HomeMy WebLinkAboutTIS 2022-12-05 Item 2A - Powerpoint to be Shown at Meeting - Public Works Maintenance and Engineering BuildingTUKWILA PUBLIC WORKS
Maintenance and Engineering Building
Test -to -Fit Phase December 5, 2022
Hari Ponnekanti, Public Works Director
Brandon Miles, PW Project Manager
Cody -Lee A. Gray, Operations Manager
Bryan Still, Operations Manager
John Palewicz Consulting
Justine Kim, Senior Project Manager, SOJ
Laura Maman, Principal, Miller Hayashi Architects
Herrera, Landscape Architecture and Environmental Engineering
Cannon Engineering, Civil Engineering
Tres West, Electrical Engineering
PCS Structural Solutions, Structrural Enginering
RC Cost, Cost Analysis
TEAM
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
1. Fulfill the commitment the City made to the
community and staff in 2016 on Public Safety
-Justice Center
-Two new fire stations
-Fleet and Facilities
2. Minkler Shops
-Too small
-Do not meet current seismic standards
-Adjacent to Green River levee
3. Maximize Operational Effectiveness by
consolidating Public Works operations
POLICY GOALS
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
Property Marketability
Operating and Maintenance Costs
Property Value
Property Attributes
Work process efficiency
Facility Quality
Location
Public
Staff
Services provided
Deliveries and Vendors
Good Neighbor
FACILITY EVALUATION CRITERIA
Public and Staff Experience
Public Image
Customer Service
Quality of Work Life
Facility Specifics
Meet current seismic standards
Natural disaster resiliency
Operational Flexibility
Expansion Potential
Americans with Disabilities Act Compliance
Acoustics
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
"Making people happy and
keeping people safe"
"We keep public safety
vehicles on the road"
"Opportunity to celebrate PW
successes, share stories and
images of past projects."
Safe
Functional
Efficient
Forward Looking
"Public Works keeps the City
in good working order"
PUBLIC WORKS VISION
"Public Works is the
backbone of the City. This is
an opportunity to highlight
this to the public:'
"Team Work"
"When no one else is in the
city, Public Works is on the
job clearing the snow."
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
•
FORMER
GEORGE
LONG
gHnp
CONTEXT
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
EXISTING SITE
Duwamish River
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
SITE ATTRIBUTES
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
Water/
1PU WATER TRAN UNE
nr
OVERHEAD TRANS MISSION UNC
WATER/ OMMUNICATI
Telecom •EM.
Easement
/
/
SEATTLE CITY LIGHT
LIGH RAIL
SUPP T
PYLON
PYLON
n
//
v
/Ks—WATER/ELECTRICAL
SITE ATTRIBUTES
Seattle City Light
Easement
SALINE JU' ' FICTION
(E)
UPS FACILITY
/
WATER EASEMENT
—SHORELINE BUFFER
Sound Transit
Easement
•• Light Rail
• Supports
Chinook Winds
Mitigation Projec
-
Restoration Area identified in
Dept. of Ecology Waiver Request
mr-
Duwamish /
I / Gardens Park /
2400,
„NO 000 osa„
_iii lii I 1 1
DUWAMISH RIVER
Light Rail Track
(above)
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
EXISTING SITE PHOTOS
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
SKI_ WATER TRAN +o UNE \ - \ \
8112SI
\ \\
WATER//OMMUNICATIr� :.� V' \ '�A
EASEMENT/ �\� \
IMPERVIOUS SURFACES
OVERHEAD TRANSMISSIOI�UNES -� __ \
SEATTLE CITY LIGHT
GHT\ RAIL
SUPPORT
PYLON\
ilk \\A
\ \ \
, s 4 . %\LIGHTL
UPPORT
IlkLON \
\p SOUNDSNT TRANSI
• ��rG LIG RAIL
RT
■ PYLO
, \\
\`LIGHT\RAIL
Ili " \ YLONOR\T
1
1
1
I
1
WATER/ELECTRICAL
EME
(E)
UPS FACILITY
\ WATER EASEMENT)
-_ SHORELINE BUFFER
Existing
mpervious Surface
Approximately
465,000 SF
Fence & Edge of ••
Existing Paving
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
accred ViHap Sites
Water -related Prates
Other Villages
Other Named Places
APPROX SITE
LOCATION
MAP EXCERPT FOM THE BURKE MUSEUM'S WATERLINES PROJECT
ART & DESIGN.Y MICHAEL A. LEWIS & JORDAN WEST MONEZ
STORY OF THE WATERSHED
THE RIVER IS OUR RELATIVE
Historically the Duwamish River watershed was a
Culturally and ecologically rich corridor.
