HomeMy WebLinkAboutRes 2058 - 2023-2024 Consolidated Permit Fee Schedule (Repealed by Res 2105)
Cover page to Resolution 2058
The full text of the resolution follows this cover page.
Resolution 2058 was amended or repealed by the following resolutions.
AMENDED REPEALED
Section(s) Amended Amended by Res # Section(s) Repealed Repealed by Res #
4 “Land Use Fee Schedule” 2103 2105
Res tioi
70.5
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REPEALING RESOLUTION NOS.
2012, 2021, AND 2046, AND ADOPTING A CONSOLIDATED
PERMIT FEE SCHEDULE.
WHEREAS, the City Council adopted Resolution No. 2012 in 2020, establishing the
City's current consolidated permit fee schedule; and
WHEREAS, Resolution No. 2012 was amended by Resolution Nos. 2021 and
2046, which amended the fees for wireless permits, tree/landscape permits, and zoning
verification letters; and
WHEREAS, the Public Works permit structure for infrastructure and right-of-way
permits has changed due to an update to Tukwila Municipal Code Chapter 11.08; and
WHEREAS, the permit structure for small wireless facilities has changed due to an
update of TMC Chapter 18.58; and
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the City's primary cost for permit processing is employee salaries and
benefits; and
WHEREAS, the Seattle Consumer Price Index (CPI -W) was 9.5% for the June
2022 period; and
WHEREAS, the cost for employee benefits has also risen; and
WHEREAS, increasing flat fee permits by 8.5% in 2023 and 7% in 2024 will enable
revenues to track with increasing City labor costs; and
WHEREAS, the permit fees for short plats, subdivisions, development agreements,
rezones, and lot consolidations have been increased by larger amounts based on the
amount of staff time required and comparison with other jurisdictions;
CC \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
Page 1 of 12
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution Nos. 2012, 2021, and 2046 are hereby repealed,
effective January 1, 2023.
Section 2. For 2023 and 2024, the Technology Fee shall be set at 5% of the
applicable permit fee.
Section 3. Right -of -Way Use and Franchise Permit fees shall be charged
according to the following schedule:
RIGHT-OF-WAY USE PERMITS FEE SCHEDULE
Permit Description
Right -of -Way Use Permit
(ROWUP). Required for
(Franchise and Non -
Franchise Holders).
2023 Fee
$276.00 application base fee,
Technology Fee and, as
applicable, four additional fees
based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
See Public Works Bulletin Al for
fee schedule.
2024 Fee
$295.00 application base fee,
Technology Fee and, as
applicable, four additional fees
based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
See Public Works Bulletin Al for
fee schedule.
Annual Activities Blanket
Permit (AABP). Issued to
Existing Franchise Holders.
$276.00 application base fee,
Technology Fee and, as
applicable, two additional fees
based on construction value:
1) Plan Review
2) Construction Inspection
See Public Works Bulletin Al for
fee schedule.
$295.00 application base fee,
Technology Fee and, as
applicable, two additional fees
based on construction value:
1) Plan Review
2) Construction Inspection
See Public Works Bulletin Al for
fee schedule.
Franchise application
deposit for all franchise
applications except cable
franchises.'
$5,506.00 deposit
$5,891.00 deposit
' Requires a deposit with franchise application. The deposit is intended to cover all administrative
expenses incurred by the City (including staff/consultant related time) associated with the review
of each franchise application and associated franchise negotiations. Additional fees may apply if
additional staff/consultant related time is necessary. Any application fee deposit monies not used
for administrative expenses associated with the review of each franchise application and franchise
negotiation shall be returned to the applicant following the approval or denial of the franchise by
the City Council. This administrative fee excludes normal permit fees required for work within the
City rights-of-way.
