Loading...
HomeMy WebLinkAbout2022 - Stop Work Order - Santiago P Ramirez / Marino Ramirez - 20221229000892Instrument Number: 20221229000892 Docun'ontzNRocz S206.50 Page -1 of 4 XXuoordDutud2/29/2#22 4:47 PM Electronically Recorded King County, WA Return Address: CitynfTukwi|a—CityClerk S2OOSouth«onterBoulevard Tukwila, WA 98122 Please print or type information WASHINGTON STATE RECORDER'S Cover Sheet (RCW 65.04) Document Title(s) (or transactions contained therein): (all areas applicable to your document must be filled in) 1. Stop Work 2. 3. 4. Reference Number(s) of Documents assigned or released: Additional reference #s on page_of document Grantor(s) Exactly as name(s) appear on document 1. City of Tukwila Z. ' Additional names on page of document. Grantee(s) Exactly as name(s) appear on docurnent 1. Santiago P Ramirez Z. Marino Ramirez , Additional names on page of document. Legal description (abbreviated: i.e. lot, block, plat or section, township, range) RIVERTON MACADAM ROAD TRS LESS E 10 FT OF 14 PLetBlock: Z,Plat Lot: l3 -l4 Additional legal is on page of document. Assessor's Property Tax Parcel/Account Number Assessor Tax # not yet assigned. 7347600090 The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or completeness of the indexing information provided herein. "I am signing below and paying an additional $50 recording fee (as provided in RCW 36.18.010 and referred to as an emergency nonstandard document), because this document does not meet margin and formatting requirements. Furthermore, I hereby understand that the recording process may cover up or otherwise obscure some part of the text of the original document as a result of this request." Signature of Requesting Party Note to submitter: Do not sign above nor pay additional $50 fee if the document meets margin/formatting requirements Instrument Number: 20221229000892 Document:N Rec: S206.50 Page -2 of 4 Record Date 12/29/2022 4:47 PM King County, WA CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT CODE ENFORCEMENT 6300 SOUTHCENTER BLVD, SUITE 100 TUKWILA, WA 98188 (206) 431-3676 STOP WORK ALL PERSONS ENGAGED IN DOING OR CAUSING WORK TO BE DONE ARE HEREBY ORDERED TO IMMEDIATELY STOP ALL WORK. TMC §8.45.090 and 2015 IPMC §112 Case Number: CE22-0205 Location at: 4416 S 137th St, King County Parcel # 7347600090 VIOLATION: Remodeling of the interior and exterior of the house without the required permits. CODE REFERENCES: • IRC 105.1 PERMITS REQUIRED (as adopted by TMC 16.04.020) Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. Instrument Number: 20221229000892 Document:N Rec: S206.50 Page -3 of 4 Record Date 12/29/2022 4:47 PM King County, WA • IRC 110.1 INSPECTIONS (as adopted by TMC 16.04.020) Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. IRC 110.5 INSPECTION REQUESTS (as adopted by TMC 16.04.020) It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. CORRECTIVE ACTION REQUIRED BEFORE WORK MAY RESUME: 1. IMMEDIATELY CEASE ALL EXTERIOR AND INTERIOR CONSTRUCTION WORK UNTIL ALL REQUIRED PERMITS HAVE BEEN REVIEWED, APPROVED, AND ISSUED; and 2. Secure the home from unlawful entry by boarding all accessible windows and doors; and 3. Obtain a Single -Family Residential Remodel and Addition Permit from the City of Tukwila. To apply for said Permit, new plans must be submitted due to the extensive remodel / demolition of the exterior and interior of the house. Plans must include, but not limited to the following: a. Structural engineer reports and plans which include but not limited to all foundations (specifically cracks, saw cuts, holes), all floor joists, floor decking, all exterior walls and rafters' structural members; exterior plywood and OSB boards that have been exposed to the elements; locations where exterior and/or interior walls have been removed or proposed to be removed, locations where exterior windows / doors have been removed or locations where new windows / doors have or will be installed. b. Architectural plans which show the existing floor plan and the proposed floor plan which include but not limited to walls that have been or will be removed, walls that have been constructed, existing windows, new windows; and 4. Obtain additional permits, required by the TMC, related to the remodel and/or addition, including Electrical, Plumbing & Gas, and Mechanical. For more Instrument Number: 20221229000892 Document:N Rec: S206.50 Page -4 of 4 Record Date 12/29/2022 4:47 PM King County, WA information, please contact the Department of Community Development at 206- 431-3670 and ask to speak with a Building Plans Examiner regarding additional permit requirements for the house; and 5. Pay all applicable permit fees. Construction started before the Building Permit was approved and issued, therefore an additional fee will be due before the building permit will be issued. Other additional fees will be required for Electrical, Plumbing and Gas, Mechanical, and any other required permit(s). Compliance date to submit complete permit application, plans, calculations, reports, and any other required documents: February 1, 2023 Please contact the Permit Center at 206-431-3670 or PermitsaTukwilawa.qov between the hours of 8:30 am and 4:00 pm and a Permit Technician will assist you through the process to submit your application(s) successfully. Any violation of a Stop Work Order may be prosecuted with a Notice of Violation and Order and is hereby declared to be a public nuisance, subject to the assessment of penalties of $250.00 per day for each violation and costs and legal fees necessary for abatement (See TMC 8.45.090 and TMC 8.45.120.A.2.a). POSTED on , 2022 Time: A.M./P.M. BY: Jim Toole Code Enforcement Officer P 206-431-3676 E-mail: "im.toole ukwila a.• ov IT IS UNLAWFUL TO REMOVE OR DEFACE THIS NOTICE TMC 8.45.020(B)(3)