Loading...
HomeMy WebLinkAboutTIS 2022-12-05 Item 2A - Powerpoint to be Shown at Meeting - Public Works Maintenance and Engineering BuildingTUKWILA PUBLIC WORKS Maintenance and Engineering Building Test -to -Fit Phase December 5, 2022 Hari Ponnekanti, Public Works Director Brandon Miles, PW Project Manager Cody -Lee A. Gray, Operations Manager Bryan Still, Operations Manager John Palewicz Consulting Justine Kim, Senior Project Manager, SOJ Laura Maman, Principal, Miller Hayashi Architects Herrera, Landscape Architecture and Environmental Engineering Cannon Engineering, Civil Engineering Tres West, Electrical Engineering PCS Structural Solutions, Structrural Enginering RC Cost, Cost Analysis TEAM Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects 1. Fulfill the commitment the City made to the community and staff in 2016 on Public Safety -Justice Center -Two new fire stations -Fleet and Facilities 2. Minkler Shops -Too small -Do not meet current seismic standards -Adjacent to Green River levee 3. Maximize Operational Effectiveness by consolidating Public Works operations POLICY GOALS Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects Property Marketability Operating and Maintenance Costs Property Value Property Attributes Work process efficiency Facility Quality Location Public Staff Services provided Deliveries and Vendors Good Neighbor FACILITY EVALUATION CRITERIA Public and Staff Experience Public Image Customer Service Quality of Work Life Facility Specifics Meet current seismic standards Natural disaster resiliency Operational Flexibility Expansion Potential Americans with Disabilities Act Compliance Acoustics Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects "Making people happy and keeping people safe" "We keep public safety vehicles on the road" "Opportunity to celebrate PW successes, share stories and images of past projects." Safe Functional Efficient Forward Looking "Public Works keeps the City in good working order" PUBLIC WORKS VISION "Public Works is the backbone of the City. This is an opportunity to highlight this to the public:' "Team Work" "When no one else is in the city, Public Works is on the job clearing the snow." Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects • FORMER GEORGE LONG gHnp CONTEXT Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects EXISTING SITE Duwamish River Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects SITE ATTRIBUTES Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects Water/ 1PU WATER TRAN UNE nr OVERHEAD TRANS MISSION UNC WATER/ OMMUNICATI Telecom •EM. Easement / / SEATTLE CITY LIGHT LIGH RAIL SUPP T PYLON PYLON n // v /Ks—WATER/ELECTRICAL SITE ATTRIBUTES Seattle City Light Easement SALINE JU' ' FICTION (E) UPS FACILITY / WATER EASEMENT —SHORELINE BUFFER Sound Transit Easement •• Light Rail • Supports Chinook Winds Mitigation Projec - Restoration Area identified in Dept. of Ecology Waiver Request mr- Duwamish / I / Gardens Park / 2400, „NO 000 osa„ _iii lii I 1 1 DUWAMISH RIVER Light Rail Track (above) Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects EXISTING SITE PHOTOS Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects SKI_ WATER TRAN +o UNE \ - \ \ 8112SI \ \\ WATER//OMMUNICATIr� :.