CURRENTLY LIVING WITHIN THE WATERSHED:
15 FISH SPECIES
76 BIRD SPECIES
34 MAMMAL SPECIES
8 AMPHIBIAN SPECIES
4 REPTILE SPECIES
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
Floodplain Forest
Freshwater Wetlands and Bogs
STORY OF THE WATERSHED
PURPLE MARTIN
BALD EAGLE
OSPREY
GREAT BLUE HERON
STELLARS JAY
WOOD DUCK
DOUGLAS SQUIRREL
WESTERN GREY SQUIRREL
FOX
NORTHERN RIVER OTTER
LONG-EARED WEASEL
TOWNSEND'S CHIPMUNK
BRUSH RABBIT
NUTRIA
WESTERN POND TURTLE
WESTERN PAINTED TURTLE
PUGET SOUND STEELHEAD
COHO SALMON
CHUM SALMON
SOCKEYE
PUGET SOUND BULL TROUT
CHINOOK SALMON
DRAGONFLIES
BEES
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
DUWAMISH
ESTUARY
SUBWATERSH ED
APPROX SITE
LOCATION
Excerpt from Green/Duwamish River Watershed; Salmon Habitat Plan 2021
STORY OF THE WATERSHED
SALMON REARING HABITAT
The site has potential to provide shallow water rearing
habitat for juvenile salmonids which is critical to increasing
salmonid survival and restoring this key species to the river.
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
EXISTING SITE
200' SHORELINE JURISDICTION
SECTION A: EXISTING SITE SECTION THROUGH RESTORATION PARCEL
SCALE: 1:30
48'
RESTORATION SITE
200' SHORELINE JURISDICTION
STORMWATER FACILITY
L
SECTION A': VIEW WEST FROM RESTORATION SITE
SCALE 1:30
TRAIL CONNECTOR
MAINTENANCE
AND
ENGINEERING
BUILDING
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
Floating Wetland
Port Of Seattle Floating Wetland Concept
Bioretention Facilities
STORMWATER
THE FLOW OF WATER
TELLS A STORY
Using stormwater features to
showcase the movement and
treatment of water onsite
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
UNCOVERED
YARD STORAGE
80'X100'
COVERED STORAGE
EROSION CONTROL
SHELVING, PALLETS
20'X20'
SALT
40'X40'
f `
�l
SALT
SAND
25'X25'
TRAFFIC SIGNAL
POLES AND SIGN
POSTS STORAGE
(RACKS)110'-6"X7'-4"
COVERED STORAGE
WIRE SPOOLS
30'X21'-8"
(15' ASILE)
GRAVEL (19)BULK BINS
25X25
�- - SALT, SALT/SAND,
GRAVEL, SPOILS,
\ % ORGANICS
WASH BAY FOR
TRUCKS
55'X34'-6"
GENERATOR
ENCLOSURE
35'-6"X40'
PIPE STORAGE
(RACKS)100'X29'-8"
(15' ASILE)
(5) SNOW PLOWS
AND SALT
SPREADER
60'-3"X9'
BOLLARD STORAGE
17'X25"
SIGNAL CONTROL
BOXES 34'X15'
SITE PROGRAM ELEMENTS
COVERED
ROAD CONE
STORAGE (3 SIDES
OPEN) 20'X21'
COVERED STORAGE
SPILL RESPONSE KIT
26'X22'
COVERED STORAGE
SHORING/EXCAVATION
(LOOSE EQUIP)
17'X18'
(2) AREAS FOR
MATERIAL LOADING
COVERED
35'X10' EACH
COVERED STORAGE (6) SANDING RACKS
ROAD MAINT. EQUIP 10'X16' EACH
(LOOSE EQUIP)
29'-6" X 14'
HAZMAT WASTE /
MATERIAL (2)
CONTAINERS FOR
(8) 55 GAL DRUMS)
TANK FILLING W/
RACK FOR (18)
VERTICAL TANKS
BOLLARD SURROUND
15'X10' & GATE
COVERED MATERIAL
STORAGE (PALLETS)
39'X30'
MAINTENANCE AND ENGINEERING BUILDING
2 -STORY
40,000 SF
POLICE IMPOUND
100' X 62'-6"
PARKING STALLS
TYPE
FLEET
FLEET
FLEET
STAFF
STALL SIZE
9x20
10x30
15x45
9x19
00
0
I I
/' SPOILS
032'-0"- o32'-0"-11. 32'-0"- (3) 032-0"
COVERED
45
57
4
UNCOVERED
20
23
4
77
COVERED ROAD
PAINT STORAGE
15'X6'
(3 PALLET RACKS)
(3) BRINE TANKS
AND PUMP
