first $5,000 plus $19.88 for each $1,000 or fraction thereof, to and including $50,000, + Technolo•y Fee $1,099.88 for the first $50,000 plus $14.48 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $4,007.02 for the first $250,000 plus $10.26 for each $1,000 or fraction thereof, to ...and including $1,000,000, + Technology Fee.................................................................... Over $1,000,000 $11,728.04 plus 0.5% of cost over $1,000,000, + Technology Fee 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) Temporary service/generators Manufactured/mobile home parks and RV park sites, each service and feeder Carnivals: • Base fee • Each concession fee $113.93 + Technology Fee $113.93 + Technology Fee $113.93 + Technology Fee $113.93 + Technology Fee • Each ride and generator truck InInspections ns pectioj s or plan review not specified elsewhere (one hour minimum). Safety inspections, plan revisions Adult family home inspection (paid at the time of scheduling the inspection) $12.11 + Technology Fee $12.11 + Technology Fee $113.93 per hour $113.93 per hour $113.93 for each inspection Residential structure remodel or repair (up to $20,000 construction value) CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22 NG:bjs Review and analysis by Barbara Saxton $45.00 Page 11 of 12 Section 10. Other inspections and fees will be charged according to the foliowing schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (four hour minimum charge) Re -inspection fee (minimum charge one hour) Inspection for which no fee is specificallyindioated-- s or safety inspections x��*/""�/"/�""="/"","="../",a�.,,h�""�" additions, ",=",/"/""=t"�"""","� """'"""'p='�,'"~'"y""""r=~~'�^~'~ '~`~~''~~~~r~`~~ $115.63 per -.--- -��-,- '-_ $115.63 per hour $115.63 per hour $115.G3per hour Work commencing before permit issuance shall be subject to an investigation fee 100%ofthe permit fee equal to 100% of thepermit fee. Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee iso separate fee from the permit fee and is required when plans are required in order to document com|i ith thde. Work covered prior to inspection or work not ready at the time of inspection may bocharged ure-inspection fee Expired permit final - includes two inspections Expirodpennit�na|-each add�ona|inspection $77.09 Minor residential remodel plan review and permit (projects valued up to $20,000 $45.00 including buik1ing, nachanica, electrical, and plumbing within 1 year) Certificate of Occupancy replacement $154.18 $113.93 Section 11. Effective Date. This resolution and the fee schedules contained herein shall be effective January 1, 2023. PASSED BY THE CITY COUNCIL OF TH, WASHINGTON, at a Special Meeting thereof this Z-6.4' day of MAIAloodoe , 2022. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: � � Office 'of the City Attorney Thomas McLeod,'. . President ��— Filed with the CitClerk: /(-7-2~ Passed by the City Council: /f���~��~^~ Resolution Number: ' CC. \LegislativeDevelopmont \Conso|idated permit fee schedule 2023-2024 11-22-22 Page 12 of 12