� V' \ '�A EASEMENT/ �\� \ IMPERVIOUS SURFACES OVERHEAD TRANSMISSIOI�UNES -� __ \ SEATTLE CITY LIGHT GHT\ RAIL SUPPORT PYLON\ ilk \\A \ \ \ , s 4 . %\LIGHTL UPPORT IlkLON \ \p SOUNDSNT TRANSI • ��rG LIG RAIL RT ■ PYLO , \\ \`LIGHT\RAIL Ili " \ YLONOR\T 1 1 1 I 1 WATER/ELECTRICAL EME (E) UPS FACILITY \ WATER EASEMENT) -_ SHORELINE BUFFER Existing mpervious Surface Approximately 465,000 SF Fence & Edge of •• Existing Paving Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects accred ViHap Sites Water -related Prates Other Villages Other Named Places APPROX SITE LOCATION MAP EXCERPT FOM THE BURKE MUSEUM'S WATERLINES PROJECT ART & DESIGN.Y MICHAEL A. LEWIS & JORDAN WEST MONEZ STORY OF THE WATERSHED THE RIVER IS OUR RELATIVE Historically the Duwamish River watershed was a Culturally and ecologically rich corridor. CURRENTLY LIVING WITHIN THE WATERSHED: 15 FISH SPECIES 76 BIRD SPECIES 34 MAMMAL SPECIES 8 AMPHIBIAN SPECIES 4 REPTILE SPECIES Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects Floodplain Forest Freshwater Wetlands and Bogs STORY OF THE WATERSHED PURPLE MARTIN BALD EAGLE OSPREY GREAT BLUE HERON STELLARS JAY WOOD DUCK DOUGLAS SQUIRREL WESTERN GREY SQUIRREL FOX NORTHERN RIVER OTTER LONG-EARED WEASEL TOWNSEND'S CHIPMUNK BRUSH RABBIT NUTRIA WESTERN POND TURTLE WESTERN PAINTED TURTLE PUGET SOUND STEELHEAD COHO SALMON CHUM SALMON SOCKEYE PUGET SOUND BULL TROUT CHINOOK SALMON DRAGONFLIES BEES Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects DUWAMISH ESTUARY SUBWATERSH ED APPROX SITE LOCATION Excerpt from Green/Duwamish River Watershed; Salmon Habitat Plan 2021 STORY OF THE WATERSHED SALMON REARING HABITAT The site has potential to provide shallow water rearing habitat for juvenile salmonids which is critical to increasing salmonid survival and restoring this key species to the river. Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects EXISTING SITE 200' SHORELINE JURISDICTION SECTION A: EXISTING SITE SECTION THROUGH RESTORATION PARCEL SCALE: 1:30 48' RESTORATION SITE 200' SHORELINE JURISDICTION STORMWATER FACILITY L SECTION A': VIEW WEST FROM RESTORATION SITE SCALE 1:30 TRAIL CONNECTOR MAINTENANCE AND ENGINEERING BUILDING Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects Floating Wetland Port Of Seattle Floating Wetland Concept Bioretention Facilities STORMWATER THE FLOW OF WATER TELLS A STORY Using stormwater features to showcase the movement and treatment of water onsite Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects UNCOVERED YARD STORAGE 80'X100' COVERED STORAGE EROSION CONTROL SHELVING, PALLETS 20'X20' SALT 40'X40' f ` �l SALT SAND 25'X25' TRAFFIC SIGNAL POLES AND SIGN POSTS STORAGE (RACKS)110'-6"X7'-4" COVERED STORAGE WIRE SPOOLS 30'X21'-8" (15' ASILE) GRAVEL (19)BULK BINS 25X25 �- - SALT, SALT/SAND, GRAVEL, SPOILS, \ % ORGANICS WASH BAY FOR TRUCKS 55'X34'-6" GENERATOR ENCLOSURE 35'-6"X40' PIPE STORAGE (RACKS)100'X29'-8" (15' ASILE) (5) SNOW PLOWS AND SALT SPREADER 60'-3"X9' BOLLARD STORAGE 17'X25" SIGNAL CONTROL BOXES 34'X15' SITE PROGRAM ELEMENTS COVERED ROAD CONE STORAGE (3 SIDES OPEN) 20'X21' COVERED STORAGE SPILL RESPONSE KIT 26'X22' COVERED STORAGE SHORING/EXCAVATION (LOOSE EQUIP) 17'X18' (2) AREAS