35'X29' AREA
COVERED PESTICIDE
STORAGE, SECURED
AND ENTRY GATE
25'X10'
COVERED LUMBER
STORAGE (2) RACKS
LOAD FROM LONG
— SIDE
20'-6" X 7'
DECANT
35'X80'
(18' AWNING)
0 0 O
❑❑❑❑❑
RECYCLE AND
GARBAGE
(3) 22'X8'
(2) 5'X5'
(3) 6'X4'
INDOOR
2
3
3
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
TORAGE
SIGNAL SHOP
STORAGE
OFFICE
SIGN SHOP
STORAGE
PAI T
STORAGE
PARTS
STORAGE
WATER
RTS
RAGE
ALL
GENDER
RESTROOM
TOOL
ECONT
EQUIP / MATERIAL
STORAGE
WAREHOUSE
ART
EWE
HIPPING + MACHINE EL G
RECEIVING,
�SHOP� SHOP_)
TOOL ROOM
DRIVE THROUGH TOOL STORAGE
MECH
ROOM
TRASH/
RECYCLING
TEL
RM
AV
CLST
MAIN ENANCE
;LO ET
WIMEN'S R.STROOM
VWER
BREAK
ROOM
COVERED
OUTDOOR
ELECTRICAL
ROOM
WOMEN'S°
LOCKER LAUNDRY
WOMEN'S
DECON
DRYING
FITNESS
CENTER
EMPLOYEE
RESOURCE
CENTER
MEN'S
RESTROOM
SHOWER
MEN'S
LOCKER
J
MEN'S
DRYING
BUILDING PROGRAM ELEMENTS
TRAINING/
DISPATCH
MEETING
SPACE
LARGE
MEETING
ROOM
ECEPTION
MEDIUM
MEETING
ROOM
LOBBY
ENTRY
OFFICE
HEALTH & WELLBEING
SHOP
EQUIPMENT/ STORAGE/ WAREHOUSE
TRAFFIC
OPERATIONS
SCADA
OFFICE
CHAIR
STORAGE
SMALL
MEETING
ROOM
VISITOR
RESTROOM
OFFICES
STREET
DEPARTMENT
WATER
DEPARTMENT
1'
SEWER/
SURFACE
WATER
DEPARTM NT
ENGINEERING
DEPARTMENT
TOOL ROOM / DECON
LAUNDRY / DRYING ROOM
BUILDING SUPPORT
IP •
I DRIVE THROUGH TOOL STORAGE
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
DRIVE THROUGH TOOL STORAGE - EXAMPLE
Tool Depository, Pierce County Public Works Central Maintenance Facility
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
ierce ounty Pub is orks Central Mat ` tenance Facility
CARDBOARD BINS
SCRAP GLASS & LIGHTS BIN
STYROFOAM BIN
PAPER BIN
RAMP
WASTE / RECYCLING
Pierce County Sewer and Traffic Operations Facility
22'WX7'HX8'D 22'WX7'HX8'D 22'WX7'HX8'D
SCRAP SCRAP GARBAGE
METAL WOOD DUMPSTER
BIN BIN
+48" RAMP
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
SALT
,
40'
,
Diameter,/'
7 N
GRAVEL
25'
\Diamete-r
N
SALT
SAND
'2 5'
'
'Diameter
40,-0"
y
25'-0"
J,
25'-0"
X
L)
N
e
r
SALT / SAND STORAGE AREA/ PLAN
TABLE 2: STORING SALT IN CONICAL PILES
Length of
Space Slope from Exposed
Diameter Occupied Height Ground to Volume of Surface
Salt of Pile by Pile of Pile Peak Pile In Area
Short Tons ft ft2 ft ft ft3 ft2
24 19.33 295 6.0 11 600 339
50 24.67 479 8.0 15 1,250 565
80 28.92 655 9.0 17 2,000 773
100
31.17
765
10.0
18
2,500
904
300 45.00 1,595 14.0 27
7,500 1,877
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
OPEN FENCE
ALTERNATIVE MATERIALS/ ART & IDENTITY
FENCE
SITE CONC
1III[36:{IIIIIIIJI
TUKWILA INTL BLVD PLANTER SIDE-
WALK
PLANTED MOUND
BIORETENTION
PARKING LOT DRIVE AISLE
PARKING STALL
FLEET AND
FACILITIES BLDG
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
STRATEGIC VIEWS FROM TRAIL AND M&E BUILDING
VEGETATED FENCE
MAHONIA AS DENSE DETERRANT
VIEW TO UPS SITE FROM DUWAMISH
GARDENS
FENCE
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
WELLNESS AND EMPLOYEE WELL BEING
Many of us spend 90% or more of our time indoors,
and our work environments are one of the biggest determinants of our overall health.