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
Page 2 of 12
Permit Description
2023 Fee
Franchise Application Fee–
Cable
Street Vacation
Latecomer's Agreements
Flood Zone Control Permit
Infrastructure Inspector
Safety, Investigation or
Re -inspection Fee
Infrastructure Inspection
Outside of Normal Business
Hours (four-hour minimum
charge)
$5,506.00 plus 5% of total
revenue
$1,322.00
$549.00 processing fee, plus
17% administrative fee, plus
$549.00 segregation fee
$55.00 + Technology Fee
$77.00 per hour
2024 Fee
$5,891.00 plus 5% of total
revenue
$1,415.00
$587.00 processing fee, plus
17% administrative fee, plus
$587.00 segregation fee
$59.00 + Technology Fee
I $83.00 per hour
$116.00 per hour
$124.00 per hour
Section 4. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type
APPEALS
Appeal of Type 1, 2 and 4 Decisions
SEPA MDNS Appeal
Appeal of Sign Code Decision
Appeal of Fire Impact Fees
2023 Fee
2024 Fee
Plus
Hearing
Examiner
Fee
$743 $795
Plus
Technology
Fee (TF)
$743 $795
$743 $795
Appeal of Parks Impact Fees
$743
$743
Appeal of Transportation Impact Fees
SIGNS (TMC Chapter 19)
Permanent
Temporary
$743
$307
$795
$795
$795
Pole/Banner Initial Application
Special Event
Pole/Banner Annual Renewal
New Billboard
$50
$328
$54
$307
$328
+ TF
+ TF
+ TF
$133
$67
$142
$72
Master Sign Program—Admin
Master Sign Program—BAR
$743
$2,744
$795
$2,936
$4,393
$4,701
+ TF
+ TF
+ TF
+ TF
+ TF
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
Page 3 of 12
Decision Type
2023 Fee 2024 Fee
Plus
Hearing
Examine
r Fee
Plus
Technolog
y Fee (TF)
TUC MODIFICATIONS
Modification to TUC Corridor
Standards
(TMC Section 18.28.130.C)
Modification to TUC Open Space
Regulations
(TMC Section 18.28.250. D. 4. d)
Transit Reduction to Parking
Requirements
(TMC Section 18.28.260.8.5. b)
DESIGN REVIEW (TMC Section 18.60.030)
Administrative
Public Hearing
Major Modification
Minor Modification
$743
$743
$743
$2,822
$5,058
$1,733
$795
$795
$795
$3,020
$5,412
$1,854
$788
PARKING VARIANCES AND SPECIAL PERMISSIONS
Administrative Parking Variance
(Type 2—TMC Section 18.56.140)
Parking Variance
(Type 3—TMC Section 18.56.140)
$843
$743 $795
+ TF
..........
+ TF
+ TF
+ TF
+ TF
$1,310
+ TF
Parking Standard for use not
specified
(TMC Section 18.28.250. D. 4. d.1 and
TMC Section 18.56.100)
Residential Parking Reduction
(TMC Section 18.56.065)
Shared, covenant, Complementary
Parking Reduction
(TMC Section 18.56.070)
Parking Lot Restriping
(TMC Section 18.56.120)
$732
$743
$795
VARIANCES, SPECIAL PERMISSIONS AND SITE PLAN REVIEW
Variances
(TMC Chapter 18.72)
Environmentally Sensitive Areas
Deviation, Buffer Reduction
(TMC Chapter 18.45)
Reduced fee for LDR home-
owners, no associated short plat
$3,571
$1,889
$743
$3,821
$2,021
$795
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
Page 4 of 12
Decision Type
Reasonable Use Exception
(TMC Section 18„45..180)
Exception from Single Family
Design Standard
(TMC Section 18.50.055)
2023 Fee
2024 Fee
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
$3,778 $4,042
+ HE
$743 $795
Special Permission Cargo
Container
(TMC Section 98.50.060)
Tree Permit for single family
residential properties
(TMC Chapters 18.44, 18.45 and
18.54, including shoreline and
critical areas tree permits)
Tree Permit and Landscape
Modification Permit and Exceptions
for non -single family residential
properties
(TMC Section 18.53.120, and
Chapters 18.44, 18.45 and 18.54,
including shoreline and critical
areas tree permits) ................................
$743 $795
$135
$743
LOT CREATION AND CONSOLIDATION
Boundary Line Adjustment
(TMC Chapter 17.08)
Lot Consolidation
(TMC Chapter 17.08)
Short Plat (2-4 lots)
(TMC Chapter 17.12)
Short Plat (5-9 lots)
(TMC Chapter 17.12)
Subdivision Preliminary Plat
(10+ lots)
(TMC Section 17.14.020)
Subdivision Final Plat (10+ lots)
(TMC Section 97.12.030) ,..........
Binding Site Improvement Plan
(TMC Chapter 17.16)
$144
$795
$2,100 $2,247
$1,000 $1,070
$6,000 $6,420
$8,000 $8,560
$8,500 $9,095
$5,000 $5,350
$4,823 $5,160
+ TF
+ TF
+ TF
+ TF
+ TF
+ TF
+ TF
+ HE
+ TF
+ TF
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
+ TF
Page 5 of 12
Decision Type
Planned Residential
Administrative
(TMC Section 18.46.
Planned Residential
Public Hearing
(TMC Section 18.46.