FOR MATERIAL LOADING COVERED 35'X10' EACH COVERED STORAGE (6) SANDING RACKS ROAD MAINT. EQUIP 10'X16' EACH (LOOSE EQUIP) 29'-6" X 14' HAZMAT WASTE / MATERIAL (2) CONTAINERS FOR (8) 55 GAL DRUMS) TANK FILLING W/ RACK FOR (18) VERTICAL TANKS BOLLARD SURROUND 15'X10' & GATE COVERED MATERIAL STORAGE (PALLETS) 39'X30' MAINTENANCE AND ENGINEERING BUILDING 2 -STORY 40,000 SF POLICE IMPOUND 100' X 62'-6" PARKING STALLS TYPE FLEET FLEET FLEET STAFF STALL SIZE 9x20 10x30 15x45 9x19 00 0 I I /' SPOILS 032'-0"- o32'-0"-11. 32'-0"- (3) 032-0" COVERED 45 57 4 UNCOVERED 20 23 4 77 COVERED ROAD PAINT STORAGE 15'X6' (3 PALLET RACKS) (3) BRINE TANKS AND PUMP 35'X29' AREA COVERED PESTICIDE STORAGE, SECURED AND ENTRY GATE 25'X10' COVERED LUMBER STORAGE (2) RACKS LOAD FROM LONG — SIDE 20'-6" X 7' DECANT 35'X80' (18' AWNING) 0 0 O ❑❑❑❑❑ RECYCLE AND GARBAGE (3) 22'X8' (2) 5'X5' (3) 6'X4' INDOOR 2 3 3 Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects TORAGE SIGNAL SHOP STORAGE OFFICE SIGN SHOP STORAGE PAI T STORAGE PARTS STORAGE WATER RTS RAGE ALL GENDER RESTROOM TOOL ECONT EQUIP / MATERIAL STORAGE WAREHOUSE ART EWE HIPPING + MACHINE EL G RECEIVING, �SHOP� SHOP_) TOOL ROOM DRIVE THROUGH TOOL STORAGE MECH ROOM TRASH/ RECYCLING TEL RM AV CLST MAIN ENANCE ;LO ET WIMEN'S R.STROOM VWER BREAK ROOM COVERED OUTDOOR ELECTRICAL ROOM WOMEN'S° LOCKER LAUNDRY WOMEN'S DECON DRYING FITNESS CENTER EMPLOYEE RESOURCE CENTER MEN'S RESTROOM SHOWER MEN'S LOCKER J MEN'S DRYING BUILDING PROGRAM ELEMENTS TRAINING/ DISPATCH MEETING SPACE LARGE MEETING ROOM ECEPTION MEDIUM MEETING ROOM LOBBY ENTRY OFFICE HEALTH & WELLBEING SHOP EQUIPMENT/ STORAGE/ WAREHOUSE TRAFFIC OPERATIONS SCADA OFFICE CHAIR STORAGE SMALL MEETING ROOM VISITOR RESTROOM OFFICES STREET DEPARTMENT WATER DEPARTMENT 1' SEWER/ SURFACE WATER DEPARTM NT ENGINEERING DEPARTMENT TOOL ROOM / DECON LAUNDRY / DRYING ROOM BUILDING SUPPORT IP • I DRIVE THROUGH TOOL STORAGE Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects DRIVE THROUGH TOOL STORAGE - EXAMPLE Tool Depository, Pierce County Public Works Central Maintenance Facility Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects ierce ounty Pub is orks Central Mat ` tenance Facility CARDBOARD BINS SCRAP GLASS & LIGHTS BIN STYROFOAM BIN PAPER BIN RAMP WASTE / RECYCLING Pierce County Sewer and Traffic Operations Facility 22'WX7'HX8'D 22'WX7'HX8'D 22'WX7'HX8'D SCRAP SCRAP GARBAGE METAL WOOD DUMPSTER BIN BIN +48" RAMP Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects SALT , 40' , Diameter,/' 7 N GRAVEL 25' \Diamete-r N SALT SAND '2 5' ' 'Diameter 40,-0" y 25'-0" J, 25'-0" X L) N e r SALT / SAND STORAGE AREA/ PLAN TABLE 2: STORING SALT IN CONICAL PILES Length of Space Slope from Exposed Diameter Occupied Height Ground to Volume of Surface Salt of Pile by Pile of Pile Peak Pile In Area Short Tons ft ft2 ft ft ft3 ft2 24 19.33 295 6.0 11 600 339 50 24.67 479 8.0 15 1,250 565 80 28.92 655 9.0 17 2,000 773 100 31.17 765 10.0 18 2,500 904 300 45.00 1,595 14.0 27 7,500 1,877 Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects OPEN FENCE ALTERNATIVE MATERIALS/ ART & IDENTITY FENCE SITE CONC 1III[36:{IIIIIIIJI TUKWILA INTL BLVD PLANTER SIDE- WALK PLANTED MOUND BIORETENTION PARKING LOT DRIVE AISLE