AIR
• air quality management
• smoke-free environment
• ventilation design and particle
filtration
• improve air supply
MOVEMENT
• circulation network
• ergonomic design
• active furnishings
• physical activity opportunities,
promotion, spaces and equipment
WATER
• high quality drinking water and water
management
• performance metrics and monitoring
• drinking water promotion
• enhanced quality
THERMAL COMFORT
• performance metrics
• thermal zoning
• individual controls
• radiant thermal comfort
• humidity control
LIGHT
• visual and circadian lighting design
• daylight design strategies
• glare control & visual balance
• electric light quality
• occupant lighting control
SOUND
• mitigate noise levels
• sound barriers
• decreased reverberation time
• sound reducing surfaces
• minimize background sound
ukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
WELLNESS AND EMPLOYEE WELL BEING
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
'f IIIIIl11rni41111111111111
17IIIlII11FS l!I 12111
14=1 6r
m._.
111111 IIIIH
MEMO
11111AAA991111111A14
Option A
ri— YY1, �a [Flialililai
\ FN.
\ More butler at wetland restoration
CoNS:
es
\W lung facade harder to control glare
Gose pmwmlty to Iighball trac'a
\-adrIvonay lte crossas PA s
'\ driveway atE Marginal WHYS
i ': IiiaaiiiarIIi
Option B
S 112 ST
1 REEL111 1111111111,
'y a11111111 , 11 11 11111111111
-7,11111111131$ 111111111
11111111 &I 111111111
DECANT ,
gC dtl buildings into adjacent campus
$ gi point envy for Vzitors
\ NA building footprint
:Aad l improvement footprint
View oppM Itarom covered roof deck
CONS'.
*ant ltl on E Marginal Way
rrence Storage may not be feasible location
rmng and storage less attractive program
Os along wetlan butler (need screening)
M1 pncloeure further
from WE building
IIIIIIIIIIIIIIIIII
Id lllI1111111Y`i41111111II
1
Option E
SITE CONCEPTS
Boo ono
Olitialguiumm16"j jj ;AliiiiaiYii
0
�1�1011111YA
imumumnionnummktO
1111 E a11IlIIII111
Option C
J"
11111111301431:::::�
111�€trrrtfllGll
1laiiiilEl6iii='o�
II�� [•-noon l: II
HE:111111111111n11� \'
IIYYY
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
S 112 ST
VCOVERED
) 1,ix45
POLICE
IMPOUND
wi1.11IiWiIri1iTh
FLEET PARKING
SITE CONCEPT
Buildingat west
�
side of Duwamish
buffer.
1
'E•
BRINE TANKS
0000
00000
C
TOOLS/EQUIP/PARTS (REMOVED FROM M&E)
11 1ILOADINGII I1
1
I 11 11 11 I1
I
EXTERIOR COVERED STORAGE
;OVEI;ED
3C) 3X20
MAINTENANCE AND
ENGINEERING BUILDING
3 -STORY
35,000 SF
1114 1111111 ��i�
11,11onsom IUI ,' VISITOR
PARKLNG-
STAF
RKIN�,
NCOVER
I 6) 9x19
WO 0s:"O
ti
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
UNCOVERED
YARD
\STORAGE
S 112 ST
POLICE IMPOUND
SITE CONCEPT B
�— M&E Buildingat east
side of Duwamish
buffer.