Planned Residential
Minor Modification
(TMC Section 18.46.
Planned Residential
Major Modification
(TMC Section 18.46.
2023 Fee
2024 Fee
Development -
110)
Development -
110)
Development -
130)
Development -
130)
$2,744 $2,936
$6,298 $6,739
$743 $795
$3,063 $3,277
Plus
Hearing
Examiner
Fee
WIRELESS COMMUNICATION FACILITY (TMC Section 18.58.050)
Eligible Facilities Modification
Substantial Change
New Macro Facility
$743 $795
$2,118 $2,266
$4,237 $4,534
Plus
Technology
Fee (TF)
+HE
+ TF
+ TF
+ TF
SMALL WIRELESS COMMUNICATION FACILITY PERMITS (TMC Chapter 23.04)
Non-recurring fee per application,
which covers up to 5 small wireless
communication facilities (SWF), plus
added fee for each additional SWF
beyond 5
Non-recurring fee per application for
each new pole intended to support
one or more SWF
$543 for
up to 5
$109 for
each
additional
$1,085
$580 for
up to 5
$116 for
each
additional
$1,161
+ TF
+ TF
Recurring site fee (per year) for
locating a SWF on City property
SEPA AND ENVIRONMENTAL
Checklist
SEPA EIS
SEPA Planned Action
SEPA Addendum
SEPA Exemption Letter
Critical Area MasterPlaa..
Master n Overlay
(TMC Section 18.45.160)
$293
$313
$2,157 $2,308
$3,778 $4,042
$743 $795
$743 $795
$442 $473
$6,298 $6,739
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
+ TF
+ TF
+ TF
+ TF
...................
+ TF
+ TF
+ TF
Page 6 of 12
Decision Type
SHORELINE PERMITS
Project value: $5,000 - $10,000
$10,001 - $50,000
$50,001 - $500,000
$1,492
$3,493
$5,566
$1,596
$3,737
$5,956
Plus
Technology
Fee (TF)
+ TF
+ TF
+ TF
More than $500,000
Permit Exemption Letter, Shoreline
Shoreline Permit Revision
Conditional Use Permit, Shoreline
(TMC Section 18.44.050)
Shoreline Environment Redesignation
$7,059 $7,553
$307 $329
$771 $825
$4,901 $5,244 + HE
$4,042
+ TF
+ TF
+ TF
+ TF
+ TF
NOISE VARIANCES (TMC Section 8.22.120)
Type I
$609 I $651
Type II $827 $885
...-Tpel11_mm.m,..�_..............................................................................................................................w.........................$1....,839..............................$1,968
Y
USE PERMITS
+ TF
Conditional Use Permit
(TMC Section 18.64.020)
Unclassified Use Permit
(TMC Chapter 18.66)
$4,901
$5,244
$6,739
+ HE
+ TF
+ TF
TSO Special Permission Use
$1,224
$1,310
+HE +TF
COMPREHENSIVE PLAN CHANGES (TMC Chapter 18.84)
Rezone (Map Change -
separate Comprehensive Plan
amendment fees also apply)
$8,000
$8,560
+ TF
Comprehensive Plan Amendment $5,035 $5,388
+ TF
Zoning Code Text Amendment $5,729
$6,130
+ TF
MISCELLANEOUS SERVICES AND CHARGES
Development Agreement
Code Interpretation
(TMC Section 18.96.020)
Zoning Verification Letter
(Up to two contiguous parcels;
$50 for each additional parcel.)