PARKING STALL FLEET AND FACILITIES BLDG Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects STRATEGIC VIEWS FROM TRAIL AND M&E BUILDING VEGETATED FENCE MAHONIA AS DENSE DETERRANT VIEW TO UPS SITE FROM DUWAMISH GARDENS FENCE Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects WELLNESS AND EMPLOYEE WELL BEING Many of us spend 90% or more of our time indoors, and our work environments are one of the biggest determinants of our overall health. AIR • air quality management • smoke-free environment • ventilation design and particle filtration • improve air supply MOVEMENT • circulation network • ergonomic design • active furnishings • physical activity opportunities, promotion, spaces and equipment WATER • high quality drinking water and water management • performance metrics and monitoring • drinking water promotion • enhanced quality THERMAL COMFORT • performance metrics • thermal zoning • individual controls • radiant thermal comfort • humidity control LIGHT • visual and circadian lighting design • daylight design strategies • glare control & visual balance • electric light quality • occupant lighting control SOUND • mitigate noise levels • sound barriers • decreased reverberation time • sound reducing surfaces • minimize background sound ukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects WELLNESS AND EMPLOYEE WELL BEING Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects 'f IIIIIl11rni41111111111111 17IIIlII11FS l!I 12111 14=1 6r m._. 111111 IIIIH MEMO 11111AAA991111111A14 Option A ri— YY1, �a [Flialililai \ FN. \ More butler at wetland restoration CoNS: es \W lung facade harder to control glare Gose pmwmlty to Iighball trac'a \-adrIvonay lte crossas PA s '\ driveway atE Marginal WHYS i ': IiiaaiiiarIIi Option B S 112 ST 1 REEL111 1111111111, 'y a11111111 , 11 11 11111111111 -7,11111111131$ 111111111 11111111 &I 111111111 DECANT , gC dtl buildings into adjacent campus $ gi point envy for Vzitors \ NA building footprint :Aad l improvement footprint View oppM Itarom covered roof deck CONS'. *ant ltl on E Marginal Way rrence Storage may not be feasible location rmng and storage less attractive program Os along wetlan butler (need screening) M1 pncloeure further from WE building IIIIIIIIIIIIIIIIII Id lllI1111111Y`i41111111II 1 Option E SITE CONCEPTS Boo ono Olitialguiumm16"j jj ;AliiiiaiYii 0 �1�1011111YA imumumnionnummktO 1111 E a11IlIIII111 Option C J" 11111111301431:::::� 111�€trrrtfllGll 1laiiiilEl6iii='o� II�� [•-noon l: II HE:111111111111n11� \' IIYYY Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects S 112 ST VCOVERED ) 1,ix45 POLICE IMPOUND wi1.11IiWiIri1iTh FLEET PARKING SITE CONCEPT Buildingat west � side of Duwamish buffer. 1 'E• BRINE TANKS 0000 00000 C TOOLS/EQUIP/PARTS (REMOVED FROM M&E) 11 1ILOADINGII I1 1 I 11 11 11 I1 I EXTERIOR COVERED STORAGE ;OVEI;ED 3C) 3X20 MAINTENANCE AND ENGINEERING BUILDING 3 -STORY 35,000 SF 1114 1111111 ��i� 11,11onsom IUI ,' VISITOR PARKLNG- STAF RKIN�, NCOVER I 6) 9x19 WO 0s:"O ti Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects UNCOVERED YARD \STORAGE S 112 ST POLICE IMPOUND SITE CONCEPT B �— M&E Buildingat east side of Duwamish buffer. FLEET PARKING IIIIIILIEEL_ 11111„1, SALT G 11 \ 1\ / SALT SANDII \\_/ \-_, SPOILS FLEET PARKING COVERED (46) 10x30 0 a 0 o PIPE' STOR STA RKIN (�1 COVER:1 ) 9x19 COVERED (18) 9X20 0 FLEET PARKING COVERED (32) 9X20 ,ENER _NCLOS Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects QV STAFF & VISITO PARKING (35) 9x19 UNCOVERED YARD STORAGE POLICE IMPOUND S 112 ST BIM (E) FLEET AND FACILITIES BUILDING SPOILS DECANT r 10irrop V R FLEET PARKING D 5 i 111111;;:':1!I- 1111111111 / SPOILS EXTERIOR COVERED STORAGE 1 re AINTENANCE AND ENGINEERING BUILDING 2 -STORY 40000 SF r \\ \ —-------M&E Building as far \ north as possible. SCL easement prevents building from facing street front. SITECONCEPTC PE R ST S RPS TRUCK WASH 0 z EXTERIO COVERE STORAGI x>O0ooEl0(3 POLE STORAGE SALT/ SAND GRAVEL COVERED 1711 11111 111111111111 NCOVER 4) 9x19' STAFF PARKING moimmisammoiontilli ( V 0) RE D 1)x. 0 • 1 O / / E 7 1 / 11 / / r 1 , I \ _ 1 /7/ // 1 Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects STAFF & VISITOR PARKING 1.x45 OVSRED 4) 5x 5 \ S 112 ST ,ra nv wow re FLEET PARKING POLICE IMPOUND (E) FLEET AND FACILITIES BUILDING 1 POt _, EXTERIOR COVERED STORAGE GENERAL DECANT SITE CONCEPT D — M&E Building at East MarginalWayS Sound Transit easement prevents building from facing street front. O O 0SALT SALT SAND GRAVEL VISITOR PARKING UNCOVERED (14) 9x19 STAFF PA r Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects --- POLICE IMPOUND S 112 ST UNCOVERED (40) 9020 STAFF PARKING ®1111111111I111111111111111111 G0000 CL SITE CONCEPT E --- M&E Building at Tukwila International Boulevard near the 33 F&F Building. v \ tP VI DECANT UNCOVERED (4) 15x45 C OVE 44) RE D 9\ 20 / /// j � / // % 1 / ( x` % ) 1 ` / / I i Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects CDV (2:) _RED 1030 TOOLS/EQU P/PARTS (REMOVED FROM M&E) I I I 11 LOADING I I 11 I I II II II II I EXTERIOR COVERED STORAGE TRUCK WASH COVE (23 RE 10x30 DECANT UNCOVERED (4) 15x45 C OVE 44) RE D 9\ 20 / /// j � / // % 1 / ( x` % ) 1 ` / / I i Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects 07 IM empowveqmpawilm ift STAFF PARKING (5)9x19 NC (4) VER[D 5x4 1) 1 5 4 1 5x4 S 112 ST ca Wafts& Gwirswrp iiiiiii�s''iiiiiiiiiiii o FLEET STAFF PARKING PARKING l!IIU!M!®,111111 liiiiiii — ii1iIi2iiI;II iiiIN = VISIUNGCOVEREDKING TRUCK WASH Demolish portion of existing building to create traffic circulation (E) 22,000 SF ADDITION 18,000 SF SITE CONCEPT F `\ -----U -Upgrade existing loading dock structure. Add new 1 -story addition for M&E program. Site program elements do not fit. \ OVERED ERIOR S •RAGE GENE"ATOR ENCLISURE GRAVEL —C6V€R€ D (i4) 1Ux30 UNC VERE ( 7) 10x3 PROGRAM ELEMENTS THAT COULDN'T FIT ON THE SITE PLAN d POLE STORAGE 110'X8' FUEL TANK FILLING 15'X10' POLICE EVIDENCE STORAGE PIPE STORAGE 100'X30' 00 0� BRINE TANKS POLICE IMPOUND SPOILS 1 6,000SF UNCOVERED YARD STORAGE Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects DISCUSSION AND NEXT STEPS Next Steps: - Edit presentation to incorporate committee feedback on presentation - Monday December 12th, Commitee of the Whole meeting - Wednesday January 11th, Public Open House - Return to Council in January. Schedule to be coordinated. Tukwila Public Works M&E Building December 5, 2022 Miller Hayashi Architects