FLEET PARKING
IIIIIILIEEL_
11111„1,
SALT G 11 \ 1\ /
SALT SANDII \\_/ \-_,
SPOILS
FLEET
PARKING
COVERED
(46) 10x30
0
a
0
o
PIPE'
STOR
STA
RKIN
(�1 COVER:1
) 9x19
COVERED
(18) 9X20
0
FLEET
PARKING
COVERED
(32) 9X20
,ENER
_NCLOS
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
QV
STAFF & VISITO
PARKING
(35) 9x19
UNCOVERED
YARD
STORAGE
POLICE IMPOUND
S 112 ST
BIM
(E)
FLEET AND FACILITIES
BUILDING
SPOILS
DECANT
r 10irrop
V
R
FLEET PARKING
D
5
i
111111;;:':1!I- 1111111111
/
SPOILS
EXTERIOR
COVERED
STORAGE
1
re
AINTENANCE AND
ENGINEERING BUILDING
2 -STORY
40000 SF
r
\\
\
—-------M&E Building as far
\
north as possible. SCL
easement prevents
building from facing
street front.
SITECONCEPTC
PE
R
ST
S RPS
TRUCK
WASH
0
z
EXTERIO
COVERE
STORAGI
x>O0ooEl0(3
POLE
STORAGE
SALT/
SAND
GRAVEL
COVERED
1711
11111
111111111111
NCOVER
4) 9x19'
STAFF
PARKING
moimmisammoiontilli
(
V
0)
RE D
1)x.
0
•
1
O
/
/
E 7
1 /
11
/
/ r
1 ,
I \ _
1
/7/ //
1
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
STAFF & VISITOR
PARKING
1.x45
OVSRED
4) 5x 5
\
S 112 ST
,ra nv wow re
FLEET PARKING
POLICE
IMPOUND
(E)
FLEET AND FACILITIES
BUILDING
1
POt _,
EXTERIOR COVERED STORAGE
GENERAL
DECANT
SITE CONCEPT D
— M&E Building at
East MarginalWayS
Sound Transit
easement prevents
building from facing
street front.
O
O
0SALT
SALT
SAND
GRAVEL
VISITOR PARKING
UNCOVERED
(14) 9x19
STAFF PA
r
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
---
POLICE IMPOUND
S 112 ST
UNCOVERED (40) 9020 STAFF PARKING
®1111111111I111111111111111111
G0000
CL
SITE CONCEPT E
--- M&E Building at
Tukwila International
Boulevard near the
33 F&F Building.
v
\ tP
VI
DECANT
UNCOVERED
(4) 15x45
C
OVE
44)
RE
D
9\
20
/ ///
j � /
// %
1 /
( x`
% ) 1 `
/ / I
i
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
CDV
(2:)
_RED
1030
TOOLS/EQU P/PARTS (REMOVED FROM M&E)
I I I 11 LOADING I I 11 I
I II II II II I
EXTERIOR COVERED STORAGE
TRUCK
WASH
COVE
(23
RE
10x30
DECANT
UNCOVERED
(4) 15x45
C
OVE
44)
RE
D
9\
20
/ ///
j � /
// %
1 /
( x`
% ) 1 `
/ / I
i
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
07 IM
empowveqmpawilm
ift
STAFF PARKING
(5)9x19
NC
(4)
VER[D
5x4
1) 1 5 4
1 5x4
S 112 ST
ca Wafts& Gwirswrp
iiiiiii�s''iiiiiiiiiiii o
FLEET
STAFF PARKING PARKING
l!IIU!M!®,111111 liiiiiii
— ii1iIi2iiI;II iiiIN = VISIUNGCOVEREDKING
TRUCK
WASH
Demolish portion of
existing building to
create traffic circulation
(E)
22,000 SF
ADDITION
18,000 SF
SITE CONCEPT F
`\
-----U -Upgrade existing
loading dock structure.
Add new 1 -story
addition for M&E
program.
Site program elements
do not fit.
\
OVERED
ERIOR
S •RAGE
GENE"ATOR
ENCLISURE
GRAVEL
—C6V€R€ D
(i4) 1Ux30
UNC VERE
( 7) 10x3
PROGRAM ELEMENTS THAT
COULDN'T FIT ON THE SITE PLAN
d
POLE STORAGE
110'X8'
FUEL TANK FILLING
15'X10'
POLICE
EVIDENCE
STORAGE
PIPE STORAGE
100'X30'
00
0�
BRINE TANKS
POLICE IMPOUND
SPOILS
1 6,000SF
UNCOVERED
YARD
STORAGE
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects
DISCUSSION AND NEXT STEPS
Next Steps:
- Edit presentation to incorporate committee feedback on presentation
- Monday December 12th, Commitee of the Whole meeting
- Wednesday January 11th, Public Open House
- Return to Council in January. Schedule to be coordinated.
Tukwila Public Works
M&E Building
December 5, 2022
Miller Hayashi Architects