Legal Lot Verification
$5,000 $5,350
$442 $473
$442 $473
$704 $753
Preapplication Meeting
$609 $651
In -lieu Tree Replacement Fee
$458
$490
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
Page 7 of 12
Decision Type 2023 Fee 2024 Fee
$575 $615
Mailing Fee to Generate Labels,
er .ro.ect
Public Notice Mailing Fee per address
for each mailing
$1
$1
Plus
Hearing
Examiner
Fee
Plus
Technology
Fee (TF)
Section 5. Building permit fees will be charged according to the following
schedule:
Total Valuation
$1 to $500
$501 to $2,000
BUILDING PERMIT FEE SCHEDULE
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
Building Permit Fees
$73.01 + Technology Fee
$73.01 for the first $500,add
lus $4.83 for each additional itional $100, or fraction
thereof, to and including $2,000, + Technology Fee
$145.47 for the first $2,000, plus $22.01 for each additional $1,000,
or fraction thereof, to and including $25,000, + Technology Fee
$674.44 for the first $25,000, plus $17.19 for each additional $1,000,
or fraction thereof, to and including $50,000, + Technology Fee
$1,104.49 for the first $50,000, plus $11.90 for each additional $1,000,
or fraction thereof, to and including $100,000, + Technology Fee
$1,697.97 for the first $100,000, plus $9.55 for each additional $1,000,
or fraction thereof, to and including $500,000, + Technology Fee
$500,001 to $1,000,000
$1,000,001 to $5,000,000
$5,000,001 and up
$5,511.25 for the first $500,000, plus $7.86 for each additional $1,000,
or fraction thereof, to and including $1,000,000, + Technology Fee
$9,484.31 for the first $1,000,000, plus $5.27 for each additional $1,000,
or fraction thereof, to and including $5,000,000, + Technology Fee
$30,602.36 for the first $5,000.000, plus $5.05 for each $1,000 or fraction
thereof, + Technology Fee
A. Non -Structural Plan Review Fee. A non-structural plan review fee shall be
paid at the time of submitting plans and specifications for review. The non-structural
plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
schedule. The non-structural plan review fee specified herein is a separate fee from the
permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed
necessary, a structural plan review fee shall be charged. The structural plan review fee
shall be 35% of the calculated non-structural plan review fee.
C. Total Value of All Construction Work. The latest Building Data Valuation that
is updated twice a year by the International Code Council shall be used for the purposes
of calculating value of the construction work.
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton Page 8 of 12
Section 6. M8Ch@Oic@l permit fees will be charged according to the following
schedule:
Valuation of
Work (Total
Contract Amount)
$25Uorless
$251 to $500
$1,001 to $5,000
$5.001to$50.000
$50,001 to $250,000
$250.001to$1.000.000
$1.000.001 and up
MECHANICAL PERMIT FEE SCHEDULE
Mechanical Permit Fee
$36.50 for issuance of each permit (base fee) + Technology Fee
$73.01 + Technology Fee
$73.01 for first $250, plus $8.79 for each $1 00 or fraction thereof,
to and incldin $500 + Technology Fee
$95.02 for the first $5OO.plus $877for each $100orfraction thereof,
tnand including $1.00O.+Teohno|ngyFee
%143.88for the first $1.O0O.plus S10.83for each $1.00Oorfraction
thereof, to and including $5,000, + Technology Fee
$187.25for the first $5.00O.plus $11.28for each $1.OUOnrfraction
thereof, hoandinduding$50.000.+Teohno|ngyFeo
$718.UOfor the first $5O.00U.plus $0.43for each $1.00Onrfraction
thereof, to and including $250,000, + Technology Fee
$2.G05.15for the first $25O.UUO.plus $8.31for each $1.00Oorfraction
thonen�toandino|uding$1.0OO.0O0.+Teohno|ogyFee
$8.838.4Gfor the first $1.O00.000.plus $7.52for each $1.0U0or
fraction thereof, + Technology Fee
Section 7. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance -Issuance of each permit (base fee)
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
For each additional fixture
For each buikdingsevvnrand each �ai�rpark oevver
Rain wahersysham-perdrain (inside building)
For each water heater and/or vent
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type ginterceptors
For each grease interceptor for commercial kitchens
For each repair or alteration of water piping and/or water treating
equipment, each occurrence
For each repair or alteration of drainage or vent piping, each
nmmre______
For each medical gas piping system serving one to five
inlets/outlets for a speoificgoe
CC: \Legislative Development\Consolidated permit fee schedue 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
$36.50 + Technology Fee
$73.01 + Technology Fee
$16.51 + Technology Fee
$27.53 Technology Fee
$16.51 + Technology Fee
$16.51 + Technology Fee
$33.04 + Technology Fee
$33.O4+Technology Fee
$16.51 + Technology Fee
$16.51 + Technology Fee
$ 93.60 + Technology Fee
Page 9 of 12
For each additional medicagas inlets/outlet
Foroaoh|avvnnphnk|ereyob*monanyone(1)meterinc|uding
backflow protection devices therefor.
$18.68 + Technology Fee
For atmospheric -type vacuum breakers not included in Iawn
sprinkler backflow protection:
1 to 5 $16.51 +Teohno|ogy Fee
Over 5 $16.51 for first 5 plus $3.57 for each additional
+ Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inohdiameter and smaller $33.04 + Technology Fee
Over 2 -inch diameter: $36.34 + Technology Fee
$33.04 + Technology Fee
Section 8. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appHance with both plumbing and gas
connection.)
Unit Fee Schedule
For each gas piping system of one to five outlets
For each additional gas piping system outlet, per outlet
$36.50 + Technology Fee
$73.01 + Technology Fee
$16.51 + Technology Fee
Section 9. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a garage)
Garages, pools, spas and outbuildings
Low voltage systems
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration—no added/altered circuits
Service change $1O0.O4with added/altered circuits, plus $11.01for
each added circuit (maximum permit fee
Circuits added/altered without service change (includes up to
5 circuits)
Circuits $66.08 added!altered without service change (more than 5
circuits); $11.U1for each added circuit (maximum permit fee $100.U4
Technology F
Meter/mast repair
Low voltage systems
Do: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
$196.06 + Technology Fee
$132.15 + Technology Fee
$66.08 + Technology Fee
$132.15 + Technology Fee
$109.04 + Technology Fee
$66.08 + Technology Fee
$66.08 + Technology Fee
$88.10 + Technology Fee
Page 10 of 12
3. MULTI -FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
$250 or less
$251 - $1...000........
Permit Fee
$73.01 + Technology Fee
$73.01 for the first $250 plus $4.83 for each $100 or fraction thereof, to and
including $1,000, + Technology Fee
$1,001 - $5,000
$5,001 - $50,000
$50,001 - $250,000
$250,001 - $1,000,000
$108.97 for the first $1,000 plus $24.26 for each $1,000 or fraction thereof,
to and including $5,000, + Technology Fee
$205.90 for the first $5,000 plus $19.88 for each $1,000 or fraction thereof,
to and including $50,000, + Technolo•y Fee
$1,099.88 for the first $50,000 plus $14.48 for each $1,000 or fraction thereof,
to and including $250,000, + Technology Fee
$4,007.02 for the first $250,000 plus $10.26 for each $1,000 or fraction
thereof, to
...and including $1,000,000, + Technology Fee....................................................................
Over $1,000,000
$11,728.04 plus 0.5% of cost over $1,000,000, + Technology Fee
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
Temporary service/generators
Manufactured/mobile home parks and RV park sites, each service and
feeder
Carnivals:
• Base fee
• Each concession fee
$113.93 + Technology Fee
$113.93 + Technology Fee
$113.93 + Technology Fee
$113.93 + Technology Fee
• Each ride and generator truck
InInspections
ns pectioj s or plan review not specified elsewhere (one hour
minimum).
Safety inspections, plan revisions
Adult family home inspection (paid at the time of scheduling the
inspection)
$12.11 + Technology Fee
$12.11 + Technology Fee
$113.93 per hour
$113.93 per hour
$113.93 for each inspection
Residential structure remodel or repair (up to $20,000 construction
value)
CC: \Legislative Development\Consolidated permit fee schedule 2023-2024 11-22-22
NG:bjs Review and analysis by Barbara Saxton
$45.00
Page 11 of 12
Section 10. Other inspections and fees will be charged according to the foliowing
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (four hour minimum charge)
Re -inspection fee (minimum charge one hour)
Inspection for which no fee is specificallyindioated-- s or safety
inspections
x��*/""�/"/�""="/"","="../",a�.,,h�""�" additions, ",=",/"/""=t"�"""","�
"""'"""'p='�,'"~'"y""""r=~~'�^~'~ '~`~~''~~~~r~`~~
$115.63 per
-.--- -��-,- '-_
$115.63 per hour
$115.63 per hour
$115.G3per hour
Work commencing before permit issuance shall be subject to an investigation fee 100%ofthe permit fee
equal to 100% of thepermit fee.
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee iso
separate fee from the permit fee and is required when plans are required in order
to document com|i ith thde.
Work covered prior to inspection or work not ready at the time of inspection may
bocharged ure-inspection fee
Expired permit final - includes two inspections
Expirodpennit�na|-each add�ona|inspection $77.09
Minor residential remodel plan review and permit (projects valued up to $20,000 $45.00
including buik1ing, nachanica, electrical, and plumbing within 1 year)
Certificate of Occupancy replacement
$154.18
$113.93
Section 11. Effective Date. This resolution and the fee schedules contained
herein shall be effective January 1, 2023.
PASSED BY THE CITY COUNCIL OF TH, WASHINGTON, at
a Special Meeting thereof this Z-6.4' day of MAIAloodoe , 2022.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
�
�
Office 'of the City Attorney
Thomas McLeod,'. .
President
��—
Filed with the CitClerk: /(-7-2~
Passed by the City Council: /f���~��~^~
Resolution Number: '
CC. \LegislativeDevelopmont \Conso|idated permit fee schedule 2023-2024 11-22-22
Page 12 of 12